Sunya Power
Loading Dataset
parsing…
Sunya Power
— GW
Capacity · Canonical
—%
Retail Utility Match
— tracked facilities. — matched to a serving utility, with sources.
Sized by capacity (where known). Colored by power class, RTO, or quality tier. Click any point.
Filters & Layers
— shown
Color By
Power Classification
Status
RTO / Market
NERC Region
State
Operator / Sponsor
Capacity (MW)any
—
Facility Type
Quick Filters
Canonical facilities only—
Map Layers
Data Centers—
Operating Plants—
Planned Plants—
Power Classification
Behind-the-Meter
Grid
Hybrid
Unclassified
known MW scale
unknown MW / approximate centroid uses dashed outline
/
—
Rows
—
GW Total
Filter
Facility Operator Sponsor State Location MW Power RTO Retail Utility / Provider Tier Status
— mappable generator units (of — total), colored by technology, sized by nameplate.
Source: EIA-860M; owners from EIA-860. Operating & planned shown by default; rows without coordinates remain table-only. Cancelled units remain searchable in the table. Click any plant.
Filters & Layers
— shown
Technologyall
Lifecycle
State
Balancing Authority
Owner
Capacity (MW)≥ 5 MW
—
Overlay
Show Data Centers—
Technology
known MW scale
unknown MW uses minimum dashed dot
/
—
Units
—
GW Total
Filter
Plant Owner State BA MW Technology Fuel Op. Yr Lifecycle
/
—
Utilities
—
M Residential
Filter
Utility State Ownership BA Residential Cust. Avg. Res. Rate Res. MWh Com. MWh Ind. MWh
Rate Layer · Preview

Who pays for the data center boom?

A utility-by-utility ranking of residential bill increases filed at state commissions, mapped against source-linked data center load for each serving utility. Currently a preview: only the data-center linkage side is populated. Virginia rate filings ingest first, then PJM.

Filings Tracked
—
VA backfill in progress
Utilities Covered
—
dataset total updates after load
Avg. Monthly Δ
$—
Residential bill impact
Plants Linked
—
EIA-tagged generators
Layer Status · Backfill in Progress
Virginia first — then PJM, ERCOT, MISO.
The rate layer ingests every regulatory filing that changes a customer's bill: docket, requested vs. approved ROE, the customer-class breakdown, the project (plant, transmission line, rider) driving the cost, and the source quote. About 50 Virginia filings come online first; full PJM follows. The table below previews what each row will carry once populated.
Preview: Utility Bill-Increase Rankings
# Utility State Linked DCs Linked DC Capacity (MW) Filings (12mo) Avg. Monthly Δ Driving Project
Data Center
—
SUNYA POWER — VIEW: MAP SOURCES: EIA-860M · EIA-860 · EIA-861 · SUNYA RESEARCH —