[{"id":"60fbfceea0c5","cid":"60fbfceea0c5","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Bridgeport","county":"Jackson","state":"AL","lat":34.764114,"lng":-85.980056,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Thanks to an arrangement with Tennessee Valley Authority, our electric utility, we'll be able to scout new renewable energy projects and work with TVA to bring the power onto their electrical grid. Ultimately, this contributes to our goal of being powered by 100% renewable energy.","pscan":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/a-power-plant-for-internet-our-newest/","uconf":"High","uquote":"Thanks to an arrangement with Tennessee Valley Authority, our electric utility, we'll be able to scout new renewable energy projects and work with TVA to bring the power onto their electrical grid.","uscan":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/a-power-plant-for-internet-our-newest/","uname":"Tennessee Valley Authority","rto":"non-RTO","nerc":"SERC","op":"Google","spon":"Google","tenant":"Google","ay":2015,"oy":2022,"deal":"$600 million initial investment announced in 2015","dealScan":"https://www.madeinalabama.com/2018/04/google-kicks-off-construction-on-alabama-data-center/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"blog.google;madeinalabama.com","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/a-power-plant-for-internet-our-newest/","https://www.madeinalabama.com/2018/04/google-kicks-off-construction-on-alabama-data-center/"],"rawUkey":"18642|AL","rawUname":"Tennessee Valley Authority","reportedUtility":"Tennessee Valley Authority"},{"id":"2cff6b18cfa6","cid":"2cff6b18cfa6","canon":1,"dups":2,"ftype":"data_center","name":"Meta","city":"Huntsville","county":"Madison","state":"AL","lat":34.764238,"lng":-86.55108,"cprec":"distinct","status":"Operational","mw":50,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. In Alabama, we worked with Tennessee Valley Authority to meet our 100% clean and renewable energy goal for the Huntsville Data Center. Through joint efforts with the Tennessee Valley Authority (TVA), the Huntsville data center is fully powered by renewable energy.","uquote":"In Alabama, we worked with Tennessee Valley Authority to meet our 100% clean and renewable energy goal for the Huntsville Data Center. Grid Operator: Tennessee Valley Authority. Through joint efforts with the Tennessee Valley Authority (TVA), the Huntsville data center is fully powered by renewable energy.","uscan":"https://huntsvillebusinessjournal.com/news/2022/06/14/meta-announces-further-expansion-of-huntsville-data-center-campus/","uname":"Tennessee Valley Authority","rto":"non-RTO","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2018,"oy":2021,"deal":"Meta's total investment in Huntsville to over $1.5 billion. Meta-contracted projects will add 447 MW of new renewable energy to support the Huntsville Data Center, with Meta-supported renewable energy projects in the state representing $75 million in local investment.","dealScan":"https://huntsvillebusinessjournal.com/news/2022/06/14/meta-announces-further-expansion-of-huntsville-data-center-campus/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"huntsvillebusinessjournal.com","srcUrls":["https://huntsvillebusinessjournal.com/news/2022/06/14/meta-announces-further-expansion-of-huntsville-data-center-campus/"],"band":"50-100 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"18642|AL","rawUname":"Tennessee Valley Authority","reportedUtility":"Tennessee Valley Authority"},{"id":"58e190eb6fdd","cid":"2cff6b18cfa6","canon":0,"dups":2,"ftype":"data_center","name":"Meta","city":"Huntsville","county":"Madison","state":"AL","lat":34.764238,"lng":-86.55108,"cprec":"distinct","status":"Operational","mw":50,"pc":"Grid","pconf":"High","pquote":"Facebook said it has negotiated a “renewable energy tariff” with Tennessee Valley Authority, which will enable it (and other “qualifying customers”) to buy renewable energy for the data center. The company plans to power the facility 100 percent with energy from new solar projects in the area.","pscan":"https://www.datacenterknowledge.com/hyperscalers/facebook-to-build-750m-data-center-in-huntsville-alabama","uquote":"Facebook said it has negotiated a “renewable energy tariff” with Tennessee Valley Authority, which will enable it (and other “qualifying customers”) to buy renewable energy for the data center.","uname":"Tennessee Valley Authority","rto":"non-RTO","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2018,"oy":2021,"contro":"Construction on expansion paused in late 2022 due to redesigning.","deal":"$750 million initial investment announced in 2018, with $86.25 million in state incentives.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/facebook-to-build-750m-data-center-in-huntsville-alabama"],"band":"50-100 MW","rawUkey":"18642|AL","rawUname":"Tennessee Valley Authority","reportedUtility":"Tennessee Valley Authority","lflag":"nonrate_utility_link_removed nonretail_eia861_not_rate_utility"},{"id":"83290190767e","cid":"83290190767e","canon":0,"dups":1,"ftype":"data_center","name":"OpenAI Stargate UAE","state":"AL","lat":32.8,"lng":-86.8,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only country_scope_review","quarantine":1,"quarantineReason":"Name indicates UAE/non-US project, but record geocoded to Alabama with no resolved source.","srcUrls":null,"srcDom":null},{"id":"4fa40a9bcfec","cid":"4fa40a9bcfec","canon":1,"dups":1,"ftype":"data_center","name":"11:11 Systems","city":"Scottsdale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power.","uconf":"High","uquote":"Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"11:11 Systems","spon":"Tiger Infrastructure Partners","oy":2022,"deal":"Acquisition of Sungard Availability Services by 11:11 Systems in November 2022","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"054900e47f33","cid":"054900e47f33","canon":1,"dups":1,"ftype":"data_center","name":"Aetna (IT Center)","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"4897844f15f9","cid":"4897844f15f9","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":400,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Energy-efficient infrastructure with closed-loop chilled-water systems, near-zero water-utilization efficiency (WUE) and access to 100 % renewable power sourcing via the local utility.","uquote":"Arizona Public Service Company (“APS”) is a wholly-owned subsidiary of Pinnacle West Capital Corporation and is engaged in the business of generating, transmitting, and distributing electricity in eleven of Arizona's fifteen counties. APS serves more than one million retail electric customers in Arizona...","uscan":"https://www.caiso.com/documents/aps-comments-ferc_order764marketchangesdraftfinalproposal.pdf","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2022,"oy":2024,"contro":"Chandler City Council passed an ordinance to significantly restrict future data center development due to concerns over water usage, energy demand, and noise.","deal":"Aligned Data Centers closed a $2.6 billion credit facility in March 2026, supported by facilities in Dallas, Phoenix, and Northern Virginia. Macquarie Asset Management agreed to sell Aligned Data Centers for approximately $40 billion to a consortium including AI Infrastructure Partnership, MGX, and BlackRock's Global Infrastructure Partners, expected to close in H1 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"caiso.com","srcUrls":["https://www.caiso.com/documents/aps-comments-ferc_order764marketchangesdraftfinalproposal.pdf"]},{"id":"63807d29451d","cid":"63807d29451d","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":180,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The campus will also benefit from Arizona's attractive sales tax incentives, reliable power grid and ample access to renewable energy resources.","pscan":"https://aligneddc.com/press-release/aligned-expands-phoenix-footprint-with-new-hyperscale-data-center/","uconf":"High","uquote":"To support the campus's energy needs, the project will incorporate a new 230 kV transmission line provided by Arizona Public Service (APS).","uscan":"https://www.glendaleaz.gov/Work/Economic-Development/Economic-Development-News/2025/Aligned-Data-Centers-Breaks-Ground-on-Phx-13-Facility","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"Artificial Intelligence Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners (acquiring consortium)","ay":2015,"oy":2017,"contro":"City of Phoenix passed a data center zoning and noise limit ordinance, leading to Aligned Data Centers seeking compensation or waivers for their Deer Valley property plans.","deal":"Aligned Data Centers closed a $2.58 billion credit facility in March 2026 to finance U.S. expansion, including Phoenix facilities. Additionally, Aligned Data Centers is being acquired by a consortium for $40 billion, with the deal expected to close in H1 2026.","dealScan":"https://pulse2.com/aligned-data-centers-2-58-billion-credit-facility-closed-to-fuel-u-s-expansion/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"aligneddc.com;glendaleaz.gov;pulse2.com","srcUrls":["https://aligneddc.com/press-release/aligned-expands-phoenix-footprint-with-new-hyperscale-data-center/","https://www.glendaleaz.gov/Work/Economic-Development/Economic-Development-News/2025/Aligned-Data-Centers-Breaks-Ground-on-Phx-13-Facility","https://pulse2.com/aligned-data-centers-2-58-billion-credit-facility-closed-to-fuel-u-s-expansion/"]},{"id":"b212af564591","cid":"b212af564591","canon":0,"dups":1,"ftype":"data_center","name":"American Express","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Arizona Public Service.","pscan":"https://www.interconnection.fyi/data-center/project/american-express-ipc-facility-41f70dcc","uconf":"High","uquote":"Grid Operator: Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/american-express-ipc-facility-41f70dcc","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"American Express Travel Related Services Company","tenant":"American Express Travel Related Services Company","deal":"Griffin Capital acquired a Phoenix data center and office building for $91.5 million in June 2015.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/american-express-ipc-facility-41f70dcc"]},{"id":"ed73d648b47e","cid":"ed73d648b47e","canon":1,"dups":1,"ftype":"data_center","name":"American Express IPC Facility","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Arizona Public Service.","pscan":"https://www.interconnection.fyi/data-center/project/american-express-ipc-facility-41f70dcc","uconf":"High","uquote":"Grid Operator: Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/american-express-ipc-facility-41f70dcc","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"American Express Travel Related Services Company","spon":"Griffin Capital Essential Asset REIT II","tenant":"American Express Travel Related Services Company","oy":1980,"deal":"Acquisition by Griffin Capital Essential Asset REIT II, Inc. for $91.5 million on May 26, 2015.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity legacy_facility_year_review","srcUrls":["https://www.interconnection.fyi/data-center/project/american-express-ipc-facility-41f70dcc"]},{"id":"b8511fc29eff","cid":"b8511fc29eff","canon":1,"dups":1,"ftype":"data_center","name":"Apple","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":50,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Power from the solar plant won't go directly to Apple's facility in Mesa, but the solar power is to offset the power consumed in Mesa.","pscan":"https://baxtel.com/data-center/apple-mesa","uquote":"The makers of the iPhone partnered with the Salt River Project and other Arizona groups in 2014 to find space for the project. The team found a spot in Florence to build the 282-acre, 50-megawatt Bonnybrooke solar farm that became operational in December 2016. Apple made an agreement with SRP that year to sell the utility 50 megawatts of energy produced at Bonnybrooke.","uscan":"https://www.aztechcouncil.org/tech_magazine/apple-plants-crowning-achievement-for-renewable-energy-in-mesa/","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Apple","spon":"Apple","tenant":"Apple","ay":2015,"oy":2017,"contro":"The facility was previously a failed sapphire glass plant by GT Advanced, which went bankrupt and had a legal dispute with Apple.","controScan":"https://realestatedaily-news.com/turning-closed-apple-mesa-facility-2-billion-data-center/?print=print","deal":"Apple invested $2 billion over 10 years to open the data center, announced in February 2015. Apple also made an agreement with Salt River Project to sell the utility 50 megawatts of energy produced at the Bonnybrooke solar farm, retaining environmental credits.","dealScan":"https://realestatedaily-news.com/turning-closed-apple-mesa-facility-2-billion-data-center/?print=print","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"baxtel.com;aztechcouncil.org;realestatedaily-news.com","srcUrls":["https://baxtel.com/data-center/apple-mesa","https://www.aztechcouncil.org/tech_magazine/apple-plants-crowning-achievement-for-renewable-energy-in-mesa/","https://realestatedaily-news.com/turning-closed-apple-mesa-facility-2-billion-data-center/?print=print"],"lflag":"source_quality_reclassified"},{"id":"ccce63a29958","cid":"ccce63a29958","canon":1,"dups":1,"ftype":"data_center","name":"APS Aligned Energy Data Center","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":180,"pc":"Grid","pconf":"High","pquote":"The company continues to pursue carbon-free energy in the US, supported by renewables, power purchase agreements and renewable energy credits, while acknowledging that natural gas may play a bridging, or potentially longer-term, role as grids decarbonise.","pscan":"https://capacityglobal.com/news/aligned-40bn-moment/","uquote":"Arizona Public Service (APS), listing several data centers among its largest electricity consumers between 2022 and 2025. Listed in alphabetical order, an 180 MW data center campus owned and operated by Aligned Data Centers features on this list.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","oy":2018,"deal":"Aligned Data Centers completed a capital raise of over $5 billion in new primary equity and over $7 billion of new debt commitments on January 15, 2025.","dealScan":"https://aligneddc.com/press-release/aligned-data-centers-completes-12-billion-capital-raise/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"capacityglobal.com;aligneddc.com","srcUrls":["https://capacityglobal.com/news/aligned-40bn-moment/","https://aligneddc.com/press-release/aligned-data-centers-completes-12-billion-capital-raise/"],"band":"100-250 MW"},{"id":"be19b73edb39","cid":"be19b73edb39","canon":1,"dups":1,"ftype":"data_center","name":"Ark Data Centers","city":"Tucson","county":"Pima","state":"AZ","lat":32.128038,"lng":-111.783657,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The facility is a stable, predictable, high-performance data center complete with environmental systems and controls, redundant back-up power and HVAC, specialized fire detection and reinforced concrete building construction. The onsite generators have been engineered in an N+1 redundant design. It features a power infrastructure with a capacity of 3.6 MW, ensuring ample energy supply for its operations. The facility is equipped with N+1 redundancy for both power and cooling systems, which means there is a backup component for every critical part, enhancing reliability.","uconf":"High","uquote":"Chris Lindsey. Area of Expertise: Power systems and renewable energy. Organization/Affiliation: Tucson Electric Power. Dan Stormont. Area of Expertise: Environmental. Organization/Affiliation: Commission on Climate, Energy & Sustainability. Darin Gregg. Area of Expertise: Large-scale data user. Organization/Affiliation: USAF Intelligence. Ed Hendel. Area of Expertise: Water/land use. Organization/Affiliation: Citizen's Water Advisory Committee. Jason Makansi. Area of Expertise: Land use regulations. Organization/Affiliation: Planning Commission Liaison. Josh Wright. Area of Expertise: Data center regulations. Organization/Affiliation: UA Chief Facilities and Planning Officer. Kate Hotten. Area of Expertise: Environmental. Organization/Affiliation: Coalition for Sonoran Desert Protection. Lisa Shipek. Area of Expertise: Water / environmental. Organization/Affiliation: Watershed Management Group. Remy Franklin. Area of Expertise: Energy Resources. Organization/Affiliation: InterwestEnergy Alliance. Ryan Gruver. Area of Expertise: Data center operations. Organization/Affiliation: Data Center Technology Executive. Chris Dougherty. Area of Expertise: Data Centers. Organization/Affiliation: Ark Data Center.","ukey":"24211|AZ","uname":"Tucson Electric Power Co","rto":"non-RTO","nerc":"WECC","op":"Ark Data Centers","spon":"Ark Data Centers","ay":2012,"oy":2013,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"b554ffb44744","cid":"b554ffb44744","canon":1,"dups":1,"ftype":"data_center","name":"Care Mark","city":"Scottsdale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Data centers typically pull electricity from the city grid, for which they are charged industrial rates.","pscan":"https://www.apmresearchlab.org/10x/data-centers-resource","uconf":"Medium","uquote":"Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power.","uscan":"https://baxtel.com/data-center/11-11-systems-scottsdale","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"CVS Health / CVS Caremark","spon":"Robert C. Samuel Revocable Trust","tenant":"CVS Health / CVS Caremark","deal":"Sale of 38-acre campus leased to CVS Caremark for $71.5 million to Robert C. Samuel Revocable Trust in August 2024.","dealScan":"https://therealdeal.com/national/phoenix/2024/08/13/net-lease-sells-medical-campus-in-scottsdale-for-72m/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"apmresearchlab.org;baxtel.com;therealdeal.com","srcUrls":["https://www.apmresearchlab.org/10x/data-centers-resource","https://baxtel.com/data-center/11-11-systems-scottsdale","https://therealdeal.com/national/phoenix/2024/08/13/net-lease-sells-medical-campus-in-scottsdale-for-72m/"]},{"id":"94f70a44fb33","cid":"94f70a44fb33","canon":1,"dups":1,"ftype":"data_center","name":"Carter Funds","city":"Tucson","county":"Pima","state":"AZ","lat":32.128038,"lng":-111.783657,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The property has an on-site power substation expandable to 20MW per Tucson Electric Power.","pscan":"https://www.connectcre.com/stories/carter-funds-acquires-tucson-data-center/","uconf":"High","uquote":"The property has an on-site power substation expandable to 20MW per Tucson Electric Power.","ukey":"24211|AZ","uname":"Tucson Electric Power Co","rto":"non-RTO","nerc":"WECC","op":"TECfusions","spon":"Aphorio Carter Fund Management Company","tenant":"TECfusions","ay":2023,"oy":2004,"deal":"Aphorio Carter acquired the Tucson Tech Data Center for $13 million and plans to spend an additional $8 million in improvements, announced October 19, 2023.","dealScan":"https://www.prnewswire.com/news-releases/aphorio-carter-purchases-13-million-data-center-in-tucson-az-301962110.html","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"connectcre.com;prnewswire.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.connectcre.com/stories/carter-funds-acquires-tucson-data-center/","https://www.prnewswire.com/news-releases/aphorio-carter-purchases-13-million-data-center-in-tucson-az-301962110.html"]},{"id":"8e823ef2bc6f","cid":"8e823ef2bc6f","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":17,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Collaborating with an engineering firm and their local electric utility, Csquare conducted an energy audit at its Mesa, Arizona, site to pinpoint opportunities for energy savings without compromising reliability. Audits found optimization efforts for both air and water cooling systems, specifically focusing on reducing airflow and resetting chilled water temperatures. Through a partnership with the local utility, Csquare secured $75,000 in financial incentives through a utility energy-efficiency program.","uquote":"SRP Telecom. Network. 10.","uscan":"https://marketplace.upstack.com/data-centers/evoque-dcs-mesa-phx1","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Global Data Centers","ay":1985,"deal":"Centersquare acquired Evoque Data Center Solutions in early 2024.","dealScan":"https://baxtel.com/data-center/centersquare-phx1","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;baxtel.com","lflag":"online_before_announced legacy_facility_year_review","srcUrls":["https://marketplace.upstack.com/data-centers/evoque-dcs-mesa-phx1","https://baxtel.com/data-center/centersquare-phx1"]},{"id":"2c478a6d32a7","cid":"2c478a6d32a7","canon":1,"dups":1,"ftype":"data_center","name":"Charles Schwab","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Arizona Public Service.","uconf":"High","uquote":"Grid Operator: Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Charles Schwab &","spon":"Charles Schwab &","oy":1998,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fab6a5884333","cid":"fab6a5884333","canon":0,"dups":1,"ftype":"data_center","name":"Charles Schwab","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Arizona Public Service.","pscan":"https://www.interconnection.fyi/data-center/project/charles-schwab-office-bldg-af96e059","uconf":"High","uquote":"Grid Operator. Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/charles-schwab-office-bldg-af96e059","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Charles Schwab &","spon":"Charles Schwab &","tenant":"Charles Schwab &","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/charles-schwab-office-bldg-af96e059"]},{"id":"31dc86cc823c","cid":"31dc86cc823c","canon":1,"dups":1,"ftype":"data_center","name":"Charles Schwab Office Bldg","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Arizona Public Service.","uconf":"High","uquote":"Grid Operator. Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Charles Schwab &","spon":"Charles Schwab &","tenant":"Charles Schwab &","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ae96cf823b77","cid":"ae96cf823b77","canon":1,"dups":1,"ftype":"data_center","name":"Comarch","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The Phoenix data center is equipped with state-of-the-art servers, including redundant power and advanced cooling systems, with two standby diesel fuel engine generators Constructed with quality in mind, the center is designed to be TIA942 / Rated -3 compliant.","uconf":"High","uquote":"The project consisted of completing the electrical work, including excavating and encasing switchboard vaults, completing TelCom encasing and furnishing of manhole, provide primary and secondary conduit for SRP, install a transformer pad with slurry backfill, and encase an SRP Feeder and switch cabinet.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Comarch","spon":"Comarch","ay":2021,"oy":2023,"deal":"Investment of $26 million for construction, completed June 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"uscan":"https://bfcontracting.com/projects/comarch-data-center/","srcUrls":["https://bfcontracting.com/projects/comarch-data-center/"],"srcDom":"bfcontracting.com","lflag":"source_quality_reclassified"},{"id":"cc3a74bb0078","cid":"cc3a74bb0078","canon":1,"dups":1,"ftype":"data_center","name":"Comarch Data Center","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Grid","pconf":"High","pquote":"It supports power densities up to 12kW per rack and maintains 2N redundancy across UPS, PDU, and generator systems, supported by 72-hour on-site fuel storage.","uquote":"B&F provided site dry utility services for Comarch Data Center. The project consisted of completing the electrical work, including excavating and encasing switchboard vaults, completing TelCom encasing and furnishing of manhole, provide primary and secondary conduit for SRP, install a transformer pad with slurry backfill, and encase an SRP Feeder and switch cabinet.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Comarch","spon":"Comarch","ay":2021,"oy":2022,"deal":"$26 million investment, completed June 2023","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f5561f57505b","cid":"f5561f57505b","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":212,"pc":"Grid","pconf":"High","pquote":"Compass Datacenters also features, with its DC campus located in Goodyear being one of APS' 20 largest electricity consumers over the past three years.","pscan":"https://newprojectmedia.com/origination-aps-and-nipsco-reveal-largest-electricity-consumers-for-2025-data-centers-highlighted/","uquote":"The city of Goodyear, APS, and Greater Phoenix Economic Council worked in partnership to assist Compass in bringing its facility to Goodyear.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Compass Datacenters","spon":"KKR","ay":2019,"oy":2019,"deal":"Permanent, long-term capital partnership with KKR, announced March 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"newprojectmedia.com","srcUrls":["https://newprojectmedia.com/origination-aps-and-nipsco-reveal-largest-electricity-consumers-for-2025-data-centers-highlighted/"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"097b951e789d","cid":"097b951e789d","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters PHX I","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":212,"pc":"Grid","pconf":"High","pquote":"Goodyear is supported by Arizona Public Services, who work with Compass to customize their infrastructure. Together, we build 235-kilovolt and 69-kilovolt substations that deliver 240 megawatts of capacity for the 190-acre campus, all at rates lower than competing alternatives.","uquote":"Goodyear is supported by Arizona Public Services, who work with Compass to customize their infrastructure.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Compass Datacenters","spon":"Ontario Teachers' Pension Plan, RedBird Capital Partners","ay":2019,"oy":2021,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e353e17e1c8c","cid":"e353e17e1c8c","canon":1,"dups":1,"ftype":"data_center","name":"Cox Communications","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Supporting the NOC is a room filled with dozens of uninterruptible power supplies capable of powering the key components of the NOC in the event of a power failure. Minutes after such a power failure, an outdoor generator would take over for the uninterruptible power supplies, creating a seamless backup system.","uconf":"High","uquote":"APS is the largest electric utility corporation in Arizona, serving more more than one million customers.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Cox Communications","spon":"Cox Enterprises","tenant":"Cox Communications","ay":2010,"oy":2010,"deal":"$70 Million investment announced January 2010","dealScan":"https://www.enr.com/articles/23527-10-cox-deer-valley-technology-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"enr.com","srcUrls":["https://www.enr.com/articles/23527-10-cox-deer-valley-technology-center"],"lflag":"source_quality_reclassified"},{"id":"8abbd11670c9","cid":"8abbd11670c9","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":169,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The data center has a total of 110 MW of power delivered through on site sub station and delivered by two independent circuits. The facility has a 400 KVA PDU with dual input static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with a 5,000 gallon belly tank.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-chandler-data-center/","uconf":"High","uquote":"Grid Operator. Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-4040c05a","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2011,"oy":2013,"deal":"Acquired by KKR and Global Infrastructure Partners for $15 billion in March 2022.","dealScan":"https://baxtel.com/data-center/cyrusone-chandler-phoenix-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-chandler-data-center/","https://www.interconnection.fyi/data-center/project/cyrusone-4040c05a","https://baxtel.com/data-center/cyrusone-chandler-phoenix-campus"]},{"id":"9d509d09c618","cid":"9d509d09c618","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne - Chandler","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":110,"pc":"Grid","pconf":"High","pquote":"The data center has a total of 110 MW of power delivered through on site sub station and delivered by two independent circuits. The facility has a 400 KVA PDU with dual input static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with a 5,000 gallon belly tank.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-chandler-data-center/","uconf":"High","uquote":"Grid Operator: Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-4040c05a","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2011,"oy":2013,"contro":"Noise complaints from residents regarding HVAC systems.","deal":"CyrusOne Inc. acquired by KKR and Global Infrastructure Partners for approximately $15 billion on March 25, 2022.","dealScan":"https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;global-infra.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-chandler-data-center/","https://www.interconnection.fyi/data-center/project/cyrusone-4040c05a","https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/"],"band":"100-250 MW"},{"id":"9549eeeb6d42","cid":"9549eeeb6d42","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"This 288,000 square foot facility is built for reliability with a utility power capacity of 32.3 MW and redundant UPS configurations.","pscan":"https://inflect.com/building/120-east-van-buren-street-phoenix/digital-realty/datacenter/phx1","uquote":"Digital Realty (DLR) said it had worked with utility provider APS to boost the power capacity to 31 megawatts at 120 East Van Buren Street, a 287,500 square foot data center facility.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-adds-power-capacity-in-phoenix","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty","ay":2006,"oy":2007,"deal":"Acquisition of 120 East Van Buren for $175 million in July 2006.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"inflect.com;datacenterknowledge.com","srcUrls":["https://inflect.com/building/120-east-van-buren-street-phoenix/digital-realty/datacenter/phx1","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-adds-power-capacity-in-phoenix"]},{"id":"9687ebed0bd6","cid":"9687ebed0bd6","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":54,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Digital Realty Chandler features enterprise-class power and cooling at massive scale: 54MW total critical IT power capacity. 2N redundant power architecture with dual utility feeds.","uconf":"High","uquote":"The local power utility, Salt River Project (SRP), provides green options and has a long history of maintaining robust, stable, and low cost power","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-outlines-expansion-in-phoenix","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty","oy":2006,"deal":"Acquisition of 365 Main portfolio including Chandler site for $725 million in June 2010.","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-365-main-sites-for-725m","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-outlines-expansion-in-phoenix","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-365-main-sites-for-725m"]},{"id":"381e11a048ce","cid":"381e11a048ce","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty Trust","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"This 288,000 square foot facility is built for reliability with a utility power capacity of 32.3 MW and redundant UPS configurations.... The local utility provides up to 2500 total kilowatts of power (2.5 Megawatts) and the UPS systems have a capacity of 1150 kilowatts and are arranged in a 2N configuration.... On site generators are also configured in an N+1 arrangement, and can deliver up to 8,200 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-phoenix-data-center-phx1/","uconf":"High","uquote":"Digital Realty (DLR) said it had worked with utility provider APS to boost the power capacity to 31 megawatts at 120 East Van Buren Street, a 287,500 square foot data center facility.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Digital Realty Trust","spon":"Digital Realty Trust","oy":2007,"deal":"Acquisition of 120 East Van Buren for $175 million by Digital Realty Trust on July 27, 2006.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-phoenix-data-center-phx1/"],"band":"25-50 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"16c739fef54f","cid":"16c739fef54f","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty Trust Chandler","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":54,"pc":"Grid","pconf":"High","pquote":"Digital Realty Chandler features enterprise-class power and cooling at massive scale: 54MW total critical IT power capacity; 2N redundant power architecture with dual utility feeds.","pscan":"https://arizonacolocation.com/colocation/digital-realty-chandler","uquote":"The local power utility, Salt River Project (SRP), provides green options and has a long history of maintaining robust, stable, and low cost power,","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-outlines-expansion-in-phoenix","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Digital Realty Trust","spon":"Digital Realty Trust","ay":2006,"oy":2011,"deal":"Acquisition of Rockwood Capital/365 Main Portfolio for approximately $725.0 million, completed July 14, 2010.","dealScan":"https://www.prnewswire.com/news-releases/digital-realty-trust-completes-acquisition-of-rockwood-capital365-main-portfolio-98405574.html","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"arizonacolocation.com;datacenterknowledge.com;prnewswire.com","srcUrls":["https://arizonacolocation.com/colocation/digital-realty-chandler","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-outlines-expansion-in-phoenix","https://www.prnewswire.com/news-releases/digital-realty-trust-completes-acquisition-of-rockwood-capital365-main-portfolio-98405574.html"],"band":"50-100 MW"},{"id":"78265f475aa8","cid":"78265f475aa8","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Tempe","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: – PDU – UPS – Generators; Capable of 20+kW per cabinet; Capable of 600+ watts per sq ft. Incoming Electrical Voltage (To The Site): 480.0 kV. Incoming Electrical Service Type: Single Feed.","uquote":"Local utility Salt River Project has extended a warm welcome to all operators.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","tenant":"Microsoft, Amazon","oy":2014,"deal":"EQT Infrastructure acquired EdgeConneX in 2020","dealScan":"https://www.interglobixmagazine.com/edgeconnex-from-past-to-present/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interglobixmagazine.com","srcUrls":["https://www.interglobixmagazine.com/edgeconnex-from-past-to-present/"],"lflag":"source_quality_reclassified"},{"id":"296ad562374d","cid":"296ad562374d","canon":1,"dups":1,"ftype":"data_center","name":"Edged Phoenix","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"At the opening, the company was joined by Mesa city officials, representatives from the Mesa Chamber of Commerce, local contractor Haydon Building Corp., utility partner Salt River Project, and fibre network provider Light Source Communications.","uquote":"At the opening, the company was joined by Mesa city officials, representatives from the Mesa Chamber of Commerce, local contractor Haydon Building Corp., utility partner Salt River Project, and fibre network provider Light Source Communications.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Edged US","spon":"Endeavour","ay":2024,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"42f3572130f3","cid":"42f3572130f3","canon":1,"dups":1,"ftype":"data_center","name":"Ensono","city":"Tempe","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","op":"Ensono","spon":"KKR","deal":"KKR acquired Ensono in 2021 for an estimated $1.7 billion.","dealScan":"https://www.crn.com/news/cloud/it-s-official-it-services-giant-ensono-acquired-by-kkr","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"crn.com","srcUrls":["https://www.crn.com/news/cloud/it-s-official-it-services-giant-ensono-acquired-by-kkr"],"lflag":"source_quality_reclassified"},{"id":"03690a88b4ee","cid":"03690a88b4ee","canon":1,"dups":1,"ftype":"data_center","name":"Expedient","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Expedient's 45,000 square foot Phoenix facility offers raised floor space, redundant electric utility power feeds, 3 auto-cutover diesel generators, multiple cooling systems, advanced fire suppression, and a carrier-neutral telecommunications infrastructure.","pscan":"https://www.expedient.com/uploads/EXP__Sell_Sheet--DC_Phoenix.pdf","uconf":"Medium","uquote":"Further to the north, Arizona Public Service, which serves 1.2 million customers around Phoenix, floated a different utility-owned solar pilot project.","uscan":"https://www.utilitydive.com/news/how-arizona-public-service-is-preparing-for-the-grid-of-the-future/413667/","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Expedient","spon":"InfraBridge (DigitalBridge)","tenant":"University of Phoenix, Los Angeles Regional Food Bank, Blue Cross Blue Shield of Arizona","ay":2021,"oy":2021,"deal":"In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"expedient.com;utilitydive.com","srcUrls":["https://www.expedient.com/uploads/EXP__Sell_Sheet--DC_Phoenix.pdf","https://www.utilitydive.com/news/how-arizona-public-service-is-preparing-for-the-grid-of-the-future/413667/"]},{"id":"bb12c88b3b04","cid":"bb12c88b3b04","canon":1,"dups":1,"ftype":"data_center","name":"Fiserv","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"94fab766be2f","cid":"94fab766be2f","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power to the data center is fed through multiple medium voltage utility power feeds. 2N+1 Redundant UPS system of 5,400 kW power capacity with redundant battery strings provides backup power supply in case of utility power loss that is being backed up by 10 MW fully redundant diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/flexential-deer-valley-data-center/","uconf":"Medium","uquote":"Additionally, Arizona public service offers an extra high load factor rate of over 90% to colocation facilities that consume at least 5 megawatts of energy.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","ay":2017,"oy":2013,"deal":"$1.4 billion financing package backed by 28 data centers, including Phoenix, announced March 09, 2026","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://cloudandcolocation.com/datacenters/flexential-deer-valley-data-center/"]},{"id":"9ca88dea6a7b","cid":"9ca88dea6a7b","canon":1,"dups":1,"ftype":"data_center","name":"Global Federal Credit Union","city":"Glendale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The project's feature of passive, closed-transition transfer from utility to the emergency generator and vice versa was a first in APS territory as the Utility had not previously allowed such an arrangement.","uquote":"The project's feature of passive, closed-transition transfer from utility to the emergency generator and vice versa was a first in APS territory as the Utility had not previously allowed such an arrangement.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Global Federal Credit Union","spon":"Global Federal Credit Union","ay":2012,"oy":2012,"deal":"Project renovation cost of $2,312,196, completed May 2012.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"d66e0c3739bd","cid":"d66e0c3739bd","canon":1,"dups":1,"ftype":"data_center","name":"GoDaddy","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Arizona Public Service.","pscan":"https://www.interconnection.fyi/data-center/project/godaddy-ade5c1ae","uconf":"High","uquote":"Grid Operator: Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/godaddy-ade5c1ae","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"GoDaddy","spon":"Godaddy.Com","tenant":"GoDaddy","ay":2005,"oy":2006,"deal":"Facility purchased for $9.5 million in November 2005.","dealScan":"https://www.datacenterknowledge.com/investing/go-daddy-pays-9-5m-for-phoenix-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;datacenterknowledge.com","srcUrls":["https://www.interconnection.fyi/data-center/project/godaddy-ade5c1ae","https://www.datacenterknowledge.com/investing/go-daddy-pays-9-5m-for-phoenix-data-center"]},{"id":"ded31fa54915","cid":"ded31fa54915","canon":1,"dups":1,"ftype":"data_center","name":"Godaddy.Com","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Eleven diesel backup generators support the Go Daddy data center in Phoenix (Photo: Rich Miller).","pscan":"https://www.datacenterknowledge.com/business/inside-go-daddy-s-phoenix-data-center","uquote":"Grid Operator. Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"GoDaddy","spon":"Godaddy.Com","tenant":"GoDaddy","oy":2006,"deal":"Purchase of 270,000 square foot facility for $9.2 million in November 2005.","dealScan":"https://www.datacenterknowledge.com/investing/go-daddy-pays-9-5m-for-phoenix-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com","lflag":"operational_null_capacity","srcUrls":["https://www.datacenterknowledge.com/business/inside-go-daddy-s-phoenix-data-center","https://www.datacenterknowledge.com/investing/go-daddy-pays-9-5m-for-phoenix-data-center"]},{"id":"ae2874fd8aa5","cid":"ae2874fd8aa5","canon":1,"dups":1,"ftype":"data_center","name":"Godaddy.Com - N Hayden Rd","city":"Scottsdale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Arizona Public Service.","uconf":"High","uquote":"Grid Operator. Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Godaddy.Com","spon":"GoDaddy","tenant":"Godaddy.Com","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"14ab4897d799","cid":"14ab4897d799","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers - Chandler","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"SRP provides the Phoenix data center with up to 30 MWs of reliable and affordable power (average annual costs per kWh of less than $0.07) from diverse substations.","uconf":"High","uquote":"SRP provides the Phoenix data center with up to 30 MWs of reliable and affordable power (average annual costs per kWh of less than $0.07) from diverse substations.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"H5 Data Centers","spon":"H5 Capital / Josh Simms","ay":2013,"oy":2013,"deal":"H5 Data Centers acquired NextFort data center in Chandler, Arizona in January 2016.","dealScan":"https://h5datacenters.com/h5-data-centers-announces-data-center-lease-renewal-with-xo-communications.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"h5datacenters.com","srcUrls":["https://h5datacenters.com/h5-data-centers-announces-data-center-lease-renewal-with-xo-communications.html"],"band":"25-50 MW"},{"id":"0c9e5acfaa35","cid":"0c9e5acfaa35","canon":1,"dups":1,"ftype":"data_center","name":"Infocrossing","city":"Tempe","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","op":"Wipro","spon":"Wipro","oy":2006,"deal":"Wipro acquired Infocrossing for $600 million in August 2007. Infocrossing executed a $25 million sale/leaseback agreement for two data centers, including the Tempe facility, in January 2006.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6f069f125af1","cid":"6f069f125af1","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":89,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"AZP-2 is a hyperscale-ready data center powered by 100% renewable energy.... Our facilities are matched by 100% renewable energy, and our customers can take credit for the green energy that Iron Mountain buys on their own sustainability reporting with Green Power Pass.... We have matched 100% of the energy consumption in our data centers with clean energy annually since 2017.","uconf":"Medium","uquote":"Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power.","uscan":"https://baxtel.com/data-center/iron-mountain-azp3","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Iron Mountain","spon":"Iron Mountain","tenant":"Fortune 100 customer, Cyxtera","ay":2018,"oy":2019,"deal":"Acquisition of IO Data Centers U.S. operations for $1.34 billion in January 2018","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/iron-mountain-azp3"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"20b5b716a172","cid":"20b5b716a172","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Scottsdale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has 5.8 MW of 100% renewable power, delivering up to 20 kW per customer cabinet and scalable up to 9.6 MW for future needs.","uquote":"Electric Utility Provider: Arizona Public Service with 24MW of utility power","uscan":"https://baxtel.com/data-center/iron-mountain-scottsdale","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Iron Mountain Data Centers","spon":"Iron Mountain Incorporated","deal":"Acquisition of IO Data Centers U.S. operations for approximately $1.34 billion, closed January 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/iron-mountain-scottsdale"],"lflag":"source_quality_reclassified"},{"id":"c8d0d0b7160a","cid":"c8d0d0b7160a","canon":1,"dups":1,"ftype":"data_center","name":"Kyndryl","city":"Tucson","county":"Pima","state":"AZ","lat":32.128038,"lng":-111.783657,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"162a3f2e90f8","cid":"162a3f2e90f8","canon":1,"dups":1,"ftype":"data_center","name":"Landmark Dividend","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":16,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power The Property is served by two substations, Country Club (CC) - 1 feeder, and Metro (MET) - 3 feeders.","pscan":"https://www.4010datacenter.com/","uquote":"Arizona Public Service (APS) Electric Company... APS is the largest electric utility corporation in Arizona, serving more than one million customers.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"BCS","spon":"DigitalBridge","tenant":"PayPal","ay":2020,"deal":"Acquisition of data center campus from PayPal Inc. by Landmark Dividend for $122 million in March 2020. Landmark Dividend acquired by DigitalBridge in June 2021. A wholly owned subsidiary of Abu Dhabi Investment Authority (\"ADIA\") acquired a 40% interest in Landmark in April 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"4010datacenter.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.4010datacenter.com/"]},{"id":"1000b46f178b","cid":"1000b46f178b","canon":1,"dups":1,"ftype":"data_center","name":"Mapletree Industrial Trust","city":"Tempe","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Arizona Public Service.","uquote":"Grid Operator: Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Mapletree US Management","spon":"Mapletree Investments Pte","oy":2021,"deal":"Acquisition of 29 data centers, including 2005 East Technology Circle, Tempe, from Sila Realty Trust for US$1.32 billion, expected to complete in Q3 2021.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"bbb181542515","cid":"bbb181542515","canon":1,"dups":1,"ftype":"data_center","name":"MECP1 Mesa Intermediate 1","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"USBIA-San Carlos Project, a Federal utility provider located at 13805 North Arizona Boulevard Coolidge, Arizona 85128 United States of America, has been a cornerstone in serving the energy needs of the community.","pscan":"https://energypal.com/utilities/usbia-san-carlos-project","uquote":"USBIA-San Carlos Project, a Federal utility provider located at 13805 North Arizona Boulevard Coolidge, Arizona 85128 United States of America, has been a cornerstone in serving the energy needs of the community.","uscan":"https://energypal.com/utilities/usbia-san-carlos-project","ukey":"19604|AZ","uname":"USBIA-San Carlos Project","rto":"non-RTO","nerc":"WECC","op":"EdgeCore Digital Infrastructure","spon":"Partners Group","deal":"$1.9 billion senior secured credit facility for MECP1 Mesa 1, LLC on January 4, 2024","dealScan":"https://www.davispolk.com/experience/edgecore-digital-infrastructure-1-9-billion-project-financing","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"energypal.com;davispolk.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://energypal.com/utilities/usbia-san-carlos-project","https://www.davispolk.com/experience/edgecore-digital-infrastructure-1-9-billion-project-financing"]},{"id":"b73b9ed542a9","cid":"b73b9ed542a9","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The site will be supported by 100% renewable energy and is slated for LEED Gold certification by the U.S. Green Building Council. Today, Meta announced its Mesa data center will soon be supported by new solar energy from Salt River Project (SRP) through a contract with a leading U.S. clean energy provider, Ørsted.","uconf":"High","uquote":"Today, Meta announced its Mesa data center will soon be supported by new solar energy from Salt River Project (SRP) through a contract with a leading U.S. clean energy provider, Ørsted.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2021,"oy":2025,"contro":"City government passed new regulations restricting data center construction due to concerns over tax breaks, utility costs, noise, and property values.","deal":"$1 billion investment; PPA with Ørsted for 300MW solar farm and 300MW battery storage.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0bc13d4565af","cid":"0bc13d4565af","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"El Mirage","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Microsoft intends to develop the datacenter campuses in El Mirage and Goodyear, Arizona to be among the most sustainably designed and operated in the world – powered with 100% renewable energy. Microsoft will partner with First Solar, an Arizona-based global leader in solar energy, on their Sun Streams 2 photovoltaic (PV) solar plant. The 150-megawatt plant utilizes some of the most sophisticated and eco-efficient solar technology available today and will provide enough power to cover the energy load for each new datacenter campus once the solar project is operational. In this region, we will fulfill that commitment through a power purchase agreement with Sun Streams 2. Power will be provided by the existing Arizona Public Service on-site substation.","uconf":"High","uquote":"Power will be provided by the existing Arizona Public Service on-site substation. Utility Provider: Arizona Public Service (APS). Thank you Microsoft for selecting the City of El Mirage for this amazing opportunity and many thanks to our partners at the Governor's Office, John F. Long Properties, Arizona Commerce Authority, NOVO Development, APS, CBRE and Greater Phoenix Economic Council.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2019,"oy":2021,"deal":"Microsoft paid $258 million for approximately 283 acres of land in El Mirage on May 31, 2024.","dealScan":"https://baxtel.com/data-center/microsoft-dysart-campus-dc1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/microsoft-dysart-campus-dc1"],"lflag":"source_quality_reclassified"},{"id":"67590dfd0e3a","cid":"579076e563d8","canon":0,"dups":2,"ftype":"data_center","name":"Microsoft","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":143,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft intends to develop the datacenter campuses in El Mirage and Goodyear, Arizona to be among the most sustainably designed and operated in the world – powered with 100% renewable energy.","uquote":"Microsoft thanks the citizens of Arizona, its partners, and government officials, especially Gov. Doug Ducey, Mayor Georgia Lord of Goodyear, and Mayor Alexis Hermosillo of El Mirage, the Arizona Commerce Authority, Arizona Public Service and First Solar for helping make its vision of sustainable datacenters and increased renewable energy in Arizona possible.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft, OpenAI","ay":2019,"oy":2024,"contro":"Water usage concerns and updated development agreements due to wastewater volume.","controScan":"https://www.aztechcouncil.org/microsoft-agrees-to-make-data-centers-air-cooled-amid-water-infrastructure-challenges-in-goodyear/","deal":"Power purchase agreement with Longroad Energy for 150-MW Sun Streams 2 solar plant (2019); $42M contribution to Goodyear's wastewater capacity expansion (2023).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"aztechcouncil.org","srcUrls":["https://www.aztechcouncil.org/microsoft-agrees-to-make-data-centers-air-cooled-amid-water-infrastructure-challenges-in-goodyear/"],"lflag":"source_quality_reclassified"},{"id":"579076e563d8","cid":"579076e563d8","canon":1,"dups":2,"ftype":"data_center","name":"Microsoft","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":143,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The Goodyear Data Center (PHX70), situated in Goodyear, Arizona, is a state-of-the-art facility in Microsoft Azure's global network.... Sustainability Commitment: Aligned with Microsoft's goal of achieving carbon-negative operations by 2030, the facility is powered by 100% renewable energy, including solar energy harnessed from Arizona's abundant sunshine.","uconf":"High","uquote":"Microsoft thanks the citizens of Arizona, its partners, and government officials, especially Gov. Doug Ducey, Mayor Georgia Lord of Goodyear, and Mayor Alexis Hermosillo of El Mirage, the Arizona Commerce Authority, Arizona Public Service and First Solar for helping make its vision of sustainable datacenters and increased renewable energy in Arizona possible.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft Azure","ay":2019,"oy":2021,"contro":"Water usage dispute leading to revised development agreement and cooling system changes; criticism for lack of transparency regarding water usage.","deal":"March 17, 2023: Microsoft agreed to pay $36M for a $90M expansion of Goodyear's 157th Avenue Wastewater Treatment Plant, plus $5M for a new sewer line and $800K for a city coordinator. July 30, 2019: Partnership with First Solar for the 150-megawatt Sun Streams 2 photovoltaic (PV) solar plant to cover energy load.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"557bf612e6f3","cid":"557bf612e6f3","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp - Broadway Rd","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":143,"pc":"Grid","pconf":"High","pquote":"Sustainability Commitment: Aligned with Microsoft's goal of achieving carbon-negative operations by 2030, the facility is powered by 100% renewable energy, including solar energy harnessed from Arizona's abundant sunshine.","uconf":"High","uquote":"Grid Operator. Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corp-broadway-rd-02357f8a","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft Azure / OpenAI","ay":2019,"oy":2024,"contro":"Community opposition and regulatory pushback due to concerns over water usage, leading Microsoft to agree to switch cooling systems for future buildings and invest in wastewater capacity.","controScan":"https://www.aztechcouncil.org/microsoft-agrees-to-make-data-centers-air-cooled-amid-water-infrastructure-challenges-in-goodyear/","deal":"Partnership with First Solar for a 150-megawatt Sun Streams 2 photovoltaic (PV) solar plant (announced July 2019) and investment of over $40 million to expand Goodyear's wastewater capacity (announced March 2023).","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;aztechcouncil.org","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corp-broadway-rd-02357f8a","https://www.aztechcouncil.org/microsoft-agrees-to-make-data-centers-air-cooled-amid-water-infrastructure-challenges-in-goodyear/"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"692029e8e4f2","cid":"692029e8e4f2","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp - Citrus Rd","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Microsoft intends to develop the datacenter campuses in El Mirage and Goodyear, Arizona to be among the most sustainably designed and operated in the world – powered with 100% renewable energy.","uconf":"High","uquote":"In Goodyear, AZ, the primary utility provider is APS (Arizona Public Service).","uscan":"https://palmetto.com/local/arizona/goodyear/","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft Azure","ay":2019,"contro":"Water and wastewater capacity disputes with the City of Goodyear.","controScan":"https://www.aztechcouncil.org/microsoft-agrees-to-make-data-centers-air-cooled-amid-water-infrastructure-challenges-in-goodyear/","deal":"Power Purchase Agreement (PPA) with First Solar for the 150-megawatt Sun Streams 2 solar plant. Agreement with City of Goodyear to pay $36 million for a $90 million expansion of the 157th Avenue Wastewater Treatment Plant.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"palmetto.com;aztechcouncil.org","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://palmetto.com/local/arizona/goodyear/","https://www.aztechcouncil.org/microsoft-agrees-to-make-data-centers-air-cooled-amid-water-infrastructure-challenges-in-goodyear/"]},{"id":"9ad4fae12c04","cid":"9ad4fae12c04","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp - Olive Ave","city":"El Mirage","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Power will be provided by the existing Arizona Public Service on-site substation.","uconf":"High","uquote":"Power will be provided by the existing Arizona Public Service on-site substation.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2019,"oy":2021,"deal":"Land acquisition of 283 acres for $258 million on May 31, 2024; Power Purchase Agreement with First Solar for Sun Streams 2 (announced July 2019)","dealScan":"https://www.aztechcouncil.org/microsoft-buys-land-el-mirage-data-center/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"aztechcouncil.org","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.aztechcouncil.org/microsoft-buys-land-el-mirage-data-center/"]},{"id":"301d2eb2320c","cid":"301d2eb2320c","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":143,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft intends to develop the datacenter campuses in El Mirage and Goodyear, Arizona to be among the most sustainably designed and operated in the world – powered with 100% renewable energy. Microsoft has already invested in power purchase agreements (PPAs) to support the West Valley datacenter and will procure 100% renewable energy coverage globally by 2025.","uquote":"Microsoft will partner with First Solar, an Arizona-based global leader in solar energy, on their Sun Streams 2 photovoltaic (PV) solar plant. The 150-megawatt plant utilizes some of the most sophisticated and eco-efficient solar technology available today and will provide enough power to cover the energy load for each new datacenter campus once the solar project is operational. That includes via collaborations with Tempe-based First Solar (Nasdaq: FSLR), Arizona Public Service (APS) and getting solar energy from a 150MW First Solar production facility in Maricopa, according to Brian Janous, general manager for energy for Microsoft (Nasdaq: MSFT).","uscan":"https://www.roselawgroup.com/microsoft-data-centers-in-goodyear-el-mirage-to-have-renewable-energy-focus/","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2019,"oy":2024,"contro":"Significant community opposition and criticism regarding water usage, lack of transparency on water consumption, and impact on local resources.","deal":"$42M contribution to Goodyear's wastewater capacity expansion (March 2023); 150MW PPA with First Solar for Sun Streams 2 solar plant (July 2019); Water replenishment deal with Gila River Water Storage, LLC (June 2021).","dealScan":"https://azure.microsoft.com/en-us/blog/expanding-cloud-services-microsoft-launches-its-sustainable-datacenter-region-in-arizona/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"roselawgroup.com;azure.microsoft.com","srcUrls":["https://www.roselawgroup.com/microsoft-data-centers-in-goodyear-el-mirage-to-have-renewable-energy-focus/","https://azure.microsoft.com/en-us/blog/expanding-cloud-services-microsoft-launches-its-sustainable-datacenter-region-in-arizona/"]},{"id":"43d91b58b53f","cid":"43d91b58b53f","canon":1,"dups":1,"ftype":"data_center","name":"Nestle","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Arizona Public Service.","pscan":"https://www.interconnection.fyi/data-center/project/nestle-data-center-6fe97245","uconf":"Medium","uquote":"Grid Operator. Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/nestle-data-center-6fe97245","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Nestle USA","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/nestle-data-center-6fe97245"]},{"id":"4ceb7a911a5d","cid":"4ceb7a911a5d","canon":1,"dups":1,"ftype":"data_center","name":"Nestle Data Center","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","uquote":"Grid Operator. Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Nestle USA","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2404c122c360","cid":"2404c122c360","canon":1,"dups":1,"ftype":"data_center","name":"Northern Trust Securities","city":"Tempe","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","op":"Northern Trust","spon":"Northern Trust","ay":2015,"oy":2015,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"15552ae9c429","cid":"15552ae9c429","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":240,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"36MW of critical IT load, N+1 distributed redundancy for each 6MW vault, diverse power distribution to data hall and an on-site substation.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/phoenix-ph1-data-center","uquote":"Grid Operator. Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT Group","oy":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.global.ntt","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/phoenix-ph1-data-center"],"lflag":"source_quality_reclassified"},{"id":"9dd0fb644043","cid":"9dd0fb644043","canon":1,"dups":1,"ftype":"data_center","name":"PH Data Center","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":17,"pc":"Grid","pconf":"High","pquote":"Utility power: 17.3MW.","pscan":"https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-PHX-SpecSheet.pdf","uconf":"High","uquote":"Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.... Utility Provider: Arizona Public Service.","uscan":"https://baxtel.com/data-center/centersquare-phoenix-ph1","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Centersquare","spon":"Centersquare","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"csquare.com;baxtel.com","srcUrls":["https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-PHX-SpecSheet.pdf","https://baxtel.com/data-center/centersquare-phoenix-ph1"],"band":"10-25 MW","lflag":"citation_artifact_removed"},{"id":"719018b6e946","cid":"719018b6e946","canon":1,"dups":1,"ftype":"data_center","name":"Phoenix 1","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":4,"pc":"Grid","pconf":"High","pquote":"Stream will dedicate land for an onsite substation to be constructed by Arizona Public Service (APS) with ultimate power capacity of 350 MW.","uconf":"High","uquote":"Stream will dedicate land for an onsite substation to be constructed by Arizona Public Service (APS) with ultimate power capacity of 350 MW.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Stream Data Centers","spon":"Stream Data Centers","ay":2019,"oy":2020,"deal":"Acquisition of a 418,000-square-foot facility on 157 acres of land by Stream Data Centers on February 15, 2019.","dealScan":"https://www.streamdatacenters.com/news/stream-data-centers-to-develop-hyperscale-data-center-campus-in-phoenix-market/","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/news/stream-data-centers-to-develop-hyperscale-data-center-campus-in-phoenix-market/"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"13ab24bba994","cid":"13ab24bba994","canon":1,"dups":1,"ftype":"data_center","name":"Phoenix Data Center","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":69,"pc":"Grid","pconf":"High","pquote":"Power & Cooling 69 MW of Dedicated Substation Over twenty (20) 2.0 MW Generator Capacity (N+2) 2 x 600 kW UPS back-up power for AC customers (2N) Hold Isle containment.","uconf":"Medium","uquote":"Utility: Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Evocative Data Centers","spon":"Aligned Data Centers","oy":2016,"deal":"Evocative acquired this facility as part of the acquisition of 9 INAP Data Centers on September 14, 2022.","dealScan":"https://evocative.com/news/evocative-signs-definitive-agreement-to-acquire-9-inap-data-centers/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"evocative.com","srcUrls":["https://evocative.com/news/evocative-signs-definitive-agreement-to-acquire-9-inap-data-centers/"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"0a34eeff08d4","cid":"0a34eeff08d4","canon":1,"dups":1,"ftype":"data_center","name":"phoenixNAP","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"PhoenixNAP's Phoenix facility features robust power infrastructure designed for maximum uptime: Redundant utility feeds from multiple substations. N+1 UPS systems with battery backup providing continuous power conditioning. Diesel generators with on-site fuel storage and automatic failover (< 10 seconds) A+B power distribution to every rack for full redundancy.","pscan":"https://arizonacolocation.com/colocation/phoenix-nap","uquote":"Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power.","uscan":"https://baxtel.com/data-center/phoenixnap-phx02","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"RadiusDC","spon":"Blue Owl","tenant":"phoenixNAP","ay":2010,"oy":2026,"deal":"RadiusDC acquired phoenixNAP's Phoenix data center and colocation business, expected to close in Q2 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"arizonacolocation.com;baxtel.com","srcUrls":["https://arizonacolocation.com/colocation/phoenix-nap","https://baxtel.com/data-center/phoenixnap-phx02"],"lflag":"source_quality_reclassified"},{"id":"5146d9d4b56f","cid":"5146d9d4b56f","canon":1,"dups":1,"ftype":"data_center","name":"PHX01 / PHX02 / PHX03 / PHX05","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":180,"pc":"Grid","pconf":"High","pquote":"Aligned says that its campus will also benefit from Arizona's attractive sales tax incentives, reliable power grid and ample access to renewable energy resources. The Arizona Public Service (APS) has one of the country's most substantial renewable energy portfolios, using a balanced energy mix that is 50% carbon-free.","uquote":"The Arizona Public Service (APS) has one of the country's most substantial renewable energy portfolios, using a balanced energy mix that is 50% carbon-free.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"Aligned Data Centers","ay":2022,"oy":2017,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"100-250 MW","srcUrls":null,"srcDom":null},{"id":"545c0649dd4d","cid":"545c0649dd4d","canon":1,"dups":1,"ftype":"data_center","name":"PHX04","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Energy-efficient infrastructure with closed-loop chilled-water systems, near-zero water-utilization efficiency (WUE) and access to 100 % renewable power sourcing via the local utility.","uconf":"Medium","uquote":"Chandler's utility billing system makes it easy to manage your account, access your information, and pay your bill via the method that is most convenient for you.","uscan":"https://www.chandleraz.gov/residents/utility-services","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2022,"deal":"Macquarie Asset Management has agreed to sell Aligned Data Centers to a consortium (AIP, MGX, BlackRock's Global Infrastructure Partners) for approximately $US40 billion, with the deal expected to close in the first half of 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"chandleraz.gov","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.chandleraz.gov/residents/utility-services"]},{"id":"56156c8e602d","cid":"56156c8e602d","canon":1,"dups":1,"ftype":"data_center","name":"PHX065","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Arizona Public Service.","pscan":"https://www.interconnection.fyi/data-center/project/phx065-12397e20","uconf":"High","uquote":"Grid Operator: Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/phx065-12397e20","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/phx065-12397e20"]},{"id":"256a324d1c26","cid":"256a324d1c26","canon":1,"dups":1,"ftype":"data_center","name":"PHX07, PHX12, PHX13, PHX14","city":"Waddell","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":72,"pc":"Grid","pconf":"High","pquote":"Arizona Public Service (APS) will build a new 230 kV transmission line to meet the campus's substantial energy requirements. Energy-efficient design: the facility offers 100 % renewable power options, uses near-zero-water-usage (WUE) cooling design, and tracks eCarbon for a reduced environmental footprint.","uconf":"High","uquote":"Arizona Public Service (APS) will build a new 230 kV transmission line to meet the campus's substantial energy requirements.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"DigitalBridge","ay":2024,"oy":2025,"deal":"Land acquisition by Aligned Data Centers for 100-acre property at 8785 N Reems Road in December 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9a6999ca15df","cid":"9a6999ca15df","canon":1,"dups":1,"ftype":"data_center","name":"Platypus Development","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"99df79ebd683","cid":"99df79ebd683","canon":1,"dups":1,"ftype":"data_center","name":"PSCU Financial Services","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","op":"Velera","spon":"Velera","tenant":"Velera","oy":2013,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"20e9883ee6ad","cid":"20e9883ee6ad","canon":1,"dups":1,"ftype":"data_center","name":"QTS Glendale I","city":"Litchfield Park","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":750,"pc":"Grid","pconf":"Medium","pquote":"Designed to meet rapid, large-scale deployments, QTS Glendale is expected to have more than 750 megawatts of critical power capacity. A 29-acre substation is also slated for the site that has room for future growth, the Phoenix Business Journal reported.","rto":"non-RTO","nerc":"WECC","op":"QTS Data Centers","spon":"Blackstone","ay":2022,"deal":"Land acquisition for $255.3 million in July 2022","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"250+ MW","srcUrls":null,"srcDom":null},{"id":"717411b39953","cid":"717411b39953","canon":1,"dups":1,"ftype":"data_center","name":"QTS Investment Properties Phoenix","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Salt River Project (SRP)","pdt":"280+ MW planned capacity","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2ab6b4f7a393","cid":"2ab6b4f7a393","canon":1,"dups":1,"ftype":"data_center","name":"Salt River Project - Information Systems Building","city":"Tempe","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Salt River Project (SRP)","uquote":"As one of the nation's largest public power utilities, Salt River Project (SRP) provides electricity and water to more than two million people in Central Arizona.","uscan":"https://feifire.com/sector/office-buildings/salt-river-project-information-systems-building/","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Salt River Project","spon":"Salt River Project","oy":1989,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"feifire.com","lflag":"operational_null_capacity source_quality_reclassified legacy_facility_year_review","srcUrls":["https://feifire.com/sector/office-buildings/salt-river-project-information-systems-building/"]},{"id":"44c326e678da","cid":"44c326e678da","canon":1,"dups":1,"ftype":"data_center","name":"Scottsdale Data Center AZS-1","city":"Scottsdale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"The data center has 5.8 MW of 100% renewable power, delivering up to 20 kW per customer cabinet and scalable up to 9.6 MW for future needs.","uconf":"Medium","uquote":"Arizona Public Service. IT Services.","uscan":"https://marketplace.upstack.com/data-centers/iron-mountain-data-centers-azs-1","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Iron Mountain","spon":"Iron Mountain","deal":"Iron Mountain acquired IO Data Centers and their 4 data centers in 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"marketplace.upstack.com","srcUrls":["https://marketplace.upstack.com/data-centers/iron-mountain-data-centers-azs-1"],"band":"< 10 MW"},{"id":"4c4c88d9776e","cid":"4c4c88d9776e","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":246,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The campus will also feature a dedicated onsite substation to power the future campus and will run on 100% renewable energy, a standard initiative across STACK Americas' data center portfolio.","pscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-plans-230mw-five-building-campus-in-central-phoenix/","uconf":"High","uquote":"Arizona Public Service (APS) offers nearby, robust power solutions, and Arizona has the richest source for solar power in the country.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"STACK Infrastructure","spon":"IPI Partners","ay":2022,"contro":"Resident opposition to data centers in Phoenix due to water and power usage, noise, and zoning disputes. Phoenix City Council voted to restrict data center development, leading to landowners seeking compensation for diminished property values.","deal":"STACK Infrastructure secured an additional US$3bn of green financing in August 2024, which will be used to develop campuses including one in Phoenix, Arizona.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","lflag":"online_before_announced","srcUrls":["https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-plans-230mw-five-building-campus-in-central-phoenix/"]},{"id":"644f6e9f24f5","cid":"644f6e9f24f5","canon":1,"dups":1,"ftype":"data_center","name":"Stone Applications","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The 280KSF air-cooled data center will be used as part of the backbone for Google's various service offerings, including search, Gmail and continuing work in artificial intelligence advancement.","uconf":"High","uquote":"The agreements were signed in July 2019 after collaboration between Google, Mesa, the Arizona Commerce Authority, Salt River Project and the Greater Phoenix Economic Council.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","ay":2019,"oy":2025,"deal":"Development Agreement and Government Property Lease Excise Tax (GPLET) Lease Agreement with Stone Applications, LLC, signed in July 2019, with a commitment to spend $600M in capital expenditures for Phase I and $1 billion total upon completion.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"dfb7804e1d25","cid":"dfb7804e1d25","canon":1,"dups":1,"ftype":"data_center","name":"T-Mobile - Phoenix Switch","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"545a5cc77202","cid":"545a5cc77202","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":176,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Powered by Arizona Public Service Company (APS); Dedicated substation onsite; Multiple, diverse utility power feeds supporting the campus; Receiving power at 69+kV and distributing around campus at 12kV and 480V within the building; All systems 100% concurrently maintainable.","uconf":"High","uquote":"Powered by Arizona Public Service Company (APS)","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Vantage Data Centers","spon":"DigitalBridge Group, , Silver Lake","ay":2019,"oy":2024,"deal":"$735 million refinancing package for three data centers in Goodyear, Ariz., originated by Wells Fargo, Citibank and Goldman Sachs, reported June 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c4b8d7be6108","cid":"c4b8d7be6108","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers (AZ1)","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":176,"pc":"Grid","pconf":"High","pquote":"Powered by Arizona Public Service Company (APS); Dedicated substation onsite; Multiple, diverse utility power feeds supporting the campus; Receiving power at 69+kV and distributing around campus at 12kV and 480V within the building; All systems 100% concurrently maintainable.","uconf":"High","uquote":"Powered by Arizona Public Service Company (APS)","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Vantage Data Centers","spon":"DigitalBridge","ay":2019,"oy":2023,"deal":"$735M loan to refinance a trio of adjoining data centers, June 2025","dealScan":"https://www.bisnow.com/national/news/data-center/vantage-lands-735m-mortgage-for-phoenix-data-centers-129898","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","srcUrls":["https://www.bisnow.com/national/news/data-center/vantage-lands-735m-mortgage-for-phoenix-data-centers-129898"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"ef2cbe5a371d","cid":"ef2cbe5a371d","canon":1,"dups":1,"ftype":"data_center","name":"Viawest","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Multiple medium voltage (12.47kV class) utility power feeds. 10 MW redundant, fault tolerant diesel power generation capacity. 2(N+1) 5.4 MW redundant, fault tolerant UPS capacity.","pscan":"https://www.datacenterknowledge.com/business/viawest-enters-phoenix-market-with-new-data-center","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","tenant":"Cox Communications","ay":2013,"oy":2014,"deal":"Peak 10 acquired ViaWest for $1.67 billion in August 2017; Cox Communications sold the facility to Viawest.","dealScan":"https://baxtel.com/data-centers/flexential","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;baxtel.com","srcUrls":["https://www.datacenterknowledge.com/business/viawest-enters-phoenix-market-with-new-data-center","https://baxtel.com/data-centers/flexential"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"b590837bc6e5","cid":"b590837bc6e5","canon":1,"dups":1,"ftype":"data_center","name":"Zayo Data Center","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"Phoenix data center is a reliable power infrastructure facility providing 2,400 kW of utility power. The facility also provides 48V DC power delivered to customer's equipment. The immediate power failure is protected by 1,500 kW UPS in 2N configuration, and automatic transfer of load to 3,000 kw diesel generators in N+1 redundancy. The diesel generators have fuel storage for 24 hours runtime at full load with fuel supply refuel.","pscan":"https://cloudandcolocation.com/datacenters/zayo-phoenix-data-center/","uconf":"Medium","uquote":"Residents of Phoenix city, Arizona receive electricity, water, and natural gas services from local utility providers. If you're moving to Phoenix city, you'll typically need to set up utility service before your move-in date. 1Contact the electricity provider (Arizona Public Service) to start electric service.","uscan":"https://whoismyutility.com/arizona/phoenix","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","deal":"DataBank acquired all data center assets from Zayo Group in 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;whoismyutility.com","srcUrls":["https://cloudandcolocation.com/datacenters/zayo-phoenix-data-center/","https://whoismyutility.com/arizona/phoenix"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"e00c5b7a03ad","cid":"e00c5b7a03ad","canon":0,"dups":1,"ftype":"data_center","name":"11:11 Systems","city":"Scottsdale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Arizona Public Service","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"38909ca18e3b","cid":"38909ca18e3b","canon":0,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Energy-efficient infrastructure includes high-performance mechanical systems and access to renewable power sourcing, reflecting Aligned's commitment to sustainable data centre operations.","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"AI Infrastructure Partnership (AIP), MGX, BlackRock's Global Infrastructure Partners","ay":2022,"oy":2025,"contro":"Chandler City Council passed an ordinance in December 2022 to significantly restrict future data center development.","deal":"Land acquisition for PHX06 site for $115M.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text stale_future_status_year,merged_duplicate","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"b9d6a7c297aa","cid":"b9d6a7c297aa","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Waddell","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","proc":"Tariff (utility)","pcp":"Arizona Public Service (APS)","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"38ce147e96a2","cid":"38ce147e96a2","canon":1,"dups":1,"ftype":"data_center","name":"Aligned PHX06","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Designed with sustainability in mind: Aligned's philosophy of high-efficiency power, advanced cooling systems and renewables-ready infrastructure underpins this campus, aligning with enterprise ESG priorities.","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"Artificial Intelligence Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners (GIP)","ay":2022,"oy":2025,"contro":"Chandler City Council passed an ordinance to restrict future data center development, requiring planned area development zoning, sound mitigation measures, and neighborhood meetings.","deal":"Land acquisition for PHX06 site for $115M in 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"efb7fe2c075c","cid":"efb7fe2c075c","canon":1,"dups":1,"ftype":"data_center","name":"American Express","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"7f90fb216b61","cid":"7f90fb216b61","canon":1,"dups":1,"ftype":"data_center","name":"CBRE","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"An existing Salt River Project substation that powers the data center is located on an adjacent parcel and would be expanded as part of the project.... As part of the project, the nearby Salt River Project substation currently powering the data center will also be expanded. In addition, the owner will replace the entire facility's old water-cooling system with an electric air-cooling method.","uconf":"High","uquote":"An existing Salt River Project substation that powers the data center is located on an adjacent parcel and would be expanded as part of the project.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"CBRE Investment Management","spon":"CBRE Investment Management","ay":2024,"contro":"Local residents' concerns about noise at the data center were a factor in delaying approval of the expansion. The proposal also involved replacing an outdated water-intensive cooling system with an electric air-cooling method to save water.","deal":"CBRE Global Investors acquired the data center in 2019 for $72.8 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"cdf0646b49a0","cid":"cdf0646b49a0","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Tempe","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Arizona Public Service (APS)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"e2d12e7adf8b","cid":"e2d12e7adf8b","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters","city":"El Mirage","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":108,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The initial phase of construction includes two data centers that will deliver a combined 72 MW of IT load, with a master plan to expand up to 350 MW supported by an on-site 230kV substation.","uquote":"Electricity. Arizona Public Service. Arizona's largest and longest-serving electric company.","uscan":"https://www.elmirageaz.gov/574/Utilities-Overview","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Compass Datacenters","spon":"Brookfield and a Canadian pension fund","ay":2023,"deal":"Land acquisition from Dermody Properties for $79.3M (reported June 2024)","dealScan":"https://www.bisnow.com/national/news/data-center/compass-datacenters-buys-120-acres-near-phoenix-for-planned-campus-124627","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"elmirageaz.gov;bisnow.com","lflag":"online_before_announced","srcUrls":["https://www.elmirageaz.gov/574/Utilities-Overview","https://www.bisnow.com/national/news/data-center/compass-datacenters-buys-120-acres-near-phoenix-for-planned-campus-124627"]},{"id":"0cfb05042df2","cid":"0cfb05042df2","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters PHX II","city":"El Mirage","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":108,"pc":"Grid","pconf":"High","pquote":"New electrical infrastructure is under construction in the City of El Mirage to provide clean and reliable electric service to a new data center customer and support the continuing economic growth and development in the West Valley.","pscan":"https://www.elmirageaz.gov/574/Utilities-Overview","uquote":"Electricity. Arizona Public Service. Arizona's largest and longest-serving electric company.","uscan":"https://www.elmirageaz.gov/574/Utilities-Overview","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Compass Datacenters","spon":"Brookfield and a Canadian pension fund","ay":2023,"deal":"Land acquisition from Dermody Properties for $79.3M in June 2024","dealScan":"https://www.bisnow.com/national/news/data-center/compass-datacenters-buys-120-acres-near-phoenix-for-planned-campus-124627","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"elmirageaz.gov;bisnow.com","lflag":"online_before_announced","srcUrls":["https://www.elmirageaz.gov/574/Utilities-Overview","https://www.bisnow.com/national/news/data-center/compass-datacenters-buys-120-acres-near-phoenix-for-planned-campus-124627"],"band":"100-250 MW"},{"id":"e5a2d4759bda","cid":"e5a2d4759bda","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne - Mesa","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Salt River Project (SRP)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"275e65ef0ff6","cid":"275e65ef0ff6","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"359ac3cc7753","cid":"359ac3cc7753","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":434,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Google said today it has signed an eight-year contract with utility provider Salt River Project, to provide 434 megawatts of renewable energy capacity to the grid supporting Google's first Arizona data center.","pscan":"https://www.latitudemedia.com/news/in-lieu-of-water-cooling-google-locks-down-renewables-for-mesa-data-center/","uconf":"High","uquote":"Google said today it has signed an eight-year contract with utility provider Salt River Project, to provide 434 megawatts of renewable energy capacity to the grid supporting Google's first Arizona data center.","uscan":"https://www.latitudemedia.com/news/in-lieu-of-water-cooling-google-locks-down-renewables-for-mesa-data-center/","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","ay":2019,"oy":2025,"deal":"City of Mesa offered tax incentives worth at least $16 million over a 25-year period (July 2019); Google broke ground on a new $600 million data center (October 2023), with a total expected spend of $1 billion.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"latitudemedia.com","srcUrls":["https://www.latitudemedia.com/news/in-lieu-of-water-cooling-google-locks-down-renewables-for-mesa-data-center/"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"b53646414174","cid":"b53646414174","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers","city":"Chandler","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Salt River Project (SRP)","pdt":"up to 30 MWs, less than $0.07/kwh avg. annual power pricing","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"96d58e8883af","cid":"96d58e8883af","canon":1,"dups":1,"ftype":"data_center","name":"IB10 Hermosa Ranch","city":"Avondale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","rto":"non-RTO","nerc":"WECC","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2028,"contro":"The Avondale Planning Commission recommended against an earlier request last November due to concerns about impacts to the surrounding residential areas and the potential for putting too much strain on area water supplies.... Despite concerns from city staff, the Avondale City Council unanimously approved a major general plan amendment and rezoned the site in May.... The amendment also addressed height allowances for the data center campus, as well as operational requirements for QTS.","deal":"QTS Data Centers acquired 206.08 acres of land for $246,866,895 in July 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"cacc8248cb80","cid":"cacc8248cb80","canon":1,"dups":1,"ftype":"data_center","name":"Novva Phoenix","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":300,"pc":"Grid","pconf":"High","pquote":"Novva Mesa will employ the latest technology to help us reach ambitious goals, such as 100 percent renewable energy use and drastically less water use when compared to a typical data center.” “Backup diesel generators designed to operate using second-generation biofuel and hydrotreated vegetable oil to reduce emissions.”","uquote":"APS (Arizona Public Service) serves portions of east and southeast Mesa. Novva Data Centers... announced plans to build a 300MW data center campus on 160 acres of land outside of the 202 loop at the northwest alignment of Ellsworth and Warner roads in southeast Mesa.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Novva Data Centers","spon":"CIM Group","ay":2024,"oy":2026,"deal":"Land acquisition via state land auction in August 2023 for $62.7 million; $3 billion investment for build-out over next decade.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"82a04fd3fd99","cid":"82a04fd3fd99","canon":1,"dups":1,"ftype":"data_center","name":"PHX01","city":"Avondale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":240,"pc":"Grid","pconf":"High","pquote":"The campus, designed for artificial intelligence and high-performance computing workloads, will be powered by an on-site 250-megawatt dedicated substation. [...] The Avondale campus is committed to 100 percent renewable energy.","pscan":"https://www.connectcre.com/stories/work-underway-on-3b-phoenix-area-data-center-venture/","uquote":"Utility provider SRP will operate a 250MW substation onsite.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"Prime Data Centers","spon":"Nuveen and Snowhawk","ay":2023,"deal":"$3 billion planned investment for the campus, announced with groundbreaking on May 21, 2026","dealScan":"https://www.connectcre.com/stories/work-underway-on-3b-phoenix-area-data-center-venture/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"connectcre.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.connectcre.com/stories/work-underway-on-3b-phoenix-area-data-center-venture/"],"band":"100-250 MW"},{"id":"f46331eb7bfd","cid":"f46331eb7bfd","canon":1,"dups":1,"ftype":"data_center","name":"PHX069","city":"Avondale","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Arizona Public Service.","pscan":"https://www.interconnection.fyi/data-center/project/phx069-85cbf87a","uconf":"Medium","uquote":"Grid Operator. Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/phx069-85cbf87a","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","tenant":"Amazon","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/phx069-85cbf87a"]},{"id":"2c9cd4b9e00f","cid":"2c9cd4b9e00f","canon":1,"dups":1,"ftype":"data_center","name":"PHX08","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","uquote":"Grid Operator. Arizona Public Service.","uscan":"https://www.interconnection.fyi/data-center/project/phx08-0f6c69a0","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"AI Infrastructure Partnership (AIP), MGX, BlackRock's Global Infrastructure Partners","contro":"Phoenix City Council is creating a regulatory framework for data centers due to concerns over noise, water, landscaping, and tax breaks.","controScan":"https://phoenix.legistar.com/LegislationDetail.aspx?ID=7447349&GUID=CFD35FCB-1DB0-409C-A96B-F814C05FC09A&Options=&Search=","deal":"Aligned acquired adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive for $93 million in an all-cash deal in September 2022.","dealScan":"https://baxtel.com/data-center/aligned-phx-08","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;baxtel.com;phoenix.legistar.com","srcUrls":["https://www.interconnection.fyi/data-center/project/phx08-0f6c69a0","https://baxtel.com/data-center/aligned-phx-08","https://phoenix.legistar.com/LegislationDetail.aspx?ID=7447349&GUID=CFD35FCB-1DB0-409C-A96B-F814C05FC09A&Options=&Search="]},{"id":"ff4bbe6103a1","cid":"ff4bbe6103a1","canon":1,"dups":1,"ftype":"data_center","name":"PHX11","city":"Mesa","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":115,"pc":"Grid","pconf":"High","pquote":"EdgeConneX serves the Phoenix Metropolitan Area from its connectivity-rich and high power density Edge Data Center® (EDC), located near the heart of the Arizona State University Campus in Tempe, and less than 20 minutes from downtown Phoenix. Our Phoenix Edge Data Center® (EDC) has been purpose-built and precisely located in order to provide a secure colocation facility for customers wishing to deliver content and applications to local-market consumers, with the lowest possible latency. We also have 50 acres of land in Mesa, Arizona available to be developed for a build-to-suit data center solution. Microsoft Azure ExpressRoute and AWS Direct Connect are both available locally in our Phoenix datacenter facility, offering direct edge cloud on-ramp locations from which customers can establish secure, scalable and affordable links to Microsoft and Amazon services.","uconf":"High","uquote":"SRP electric service area as defined in the August 31, 1955 territorial agreement between SRPAIPD and APS, and in the September 15, 1954 agreement between SRPAIPD and City of Mesa. Includes non-SRP islands within SRP territory. Does not include power contract areas: Eastern Area (Eastern Mining Area), Marinette, or Camelback areas.... Mesa. Gilbert. Chandler. Peoria. Glendale. Phoenix. Scottsdale. Tempe. APS. APS. APS. APS. APS. APS. APS. MESA. APS.... SRP electric service area. Area served by other electrical utility. City of Mesa Boundary within the SRP Valley. Service Area.","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"3bac218f9a3d","cid":"3bac218f9a3d","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Litchfield Park","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":750,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"A 29-acre substation will be adjacent to the site. The project is planned for 750 MW of power, enough to power 120,000 homes.","pscan":"https://www.connectcre.com/stories/qts-building-3rd-phoenix-area-data-center/","uquote":"Electricity. Contact Arizona Public Service (APS) to set up electrical services and report street light outages. Arizona Public Service Company.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone Infrastructure Partners and Blackstone Real Estate Income Trust","ay":2022,"deal":"Land acquisition in July 2022 for $255 million","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"connectcre.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.connectcre.com/stories/qts-building-3rd-phoenix-area-data-center/"]},{"id":"fbe517970d8a","cid":"fbe517970d8a","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":210,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The campus is served by the local utility Salt River Project (SRP), with an electrical infrastructure plan supporting 210 MW+ of critical load for the campus. The key elements of power and resiliency include: Utility Power Supply: SRP, a major public utility in Arizona, is the energy provider to the campus.","pscan":"https://www.mmcginvest.com/post/qts-phoenix-dc1-data-center-feasibility-study-investment-analysis","uconf":"High","uquote":"The campus is served by the local utility Salt River Project (SRP), with an electrical infrastructure plan supporting 210 MW+ of critical load for the campus.","uscan":"https://www.mmcginvest.com/post/qts-phoenix-dc1-data-center-feasibility-study-investment-analysis","ukey":"16572|AZ","uname":"Salt River Project","rto":"non-RTO","nerc":"WECC","op":"QTS Data Centers","spon":"Blackstone","tenant":"Microsoft , Hyperscale tenants","ay":2023,"oy":2025,"contro":"General opposition to data centers in Phoenix due to water and energy use; Phoenix crackdown on data center construction facing legal challenges.","controScan":"https://www.datacenterknowledge.com/data-center-construction/blackstone-is-building-a-25b-empire-of-power-hungry-data-centers","deal":"$510 million financing package in March 2026; $600 million ABS financing package in September 2025.","dealScan":"https://www.connectcre.com/stories/qts-tapping-two-phoenix-data-centers-for-refinancing/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"mmcginvest.com;connectcre.com;datacenterknowledge.com","srcUrls":["https://www.mmcginvest.com/post/qts-phoenix-dc1-data-center-feasibility-study-investment-analysis","https://www.connectcre.com/stories/qts-tapping-two-phoenix-data-centers-for-refinancing/","https://www.datacenterknowledge.com/data-center-construction/blackstone-is-building-a-25b-empire-of-power-hungry-data-centers"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"b66906f6699a","cid":"b66906f6699a","canon":1,"dups":1,"ftype":"data_center","name":"SI PHX02A","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The campus will also feature a dedicated onsite substation to power the future campus and will run on 100% renewable energy.","uquote":"Utility Provider: Arizona Public Service.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"STACK Infrastructure","spon":"IPI Partners","oy":2027,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ca08fae394cb","cid":"ca08fae394cb","canon":1,"dups":1,"ftype":"data_center","name":"Stream Data Centers","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","mw":280,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Dedicated on-site APS substation with ultimate power capacity of 480 MW.","pscan":"https://www.streamdatacenters.com/locations/phoenix/","uquote":"Stream will dedicate land for an onsite substation to be constructed by Arizona Public Service (APS) with ultimate power capacity of 350 MW.","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Stream Data Centers","spon":"Apollo Global Management","ay":2019,"oy":2020,"contro":"Goodyear officials are moving to formally regulate data centers, prompting new zoning rules aimed at addressing noise, building design and water-use concerns.","deal":"Apollo Global Management to acquire a majority interest in Stream Data Centers from Stream Realty Partners (August 2025)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/locations/phoenix/"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"92110e4a5e28","cid":"92110e4a5e28","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers (AZ2)","city":"Goodyear","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Powered by Arizona Public Service Company (APS); Dedicated substation onsite; Multiple, diverse utility power feeds supporting the campus; Receiving power at 69+kV and distributing around campus at 12kV and 480V within the building; All systems 100% concurrently maintainable.","uconf":"High","uquote":"Powered by Arizona Public Service Company (APS)","ukey":"803|AZ","uname":"Arizona Public Service Co","rto":"non-RTO","nerc":"WECC","op":"Vantage Data Centers Management Company","spon":"DigitalBridge, Silver Lake","deal":"$735 million refinancing package for three data centers in Goodyear, Ariz., reported June 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2b5938f57332","cid":"2b5938f57332","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty Trust","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Cancelled","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"f852ffaf27de","cid":"f852ffaf27de","canon":1,"dups":1,"ftype":"data_center","name":"PHX1 Data Center","city":"Phoenix","county":"Maricopa","state":"AZ","lat":33.345176,"lng":-112.49893,"cprec":"shared_centroid","status":"Cancelled","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"371456d18406","cid":"371456d18406","canon":1,"dups":1,"ftype":"data_center","name":"Walmart","city":"Bentonville","county":"Benton","state":"AR","lat":36.337819,"lng":-94.256298,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","rto":"MISO","nerc":"SERC","op":"Walmart","spon":"Walmart","tenant":"Walmart","ay":2012,"oy":2012,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"2bd24f509618","cid":"2bd24f509618","canon":1,"dups":1,"ftype":"data_center","name":"15894 Valley Boulevard Investors LLC","city":"Fontana","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"d94263d82770","cid":"d94263d82770","canon":1,"dups":1,"ftype":"data_center","name":"162 Jefferson","city":"Menlo Park","county":"San Mateo","state":"CA","lat":37.414672,"lng":-122.371546,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Pacific Gas and Electric Company.","pscan":"https://www.interconnection.fyi/data-center/project/162-jefferson-72f62a8f","uconf":"High","uquote":"Grid Operator. Pacific Gas and Electric Company.","uscan":"https://www.interconnection.fyi/data-center/project/162-jefferson-72f62a8f","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","ay":2017,"oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/162-jefferson-72f62a8f"],"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"3ea3eecdc327","cid":"3ea3eecdc327","canon":1,"dups":1,"ftype":"data_center","name":"16633 Ventura, LP","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"940ae610e715","cid":"940ae610e715","canon":1,"dups":1,"ftype":"data_center","name":"23 & Me","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"59897a174c11","cid":"59897a174c11","canon":1,"dups":1,"ftype":"data_center","name":"365 Data Centers","city":"Rancho Cordova","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Our Rancho Cordova data center leverages robust metro fiber infrastructure and utility feeds from Sacramento Municipal Utility District to provide highly reliable, edge colocation.","uconf":"High","uquote":"Our Rancho Cordova data center leverages robust metro fiber infrastructure and utility feeds from Sacramento Municipal Utility District to provide highly reliable, edge colocation.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"365 Data Centers","spon":"Stonecourt Capital","oy":2022,"deal":"365 Data Centers acquired all U.S. colocation data centers from Sungard Availability Services in 2022.; Stonecourt Capital LP acquired 365 Data Centers on October 6, 2020.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a88e761ca978","cid":"a88e761ca978","canon":1,"dups":1,"ftype":"data_center","name":"365 Data Centers","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Incoming Electrical Voltage (To The Site). 480.0 kV. Incoming Electrical Service Type. Dual Circuits. Electrical Distribution. Isolated Redundant. UPS Type. Static UPS. UPS Redundancy. N+1. PDU Redundancy. N+1. Generator Redundancy. N+1. Concurrently Maintainable Electric. Avg Power Capacity Per Rack. 5.0 kW. Diesel Fuel Runtime At Full Load. 24 Hrs.","rto":"CAISO","nerc":"WECC","op":"365 Data Centers","spon":"Stonecourt Capital","ay":1938,"oy":2020,"deal":"Acquisition of Atlantic Metro Communications by 365 Data Centers, including a Los Angeles facility, in November 2020.","dealScan":"https://www.prnewswire.com/news-releases/365-data-centers-acquires-atlantic-metro-301174639.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/365-data-centers-acquires-atlantic-metro-301174639.html"],"lflag":"source_quality_reclassified legacy_facility_year_review"},{"id":"95342c0aa79c","cid":"95342c0aa79c","canon":1,"dups":1,"ftype":"data_center","name":"611 Wilshire Properties","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Technical (IT) power supplied by on-site battery powered UPS; Mechanical systems backed up by standby generator; Fully diverse power distribution to technical areas; On-site fuel storage for 24x7x365 fuel delivery.","pscan":"https://www.xyvest.com/data-center-space/","uquote":"The Los Angeles Department of Water and Power (LADWP) is the largest municipal utility in the United States with 8,100 megawatts of electric generating capacity (2021–2022) and delivering an average of 435 million gallons of water per day (487,000 acre-ft per year) to more than four million residents and local businesses in the City of Los Angeles and several adjacent cities and communities in southwestern Los Angeles County, California.","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Xyvest Holdings","spon":"Xyvest Holdings","oy":1998,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"xyvest.com","lflag":"operational_null_capacity source_quality_reclassified utility_alias_corrected","srcUrls":["https://www.xyvest.com/data-center-space/"],"rawUkey":"11208|CA","rawUname":"Los Angeles Department of Water & Power","reportedUtility":"Los Angeles Department of Water & Power"},{"id":"4c8f419d2f29","cid":"4c8f419d2f29","canon":1,"dups":1,"ftype":"data_center","name":"700 Wilshire Properties","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Technical (IT) power supplied by on-site battery powered UPS; Mechanical systems backed up by standby generator; Fully diverse power distribution to technical areas; On-site fuel storage for 24x7x365 fuel delivery.","pscan":"https://www.psychz.net/los-angeles-data-center.html","uconf":"High","uquote":"After purchasing the remaining distribution system of Southern California Edison within the city limits in 1922, LADWP became the sole water and electricity provider for the City of Los Angeles. It is now the largest municipal utility in the nation, serving a population of 4.0 million residents over a 473 square mile area.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Psychz Networks","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"psychz.net","srcUrls":["https://www.psychz.net/los-angeles-data-center.html"],"rawUkey":"11208|CA","rawUname":"Los Angeles Department of Water & Power","reportedUtility":"Southern California Edison Co","lflag":"utility_alias_corrected"},{"id":"063db7341f54","cid":"063db7341f54","canon":1,"dups":1,"ftype":"data_center","name":"A T & T","city":"WOODLAND HILLS","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"73025c7833bd","cid":"73025c7833bd","canon":1,"dups":1,"ftype":"data_center","name":"Acorn Technology","city":"Riverside","county":"Riverside","state":"CA","lat":33.729828,"lng":-116.002239,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Our facilities are carrier agnostic, with multiple redundancies in power, bandwidth, and cooling infrastructure to meet customers' uptime needs. Features: [x] Generator [x] UPS","rto":"CAISO","nerc":"WECC","op":"Acorn Technology Services","oy":2007,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"dbed234edcf5","cid":"dbed234edcf5","canon":1,"dups":1,"ftype":"data_center","name":"AGRICULTURAL WASTE SOLUTIONS (AWS)","city":"MORENO VALLEY","state":"CA","lat":37,"lng":-119.7,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3ab97ddc14ed","cid":"3ab97ddc14ed","canon":1,"dups":1,"ftype":"data_center","name":"Alchemy Communications","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The power to data center is served through two power feeds from separate power grids from Southern California Edison utility. The data center provides 4 x UPS battery systems in N+1 redundancy from the protection on the power failure that is backed up by 4 x 600 kW N+1 generators with fuel storage for 16 hours of runtime.","pscan":"https://cloudandcolocation.com/datacenters/alchemy-communications-irvine-data-center/","uconf":"High","uquote":"The power to data center is served through two power feeds from separate power grids from Southern California Edison utility.","uscan":"https://cloudandcolocation.com/datacenters/alchemy-communications-irvine-data-center/","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Alchemy Communications","spon":"affiliates of the secured lender","oy":1989,"deal":"Sale of Dynascale and Alchemy by Parlement Technologies to affiliates of the secured lender in October 2024.","dealScan":"https://www.force10partners.com/engagement/dynascale-alchemy/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;force10partners.com","srcUrls":["https://cloudandcolocation.com/datacenters/alchemy-communications-irvine-data-center/","https://www.force10partners.com/engagement/dynascale-alchemy/"],"lflag":"source_quality_reclassified legacy_facility_year_review"},{"id":"267e837b7388","cid":"267e837b7388","canon":1,"dups":1,"ftype":"data_center","name":"Alexandria Real Estate Equities, Inc","city":"South San Francisco","county":"San Mateo","state":"CA","lat":37.414672,"lng":-122.371546,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"746781a11af3","cid":"746781a11af3","canon":1,"dups":1,"ftype":"data_center","name":"ALLDATA Sollutions","city":"Elk Grove","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"7642c90f6157","cid":"7642c90f6157","canon":1,"dups":1,"ftype":"data_center","name":"ALOM","city":"Fremont","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"9329a15c2751","cid":"9329a15c2751","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Brea","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"29931bb291b9","cid":"29931bb291b9","canon":1,"dups":2,"ftype":"data_center","name":"Amazon","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":20,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"SVP will enter into a 15-year agreement with Amazon Web Services (AWS) and another, contingent agreement, with San Jose-based energy company Bloom Energy for the energy transmission.","pscan":"https://www.svvoice.com/svp-makes-deal-with-amazon-to-power-data-center/","uquote":"SVP will enter into a 15-year agreement with Amazon Web Services (AWS) and another, contingent agreement, with San Jose-based energy company Bloom Energy for the energy transmission.","uscan":"https://www.svvoice.com/svp-makes-deal-with-amazon-to-power-data-center/","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","deal":"15-year power purchase agreement with Silicon Valley Power and Bloom Energy for 20 MW, approved July 2024.","dealScan":"https://www.svvoice.com/svp-makes-deal-with-amazon-to-power-data-center/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"svvoice.com","srcUrls":["https://www.svvoice.com/svp-makes-deal-with-amazon-to-power-data-center/"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"ce23d982c3ac","cid":"ce23d982c3ac","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Highland","county":"San Bernardino","state":"CA","lat":34.856661,"lng":-116.181571,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Southern California Edison.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-5cfe4b83","uconf":"High","uquote":"Grid Operator: Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-5cfe4b83","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2020,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-5cfe4b83"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"5de7b86ace60","cid":"5de7b86ace60","canon":1,"dups":2,"ftype":"data_center","name":"Amazon","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern California Edison.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-e90b8925","uconf":"High","uquote":"Grid Operator. Southern California Edison.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Amazon","spon":"AMAZON.COM SERVICES - SAX1","tenant":"Amazon","ay":2022,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-e90b8925"]},{"id":"b5fb30633cb2","cid":"5de7b86ace60","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Southern California Edison.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-e90b8925","uconf":"High","uquote":"Grid Operator: Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e90b8925","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Amazon","spon":"AMAZON.COM SERVICES - SAX1","tenant":"Amazon","ay":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-e90b8925"]},{"id":"7bed39cd789f","cid":"7bed39cd789f","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern California Edison.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-d420013d","uconf":"High","uquote":"Grid Operator. Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-d420013d","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Amazon","spon":"AMAZON.COM SERVICES - SAX5","tenant":"Amazon","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-d420013d"]},{"id":"38a3a1579aec","cid":"38a3a1579aec","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Newark","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"ec7de7b3d763","cid":"29931bb291b9","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":20,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Santa Clara's City Council approved a deal with Bloom Energy to purchase additional energy to help supply an Amazon data center... That agreement — essentially two agreements: one with Bloom and another with Amazon — would secure 20 megawatts for a data center located at 2315 Mission College Blvd. Demand for energy beyond what Silicon Valley Power (SVP) can provide is increasing with some of the utility's marquee customers, Pineda said. Consequently, SVP asked the council to authorize securing an additional 80 megawatts as part of the agreement to service these customers.","uconf":"High","uquote":"Demand for energy beyond what Silicon Valley Power (SVP) can provide is increasing with some of the utility's marquee customers, Pineda said. Consequently, SVP asked the council to authorize securing an additional 80 megawatts as part of the agreement to service these customers.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2024,"deal":"Power purchase agreement with Bloom Energy and Amazon for 20 megawatts, approved July 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"695fc6bbb7e7","cid":"695fc6bbb7e7","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON","city":"MORENO VALLEY","county":"Riverside","state":"CA","lat":33.729828,"lng":-116.002239,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Moreno Valley Utility (MVU)","rto":"CAISO","nerc":"WECC","op":"Amazon","spon":"Amazon","tenant":"Amazon","oy":2014,"contro":"Unionization efforts by workers at the Amazon fulfillment center ONT8 in Moreno Valley.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"32a3859a700a","cid":"32a3859a700a","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON - GOLDEN STATE FC LLC ONT9","city":"REDLANDS","county":"San Bernardino","state":"CA","lat":34.856661,"lng":-116.181571,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"9548eed240e9","cid":"9548eed240e9","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON .COM SERVICES, LLC - FAT1","city":"FRESNO","county":"FRESNO","state":"CA","lat":36.761006,"lng":-119.655019,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"c5eb698b9eed","cid":"c5eb698b9eed","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON SNA 6","city":"EASTVALE","county":"Riverside","state":"CA","lat":33.729828,"lng":-116.002239,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern California Edison.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-sna-6-ade53432","uquote":"Grid Operator. Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-sna-6-ade53432","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2018,"oy":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-sna-6-ade53432"]},{"id":"25efade8278b","cid":"25efade8278b","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES INC","city":"BAKERSFIELD","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"AES Corp","pdt":"15-year deal, 1 GW solar plus 1 GW/4 GWh battery site","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"93da79acf10b","cid":"93da79acf10b","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC","city":"FRESNO","county":"FRESNO","state":"CA","lat":36.761006,"lng":-119.655019,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Pacific Gas and Electric Company.","uconf":"High","uquote":"Grid Operator: Pacific Gas and Electric Company.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"AMAZON.COM SERVICES","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded utility_alias_corrected","pscan":"https://interconnection.fyi/data-center/amazon-com-services-llc-qxy8-data-center-in-fresno-county-ca","uscan":"https://interconnection.fyi/data-center/amazon-com-services-llc-qxy8-data-center-in-fresno-county-ca","srcUrls":["https://interconnection.fyi/data-center/amazon-com-services-llc-qxy8-data-center-in-fresno-county-ca"],"srcDom":"interconnection.fyi","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"4a756571f648","cid":"4a756571f648","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC","city":"STOCKTON","county":"SAN JOAQUIN","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Lathrop Irrigation District.","uconf":"High","uquote":"Grid Operator: Lathrop Irrigation District.","ukey":"12745|CA","uname":"Modesto Irrigation District","rto":"CAISO","nerc":"WECC","op":"AMAZON.COM SERVICES","spon":"AMAZON.COM SERVICES","tenant":"Amazon Web Services","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c5f21599c26c","cid":"c5f21599c26c","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC","city":"MANTECA","county":"SAN JOAQUIN","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"abaa7f58eac7","cid":"abaa7f58eac7","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC","city":"VISALIA","county":"TULARE","state":"CA","lat":36.228834,"lng":-118.781055,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Southern California Edison.","uquote":"Grid Operator: Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-com-services-llc-3dda3700","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"AMAZON.COM SERVICES","spon":"Amazon.com","tenant":"Amazon","ay":2020,"oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-com-services-llc-3dda3700"]},{"id":"d93c40f2397a","cid":"d93c40f2397a","canon":0,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC","city":"VISALIA","county":"TULARE","state":"CA","lat":36.228834,"lng":-118.781055,"cprec":"distinct","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"0fac4b211e84","cid":"0fac4b211e84","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC - BFL2","city":"SHAFTER","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"a45b39b2c540","cid":"a45b39b2c540","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC - MCE1","city":"TURLOCK","state":"CA","lat":37,"lng":-119.7,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"ae4a14c80394","cid":"ae4a14c80394","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC - QXY8","city":"FRESNO","county":"FRESNO","state":"CA","lat":36.761006,"lng":-119.655019,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Pacific Gas and Electric Company","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded utility_alias_corrected unlinked_source_text","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"71cfb6e7651e","cid":"71cfb6e7651e","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC - SCK6","city":"TRACY","county":"SAN JOAQUIN","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Lathrop Irrigation District","uquote":"Grid Operator. Lathrop Irrigation District.","ukey":"12745|CA","uname":"Modesto Irrigation District","rto":"CAISO","nerc":"WECC","op":"AMAZON.COM SERVICES","spon":"AMAZON.COM SERVICES","tenant":"AMAZON.COM SERVICES","oy":2022,"contro":"Amazon's e-commerce giant has come under fire for what workers called poor working conditions at its Tracy facilities.","controScan":"https://www.youtube.com/watch?v=SQp9mEWkl4g","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.youtube.com/watch?v=SQp9mEWkl4g"]},{"id":"51bda56c23fe","cid":"51bda56c23fe","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC - TCY5","city":"TRACY","county":"SAN JOAQUIN","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"390f5210bea9","cid":"390f5210bea9","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC-MIT2","city":"SHAFTER","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Pacific Gas and Electric Company","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"486cf87314ef","cid":"be0bae5896cd","canon":0,"dups":2,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC-TCY2","city":"STOCKTON","county":"SAN JOAQUIN","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"be0bae5896cd","cid":"be0bae5896cd","canon":1,"dups":2,"ftype":"data_center","name":"AMAZON.COM SERVICES LLC-TCY2","city":"STOCKTON","county":"SAN JOAQUIN","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Lathrop Irrigation District","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e491c7ec79cf","cid":"e491c7ec79cf","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES, LCC - OAK4","city":"TRACY","county":"SAN JOAQUIN","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","proc":"Co-located generation","pcp":"PowerFlex, Prologis","pdt":"3,803 kW rooftop solar system","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0edee5658014","cid":"0edee5658014","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES, LLC - OAK3","city":"PATTERSON","county":"STANISLAUS","state":"CA","lat":37.562316,"lng":-121.002831,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Turlock Irrigation District","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"64f7777558a8","cid":"64f7777558a8","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM SERVICES,LLC - SMF3","city":"STOCKTON","county":"SAN JOAQUIN","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","op":"AMAZON.COM SERVICES","spon":"Amazon.com","contro":"Amazon sellers reported receiving issues and slow processing times at the SMF3 warehouse.","controScan":"https://sellercentral.amazon.com/seller-forums/discussions/t/cff8099ad191d86236b303f426936acd","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"sellercentral.amazon.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://sellercentral.amazon.com/seller-forums/discussions/t/cff8099ad191d86236b303f426936acd"]},{"id":"249fae66bc9f","cid":"249fae66bc9f","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM. GOLDENSTATE FC LLC-LGB8","city":"RIALTO","county":"San Bernardino","state":"CA","lat":34.856661,"lng":-116.181571,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"0d22fd18cb8e","cid":"0d22fd18cb8e","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON.COM.GOLDENSTATE FC LLC-LAX5","city":"BUENA PARK","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","op":"AMAZON.COM.GOLDENSTATE FC","spon":"Amazon.com","tenant":"Amazon","oy":2017,"contro":"Wage and hour lawsuit alleging failure to pay proper wages and provide uninterrupted meal and rest periods.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e0737e870270","cid":"e0737e870270","canon":1,"dups":1,"ftype":"data_center","name":"AMERICAN EXPRESS","city":"CULVER CITY","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"36cd378ded82","cid":"36cd378ded82","canon":1,"dups":1,"ftype":"data_center","name":"AMERICAN EXPRESS CONTRUCTION","city":"VAN NUYS","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Los Angeles Department of Water and Power.","pscan":"https://www.interconnection.fyi/data-center/project/american-express-contruction-819d2639","uconf":"Medium","uquote":"Grid Operator. Los Angeles Department of Water and Power.","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"AMERICAN EXPRESS CONTRUCTION","oy":2013,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/american-express-contruction-819d2639"]},{"id":"79fe58e3bce5","cid":"79fe58e3bce5","canon":1,"dups":1,"ftype":"data_center","name":"AMERICAN EXPRESS TRAVEL RELATED SERV","city":"EL SEGUNDO","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"2031bfed56ba","cid":"2031bfed56ba","canon":1,"dups":1,"ftype":"data_center","name":"American Medical Response","city":"Modesto","county":"Stanislaus","state":"CA","lat":37.562316,"lng":-121.002831,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"American Medical Response","spon":"Global Medical Response","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"070efbecb5be","cid":"070efbecb5be","canon":1,"dups":1,"ftype":"data_center","name":"Apple","city":"Culver City","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The building site will be environmentally friendly and powered by 100% renewable energy. In Apple's ongoing efforts to put environmental sustainability at the forefront of all its facilities, the new additions will also be powered by 100 percent renewable energy and incorporate other green building features.","rto":"CAISO","nerc":"WECC","op":"Apple","spon":"Apple","tenant":"Apple","ay":2021,"oy":2026,"contro":"Gentrification concerns and discussions about raising business taxes.","deal":"Apple bought a square block of office and warehouse properties for $162 million in late 2020. This expansion is part of Apple's $430 billion investment and commitment to create 20,000 jobs in the U.S. over five years.","dealScan":"https://therealdeal.com/la/2020/12/04/apple-snags-culver-city-office-warehouse-space-in-162m-deal/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"therealdeal.com","srcUrls":["https://therealdeal.com/la/2020/12/04/apple-snags-culver-city-office-warehouse-space-in-162m-deal/"],"lflag":"source_quality_reclassified"},{"id":"08088da4fe32","cid":"08088da4fe32","canon":1,"dups":1,"ftype":"data_center","name":"APPLE COMPUTER","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","rto":"CAISO","nerc":"WECC","op":"Apple","spon":"Apple","tenant":"Apple","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"64244a697525","cid":"64244a697525","canon":1,"dups":1,"ftype":"data_center","name":"AT & T","city":"SANTA ANA","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"f66f73319116","cid":"f66f73319116","canon":1,"dups":1,"ftype":"data_center","name":"AT & T","city":"RANCHO DOMINGUEZ","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"4ca164d92626","cid":"4ca164d92626","canon":1,"dups":1,"ftype":"data_center","name":"AT & T (RIVERSIDE)","city":"RIVERSIDE","county":"Riverside","state":"CA","lat":33.729828,"lng":-116.002239,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","rawName":"AT & T  (RIVERSIDE)","srcUrls":null,"srcDom":null},{"id":"8b1ef01fe939","cid":"8b1ef01fe939","canon":1,"dups":1,"ftype":"data_center","name":"AT&T","city":"Redwood City","county":"San Mateo","state":"CA","lat":37.414672,"lng":-122.371546,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The entire critical infrastructure is protected by UPS system in N+ 1 redundant configuration on the loss of utility power. The battery rooms support the UPS system providing 15 minutes of UPS backup time at full load. The emergency power to the data center is provided by diesel generators in N+1 redundancy with fuel storage onsite.","pscan":"https://cloudandcolocation.com/datacenters/att-redwood-city-data-center/","uquote":"PG&E provides some utility services to Redwood City Residents. This includes providing: Electricity transmission and distribution; Natural gas service; Optional electricity service; Maintenance and repair services.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Csquare","spon":"Brookfield Infrastructure Partners","tenant":"AT&T","ay":2018,"oy":2013,"deal":"AT&T sold its data center colocation operations and assets to Brookfield Infrastructure for $1.1 billion, closing in January 2019. Evoque Data Center Solutions was formed by Brookfield to operate these assets. Evoque merged with Cyxtera in January 2024 to form Centersquare, which rebranded to Csquare in late 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://cloudandcolocation.com/datacenters/att-redwood-city-data-center/"]},{"id":"50a5e0f12341","cid":"50a5e0f12341","canon":1,"dups":1,"ftype":"data_center","name":"AT&T","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"AT&T","spon":"AT&T","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"cafa4719d982","cid":"cafa4719d982","canon":1,"dups":1,"ftype":"data_center","name":"AT&T","city":"MERCED","county":"MERCED","state":"CA","lat":37.194806,"lng":-120.722802,"cprec":"distinct","status":"Operational","rto":"CAISO","nerc":"WECC","op":"AT&T","spon":"AT&T","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"eadb4300df32","cid":"eadb4300df32","canon":1,"dups":1,"ftype":"data_center","name":"AT&T","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"AT&T's Madison Complex is one of the world's largest “switching stations,” with its energy-intensive data center providing access to over one million phone lines. The original AT&T microwave network was built with vacuum tube amplifiers which require very high voltages to operate. They each were powered by two diesel generators at any given time one was operational and the other was the standby or backup. The batteries supply the 48Vdc for the copper plant.","uquote":"The Los Angeles Department of Water and Power is the City's water and electricity utility provider.","uscan":"https://business.lacity.gov/resources/departments/department-water-and-power","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"AT&T","spon":"AT&T","oy":1961,"contro":"The site plays host to technology used in the NSA's Fairview surveillance program.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"business.lacity.gov","lflag":"operational_null_capacity legacy_facility_year_review","srcUrls":["https://business.lacity.gov/resources/departments/department-water-and-power"]},{"id":"cfbc1d5b8715","cid":"cfbc1d5b8715","canon":1,"dups":1,"ftype":"data_center","name":"Avnet","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c4caa7037d7f","cid":"c4caa7037d7f","canon":1,"dups":1,"ftype":"data_center","name":"BANK OF AMERICA-LOS ANGELES DATA CENTER","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"aa21aaaffe3c","cid":"aa21aaaffe3c","canon":1,"dups":1,"ftype":"data_center","name":"Bracket Global LLC","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c14a5f3222d0","cid":"c14a5f3222d0","canon":1,"dups":1,"ftype":"data_center","name":"California Legislative Counsel","city":"Sacramento","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uquote":"SMUD. ​SMUD is the electric service provider for Sacramento County.","uscan":"https://economic.saccounty.gov/us/en/utility-providers.html","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"California Legislative Counsel","spon":"State of California","tenant":"California Legislature / State of California","ay":1981,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"economic.saccounty.gov","lflag":"online_before_announced legacy_facility_year_review","srcUrls":["https://economic.saccounty.gov/us/en/utility-providers.html"]},{"id":"5f59354d5b05","cid":"5f59354d5b05","canon":1,"dups":1,"ftype":"data_center","name":"Carinet Inc","city":"Kearney Mesa","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"CariNet Inc., illustrates why CariNet is a superior hosting company. Citing our redundant power systems, 24/7 support and flexible server architecture.","uquote":"The battery system is located behind the manufacturing site's retail meter with San Diego & Gas Electric.","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"Carinet","spon":"Carinet","oy":1997,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"689f3da58b79","cid":"689f3da58b79","canon":1,"dups":1,"ftype":"data_center","name":"CBRE","city":"Anaheim","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"ed02067e576d","cid":"ed02067e576d","canon":1,"dups":1,"ftype":"data_center","name":"CBS","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"271a3c4faf17","cid":"271a3c4faf17","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Hawthorne","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Utility power: 25.9MW. Generator capacity: 4MW. UPS capacity: 2.7MW.","pscan":"https://www.csquare.com/data-centers/los-angeles","uquote":"Grid Operator. Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/centersquare-86ecbda3","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","ay":2024,"contro":"Trademark infringement lawsuit filed against Centersquare by CenterSquare Investment Management.","deal":"April 2024 merger of Evoque and Cyxtera to form Centersquare.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"csquare.com;interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.csquare.com/data-centers/los-angeles","https://www.interconnection.fyi/data-center/project/centersquare-86ecbda3"]},{"id":"09ed12f12b2a","cid":"09ed12f12b2a","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Pacific Gas and Electric Company.","pscan":"https://www.interconnection.fyi/data-center/project/centersquare-4153ce3c","uquote":"Grid Operator: Pacific Gas and Electric Company.","uscan":"https://www.interconnection.fyi/data-center/project/centersquare-4153ce3c","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Mapletree Industrial Trust","ay":1999,"oy":1999,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/centersquare-4153ce3c"],"rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","lflag":"utility_alias_corrected"},{"id":"1171d331c0f2","cid":"1171d331c0f2","canon":0,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"52,000 sq/ft of raised floor space and access to 9 MW of utility power","uconf":"High","uquote":"The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.","uscan":"https://baxtel.com/data-center/csquare-santa-clara-sf04","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/csquare-santa-clara-sf04"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"af15ac715c25","cid":"8b360ef9fee4","canon":0,"dups":3,"ftype":"data_center","name":"Centersquare","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Csquare SFO2 Santa Clara Data Center Campus is located at 4650 Old Ironsides Drive, Santa Clara, CA, USA. The data center is 214552 sqft. There is a total of 159238 sqft in raised floor space for colocation. It has access to 10.0 MW of power.","uquote":"The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.","uscan":"https://baxtel.com/data-center/centersquare-santa-clara-sf01-dc2","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","ay":2025,"deal":"Acquisition of two data centers in Santa Clara for $97 million by Centersquare from Menlo Equities, including $55 million for 4650 Old Ironsides Drive, on November 18-20, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://baxtel.com/data-center/centersquare-santa-clara-sf01-dc2"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)"},{"id":"11389554937f","cid":"8b360ef9fee4","canon":0,"dups":3,"ftype":"data_center","name":"Centersquare","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Csquare SFO2 Santa Clara Data Center Campus... It has access to 10.0 MW of power.","uquote":"city-owned utility Silicon Valley Power","uscan":"https://therealdeal.com/san-francisco/2025/11/20/centersquare-spends-97-million-on-santa-clara-data-centers/","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure","oy":2010,"deal":"Centersquare acquired the data center at 4650 Old Ironsides Drive for $55 million in November 2025.","dealScan":"https://therealdeal.com/san-francisco/2025/11/20/centersquare-spends-97-million-on-santa-clara-data-centers/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"therealdeal.com","srcUrls":["https://therealdeal.com/san-francisco/2025/11/20/centersquare-spends-97-million-on-santa-clara-data-centers/"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected"},{"id":"8b360ef9fee4","cid":"8b360ef9fee4","canon":1,"dups":3,"ftype":"data_center","name":"Centersquare","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Csquare SFO2 Santa Clara Data Center Campus... It has access to 10.0 MW of power.","uquote":"city-owned utility Silicon Valley Power doesn't yet have the capacity to deliver enough electricity to turn on the power. The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","deal":"Acquisition of two data centers in Santa Clara for $97 million in November 2025, including $55 million for 4650 Old Ironsides Drive.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"fd0cf142608b","cid":"fd0cf142608b","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"100,573 sq/ft of raised floor space and access to 7.5 MW of utility power","uconf":"Medium","uquote":"The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"46845d1654d3","cid":"46845d1654d3","canon":0,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"100,573 sq/ft of raised floor space and access to 7.5 MW of utility power;","uconf":"High","uquote":"Power Utility: PG&E. A small number of residents and businesses still get their electricity from PG&E.","uscan":"https://baxtel.com/data-center/centersquare-sunnyvale-sf03","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure","deal":"Centersquare was formed in 2024 when Brookfield Infrastructure combined Evoque Data Center Solutions and the acquired assets of Cyxtera Technologies.","dealScan":"https://baxtel.com/data-center/centersquare-sunnyvale-sf03","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/centersquare-sunnyvale-sf03"],"lflag":"merged_duplicate"},{"id":"647f422d5377","cid":"647f422d5377","canon":1,"dups":1,"ftype":"data_center","name":"Cerulean Global","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"cbaf8b63a725","cid":"cbaf8b63a725","canon":1,"dups":1,"ftype":"data_center","name":"Cisco","city":"Mountain View","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Each Cisco Data Center is supported by a direct feed from the local power company, backed up by a room full of battery backup systems, which in turn are backed up by diesel generators. We do not use solar or wind power for IT infrastructure.","uquote":"Pacific Gas and Electric Company (PG&E) is the local distribution utility for Mountain View, CA.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Cisco Systems","spon":"Cisco Systems","tenant":"Cisco Systems","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"56ca956e9f09","cid":"56ca956e9f09","canon":1,"dups":1,"ftype":"data_center","name":"Cisco","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power and space: Cisco's largest Production data center; ~2.700 m2 raised floor area; power capacity of dual redundant 10 MW utility feeds.","pscan":"https://www.cisco.com/c/dam/global/da_dk/assets/docs/presentations/greenit_datacenter_transformation.pdf","uquote":"Grid Operator. Pacific Gas and Electric Company.","uscan":"https://www.interconnection.fyi/data-center/project/cisco-b8b57f40","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Cisco","spon":"Cisco Systems","tenant":"Cisco","ay":1999,"oy":2008,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cisco.com;interconnection.fyi","srcUrls":["https://www.cisco.com/c/dam/global/da_dk/assets/docs/presentations/greenit_datacenter_transformation.pdf","https://www.interconnection.fyi/data-center/project/cisco-b8b57f40"],"lflag":"citation_artifact_removed source_quality_reclassified utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"fe63f3ec0849","cid":"fe63f3ec0849","canon":1,"dups":1,"ftype":"data_center","name":"Citrix Systems International","city":"Goleta","county":"Santa Barbara","state":"CA","lat":34.536677,"lng":-120.038364,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Central Coast Community Energy (generation), Southern California Edison (transmission and distribution)","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected unlinked_source_text","ukey":"17609|CA","uname":"Southern California Edison Co","reportedUtility":"Southern California Edison Co","srcUrls":null,"srcDom":null},{"id":"5a15416edcc1","cid":"5a15416edcc1","canon":1,"dups":1,"ftype":"data_center","name":"City National Bank","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"City National Bank","spon":"Royal Bank of Canada","oy":2014,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"17fa418e1aa6","cid":"17fa418e1aa6","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"480v 3-phase utility feed - 1,200 amps... Uninterruptible Power Supply (UPS) and backup generators keep your services running when grid power fails.","uquote":"Any entity that seeks to interconnect a proposed generating or energy storage facility to SDG&E's transmission system or distribution system... is considered an Interconnection Customer (IC) by SDG&E.","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"Cogent Communications","spon":"Cogent Communications","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"489e3f96bf5a","cid":"489e3f96bf5a","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"La Mirada","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Facilities. 480v 3-phase utility feed - 3,000 amps. (4) UPS Systems - (2) for DC 1 at 900kVA each (2) Units for DC2, at 300kVA each. (3) Caterpillar Diesel Generators. (2) 1500kW Generators for DC 1. (1) 750kW Generator for DC 2. Each unit has a diesel fuel tank (2) 2800 Gallon tanks and (1) 2000 Gallon tank.","uquote":"For reference, please be aware of the following resources that are made available from our electricity provider, Southern California Edison (SCE), for information regarding Public Safety Power Shutoffs: Southern California Edison (SCE) | Public Safety Power Shutoffs.","uscan":"https://www.swwc.com/suburban/additional-resources/","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Cogent Communications","spon":"Cogent Communications","oy":2007,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"swwc.com","srcUrls":["https://www.swwc.com/suburban/additional-resources/"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"6fade193ad2b","cid":"6fade193ad2b","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Pasadena","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Virtually all of this electricity is Scope 2 in nature — that is it is produced remotely and delivered through electric grid infrastructure.","uquote":"Installers must submit an online application with Pasadena Water and Power through PWP's online application system – PowerClerk.","uscan":"https://pwp.cityofpasadena.net/solar-application-instructions/","ukey":"2507|CA","uname":"City of Burbank Water and Power","rto":"CAISO","nerc":"WECC","op":"Cogent Communications","spon":"Cogent Communications","oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"pwp.cityofpasadena.net","srcUrls":["https://pwp.cityofpasadena.net/solar-application-instructions/"],"lflag":"source_quality_reclassified"},{"id":"5c05242fbc82","cid":"5c05242fbc82","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Rialto","county":"San Bernardino","state":"CA","lat":34.856661,"lng":-116.181571,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Two 480v 3-phase utility feeds - at 2500 amps each. • Utility Provider Southern California Edison. • Two 1500 kW Diesel Power Standby Generators, each with 2000 amp Automatic Transfer Switch, one 750kW Diesel Powered Standby Generator with 1600 amp ATS.","pscan":"https://cogentco.com/files/docs/wholesale_colocation/Rialto_Wholesale_2025.pdf","uquote":"Utility Provider Southern California Edison.","uscan":"https://cogentco.com/files/docs/wholesale_colocation/Rialto_Wholesale_2025.pdf","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Cogent Communications","spon":"Cogent Communications","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cogentco.com","srcUrls":["https://cogentco.com/files/docs/wholesale_colocation/Rialto_Wholesale_2025.pdf"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"358f38953466","cid":"358f38953466","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Burbank","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power resiliency via one 480 V 3-phase utility feed, N+1 UPS, and diesel generator backups ensuring continuous operation.","uquote":"BWP is a not-for-profit organization owned by the citizens of Burbank. As responsible stewards of energy resources, our mission is to provide reliable, affordable, and sustainable water and electric services to the residential and business community.","uscan":"https://www.burbankwaterandpower.com/","ukey":"2507|CA","uname":"City of Burbank Water and Power","rto":"CAISO","nerc":"WECC","op":"Cogent Communications","spon":"Cogent Communications Holdings","ay":2026,"deal":"Sale of 10 data center facilities, including Burbank, for $225 million in cash to an entity sponsored by I Squared Capital, announced May 26, 2026.","dealScan":"https://www.cogentco.com/en/about-cogent/press-releases/5078-cogent-communications-announces-definitive-agreement-to-sell-10-data-center-facilities-05-26-26","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"burbankwaterandpower.com;cogentco.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.burbankwaterandpower.com/","https://www.cogentco.com/en/about-cogent/press-releases/5078-cogent-communications-announces-definitive-agreement-to-sell-10-data-center-facilities-05-26-26"]},{"id":"2657e74502e5","cid":"2657e74502e5","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Marina Del Rey","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uquote":"Southern California Edison (SCE) is the primary electric utility company for much of Southern California, United States. It provides 15 million people with electricity across a service territory of approximately 50,000 square miles....Marina Del Rey [is in] SCE Service Territory Cities....The Los Angeles Department of Water and Power (LADWP) is the largest municipal utility in the United States...delivering...to more than four million residents and local businesses in the City of Los Angeles and several adjacent cities and communities in southwestern Los Angeles County, California....Marina del Rey Utility Companies:... L.A. Department of water and power – LADWP... Southern california edison.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Cogent Communications","spon":"Cogent Communications","tenant":"USC Information Sciences Institute (ISI)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected","rawUkey":"11208|CA","rawUname":"Los Angeles Department of Water & Power","reportedUtility":"Southern California Edison Co","srcUrls":null,"srcDom":null},{"id":"a6d4dc5319bb","cid":"a6d4dc5319bb","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Anaheim","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power failure is protected by the UPS system which is able to provide back up supply up to 4 hours. Power Systems: Multiple UPS configurations for uninterrupted power; Diesel backup generator to maintain operations during outages","uconf":"High","uquote":"Carrier Availability - Cogent - Level 3 - Wilcon - City of Anaheim/Public Utilities Facilities - 1,100 square feet of non-raised floor colocation space - 208v 3-phase utility feed - 200 amps.","rto":"CAISO","nerc":"WECC","op":"Cogent Communications","spon":"Cogent Communications","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1ad752f1c3af","cid":"1ad752f1c3af","canon":1,"dups":1,"ftype":"data_center","name":"COLO RIVER AQDCT WHITEWATER SIPHONS EROS","city":"WHITE WATER","county":"Riverside","state":"CA","lat":33.729828,"lng":-116.002239,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"7631c5c58bb8","cid":"7631c5c58bb8","canon":1,"dups":1,"ftype":"data_center","name":"Cologix","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"SV1 includes secure cabinets and redundant power availability design. Cologix operates the SV1 data center with on-site technicians 24/7/365. Power. 9 MW of scalable power. N+1 redundant UPS system. Three independent utility feeds dedicated to the facility. 15 MW of generator backup power.","uconf":"High","uquote":"Utility provided by Silicon Valley Power with significantly lower utility rates than other regional providers Grid Operator. Silicon Valley Power.","uscan":"https://www.interconnection.fyi/data-center/project/cologix-81df7cfd","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Cologix","spon":"Mubadala","ay":2021,"oy":2021,"deal":"Cologix acquired vXchnge's 84,000 square foot data center and five-acre campus in Santa Clara, California, announced April 14, 2021, and completed May 1, 2021. The deal was funded by equity from Mubadala and increased debt facilities.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cologix-81df7cfd"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)"},{"id":"97ea2df68745","cid":"97ea2df68745","canon":1,"dups":1,"ftype":"data_center","name":"Coloswitch","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Los Angeles Department of Water and Power.","uconf":"High","uquote":"Grid Operator. Los Angeles Department of Water and Power.","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Coloswitch","spon":"Coloswitch","ay":2015,"oy":2015,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2f332a8a6a0b","cid":"2f332a8a6a0b","canon":1,"dups":1,"ftype":"data_center","name":"Conscious Capital","city":"Rancho Cordova","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"5 MW, 4 Generators, 3x6000 Gallon Diesel Tanks for 4-way power backup. Every kilowatt-hour generated by these panels is a kilowatt-hour we don't need to draw from the utility grid.","rto":"CAISO","nerc":"WECC","op":"Conscious Data Centers","spon":"OneSource Cloud","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fd1c9026618f","cid":"fd1c9026618f","canon":1,"dups":1,"ftype":"data_center","name":"CONSCIOUS CAPITAL DATA CENTER, LLC","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Conscious Data Center operates a Tier III secure carrier-neutral data center with 50,000 sq. ft. of raised floor space and 5 megawatts (MW) of power capacity in seismically neutral Sacramento.... Power, 5 MW, 4 Generators, 3x6000 Gallon Diesel Tanks for 4-way power backup.","pscan":"https://consciousdatacenters.com/","rto":"CAISO","nerc":"WECC","op":"Conscious Data Centers","spon":"Conscious Data Centers","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"consciousdatacenters.com","srcUrls":["https://consciousdatacenters.com/"],"band":"< 10 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"8284589e7f97","cid":"8284589e7f97","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"CoreSite alone took 20-30 megawatts of power usage off the grid each day in the Bay Area by transferring sites at Santa Clara Campus to generator.","uquote":"UTILITIES. Silicon Valley Power.","uscan":"https://www.coresite.com/data-center/sv4-santa-clara-ca","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"CoreSite","spon":"American Tower","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"coresite.com","srcUrls":["https://www.coresite.com/data-center/sv4-santa-clara-ca"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"1839e276bade","cid":"1839e276bade","canon":0,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"UTILITIES. Onsite 2N Silicon Valley Power Substation.... CoreSite alone took 20-30 megawatts of power usage off the grid each day in the Bay Area by transferring sites at Santa Clara Campus to generator.","uconf":"High","uquote":"UTILITIES. Onsite 2N Silicon Valley Power Substation.... UTILITIES. Silicon Valley Power.... competitive power pricing from the municipal utility, Silicon Valley Power","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"CoreSite","spon":"American Tower","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected,merged_duplicate","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"15a0bcbe4212","cid":"15a0bcbe4212","canon":0,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"CoreSite alone took 20-30 megawatts of power usage off the grid each day in the Bay Area by transferring sites at Santa Clara Campus to generator.","pscan":"https://www.coresite.com/blog/when-the-grid-is-strained-coresite-reduces-data-center-power-draw","uquote":"Development sites have grown scarce in Santa Clara, which has emerged as the Data Center Capital of Silicon Valley due to competitive power pricing from the municipal utility, Silicon Valley Power, whose rates are significantly lower than the cost of power from PG&E in surrounding towns.","uscan":"https://www.datacenterfrontier.com/site-selection/article/11430797/coresite-buying-property-to-expand-in-santa-clara","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"CoreSite","spon":"American Tower","oy":2019,"contro":"Planning commission debate over land use, noise concerns, and diesel generator emissions for a CoreSite data center in Santa Clara.","controScan":"https://www.svvoice.com/long-debate-over-future-of-santa-clara-leads-to-no-action-on-proposed-data-center/","deal":"CoreSite acquired three Santa Clara buildings for $100 million from GI Partners in February 2026.","dealScan":"https://news.theregistrysf.com/coresite-pays-100mm-for-three-santa-clara-buildings-on-site-planned-for-244000-sqft-data-center-development/","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"coresite.com;datacenterfrontier.com;news.theregistrysf.com;svvoice.com","srcUrls":["https://www.coresite.com/blog/when-the-grid-is-strained-coresite-reduces-data-center-power-draw","https://www.datacenterfrontier.com/site-selection/article/11430797/coresite-buying-property-to-expand-in-santa-clara","https://news.theregistrysf.com/coresite-pays-100mm-for-three-santa-clara-buildings-on-site-planned-for-244000-sqft-data-center-development/","https://www.svvoice.com/long-debate-over-future-of-santa-clara-leads-to-no-action-on-proposed-data-center/"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"57f29b7d5c8a","cid":"57f29b7d5c8a","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"CoreSite supplemented electrical power with new backup generators that would ensure power could not be interrupted.... It sits on the same high-priority utility grid as many LA government buildings and offers access to more than 330 carriers and the native cloud on ramps to AWS, Microsoft Azure, Google Cloud, Oracle and IBM.","pscan":"https://ladwpnews.com/ladwp-and-coresite-announce-major-energy-savings/","uquote":"CoreSite Realty Corporation (CoreSite), one of the nation's premier data center corporations and a key customer of the Los Angeles Department of Water and Power (LADWP), received a nearly $3 million rebate for energy efficiency upgrades at its LA2 facility in downtown Los Angeles.","uscan":"https://ladwpnews.com/ladwp-and-coresite-announce-major-energy-savings/","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"CoreSite","spon":"American Tower","ay":2020,"oy":2021,"contro":"Permitting and design challenges related to blending with neighboring structures and utility coordination.","controScan":"https://www.dpr.com/projects/coresite-la3-data-center","deal":"American Tower acquired CoreSite for approximately $10.1 billion, announced November 15, 2021, and closed December 28, 2021.","dealScan":"https://www.coresite.com/news/american-tower-acquire-coresite","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"ladwpnews.com;coresite.com;dpr.com","srcUrls":["https://ladwpnews.com/ladwp-and-coresite-announce-major-energy-savings/","https://www.coresite.com/news/american-tower-acquire-coresite","https://www.dpr.com/projects/coresite-la3-data-center"],"lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"11208|CA","rawUname":"Los Angeles Department of Water & Power","reportedUtility":"Los Angeles Department of Water & Power"},{"id":"d5787233be31","cid":"d5787233be31","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Milpitas","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"In Milpitas, CoreSite owns and operates a data center (SV2) covering approximately 76,000 sq. ft. that runs on both PG&E and Bloom Energy power. Bloom powers about one-third of the facility and offers green energy and an alternate redundant power source.","proc":"Tariff (utility)","pcp":"Pacific Gas and Electric Company","uconf":"High","uquote":"In Milpitas, CoreSite owns and operates a data center (SV2) covering approximately 76,000 sq. ft. that runs on both PG&E and Bloom Energy power.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"CoreSite","spon":"American Tower, Stonepeak","oy":2000,"deal":"CoreSite acquired by American Tower in November 2021; Stonepeak acquired 10% stake in CoreSite in July 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"97af49bd1d77","cid":"97af49bd1d77","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"UPS/PDU/RPP. 2N UPS redundant. UPTIME. 100% uptime SLA. OPERATIONS. 24x7x365 remote hands.... 100% uptime SLA supported by N, N+1, 2N UPS and N generator power.","rto":"CAISO","nerc":"WECC","op":"CoreSite","spon":"American Tower","oy":2000,"deal":"American Tower acquired CoreSite for approximately $10.1 billion, closed December 2021.","dealScan":"https://www.coresite.com/news/american-tower-completes-acquisition-coresite-realty-corporation","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"coresite.com","srcUrls":["https://www.coresite.com/news/american-tower-completes-acquisition-coresite-realty-corporation"],"lflag":"citation_artifact_removed"},{"id":"15117fcccb81","cid":"15117fcccb81","canon":1,"dups":1,"ftype":"data_center","name":"CORESITE ONE WILSHIRE, LLC","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"CoreSite investments include installing a completely new, enterprise-class data center generator plant and upgrading the accompanying system, to provide the redundancy necessary to support the digital highways running through the building.","uquote":"Utility Provider: LADWP.","uscan":"https://baxtel.com/data-center/one-wilshire-building","rto":"CAISO","nerc":"WECC","op":"CoreSite","spon":"GI Partners","tenant":"Amazon, Microsoft, Google, IBM Cloud, Oracle FastConnect","ay":2001,"deal":"GI Partners acquired One Wilshire for $437 million in 2013","dealScan":"https://www.datacenterknowledge.com/deals/gi-partners-buys-la-telecom-hub-one-wilshire","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;datacenterknowledge.com","lflag":"online_before_announced source_quality_reclassified utility_alias_corrected","srcUrls":["https://baxtel.com/data-center/one-wilshire-building","https://www.datacenterknowledge.com/deals/gi-partners-buys-la-telecom-hub-one-wilshire"],"band":"25-50 MW","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","reportedUtility":"Los Angeles Department of Water & Power"},{"id":"6fd8e50c53ae","cid":"6fd8e50c53ae","canon":1,"dups":1,"ftype":"data_center","name":"CORESITE REAL ESTATE 900 N, ALAMEDA, LLC","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"26 MW from two utility feeds - 300 W/ft2 of maximum power density. Backed by 5min UPS on max load and 48hr max load on generators in N+1, configuration. DC power available. [...] Diverse utility feeds.","pscan":"https://www.clouvider.com/los-angeles-la2-coresite-datacenter/","uquote":"WHEREAS, CoreSite Real Estate, L.L.C., (CoreSite) owns and operates its LA2 colocation facility located at 900 North Alameda Street, Los Angeles, CA 90012. (Property); and. WHEREAS, LADWP desires to lease a portion of the Property to operate its data center and colocation facility in approximately 1,334 square feet of space along with ancillary storage and common areas (Data Center Space) pursuant to the terms and conditions of a Lease Agreement (Agreement);","uscan":"https://cityclerk.lacity.org/onlinedocs/2016/16-0665_misc_1_06-08-2016.pdf","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"CoreSite Realty","spon":"American Tower","tenant":"Los Angeles Department of Water and Power","ay":2000,"deal":"American Tower acquired CoreSite Realty Corporation for approximately $10.1 billion, closing on December 28, 2021.","dealScan":"https://www.coresite.com/news/american-tower-acquire-coresite","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"clouvider.com;cityclerk.lacity.org;coresite.com","lflag":"online_before_announced source_quality_reclassified utility_alias_corrected","srcUrls":["https://www.clouvider.com/los-angeles-la2-coresite-datacenter/","https://cityclerk.lacity.org/onlinedocs/2016/16-0665_misc_1_06-08-2016.pdf","https://www.coresite.com/news/american-tower-acquire-coresite"],"band":"25-50 MW","rawUkey":"11208|CA","rawUname":"Los Angeles Department of Water & Power","reportedUtility":"Los Angeles Department of Water & Power"},{"id":"2349be76309b","cid":"2349be76309b","canon":1,"dups":1,"ftype":"data_center","name":"Cottage Health","city":"Goleta","county":"Santa Barbara","state":"CA","lat":34.536677,"lng":-120.038364,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Central Coast Community Energy (generation) and Southern California Edison (delivery)","rto":"CAISO","nerc":"WECC","op":"Cottage Health","spon":"Cottage Health","oy":2017,"contro":"Data breaches and settlements regarding patient record security.","controScan":"https://www.independent.com/2017/11/24/cottage-hospital-pays-2-million-settle-security-breach-lawsuit/","deal":"$2 million settlement with California Attorney General (2017) and $3 million settlement with OCR (2019) for HIPAA violations.","dealScan":"https://oag.ca.gov/news/press-releases/attorney-general-becerra-announces-2-million-settlement-involving-santa-barbara","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oag.ca.gov;independent.com","srcUrls":["https://oag.ca.gov/news/press-releases/attorney-general-becerra-announces-2-million-settlement-involving-santa-barbara","https://www.independent.com/2017/11/24/cottage-hospital-pays-2-million-settle-security-breach-lawsuit/"],"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected","ukey":"17609|CA","uname":"Southern California Edison Co","reportedUtility":"Southern California Edison Co"},{"id":"f0a881f669b7","cid":"f0a881f669b7","canon":1,"dups":1,"ftype":"data_center","name":"COX COMM OF OR. CO., RSM SWITCH/HUB","city":"RANCHO SANTA MARGARITA","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"3d7bc733d69c","cid":"3d7bc733d69c","canon":1,"dups":1,"ftype":"data_center","name":"CT Corporation System","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"bd36434f9991","cid":"bd36434f9991","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","proc":"Co-located generation","pdt":"up to 27 megawatts","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4a7e98fe32eb","cid":"4a7e98fe32eb","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"we maintain diverse utility feeds that provide 5 megawatts from the substation. we have two two megawatt diesel generators for data Hall 1 and data Hall 2. we also have two three megawatt diesel generators for data Hall. 3 each power block in this tier 3 design will hold a hundred percent of the load. and is concurrently maintainable the crack units are powered by a primary and a secondary feed. which are both backed up by generators.","pscan":"https://www.youtube.com/watch?v=4_6-zb-lhMs","uconf":"High","uquote":"Grid Operator. San Diego Gas and Electric.","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"DataBank","spon":"DigitalBridge","ay":2022,"oy":2023,"deal":"DataBank issued $715 million of secured notes in March 2023 and secured a $350 million credit facility in April 2023 to fund continued expansions.","dealScan":"https://www.databank.com/resources/press-releases/databank-announces-record-sales-and-financial-results-for-first-half-of-2023/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"youtube.com;databank.com","srcUrls":["https://www.youtube.com/watch?v=4_6-zb-lhMs","https://www.databank.com/resources/press-releases/databank-announces-record-sales-and-financial-results-for-first-half-of-2023/"]},{"id":"4363c94ad1ec","cid":"4363c94ad1ec","canon":1,"dups":2,"ftype":"data_center","name":"DataBank","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"SNA2 features a 2N power design and N+1 cooling while security measures include dual-factor authentication, 7x24x365 staffing, mantrap access, intrusion detection alarms, and CCTV.... we have deployed a modular design that provides three Diverse Power lineups from three two megawatt Transformers that feed eight UPS's for it load.... we start with diversity in the utility feeds which provide 10 megawatts to the facility.","pscan":"https://www.youtube.com/watch?v=a56x2tOPxFg","uconf":"High","uquote":"The primary supplier of retail electricity to Irvine is the Southern California Edison Company (SCE). On March 31, 1998, the electricity generation market was deregulated creating the ability for other providers to supply electricity. However, as of June 1998, SCE remains the primary supplier for the City of Irvine.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"DataBank","spon":"DigitalBridge","ay":2022,"oy":2023,"deal":"Acquisition of zColo's U.S. and U.K. data center assets from Zayo in December 2020.","dealScan":"https://www.databank.com/about-databank/databanks-history/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"youtube.com;databank.com","srcUrls":["https://www.youtube.com/watch?v=a56x2tOPxFg","https://www.databank.com/about-databank/databanks-history/"],"lflag":"citation_artifact_removed"},{"id":"6a74dcb1d3a4","cid":"4363c94ad1ec","canon":0,"dups":2,"ftype":"data_center","name":"DataBank","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"we start with diversity in the utility feeds which provide 10 megawatts to the facility. the 2 megawatt diesel generators are in protective cases for noise reduction.","pscan":"https://www.youtube.com/watch?v=a56x2tOPxFg","rto":"CAISO","nerc":"WECC","op":"DataBank","spon":"IPI Partners","ay":2020,"oy":2023,"deal":"Acquisition of Zayo facilities in 2020; $2.0 billion equity raise in October 2024","dealScan":"https://datacenterplanet.com/data-center/databank-completes-california-data-center-expansion/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;datacenterplanet.com","srcUrls":["https://www.youtube.com/watch?v=a56x2tOPxFg","https://datacenterplanet.com/data-center/databank-completes-california-data-center-expansion/"],"lflag":"source_quality_reclassified"},{"id":"4edd2df4a769","cid":"4edd2df4a769","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"DataBank's SFO1 Silicon Valley data center features a N+1 power design and N+1 cooling and is a carrier-neutral interconnection hub with access to on-site carriers and Internet, fiber, and cross-connect options. This facility provides 3 MW of total marketed power capacity, making it a standout choice for colocation in Silicon Valley. Beyond its power profile, the site supports diverse cable routing and maintains a... Generator configuration 3 Cummings 2MW diesel generators service the facility.","pscan":"https://inflect.com/building/5101-lafayette-street-santa-clara/databank-ltd/datacenter/zayo-5101-lafayette-st","uconf":"High","uquote":"Silicon Valley Power (SVP) is a not-for-profit municipal electric utility owned and operated by the City of Santa Clara, California, United States.... The City has owned and operated its own electric, water and sewer utilities for over a century.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"DataBank","spon":"DigitalBridge","oy":2012,"deal":"DataBank acquired zColo's U.S. and U.K. data center assets in December 2020 for $1.4B, which included the 5101 Lafayette St. Santa Clara facility.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","srcUrls":["https://inflect.com/building/5101-lafayette-street-santa-clara/databank-ltd/datacenter/zayo-5101-lafayette-st"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)"},{"id":"e2c28faaecd5","cid":"e2c28faaecd5","canon":1,"dups":1,"ftype":"data_center","name":"Databank Holdings Ltd","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":7,"pc":"Grid","pconf":"High","pquote":"we maintain diverse utility feeds that provide 5 megawatts from the substation. we have two two megawatt diesel generators for data Hall 1 and data Hall 2. we also have two three megawatt diesel generators for data Hall. 3 each power block in this tier 3 design will hold a hundred percent of the load. and is concurrently maintainable","pscan":"https://www.youtube.com/watch?v=4_6-zb-lhMs","uquote":"Grid Operator. San Diego Gas and Electric.","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"DataBank","spon":"Databank Holdings","ay":2020,"oy":2023,"deal":"DataBank acquired US data centers from Zayo in 2020; DataBank announced expansion of SAN1 facility in March 2022, with grand opening in May 2023.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=4_6-zb-lhMs"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"c58fda7abaae","cid":"0b8824fda746","canon":0,"dups":3,"ftype":"data_center","name":"Databank Holdings Ltd","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":7,"pc":"Grid","pconf":"High","pquote":"Our San Diego colocation facility features a 2N power infrastructure and serves cloud providers, healthcare, and enterprises with edge application and network technologies.","pscan":"https://www.databank.com/data-centers/san-diego/","uquote":"Grid Operator: San Diego Gas and Electric.","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"Databank Holdings","spon":"DigitalBridge","ay":2020,"oy":2023,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/san-diego/"],"band":"< 10 MW"},{"id":"0b8824fda746","cid":"0b8824fda746","canon":0,"dups":3,"ftype":"data_center","name":"Databank Holdings Ltd","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":7,"pc":"Grid","pconf":"High","pquote":"DataBank's San Diego colocation facility features a 2N power infrastructure and serves cloud providers, healthcare, and enterprises with edge application and network technologies.... we maintain diverse utility feeds that provide 5 megawatts from the substation. we have two two megawatt diesel generators for data Hall 1 and data Hall 2. we also have two three megawatt diesel generators for data Hall. 3 each power block in this tier 3 design will hold a hundred percent of the load. and is concurrently maintainable the crack units are powered by a primary and a secondary feed. which are both backed up by generators.","pscan":"https://www.databank.com/data-centers/san-diego/","uconf":"High","uquote":"Grid Operator: San Diego Gas and Electric.","uscan":"https://www.interconnection.fyi/data-center/project/databank-c819f55f","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"Databank Holdings","spon":"IPI Partners","ay":2022,"oy":2023,"deal":"Zayo sold all their US data centers to DataBank in 2020.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;interconnection.fyi","srcUrls":["https://www.databank.com/data-centers/san-diego/","https://www.interconnection.fyi/data-center/project/databank-c819f55f"],"band":"< 10 MW","lflag":"citation_artifact_removed,merged_duplicate"},{"id":"b4e514481239","cid":"0b8824fda746","canon":0,"dups":3,"ftype":"data_center","name":"Databank Holdings Ltd","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":7,"pc":"Grid","pconf":"High","pquote":"DataBank's San Diego colocation facility features a 2N power infrastructure and serves cloud providers, healthcare, and enterprises with edge application and network technologies.","pscan":"https://www.databank.com/data-centers/san-diego/","uquote":"Grid Operator: San Diego Gas and Electric.","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"Databank Holdings","spon":"DigitalBridge, AustralianSuper","ay":2022,"oy":2023,"deal":"Acquisition of US data centers from Zayo in 2020.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/san-diego/"],"band":"< 10 MW"},{"id":"2d8b6f840477","cid":"2d8b6f840477","canon":1,"dups":1,"ftype":"data_center","name":"Datacate","city":"Rancho Cordova","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Dual power feed, N+1 UPS systems, and N+1 diesel generators. Multi-layered redundancy against power outages.","pscan":"https://www.datacate.net/gcdc-facility/","uconf":"High","uquote":"Datacate partnered with the Sacramento Municipal Utility District (SMUD) in a pilot program to revolutionize data center cooling using ultra-efficient Climate Wizard air conditioning technology.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"Datacate","spon":"Datacate","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"datacate.net","srcUrls":["https://www.datacate.net/gcdc-facility/"],"lflag":"source_quality_reclassified"},{"id":"2a6f93c00d0a","cid":"2a6f93c00d0a","canon":1,"dups":1,"ftype":"data_center","name":"David Grant Medical Center","city":"Fairfield","county":"Solano","state":"CA","lat":38.267226,"lng":-121.939594,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"A fire at a substation off base caused Travis to lose almost all of its electricity, forcing base officials to go to minimal manning until the lights came back on. The base's 60th Civil Engineering Squadron worked with PG&E to restore power. While certain facilities such as the base hospital, some force support squadron buildings, the commissary, and dining facilities remained with power, other buildings such as the exchange, the fitness center, and the visitor center were closed.","uconf":"High","uquote":"The base's 60th Civil Engineering Squadron worked with PG&E to restore power.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"60th Medical Group (US Air Force)","spon":"United States Air Force","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"aeea75600ac8","cid":"aeea75600ac8","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The local utility provides up to 168 total kilowatts of power (0.1 Megawatts) and the UPS systems have a capacity of 20 kilowatts and are arranged in a N+1 configuration. Santa Clara is the data center capital of Silicon Valley because the municipal utility, Silicon Valley Power, offers slightly lower rates than those available from PG&E in surrounding towns.","uconf":"High","uquote":"Santa Clara is the data center capital of Silicon Valley because the municipal utility, Silicon Valley Power, offers slightly lower rates than those available from PG&E in surrounding towns. This single-tenant data center is serviced by Silicon Valley Power and is located in the heart of Digital Realty's Silicon Valley data center campus and is LEED Platinum certified.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected,merged_duplicate","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"51b8c71c87e5","cid":"51b8c71c87e5","canon":0,"dups":4,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Digital Realty's data center at 3205 Alfred Street offers maximum product flexibility near Highway 101 on major fiber routes and near three cost-effective substations on the power grids of Silicon Valley Power.","uconf":"High","uquote":"Digital Realty's data center at 3205 Alfred Street offers maximum product flexibility near Highway 101 on major fiber routes and near three cost-effective substations on the power grids of Silicon Valley Power.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2017,"oy":2018,"deal":"Investment of approximately $75 million, announced October 5, 2017","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected,merged_duplicate","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"e5e88a17ea56","cid":"e5e88a17ea56","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Oakland","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":14,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"This facility supports 14.5 MW of utility power capacity, making it a key site for colocation in San Francisco.... With an Electrical Tier classification of Tier 3, the facility guarantees redundant power systems, featuring N+1 UPS redundancy and N+1 generator redundancy.","pscan":"https://inflect.com/building/720-2nd-street-oakland/digital-realty/datacenter/digital-realty-720-2nd-street","uconf":"High","uquote":"Strategically located in a fiber-rich district and directly adjacent to PG&E substation, the facility is four blocks from Jack London Square and proximate to the central business district of Oakland.","uscan":"https://baxtel.com/data-center/720-2nd-digital-realty","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","oy":2007,"deal":"Acquisition of five-property data center portfolio, including 720 2nd Street in Oakland, from Rockwood Capital/365 Main, Inc. for $725 Million, announced June 2, 2010.","dealScan":"https://www.prnewswire.com/news-releases/digital-realty-trust-enters-into-definitive-asset-purchase-agreement-for-a-five-property-datacenter-portfolio-95399649.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"inflect.com;baxtel.com;prnewswire.com","srcUrls":["https://inflect.com/building/720-2nd-street-oakland/digital-realty/datacenter/digital-realty-720-2nd-street","https://baxtel.com/data-center/720-2nd-digital-realty","https://www.prnewswire.com/news-releases/digital-realty-trust-enters-into-definitive-asset-purchase-agreement-for-a-five-property-datacenter-portfolio-95399649.html"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"3e4c8cbe78f6","cid":"3e4c8cbe78f6","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":45,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Digital Realty SFO10... features 45 MW of utility power capacity to handle significant growth for enterprise users. On site generators are also configured in an N+1 arrangement, and can deliver up to 10,000 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-san-francisco-data-center-sfr1/","uconf":"High","uquote":"Strategically located in a fiber-rich district and directly adjacent to PG&E substation, the facility is four blocks from Jack London Square and proximate to the central business district of Oakland.","uscan":"https://baxtel.com/data-centers/digital-realty-trust","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"Colocation (Enterprise users, Cloud providers, Carriers)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-san-francisco-data-center-sfr1/","https://baxtel.com/data-centers/digital-realty-trust"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"45506ced9f9b","cid":"45506ced9f9b","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Digital Realty has tapped the San Francisco Public Utility Commission's (SFPUC) clean electricity to power its 227,000 square-foot, 8.6MW facility.","uquote":"Digital Realty, a San Francisco-based global provider of colocation and interconnection solutions, transitioned from the area's electric utility, Pacific Gas and Electric Co. (PG&E), to SFPUC's greenhouse-gas-free electricity in December 2017.","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"Multiple (over 150 unique customers)","deal":"Acquisition of 365 Main portfolio for $725 Million in 2010; Acquisition of adjacent 360 Spear Street facility for $85 million in January 2012","dealScan":"https://baxtel.com/data-center/365-main-sfr2-digital-realty","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/365-main-sfr2-digital-realty"],"ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"1df8549399d4","cid":"1df8549399d4","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"This facility supports 14.4 MW of utility power capacity and is a key site for colocation in Silicon Valley. The local utility provides up to 168 total kilowatts of power (0.1 Megawatts) and the UPS systems have a capacity of 20 kilowatts and are arranged in a N+1 configuration. This set up allows for up to 80 watts of power to be delivered per square foot. On site generators are also configured in an N arrangement, and can deliver up to 150 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-santa-clara-data-center-scl1/","uconf":"High","uquote":"Santa Clara is the data center capital of Silicon Valley because the municipal utility, Silicon Valley Power, offers slightly lower rates than those available from PG&E in surrounding towns.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2006,"deal":"Acquisition of facility by Digital Realty in 2006","dealScan":"https://baxtel.com/data-center/digital-realty-silicon-valley-sjc10","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-santa-clara-data-center-scl1/","https://baxtel.com/data-center/digital-realty-silicon-valley-sjc10"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)"},{"id":"8e704e3cbd4a","cid":"8e704e3cbd4a","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The local utility provides up to 25,000 total kilowatts of power (25 Megawatts) and the UPS systems have a capacity of 5,700 kilowatts and are arranged in a 2N configuration. This set up allows for up to 425 watts of power to be delivered per square foot. On site generators are also configured in an N+1 arrangement, and can deliver up to 24,000 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-santa-clara-data-center-scl2/","uquote":"Silicon Valley Power (SVP) is a not-for-profit municipal electric utility owned and operated by the City of Santa Clara, California, United States.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty","oy":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-santa-clara-data-center-scl2/"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"dbc2d997242b","cid":"51b8c71c87e5","canon":0,"dups":4,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"This single-tenant data center is serviced by Silicon Valley Power","uconf":"High","uquote":"This single-tenant data center is serviced by Silicon Valley Power","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"ebbf1a9bb6c7","cid":"51b8c71c87e5","canon":0,"dups":4,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"This single-tenant data center is serviced by Silicon Valley Power","uconf":"High","uquote":"This single-tenant data center is serviced by Silicon Valley Power","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"2d25df262cfd","cid":"51b8c71c87e5","canon":0,"dups":4,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"This single-tenant data center is serviced by Silicon Valley Power and is located in the heart of Digital Realty's Silicon Valley data center campus and is LEED Platinum certified.","uconf":"High","uquote":"This single-tenant data center is serviced by Silicon Valley Power and is located in the heart of Digital Realty's Silicon Valley data center campus and is LEED Platinum certified.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","oy":2010,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"c42a6a479f4a","cid":"c42a6a479f4a","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Strategically located on major fiber routes and multiple power grids, Digital Realty's data center facility at 1100 Space Park Drive in Santa Clara, CA offers a seismically rated infrastructure for businesses throughout Silicon Valley.","uconf":"High","uquote":"Silicon Valley Power provides power to more than 50,000 customers, including Applied Materials, Intel, National Semiconductor, Digital Realty Trust and Yahoo.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","oy":2006,"deal":"Acquired facility in 2006 by Digital Realty. Digital Realty acquired Telx in 2015, which formerly operated the building.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected,merged_duplicate","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"c335562daa14","cid":"c335562daa14","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"This Platinum LEED-certified data center is located on a strategic spot, close to major fiber routes and near several power substations run by Silicon Valley Power. This setup provides the data center with dependable power and robust connectivity.","pscan":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc15","uconf":"High","uquote":"near several power substations run by Silicon Valley Power.","uscan":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc15","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2008,"oy":2009,"deal":"Acquisition of 50 percent interest in 1201 Comstock Street by Digital Realty on June 30, 2008.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"digitalrealty.com","srcUrls":["https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc15"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"d4df44b62069","cid":"d4df44b62069","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"This LEED Gold-certified data center is located near three sub-stations of Silicon Valley Power's power grids, ensuring power that won't quit. Utility power capacity9000 kW.","pscan":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc14","uconf":"High","uquote":"This LEED Gold-certified data center is located near three sub-stations of Silicon Valley Power's power grids, ensuring power that won't quit.","uscan":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc14","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"digitalrealty.com","srcUrls":["https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc14"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"bfca4cd19d5c","cid":"bfca4cd19d5c","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":60,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The local utility provides up to 25,000 total kilowatts of power (25 Megawatts) and the UPS systems have a capacity of 5,700 kilowatts and are arranged in a 2N configuration. This set up allows for up to 425 watts of power to be delivered per square foot. On site generators are also configured in an N+1 arrangement, and can deliver up to 24,000 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-santa-clara-data-center-scl2/","uconf":"High","uquote":"This single-tenant data center is serviced by Silicon Valley Power and is located in the heart of Digital Realty's Silicon Valley data center campus and is LEED Platinum certified.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"Microsoft","deal":"Digital Realty acquired the facility in 2004","dealScan":"https://baxtel.com/data-center/santa-clara-sc1-digital-realty","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-santa-clara-data-center-scl2/","https://baxtel.com/data-center/santa-clara-sc1-digital-realty"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected"},{"id":"303c2bb7a01d","cid":"303c2bb7a01d","canon":1,"dups":1,"ftype":"data_center","name":"eBay","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Co-located generation","pcp":"Bloom Energy","pdt":"500kW installation","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"bbbb4da3ecae","cid":"bbbb4da3ecae","canon":1,"dups":1,"ftype":"data_center","name":"EDCO USA LLC, ATT CENTER","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e39c4f8ff3c9","cid":"e39c4f8ff3c9","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Arcata","county":"Humboldt","state":"CA","lat":40.706655,"lng":-123.926176,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"According to the meeting request form Community Development Director David Loya shared with the Outpost, the project proposal included “renovation of a 10,000 [square foot] hardware store into a Cable Landing Station with office space,” with plans to “provide primary power with fuel cells, backed up with utility power in addition to diesel generators.”","pscan":"https://lostcoastoutpost.com/2020/aug/21/remember-fat-internet-pipe-was-going-rise-out-sea/","uconf":"Medium","uquote":"California's biggest utility company, Pacific Gas and Electric (PG&E), has revealed a new $73 billion spending program to upgrade its grid infrastructure to meet the surging demand from artificial intelligence and cloud computing.","uscan":"https://baxtel.com/news/data-centers/edgeconnex-arcata","rto":"CAISO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure, Sixth Street (minority stake)","ay":2020,"oy":2021,"contro":"Community concerns over noise and an 'oppressive fence' with spikes.","controScan":"https://lostcoastoutpost.com/2020/nov/25/arcata-datacenter-fiber-optic-line/","deal":"EQT Infrastructure acquired EdgeConneX for $2.5 billion to $3 billion (2020); EQT Infrastructure sold a minority stake in EdgeConneX to Sixth Street (2024).","dealScan":"https://www.crn.com/news/data-center/edge-data-center-pioneer-edgeconnex-acquired-by-eqt","tier":2,"tlbl":"Reputable journalism","srcCt":4,"srcDom":"lostcoastoutpost.com;baxtel.com;crn.com","srcUrls":["https://lostcoastoutpost.com/2020/aug/21/remember-fat-internet-pipe-was-going-rise-out-sea/","https://baxtel.com/news/data-centers/edgeconnex-arcata","https://www.crn.com/news/data-center/edge-data-center-pioneer-edgeconnex-acquired-by-eqt","https://lostcoastoutpost.com/2020/nov/25/arcata-datacenter-fiber-optic-line/"],"lflag":"source_quality_reclassified utility_alias_corrected","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"f501ad4c2cd2","cid":"f501ad4c2cd2","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: PDU; UPS; Generators.","uconf":"High","uquote":"Within 10 miles from downtown SDG.","uscan":"https://www.edgeconnex.com/locations/americas/san-diego-ca/","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","oy":2015,"deal":"EdgeConneX acquired by EQT Infrastructure for $2.6 billion in 2020","dealScan":"https://www.edgeconnex.com/news/press-releases/eqt-infrastructure-to-acquire-leading-global-data-center-provider-edgeconnex/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"edgeconnex.com","lflag":"operational_null_capacity","srcUrls":["https://www.edgeconnex.com/locations/americas/san-diego-ca/","https://www.edgeconnex.com/news/press-releases/eqt-infrastructure-to-acquire-leading-global-data-center-provider-edgeconnex/"]},{"id":"2f0dc8e8a076","cid":"2f0dc8e8a076","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Rancho Cordova","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"In addition, EdgeConneX installed a rooftop solar installation at this facility. The solar array developed with Madison Energy aims to reduce our carbon footprint and decrease operational energy costs, providing clean power directly to SAC01. Partnering with Madison Energy Infrastructure, we designed this project as a pilot to test the efficacy of on-site renewable generation. While many data centers rely on buying renewable energy credits (RECs) or on-site power purchase agreements (PPAs), producing power on the facility roof offers unique advantages. It reduces transmission losses, alleviates strain on the local grid during peak hours, and provides a visible testament to our green energy goals.","proc":"Co-located generation","pcp":"Madison Energy Infrastructure","uquote":"Sacramento Municipal Utility District (SMUD) in Rancho Cordova - Company & Customer Service Info. SMUD is the electric service provider for Sacramento County and offers some of the lowest electricity rates in California, alongside various rebates and incentives for energy efficiency.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure (majority), Sixth Street (minority)","oy":2017,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0ce4038d80ac","cid":"0ce4038d80ac","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The Santa Clara data center cluster has developed concurrently thanks to the local utility's keen interest in working with the sector and strong network availability.","uquote":"The City has owned and operated its own electric, water and sewer utilities for over a century. Lower utility rates and high standards of service have encouraged the relocation and growth of businesses in our community. Electric Silicon Valley Power, Water, Recycled Water.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure, Sixth Street","ay":2017,"deal":"EdgeConneX Silicon Valley Holdings II acquired 3 buildings in Santa Clara, including 1700 Richard Ave, for $83.3 million on August 19, 2020.","dealScan":"https://baxtel.com/news/edgeconnex-acquires-expansion-facilities-in-santa-clara","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://baxtel.com/news/edgeconnex-acquires-expansion-facilities-in-santa-clara"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)"},{"id":"202f55f3c639","cid":"202f55f3c639","canon":1,"dups":2,"ftype":"data_center","name":"EdgeConneX","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: PDU; UPS; Generators. Capable of 20+kW per cabinet; Capable of 600+ watts per sq ft; Ghost space not required for coolingpower dense installations; Real-time branch circuit monitoring.","pscan":"https://www.edgeconnex.com/locations/americas/san-diego-ca/","uconf":"High","uquote":"San Diego Gas & Electric is a regulated public utility that provides natural gas and electricity to San Diego County and southern Orange County in southwestern California.","uscan":"https://www.nationalcitychamber.org/list/member/san-diego-gas-electric-11725","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","oy":2015,"deal":"EQT Infrastructure acquired EdgeConneX in 2020 for USD 2.6bn. In September 2024, EQT Infrastructure sold a minority stake in EdgeConneX to funds managed by Sixth Street.","dealScan":"https://www.prnewswire.com/news-releases/eqt-welcomes-sixth-street-as-strategic-investor-in-edgeconnex-302256953.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"edgeconnex.com;nationalcitychamber.org;prnewswire.com","lflag":"operational_null_capacity","srcUrls":["https://www.edgeconnex.com/locations/americas/san-diego-ca/","https://www.nationalcitychamber.org/list/member/san-diego-gas-electric-11725","https://www.prnewswire.com/news-releases/eqt-welcomes-sixth-street-as-strategic-investor-in-edgeconnex-302256953.html"]},{"id":"1214fe92778a","cid":"202f55f3c639","canon":0,"dups":2,"ftype":"data_center","name":"EdgeConneX","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: PDU; UPS; Generators. Capable of 20+kW per cabinet; Capable of 600+ watts per sq ft; Ghost space not required for coolingpower dense installations; Real-time branch circuit monitoring.","pscan":"https://www.edgeconnex.com/locations/americas/san-diego-ca/","uconf":"High","uquote":"Our San Diego Data Center At a Glance. Facts and figures you need to know about our San Diego, CA data center. Size 9,477 sq ft facility. Within 10 miles from downtown SDG. 12 miles from San Diego International Airport. 2,386 sq ft of raised floor for tenant racks.","uscan":"https://www.edgeconnex.com/locations/americas/san-diego-ca/","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","oy":2015,"deal":"EdgeConneX acquired by EQT Infrastructure for $2.5bn to $3bn in Q4 2020.","dealScan":"https://pe-insights.com/investment-firm-eqt-agrees-to-purchase-edgeconnex-for-3-billion/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"edgeconnex.com;pe-insights.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.edgeconnex.com/locations/americas/san-diego-ca/","https://pe-insights.com/investment-firm-eqt-agrees-to-purchase-edgeconnex-for-3-billion/"]},{"id":"47bb87aeef5f","cid":"47bb87aeef5f","canon":1,"dups":1,"ftype":"data_center","name":"EDGECONNEX SACRAMENTO HOLDINGS, LLC","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The EdgeConneX Sacramento SAC01 data center earned ENERGY STAR® certification from the U.S. Environmental Protection Agency. This certification represents proven, verified superior energy performance over a 12-month period. In addition, EdgeConneX installed a rooftop solar installation at this facility. The solar array developed with Madison Energy aims to reduce our carbon footprint and decrease operational energy costs, providing clean power directly to SAC01. Power: Concurrently maintainable power in a minimum of an N+1 configuration to include: PDU. UPS. Generators.","uconf":"High","uquote":"Our Rancho Cordova data center leverages robust metro fiber infrastructure and utility feeds from Sacramento Municipal Utility District to provide highly reliable, edge colocation.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","oy":2017,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8c5a761fe6d9","cid":"8c5a761fe6d9","canon":1,"dups":1,"ftype":"data_center","name":"EdgeCore","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Utility power will be available at the site through Silicon Valley Power beginning in Q1 2024.","pscan":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-breaks-ground-on-first-of-two-silicon-valley-data-centers","uconf":"High","uquote":"Utility power will be available at the site through Silicon Valley Power beginning in Q1 2024.","uscan":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-breaks-ground-on-first-of-two-silicon-valley-data-centers","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"EdgeCore Digital Infrastructure","spon":"Partners Group","ay":2019,"oy":2025,"deal":"$440 million debt financing transaction completed March 2024","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"edgecore.com","srcUrls":["https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-breaks-ground-on-first-of-two-silicon-valley-data-centers"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected"},{"id":"1703a762c063","cid":"1703a762c063","canon":1,"dups":1,"ftype":"data_center","name":"Element Critical","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Redundant UPS in N+ 1 configuration and battery bank provides the emergency power to data center on the loss of utility power. Automatic transfer switches ensure the smooth transition of power to diesel generators in N+1 redundancy. Total Utility Power: 15MW (Expandable to 21+ MW).","pscan":"https://cloudandcolocation.com/datacenters/element-critical-sunnyvale-data-center/","uconf":"High","uquote":"Electrical Power for the Data Center is Provided by PG&E via Two 12.47KV Feeders w/ Area 'A' fed by Three ±2,500 KVA Transformers","uscan":"https://baxtel.com/data-center/element-critical-sv1","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Element Critical","spon":"26North Partners, Arctos Partners, Mercuria Energy Trading, Safanad","oy":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/element-critical-sunnyvale-data-center/","https://baxtel.com/data-center/element-critical-sv1"]},{"id":"2bf88ae8f7c2","cid":"2bf88ae8f7c2","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center has four utility feeds, and nine power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 12 kV of utility voltage. The immediate power failure is protected by blocked redundant UPS system in N+1 configuration. The standby power is provided by 9 x 2,000 kW diesel generators in N+1 configuration. Incoming Electrical Service Type. Dual Circuits.","pscan":"https://cloudandcolocation.com/datacenters/equinix-santa-clara-south-data-center-sv2/","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","deal":"Lease agreement between Equinix LLC and Digital 1350 Duane, LLC for SV2 on March 27, 2014, for approximately $180 million over the initial term.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-santa-clara-south-data-center-sv2/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"fbb6e92d958c","cid":"eb3d5eefb7ba","canon":0,"dups":3,"ftype":"data_center","name":"Equinix","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has four utility feeds, and nine power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 12 kV of utility voltage. The immediate power failure is protected by blocked redundant UPS system in N+1 configuration. The standby power is provided by 9 x 2,000 kW diesel generators in N+1 configuration.","uconf":"High","uquote":"Silicon Valley Power (SVP) is a not-for-profit municipal electric utility owned and operated by the City of Santa Clara, California, United States.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","oy":2003,"deal":"On March 27, 2014, Equinix LLC and Digital 1350 Duane, LLC entered into a lease agreement for approximately 160,000 square feet of data center space in SV2, with an initial fixed term of 15 years and two options to renew at 9.5 years each, extending the term to 2048.","dealScan":"https://investor.equinix.com/sec-filings/current-reports/content/0001193125-14-121891/0001193125-14-121891.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"investor.equinix.com","srcUrls":["https://investor.equinix.com/sec-filings/current-reports/content/0001193125-14-121891/0001193125-14-121891.pdf"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"eb3d5eefb7ba","cid":"eb3d5eefb7ba","canon":0,"dups":3,"ftype":"data_center","name":"Equinix","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has four utility feeds, and nine power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 12 kV of utility voltage. The immediate power failure is protected by blocked redundant UPS system in N+1 configuration. The standby power is provided by 9 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-santa-clara-south-data-center-sv2/","uconf":"High","uquote":"Utility Provider: Power: Silicon Valley Power critical grid.","uscan":"https://baxtel.com/data-center/equinix-santa-clara-sv17","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","oy":1997,"deal":"Equinix invested $41 million to expand its existing data center in Santa Clara, Calif. by approximately 1,100 new cabinets, with expansion space expected to open in Q2 2008.","dealScan":"https://www.datacenterknowledge.com/deals/busy-year-for-santa-clara-data-center-deals","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cloudandcolocation.com;baxtel.com;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-santa-clara-south-data-center-sv2/","https://baxtel.com/data-center/equinix-santa-clara-sv17","https://www.datacenterknowledge.com/deals/busy-year-for-santa-clara-data-center-deals"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"b4ce2fe8acf5","cid":"b4ce2fe8acf5","canon":1,"dups":2,"ftype":"data_center","name":"Equinix","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Equinix Los Angele data center has a N+1 power infrastructure, and offers 99.999% SLA on power.... The standby power is provided by 2 x 1,250 kW diesel generators in N+1 configuration. The data center has a single utility feed, and two power transformers. Incoming Electrical Service Type: Single Feed.","pscan":"https://marketplace.upstack.com/data-centers/equinix-data-center-los-angeles-la2","uconf":"High","uquote":"Grid Operator: Los Angeles Department of Water and Power.","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","ay":1925,"oy":2000,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"marketplace.upstack.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified legacy_facility_year_review","srcUrls":["https://marketplace.upstack.com/data-centers/equinix-data-center-los-angeles-la2"]},{"id":"22bd3ef75b58","cid":"22bd3ef75b58","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Palo Alto","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and two power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 15.5 kV of utility voltage.... powered by 100% wind renewable energy certificates and 100% carbon neutral through the local utility.","uquote":"Approve and authorize the City Manager or designee to execute the license of a Private Cage agreement, included here as Attachment A, with Equinix, LLC (“Equinix”) for a Term Not-to-Exceed Three Years and a Total Not-to-Exceed Amount of $536,528 for the City of Palo Alto Fiber Optic Utility to lease a fiber optic private cage with kVa power access and termination services at the Palo Alto Internet Exchange (“PAIX”).","ukey":"57483|CA","uname":"Liberty Utilities","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","ay":1996,"oy":2010,"contro":"Legal dispute with landlord over lease terms in 2010.","deal":"Acquisition of Switch and Data by Equinix for US$683.4 million in May 2010.","dealScan":"https://www.itnews.com.au/news/equinix-completes-740m-data-centre-buyout-173736","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"itnews.com.au","srcUrls":["https://www.itnews.com.au/news/equinix-completes-740m-data-centre-buyout-173736"],"lflag":"citation_artifact_removed"},{"id":"091f502712e2","cid":"091f502712e2","canon":0,"dups":2,"ftype":"data_center","name":"Equinix","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and seven power transformer. The data center provides AC power, and DC power to customer's equipment. The facility has 21 kV of utility voltage. The immediate power failure is protected by 100% redundant UPS system in 2N configuration in phase I, and distributed redundant UPS system in N+1 configuration in phase II. The standby power is provided by 3 x 750 kW diesel generators in N+1 configuration","pscan":"https://cloudandcolocation.com/datacenters/equinix-san-jose-south-data-center-sv1/","uconf":"High","uquote":"Utility Provider: PG&E.","uscan":"https://baxtel.com/data-center/equinix-san-jose-campus","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","ay":1998,"oy":2000,"deal":"Acquisition of former IBM Black Centre building in 1998.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-san-jose-south-data-center-sv1/","https://baxtel.com/data-center/equinix-san-jose-campus"],"lflag":"merged_duplicate"},{"id":"bbcab181ae3a","cid":"bbcab181ae3a","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"El Segundo","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has dual utility feeds, and ten power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 16,340V of utility voltage. Immediate power failure is protected by block redundant UPS' in N+1 configuration. Standby power is provided by 11 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-el-segundo-data-center-1-la3/","uquote":"Equinix received a $1 million rebate from Southern California Edison (SCE) for upgrades to the LA3 facility that boosted energy efficiency.","uscan":"https://baxtel.com/data-center/equinix-el-segundo-la3","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tenant":"Colocation","deal":"Equinix received a $1 million rebate from Southern California Edison (SCE) for upgrades to the LA3 facility that boosted energy efficiency.","dealScan":"https://baxtel.com/data-center/equinix-el-segundo-la3","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-el-segundo-data-center-1-la3/","https://baxtel.com/data-center/equinix-el-segundo-la3"],"lflag":"merged_duplicate"},{"id":"b4999d68bee8","cid":"b4999d68bee8","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":21,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The utility power is supplied to the site at 21kV and standby power is supplied from seven (7) 3 MW diesel engine generators.","pscan":"https://redwoodeg.com/projects/equinix-sv-5-data-center-(phase-1,-2-and-3).html","uconf":"High","uquote":"The Equinix San Jose data centers power is fed from a single Pacific Gas & Electric utility feed.","uscan":"https://cloudandcolocation.com/datacenters/equinix-san-jose-data-centerp-sv5/","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","oy":2010,"deal":"Construction contract for $34 Million","dealScan":"https://redwoodeg.com/projects/equinix-sv-5-data-center-(phase-1,-2-and-3).html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"redwoodeg.com;cloudandcolocation.com","srcUrls":["https://redwoodeg.com/projects/equinix-sv-5-data-center-(phase-1,-2-and-3).html","https://cloudandcolocation.com/datacenters/equinix-san-jose-data-centerp-sv5/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"f736fdbc9876","cid":"091f502712e2","canon":0,"dups":2,"ftype":"data_center","name":"Equinix","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"It is a single-story steel frame on concrete slab with 100% wind renewable energy certificates just 14 miles from San Jose International Airport (SJC) and 46 miles from San Francisco International Airport (SFO).","uquote":"Included in the project's plan is a new PG&E substation (Saint Teresa) that will supplement the Edenvale Service Center Substation at 6402 Sain Teresa Boulevard.","uscan":"https://baxtel.com/data-center/equinix-san-jose-campus","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tenant":"Microsoft, Google, Amazon AWS","ay":1999,"oy":2000,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/equinix-san-jose-campus"]},{"id":"c07f3b9cc531","cid":"c07f3b9cc531","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":28,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"PG&E officially powered a data center in South San Jose — the first of a dozen large‑load customers being tracked under the agreement. SV12 now has access to 40 megawatts of power.","pscan":"https://www.pge.com/en/newsroom/currents/future-of-energy/pg-e-delivers-first-san-jose-data-center-as-part-of-historic-agr.html","uquote":"Together with the city and Equinix, PG&E officially powered a data center in South San Jose","uscan":"https://www.pge.com/en/newsroom/currents/future-of-energy/pg-e-delivers-first-san-jose-data-center-as-part-of-historic-agr.html","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix, PGIM Real Estate","oy":2026,"deal":"Joint venture with PGIM Real Estate; Implementation Agreement with City of San Jose and PG&E (Jan 2026)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"pge.com","srcUrls":["https://www.pge.com/en/newsroom/currents/future-of-energy/pg-e-delivers-first-san-jose-data-center-as-part-of-historic-agr.html"]},{"id":"f63277a84709","cid":"f63277a84709","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility Providers: Pacific Gas and Electric (PG&E)","uquote":"Utility Providers: Pacific Gas and Electric (PG&E)","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","oy":2000,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected,merged_duplicate","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"503e69b767f3","cid":"eb3d5eefb7ba","canon":0,"dups":3,"ftype":"data_center","name":"Equinix","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has four utility feeds, and nine power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 12 kV of utility voltage. The immediate power failure is protected by blocked redundant UPS system in N+1 configuration. The standby power is provided by 9 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-santa-clara-south-data-center-sv2/","uconf":"High","uquote":"The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.","uscan":"https://baxtel.com/data-center/equinix-santa-clara-sv2","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","ay":1997,"oy":2003,"deal":"Lease agreement between Equinix LLC and Digital 1350 Duane, LLC for 160,000 sq ft of data center space, with an initial fixed term of 15 years and total rent obligation of approximately $180 million, dated March 27, 2014.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-santa-clara-south-data-center-sv2/","https://baxtel.com/data-center/equinix-santa-clara-sv2"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected"},{"id":"7ba5310be835","cid":"7ba5310be835","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center has four utility feeds, and nine power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 12 kV of utility voltage. The immediate power failure is protected by blocked redundant UPS system in N+1 configuration. The standby power is provided by 9 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-santa-clara-south-data-center-sv2/","uconf":"High","uquote":"Low and stable electric rates from Silicon Valley Power. Reliable, redundant electric systems. Access to fiber infrastructure. Proximity to Silicon Valley's largest businesses and tech companies. Streamlined permitting processes and development support from the City.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-santa-clara-south-data-center-sv2/"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"a692ed1c10b2","cid":"a692ed1c10b2","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and five power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 12 kV of utility voltage. The immediate power failure is protected by blocked redundant UPS system in N+1 configuration. The standby power is provided by 5 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-sunnyvale-data-center-sv4/","uquote":"Gas & Electric. (800) 743-5000 www.pge.com","uscan":"https://siliconvalleyandbeyond.com/sunnyvale-utilities/","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","ay":2006,"oy":2006,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;siliconvalleyandbeyond.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-sunnyvale-data-center-sv4/","https://siliconvalleyandbeyond.com/sunnyvale-utilities/"],"lflag":"source_quality_reclassified"},{"id":"e086d3996be8","cid":"b4ce2fe8acf5","canon":0,"dups":2,"ftype":"data_center","name":"Equinix","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center has a single utility feed, and two power transformers.","pscan":"https://cloudandcolocation.com/datacenters/equinix-los-angeles-data-center-2-la2/","uconf":"High","uquote":"Grid Operator. Los Angeles Department of Water and Power.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-c2888e9c","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-los-angeles-data-center-2-la2/","https://www.interconnection.fyi/data-center/project/equinix-c2888e9c"]},{"id":"f7dc3f1a5e8a","cid":"f7dc3f1a5e8a","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"El Segundo","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center has dual utility feeds, and ten power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 16,340V of utility voltage. Immediate power failure is protected by block redundant UPS' in N+1 configuration. Standby power is provided by 11 x 2,000 kW diesel generators in N+1 configuration.... The data center has a single utility feed, and six x 6 MVA power transformers. The data center can provide AC or DC power to customer's equipment. The facility has 16 kV of utility voltage. Immediate power failure is protected by block redundant 9.0 MW UPS power in N+1 configuration. The standby power is provided by 7 x 2,500 kW diesel generators in N+1 configuration.... Equinix received a $1 million rebate from Southern California Edison (SCE) for upgrades to.... offers 100% wind renewable energy certificates.... offers 100% renewable energy through solar power purchase agreements.","pscan":"https://cloudandcolocation.com/datacenters/equinix-el-segundo-data-center-1-la3/","uquote":"Grid Operator: Southern California Edison.... Equinix received a $1 million rebate from Southern California Edison (SCE) for upgrades to.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-c71874bf","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tenant":"Amazon Web Services (AWS), Google Cloud Platform","ay":2005,"oy":2009,"contro":"Property tax reassessment dispute; MySpace power outage.","deal":"LA3 acquisition for $34.5 million in 2005; LA4 first phase construction for $95 million in 2009; $1 million energy efficiency rebate from Southern California Edison.","dealScan":"https://www.datacenterknowledge.com/deals/equinix-buys-la-data-center-plans-more-deals","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-el-segundo-data-center-1-la3/","https://www.interconnection.fyi/data-center/project/equinix-c71874bf","https://www.datacenterknowledge.com/deals/equinix-buys-la-data-center-plans-more-deals"],"lflag":"citation_artifact_removed source_quality_reclassified,merged_duplicate"},{"id":"56c07240c51d","cid":"56c07240c51d","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Torrance","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"N+1 Power redundancy.... Two systems, each having 3 x 2,000 kW diesel generators.","uconf":"High","uquote":"Southern California Edison | 505 Maple Ave., Torrance, CA, 90503 |... One of the nation's largest and inovative electrical utility.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tenant":"Managed hosting services, social media platforms, online retail services, 345+ companies, 75+ network providers, Amazon Web Services (AWS) Direct Connect","oy":2000,"deal":"Acquisition from Verizon in May 2017","dealScan":"https://baxtel.com/data-center/equinix-los-angeles-la7","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/equinix-los-angeles-la7"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"0715e3d347ae","cid":"0715e3d347ae","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX","city":"EL SEGUNDO","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":20,"pc":"Grid","pconf":"High","pquote":"It has access to 5.0 MW of power.... and offers 100% wind renewable energy certificates.","uconf":"High","uquote":"Electric Utility Provider: Southern California Edison.","uscan":"https://baxtel.com/data-center/equinix-el-segundo-la3","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tenant":"Amazon Web Services (AWS), Google Cloud Platform","oy":2006,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/equinix-el-segundo-la3"],"band":"10-25 MW","lflag":"citation_artifact_removed"},{"id":"047b5ac2a132","cid":"047b5ac2a132","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX LA","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"LA2 is an 8-story Telco Hotel reinforced concrete with a brick-stone veneered facade that uses 100% wind renewable energy certificates. LA1 is a 7-story multi-tenant steel and concrete building that uses 100% wind renewable energy certificates. Equinix Los Angeles enables AI at the edge through high-density power, rich cloud and media ecosystems, and direct access to subsea cables supporting real-time, globally connected AI workloads.... 100% Renewable Energy Coverage.","uquote":"Grid Operator: Los Angeles Department of Water and Power.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-c2888e9c","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tenant":"Amazon Web Services (AWS), Google Cloud Platform, Microsoft Azure","ay":2009,"oy":2009,"deal":"Acquisition of LA7 (and 28 other data centers) from Verizon for $3.6 billion in May 2017.","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;investor.equinix.com","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-c2888e9c","https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from"],"band":"< 10 MW","lflag":"citation_artifact_removed"},{"id":"7f8d1eb6f665","cid":"7f8d1eb6f665","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX LLC","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","proc":"Co-located generation","pcp":"Southern Company subsidiary","pdt":"15-year PPA, part of a larger project for more than 37 megawatts of power","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c0b302c4ece3","cid":"c0b302c4ece3","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX OPERATING CO INC","city":"EL SEGUNDO","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"The data center has dual utility feeds, and ten power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 16,340V of utility voltage. Immediate power failure is protected by block redundant UPS' in N+1 configuration. Standby power is provided by 11 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-el-segundo-data-center-1-la3/","uquote":"Electric Utility Provider: Southern California Edison.","uscan":"https://baxtel.com/data-center/equinix-el-segundo-la3","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-el-segundo-data-center-1-la3/","https://baxtel.com/data-center/equinix-el-segundo-la3"],"band":"< 10 MW"},{"id":"c83e6cf416d3","cid":"c83e6cf416d3","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX OPERATING CO., INC.","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"The data center has three utility feeds, and three power transformers. The data center can provide AC power, and DC power to customer's equipment. The facility has three phase, 480V of utility voltage. Immediate power failure is protected by distributed redundant UPS' in a N+1 configuration. Standby power is provided by 3 x 1,500 kW & 2 x 1,500 kW diesel generators for the 6th and 7th floor in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-los-angeles-data-center-1-la1/","uquote":"The Los Angeles Department of Water and Power (LADWP) is the largest municipal utility in the United States with 8,100 megawatts of electric generating capacity (2021–2022) and delivering an average of 435 million gallons of water per day (487,000 acre-ft per year) to more than four million residents and local businesses in the City of Los Angeles and several adjacent cities and communities in southwestern Los Angeles County, California.","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Equinix Operating","spon":"Digital Realty Trust","tenant":"Amazon Web Services, Google Cloud Platform, Microsoft Azure","ay":1999,"oy":1999,"deal":"Lease assignment and assumption on January 1, 2006; $31 million expansion/upgrade project (date not specified)","dealScan":"https://www.atce.com/all-projects/equinix-los-angeles-ibx","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;atce.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-los-angeles-data-center-1-la1/","https://www.atce.com/all-projects/equinix-los-angeles-ibx"],"band":"< 10 MW","lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"11208|CA","rawUname":"Los Angeles Department of Water & Power","reportedUtility":"Los Angeles Department of Water & Power"},{"id":"6b4aed0d0afe","cid":"6b4aed0d0afe","canon":0,"dups":1,"ftype":"data_center","name":"EQUINIX, LLC","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Equinix, Inc. (Nasdaq: EQIX), the global interconnection and data center company, today announced that it has signed a power purchase agreement (PPA) for 105 megawatts (MWAC) of new solar power with SunEdison, Inc. (NYSE: SUNE), the largest global renewable energy development company. This purchase will cover all of Equinix's California data centers, including 11 facilities located in the Los Angeles and Silicon Valley metro areas, as well as its Redwood City, California global headquarters.","pscan":"https://www.prnewswire.com/news-releases/equinix-to-make-california-data-centers-100-renewable-300147687.html","uconf":"High","uquote":"Grid Operator. Los Angeles Department of Water and Power.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-c2888e9c","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tenant":"Amazon Web Services (AWS), Google Cloud Platform, Microsoft Azure","deal":"Power Purchase Agreement (PPA) for 105 MWAC of new solar power with SunEdison, Inc. on September 23, 2015.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"prnewswire.com;interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://www.prnewswire.com/news-releases/equinix-to-make-california-data-centers-100-renewable-300147687.html","https://www.interconnection.fyi/data-center/project/equinix-c2888e9c"]},{"id":"970d82305138","cid":"970d82305138","canon":1,"dups":1,"ftype":"data_center","name":"Equinix, Verizon","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Pacific Gas and Electric Company (PG&E)","rto":"CAISO","nerc":"WECC","op":"Equinix","spon":"Equinix","tenant":"Verizon","ay":2016,"deal":"Equinix acquired a portfolio of 24 data center sites from Verizon for $3.6 billion, announced December 2016 and closed May 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text utility_alias_corrected","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"f510e1064848","cid":"f510e1064848","canon":1,"dups":2,"ftype":"data_center","name":"Evocative Data Centers","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Located on the Silicon Valley Power and PG&E electrical grids, this power-rich data center in Santa Clara offers room to grow with a superior modular design for enhanced flexibility and reliability. They provide outstanding performance with 100 percent uptime, connect seamlessly to San Francisco via a fiber ring, and leverage Santa Clara's low electricity rates to ensure you'll receive superior connectivity at the lowest price. GENERATORS: 3 X 2 MW. Cummings generators.","pscan":"https://evocative.com/data-centers/santa-clara-ca-data-center-sjc11/","uconf":"High","uquote":"Electric Utility Provider: Silicon Valley Power (SVP) (Owned by Santa Clara) Located on the Silicon Valley Power and PG&E electrical grids, this power-rich data center in Santa Clara offers room to grow with a superior modular design for enhanced flexibility and reliability.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Evocative Data Centers","spon":"Crestline Investors","oy":2022,"contro":"Community and regulatory concerns in Santa Clara regarding data center land use, electricity, water consumption, and diesel generator emissions.","deal":"Acquisition of INAP data centers by Evocative, funded by Crestline Investors, Inc. (September 28, 2022).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"evocative.com","srcUrls":["https://evocative.com/data-centers/santa-clara-ca-data-center-sjc11/"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"ec2ef03c9f29","cid":"ec2ef03c9f29","canon":1,"dups":1,"ftype":"data_center","name":"Evocative Data Centers","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Two utility substations and 24x7x365 staffing ensure availability.","uquote":"PG&E will continue to be responsible for delivery for SJCE customers.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Evocative Data Centers","spon":"VPLS","oy":2011,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fb1e3dfa25bf","cid":"fb1e3dfa25bf","canon":1,"dups":1,"ftype":"data_center","name":"Evocative Data Centers","city":"Emeryville","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Strategically located in a fiber-rich district and directly adjacent to PG&E substation, the facility is four blocks from Jack London Square and proximate to the central business district of Oakland. Power: 3 x 270 kW UPS back-up power for AC customers (N+1); DC power A and B options available; Onsite 1,000 kW diesel generator.","pscan":"https://baxtel.com/data-center/evocative-emeryville-oakland-oak1","uconf":"High","uquote":"Strategically located in a fiber-rich district and directly adjacent to PG&E substation, the facility is four blocks from Jack London Square and proximate to the central business district of Oakland. Customers in Emeryville can choose Ava's Bright Choice service or return to PG&E service at any time.","uscan":"https://baxtel.com/data-center/evocative-emeryville-oakland-oak1","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Evocative","ay":2017,"deal":"Acquisition of two facilities from 365 Data Centers in 2017.","dealScan":"https://www.datacenterknowledge.com/operations-and-management/evocative-appoints-new-ceo-acquires-bay-area-data-centers","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;datacenterknowledge.com","lflag":"online_before_announced","srcUrls":["https://baxtel.com/data-center/evocative-emeryville-oakland-oak1","https://www.datacenterknowledge.com/operations-and-management/evocative-appoints-new-ceo-acquires-bay-area-data-centers"]},{"id":"e29abc38fa6e","cid":"e29abc38fa6e","canon":1,"dups":1,"ftype":"data_center","name":"Evocative Data Centers","city":"El Segundo","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Our LAX10 facility boasts N+1 Redundant Hi Tech Rotary UPS Units, high density cooling capacity, and Zone 4 seismically-ratedconstruction. Backup generators, 24x7x365 security, and dark fiber and wave services for connectivity offer unparalleledperformance.","pscan":"https://marketplace.upstack.com/data-centers/evocative-data-center-lax10","uquote":"Electric Utility Provider: Southern California Edison.","uscan":"https://baxtel.com/data-center/evocative-los-angeles-lax2","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Evocative Data Centers","spon":"Crestline Investors","deal":"Debt financing from a large global investment firm and continued equity support from Crestline Investors (December 16, 2025).","dealScan":"https://evocative.com/news/evocative-raises-financing-to-fuel-continued-growth/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"marketplace.upstack.com;baxtel.com;evocative.com","srcUrls":["https://marketplace.upstack.com/data-centers/evocative-data-center-lax10","https://baxtel.com/data-center/evocative-los-angeles-lax2","https://evocative.com/news/evocative-raises-financing-to-fuel-continued-growth/"],"lflag":"source_quality_reclassified"},{"id":"978ddad17c04","cid":"f510e1064848","canon":0,"dups":2,"ftype":"data_center","name":"Evocative Data Centers","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Located on the Silicon Valley Power and PG&E electrical grids, this power-rich data center in Santa Clara offers room to grow with a superior modular design for enhanced flexibility and reliability.","pscan":"https://marketplace.upstack.com/data-centers/evocative-data-center-sjc11","uquote":"Located on the Silicon Valley Power and PG&E electrical grids, this power-rich data center in Santa Clara offers room to grow with a superior modular design for enhanced flexibility and reliability.","uscan":"https://marketplace.upstack.com/data-centers/evocative-data-center-sjc11","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Evocative Data Centers","spon":"Crestline Investors","ay":1988,"deal":"Evocative acquired INAP data center portfolio in September 2022, funded by an incremental equity investment from Crestline Investors.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"marketplace.upstack.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified legacy_facility_year_review","srcUrls":["https://marketplace.upstack.com/data-centers/evocative-data-center-sjc11"],"rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Silicon Valley Power (City of Santa Clara)"},{"id":"95a28f87021a","cid":"95a28f87021a","canon":1,"dups":1,"ftype":"data_center","name":"Evocative Data Centers","city":"Redondo Beach","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"redundant utility power feeds into the facility from separate utility transformers that are built to meet your power and cooling. needs if one system goes down the redundant systems kick in keeping your infrastructure. running all power to client systems is UPS conditioned allowing for continued uptime during a utility or service interruption while the building generator systems kick in our facility generators are N+1 redundant allowing for continued uptime.","pscan":"https://www.youtube.com/watch?v=LgjYmKqLGww","uconf":"High","uquote":"Electric Utility Provider: Southern California Edison.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Evocative","spon":"Crestline Investors","oy":2012,"deal":"Evocative acquired 9 INAP data centers, including LAX14, in September 2022.","dealScan":"https://evocative.com/news/evocative-signs-definitive-agreement-to-acquire-9-inap-data-centers/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;evocative.com","srcUrls":["https://www.youtube.com/watch?v=LgjYmKqLGww","https://evocative.com/news/evocative-signs-definitive-agreement-to-acquire-9-inap-data-centers/"],"lflag":"source_quality_reclassified"},{"id":"236a62037e61","cid":"236a62037e61","canon":1,"dups":1,"ftype":"data_center","name":"Franklin Templeton","city":"Stockton","county":"San Joaquin","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uconf":"High","uquote":"Pacific Gas and Electric Company (PG&E) is the primary electric utility serving Stockton, California.","uscan":"https://www.pge.com/en/contact-us.html","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Franklin Templeton","spon":"Franklin Templeton","tenant":"Franklin Templeton","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"pge.com","srcUrls":["https://www.pge.com/en/contact-us.html"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"be86b64b49f7","cid":"be86b64b49f7","canon":1,"dups":1,"ftype":"data_center","name":"Fujitsu","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"26f58cfe73df","cid":"26f58cfe73df","canon":1,"dups":1,"ftype":"data_center","name":"Gap Inc.","city":"Rocklin","county":"Placer","state":"CA","lat":39.062032,"lng":-120.722718,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"WELL-MAINTAINED BUILDING WITH RECENT UPGRADES. » New roof and solar energy panels reducing operating expenses.","pscan":"https://yafcteam.com/properties/gap-data-center-for-sale-rocklin-california/","uquote":"Pacific Gas & Electric (PG&E) is the investor owned utility (IOU) that services Rocklin. They own the power lines and means of electricity transmission in the city.","uscan":"https://www.rocklin.ca.us/post/electricity-options","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Gap","tenant":"Gap","oy":1999,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"yafcteam.com;rocklin.ca.us","srcUrls":["https://yafcteam.com/properties/gap-data-center-for-sale-rocklin-california/","https://www.rocklin.ca.us/post/electricity-options"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"9a44b7e7a0c2","cid":"9a44b7e7a0c2","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"San Bruno","county":"San Mateo","state":"CA","lat":37.414672,"lng":-122.371546,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"a43c6f7de982","cid":"a43c6f7de982","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"25cc86db3def","cid":"25cc86db3def","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uquote":"The county seat of Santa Clara is touting its partnership with Pacific Gas & Electric, claiming the city is “the West Coast's premier destination for data center development.”","uscan":"https://calmatters.org/environment/2025/12/data-center-energy-san-jose/","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"calmatters.org","srcUrls":["https://calmatters.org/environment/2025/12/data-center-energy-san-jose/"],"lflag":"source_quality_reclassified"},{"id":"fb559fd22a9a","cid":"fb559fd22a9a","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"South San Francisco","county":"San Mateo","state":"CA","lat":37.414672,"lng":-122.371546,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"f373cdc6b6ce","cid":"f373cdc6b6ce","canon":1,"dups":1,"ftype":"data_center","name":"GOOGLE INC","city":"VENICE","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"ac8c9d532d62","cid":"ac8c9d532d62","canon":1,"dups":1,"ftype":"data_center","name":"Guideware Software","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"3d81786a5759","cid":"3d81786a5759","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers","city":"San Luis Obispo","county":"San Luis Obispo","state":"CA","lat":35.388189,"lng":-120.448897,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power. 2N UPS Power; Redundant utility feeds; 48-hour diesel runtime.","pscan":"https://h5datacenters.com/san-luis-obispo-data-center.html","uconf":"Medium","uquote":"Electricity in SLO is provided by Pacific Gas & Electric Company.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"H5 Data Centers","spon":"Novacap","tenant":"International carrier","oy":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"h5datacenters.com","srcUrls":["https://h5datacenters.com/san-luis-obispo-data-center.html"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"1407164207f7","cid":"1407164207f7","canon":1,"dups":1,"ftype":"data_center","name":"Hosting.com","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has 4 MW of utility power that is provided by three utility feeds. The system is protected by UPS systems in N+1 configuration on the loss of utility power, including 3 x 160 kVA PowerWare 9315 UPS units, 1 x 160 kVA PowerWare 9390 UPS unit, and 2 x 500 kVA PowerWare 9315 UPS units. The emergency power is provided by 2 x 1.5 MW Cummins diesel generators and 1 x 1 MW Cummins diesel generator with 36 hours of fuel supply.","pscan":"https://cloudandcolocation.com/datacenters/hosting-com-san-francisco-data-center/","uquote":"Pacific Gas and Electric Company (PG&E) is the main San Francisco electric utility provider.","uscan":"https://bekinsmovingservices.com/blog/san-francisco-ca-utilities/","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Data Canopy","spon":"Metropolitan Partners Group","deal":"Hosting.com was acquired by Ntirety on August 31, 2009. Data Canopy acquired Ntirety's colocation business in June 2023, facilitated by a $50 million investment from Metropolitan Partners Group.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;bekinsmovingservices.com","srcUrls":["https://cloudandcolocation.com/datacenters/hosting-com-san-francisco-data-center/","https://bekinsmovingservices.com/blog/san-francisco-ca-utilities/"],"rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","lflag":"utility_alias_corrected"},{"id":"b85591959a32","cid":"b85591959a32","canon":1,"dups":1,"ftype":"data_center","name":"HOSTING.COM, DATA CENTERS LLC","city":"IRVINE","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"The data center has 2.8 MW of building utility power that is provided by dual utility feeds. The system is protected by 3×300 kVA Liebert 300 series UPS modules and 3×450 kVA Liebert 300 series UPS modules in N+1 configuration on the loss of utility power. The emergency power is provided by 3 x 700 kW diesel generators in N+1 configuration with 36+ hours of fuel capacity.","pscan":"https://cloudandcolocation.com/datacenters/hosting-com-irvine-data-center/","uconf":"High","uquote":"Southern California Edison (SCE) is the electrical utility provider for the City of Irvine, offering convenient, 24-hour customer service.","uscan":"https://www.cityofirvine.gov/live/utilities","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Data Canopy","spon":"Metropolitan Partners Group","ay":2023,"deal":"Intelishift acquired Data Canopy, which had acquired Ntirety's colocation business, with a $50 million growth capital investment from Metropolitan Partners Group in June 2023.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cloudandcolocation.com;cityofirvine.gov","lflag":"online_before_announced","srcUrls":["https://cloudandcolocation.com/datacenters/hosting-com-irvine-data-center/","https://www.cityofirvine.gov/live/utilities"],"band":"< 10 MW"},{"id":"937599c88ecc","cid":"937599c88ecc","canon":1,"dups":1,"ftype":"data_center","name":"INFOCROSSING WEST","city":"BREA","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","deal":"Infocrossing acquired by Wipro Ltd. for $600 million (August 2007)","dealScan":"https://www.datacenterknowledge.com/deals/infocrossing-bought-by-wipro-for-600m","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.datacenterknowledge.com/deals/infocrossing-bought-by-wipro-for-600m"]},{"id":"33d1944eecd4","cid":"33d1944eecd4","canon":1,"dups":1,"ftype":"data_center","name":"INTEL CORPORATION","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"2127904fa7cc","cid":"2127904fa7cc","canon":1,"dups":1,"ftype":"data_center","name":"Intuit","city":"Mountain View","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Just Energy (through Commerce Energy)","pdt":"8-year term, 2 MW load","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5e03d1c881af","cid":"5e03d1c881af","canon":1,"dups":1,"ftype":"data_center","name":"IRON MOUNTAIN","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"60700d5cf6d7","cid":"60700d5cf6d7","canon":1,"dups":1,"ftype":"data_center","name":"IRON MOUNTAIN","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e311c212d01e","cid":"e311c212d01e","canon":1,"dups":1,"ftype":"data_center","name":"IRON MOUNTAIN","city":"COMPTON","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"3346f3bac999","cid":"3346f3bac999","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain Off Site Data Protection","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","op":"Iron Mountain","spon":"Iron Mountain Incorporated","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"0ceefeeb3545","cid":"0ceefeeb3545","canon":1,"dups":1,"ftype":"data_center","name":"Irvine Company","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"18d5dd1262de","cid":"18d5dd1262de","canon":1,"dups":1,"ftype":"data_center","name":"Irvine Company","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"396bd725b5d6","cid":"396bd725b5d6","canon":1,"dups":1,"ftype":"data_center","name":"Jamestown Concord Tech Building","city":"Concord","county":"Contra Costa","state":"CA","lat":37.919479,"lng":-121.951543,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Pacific Gas and Electric Company (PG&E)","rto":"CAISO","nerc":"WECC","spon":"Jamestown","deal":"Jamestown acquired the property as part of a $103.1 million portfolio deal in September 2018.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded utility_alias_corrected","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"a8d396ecd4ad","cid":"a8d396ecd4ad","canon":1,"dups":1,"ftype":"data_center","name":"JPPF 360 E Second LP","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Los Angeles Department of Water and Power (LADWP)","rto":"CAISO","nerc":"WECC","spon":"Jamestown, L.P.","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","reportedUtility":"Los Angeles Department of Water & Power","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f81e88d741af","cid":"f81e88d741af","canon":1,"dups":1,"ftype":"data_center","name":"Kaiser Permanente","city":"Napa","county":"Napa","state":"CA","lat":38.5071,"lng":-122.325904,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Pacific Gas and Electric Company (PG&E)","rto":"CAISO","nerc":"WECC","op":"Kaiser Permanente","spon":"Kaiser Permanente","tenant":"Kaiser Permanente","ay":2011,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced utility_alias_corrected unlinked_source_text","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"acdb482e41b4","cid":"acdb482e41b4","canon":1,"dups":1,"ftype":"data_center","name":"Kaiser Permanente","city":"Pleasanton","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"Medium","pquote":"Kaiser Permanente's 160,000 square-foot premier data center has been recognized for making many improvements to its energy efficiency since 2008, including: • Earned ENERGY STAR Data Center Certification in 2010 – making Kaiser Permanente the first health care provider to earn that recognition. • Won the first place award in Facilities Innovation2 at the Uptime Institute's 2011 Green Enterprise IT. Symposium for its development and implementation of computer room functional efficiency (CRFE) metric. • Received Platinum Certification for Existing Building Operations & Maintenance from the US Green. Building Council's Leadership in Energy and Environmental Design (LEED) program – the first (and currently only) data center in the world to earn this prestigious award. Healthcare provider Kaiser Permanente owns and operates data centers that host corporate service applications for over 200,000 employees.","pscan":"https://www.energystar.gov/sites/default/files/2025-08/Kaiser_Permanente_case_study.pdf","uquote":"Electricity. PG&E. 800.743.5000.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Kaiser Permanente","spon":"Kaiser Permanente","tenant":"Kaiser Permanente","ay":2006,"oy":2010,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"energystar.gov","srcUrls":["https://www.energystar.gov/sites/default/files/2025-08/Kaiser_Permanente_case_study.pdf"]},{"id":"7ad65e855476","cid":"7ad65e855476","canon":1,"dups":1,"ftype":"data_center","name":"Kaiser Permanente","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The 1- and 2- story buildings house the facility's Central Utility Plant (CUP), mechanical and electrical equipment such as chillers, air handling units, batteries, and emergency generators, which will support the functions of the existing data center.","pscan":"https://forell.com/projects/kaiser-permanente-data-center","rto":"CAISO","nerc":"WECC","op":"Kaiser Permanente","spon":"Kaiser Permanente","tenant":"Kaiser Permanente","ay":2006,"oy":2008,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"forell.com","srcUrls":["https://forell.com/projects/kaiser-permanente-data-center"]},{"id":"ed250531eac2","cid":"ed250531eac2","canon":1,"dups":1,"ftype":"data_center","name":"Kaiser Permanente","city":"Walnut Creek","county":"Contra Costa","state":"CA","lat":37.919479,"lng":-121.951543,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uquote":"Water & Power · Pacific Gas and Electric Company · Contra Costa Water District · East Bay Municipal Utility District · Walnut Creek City Hall · Connect with us · How can we help?","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","srcUrls":null,"srcDom":null},{"id":"4023377a6ab9","cid":"4023377a6ab9","canon":1,"dups":1,"ftype":"data_center","name":"Lanset America Corporation","city":"Sacramento","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Sacramento Municipal Utility District.","uquote":"Grid Operator: Sacramento Municipal Utility District.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"Lanset America","spon":"Lanset America","ay":2000,"oy":2005,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7c4d19f8089a","cid":"7c4d19f8089a","canon":1,"dups":1,"ftype":"data_center","name":"Lason a Lason Company","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"49816b76cbd6","cid":"49816b76cbd6","canon":0,"dups":1,"ftype":"data_center","name":"LightEdge","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Our electrical power is backed up by uninterruptible power supplies and generators to protect the critical electrical load if there is a utility outage","uquote":"9.1 Megawatts from SDG&E.","uscan":"https://www.lightedge.com/wp-content/uploads/2023/02/Lightwave-Data-Center-San-Diego.pdf","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"LightEdge","spon":"GI Partners","deal":"GI Partners acquired a controlling interest in LightEdge on September 14, 2021.","dealScan":"https://www.prnewswire.com/news-releases/lightedge-announces-acquisition-by-gi-partners-301376162.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"lightedge.com;prnewswire.com","srcUrls":["https://www.lightedge.com/wp-content/uploads/2023/02/Lightwave-Data-Center-San-Diego.pdf","https://www.prnewswire.com/news-releases/lightedge-announces-acquisition-by-gi-partners-301376162.html"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"8bd46518fb92","cid":"8bd46518fb92","canon":1,"dups":1,"ftype":"data_center","name":"LightEdge","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"9.1 Megawatts from SDG&E.","uconf":"High","uquote":"9.1 Megawatts from SDG&E.","rto":"CAISO","nerc":"WECC","op":"LightEdge","spon":"The Anschutz","deal":"Acquisition of NFINIT by LightEdge in 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7bf86ba4011c","cid":"7bf86ba4011c","canon":1,"dups":1,"ftype":"data_center","name":"LinkedIn","city":"Carpinteria","county":"Santa Barbara","state":"CA","lat":34.536677,"lng":-120.038364,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Southern California Edison.","pscan":"https://www.interconnection.fyi/data-center/project/linkedin-37a0758d","uconf":"High","uquote":"Grid Operator: Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/linkedin-37a0758d","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"LinkedIn","spon":"Microsoft","tenant":"LinkedIn","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/linkedin-37a0758d"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"9efa3cb67878","cid":"9efa3cb67878","canon":1,"dups":1,"ftype":"data_center","name":"Long Beach Data Center","city":"Long Beach","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Long Beach data center provides a reliable power infrastructure. The entire critical infrastructure is protected by fully conditioned UPS system on the loss of utility power. The standby diesel generator with failover switch automatically started on sensing the utility power loss and provides the emergency power till the utility restores.","pscan":"https://cloudandcolocation.com/datacenters/rocket-internetworking-long-beach-data-center/","uconf":"High","uquote":"The California Public Utilities Commission (CPUC) enforcement division ordered Southern California Edison (SCE) to conduct an “extraordinary” investigation of its electrical grid under the City of Long Beach after several recent power outages caused by fires and explosions in underground vaults.... Edison, however, argues the cost should be passed on as a surcharge, paid only by its 150,000 customers in Long Beach.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Rocket InterNetWorking","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/rocket-internetworking-long-beach-data-center/"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"3fb1ad02c316","cid":"3fb1ad02c316","canon":1,"dups":1,"ftype":"data_center","name":"Los Angeles County Internal Services Department","city":"Malibu","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Southern California Edison (SCE) and Clean Power Alliance (CPA)","rto":"CAISO","nerc":"WECC","op":"Los Angeles County Internal Services Department","spon":"Los Angeles County","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"17609|CA","uname":"Southern California Edison Co","reportedUtility":"Southern California Edison Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2f959899f2df","cid":"2f959899f2df","canon":1,"dups":1,"ftype":"data_center","name":"Los Angeles County Internal Services Department","city":"Rolling Hills","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Manages the County's Utilities (water/power/gas) billing for an annual budget of over $197 million.... If you experience a power outage at a Los Angeles County department facility, first contact your building or facilities administrator (or your manager/supervisor) to determine whether the issue is related to a utility provider or isolated to the building. If the outage appears to be a utility issue (typically affecting multiple buildings or a larger area): City of Los Angeles (LADWP service territory): Visit the Los Angeles Department of Water and Power (LADWP) Outage Information page at LADWP.com/outages or call 1-800-342-5397. Southern California Edison (SCE service territory – unincorporated LA County and surrounding areas): Visit the SCE Power Outages page at SCE.com or call 1-800-611-1911.","uconf":"High","uquote":"Southern California Edison - Power Outages: https://www.sce.com/outage-center/check-outage-status, (800) 611-1911, www.sce.com.","uscan":"https://www.rolling-hills.org/residents/utility_companies_and_trash_service/index.php","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Los Angeles County Internal Services Department","spon":"Los Angeles County Internal Services Department","tenant":"Los Angeles County Internal Services Department","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rolling-hills.org","srcUrls":["https://www.rolling-hills.org/residents/utility_companies_and_trash_service/index.php"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"3109ffd054c5","cid":"fcd54c77403c","canon":0,"dups":2,"ftype":"data_center","name":"Lumen Technologies","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power: DC power systems with generator and battery backup.","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fcd54c77403c","cid":"fcd54c77403c","canon":1,"dups":2,"ftype":"data_center","name":"Lumen Technologies","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power. AC and DC Power. Generator, UPS, and battery backup. The datacenter located at 8929 Aero Drive in San Diego is operated by Lumen. It features 2N UPS power redundancy, ensuring high availability and reliability.","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"18a54d01a826","cid":"18a54d01a826","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Mad River","county":"Humboldt","state":"CA","lat":40.706655,"lng":-123.926176,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"89519372c9e7","cid":"89519372c9e7","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Wildwood","county":"Shasta","state":"CA","lat":40.760514,"lng":-122.043556,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c4fc821fa595","cid":"c4fc821fa595","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Emeryville","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"Medium","pquote":"The facility provides a total power capacity of 4 MW, ensuring ample energy supply for operational needs. It features N+1 power redundancy, which means there's a backup power source in case the primary source fails, ensuring continuous operation.","pscan":"https://inflect.com/building/1075-triangle-court-west-sacramento/lumen/datacenter/level-3-west-sacramento","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","srcUrls":["https://inflect.com/building/1075-triangle-court-west-sacramento/lumen/datacenter/level-3-west-sacramento"],"lflag":"source_quality_reclassified"},{"id":"b094d4516509","cid":"b094d4516509","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Lompoc","county":"Santa Barbara","state":"CA","lat":34.536677,"lng":-120.038364,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"01c6d69cccb7","cid":"01c6d69cccb7","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Oakland","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has very reliable N+1 electrical design and distribution offering 99.999 % SLA on power. Redundant UPS in N+ 1 configuration and battery bank provides the emergency power to data center on the loss of utility power. Automatic transfer switches ensure the smooth transition of power to diesel generators in N+1 redundancy.","pscan":"https://cloudandcolocation.com/datacenters/level-3-communications-emeryville-data-center/","uconf":"Medium","uquote":"Strategically located in a fiber-rich district and directly adjacent to PG&E substation, the facility is four blocks from Jack London Square and proximate to the central business district of Oakland.","uscan":"https://baxtel.com/data-center/lumen-san-francisco-1","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/level-3-communications-emeryville-data-center/","https://baxtel.com/data-center/lumen-san-francisco-1"]},{"id":"4bd25166ff31","cid":"4bd25166ff31","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Pittsburg","county":"Contra Costa","state":"CA","lat":37.919479,"lng":-121.951543,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"0c276220d612","cid":"0c276220d612","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"West Sacramento","county":"Yolo","state":"CA","lat":38.679609,"lng":-121.90275,"cprec":"distinct","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The facility provides a total power capacity of 4 MW, ensuring ample energy supply for operational needs. It features N+1 power redundancy, which means there's a backup power source in case the primary source fails, ensuring continuous operation.","uconf":"High","uquote":"West Sacramento is in PG&E service territory.... SMUD does not service Yolo county. PG&E provides electricity and gas to West Sac.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":4,"tlbl":"Blog/social","srcCt":1,"uscan":"https://www.reddit.com/r/Sacramento/comments/b3tgap/quick_question_for_those_of_you_in_west_sac_is/","srcUrls":["https://www.reddit.com/r/Sacramento/comments/b3tgap/quick_question_for_those_of_you_in_west_sac_is/"],"srcDom":"reddit.com","lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Sacramento Municipal Util Dist"},{"id":"dd3db6421d3d","cid":"dd3db6421d3d","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Sacramento","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Power. DC Power. Generator and battery backup.","uconf":"High","uquote":"The center is also the first of several approved facilities on the 38-acre (16,500 sq ft) campus in McClellan Park.... the partnership with the Sacramento Municipal Utilities District (SMUD) offers prospective tenants one of the most stable, robust and green power options on the West coast.... The largest electricity provider in Sacramento County, California by megawatt hours sold is Sacramento Municipal Utility District.... Sacramento, California: Sacramento Municipal Utility District: 100.00%.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"c26f743ea216","cid":"89f01502dd88","canon":0,"dups":2,"ftype":"data_center","name":"Lumen Technologies","city":"San Luis Obispo","county":"San Luis Obispo","state":"CA","lat":35.388189,"lng":-120.448897,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"89f01502dd88","cid":"89f01502dd88","canon":1,"dups":2,"ftype":"data_center","name":"Lumen Technologies","city":"San Luis Obispo","county":"San Luis Obispo","state":"CA","lat":35.388189,"lng":-120.448897,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"a3787af6ec2b","cid":"a3787af6ec2b","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"AC and DC Power. Generator, UPS, and battery backup.... It has access to 8.0 MW of power.","uquote":"The City of Santa Clara, dba Silicon Valley Power (SVP)... Silicon Valley Power (SVP) is a not-for-profit municipal electric utility owned and operated by the City of Santa Clara, California, United States.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"ffaec98dbee1","cid":"ffaec98dbee1","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Bakersfield","county":"Kern","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Bakersfield data center provides a redundant and reliable power infrastructure. The entire critical infrastructure is protected by a redundant UPS system in the event of an immediate power failure. The redundant standby diesel generators provide the data center emergency power in the event of a prolonged power outage with fuel storage onsite. Grid Operator: Pacific Gas and Electric Company.","pscan":"https://cloudandcolocation.com/datacenters/tw-telecom-bakersfield-data-center/","uconf":"High","uquote":"Grid Operator: Pacific Gas and Electric Company.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","ay":1987,"oy":1987,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/tw-telecom-bakersfield-data-center/"],"rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","lflag":"utility_alias_corrected legacy_facility_year_review"},{"id":"81c81331c3aa","cid":"81c81331c3aa","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Redundant UPS in N+ 1 configuration and battery bank provides the emergency power to data center on the loss of utility power. Automatic transfer switches ensure the smooth transition of power to diesel generators in N+1 redundancy.","pscan":"https://cloudandcolocation.com/datacenters/level-3-communications-sunnyvale-data-center-1/","uconf":"High","uquote":"The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.","uscan":"https://baxtel.com/data-center/lumen-sunnyvale-1","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tenant":"Colocation","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/level-3-communications-sunnyvale-data-center-1/","https://baxtel.com/data-center/lumen-sunnyvale-1"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected"},{"id":"fc2287f86f1a","cid":"fc2287f86f1a","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Tustin","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6452b6b4ccbd","cid":"6452b6b4ccbd","canon":1,"dups":1,"ftype":"data_center","name":"MCallen Data Center LLC","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Power redundancy: UPS Battery Backup: 20 minutes; Power Plant Backup: 2 hours; Emergency Generator: 500 kW; Energy redundancy: N+1; 72-hour on-site fuel autonomy; Cooling infrastructure: N+1 HVAC cooling redundancy; Temperature operation: 27°C (80.6°F) and 18°C (64.4°F); Direct Fresh Air upflow economizers; Building details: 1-story concrete construction; Built in 2023; 7,920 sq. ft. building footprint with 3,000 sq. ft. white space; Seismic zone compliant (San Diego region); No raised floor. SDG1 provides the reliability and interconnection density required for high-traffic network operators and cross-border digital infrastructure.","uquote":"San Diego Gas & Electric is a regulated public utility that provides natural gas and electricity to San Diego County and southern Orange County in southwestern California.","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"MDC Data Centers","spon":"MDC Data Centers","oy":2023,"deal":"Partnership with Vívaro Telecom for the San Diego data center, announced January 17, 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ac92593dcb47","cid":"ac92593dcb47","canon":1,"dups":1,"ftype":"data_center","name":"McKesson","city":"Rancho Cordova","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"McKesson","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"96536886708e","cid":"96536886708e","canon":1,"dups":1,"ftype":"data_center","name":"MCKESSON DATA CENTER","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","op":"McKesson","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c5b65177588a","cid":"c5b65177588a","canon":1,"dups":1,"ftype":"data_center","name":"MDC Data Centers","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electrical capacity: 500 kW installed, upgradable to 1 MW.... Redundant power systems including UPS battery backup, emergency generators, and multi-hour fuel autonomy designed for uninterrupted uptime.","rto":"CAISO","nerc":"WECC","op":"MDC Data Centers","spon":"MDC Data Centers","tenant":"Vívaro Telecom, Uniti Wholesale","ay":2022,"oy":2023,"deal":"Foundational partnership with Vívaro Telecom announced January 17, 2023. Uniti Wholesale expanded its presence with a new data center presence announced October 20, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"54c7c90ac066","cid":"54c7c90ac066","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Burlingame","county":"San Mateo","state":"CA","lat":37.414672,"lng":-122.371546,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uquote":"The City of Burlingame has opted to purchase 100% renewable energy for all City municipal electricity accounts as part of Peninsula Clean Energy's ECO100 rate... Residents also have the option to receive service from PG&E.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"uscan":"https://www.burlingame.org/our_city/departments/public_works/utilities.php","srcUrls":["https://www.burlingame.org/our_city/departments/public_works/utilities.php"],"srcDom":"burlingame.org","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"8e661a2f59cb","cid":"8e661a2f59cb","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Fremont","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Pacific Gas and Electric Company.","pscan":"https://www.interconnection.fyi/data-center/project/meta-7bd91065","uconf":"High","uquote":"Grid Operator. Pacific Gas and Electric Company.","uscan":"https://www.interconnection.fyi/data-center/project/meta-7bd91065","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/meta-7bd91065"],"rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"bee1fea59c8f","cid":"bee1fea59c8f","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"46b9fdd120ed","cid":"46b9fdd120ed","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Newark","county":"Mendocino","state":"CA","lat":39.432388,"lng":-123.442881,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"2d80e14df5b0","cid":"2d80e14df5b0","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"3805feefdb2a","cid":"3805feefdb2a","canon":1,"dups":1,"ftype":"data_center","name":"META HOUSING CORP/BURBANK SR. ARTIST COL","city":"BURBANK","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"60ffa3a0b4a0","cid":"60ffa3a0b4a0","canon":1,"dups":1,"ftype":"data_center","name":"Micron Technology","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Micron Technology","spon":"Micron Technology","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"59dfc8bd1c6b","cid":"59dfc8bd1c6b","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":35,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The retrofit included a Tier II IDF network upgrade, reuse of existing generators, MV transformers, and select feeders. [...] BKF also engineered new cooling towers and utility connections to meet the facility's expanded capacity.","pscan":"https://www.bkf.com/projects/microsoft-data-center-by1-2-retrofit/","uquote":"Officials said city-owned power utility Silicon Valley Power has lower electricity rates compared to PG&E, a plus for data centers that need reliable energy, and the reason so many companies have planted their data centers in the city.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bkf.com","srcUrls":["https://www.bkf.com/projects/microsoft-data-center-by1-2-retrofit/"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"83bffd3a3489","cid":"83bffd3a3489","canon":0,"dups":1,"ftype":"data_center","name":"Nautilus Data Technologies","city":"Stockton","county":"San Joaquin","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"69kV bulk substation feeds the Nautilus on-premise substation via a dedicated 12kV 10MVA feed. 480V utility power feeds from on-site substation via diverse paths to the facility.","uconf":"High","uquote":"What's really great is it has a separate PG&E grid, so they're basically isolated from any outages.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Nautilus Data Technologies","spon":"Pangaea Ventures","tenant":"Backblaze","ay":2018,"oy":2020,"deal":"$100 million multi-draw, senior secured debt facility with Orion Energy Partners, L.P. (May 2020)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"05a17eb77d28","cid":"05a17eb77d28","canon":1,"dups":1,"ftype":"data_center","name":"NEW CINGULAR WIRELESS PCS, LLC DBA ATT","city":"TULARE","county":"TULARE","state":"CA","lat":36.228834,"lng":-118.781055,"cprec":"distinct","status":"Operational","rto":"CAISO","nerc":"WECC","op":"NEW CINGULAR WIRELESS PCS, DBA ATT","spon":"AT&T","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"ea81ee5c3419","cid":"ea81ee5c3419","canon":0,"dups":1,"ftype":"data_center","name":"NTT","city":"Sacramento","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"CA1, one of three data centers on our 52.7MW campus, is powered by 100% green energy.... power for the Sacramento. campus is provided by the Sacramento Municipal Utilities District or SMUD. who's the local utility provider. here each of our buildings have a dedicated substation fed by a primary. and alternate feed to ensure redundancy.","pscan":"https://www.youtube.com/watch?v=ad7PzzMhCbM","uquote":"power for the Sacramento. campus is provided by the Sacramento Municipal Utilities District or SMUD. who's the local utility provider.","uscan":"https://www.youtube.com/watch?v=ad7PzzMhCbM","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT Group","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=ad7PzzMhCbM"],"lflag":"citation_artifact_removed source_quality_reclassified,merged_duplicate"},{"id":"b8432a36f2c3","cid":"b8432a36f2c3","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Sacramento","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":52,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The Sacramento CA1 Data Center is part of a 52.7MW campus powered entirely by 100% green energy.","uquote":"We've partnered with SMUD to offer options for 100% green energy.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"NTT Global Data Centers Americas","spon":"NTT","deal":"NTT DATA secured nearly 115 MW of new data center capacity commitments across three US campuses, including Sacramento, in March 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"70465ce9664e","cid":"70465ce9664e","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":16,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"For power, the local utility provides the data center with over 2.25 megawatts of total power and the data center has also earned a LEED Gold certification for implementing the latest power efficiency standards. 16MW of critical IT load, N+1 distributed redundancy for each vault, diverse power distribution to data hall and renewable energy options available.","uconf":"High","uquote":"For power, the local utility provides the data center with over 2.25 megawatts of total power The City of Santa Clara dba Silicon Valley Power (SVP) appreciates the opportunity to comment on the CAISO Draft 2021-2022 Transmission Plan (Draft Plan, hereafter).","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT Group","ay":2019,"oy":2021,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"734f76c489a0","cid":"734f76c489a0","canon":1,"dups":1,"ftype":"data_center","name":"NTT GLOBAL DATA CENTERS AMERICAS, INC.","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":52,"pc":"Grid","pconf":"High","pquote":"Sacramento CA1 Data Center is part of a 52.7MW campus powered entirely by 100% green energy.... power for the Sacramento. campus is provided by the Sacramento Municipal Utilities District or SMUD. who's the local utility provider.... On-Site Generation. Standby generators for emergency power.","uconf":"High","uquote":"power for the Sacramento. campus is provided by the Sacramento Municipal Utilities District or SMUD. who's the local utility provider.... we've partnered with SMUD to offer options for 100% green energy.... Grid Operator: Sacramento Municipal Util Dist.","uscan":"https://www.youtube.com/watch?v=ad7PzzMhCbM","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"NTT Global Data Centers Americas","spon":"NTT","ay":2020,"deal":"NTT Communications acquired RagingWire Data Centers, Inc. in January 2014.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.youtube.com/watch?v=ad7PzzMhCbM"],"band":"50-100 MW"},{"id":"ee5100f76f92","cid":"ee5100f76f92","canon":1,"dups":1,"ftype":"data_center","name":"One Data Center America","city":"Ontario","county":"San Bernardino","state":"CA","lat":34.856661,"lng":-116.181571,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Southern California Edison power feeds; Additional future 2nd feed available from the utility.... Dedicated UPS System; Concurrently maintainable.... Backup generator; Fuel storage onsite; Equates to 48+ hours of generator run time at full load; Concurrently maintainable.","uconf":"High","uquote":"Southern California Edison power feeds","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"One Data Center America","spon":"One Data Center America","oy":2019,"deal":"$3.5 million investment in upgrades (October 2019)","dealScan":"https://inlandempire.us/new-data-center-now-open-in-the-inland-empire/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inlandempire.us","srcUrls":["https://inlandempire.us/new-data-center-now-open-in-the-inland-empire/"],"lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"fd7dc9ac5e6f","cid":"fd7dc9ac5e6f","canon":1,"dups":1,"ftype":"data_center","name":"ORACLE CORP","city":"EL SEGUNDO","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"10d63e69f258","cid":"10d63e69f258","canon":1,"dups":1,"ftype":"data_center","name":"ORANGE CO - DATA CENTER","city":"SANTA ANA","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","op":"Orange County Information Technology (OCIT)","spon":"County of Orange","tenant":"County of Orange","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"9fe4a0b3e07a","cid":"9fe4a0b3e07a","canon":1,"dups":1,"ftype":"data_center","name":"Pacific Bell","city":"San Ramon","county":"Contra Costa","state":"CA","lat":37.919479,"lng":-121.951543,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Co-located generation","pcp":"Bloom Energy","pdt":"7.5 MW across 11 AT&T facilities in California","uquote":"Gas and Electricity, Pacific Gas & Electric (PG&E), (800) 743-5000.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"AT&T","spon":"Sunset Development and MetLife","tenant":"AT&T","ay":1983,"oy":1986,"contro":"The project included height variances and dimensional variances from the county parking ordinance.","controScan":"https://ceqanet.lci.ca.gov/1983010410","deal":"In 2013, AT&T sold 2600 Bishop Ranch and leased back space. In 2014, Sunset Development Co. and MetLife Inc. purchased the property.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"ceqanet.lci.ca.gov","srcUrls":["https://ceqanet.lci.ca.gov/1983010410"],"lflag":"shared_coordinate_precision_downgraded legacy_facility_year_review"},{"id":"77b8488e5389","cid":"77b8488e5389","canon":1,"dups":1,"ftype":"data_center","name":"PC Solutions","city":"Clovis","county":"Fresno","state":"CA","lat":36.761006,"lng":-119.655019,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"ef8051b92982","cid":"c43d8f0e0b2f","canon":0,"dups":2,"ftype":"data_center","name":"Prime Data Centers","city":"McClellan Park","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"power delivered from one of the most reliable and sustainable utility providers in the nation, the Sacramento Municipal Utilities District (SMUD).","uquote":"power delivered from one of the most reliable and sustainable utility providers in the nation, the Sacramento Municipal Utilities District (SMUD).","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"Prime Data Centers","spon":"Prime Data Centers","tenant":"a publicly traded global enterprise","ay":2020,"oy":2020,"deal":"8MW build-to-suit lease announced April 20, 2021","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"pscan":"https://primedatacenters.com/prime-data-centers-announces-8mw-lease-in-sacramento-with-public-tech-company/","uscan":"https://primedatacenters.com/prime-data-centers-announces-8mw-lease-in-sacramento-with-public-tech-company/","dealScan":"https://primedatacenters.com/prime-data-centers-announces-8mw-lease-in-sacramento-with-public-tech-company/","srcUrls":["https://primedatacenters.com/prime-data-centers-announces-8mw-lease-in-sacramento-with-public-tech-company/"],"srcDom":"primedatacenters.com","lflag":"source_quality_reclassified"},{"id":"c43d8f0e0b2f","cid":"c43d8f0e0b2f","canon":1,"dups":2,"ftype":"data_center","name":"Prime Data Centers","city":"McClellan Park","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"In addition, the partnership with the Sacramento Municipal Utilities District (SMUD) offers prospective tenants one of the most stable, robust and green power options on the West coast.","uquote":"In addition, the partnership with the Sacramento Municipal Utilities District (SMUD) offers prospective tenants one of the most stable, robust and green power options on the West coast.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"Prime Data Centers","spon":"Macquarie Capital","ay":2020,"oy":2019,"contro":"Special Development Permit to deviate from front yard setback standards (31 feet proposed vs 56 feet minimum) and project will have a significant environmental impact, requiring mitigated measures.","controScan":"https://ceqanet.lci.ca.gov/1996122010/10","deal":"Strategic partnership and equity investment with Macquarie Capital, targeting capital investments in excess of $5 billion over 10 years (June 24, 2021).","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"ceqanet.lci.ca.gov","lflag":"online_before_announced","srcUrls":["https://ceqanet.lci.ca.gov/1996122010/10"]},{"id":"a2f5d306910f","cid":"a2f5d306910f","canon":1,"dups":1,"ftype":"data_center","name":"PRIME DATA CENTERS DBA SVO BUILDING ONE LLC","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"High","pquote":"On-Site Generation. Standby generators for emergency power. In addition, the partnership with the Sacramento Municipal Utilities District (SMUD) offers prospective tenants one of the most stable, robust and green power options on the West coast.","pscan":"https://www.interconnection.fyi/data-center/project/prime-data-centers-dba-svo-building-one-llc-d84a59b0","uquote":"Grid Operator: Sacramento Municipal Utility District. In addition, the partnership with the Sacramento Municipal Utilities District (SMUD) offers prospective tenants one of the most stable, robust and green power options on the West coast.","uscan":"https://www.interconnection.fyi/data-center/project/prime-data-centers-dba-svo-building-one-llc-d84a59b0","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"PRIME DATA CENTERS DBA SVO BUILDING ONE","ay":2020,"oy":2020,"contro":"Lawsuit by equipment manufacturer Vertiv against SVO Building One, LLC regarding a data center project.","controScan":"https://natlawreview.com/article/data-center-dispute-reinforces-broad-duty-defend-standard","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;natlawreview.com","srcUrls":["https://www.interconnection.fyi/data-center/project/prime-data-centers-dba-svo-building-one-llc-d84a59b0","https://natlawreview.com/article/data-center-dispute-reinforces-broad-duty-defend-standard"],"band":"< 10 MW"},{"id":"23086a8c5715","cid":"23086a8c5715","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Sacramento","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"A total power capacity of 9.0 MW is provided by a dedicated, on-site, 69 kV Sacramento Municipal Utility District (SMUD) substation that is fed by redundant substations located a quarter-mile away at the regional Natomas-Area SMUD complex.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-sacramento-data-center/","uconf":"High","uquote":"A total power capacity of 9.0 MW is provided by a dedicated, on-site, 69 kV Sacramento Municipal Utility District (SMUD) substation that is fed by redundant substations located a quarter-mile away at the regional Natomas-Area SMUD complex.","uscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-sacramento-data-center/","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"QTS (Quality Technology Services)","spon":"Blackstone","ay":2013,"oy":2013,"deal":"QTS acquired Herakles data center on January 3, 2013. Blackstone acquired QTS Realty Trust on August 31, 2021.","dealScan":"https://baxtel.com/data-center/qts-sacramento","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-sacramento-data-center/","https://baxtel.com/data-center/qts-sacramento"]},{"id":"02a535668ce9","cid":"02a535668ce9","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power delivered via dual entrances from redundant Silicon Valley Power substations. UPS in an N+1 configuration. 10,200 gallons of on-site diesel fuel with multiple refueling contracts.","pscan":"https://baxtel.com/data-center/qts-santa-clara-i","uconf":"High","uquote":"Power delivered via dual entrances from redundant Silicon Valley Power substations.","uscan":"https://baxtel.com/data-center/qts-santa-clara-i","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"QTS","spon":"Blackstone","deal":"Blackstone acquired QTS for $10 billion (mid-2021)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/qts-santa-clara-i"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected"},{"id":"89ad4dbc8daf","cid":"89ad4dbc8daf","canon":1,"dups":1,"ftype":"data_center","name":"QTS SACRAMENTO, LLC","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"Total power capacity of 9.0MW is provided by a dedicated, on-site, 69kV Sacramento Municipal Utility District (SMUD) substation.","uquote":"Total power capacity of 9.0MW is provided by a dedicated, on-site, 69kV Sacramento Municipal Utility District (SMUD) substation.","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"QTS Data Centers","spon":"Blackstone","ay":2012,"oy":2013,"deal":"QTS acquired Herakles Data Center in 2012/2013.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8960bebb4495","cid":"8960bebb4495","canon":1,"dups":1,"ftype":"data_center","name":"Quest","city":"Roseville","county":"Placer","state":"CA","lat":39.062032,"lng":-120.722718,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Quest's Roseville HABC offers one of the most advanced fiber optic cable and redundant broadband and power infrastructures in California, as well as robust As-A-Service offerings for Infrastructure, Disaster Recovery, and more.","uconf":"High","uquote":"In Roseville, California, extreme summer heat, growing community demand, and ongoing infrastructure modernization are among the operational priorities Roseville Electric Utility plans for each year.... RSEC is advantageously located in Placer County, just north of Roseville, and is directly connected to Roseville's distribution system.","uscan":"https://www.nwppa.org/bulletin/repowering-reliability-roseville-electric-plans-for-the-next-era-of-peak-demand/","ukey":"18260|CA","uname":"Surprise Valley Electrification","rto":"CAISO","nerc":"WECC","op":"Quest Technology Management","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nwppa.org","srcUrls":["https://www.nwppa.org/bulletin/repowering-reliability-roseville-electric-plans-for-the-next-era-of-peak-demand/"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"268fc2eb57c1","cid":"268fc2eb57c1","canon":1,"dups":1,"ftype":"data_center","name":"Quinby Wilshire LLC","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Los Angeles Department of Water and Power","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"eb6a9a5245bc","cid":"eb6a9a5245bc","canon":1,"dups":1,"ftype":"data_center","name":"Rackspace","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"Medium","pquote":"Officials said city-owned power utility Silicon Valley Power has lower electricity rates compared to PG&E, a plus for data centers that need reliable energy, and the reason so many companies have planted their data centers in the city. Facility fed by multiple power grids; 5 Hitech DRUPS each rated at 1.5 MW and set up in an N+2 configuration with 1.5 MW generator that backs up a 1100KW static UPS; The complete electrical system is set up in a N+N configuration using static switches that feed multiple PDU's which bring a true A&B feed to each customer rack; Pre-negotiated one-hour advanced notice contact for any pending rotating block outages.","uquote":"Officials said city-owned power utility Silicon Valley Power has lower electricity rates compared to PG&E, a plus for data centers that need reliable energy, and the reason so many companies have planted their data centers in the city.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Rackspace","spon":"Apollo Global Management","ay":2020,"oy":2021,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"d99275c15262","cid":"d99275c15262","canon":1,"dups":1,"ftype":"data_center","name":"Regulus Cyber","city":"Napa","county":"Napa","state":"CA","lat":38.5071,"lng":-122.325904,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"5bc6b3369585","cid":"5bc6b3369585","canon":1,"dups":1,"ftype":"data_center","name":"RiCloud","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Hong Kong-based RiCloud has completed a $100M conversion of a vacant San Jose office building into a colocation data center. What was previously an 80K SF SF office building constructed in the mid-1980s will now house up to 1,500 server racks with 10 megawatts of capacity, Data Center Dynamics reports.","pscan":"https://www.bisnow.com/national/news/data-center/100m-project-converts-san-jose-offices-to-data-center-115677","uconf":"High","uquote":"San Jose indicated that the new agreement with Pacific Gas and Electric (PG&E) is the first of its kind between the utility and a municipality in its service area, and positions San Jose as “the most power-ready city in California and the West Coast's premier destination for data center development” by guaranteeing speed and certainty of power delivery for data center customers.","uscan":"https://www.rcrwireless.com/20250729/ai-infrastructure/san-jose-data-center","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"RiCloud","spon":"Yuxing InfoTech Investment Holdings","ay":2017,"oy":2021,"deal":"$100M conversion of office building to data center, completed 2021","dealScan":"https://www.bisnow.com/national/news/data-center/100m-project-converts-san-jose-offices-to-data-center-115677","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"bisnow.com;rcrwireless.com","srcUrls":["https://www.bisnow.com/national/news/data-center/100m-project-converts-san-jose-offices-to-data-center-115677","https://www.rcrwireless.com/20250729/ai-infrastructure/san-jose-data-center"],"rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co.","lflag":"utility_alias_corrected"},{"id":"2067340dea82","cid":"2067340dea82","canon":1,"dups":1,"ftype":"data_center","name":"Rosegate LLC","city":"Hawthorne","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"384982679dcb","cid":"384982679dcb","canon":1,"dups":1,"ftype":"data_center","name":"ScaleMatrix","city":"San Diego","county":"San Diego","state":"CA","lat":33.023604,"lng":-116.776117,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"ELECTRICAL POWER. Aggregate Power Availability. 5MW. Utility Upgrade Capacity. 20MW+. UPS Redundancy. 2N. PDU Redundancy. 2N. Generator Redundancy. 2N. Concurrently Maintainable Electric. Yes.","uconf":"High","uquote":"Grid Operator. San Diego Gas and Electric.","uscan":"https://www.interconnection.fyi/data-center/project/scalematrix-5103cd17","ukey":"16609|CA","uname":"San Diego Gas & Electric Co","rto":"CAISO","nerc":"WECC","op":"ScaleMatrix","spon":"ScaleMatrix","ay":2011,"oy":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/scalematrix-5103cd17"]},{"id":"9e379989775b","cid":"9e379989775b","canon":1,"dups":1,"ftype":"data_center","name":"SHEARSON AMERICAN EXPRESS","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"bd8cdde52372","cid":"bd8cdde52372","canon":1,"dups":4,"ftype":"data_center","name":"Slater Land, Inc.","city":"Chico","county":"Butte","state":"CA","lat":39.665336,"lng":-121.603209,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Pacific Gas and Electric Company.","pscan":"https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163","uquote":"Grid Operator. Pacific Gas and Electric Company.","uscan":"https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Slater Land","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"1d5e1eeee446","cid":"bd8cdde52372","canon":0,"dups":4,"ftype":"data_center","name":"Slater Land, Inc.","city":"Chico","county":"Butte","state":"CA","lat":39.665336,"lng":-121.603209,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Pacific Gas and Electric Company.","pscan":"https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163","uconf":"High","uquote":"Grid Operator. Pacific Gas and Electric Company.","uscan":"https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Slater Land","spon":"Slater Land","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163"],"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"9fa6bf39dff1","cid":"bd8cdde52372","canon":0,"dups":4,"ftype":"data_center","name":"Slater Land, Inc.","city":"Chico","county":"Butte","state":"CA","lat":39.665336,"lng":-121.603209,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Pacific Gas and Electric Company.","pscan":"https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163","uconf":"Medium","uquote":"Grid Operator. Pacific Gas and Electric Company.","uscan":"https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Slater Land","spon":"Slater Land","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163"],"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"08edf1527596","cid":"bd8cdde52372","canon":0,"dups":4,"ftype":"data_center","name":"Slater Land, Inc.","city":"Chico","county":"Butte","state":"CA","lat":39.665336,"lng":-121.603209,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Pacific Gas and Electric Company.","pscan":"https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163","uconf":"High","uquote":"Grid Operator. Pacific Gas and Electric Company.","uscan":"https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Slater Land","spon":"Slater Land","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/slater-land-inc-3c781163"],"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"5a962ed3b279","cid":"5a962ed3b279","canon":1,"dups":1,"ftype":"data_center","name":"SMS Datacenter","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Irvine data center includes 2N redundancy for power and cooling, multiple substations feeding transformers, UPS-backed cabinet power, diesel generators with more than 72 hours of runtime at 100% load, and CRAC-based environmental controls for temperature, air distribution, and humidity.","uconf":"High","uquote":"Grid Operator. Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/sms-datacenter-f4a89731","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"SMS Datacenter","spon":"A holding company that also owns an 800+ employee conglomerate of companies in Europe and Latin America (part of the Systems Management Specialists (SMS) family of companies)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/sms-datacenter-f4a89731"]},{"id":"d8e7271c94e8","cid":"d8e7271c94e8","canon":1,"dups":1,"ftype":"data_center","name":"SOMO village","city":"Rohnert Park","county":"Sonoma","state":"CA","lat":38.525182,"lng":-122.92611,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","proc":"Co-located generation","pdt":"3.1 MW of PV","uquote":"There are three main utility companies in California: Pacific Gas & Electric (PG&E). Southern California Edison (SCE). San Diego Gas & Electric (SDG&E). These companies are Investor Owned Utilities (IOUs), meaning they're private for-profit companies. The IOUs in California cover most of the state, but some towns and cities in California get power from not-for-profit, community-owned utilities, which aren't subject to IOU requirements.","uscan":"https://www.energysage.com/local-data/electricity-cost/ca/sonoma-county/rohnert-park/","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"energysage.com","srcUrls":["https://www.energysage.com/local-data/electricity-cost/ca/sonoma-county/rohnert-park/"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Southern California Edison Co"},{"id":"4590912aa08a","cid":"4590912aa08a","canon":1,"dups":1,"ftype":"data_center","name":"Spectrum","city":"Turlock","county":"Stanislaus","state":"CA","lat":37.562316,"lng":-121.002831,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"cce7fdac5c24","cid":"cce7fdac5c24","canon":1,"dups":1,"ftype":"data_center","name":"Square","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"0610508d8cfe","cid":"0610508d8cfe","canon":1,"dups":1,"ftype":"data_center","name":"SRI Ten 706 Wilshire LLC","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"8ee81f888410","cid":"8ee81f888410","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"San Jose","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"This 3-story, 240,000 square foot facility boasts 32MW of capacity, delivered turnkey and powered by 100% renewable energy on PG&E's Direct Access program.","uconf":"High","uquote":"The data center measures 240,000 sq ft (22,300 sqm) across three stories, and is powered by 100 percent renewable energy through PG&E's Direct Access program.","uscan":"https://baxtel.com/data-center/stack-svy01b","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"STACK Infrastructure","spon":"IPI Partners","ay":2020,"oy":2021,"deal":"$325 million structured debt financing, September 1, 2020","dealScan":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-closes-325-million-structured-debt-financing/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;stackinfra.com","srcUrls":["https://baxtel.com/data-center/stack-svy01b","https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-closes-325-million-structured-debt-financing/"]},{"id":"2b804adc513e","cid":"2b804adc513e","canon":1,"dups":1,"ftype":"data_center","name":"Stanford University Data Center","city":"Menlo Park","county":"San Mateo","state":"CA","lat":37.414672,"lng":-122.371546,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The SRCF has a resilient but not redundant power infrastructure. The transmission grade power, delivered to SLAC and the SRCF, is UPS and generator protected, providing significant assurance should there be a regional power outage.","pscan":"https://srcc.stanford.edu/facilities","uquote":"“The challenge is acute and urgent in the San Francisco Bay Area,” said Liang Min, managing director of Bits & Watts, the smart grid initiative of the Stanford Doerr School of Sustainability's Precourt Institute for Energy. “PG&E's data center pipeline has doubled just since February.”","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Stanford University","spon":"Stanford University","tenant":"Stanford University (internal research)","ay":2013,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"srcc.stanford.edu","srcUrls":["https://srcc.stanford.edu/facilities"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"ec8a19b93e0f","cid":"ec8a19b93e0f","canon":1,"dups":1,"ftype":"data_center","name":"Stonepeak Infrastructure Partners","city":"San Luis Obispo","county":"San Luis Obispo","state":"CA","lat":35.388189,"lng":-120.448897,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"a1dddbc62eb2","cid":"a1dddbc62eb2","canon":1,"dups":1,"ftype":"data_center","name":"SunGard BiTech","city":"Chico","county":"Butte","state":"CA","lat":39.665336,"lng":-121.603209,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"685d17c03436","cid":"685d17c03436","canon":1,"dups":1,"ftype":"data_center","name":"Sutter Health","city":"Sacramento","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Sacramento Municipal Utility District.","pscan":"https://www.interconnection.fyi/data-center/project/sutter-health-dba6f421","uconf":"High","uquote":"Grid Operator. Sacramento Municipal Utility District.","uscan":"https://www.interconnection.fyi/data-center/project/sutter-health-dba6f421","ukey":"16534|CA","uname":"Sacramento Municipal Util Dist","rto":"CAISO","nerc":"WECC","op":"Sutter Health","spon":"Sutter Health","ay":2002,"oy":2011,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/sutter-health-dba6f421"]},{"id":"84b5694815f1","cid":"84b5694815f1","canon":1,"dups":1,"ftype":"data_center","name":"T-Mobile","city":"Rancho Cordova","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"e95f2be84cfd","cid":"e95f2be84cfd","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE","city":"IRVINE","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c3958ede91e0","cid":"c3958ede91e0","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE","city":"ORANGE","state":"CA","lat":37,"lng":-119.7,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"7926ef84047d","cid":"7926ef84047d","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE","city":"MANHATTAN BEACH","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e113e508c0fe","cid":"e113e508c0fe","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE","city":"COMPTON","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"330655a66723","cid":"330655a66723","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE","city":"LOS ANGELES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"b3520a3eeb2f","cid":"b3520a3eeb2f","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE","city":"RANCHO PALOS VERDES","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","contro":"The Rancho Palos Verdes City Council rejected plans to allow more cell towers to address dead zones after residents protested against the amendments, arguing the equipment would ruin the city's aesthetics.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"50adadcc95b0","cid":"50adadcc95b0","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE","city":"PASADENA","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"cd395d6e8ef2","cid":"cd395d6e8ef2","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE PROJECT: SV00249A","city":"KEENE","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"0b2a4153584f","cid":"0b2a4153584f","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE PROJECT: SV00250A","city":"CALIENTE","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"00155d9e2f67","cid":"00155d9e2f67","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE USA INC","city":"RIVERSIDE","county":"Riverside","state":"CA","lat":33.729828,"lng":-116.002239,"cprec":"shared_centroid","status":"Operational","uconf":"High","uquote":"Electric service in Riverside is provided by Riverside Public Utilities (RPU), a city-owned utility known for offering reliable service and strong sustainability initiatives. Grid Operator. City of Riverside.","uscan":"https://www.interconnection.fyi/data-center/project/t-mobile-usa-inc-35344078","ukey":"57483|CA","uname":"Liberty Utilities","rto":"CAISO","nerc":"WECC","op":"T-MOBILE USA","spon":"T-MOBILE USA","tenant":"T-MOBILE USA","ay":2013,"oy":2013,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/t-mobile-usa-inc-35344078"]},{"id":"5bf45f39d864","cid":"5bf45f39d864","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE USA INC","city":"TORRANCE","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"129e3878d8ba","cid":"129e3878d8ba","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE USA INC","city":"BURBANK","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"b8e0e8e0a13e","cid":"b8e0e8e0a13e","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE USA INC","city":"SOUTH EL MONTE","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"4a79074cbdb0","cid":"4a79074cbdb0","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE USA INC","city":"SANTA FE SPRINGS","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c7be735c1a46","cid":"c7be735c1a46","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE USA INC","city":"IRVINE","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"205306c70372","cid":"205306c70372","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST CORP LAH0082A","city":"HAWTHORNE","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"dee92df06336","cid":"dee92df06336","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST CORPORATION","city":"BAKERSFIELD","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"153aca39f928","cid":"153aca39f928","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST CORPORATION: SV00379A","city":"BAKERSFIELD","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"108d291747e0","cid":"108d291747e0","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST CORPORATION: SV00380A","city":"MCFARLAND","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e367b4a7a75f","cid":"e367b4a7a75f","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST LLC","city":"DELANO","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern California Edison.","uquote":"Grid Operator. Southern California Edison.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"T-MOBILE WEST","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6fe06accbc88","cid":"6fe06accbc88","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST LLC","city":"SHAFTER","county":"KERN","state":"CA","lat":35.346629,"lng":-118.729506,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"215daf48408d","cid":"215daf48408d","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST LLC","city":"PICO RIVERA","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"3b87def1fd86","cid":"3b87def1fd86","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST LLC","city":"SAN DIMAS","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c23240f884c3","cid":"c23240f884c3","canon":1,"dups":1,"ftype":"data_center","name":"T-MOBILE WEST LLC, CELL SITE #SC14041Z, SN041","county":"Sacramento","state":"CA","lat":38.450136,"lng":-121.344329,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"a74f6835c49d","cid":"a74f6835c49d","canon":1,"dups":1,"ftype":"data_center","name":"T5 Data Centers","city":"Newark","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":49,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Located in the East Bay suburb of Newark, CA, T5@Silicon Valley takes advantage of the PG&E Direct Access program that provides customers with aggressive power rates comparable to Silicon Valley Power and high reliability.","uquote":"Located in the East Bay suburb of Newark, CA, T5@Silicon Valley takes advantage of the PG&E Direct Access program that provides customers with aggressive power rates comparable to Silicon Valley Power and high reliability.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"T5 Data Centers","spon":"QuadReal Property Group","tenant":"Apple","ay":2020,"oy":2022,"deal":"Acquisition of previously enterprise-owned data center in Newark, CA by T5 Data Centers, announced October 6, 2020.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"4cbaf53cd21a","cid":"4cbaf53cd21a","canon":1,"dups":1,"ftype":"data_center","name":"T5@ LOS ANGELES, LLC","city":"EL SEGUNDO","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":17,"pc":"Grid","pconf":"High","pquote":"The data center has redundant 2.5 MW of Caterpillar generators to power the dedicated on site 28 MVA substation. This dedicated power substation also help reduced electricity cost. The entire electrical and mechanical infrastructure is configured in N+1 redundancy with optional 2N UPS capability keeps the critical system up and running.","pscan":"https://cloudandcolocation.com/datacenters/t5-data-centers-los-angeles-data-center/","uquote":"Dedicated on-site SoCal Edison 28MVA substation.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Serverfarm","spon":"Serverfarm, NantWorks","tenant":"hyperscale, transportation, healthcare, government","ay":2012,"oy":2013,"deal":"Acquisition by Serverfarm and NantWorks from T5 Data Centers for $71 million in April 2021.","dealScan":"https://capacityglobal.com/news/serverfarm-acquires-t5-data-centre-for-71m/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;capacityglobal.com","srcUrls":["https://cloudandcolocation.com/datacenters/t5-data-centers-los-angeles-data-center/","https://capacityglobal.com/news/serverfarm-acquires-t5-data-centre-for-71m/"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"dd9c3dc23de8","cid":"dd9c3dc23de8","canon":1,"dups":1,"ftype":"data_center","name":"Tech Corners","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"PG&E","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"34101432c88b","cid":"34101432c88b","canon":1,"dups":1,"ftype":"data_center","name":"Telehouse America","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Commercial power capacity: 665kVA. One static UPS: 500kVA, N+1. One diesel generator: 1@1000kVA. Battery capacity: 15 minutes at full load. Diesel fuel reserve: 48 hours at full load. Redundant cooling.","pscan":"https://www.telehouse.com/global-data-centers/america/los-angeles-data-centers/telehouse-los-angeles/","uconf":"High","uquote":"The Los Angeles Department of Water and Power (LADWP) is the largest municipal utility in the United States with 8,100 megawatts of electric generating capacity (2021–2022) and delivering an average of 435 million gallons of water per day (487,000 acre-ft per year) to more than four million residents and local businesses in the City of Los Angeles and several adjacent cities and communities in southwestern Los Angeles County, California.","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Telehouse America","spon":"KDDI","oy":1998,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"telehouse.com;en.wikipedia.org","lflag":"operational_null_capacity utility_alias_corrected","uscan":"https://en.wikipedia.org/wiki/Los_Angeles_Department_of_Water_and_Power","srcUrls":["https://www.telehouse.com/global-data-centers/america/los-angeles-data-centers/telehouse-los-angeles/","https://en.wikipedia.org/wiki/Los_Angeles_Department_of_Water_and_Power"],"rawUkey":"11208|CA","rawUname":"Los Angeles Department of Water & Power","reportedUtility":"Los Angeles Department of Water & Power"},{"id":"6fbaf69a0668","cid":"6fbaf69a0668","canon":1,"dups":1,"ftype":"data_center","name":"TGS","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Southern California Edison.","uconf":"High","uquote":"Grid Operator: Southern California Edison.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"TGS Management","spon":"TGS Management","tenant":"TGS Management","ay":2020,"oy":2023,"deal":"Land acquisition for $28 million in 2020.","dealScan":"https://therealdeal.com/la/2023/02/01/tgs-management-pays-240m-to-buy-42-acres-for-irvine-data-hub/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"therealdeal.com","srcUrls":["https://therealdeal.com/la/2023/02/01/tgs-management-pays-240m-to-buy-42-acres-for-irvine-data-hub/"]},{"id":"98dbf4cb6a0e","cid":"98dbf4cb6a0e","canon":1,"dups":1,"ftype":"data_center","name":"The 3250 Wilshire Blvd, Partners","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Our fully redundant power systems are designed to keep your equipment and infrastructure available at all times. Multiple inline UPS units, in conjunction with our backup generators, support a 100% Power Uptime SLA.","pscan":"https://www.xfernet.com/services/colocation/","uconf":"High","uquote":"The Los Angeles Department of Water and Power (LADWP) is the largest municipal utility in the United States with 8,100 megawatts of electric generating capacity (2021–2022) and delivering an average of 435 million gallons of water per day (487,000 acre-ft per year) to more than four million residents and local businesses in the City of Los Angeles and several adjacent cities and communities in southwestern Los Angeles County, California.","ukey":"11208|CA","uname":"Los Angeles Department of Water & Power","rto":"CAISO","nerc":"WECC","op":"Xfernet","ay":1998,"oy":1998,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"xfernet.com;en.wikipedia.org","uscan":"https://en.wikipedia.org/wiki/Los_Angeles_Department_of_Water_and_Power","srcUrls":["https://www.xfernet.com/services/colocation/","https://en.wikipedia.org/wiki/Los_Angeles_Department_of_Water_and_Power"],"rawUkey":"11208|CA","rawUname":"Los Angeles Department of Water & Power","reportedUtility":"Los Angeles Department of Water & Power","lflag":"utility_alias_corrected"},{"id":"bf8e40e562e0","cid":"bf8e40e562e0","canon":1,"dups":1,"ftype":"data_center","name":"The Swig Company","city":"San Francisco","county":"San Francisco","state":"CA","lat":37.727239,"lng":-123.032229,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Commercial Power delivered by PG&E and is expandable.","uquote":"Commercial Power delivered by PG&E and is expandable.","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Fortress Data Centers","spon":"Chirisa Investments","oy":2015,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7cebee6adc25","cid":"7cebee6adc25","canon":1,"dups":1,"ftype":"data_center","name":"Toyama Group","city":"Sunnyvale","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"a1a370a306fe","cid":"a1a370a306fe","canon":1,"dups":1,"ftype":"data_center","name":"TPx","city":"Santa Ana","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4304f2421203","cid":"4304f2421203","canon":1,"dups":1,"ftype":"data_center","name":"University of California","city":"Summerland","county":"Santa Barbara","state":"CA","lat":34.536677,"lng":-120.038364,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"SCE provides billing and delivers electric service to residents and businesses in the City of Santa Barbara, while Santa Barbara Clean Energy provides electricity choices to reduce carbon emissions.","uquote":"Southern California Edison (SCE) provides safe, reliable, affordable, and clean power to Southern California, including Santa Barbara.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"UC Santa Barbara Information Technology Services","spon":"The Regents of the University of California","tenant":"UCSB Academic, Administrative, and Research communities","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"118624321b60","cid":"118624321b60","canon":1,"dups":1,"ftype":"data_center","name":"unWired Broadband","city":"Fresno","county":"Fresno","state":"CA","lat":36.761006,"lng":-119.655019,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Our data center facility in Fresno, CA is equipped with 24/7 video surveillance, alarm monitoring, a state-of-the-art cooling system, fire suppression system and more. You can trust that your vital data is safe and protected in our facility.... Power. grey check mark 208 VAC, 110VAC or 48VDC options. grey check mark Dual path 2N or N+1 configurations. grey check mark 250 eKW, 313 KVA standby generator. grey check mark 192 Battery, 1100 Amp hour battery array.","uconf":"High","uquote":"Utility & Water Companies... Pacific Gas and Electric Company","uscan":"https://business.fresnochamber.com/list/ql/utility-water-companies-19","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"unWired Broadband","spon":"O2 Investment Partners","deal":"O2 Investment Partners made a significant growth investment in unWired Broadband LLC on July 6, 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"business.fresnochamber.com","srcUrls":["https://business.fresnochamber.com/list/ql/utility-water-companies-19"],"lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"932a8109b0d7","cid":"932a8109b0d7","canon":1,"dups":1,"ftype":"data_center","name":"US Department of Defense","city":"Seaside","county":"Monterey","state":"CA","lat":36.240104,"lng":-121.315578,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Defense Manpower Data Center (DMDC)","spon":"Department of Defense","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"2578100b7fdf","cid":"2578100b7fdf","canon":1,"dups":1,"ftype":"data_center","name":"US Navy","city":"Monterey","county":"Monterey","state":"CA","lat":36.240104,"lng":-121.315578,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"“Electricity use at NSA Monterey has been reduced despite increases in computer center data-processing demand and equipment purchases,” Taber added.","uconf":"High","uquote":"Pacific Gas and Electric Company (PG&E) supplies electric service in all or portions of the listed ZIP. Codes in Northern and Central California.... MONTEREY.... 93940","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Naval Postgraduate School (Information Technology & Communications Services)","spon":"United States Navy","oy":2025,"deal":"NVIDIA granted an NVIDIA DGX GB300 system (October 2025)","dealScan":"https://blogs.nvidia.com/blog/naval-postgraduate-school-ai/","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"blogs.nvidia.com","srcUrls":["https://blogs.nvidia.com/blog/naval-postgraduate-school-ai/"],"lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"14328|CA","rawUname":"Pacific Gas & Electric Co.","reportedUtility":"Pacific Gas & Electric Co."},{"id":"622e382bb9f6","cid":"622e382bb9f6","canon":1,"dups":1,"ftype":"data_center","name":"US Postal Service","city":"San Mateo","county":"San Mateo","state":"CA","lat":37.414672,"lng":-122.371546,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"This complete site outage will accommodate a multimillion dollar infrastructure upgrade to our uninterruptible power supply and battery backup systems, improving our ability to handle power events from our service provider.","uconf":"High","uquote":"Peninsula Clean Energy appears as a separate line item on customer PG&E bills, replacing a higher charge imposed by PG&E for generating power. PG&E still charges all customers, including those receiving Peninsula Clean Energy-generated power, for delivering the electricity and for gas service.","uscan":"https://cal-cca.org/peninsula-clean-energy-lowers-2025-electric-generation-rates/","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"US Postal Service","spon":"US Postal Service","tenant":"US Postal Service","contro":"Proposal to close and sell the IT center, causing employee issues, later reversed.","deal":"Multimillion dollar infrastructure upgrade to uninterruptible power supply and battery backup systems in October 2009.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cal-cca.org","srcUrls":["https://cal-cca.org/peninsula-clean-energy-lowers-2025-electric-generation-rates/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"ba5abc95be80","cid":"ba5abc95be80","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE ASSOCIATES","city":"SANTA FE SPRINGS","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"ce55edb1bfe2","cid":"ce55edb1bfe2","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE ASSOCIATES INC","city":"GARDENA","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e28e6b3f5705","cid":"e28e6b3f5705","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":77,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Power provided by Silicon Valley Power (SVP) offering low rates and high reliability.","uconf":"High","uquote":"Power provided by Silicon Valley Power (SVP) offering low rates and high reliability.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Vantage Data Centers","spon":"DigitalBridge Group, , Silver Lake, PSP Investments, IMCO, AustralianSuper","ay":2010,"oy":2010,"deal":"$350 million loan in November 2022 for redevelopment of a Santa Clara site.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","srcUrls":null,"srcDom":null},{"id":"ca7d1f50c321","cid":"ca7d1f50c321","canon":0,"dups":1,"ftype":"data_center","name":"Vantage Data Centers","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":51,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Power provided by Silicon Valley Power (SVP), the leading energy provider in the region.","uconf":"High","uquote":"Power provided by Silicon Valley Power (SVP), the leading energy provider in the region.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Vantage Data Centers","spon":"DigitalBridge Group","tenant":"Telx, Cloudera","ay":2010,"oy":2011,"contro":"Electric rates are rising as the municipal utility spends heavily on transmission lines and other infrastructure to accommodate the voracious power demand from more than 50 data centers, which now consume 60% of the city's electricity. An analysis last year by the Silicon Valley Voice newspaper questioned the lower rates data centers pay compared with residents.","deal":"DigitalBridge Group, Inc. acquired CA22, a 24MW hyperscale data center in Santa Clara, for $539 million on October 1, 2021.","dealScan":"https://www.digitalbridge.com/news/2021-10-01-digitalbridge-announces-expansion-of-vantage-sdc-platform","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"digitalbridge.com","srcUrls":["https://www.digitalbridge.com/news/2021-10-01-digitalbridge-announces-expansion-of-vantage-sdc-platform"],"rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"a34ed8b252fb","cid":"a34ed8b252fb","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers Management","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":77,"pc":"Grid","pconf":"High","pquote":"Power provided by Silicon Valley Power (SVP) offering low rates and high reliability.","uquote":"Power provided by Silicon Valley Power (SVP) offering low rates and high reliability.","ukey":"16655|CA","uname":"Silicon Valley Power (City of Santa Clara)","rto":"CAISO","nerc":"WECC","op":"Vantage Data Centers","spon":"DigitalBridge Group","ay":2010,"oy":2025,"deal":"$350 million loan from Societe Generale for Santa Clara site redevelopment (November 23, 2022)","dealScan":"https://therealdeal.com/san-francisco/2022/11/23/vantage-data-centers-gets-350m-loan-for-santa-clara-site/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"therealdeal.com","srcUrls":["https://therealdeal.com/san-francisco/2022/11/23/vantage-data-centers-gets-350m-loan-for-santa-clara-site/"],"band":"50-100 MW","rawUkey":"60759|CA","rawUname":"Silicon Valley Clean Energy Authority","reportedUtility":"Silicon Valley Power (City of Santa Clara)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"96e80589c092","cid":"96e80589c092","canon":1,"dups":1,"ftype":"data_center","name":"Verint","city":"Santa Clara","county":"Santa Clara","state":"CA","lat":37.221614,"lng":-121.68954,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Verint Systems","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"11e40234347f","cid":"11e40234347f","canon":1,"dups":2,"ftype":"data_center","name":"Verizon","city":"Bloomington","county":"San Bernardino","state":"CA","lat":34.856661,"lng":-116.181571,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern California Edison.","uquote":"Grid Operator. Southern California Edison.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Verizon","spon":"Verizon","ay":2006,"oy":2006,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"0132d8894997","cid":"11e40234347f","canon":0,"dups":2,"ftype":"data_center","name":"Verizon","city":"Bloomington","county":"San Bernardino","state":"CA","lat":34.856661,"lng":-116.181571,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern California Edison.","uquote":"Grid Operator. Southern California Edison.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Verizon","spon":"Verizon Data Services","ay":2006,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"6cf8280a9e74","cid":"6cf8280a9e74","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Fremont","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Verizon","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"fe900ec18e08","cid":"fe900ec18e08","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Hayward","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Verizon","spon":"Verizon","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"1fabb37a4a06","cid":"1fabb37a4a06","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Smith River","county":"Del Norte","state":"CA","lat":41.749903,"lng":-123.980998,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Pacific Power safely re-energized the transmission lines serving Crescent City and Del Norte County, and all customers have been returned to electric grid service on Sunday.","pscan":"https://www.pacificpower.net/about/newsroom/news-releases/Del-Norte-county-re-energized.html","uconf":"High","uquote":"Pacific Power. Electric utility company. 1054 Northcrest Dr, Crescent City, CA 95531.","uscan":"https://static1.squarespace.com/static/5e9e7d49658f9778db8d255f/t/5f1c75847fbac53ab4e73285/1595700612630/Del+Norte+County+-+Utilities.pdf","ukey":"14354|CA","uname":"PacifiCorp","rto":"CAISO","nerc":"WECC","op":"Verizon","spon":"Frontier Communications","ay":2015,"oy":2015,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"pacificpower.net;static1.squarespace.com","srcUrls":["https://www.pacificpower.net/about/newsroom/news-releases/Del-Norte-county-re-energized.html","https://static1.squarespace.com/static/5e9e7d49658f9778db8d255f/t/5f1c75847fbac53ab4e73285/1595700612630/Del+Norte+County+-+Utilities.pdf"],"lflag":"source_quality_reclassified"},{"id":"e95b323ac5ee","cid":"e95b323ac5ee","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tenant":"Verizon","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"3c7e259b4d4c","cid":"3c7e259b4d4c","canon":1,"dups":1,"ftype":"data_center","name":"Williams Communications","city":"Anaheim","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4a1a231db78f","cid":"4a1a231db78f","canon":1,"dups":1,"ftype":"data_center","name":"Williams Sonoma","city":"Rocklin","county":"Placer","state":"CA","lat":39.062032,"lng":-120.722718,"cprec":"shared_centroid","status":"Operational","pc":"Behind-the-Meter","pconf":"High","pquote":"A Bloom Fuel Cell Plant powered by natural gas and sized at 600 kW provides power to the data center","proc":"Co-located generation","pcp":"Bloom Energy","pdt":"600 kW","uquote":"Residents of the City of Rocklin have long been concerned with rising energy costs and the overall service provided by PG&E.","uscan":"https://www.rocklin.ca.us/utilities","rto":"CAISO","nerc":"WECC","op":"Williams-Sonoma","spon":"Williams-Sonoma","tenant":"Williams-Sonoma","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rocklin.ca.us","lflag":"operational_null_capacity source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.rocklin.ca.us/utilities"]},{"id":"52e3c799919a","cid":"52e3c799919a","canon":1,"dups":1,"ftype":"data_center","name":"Workday","city":"Pleasanton","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"735d1d45d6ba","cid":"735d1d45d6ba","canon":1,"dups":1,"ftype":"data_center","name":"17836 Walnut 23, LLC","city":"El Segundo","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"27201281d3db","cid":"27201281d3db","canon":1,"dups":1,"ftype":"data_center","name":"Altice USA","city":"Blythe","county":"Riverside","state":"CA","lat":33.729828,"lng":-116.002239,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"c82a6b85d52d","cid":"c82a6b85d52d","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Hayward","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Proposed","mw":49,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"This purpose-built data center provides nearly 300,000 square feet and 49 megawatts of available power.","pscan":"https://www.graywolf.com/projects/data-center-ecosystem/hayward-exchange-92-data-center/","uquote":"On Oct. 24, 2023 East Bay Community Energy (EBCE) became Ava Community Energy (Ava). Commercial: In June 2018, Ava became the default electricity provider for Hayward commercial accounts. PG&E will continue providing electricity to residents and business owners who choose to opt out of EBCE electric service.","uscan":"https://www.hayward-ca.gov/residents/utilities","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Amazon","spon":"Hines, MetLife Investment Management","tenant":"Amazon","ay":2022,"oy":2023,"deal":"Amazon leased a data center from Hines and MetLife Investment Management, reported March 2022.","dealScan":"https://news.theregistrysf.com/hines-metlife-lease-278500-sqft-hayward-data-center-to-amazon%EF%BF%BC/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"graywolf.com;hayward-ca.gov;news.theregistrysf.com","srcUrls":["https://www.graywolf.com/projects/data-center-ecosystem/hayward-exchange-92-data-center/","https://www.hayward-ca.gov/residents/utilities","https://news.theregistrysf.com/hines-metlife-lease-278500-sqft-hayward-data-center-to-amazon%EF%BF%BC/"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"59b4a792540a","cid":"59b4a792540a","canon":1,"dups":1,"ftype":"data_center","name":"Bonafide Medical Group","city":"Thousand Oaks","county":"Ventura","state":"CA","lat":34.358748,"lng":-119.133145,"cprec":"distinct","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"0742b5ec38e0","cid":"0742b5ec38e0","canon":0,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern California Edison.","pscan":"https://www.interconnection.fyi/data-center/project/centersquare-845f9828","uconf":"High","uquote":"Grid Operator. Southern California Edison.","uscan":"https://www.interconnection.fyi/data-center/project/centersquare-845f9828","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/centersquare-845f9828"]},{"id":"548da9924aa6","cid":"548da9924aa6","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Irvine","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Southern California Edison.","pscan":"https://www.interconnection.fyi/data-center/project/centersquare-845f9828","uquote":"Grid Operator. Southern California Edison.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/centersquare-845f9828"]},{"id":"d44269920895","cid":"d44269920895","canon":0,"dups":1,"ftype":"data_center","name":"Cogent","city":"Anaheim","county":"Orange","state":"CA","lat":33.675687,"lng":-117.777207,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"657fef4d1bec","cid":"657fef4d1bec","canon":1,"dups":1,"ftype":"data_center","name":"Databank, CoreSite","city":"Los Angeles","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Joint venture","pcp":"Goodman Group","pdt":"50/50 joint venture, 32MW facility (first 6MW available in December 2026)","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8c0b3ceaa98c","cid":"8c0b3ceaa98c","canon":1,"dups":1,"ftype":"data_center","name":"DEX","city":"Camarillo","county":"Ventura","state":"CA","lat":34.358748,"lng":-119.133145,"cprec":"distinct","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"bb8d6b105c82","cid":"bb8d6b105c82","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"El Segundo","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"353306558828","cid":"353306558828","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Burbank","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"fce21df78607","cid":"fce21df78607","canon":1,"dups":1,"ftype":"data_center","name":"EContactLive Inc","city":"Riverbank","county":"Stanislaus","state":"CA","lat":37.562316,"lng":-121.002831,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"35338fb49e32","cid":"35338fb49e32","canon":1,"dups":1,"ftype":"data_center","name":"Enloe Medical Center","city":"Chico","county":"Butte","state":"CA","lat":39.665336,"lng":-121.603209,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"In fiscal year 2022, Enloe Medical Center began using Bloom Energy Fuel Cells. Investing in and installing the fuel cells has decreased energy use by 27%. Producing 1,700 kilowatt per day is equivalent to the amount of energy necessary to power 60 homes. The fuel cells are not only more energy efficient, but they also emit little to no pollution into the air. The vapor seen coming off the fuel cells is mostly water vapor and heat. This decrease in energy will positively impact Enloe's bottom line, freeing up funds to invest in other equipment needs to better serve our employees and patients.","uquote":"Electricity and Natural Gas. PG&E - website.","uscan":"https://localwiki.org/chico/Utilities","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Enloe Medical Center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"localwiki.org","srcUrls":["https://localwiki.org/chico/Utilities"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"743813e28323","cid":"743813e28323","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Santa Barbara","county":"Santa Barbara","state":"CA","lat":34.536677,"lng":-120.038364,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The changes include a new entryway, two generators, two uninterruptable power-supply systems, and three equipment chillers on new concrete pads within the existing greenbelt on the west side of the property. California is home to roughly 288 data centers, including multiple smaller facilities in Santa Barbara. Southern California Edison expects some demand growth from AI but says transportation electrification and building electrification are currently larger contributors.","pscan":"https://www.noozhawk.com/google_artificial_intelligence_goleta_design_review_board_20180630/","uconf":"High","uquote":"Southern California Edison expects some demand growth from AI but says transportation electrification and building electrification are currently larger contributors. To learn more about Energy Management Solutions and apply for incentives, visit sce.com/datacenter or call your SCE Account Manager. Programs are funded by California utility ratepayers and administered by SCE under the auspices of the California Public Utilities Commission.","ukey":"17609|CA","uname":"Southern California Edison Co","rto":"CAISO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","ay":2021,"tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"noozhawk.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.noozhawk.com/google_artificial_intelligence_goleta_design_review_board_20180630/"]},{"id":"b888dd2f45a1","cid":"b888dd2f45a1","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Santa Barbara","county":"Santa Barbara","state":"CA","lat":34.536677,"lng":-120.038364,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"e33d0934f2e0","cid":"e33d0934f2e0","canon":1,"dups":1,"ftype":"data_center","name":"Nautilus Data Technologies","city":"Stockton","county":"San Joaquin","state":"CA","lat":37.934982,"lng":-121.272244,"cprec":"shared_centroid","status":"Proposed","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"69kV bulk substation feeds the Nautilus on-premise substation via a dedicated 12kV 10MVA feed; 480V line-ups routed via diverse paths to the data center in a 4-to-make-3 configuration; N+2 at the UPS level; On-site fuel storage to support 26 hours run time per generator at full load plus one full engine/fuel redundancy.","uquote":"What's really great is it has a separate PG&E grid, so they're basically isolated from any outages.","uscan":"https://insider.govtech.com/california/news/for-stockton-data-barge-its-all-about-colocation-colocation-colocation","ukey":"14328|CA","uname":"Pacific Gas & Electric Co.","rto":"CAISO","nerc":"WECC","op":"Nautilus Data Technologies","spon":"Orion Energy Partners, L.P.","tenant":"City of Stockton, San Joaquin County, Backblaze, prominent artificial intelligence company","ay":2018,"oy":2020,"deal":"$100 million multi-draw, senior secured debt facility with Orion Energy Partners, L.P. (May 26, 2020)","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"insider.govtech.com","srcUrls":["https://insider.govtech.com/california/news/for-stockton-data-barge-its-all-about-colocation-colocation-colocation"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"5fee17d08361","cid":"5fee17d08361","canon":1,"dups":1,"ftype":"data_center","name":"Prime Data Centers","city":"Vernon","county":"Los Angeles","state":"CA","lat":34.196398,"lng":-118.261862,"cprec":"shared_centroid","status":"Proposed","mw":33,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Power delivery is provided by Vernon's municipally owned and operated electric utility (VPU).","uconf":"High","uquote":"Power delivery is provided by Vernon's municipally owned and operated electric utility (VPU).","rto":"CAISO","nerc":"WECC","op":"Prime Data Centers","spon":"Snowhawk , Nuveen","tenant":"Lambda","ay":2022,"oy":2024,"contro":"Requested zoning code variances for automobile parking, truck parking, truck loading, truck maneuvering, and additional street right of way.","controScan":"https://d2kbkoa27fdvtw.cloudfront.net/cityofvernon/51e1f25d6db1b1dfafb7892b893db6570.pdf","deal":"Snowhawk and Nuveen made a strategic investment in Prime Data Centers on July 31, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"d2kbkoa27fdvtw.cloudfront.net","srcUrls":["https://d2kbkoa27fdvtw.cloudfront.net/cityofvernon/51e1f25d6db1b1dfafb7892b893db6570.pdf"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"1072048e5037","cid":"1072048e5037","canon":1,"dups":1,"ftype":"data_center","name":"Teleplan International","city":"Roseville","county":"Placer","state":"CA","lat":39.062032,"lng":-120.722718,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"bdea855bfaea","cid":"bdea855bfaea","canon":1,"dups":1,"ftype":"data_center","name":"Tri Counties Bank","city":"Chico","county":"Butte","state":"CA","lat":39.665336,"lng":-121.603209,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"4ffe7d7d0cb8","cid":"4ffe7d7d0cb8","canon":0,"dups":1,"ftype":"data_center","name":"Tri Counties Bank","city":"Chico","county":"Butte","state":"CA","lat":39.665336,"lng":-121.603209,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","op":"Tri Counties Bank","spon":"TriCo Bancshares","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"3d94f25dd58c","cid":"3d94f25dd58c","canon":0,"dups":1,"ftype":"data_center","name":"US Navy","city":"Monterey","county":"Monterey","state":"CA","lat":36.240104,"lng":-121.315578,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"349224ae5240","cid":"349224ae5240","canon":1,"dups":1,"ftype":"data_center","name":"Yardi Systems","city":"Goleta","county":"Santa Barbara","state":"CA","lat":34.536677,"lng":-120.038364,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"265577bab939","cid":"53811945e75f","canon":0,"dups":2,"ftype":"data_center","name":"Quarantined unnamed CA data-center record","county":"Merced","state":"CA","lat":37.194806,"lng":-120.722802,"cprec":"distinct","status":"Cancelled","mw":250,"band":"250+ MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"","quarantine":1,"quarantineReason":"Blank record with no operator, city, or resolved source URL; hidden from default canonical views.","lflag":"blank_unsourced_record","srcUrls":null,"srcDom":null},{"id":"009d43fc2619","cid":"009d43fc2619","canon":0,"dups":3,"ftype":"data_center","name":"Quarantined unnamed CA data-center record","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Cancelled","mw":175,"band":"100-250 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"","quarantine":1,"quarantineReason":"Blank record with no operator, city, or resolved source URL; hidden from default canonical views.","lflag":"blank_unsourced_record","srcUrls":null,"srcDom":null},{"id":"53811945e75f","cid":"53811945e75f","canon":0,"dups":2,"ftype":"data_center","name":"Quarantined unnamed CA data-center record","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Cancelled","mw":250,"band":"250+ MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"","quarantine":1,"quarantineReason":"Blank record with no operator, city, or resolved source URL; hidden from default canonical views.","lflag":"blank_unsourced_record","srcUrls":null,"srcDom":null},{"id":"e34c5d66c1f4","cid":"009d43fc2619","canon":0,"dups":3,"ftype":"data_center","name":"Quarantined unnamed CA data-center record","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Cancelled","mw":175,"band":"100-250 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"","quarantine":1,"quarantineReason":"Blank record with no operator, city, or resolved source URL; hidden from default canonical views.","lflag":"blank_unsourced_record","srcUrls":null,"srcDom":null},{"id":"7097c8c0e0e4","cid":"009d43fc2619","canon":0,"dups":3,"ftype":"data_center","name":"Quarantined unnamed CA data-center record","county":"Alameda","state":"CA","lat":37.647139,"lng":-121.912488,"cprec":"shared_centroid","status":"Cancelled","mw":175,"band":"100-250 MW","rto":"CAISO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"","quarantine":1,"quarantineReason":"Blank record with no operator, city, or resolved source URL; hidden from default canonical views.","lflag":"blank_unsourced_record","srcUrls":null,"srcDom":null},{"id":"66933c7ae61d","cid":"66933c7ae61d","canon":1,"dups":1,"ftype":"data_center","name":"11:11 Systems","city":"Thornton","county":"Adams","state":"CO","lat":39.874325,"lng":-104.331872,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The datacenter at 550 East 84th Avenue, Thornton, is designed to meet high standards of reliability and efficiency. It offers 2.2 MW of power capacity, ensuring ample energy supply for its operations. The facility's power infrastructure is supported by N+1 redundancy, providing a backup system to maintain continuous power in case of any failures.","pscan":"https://inflect.com/building/550-east-84th-avenue-thornton/11-11-systems/datacenter/den550","uquote":"CRL assisted Public Service Company of Colorado/Xcel Energy with the siting and approval of a substation in the City of Thornton, CO.","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"11:11 Systems","spon":"Tiger Infrastructure Partners","oy":2021,"deal":"11:11 Systems acquired iland Internet Solutions Corporation in December 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","srcUrls":["https://inflect.com/building/550-east-84th-avenue-thornton/11-11-systems/datacenter/den550"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"9d659846b8cf","cid":"9d659846b8cf","canon":1,"dups":1,"ftype":"data_center","name":"365 Data Centers","city":"Aurora","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power capacity: 8 MW allocated to the data center; Redundant UPS: 2N UPS configuration with 16 total units (redundant); Generator redundancy: N+1 generator system with 34,000-gallon fuel tank","uconf":"High","uquote":"Xcel Energy provides electric and gas service to the majority of residences in the city of Aurora.","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"365 Data Centers","spon":"Stonecourt Capital , Lumerity Capital","ay":2001,"oy":2001,"deal":"Acquisition of Sungard Availability Services' U.S. colocation and network business by 365 Data Centers in 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3ad89e24ffd8","cid":"3ad89e24ffd8","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Aurora","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b06da722678c","cid":"b06da722678c","canon":1,"dups":1,"ftype":"data_center","name":"American Honda Motor Company","city":"Longmont","county":"Boulder","state":"CO","lat":40.094962,"lng":-105.397704,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The site is adjacent to an electrical substation, which will be expanded next year by it owners, the Longmont Power & Communications, the city of Longmont and Platte River Power Authority. \"Initially, what they told us is they would need about 5 megawatts of power,\" said Bill Ewer of the Longmont Power & Communications, which would be only slightly less than what Amgen and Seagate Technology use in substantially larger facilities.","pscan":"https://www.datacenterknowledge.com/business/honda-plans-data-center-in-colorado","uquote":"The site is adjacent to an electrical substation, which will be expanded next year by it owners, the Longmont Power & Communications, the city of Longmont and Platte River Power Authority.","rto":"non-RTO","nerc":"WECC","op":"American Honda Motor Company","spon":"Honda Motor Company","tenant":"American Honda Motor Company","ay":2006,"oy":2008,"deal":"Initial capital investment of $20 million (July 2006)","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/business/honda-plans-data-center-in-colorado"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"ef9ecca332a2","cid":"ef9ecca332a2","canon":1,"dups":1,"ftype":"data_center","name":"Catholic Health Initiative","city":"Englewood","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Catholic Health Initiatives consortium is requesting bids that allow telecommunications and broadband services for clinical teleconsultation (video and voice), exchange of medical records, exchange of large radiographic and patient images files, video conferencing and training, voice services and backup/redundant connectivity.","pscan":"https://rhc.usac.org/hcf/seam/docstore/document.xhtml;jsessionid=k8NyQFuYHDJbwCDnO1NV5Mis.hcf002?docId=1&cid=1101","uconf":"High","uquote":"Colorado's electricity market is regulated, which means you can't choose which company supplies your electricity. Instead, the state determines your electric utility company based on where you live. There are two main utility companies in Colorado, both of which are Investor Owned Utilities (IOUs), meaning they're private for-profit companies: Xcel Energy. Black Hills Energy.","uscan":"https://www.energysage.com/local-data/electricity-cost/co/arapahoe-county/englewood/","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"CommonSpirit Health","spon":"CommonSpirit Health","tenant":"CommonSpirit Health","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rhc.usac.org;energysage.com","srcUrls":["https://rhc.usac.org/hcf/seam/docstore/document.xhtml;jsessionid=k8NyQFuYHDJbwCDnO1NV5Mis.hcf002?docId=1&cid=1101","https://www.energysage.com/local-data/electricity-cost/co/arapahoe-county/englewood/"],"lflag":"source_quality_reclassified"},{"id":"7203ca621328","cid":"7203ca621328","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Highlands Ranch","county":"Douglas","state":"CO","lat":39.325414,"lng":-104.925987,"cprec":"distinct","status":"Operational","mw":21,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility power: 18.3MW; UPS capacity: 9.2MW; Generator capacity: 15MW","uquote":"Electric and Gas. Xcel Energy. P.O. Box 9477. Minneapolis, Minnesota 55484. 800-895-4999.","uscan":"https://www.ps-shepherd.com/utility-providers","rto":"non-RTO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure","deal":"Centersquare acquired 10 data centers across the United States and Canada with an enterprise value of $1 billion in October 2025.","dealScan":"https://www.csquare.com/blog/centersquare-builds-backbone-for-ai-era-with-1-billion-dollar-expansion","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"ps-shepherd.com;csquare.com","srcUrls":["https://www.ps-shepherd.com/utility-providers","https://www.csquare.com/blog/centersquare-builds-backbone-for-ai-era-with-1-billion-dollar-expansion"],"lflag":"source_quality_reclassified"},{"id":"bee27a22b18b","cid":"bee27a22b18b","canon":1,"dups":1,"ftype":"data_center","name":"Computershare","city":"Englewood","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"eb472d2f70b2","cid":"eb472d2f70b2","canon":0,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Denver","county":"Denver","state":"CO","lat":39.76185,"lng":-104.881105,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The building incorporates redundant electrical distribution, water-cooled chillers, cooling towers and backup diesel generators within a secure equipment yard.","pscan":"https://www.dpr.com/projects/coresite-de3-data-center-phase-1-denver-co","uconf":"High","uquote":"Xcel Energy, the state's largest utility, is the primary provider of electricity and natural gas in the Metro Denver area.","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"CoreSite","spon":"American Tower","ay":2012,"deal":"Acquisition of Comfluent for $3 million in April 2012; Acquisition of Denver Gas and Electric Building for $38 million on April 8, 2025.","dealScan":"https://milehighcre.com/coresite-acquires-historic-denver-gas-and-electric-building/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"dpr.com;milehighcre.com","lflag":"online_before_announced shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":["https://www.dpr.com/projects/coresite-de3-data-center-phase-1-denver-co","https://milehighcre.com/coresite-acquires-historic-denver-gas-and-electric-building/"]},{"id":"8525ab870c18","cid":"8525ab870c18","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Centennial","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"DataBank's Denver Centennial colocation facility provides redundant power and cooling distribution engineered at 175 to 310 watts per sq. ft. and raised floor specifically optimized for high-density and ultra-high-density deployments.... 10mW total utility power capacity, three separate utility feeds with diverse paths back to the substation.","pscan":"https://baxtel.com/data-center/databank-centennial-den2","uconf":"High","uquote":"Located near the Denver Tech Center and other data centers in southeast Denver, the DataBank Centennial Campus spans 11 acres and features our DEN2 and DEN5 data centers, powered by an Xcel Energy off-site substation.","uscan":"https://www.databank.com/data-centers/denver/centennial-campus/","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"DataBank","spon":"Digital Bridge Holdings","oy":2011,"deal":"DataBank purchased the building and land at 6900 South Peoria Street (DEN2) on February 2, 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;databank.com","srcUrls":["https://baxtel.com/data-center/databank-centennial-den2","https://www.databank.com/data-centers/denver/centennial-campus/"],"lflag":"citation_artifact_removed"},{"id":"300532c5843b","cid":"300532c5843b","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Denver","county":"Denver","state":"CO","lat":39.76185,"lng":-104.881105,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The facility provides 2MW of on-site power, a N+1 power design, and N+1 cooling for the ultimate in uptime assurance.","pscan":"https://marketplace.upstack.com/data-centers/databank-data-center-denver-den3","uconf":"Medium","uquote":"Xcel Energy, the state's largest utility, is the primary provider of electricity and natural gas in the Metro Denver area.","uscan":"https://www.metrodenver.org/do-business/transportation-and-infrastructure/telecom-utilities","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"DataBank","spon":"DigitalBridge","ay":1985,"oy":2016,"contro":"City and County of Denver imposed temporary moratoriums on new data centers.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;metrodenver.org","srcUrls":["https://marketplace.upstack.com/data-centers/databank-data-center-denver-den3","https://www.metrodenver.org/do-business/transportation-and-infrastructure/telecom-utilities"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded legacy_facility_year_review"},{"id":"817d6a30777c","cid":"817d6a30777c","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Westminster","county":"Jefferson","state":"CO","lat":39.579511,"lng":-105.245462,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"N+1 Power Design; 0.5MW Critical IT Load; 120V, 208V, 3P AC","pscan":"https://www.databank.com/data-centers/denver/westminster/","uconf":"High","uquote":"Xcel Energy serves the Denver/Boulder area, Northern Colorado, parts of the central mountains and Western Slope, as well as portions of Southern Colorado and provides electricity to approximately 1.6 million Colorado customers.","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"DataBank","spon":"AustralianSuper","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":["https://www.databank.com/data-centers/denver/westminster/"]},{"id":"0127dcc92c9e","cid":"0127dcc92c9e","canon":1,"dups":1,"ftype":"data_center","name":"Denver Federal Center","city":"Denver","county":"Denver","state":"CO","lat":39.76185,"lng":-104.881105,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Hybrid","pconf":"Medium","pquote":"With approximately half of the campus electricity generated by solar photovoltaics, the project is designed to cut grid-purchased energy use approximately by 51% and reduce fossil fuel consumption by 51.5%.","proc":"Co-located generation","pdt":"$183 million contract for 14.4 MW solar and geothermal systems","uquote":"Public Service Company of Colorado (PSCo), doing business as Psco, is a for-profit energy company and subsidiary of Xcel Energy that provides electric, natural gas, and steam utility services across multiple states. PSCo has been awarded numerous prime contracts by federal agencies to directly supply utilities and support infrastructure projects at facilities across the United States. This includes multi-million dollar purchase orders and delivery orders from... General Services Administration.","rto":"non-RTO","nerc":"WECC","op":"General Services Administration (GSA)","spon":"General Services Administration (GSA)","tenant":"Federal Agencies","ay":2009,"oy":2010,"deal":"Energy Savings Performance Contract (ESPC) with Ameresco for $183 million, announced January 13, 2025, to advance electrification with 14.4 MW solar PV and geothermal systems.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"140032c60d3e","cid":"140032c60d3e","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Centennial","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and two power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 0.48 kVA of utility power. The immediate power failure is protected by 4 x 225 kVA parallel redundant UPS in N+1 configuration. The standby power is provided by 1 x 1,000 kW and 1 x 1,500 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-denver-data-center-de1/","uconf":"High","uquote":"Renewable Energy Coverage: 100% from Xcel Energy Renewable*Connect Colorado (in-state solar).","uscan":"https://res.cloudinary.com/hjlz68xhm/image/upload/v1711134172/sbyai0u84z2kovyahg4c.pdf","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"Equinix","spon":"Aphorio Carter Critical Infrastructure Fund","ay":2000,"oy":2000,"deal":"Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center for approximately $7.3 million in 2024.","dealScan":"https://baxtel.com/data-center/equinix-denver-de1","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;res.cloudinary.com;baxtel.com","lflag":"operational_null_capacity","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-denver-data-center-de1/","https://res.cloudinary.com/hjlz68xhm/image/upload/v1711134172/sbyai0u84z2kovyahg4c.pdf","https://baxtel.com/data-center/equinix-denver-de1"]},{"id":"c4c0d91be5b0","cid":"c4c0d91be5b0","canon":1,"dups":1,"ftype":"data_center","name":"Evergeen Technologies","county":"Lincoln","state":"CO","lat":38.99374,"lng":-103.507555,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"e80a109798ce","cid":"e80a109798ce","canon":1,"dups":1,"ftype":"data_center","name":"Exempla Data Center","city":"Lakewood","county":"Jefferson","state":"CO","lat":39.579511,"lng":-105.245462,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"c5796eb44379","cid":"c5796eb44379","canon":1,"dups":1,"ftype":"data_center","name":"Expedient","city":"Centennial","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Expedient's Denver facility offers 18,500 square foot of raised floor space, redundant electric utility power feeds, multiple cooling systems, advanced fire suppression, and a carrier-neutral telecommunications infrastructure.","rto":"non-RTO","nerc":"WECC","op":"Expedient","spon":"Strategic Capital Fund Management","ay":2021,"oy":2021,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"08cb47fa1cfc","cid":"08cb47fa1cfc","canon":1,"dups":1,"ftype":"data_center","name":"FedEx","city":"Colorado Springs","county":"El Paso","state":"CO","lat":38.827383,"lng":-104.527472,"cprec":"distinct","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The EDC-W is equipped with multiple redundancies to maintain a constant availability of power. The building is connected to two separate utility sub-stations that can easily be switched from one to the other, if required. To ensure total reliability, nearly 2,000 batteries can keep the data center running for a sufficient period of time at full load, giving eight onsite generators more than enough time to power up.","pscan":"https://newsroom.fedex.com/newsroom/united-states-english/fedex-unveils-green-data-center-in-colorado-springs","uconf":"High","uquote":"Colorado Springs Utilities is a municipally owned, non-profit provider for all primary utilities (water, wastewater, electric, and natural gas.)","uscan":"https://baxtel.com/data-center/colorado-springs","ukey":"3989|CO","uname":"City of Colorado Springs - (CO)","rto":"non-RTO","nerc":"WECC","op":"FedEx","spon":"FedEx","tenant":"FedEx","ay":2006,"oy":2011,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"newsroom.fedex.com;baxtel.com","srcUrls":["https://newsroom.fedex.com/newsroom/united-states-english/fedex-unveils-green-data-center-in-colorado-springs","https://baxtel.com/data-center/colorado-springs"]},{"id":"631216fb09f6","cid":"631216fb09f6","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Englewood","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Redundant UPS system of 18 MW power capacity with redundant battery strings provides backup power supply in case of utility power loss that is being backed up by 29 MW fully redundant diesel generators having 50,000 gallons diesel fuel. Power to the data center is fed through multiple medium voltage utility power feeds of 13.2 kV from diverse power substations.","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners, Hamilton Lane","ay":2013,"oy":2013,"deal":"GI Partners closed a continuation vehicle and strategic investment from GI Data Infrastructure in Flexential, anchored by funds managed by Hamilton Lane, which, combined with the November 2024 investment from Morgan Stanley Infrastructure Partners, totals approximately $1 billion in primary equity (August 20, 2025).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"23d3276e6771","cid":"23d3276e6771","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Thornton","county":"Adams","state":"CO","lat":39.874325,"lng":-104.331872,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"Medium","pquote":"In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.","uquote":"Depending on your location, electric and gas services are provided to residents of Thornton by Xcel Energy or United Power. This information should be on your electric or gas utility bill. To view the geographic areas serviced by each company, view our Utility Service Areas Map (opens in new window).","rto":"non-RTO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"pscan":"https://www.baxtel.com/data-centers/google/denver-thorton-data-center","uscan":"https://www.thorntonco.gov/residents/Pages/electric-gas-utility-services.aspx","srcUrls":["https://www.baxtel.com/data-centers/google/denver-thorton-data-center","https://www.thorntonco.gov/residents/Pages/electric-gas-utility-services.aspx"],"srcDom":"baxtel.com;thorntonco.gov","lflag":"shared_coordinate_precision_downgraded"},{"id":"2dd46a70e49c","cid":"2dd46a70e49c","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Denver","county":"Denver","state":"CO","lat":39.76185,"lng":-104.881105,"cprec":"shared_centroid","status":"Operational","mw":14,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Our facility provides the highest levels of redundancy, efficiency, and compliance standards, powered by 100% matched renewable energy with N+1 redundancy.","uconf":"High","uquote":"Utility: Xcel Energy with diverse power feeds","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"Iron Mountain","spon":"Iron Mountain Incorporated","ay":2017,"oy":2001,"contro":"Denver City Council imposed a temporary moratorium on new data centers due to concerns about electricity demand, water use, and air quality, with Iron Mountain DEN-1 being an existing facility in the city.","deal":"Iron Mountain acquired MAG DATACENTERS, LLC (FORTRUST) for approximately $128 million on July 28, 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"a1b4ab1678e2","cid":"a1b4ab1678e2","canon":1,"dups":1,"ftype":"data_center","name":"JPMorgan Chase","city":"Aurora","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":25,"band":"25-50 MW","uquote":"The Colorado Public Utilities Commission is requiring Xcel Energy, the state's largest electricity provider, to use a set of “principles” when negotiating with data center developers, including upfront fees, 15-year contracts, minimum bills, security deposits and early-exit fees.... This Xcel Energy Certified MegaSite has 1,250-2,000+ acres of developable land available within a 6,500-acre master-planned industrial development.... Custom Incentive Packages through Xcel Energy and the City of Aurora; Xcel Energy Megasite Certified.","uscan":"https://coloradosun.com/2025/12/10/data-center-power-demands-colorado-xcel-tri-state/","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"JPMorgan Chase","spon":"JPMorgan Chase","tenant":"JPMorgan Chase","oy":2021,"deal":"$11 million in tax incentives","dealScan":"https://baxtel.com/data-center/jp-morgan-aurora","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"coloradosun.com;baxtel.com","srcUrls":["https://coloradosun.com/2025/12/10/data-center-power-demands-colorado-xcel-tri-state/","https://baxtel.com/data-center/jp-morgan-aurora"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"de78254927fe","cid":"de78254927fe","canon":1,"dups":1,"ftype":"data_center","name":"JPMorgan Chase","city":"Broomfield","county":"Broomfield","state":"CO","lat":39.953593,"lng":-105.050787,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"32ec9b91188b","cid":"32ec9b91188b","canon":1,"dups":1,"ftype":"data_center","name":"Kyndryl","city":"Boulder","county":"Boulder","state":"CO","lat":40.094962,"lng":-105.397704,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Western Area Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/kyndryl-57da7583","uconf":"High","uquote":"Electric service. For new service, questions or concerns, or to report a problem with power service, including reporting power outages, power line issues, or for miscellaneous items to be removed from power lines: Contact Xcel Energy at 1-800-895-1999. Xcel Energy is Colorado's largest utility, and the primary provider of electricity and natural gas to major urban areas and many rural areas in the state.","uscan":"https://bouldercolorado.gov/list-boulder-utilities","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"Kyndryl","spon":"Kyndryl","tenant":"Kyndryl","ay":2021,"oy":2020,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;bouldercolorado.gov","lflag":"online_before_announced shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/kyndryl-57da7583","https://bouldercolorado.gov/list-boulder-utilities"]},{"id":"bc834a3446c0","cid":"bc834a3446c0","canon":1,"dups":1,"ftype":"data_center","name":"Leidos","city":"Boulder","county":"Boulder","state":"CO","lat":40.094962,"lng":-105.397704,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","op":"Leidos","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"4e83d57c8854","cid":"4e83d57c8854","canon":1,"dups":1,"ftype":"data_center","name":"Leidos","city":"Denver","county":"Adams","state":"CO","lat":39.874325,"lng":-104.331872,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"f2483ac51a71","cid":"f2483ac51a71","canon":1,"dups":1,"ftype":"data_center","name":"Nissan","city":"Englewood","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Public Service Company Of Colorado.","uquote":"Grid Operator. Public Service Company Of Colorado.","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"Nissan","spon":"Nissan North America","ay":2019,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"dd486138f4fe","cid":"dd486138f4fe","canon":1,"dups":1,"ftype":"data_center","name":"Oracle","city":"Broomfield","county":"Jefferson","state":"CO","lat":39.579511,"lng":-105.245462,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","op":"Oracle","spon":"Oracle","tenant":"Oracle","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"816a9ae8c257","cid":"816a9ae8c257","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Aurora","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":177,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The QTS Realty Trust facility, on 80 acres near the intersection of Interstate 70 and E-470, required its own $28 million, 230-kilovolt transmission line just to connect to the grid.","pscan":"https://kimmonson.com/news/aurora-ai-data-center-power-175000-homes/","uconf":"High","uquote":"A single data center under construction in Aurora will demand 177 megawatts of electricity when it reaches full capacity, enough to power roughly 175,000 homes and surpassing Xcel Energy's largest existing industrial customer.","uscan":"https://kimmonson.com/news/aurora-ai-data-center-power-175000-homes/","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone","ay":2023,"oy":2025,"contro":"Controversy over discounted electricity rates (Economic Development Rate - EDR) for QTS, with concerns about ratepayers subsidizing costs and environmental impact (power/water usage).","controScan":"https://kimmonson.com/news/aurora-ai-data-center-power-175000-homes/","deal":"Aurora City Council approved a tax rebate agreement for QTS on April 24, 2023, capped at $19,088,438. QTS also required a $28 million, 230-kilovolt transmission line to connect to the grid.","dealScan":"https://www.9news.com/article/news/local/denver-city-council-apologizes-data-center-moratorium/73-9f34e8b7-75e3-491b-90ac-17dee009a520","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"kimmonson.com;9news.com","srcUrls":["https://kimmonson.com/news/aurora-ai-data-center-power-175000-homes/","https://www.9news.com/article/news/local/denver-city-council-apologizes-data-center-moratorium/73-9f34e8b7-75e3-491b-90ac-17dee009a520"]},{"id":"b79ba46b6cde","cid":"b79ba46b6cde","canon":1,"dups":1,"ftype":"data_center","name":"Sidus Group","city":"Denver","county":"Denver","state":"CO","lat":39.76185,"lng":-104.881105,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"eb7e050de6d8","cid":"eb7e050de6d8","canon":1,"dups":1,"ftype":"data_center","name":"Spectrum","city":"Centennial","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Xcel Energy","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"65ab6776995d","cid":"65ab6776995d","canon":1,"dups":1,"ftype":"data_center","name":"US General Services Administration","city":"Denver","county":"Jefferson","state":"CO","lat":39.579511,"lng":-105.245462,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"These systems, along with other ECMs, would replace approximately 90 percent of fossil fuel consumption on campus and allow for self-generated solar PV to electrify approximately half of the campus. The proposed project is needed to cut DFC grid- purchased energy use by approximately 65 percent and water usage by approximately 29 percent. The $183 million award will advance the electrification of the DFC with 14.4 megawatts of ground-mount (MW) solar photovoltaic systems and 62.4 million British thermal units per hour (MMBtu/h) of geothermal bores, alongside 20.1 MMBtu/h of electric heat pump capacity.","proc":"Co-located generation","pcp":"Ameresco","pdt":"$183 million contract, aiming for net-zero campus by 2045","uconf":"High","uquote":"Xcel Energy, Colorado's largest electric utility, is expected to file a proposal by April 2.","uscan":"https://www.govtech.com/artificial-intelligence/colorado-still-grappling-with-who-pays-for-data-center-power","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"US General Services Administration","spon":"US General Services Administration","tenant":"Various federal agencies","oy":2010,"deal":"Energy Savings Performance Contract (ESPC) with Ameresco for $183 million, announced January 13, 2025.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"govtech.com","srcUrls":["https://www.govtech.com/artificial-intelligence/colorado-still-grappling-with-who-pays-for-data-center-power"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"1163c756cb6e","cid":"1163c756cb6e","canon":1,"dups":1,"ftype":"data_center","name":"US Signal","city":"Englewood","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility Feeds: 2,500 kVA.","uconf":"High","uquote":"Utility Provider: Xcel Energy.","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"US Signal Company","spon":"Igneo Infrastructure Partners","ay":2013,"oy":2015,"deal":"US Signal acquired OneNeck IT Solutions (including this data center) from Telephone and Data Systems, Inc. (TDS) in Q3 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b576ae16dae1","cid":"b576ae16dae1","canon":1,"dups":1,"ftype":"data_center","name":"Visa","city":"Highlands Ranch","county":"Douglas","state":"CO","lat":39.325414,"lng":-104.925987,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Resilience through Redundancy: • Multiple connections to grid power. • Back-up battery and diesel generator power. • Backup cooling capacity.","pscan":"https://usa.visa.com/content/dam/VCOM/global/visa-everywhere/documents/visa-data-center-infographic.pdf","uquote":"Electric and Gas. Xcel Energy. P.O. Box 9477. Minneapolis, Minnesota 55484. 800-895-4999.","uscan":"https://www.ps-shepherd.com/utility-providers","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"Visa","spon":"Visa","tenant":"Visa","oy":2002,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"usa.visa.com;ps-shepherd.com","srcUrls":["https://usa.visa.com/content/dam/VCOM/global/visa-everywhere/documents/visa-data-center-infographic.pdf","https://www.ps-shepherd.com/utility-providers"],"lflag":"source_quality_reclassified"},{"id":"8a4043bc33a6","cid":"8a4043bc33a6","canon":1,"dups":1,"ftype":"data_center","name":"Walmart","city":"Colorado Springs","county":"El Paso","state":"CO","lat":38.827383,"lng":-104.527472,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Colorado Springs Utilities (Utilities) engages in the production, purchase, and distribution of electricity. These activities incur fuel related (production and purchases) and non-fuel related (production and distribution) expenditures.... Utilities proposes the addition of a new large load rate schedule applicable to industrial customers with loads greater than 10MW to advance and balance the principles of: • Supporting economic development and rate competitiveness. • Ensuring resource and infrastructure adequacy. • Minimize cost shifting to existing customers. • Mitigate stranded cost risk. • Protect Utilities' financial health.","pscan":"https://www.csu.org/hubfs/Document-Library/2026-Rate-Case-Filing.pdf?hsLang=en","uconf":"High","uquote":"Colorado Springs Utilities provides electricity to more than 260,000 customers across the Front Range.","uscan":"https://coloradospringsutilities.jobs/colorado-springs-co/senior-electric-distribution-system-operator/23AEDE1F506C4E48BE931D99507974C3/job/","ukey":"3989|CO","uname":"City of Colorado Springs - (CO)","rto":"non-RTO","nerc":"WECC","op":"Walmart","spon":"Walmart","tenant":"Walmart","ay":2011,"oy":2012,"deal":"Construction costs estimated at $100 million; $4.5 million in sales and business personal property tax rebates; 2011 land purchase for $5.3 million.","dealScan":"https://www.datacenterknowledge.com/business/wal-mart-confirms-colorado-springs-project","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"csu.org;coloradospringsutilities.jobs;datacenterknowledge.com","srcUrls":["https://www.csu.org/hubfs/Document-Library/2026-Rate-Case-Filing.pdf?hsLang=en","https://coloradospringsutilities.jobs/colorado-springs-co/senior-electric-distribution-system-operator/23AEDE1F506C4E48BE931D99507974C3/job/","https://www.datacenterknowledge.com/business/wal-mart-confirms-colorado-springs-project"],"lflag":"citation_artifact_removed"},{"id":"418abedbef4e","cid":"418abedbef4e","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Englewood","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Xcel Energy.","uconf":"High","uquote":"Grid Operator. Xcel Energy.","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"Centersquare","spon":"Brookfield Infrastructure","ay":2009,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4066a54e1b8f","cid":"4066a54e1b8f","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Littleton","county":"Douglas","state":"CO","lat":39.325414,"lng":-104.925987,"cprec":"distinct","status":"Proposed","mw":17.5,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"75838ae6cab2","cid":"75838ae6cab2","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Denver","county":"Denver","state":"CO","lat":39.76185,"lng":-104.881105,"cprec":"shared_centroid","status":"Proposed","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Emergency backup generators are located on the property for emergency use. The generators will periodically be tested as their maintenance requires, which is less than 50 hours per year. [...] Utility Power: Power taken at 13.2kV (and stepped down to 480V once inside the building) to achieve rate reduction and distribution efficiencies.","pscan":"https://www.dpr.com/projects/coresite-de3-data-center-phase-1-denver-co","uconf":"High","uquote":"The meeting was moderated by Denver City Council member Daryl Watson. and featured representatives from Excel Energy Denver Water.","uscan":"https://www.youtube.com/shorts/hklKd8P36CA","ukey":"15466|CO","uname":"Public Service Co of Colorado","rto":"non-RTO","nerc":"WECC","op":"CoreSite","spon":"Stonepeak, American Tower","ay":2024,"oy":2026,"contro":"Community opposition, city council apology, and one-year moratorium on new data center construction due to concerns about energy and water use, noise, and placement.","controScan":"https://www.9news.com/article/news/local/denver-city-council-apologizes-data-center-moratorium/73-9f34e8b7-75e3-491b-90ac-17dee009a520","deal":"Joint venture formed in July 2024 between Stonepeak and American Tower (CoreSite) to develop, construct, and operate DE3, with an estimated development cost of over $250 million. CoreSite purchased the 13.6-acre property in December 2022 for $33.15 million.","dealScan":"https://stonepeak.com/news/stonepeak-forms-joint-venture-with-american-tower-to-construct-a-new-data-center-in-denver-colorado","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"dpr.com;youtube.com;stonepeak.com;9news.com","srcUrls":["https://www.dpr.com/projects/coresite-de3-data-center-phase-1-denver-co","https://www.youtube.com/shorts/hklKd8P36CA","https://stonepeak.com/news/stonepeak-forms-joint-venture-with-american-tower-to-construct-a-new-data-center-in-denver-colorado","https://www.9news.com/article/news/local/denver-city-council-apologizes-data-center-moratorium/73-9f34e8b7-75e3-491b-90ac-17dee009a520"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"869a2ee2528f","cid":"869a2ee2528f","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Crusoe Energy","county":"Jackson","state":"CO","lat":40.663432,"lng":-106.329248,"cprec":"distinct","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"For Crusoe, the business model is to purchase the gas at below-market rates to run a module consisting of a generator that powers two large trailers packed with crypto mining computers.","proc":"Co-located generation","pcp":"D90 Energy","pdt":"purchase the gas at below-market rates","rto":"non-RTO","nerc":"WECC","op":"Crusoe Energy","spon":"Valor Equity Partners, Mubadala Capital","tenant":"Crusoe Energy","ay":2022,"deal":"Gas purchase agreement with D90 Energy","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3ca3c071abb1","cid":"3ca3c071abb1","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Englewood","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Western Area Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/equinix-adba993c","uconf":"High","uquote":"2022 COLORADO COMMUNITIES SERVED BY XCEL ENERGY lists Englewood as a community served by Xcel Energy. Public Service Company of Colorado (PSCo) – now known as Xcel Energy – has been providing gas and electric power to communities in Colorado since it was known as Denver Gas Company. Public Service Company of Colorado is an operating utility engaged primarily in the generation, purchase, transmission, distribution, and sale of electricity in Colorado, to a territory that includes Denver and other cities as well as rural sections of Colorado. It is a subsidiary of Xcel Energy.","rto":"non-RTO","nerc":"WECC","op":"Equinix","spon":"Equinix","ay":2000,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-adba993c"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"14231b38e138","cid":"14231b38e138","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Aurora","county":"Arapahoe","state":"CO","lat":39.644554,"lng":-104.331706,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"d82e59b5c4de","cid":"d82e59b5c4de","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Denver","county":"Denver","state":"CO","lat":39.76185,"lng":-104.881105,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"f24d465ae561","cid":"f24d465ae561","canon":1,"dups":1,"ftype":"data_center","name":"Stonepeak Infrastructure Partners","city":"Longmont","county":"Boulder","state":"CO","lat":40.094962,"lng":-105.397704,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"8467720b2ca1","cid":"8467720b2ca1","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Washington","county":"District of Columbia","state":"DC","lat":38.904247,"lng":-77.016517,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Cogent Data Centers provide secure access, controlled by cameras and biometric hand scanners; Uninterruptible Power Supply (UPS) and backup generators keep your services running when grid power fails.","uconf":"High","uquote":"In the local DC context, our utility Pepco purchases energy from PJM.","uscan":"https://www.wepowerdc.org/latest-news/who-is-our-grid-operator-pjm","ukey":"15270|DC","uname":"Potomac Electric Power Co","rto":"PJM","nerc":"RFC","op":"Cogent Communications","spon":"Cogent Communications","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wepowerdc.org","srcUrls":["https://www.wepowerdc.org/latest-news/who-is-our-grid-operator-pjm"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"42adcc03f789","cid":"42adcc03f789","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Washington","county":"District of Columbia","state":"DC","lat":38.904247,"lng":-77.016517,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Single utility feed from highly stable White House utility grid. UPS/PDU/RPP. 4:3 distributed redundant UPS with 2N. UPTIME. 100% uptime SLA. OPERATIONS. 24x7x365 remote hands.","pscan":"https://www.coresite.com/data-center/dc2-washington-d-c","uquote":"The Potomac Electric Power Company (PEPCO) is an American utility company that supplies electric power to the city of Washington, DC, and to surrounding communities in Maryland.","ukey":"15270|DC","uname":"Potomac Electric Power Co","rto":"PJM","nerc":"RFC","op":"CoreSite","spon":"American Tower, Stonepeak Partners","oy":2018,"deal":"CoreSite acquired by American Tower in December 2021 for approximately $10.1 billion. Stonepeak Partners LP invested an additional $570.0 million in October 2022, bringing its total investment to $3.07 billion for an approximately 36% ownership interest in American Tower's U.S. data center business.","dealScan":"https://stonepeak.com/news/stonepeak-upsizes-investment-in-american-towers-data-center-business","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"coresite.com;stonepeak.com","srcUrls":["https://www.coresite.com/data-center/dc2-washington-d-c","https://stonepeak.com/news/stonepeak-upsizes-investment-in-american-towers-data-center-business"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"c1180c1538d2","cid":"c1180c1538d2","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Washington","county":"District of Columbia","state":"DC","lat":38.904247,"lng":-77.016517,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center provides AC and DC power to the customer equipment. The facility has A & B DC power feeds offering redundancy and protection.","uquote":"The Potomac Electric Power Company (PEPCO) is an American utility company that supplies electric power to the city of Washington, D.C., and to surrounding communities in Maryland.","ukey":"15270|DC","uname":"Potomac Electric Power Co","rto":"PJM","nerc":"RFC","op":"Verizon","spon":"Verizon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"eddfb9790163","cid":"eddfb9790163","canon":1,"dups":1,"ftype":"data_center","name":"Christiana Care Health Services","city":"Newark","county":"New Castle","state":"DE","lat":39.575915,"lng":-75.644132,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Delmarva Power and Light.","pscan":"https://www.interconnection.fyi/data-center/project/christiana-care-health-services-b183b1ac","uconf":"High","uquote":"Grid Operator. Delmarva Power and Light.","uscan":"https://www.interconnection.fyi/data-center/project/christiana-care-health-services-b183b1ac","ukey":"5027|DE","uname":"Delmarva Power","rto":"PJM","nerc":"RFC","op":"Christiana Care Health Services","spon":"Christiana Care Health Services","ay":2009,"oy":2009,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/christiana-care-health-services-b183b1ac"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"e46a773197bd","cid":"2d125507c677","canon":0,"dups":2,"ftype":"data_center","name":"Data Canopy","city":"Newark","county":"New Castle","state":"DE","lat":39.575915,"lng":-75.644132,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility feeds: 3. Fault tolerant, conditioned UPS power. UPS Redundancy: 2N & N+1. Liebert, Powerware, and GE UPS infrastructure. Generac generators with 60+ hour fuel supply. 7,000 gallons diesel fuel on site.","uconf":"High","uquote":"The City of Newark offers municipal services including electric, water, and sewer. Offering green energy opportunities through grants and Community Solar, as the local electric utility, Newark is there for residents focused on adopting cleaner energy options.","uscan":"https://www.demecinc.net/economic-development/newark/","ukey":"13519|DE","uname":"City of Newark - (DE)","rto":"PJM","nerc":"RFC","op":"Data Canopy","spon":"Metropolitan Partners Group","deal":"Data Canopy acquired Ntirety's colocation business in June 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"demecinc.net","srcUrls":["https://www.demecinc.net/economic-development/newark/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"2d125507c677","cid":"2d125507c677","canon":1,"dups":2,"ftype":"data_center","name":"Data Canopy","city":"Newark","county":"New Castle","state":"DE","lat":39.575915,"lng":-75.644132,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"6MW building power capacity. Utility feeds: 3. Fault tolerant, conditioned UPS power. UPS Redundancy: 2N & N+1. Liebert, Powerware, and GE UPS infrastructure. Generac generators with 60+ hour fuel supply. 7,000 gallons diesel fuel on site.","uconf":"High","uquote":"The City of Newark offers municipal services including electric, water, and sewer.","uscan":"https://www.demecinc.net/economic-development/newark/","ukey":"13519|DE","uname":"City of Newark - (DE)","rto":"PJM","nerc":"RFC","op":"Data Canopy","spon":"Data Canopy","oy":2023,"deal":"Data Canopy acquired Ntirety's colocation business in June 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"demecinc.net","srcUrls":["https://www.demecinc.net/economic-development/newark/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"a6d68123487d","cid":"a6d68123487d","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Newark","county":"New Castle","state":"DE","lat":39.575915,"lng":-75.644132,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","uquote":"The City of Newark offers municipal services including electric, water, and sewer. Offering green energy opportunities through grants and Community Solar, as the local electric utility, Newark is there for residents focused on adopting cleaner energy options.","uscan":"https://www.demecinc.net/economic-development/newark/","ukey":"13519|DE","uname":"City of Newark - (DE)","rto":"PJM","nerc":"RFC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"demecinc.net","srcUrls":["https://www.demecinc.net/economic-development/newark/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"71e9493bf27c","cid":"71e9493bf27c","canon":1,"dups":1,"ftype":"data_center","name":"Fiserv","city":"Wilmington","county":"New Castle","state":"DE","lat":39.575915,"lng":-75.644132,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3bf2489e94d7","cid":"3bf2489e94d7","canon":1,"dups":1,"ftype":"data_center","name":"JPMorgan Chase","city":"Bear","county":"New Castle","state":"DE","lat":39.575915,"lng":-75.644132,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Delmarva Power and Light.","pscan":"https://www.interconnection.fyi/data-center/project/jpmorgan-chase-a5884298","uconf":"High","uquote":"Grid Operator. Delmarva Power and Light.","uscan":"https://www.interconnection.fyi/data-center/project/jpmorgan-chase-a5884298","ukey":"5027|DE","uname":"Delmarva Power","rto":"PJM","nerc":"RFC","op":"JPMorgan Chase","spon":"JP Morgan Chase Bank","tenant":"JPMorgan Chase","ay":2007,"oy":2004,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/jpmorgan-chase-a5884298"]},{"id":"d8875ea829ea","cid":"d8875ea829ea","canon":1,"dups":1,"ftype":"data_center","name":"JPMorgan Chase","city":"Newark","county":"New Castle","state":"DE","lat":39.575915,"lng":-75.644132,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Delmarva Power and Light.","pscan":"https://www.interconnection.fyi/data-center/project/jpmorgan-chase-a5884298","uconf":"High","uquote":"Grid Operator. Delmarva Power and Light.","uscan":"https://www.interconnection.fyi/data-center/project/jpmorgan-chase-a5884298","ukey":"5027|DE","uname":"Delmarva Power","rto":"PJM","nerc":"RFC","op":"JPMorgan Chase","spon":"JP Morgan Chase Bank","ay":2007,"oy":2005,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/jpmorgan-chase-a5884298"]},{"id":"c55f1cfaef44","cid":"c55f1cfaef44","canon":1,"dups":1,"ftype":"data_center","name":"JPMorgan Chase","city":"Wilmington","county":"New Castle","state":"DE","lat":39.575915,"lng":-75.644132,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Delmarva Power and Light","uquote":"Grid Operator: Delmarva Power and Light.","uscan":"https://www.interconnection.fyi/data-center/project/jpmorgan-chase-a5884298","ukey":"5027|DE","uname":"Delmarva Power","rto":"PJM","nerc":"RFC","op":"JPMorgan Chase","spon":"JPMorgan Chase Bank","ay":2001,"oy":2004,"deal":"JP Morgan's $300 million Delaware Technology Center (DTC) project in Wilmington, Delaware, a renovated space designed to house an additional 1,800 jobs.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/jpmorgan-chase-a5884298"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"357e79ea626a","cid":"357e79ea626a","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Orlando","county":"Orange","state":"FL","lat":28.514391,"lng":-81.323284,"cprec":"distinct","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Diverse underground utility feeds from high-reliability electrical grid. A “fun fact” about the Orlando data center (OR1) is that the backup power system is run on diesel generators, but OR1 also has gas turbine generators like you see on a commercial aircraft. Gas turbines can operate as a primary power source and can run for months on end before needing maintenance.","pscan":"https://www.coresite.com/data-center/or1-orlando-fl","uquote":"The Orlando Utilities Commission (OUC) is a municipally owned public utility providing electric and water service to the citizens of Orlando, Florida and portions of adjacent unincorporated areas of Orange County","uscan":"https://www.gem.wiki/Orlando_Utilities","ukey":"14610|FL","uname":"Orlando Utilities Comm","rto":"non-RTO","nerc":"SERC","op":"CoreSite","spon":"American Tower","ay":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"coresite.com;gem.wiki","lflag":"online_before_announced","srcUrls":["https://www.coresite.com/data-center/or1-orlando-fl","https://www.gem.wiki/Orlando_Utilities"]},{"id":"ff387efd28cd","cid":"ff387efd28cd","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Doral","county":"Miami-Dade","state":"FL","lat":25.616009,"lng":-80.50375,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"Medium","pquote":"The MI2 data center features critical building infrastructure, with all major systems designed to be concurrently maintainable, while MI1 provides ultra-low latency to greater Miami and South American network points of presences (POPs) — together creating an ideal interconnection site for content caching.","pscan":"https://www.coresite.com/data-center/mi2-miami-fl","uconf":"High","uquote":"Doral, Florida: Florida Power & Light: 100.00%","ukey":"6452|FL","uname":"Florida Power & Light Co","rto":"non-RTO","nerc":"SERC","op":"CoreSite","spon":"American Tower , Stonepeak","ay":2022,"oy":2022,"deal":"CoreSite acquired the MI2 facility for $34 million on September 27, 2022.","dealScan":"https://baxtel.com/data-center/coresite-mi2","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"coresite.com;baxtel.com","srcUrls":["https://www.coresite.com/data-center/mi2-miami-fl","https://baxtel.com/data-center/coresite-mi2"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"d3a38393c361","cid":"d3a38393c361","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Miami","county":"Miami-Dade","state":"FL","lat":25.616009,"lng":-80.50375,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: PDU. UPS. Generators.","uconf":"High","uquote":"Network Providers: CenturyLink. Comcast FiberLight. FPL Level 3. Windstream.","uscan":"https://baxtel.com/data-center/edgeconnex-mia01","ukey":"6452|FL","uname":"Florida Power & Light Co","rto":"non-RTO","nerc":"SERC","op":"EdgeConneX","spon":"EQT Infrastructure","ay":2015,"oy":2015,"deal":"Sixth Street acquired a minority stake in EdgeConneX from EQT on September 24, 2024.","dealScan":"https://baxtel.com/data-center/edgeconnex-miami-mia02","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/edgeconnex-mia01","https://baxtel.com/data-center/edgeconnex-miami-mia02"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"6a57b62449f9","cid":"6a57b62449f9","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Miami","county":"Miami-Dade","state":"FL","lat":25.616009,"lng":-80.50375,"cprec":"shared_centroid","status":"Operational","mw":17,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The power to the data center is fed from dual utility feeds. The redundant 300 kVA UPS system in N+1 configuration provides A+B power to each cabinet. The backup emergency power to the data center is provided by redundant diesel generators with a total of 1.5 MW of total capacity onsite.","uquote":"The largest electricity company in Miami-Dade County, Florida by total customer count is Florida Power & Light.","ukey":"6452|FL","uname":"Florida Power & Light Co","rto":"non-RTO","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2017,"oy":2017,"deal":"Acquisition of 29 data centers from Verizon Communications Inc. for $3.6 billion in cash, closed May 1, 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"fee1b36ab28f","cid":"fee1b36ab28f","canon":1,"dups":1,"ftype":"data_center","name":"Six/Ten","city":"Winter Haven","county":"Polk","state":"FL","lat":27.953649,"lng":-81.693534,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility Power Grid (Hospital and Utility Redundancy)","uconf":"High","uquote":"480V, 4000 AMP service from Tampa Electric company.","ukey":"18454|FL","uname":"Tampa Electric Co","rto":"non-RTO","nerc":"SERC","op":"Six/Ten","spon":"Six/Ten","tenant":"Sprint/Nextel (previous), Protected Trust","ay":1999,"oy":2015,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fc5e26bfee30","cid":"fc5e26bfee30","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Temple Terrace","county":"Hillsborough","state":"FL","lat":27.88761,"lng":-82.374417,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Tampa Electric, commonly known as TECO, is the primary electricity provider for Temple Terrace residents. They offer reliable power services with a focus on customer satisfaction.","pscan":"https://vreelandre.com/utilities/temple-terrace","uconf":"High","uquote":"Tampa Electric, commonly known as TECO, is the primary electricity provider for Temple Terrace residents.","uscan":"https://vreelandre.com/utilities/temple-terrace","ukey":"18454|FL","uname":"Tampa Electric Co","rto":"non-RTO","nerc":"SERC","op":"Verizon Data Services","spon":"Verizon Communications","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"vreelandre.com","srcUrls":["https://vreelandre.com/utilities/temple-terrace"],"lflag":"source_quality_reclassified"},{"id":"37ad4a037328","cid":"37ad4a037328","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Tampa","county":"HIllsborough","state":"FL","lat":27.88761,"lng":-82.374417,"cprec":"distinct","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Duke Energy Florida","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"6455|FL","uname":"Duke Energy Florida, LLC","reportedUtility":"Duke Energy Florida, LLC","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"62d2452bd52b","cid":"62d2452bd52b","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Miami Gardens","county":"Miami-Dade","state":"FL","lat":25.616009,"lng":-80.50375,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"SERC","op":"EdgeConneX","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"92aed24cdbc6","cid":"92aed24cdbc6","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"Miami","county":"Miami-Dade","state":"FL","lat":25.616009,"lng":-80.50375,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"b0dd81696d3c","cid":"b0dd81696d3c","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Miami","county":"Miami-Dade","state":"FL","lat":25.616009,"lng":-80.50375,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"fed4490896f9","cid":"fed4490896f9","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Doral","county":"Miami-Dade","state":"FL","lat":25.616009,"lng":-80.50375,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"1aaa1ad6e827","cid":"1aaa1ad6e827","canon":1,"dups":1,"ftype":"data_center","name":"75 South Data Center Campus","city":"UNINCORPORATED","county":"SPALDING","state":"GA","lat":33.262348,"lng":-84.284905,"cprec":"distinct","status":"Future / Expansion","mw":450,"pc":"Grid","pconf":"Medium","pquote":"Located south of Atlanta in the Griffin area, the facility is engineered for high-performance computing, including an on-site power substation and a closed-loop cooling system designed to protect local water resources.","pscan":"https://baxtel.com/data-center/75-south-data-center-campus","rto":"non-RTO","nerc":"SERC","op":"Hillwood","spon":"Hillwood","oy":2030,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"status_adjusted_future_expansion","srcUrls":["https://baxtel.com/data-center/75-south-data-center-campus"],"band":"250+ MW","rawStatus":"Operational"},{"id":"a00175fcc86e","cid":"a00175fcc86e","canon":1,"dups":1,"ftype":"data_center","name":"ADP","city":"Alpharetta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"SERC","op":"ADP","spon":"ADP","tenant":"ADP","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"9437056bcc21","cid":"9437056bcc21","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Duluth","county":"Gwinnett","state":"GA","lat":33.958756,"lng":-84.025735,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern Company.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-7e7512ce","uconf":"High","uquote":"Grid Operator. Southern Company.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-7e7512ce","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-7e7512ce"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"3330be6a53d7","cid":"3330be6a53d7","canon":0,"dups":2,"ftype":"data_center","name":"AT&T","city":"Alpharetta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"10.7 MW of utility power supporting mission-critical operations.","uquote":"Alpharetta, Georgia: Sawnee Electric Membership Corporation: 14.99% Cobb Electric Membership Corp: 1.30% Georgia Power: 83.71%","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"AT&T","tenant":"AT&T","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"e2c679c0788b","cid":"3330be6a53d7","canon":0,"dups":2,"ftype":"data_center","name":"AT&T","city":"Alpharetta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"10.7 MW of utility power supporting mission-critical operations; 3.75 MW of critical UPS load in a N+1 redundant configuration","pscan":"https://platform.reverecre.com/project/a8408340-0f27-4bef-a618-9b6d0fe5505c","uquote":"Alpharetta, Georgia: Sawnee Electric Membership Corporation: 14.99% Cobb Electric Membership Corp: 1.30% Georgia Power: 83.71%","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"AT&T","tenant":"AT&T","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"platform.reverecre.com","srcUrls":["https://platform.reverecre.com/project/a8408340-0f27-4bef-a618-9b6d0fe5505c"],"lflag":"source_quality_reclassified"},{"id":"6a9979177739","cid":"6a9979177739","canon":1,"dups":1,"ftype":"data_center","name":"AT&T","city":"Alpharetta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Georgia Power","pdt":"10.7 MW","uquote":"Electricity: Georgia Power serves Fulton County and Alpharetta.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ad71d5632749","cid":"ad71d5632749","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Atlanta","county":"DeKalb","state":"GA","lat":33.770661,"lng":-84.226343,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Georgia Power","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"7140|GA","uname":"Georgia Power Co","reportedUtility":"Georgia Power Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5a89c826c5c8","cid":"5a89c826c5c8","canon":0,"dups":1,"ftype":"data_center","name":"Data Center - 0 Social Circle Parkway","city":"SOCIAL CIRCLE","county":"WALTON","state":"GA","lat":33.783887,"lng":-83.731829,"cprec":"distinct","status":"Operational","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_unsourced_permit_record","rawName":"Data Center - 0 Social Circle Parkway","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"16d9aaf134b7","cid":"16d9aaf134b7","canon":0,"dups":1,"ftype":"data_center","name":"DataBank","city":"Atlanta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility feeds will initially provide more than 8 MW of critical IT power.","uconf":"High","uquote":"Positioned adjacent to a Georgia Power substation, ATL4 ensures very high power reliability.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"DataBank","spon":"DigitalBridge","tenant":"Georgia Institute of Technology","ay":2018,"oy":2019,"deal":"Collaboration with Georgia Tech for High-Performance Computing Center (announced 2018)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"6715003a9972","cid":"6715003a9972","canon":0,"dups":1,"ftype":"data_center","name":"DataBank","city":"Atlanta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"DataBank's ATL3 Atlanta West End data center provides 1.5MW of on-site power, a 2N power design, and N+1 cooling for the ultimate in uptime assurance.","uconf":"High","uquote":"Utility Provider: Georgia Power.","uscan":"https://baxtel.com/data-center/databank-atlanta-atl4","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"DataBank","spon":"DigitalBridge, Swiss Life Asset Managers, EDF Invest, TJC","ay":2021,"oy":2022,"deal":"$250M equity investment from TJC and $600M secondary share sale (January 30, 2025), part of a $2B equity round (October 2024).","dealScan":"https://www.databank.com/resources/press-releases/databank-announces-250m-equity-investment-from-tjc-and-a-600m-secondary-share-sale/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;databank.com","srcUrls":["https://baxtel.com/data-center/databank-atlanta-atl4","https://www.databank.com/resources/press-releases/databank-announces-250m-equity-investment-from-tjc-and-a-600m-secondary-share-sale/"],"lflag":"merged_duplicate"},{"id":"13b3d32db82f","cid":"13b3d32db82f","canon":1,"dups":1,"ftype":"data_center","name":"DC Blox - ATL East Data Center","city":"UNINCORPORATED","county":"ROCKDALE","state":"GA","lat":33.652081,"lng":-84.02637,"cprec":"distinct","status":"Operational","mw":216,"pc":"Grid","pconf":"High","pquote":"The campus is designed at full build-out to accommodate 750,000 square feet of space with 216MW of total power committed by Georgia Power.","uconf":"High","uquote":"The campus is designed at full build-out to accommodate 750,000 square feet of space with 216MW of total power committed by Georgia Power.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"DC BLOX","spon":"Future Standard","tenant":"Unnamed hyperscaler","ay":2023,"oy":2025,"contro":"Community opposition, environmental concerns, and a moratorium on new data centers.","controScan":"https://ocgnews.com/public-pushback-mounts-over-data-centers-proposed-battery-storage-system-in-rockdale-county/","deal":"DC BLOX secured an expansion of its green Senior Secured Credit Facilities loan (SSCF) to $850 million from the original $265 million in May 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"ocgnews.com","srcUrls":["https://ocgnews.com/public-pushback-mounts-over-data-centers-proposed-battery-storage-system-in-rockdale-county/"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"1158ecd7cbc0","cid":"1158ecd7cbc0","canon":1,"dups":1,"ftype":"data_center","name":"DC Blox- ATL West Data Center","city":"DOUGLASVILLE","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Operational","mw":180,"pc":"Grid","pconf":"High","pquote":"Utility Provider: Greystone Power Cooperative.","uconf":"High","uquote":"Utility Provider: Greystone Power Cooperative.","ukey":"7090|GA","uname":"GreyStone Power Corporation","rto":"non-RTO","nerc":"SERC","op":"DC BLOX","spon":"Future Standard, Post Road Group, Bain Capital Credit","ay":2023,"oy":2025,"deal":"$1.15 billion green loan financing closed August 11, 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"17a62bb3e06d","cid":"17a62bb3e06d","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Alpharetta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Southern Company.... Currently 94% of DXC's direct carbon emissions come from electricity consumption in these buildings.","uquote":"Grid Operator. Southern Company.","uscan":"https://www.interconnection.fyi/data-center/project/dxc-technology-b627afb6","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"DXC Technology","spon":"DXC Technology","ay":2006,"oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/dxc-technology-b627afb6"],"lflag":"citation_artifact_removed"},{"id":"276a51e5da89","cid":"276a51e5da89","canon":1,"dups":1,"ftype":"data_center","name":"Edged Energy","city":"Atlanta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":168,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Redundant utility feeds from Georgia Power.... Full microgrid connectivity with the local grid enhances the campus's reliability and resilience, supporting continuous operations under adverse conditions. Additionally, it features a fully automated, self-healing 24.9 kV medium voltage distribution system, which provides optimal energy efficiency. The Edged Atlanta Campus, designed as a 168 MW critical IT campus, includes the recently completed 27 MW data center, a second 100 MW facility currently under construction and a third 41 MW facility. This project exemplifies PowerSecure's dedication to delivering sustainable, reliable and resilient power solutions, and reinforces Edged Energy's commitment to a clean energy future.","pscan":"https://baxtel.com/data-center/edged-energy-atlanta01-03","uconf":"High","uquote":"The event was attended by City of Atlanta and Fulton County officials, local utility provider Georgia Power and key project partners.... Redundant utility feeds from Georgia Power.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Edged Energy","spon":"Endeavour","ay":2024,"oy":2024,"deal":"Edged secured nearly $2 billion in cumulative financing year-to-date, including a $1.3 billion Senior Secured Notes offering in April 2026, to support development in Atlanta and Chicago.","dealScan":"https://bebeez.eu/2026/05/29/edged-secures-2bn-financing-to-fuel-us-data-center-build-out/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;bebeez.eu","srcUrls":["https://baxtel.com/data-center/edged-energy-atlanta01-03","https://bebeez.eu/2026/05/29/edged-secures-2bn-financing-to-fuel-us-data-center-build-out/"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"7a78d55f897d","cid":"7a78d55f897d","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Atlanta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Atlanta AT1 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center has dual utility feeds, and two 3.75 power transformers at 2nd & 6th floor each. The immediate at power failure is protected by 10 x 625 kVA parallel redundant UPS in N+1 configuration. The standby power is provided by 2 x 2,250 kW diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/equinix-atlanta-data-center-at1/","uconf":"High","uquote":"Grid Operator: Southern Company.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-af90b330","ukey":"10624|GA","uname":"Southern Rivers Energy","rto":"non-RTO","nerc":"SERC","op":"Equinix","spon":"Mapletree Industrial Trust","oy":2010,"deal":"Acquisition by Mapletree Industrial Trust in 2017; Acquisition by Equinix from Switch & Data in 2010.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/equinix-adds-new-space-in-virginia-atlanta","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-atlanta-data-center-at1/","https://www.interconnection.fyi/data-center/project/equinix-af90b330","https://www.datacenterknowledge.com/hyperscalers/equinix-adds-new-space-in-virginia-atlanta"]},{"id":"a87babf20bbf","cid":"a87babf20bbf","canon":1,"dups":1,"ftype":"data_center","name":"GA Tech High Performance Computing Center (GT HPCC)","city":"ATLANTA","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"High","pquote":"19.8 MW of utility power provided by Georgia Power via underground duct banks into below grade transformer vaults. Roof mounted 2,500 kW generators provide 24-hour on-site fuel supply for each generator.","uquote":"19.8 MW of utility power provided by Georgia Power via underground duct banks into below grade transformer vaults.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"DataBank","tenant":"Georgia Institute of Technology","ay":2018,"oy":2019,"deal":"NSF awarded $3.7 million to Georgia Tech for HPC resource (July 23 2019)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"aff68a097d96","cid":"aff68a097d96","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Lithia Springs","county":"Douglas","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The datacenter located at 300 Riverside Parkway in Lithia Springs, Douglas County, is a Google facility designed with robust infrastructure to ensure optimal performance and security. This datacenter is equipped with a reliable power system, featuring dual redundant feeds and on-site generators to maintain continuous operation even during power outages.","uquote":"The state's largest utility is building power plants and a web of transmission lines to carry electricity to satisfy unprecedented demand, mostly from new server farms.... Then, last fall, the couple got a letter from Georgia Power. It said new, high-voltage transmission lines the company plans to build may need to cross their property, and invited them to a community meeting to learn more.","uscan":"https://www.ajc.com/business/2026/05/the-data-center-boom-is-transforming-georgia-some-residents-could-lose-their-land/","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Google","spon":"Google","tenant":"Google","ay":2003,"oy":2007,"deal":"$300 million data center expansion announced June 2, 2015","dealScan":"https://www.datacenterknowledge.com/hyperscalers/google-to-spend-300m-on-second-atlanta-metro-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"ajc.com;datacenterknowledge.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.ajc.com/business/2026/05/the-data-center-boom-is-transforming-georgia-some-residents-could-lose-their-land/","https://www.datacenterknowledge.com/hyperscalers/google-to-spend-300m-on-second-atlanta-metro-data-center"]},{"id":"31c30497b9a5","cid":"31c30497b9a5","canon":1,"dups":1,"ftype":"data_center","name":"Gregory Road Data Center","city":"COVINGTON","county":"NEWTON","state":"GA","lat":33.552751,"lng":-83.85136,"cprec":"distinct","status":"Future / Expansion","pc":"Grid","pconf":"Medium","pquote":"The development would include 5 data center buildings, 2 maintenance buildings, an electrical power substation, an electrical switch yard, a wastewater treatment plant, and 27 residential units on lots ranging from 2.5 to 4 acres.","uquote":"Covington's reliable, competitive electric power is secured from a wholesale provider: The Municipal Electric Authority of Georgia (MEAG Power) that has over $8 billion in assets and 2069 megawatts of capacity. MEAG Power is a premier joint action agency that serves 49 Participant communities, like Covington, throughout the state. The City of Covington has been providing residents of Covington and Newton County with dependable natural gas service since 1956.","rto":"non-RTO","nerc":"SERC","op":"Universal Planning and Development","ay":2025,"oy":2036,"contro":"The land is currently located in unincorporated Newton County, but Universal Planning and Development is looking for the city of Covington to annex the site into its city limits. In this specific case, the land would also need to undergo rezoning to allow for industrial use. The Newton County Board of Commissioners voted to enact a pair of moratoriums on the acceptance of applications, requests or submissions proposing the development of data centers.","controScan":"https://www.covnews.com/news/data-center-proposed-gregory-road-developers-seek-annexation-city-covington/","deal":"Project estimated value at built-out is $5.7 billion.","dealScan":"https://baxtel.com/data-center/gregory-road-dc-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;covnews.com","lflag":"operational_null_capacity status_adjusted_future_expansion","srcUrls":["https://baxtel.com/data-center/gregory-road-dc-campus","https://www.covnews.com/news/data-center-proposed-gregory-road-developers-seek-annexation-city-covington/"],"rawStatus":"Operational"},{"id":"9b3e8334d233","cid":"c8a84b4e3369","canon":0,"dups":2,"ftype":"data_center","name":"Lithia Springs Data Center","city":"UNINCORPORATED","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Georgia Power","pdt":"New rules allow for minimum billing requirements and longer contract terms (5 to 15 years) for new large-load customers using more than 100 megawatts of electricity.","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"7140|GA","uname":"Georgia Power Co","reportedUtility":"Georgia Power Co","srcUrls":null,"srcDom":null},{"id":"1afebd0f3dfa","cid":"1afebd0f3dfa","canon":1,"dups":1,"ftype":"data_center","name":"Lithia Springs Data Center","city":"UNINCORPORATED","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Operational","mw":81,"pc":"Grid","pconf":"High","pquote":"The data center is a N+1 power design, and a total of 3.240 MW of power is fed to the facility.","pscan":"https://cloudandcolocation.com/datacenters/cyxtera-lithia-springs-data-center/","rto":"non-RTO","nerc":"SERC","op":"Csquare","spon":"Brookfield Infrastructure Partners","oy":1998,"deal":"Brookfield Infrastructure Partners acquired 31 data center facilities from AT&T for $1.1 billion in 2019. Brookfield acquired Cyxtera in November 2023. Evoque and Cyxtera merged in April 2024 and rebranded as Centersquare.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyxtera-lithia-springs-data-center/"],"band":"50-100 MW"},{"id":"8b7fe41ab0f2","cid":"8b7fe41ab0f2","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Social Circle","county":"Walton","state":"GA","lat":33.783887,"lng":-83.731829,"cprec":"distinct","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Meta;s, formerly Facebook, data center in Social Circle just East of Atlanta, will be powered by 100 percent clean and renewable energy and cooled using outside air. As part of that commitment, we are also excited to announce that we are partnering with Walton Electric Membership Corporation to bring hundreds of MWs of renewable energy to the area's electrical grid.","uconf":"High","uquote":"As part of that commitment, we are also excited to announce that we are partnering with Walton Electric Membership Corporation to bring hundreds of MWs of renewable energy to the area's electrical grid.","ukey":"20065|GA","uname":"Walton Electric Member Corp","rto":"non-RTO","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2018,"oy":2021,"contro":"Community opposition and controversy regarding water quality and usage, leading to a 90-day moratorium on new data centers in Social Circle.","controScan":"https://www.youtube.com/shorts/smV5wr92v88","deal":"Partnership with Walton Electric Membership Corporation for hundreds of MWs of renewable energy, resulting in millions of dollars of investment into solar resources.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/shorts/smV5wr92v88"],"lflag":"source_quality_reclassified"},{"id":"e0b655a9a326","cid":"e0b655a9a326","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Douglasville","county":"Douglas","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Future / Expansion","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Microsoft pledges it will work with local utilities to pay for its own power infrastructure and electricity without impacting other customers' rates.","pscan":"https://www.ajc.com/business/2026/01/as-georgians-push-back-on-data-centers-microsoft-pitches-local-benefits/","uquote":"Atlanta's expanding digital economy is driving unprecedented growth in data center development within GreyStone Power Corporation's service territory.","uscan":"https://www.greystonepower.com/setting-strategy-powering-data-centers-while-safeguarding-co-op-members","ukey":"7090|GA","uname":"GreyStone Power Corporation","rto":"non-RTO","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2021,"oy":2027,"contro":"Growing public opposition in Georgia to data centers, including those in Douglasville, due to concerns over electricity and water usage, and local tax breaks.","controScan":"https://www.ajc.com/business/2026/01/as-georgians-push-back-on-data-centers-microsoft-pitches-local-benefits/","deal":"Microsoft bought 93 acres in Douglasville, Douglas County for $13.8 million in May 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"ajc.com;greystonepower.com","lflag":"status_adjusted_future_expansion source_quality_reclassified","srcUrls":["https://www.ajc.com/business/2026/01/as-georgians-push-back-on-data-centers-microsoft-pitches-local-benefits/","https://www.greystonepower.com/setting-strategy-powering-data-centers-while-safeguarding-co-op-members"],"rawStatus":"Operational"},{"id":"2f94e6f4c248","cid":"2f94e6f4c248","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"East Point","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"In Georgia, Microsoft purchases water from the City of East Point, the City of Atlanta, and the Douglasville-Douglas County Water and Sewer Authority. On warm days when the temperature exceeds 85°F (29.4°C), water flows into the facility and cycles through the cooling system between 2–5 times. A portion of the water evaporates, while the remainder is typically discharged back to the local wastewater treatment plant in compliance with local regulations.","pscan":"https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Georgia.pdf","uconf":"High","uquote":"The Georgia Public Service Commission voted Tuesday to greenlight most of the fleet additions Georgia Power requested.","uscan":"https://www.ajc.com/news/business/microsoft-buys-another-136-acres-south-of-atlanta-to-build-data-centers/QVKCHVK7WZCC7HZUMXHUVQOZWA/","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2021,"oy":2026,"contro":"Community feedback regarding substation location, noise, lighting, screening, and community benefits; broader opposition to data centers due to electricity bills and water supplies.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"local.microsoft.com;ajc.com","srcUrls":["https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Georgia.pdf","https://www.ajc.com/news/business/microsoft-buys-another-136-acres-south-of-atlanta-to-build-data-centers/QVKCHVK7WZCC7HZUMXHUVQOZWA/"]},{"id":"7ff4cfd8cdff","cid":"7ff4cfd8cdff","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Palmetto","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Datacenters require a reliable and resilient supply of electric power. These sites' largest operating cost is energy.... All generators will be diesel fueled with renewable hydrocarbon diesel used as an alternative fuel and they will provide backup power to servers and other electronic equipment in the event of a power outage at the Facility.","pscan":"https://epd.georgia.gov/document/document/28510-narrative/download","uquote":"Georgia Power, the state's largest electric utility, is seeking regulatory approval for significant increases in electricity-generating capacity, largely driven by the proliferation of data center projects.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2021,"oy":2025,"contro":"Growing presence of data centers has sparked controversy among communities, utility companies and lawmakers. Microsoft, T5, and DC Blox all canceled projects in Douglas and Fulton counties after community opposition.","deal":"Received a $14.5 million property tax break from the Development Authority of Fulton County in November 2020. Paid $6 million in February 2024 to acquire nearly 21 acres. Paid $52.5 million in April 2024 to acquire about 136 acres.","dealScan":"https://www.ajc.com/news/business/microsoft-buys-another-136-acres-south-of-atlanta-to-build-data-centers/QVKCHVK7WZCC7HZUMXHUVQOZWA/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"epd.georgia.gov;ajc.com","srcUrls":["https://epd.georgia.gov/document/document/28510-narrative/download","https://www.ajc.com/news/business/microsoft-buys-another-136-acres-south-of-atlanta-to-build-data-centers/QVKCHVK7WZCC7HZUMXHUVQOZWA/"],"lflag":"citation_artifact_removed"},{"id":"4de4cb2852a7","cid":"4de4cb2852a7","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Data Center Palmetto","city":"PALMETTO","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Georgia Power has also confirmed that it has adequate generation capacity to serve the project, including new capacity added through Plant Vogtle. Lastly, the Georgia Public Service Commission enacted new rules in January, 2025, to prevent the transfer of costs from large power users to rate payers, requiring improvements to be funded by the off-taker.","uconf":"High","uquote":"Georgia Power, the state's largest electric utility, is in the process of asking regulators to approve huge amounts of new electricty-generating capacity — mostly powered by fossil fuels — mainly due to the vast number of data center projects across the state.","uscan":"https://www.ajc.com/news/business/microsoft-buys-land-for-expansion-of-fulton-county-data-center/WMEP3QOMDVDCXNLE3XM7MYMEBM/","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2020,"oy":2025,"contro":"Community opposition and moratoriums due to strain on power grids and environmental concerns. The City of Palmetto raised urgent concerns over a proposed data center in neighboring Coweta County (Project Peach, which is the Microsoft Palmetto campus) due to increased industrial traffic, environmental strain, and potential property cost increases without contributing to Palmetto's tax base.","controScan":"https://therealdeal.com/national/atlanta/2024/03/04/microsoft-buys-21-acres-to-expand-atlanta-data-center/","deal":"Received a $14.5 million property tax break from the Development Authority of Fulton County in November 2020 for a project valued at $420 million.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"ajc.com;therealdeal.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.ajc.com/news/business/microsoft-buys-land-for-expansion-of-fulton-county-data-center/WMEP3QOMDVDCXNLE3XM7MYMEBM/","https://therealdeal.com/national/atlanta/2024/03/04/microsoft-buys-21-acres-to-expand-atlanta-data-center/"]},{"id":"c95afe8da276","cid":"c95afe8da276","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Fairwater Atlanta","county":"Fayette","state":"GA","lat":33.412717,"lng":-84.493941,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The Atlanta site was selected with resilient utility power in mind and is capable of achieving 4×9 availability at 3×9 cost. By securing highly available grid power, we can also forgo traditional resiliency approaches for the GPU fleet (such as on-site generation, UPS systems and dual-corded distribution), driving cost savings for customers and faster time-to-market for Microsoft.","pscan":"https://www.wsbtv.com/news/local/atlanta/microsoft-reveals-new-datacenter-atlanta-be-help-create-worlds-1st-ai-superfactory/NPLE2ASPKJG2FEC6BNF7CYFXDY/","uconf":"High","uquote":"By total revenue, Coweta Fayette EMC is the largest electricity provider in Fayette County, Georgia.","ukey":"4432|GA","uname":"Coweta-Fayette El Member Corp","rto":"non-RTO","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2025,"oy":2025,"contro":"Community opposition regarding water usage and electricity costs, specifically linked to the QTS campus in Fayetteville where Microsoft's facility is located, leading to a ban on new data centers in Fayetteville.","deal":"Fayette County Development Authority acquired an 85-acre parcel for $21.4 million for Microsoft data center development (March 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wsbtv.com","srcUrls":["https://www.wsbtv.com/news/local/atlanta/microsoft-reveals-new-datacenter-atlanta-be-help-create-worlds-1st-ai-superfactory/NPLE2ASPKJG2FEC6BNF7CYFXDY/"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"accdf71bb693","cid":"accdf71bb693","canon":1,"dups":1,"ftype":"data_center","name":"Project Azelea","city":"UNINCORPORATED","county":"MCDUFFIE","state":"GA","lat":33.480613,"lng":-82.479533,"cprec":"distinct","status":"Future / Expansion","mw":400,"pc":"Grid","pconf":"High","pquote":"The site will feature six data center buildings and will consume approximately 400 megawatts (MW) of energy provided by Jefferson Energy. Additionally, the campus will include its own substation and backup generators to ensure energy reliability.","uconf":"High","uquote":"The site will feature six data center buildings and will consume approximately 400 megawatts (MW) of energy provided by Jefferson Energy.","rto":"non-RTO","nerc":"SERC","op":"Project Turbo","ay":2026,"oy":2029,"contro":"Energy supply challenges reported; \"Sufficient energy supply is not available to serve this project.\"","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text status_adjusted_future_expansion","band":"250+ MW","rawStatus":"Operational","srcUrls":null,"srcDom":null},{"id":"1f9b775dcf43","cid":"1f9b775dcf43","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Atlanta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":278,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"This massive facility features its own on-site Georgia Power substation and direct fiber access to a wide variety of carrier alternatives.","uquote":"This massive facility features its own on-site Georgia Power substation and direct fiber access to a wide variety of carrier alternatives.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"QTS","spon":"Blackstone","ay":2006,"oy":2020,"contro":"Howell Station residents have been locked in fights with the facility's operator QTS over the constant construction, its requested tax breaks and its electricity needs.","deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion on August 31, 2021. QTS also signed a 20-year agreement with Georgia Power for nearly 350 megawatts of new renewable energy, effective 2024.","dealScan":"https://baxtel.com/data-center/qts-atlanta-suwanee","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/qts-atlanta-suwanee"],"lflag":"source_quality_reclassified"},{"id":"f90e861763a5","cid":"f90e861763a5","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Suwanee","county":"Gwinnett","state":"GA","lat":33.958756,"lng":-84.025735,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Utility power to the data center is provided via 4 independent and redundant Georgia power feeds.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-suwanee-data-center/","uconf":"High","uquote":"Utility power to the data center is provided via four (4) independent redundant Georgia Power feeds.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"QTS","spon":"Blackstone","ay":2005,"deal":"$2.1 billion CMBS note to refinance SUW1DC2, a 23-megawatt property part of a two-building, 53-acre complex in Suwanee, Ga, closing estimated Feb. 25, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","lflag":"online_before_announced shared_coordinate_precision_downgraded","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-suwanee-data-center/"]},{"id":"234afc1f67c0","cid":"234afc1f67c0","canon":1,"dups":1,"ftype":"data_center","name":"Rock House Road Data Center Site","city":"UNINCORPORATED","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Future / Expansion","rto":"non-RTO","nerc":"SERC","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon AWS","ay":2023,"oy":2028,"contro":"Douglas County imposed a 90-day moratorium on data centers due to concerns about environmental and community impact, including noise, pollution, and electricity rates. The project itself faced opposition for not aligning with rural development plans and impacting wetlands and forests.","controScan":"https://www.fox5atlanta.com/news/douglas-county-data-centers-moratorium","deal":"Amazon purchased 156 acres for $37.1 million in September 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fox5atlanta.com","lflag":"operational_null_capacity status_adjusted_future_expansion","srcUrls":["https://www.fox5atlanta.com/news/douglas-county-data-centers-moratorium"],"rawStatus":"Operational"},{"id":"7e466d15b5a0","cid":"7e466d15b5a0","canon":1,"dups":1,"ftype":"data_center","name":"Southeast Data Center campus","city":"FAYETTEVILLE","county":"FAYETTE","state":"GA","lat":33.412717,"lng":-84.493941,"cprec":"shared_centroid","status":"Operational","mw":250,"pc":"Grid","pconf":"High","pquote":"To prepare, Georgia Power is pumping funds into proposed necessary investments in its generation and transmission system.... Georgia's Public Service Commission also froze Georgia Power's base rates through 2028, specifically to prevent data centers from shifting electricity costs to residential customers.","uconf":"High","uquote":"From the Georgia Public Service Commission: \"On July 31, 2025, the Commission ordered a freeze of Georgia Power base rates through 2028.\"... Fayette County, Georgia, was telling residents to stop watering their lawns to conserve water... a data center campus 20 miles south of Atlanta had been drawing roughly 29 million gallons through two water connections the county didn't know existed, Politico reported Saturday.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","tenant":"Microsoft","oy":2026,"contro":"Residents protested after the facility consumed nearly 30 million gallons of water without being properly billed, leading to low water pressure during drought conditions. The city also banned new data centers in every zoning district.","deal":"QTS plans to invest up to $1 billion in the project.","dealScan":"https://baxtel.com/data-center/qts-fayetteville","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/qts-fayetteville"],"band":"250+ MW","lflag":"citation_artifact_removed source_quality_reclassified coordinate_cluster_reclassified"},{"id":"a69c9a6840e8","cid":"a69c9a6840e8","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Alpharetta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Strategically located near the headquarters of several Fortune 500 companies and powered by Georgia Power, ATL01 offers essential reliability to cloud providers.","pscan":"https://www.stackinfra.com/locations/americas/atlanta/atl01/","uconf":"High","uquote":"Strategically located near the headquarters of several Fortune 500 companies and powered by Georgia Power, ATL01 offers essential reliability to cloud providers.","uscan":"https://www.stackinfra.com/locations/americas/atlanta/atl01/","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"STACK Infrastructure","spon":"IPI Partners","ay":2011,"oy":2011,"deal":"Acquisition of Alpharetta facility from T5 Data Centers in 2019.","dealScan":"https://baxtel.com/data-center/stack-atl01-future-expansion","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"stackinfra.com;baxtel.com","srcUrls":["https://www.stackinfra.com/locations/americas/atlanta/atl01/","https://baxtel.com/data-center/stack-atl01-future-expansion"],"lflag":"source_quality_reclassified"},{"id":"8703db11f110","cid":"8703db11f110","canon":1,"dups":1,"ftype":"data_center","name":"Stonewall Tell Data Center","city":"SOUTH FULTON","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"A DRI review of a proposal to construct a data center with a total of 1,902,000 SF of space in three buildings along with an electrical substation and supporting facilities on a 59-acre currently wooded site on Stonewall Tell Road south of South Fulton Parkway in the City of South Fulton in Fulton County.","pscan":"https://documents.atlantaregional.com/Land%20Use/Reviews/ID5486/2025%20Stonewall%20Tell%20Data%20Center%20DRI%204342%20-%20Final%20Report.pdf","uquote":"The meeting brought together state legislators, City officials, regional planning experts, and the representatives from Georgia Power and Atlanta Watershed Management alongside residents to engage in discussions centered on legislation, zoning, infrastructure, environmental concerns, and potential community benefits of data centers.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","spon":"RSC Investment Management","ay":2024,"contro":"Residents expressed concerns about noise, water use, lighting, and power. The project is also not aligned with local environmental preservation recommendations.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"documents.atlantaregional.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://documents.atlantaregional.com/Land%20Use/Reviews/ID5486/2025%20Stonewall%20Tell%20Data%20Center%20DRI%204342%20-%20Final%20Report.pdf"]},{"id":"12aabd4ebfd4","cid":"12aabd4ebfd4","canon":1,"dups":1,"ftype":"data_center","name":"Stream Data Center","city":"UNINCORPORATED","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Georgia Power","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"7140|GA","uname":"Georgia Power Co","reportedUtility":"Georgia Power Co","srcUrls":null,"srcDom":null},{"id":"8923943f48aa","cid":"8923943f48aa","canon":1,"dups":1,"ftype":"data_center","name":"Switch","city":"Lithia Springs","county":"Cobb","state":"GA","lat":33.939929,"lng":-84.574121,"cprec":"distinct","status":"Operational","mw":110,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The facility is located at 1 Switch Way in Lithia Springs and operates in Georgia Power territory. Switch lists the Atlanta facility with up to 1.0 million square feet of data center space, 100% renewable energy, 100% power uptime guarantee, and cabinet support up to 2 MW per cabinet. As part of its long-standing commitment to being a leader in sustainability, Switch is working with local energy providers to ensure its campus will be powered using 100-percent green energy from new, local, renewable energy resources.","uconf":"High","uquote":"The facility is located at 1 Switch Way in Lithia Springs and operates in Georgia Power territory. Utility Provider: Georgia Power.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Switch","spon":"DigitalBridge Group , IFM Investors","ay":2017,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2386125d7138","cid":"2386125d7138","canon":1,"dups":1,"ftype":"data_center","name":"Switch KEEP 2.0 Atlanta North Campus","city":"CARTERSVILLE","county":"BARTOW","state":"GA","lat":34.240917,"lng":-84.838188,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"A development of regional impact statement filed with the state shows the complex will start with “a single data center” accompanied by “associated driveways, detention ponds, and an electrical substation.”","uconf":"High","uquote":"The City of Cartersville (Water and Sewer), Cartersville Electric Service, Atlanta Gas Light and Georgia Power are the current utility providers in the area.","uscan":"https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Packet-b58e831ed92648fa9166bfd997eba875.pdf","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Switch","spon":"IFM Investors","ay":2023,"oy":2026,"contro":"Community concerns regarding noise and impact on residential areas led to a county ordinance requiring buffers and noise limits.","deal":"Project investment of $772 million announced in November 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mccmeetings.blob.core.usgovcloudapi.net","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Packet-b58e831ed92648fa9166bfd997eba875.pdf"],"rawUkey":"14649|GA","rawUname":"Planters Electric Member Corp","reportedUtility":"Georgia Power Co"},{"id":"a5393a087c48","cid":"a5393a087c48","canon":1,"dups":1,"ftype":"data_center","name":"T 5 @ Augusta LP","city":"UNINCORPORATED","county":"RICHMOND","state":"GA","lat":33.361486,"lng":-82.074998,"cprec":"distinct","status":"Future / Expansion","mw":200,"pc":"Grid","pconf":"High","pquote":"15 MW available immediately from adjacent GA Power substation. In addition, our clients get a business-friendly and stable tax environment, with 100% sales tax abatement on IT purchases, property tax rebates, and low-cost reliable power.","pscan":"https://www.datacenterknowledge.com/colocation/t5-hopes-to-attract-federal-customers-with-a-200mw-campus-in-georgia","uconf":"High","uquote":"15MW of power available immediately from Georgia Power Georgia Power is an investor-owned, tax-paying utility that serves 2.35 million customers in all but four of Georgia's 159 counties.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"T5 Data Centers","spon":"QuadReal Property Group","ay":2022,"oy":2033,"deal":"QuadReal Property Group's $2.5 billion investment in T5 Data Centers in 2019","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"status_adjusted_future_expansion","srcUrls":["https://www.datacenterknowledge.com/colocation/t5-hopes-to-attract-federal-customers-with-a-200mw-campus-in-georgia"],"band":"100-250 MW","rawStatus":"Operational"},{"id":"a180d3c64bf7","cid":"a180d3c64bf7","canon":1,"dups":1,"ftype":"data_center","name":"T5 - ATL III Data Center","city":"UNINCORPORATED","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Operational","mw":66,"pc":"Grid","pconf":"High","pquote":"Diverse power feeds from two diverse Georgia Power Substations: • Grover Lake Substation. • Factory Shoals Substation.","uquote":"Diverse power feeds from two diverse Georgia Power Substations: • Grover Lake Substation. • Factory Shoals Substation.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"T5 Data Centers","spon":"QuadReal Property Group and T5 principals","ay":2022,"oy":2025,"contro":"Environmental concerns regarding wooded areas and stream buffer intrusions.","deal":"QuadReal and T5 Capital raise to support data center platform growth to $8.0 billion (February 2025).","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5cab2057d267","cid":"5cab2057d267","canon":1,"dups":1,"ftype":"data_center","name":"T5 - ATL IV Data Center","city":"UNINCORPORATED","county":"COWETA","state":"GA","lat":33.352897,"lng":-84.762138,"cprec":"distinct","status":"Future / Expansion","mw":300,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Georgia Power.","pscan":"https://www.interconnection.fyi/data-center/project/t5-atl-iv-data-center-ffbcabed","uquote":"Grid Operator. Georgia Power.","uscan":"https://www.interconnection.fyi/data-center/project/t5-atl-iv-data-center-ffbcabed","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"T5 Data Centers","spon":"QuadReal Property Group","ay":2023,"oy":2030,"deal":"$1.5B project, announced September 2023","dealScan":"https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-t5-targeting-coweta-for-massive-data-center-complex-120875","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;bisnow.com","lflag":"status_adjusted_future_expansion","srcUrls":["https://www.interconnection.fyi/data-center/project/t5-atl-iv-data-center-ffbcabed","https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-t5-targeting-coweta-for-massive-data-center-complex-120875"],"band":"250+ MW","rawStatus":"Operational"},{"id":"0150a4869e2c","cid":"0150a4869e2c","canon":1,"dups":1,"ftype":"data_center","name":"T5 ATL IV","city":"FAIRBURN","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Future / Expansion","mw":300,"pc":"Grid","pconf":"High","pquote":"An onsite electrical substation will provide efficient and redundant utility power which is expected to be operational in 2026. T5 is funding and that connects directly to Georgia Power's high-voltage transmission network.","uconf":"High","uquote":"Grid Operator: Georgia Power. T5 is funding and that connects directly to Georgia Power's high-voltage transmission network.","uscan":"https://www.interconnection.fyi/data-center/project/t5-atl-iv-61d6cfff","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"T5 Data Centers","spon":"QuadReal Property Group","ay":2024,"oy":2027,"contro":"Discussion/vote on moratorium exemption","deal":"Multibillion-dollar joint venture with Canadian real estate firm QuadReal Property Group (announced May 2025)","dealScan":"https://www.bisnow.com/national/news/deal-sheet/data-center-firm-t5-expanding-footprint-in-atlanta-and-chicago-129337","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;bisnow.com","lflag":"status_adjusted_future_expansion source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/t5-atl-iv-61d6cfff","https://www.bisnow.com/national/news/deal-sheet/data-center-firm-t5-expanding-footprint-in-atlanta-and-chicago-129337"],"band":"250+ MW","rawStatus":"Operational"},{"id":"8ef39c8f4e6b","cid":"8ef39c8f4e6b","canon":1,"dups":1,"ftype":"data_center","name":"T5 Data Centers","city":"Lithia Springs","county":"Douglas","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Operational","mw":20,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility Provider: Georgia Power.","pscan":"https://baxtel.com/data-center/t5-atlanta-iii-campus","uquote":"Utility Provider: Georgia Power.","uscan":"https://baxtel.com/data-center/t5-atlanta-iii-campus","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"T5 Data Centers","spon":"QuadReal Property Group","oy":2025,"contro":"Community opposition led to project cancellations.","deal":"Multibillion-dollar joint venture with Canadian real estate firm QuadReal Property Group for gigawatt-scale campuses, including a 300MW campus in Lithia Springs. JV plans to raise $8B.","dealScan":"https://www.bisnow.com/national/news/deal-sheet/data-center-firm-t5-expanding-footprint-in-atlanta-and-chicago-129337","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;bisnow.com","srcUrls":["https://baxtel.com/data-center/t5-atlanta-iii-campus","https://www.bisnow.com/national/news/deal-sheet/data-center-firm-t5-expanding-footprint-in-atlanta-and-chicago-129337"]},{"id":"b10c5aaf58c8","cid":"b10c5aaf58c8","canon":1,"dups":1,"ftype":"data_center","name":"Travelers Indemnity Company","city":"Norcross","county":"Gwinnett","state":"GA","lat":33.958756,"lng":-84.025735,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Southern Company.","uconf":"High","uquote":"Grid Operator: Southern Company.","ukey":"10624|GA","uname":"Southern Rivers Energy","rto":"non-RTO","nerc":"SERC","op":"Travelers Indemnity Company","spon":"The Travelers Companies","ay":2000,"oy":2004,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"012207ca8891","cid":"012207ca8891","canon":1,"dups":1,"ftype":"data_center","name":"United Parcel Service","city":"Alpharetta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Both data centers are completely self-sufficient with dual paths for electricity and chilled water. Three 1,200-kilowatt and four 1,600-kilowatt engine-generators to provide backup power.","pscan":"https://cmapspublic3.ihmc.us/rid=1JZJLM798-8KX16S-ZSW/UPS%20Data%20Centers%20Fact%20Sheet%20-%20UPS%20Pressroom.pdf","uconf":"High","uquote":"Alpharetta, Georgia: Sawnee Electric Membership Corporation: 14.99% Cobb Electric Membership Corp: 1.30% Georgia Power: 83.71%","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"United Parcel Service","spon":"United Parcel Service","tenant":"United Parcel Service","ay":1995,"oy":1995,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cmapspublic3.ihmc.us","srcUrls":["https://cmapspublic3.ihmc.us/rid=1JZJLM798-8KX16S-ZSW/UPS%20Data%20Centers%20Fact%20Sheet%20-%20UPS%20Pressroom.pdf"]},{"id":"b822c9e01718","cid":"b822c9e01718","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Center","city":"DOUGLASVILLE","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Georgia Power.","pscan":"https://www.interconnection.fyi/data-center/project/vantage-data-center-3ffc0c08","uquote":"Grid Operator. Georgia Power.","uscan":"https://www.interconnection.fyi/data-center/project/vantage-data-center-3ffc0c08","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge Group","ay":2023,"oy":2025,"deal":"Vantage Data Centers received more than $8 billion in equity investment since September (prior to Jan 2024).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/vantage-data-center-3ffc0c08"]},{"id":"583289e45cc9","cid":"583289e45cc9","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Center - Stacks Rd","city":"SOUTH FULTON","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Future / Expansion","rto":"non-RTO","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge Group","ay":2025,"oy":2027,"contro":"Environmental concerns regarding tree clearing and heat island effect.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text status_adjusted_future_expansion","rawStatus":"Operational","srcUrls":null,"srcDom":null},{"id":"0f0ac9c99a49","cid":"0f0ac9c99a49","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Center - Westlake","city":"SOUTH FULTON","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Future / Expansion","mw":96,"pc":"Grid","pconf":"High","pquote":"The Westlake campus leverages proximity to Atlanta's major fiber corridors, robust utility infrastructure, and transportation networks, ensuring low-latency connectivity, reliable power, and scalability for large enterprises and cloud providers.","uconf":"Medium","uquote":"After years of negotiations, data centers and other large customers of Georgia Power have finally won a pathway to pay for their own new clean energy projects to be built and connected to the utility's grid.","uscan":"https://www.canarymedia.com/articles/data-centers/georgia-power-byo-clean-energy","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge Group","ay":2024,"oy":2028,"contro":"Project not aligned with regional growth policies, requires clearing of forested site exacerbating heat island and climate change impacts.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"canarymedia.com","lflag":"status_adjusted_future_expansion source_quality_reclassified","srcUrls":["https://www.canarymedia.com/articles/data-centers/georgia-power-byo-clean-energy"],"band":"50-100 MW","rawStatus":"Operational"},{"id":"93d78fb100d7","cid":"93d78fb100d7","canon":1,"dups":1,"ftype":"data_center","name":"Wallace Jackson Data Center Campus","city":"UNINCORPORATED","county":"SPALDING","state":"GA","lat":33.262348,"lng":-84.284905,"cprec":"distinct","status":"Future / Expansion","rto":"non-RTO","nerc":"SERC","op":"Wallace Jackson","spon":"Wallace Jackson / Havenwood Holdings","ay":2026,"oy":2035,"contro":"Community opposition regarding environmental impacts, loss of farmland, and land use.","controScan":"https://www.ajc.com/business/2026/01/whats-37b-and-larger-than-3-malls-georgias-next-potential-data-center/","deal":"$3.9 billion project approved by Spalding County Commissioners on January 23, 2026.","dealScan":"https://news.constructconnect.com/spalding-county-greenlights-3.9-billion-ga-data-center-project","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"news.constructconnect.com;ajc.com","lflag":"operational_null_capacity status_adjusted_future_expansion source_quality_reclassified","srcUrls":["https://news.constructconnect.com/spalding-county-greenlights-3.9-billion-ga-data-center-project","https://www.ajc.com/business/2026/01/whats-37b-and-larger-than-3-malls-georgias-next-potential-data-center/"],"rawStatus":"Operational"},{"id":"a2aa39aadf7f","cid":"a2aa39aadf7f","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Douglasville","county":"Douglas","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"ea8c9fdefd51","cid":"ea8c9fdefd51","canon":1,"dups":1,"ftype":"data_center","name":"Ascent","city":"Alpharetta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Georgia Power","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"7140|GA","uname":"Georgia Power Co","reportedUtility":"Georgia Power Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2981773851db","cid":"2981773851db","canon":1,"dups":1,"ftype":"data_center","name":"ATL2 East","city":"FAYETTEVILLE","county":"FAYETTE","state":"GA","lat":33.412717,"lng":-84.493941,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Ninety-percent of all new Georgia Power load growth is going toward data centers, Georgia Power stated in Public Service Commission fillings in 2025 when 10 gigawatts of power was approved.","uconf":"High","uquote":"Ninety-percent of all new Georgia Power load growth is going toward data centers, Georgia Power stated in Public Service Commission fillings in 2025 when 10 gigawatts of power was approved.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","ay":2026,"oy":2029,"contro":"Water usage dispute, community opposition to transmission lines, city moratorium on new data centers.","controScan":"https://saportareport.com/sustainability-atlantas-data-center-boom-is-it-worth-it/atlanta-way-2-0/kendall-brown/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"saportareport.com","srcUrls":["https://saportareport.com/sustainability-atlantas-data-center-boom-is-it-worth-it/atlanta-way-2-0/kendall-brown/"],"lflag":"coordinate_cluster_reclassified"},{"id":"cacc1b8b2627","cid":"cacc1b8b2627","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Lithia Springs","county":"Douglas","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Georgia Power","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"7140|GA","uname":"Georgia Power Co","reportedUtility":"Georgia Power Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9d2e736d68f6","cid":"9d2e736d68f6","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Atlanta","county":"Fulton","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Proposed","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The property is adjacent to an existing Georgia Power sub-station ensuring adequate power. Located at 200 Selig Drive in Atlanta, ATL4 is adjacent to the Georgia Power substation to ensure reliable power for customers.","pscan":"https://www.prnewswire.com/news-releases/databank-acquires-land-in-atlanta-for-new-data-center-campus-301548545.html","uconf":"High","uquote":"The property is adjacent to an existing Georgia Power sub-station ensuring adequate power. Located at 200 Selig Drive in Atlanta, ATL4 is adjacent to the Georgia Power substation to ensure reliable power for customers.","uscan":"https://www.prnewswire.com/news-releases/databank-acquires-land-in-atlanta-for-new-data-center-campus-301548545.html","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"DataBank","spon":"DigitalBridge","ay":2022,"deal":"Land acquisition on May 17, 2022, for 18 acres and an existing data center facility.","dealScan":"https://www.prnewswire.com/news-releases/databank-acquires-land-in-atlanta-for-new-data-center-campus-301548545.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.prnewswire.com/news-releases/databank-acquires-land-in-atlanta-for-new-data-center-campus-301548545.html"]},{"id":"11d272ad5b36","cid":"11d272ad5b36","canon":1,"dups":1,"ftype":"data_center","name":"Hampton Technology Park","city":"HAMPTON","county":"HENRY","state":"GA","lat":33.452947,"lng":-84.154021,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Georgia Power.","pscan":"https://www.interconnection.fyi/data-center/project/hampton-technology-park-f0a3fc5f","uconf":"High","uquote":"Grid Operator. Georgia Power.","uscan":"https://www.interconnection.fyi/data-center/project/hampton-technology-park-f0a3fc5f","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Hampton Technology Park Owner","spon":"Hampton Technology Park Owner","ay":2026,"oy":2033,"contro":"The project prompted recent moratoriums on new data center developments and annexations in Hampton, GA, due to community concerns and the need for rezoning.","controScan":"https://www.ajc.com/business/2026/03/metro-atlanta-cities-question-how-many-data-centers-are-too-many/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;ajc.com","srcUrls":["https://www.interconnection.fyi/data-center/project/hampton-technology-park-f0a3fc5f","https://www.ajc.com/business/2026/03/metro-atlanta-cities-question-how-many-data-centers-are-too-many/"],"lflag":"source_quality_reclassified"},{"id":"858b54e413ba","cid":"858b54e413ba","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Fayetteville","county":"Fayette","state":"GA","lat":33.412717,"lng":-84.493941,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"Medium","pquote":"As part of QTS's robust Atlanta-area portfolio, the Fayetteville facility leverages proximity to major network routes, dark fiber, and diverse utility infrastructure—offering a secure, resilient environment for high-performance compute. The site also supports sustainability goals with access to renewable energy and is enabled by QTS's signature Software-Defined Data Center (SDDC) platform, giving customers full visibility and control over their infrastructure.","uconf":"High","uquote":"The Fayetteville campus will be powered by Georgia Power with about 16 buildings spanning over more than 600 acres, or about 450 football fields.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","ay":2022,"oy":2026,"contro":"Community opposition regarding noise, fumes, lights, and water usage; controversy over unpaid water bills during construction.","controScan":"https://www.cbsnews.com/atlanta/news/georgias-data-center-boom-leave-residents-concerns-about-environmental-impacts/","deal":"Land acquisition in August 2022 for $153.8 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cbsnews.com","srcUrls":["https://www.cbsnews.com/atlanta/news/georgias-data-center-boom-leave-residents-concerns-about-environmental-impacts/"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"91c6693c3244","cid":"91c6693c3244","canon":0,"dups":1,"ftype":"data_center","name":"QTS","city":"Suwanee","county":"Gwinnett","state":"GA","lat":33.958756,"lng":-84.025735,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility power to the data center is provided via 4 independent and redundant Georgia power feeds.","uconf":"High","uquote":"Utility power to the data center is provided via 4 independent and redundant Georgia power feeds.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"b0c9daf53cdc","cid":"b0c9daf53cdc","canon":1,"dups":1,"ftype":"data_center","name":"The Crossings","city":"UNION CITY","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Proposed","uquote":"Grid Operator. Georgia Power.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"Link Logistics","spon":"Blackstone","ay":2026,"oy":2028,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0fc24c0fedc4","cid":"0fc24c0fedc4","canon":0,"dups":1,"ftype":"data_center","name":"DC Blox- ATL West Data Center","city":"DOUGLASVILLE","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Cancelled","mw":120,"pc":"Grid","pconf":"High","pquote":"Utility Provider: Greystone Power Cooperative. Reserved power with local utilities.","uquote":"Utility Provider: Greystone Power Cooperative.","ukey":"7090|GA","uname":"GreyStone Power Corporation","rto":"non-RTO","nerc":"SERC","op":"DC BLOX","ay":2023,"oy":2026,"contro":"Community opposition, environmental concerns, and a county-wide moratorium on data centers.","controScan":"https://www.fox5atlanta.com/news/douglas-county-data-centers-moratorium","deal":"$1.15 billion green loan financing closed on August 11, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fox5atlanta.com","srcUrls":["https://www.fox5atlanta.com/news/douglas-county-data-centers-moratorium"],"band":"100-250 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"c8a84b4e3369","cid":"c8a84b4e3369","canon":0,"dups":2,"ftype":"data_center","name":"Lithia Springs Data Center","city":"UNINCORPORATED","county":"DOUGLAS","state":"GA","lat":33.701242,"lng":-84.767314,"cprec":"shared_centroid","status":"Cancelled","proc":"Tariff (utility)","pcp":"Georgia Power","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"7140|GA","uname":"Georgia Power Co","reportedUtility":"Georgia Power Co","lflag":"utility_alias_corrected unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"8660d2876ee6","cid":"8660d2876ee6","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft CCO06 Data Center","city":"PALMETTO","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Cancelled","proc":"Tariff (utility)","pcp":"Georgia Power","rto":"non-RTO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"7140|GA","uname":"Georgia Power Co","reportedUtility":"Georgia Power Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e422a0e93d21","cid":"e422a0e93d21","canon":1,"dups":1,"ftype":"data_center","name":"Project Bus","city":"TEMPLE","county":"CARROLL","state":"GA","lat":33.582237,"lng":-85.080527,"cprec":"distinct","status":"Cancelled","pc":"Grid","pconf":"Medium","pquote":"The development plan called for 12 industrial-scale buildings and two dedicated electrical substations centered around the intersection of Vaughn and Center Point Roads.","pscan":"https://baxtel.com/data-center/atlas-development-project-bus","rto":"non-RTO","nerc":"SERC","op":"Atlas Development","ay":2026,"oy":2036,"contro":"Intense community pushback and refusal of land annexation by Carroll County Board of Commissioners.","controScan":"https://baxtel.com/data-center/atlas-development-project-bus","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/atlas-development-project-bus"]},{"id":"6df7a6241e6b","cid":"6df7a6241e6b","canon":1,"dups":1,"ftype":"data_center","name":"T5 Data Center","city":"FAIRBURN","county":"FULTON","state":"GA","lat":33.790034,"lng":-84.468182,"cprec":"shared_centroid","status":"Cancelled","pc":"Grid","pconf":"High","pquote":"Grid Operator. Georgia Power.","uconf":"High","uquote":"Grid Operator. Georgia Power.","ukey":"7140|GA","uname":"Georgia Power Co","rto":"non-RTO","nerc":"SERC","op":"T5 Data Centers","ay":2024,"contro":"T5 canceled projects in Fulton County after community opposition.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"dd6165f7f569","cid":"dd6165f7f569","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Kuna","county":"Ada","state":"ID","lat":43.451477,"lng":-116.244376,"cprec":"distinct","status":"Operational","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The Meta Kuna Data Center will be supported by 100% renewable energy from new resources connected to Idaho Power's system.","uquote":"The Meta Kuna Data Center will be supported by 100% renewable energy from new resources connected to Idaho Power's system.","ukey":"9191|ID","uname":"Idaho Power Co","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta Platforms","tenant":"Meta","ay":2022,"oy":2026,"contro":"Community opposition due to perceived politics, water usage concerns, and loss of farmland; also a legislative bill that could impact its urban renewal district status.","controScan":"https://www.ktvb.com/article/news/local/idaho-press/controversy-kuna-metas-new-data-center-mixed-response/277-8d637f2d-5671-4a2e-bc4f-b7cef0538fd0","deal":"$800 million investment in data center, $70 million investment in water and sewer system, $200 million solar project.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"ktvb.com","srcUrls":["https://www.ktvb.com/article/news/local/idaho-press/controversy-kuna-metas-new-data-center-mixed-response/277-8d637f2d-5671-4a2e-bc4f-b7cef0538fd0"],"lflag":"source_quality_reclassified"},{"id":"af034aa4fce9","cid":"af034aa4fce9","canon":1,"dups":1,"ftype":"data_center","name":"ADP","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"ComEd","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"4110|IL","uname":"Commonwealth Edison Co","reportedUtility":"Commonwealth Edison Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ea5b9511f0bf","cid":"ea5b9511f0bf","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Northlake","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":100,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The campus is at the convergence of more than 12 metro, long-haul and international fiber networks, offering customers extensive local and global connectivity options and will draw redundant, critical power from two on-site substations with 170 MW total capacity.","uconf":"High","uquote":"Commonwealth Edison is in charge of transmitting electricity in the Northlake area. As Commonwealth Edison is in charge of delivering electricity to your house or commercial establishment, you should connect with them if you're having problems with your electricity services, such as power interruptions, energy fluctuations, etc. Commonwealth Edison, also known as ComEd, is Chicago's utility. The largest electric utility in Illinois, ComEd provides electricity to Chicago and much of Northern Illinois.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"BlackRock 's Global Infrastructure Partners","ay":2021,"oy":2022,"deal":"$700 million refinancing in November 2023","dealScan":"https://therealdeal.com/chicago/2023/12/27/aligned-data-centers-scores-700m-northlake-loan/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"therealdeal.com","srcUrls":["https://therealdeal.com/chicago/2023/12/27/aligned-data-centers-scores-700m-northlake-loan/"],"lflag":"source_quality_reclassified"},{"id":"d8da795e5411","cid":"d8da795e5411","canon":1,"dups":1,"ftype":"data_center","name":"AllState","city":"Rochelle","county":"Ogle","state":"IL","lat":42.041884,"lng":-89.320176,"cprec":"distinct","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The raised floor area is supported by a 2N electrical distribution, 2N UPS system, N+1 generators, N+1 mechanical equipment, 2N mechanical piping, 2N domestic water service, and 2N primary electrical service (power routed from two substations).","pscan":"https://www.mortenson.com/projects/allstate-insurance-data-center","uquote":"The city worked closely with Rochelle Municipal Utilities (RMU) and the Northern Illinois Technology Triangle Project (NITT) on providing connectivity to the business park.","uscan":"https://www.datacenterknowledge.com/business/allstate-plans-50-000sf-illinois-data-center","ukey":"16179|IL","uname":"Rochelle Municipal Utilities","rto":"PJM","nerc":"RFC","op":"Allstate","spon":"Allstate Insurance Company","tenant":"Allstate","ay":2007,"oy":2009,"deal":"Allstate spent $50 million on the facility and received $278,000 in tax incentives and job training funds from the Illinois Department of Commerce and Economic Opportunity (announced September 2007).","dealScan":"https://www.datacenterknowledge.com/business/allstate-plans-50-000sf-illinois-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"mortenson.com;datacenterknowledge.com","srcUrls":["https://www.mortenson.com/projects/allstate-insurance-data-center","https://www.datacenterknowledge.com/business/allstate-plans-50-000sf-illinois-data-center"]},{"id":"18eb1706578a","cid":"18eb1706578a","canon":1,"dups":1,"ftype":"data_center","name":"Ascent","city":"Northlake","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The new facility will feature a dedicated on-site utility substation with dual diverse connections to the transmission grid.","pscan":"https://www.datacenterknowledge.com/business/ascent-plans-major-chicago-data-center","uquote":"Commonwealth Edison is in charge of transmitting electricity in the Northlake area.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Ascent","spon":"Carter Validus Mission Critical REIT","tenant":"Comcast","ay":2009,"oy":2009,"deal":"Acquisition of Ascent CH2 Data Center Facility by Carter Validus Mission Critical REIT, Inc. for $211.7 million in May 2014.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/business/ascent-plans-major-chicago-data-center"]},{"id":"0a0ef423b5aa","cid":"0a0ef423b5aa","canon":1,"dups":1,"ftype":"data_center","name":"Blue Cross Blue Shield","city":"Waukegan","county":"Lake","state":"IL","lat":42.185968,"lng":-87.805939,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","op":"Health Care Service","spon":"Health Care Service","tenant":"Health Care Service","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"94688690c71b","cid":"94688690c71b","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Lisle ORD4 Data Center... Utility power: 88.9MW","pscan":"https://www.csquare.com/data-centers/chicago","uquote":"Commonwealth Edison, commonly known by syllabic abbreviation as ComEd, is the largest electric utility in Illinois, and the primary electric provider in Chicago and much of Northern Illinois.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","deal":"Brookfield affiliates acquired substantially all assets of Cyxtera in November 2023 and combined with Evoque to rebrand as Centersquare in April 2024.","dealScan":"https://baxtel.com/data-center/centersquare-chicago-ord1-b-c-d","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"csquare.com;baxtel.com","srcUrls":["https://www.csquare.com/data-centers/chicago","https://baxtel.com/data-center/centersquare-chicago-ord1-b-c-d"],"lflag":"citation_artifact_removed"},{"id":"78283c33030a","cid":"78283c33030a","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Utility power: 25.9MW. UPS capacity: 12.7MW. Generator capacity: 22.8MW.","pscan":"https://www.csquare.com/data-centers/chicago","uconf":"High","uquote":"Elk Grove Village is serviced by the following companies: Commonwealth Edison Electric Services Phone # 1-800-334-7661. Website: www.comed.com.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","ay":2000,"oy":2014,"deal":"Acquisition of the facility by Centersquare (via Brookfield) for $83.50M in January 2024.","dealScan":"https://assets.ctfassets.net/o03ihmgd94o7/55JyQIaSod78bBlF88zZUW/dbe379a5b21a7cd44540817a578756cb/2024_Data_Center_Acquisition_Report.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"csquare.com;assets.ctfassets.net","srcUrls":["https://www.csquare.com/data-centers/chicago","https://assets.ctfassets.net/o03ihmgd94o7/55JyQIaSod78bBlF88zZUW/dbe379a5b21a7cd44540817a578756cb/2024_Data_Center_Acquisition_Report.pdf"]},{"id":"c5d77414608d","cid":"c5d77414608d","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Lisle","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Csquare Chicago (CH1-Lisle) Data Center is located at 4513 Western Ave, Lisle, Illinois, USA. The data center is 190057 sqft. There is a total of 99650 sqft in raised floor space for colocation. It has access to 15.0 MW of power. We found 218 data center locations within 50 miles of this facility. Certifications for this location include FISMA, HIPAA, ISAE-3402, NIST 800-53, PCI DSS, SOC 1 Type 2, SOC 2 Type 2, SOC 3.","uquote":"Grid Operator: Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Centersquare","spon":"Brookfield Infrastructure","oy":2015,"contro":"Construction halted due to unapproved exterior work and lack of permits; proposal to add 19.5 MW fuel cell dropped due to community opposition and special-use permit requirement.","controScan":"https://www.dailyherald.com/20260217/news/construction-work-stopped-at-data-center-site-in-lisle/","deal":"Centersquare (Brookfield Infrastructure) acquired Evoque Data Center Solutions (which included the Lisle facility) and Cyxtera Technologies in early 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"dailyherald.com","srcUrls":["https://www.dailyherald.com/20260217/news/construction-work-stopped-at-data-center-site-in-lisle/"]},{"id":"a00ad1513af0","cid":"a00ad1513af0","canon":1,"dups":1,"ftype":"data_center","name":"CloudHQ","city":"Mt. Prospect","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Future / Expansion","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"CloudHQ's first Chicagoland campus is located on the former United Airlines headquarters in Mount Prospect, Illinois. The historic site will be transformed into a state-of-the-art data center campus providing up to 300 MWs of critical IT load, deliverable in many different configurations, via the on-site substation.","uconf":"High","uquote":"Energy supplier ComEd– a unit Exelon Corp.— as part of the future project, said that a new electrical substation will be built, as well as high-voltage lines will be extended and additional investments in technology will be provided.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"CloudHQ","spon":"CloudHQ","ay":2022,"oy":2027,"deal":"$2.5 billion investment and $3 million community contribution (November 18, 2025)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text status_adjusted_future_expansion","rawStatus":"Operational","srcUrls":null,"srcDom":null},{"id":"872862a21cac","cid":"872862a21cac","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The site is backed by N+1 power redundancy, with diverse underground utility feeds and high-efficiency UPS systems. On-site fuel storage ensures up to 36 hours of operation without external refuelling.","uconf":"High","uquote":"Utility Provider: ComEd.","uscan":"https://baxtel.com/data-center/coresite-chicago-ch1","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"CoreSite","spon":"American Tower","tenant":"Multiple hyperscalers and enterprises","ay":2007,"deal":"American Tower acquired CoreSite for approximately $10.1 billion, announced November 15, 2021.","dealScan":"https://www.coresite.com/news/american-tower-acquire-coresite","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;coresite.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://baxtel.com/data-center/coresite-chicago-ch1","https://www.coresite.com/news/american-tower-acquire-coresite"]},{"id":"dc445c9ac39e","cid":"dc445c9ac39e","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Aurora","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","mw":109,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Notable attendees included Illinois Governor JB Pritzker, Aurora Mayor Richard Irvin and Gil Quiniones, ComEd President and CEO, who all spoke at the event.","pscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-new-data-center-in-aurora","uconf":"High","uquote":"Among those in attendance were Gov. JB Pritzker, Aurora Mayor Richard Irvin, Cyrus One CEO Eric Schwartz and Gil Quiniones, CEO of ComEd utility company.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"CME Group","ay":2016,"oy":2016,"contro":"Residents near CyrusOne's facility have complained of “unlivable” noise from backup generators, leading to a temporary moratorium on new data centers in Aurora and efforts for sound mitigation.","controScan":"https://therealdeal.com/chicago/2025/09/29/moratorium-on-data-centers-to-give-aurora-time-to-draft-rules/","deal":"CyrusOne acquired CME Group's suburban Chicago data center in Aurora, Ill. for $130 million in March 2016.","dealScan":"https://www.prnewswire.com/news-releases/cme-group-announces-agreement-to-sell-aurora-ill-data-center-to-cyrusone-300236608.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"cyrusone.com;prnewswire.com;therealdeal.com","srcUrls":["https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-new-data-center-in-aurora","https://www.prnewswire.com/news-releases/cme-group-announces-agreement-to-sell-aurora-ill-data-center-to-cyrusone-300236608.html","https://therealdeal.com/chicago/2025/09/29/moratorium-on-data-centers-to-give-aurora-time-to-draft-rules/"]},{"id":"b04beb44f5d1","cid":"b04beb44f5d1","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Mt. Prospect","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"DataBank's ORD3 Mount Prospect data center features... 2.7MW Critical IT Load... 100% Renewable Energy Source.","pscan":"https://www.databank.com/data-centers/chicago/mount-prospect/","uquote":"Commonwealth Edison is charged with overseeing the delivery of electricity in Mount Prospect, Illinois.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"DataBank","spon":"DigitalBridge","ay":2020,"oy":2020,"deal":"DataBank acquired zColo data center assets from Zayo Group Holdings in December 2020.","dealScan":"https://www.databank.com/resources/press-releases/databank-closes-acquisition-of-zcolo-us-and-uk-data-center-assets/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/chicago/mount-prospect/","https://www.databank.com/resources/press-releases/databank-closes-acquisition-of-zcolo-us-and-uk-data-center-assets/"],"lflag":"source_quality_reclassified"},{"id":"246b7e21c770","cid":"246b7e21c770","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Oak Brook","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","mw":22,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"N+1 Power Design; 8.75MW Critical IT Load; 100% Renewable Energy Source.","pscan":"https://www.databank.com/data-centers/chicago/oak-brook/","uconf":"High","uquote":"Commonwealth Edison is in charge of delivering electricity in your area. In case of a power failure or if you have concerns about your electricity services, you can reach out to Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"DataBank","spon":"DigitalBridge","oy":2020,"deal":"DataBank acquired zColo's U.S. and U.K. data center assets from Zayo in December 2020.","dealScan":"https://www.databank.com/about-databank/databanks-history/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/chicago/oak-brook/","https://www.databank.com/about-databank/databanks-history/"],"lflag":"source_quality_reclassified"},{"id":"1074a83aa95e","cid":"1074a83aa95e","canon":1,"dups":1,"ftype":"data_center","name":"Deere & Company","city":"Moline","county":"Rock Island","state":"IL","lat":41.468421,"lng":-90.572125,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"MISO","nerc":"RFC","op":"Deere & Company","spon":"Deere & Company","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"51ab856ab0db","cid":"51ab856ab0db","canon":1,"dups":1,"ftype":"data_center","name":"Digital Capital Partners","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"In terms of power, the datacenter is equipped with a redundant power infrastructure, including an 800 kVA capacity. This ensures continuous and uninterrupted power supply, crucial for maintaining operational uptime. The facility also has backup generators to provide additional power security in case of outages.","pscan":"https://inflect.com/building/725-south-wells-street-chicago/digital-capital-partners-llc/datacenter/chicago","uconf":"High","uquote":"Chicago's biggest electricity company, Commonwealth Edison Co., is taking steps to prevent the data center boom backing the rise of artificial intelligence from raising energy bills for consumers.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"fifteenfortyseven Critical Systems Realty (1547)","spon":"CIM Group, fifteenfortyseven Critical Systems Realty (1547)","deal":"Acquisition of operating data center at 725 S. Wells Street by CIM Group and fifteenfortyseven Critical Systems Realty (1547) in July 2019.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","srcUrls":["https://inflect.com/building/725-south-wells-street-chicago/digital-capital-partners-llc/datacenter/chicago"],"lflag":"source_quality_reclassified"},{"id":"a3e1deba9ed5","cid":"a3e1deba9ed5","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Franklin Park","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":80,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Primary electrical service for Digital Chicago will be provided by Commonwealth Edison Company.","pscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-campus-in-suburban-chicago","uquote":"Primary electrical service for Digital Chicago will be provided by Commonwealth Edison Company.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-campus-in-suburban-chicago","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2012,"oy":2013,"deal":"acquisition of a 575,000 square foot redevelopment property in Franklin Park, Ill. for $22.3 million (June 2012)","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-campus-in-suburban-chicago","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-campus-in-suburban-chicago"],"lflag":"merged_duplicate"},{"id":"a0c789749cc2","cid":"a0c789749cc2","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Digital Realty Chicago ORD23 Data Center is located at 505 North Railroad Avenue, Northlake, IL, USA. The data center is 251000 sqft.... It has access to 40.0 MW of power.","uconf":"Medium","uquote":"The eight-story Lakeside Technology Center at 350 E. Cermak contains over 1.1 million square feet of space, with 109MW of utility power provided by Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Digital Realty","spon":"Digital Realty Trust","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"f46003b1a1aa","cid":"f46003b1a1aa","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The local utility provides up to 8000 total kilowatts of power (8 Megawatts) and the UPS systems have a capacity of 1075 kilowatts and are arranged in an N+1 to 2N configuration.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-chicago-datacenter-chi1/","uquote":"The eight-story Lakeside Technology Center at 350 E. Cermak contains over 1.1 million square feet of space, with 109MW of utility power provided by Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Digital Realty","spon":"Digital Realty Trust","contro":"Noise complaints from residents regarding loud fans and alarms at the existing Cermak Road data center.","controScan":"https://www.cbsnews.com/chicago/news/south-loop-residents-fight-new-data-center/","deal":"Digital Realty acquired the Lakeside Technology Center (350 E Cermak) in 2005 for $140 million.","dealScan":"https://www.datacenterknowledge.com/deals/drt-completes-140-million-deal-for-lakeside","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cloudandcolocation.com;datacenterknowledge.com;cbsnews.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-chicago-datacenter-chi1/","https://www.datacenterknowledge.com/deals/drt-completes-140-million-deal-for-lakeside","https://www.cbsnews.com/chicago/news/south-loop-residents-fight-new-data-center/"],"lflag":"merged_duplicate"},{"id":"a29d2b9e157d","cid":"f86555f61639","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Electrical Grid Capacity: Elk Grove Village's industrial legacy provides exceptional power infrastructure: ComEd Infrastructure: Multiple 138kV substations throughout park; Redundant transmission paths from different directions; Distribution capacity exceeding 500 MW park-wide; Proven reliability >99.95% (better than residential areas); Experience supporting multi-megawatt industrial loads.","pscan":"https://illinoiscommercialenergy.com/resources/lower-data-center-energy-costs-elk-grove-village/","uquote":"Electrical Grid Capacity: Elk Grove Village's industrial legacy provides exceptional power infrastructure: ComEd Infrastructure: Multiple 138kV substations throughout park.","uscan":"https://illinoiscommercialenergy.com/resources/lower-data-center-energy-costs-elk-grove-village/","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Digital Realty","spon":"GI Partners","ay":2005,"oy":2007,"contro":"Community concerns regarding water use, electricity demand, noise, and tax incentives for data centers in Elk Grove Village, leading to a proposed two-year moratorium on tax incentives for new data center developments.","controScan":"https://www.youtube.com/watch?v=Ymt2wHBko1U","deal":"GI Partners acquired a 65% interest in two hyperscale data centers in Elk Grove Village, IL from Digital Realty Trust, with Digital Realty retaining 35% interest and continuing operations. The deal was financed through a 10-year, $450 million fixed-rate loan from Barclays, Citigroup and Morgan Stanley banks, reported June 05, 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"illinoiscommercialenergy.com;youtube.com","srcUrls":["https://illinoiscommercialenergy.com/resources/lower-data-center-energy-costs-elk-grove-village/","https://www.youtube.com/watch?v=Ymt2wHBko1U"],"lflag":"source_quality_reclassified"},{"id":"f86555f61639","cid":"f86555f61639","canon":1,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"CH1 combines state-of-the-art concurrently maintainable power, security, cooling and energy efficiency options to help you meet your business objectives.... UPS redundancy: N+2.","uconf":"High","uquote":"Electricity for data centers is patched directly from ComEd substations, and generators are usually only tested for a few minutes a month. Also, the 20 data centers represent just a fraction of the 5,600 businesses within the village and its six-square-mile business park. Johnson said ComEd has rated Elk Grove Village as number one in the country for electricity reliability and the lowest frequency of outages. Power lines are buried in most of the village rather than above-ground.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Digital Realty","spon":"GI Partners","ay":2005,"oy":2007,"deal":"Joint venture with GI Partners for 65% stake in two hyperscale data centers, announced July 17, 2023, with $743 million gross proceeds.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"0e7cb90b6f32","cid":"0e7cb90b6f32","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"With cutting-edge power, security, cooling, and energy efficiency options, this site delivers the ultimate in flexibility and reliability—along with our standard-setting, nonstop operational expertise. Chicago is one of America's leading telecommunications infrastructure cities and has a low risk for natural disasters. Chicago's bustling activity attracts Fortune 500 companies who enjoy some of the country's most competitive power rates. Eighteen 2,250 kW diesel-engine generators.","pscan":"https://marketplace.upstack.com/data-centers/digital-realty-dft-data-center-chicago-ch2","uquote":"Digital Realty and CenterPoint Properties have commenced design and engineering for the planned 12-story annex, which would provide up to 54 Megawatts of utility power from Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Digital Realty","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"marketplace.upstack.com","srcUrls":["https://marketplace.upstack.com/data-centers/digital-realty-dft-data-center-chicago-ch2"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"5ebad9884454","cid":"5ebad9884454","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Franklin Park","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":94,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Primary electrical service for Digital Chicago will be provided by Commonwealth Edison Company.","uconf":"High","uquote":"Primary electrical service for Digital Chicago will be provided by Commonwealth Edison Company.... ComEd today joined Digital Realty... to cut the ribbon on a new electrical substation that provides more power capacity to support future growth and operation of data centers in the region.","uscan":"https://www.villageoffranklinpark.com/assets/1/7/11.7.22_ComEd,_Digital_Realty_cut_ribbon_on_substation_for_growing_data_center_campus.pdf","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"Google, Microsoft, Oracle","ay":2012,"oy":2013,"contro":"Biometrics lawsuit regarding fingerprint scanning without consent at Illinois facilities.","deal":"Acquisition of 575,000 sq ft redevelopment property for $22.3 million in June 2012.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"villageoffranklinpark.com","srcUrls":["https://www.villageoffranklinpark.com/assets/1/7/11.7.22_ComEd,_Digital_Realty_cut_ribbon_on_substation_for_growing_data_center_campus.pdf"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"cfb657105340","cid":"cfb657105340","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Northlake","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Digital Realty already matches 100% of the electricity used by its 11 Illinois data centers with renewable and carbon-free sources, both within Illinois and nationwide.","uconf":"Medium","uquote":"ComEd today joined Digital Realty, the largest global provider of cloud- and carrier-neutral data center, colocation, and interconnection solutions, and community members to cut the ribbon on a new electrical substation that provides more power capacity to support future growth and operation of data centers in the region.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Digital Realty","spon":"Digital Realty","ay":2009,"oy":2011,"deal":"Acquisition by Digital Realty from Validus Mission Critical REIT for $315 million in October 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"162706d6634b","cid":"162706d6634b","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"a9bff50258af","cid":"723059704317","canon":0,"dups":2,"ftype":"data_center","name":"EdgeConneX","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":28,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Local utility ComEd has responded positively to the data center industry, with the power constrictions so prevalent in other major cities nonexistent to date in Chicago. Power availability has created a multifaceted market; while downtown attracts smaller points-of-presence for peering, larger deployments often move to suburbs such as Elk Grove Village, Franklin Park, Oak Brook, and more.","uquote":"Local utility ComEd has responded positively to the data center industry, with the power constrictions so prevalent in other major cities nonexistent to date in Chicago.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"EdgeConneX","spon":"EQT Infrastructure","tenant":"Microsoft","ay":2016,"deal":"Acquisition of building from Prologis for $22.8 million in 2016","dealScan":"https://www.datacenterknowledge.com/hyperscalers/with-microsoft-data-center-deal-edgeconnex-takes-on-wholesale-giants","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/with-microsoft-data-center-deal-edgeconnex-takes-on-wholesale-giants"]},{"id":"723059704317","cid":"723059704317","canon":1,"dups":2,"ftype":"data_center","name":"EdgeConneX","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":28,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Local utility ComEd has responded positively to the data center industry, with the power constrictions so prevalent in other major cities nonexistent to date in Chicago. Elk Grove Village is serviced by the following companies: Commonwealth Edison Electric Services Phone # 1-800-334-7661.","uconf":"High","uquote":"Local utility ComEd has responded positively to the data center industry, with the power constrictions so prevalent in other major cities nonexistent to date in Chicago. Elk Grove Village is serviced by the following companies: Commonwealth Edison Electric Services Phone # 1-800-334-7661.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"EdgeConneX","spon":"EQT Infrastructure","tenant":"Microsoft","ay":2016,"contro":"Community concerns regarding data centers' water and energy usage, and a proposed two-year moratorium on tax incentives for new data center developments in Illinois.","deal":"Acquisition of a 132,000 sq ft vacant warehouse from Prologis for $22.8 MM in 2016.","dealScan":"https://nadatacenters.com/wp-content/uploads/NADC-Newsletter-2017-R3.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nadatacenters.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://nadatacenters.com/wp-content/uploads/NADC-Newsletter-2017-R3.pdf"]},{"id":"abbe439a4a04","cid":"abbe439a4a04","canon":0,"dups":1,"ftype":"data_center","name":"Element Critical","city":"Wood Dale","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Total utility power is 7 MW, delivered in N, N+1, 2N configurations. Abundant power is delivered by dual substations through diverse paths into the facility.","uconf":"High","uquote":"6.1 MW of committed utility power from ComEd.","uscan":"https://invest.jll.com/us/en/listings/special-purpose-facility/element-critical-ch1-2","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Element Critical","spon":"Safanad, 26North Partners, Arctos, Mercuria","ay":2019,"oy":2024,"deal":"Acquisition of the site from Sungard in January 2019","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"invest.jll.com","srcUrls":["https://invest.jll.com/us/en/listings/special-purpose-facility/element-critical-ch1-2"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"8280403bd0c5","cid":"8280403bd0c5","canon":1,"dups":1,"ftype":"data_center","name":"Element Critical","city":"Wood Dale","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Chicago One offers 7 megawatts of available power, delivered in N, N+1, and 2N configurations. Chicago Two offers 5 megawatts also in the same configurations. Each campus draws power from dual substations that feed the buildings through diverse routes, giving customers a buffer against utility disruptions.","uconf":"High","uquote":"Utility fed via dual 12 kV ComEd utility feeds.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Element Critical","spon":"26North Partners, Arctos, Mercuria, Safanad","ay":2019,"deal":"Acquisition of two enterprise data centers in Wood Dale, IL by Element Critical, announced January 8, 2019, with plans to invest more than $40 million to develop and enhance the facilities.","dealScan":"https://www.globenewswire.com/news-release/2019/01/08/1681758/0/en/element-critical-enters-chicago-market-acquiring-two-data-centers-in-the-suburbs.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"globenewswire.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.globenewswire.com/news-release/2019/01/08/1681758/0/en/element-critical-enters-chicago-market-acquiring-two-data-centers-in-the-suburbs.html"]},{"id":"6fcde1f665ff","cid":"6fcde1f665ff","canon":1,"dups":1,"ftype":"data_center","name":"Ensono","city":"Downers Grove","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Ensono, a leading hybrid IT services provider, was awarded $143,000 by Commonwealth Edison Company (ComEd), a unit of Chicago-based Exelon Corporation, the nation's leading competitive energy provider, for energy efficiencies in Ensono's Downers Grove-based data center.","uconf":"High","uquote":"Ensono, a leading hybrid IT services provider, was awarded $143,000 by Commonwealth Edison Company (ComEd), a unit of Chicago-based Exelon Corporation, the nation's leading competitive energy provider, for energy efficiencies in Ensono's Downers Grove-based data center.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Ensono","spon":"KKR","oy":2016,"deal":"KKR acquired Ensono for USD 1.7 billion in 2021","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"32a444f05106","cid":"32a444f05106","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Equinix CH3 data center is designed with power systems that have built-in redundancy, full Uninterruptible Power Supply (UPS) systems with N+1 levels or greater, and backup generator systems in the event of a local utility failure.","pscan":"https://claycorp.com/project/equinix-ch3","uconf":"High","uquote":"Elk Grove Village is serviced by the following companies: Commonwealth Edison Electric Services Phone # 1-800-334-7661. Website: www.comed.com.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Equinix","spon":"Equinix","ay":2006,"oy":2007,"deal":"Acquisition of 228,000 sq ft office/warehouse complex for $9.75 million in June 2006; $175 million investment for the first phase of CH3, grand opening October 2007.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"claycorp.com","srcUrls":["https://claycorp.com/project/equinix-ch3"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"599309bdcbd3","cid":"599309bdcbd3","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Chicago CH1 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center provides electrical capacity of 2.4 kVA per cabinet. The data center has dual utility feeds, and five power transformers. The data center provides 12 kV- 3 phase AC power, and DC power to customer's equipment. The immediate power failure is protected by redundant UPS in N+1 configuration. The standby power is provided by 6 x 1,500 kW diesel generators in N+2 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-chicago-data-center-ch1/","uconf":"High","uquote":"Chicago's biggest electricity company, Commonwealth Edison Co., is taking steps to prevent the data center boom backing the rise of artificial intelligence from raising energy bills for consumers.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-chicago-data-center-ch1/"],"lflag":"source_quality_reclassified"},{"id":"0e0304b69572","cid":"0e0304b69572","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Equinix CH3 data center is designed with power systems that have built-in redundancy, full Uninterruptible Power Supply (UPS) systems with N+1 levels or greater, and backup generator systems in the event of a local utility failure.","pscan":"https://claycorp.com/project/equinix-ch3","uquote":"The main utility company in Elk Grove Village, Illinois is Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Equinix","spon":"Equinix","ay":2006,"oy":2007,"deal":"Land acquisition for $9.75 million in June 2006; $175 million investment for first phase in October 2007.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/equinix-opens-175m-chicago-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"claycorp.com;datacenterknowledge.com","srcUrls":["https://claycorp.com/project/equinix-ch3","https://www.datacenterknowledge.com/hyperscalers/equinix-opens-175m-chicago-data-center"]},{"id":"29e44c390a60","cid":"29e44c390a60","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Des Plaines","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Located in Des Plaines, Illinois, our 36 MW facility offers comprehensive colocation & data center services that both Chicago and global businesses, alike, trust, matched by 100% renewable energy. It features a diverse utility feed and on-site generators, providing a high level of power redundancy.","pscan":"https://inflect.com/building/1680-east-touhy-avenue-des-plaines/iron-mountain/datacenter/chi-1","uquote":"Commonwealth Edison is responsible for overseeing the transmission of electricity in the Des Plaines area.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Iron Mountain","spon":"Pritzker Realty Group","ay":2018,"oy":2025,"deal":"Cook County 6B tax incentive and over $99.5 million construction cost","dealScan":"https://www.journal-topics.com/articles/touhy-avenue-data-center-work-could-begin-in-march/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"inflect.com;journal-topics.com","srcUrls":["https://inflect.com/building/1680-east-touhy-avenue-des-plaines/iron-mountain/datacenter/chi-1","https://www.journal-topics.com/articles/touhy-avenue-data-center-work-could-begin-in-march/"],"lflag":"source_quality_reclassified"},{"id":"18cc947915d2","cid":"18cc947915d2","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"DeKalb","county":"DeKalb","state":"IL","lat":41.894612,"lng":-88.768991,"cprec":"distinct","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 765 megawatts of new renewable energy in Illinois.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-DeKalb-Data-Center.pdf","uconf":"High","uquote":"“ComEd is proud to partner with Meta and the city of DeKalb in powering this state-of-the-art campus that will fuel today's growing digital economy while bringing jobs and economy activity to our communities,” said ComEd CEO Gil Quiniones.","uscan":"https://www.illinois.gov/news/release.html?releaseid=28370","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2020,"oy":2023,"deal":"20-year nuclear energy agreement with Constellation Energy for Meta's Illinois-based data center, starting in 2027.","dealScan":"https://www.techtarget.com/searchdatacenter/news/366625268/Meta-inks-20-year-nuclear-deal-to-power-data-center","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;illinois.gov;techtarget.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-DeKalb-Data-Center.pdf","https://www.illinois.gov/news/release.html?releaseid=28370","https://www.techtarget.com/searchdatacenter/news/366625268/Meta-inks-20-year-nuclear-deal-to-power-data-center"]},{"id":"0505509d58fa","cid":"0505509d58fa","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"ComEd continues to meet the needs of all customers that have applied for electric service and begun the engineering process, and we are actively engaged with new data center customers who are making plans to come to the market.","pscan":"https://www.journal-topics.com/articles/comed-dragging-feet-on-building-substations-for-revenue-generating-data-centers-elk-grove-mayor-says/","uconf":"High","uquote":"“We need ComEd to provide power,” Johnson said in a recent interview with the Journal & Topics.","uscan":"https://www.journal-topics.com/articles/comed-dragging-feet-on-building-substations-for-revenue-generating-data-centers-elk-grove-mayor-says/","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2020,"oy":2023,"contro":"Concerns from residents and state lawmakers about water usage, power reliability, and the need for regulation, including a proposed 'Power Act' bill.","controScan":"https://www.youtube.com/watch?v=Ymt2wHBko1U","deal":"Land acquisition for $52.2 million in January 2020; initial building construction valued at $123 million.","dealScan":"https://www.journal-topics.com/articles/new-details-learned-about-microsofts-plans-for-elk-grove-tech-park/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"journal-topics.com;youtube.com","srcUrls":["https://www.journal-topics.com/articles/comed-dragging-feet-on-building-substations-for-revenue-generating-data-centers-elk-grove-mayor-says/","https://www.journal-topics.com/articles/new-details-learned-about-microsofts-plans-for-elk-grove-tech-park/","https://www.youtube.com/watch?v=Ymt2wHBko1U"],"lflag":"source_quality_reclassified"},{"id":"40b6ca754c52","cid":"40b6ca754c52","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Hoffman Estates","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"A ComEd substation is being designed to serve Microsoft's 53-acre campus on Lakewood Boulevard. Construction of the on-site substation and additional infrastructure utilities began in 2023.","uconf":"High","uquote":"Grid Operator: Commonwealth Edison. A ComEd substation is being designed to serve Microsoft's 53-acre campus on Lakewood Boulevard.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-275331ab","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2021,"oy":2025,"deal":"Microsoft acquired 30 acres of land for $41.5 million in March 2023","dealScan":"https://therealdeal.com/chicago/2023/03/17/microsoft-pays-42m-for-hoffman-estates-spec-industrial-site/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;therealdeal.com","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-275331ab","https://therealdeal.com/chicago/2023/03/17/microsoft-pays-42m-for-hoffman-estates-spec-industrial-site/"]},{"id":"a41743554bad","cid":"a41743554bad","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Northlake","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":158,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"There are three 66 MVA electrical substations that provide a total of 158 megawatts of utility power.","pscan":"https://baxtel.com/data-center/microsoft-chicago-northlake","uquote":"Power delivery timelines and costs continued to rise with ComEd currently inundated with new requests.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2007,"oy":2009,"contro":"Water supply expansion required an intergovernmental agreement and $8 million investment by Northlake, paid for by Microsoft water sales.","controScan":"https://www.datacenterknowledge.com/hyperscalers/northlake-buys-extra-water-for-microsoft-site","deal":"Intergovernmental agreement for water supply with Franklin Park, including Northlake's $8 million investment in pumps and a generator, paid for by Microsoft water sales (August 2008).","dealScan":"https://www.datacenterknowledge.com/hyperscalers/northlake-buys-extra-water-for-microsoft-site","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;datacenterknowledge.com","srcUrls":["https://baxtel.com/data-center/microsoft-chicago-northlake","https://www.datacenterknowledge.com/hyperscalers/northlake-buys-extra-water-for-microsoft-site"]},{"id":"e635fc9772a4","cid":"e635fc9772a4","canon":1,"dups":1,"ftype":"data_center","name":"Northern Trust","city":"Rochelle","county":"Ogle","state":"IL","lat":42.041884,"lng":-89.320176,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"We do not only rely upon redundant connections to the national power grid to guarantee uptime. Our state of the art data center includes on-site, diesel-powered generation and centralized Uninterruptible Power Systems (UPS) to provide power conditioning and ensure uninterrupted dedicated hosting data center operation. Redundant Power Sources Our facility is fed by two separate electrical sub-stations, each with dual substation transformers, and backed by 2 separate connections (looped) to the national electrical grid.","pscan":"https://www.rmu.net/content/rmu-services/fiber-optic-internet-phone/rochelle-technology-center/","uquote":"Rochelle Municipal Utilities (RMU) will manage billing and delivery.","ukey":"16179|IL","uname":"Rochelle Municipal Utilities","rto":"PJM","nerc":"RFC","op":"Northern Trust","spon":"Northern Trust","tenant":"Northern Trust","ay":2008,"oy":2011,"deal":"Initial investment of $50 million announced in 2008","dealScan":"https://www.datacenterknowledge.com/investing/northern-trust-plans-50m-rochelle-site","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"rmu.net;datacenterknowledge.com","srcUrls":["https://www.rmu.net/content/rmu-services/fiber-optic-internet-phone/rochelle-technology-center/","https://www.datacenterknowledge.com/investing/northern-trust-plans-50m-rochelle-site"]},{"id":"b21a29998410","cid":"b21a29998410","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Itasca","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"36MW of critical IT load, N+1 distributed redundancy for each vault, diverse power distribution to data hall and renewable energy options available.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch1-data-center","uquote":"Itasca, Illinois's primary utility company is Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"NTT Global Data Centers","spon":"NTT","tenant":"Hyperscale and Enterprise","oy":2019,"deal":"NTT Global Data Centers acquired two office buildings for $27.5 million in November 2023 for future data center expansion (CH4).","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.global.ntt","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch1-data-center"]},{"id":"c6d84fec5ec5","cid":"c6d84fec5ec5","canon":1,"dups":1,"ftype":"data_center","name":"NYI","city":"Oak Brook","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility Power of 1600A @ 480vac, 600 kW backup UPS Capacity (4 Mitsubishi UPS Modules @ N+1) and 1.25 megawatt diesel generator. Grid Operator: Commonwealth Edison.","pscan":"https://www.interconnection.fyi/data-center/project/nyi-2d6e679b","uquote":"Grid Operator: Commonwealth Edison.","uscan":"https://www.interconnection.fyi/data-center/project/nyi-2d6e679b","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"NYI","spon":"NYI","deal":"Acquisition of former Navisite data center by NYI, September 12, 2019.","dealScan":"https://www.telecomramblings.com/2019/09/nyi-expands-chicago/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;telecomramblings.com","srcUrls":["https://www.interconnection.fyi/data-center/project/nyi-2d6e679b","https://www.telecomramblings.com/2019/09/nyi-expands-chicago/"],"lflag":"source_quality_reclassified"},{"id":"375bbdc71aff","cid":"375bbdc71aff","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":95,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Power - 40 MW of critical power - Power to the facility is provided by dual utility from the Quarry substation and an emergency utility line comes from Crawford all three lines are 8MVA. Mortenson also built the most critical component on the QTS campus: a new 125 MW Substation. The intricate process of taking the entire data center off the existing grid and moving it to the new substation service was successfully completed with zero interruptions.","pscan":"https://www.mortenson.com/projects/qts-data-center","uconf":"High","uquote":"QTS designated two acres of the campus for a ComED substation to power the campus buildout. Careful coordination and planning with the local utility company and trade partners allowed us to overlap work on the data halls with the substation project. Powering Lives | ComEd - An Exelon Company.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"QTS","spon":"Blackstone","ay":2014,"oy":2016,"deal":"Acquisition of former Sun Times Press facility for approximately $18 million (July 2014). QTS Realty Trust acquired by Blackstone Funds in $10 Billion Transaction (expected to close H2 2021). 10-year agreement to purchase 100% renewable energy in Chicago and Piscataway data centers (May 23, 2019).","dealScan":"https://www.prnewswire.com/news-releases/qts-extends-renewable-energy-purchasing-leadership-signs-agreement-to-purchase-100-renewable-power-in-chicago-and-piscataway-data-centers-300855907.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;prnewswire.com","srcUrls":["https://www.mortenson.com/projects/qts-data-center","https://www.prnewswire.com/news-releases/qts-extends-renewable-energy-purchasing-leadership-signs-agreement-to-purchase-100-renewable-power-in-chicago-and-piscataway-data-centers-300855907.html"],"lflag":"source_quality_reclassified"},{"id":"16e0aa7fa0b0","cid":"16e0aa7fa0b0","canon":1,"dups":1,"ftype":"data_center","name":"Serverfarm","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"the facility offers utility power provided via 12 diverse feeds originating at four separate substations. Capacity. Utility, 32MW. IT, 21.5MW.","pscan":"https://www.serverfarmllc.com/chicago-data-center/","uconf":"High","uquote":"The giant spike that we saw in ComEd bills this past summer was largely due to the impact of data center electric demand on the system,\" she said.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Serverfarm","spon":"Manulife Investment Management","tenant":"Peerless Network","ay":2010,"oy":2013,"deal":"Serverfarm closed a $589 million asset-backed securities (ABS) offering in December 2025 to refinance existing debt, using three fully leased US data centers including Chicago as collateral.","dealScan":"https://www.serverfarmllc.com/press-releases/manulife-im-backed-serverfarm-closes-589-million-abs-offering/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"serverfarmllc.com","srcUrls":["https://www.serverfarmllc.com/chicago-data-center/","https://www.serverfarmllc.com/press-releases/manulife-im-backed-serverfarm-closes-589-million-abs-offering/"],"lflag":"source_quality_reclassified"},{"id":"d01d7fb2d9d0","cid":"d01d7fb2d9d0","canon":1,"dups":1,"ftype":"data_center","name":"Skybox","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"With redundant power feeds from ComEd's Itasca substation and dedicated dual 34.5 kVa services, you'll have access to 30MW of reliable power exclusively for your use. Plus, take advantage of renewable programs through ComEd.","uconf":"High","uquote":"The campus is served by dedicated redundant power feeds from the robust ComEd Itasca substation.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Skybox Datacenters","spon":"unnamed third-party North American fund manager","tenant":"Undisclosed tenant","ay":2021,"oy":2022,"deal":"M&A: DigiCo Infrastructure REIT sold its stake on the facility to an unnamed third-party North American fund manager in April 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"777258e6e590","cid":"777258e6e590","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"ComEd (Chicago area) operates in PJM, while Ameren (downstate) is in MISO. This means pricing dynamics differ between regions. Chicago often sees higher capacity costs due to PJM market structure.","pscan":"https://kilowattlogic.com/markets/illinois","uconf":"High","uquote":"Northern Illinois (ComEd) is in PJM, while central and southern Illinois (Ameren) are in MISO.","uscan":"https://illinoiscommercialenergy.com/resources/navigating-pjm-miso-markets-illinois-businesses/","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"STACK Infrastructure","spon":"Blue Owl Capital","ay":2014,"oy":2015,"deal":"IPI Partners acquired an Elk Grove Village data center from T5 Data Centers for $118.9 million in September 2018.","dealScan":"https://baxtel.com/news/ipi-partners-buys-elk-grove-village-suburban-data-center-for-119m","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"kilowattlogic.com;illinoiscommercialenergy.com;baxtel.com","srcUrls":["https://kilowattlogic.com/markets/illinois","https://illinoiscommercialenergy.com/resources/navigating-pjm-miso-markets-illinois-businesses/","https://baxtel.com/news/ipi-partners-buys-elk-grove-village-suburban-data-center-for-119m"],"lflag":"source_quality_reclassified"},{"id":"fd9be6037c85","cid":"fd9be6037c85","canon":0,"dups":1,"ftype":"data_center","name":"Stream Data Centers","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Stream's new campus in Elk Grove Village, IL will help meet the growing demand for Chicago market data center services, connecting customers to the benefits of strong infrastructure, a central location and clean, affordable and reliable power found in the ComEd service territory.","uquote":"Stream's new campus in Elk Grove Village, IL will help meet the growing demand for Chicago market data center services, connecting customers to the benefits of strong infrastructure, a central location and clean, affordable and reliable power found in the ComEd service territory.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Stream Data Centers","spon":"SDC CHI II BUSSE","ay":2020,"oy":2022,"deal":"Site acquisition and development launched in 2020.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"bd159a7ac993","cid":"bd159a7ac993","canon":0,"dups":1,"ftype":"data_center","name":"Stream Data Centers","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Top-performing utility power, in a reliable and competitive energy market. Two (2) 25MW utility feeds from two separate substations.","pscan":"https://www.streamdatacenters.com/news/stream-data-centers-announces-new-chicago-area-development/","uconf":"High","uquote":"Stream's new campus in Elk Grove Village, IL will help meet the growing demand for Chicago market data center services, connecting customers to the benefits of strong infrastructure, a central location and clean, affordable and reliable power found in the ComEd service territory.","uscan":"https://www.streamdatacenters.com/locations/chicago-data-centers/","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Stream Data Centers","spon":"Stream Data Centers","ay":2018,"oy":2018,"deal":"Stream Data Centers LP secured over $600 million in debt capital financing for hyperscale data center builds in Phoenix and Chicago, announced April 2, 2024, and closed April 24, 2024.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/news/stream-data-centers-announces-new-chicago-area-development/","https://www.streamdatacenters.com/locations/chicago-data-centers/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"09fe754b2f4e","cid":"09fe754b2f4e","canon":1,"dups":1,"ftype":"data_center","name":"T5 Data Centers","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"“We have completed the necessary steps to secure utility power with ComEd and will begin construction shortly to meet the growing demand from our customers. This capacity will be delivered at a critical time, as available data center space in this key market is limited,” said David Horowitz, Senior Vice President Head of Leasing at T5 Data Centers.","uconf":"High","uquote":"“We have completed the necessary steps to secure utility power with ComEd and will begin construction shortly to meet the growing demand from our customers.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"T5 Data Centers","spon":"T5 Data Centers","tenant":"Enterprise and hyperscale cloud computing customers","ay":2020,"oy":2020,"deal":"Acquisition of a 164,000-square-foot data center shell on January 20, 2020","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"802c54e18d2d","cid":"802c54e18d2d","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"Utilities. One 2,500kVA primary utility transformer. Generators. 2 x 2.25MW diesel generator on-site, 2,300 gallon tanks + (1) external 14,000 gallon tank.","pscan":"https://web.tierpoint.com/hubfs/data-center/il-chicago-polk-data-center-spec-sheet.pdf","uconf":"High","uquote":"Commonwealth Edison, commonly known by syllabic abbreviation as ComEd, is the largest electric utility in Illinois, and the primary electric provider in Chicago and much of Northern Illinois.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"TierPoint","spon":"Argo Infrastructure Partners","ay":2013,"oy":2013,"deal":"TierPoint acquired AlteredScale, including this data center, in December 2015.","dealScan":"https://baxtel.com/data-center/tierpoint-chicago-polk","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"web.tierpoint.com;baxtel.com","srcUrls":["https://web.tierpoint.com/hubfs/data-center/il-chicago-polk-data-center-spec-sheet.pdf","https://baxtel.com/data-center/tierpoint-chicago-polk"],"band":"< 10 MW"},{"id":"864fcac0b728","cid":"864fcac0b728","canon":1,"dups":1,"ftype":"data_center","name":"United Airlines","city":"Arlington Heights","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"United's network operations center is moving from Willis Tower to suburban Arlington Heights, offering enhanced security, backup power and expansion space.","uconf":"High","uquote":"ComEd is the electric utility that serves the Arlington Heights area. To establish electric service with Commonwealth Edison, please call 800. Edison1 or sign-up online at ComEd.","uscan":"https://www.vah.com/residents/utilities.php","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"United Airlines","spon":"United Airlines","tenant":"United Airlines","oy":2022,"deal":"United Airlines purchased a 205,000-square-foot office building at 1421 W. Shure Drive, formerly owned by Motorola, to expand its network operations facility.","dealScan":"https://www.connectcre.com/stories/united-airlines-acquires-former-motorola-property-for-operations/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"vah.com;connectcre.com","srcUrls":["https://www.vah.com/residents/utilities.php","https://www.connectcre.com/stories/united-airlines-acquires-former-motorola-property-for-operations/"],"lflag":"source_quality_reclassified"},{"id":"87bd5b12f723","cid":"87bd5b12f723","canon":1,"dups":1,"ftype":"data_center","name":"Woverine Trading","city":"Lombard","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"360TCS provides mission-critical co-location and disaster recovery services in our Lombard, IL data center. The facility features an energy efficient, fully redundant design utilizing the latest advances in available technology to ensure 100% availability.","uquote":"ComEd is the local electricity service provider for Lombard residents.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Wolverine Trading Technologies","spon":"Wolverine Trading","tenant":"Wolverine Trading","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e90a1e876e2e","cid":"e90a1e876e2e","canon":1,"dups":1,"ftype":"data_center","name":"WW Grainger","city":"Lake Forest","county":"Lake","state":"IL","lat":42.185968,"lng":-87.805939,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Cosentini also engineered electrical site service via dual paths of primary service to the suburban site. This also entailed the development of an automatic transfer between the two primary services at the lot line, and then came into the building at multiple locations to establish transformer locations.... Innovative details include a passive fuel sharing system between the generator belly tanks that allows up to 72 hours of continuous run time without refueling and carefully charting future expansion steps without interruption to live data operations.","pscan":"https://www.pepperconstruction.com/project/grainger-lake-forest-data-center-worlds-first-leed-v4-gold","uconf":"High","uquote":"Commonwealth Edison (ComEd) is one of the electricity providers for the City of Lake Forest.","uscan":"https://www.cityoflakeforest.com/community/utility___telecom_services/index.php","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"W.W. Grainger","spon":"W.W. Grainger","tenant":"W.W. Grainger","oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"pepperconstruction.com;cityoflakeforest.com","srcUrls":["https://www.pepperconstruction.com/project/grainger-lake-forest-data-center-worlds-first-leed-v4-gold","https://www.cityoflakeforest.com/community/utility___telecom_services/index.php"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"93912af77148","cid":"93912af77148","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Center (EGV) PropCo LLC","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Direct access to existing power and municipal utility resources. The Illinois EPA has received an application for a construction permit for Aligned Data Center (EGV) PropCo LLC located at 50 and 150 NW Point Blvd in Elk Grove Village. The application requests authorization for the construction of one hundred and twelve (112) diesel-powered emergency generator sets.","pscan":"https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Aligned%20Data%20Center%20(EGV)%20PropCo%20LLC%20031440AWF%20Consruction%2024050021.pdf","uconf":"High","uquote":"To handle the power requirements of data centers, Elk Grove Village is currently home to two large ComEd electric substations... ComEd Infrastructure: Multiple 138kV substations throughout park.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"BlackRock 's Global Infrastructure Partners","ay":2023,"oy":2028,"contro":"Community concerns and proposed state-level regulation/moratorium on tax incentives due to energy and water use.","controScan":"https://www.youtube.com/watch?v=Ymt2wHBko1U","deal":"Land acquisition for $29 million in March 2023, $35 million in two separate deals, and $14.2 million purchase. Development Assistance Agreement for $5,192.00 in 2023.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"epa.illinois.gov;youtube.com","srcUrls":["https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Aligned%20Data%20Center%20(EGV)%20PropCo%20LLC%20031440AWF%20Consruction%2024050021.pdf","https://www.youtube.com/watch?v=Ymt2wHBko1U"]},{"id":"b2278782e3fb","cid":"b2278782e3fb","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Energy","city":"Northlake","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":100,"pc":"Grid","pconf":"High","pquote":"The campus is at the convergence of more than 12 metro, long-haul and international fiber networks, offering customers extensive local and global connectivity options and will draw redundant, critical power from two on-site substations with 170 MW total capacity.","uconf":"High","uquote":"The ComEd territory in northern Illinois, for example, has enough large-load energy projects in its queue to more than double the amount of energy demand in the territory by 2040.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"BlackRock and MGX","ay":2021,"oy":2023,"deal":"Refinancing of $700 million in November 2023, with Toronto Dominion Bank issuing a $402 million loan and Wilmington Trust issuing a $300 million loan.","dealScan":"https://therealdeal.com/chicago/2023/12/27/aligned-data-centers-scores-700m-northlake-loan/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"therealdeal.com","srcUrls":["https://therealdeal.com/chicago/2023/12/27/aligned-data-centers-scores-700m-northlake-loan/"],"band":"100-250 MW","oy_stale":1,"lflag":"stale_future_status_year"},{"id":"4435d2c878d9","cid":"4435d2c878d9","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters ORD I LLC","city":"Hoffman Estates","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Dallas – June 13, 2024 – This morning, Compass Datacenters, alongside partners from the Village of Hoffman Estates and ComEd, celebrated the start of work to transform the former Sears Headquarter site into a hyperscale data center campus.","uquote":"Dallas – June 13, 2024 – This morning, Compass Datacenters, alongside partners from the Village of Hoffman Estates and ComEd, celebrated the start of work to transform the former Sears Headquarter site into a hyperscale data center campus.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Compass Datacenters","spon":"Ontario Teachers' Pension Plan and Brookfield Infrastructure","ay":2023,"oy":2026,"deal":"Cook County Class 6B Classification for property tax assessment purposes approved on February 17, 2025; Land acquisition in September 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"99882c08d8c8","cid":"99882c08d8c8","canon":0,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":22,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Illinois EPA has received an application for a Construction Permit for Elk Grove Village (CHI10-11) Data Center located at 201 Innovation Drive in Elk Grove Village. The application requests authorization to construct one 500 kWe diesel-fired emergency generator and twelve 3,100 kWe diesel-fired emergency generator sets and will be operated under the current permitted limits established in Construction Permit 20120040.","pscan":"https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Elk%20Grove%20Village%20(CHI10-11-12)%20Data%20Center%20031440AUK%20Construction%2024070017.pdf","uconf":"High","uquote":"Local utility ComEd has responded positively to the data center industry, with the power constrictions so prevalent in other major cities nonexistent to date in Chicago. ComEd Infrastructure: Multiple 138kV substations throughout park; Redundant transmission paths from different directions; Distribution capacity exceeding 500 MW park-wide; Proven reliability >99.95% (better than residential areas); Experience supporting multi-megawatt industrial loads.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"EdgeConneX","spon":"EQT Infrastructure","ay":2022,"oy":2023,"contro":"Community opposition and state-level regulatory pushback regarding data center energy and water use.","deal":"EdgeConneX plans to invest up to $210 million in developing the facility.","dealScan":"https://baxtel.com/news/edgeconnex-granted-property-tax-break-for-its-22mw-data-center-in-elk-grove","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"epa.illinois.gov;baxtel.com","srcUrls":["https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Elk%20Grove%20Village%20(CHI10-11-12)%20Data%20Center%20031440AUK%20Construction%2024070017.pdf","https://baxtel.com/news/edgeconnex-granted-property-tax-break-for-its-22mw-data-center-in-elk-grove"],"oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"7fefa18d8851","cid":"7fefa18d8851","canon":1,"dups":1,"ftype":"data_center","name":"Edged Energy","city":"Aurora","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Proposed","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"As the electrical company serving northern Illinois, ComEd will be providing the infrastructure needed to power the new data center campus from its nearby regional substation. Additionally, Seefried and Edged Energy will be adding a new substation onsite to support future phases of the development.","pscan":"https://databid.com/blog/new-data-center-campus-to-be-constructed-in-aurora","uconf":"High","uquote":"local utility provider ComEd","uscan":"https://databid.com/blog/new-data-center-campus-to-be-constructed-in-aurora","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Edged US","spon":"Endeavour","ay":2023,"oy":2025,"deal":"Phase 1 Investment of $300M","dealScan":"https://www.auroradyn.com/case-studies/edged-sustainable-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"databid.com;auroradyn.com","srcUrls":["https://databid.com/blog/new-data-center-campus-to-be-constructed-in-aurora","https://www.auroradyn.com/case-studies/edged-sustainable-data-center"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"14618e48ed75","cid":"14618e48ed75","canon":1,"dups":1,"ftype":"data_center","name":"Elk Grove Village (CH1-CH2-CH3) Data Center","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Commonwealth Edison.","pscan":"https://www.interconnection.fyi/data-center/project/elk-grove-village-ch1-ch2-ch3-data-center-7c157de7","uquote":"Grid Operator: Commonwealth Edison.","uscan":"https://www.interconnection.fyi/data-center/project/elk-grove-village-ch1-ch2-ch3-data-center-7c157de7","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","ay":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/elk-grove-village-ch1-ch2-ch3-data-center-7c157de7"]},{"id":"4bd6d6f90898","cid":"4bd6d6f90898","canon":1,"dups":1,"ftype":"data_center","name":"Elk Grove Village (CHI10-11-12) Data Center","city":"Elk Grove","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Illinois EPA has received an application for a Construction Permit for Elk Grove Village (CHI10-11) Data Center located at 201 Innovation Drive in Elk Grove Village. The application requests authorization to construct one 500 kWe diesel-fired emergency generator and twelve 3,100 kWe diesel-fired emergency generator sets and will be operated under the current permitted limits established in Construction Permit 20120040.","pscan":"https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Elk%20Grove%20Village%20(CHI10-11-12)%20Data%20Center%20031440AUK%20Construction%2024070017.pdf","uquote":"Grid Operator. Commonwealth Edison. Permit Status. Approved. Permit Details. Contact sales for permit type, permit ID, and dates.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-a3c975e6","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2020,"deal":"Microsoft paid Brennan Investment Group $52.2 million in January 2020 to purchase a 36.6-acre parcel.","dealScan":"https://baxtel.com/data-center/microsoft-elk-grove","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"epa.illinois.gov;interconnection.fyi;baxtel.com","lflag":"online_before_announced","srcUrls":["https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/Elk%20Grove%20Village%20(CHI10-11-12)%20Data%20Center%20031440AUK%20Construction%2024070017.pdf","https://www.interconnection.fyi/data-center/project/microsoft-a3c975e6","https://baxtel.com/data-center/microsoft-elk-grove"]},{"id":"b3f434e53533","cid":"b3f434e53533","canon":1,"dups":1,"ftype":"data_center","name":"Ensono Data Center","city":"Downers Grove","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Commonwealth Edison (ComEd)","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"4110|IL","uname":"Commonwealth Edison Co","reportedUtility":"Commonwealth Edison Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ffcb2e0862a2","cid":"ffcb2e0862a2","canon":1,"dups":1,"ftype":"data_center","name":"Equinix LLC","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":49,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"This permit is issued based on the construction of the fifteen (15) Diesel-Powered Emergency Generators not constituting a new major source or major modification pursuant to Title I of the Clean Air Act, specifically 35 Ill. Adm. Code Part 203 (Major Stationary Sources Construction and Modification).","pscan":"https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/ira-analyses/23080013.pdf","uconf":"High","uquote":"The main utility company in Elk Grove Village, Illinois is Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Equinix","spon":"Equinix","ay":2025,"oy":2026,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"epa.illinois.gov","srcUrls":["https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/ira-analyses/23080013.pdf"],"lflag":"source_quality_reclassified"},{"id":"267cf02c9597","cid":"267cf02c9597","canon":1,"dups":1,"ftype":"data_center","name":"Equinix LLC","city":"Chicago","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"ComEd (Commonwealth Edison)","rto":"PJM","nerc":"RFC","op":"Equinix","spon":"Equinix","ay":2021,"contro":"A planned Equinix data center in Chicago was scuttled after interference from politicians and a rival developer who wanted to build on the property themselves, a lawsuit alleges.","deal":"Property sale agreement to Equinix for $30M in 2021","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text utility_alias_corrected","ukey":"4110|IL","uname":"Commonwealth Edison Co","reportedUtility":"Commonwealth Edison Co","srcUrls":null,"srcDom":null},{"id":"db81fbe2b4af","cid":"db81fbe2b4af","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Franklin Park","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","proc":"Tariff (utility)","pcp":"ComEd","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"4110|IL","uname":"Commonwealth Edison Co","reportedUtility":"Commonwealth Edison Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"22f5bf20af4c","cid":"22f5bf20af4c","canon":1,"dups":1,"ftype":"data_center","name":"Stream Data Centers","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Stream's new campus in Elk Grove Village, IL will help meet the growing demand for Chicago market data center services, connecting customers to the benefits of strong infrastructure, a central location and clean, affordable and reliable power found in the ComEd service territory.","pscan":"https://www.streamdatacenters.com/locations/chicago-data-centers/","uconf":"High","uquote":"Stream Data Centers today joined ComEd and Elk Grove Village to mark the groundbreaking of ComEd's new substation, which will support the data center developer's third campus in Elk Grove Village, which is expected to begin benefiting customers in 2027.","uscan":"https://www.streamdatacenters.com/news/comed-groundbreaking-egv/","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"Stream Data Centers","tenant":"Hyperscaler","ay":2023,"oy":2027,"contro":"Community opposition and land acquisition challenges due to demolition of residential properties and annexation discussions.","controScan":"https://therealdeal.com/chicago/2023/09/14/stream-data-center-finalizes-elk-cove-land-assemblage/","deal":"Land acquisition through homeowner buyouts (approx. $950,000 apiece) in Roppolo subdivision, announced September 2023.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"streamdatacenters.com;therealdeal.com","srcUrls":["https://www.streamdatacenters.com/locations/chicago-data-centers/","https://www.streamdatacenters.com/news/comed-groundbreaking-egv/","https://therealdeal.com/chicago/2023/09/14/stream-data-center-finalizes-elk-cove-land-assemblage/"],"lflag":"source_quality_reclassified"},{"id":"2159579251a9","cid":"2159579251a9","canon":1,"dups":1,"ftype":"data_center","name":"T5@Chicago II LP","city":"Elk Grove Village","county":"Cook","state":"IL","lat":41.894294,"lng":-87.645455,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Commonwealth Edison.","uconf":"High","uquote":"Grid Operator: Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"T5 Data Centers","ay":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1054656d0eb9","cid":"1054656d0eb9","canon":1,"dups":1,"ftype":"data_center","name":"zColo LLC - Oak Brook","city":"Oak Brook","county":"DuPage","state":"IL","lat":41.852058,"lng":-88.086039,"cprec":"shared_centroid","status":"Proposed","mw":8,"pc":"Grid","pconf":"High","pquote":"With over 12 MW total power, brought in from diverse sub-stations, this facility has the power and design to accommodate over 150 watts per square foot. We also offer hot air containment cabinets necessary to deploy high density applications such as blade servers. 6 diesel generators, each with it's own 2000 gallon belly tank, provide the ability for the data center to continue to function at full capacity for extended periods of time in the unlikely event of a prolonged interruption in primary power.","uquote":"Grid Operator. Commonwealth Edison.","ukey":"4110|IL","uname":"Commonwealth Edison Co","rto":"PJM","nerc":"RFC","op":"DataBank","spon":"Colony Capital (now DigitalBridge)","ay":2021,"deal":"DataBank acquired zColo's US and UK data center assets from Zayo Group Holdings for $1.4 billion in December 2020.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"< 10 MW","srcUrls":null,"srcDom":null},{"id":"1d92af7bad6e","cid":"1d92af7bad6e","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Portage","county":"Porter","state":"IN","lat":41.509914,"lng":-87.071313,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Amazon's partnership with NIPSCO and GenCo is a cornerstone of this approach, enabling the development of data center campuses that will be powered by up to 3 gigawatts of new generation capacity to serve Amazon's needs, with any excess generation enhancing grid reliability for all NIPSCO customers.","pscan":"https://www.nisource.com/news/article/powering-indiana-s-future-how-nipsco-genco-and-amazon-keep-energy-reliable-and-affordable-20251124","uconf":"High","uquote":"The plans include a $1 billion deal with NIPSCO, the power utility for most of northern Indiana, where Amazon will cover all of the costs to build out the 2.4 gigawatts of power the data centers will need.","uscan":"https://www.wthr.com/article/money/business/amazon-building-15-billion-in-data-center-campuses-in-indiana-nipsco-power-electricity-rates-bills-deal-ai-artificial-intelligence/531-af4320f9-50ba-42c4-8582-f431c8f1af84","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2023,"contro":"Council member expressed dissent over tax reductions.","controScan":"https://cioinfluence.com/it-and-devops/aws-receives-tax-abatement-for-data-center-expansion-in-portage-indiana/","deal":"Portage City Council granted property tax reductions for a $35 million building and $52 million in IT equipment (December 2023).","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"nisource.com;wthr.com;cioinfluence.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.nisource.com/news/article/powering-indiana-s-future-how-nipsco-genco-and-amazon-keep-energy-reliable-and-affordable-20251124","https://www.wthr.com/article/money/business/amazon-building-15-billion-in-data-center-campuses-in-indiana-nipsco-power-electricity-rates-bills-deal-ai-artificial-intelligence/531-af4320f9-50ba-42c4-8582-f431c8f1af84","https://cioinfluence.com/it-and-devops/aws-receives-tax-abatement-for-data-center-expansion-in-portage-indiana/"]},{"id":"159fd99866e9","cid":"159fd99866e9","canon":1,"dups":1,"ftype":"data_center","name":"Cooper Standard","city":"Auburn","county":"De Kalb","state":"IN","lat":41.39676,"lng":-85.002697,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"In 2004, Cooper Tire and Rubber (now Cooper Standard) was about to be sold from its parent company. The $1.6 billion auto component manufacturer needed a data center but bandwidth was insufficient and inconsistent in Auburn. Cooper considered leaving because the incumbents, Mediacom and AT&T, could not or would not provide the broadband capacity the company needed. If Cooper left town, an estimated $7 million in wages and benefits from 75 high-paying tech jobs would also leave. [...] Rather than lose Cooper, the City of Auburn stepped in to fill the connectivity gap in 2005.","uconf":"High","uquote":"Auburn Electric, the owner of the network, operates and maintains the fiber infrastructure. [...] The electric utility created AES as a sub-department to operate the electronics that provide telecommunications services.","rto":"PJM","nerc":"RFC","op":"Cooper Standard","spon":"Cooper Standard","ay":2004,"contro":"Cooper Standard considered leaving Auburn due to insufficient broadband for its data center needs, prompting the city to intervene.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7b51633b96c3","cid":"7b51633b96c3","canon":1,"dups":1,"ftype":"data_center","name":"Digital Crossroads - Hammond","city":"Hammond","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Operational","mw":20,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Digital Crossroads Campus is in NIPSCO's exclusive electric service territory.... The data center campus will utilize ~1MW of renewable solar energy to power the offices, common spaces and other non-critical areas of the data center.","pscan":"https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/2f761d73-6366-f011-bec2-001dd8084fd9/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46183%20DX%20Hammond%20Intervenor","uconf":"High","uquote":"The Digital Crossroads Campus is in NIPSCO's exclusive electric service territory.... Merrillville-based utility NIPSCO.","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Digital Crossroad","spon":"DX Hammond JV (managed by Decennial Group, )","ay":2018,"oy":2020,"contro":"Concerns about NIPSCO's ability to supply power fast enough for campus expansion, potentially delaying major deals.","deal":"Initial funding closed January 9, 2019, with Star America providing equity for the first phase. A $28 million investment from Energy Solutions Group and United Leasing and Finance for expansion was announced February 13, 2023.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"iurc.portal.in.gov","srcUrls":["https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/2f761d73-6366-f011-bec2-001dd8084fd9/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46183%20DX%20Hammond%20Intervenor"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"cb2575c061a6","cid":"cb2575c061a6","canon":1,"dups":1,"ftype":"data_center","name":"Health & Hospital Corporation of Marion County","city":"Indianapolis","county":"Marion","state":"IN","lat":39.782976,"lng":-86.135794,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Emergency generators to enable full operation during a loss of power and provide for sheltering in place.","pscan":"https://hhcorp.org/facts-and-figures/","uconf":"High","uquote":"Indianapolis Power and Light Company.","uscan":"https://hhcorp.org/wp-content/uploads/2025/07/HHC-2024-ACFR-Final.pdf","ukey":"9273|IN","uname":"AES Indiana","rto":"MISO","nerc":"RFC","op":"Health & Hospital of Marion County","spon":"Health & Hospital of Marion County","tenant":"Health & Hospital of Marion County","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"hhcorp.org","srcUrls":["https://hhcorp.org/facts-and-figures/","https://hhcorp.org/wp-content/uploads/2025/07/HHC-2024-ACFR-Final.pdf"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"a3b6cf312fb1","cid":"a3b6cf312fb1","canon":1,"dups":1,"ftype":"data_center","name":"Amazon - New Carlisle","city":"New Carlisle","county":"St. Joseph","state":"IN","lat":41.617723,"lng":-86.288048,"cprec":"shared_centroid","status":"Construction","mw":2250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The facility will consume 2.2 gigawatts of electricity – enough to power 1 million homes.","pscan":"https://www.spokesman.com/stories/2025/jul/13/at-amazons-biggest-data-center-everything-is-super/","uconf":"High","uquote":"Indiana Michigan Power will serve the facility in New Carlisle.","uscan":"https://www.govtech.com/artificial-intelligence/indiana-data-center-could-bring-significant-power-use","ukey":"9324|IN","uname":"Indiana Michigan Power Co","rto":"MISO","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon","tenant":"Anthropic","ay":2023,"oy":2025,"contro":"Residents have raised concerns about water use, energy consumption, property values, noise, and impact on wildlife habitat. Community opposition also exists regarding building on a 10-acre wetland.","controScan":"https://indianaeconomicdigest.net/Content/Default/Major-Indiana-News/Article/Amazon-to-invest-7-billion-in-new-data-center-that-will-bring-hundreds-of-permanent-jobs-to-Northwest-Indiana/-3/5308/121498","deal":"Amazon is investing $11 billion in the campus. The Indiana Economic Development Corporation (IEDC) is offering AWS data center sales tax exemptions for eligible capital investments over a 50-year term. St. Joseph County Council approved a 50% real property tax abatement for 10 years and an 85% Enterprise Technology Exemption for 35 years. The county granted Amazon more than $4 billion in property and technology tax exemptions over 35 years. Amazon also invested $1.25 billion in Anthropic in September 2023, followed by further investments.","dealScan":"https://baxtel.com/data-center/amazon-new-carlisle-i-dc1","tier":2,"tlbl":"Reputable journalism","srcCt":4,"srcDom":"spokesman.com;govtech.com;baxtel.com;indianaeconomicdigest.net","srcUrls":["https://www.spokesman.com/stories/2025/jul/13/at-amazons-biggest-data-center-everything-is-super/","https://www.govtech.com/artificial-intelligence/indiana-data-center-could-bring-significant-power-use","https://baxtel.com/data-center/amazon-new-carlisle-i-dc1","https://indianaeconomicdigest.net/Content/Default/Major-Indiana-News/Article/Amazon-to-invest-7-billion-in-new-data-center-that-will-bring-hundreds-of-permanent-jobs-to-Northwest-Indiana/-3/5308/121498"],"lflag":"large_project_duplicate_review source_quality_reclassified shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"7d32eef2d099","cid":"7d32eef2d099","canon":0,"dups":1,"ftype":"data_center","name":"Anthropic-Amazon New Carlisle","county":"St. Joseph","state":"IN","lat":41.617723,"lng":-86.288048,"cprec":"shared_centroid","status":"Construction","mw":2200,"pc":"Grid","pconf":"High","pquote":"The facility will consume 2.2 gigawatts of electricity — enough to power a million homes.... Indiana Michigan Power, a subsidiary of American Electric Power, partnered with AWS to deliver the necessary high-voltage infrastructure.","pscan":"https://new-savanna.blogspot.com/2025/06/amazons-new-power-hogging-data-center.html","uquote":"Indiana Michigan Power, a subsidiary of American Electric Power, partnered with AWS to deliver the necessary high-voltage infrastructure.","ukey":"9324|IN","uname":"Indiana Michigan Power Co","rto":"MISO","nerc":"RFC","op":"Amazon","spon":"Amazon","tenant":"Anthropic","ay":2023,"oy":2025,"contro":"Community opposition regarding water usage, light pollution, traffic, loss of farmland, and tax abatements.","deal":"Amazon's $11 billion investment in the data center campus, announced in 2023/2024.","dealScan":"https://www.alphaspread.com/market-news/product-launches/amazon-opens-11-billion-ai-data-center-in-indiana-to-support-anthropic","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"new-savanna.blogspot.com;alphaspread.com","srcUrls":["https://new-savanna.blogspot.com/2025/06/amazons-new-power-hogging-data-center.html","https://www.alphaspread.com/market-news/product-launches/amazon-opens-11-billion-ai-data-center-in-indiana-to-support-anthropic"],"band":"250+ MW","lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded stale_future_status_year large_project_duplicate_review,merged_duplicate","oy_stale":1},{"id":"c74b014ed271","cid":"c74b014ed271","canon":1,"dups":1,"ftype":"data_center","name":"Google - Fort Wayne","city":"Fort Wayne","county":"Allen","state":"IN","lat":41.091909,"lng":-85.071791,"cprec":"distinct","status":"Construction","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The diesel generators at the Google Data Center are strictly backup power sources. They are not used for regular operations and do not run continuously to supply electricity. Their purpose is to provide emergency power during a utility outage. Indiana Michigan Power (I&M), an American Electric Power (Nasdaq: AEP) company, recently filed a special, joint contract with Google, designed to support I&M's capacity needs through clean generation and use of a Demand Response structure.","uconf":"High","uquote":"Indiana Michigan Power (I&M), an American Electric Power (Nasdaq: AEP) company, recently filed a special, joint contract with Google, designed to support I&M's capacity needs through clean generation and use of a Demand Response structure.","ukey":"9324|IN","uname":"Indiana Michigan Power Co","rto":"PJM","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2024,"oy":2025,"contro":"Community opposition regarding environmental impact (wetlands, diesel generators), water usage, and tax abatements.","controScan":"https://www.openpetition.org/us/petition/online/tell-city-leadership-that-you-are-concerned-about-data-centers","deal":"$2 billion investment announced April 2024; 10-year, 50% tax abatement from Fort Wayne (waiving over $55 million in property taxes, with a supplemental payment of at least $1 million/year); Demand Response structure agreement filed with Indiana Michigan Power in July 2025.","dealScan":"https://www.youtube.com/watch?v=QI1SX3LsRoM","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;openpetition.org","srcUrls":["https://www.youtube.com/watch?v=QI1SX3LsRoM","https://www.openpetition.org/us/petition/online/tell-city-leadership-that-you-are-concerned-about-data-centers"],"lflag":"citation_artifact_removed source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"82f7d1679bed","cid":"82f7d1679bed","canon":1,"dups":1,"ftype":"data_center","name":"Meta - Jeffersonville","city":"Jeffersonville","county":"Clark","state":"IN","lat":38.476217,"lng":-85.711122,"cprec":"distinct","status":"Construction","mw":407,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Once operational, the Jeffersonville Data Center will be supported by 100% renewable energy through our investments in new renewable energy projects and like our other data centers, will achieve LEED Gold certification. Meta is working with multiple local partners, including Duke Energy, to meet our 100% clean and renewable energy goal for the Jeffersonville Data Center.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Jeffersonville-Data-Center.pdf","uconf":"High","uquote":"Meta is working with multiple local partners, including Duke Energy, to meet our 100% clean and renewable energy goal for the Jeffersonville Data Center.","ukey":"15470|IN","uname":"Duke Energy Indiana, LLC","rto":"MISO","nerc":"RFC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2024,"oy":2026,"contro":"Community opposition regarding tax exemptions, water/energy usage, and local funding.","controScan":"https://www.latitudemedia.com/news/metas-senate-scrutiny-signals-growing-backlash-to-data-centers-thirst-for-gas/","deal":"$800 million investment and a 35-year data center sales tax exemption from the Indiana Economic Development Corporation.","dealScan":"https://www.ibj.com/articles/meta-to-build-800m-data-center-add-100-jobs-in-indiana","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;ibj.com;latitudemedia.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Jeffersonville-Data-Center.pdf","https://www.ibj.com/articles/meta-to-build-800m-data-center-add-100-jobs-in-indiana","https://www.latitudemedia.com/news/metas-senate-scrutiny-signals-growing-backlash-to-data-centers-thirst-for-gas/"]},{"id":"48b2fd98497d","cid":"48b2fd98497d","canon":1,"dups":1,"ftype":"data_center","name":"Meta - Lebanon","city":"Lebanon","county":"Boone","state":"IN","lat":40.050892,"lng":-86.469014,"cprec":"distinct","status":"Construction","mw":1000,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Meta states that it pays the full cost of the energy used by its data centres and works with utilities to plan demand years in advance to avoid shifting costs onto residents.... We pay the full costs for energy used by our data centers and work closely with utilities to plan for our energy needs years in advance to ensure residents aren't negatively impacted.","pscan":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","uconf":"High","uquote":"Meta is also donating $1 million per year, over the next 20 years, to the Boone REMC Community Fund to provide direct energy cost assistance to families in need.","uscan":"https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/","ukey":"24753|IN","uname":"Boone County Rural EMC","rto":"MISO","nerc":"RFC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2026,"oy":2027,"contro":"Boone County is considering a one-year moratorium on data center development due to concerns about infrastructure and water. Residents have also expressed opposition regarding water usage, electricity prices, and the secrecy surrounding the project.","deal":"Investment of more than $10 billion. Indiana Economic Development Corporation committed a 35-year data center sales tax exemption for a minimum $1 billion in eligible capital invested within the first six years, with potential for up to 50 years. Meta will make an annual community impact payment of $1.5 million to the city of Lebanon for each completed phase of the up to six-phase project. Meta is investing over $120 million in critical water infrastructure and other public improvements, including roads, transmission lines, and utility upgrades. Meta is donating $1 million per year for 20 years to the Boone REMC Community Fund for energy cost assistance.","dealScan":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"about.fb.com;lebanon.in.gov","srcUrls":["https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/"],"lflag":"citation_artifact_removed"},{"id":"7564af760113","cid":"7564af760113","canon":1,"dups":1,"ftype":"data_center","name":"Phoenix Investments - Michigan City","city":"Michigan City","county":"LaPorte","state":"IN","lat":41.549013,"lng":-86.744739,"cprec":"shared_centroid","status":"Construction","mw":300,"pc":"Grid","pconf":"High","pquote":"Google said it would pay for infrastructure at the site as well as the full electricity bill for the data center, one of many being built locally and nationally.","pscan":"https://indianaeconomicdigest.net/Content/Default/Major-Indiana-News/Article/Google-buys-832-million-Michigan-City-data-center-under-construction-will-pay-for-power-infrastructure/-3/5308/121306","uconf":"High","uquote":"The site's M-1 zoning, access to utilities, and proximity to a NIPSCO substation make it compatible with this type of use.","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2027,"contro":"Community opposition regarding environmental impact (water, noise, brownfield site pollution), labor practices (out-of-state contractors, worker safety, union protests, lawsuit), and tax abatements. A worker fell from the roof in October 2025.","controScan":"https://www.insideindianabusiness.com/articles/a-significant-economic-boom-michigan-city-council-grants-abatements-for-800m-data-center","deal":"Phoenix Investors acquired the site for $1.25 million in late 2022. Indiana Economic Development Corp. approved ~$42 million in tax incentives (June 2025). Michigan City Council approved property tax abatements and $26.1 million in economic development incentive payments (September 2025). Google acquired the Project Maize development from Phoenix Investors (March/April 2026).","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"indianaeconomicdigest.net;insideindianabusiness.com","srcUrls":["https://indianaeconomicdigest.net/Content/Default/Major-Indiana-News/Article/Google-buys-832-million-Michigan-City-data-center-under-construction-will-pay-for-power-infrastructure/-3/5308/121306","https://www.insideindianabusiness.com/articles/a-significant-economic-boom-michigan-city-council-grants-abatements-for-800m-data-center"],"band":"250+ MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"94cadb1be4a7","cid":"94cadb1be4a7","canon":1,"dups":1,"ftype":"data_center","name":"Abei Energy - Starke","city":"Knox","county":"Starke*","state":"IN","lat":41.284478,"lng":-86.644636,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Abei Digital nace como una evolución natural de una empresa con una sólida trayectoria en el sector de las energías renovables... La experiencia acumulada nos ha permitido generar sinergias con los principales operadores de red eléctrica, facilitando la implementación de soluciones energéticamente eficientes en entornos críticos.","pscan":"https://abeienergy.com/tecnologias/datacenters/","uconf":"High","uquote":"GAS AND ELECTRIC - Northern Indiana Public Service Company (NIPSCO).","uscan":"https://www.scedf.biz/resources/links","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Abei Energy","spon":"Abei Energy","ay":2025,"contro":"A proposed one-year moratorium on large hyperscale data centers in Starke County is headed to the County Board of Commissioners for consideration. Dozens of residents voiced opposition to data center development, raising concerns about water use, environmental impact, and electricity bills.","controScan":"https://www.govtech.com/products/residents-push-indiana-community-toward-halt-on-data-centers","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"abeienergy.com;scedf.biz;govtech.com","lflag":"online_before_announced","srcUrls":["https://abeienergy.com/tecnologias/datacenters/","https://www.scedf.biz/resources/links","https://www.govtech.com/products/residents-push-indiana-community-toward-halt-on-data-centers"]},{"id":"8cc9cc7094fb","cid":"8cc9cc7094fb","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"New Carlisle","county":"St. Joseph","state":"IN","lat":41.617723,"lng":-86.288048,"cprec":"shared_centroid","status":"Proposed","mw":2250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"AEP[American Electric Power] has told regulators that new, large-scale data centers will more than double the amount of peak power it must provide Indiana, from about 2.8 gigawatts in 2024 to more than seven gigawatts by approximately 2030. Amazon's campus alone accounts for about half of the additional load growth.","pscan":"https://new-savanna.blogspot.com/2025/06/amazons-new-power-hogging-data-center.html","uquote":"Energy agreement with NIPSCO will improve local citizen services and is expected to provide approximately $1 billion in cost savings to current Indiana residents and businesses over 15 years.","uscan":"https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Amazon","spon":"Amazon.com","tenant":"Anthropic","ay":2024,"oy":2025,"contro":"Community opposition regarding water use, environmental impact, noise, and zoning disputes.","controScan":"https://wibc.com/733970/new-carlisle-opposes-data-center/","deal":"$11 billion investment announced in April 2024, with 50-year sales tax exemptions and 10-year property tax abatements.","dealScan":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"new-savanna.blogspot.com;aboutamazon.com;iedc.in.gov;wibc.com","srcUrls":["https://new-savanna.blogspot.com/2025/06/amazons-new-power-hogging-data-center.html","https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers","https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","https://wibc.com/733970/new-carlisle-opposes-data-center/"],"lflag":"large_project_duplicate_review shared_coordinate_precision_downgraded stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"628d96433c63","cid":"628d96433c63","canon":1,"dups":1,"ftype":"data_center","name":"Amazon - Portage","city":"Portage","county":"Porter","state":"IN","lat":41.509914,"lng":-87.071313,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"To power the new development in Northwest Indiana, AWS will contract with GenCo, a subsidiary of Merrillville-based NIPSCO. Amazon and NIPSCO leaders said the new electric capacity will be built without passing costs onto existing NIPSCO customers. Amazon will pay all costs associated with serving its new data center campuses, including new infrastructure and power generation needs.","pscan":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","uquote":"To power the new development in Northwest Indiana, AWS will contract with GenCo, a subsidiary of Merrillville-based NIPSCO.","uscan":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2023,"contro":"Council member Ferdinand Alvarez expressed dissent and voted against tax abatements, stating Amazon should bear its tax responsibilities independently.","controScan":"https://www.lakeshorepublicmedia.org/local-news/2023-12-07/portage-council-approves-tax-abatements-for-amazon-data-center","deal":"Property tax abatements from Portage City Council for a $35 million building investment (10 years) and $52 million worth of IT equipment (5 years), approved December 2023.","dealScan":"https://www.lakeshorepublicmedia.org/local-news/2023-12-07/portage-council-approves-tax-abatements-for-amazon-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"nwiforum.org;lakeshorepublicmedia.org","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","https://www.lakeshorepublicmedia.org/local-news/2023-12-07/portage-council-approves-tax-abatements-for-amazon-data-center"]},{"id":"569fe658d364","cid":"569fe658d364","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Indianapolis","county":"Marion","state":"IN","lat":39.782976,"lng":-86.135794,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Indianapolis Power and Light (now AES Indiana)","rto":"MISO","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"68a72eed3ab4","cid":"68a72eed3ab4","canon":1,"dups":1,"ftype":"data_center","name":"Digital Crossroad","city":"Hammond","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Proposed","mw":20,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility, 15kV service to building, dedicated on-site substation.","pscan":"https://digitalcrossroad.com/data-centers/indiana-data-center/dx-1-specs/","uquote":"The Digital Crossroads Campus is in NIPSCO's exclusive electric service territory.","uscan":"https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/2f761d73-6366-f011-bec2-001dd8084fd9/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46183%20DX%20Hammond%20Intervenor","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"DX Hammond JV","spon":"Decennial Group","ay":2018,"oy":2020,"deal":"Acquisition by DX Hammond in 2021","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalcrossroad.com;iurc.portal.in.gov","srcUrls":["https://digitalcrossroad.com/data-centers/indiana-data-center/dx-1-specs/","https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/2f761d73-6366-f011-bec2-001dd8084fd9/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46183%20DX%20Hammond%20Intervenor"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"6e1f4d0d66d3","cid":"6e1f4d0d66d3","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Fort Wayne","county":"Allen","state":"IN","lat":41.091909,"lng":-85.071791,"cprec":"distinct","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The diesel generators at the Google Data Center are strictly backup power sources. They are not used for regular operations and do not run continuously to supply electricity. Their purpose is to provide emergency power during a utility outage.","pscan":"https://engage.cityoffortwayne.org/data-center","uconf":"High","uquote":"As construction continues in Fort Wayne, Google and I&M await approval from the IURC, which is anticipated to be finalized in the first quarter of 2026.","uscan":"https://siteselection.com/google-in-indiana-google-this-2-billion-in-fort-wayne/","ukey":"9324|IN","uname":"Indiana Michigan Power Co","rto":"PJM","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2024,"oy":2025,"contro":"Community concerns regarding environmental effects, energy consumption, and diesel backup generators; approval to build on protected wetlands.","deal":"$2 billion investment announced April 26, 2024.","dealScan":"https://iedc.in.gov/events/news/details/2024/04/26/gov.-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"engage.cityoffortwayne.org;siteselection.com;iedc.in.gov","srcUrls":["https://engage.cityoffortwayne.org/data-center","https://siteselection.com/google-in-indiana-google-this-2-billion-in-fort-wayne/","https://iedc.in.gov/events/news/details/2024/04/26/gov.-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"01e3579039b5","cid":"01e3579039b5","canon":1,"dups":1,"ftype":"data_center","name":"Google - Indianapolis (Wanamaker)","city":"Indianapolis","county":"Marion","state":"IN","lat":39.782976,"lng":-86.135794,"cprec":"shared_centroid","status":"Proposed","mw":390,"pc":"Grid","pconf":"High","pquote":"AES Indiana made regulatory filings on Wednesday that detail how it plans to provide power to Google's proposed data center in Morgan County. The electric utility said its agreement with Google requires that the technology giant pay the full cost of powering the 390-megawatt data center project near Monrovia, as well as three other proposed energy projects across Indiana.","uconf":"High","uquote":"AES Indiana made regulatory filings on Wednesday that detail how it plans to provide power to Google's proposed data center in Morgan County.","uscan":"https://www.insideindianabusiness.com/articles/aes-indiana-details-plan-to-power-proposed-google-data-center","ukey":"9273|IN","uname":"AES Indiana","rto":"MISO","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2030,"contro":"Significant community opposition regarding water and power consumption, environmental impacts, and tax benefits led Google to withdraw its rezoning proposal.","controScan":"https://www.wfyi.org/wfyi-news/2025-09-22/indianapolis-council-google-data-center-vote-withdrawl","deal":"10-year property tax abatement for the first building (estimated cost $314 million) and a data-center specific tax credit of $42 million over 35 years. Agreement with AES Indiana for Google to pay full cost of power and infrastructure, estimated at $1.3 billion.","dealScan":"https://www.insideindianabusiness.com/articles/indy-commission-gives-initial-ok-to-googles-billion-dollar-data-center-plan","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"insideindianabusiness.com;wfyi.org","srcUrls":["https://www.insideindianabusiness.com/articles/aes-indiana-details-plan-to-power-proposed-google-data-center","https://www.insideindianabusiness.com/articles/indy-commission-gives-initial-ok-to-googles-billion-dollar-data-center-plan","https://www.wfyi.org/wfyi-news/2025-09-22/indianapolis-council-google-data-center-vote-withdrawl"],"band":"250+ MW","lflag":"shared_coordinate_precision_downgraded"},{"id":"31db7a30c2e2","cid":"31db7a30c2e2","canon":1,"dups":1,"ftype":"data_center","name":"Google - Monrovia","city":"Monrovia","county":"Morgan","state":"IN","lat":39.482646,"lng":-86.447457,"cprec":"distinct","status":"Proposed","mw":1200,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"AES Indiana's partnership with Google is structured so that all costs for Google's proposed data center in Monrovia, Indiana are paid by Google — not the 533,000 customers AES Indiana serves across Central Indiana.","pscan":"https://www.aesindiana.com/data-centers","uconf":"High","uquote":"AES Indiana made regulatory filings on Wednesday that detail how it plans to provide power to Google's proposed data center in Morgan County.","uscan":"https://www.insideindianabusiness.com/articles/aes-indiana-details-plan-to-power-proposed-google-data-center","ukey":"9273|IN","uname":"AES Indiana","rto":"MISO","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2027,"contro":"Community opposition, protests, concerns about water/energy use, noise, property values, and lawsuits filed against the county.","controScan":"https://www.ipm.org/news/2026-04-03/monrovia-explores-annexing-site-of-future-google-data-center","deal":"Google to pay $1.3 billion for power infrastructure and energy projects (April 2026); 10-year, 50% abatement on property taxes for data center buildings, in return for $1 million to local schools and nonprofits (December 2025).","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"aesindiana.com;insideindianabusiness.com;ipm.org","srcUrls":["https://www.aesindiana.com/data-centers","https://www.insideindianabusiness.com/articles/aes-indiana-details-plan-to-power-proposed-google-data-center","https://www.ipm.org/news/2026-04-03/monrovia-explores-annexing-site-of-future-google-data-center"]},{"id":"f75717d2bc1c","cid":"f75717d2bc1c","canon":1,"dups":1,"ftype":"data_center","name":"Hobart Devco - Hobart","city":"Hobart","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Proposed","mw":2400,"pc":"Grid","pconf":"High","pquote":"NIPSCO is building more capacity to serve the new data center.","pscan":"https://indianaeconomicdigest.net/Content/Default/Major-Indiana-News/Article/Amazon-to-invest-7-billion-in-new-data-center-that-will-bring-hundreds-of-permanent-jobs-to-Northwest-Indiana/-3/5308/121498","uquote":"NIPSCO owns the farm field where the data center would be built, currently leasing it to a farmer who is raising crops there.","uscan":"https://indianaeconomicdigest.net/Content/Default/Major-Indiana-News/Article/Amazon-to-invest-7-billion-in-new-data-center-that-will-bring-hundreds-of-permanent-jobs-to-Northwest-Indiana/-3/5308/121498","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","ay":2025,"oy":2028,"contro":"Significant community opposition, lawsuits, and concerns over environmental impact, noise, and property values.","controScan":"https://hobartdatacenters.org/","deal":"Amazon to pay the city of Hobart $47 million upfront and an additional $55 million when building permits are issued, along with a 10-year 100% tax abatement and a 35-year 100% exemption for IT equipment.","dealScan":"https://www.youtube.com/watch?v=ksZB1HLGinU","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"indianaeconomicdigest.net;youtube.com;hobartdatacenters.org","srcUrls":["https://indianaeconomicdigest.net/Content/Default/Major-Indiana-News/Article/Amazon-to-invest-7-billion-in-new-data-center-that-will-bring-hundreds-of-permanent-jobs-to-Northwest-Indiana/-3/5308/121498","https://www.youtube.com/watch?v=ksZB1HLGinU","https://hobartdatacenters.org/"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"096a50f67afb","cid":"096a50f67afb","canon":1,"dups":1,"ftype":"data_center","name":"Jumping Bison LLC - Greensburg","city":"Greensburg","county":"Decatur","state":"IN","lat":39.30598,"lng":-85.499831,"cprec":"distinct","status":"Proposed","mw":50,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Duke Energy.","pscan":"https://www.interconnection.fyi/data-center/project/jumping-bison-llc-greensburg-c0097e6c","uquote":"Grid Operator: Duke Energy.","uscan":"https://www.interconnection.fyi/data-center/project/jumping-bison-llc-greensburg-c0097e6c","ukey":"15470|IN","uname":"Duke Energy Indiana, LLC","rto":"MISO","nerc":"RFC","op":"Jumping Bison","ay":2024,"contro":"Significant local opposition from the \"Coalition to Protect Decatur County Against AI Data Center\" due to perceived lack of transparency and potential risks.","controScan":"https://baxtel.com/data-center/jumping-bison-greensburg-in","deal":"10-year, 60-percent real property tax abatement approved by Greensburg City Council in December 2024 for a two-phase project with a $400 million investment for each phase, totaling $800 million.","dealScan":"https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;wrbiradio.com;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/jumping-bison-llc-greensburg-c0097e6c","https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/","https://baxtel.com/data-center/jumping-bison-greensburg-in"]},{"id":"7fa05c8b16a5","cid":"7fa05c8b16a5","canon":1,"dups":1,"ftype":"data_center","name":"Karis Critical - Merrillville","city":"Merrillville","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"NIPSCO","uquote":"The project also requires planned unit development approval from the Plan Commission as well as power authorization from NIPSCO before it can proceed.","uscan":"https://www.merrillville.in.gov/news_detail_T27_R267.php","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Karis Critical","ay":2024,"contro":"Merrillville Town Council approved a one-year moratorium on data centers.","controScan":"https://nwitimes.com/news/local/lake/merrillville/article_f506303d-f5ce-4bcc-bb4c-a6abf68fb24d.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"merrillville.in.gov;nwitimes.com","lflag":"online_before_announced shared_coordinate_precision_downgraded","srcUrls":["https://www.merrillville.in.gov/news_detail_T27_R267.php","https://nwitimes.com/news/local/lake/merrillville/article_f506303d-f5ce-4bcc-bb4c-a6abf68fb24d.html"]},{"id":"d4c81b0311e7","cid":"d4c81b0311e7","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Jeffersonville","county":"Clark","state":"IN","lat":38.476217,"lng":-85.711122,"cprec":"distinct","status":"Proposed","mw":407,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Once operational, the Jeffersonville Data Center will be supported by 100% renewable energy through our investments in new renewable energy projects and like our other data centers, will achieve LEED Gold certification.","pscan":"https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","uquote":"Meta is proud to work alongside Governor Eric Holcomb, the Jeffersonville Indiana, River Ridge Commerce Center, Indiana Economic Development Corporation, One Southern Indiana Chamber & Economic Development, Duke Energy, and all of the partners that have helped Meta get to today.","uscan":"https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","ukey":"15470|IN","uname":"Duke Energy Indiana, LLC","rto":"MISO","nerc":"RFC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2024,"oy":2026,"contro":"Community opposition regarding tax exemptions and resource usage (energy and water).","controScan":"https://www.whas11.com/article/news/local/indiana/clark-county-citizens-meta-data-center-help-fill-funding-gaps/417-ecf1afdf-641c-4dd1-8553-6d2decd9ed7d","deal":"$800 million investment and a 35-year data center sales tax exemption from the Indiana Economic Development Corporation.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;whas11.com","srcUrls":["https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","https://www.whas11.com/article/news/local/indiana/clark-county-citizens-meta-data-center-help-fill-funding-gaps/417-ecf1afdf-641c-4dd1-8553-6d2decd9ed7d"]},{"id":"d7cb21b5617b","cid":"d7cb21b5617b","canon":1,"dups":1,"ftype":"data_center","name":"Metrobloks - Indianapolis","city":"Indianapolis","county":"Marion","state":"IN","lat":39.782976,"lng":-86.135794,"cprec":"shared_centroid","status":"Proposed","mw":72,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The Metrobloks facility would draw electricity through contracts with AES Indiana, the local utility, rather than pulling from the residential grid, according to a letter in the petition filing.","pscan":"https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood","uconf":"High","uquote":"The Metrobloks facility would draw electricity through contracts with AES Indiana, the local utility, rather than pulling from the residential grid, according to a letter in the petition filing.","uscan":"https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood","ukey":"9273|IN","uname":"AES Indiana","rto":"MISO","nerc":"RFC","op":"Metrobloks","ay":2025,"oy":2027,"contro":"Community opposition, rezoning debate, and a lawsuit over pollution and quality-of-life concerns.","controScan":"https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood","deal":"$500 million development project","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wfyi.org","srcUrls":["https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"a654c720e8ec","cid":"a654c720e8ec","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft - Granger","city":"Granger","county":"St. Joseph","state":"IN","lat":41.617723,"lng":-86.288048,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Indiana Michigan Power — an American Electric Power utility — the Indiana Office of Utility Consumer Counselor, Citizens Action Coalition of Indiana, Amazon Data Services, Google, Microsoft and the Data Center Coalition have reached an agreement outlining the terms for connecting new large loads to the grid.","uquote":"Indiana Michigan Power — an American Electric Power utility — the Indiana Office of Utility Consumer Counselor, Citizens Action Coalition of Indiana, Amazon Data Services, Google, Microsoft and the Data Center Coalition have reached an agreement outlining the terms for connecting new large loads to the grid.... On Tuesday St. Joseph County, the City of Mishawaka, which will be providing water and sewer services to the project, and Microsoft itself have now approved a Memorandum of Understanding to allow pre-construction work to begin soon at the site.","ukey":"12674|IN","uname":"City of Mishawaka","rto":"MISO","nerc":"RFC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"oy":2027,"contro":"Community opposition regarding rezoning, environmental impact (flooding, drainage, air quality, noise, water usage), and lack of site plan details. Project was also delayed due to debate over water and sewer utilities.","controScan":"https://www.insideindianabusiness.com/articles/microsoft-planning-for-new-data-center-in-granger","deal":"Land acquisition for $77.5 million in 2024; pre-development funding of up to $12.6 million in 2026; agreement with Indiana Michigan Power for large load interconnection in 2024, including $500,000 annually for five years to Indiana Community Action Association.","dealScan":"https://www.insideindianabusiness.com/articles/microsoft-planning-for-new-data-center-in-granger","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"insideindianabusiness.com","srcUrls":["https://www.insideindianabusiness.com/articles/microsoft-planning-for-new-data-center-in-granger"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"29623b550a6f","cid":"29623b550a6f","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft - LaPorte","city":"LaPorte","county":"LaPorte","state":"IN","lat":41.549013,"lng":-86.744739,"cprec":"shared_centroid","status":"Proposed","mw":538,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"He added that the company has agreed to truck water in and out of the site, and the city has been in contact with the Indiana Utility Regulatory Commission to make sure NIPSCO customers don't have to cover the cost of the increased electrical demand.... Microsoft and U.S. Midwest electric power provider Midcontinent Independent System Operator (MISO) announced the launch of a new grid modernization collaboration, using AI and cloud technology to help meet increasing energy needs driven by factors including data center growth and electrification.","pscan":"https://www.wvpe.org/wvpe-news/2026-03-04/microsoft-to-pay-full-share-of-property-taxes-for-laporte-data-center-project","uquote":"He added that the company has agreed to truck water in and out of the site, and the city has been in contact with the Indiana Utility Regulatory Commission to make sure NIPSCO customers don't have to cover the cost of the increased electrical demand.","uscan":"https://www.wvpe.org/wvpe-news/2026-03-04/microsoft-to-pay-full-share-of-property-taxes-for-laporte-data-center-project","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"oy":2032,"contro":"Community concerns about water usage, noise, light pollution, and traffic from construction have been reported, leading to town hall meetings and discussions with city officials.","deal":"Microsoft will invest $1 billion (announced June 2024). The Indiana Economic Development Corporation (IEDC) committed a 35-year data center sales tax credit for a minimum $1 billion in eligible capital investment. An updated tax agreement (March 2026) ensures Microsoft pays property taxes in full, with 15% allocated to the La Porte Community School Corp. for 20 years.","dealScan":"https://cityoflaporte.com/news/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"wvpe.org;cityoflaporte.com","srcUrls":["https://www.wvpe.org/wvpe-news/2026-03-04/microsoft-to-pay-full-share-of-property-taxes-for-laporte-data-center-project","https://cityoflaporte.com/news/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana"],"lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"f05acaac4c11","cid":"f05acaac4c11","canon":1,"dups":1,"ftype":"data_center","name":"Province Group - Merrillville","city":"Merrillville","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Proposed","uquote":"Northern Indiana Public Service Company (NIPSCO), with headquarters in Merrillville, Indiana, is one of the seven energy distribution companies of NiSource Inc. (NYSE: NI).","uscan":"https://www.vitanuova.net/website-archives/lakefrontdistrict/partners/nipsco/","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Province Group","spon":"Province Group","ay":2024,"oy":2029,"contro":"Merrillville Town Council placed a moratorium on data center projects from June 1, 2026, through May 31, 2027, to assess impacts.","controScan":"https://indianaeconomicdigest.net/Content/Default/Also-In-The-News/Article/Merrillville-approves-1-year-data-center-moratorium/-3/5307/121499","deal":"Province Group plans to invest up to $500 million in the development of the Merrillville Technology Park.","dealScan":"https://baxtel.com/data-center/province-group-merrillville-tech-park","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"vitanuova.net;baxtel.com;indianaeconomicdigest.net","srcUrls":["https://www.vitanuova.net/website-archives/lakefrontdistrict/partners/nipsco/","https://baxtel.com/data-center/province-group-merrillville-tech-park","https://indianaeconomicdigest.net/Content/Default/Also-In-The-News/Article/Merrillville-approves-1-year-data-center-moratorium/-3/5307/121499"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"a37281180c89","cid":"a37281180c89","canon":1,"dups":1,"ftype":"data_center","name":"Sabey Corp. - Indianapolis","city":"Indianapolis","county":"Marion","state":"IN","lat":39.782976,"lng":-86.135794,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Sabey will fund 100% of customer‑specific and dedicated facilities and make contributions in aid of construction (CIAC) for any incremental upstream reinforcements attributable to our load—so costs are not shifted to general ratepayers.","pscan":"https://sabeydecaturdatacenter.com/faq.pdf","uquote":"The company's filings with the city's Department of Metropolitan Development indicate that electric utility AES Indiana is supportive of the project.","ukey":"9273|IN","uname":"AES Indiana","rto":"MISO","nerc":"RFC","op":"Sabey Data Centers","spon":"Sabey and institutional clients managed by National Real Estate Advisors","ay":2025,"oy":2028,"contro":"Community opposition and lawsuit over zoning approval process, citing concerns about noise, energy demand, water use, jobs, and property values.","deal":"$4 billion project cost, request for 50% property tax abatement, and commitment of over $5 million for township improvements.","dealScan":"https://www.inkfreenews.com/2025/11/21/4b-data-center-planned-for-indianapolis/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"sabeydecaturdatacenter.com;inkfreenews.com","srcUrls":["https://sabeydecaturdatacenter.com/faq.pdf","https://www.inkfreenews.com/2025/11/21/4b-data-center-planned-for-indianapolis/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"ff06f619b753","cid":"ff06f619b753","canon":1,"dups":1,"ftype":"data_center","name":"Sentinel - Hebron","city":"Hebron","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Proposed","mw":504,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The Eagle Creek site, Sentinel explained, was selected in part because of its proximity to a 345-kilovolt transmission line, which would make it easy to supply high-capacity, reliable power to the data center. NIPSCO would be interconnected to the grid.","uquote":"NIPSCO would be interconnected to the grid.","uscan":"https://indianaeconomicdigest.net/Content/Most-Recent/High-Tech/Article/Lake-County-plan-commission-mulls-data-center-proposal-near-Lowell/31/118/120649","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Sentinel Data Centers","spon":"Sentinel Data Centers","ay":2025,"contro":"Significant community opposition, including a Facebook group with over a thousand members, concerns over rezoning agricultural land, noise, water usage, and multiple public hearings with overwhelming opposition.","deal":"$5 billion investment","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"indianaeconomicdigest.net","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://indianaeconomicdigest.net/Content/Most-Recent/High-Tech/Article/Lake-County-plan-commission-mulls-data-center-proposal-near-Lowell/31/118/120649"]},{"id":"d640ab95cf44","cid":"d640ab95cf44","canon":1,"dups":1,"ftype":"data_center","name":"Surge Development - Knightstown","city":"Knightstown","county":"Henry","state":"IN","lat":39.929591,"lng":-85.397363,"cprec":"distinct","status":"Proposed","pc":"Behind-the-Meter","pconf":"High","pquote":"\"That's why we're bringing our own power,\" developer Chris King said. \"We've been focused on locating next to a natural gas pipe where we have the ability to do generation on-site.\"","proc":"Co-located generation","uconf":"High","uquote":"Henry County REMC provides electric service to a defined territory that includes the proposed data center site near State Road 109 and I-70, just outside of Knightstown.","uscan":"https://www.hcremc.com/alerts/a-note-on-the-proposed-data-center-in-henry-county/","rto":"PJM","nerc":"RFC","spon":"Surge Development , GM Development","ay":2025,"contro":"Significant community opposition and regulatory pushback, leading to the proposal being tabled and a split vote by county commissioners.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"hcremc.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.hcremc.com/alerts/a-note-on-the-proposed-data-center-in-henry-county/"]},{"id":"def5e656a0b2","cid":"def5e656a0b2","canon":1,"dups":1,"ftype":"data_center","name":"Takanock - Goshen","city":"Goshen","county":"Elkhart","state":"IN","lat":41.600693,"lng":-85.863986,"cprec":"distinct","status":"Proposed","mw":1500,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Takanock has developed a patent-pending data center design, enabling utilization of backup generators as flexible grid resources without jeopardizing reliability during periods of grid outages. By leveraging innovative co-located generation, Takanock enhances grid stability, accelerates data center deployment, and supports the integration of renewable energy into the grid. Company specializes in onsite gas generation.","pscan":"https://www.reamp.org/wp-content/uploads/2025/06/RE-AMP-Data-Centers-Appendix.pdf","proc":"Co-located generation","pcp":"Takanock","pdt":"1,500 MW","uquote":"Goshen. Indiana. Takanock. 1,500. Company specializes in onsite gas generation. Developing, having trouble with NIPSCO. Entergy, NIPSCO and Alliant account for about 60% of capacity under MISO's fast-track interconnection review.","uscan":"https://www.utilitydive.com/news/entergy-gas-fired-miso-fast-track-interconnection-eras/821460/","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"PJM","nerc":"RFC","op":"Takanock","spon":"ArcLight and DigitalBridge","ay":2024,"contro":"Community opposition regarding noise from generators and rezoning in Elkhart County. Developing, having trouble with NIPSCO.","controScan":"https://www.reamp.org/wp-content/uploads/2025/06/RE-AMP-Data-Centers-Appendix.pdf","deal":"$500 million capital commitments from ArcLight and DigitalBridge (announced June 25, 2025)","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"reamp.org;utilitydive.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.reamp.org/wp-content/uploads/2025/06/RE-AMP-Data-Centers-Appendix.pdf","https://www.utilitydive.com/news/entergy-gas-fired-miso-fast-track-interconnection-eras/821460/"]},{"id":"2f27240d5868","cid":"2f27240d5868","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - Brazil","city":"Brazil","county":"Clay","state":"IN","lat":39.393928,"lng":-87.115858,"cprec":"distinct","status":"Proposed","mw":400,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Proposed ~400 MW data center in Brazil, IN. Served by WVPA / Parke County REMC.","uquote":"Proposed ~400 MW data center in Brazil, IN. Served by WVPA / Parke County REMC.","rto":"MISO","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"89247db9737b","cid":"89247db9737b","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - Dale","city":"Dale","county":"Spencer","state":"IN","lat":38.009697,"lng":-87.010375,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Talks are currently underway to ascertain whether sufficient power will be available, but Ault was confident on that front.","pscan":"https://spencercountyonline.com/name-change-data-center-and-more-announced-at-spencer-county-economic-development-annual-meeting/","uquote":"Proposed data center in Dale. Served by Southern Indiana REMC / Duke Energy.","uscan":"https://ailawtracker.org/data-centers","ukey":"15470|IN","uname":"Duke Energy Indiana, LLC","rto":"MISO","nerc":"RFC","op":"Digital Resources","spon":"Digital Resources","ay":2025,"contro":"Southwestern Indiana Citizens for Quality of Life (SWICQL) scheduled a public program in Dale to educate about the impacts of artificial intelligence data centers.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"spencercountyonline.com;ailawtracker.org","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://spencercountyonline.com/name-change-data-center-and-more-announced-at-spencer-county-economic-development-annual-meeting/","https://ailawtracker.org/data-centers"]},{"id":"92243be21689","cid":"92243be21689","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - Gary","city":"Gary","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"NIPSCO (Northern Indiana Public Service Co.)","rto":"MISO","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0af1f815c593","cid":"0af1f815c593","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - Marble Hill","city":"Hanover","county":"Jefferson","state":"IN","lat":38.783604,"lng":-85.44009,"cprec":"distinct","status":"Proposed","mw":310,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Served by Hoosier Energy.","pscan":"https://ailawtracker.org/data-centers","uconf":"High","uquote":"Served by Hoosier Energy.","uscan":"https://ailawtracker.org/data-centers","ukey":"17038|IN","uname":"RushShelby Energy","rto":"MISO","nerc":"RFC","ay":2026,"contro":"Community debate and a 10-month moratorium on new data center permits due to concerns about secrecy, resource strain (electricity and water), economic trade-offs, and environmental impact.","controScan":"https://www.eaglecountryonline.com/news/local-news/jefferson-county-data-center-sparks-community-debate/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"ailawtracker.org;eaglecountryonline.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://ailawtracker.org/data-centers","https://www.eaglecountryonline.com/news/local-news/jefferson-county-data-center-sparks-community-debate/"]},{"id":"7a62c7e9521c","cid":"7a62c7e9521c","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - McCordsville","city":"McCordsville","county":"Hancock","state":"IN","lat":39.822529,"lng":-85.77315,"cprec":"distinct","status":"Proposed","proc":"Tariff (utility)","pcp":"Duke Energy","rto":"MISO","nerc":"RFC","contro":"Surge Development withdrew its application to rezone over 700 acres for the 'Hancock County MegaSite' data center due to community opposition.","controScan":"https://www.wthr.com/article/money/business/application-withdrawn-surge-development-hancock-county-greenfield-data-center-tuttle-orchards/531-48204cbc-eba5-4666-bd66-6e88cb6d2412","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wthr.com","srcUrls":["https://www.wthr.com/article/money/business/application-withdrawn-surge-development-hancock-county-greenfield-data-center-tuttle-orchards/531-48204cbc-eba5-4666-bd66-6e88cb6d2412"],"lflag":"source_quality_reclassified"},{"id":"8db9a2450d5f","cid":"8db9a2450d5f","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - Monrovia","city":"Monrovia","county":"Morgan","state":"IN","lat":39.482646,"lng":-86.447457,"cprec":"distinct","status":"Proposed","mw":390,"pc":"Grid","pconf":"High","pquote":"Google said it will pay for all of the electricity its data center uses, as well as any other costs associated with its development. The electric utility said its agreement with Google requires that the technology giant pay the full cost of powering the 390-megawatt data center project near Monrovia, as well as three other proposed energy projects across Indiana.","uquote":"AES Indiana made regulatory filings on Wednesday that detail how it plans to provide power to Google's proposed data center in Morgan County. AES Indiana will supply power for Google and an AES electrical transmission line runs through the site.","ukey":"9273|IN","uname":"AES Indiana","rto":"MISO","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2028,"contro":"Significant community opposition, lawsuits, concerns about water/energy use, noise, property values, and lack of transparency.","deal":"Google to pay full cost of powering the 390-megawatt data center project and three other energy projects across Indiana, estimated at $1.3 billion. Development agreement includes Google paying no local taxes on qualified computing equipment for a 40-year period and a 50% abatement on property taxes for 10 years on data center buildings.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a193c17382b0","cid":"a193c17382b0","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - New Carlisle","city":"New Carlisle","county":"St. Joseph","state":"IN","lat":41.617723,"lng":-86.288048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The data center would be served by Indiana Michigan Power.","pscan":"https://indianaeconomicdigest.net/MobileContent/Default/All-The-News-Digest/Article/-12-billion-data-center-proposed-in-New-Carlisle-in-St-Joseph-County/-3/5310/119966","uconf":"High","uquote":"The data center would be served by Indiana Michigan Power.","uscan":"https://indianaeconomicdigest.net/MobileContent/Default/All-The-News-Digest/Article/-12-billion-data-center-proposed-in-New-Carlisle-in-St-Joseph-County/-3/5310/119966","ukey":"9324|IN","uname":"Indiana Michigan Power Co","rto":"MISO","nerc":"RFC","op":"Mall-O-Manor","ay":2025,"contro":"The Plan Commission voted against the project because it was inconsistent with the comprehensive land use plan and due to public opposition to the project. Residents raised concerns about water and electricity use and traffic. The St. Joseph County Council voted 7-2 to deny the rezoning request after a 10-hour meeting.","controScan":"https://indianaeconomicdigest.net/MobileContent/Default/All-The-News-Digest/Article/-12-billion-data-center-proposed-in-New-Carlisle-in-St-Joseph-County/-3/5310/119966","deal":"$12 billion proposed investment","dealScan":"https://indianaeconomicdigest.net/MobileContent/Default/All-The-News-Digest/Article/-12-billion-data-center-proposed-in-New-Carlisle-in-St-Joseph-County/-3/5310/119966","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"indianaeconomicdigest.net","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://indianaeconomicdigest.net/MobileContent/Default/All-The-News-Digest/Article/-12-billion-data-center-proposed-in-New-Carlisle-in-St-Joseph-County/-3/5310/119966"]},{"id":"6103711d3259","cid":"6103711d3259","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - New Haven","city":"New Haven","county":"Allen","state":"IN","lat":41.091909,"lng":-85.071791,"cprec":"distinct","status":"Proposed","mw":500,"band":"250+ MW","uquote":"Indiana Michigan Power says it serves data centers in Fort Wayne, Granger and New Carlisle and has added generation resources that include wind energy and power plant purchases.","ukey":"9324|IN","uname":"Indiana Michigan Power Co","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"da5ced32df09","cid":"da5ced32df09","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - Wheatfield","city":"Wheatfield","county":"Jasper","state":"IN","lat":41.017688,"lng":-87.118814,"cprec":"distinct","status":"Proposed","mw":2400,"pc":"Behind-the-Meter","pconf":"High","pquote":"The gas plant would supply energy not to the local community, which is served by an electric co-op, but to the data center. Recent filings and an announcement by NIPSCO suggest that the center's supercomputing systems would likely be used for Amazon Web Services. The plant would be built and owned by a controversial subsidiary of NIPSCO's parent company, NiSource, created specifically to serve large-load customers.","pscan":"https://www.canarymedia.com/articles/fossil-fuels/this-indiana-community-is-caught-between-coal-and-the-data-center-boom","proc":"Dedicated PPA","pcp":"Amazon Web Services (AWS) and NIPSCO Generation (GenCo)","pdt":"15-year deal, up to 3 GW of gas-fired generation and battery storage, approximately $7 billion (combined cost for generation, storage, and transmission)","uquote":"Our partners at The Times of Northwest Indiana report the tech giant plans to build the facility on a 304-acre site near Wheatfield owned by Merrillville-based Northern Indiana Public Service Co., or NIPSCO.","uscan":"https://www.insideindianabusiness.com/articles/amazon-planning-7-billion-data-center-near-nipsco-plant","rto":"MISO","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2025,"oy":2027,"contro":"Community opposition regarding water use, energy consumption, property values, noise, and environmental impact; Merrillville passed a moratorium on new data centers.","deal":"Amazon plans to invest $7 billion; agreed to pay Jasper County $90 million upfront and $22 million annually for 10 years.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"canarymedia.com;insideindianabusiness.com","srcUrls":["https://www.canarymedia.com/articles/fossil-fuels/this-indiana-community-is-caught-between-coal-and-the-data-center-boom","https://www.insideindianabusiness.com/articles/amazon-planning-7-billion-data-center-near-nipsco-plant"],"band":"250+ MW","lflag":"large_project_duplicate_review"},{"id":"f007452139d1","cid":"f007452139d1","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - Wolcutt","city":"Wolcutt","county":"White","state":"IN","lat":40.75095,"lng":-86.864293,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The area is near Interstate 65 and located right on an electrical substation.","pscan":"https://www.insideindianabusiness.com/articles/tensions-rise-as-white-county-rezones-for-possible-data-center","uquote":"For Wolcott, Indiana: Carroll White REMC: 10.43% Northern Indiana Public Services Company: 89.57%","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","ay":2025,"contro":"Community opposition and a county-wide moratorium on data center developments.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"insideindianabusiness.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.insideindianabusiness.com/articles/tensions-rise-as-white-county-rezones-for-possible-data-center"]},{"id":"e1012ca73c93","cid":"e1012ca73c93","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed-Kingbury","city":"Kingbury","county":"LaPorte","state":"IN","lat":41.549013,"lng":-86.744739,"cprec":"shared_centroid","status":"Proposed","uquote":"Electric Power / Natural Gas: Northern Indiana Power Service Corporation (NIPSCO)","uscan":"https://laportecountyoed.org/wp-content/uploads/2023/12/Kingsbury_Industrial_Park_Promo_Brochure_6.22_1.pdf","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"laportecountyoed.org","srcUrls":["https://laportecountyoed.org/wp-content/uploads/2023/12/Kingsbury_Industrial_Park_Promo_Brochure_6.22_1.pdf"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"643a68c74c6b","cid":"643a68c74c6b","canon":1,"dups":1,"ftype":"data_center","name":"Wylie Capital - Hobart","city":"Hobart","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Proposed","uquote":"The new data center will use an estimated 1 million gallons of water to cool the computers. Wylie Capital has been in talks with Indiana American Water about supplying the water. [...] NIPSCO is now putting together a report on how much power it will be able to provide to the site and on what schedule.","uscan":"https://indianaeconomicdigest.net/MobileContent/Most-Recent/Lake/Article/1-2-million-square-foot-data-center-could-bring-600-million-in-investment-six-figure-jobs-to-Merrillville/31/198/117818","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Wylie Capital","spon":"Wylie Capital","ay":2025,"contro":"Community opposition, zoning disputes, and incomplete permit documents.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"indianaeconomicdigest.net","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://indianaeconomicdigest.net/MobileContent/Most-Recent/Lake/Article/1-2-million-square-foot-data-center-could-bring-600-million-in-investment-six-figure-jobs-to-Merrillville/31/198/117818"]},{"id":"d928dc822684","cid":"d928dc822684","canon":1,"dups":1,"ftype":"data_center","name":"Wylie Capital - Merrillville","city":"Merrillville","county":"Lake","state":"IN","lat":41.472247,"lng":-87.374337,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The proposed data center is near Pinnacle Hospital, which would draw its power from different transmission lines. NIPSCO is now putting together a report on how much power it...","pscan":"https://indianaeconomicdigest.net/MobileContent/Most-Recent/Lake/Article/1-2-million-square-foot-data-center-could-bring-600-million-in-investment-six-figure-jobs-to-Merrillville/31/198/117818","uconf":"High","uquote":"NIPSCO is now putting together a report on how much power it...","uscan":"https://indianaeconomicdigest.net/MobileContent/Most-Recent/Lake/Article/1-2-million-square-foot-data-center-could-bring-600-million-in-investment-six-figure-jobs-to-Merrillville/31/198/117818","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Wylie Capital","spon":"Wylie Capital","ay":2024,"contro":"Public sentiment is turning sharply against data centers due to concerns over utility rate hikes and long-term building vacancy.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"indianaeconomicdigest.net","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://indianaeconomicdigest.net/MobileContent/Most-Recent/Lake/Article/1-2-million-square-foot-data-center-could-bring-600-million-in-investment-six-figure-jobs-to-Merrillville/31/198/117818"]},{"id":"d44efb0b4fef","cid":"d44efb0b4fef","canon":1,"dups":1,"ftype":"data_center","name":"Agincourt - Valparaiso","city":"Valparaiso","county":"Porter","state":"IN","lat":41.509914,"lng":-87.071313,"cprec":"shared_centroid","status":"Cancelled","pc":"Grid","pconf":"High","pquote":"As they have shared with the RDC, they are working with NIPSCO to confirm sufficient power can be brought to the site. They must also work with Valparaiso City Utilities on the availability of water as well as protection of existing test wells on the property.","uquote":"As they have shared with the RDC, they are working with NIPSCO to confirm sufficient power can be brought to the site. They must also work with Valparaiso City Utilities on the availability of water as well as protection of existing test wells on the property.","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Agincourt Investments","spon":"Agincourt Investments","ay":2025,"contro":"Significant public opposition voiced at a City Council meeting regarding noise, resource consumption, property values, potential health impacts, and lack of transparency, leading to the project's withdrawal.","controScan":"https://baxtel.com/data-center/agincourt-valparaiso-in","deal":"Option agreement for approximately 180 acres for just over $9 million ($50,000 an acre) with a $50,000 deposit, approved January 9, 2025.","dealScan":"https://www.govtech.com/products/valparaiso-ind-mayor-says-data-center-dead-after-outcry","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"govtech.com;baxtel.com","lflag":"online_before_announced shared_coordinate_precision_downgraded","srcUrls":["https://www.govtech.com/products/valparaiso-ind-mayor-says-data-center-dead-after-outcry","https://baxtel.com/data-center/agincourt-valparaiso-in"]},{"id":"bd050e4ee60b","cid":"bd050e4ee60b","canon":1,"dups":1,"ftype":"data_center","name":"Digital Resources Acquisitions LLC - Elletsville","city":"Elletsville","county":"Monroe","state":"IN","lat":39.160729,"lng":-86.52331,"cprec":"distinct","status":"Cancelled","uconf":"High","uquote":"Brief update we had a very good conversation with Hoosier Energy today on getting All applications and...","uscan":"https://bloomdocs.org/wp-content/uploads/simple-file-list/2024-10-26-Scott-Reynolds-APRA-request-Ellettsville.pdf","ukey":"17038|IN","uname":"RushShelby Energy","rto":"MISO","nerc":"RFC","op":"Digital Resources Acquisitions","ay":2024,"contro":"Community opposition due to lack of disclosure and potential noise concerns.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bloomdocs.org","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://bloomdocs.org/wp-content/uploads/simple-file-list/2024-10-26-Scott-Reynolds-APRA-request-Ellettsville.pdf"]},{"id":"94453c4f226a","cid":"94453c4f226a","canon":1,"dups":1,"ftype":"data_center","name":"Google - Indianapolis (Franklin Township)","city":"Indianapolis","county":"Marion","state":"IN","lat":39.782976,"lng":-86.135794,"cprec":"shared_centroid","status":"Cancelled","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Councilor Michael-Paul Hart (R-District 20), who represents the district, had repeatedly raised concerns about the strain the project could place on AES Indiana's power grid.","pscan":"https://www.wthr.com/article/news/local/indianapolis-franklin-township-google-data-center-plan-pulled-after-city-county-council-discussion/531-b8223650-5721-4108-a927-9ac38d894b3e","uconf":"High","uquote":"Councilor Michael-Paul Hart (R-District 20), who represents the district, had repeatedly raised concerns about the strain the project could place on AES Indiana's power grid.","uscan":"https://www.wthr.com/article/news/local/indianapolis-franklin-township-google-data-center-plan-pulled-after-city-county-council-discussion/531-b8223650-5721-4108-a927-9ac38d894b3e","ukey":"9273|IN","uname":"AES Indiana","rto":"MISO","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2025,"contro":"Community opposition regarding water, power strain, environmental impacts, and loss of farmland.","deal":"Tax incentives, including a real property abatement and a 40-year personal property exemption, approved by the Indiana Economic Development Corp.","dealScan":"https://www.ibj.com/articles/google-formally-withdraws-plans-for-data-center-campus-in-franklin-township","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"wthr.com;ibj.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.wthr.com/article/news/local/indianapolis-franklin-township-google-data-center-plan-pulled-after-city-county-council-discussion/531-b8223650-5721-4108-a927-9ac38d894b3e","https://www.ibj.com/articles/google-formally-withdraws-plans-for-data-center-campus-in-franklin-township"]},{"id":"ff583bed06b3","cid":"ff583bed06b3","canon":1,"dups":1,"ftype":"data_center","name":"Logistix - Frankfort","city":"Frankfort","county":"Clinton","state":"IN","lat":40.305944,"lng":-86.477567,"cprec":"distinct","status":"Cancelled","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Frankfort's utility board in May approved a “will serve” letter signaling that it is prepared to supply power to the project so long as Logistix donates land to build a substation and the project breaks ground within three years. According to Frankfort Municipal Utilities General Manager Todd Corrie, the facility could draw up to 300 megawatts of electricity and use as much as 1 million gallons of water per day.","pscan":"https://www.inkfreenews.com/2025/07/25/frankfort-data-center-proposal-shifts-to-clinton-county/","uconf":"High","uquote":"Frankfort's utility board in May approved a “will serve” letter signaling that it is prepared to supply power to the project. Todd Corrie, General Manager of Frankfort Municipal Utilities, made the request on behalf of the developer, Logistix.","rto":"MISO","nerc":"RFC","spon":"Logistix Property Group","ay":2025,"contro":"Local opposition and denial of rezoning by county commissioners.","deal":"Proposed initial investment of $10 billion to $12 billion.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inkfreenews.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.inkfreenews.com/2025/07/25/frankfort-data-center-proposal-shifts-to-clinton-county/"]},{"id":"ba2226e549db","cid":"ba2226e549db","canon":1,"dups":1,"ftype":"data_center","name":"Prologis - Leesburg","city":"Leesburg","county":"Kosciusko","state":"IN","lat":41.244293,"lng":-85.861575,"cprec":"distinct","status":"Cancelled","mw":720,"pc":"Grid","pconf":"High","pquote":"Prologis was interested in the Kosciusko County parcel specifically because three power lines converge at the site. Extending or rerouting those lines is apparently a nonstarter.","pscan":"https://www.insideindianabusiness.com/articles/not-a-reasonable-and-prudent-location-kosciusko-county-commissioners-shut-down-data-center-plans","uquote":"the attorney for Prologis, Steve Snyder said the land northwest of Leesburg was the ideal location because of its proximity to a NIPSCO substation that connected three massive transmission lines.","uscan":"https://www.newsnowwarsaw.com/commissioners-pull-the-plug-on-data-center-rezoning-request/","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"PJM","nerc":"RFC","op":"Prologis","spon":"Prologis","ay":2025,"oy":2039,"contro":"Community opposition and zoning denial due to concerns about loss of prime farmland, environmental impact, water usage, traffic, noise, and incompatibility with the county's comprehensive plan.","controScan":"https://www.insideindianabusiness.com/articles/not-a-reasonable-and-prudent-location-kosciusko-county-commissioners-shut-down-data-center-plans","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"insideindianabusiness.com;newsnowwarsaw.com","srcUrls":["https://www.insideindianabusiness.com/articles/not-a-reasonable-and-prudent-location-kosciusko-county-commissioners-shut-down-data-center-plans","https://www.newsnowwarsaw.com/commissioners-pull-the-plug-on-data-center-rezoning-request/"],"band":"250+ MW"},{"id":"dca5bcdeb8d3","cid":"dca5bcdeb8d3","canon":1,"dups":1,"ftype":"data_center","name":"Provident Realty - Burns Harbor","city":"Burns Harbor","county":"Porter","state":"IN","lat":41.509914,"lng":-87.071313,"cprec":"shared_centroid","status":"Cancelled","uquote":"The largest electricity company in Porter County by megawatt hours sold is Northern Indiana Public Services Company. The Bailly Generating Station was a 604-megawatt (MW) coal power plant located in Burns Harbor, Indiana, on the shore of Lake Michigan adjacent to the Port of Indiana. The plant, which began operation in 1962 and tripled its capacity in 1968, is owned and operated by the Northern Indiana Public Service Company (NIPSCO), an electric-utility operating division of the energy holding company NiSource.","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"Provident Realty","spon":"Provident Realty Advisors","contro":"Significant local opposition due to concerns over height, setbacks, noise, water, power demands, environmental impact, and property values, leading to the withdrawal of the petition.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3b118dbf1287","cid":"3b118dbf1287","canon":1,"dups":1,"ftype":"data_center","name":"Provident Realty - Chesterton","city":"Chesterton","county":"Porter","state":"IN","lat":41.509914,"lng":-87.071313,"cprec":"shared_centroid","status":"Cancelled","pc":"Grid","pconf":"Medium","pquote":"An on-site substation will ensure robust power supply, reflecting the campus's commitment to reliability and performance. The proposed eight buildings, each of which measured 150,000 square feet, were planned with its own bank of backup generators, he said.","pscan":"https://nwitimes.com/news/local/business/article_cfa2c0e8-27e4-11ef-82c9-13d5c84f02ce.html","rto":"MISO","nerc":"RFC","op":"Provident Realty Advisors","spon":"Provident Realty Advisors","ay":2024,"oy":2026,"contro":"The project was withdrawn due to intense local opposition from residents and environmental groups over water and power consumption, noise pollution, property values, and wildlife impact, as well as opposition from Chesterton town officials.","deal":"A proposed $1.3 billion data center project, with Provident Realty Advisors entering an agreement to purchase 71 acres of the former Brassie Golf Course.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nwitimes.com","srcUrls":["https://nwitimes.com/news/local/business/article_cfa2c0e8-27e4-11ef-82c9-13d5c84f02ce.html"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"f909370f8c8b","cid":"f909370f8c8b","canon":1,"dups":1,"ftype":"data_center","name":"Province Group - Bristol","city":"Bristol","county":"Elkhart","state":"IN","lat":41.600693,"lng":-85.863986,"cprec":"distinct","status":"Cancelled","pc":"Grid","pconf":"High","pquote":"However, the buyer would still need a commitment from utility company NIPSCO to extend a power line to the data center.","pscan":"https://www.abc57.com/news/debate-over-data-center-possibly-coming-to-bristol","uconf":"High","uquote":"However, the buyer would still need a commitment from utility company NIPSCO to extend a power line to the data center.","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"PJM","nerc":"RFC","op":"Province Group","spon":"Province Group","ay":2024,"contro":"Community opposition regarding noise, water/electricity usage, property values, light pollution, traffic, and loss of farmland.","controScan":"https://www.abc57.com/news/debate-over-data-center-possibly-coming-to-bristol","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"abc57.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.abc57.com/news/debate-over-data-center-possibly-coming-to-bristol"]},{"id":"072f3f128ac8","cid":"072f3f128ac8","canon":1,"dups":1,"ftype":"data_center","name":"QTS - Jeremiah A","city":"Wheeler","county":"Porter","state":"IN","lat":41.509914,"lng":-87.071313,"cprec":"shared_centroid","status":"Cancelled","pc":"Grid","pconf":"High","pquote":"Currently there are no plans for solar power or on-site generation at this location. Will there be on-site substations? Yes, on-site substations are planned to leverage the existing transmission.","uquote":"He said he's not opposed to data centers and sees the need, but is concerned with where they will be located and if existing NIPSCO customers will be forced to pay higher rates for electricity for them.","uscan":"https://indianaeconomicdigest.net/Content/Default/Also-In-The-News/Article/Latest-Porter-County-data-center-proposal-meets-more-public-pushback/-3/5307/118720","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"QTS Data Centers","spon":"Blackstone","ay":2025,"contro":"Significant community opposition regarding location, environmental impact, noise, and property values.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"indianaeconomicdigest.net","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://indianaeconomicdigest.net/Content/Default/Also-In-The-News/Article/Latest-Porter-County-data-center-proposal-meets-more-public-pushback/-3/5307/118720"]},{"id":"bade5ddf4ba2","cid":"bade5ddf4ba2","canon":1,"dups":1,"ftype":"data_center","name":"QTS - Jeremiah B","city":"Wheeler","county":"Porter","state":"IN","lat":41.509914,"lng":-87.071313,"cprec":"shared_centroid","status":"Cancelled","pc":"Grid","pconf":"High","pquote":"Currently there are no plans for solar power or on-site generation at this location. Will there be on-site substations? Yes, on-site substations are planned to leverage the existing transmission.","uquote":"The largest electricity company in Porter County by megawatt hours sold is Northern Indiana Public Services Company.","ukey":"13756|IN","uname":"Northern Indiana Pub Serv Co","rto":"MISO","nerc":"RFC","op":"QTS Data Centers","spon":"Blackstone","ay":2025,"contro":"Significant community opposition regarding location, environmental impact, noise, light, and property values.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"0038da4a2bbc","cid":"0038da4a2bbc","canon":1,"dups":1,"ftype":"data_center","name":"Surge Development - Greenfield","city":"Greenfield","county":"Hancock","state":"IN","lat":39.822529,"lng":-85.77315,"cprec":"distinct","status":"Cancelled","proc":"Tariff (utility)","pcp":"Duke Energy Indiana","rto":"MISO","nerc":"RFC","op":"Surge Development","ay":2025,"contro":"Community resistance due to concerns about impact on Tuttle Orchards, noise, water, and sewer.","controScan":"https://www.wthr.com/article/money/business/application-withdrawn-surge-development-hancock-county-greenfield-data-center-tuttle-orchards/531-48204cbc-eba5-4666-bd66-6e88cb6d2412","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wthr.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://www.wthr.com/article/money/business/application-withdrawn-surge-development-hancock-county-greenfield-data-center-tuttle-orchards/531-48204cbc-eba5-4666-bd66-6e88cb6d2412"],"ukey":"15470|IN","uname":"Duke Energy Indiana, LLC","reportedUtility":"Duke Energy Indiana, LLC"},{"id":"a4efba9d8624","cid":"a4efba9d8624","canon":1,"dups":1,"ftype":"data_center","name":"Unnamed - Merom","city":"Merom","county":"Sullivan","state":"IN","lat":39.089225,"lng":-87.415843,"cprec":"distinct","status":"Cancelled","mw":1580,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Hallador and the unnamed data center developer signed an Conversion Transaction Commitment Agreement effective January 2, 2025. During the third quarter of 2024, Hallador signed a non-binding term sheet with the developer to support the delivery of energy and capacity, through a utility partner, for 10+ years.","uconf":"High","uquote":"We Signed Memorandum of Understanding (MOU) with Hoosier Energy and WIN REMC to Provide Opportunities for Non-Traditional Energy Sales at the Merom Site. Allows us to potentially capture additional margins above our traditional wholesale energy markets. Allows us to market industrial users of power, such as data centers, AI providers and power dense manufacturers, to the Merom property.","rto":"MISO","nerc":"RFC","ay":2024,"deal":"Conversion Transaction Commitment Agreement with cumulative payments of up to $5 million to Hallador Power Company, effective January 2, 2025, terminated May 19, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2821f9ef1ff0","cid":"2821f9ef1ff0","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers - Pittsboro","city":"Pittsboro","county":"Hendricks","state":"IN","lat":39.768963,"lng":-86.509908,"cprec":"distinct","status":"Cancelled","mw":400,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Pittsboro officials say Vantage Data Centers will not be permitted to use temporary wells or septic systems, ensuring the facility is connected to the town's utilities.","pscan":"https://www.ibj.com/articles/pittsboro-officials-approve-rezoning-for-proposed-data-center","uquote":"Baker said offered to facilitate conversations with Wabash Valley Power Alliance and Hendricks Power Cooperative so those entities can address the steelmaker's concerns.","uscan":"https://www.ibj.com/articles/pittsboro-officials-approve-rezoning-for-proposed-data-center","rto":"MISO","nerc":"RFC","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper and PSP Investments","ay":2025,"contro":"A group of Pittsboro residents filed a lawsuit in April 2025 to halt the project, alleging officials failed to provide sufficient notice of annexation or rezoning and did not require Vantage to produce impact studies.","controScan":"https://www.insideindianabusiness.com/articles/pittsboro-residents-ask-court-to-halt-planned-hendricks-county-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"ibj.com;insideindianabusiness.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.ibj.com/articles/pittsboro-officials-approve-rezoning-for-proposed-data-center","https://www.insideindianabusiness.com/articles/pittsboro-residents-ask-court-to-halt-planned-hendricks-county-data-center"]},{"id":"81935fff3eb7","cid":"81935fff3eb7","canon":1,"dups":1,"ftype":"data_center","name":"Apple","city":"Waukee","county":"Dallas","state":"IA","lat":41.68532,"lng":-94.040706,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Like all Apple data centers, the new facility will run entirely on renewable energy from day one.","pscan":"https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/","uconf":"High","uquote":"MidAmerican Energy, September 2022, Ongoing partnership for the utility to supply Apple's future Waukee, Iowa, data center campus with 100% renewable energy from its inception.","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Apple","spon":"Apple","tenant":"Apple","ay":2017,"oy":2020,"contro":"Property tax valuation error costing Waukee schools and city millions, and controversy over tax abatements.","controScan":"https://www.youtube.com/watch?v=pTMZw3mTNiY","deal":"$207.8 million in state and local incentives, including a $188.2 million property tax abatement, and Apple's commitment of up to $100 million to a Public Improvement Fund.","dealScan":"https://www.ciodive.com/news/apple-setting-up-shop-in-iowa-with-14b-for-new-data-centers/503472/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"apple.com;ciodive.com;youtube.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/","https://www.ciodive.com/news/apple-setting-up-shop-in-iowa-with-14b-for-new-data-centers/503472/","https://www.youtube.com/watch?v=pTMZw3mTNiY"]},{"id":"d83f03c407ee","cid":"d83f03c407ee","canon":1,"dups":1,"ftype":"data_center","name":"Cast & Crew","city":"Waukee","county":"Dallas","state":"IA","lat":41.68532,"lng":-94.040706,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"MISO","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b182ef9088ee","cid":"b182ef9088ee","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Council Bluffs","county":"Pottawattamie","state":"IA","lat":41.340184,"lng":-95.544905,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Omaha-Council Bluffs (OCB1) data center is now powered entirely by renewable electricity, thanks to a green tariff with MidAmerican's GreenAdvantage program, which supports wind and solar projects. Utility capacity – 18 MW; Utility Voltage – 13,200 (13.2 kV); 17 of transformers on site – (16 each @ 2.5 MW, 1 each @ 1.5 MW)... Generator Power – 16 each 2.25 MW Diesel (Critical), 1 each 1.25 MW Diesel (House)","pscan":"https://www.cyrusone.com/resources/blogs/harnessing-the-wind-and-sun-council-bluffs-data-center-now-powered-by-100-renewable-electricity","uconf":"High","uquote":"made possible through a green tariff with our local utility, MidAmerican, and their GreenAdvantage program. MidAmerican's GreenAdvantage program incorporates both wind and solar electricity projects.","uscan":"https://www.cyrusone.com/resources/blogs/harnessing-the-wind-and-sun-council-bluffs-data-center-now-powered-by-100-renewable-electricity","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2019,"oy":2020,"deal":"CyrusOne secured approximately $9.7 billion in new debt capital (Warehouse Credit Facility and Revolving Credit Facility) in January 2025.","dealScan":"https://www.cyrusone.com/media-coverage-press-releases/cyrusone-secures-9-7-billion-in-new-debt-capital-to-fund-datacenter-growth","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/resources/blogs/harnessing-the-wind-and-sun-council-bluffs-data-center-now-powered-by-100-renewable-electricity","https://www.cyrusone.com/media-coverage-press-releases/cyrusone-secures-9-7-billion-in-new-debt-capital-to-fund-datacenter-growth"],"lflag":"citation_artifact_removed coordinate_cluster_reclassified"},{"id":"39132646c30f","cid":"39132646c30f","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Council Bluffs","county":"Pottawattamie","state":"IA","lat":41.340184,"lng":-95.544905,"cprec":"shared_centroid","status":"Operational","mw":100,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Just before Earth Day in April, Google and MidAmerican Energy announced that the utility will supply Google's data center in Council Bluffs, across the Missouri River from Omaha, with up to 407 megawatts (MW) of wind-sourced energy. Google's new data center in Council Bluffs, Iowa will use 38 diesel generators to keep servers online in the event of a grid outage. Google's Council Bluffs, Iowa, data center campus runs on 95 percent carbon-free electricity, said a company spokesperson.","pscan":"https://siteselection.com/the-invisible-crop/","uconf":"High","uquote":"Just before Earth Day in April, Google and MidAmerican Energy announced that the utility will supply Google's data center in Council Bluffs, across the Missouri River from Omaha, with up to 407 megawatts (MW) of wind-sourced energy. Google has signed a contract with its utility provider in Iowa for 407 megawatts of wind energy to support its data center operations in Council Bluffs.","uscan":"https://siteselection.com/the-invisible-crop/","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","ay":2007,"oy":2009,"contro":"Water consumption concerns","controScan":"https://www.informationweek.com/sustainability/iowa-grapples-with-data-centers-and-demand-for-water","deal":"$1 billion investment in 2024","dealScan":"https://www.youtube.com/watch?v=B3QOv6HdgNQ","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"siteselection.com;youtube.com;informationweek.com","srcUrls":["https://siteselection.com/the-invisible-crop/","https://www.youtube.com/watch?v=B3QOv6HdgNQ","https://www.informationweek.com/sustainability/iowa-grapples-with-data-centers-and-demand-for-water"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"378201499e02","cid":"378201499e02","canon":0,"dups":1,"ftype":"data_center","name":"Google","city":"Council Bluffs","county":"Pottawattamie","state":"IA","lat":41.340184,"lng":-95.544905,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Google celebrated Earth Day by announcing a 407 megawatt deal with Iowa utility MidAmerican Energy to supply wind energy to support Google's data center campus in Council Bluffs. Google's new data center in Council Bluffs, Iowa will use 38 diesel generators to keep servers online in the event of a grid outage.","pscan":"https://www.datacenterknowledge.com/sustainability/google-we-ve-bought-1-gigawatt-of-renewable-energy","uconf":"High","uquote":"Google celebrated Earth Day by announcing a 407 megawatt deal with Iowa utility MidAmerican Energy to supply wind energy to support Google's data center campus in Council Bluffs.","uscan":"https://www.datacenterknowledge.com/sustainability/google-we-ve-bought-1-gigawatt-of-renewable-energy","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","ay":2007,"oy":2009,"contro":"Water consumption concerns","controScan":"https://www.nasuca.org/wp-content/uploads/2025/02/2025-06-10-NASUCA-Data-Centers-Final-Schneider.pdf","deal":"$7 billion investment in Iowa, including Council Bluffs expansion (announced June 06, 2025)","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;nasuca.org","srcUrls":["https://www.datacenterknowledge.com/sustainability/google-we-ve-bought-1-gigawatt-of-renewable-energy","https://www.nasuca.org/wp-content/uploads/2025/02/2025-06-10-NASUCA-Data-Centers-Final-Schneider.pdf"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified,merged_duplicate"},{"id":"c5d48d883632","cid":"c5d48d883632","canon":1,"dups":1,"ftype":"data_center","name":"Google Council Bluffs (East)","county":"Pottawattamie","state":"IA","lat":41.340184,"lng":-95.544905,"cprec":"shared_centroid","status":"Operational","mw":125,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Google celebrated Earth Day by announcing a 407 megawatt deal with Iowa utility MidAmerican Energy to supply wind energy to support Google's data center campus in Council Bluffs. The agreement will power both of Google's current facilities and also allow for future expansion.... Google's new data center in Council Bluffs, Iowa will use 38 diesel generators to keep servers online in the event of a grid outage.","pscan":"https://www.datacenterknowledge.com/sustainability/google-we-ve-bought-1-gigawatt-of-renewable-energy","uconf":"High","uquote":"The largest electric company in Pottawattamie County is MidAmerican Energy which has a historical average rate of 0.11/kWH.... Electricity for the City of Crescent is provided by MidAmerican Energy.","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","oy":2025,"deal":"407 MW wind energy supply deal with MidAmerican Energy (April 2014)","dealScan":"https://siteselection.com/the-invisible-crop/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;siteselection.com","srcUrls":["https://www.datacenterknowledge.com/sustainability/google-we-ve-bought-1-gigawatt-of-renewable-energy","https://siteselection.com/the-invisible-crop/"],"lflag":"citation_artifact_removed source_quality_reclassified coordinate_cluster_reclassified"},{"id":"72096f0d194c","cid":"72096f0d194c","canon":1,"dups":1,"ftype":"data_center","name":"ITS","city":"Monticello","county":"Jones","state":"IA","lat":42.125118,"lng":-91.116914,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Redundant Power. N+1 UPS systems with automatic generator backup.","pscan":"https://its.tech/about/data-center/","uquote":"City of Monticello, IA is a utilities provider. The company is dedicated to providing affordable and reliable electric, water, and sewer services to the residents and businesses.","uscan":"https://www.doxo.com/u/biller/monticello-berndes-center-319398C6","ukey":"554|IA","uname":"City of Ames - (IA)","rto":"MISO","nerc":"MRO","op":"ITS - Infrastructure Technology Solutions","spon":"ITS - Infrastructure Technology Solutions","oy":2007,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"its.tech;doxo.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://its.tech/about/data-center/","https://www.doxo.com/u/biller/monticello-berndes-center-319398C6"]},{"id":"b298d1aeb614","cid":"b298d1aeb614","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft","city":"West Des Moines","county":"Polk","state":"IA","lat":41.684816,"lng":-93.568971,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"As a result, most data centers in the state have opted to purchase their energy from the grid, as opposed to building their own power plants onsite, the companies told Inside Climate News.","pscan":"https://insideclimatenews.org/news/28072025/big-beautiful-bill-iowa-data-centers/","uconf":"High","uquote":"Grid Operator: MidAmerican Energy.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-cef9a0d6","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2008,"oy":2012,"contro":"Water usage concerns led to Microsoft committing to zero-water cooling systems for new facilities.","controScan":"https://www.iowapublicradio.org/ipr-news/2025-07-30/from-water-to-policing-midwest-cities-take-on-ai-with-few-guardrails","deal":"Project Alluvion, a four-phase regional data center, costing a total of $1,126,218,400, with $20,256,000 in sales tax rebates approved by the Iowa Economic Development Authority.","dealScan":"https://www.iowapublicradio.org/ipr-news/2014-04-18/microsoft-announces-1-1-billion-data-center-in-west-des-moines","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"insideclimatenews.org;interconnection.fyi;iowapublicradio.org","srcUrls":["https://insideclimatenews.org/news/28072025/big-beautiful-bill-iowa-data-centers/","https://www.interconnection.fyi/data-center/project/microsoft-cef9a0d6","https://www.iowapublicradio.org/ipr-news/2014-04-18/microsoft-announces-1-1-billion-data-center-in-west-des-moines","https://www.iowapublicradio.org/ipr-news/2025-07-30/from-water-to-policing-midwest-cities-take-on-ai-with-few-guardrails"],"lflag":"coordinate_cluster_reclassified,merged_duplicate"},{"id":"652248e3ee7e","cid":"652248e3ee7e","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft","city":"West Des Moines","county":"Polk","state":"IA","lat":41.684816,"lng":-93.568971,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: MidAmerican Energy.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-cef9a0d6","uconf":"High","uquote":"Grid Operator: MidAmerican Energy.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-cef9a0d6","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified coordinate_cluster_reclassified,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-cef9a0d6"]},{"id":"dd6abac26f82","cid":"dd6abac26f82","canon":1,"dups":2,"ftype":"data_center","name":"Microsoft","city":"West Des Moines","county":"Polk","state":"IA","lat":41.684816,"lng":-93.568971,"cprec":"shared_centroid","status":"Operational","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Additionally, the data centers are 100% powered by renewable energy.”. \"Microsoft matches 100 percent of Iowa data center energy consumption with contracted carbon-free electricity, a spokesperson told Inside Climate News, and the same is also true for Meta.... As a result, most data centers in the state have opted to purchase their energy from the grid, as opposed to building their own power plants onsite, the companies told Inside Climate News.\"","pscan":"https://insideclimatenews.org/news/28072025/big-beautiful-bill-iowa-data-centers/","uconf":"High","uquote":"MidAmerican Energy said it experienced overall retail load growth across residential, business and commercial/industrial sectors, of 2.8% in 2023 and 1.5% in 2024. “We expect to realize an increase above [2023 and 2024 numbers] in 2025 due, in large part, to data center load growth,” Geoff Greenwood, media relations manager at MidAmerican Energy Co., said in an email.. MidAmerican's electric delivery system is connected to a regional grid that's managed by an independent entity called Midcontinent Independent System Operator, or MISO.","uscan":"https://www.midamericanenergy.com/electricity-interconnected-grid","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2008,"oy":2012,"contro":"Community concerns regarding water usage and electricity prices, leading to Microsoft's \"Community-First AI Infrastructure\" initiative.","deal":"$20.3 million sales tax rebate from Iowa Economic Development Authority Board and $18 million in incentives from West Des Moines for Project Alluvion.","dealScan":"https://www.freedomfoundation.com/labor/microsoft-plans-1-1-billion-project-in-business-friendly-iowa/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"insideclimatenews.org;midamericanenergy.com;freedomfoundation.com","srcUrls":["https://insideclimatenews.org/news/28072025/big-beautiful-bill-iowa-data-centers/","https://www.midamericanenergy.com/electricity-interconnected-grid","https://www.freedomfoundation.com/labor/microsoft-plans-1-1-billion-project-in-business-friendly-iowa/"],"lflag":"citation_artifact_removed source_quality_reclassified coordinate_cluster_reclassified"},{"id":"ca6dd5532196","cid":"dd6abac26f82","canon":0,"dups":2,"ftype":"data_center","name":"Microsoft","city":"West Des Moines","county":"Polk","state":"IA","lat":41.684816,"lng":-93.568971,"cprec":"shared_centroid","status":"Operational","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft matches 100 percent of Iowa data center energy consumption with contracted carbon-free electricity, a spokesperson told Inside Climate News, and the same is also true for Meta.... As a result, most data centers in the state have opted to purchase their energy from the grid, as opposed to building their own power plants onsite, the companies told Inside Climate News.","pscan":"https://insideclimatenews.org/news/28072025/big-beautiful-bill-iowa-data-centers/","uconf":"High","uquote":"Grid Operator. MidAmerican Energy.","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2014,"oy":2021,"contro":"Community concerns regarding electricity prices and water use related to data center projects.","deal":"$20.256 million sales tax rebate approved by Iowa Economic Development Authority in April 2014.","dealScan":"https://www.iowapublicradio.org/ipr-news/2014-04-18/microsoft-announces-1-1-billion-data-center-in-west-des-moines","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"insideclimatenews.org;iowapublicradio.org","srcUrls":["https://insideclimatenews.org/news/28072025/big-beautiful-bill-iowa-data-centers/","https://www.iowapublicradio.org/ipr-news/2014-04-18/microsoft-announces-1-1-billion-data-center-in-west-des-moines"],"lflag":"citation_artifact_removed source_quality_reclassified coordinate_cluster_reclassified"},{"id":"8d1c3e9f6aff","cid":"8d1c3e9f6aff","canon":1,"dups":1,"ftype":"data_center","name":"Google Cedar Rapids","county":"Linn","state":"IA","lat":42.077951,"lng":-91.597674,"cprec":"distinct","status":"Construction","mw":600,"pc":"Grid","pconf":"High","pquote":"Built to operate on redundant power infrastructure, backed by partnerships with regional energy provider Alliant Energy, ensuring consistent supply and renewable integration.","uquote":"Google hosted a special announcement celebration in Cedar Rapids to officially confirm their data center project at Alliant Energy's Big Cedar Industrial Center in late May 2025.","uscan":"https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2026,"contro":"Google is seeking to bypass Linn County's data center zoning rules, particularly regarding water use and economic agreements, by pursuing annexation into the city of Palo.","deal":"Initial investment estimated at over USD 500 million. Google has secured $56 million in tax incentives over 20 years to support the development. Google signs 615 MW PPA with NextEra Energy to restart Duane Arnold nuclear plant for AI data centers - Phase Power: 615 MW (Aug 31, 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"alliantenergy.com","srcUrls":["https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement"],"band":"250+ MW"},{"id":"aa0700ab55fb","cid":"aa0700ab55fb","canon":1,"dups":1,"ftype":"data_center","name":"QTS Cedar Rapids","county":"Linn","state":"IA","lat":42.077951,"lng":-91.597674,"cprec":"distinct","status":"Construction","mw":420,"pc":"Grid","pconf":"High","pquote":"US-based energy provider Alliant Energy, owner of the industrial park, is providing the power infrastructure.","pscan":"https://www.constructionbriefing.com/news/construction-starts-on-us10bn-iowa-data-centre-campus/8083316.article","uquote":"US-based energy provider Alliant Energy, owner of the industrial park, is providing the power infrastructure.","uscan":"https://www.constructionbriefing.com/news/construction-starts-on-us10bn-iowa-data-centre-campus/8083316.article","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"QTS Data Centers","spon":"Blackstone","ay":2025,"oy":2026,"contro":"Concerns raised by residents about potential increases in utility rates and water consumption, though QTS is implementing a water-free cooling system.","controScan":"https://dailyiowan.com/2025/12/09/cedar-rapids-data-centers-ignite-concern-from-energy-advocates-excitement-from-officials/","deal":"Planned $10 billion investment in the data center campus and a commitment of up to $18 million over 20 years to the City of Cedar Rapids' Community Betterment Fund.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"constructionbriefing.com;dailyiowan.com","srcUrls":["https://www.constructionbriefing.com/news/construction-starts-on-us10bn-iowa-data-centre-campus/8083316.article","https://dailyiowan.com/2025/12/09/cedar-rapids-data-centers-ignite-concern-from-energy-advocates-excitement-from-officials/"],"band":"250+ MW"},{"id":"70d073b633e6","cid":"70d073b633e6","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Altoona","county":"Polk","state":"IA","lat":41.684816,"lng":-93.568971,"cprec":"shared_centroid","status":"Proposed","mw":1401,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. In Iowa, we worked with MidAmerican Energy and other partners to meet our 100% clean and renewable energy goal for the Altoona Data Center.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Altoona-Data-Center.pdf","uconf":"High","uquote":"In Iowa, we worked with MidAmerican Energy and other partners to meet our 100% clean and renewable energy goal for the Altoona Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Altoona-Data-Center.pdf","ukey":"12341|IA","uname":"MidAmerican Energy Co","rto":"MISO","nerc":"MRO","op":"Meta","spon":"Meta","tenant":"Meta","ay":2013,"oy":2025,"contro":"Community opposition over water, energy use, and noise pollution.","controScan":"https://greenamerica.org/metas-rush-ai-myth-and-fact","deal":"Meta announced further investments to expand renewable energy capacity in Iowa, including a 225-megawatt wind project to support the facility's growing AI operations.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;greenamerica.org","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Altoona-Data-Center.pdf","https://greenamerica.org/metas-rush-ai-myth-and-fact"],"oy_stale":1,"lflag":"stale_future_status_year coordinate_cluster_reclassified"},{"id":"96cb791863ca","cid":"96cb791863ca","canon":1,"dups":1,"ftype":"data_center","name":"Armstrong Energy Corporation","city":"Belpre","county":"Edwards","state":"KS","lat":37.883595,"lng":-99.304746,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"a1b3f30b6190","cid":"a1b3f30b6190","canon":0,"dups":1,"ftype":"data_center","name":"DataBank","city":"Lenexa","county":"Johnson","state":"KS","lat":38.883907,"lng":-94.82233,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Powered by two separate substations with on-site, diesel-powered generators for backup.","pscan":"https://www.databank.com/data-centers/kansas-city/south-lake-campus/south-lake/","uconf":"High","uquote":"Power. Evergy, 888.471.5275.","ukey":"10000|KS","uname":"Evergy Metro","rto":"SPP","nerc":"MRO","op":"DataBank","spon":"DigitalBridge","ay":2018,"oy":2018,"deal":"DataBank initiated expansion efforts following the 2021 issuance of over $750 million in secured revenue notes, and further financing in 2023/2024 including $715 million in asset-backed securities and an additional $325 million.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/kansas-city/south-lake-campus/south-lake/"],"lflag":"shared_coordinate_precision_downgraded,merged_duplicate"},{"id":"6ddd7cbfd397","cid":"6ddd7cbfd397","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Overland Park","county":"Johnson","state":"KS","lat":38.883907,"lng":-94.82233,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility power is fed by two separate substations with dedicated diesel generators on site for load backup.","pscan":"https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_KC2_Q32020_v1.pdf","uquote":"Grid Operator: Evergy.","ukey":"10000|KS","uname":"Evergy Metro","rto":"SPP","nerc":"MRO","op":"DataBank","spon":"DigitalBridge","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_KC2_Q32020_v1.pdf"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"ff7471c78b09","cid":"ff7471c78b09","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Overland Park","county":"Johnson","state":"KS","lat":38.883907,"lng":-94.82233,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The power to the data center is fed by dual feed, single grid power from Kansas City Power and Light. Redundant 255 KVA UPS system provides emergency power with automatic transfer to 1 x 500 KW diesel generator on power failure.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-overland-park-data-center/","uconf":"High","uquote":"The power to the data center is fed by dual feed, single grid power from Kansas City Power and Light.","uscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-overland-park-data-center/","rto":"SPP","nerc":"MRO","op":"QTS","spon":"Blackstone","ay":2003,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion on August 31, 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-overland-park-data-center/"]},{"id":"644d86b038c8","cid":"644d86b038c8","canon":1,"dups":1,"ftype":"data_center","name":"State Farm","city":"Olathe","county":"Johnson","state":"KS","lat":38.883907,"lng":-94.82233,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.","pscan":"https://baxtel.com/data-center/digico-kansas-city-kcm1","uconf":"High","uquote":"reliable power provided by KCP&L","uscan":"https://baxtel.com/data-center/digico-kansas-city-kcm1","ukey":"10000|KS","uname":"Evergy Metro","rto":"SPP","nerc":"MRO","op":"DigiCo Infrastructure REIT","spon":"DigiCo Infrastructure REIT","tenant":"State Farm","oy":2016,"deal":"DigiCo acquired two enterprise data centers in the US, 100 percent leased to insurance company State Farm, for $248 million (December 2024/January 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digico-kansas-city-kcm1"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"797c41a38435","cid":"797c41a38435","canon":1,"dups":1,"ftype":"data_center","name":"CLOP Olathe KS LLC","city":"Olathe","county":"Johnson","state":"KS","lat":38.883907,"lng":-94.82233,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Evergy.","uconf":"High","uquote":"Grid Operator. Evergy.","ukey":"10000|KS","uname":"Evergy Metro","rto":"SPP","nerc":"MRO","op":"CLOP Olathe KS","spon":"CLOP Olathe KS","ay":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"2c55622d7c25","cid":"2c55622d7c25","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Lenexa","county":"Johnson","state":"KS","lat":38.883907,"lng":-94.82233,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7ddf701438d7","cid":"7ddf701438d7","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Florence","county":"Boone","state":"KY","lat":38.9589,"lng":-84.736371,"cprec":"distinct","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Multiple levels of power redundancy are available in N and N+1 configurations. Standby Power Description: 5 x 1.5kW diesel generators; 2 x 2.0 diesel generators and 1 x 1.75kW generator.","uconf":"Medium","uquote":"Florence, Kentucky: Owen Electrictric Cooperative: 15.14% Duke Energy Kentucky: 84.86%. Duke Energy Kentucky has an estimated 4,808 total residential customers, which is more than all other electricity providers who operate in the city. The city awarded Duke Energy and Owen Electric Cooperative 20-year contracts to do. Duke Energy and Owen Electric, the city's only electricity utilities, submitted bids.","uscan":"https://linknky.com/news/2025/12/17/florence-city-council-approves-duke-energy-owen-electric-franchise-agreements/","ukey":"19446|KY","uname":"Duke Energy Kentucky","rto":"non-RTO","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","deal":"Acquisition of CyrusOne by KKR and Global Infrastructure Partners for approximately $15 billion in March 2022.","dealScan":"https://baxtel.com/data-center/cyrusone-kentucky","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"linknky.com;baxtel.com","srcUrls":["https://linknky.com/news/2025/12/17/florence-city-council-approves-duke-energy-owen-electric-franchise-agreements/","https://baxtel.com/data-center/cyrusone-kentucky"]},{"id":"2dd8c32bac0c","cid":"2dd8c32bac0c","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Slidell","county":"St. Tammany Parish","state":"LA","lat":30.410022,"lng":-89.951962,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: PDU. UPS. Generators. Capable of 20+kW per cabinet. Capable of 600+ watts per sq ft.","uquote":"Grid Operator. Cleco Holdings.","uscan":"https://www.interconnection.fyi/data-center/project/edgeconnex-54e48ad3","rto":"MISO","nerc":"SERC","op":"EdgeConneX","spon":"EdgeConneX New Orleans Holdings","ay":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/edgeconnex-54e48ad3"]},{"id":"37962279a626","cid":"37962279a626","canon":1,"dups":1,"ftype":"data_center","name":"Meta Hyperion","state":"LA","lat":31,"lng":-91.9,"cprec":"distinct","status":"Construction","mw":5000,"pc":"Behind-the-Meter","pconf":"High","pquote":"Meta will pay for the construction of all 10 plants and has committed to funding 2.5 gigawatts of new renewable energy resources, 240 miles of new transmission lines, and battery energy storage systems.","pscan":"https://thenextweb.com/news/meta-200-billion-hyperion-data-center-louisiana","uquote":"To power the campus, Entergy Louisiana is building 10 gas-fired power plants, tripling the three originally planned.","uscan":"https://thenextweb.com/news/meta-200-billion-hyperion-data-center-louisiana","rto":"MISO","nerc":"SERC","op":"Meta Platforms","spon":"Blue Owl Capital and Meta Platforms","tenant":"Meta Platforms","ay":2024,"oy":2030,"contro":"Public opposition and ethical concerns regarding a state senator's land dealings near the site.","deal":"Joint venture agreement with Blue Owl Capital for approximately $27 billion in total development costs, dated October 21, 2025.","dealScan":"https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"thenextweb.com;about.fb.com","srcUrls":["https://thenextweb.com/news/meta-200-billion-hyperion-data-center-louisiana","https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/"],"band":"250+ MW","lflag":"source_quality_reclassified large_project_duplicate_review"},{"id":"7a9917ee5959","cid":"7a9917ee5959","canon":1,"dups":1,"ftype":"data_center","name":"FirstLight Fiber","city":"Brunswick","county":"Cumberland","state":"ME","lat":43.808348,"lng":-70.330375,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Commercial power; single substation to dual path power feeds; independent A and B power feeds connected to every rack; 2N power design; Dual independent 750kW generators; 2 ATS, 2 UPS and PDU; 12-15 kW usage in liquid-cooled rack; Supports AC 120v AC, 230v AC single and 208v three-phase; Single A, and A+B feeds; 2N HVAC cooling. Power is sourced entirely from renewable energy.","pscan":"https://baxtel.com/data-center/firstlight-brunswick","uconf":"High","uquote":"To pay your monthly Brunswick Landing Electric Utility bill, you have three options: Pay your Brunswick Landing Electric Utility bill online, or Make a check payable to “Brunswick Landing Electric Utility” and mail it to Brunswick Landing Electric Utility, 15 Terminal Road, Brunswick, Maine 04011, or Drop your check made payable to “Brunswick Landing Electric Utility” in the dropbox within the front entrance of the first floor of 15 Terminal Road (get directions) IMPORTANT INFO BELOW ON BILLING.","rto":"ISO-NE","nerc":"NPCC","op":"FirstLight Fiber","spon":"Antin Infrastructure Partners","ay":2025,"oy":2025,"deal":"Antin Infrastructure Partners completed the acquisition of FirstLight Fiber from Oak Hill Capital Partners on July 25, 2018. FirstLight completed a major expansion of its Brunswick, Maine Data Center on February 4, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/firstlight-brunswick"],"lflag":"source_quality_reclassified"},{"id":"6b2ed0c22f4b","cid":"6b2ed0c22f4b","canon":1,"dups":1,"ftype":"data_center","name":"Northland Management","city":"Portland","county":"Cumberland","state":"ME","lat":43.808348,"lng":-70.330375,"cprec":"distinct","status":"Proposed","mw":10,"band":"10-25 MW","rto":"ISO-NE","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"9eaab9a94413","cid":"9eaab9a94413","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Jessup","county":"Anne Arundel","state":"MD","lat":38.991617,"lng":-76.560894,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-150f6f6c","uquote":"Baltimore Gas and Electric (BGE) is a subsidiary of Exelon Corporation. The utility provides both electric and gas service in the central Maryland area, including Baltimore City, Baltimore County, and Anne Arundel Counties","uscan":"https://opc.maryland.gov/Consumer-Learning/Electricity/Your-Local-Electricity-Companies","ukey":"1167|MD","uname":"Baltimore Gas & Electric Co","rto":"PJM","nerc":"RFC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2021,"oy":2021,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;opc.maryland.gov","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-150f6f6c","https://opc.maryland.gov/Consumer-Learning/Electricity/Your-Local-Electricity-Companies"],"rawUkey":"1167|MD","rawUname":"Baltimore Gas & Electric Co","reportedUtility":"Baltimore Gas & Electric Co","lflag":"utility_alias_corrected"},{"id":"b6e22fd7dbfb","cid":"b6e22fd7dbfb","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Laurel","county":"Howard","state":"MD","lat":39.252264,"lng":-76.924406,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"5fb164d66d9d","cid":"5fb164d66d9d","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Severn","county":"Anne Arundel","state":"MD","lat":38.991617,"lng":-76.560894,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","rto":"PJM","nerc":"RFC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2021,"oy":2021,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"49bd173a8e00","cid":"49bd173a8e00","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Elkridge","county":"Howard","state":"MD","lat":39.252264,"lng":-76.924406,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Infrastructure Resilience: Equipped with three 480V 3-phase utility feeds (3,000A each) from diverse substations, supported by N+1 redundant power systems. Utility Provider CPV Retail Energy / bge.","uconf":"High","uquote":"Utility Provider CPV Retail Energy / bge.","uname":"Baltimore Gas & Electric Co","rto":"PJM","nerc":"RFC","op":"Cogent Communications","spon":"I Squared Capital","ay":2003,"oy":2003,"deal":"Cogent Communications Holdings, Inc. (NASDAQ:CCOI) announced today that its subsidiary Cogent Fiber, LLC has entered into a definitive agreement to sell 10 data center facilities to a newly formed entity sponsored by I Squared Capital for $225 million in cash.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"65439|MD","rawUname":"CPV Retail Energy LP","reportedUtility":"Baltimore Gas & Electric Co","ukey":"1167|MD","srcUrls":null,"srcDom":null},{"id":"9b98c6fe68bc","cid":"9b98c6fe68bc","canon":1,"dups":1,"ftype":"data_center","name":"Data Point","city":"Baltimore","county":"Baltimore City","state":"MD","lat":39.300032,"lng":-76.610476,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Dual power feeds deliver power to the facility, and the architecture is anchored by 6 UPS auto-fail over systems. 3 1,000 kilowatt Diesel generators are also on site which can produce 3 megawatts of additional power when necessary.","pscan":"https://cloudandcolocation.com/datacenters/datapoint-baltimore-tidepoint-data-center/","uconf":"High","uquote":"BGE stated that it ensures the majority of costs would go to the company building the data center.","rto":"PJM","nerc":"RFC","op":"Expedient Data Centers","oy":2004,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/datapoint-baltimore-tidepoint-data-center/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","ukey":"1167|MD","uname":"Baltimore Gas & Electric Co","reportedUtility":"Baltimore Gas & Electric Co"},{"id":"e118436684bb","cid":"e118436684bb","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Baltimore","county":"Baltimore City","state":"MD","lat":39.300032,"lng":-76.610476,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Total Power Infrastructure: Site-wide 1.5 MW, with 0.6 MW designated for critical IT load, and built with N+1 redundancy and extended UPS and backup generation (72-hour fuel capacity); Cooling Infrastructure: N+1 redundancy with support for 10 kW+ per air-cooled cabinet.","uconf":"Medium","uquote":"Interconnection queue requests/projects by transmission owner.... Baltimore Gas and Electric","uscan":"https://www.interconnection.fyi/data-center/project/databank-4aa3aa63","ukey":"1167|MD","uname":"Baltimore Gas & Electric Co","rto":"PJM","nerc":"RFC","op":"DataBank","spon":"DigitalBridge","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/databank-4aa3aa63"],"rawUkey":"1167|MD","rawUname":"Baltimore Gas & Electric Co","reportedUtility":"Baltimore Gas & Electric Co"},{"id":"8faefed07fc9","cid":"8faefed07fc9","canon":1,"dups":1,"ftype":"data_center","name":"Expedient","city":"Owings Mills","county":"Baltimore","state":"MD","lat":39.443167,"lng":-76.616569,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Expedient's Owings Mills facility offers 8,800 square foot of raised floor space, redundant electric utility power feeds, 2 auto-cutover diesel generators, multiple cooling systems, advanced fire suppression, and a carrier-neutral telecommunications infrastructure.","pscan":"https://www.expedient.com/uploads/EXP__Sell_Sheet--DC__Owings_Mills.pdf","uconf":"High","uquote":"Baltimore Gas and Electric (BGE) BGE is committed to powering a cleaner, brighter future for its customers, providing reliable electricity services across Maryland including Owings Mills.","ukey":"1167|MD","uname":"Baltimore Gas & Electric Co","rto":"PJM","nerc":"RFC","op":"Expedient","spon":"AMP Capital","ay":2013,"oy":2013,"deal":"Acquisition of Expedient by AMP Capital in October 2019","dealScan":"https://www.prnewswire.com/news-releases/expedient-secures-new-investment-sponsor-amp-capital-to-fund-continued-growth-and-expansion-of-its-data-center-and-enterprise-cloud-platforms-300941607.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"expedient.com;prnewswire.com","lflag":"operational_null_capacity source_quality_reclassified utility_alias_corrected","srcUrls":["https://www.expedient.com/uploads/EXP__Sell_Sheet--DC__Owings_Mills.pdf","https://www.prnewswire.com/news-releases/expedient-secures-new-investment-sponsor-amp-capital-to-fund-continued-growth-and-expansion-of-its-data-center-and-enterprise-cloud-platforms-300941607.html"],"rawUkey":"1167|MD","rawUname":"Baltimore Gas & Electric Co","reportedUtility":"Baltimore Gas & Electric Co"},{"id":"7579c299825c","cid":"7579c299825c","canon":1,"dups":1,"ftype":"data_center","name":"General Electric","city":"Rockville","county":"Montgomery","state":"MD","lat":39.137381,"lng":-77.203063,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3a3ce5429f4c","cid":"3a3ce5429f4c","canon":1,"dups":1,"ftype":"data_center","name":"SIAA","city":"Beltsville","county":"Prince Georges","state":"MD","lat":38.829278,"lng":-76.848188,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Local Utility","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"d539faf3cfa0","cid":"d539faf3cfa0","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Baltimore","county":"Baltimore City","state":"MD","lat":39.300032,"lng":-76.610476,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"2N A-side and B-side power distribution design; Redundant 1,500kW generators with minimum 48 hours runtime; 100% uptime SLA.","uconf":"High","uquote":"The grid operator said it called on pre-emergency demand response for the Baltimore Gas and Electric, Dominion and Potomac Electric Power Co. areas on Monday to address local transmission constraints and to preserve the run-time of generators that will be needed for the hot weather and higher electricity demand expected...","uscan":"https://www.utilitydive.com/news/pjm-doe-emergency-order-curtail-data-centers/820571/","ukey":"1167|MD","uname":"Baltimore Gas & Electric Co","rto":"PJM","nerc":"RFC","op":"TierPoint","spon":"Argo Infrastructure Partners","tenant":"Maryland Department of Information Technology (DoIT)","oy":2005,"deal":"Acquisition of Baltimore Technology Park by Cequel Data Centers in June 2013","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"utilitydive.com","srcUrls":["https://www.utilitydive.com/news/pjm-doe-emergency-order-curtail-data-centers/820571/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"1167|MD","rawUname":"Baltimore Gas & Electric Co","reportedUtility":"Baltimore Gas & Electric Co"},{"id":"5b24a50f8d96","cid":"5b24a50f8d96","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Linthicum Heights","county":"Anne Arundel","state":"MD","lat":38.991617,"lng":-76.560894,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Experience unmatched reliability with a 2N A-side and B-side power distribution design, redundant 1,250kW generators with a minimum 48-hour runtime, and a 100% uptime SLA.","uconf":"Medium","uquote":"The grid operator said it called on pre-emergency demand response for the Baltimore Gas and Electric, Dominion and Potomac Electric Power Co. areas on Monday to address local transmission constraints and to preserve the run-time of generators that will be needed for the hot weather and higher electricity demand expected on Tuesday and Wednesday.","uscan":"https://www.utilitydive.com/news/pjm-doe-emergency-order-curtail-data-centers/820571/","ukey":"1167|MD","uname":"Baltimore Gas & Electric Co","rto":"PJM","nerc":"RFC","op":"TierPoint","spon":"Argo Infrastructure Partners","tenant":"Anne Arundel Medical Center","oy":2018,"tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"utilitydive.com","srcUrls":["https://www.utilitydive.com/news/pjm-doe-emergency-order-curtail-data-centers/820571/"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"1167|MD","rawUname":"Baltimore Gas & Electric Co","reportedUtility":"Baltimore Gas & Electric Co"},{"id":"b4de6c7c661c","cid":"b4de6c7c661c","canon":1,"dups":1,"ftype":"data_center","name":"University of Maryland Medical System","city":"Columbia","county":"Howard","state":"MD","lat":39.252264,"lng":-76.924406,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","op":"University of Maryland Medical System","spon":"University of Maryland Medical System","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"10075b6cd6fb","cid":"10075b6cd6fb","canon":1,"dups":1,"ftype":"data_center","name":"US Federal National Mortgage Association","city":"Urbana","county":"Frederick","state":"MD","lat":39.470177,"lng":-77.397636,"cprec":"distinct","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Urbana Corporate Center was designed and developed with redundant power supply using distribution feeds from two separate substations for increased uptime reliability, multiple fiber provider availability and ample water and sewer service to support scaled industrial requirements.","uconf":"High","uquote":"Commercial businesses in Frederick County are served by Potomac Edison-FirstEnergy with programs that support the EMPOWER Maryland Energy Efficiency Act.","ukey":"15263|MD","uname":"The Potomac Edison Company","rto":"PJM","nerc":"RFC","op":"US Federal National Mortgage Association","spon":"US Federal National Mortgage Association","tenant":"US Federal National Mortgage Association","ay":2004,"oy":2005,"deal":"Fannie Mae is divesting of Fannie Mae Tech Center by year end 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"57c896de8aea","cid":"57c896de8aea","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Beltsville","county":"Prince Georges","state":"MD","lat":38.829278,"lng":-76.848188,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","op":"Verizon Communications","spon":"Verizon Communications","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"864b8d25706c","cid":"864b8d25706c","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Baltimore","county":"Baltimore City","state":"MD","lat":39.300032,"lng":-76.610476,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Baltimore Gas and Electric (BGE)","rto":"PJM","nerc":"RFC","op":"Verizon","spon":"Verizon Communications","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected unlinked_source_text","ukey":"1167|MD","uname":"Baltimore Gas & Electric Co","reportedUtility":"Baltimore Gas & Electric Co","srcUrls":null,"srcDom":null},{"id":"f6d11a0ecee3","cid":"f6d11a0ecee3","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Annapolis Junction","county":"Howard","state":"MD","lat":39.252264,"lng":-76.924406,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","proc":"Tariff (utility)","pcp":"Baltimore Gas & Electric Company (BGE)","rto":"PJM","nerc":"RFC","op":"Microsoft","spon":"Microsoft","ay":2020,"contro":"Howard County Council considering a temporary pause on new data center projects due to concerns about energy, water, and noise.","controScan":"https://www.youtube.com/watch?v=zVkbGNAQnlc","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"online_before_announced shared_coordinate_precision_downgraded utility_alias_corrected","srcUrls":["https://www.youtube.com/watch?v=zVkbGNAQnlc"],"ukey":"1167|MD","uname":"Baltimore Gas & Electric Co","reportedUtility":"Baltimore Gas & Electric Co"},{"id":"32bfd54039c1","cid":"32bfd54039c1","canon":1,"dups":1,"ftype":"data_center","name":"Montgomery County Public Safety Headquarters","city":"Gaithersburg","county":"Montgomery","state":"MD","lat":39.137381,"lng":-77.203063,"cprec":"shared_centroid","status":"Proposed","mw":1,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"Collectively, the PSHQ microgrid system can generate 9.6 million kWh annually, providing an estimated 90 percent of the facility's annual electricity consumption and nearly infinite backup capacity with minor adjustments to operations. The PSHQ building receives power from Potomac Electric Power Company's (PEPCO) two 13.2kV feeders (one acting as an alternate supply) provided with medium and low voltage switchgears. Should the grid go down, the system can sustain itself in island mode.","proc":"Co-located generation","pcp":"Duke Energy Renewables / Schneider Electric","pdt":"25-year PPA","uconf":"High","uquote":"The support of the Maryland Energy Administration and the Potomac Electric Power Company (Pepco) was critical in helping support the project. The PSHQ building receives power from Potomac Electric Power Company's (PEPCO) two 13.2kV feeders (one acting as an alternate supply) provided with medium and low voltage switchgears.","ukey":"15270|MD","uname":"Potomac Electric Power Co","rto":"PJM","nerc":"RFC","op":"Duke Energy Renewables","spon":"Duke Energy Renewables","ay":2017,"oy":2018,"deal":"25-year Energy-as-a-Service Power Purchase Agreement (PPA) agreed in February 2017","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"58b760c6ff0e","cid":"58b760c6ff0e","canon":1,"dups":1,"ftype":"data_center","name":"Sansone Group","city":"Silver Spring","county":"Montgomery","state":"MD","lat":39.137381,"lng":-77.203063,"cprec":"shared_centroid","status":"Proposed","mw":100,"band":"100-250 MW","uquote":"Pepco, a subsidiary of Pepco Holdings, Inc., provides safe and reliable electric service to more than 725,000 residential and commercial customers in Washington, D.C., and Montgomery and Prince George's counties in Maryland.","uscan":"https://web.gsscc.org/Utilities,-Industrial,-and-Environmental-Services/PEPCO-193","ukey":"15270|MD","uname":"Potomac Electric Power Co","rto":"PJM","nerc":"RFC","op":"Priseda","spon":"Sansone Group","tenant":"Priseda","contro":"Montgomery County is discussing zoning text amendments (ZTA 26-01) for data centers due to concerns about noise, visual impacts, and environmental concerns, and residents have called for a data center moratorium.","deal":"Acquisition of a 214,000 SF Tier 4 data center for $29 million (or $28.8M) on August 1, 2025, with acquisition financing arranged by JLL Capital Markets through Poverni Sheikh Group (PSG).","dealScan":"https://mocoshow.com/2025/08/16/montgomery-county-data-center-sells-for-29-million/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"web.gsscc.org;mocoshow.com","srcUrls":["https://web.gsscc.org/Utilities,-Industrial,-and-Environmental-Services/PEPCO-193","https://mocoshow.com/2025/08/16/montgomery-county-data-center-sells-for-29-million/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"b3312a567f58","cid":"b3312a567f58","canon":1,"dups":1,"ftype":"data_center","name":"11:11 Systems","city":"Marlborough","county":"Middlesex","state":"MA","lat":42.481718,"lng":-71.394916,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Eversource","rto":"ISO-NE","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected unlinked_source_text","ukey":"54913|MA","uname":"Eversource / NSTAR Electric Company","reportedUtility":"Eversource / NSTAR Electric Company","srcUrls":null,"srcDom":null},{"id":"69599b0917a3","cid":"69599b0917a3","canon":1,"dups":1,"ftype":"data_center","name":"Accenture","city":"Andover","county":"Essex","state":"MA","lat":42.642708,"lng":-70.864909,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"ISO-NE","nerc":"NPCC","op":"Accenture","spon":"Accenture","deal":"Accenture acquired Navisite in January 2024 (terms undisclosed).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"edda98219641","cid":"edda98219641","canon":1,"dups":1,"ftype":"data_center","name":"Congruity 360","city":"Fall River","county":"Bristol","state":"MA","lat":41.748588,"lng":-71.088894,"cprec":"distinct","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"All mechanical and electrical systems are configured in a 2N design to provide 24/7 uninterrupted power and cooling. [...] Congruity360 Data Center - 2- 750kW Mitsubishi UPSs.","uconf":"High","uquote":"With Fall River CEA, National Grid continues to deliver electricity, repair poles and outages and manage all electricity billing.","ukey":"11804|MA","uname":"Massachusetts Electric Co","rto":"ISO-NE","nerc":"NPCC","op":"Congruity360","spon":"Rhino Capital","tenant":"Congruity360","ay":2017,"oy":2017,"deal":"Rhino Capital acquired the property in July 2020 via an 11-year sale-leaseback with Congruity360.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"cc64d89529f7","cid":"cc64d89529f7","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Somerville","county":"Middlesex","state":"MA","lat":42.481718,"lng":-71.394916,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power is delivered from utility at high voltage, achieving rate reduction and distribution efficiency. Diverse utility feeds. The Somerville Data Center is designed to provide N, N+1, and 2N redundancy to ensure 100% SLA-backed uptime. Generators, cooling towers, chiller plants, and in-room AHU are at N+1 redundancy.","pscan":"https://www.lightwavenetworks.com/datacenters/massachusetts/somerville/","uconf":"High","uquote":"Program prices apply only to the electricity supply portion of your Eversource electric bill. Delivery charges on your Eversource electric bill are not affected by the Somerville Community Choice Electricity program.","uname":"Eversource / NSTAR Electric Company","rto":"ISO-NE","nerc":"NPCC","op":"CoreSite","spon":"American Tower","ay":2007,"deal":"Acquisition of CoreSite Realty Corporation by American Tower Corporation for approximately $10.1 billion, completed on December 28, 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"lightwavenetworks.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","srcUrls":["https://www.lightwavenetworks.com/datacenters/massachusetts/somerville/"],"rawUkey":"19107|MA","rawUname":"ENGIE Resources LLC","reportedUtility":"Eversource / NSTAR Electric Company","ukey":"54913|MA"},{"id":"4bd1456c8ea4","cid":"4bd1456c8ea4","canon":1,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Needham","county":"Norfolk","state":"MA","lat":42.171738,"lng":-71.18111,"cprec":"distinct","status":"Operational","mw":13,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"This facility offers 30 MW of utility power capacity, supporting large-scale deployments that require reliable power delivery within the Boston market.","uconf":"High","uquote":"But Eversource remains Needham's electric utility and will continue to handle our billing, address power outages, and deliver our electricity with no interruption.","uscan":"https://www.masspowerchoice.com/needham","uname":"Eversource / NSTAR Electric Company","rto":"ISO-NE","nerc":"NPCC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2000,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"masspowerchoice.com","lflag":"online_before_announced nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","srcUrls":["https://www.masspowerchoice.com/needham"],"rawUkey":"59620|MA","rawUname":"Verde Energy USA","reportedUtility":"Eversource / NSTAR Electric Company","ukey":"54913|MA"},{"id":"2244054a25db","cid":"4bd1456c8ea4","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Needham","county":"Norfolk","state":"MA","lat":42.171738,"lng":-71.18111,"cprec":"distinct","status":"Operational","mw":13,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"This facility offers 30 MW of utility power capacity, supporting large-scale deployments that require reliable power delivery within the Boston market.","pscan":"https://inflect.com/building/128-1st-avenue-needham/digital-realty/datacenter/digital-realty-128-1st-avenue","uquote":"The new energy contracts with GDF SUEZ Energy Resources will deliver electrical power to Digital Realty Trust's datacenter properties at 128 First Avenue in Needham and 55 Middlesex Turnpike in Bedford at a significantly lower cost than through the previous provider.","rto":"ISO-NE","nerc":"NPCC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2009,"oy":2010,"deal":"Acquisition of three data center properties, including 128 First Avenue, Needham, MA, for approximately $375.0 million, announced December 2009 and expected to close by January 15, 2010.","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-pays-375m-for-new-england-sites","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"inflect.com;datacenterknowledge.com","srcUrls":["https://inflect.com/building/128-1st-avenue-needham/digital-realty/datacenter/digital-realty-128-1st-avenue","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-pays-375m-for-new-england-sites"],"lflag":"citation_artifact_removed"},{"id":"a174b16c9b91","cid":"a174b16c9b91","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Bedford","county":"Middlesex","state":"MA","lat":42.481718,"lng":-71.394916,"cprec":"shared_centroid","status":"Operational","mw":10,"pc":"Grid","pconf":"High","pquote":"10 MW Utility Power Capacity","pscan":"https://baxtel.com/data-center/camber-bedford-ma","uconf":"High","uquote":"Eversource continues to deliver your electricity, repair power outages, and maintain the electricity grid; they also send you one bill for the electricity you used.","uname":"Eversource / NSTAR Electric Company","rto":"ISO-NE","nerc":"NPCC","op":"Camber Development","spon":"Camber Development","ay":2000,"oy":2000,"deal":"Digital Realty acquired the data center as part of a three-building portfolio for $375 million in 2010. Digital Realty sold the property to Camber Development for $16 million in September 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/camber-bedford-ma"],"band":"10-25 MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"19107|MA","rawUname":"ENGIE Resources LLC","reportedUtility":"Eversource / NSTAR Electric Company","ukey":"54913|MA"},{"id":"0747595b0830","cid":"0747595b0830","canon":1,"dups":1,"ftype":"data_center","name":"Evocative Data Centers","city":"Somerville","county":"Middlesex","state":"MA","lat":42.481718,"lng":-71.394916,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"It has access to 6.0 MW of power.... 6.0 MW total power.... 6 MW. Total utility power. FEEDS. 2 X 13.8 kV. diverse power feeds supporting two 3MW 480V substation transformers.","pscan":"https://evocative.com/data-centers/boston-ma-data-center-bos1/","uquote":"Electric Utility Provider: nStar.","uscan":"https://baxtel.com/data-center/evocative-somerville-bos1","ukey":"54913|MA","uname":"Eversource / NSTAR Electric Company","rto":"ISO-NE","nerc":"NPCC","op":"Evocative Data Centers","spon":"Crestline Investors","ay":2009,"oy":2009,"deal":"Evocative acquired 9 data centers, including this one, from INAP on September 28, 2022, funded by an incremental equity investment led by Crestline Investors, Inc.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"evocative.com;baxtel.com","srcUrls":["https://evocative.com/data-centers/boston-ma-data-center-bos1/","https://baxtel.com/data-center/evocative-somerville-bos1"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"54913|MA","rawUname":"NSTAR Electric Company","reportedUtility":"Eversource / NSTAR Electric Company"},{"id":"d6ac496be9fd","cid":"d6ac496be9fd","canon":1,"dups":1,"ftype":"data_center","name":"Markley Group","city":"Boston","county":"Suffolk","state":"MA","lat":42.338551,"lng":-71.018253,"cprec":"distinct","status":"Operational","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The power Markley's clients use requires the use of battery backed Uninterruptable Power Systems. Each of these systems require the support of diesel emergency generators any time the power provided by the. Utility is unavailable. All systems have layers of redundancy.","pscan":"https://www.mass.gov/doc/boston-the-markley-group-january-2021/download","uconf":"High","uquote":"The company draws power from Eversource's Boston grid system, 76 percent of which is sourced from renewable power sources.","uname":"Eversource / NSTAR Electric Company","rto":"ISO-NE","nerc":"NPCC","op":"Markley Group","spon":"Markley Group","tenant":"Multiple tenants including financial, healthcare, academic, government, entertainment, science, technology firms, NTT, British Telecom, Harvard, Massachusetts Institute of Technology, Boston Internet Exchange","ay":1997,"oy":1999,"contro":"Proposed an operational and emissions restriction to maintain the facility below major source thresholds based on nitrogen oxide (NOx) emissions.","controScan":"https://www.mass.gov/doc/boston-the-markley-group-january-2021/download","deal":"$240 million financing package from a syndicate of lenders led by TD Bank for data center expansion (April 23, 2015)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"mass.gov","srcUrls":["https://www.mass.gov/doc/boston-the-markley-group-january-2021/download"],"rawUkey":"19107|MA","rawUname":"ENGIE Resources LLC","reportedUtility":"Eversource / NSTAR Electric Company","lflag":"nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","ukey":"54913|MA"},{"id":"0e5723978a60","cid":"0e5723978a60","canon":1,"dups":1,"ftype":"data_center","name":"Northeast Data","city":"Marlborough","county":"Middlesex","state":"MA","lat":42.481718,"lng":-71.394916,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"ISO-NE","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"073700b0c84e","cid":"073700b0c84e","canon":1,"dups":1,"ftype":"data_center","name":"Springfield Technology Park","city":"Springfield","county":"Hampden","state":"MA","lat":42.136198,"lng":-72.635648,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"The 480V commercial 3 phase 1200A power is provided to the data center. The facility delivers 30A DC power per cabinet through Elgin Warren 1200A DC plant. The facility uses 80 kW UPS systems for the backup power on the loss of utility power with immediate shift over of power load to 750 kW diesel generator.","pscan":"https://cloudandcolocation.com/datacenters/lightower-springfield-data-center/","uquote":"Western Massachusetts Electric Co. (WMECo) merged with Eversource Energy (formerly Northeast Utilities) in 2012 and now operates under the Eversource brand. The company delivers electricity and natural gas to over 4 million customers across Massachusetts, Connecticut, and New Hampshire.","uscan":"https://www.chooseenergy.com/utilities/western-massachusetts-electric-wmeco-ma/","uname":"Eversource / NSTAR Electric Company","rto":"ISO-NE","nerc":"NPCC","op":"Crown Castle","spon":"Crown Castle","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;chooseenergy.com","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","srcUrls":["https://cloudandcolocation.com/datacenters/lightower-springfield-data-center/","https://www.chooseenergy.com/utilities/western-massachusetts-electric-wmeco-ma/"],"rawUkey":"19107|MA","rawUname":"ENGIE Resources LLC","reportedUtility":"Eversource / NSTAR Electric Company","ukey":"54913|MA"},{"id":"ca130a0feeaa","cid":"ca130a0feeaa","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Charlestown","county":"Suffolk","state":"MA","lat":42.338551,"lng":-71.018253,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Uniquely connected to two power grids; Redundant 1.5 and 2.0 Megalwatt diesel generators, regularly tested, for added protection; A minimum of N+1 configuration at the Computer Room Air Conditioner (CRAC) level; UPS Systems configuration: DC100 is 2N and DC200 is N+1; Minimum of 24 hours of on-site fuel storage.","pscan":"https://bostoncolocation.com/charlestown-ma-colocation.html","uconf":"High","uquote":"Boston's main utility companies delivering electricity, gas and water are: Electricity: Eversource East.","uscan":"https://www.perchenergy.com/massachusetts/electricity-massachusetts/boston","uname":"Eversource / NSTAR Electric Company","rto":"ISO-NE","nerc":"NPCC","op":"TierPoint","spon":"Argo Infrastructure Partners","oy":1999,"deal":"Argo Infrastructure Partners increased its ownership stake to represent a majority interest in TierPoint, investing ~$700 million since 2020 (July 11, 2024)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"bostoncolocation.com;perchenergy.com","srcUrls":["https://bostoncolocation.com/charlestown-ma-colocation.html","https://www.perchenergy.com/massachusetts/electricity-massachusetts/boston"],"lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"19107|MA","rawUname":"ENGIE Resources LLC","reportedUtility":"Eversource / NSTAR Electric Company","ukey":"54913|MA"},{"id":"bcb25a7e37b1","cid":"bcb25a7e37b1","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Marlborough","county":"Worcester","state":"MA","lat":42.311693,"lng":-71.940282,"cprec":"distinct","status":"Operational","mw":14,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"2N A-side and B-side power distribution design; Seven redundant 1,000kW, (1) 2.25 Meg, (2) 2.5 Meg generators with minimum 48 hours runtime; 100% uptime SLA. Utility Service. Pad mounted (2)3,300kVA transformer for Utility 1; (2) 3,300kVA transformer for. Utility 2; (2) 2,000KVA transformer for Utility 3.","pscan":"https://web.tierpoint.com/hubfs/data-center/ma-boston-marlborough-data-center-spec-sheet.pdf","uconf":"High","uquote":"While there are a number of energy providers that sell energy services to the residents of the Marlborough area, the actual transmission of electricity is handled by National Grid.","ukey":"11804|MA","uname":"Massachusetts Electric Co","rto":"ISO-NE","nerc":"NPCC","op":"TierPoint","spon":"RedBird Capital Partners, The Stephens Group, Jordan/Zalaznick Advisers, Thompson Street Capital Partners","tenant":"Crown Castle","oy":2001,"deal":"JLL Brokers $33.2M Sale of Data Center in Marlborough, Massachusetts on July 25, 2019","dealScan":"https://rebusinessonline.com/photo-jll-brokers-33-2m-sale-of-data-center-in-marlborough-massachusetts/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"web.tierpoint.com;rebusinessonline.com","srcUrls":["https://web.tierpoint.com/hubfs/data-center/ma-boston-marlborough-data-center-spec-sheet.pdf","https://rebusinessonline.com/photo-jll-brokers-33-2m-sale-of-data-center-in-marlborough-massachusetts/"],"lflag":"source_quality_reclassified"},{"id":"9ecdc3c78125","cid":"9ecdc3c78125","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Waltham","county":"Middlesex","state":"MA","lat":42.481718,"lng":-71.394916,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","proc":"Co-located generation","pcp":"Unison Energy","pdt":"20-year Energy Services Agreement","rto":"ISO-NE","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b91879da763c","cid":"b91879da763c","canon":0,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Waltham","county":"Middlesex","state":"MA","lat":42.481718,"lng":-71.394916,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Co-located generation","pcp":"Unison Energy","pdt":"20-year Energy Services Agreement, 1.994 MW (electrical output)","rto":"ISO-NE","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"2e77f4fcd41c","cid":"2e77f4fcd41c","canon":1,"dups":1,"ftype":"data_center","name":"Bacall Group","city":"Troy","county":"Oakland","state":"MI","lat":42.660452,"lng":-83.38421,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"MISO","nerc":"RFC","op":"Bacall Group","spon":"Bacall Group","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3a04cbdb53dd","cid":"3a04cbdb53dd","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Auburn Hills","county":"Oakland","state":"MI","lat":42.660452,"lng":-83.38421,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"MISO","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"dcced11b8adf","cid":"dcced11b8adf","canon":1,"dups":1,"ftype":"data_center","name":"Fiat Chrysler Automobiles","city":"Auburn Hills","county":"Oakland","state":"MI","lat":42.660452,"lng":-83.38421,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"With its participation in MIGreenPower, Stellantis will be able to attribute 100 percent of its electricity use at 70 southeast Michigan sites to solar by 2026, which will reduce the company's carbon emissions in North America by 50 percent and across its manufacturing facilities by 30 percent.","pscan":"https://www.dbusiness.com/daily-news/stellantis-to-add-400mw-of-solar-projects-in-michigan-with-dte-energy/","uconf":"High","uquote":"Stellantis in Auburns Hills and DTE Energy in Detroit today announced a clean energy commitment to add 400 megawatts of new solar projects in Michigan — enough clean energy to power approximately 130,000 homes annually — through DTE's MIGreenPower voluntary renewable energy program.","uscan":"https://www.dbusiness.com/daily-news/stellantis-to-add-400mw-of-solar-projects-in-michigan-with-dte-energy/","ukey":"5109|MI","uname":"DTE Electric Company","rto":"MISO","nerc":"RFC","op":"Stellantis North America","spon":"Stellantis North America","tenant":"Stellantis North America","oy":1991,"contro":"UAW objected to Stellantis seeking to sell or close facilities, including the Auburn Hills headquarters campus.","deal":"Clean energy commitment with DTE Energy to add 400 megawatts of new solar projects in Michigan (December 12, 2022)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"dbusiness.com","srcUrls":["https://www.dbusiness.com/daily-news/stellantis-to-add-400mw-of-solar-projects-in-michigan-with-dte-energy/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"eeaeaa030410","cid":"eeaeaa030410","canon":1,"dups":1,"ftype":"data_center","name":"Switch","city":"Caledonia","county":"Kent","state":"MI","lat":43.032497,"lng":-85.547446,"cprec":"distinct","status":"Operational","mw":237,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Consumers Energy provides 100% renewable energy to Switch's Pyramid Campus, and now Consumers Energy is housing their mission-critical data in Switch's Tier 5® Platinum data center ecosystem, the most advanced, secure and highest-rated in the Eastern United States.","uconf":"High","uquote":"The Las Vegas data center provider... will start by procuring bundled energy and Renewable Energy Credits through the Green Generation program by Consumers Energy, the utility that serves the area in Michigan where the Switch data center will be built, Adam Kramer, the company's executive VP of strategy, said.","uscan":"https://www.datacenterknowledge.com/sustainability/switch-data-center-in-michigan-to-run-on-renewable-energy","ukey":"4254|MI","uname":"Consumers Energy Co","rto":"MISO","nerc":"RFC","op":"Switch","spon":"DigitalBridge and IFM Investors","tenant":"Consumers Energy","ay":2015,"oy":2017,"contro":"Controversy over tax breaks and job creation; Caledonia Township placed a six-month moratorium on data center proposals due to community concerns.","deal":"$5 billion financing deal closed in late 2024 for projects in four areas.","dealScan":"https://www.wgvunews.org/news/2024-10-31/switch-working-on-third-data-center-at-pyramid-campus-in-kent-county","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;wgvunews.org","srcUrls":["https://www.datacenterknowledge.com/sustainability/switch-data-center-in-michigan-to-run-on-renewable-energy","https://www.wgvunews.org/news/2024-10-31/switch-working-on-third-data-center-at-pyramid-campus-in-kent-county"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"4254|MI","rawUname":"Consumers Energy Co - (MI)","reportedUtility":"Consumers Energy Co"},{"id":"32c065db8638","cid":"32c065db8638","canon":1,"dups":1,"ftype":"data_center","name":"United Shore Financial Services","city":"Pontiac","county":"Oakland","state":"MI","lat":42.660452,"lng":-83.38421,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"MISO","nerc":"RFC","op":"United Wholesale Mortgage","spon":"United Wholesale Mortgage","tenant":"United Wholesale Mortgage","ay":2017,"oy":2018,"deal":"Headquarters renovation cost nearly $80 million (2017)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"725ebc87ab6d","cid":"725ebc87ab6d","canon":1,"dups":1,"ftype":"data_center","name":"Data Recognition Corporation","city":"Brooklyn Park","county":"Hennepin","state":"MN","lat":45.006121,"lng":-93.475228,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uquote":"Xcel Energy (Electricity): As the primary electric utility, Xcel manages the grid for most of the county.","uscan":"https://hennepincountypropertysearch.com/hennepin-county-utility-guide/","ukey":"13781|MN","uname":"Xcel Energy / Northern States Power Co - Minnesota","rto":"MISO","nerc":"MRO","op":"Data Recognition","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"hennepincountypropertysearch.com","srcUrls":["https://hennepincountypropertysearch.com/hennepin-county-utility-guide/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"13781|MN","rawUname":"Northern States Power Co - Minnesota","reportedUtility":"Xcel Energy / Northern States Power Co - Minnesota"},{"id":"e90ae1c50a24","cid":"e90ae1c50a24","canon":1,"dups":1,"ftype":"data_center","name":"Data Recognition Corporation","city":"Maple Grove","county":"Hennepin","state":"MN","lat":45.006121,"lng":-93.475228,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"MISO","nerc":"MRO","op":"Data Recognition","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"89941d239eaf","cid":"89941d239eaf","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Brooklyn Park","county":"Hennepin","state":"MN","lat":45.006121,"lng":-93.475228,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The site is served by dual 4.5MW feeds from the off-site Xcel Energy substation and offers connectivity to other DataBank data centers—including the MSP4 carrier hotel (downtown Minneapolis) and interconnect hubs at MSP2 (East Twin Cities).","pscan":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","uconf":"High","uquote":"The site is served by dual 4.5MW feeds from the off-site Xcel Energy substation and offers connectivity to other DataBank data centers—including the MSP4 carrier hotel (downtown Minneapolis) and interconnect hubs at MSP2 (East Twin Cities).","uscan":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","ukey":"13781|MN","uname":"Xcel Energy / Northern States Power Co - Minnesota","rto":"MISO","nerc":"MRO","op":"DataBank","spon":"DigitalBridge Holdings","ay":2020,"oy":2021,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/"],"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"13781|MN","rawUname":"Northern States Power Co - Minnesota","reportedUtility":"Xcel Energy / Northern States Power Co - Minnesota"},{"id":"669689356c97","cid":"669689356c97","canon":1,"dups":1,"ftype":"data_center","name":"Fairview Health Services","city":"Minneapolis","county":"Hennepin","state":"MN","lat":45.006121,"lng":-93.475228,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uconf":"Medium","uquote":"An energy-saving project at Fairview Lakes Medical Center helped the Fairview health system become one of the state's top five businesses to receive a 2012 Efficiency Partner award from Xcel Energy for outstanding efforts to save energy.","uscan":"https://chisagocountypress.com/news/2012/aug/02/fairview-lakes-medical-center-energy-saving-idea-h/","ukey":"13781|MN","uname":"Xcel Energy / Northern States Power Co - Minnesota","rto":"MISO","nerc":"MRO","op":"Fairview Health Services","spon":"Fairview Health Services","oy":2009,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"chisagocountypress.com","srcUrls":["https://chisagocountypress.com/news/2012/aug/02/fairview-lakes-medical-center-energy-saving-idea-h/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"13781|MN","rawUname":"Northern States Power Co - Minnesota","reportedUtility":"Xcel Energy / Northern States Power Co - Minnesota"},{"id":"58382f6f021e","cid":"58382f6f021e","canon":1,"dups":1,"ftype":"data_center","name":"FIS Global","city":"Hopkins","county":"Hennepin","state":"MN","lat":45.006121,"lng":-93.475228,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"FIS Global operates critical financial workloads powering global banking and capital markets, processing billions of transactions per second with zero tolerance for latency. In this highly competitive environment, infrastructure scalability must be seamless and resilient. The challenge wasn't just deploying more servers — it was deploying resilient & efficient power delivery capable of supporting rapid capacity growth without impacting PUE or floor utilization. [...] Keor MOD, with its modular design allows parallel expansion up to 600 kW without major redesign, addressing capacity constraints and supporting future growth seamlessly. Lower Energy & Cooling Costs. Up to 96.8% UPS efficiency reduces energy loss and heat output, cutting power consumption and lowering PUE — directly impacting OPEX savings.","uquote":"Low-Usage Affordability Credit: 866-975-7327 Available for customers of Xcel Energy who use less than 300kWh per month and meet income guidelines. Provides a 35% credit on energy they use. Those enrolled in the Energy Assistance Program (above) are automatically enrolled in this program.","ukey":"13781|MN","uname":"Xcel Energy / Northern States Power Co - Minnesota","rto":"MISO","nerc":"MRO","op":"FIS Global","tenant":"FIS Global","oy":1980,"deal":"Off-market acquisition of the FIS Global Data Center in Minneapolis, Minnesota, assisted by Five 9s Digital. Date and amount not specified.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text shared_coordinate_precision_downgraded utility_alias_corrected legacy_facility_year_review","rawUkey":"13781|MN","rawUname":"Northern States Power Co - Minnesota","reportedUtility":"Xcel Energy / Northern States Power Co - Minnesota","srcUrls":null,"srcDom":null},{"id":"a282b6134af3","cid":"a282b6134af3","canon":1,"dups":1,"ftype":"data_center","name":"HealthPartners","city":"Mendota Heights","county":"Dakota","state":"MN","lat":44.670893,"lng":-93.062481,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Redundant electrical and HVAC systems were designed to provide an N+1 environment. Additionally, two emergency generators serve the facility.","pscan":"https://www.pegasusgrp.net/enterprise-data-center-1---healthpartners.html","uconf":"High","uquote":"Electric and Gas Service - Xcel Energy, Customer Service Phone: 800-895-4999.","ukey":"13781|MN","uname":"Xcel Energy / Northern States Power Co - Minnesota","rto":"MISO","nerc":"MRO","op":"HealthPartners","spon":"HealthPartners","tenant":"HealthPartners","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"pegasusgrp.net","lflag":"operational_null_capacity source_quality_reclassified utility_alias_corrected","srcUrls":["https://www.pegasusgrp.net/enterprise-data-center-1---healthpartners.html"],"rawUkey":"13781|MN","rawUname":"Northern States Power Co - Minnesota","reportedUtility":"Xcel Energy / Northern States Power Co - Minnesota"},{"id":"2e81b8031917","cid":"2e81b8031917","canon":1,"dups":1,"ftype":"data_center","name":"T5 Data Centers","city":"Minneapolis","county":"Hennepin","state":"MN","lat":45.006121,"lng":-93.475228,"cprec":"shared_centroid","status":"Operational","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Rest assured, we also provide redundant power and water service through independent utility sources and substations.","rto":"MISO","nerc":"MRO","op":"T5 Data Centers","spon":"Cloud Capital and Arcapita","tenant":"G42, BomberJacket Networks, Cogent Communications","ay":2019,"deal":"Acquisition by Cloud Capital and Arcapita in 2026","dealScan":"https://baxtel.com/data-center/cloud-capital-minneapolis-cbd","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://baxtel.com/data-center/cloud-capital-minneapolis-cbd"]},{"id":"1db17e6f10b7","cid":"1db17e6f10b7","canon":1,"dups":1,"ftype":"data_center","name":"Target","city":"Elk River","county":"Sherburne","state":"MN","lat":45.453176,"lng":-93.76913,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Elk River Municipal Utilities (ERMU) provides electric and water services to Elk River and parts of Otsego, Dayton, and Big Lake Township. We are public power and water, owned by those we serve and governed by members of our community. As a consumer-owned public power utility, we provide reliable, competitively priced electric service.","uconf":"High","uquote":"Elk River Municipal Utilities (ERMU) is located in the City of Elk River, the county seat of Sherburne County. In addition to serving electric customers in Elk River, ERMU also serves customers in Big Lake Township, Dayton, and Otsego.","uscan":"https://www.mmpa.org/communities/elk-river/","ukey":"20737|MN","uname":"Willmar Municipal Utilities","rto":"MISO","nerc":"MRO","op":"Target","spon":"Target","tenant":"Target","oy":2007,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mmpa.org","srcUrls":["https://www.mmpa.org/communities/elk-river/"],"lflag":"source_quality_reclassified"},{"id":"8414607306b7","cid":"8414607306b7","canon":1,"dups":1,"ftype":"data_center","name":"United Health Group","city":"Elk River","county":"Sherburne","state":"MN","lat":45.453176,"lng":-93.76913,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Elk River is an excellent location for data centers for many reasons, one being the city's 99.94% electrical reliability.","pscan":"https://www.econdev.elkrivermn.gov/why-elk-river/target-industries/","uconf":"High","uquote":"Elk River Municipal Utilities (ERMU) receives its wholesale electric power supply from MMPA and is one of twelve municipal members of the Agency.","ukey":"20737|MN","uname":"Willmar Municipal Utilities","rto":"MISO","nerc":"MRO","op":"United Health Group","spon":"CloudHQ","tenant":"United Health Group","ay":2006,"oy":2008,"deal":"Sale of data center to CloudHQ for $90 million in January 2023","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"econdev.elkrivermn.gov","lflag":"operational_null_capacity","srcUrls":["https://www.econdev.elkrivermn.gov/why-elk-river/target-industries/"]},{"id":"0beb9300a252","cid":"0beb9300a252","canon":1,"dups":1,"ftype":"data_center","name":"University of Minnesota - Minnesota Supercomputing Institute","city":"Minneapolis","county":"Hennepin","state":"MN","lat":45.006121,"lng":-93.475228,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Grid","pconf":"High","pquote":"Its main data center is located in the basement of Walter Library (room B40) on the University Twin Cities campus. It has an IT raised floor surface of approximately 3700 sq. ft. and over 1 MW of available power. The data center is connected to the 100 Gbps campus research network via multiple 40 GbE connections. The University maintains 100 Gbps connections to our regional optical network, which in turn is connected to Internet2 and beyond.","pscan":"https://rc.umn.edu/sites/rc.umn.edu/files/2020-06/MSI_Facilities_Statement_SF.pdf","uquote":"Grid Operator: Northern States Power Company.","uscan":"https://www.interconnection.fyi/data-center/project/university-of-minnesota-minnesota-supercomputing-i-16d34d1f","ukey":"13781|MN","uname":"Xcel Energy / Northern States Power Co - Minnesota","rto":"MISO","nerc":"MRO","op":"University of Minnesota - Minnesota Supercomputing Institute","spon":"Minnesota Supercomputer Center","ay":1995,"oy":1995,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rc.umn.edu;interconnection.fyi","srcUrls":["https://rc.umn.edu/sites/rc.umn.edu/files/2020-06/MSI_Facilities_Statement_SF.pdf","https://www.interconnection.fyi/data-center/project/university-of-minnesota-minnesota-supercomputing-i-16d34d1f"],"band":"< 10 MW","lflag":"shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"13781|MN","rawUname":"Northern States Power Co - Minnesota","reportedUtility":"Xcel Energy / Northern States Power Co - Minnesota"},{"id":"f08c610e56fa","cid":"f08c610e56fa","canon":1,"dups":1,"ftype":"data_center","name":"Target","city":"Brooklyn Park","county":"Hennepin","state":"MN","lat":45.006121,"lng":-93.475228,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Xcel Energy","rto":"MISO","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded utility_alias_corrected unlinked_source_text","ukey":"13781|MN","uname":"Xcel Energy / Northern States Power Co - Minnesota","reportedUtility":"Xcel Energy / Northern States Power Co - Minnesota","srcUrls":null,"srcDom":null},{"id":"a94482165a64","cid":"a94482165a64","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Madison Mega Site","county":"Madison","state":"MS","lat":32.63437,"lng":-90.03416,"cprec":"distinct","status":"Operational","mw":431,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The power for the data centers will be supplied by Entergy Corporation (NYSE:ETR) (New Orleans, Louisiana), which has nearby solar farms and plans on expanding its presence in the region. Amazon has made its own investments in Mississippi's power infrastructure, including power purchase agreements (PPAs) with five solar farms and a windfarm.","pscan":"https://www.industrialinfo.com/news/article/mississippi-incentives-package-paves-way-for-two-amazon-data-centers--327803","uconf":"High","uquote":"Electrical Supplier. Entergy.","uscan":"https://mississippi.org/mississippi-mega-sites/madison-mega-site-2/","ukey":"12685|MS","uname":"Entergy Mississippi LLC","rto":"MISO","nerc":"SERC","op":"Amazon","spon":"Amazon Web Services","tenant":"Amazon","ay":2024,"oy":2025,"contro":"Local residents have raised concerns about dust, noise, pollution, and increased traffic due to construction.","controScan":"https://www.mississippifreepress.org/amazons-canton-data-center-promises-prosperity-for-neighbors-its-bringing-dust-noise-and-pollution-fears/","deal":"$10 billion investment announced in January 2024 for two data center campuses in Madison County.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"industrialinfo.com;mississippi.org;mississippifreepress.org","srcUrls":["https://www.industrialinfo.com/news/article/mississippi-incentives-package-paves-way-for-two-amazon-data-centers--327803","https://mississippi.org/mississippi-mega-sites/madison-mega-site-2/","https://www.mississippifreepress.org/amazons-canton-data-center-promises-prosperity-for-neighbors-its-bringing-dust-noise-and-pollution-fears/"],"lflag":"source_quality_reclassified"},{"id":"9bf7b31327b5","cid":"9bf7b31327b5","canon":1,"dups":1,"ftype":"data_center","name":"US National Aeronautics and Space Administration","city":"Kiln","county":"Hancock","state":"MS","lat":30.391641,"lng":-89.482791,"cprec":"distinct","status":"Operational","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Commercial power capacity is 32MVA, backed up by 21MW of diesel generator capacity and numerous Uninterruptible Power Supplies.","pscan":"https://www.nasa.gov/centers-and-facilities/nssc/nccips/","uquote":"This is a task order of the GSA Areawide Contract 47PA0425D0027 with Southern Company Services, Inc. as a designated agency for Mississippi Power Company (MPC) for electric services.","uscan":"https://sam.gov/workspace/contract/opp/0dc150c6b1c84c4d948bdeeb05beb332/view","ukey":"12686|MS","uname":"Mississippi Power Co","rto":"MISO","nerc":"SERC","op":"NASA Shared Services Center (NSSC)","spon":"U.S. Government / NASA","tenant":"Federal Agencies","ay":2005,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"nasa.gov;sam.gov","lflag":"online_before_announced","srcUrls":["https://www.nasa.gov/centers-and-facilities/nssc/nccips/","https://sam.gov/workspace/contract/opp/0dc150c6b1c84c4d948bdeeb05beb332/view"]},{"id":"0186bbb1a6ff","cid":"0186bbb1a6ff","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Ridgeland","county":"Hinds","state":"MS","lat":32.267788,"lng":-90.466017,"cprec":"distinct","status":"Construction","pc":"Grid","pconf":"Medium","pquote":"Amazon is covering 100% of the costs associated with its new data center campuses, including all expenses for new energy infrastructure and upgrades. That investment directly enables Entergy Mississippi's Superpower Mississippi initiative. Additionally, Entergy Mississippi's commitment to meeting long-term power requirements was a key factor in the company's decision to continue its expansion. Amazon has also invested in five renewable energy projects delivering 616 megawatts of carbon-free capacity through solar and wind farms, including Delta Wind, Mississippi's first utility-scale wind farm.","uconf":"High","uquote":"The project is also supported by long-term power infrastructure commitments from Entergy Mississippi. Additionally, Entergy Mississippi's commitment to meeting long-term power requirements was a key factor in the company's decision to continue its expansion.","ukey":"12685|MS","uname":"Entergy Mississippi LLC","rto":"MISO","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2024,"oy":2027,"contro":"Concerns raised regarding large power consumption and water usage; regulatory adjustments for generators.","controScan":"https://www.supertalk.fm/this-is-what-economic-development-looks-like-amazon-to-invest-12b-more-in-mississippi-data-centers/","deal":"Initial $10 billion investment in Madison County, followed by an additional $11 billion for Madison County (total $25 billion statewide).","dealScan":"https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"governorreeves.ms.gov;supertalk.fm","srcUrls":["https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/","https://www.supertalk.fm/this-is-what-economic-development-looks-like-amazon-to-invest-12b-more-in-mississippi-data-centers/"]},{"id":"e4d0d0a744fa","cid":"e4d0d0a744fa","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Canton","county":"Madison","state":"MS","lat":32.63437,"lng":-90.03416,"cprec":"distinct","status":"Proposed","mw":650,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Amazon has worked with Entergy Mississippi to ensure we pay 100% of the costs associated with our new data center campuses, covering all expenses for new energy infrastructure and upgrades that also strengthen overall grid reliability for all customers.","pscan":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","uquote":"Amazon has worked with Entergy Mississippi to ensure we pay 100% of the costs associated with our new data center campuses, covering all expenses for new energy infrastructure and upgrades that also strengthen overall grid reliability for all customers.","uscan":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","ukey":"12685|MS","uname":"Entergy Mississippi LLC","rto":"MISO","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","ay":2024,"oy":2027,"contro":"Canton residents have raised concerns about dust, noise, pollution, and falling property values due to the data center's construction and operation. There are also concerns about increased utility rates and water consumption.","controScan":"https://www.mississippifreepress.org/amazons-canton-data-center-promises-prosperity-for-neighbors-its-bringing-dust-noise-and-pollution-fears/","deal":"Initial $10 billion investment in Madison County announced in January 2024, later expanded by an additional $11 billion in Madison County as part of a total $25 billion statewide investment. Amazon is also funding $300 million in grid improvements with Entergy Mississippi.","dealScan":"https://magnoliatribune.com/2024/01/25/mississippi-lawmakers-back-10-billion-amazon-project/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"aboutamazon.com;magnoliatribune.com;mississippifreepress.org","srcUrls":["https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","https://magnoliatribune.com/2024/01/25/mississippi-lawmakers-back-10-billion-amazon-project/","https://www.mississippifreepress.org/amazons-canton-data-center-promises-prosperity-for-neighbors-its-bringing-dust-noise-and-pollution-fears/"]},{"id":"85e0aca5c7f1","cid":"85e0aca5c7f1","canon":1,"dups":1,"ftype":"data_center","name":"Cogent","city":"Kansas City","county":"Jackson","state":"MO","lat":39.005364,"lng":-94.343211,"cprec":"distinct","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power. Multiple options, UPS, Backup Generator. The site's power infrastructure is supported by multiple UPS units ranging from 200kVA to 500kVA, East Penn battery strings, four 1200amp ATS units, and backup generator systems.","uconf":"High","uquote":"The Missouri Public Service Commission regulates investor-owned electric, natural gas, steam, water and sewer utilities in Missouri.... Kansas City. Belton (West / Along Benton Dr), Belton (West / Along Benton Dr), Evergy Missouri Metro, Spire Missouri, Inc. Kansas City. In neighboring SPP, at least 230,000 outages were documented by the utility Evergy, which serves customers in Kansas and Missouri.","uscan":"https://sustainableferc.org/miso-and-spp-can-benefit-from-a-more-connected-grid/","ukey":"10000|MO","uname":"Evergy Metro","rto":"MISO","nerc":"SERC","op":"Cogent Communications","spon":"Cogent Communications","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"sustainableferc.org","srcUrls":["https://sustainableferc.org/miso-and-spp-can-benefit-from-a-more-connected-grid/"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"0498fddef88d","cid":"0498fddef88d","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"St. Louis","county":"St. Louis city","state":"MO","lat":38.635699,"lng":-90.244582,"cprec":"shared_centroid","status":"Operational","mw":16,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Powered from Ameren UE's underground power grid with multiple feeds and back-up generation on-site, 210 N. Tucker is a carrier-neutral facility serviced by multiple fiber providers that offers the best array of connectivity options in St. Louis.","pscan":"https://www.prnewswire.com/news-releases/digital-realty-completes-major-improvements-to-210-n-tucker-data-center-property-in-st-louis-announces-further-expansion-of-colocation-offering-149627475.html","uconf":"High","uquote":"Powered from Ameren UE's underground power grid with multiple feeds and back-up generation on-site, 210 N. Tucker is a carrier-neutral facility serviced by multiple fiber providers that offers the best array of connectivity options in St. Louis.","uscan":"https://www.prnewswire.com/news-releases/digital-realty-completes-major-improvements-to-210-n-tucker-data-center-property-in-st-louis-announces-further-expansion-of-colocation-offering-149627475.html","rto":"MISO","nerc":"SERC","ay":2007,"oy":2012,"deal":"Digital Realty acquired the St. Louis properties for $53 million in 2007. Digital Realty sold the St. Louis properties (210 N. Tucker and 900 Walnut) to Netrality Properties in July 2016 as part of a four-building portfolio sale for $114 million.","dealScan":"https://www.datacenterfrontier.com/site-selection/article/11431155/netrality-acquires-st-louis-properties-from-digital-realty","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"prnewswire.com;datacenterfrontier.com","srcUrls":["https://www.prnewswire.com/news-releases/digital-realty-completes-major-improvements-to-210-n-tucker-data-center-property-in-st-louis-announces-further-expansion-of-colocation-offering-149627475.html","https://www.datacenterfrontier.com/site-selection/article/11431155/netrality-acquires-st-louis-properties-from-digital-realty"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"a29477359fbc","cid":"a29477359fbc","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"St. Louis","county":"St. Louis city","state":"MO","lat":38.635699,"lng":-90.244582,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"MISO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"02d66f7f2f8f","cid":"02d66f7f2f8f","canon":1,"dups":2,"ftype":"data_center","name":"H5 Data Centers","city":"St. Louis","county":"St. Louis city","state":"MO","lat":38.635699,"lng":-90.244582,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"N+1 UPS power; 1.5 MW generator backup power; 48-hour diesel runtime.","pscan":"https://h5datacenters.com/saint-louis-data-center.html","uconf":"High","uquote":"Multiple large data centers are planning to locate in the region, according to Ameren Missouri CEO Marty Lyons, who said some companies have already signed binding agreements.","uscan":"https://www.stlamerican.com/news/local-news/as-data-centers-loom-st-louis-confronts-energy-equity-questions/","ukey":"12698|MO","uname":"Evergy Missouri West","rto":"MISO","nerc":"SERC","op":"H5 Data Centers","spon":"H5 Data Centers","ay":2021,"deal":"Acquisition of seven data centers from vXchnge by H5 Data Centers, announced January 31, 2021.","dealScan":"https://www.bankstreet.com/app/uploads/2025/10/2022-01-31_h5_data_centers_vxchnge_transaction_press_release.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"h5datacenters.com;stlamerican.com;bankstreet.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://h5datacenters.com/saint-louis-data-center.html","https://www.stlamerican.com/news/local-news/as-data-centers-loom-st-louis-confronts-energy-equity-questions/","https://www.bankstreet.com/app/uploads/2025/10/2022-01-31_h5_data_centers_vxchnge_transaction_press_release.pdf"]},{"id":"1523fcb1f87d","cid":"02d66f7f2f8f","canon":0,"dups":2,"ftype":"data_center","name":"H5 Data Centers","city":"St. Louis","county":"St. Louis city","state":"MO","lat":38.635699,"lng":-90.244582,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"N+1 UPS power; 1.5 MW generator backup power; 48-hour diesel runtime.","pscan":"https://h5datacenters.com/saint-louis-data-center.html","uconf":"High","uquote":"Ameren Missouri is the primary electric utility provider in St. Louis","uscan":"https://utilitiesformyhome.com/utilities/missouri/st-louis/","ukey":"12698|MO","uname":"Evergy Missouri West","rto":"MISO","nerc":"SERC","op":"H5 Data Centers","spon":"H5 Data Centers","deal":"Acquisition of seven vXchnge data centers, including St. Louis, by H5 Data Centers on January 31, 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"h5datacenters.com;utilitiesformyhome.com","srcUrls":["https://h5datacenters.com/saint-louis-data-center.html","https://utilitiesformyhome.com/utilities/missouri/st-louis/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"59fff1bbec6a","cid":"59fff1bbec6a","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Kansas City","county":"Nodaway","state":"MO","lat":40.361136,"lng":-94.883146,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Evergy","rto":"MISO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"1f0532cd0a27","cid":"1f0532cd0a27","canon":1,"dups":1,"ftype":"data_center","name":"Kyndryl","city":"Hazelwood","county":"St. Louis","state":"MO","lat":38.640688,"lng":-90.446073,"cprec":"distinct","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Ameren Missouri.","uquote":"Grid Operator: Ameren Missouri. Ameren provides electric service for both residential and commercial customers in the greater St. Louis area.","ukey":"12698|MO","uname":"Evergy Missouri West","rto":"MISO","nerc":"SERC","op":"Kyndryl","spon":"Kyndryl -Hazelwood","ay":2001,"oy":2002,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c4a58a9eb3d3","cid":"c4a58a9eb3d3","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"St. Louis","county":"St. Louis city","state":"MO","lat":38.635699,"lng":-90.244582,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"It features a power system with diverse power feeds and redundant backup systems to ensure continuous operation. Power. AC and DC Power. Generator, UPS, and battery backup. Standby Power: Facility has generators (N, 2N, N+1).","pscan":"https://inflect.com/building/900-walnut-street-st-louis-mo/lumen/datacenter/level-3-st-louis-2","uconf":"High","uquote":"Ameren Missouri provides electric service to approximately 1.3 million customers across central and eastern Missouri, including the greater St. Louis area. The City of St. Louis Public Utilities Department lists \"Electric, Ameren [www.ameren.com]\" as a local utility provider.","uscan":"https://www.stlouis-mo.gov/government/departments/public-utilities/index.cfm","ukey":"12698|MO","uname":"Evergy Missouri West","rto":"MISO","nerc":"SERC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"inflect.com;stlouis-mo.gov","srcUrls":["https://inflect.com/building/900-walnut-street-st-louis-mo/lumen/datacenter/level-3-st-louis-2","https://www.stlouis-mo.gov/government/departments/public-utilities/index.cfm"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"d1387772356e","cid":"d1387772356e","canon":1,"dups":1,"ftype":"data_center","name":"MasterCard","city":"Kansas City","county":"Platte","state":"MO","lat":39.37869,"lng":-94.761477,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Kansas City Power and Light.... solar panel arrays... mounted at our Kansas City facility and the Purchase office. They're designed to reduce demand peaks during extreme weather events and maintain critical operations","pscan":"https://www.interconnection.fyi/data-center/project/mastercard-e4364702","uquote":"Grid Operator. Kansas City Power and Light.","uscan":"https://www.interconnection.fyi/data-center/project/mastercard-e4364702","ukey":"10000|MO","uname":"Evergy Metro","rto":"MISO","nerc":"SERC","op":"MasterCard","spon":"Cushman Wakefield Mastercard Kansas City Data Center","tenant":"MasterCard","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/mastercard-e4364702"],"lflag":"citation_artifact_removed"},{"id":"9865e009b536","cid":"9865e009b536","canon":1,"dups":1,"ftype":"data_center","name":"Oracle","city":"Kansas City","county":"Clay","state":"MO","lat":39.315551,"lng":-94.421502,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Evergy","rto":"MISO","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"ab4a11a548a3","cid":"ab4a11a548a3","canon":0,"dups":1,"ftype":"data_center","name":"Oracle","city":"Kansas City","county":"Clay","state":"MO","lat":39.315551,"lng":-94.421502,"cprec":"distinct","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Diverse power feeds from diverse substations (Avondale and NKC). Dedicated substation breakers. Dedicated power lines direct to NKC substation. Evergy Ttier 1 customer (same restore priority as Hospitals and 911).","pscan":"https://www.oclusters.com/data-center/","uconf":"High","uquote":"Evergy Ttier 1 customer (same restore priority as Hospitals and 911).","uscan":"https://www.oclusters.com/data-center/","ukey":"10000|MO","uname":"Evergy Metro","rto":"MISO","nerc":"SERC","op":"Oracle","spon":"Oracle","tenant":"Oracle","oy":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"oclusters.com","srcUrls":["https://www.oclusters.com/data-center/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"e7fe2f416d9c","cid":"e7fe2f416d9c","canon":0,"dups":1,"ftype":"data_center","name":"Oracle","city":"Kansas City","county":"Jackson","state":"MO","lat":39.005364,"lng":-94.343211,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power. Diverse power feeds from diverse substations (Avondale and NKC). Dedicated substation breakers. Dedicated power lines direct to NKC substation. Evergy Ttier 1 customer (same restore priority as Hospitals and 911).","pscan":"https://www.oclusters.com/data-center/","uconf":"High","uquote":"Evergy Ttier 1 customer (same restore priority as Hospitals and 911).","uscan":"https://www.oclusters.com/data-center/","ukey":"10000|MO","uname":"Evergy Metro","rto":"MISO","nerc":"SERC","op":"Oracle","spon":"Oracle","tenant":"Oracle","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"oclusters.com","srcUrls":["https://www.oclusters.com/data-center/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"59bf24b9e982","cid":"59bf24b9e982","canon":1,"dups":1,"ftype":"data_center","name":"Walmart","city":"Pineville","county":"McDonald","state":"MO","lat":36.627955,"lng":-94.343716,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"according to a 2004 Missouri Department of Natural Resources permit the site maintains eight generators to supply power to their systems during power outages.","pscan":"https://www.youtube.com/watch?v=SpiPjzhD0FU","uconf":"High","uquote":"Pineville, Missouri: Empire District Electric: 100.00%.","ukey":"5860|MO","uname":"Empire District Electric Co","rto":"MISO","nerc":"SERC","op":"Walmart","spon":"Walmart","tenant":"Walmart","ay":2004,"oy":2004,"tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=SpiPjzhD0FU"]},{"id":"07d81ea79d50","cid":"07d81ea79d50","canon":1,"dups":1,"ftype":"data_center","name":"Edged Energy","city":"Kansas City","county":"Clay","state":"MO","lat":39.315551,"lng":-94.421502,"cprec":"distinct","status":"Proposed","mw":26,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Unlike traditional data centers that consume massive amounts of water for cooling and strain the local energy grid, Edged Kansas City uses zero water and 74% less energy overhead than conventional facilities.","uconf":"High","uquote":"Located at 3420 N. Arlington Ave., this data center is an 18MW waterless-cooled development by Edged Energy, in partnership with Evergy, the local utility provider.","ukey":"10000|MO","uname":"Evergy Metro","rto":"MISO","nerc":"SERC","op":"Edged Energy","spon":"Endeavour","oy":2024,"deal":"Initial investment of $143 million (December 12, 2024)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"24d31cd601f9","cid":"24d31cd601f9","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Kansas City","county":"Platte","state":"MO","lat":39.37869,"lng":-94.761477,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The facility is planned to have net-zero carbon emissions and will be 100 percent powered by renewable energy—provided by Evergy.","uconf":"High","uquote":"The facility is planned to have net-zero carbon emissions and will be 100 percent powered by renewable energy—provided by Evergy.","ukey":"10000|MO","uname":"Evergy Metro","rto":"MISO","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2022,"oy":2024,"contro":"Reported non-compliance with Kansas City's diversity rules for minority-owned and woman-owned businesses during construction.","deal":"Investment of over $1 billion in the state of Missouri.","dealScan":"https://about.fb.com/news/2025/08/metas-kansas-city-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"about.fb.com","srcUrls":["https://about.fb.com/news/2025/08/metas-kansas-city-data-center/"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"7425fea63db2","cid":"7425fea63db2","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Crusoe Energy","county":"Richland","state":"MT","lat":47.785633,"lng":-104.563408,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The engines would be used to generate electricity through the combustion of gas that would otherwise be flared from an existing oil and gas facility.","proc":"Co-located generation","uconf":"Medium","uquote":"Montana-Dakota Utilities serves eastern Montana (think Miles City, Glendive, Sidney) as part of MDU Resources.","rto":"MISO","nerc":"WECC","op":"NYDIG","spon":"NYDIG","tenant":"NYDIG","ay":2020,"deal":"Acquisition of Crusoe's Bitcoin mining unit and Digital Flare Mitigation business by NYDIG on March 25, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"c3a18cbe0f16","cid":"15fb61ce7984","canon":0,"dups":5,"ftype":"crypto_hpc","name":"Crusoe Energy","county":"Richland","state":"MT","lat":47.785633,"lng":-104.563408,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The engines would be used to generate electricity through the combustion of gas that would otherwise be flared from an existing oil and gas facility.","proc":"Co-located generation","pcp":"Oil and gas facility (unnamed in source)","rto":"MISO","nerc":"WECC","op":"Crusoe Energy Systems","spon":"Crusoe Energy Systems","tenant":"Crusoe Energy Systems (for energy-intensive computing/bitcoin mining)","ay":2020,"oy":2020,"deal":"Crusoe's Digital Flare Mitigation business, including its bitcoin mining operations, was acquired by NYDIG in March 2025.","dealScan":"https://www.crusoe.ai/resources/newsroom/nydig-to-acquire-crusoes-bitcoin-mining-operation-crusoe-to-scale-vertically","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"crusoe.ai","srcUrls":["https://www.crusoe.ai/resources/newsroom/nydig-to-acquire-crusoes-bitcoin-mining-operation-crusoe-to-scale-vertically"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"0cdb40a33ac5","cid":"15fb61ce7984","canon":0,"dups":5,"ftype":"crypto_hpc","name":"Crusoe Energy","county":"Richland","state":"MT","lat":47.785633,"lng":-104.563408,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The engines would be used to generate electricity through the combustion of gas that would otherwise be flared from an existing oil and gas facility.","pscan":"https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5253-00.pdf","proc":"Co-located generation","rto":"MISO","nerc":"WECC","op":"Crusoe Energy Systems","spon":"Founders Fund, Bain Capital Ventures, Valor Equity Partners, Winklevoss Capital","tenant":"Crusoe Energy Systems","oy":2020,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"deq.mt.gov","srcUrls":["https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5253-00.pdf"],"lflag":"coordinate_cluster_reclassified"},{"id":"15fb61ce7984","cid":"15fb61ce7984","canon":0,"dups":5,"ftype":"crypto_hpc","name":"Crusoe Energy","county":"Richland","state":"MT","lat":47.785633,"lng":-104.563408,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The engines would be used to generate electricity through the combustion of gas that would otherwise be flared from an existing oil and gas facility.","pscan":"https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5253-00.pdf","proc":"Co-located generation","pcp":"existing oil and gas facility","rto":"MISO","nerc":"WECC","op":"Crusoe Energy Systems","ay":2020,"oy":2020,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"deq.mt.gov","srcUrls":["https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5253-00.pdf"],"lflag":"coordinate_cluster_reclassified,merged_duplicate"},{"id":"6543472aca47","cid":"15fb61ce7984","canon":0,"dups":5,"ftype":"crypto_hpc","name":"Crusoe Energy","county":"Richland","state":"MT","lat":47.785633,"lng":-104.563408,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The engines would be used to generate electricity through the combustion of gas that would otherwise be flared from an existing oil and gas facility.","pscan":"https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5253-00.pdf","rto":"MISO","nerc":"WECC","op":"Crusoe Energy Systems","spon":"Founders Fund, Bain Capital Ventures, Valor Equity Partners","tenant":"Crusoe Energy Systems","ay":2020,"deal":"Crusoe Energy Systems raised US$150 million in equity capital from venture capital funds (undated, but prior to 2018 operations). Crusoe Technologies LLC acquired the operating assets of Great American Mining on October 12, 2022, adding operational capacity in the Bakken region.","dealScan":"https://www.crusoe.ai/resources/newsroom/crusoe-enhances-gam-assets-and-flare-mitigation-services","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"deq.mt.gov;crusoe.ai","lflag":"online_before_announced coordinate_cluster_reclassified","srcUrls":["https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5253-00.pdf","https://www.crusoe.ai/resources/newsroom/crusoe-enhances-gam-assets-and-flare-mitigation-services"]},{"id":"030e710e05c7","cid":"15fb61ce7984","canon":0,"dups":5,"ftype":"crypto_hpc","name":"Crusoe Energy","county":"Richland","state":"MT","lat":47.785633,"lng":-104.563408,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The engines would be used to generate electricity through the combustion of gas that would otherwise be flared from an existing oil and gas facility. All engines combust gas from a nearby oil and gas facility, and each engine utilizes an air fuel ratio controller and a three-way catalyst to reduce emissions.","pscan":"https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5246-00.pdf","proc":"Co-located generation","pcp":"existing oil and gas facility","pdt":"combined brake-horsepower (bhp) not to exceed 12,970 (approx. 9.67 MW)","rto":"MISO","nerc":"WECC","op":"Crusoe Energy Systems","ay":2020,"oy":2020,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"deq.mt.gov","srcUrls":["https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5246-00.pdf"],"lflag":"coordinate_cluster_reclassified"},{"id":"3bb877b56d79","cid":"3bb877b56d79","canon":1,"dups":1,"ftype":"data_center","name":"Cabela's Wholesale","city":"Papillion","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"2 separate utility feeds (2 -1,500 KVA transformers); Redundant substations; Generator Power (2N) 2 – 1.5 MW Cat generators with; 36 hr run time fully loaded (3,300 gallon fuel tanks)","pscan":"https://baxtel.com/data-center/lightedge-omaha","uconf":"High","uquote":"Omaha Public Power District for its role in creating a secure “redundant” power supply system, critical to data center operations.","uscan":"https://www.morrisseyengineering.com/news/190/","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"LightEdge Solutions","tenant":"Cabela's","ay":2017,"oy":2017,"deal":"LightEdge Solutions acquired Cabela's existing data center in September 2017.","dealScan":"https://lightedge.com/lightedge-solutions-acquires-cabelas-omaha-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"baxtel.com;morrisseyengineering.com;lightedge.com","srcUrls":["https://baxtel.com/data-center/lightedge-omaha","https://www.morrisseyengineering.com/news/190/","https://lightedge.com/lightedge-solutions-acquires-cabelas-omaha-data-center/"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"76ce245fd9b7","cid":"76ce245fd9b7","canon":1,"dups":1,"ftype":"data_center","name":"CSG International","city":"Omaha","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"SPP","nerc":"MRO","op":"CSG International","spon":"CSG International","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"55b792c434a2","cid":"55b792c434a2","canon":1,"dups":1,"ftype":"data_center","name":"Doxim","city":"Gretna","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"ea2a071b9104","cid":"ea2a071b9104","canon":1,"dups":1,"ftype":"data_center","name":"Fidelity","city":"Papillion","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"“I am especially pleased that the Nebraska Department of Economic Development, in partnership with Sarpy County, the City of Papillion, Greater Omaha Economic Development Partnership and Omaha Public Power District, was able to meet Fidelity's needs.”... This massive buildout of power-hungry data centers in Sarpy County has led Omaha Public Power District (OPPD), whose service area includes Papillion, to launch an expansion of power capacity in the area.","pscan":"https://www.industrialinfo.com/iirenergy/industry-news/article/nebraska-to-get-new-data-centers-power-capacity--323234","uquote":"“I am especially pleased that the Nebraska Department of Economic Development, in partnership with Sarpy County, the City of Papillion, Greater Omaha Economic Development Partnership and Omaha Public Power District, was able to meet Fidelity's needs.”","uscan":"https://www.datacenterknowledge.com/investing/fidelity-announces-200-million-data-center-in-nebraska","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"Fidelity Investments","spon":"Fidelity Investments","tenant":"Fidelity Investments","ay":2012,"oy":2014,"deal":"$200 million investment and Nebraska Advantage Act incentives (2012)","dealScan":"https://www.datacenterknowledge.com/investing/fidelity-announces-200-million-data-center-in-nebraska","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"industrialinfo.com;datacenterknowledge.com","srcUrls":["https://www.industrialinfo.com/iirenergy/industry-news/article/nebraska-to-get-new-data-centers-power-capacity--323234","https://www.datacenterknowledge.com/investing/fidelity-announces-200-million-data-center-in-nebraska"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"0a50c30e3092","cid":"0a50c30e3092","canon":1,"dups":1,"ftype":"data_center","name":"Fiserv","city":"Omaha","county":"Douglas","state":"NE","lat":41.297091,"lng":-96.154066,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Omaha Public Power District.","uquote":"Grid Operator. Omaha Public Power District.","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"Fiserv","spon":"Fiserv","tenant":"Fiserv","ay":1998,"deal":"Fiserv acquired First Data Corporation for $21.3 billion on January 16, 2019.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"4a31d3f83148","cid":"4a31d3f83148","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Omaha","county":"Douglas","state":"NE","lat":41.297091,"lng":-96.154066,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Recognizing our growth in Nebraska, we worked with Omaha Public Power District (OPPD) to pioneer a procurement framework that enables us to supply CFE resources to OPPD, execute large-scale clean energy deals with our efficient procurement process where possible, and share the cost savings and benefits with OPPD's customer base — ultimately increasing access to clean energy capacity for all Nebraskans.","pscan":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/our-work-to-build-a-more-sustainable-future-in-nebraska/","uconf":"High","uquote":"To woo the tech company, local utility executives created a special industrial electricity rate in 2017. The utility then aggressively marketed the rate to Google. Then-Gov. Pete Ricketts (R) said in 2020 that the Omaha Public Power District was the “linchpin” to getting Google to come to Nebraska.","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"Google","spon":"Alphabet","tenant":"Google","ay":2022,"oy":2024,"contro":"Community opposition due to increased electricity demand leading to delayed coal plant closures and environmental concerns, as well as controversy over bulldozing prairie land.","deal":"$1.2 billion investment in Nebraska data centers in 2023, including the Omaha facility; $930 million investment in Nebraska data centers in 2024.","dealScan":"https://omaha.com/news/local/business/google-invests-1-2-billion-in-nebraska-in-2023-including-new-lincoln-data-center/article_2ff716aa-4105-11ee-977f-df2a3fd45ae6.html?mode=nowapp","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"blog.google;omaha.com","srcUrls":["https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/our-work-to-build-a-more-sustainable-future-in-nebraska/","https://omaha.com/news/local/business/google-invests-1-2-billion-in-nebraska-in-2023-including-new-lincoln-data-center/article_2ff716aa-4105-11ee-977f-df2a3fd45ae6.html?mode=nowapp"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"58299a7b7c78","cid":"58299a7b7c78","canon":1,"dups":1,"ftype":"data_center","name":"Google Omaha","county":"Douglas","state":"NE","lat":41.297091,"lng":-96.154066,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Electricity demand in Omaha has increased so much overall, according to the Omaha Public Power District, that permanently switching off the two coal-burning generators at its North Omaha plant could buckle the area's electricity system.","uconf":"High","uquote":"Electricity demand in Omaha has increased so much overall, according to the Omaha Public Power District, that permanently switching off the two coal-burning generators at its North Omaha plant could buckle the area's electricity system.","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","ay":2022,"oy":2024,"contro":"Increased electricity demand from Google's data centers in Omaha contributes to the continued operation of coal-burning power plants, and there are concerns about water usage and land conversion.","deal":"Google announced plans to invest at least $750 million more in Nebraska, partly for its first Omaha data center, on April 22, 2022.","dealScan":"https://www.noiseomaha.com/news-now/2022/4/22/google-announces-nebraska-growth-plan-that-includes-new-northwest-omaha-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"noiseomaha.com","srcUrls":["https://www.noiseomaha.com/news-now/2022/4/22/google-announces-nebraska-growth-plan-that-includes-new-northwest-omaha-data-center"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"1b76594c64c4","cid":"1b76594c64c4","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Bellevue","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Engineered for reliability with A-side and B-side power distribution, four diesel generators providing a total of 5,500kW ensure a minimum 48-hour runtime—backed by a 100% uptime SLA. A-side and B-side power distribution design; Four diesel generators with a total of 5500 kW available with minimum 48 hours runtime; 100% uptime SLA. Multiple Utility Feeds from Separate Substations.","pscan":"https://cloudandcolocation.com/datacenters/tierpoint-omaha-bellevue-data-center/","uconf":"High","uquote":"Omaha Public Power District is a publicly owned electric utility that serves an estimated population of 893,000 people, more than any other electric utility in the state.... OPPD has several other locations in its 13-county, 5,000-square-mile service area in southeast Nebraska.... The map of OPPD's service territory clearly includes Bellevue in Sarpy County.","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"TierPoint","spon":"Argo Infrastructure Partners","deal":"TierPoint acquired Cosentry in January 2016 for $575 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;oppd.com","uscan":"https://www.oppd.com/media/320607/2024-service-area-map.pdf","srcUrls":["https://cloudandcolocation.com/datacenters/tierpoint-omaha-bellevue-data-center/","https://www.oppd.com/media/320607/2024-service-area-map.pdf"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"8faddaa48252","cid":"8faddaa48252","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Papillion","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility Service. 6500 kW Redundant Utility Services from Diverse Substations. Generators. 2 Diesel Generators with a total of 4750 kW available.","pscan":"https://web.tierpoint.com/hubfs/data-center/ne-omaha-midlands-data-center-spec-sheet.pdf","uconf":"High","uquote":"Local Utilities; City of Papillion - Water & Sewer, 402-597-2020, www.papillion.org/503/Water-Sewer-Billing; Omaha Public Power District - Electric, 402-536-4131, www.oppd.com; Black Hills Energy - Gas, 800-890-5554, www.blackhillsenergy.com; Cox Communications - Internet / Cable TV / Phone, 402-933-3000, www.cox.com.","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"TierPoint","spon":"Argo Infrastructure Partners","oy":2010,"deal":"TierPoint acquired Cosentry in January 2016 for $575 million.","dealScan":"https://baxtel.com/data-centers/tierpoint","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"web.tierpoint.com;baxtel.com","srcUrls":["https://web.tierpoint.com/hubfs/data-center/ne-omaha-midlands-data-center-spec-sheet.pdf","https://baxtel.com/data-centers/tierpoint"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"06c6248c9660","cid":"06c6248c9660","canon":1,"dups":1,"ftype":"data_center","name":"Travelers Indemnity Company","city":"Omaha","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Sarpy County Economic Development Corp., which brokered the deal, has an option on the land. The property already has been rezoned to light industrial, and the Omaha Public Power District plans to build a substation to power the data center.","pscan":"https://www.datacenterknowledge.com/business/mystery-company-behind-project-oasis-is-travelers-insurance","uconf":"High","uquote":"The Sarpy County Economic Development Corp., which brokered the deal, has an option on the land. The property already has been rezoned to light industrial, and the Omaha Public Power District plans to build a substation to power the data center.","uscan":"https://www.datacenterknowledge.com/business/mystery-company-behind-project-oasis-is-travelers-insurance","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"Travelers Indemnity Company","spon":"Travelers Indemnity Company","ay":2013,"oy":2015,"deal":"$200 million data center project announced in September 2013","dealScan":"https://www.datacenterknowledge.com/business/mystery-company-behind-project-oasis-is-travelers-insurance","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/business/mystery-company-behind-project-oasis-is-travelers-insurance"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"eaa18ec263d0","cid":"eaa18ec263d0","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Omaha","county":"Douglas","state":"NE","lat":41.297091,"lng":-96.154066,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"if the power goes out here. four generators on site could provide up to 10 megawatts of power then there's this room full of batteries. but if the generator happens to have a delayed start or fail. our equipment uses DC. power in order to survive we need to have uninterrupted. power to all of our devices. within this facility.","uquote":"Omaha Public Power District is a publicly owned electric utility that serves a population of an estimated 833,000 people in southeast Nebraska, including the Omaha metropolitan area.","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"Verizon","spon":"Verizon","tenant":"Verizon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"656e80b1e7f0","cid":"656e80b1e7f0","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Papillion","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Construction","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Papillion mayor David Black said the city is perfect for data centers because of its central location near major interstates and Nebraska's public power infrastructure. “Both Facebook and Google want 100% renewable on their power and [Omaha Public Power District] is able to deliver that,\" Black said.","pscan":"https://nebraskapublicmedia.org/en/news/news-articles/papillion-home-to-google-data-center-by-2021/","uconf":"High","uquote":"Papillion mayor David Black said the city is perfect for data centers because of its central location near major interstates and Nebraska's public power infrastructure. “Both Facebook and Google want 100% renewable on their power and [Omaha Public Power District] is able to deliver that,\" Black said.","uscan":"https://nebraskapublicmedia.org/en/news/news-articles/papillion-home-to-google-data-center-by-2021/","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","ay":2019,"oy":2024,"contro":"Controversy exists regarding the power demand of data centers, including Google's Papillion facility, impacting Omaha Public Power District's (OPPD) plans to close coal-burning units.","deal":"Google announced a $600 million investment for the Papillion data center in October 2019.","dealScan":"https://nebraskapublicmedia.org/en/news/news-articles/papillion-home-to-google-data-center-by-2021/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nebraskapublicmedia.org","srcUrls":["https://nebraskapublicmedia.org/en/news/news-articles/papillion-home-to-google-data-center-by-2021/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"1fa7d700b222","cid":"1fa7d700b222","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Springfield","county":"Sarpy","state":"NE","lat":41.115064,"lng":-96.109125,"cprec":"shared_centroid","status":"Proposed","mw":320,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. A Meta-supported project is adding 320 megawatts of new renewable energy in Nebraska.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Sarpy-Data-Center.pdf","uconf":"High","uquote":"We worked with Omaha Public Power District to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Sarpy-Data-Center.pdf","ukey":"14127|NE","uname":"Omaha Public Power District","rto":"SPP","nerc":"MRO","op":"Meta","spon":"Meta","tenant":"Meta","ay":2017,"oy":2019,"deal":"Investment of more than $1.5 billion for a 4 million square foot campus, announced July 28, 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Sarpy-Data-Center.pdf"],"lflag":"shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"8496f5394193","cid":"8496f5394193","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Las Vegas","county":"Clark","state":"NV","lat":36.21413,"lng":-115.014398,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: – PDU – UPS – Generators.","uquote":"NV Energy is a investor-owned public utility which generates, transmits and distributes electric service in northern and southern Nevada, including the Las Vegas Valley, and provides natural gas service in the Reno – Sparks metropolitan area of northern Nevada.","ukey":"13407|NV","uname":"Nevada Power Co","rto":"non-RTO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","oy":2014,"deal":"EdgeConneX acquired by EQT Infrastructure for between $2.5 billion and $3 billion, expected to close Q4 2020.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"373d5f850b65","cid":"373d5f850b65","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"North Las Vegas","county":"Clark","state":"NV","lat":36.21413,"lng":-115.014398,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"9 MW critical power for high-density workloads.... N+1 UPS redundancy, distributed redundant 4:3 UPS.... Multiple medium voltage (15KV class) utility power feeds; 16 MW redundant, fault-tolerant diesel power generation capacity; 30,000 gallon diesel fuel supply; 9 MW redundant, fault tolerant UPS capacity;","uconf":"Medium","uquote":"NV Energy is an investor-owned public utility which generates, transmits and distributes electric service in northern and southern Nevada, including the Las Vegas Valley, and provides natural gas service in the Reno – Sparks metropolitan area of northern Nevada.... NV Energy proudly serves Nevada with a service area covering over 44000 square miles. We provide electricity to 2.4 million electric customers throughout Nevada as well as a state tourist population exceeding 40 million annually. Among the many communities we serve are Las Vegas, Reno-Sparks, Henderson, Elko.","ukey":"13407|NV","uname":"Nevada Power Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","oy":2012,"contro":"Water consumption concerns in drought-prone Nevada.","controScan":"https://www.watereducation.org/aquafornia-news/southern-nevada-data-centers-used-ton-water-2024-heres-how","deal":"Peak 10 acquired ViaWest for approximately US$1.675 billion in August 2017, leading to the Flexential rebranding in January 2018. GI Partners closed a continuation vehicle and strategic investment in Flexential in August 2025 to fund data center development.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"watereducation.org","srcUrls":["https://www.watereducation.org/aquafornia-news/southern-nevada-data-centers-used-ton-water-2024-heres-how"],"lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"035b4495478a","cid":"035b4495478a","canon":0,"dups":1,"ftype":"data_center","name":"Flexential","city":"Las Vegas","county":"Clark","state":"NV","lat":36.21413,"lng":-115.014398,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The datacenter is equipped with robust power infrastructure to ensure continuous operation. It features redundant power feeds, uninterruptible power supply (UPS) systems, and backup generators. This setup provides a high level of reliability, minimizing the risk of downtime due to power outages.","uconf":"High","uquote":"NV Energy is the main power supplying company in Las Vegas.","ukey":"13407|NV","uname":"Nevada Power Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"e0e62b88d644","cid":"e0e62b88d644","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Las Vegas","county":"Clark","state":"NV","lat":36.21413,"lng":-115.014398,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Multiple medium voltage (15KV class) utility power feeds; 16 MW redundant, fault-tolerant diesel power generation capacity; 30,000 gallon diesel fuel supply; 9 MW redundant, fault tolerant UPS capacity","pscan":"https://baxtel.com/data-center/flexential-las-vegas-lone-mountain","uconf":"High","uquote":"NV Energy is an investor-owned public utility which generates, transmits and distributes electric service in northern and southern Nevada, including the Las Vegas Valley, and provides natural gas service in the Reno – Sparks metropolitan area of northern Nevada.","ukey":"13407|NV","uname":"Nevada Power Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","oy":2013,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/flexential-las-vegas-lone-mountain"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"209767b1374d","cid":"209767b1374d","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Sparks","county":"Storey","state":"NV","lat":39.438385,"lng":-119.524646,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Power provided by NV Energy, the leading energy provider in the region; Private 500MW on-site substation providing reliable, dedicated power; 480V end-to-end electrical distribution.","uconf":"High","uquote":"Power provided by NV Energy, the leading energy provider in the region.","ukey":"13407|NV","uname":"Nevada Power Co","rto":"non-RTO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","oy":2021,"contro":"Widespread community opposition in Northern Nevada regarding data centers due to concerns about water usage, energy demand, noise, and tax abatements, with Google's facility being part of the broader discussion.","deal":"Power Purchase Agreement (PPA) with NV Energy and Ormat Technologies for up to 150 MW of geothermal power for Google's Nevada data centers, announced February 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"39537c74ea82","cid":"39537c74ea82","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Henderson","county":"Clark","state":"NV","lat":36.21413,"lng":-115.014398,"cprec":"shared_centroid","status":"Proposed","mw":60,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The battery-backed solar resources, however, will not eliminate Google's reliance on fossil fuels at the site; according to the filing, the contract price also covers NV Energy's cost of transporting natural gas for generating facilities supplying power to Google's data center.","uconf":"High","uquote":"Affiliates of Google and NV Energy agreed to power a new $600 million data center in Henderson, Nevada, near Las Vegas, through what they say is the world's biggest battery-backed solar deal for a corporate customer.","ukey":"13407|NV","uname":"Nevada Power Co","rto":"non-RTO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","ay":2019,"oy":2020,"contro":"Concerns regarding electricity supply, water usage, and noise, as well as power grid constraints.","deal":"Google and NV Energy agreed to a power purchase agreement (PPA) for a $600 million data center in Henderson, Nevada, involving approximately 350 MW of solar photovoltaics and between 250 MW and 280 MW of battery storage (announced January 7, 2020).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"4b985628cc3d","cid":"4b985628cc3d","canon":1,"dups":1,"ftype":"data_center","name":"PowerHouse","city":"Sparks","county":"Washoe","state":"NV","lat":40.73132,"lng":-119.663269,"cprec":"distinct","status":"Proposed","mw":65,"pc":"Grid","pconf":"High","pquote":"A dedicated substation will be constructed onsite and connected to the NV Energy power grid, Petersburg said.","uconf":"High","uquote":"A dedicated substation will be constructed onsite and connected to the NV Energy power grid, Petersburg said.","ukey":"13407|NV","uname":"Nevada Power Co","rto":"non-RTO","nerc":"WECC","op":"PowerHouse Data Centers","spon":"American Real Estate Partners (AREP), Harrison Street","ay":2024,"oy":2025,"deal":"$1 billion investment from Harrison Street JV (announced February 2024)","dealScan":"https://www.crn.com/news/data-center/2024/powerhouse-data-centers-plans-massive-projects-in-virginia-nevada","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"crn.com","srcUrls":["https://www.crn.com/news/data-center/2024/powerhouse-data-centers-plans-massive-projects-in-virginia-nevada"],"band":"50-100 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"93638fda5aa5","cid":"93638fda5aa5","canon":1,"dups":1,"ftype":"data_center","name":"Switch","city":"McCarran","county":"Washoe","state":"NV","lat":40.73132,"lng":-119.663269,"cprec":"distinct","status":"Proposed","mw":650,"pc":"Hybrid","pconf":"High","pquote":"In 2020, construction started on a 555 MW solar project in Nevada, of which 127 MW is behind-the-meter at Citadel. Power to the data facilities will be generated through two solar generation projects, Switch Station 1 and Switch Station 2. The Switch Stations will produce 179-megawatts of power and were originally part of a joint construction project through First Solar in partnership with NV Energy. The firm sources power from large-scale solar partnerships, including Switch Station 1 and Switch Station 2, which together produce 179MW of power at the Apex Industrial Park in Nevada. These solar plants serve Switch facilities in both Reno and Las Vegas, with renewable energy costs equivalent to 4.9 cents per kilowatt hour. Switch operates as an unregulated utility in Nevada under a 704B designation, allowing the company to handle infrastructure including networks, substations, transmission lines and power generation.","uquote":"Switch has sued NV Energy for $30 million over disagreements about power price, and in 2016 Switch was allowed to switch from NV Energy to its own solar power plants at an \"exit fee\" of $27 million. Last week, Nevada data center provider Switch sued the state’s energy regulators and utility NV Energy, asking for $30 million in damages for getting what it feels was a raw deal on an agreement it made last year to buy renewable energy for its data centers. The company serves approximately 90% of the state with electricity – keeping the lights on for more than 1.4 million customers throughout Nevada as well as a state tourist population exceeding 56 million annually.","uscan":"https://www.brkenergy.com/vdesk/hangup.php3","ukey":"13407|NV","uname":"Nevada Power Co","rto":"non-RTO","nerc":"WECC","op":"Switch","spon":"DigitalBridge, IFM Investors","tenant":"eBay","ay":2015,"contro":"Legal battles with NV Energy over power rates and independent renewable energy procurement; lawsuit with Tract Management over property covenants.","deal":"Acquisition of Switch by DigitalBridge and IFM Investors for $11 billion in December 2022; secured a $2.6 billion syndicated letter of credit and raised nearly $770 million through another bond sale in April 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"brkenergy.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.brkenergy.com/vdesk/hangup.php3"],"band":"250+ MW"},{"id":"4453e0d93426","cid":"4453e0d93426","canon":1,"dups":1,"ftype":"data_center","name":"Consolidated Communications","city":"Laconia","county":"Belknap","state":"NH","lat":43.519109,"lng":-71.425366,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Multiple power options, including 110 V AC / 208 V AC, with support for up to three-phase power. Fully redundant power feeds from diverse PDUs (Power Distribution Units), along with UPS and generator backup (N+1 for the generator backup).","uconf":"High","uquote":"City of Laconia selects a Program Supplier (Direct Energy Services, LLC, “Direct Energy”) through a competitive process → Utility (Eversource) continues delivery & billing → Eligible Consumers are enrolled by default unless they opt-out.","uname":"Eversource / Public Service Co of NH","rto":"ISO-NE","nerc":"NPCC","op":"Consolidated Communications","spon":"Searchlight Capital Partners and British Columbia Investment Management (BCI)","deal":"Consolidated Communications was acquired by Searchlight Capital Partners and British Columbia Investment Management Corporation for $3.1 billion, with the transaction closing on December 27, 2024.","dealScan":"https://www.wiley.law/pressrelease-Wiley-Advises-Searchlight-in-3-Billion-Acquisition-of-Consolidated-Communications","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wiley.law","srcUrls":["https://www.wiley.law/pressrelease-Wiley-Advises-Searchlight-in-3-Billion-Acquisition-of-Consolidated-Communications"],"lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"19107|NH","rawUname":"ENGIE Resources LLC","reportedUtility":"Eversource / Public Service Co of NH","ukey":"15472|NH"},{"id":"9e50a1a14e1b","cid":"9e50a1a14e1b","canon":1,"dups":1,"ftype":"data_center","name":"Consolidated Communications","city":"Manchester","county":"Hillsborough","state":"NH","lat":42.911532,"lng":-71.723055,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The electrical power system boasts fully redundant power feeds from diverse PDUs, N+1 generator backup, and a range of power options from 110v AC to 208v AC, including up to three-phase power.","uconf":"High","uquote":"As part of an agreement approved by the NH Public Utilities Commission, Eversource this week took ownership of all electric utility poles owned by Consolidated Communications (CCI) in NH.","uname":"Eversource / Public Service Co of NH","rto":"ISO-NE","nerc":"NPCC","op":"Consolidated Communications","spon":"Searchlight Capital Partners, L.P. and British Columbia Investment Management","deal":"Acquisition of Consolidated Communications Holdings, Inc. by Searchlight Capital Partners, L.P. and British Columbia Investment Management Corporation for approximately $3.1 billion, closed December 27, 2024.","dealScan":"https://www.wiley.law/pressrelease-Wiley-Advises-Searchlight-in-3-Billion-Acquisition-of-Consolidated-Communications","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wiley.law","srcUrls":["https://www.wiley.law/pressrelease-Wiley-Advises-Searchlight-in-3-Billion-Acquisition-of-Consolidated-Communications"],"lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"19107|NH","rawUname":"ENGIE Resources LLC","reportedUtility":"Eversource / Public Service Co of NH","ukey":"15472|NH"},{"id":"ca06a8855994","cid":"ca06a8855994","canon":1,"dups":1,"ftype":"data_center","name":"FirstLight Fiber","city":"Bedford","county":"Hillsborough","state":"NH","lat":42.911532,"lng":-71.723055,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Redundant (2N) power.","uconf":"High","uquote":"Electric: Eversource","uname":"Eversource / Public Service Co of NH","rto":"ISO-NE","nerc":"NPCC","op":"FirstLight Fiber","spon":"Antin Infrastructure Partners","oy":2026,"deal":"Acquisition of FirstLight Fiber by Antin Infrastructure Partners, completed July 25, 2018.","dealScan":"https://vermontbiz.com/news/2018/july/25/antin-completes-acquisition-firstlight","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"firstlight.net;energy.nh.gov;vermontbiz.com","pscan":"https://www.firstlight.net/data-center/","uscan":"https://www.energy.nh.gov/utilities-by-city-town","srcUrls":["https://www.firstlight.net/data-center/","https://www.energy.nh.gov/utilities-by-city-town","https://vermontbiz.com/news/2018/july/25/antin-completes-acquisition-firstlight"],"rawUkey":"19107|NH","rawUname":"ENGIE Resources LLC","reportedUtility":"Eversource / Public Service Co of NH","lflag":"nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","ukey":"15472|NH"},{"id":"0d56b7cad253","cid":"0d56b7cad253","canon":1,"dups":1,"ftype":"data_center","name":"Liberty Mutual","city":"Portsmouth","county":"Rockingham","state":"NH","lat":42.988664,"lng":-71.09908,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"ISO-NE","nerc":"NPCC","op":"Liberty Mutual","spon":"Liberty Mutual","tenant":"Liberty Mutual","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b2b794d5cb65","cid":"b2b794d5cb65","canon":1,"dups":1,"ftype":"data_center","name":"Secured Network Services","city":"Littleton","county":"Grafton","state":"NH","lat":43.926439,"lng":-71.842424,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Littleton Water and Light Department provides electrical power and potable water for residents, institutions, and businesses within the Town of Littleton and portions of the neighboring Towns of Bethlehem and Lisbon. They purchase wholesale electric power from suppliers from the New England Power Pool on an hourly basis. We have two disparate power connections, a 60kva Diesel generator, redundant HVAC systems, and continue to invest in our infrastructure.","uconf":"High","uquote":"The Littleton Water and Light Department provides electrical power and potable water for residents, institutions, and businesses within the Town of Littleton and portions of the neighboring Towns of Bethlehem and Lisbon.","rto":"ISO-NE","nerc":"NPCC","op":"Thrive","spon":"Berkshire Partners, Court Square Capital Partners","ay":2012,"oy":2012,"deal":"Acquisition of Secured Network Services by Thrive on February 13, 2025 (terms undisclosed)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c9dfda8c3859","cid":"c9dfda8c3859","canon":1,"dups":1,"ftype":"data_center","name":"365 Data Centers","city":"Bridgewater","county":"Somerset","state":"NJ","lat":40.565527,"lng":-74.619938,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power redundancy: • N+1 UPS configuration (covering over 2 MW); • 2N generator backup with 13,000-gallon fuel storage, capable of supporting ~72 hours of operations without refueling;","uconf":"High","uquote":"Expand the selections below to view the towns and municipalities where we supply electric, gas and PSE&G WorryFree Appliance services to our New Jersey customers. Electric Service Area. Electric Service map (pdf). Bergen County; Burlington County; Camden County; Essex County; Gloucester County; Hudson County; Mercer County; Middlesex County; Monmouth County; Morris County; Passaic County; Somerset County; Union County. Bergen County. Bogota, Borough... Bridgewater, Township of.","uscan":"https://nj.pseg.com/serviceterritory","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"365 Data Centers","spon":"Stonecourt Capital","tenant":"InterServer","ay":2009,"oy":2010,"deal":"Acquisition of NYI-NJ by 365 Data Centers in September 2019; Acquisition of 365 Data Centers by Stonecourt Capital in October 2020","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nj.pseg.com","srcUrls":["https://nj.pseg.com/serviceterritory"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"47583e516569","cid":"47583e516569","canon":1,"dups":1,"ftype":"data_center","name":"365 Data Centers","city":"Carlstadt","county":"Bergen","state":"NJ","lat":40.959698,"lng":-74.074727,"cprec":"distinct","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Redundant utility service from diverse substations. 2N utility feeds to the substation, tied together with automatic tie breaker.","uconf":"High","uquote":"Electric Utility Provider: Public Service Electrical & Gas (PSE&G).","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"365 Data Centers","spon":"Stonecourt Capital, Lumerity Capital, Longboat Advisors","tenant":"InterServer","ay":2000,"oy":2001,"deal":"Acquisition of Sungard's U.S. colocation and network business (including Carlstadt facility) by 365 Data Centers, expected to close Q4 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"901f2b2dc82c","cid":"901f2b2dc82c","canon":1,"dups":1,"ftype":"data_center","name":"Barclays Capital","city":"Piscataway","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"NPCC","op":"Barclays Capital","spon":"Barclays Capital","tenant":"Barclays Capital","oy":2008,"deal":"Acquisition of two Lehman Brothers data centers (Piscataway and Cranford, NJ) for $330 million in September 2008.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"892f37301a78","cid":"892f37301a78","canon":1,"dups":1,"ftype":"data_center","name":"Bloomberg","city":"South Brunswick Twp","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The power infrastructure is supported by multiple utility feeds and on-site generators, providing redundancy and ensuring continuous operation even during power outages.","pscan":"https://inflect.com/building/431-ridge-road-south-brunswick-township/bloomberg/datacenter/dayton","uquote":"Grid Operator: Public Service Electric and Gas.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Bloomberg","spon":"Bloomberg","tenant":"Bloomberg","ay":2013,"contro":"Traffic issues exacerbated by expansion","controScan":"https://patch.com/new-jersey/southbrunswick/bloomberg-expansion-expected-to-bring-1k-new-jobs-to-south-brunswick","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"inflect.com;patch.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://inflect.com/building/431-ridge-road-south-brunswick-township/bloomberg/datacenter/dayton","https://patch.com/new-jersey/southbrunswick/bloomberg-expansion-expected-to-bring-1k-new-jobs-to-south-brunswick"]},{"id":"79724c1df067","cid":"79724c1df067","canon":1,"dups":1,"ftype":"data_center","name":"Bloomberg","city":"Totowa Boro","county":"Passaic","state":"NJ","lat":41.036655,"lng":-74.299408,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"PSE&G is making investments that will provide the enhanced reliability for customers and to help New Jersey achieve its clean energy goals. With its Infrastructure Advancement Program (IAP), PSE&G is expected to invest $511 million to modernize PSE&G's electric distribution systems, providing customers with improved reliability, including during extreme weather.","pscan":"https://reliability.pseg.com/totowa/","uconf":"High","uquote":"PSE&G is making investments that will provide the enhanced reliability for customers and to help New Jersey achieve its clean energy goals. With its Infrastructure Advancement Program (IAP), PSE&G is expected to invest $511 million to modernize PSE&G's electric distribution systems, providing customers with improved reliability, including during extreme weather.","uscan":"https://reliability.pseg.com/totowa/","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Bloomberg","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"reliability.pseg.com","srcUrls":["https://reliability.pseg.com/totowa/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"cef36360c9a6","cid":"cef36360c9a6","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Jersey City","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Located just across the Hudson River from the New York Financial District, this data center which provides 100% uptime SLA is carrier-neutral and M&O Stamp-approved.","pscan":"https://marketplace.upstack.com/data-centers/cyxtera-data-center-jersey-city-ewr1-a","uconf":"High","uquote":"Power Utility Provider: PSE&G.","uscan":"https://baxtel.com/data-center/centersquare-weehawken-nj2","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","ay":1930,"oy":2012,"deal":"Brookfield acquired Cyxtera (which included this facility) in November 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;baxtel.com","srcUrls":["https://marketplace.upstack.com/data-centers/cyxtera-data-center-jersey-city-ewr1-a","https://baxtel.com/data-center/centersquare-weehawken-nj2"],"lflag":"source_quality_reclassified legacy_facility_year_review"},{"id":"acbfed151f47","cid":"acbfed151f47","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Piscataway","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"N+1 redundant power systems with UPS backup and on-site diesel generators.","uconf":"High","uquote":"Utility Provider: PSE&G","uscan":"https://baxtel.com/data-center/centersquare-piscataway-ewr3-b","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Centersquare","spon":"Brookfield Asset Management / Brookfield Infrastructure Partners","ay":2024,"contro":"Trademark infringement lawsuit","deal":"Brookfield Infrastructure Partners acquired Cyxtera for approximately $775M in late 2023.","dealScan":"https://www.credaily.com/briefs/data-centers-strategy-accelerates-with-centersquares-1b-buy/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;credaily.com","lflag":"online_before_announced","srcUrls":["https://baxtel.com/data-center/centersquare-piscataway-ewr3-b","https://www.credaily.com/briefs/data-centers-strategy-accelerates-with-centersquares-1b-buy/"]},{"id":"1f5c4b6096eb","cid":"1f5c4b6096eb","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Secaucus","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"On the electrical side, it provides an impressive capacity of 200 watts per sq. ft., with various cabinet options. The UPS configuration is 2N, and there are two utility feeders for redundancy. In case of power outages, the data center has ten 2,000 kW diesel generators and five 10,000-gallon above-ground fuel tanks for standby power. But that's not all. Centersquare Secaucus is committed to sustainability, boasting a carbon footprint-reducing 750kW of solar power generated onsite.","uconf":"High","uquote":"Grid Operator: Public Service Electric and Gas.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","ay":2022,"deal":"Centersquare acquired 10 data centers across the US and Canada with an enterprise value of US$1 billion in October 2025.","dealScan":"https://www.credaily.com/briefs/data-centers-strategy-accelerates-with-centersquares-1b-buy/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"credaily.com","lflag":"online_before_announced","srcUrls":["https://www.credaily.com/briefs/data-centers-strategy-accelerates-with-centersquares-1b-buy/"],"band":"25-50 MW"},{"id":"564f3e4af638","cid":"564f3e4af638","canon":0,"dups":1,"ftype":"data_center","name":"Cologix","city":"Parsippany","county":"Morris","state":"NJ","lat":40.858896,"lng":-74.547292,"cprec":"distinct","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Fully Redundant Power. Our power infrastructure is engineered to deliver resilient, uninterruptible power even in the event of multiple component failures. We use 2 (N+1) redundant power systems with UPS and battery validation systems,. Additionally, there is a JCP&L Power Substation onsite.","uconf":"High","uquote":"Additionally, there is a JCP&L Power Substation onsite.","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"Cologix","spon":"Stonepeak Infrastructure Partners","ay":2015,"oy":2015,"deal":"Acquisition of Net Access by Cologix in October 2015 (terms not disclosed)","dealScan":"https://www.datacenterknowledge.com/deals/cologix-enters-new-jersey-data-center-market-with-net-access-acquisition","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/deals/cologix-enters-new-jersey-data-center-market-with-net-access-acquisition"],"lflag":"merged_duplicate"},{"id":"1b8f2d474df1","cid":"1b8f2d474df1","canon":1,"dups":1,"ftype":"data_center","name":"Cologix","city":"Cedar Knolls","county":"Morris","state":"NJ","lat":40.858896,"lng":-74.547292,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Multiple 2 N+1 redundant power systems with high-efficiency UPS with individual battery validation. Onsite diesel generation back‐up.","pscan":"https://cologix.com/data-centers/new-jersey/nnj2/","uconf":"Medium","uquote":"Jersey Central Power & Light (JCP&L), is a local distribution company, providing every aspect of your electric service including generating electricitity and delivering it to your home or business.","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"Cologix","spon":"Stonepeak Infrastructure Partners","ay":2015,"deal":"Stonepeak completed a $3.0 billion equity recapitalization of Cologix on April 4, 2022.","dealScan":"https://cologix.com/news/stonepeak-successfully-completes-3-0-billion-equity-recapitalization-portfolio-company-cologix/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cologix.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://cologix.com/data-centers/new-jersey/nnj2/","https://cologix.com/news/stonepeak-successfully-completes-3-0-billion-equity-recapitalization-portfolio-company-cologix/"]},{"id":"d6041f8dd441","cid":"d6041f8dd441","canon":1,"dups":1,"ftype":"data_center","name":"Continent 8","city":"Atlantic City","county":"Atlantic","state":"NJ","lat":39.469355,"lng":-74.633759,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Continent 8 offers hosting and data storage services for digital gaming businesses, and this data center is the result of significant investments made by the company in the New Jersey gaming industry. The data center houses 90% of the state's licensed internet gaming and sports wagering platforms, making it a landmark in the gaming space.","pscan":"https://porziogov.com/continent-8-technologies-opens-state-of-the-art-data-center-in-atlantic-city/","rto":"PJM","nerc":"NPCC","op":"Continent 8 Technologies","spon":"Continent 8 Technologies","oy":2019,"contro":"CRDA board members expressed concerns regarding prevailing wages, modular construction, and duration of use during the approval of a 2023 expansion.","controScan":"https://www.yogonet.com/international/news/2022/02/16/61426-nj-authorities-clear-continent-8-to-build-igaming-data-center-at-atlantic-city-convention-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"porziogov.com;yogonet.com","srcUrls":["https://porziogov.com/continent-8-technologies-opens-state-of-the-art-data-center-in-atlantic-city/","https://www.yogonet.com/international/news/2022/02/16/61426-nj-authorities-clear-continent-8-to-build-igaming-data-center-at-atlantic-city-convention-center"],"lflag":"source_quality_reclassified"},{"id":"8d6b7e2e9f1c","cid":"8d6b7e2e9f1c","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Secaucus","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":19,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"CoreSite's NY2 New York data center... Diverse utility feeds. UPS/PDU/RPP. N+1 redundancy. Industrial electric rates are about 10 cents per kilowatt hour in Secaucus, compared to 17 cents in Manhattan, according to CoreSite.","uconf":"High","uquote":"Grid Operator: Public Service Electric and Gas. Electric Utility Provider: Public Service Electrical & Gas (PSE&G).","uscan":"https://baxtel.com/data-center/coresite-secaucus-ny4","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"CoreSite","spon":"American Tower","ay":2013,"oy":2013,"deal":"CoreSite expects to invest $65.0 million to acquire the facility, redevelop the powered shell, and complete the initial phase of inventory consisting of 65,000 square feet (announced January 18, 2013).","dealScan":"https://seabornnetworks.com/coresite-to-develop-expansive-high-performance-data-center-in-secaucus-new-jersey-to-meet-growing-demand/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;seabornnetworks.com","srcUrls":["https://baxtel.com/data-center/coresite-secaucus-ny4","https://seabornnetworks.com/coresite-to-develop-expansive-high-performance-data-center-in-secaucus-new-jersey-to-meet-growing-demand/"],"lflag":"source_quality_reclassified"},{"id":"10c0cc29e86c","cid":"10c0cc29e86c","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Somerset","county":"Somerset","state":"NJ","lat":40.565527,"lng":-74.619938,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Diverse power feeds provide power to the on-site 40 MW substation. Grid Operator: Public Service Electric and Gas.","uconf":"High","uquote":"Grid Operator: Public Service Electric and Gas.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2017,"oy":2017,"deal":"Acquisition of two data centers (Somerset, NJ and Raleigh-Durham, NC) from Sentinel Data Centers for $490 million in February/March 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"e09fe2a9dc0f","cid":"dc3597a9bf27","canon":0,"dups":2,"ftype":"data_center","name":"CyrusOne","city":"Totowa","county":"Passaic","state":"NJ","lat":41.036655,"lng":-74.299408,"cprec":"shared_centroid","status":"Operational","mw":16,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The enterprise-class NYM2 facility in Totowa, New Jersey, is a 200,000-square-foot facility offering 50,000 colocation square feet (CSF), up to 16 MW of power, and 60,000 square feet of work area recovery.... Designed to deliver 99.999% availability; 16MW of power; Designed to support high density configurations; Two separate feeds from the utility company; 2N uninterruptible power supply units; N+1 generator.","uquote":"Grid Operator: Jersey Central Power and Light.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-2a96cf83","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","tenant":"CyrusOne","oy":2009,"deal":"CyrusOne acquired colocation provider Cervalis, which included the Totowa facility, in an all-cash $400-million transaction in 2015.","dealScan":"https://www.datacenterknowledge.com/operations-and-management/cyrusone-buys-cervalis-and-its-four-new-york-data-centers","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;datacenterknowledge.com","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-2a96cf83","https://www.datacenterknowledge.com/operations-and-management/cyrusone-buys-cervalis-and-its-four-new-york-data-centers"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"dc3597a9bf27","cid":"dc3597a9bf27","canon":1,"dups":2,"ftype":"data_center","name":"CyrusOne","city":"Totowa","county":"Passaic","state":"NJ","lat":41.036655,"lng":-74.299408,"cprec":"shared_centroid","status":"Operational","mw":16,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"With 50,000 colocation square feet(CSF), 16MW of utility power and 2,500 tons of N+1 cooling capacity, the Totowa Data Center offers the highest levels of support for high-density configurations.","pscan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-totowa","uquote":"Grid Operator. Jersey Central Power and Light.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-2a96cf83","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"CyrusOne","oy":2009,"deal":"$11 million 10-year, fixed-rate permanent loan secured by Russo Development in August 2019","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;interconnection.fyi","srcUrls":["https://marketplace.upstack.com/data-centers/cyrusone-data-center-totowa","https://www.interconnection.fyi/data-center/project/cyrusone-2a96cf83"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"8c4599102b31","cid":"8c4599102b31","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Newark","county":"Essex","state":"NJ","lat":40.7874,"lng":-74.246292,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"2N Power Design; 1.7MW Critical IT Load; 120V, 208V, 3P AC Power; Available DC Power; 100% Renewable Energy Source.","uquote":"Grid Operator: Public Service Electric and Gas.","uscan":"https://www.interconnection.fyi/data-center/project/databank-84f25f0f","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"DataBank","spon":"DigitalBridge","oy":2012,"deal":"DataBank acquired zColo's U.S. and U.K. data center assets in December 2020, which included this facility.","dealScan":"https://www.databank.com/about-databank/databanks-history/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;databank.com","srcUrls":["https://www.interconnection.fyi/data-center/project/databank-84f25f0f","https://www.databank.com/about-databank/databanks-history/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"9b28a907d0ae","cid":"9b28a907d0ae","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Piscataway","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"DataBank's central New Jersey data center provides 3MW of on-site power, an N+1 power design, and N+1 cooling for always-on availability.","pscan":"https://marketplace.upstack.com/data-centers/databank-data-center-piscataway-nj2","uquote":"The utility provider is PSE&G.","uscan":"https://baxtel.com/data-center/databank-piscataway-ewr2","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"DataBank","spon":"DigitalBridge","tenant":"New Jersey Institute of Technology","ay":2020,"oy":2019,"deal":"DataBank acquired the building housing its EWR2 data center in Piscataway, New Jersey, announced May 1, 2025, for $16 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;baxtel.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://marketplace.upstack.com/data-centers/databank-data-center-piscataway-nj2","https://baxtel.com/data-center/databank-piscataway-ewr2"]},{"id":"6bdb30682637","cid":"6bdb30682637","canon":1,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Clifton","county":"Passaic","state":"NJ","lat":41.036655,"lng":-74.299408,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The local utility provides up to 24000 total kilowatts of power (24 Megawatts)","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-clifton-data-center-njr3/","uconf":"High","uquote":"Electric Utility Provider: Public Service Electrical & Gas (PSE&G)","uscan":"https://baxtel.com/data-center/digital-realty-new-york-ewr20","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Digital Realty","spon":"Digital Realty","oy":2013,"deal":"Digital Realty acquired Telx for $1.886 billion in October 2015.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-clifton-data-center-njr3/","https://baxtel.com/data-center/digital-realty-new-york-ewr20"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"86f0c8b17fc4","cid":"6bdb30682637","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Clifton","county":"Passaic","state":"NJ","lat":41.036655,"lng":-74.299408,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"The local utility provides up to 24000 total kilowatts of power (24 Megawatts) and the UPS systems have a capacity of 16200 kilowatts and are arranged in a 2N configuration. This set up allows for up to 200 watts of power to be delivered per square foot. On site generators are also configured in an N+1 arrangement, and can deliver up to 6750 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-clifton-data-center-njr3/","uquote":"Public Service Enterprise Group ( PSE&G ) Outage Map.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Digital Realty","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-clifton-data-center-njr3/"],"band":"10-25 MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"47126c4ef28b","cid":"47126c4ef28b","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Piscataway","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":34,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The campus features three buildings totaling approximately 730,000 sq.ft. as well as a dedicated, onsite 69kV substation with 2N utility redundancy and 80MVA of capacity.","uquote":"PSE&G is currently conducting statewide electric reliability improvements to its utility infrastructure. These enhancements will improve both electric service reliability and system redundancy to ensure safe and reliable service to our customers.","uscan":"https://reliability.pseg.com/piscataway/","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2009,"oy":2009,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"reliability.pseg.com","srcUrls":["https://reliability.pseg.com/piscataway/"]},{"id":"1aa70425d349","cid":"1aa70425d349","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Roseland","county":"Essex","state":"NJ","lat":40.7874,"lng":-74.246292,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"57506de3019b","cid":"57506de3019b","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Totowa Boro","county":"Passaic","state":"NJ","lat":41.036655,"lng":-74.299408,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Existing area substations can support the 15.75 megawatts of power for the initial phase of redevelopment. Digital Realty plans to construct a 50 MVA onsite substation to support future development at the site.","uconf":"High","uquote":"Grid Operator. Jersey Central Power and Light.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-7f4245a3","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2012,"deal":"Property acquisition for approximately $16.8 million on November 27, 2012","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-realty-7f4245a3"]},{"id":"19f22aec378f","cid":"19f22aec378f","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Newark","county":"Essex","state":"NJ","lat":40.7874,"lng":-74.246292,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"New York NY1 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center provides electrical capacity of 2.4 kVA per cabinet. The data center has single utility feed, and single power transformer.... The standby power is provided by 4 x 750 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-new-york-newark-data-center-ny1/","uconf":"High","uquote":"The wires company in Newark is Public Service Electric & Gas (PSEG). This is a utility company that services a broad area.","uscan":"https://www.chooseenergy.com/electricity-rates/new-jersey/newark/","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;chooseenergy.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-new-york-newark-data-center-ny1/","https://www.chooseenergy.com/electricity-rates/new-jersey/newark/"],"lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"15477|NJ","rawUname":"Public Service Elec & Gas Co","reportedUtility":"Public Service Elec & Gas Co"},{"id":"f10fa73401ca","cid":"f10fa73401ca","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"Newark","county":"Essex","state":"NJ","lat":40.7874,"lng":-74.246292,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and single power transformer. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 480V of utility voltage. The immediate power failure is protected by redundant UPS in N+2 configuration. The standby power is provided by 4 x 750 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-new-york-newark-data-center-ny1/","uconf":"High","uquote":"Public Service Electric and Gas Company (PSE&G) is New Jersey's largest electric and gas utility. In NJ's deregulated electricity market, PSE&G delivers power while customers can choose a third-party supplier (TPS) for generation. Cities & counties served. PSE&G provides electricity delivery service throughout the following areas in New Jersey: Newark.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","lflag":"operational_null_capacity source_quality_reclassified shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-new-york-newark-data-center-ny1/"]},{"id":"ff5d95756a04","cid":"ff5d95756a04","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"North Bergen","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"2 x 1,100 kVA UPS in N+1 Configuration – Phase II; 8 x 2,000 kW and 1 x 2,500 kW Diesel Generators in N+1 Configuration","uconf":"High","uquote":"PSE&G's Service Territory... Electric Service Area.... Hudson County.","uscan":"https://nj.pseg.com/serviceterritory","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Equinix","spon":"Equinix","tenant":"financial, media and enterprise companies, electronic trading community, international trade and media ecosystems, financial to high tech with low-latency connectivity to BATS, CBOE, ICAP, Knight Capital, ISE and Box","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nj.pseg.com","srcUrls":["https://nj.pseg.com/serviceterritory"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"b78875b3da2a","cid":"b78875b3da2a","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Piscataway","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"PJM","nerc":"NPCC","deal":"Equinix sold the facility formerly known as Equinix NY12 to Chirisa Investments in August 2019.","dealScan":"https://baxtel.com/news/chirisa-acquires-piscataway-facility-from-equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/news/chirisa-acquires-piscataway-facility-from-equinix"]},{"id":"c55944c0747b","cid":"c55944c0747b","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"Secaucus","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":23,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Incoming Electrical Service Type. Dual Circuits. Electrical Distribution. Block Redundant. UPS Type. Static UPS. UPS Redundancy. N+1. Generator Redundancy. N+1.","pscan":"https://marketplace.upstack.com/data-centers/equinix-colocation-new-jersey","uconf":"High","uquote":"Our Secaucus, New Jersey sites (NY2, NY4 and NY5) remain on generator power. These data centers have ample fuel onsite, and we are receiving daily fuel deliveries. Daily fuel deliveries will continue until utility power is restored. We are in regular contact with the utility company (PSE&G), who has indicated that utility power could be restored as early as today at our New Jersey sites.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Equinix","spon":"Equinix","tenant":"NYSE, NASDAQ, CBOE, IEX, BATS, ACTIV Financial, Direct Edge, prime broker infrastructure, market data providers, systematic trading operations of large quantitative funds","oy":2007,"contro":"Allegations of accounting manipulation (misclassifying capital expenditures, overselling power capacity) by Hindenburg Research, leading to an SEC probe and a shareholder class-action lawsuit.","controScan":"https://www.bisnow.com/national/news/data-center-capital-markets/equinix-says-sec-wont-pursue-action-against-the-reit-after-yearlong-probe-131983","deal":"$41.5 million settlement in a class-action lawsuit with stockholders (Uniformed Sanitationmen's Association Compensation Accrual Fund v. Equinix Inc. et al.) in July 2025.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"marketplace.upstack.com;bisnow.com","srcUrls":["https://marketplace.upstack.com/data-centers/equinix-colocation-new-jersey","https://www.bisnow.com/national/news/data-center-capital-markets/equinix-says-sec-wont-pursue-action-against-the-reit-after-yearlong-probe-131983"],"lflag":"merged_duplicate"},{"id":"37988f3c2607","cid":"37988f3c2607","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Carteret","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Equipped with N+1 UPS redundancy, N+1 cooling redundancy, and diverse utility feeders, NY11 ensures consistent operational reliability. Electric Utility Provider: Public Service Electrical & Gas (PSE&G).","pscan":"https://baxtel.com/data-center/equinix-carteret-ny11","uconf":"High","uquote":"Grid Operator. Public Service Electric and Gas. Electric Utility Provider: Public Service Electrical & Gas (PSE&G).","uscan":"https://baxtel.com/data-center/equinix-carteret-ny11","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Equinix","spon":"Equinix","tenant":"Nasdaq","oy":2000,"deal":"Multi-year partnership with Nasdaq to scale cloud infrastructure (announced December 15, 2021)","dealScan":"https://www.prnewswire.com/news-releases/equinix-collaborates-with-nasdaq-to-scale-digital-infrastructure-301445746.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;prnewswire.com","srcUrls":["https://baxtel.com/data-center/equinix-carteret-ny11","https://www.prnewswire.com/news-releases/equinix-collaborates-with-nasdaq-to-scale-digital-infrastructure-301445746.html"],"lflag":"source_quality_reclassified"},{"id":"b7055ad88b4f","cid":"b7055ad88b4f","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"Secaucus","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Secaucus NY2 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center provides electrical capacity of 2.4 kVA per cabinet. The data center has dual utility feed, and fourteen power transformer. The data center provides AC power, and DC power to customer's equipment. The facility has 26.4 kV of utility voltage. The immediate power failure is protected by distributed redundant UPS in N+1 configuration. The standby power is provided by 7 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-new-york-secaucus-data-center-ny2/","uconf":"High","uquote":"We are in regular contact with the utility company (PSE&G), who has indicated that utility power could be restored as early as today at our New Jersey sites.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Equinix","spon":"Equinix","oy":2002,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-new-york-secaucus-data-center-ny2/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"2d3b69ccda49","cid":"2d3b69ccda49","canon":1,"dups":1,"ftype":"data_center","name":"Ernst & Young","city":"Secaucus","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"89cbe4f82ef5","cid":"89cbe4f82ef5","canon":1,"dups":1,"ftype":"data_center","name":"Evocative Data Centers","city":"Secaucus","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Electric Utility Provider: Public Service Electrical & Gas (PSE&G); Power Feeds: 2 diverse feeds; 5 MW expandable to 20 MW; Redundant Power Feed: Yes; Generator Size(s): (4) 2 MW expandable to 10; UPS Size(s): (3) 1.4 MW expandable to 10.","pscan":"https://baxtel.com/data-center/evocative-secaucus-ewr1","uconf":"High","uquote":"Electric Utility Provider: Public Service Electrical & Gas (PSE&G);","uscan":"https://baxtel.com/data-center/evocative-secaucus-ewr1","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Evocative Data Centers","spon":"Crestline Investors","oy":2012,"deal":"Evocative acquired the majority of INAP's data centers, including this facility, on September 28, 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/evocative-secaucus-ewr1"]},{"id":"f493a7149fad","cid":"f493a7149fad","canon":1,"dups":1,"ftype":"data_center","name":"Fiserv","city":"Jersey City","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Public Service Electric and Gas.","uquote":"Grid Operator. Public Service Electric and Gas.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Fiserv","spon":"Fiserv","oy":2019,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3f6a4ecb1d1f","cid":"3f6a4ecb1d1f","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"East Brunswick","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Dedicated PPA","pcp":"NextEra Energy Resources and Black Bear Energy","pdt":"7.2 MW solar installation, generating more than 9 million kWh per year, covering approximately 15 percent of the data center's current energy load","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"602083597ee3","cid":"602083597ee3","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Jersey City","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"3295d538db82","cid":"3295d538db82","canon":1,"dups":1,"ftype":"data_center","name":"Lightpath","city":"Carteret","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"NPCC","op":"Lightpath","spon":"Altice USA, Morgan Stanley Infrastructure Partners","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"a6f81b5c8568","cid":"a6f81b5c8568","canon":1,"dups":1,"ftype":"data_center","name":"Lightpath","city":"Bridgewater","county":"Somerset","state":"NJ","lat":40.565527,"lng":-74.619938,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3cc9183bc2df","cid":"3cc9183bc2df","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Newark","county":"Essex","state":"NJ","lat":40.7874,"lng":-74.246292,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Lumen Newark 1 Data Center is located at 165 Halsey Street, Newark, NJ, USA.... It has access to 3.0 MW of power.","uconf":"High","uquote":"The wires company in Newark is Public Service Electric & Gas (PSEG). This is a utility company that services a broad area.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"15477|NJ","rawUname":"Public Service Elec & Gas Co","reportedUtility":"Public Service Elec & Gas Co","srcUrls":null,"srcDom":null},{"id":"1f433bc67caf","cid":"1f433bc67caf","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Jersey City","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power. AC and DC Power. Generator, UPS, and battery backup.","uconf":"High","uquote":"Jersey City's local electric utility is Public Service Electric & Gas (PSE&G).","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"0cbdf23e0c6e","cid":"0cbdf23e0c6e","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Weehawken","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"And rest assured, our facilities are equipped with AC UPS power, DC power, and generators, ensuring uninterrupted operations.","uconf":"High","uquote":"The main utility companies in New Jersey include Atlantic City Electric, Jersey Central Power & Light, Orange & Rockland, and PSE&G. All four are Investor Owned Utilities (IOUs).","uscan":"https://www.energysage.com/local-data/electricity-cost/nj/hudson-county/weehawken/","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"energysage.com","srcUrls":["https://www.energysage.com/local-data/electricity-cost/nj/hudson-county/weehawken/"],"lflag":"source_quality_reclassified"},{"id":"da0064cb51ad","cid":"da0064cb51ad","canon":1,"dups":1,"ftype":"data_center","name":"Morgan Stanley","city":"Somerset","county":"Somerset","state":"NJ","lat":40.565527,"lng":-74.619938,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Installing a 7,080-square-foot generator room slab and pads for two new 2,000-kilovolt-amp gensets; Installing all structural steel, concrete pads, and associated mechanical and electrical work for two 1,200-gallon fuel tanks in the exterior yard; Installing two 2,000- kilovolt-amp, 13.2-kilovolt interior substations.","pscan":"https://forestnj.com/case-studies/financial/morgan-stanley-data-center-expansion","uquote":"PSE&G Categories: Electric and Gas Phone: (800) 436-7734 427 Weston Canal Rd, Somerset, NJ 08873","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Morgan Stanley","spon":"Morgan Stanley","tenant":"Morgan Stanley","ay":2006,"oy":2010,"deal":"$106 million in structured financing from the New Jersey Economic Development Authority (NJEDA) in 2006","dealScan":"https://www.datacenterknowledge.com/business/morgan-stanley-plans-nj-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"forestnj.com;datacenterknowledge.com","srcUrls":["https://forestnj.com/case-studies/financial/morgan-stanley-data-center-expansion","https://www.datacenterknowledge.com/business/morgan-stanley-plans-nj-data-center"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"ad6c47140538","cid":"ad6c47140538","canon":1,"dups":1,"ftype":"data_center","name":"NJFX","city":"Wall Township","county":"Monmouth","state":"NJ","lat":40.287048,"lng":-74.152446,"cprec":"distinct","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Direct access to an existing onsite Jersey Central Power & Light substation provides NJFX with 9MW of reserved capacity, allowing tenants the flexibility of power densities ranging from 2kW to 16kW per cabinet. The site also boasts onsite N+1 UPS, allowing for on-the-fly configurable emergency power distribution.","pscan":"https://njfx.net/service-solutions/","uconf":"High","uquote":"The 64,800 square foot center is adjacent to a substation operated by Jersey Central Power & Light (JCP&L), a subsidiary of energy giant FirstEnergy.","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"NJFX","spon":"NJFX","ay":2015,"oy":2016,"deal":"Acquisition of bore pipes and conduits from SubCom LLC for approximately $2 million (February 27, 2024)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"njfx.net","srcUrls":["https://njfx.net/service-solutions/"],"lflag":"source_quality_reclassified"},{"id":"4482b8c1cd0d","cid":"4482b8c1cd0d","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Jersey City","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Power - Power to facility is provided via dual PSE&G feeds originating from 2 separate substations - UPS in an N+1 configuration - 6,900 gallons of on-site diesel fuel with refueling contracts.","uconf":"High","uquote":"Power to facility is provided via dual PSE&G feeds originating from 2 separate substations","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"QTS","spon":"Blackstone Infrastructure Partners, Blackstone Real Estate Income Trust, , and Blackstone Property Partners","tenant":"McGraw Hill","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1743192dc1eb","cid":"1743192dc1eb","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"East Windsor","county":"Mercer","state":"NJ","lat":40.282503,"lng":-74.703724,"cprec":"distinct","status":"Operational","mw":70,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The new data center would require additional electrical service from Jersey Central Power & Light, according to hard copy plans shared online by Charlie Kratovil, a Central Jersey organizer with Food & Water Watch and Food & Water Action. The facility's total energy usage must abide by JCP&L's total allocation. The QTS Princeton Solar Array is a 14.1 Megawatt Photovoltaic System, one of the largest, privately owned, net metered photovoltaic systems in the Western Hemisphere.","pscan":"https://nj1015.com/east-windsor-data-center-backlash/","uconf":"High","uquote":"The new data center would require additional electrical service from Jersey Central Power & Light, according to hard copy plans shared online by Charlie Kratovil, a Central Jersey organizer with Food & Water Watch and Food & Water Action.","uscan":"https://nj1015.com/east-windsor-data-center-backlash/","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"QTS","spon":"Blackstone","tenant":"Atos","ay":2014,"oy":2025,"contro":"Public opposition to data center expansion due to concerns about electricity, water usage, noise, and environmental impact, leading to planning board hearings and conditions for approval.","controScan":"https://nj1015.com/east-windsor-data-center-backlash/","deal":"Acquisition of data center facility from McGraw Hill Financial for approximately $75 million (July 2, 2014); additional $600 million QTS investment for expansion.","dealScan":"https://www.prnewswire.com/news-releases/qts-acquires-new-jersey-data-center-from-mcgraw-hill-financial-and-forms-strategic-partnership-with-atos-265589851.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"nj1015.com;prnewswire.com","srcUrls":["https://nj1015.com/east-windsor-data-center-backlash/","https://www.prnewswire.com/news-releases/qts-acquires-new-jersey-data-center-from-mcgraw-hill-financial-and-forms-strategic-partnership-with-atos-265589851.html"]},{"id":"85364e8098ee","cid":"85364e8098ee","canon":1,"dups":1,"ftype":"data_center","name":"Rackspace","city":"Franklin","county":"Somerset","state":"NJ","lat":40.565527,"lng":-74.619938,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"2.7 MW Total Utility Power; N+N Redundancy; Diesel-Powered Generators w/ 1,000 kW Capacity each","pscan":"https://www.rackspace.com/about/data-centers/new-york-metro-nyc2","uconf":"High","uquote":"PSE&G | Utilities, TV & Garbage Collection | Township of Franklin, NJ. PSE&G Categories: Electric and Gas","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Rackspace Technology","spon":"Rackspace Technology","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rackspace.com","srcUrls":["https://www.rackspace.com/about/data-centers/new-york-metro-nyc2"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"7c9dad7462ff","cid":"7c9dad7462ff","canon":1,"dups":1,"ftype":"data_center","name":"Rackspace","city":"Somerset","county":"Somerset","state":"NJ","lat":40.565527,"lng":-74.619938,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"2 MW Total Utility Power.... Two Diesel-Powered Generators w/ 2 MW Capacity each.","pscan":"https://www.rackspace.com/about/data-centers/new-york-metro-nyc1","uquote":"PSE&G provides electric service to 16 of our 21 towns and gas service to all 21 towns.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Rackspace Technology","spon":"Rackspace Technology","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rackspace.com","srcUrls":["https://www.rackspace.com/about/data-centers/new-york-metro-nyc1"],"lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"0de6ba8d0537","cid":"0de6ba8d0537","canon":1,"dups":1,"ftype":"data_center","name":"Tata Communications","city":"Wall","county":"Monmouth","state":"NJ","lat":40.287048,"lng":-74.152446,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"4000 Amps of power is fed to the data center, and power failure is protected by redundant 500 kVA UPS system. The secondary power source of data center is a N+1 configured diesel generators with fuel storage on site.","pscan":"https://cloudandcolocation.com/datacenters/tata-communications-wall-township-data-center/","uconf":"High","uquote":"Utilities in Wall Township. JCPL. JCPL Rates.","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"Tata Communications","spon":"Tata Group","deal":"Property acquired in partnership with NJFX in 2015.","dealScan":"https://baxtel.com/data-center/tata-wall-new-jersey","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/tata-communications-wall-township-data-center/","https://baxtel.com/data-center/tata-wall-new-jersey"]},{"id":"2229b9b3d328","cid":"2229b9b3d328","canon":1,"dups":1,"ftype":"data_center","name":"TD Bank","city":"Mount Laurel","county":"Burlington","state":"NJ","lat":39.875786,"lng":-74.663006,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"NPCC","op":"TD Bank, N.A.","spon":"The Toronto-Dominion Bank","tenant":"TD Bank, N.A.","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"7c9cb5679765","cid":"7c9cb5679765","canon":1,"dups":2,"ftype":"data_center","name":"TD Bank","city":"Mt Laurel Township","county":"Burlington","state":"NJ","lat":39.875786,"lng":-74.663006,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"0922e0ba5355","cid":"7c9cb5679765","canon":0,"dups":2,"ftype":"data_center","name":"TD Bank","city":"Mt Laurel Township","county":"Burlington","state":"NJ","lat":39.875786,"lng":-74.663006,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"1844e20b509e","cid":"1844e20b509e","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Newark","county":"Essex","state":"NJ","lat":40.7874,"lng":-74.246292,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Newark data center provides AC and DC power to the customers equipment. The facility has A & B DC power feeds offering redundancy and protection.","pscan":"https://cloudandcolocation.com/datacenters/verizon-business-standard-dc-newark/","uconf":"High","uquote":"The wires company in Newark is Public Service Electric & Gas (PSEG).","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Verizon","spon":"Verizon","tenant":"Multiple (colocation)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/verizon-business-standard-dc-newark/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","rawUkey":"15477|NJ","rawUname":"Public Service Elec & Gas Co","reportedUtility":"Public Service Elec & Gas Co"},{"id":"2495cfd9f1b6","cid":"2495cfd9f1b6","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Weehawken","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"PSE&G","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"73ce7d180f76","cid":"73ce7d180f76","canon":1,"dups":1,"ftype":"data_center","name":"Cologix","city":"Parsippany","county":"Morris","state":"NJ","lat":40.858896,"lng":-74.547292,"cprec":"distinct","status":"Proposed","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"62b1ceb06da5","cid":"62b1ceb06da5","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Clifton","county":"Passaic","state":"NJ","lat":41.036655,"lng":-74.299408,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Jersey Central Power and Light.","pscan":"https://www.interconnection.fyi/data-center/project/dxc-technology-1e11468a","uconf":"High","uquote":"Grid Operator. Jersey Central Power and Light.","ukey":"9726|NJ","uname":"Jersey Central Power & Lt Co","rto":"PJM","nerc":"NPCC","op":"DXC Technology","spon":"DXC Technology","tenant":"Credit Suisse","ay":2011,"oy":2024,"deal":"DXC Technology acquired a Credit Suisse data center in Clifton, New Jersey, for an undisclosed sum in May 2019, and signed a long-term 13-plus year managed colocation services agreement with Credit Suisse (USA), Inc.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/dxc-technology-1e11468a"],"lflag":"shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"0e941a920337","cid":"0e941a920337","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Secaucus","county":"Hudson","state":"NJ","lat":40.731375,"lng":-74.078601,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Equinix will be converting the existing building located at 600 Jefferson Avenue into a data center and is proposing to install six emergency engine-generators (generators) in two phases.","uconf":"High","uquote":"In 2000, PSE&G was split into PSE&G, a regulated gas and electric delivery company in New Jersey and PSEG Power, an unregulated US power generation company.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Equinix","spon":"Equinix","tenant":"Options Technology","ay":2023,"oy":2026,"contro":"Public hearing held due to facility being in an overburdened community.","controScan":"https://dep.nj.gov/wp-content/uploads/ej/docs/bloom-equinix-transcript-20231205.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"dep.nj.gov","srcUrls":["https://dep.nj.gov/wp-content/uploads/ej/docs/bloom-equinix-transcript-20231205.pdf"],"rawUkey":"15477|NJ","rawUname":"Public Service Elec & Gas Co","reportedUtility":"Public Service Elec & Gas Co","lflag":"utility_alias_corrected"},{"id":"dcec516d39a5","cid":"dcec516d39a5","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Edison","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"PSE&G","uquote":"Powered by PSE&G®","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"Iron Mountain","spon":"Iron Mountain","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"573fe77ab876","cid":"573fe77ab876","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Piscataway","county":"Middlesex","state":"NJ","lat":40.439621,"lng":-74.40743,"cprec":"shared_centroid","status":"Proposed","mw":65,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"QTS Realty Trust (NYSE: QTS), a leading provider of hybrid colocation and mega scale data center solutions today announced that, together with Citigroup Energy Inc. and Calpine Energy Solutions, LLC, it has signed a 10-year agreement to purchase renewable energy equal to the expected electricity needs of the Company's data centers in Chicago, Ill. and Piscataway, N.J.","uquote":"Piscataway OverviewPSE&G is currently conducting statewide electric reliability improvements to its utility infrastructure.","ukey":"15477|NJ","uname":"Public Service Elec & Gas Co","rto":"PJM","nerc":"NPCC","op":"QTS","spon":"Blackstone","oy":2023,"deal":"10-year agreement to purchase 100% renewable energy with Citigroup Energy Inc. and Calpine Energy Solutions, LLC (May 23, 2019)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"004e049650a6","cid":"004e049650a6","canon":1,"dups":1,"ftype":"data_center","name":"APS M&O Data Center Drops","city":"Albuquerque","county":"Bernalillo","state":"NM","lat":35.053628,"lng":-106.66908,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"a2cc58a0d772","cid":"a2cc58a0d772","canon":1,"dups":1,"ftype":"data_center","name":"Artesia General Hospital - Data Center Renovation","city":"Artesia","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","op":"Artesia General Hospital","spon":"Artesia General Hospital","ay":2022,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"8129cf944d1b","cid":"8129cf944d1b","canon":0,"dups":1,"ftype":"data_center","name":"FACEBOOK - BUILDING 5","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Los Lunas will be outfitted with the latest OCP compute, storage, and networking technologies and will be powered by 100-percent renewable energy, making it one of the most efficient and sustainable data centers in the world.","pscan":"https://engineering.fb.com/2016/09/14/data-center-engineering/facebook-in-los-lunas-our-newest-data-center/","uconf":"High","uquote":"To that end, we worked closely with the Public Service of New Mexico to develop a new renewable energy tariff that allows customers to purchase renewable resources.","uscan":"https://engineering.fb.com/2019/02/07/data-center-engineering/los-lunas-data-center/","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"engineering.fb.com","lflag":"operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://engineering.fb.com/2016/09/14/data-center-engineering/facebook-in-los-lunas-our-newest-data-center/","https://engineering.fb.com/2019/02/07/data-center-engineering/los-lunas-data-center/"]},{"id":"c940b82f77bd","cid":"13463eb2793f","canon":0,"dups":5,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":120,"pc":"Grid","pconf":"High","pquote":"In keeping with our commitment to efficiency and to supporting our global operations with 100 percent renewable energy, we have worked with the utility and leading developers to bolster New Mexico's renewable energy market. PNM will power the data center, and a subsidiary of the company will build solar arrays and eventually add wind power. Facebook will cover the costs of both investments. PNM also will provide backup power, should renewable energy be insufficient to meet the demands of the...","uconf":"High","uquote":"PNM will power the data center, and a subsidiary of the company will build solar arrays and eventually add wind power. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers, ordering the company to absorb a proportionate share. Community members attending public meetings on these projects have raised concerns about water consumption, energy demands, lack of community involvement and health impacts from greenhouse gas emissions and air pollution.","deal":"Village of Los Lunas approved up to $30 billion in industrial revenue bonds (IRBs) in 2016, and over $40 billion in IRBs in 2021 for expansions. The New Mexico Economic Development Department contributed a $10 million Local Economic Development Act (LEDA) grant. Meta also announced 150-megawatt geothermal power purchase agreements in June 2025.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;mmcginvest.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"100-250 MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"5386a736e70c","cid":"5386a736e70c","canon":0,"dups":3,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":320,"pc":"Grid","pconf":"High","pquote":"Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus. PNM then recovers the costs associated with these renewable energy contracts from Meta through a separate specialist contract.","pscan":"https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"Tax incentive controversy, renegotiation of energy contracts, community opposition lawsuit, water consumption concerns.","deal":"February 2025: $7.5 billion industrial revenue bond approved for expansion. June 2025: 150MW geothermal PPA with XGS Energy and 150MW with Sage Geosystems.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"energy-storage.news;datacenters.atmeta.com","srcUrls":["https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"band":"250+ MW","lflag":"merged_duplicate"},{"id":"743e42d1be14","cid":"5386a736e70c","canon":0,"dups":3,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":320,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms (Facebook)","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers, ordering the company to absorb a proportionate share. Critics also highlight “nonstop noise, pollution... and rapidly rising electric bills” and concerns about water scarcity in New Mexico.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"A $7.5 billion industrial revenue bond was approved in February 2025 to support expansion, and Meta purchased a 474-acre parcel in late December 2025. In June 2025, Meta announced 150-megawatt geothermal power purchase agreements with XGS Energy and Sage Geosystems.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;mmcginvest.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"250+ MW","lflag":"citation_artifact_removed"},{"id":"17c164426668","cid":"17c164426668","canon":1,"dups":1,"ftype":"data_center","name":"FACEBOOK - VCN 2 HVAC","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":40,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024.","uscan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"Questions raised about water and power consumption, and community capacity.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"$45 million deal with PNM for solar plants (2017); $800 million investment for Phase 3 (2024)","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;mmcginvest.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"acd360e64f06","cid":"acd360e64f06","canon":1,"dups":1,"ftype":"data_center","name":"FACEBOOK - VCN 2 PLUMBING","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms, (Facebook)","spon":"Meta Platforms, (Facebook)","tenant":"Meta Platforms, (Facebook)","contro":"Questions raised about water, power, and community capacity; water remains the most contested resource for the campus.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","lflag":"operational_null_capacity","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"]},{"id":"8aee3212a142","cid":"8aee3212a142","canon":1,"dups":1,"ftype":"data_center","name":"FACEBOOK - VCN ADMIN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"Regulatory pushback on energy contracts and community concerns about water use.","controScan":"https://www.energy-storage.news/facebook-told-to-rewrite-energy-storage-contracts-for-new-mexico-data-centre/","deal":"In June 2016, the village of Los Lunas approved an ordinance for up to $30 billion in industrial revenue bonds for Facebook subsidiary Greater Kudu LLC.","dealScan":"https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"govtech.com;energy-storage.news","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","https://www.energy-storage.news/facebook-told-to-rewrite-energy-storage-contracts-for-new-mexico-data-centre/"]},{"id":"f1ecfea2c215","cid":"f1ecfea2c215","canon":1,"dups":1,"ftype":"data_center","name":"Facebook Data Ceneter VCN Campus","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus. PNM then recovers the costs associated with these renewable energy contracts from Meta through a separate specialist contract.","uconf":"High","uquote":"PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024.","uscan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2019,"contro":"Questions raised about water usage and tax incentives.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"150-megawatt geothermal power purchase agreement with XGS Energy in June 2025; parallel 150-megawatt agreement with Sage Geosystems.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mmcginvest.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"]},{"id":"cce6654028bd","cid":"cce6654028bd","canon":0,"dups":1,"ftype":"data_center","name":"Facebook Data Center","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":120,"pc":"Grid","pconf":"High","pquote":"Meta's energy strategy at Los Lunas is perhaps the most technically ambitious dimension of the project. The campus draws power from a portfolio of renewable energy projects spanning six New Mexico counties and totaling 885 megawatts of contracted solar and wind capacity, supplemented by 100 megawatts of battery energy storage across two BESS projects. Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. As part of the agreement to bring the data center to New Mexico, the power used in the facility will be offset completely with renewable energy. Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus.","pscan":"https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. PNM is a regulated utility in New Mexico with operations primarily engaged in the generation, transmission and distribution of electricity. It is the state's largest electricity provider. PNM serves nearly 550,000 New Mexico residential and business customers in Greater Albuquerque, Rio Rancho, Los Lunas, Belen, Santa Fe, Las Vegas, Alamogordo, Ruidoso, Silver City, Deming, Bayard, Lordsburg and Clayton.","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"Concerns regarding water usage, energy consumption, tax incentives, and a ruling by the New Mexico Public Regulation Commission on transmission line costs.","deal":"$7.5 billion industrial revenue bond approved in February 2025 for expansion; Power Purchase Agreements for 885 MW solar/wind and 100 MW battery storage, and 150 MW geothermal.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"energy-storage.news;mmcginvest.com","srcUrls":["https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"100-250 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"fa44e62183ee","cid":"fa44e62183ee","canon":1,"dups":1,"ftype":"data_center","name":"Facebook Data Center VCN Building 1 Temp Power","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"As part of the agreement to bring the data center to New Mexico, the power used in the facility will be offset completely with renewable energy. The first installment of that renewable energy will be solar power provided by PNM that will be generated on three 10MW sites. The first solar plant will be built adjacent to the Facebook Data Center in Los Lunas.... PNM also will provide backup power, should renewable energy be insufficient to meet the demands of the center.... Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus.","pscan":"https://www.pnm.com/documents/28767612/28801977/Facebook+Data+Center.pdf/a8dd57f8-7c6c-4ea9-a642-676424b4419c","uconf":"High","uquote":"PNM will power the data center, and a subsidiary of the company will build solar arrays and eventually add wind power.... We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.... New Mexico's largest electricity provider, PNM services more than 500000 residential and business customers across the state.","uscan":"https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers, ordering the company to absorb a proportionate share.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Los Lunas approved up to $30 billion in industrial revenue bonds for Facebook, providing a 30-year property tax break, $10 million in Local Economic Development Act funding, $3 million in Job Incentive Training Program money, and up to $1.6 million in gross receipts tax reimbursement annually. PNM invested approximately $45 million into a 30MW solar project for the data center.","dealScan":"https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"pnm.com;govtech.com;mmcginvest.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.pnm.com/documents/28767612/28801977/Facebook+Data+Center.pdf/a8dd57f8-7c6c-4ea9-a642-676424b4419c","https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"]},{"id":"10f2b8858ac2","cid":"10f2b8858ac2","canon":1,"dups":1,"ftype":"data_center","name":"Facebook Data Center VCN Building 2 Temp Power","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Continental Divide El COOP INC.","uconf":"High","uquote":"Grid Operator. Continental Divide El COOP INC.","ukey":"4265|NM","uname":"Continental Divide El Coop Inc","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6fb1ea493b97","cid":"6fb1ea493b97","canon":1,"dups":1,"ftype":"data_center","name":"Facebook Prefabrication Tent Gas Rough-in for 2 new unit heaters","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Public Service Company of New Mexico (PNM)","pdt":"three 20-year Purchase Power Agreements (“PPAs”) for 290 MW total of solar resources; and three 20-year Energy Storage Agreements (“ESAs”) for approximately 268 MW total of four-hour batter energy storage systems; 150-megawatt geothermal power purchase agreement with XGS Energy; a parallel 150-megawatt agreement with Sage Geosystems","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a055b78ea23a","cid":"a055b78ea23a","canon":1,"dups":1,"ftype":"data_center","name":"Facebook VCN","city":"Chattanooga","county":"Hamilton","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: City of Chattanooga - (TN)","pscan":"https://www.interconnection.fyi/data-center/project/facebook-vcn-53585209","uquote":"Grid Operator: City of Chattanooga - (TN)","uscan":"https://www.interconnection.fyi/data-center/project/facebook-vcn-53585209","ukey":"6204|NM","uname":"City of Farmington - (NM)","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/facebook-vcn-53585209"]},{"id":"46cee8682ffd","cid":"46cee8682ffd","canon":0,"dups":1,"ftype":"data_center","name":"FACEBOOK VLL-5&6 DATA CENTER MECHANICAL","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":40,"pc":"Grid","pconf":"High","pquote":"Meta's energy strategy at Los Lunas is perhaps the most technically ambitious dimension of the project. The campus draws power from a portfolio of renewable energy projects spanning six New Mexico counties and totaling 885 megawatts of contracted solar and wind capacity, supplemented by 100 megawatts of battery energy storage across two BESS projects. Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. PNM also will provide backup power, should renewable energy be insufficient to meet the demands of the center.","pscan":"https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","uquote":"PNM will power the data center, and a subsidiary of the company will build solar arrays and eventually add wind power. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2021,"contro":"Concerns about water usage, tax incentives, and renegotiation of energy contracts.","deal":"Up to $30 billion in industrial revenue bonds approved in June 2016; $45 million deal with PNM for solar plants; PPAs for 50MW solar, 190MW solar, and 100MW battery storage signed with PNM.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"govtech.com;datacenters.atmeta.com","srcUrls":["https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"band":"25-50 MW","lflag":"merged_duplicate"},{"id":"77a1b5326915","cid":"77a1b5326915","canon":1,"dups":1,"ftype":"data_center","name":"FACEBOOK VLL-5&6 DATA CENTER MECHANICAL","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":80,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2019,"contro":"Community concerns about water use and a regulatory ruling regarding transmission line costs.","deal":"Industrial revenue bonds totaling $40 billion for Facebook subsidiary Greater Kudu, LLC, approved by Los Lunas Village Council.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"band":"50-100 MW"},{"id":"95b21ac4f28f","cid":"95b21ac4f28f","canon":1,"dups":1,"ftype":"data_center","name":"Los Lunas Data Center - VLL5","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":320,"pc":"Grid","pconf":"High","pquote":"The campus draws power from a portfolio of renewable energy projects spanning six New Mexico counties and totaling 885 megawatts of contracted solar and wind capacity, supplemented by 100 megawatts of battery energy storage across two BESS projects. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","pscan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. Utilities such as PNM and Xcel Energy manage large portions of the transmission system.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2019,"contro":"Questions raised about water, power, and community capacity.","deal":"150-megawatt geothermal power purchase agreement with XGS Energy (June 2025), parallel 150-megawatt agreement with Sage Geosystems.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"mmcginvest.com;datacenters.atmeta.com","srcUrls":["https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"band":"250+ MW"},{"id":"1e5ce8c7dc49","cid":"1e5ce8c7dc49","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":320,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta Platforms","tenant":"Meta","ay":2016,"oy":2019,"contro":"In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers, ordering the company to absorb a proportionate share. Water consumption is also a contested resource, with Meta holding a guaranteed water allocation of 1.5 million gallons per day from the Village of Los Lunas, expandable to 4.5 million gallons per day at full buildout.","deal":"In February 2025, the Los Lunas Village Council approved a $7.5 billion industrial revenue bond to support expansion. In June 2025, Meta announced a 150-megawatt geothermal power purchase agreement with XGS Energy, and a parallel 150-megawatt agreement with Sage Geosystems. Phase 3, with an estimated budget of $800 million, is expected to break ground in spring 2025, bringing total campus investment to approximately $3.3 billion at completion.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"band":"250+ MW"},{"id":"0777489ed518","cid":"0777489ed518","canon":1,"dups":1,"ftype":"data_center","name":"Meta VCN Phase 1 Power Zone Center","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2019,"contro":"In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers, ordering the company to absorb a proportionate share.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Initial $250 million investment for the first building of Phase 1, announced in late 2016.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mmcginvest.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"]},{"id":"3aa9c3da64bd","cid":"3aa9c3da64bd","canon":1,"dups":1,"ftype":"data_center","name":"VLL4 DATA CENTER","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Operational","mw":40,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2024,"contro":"Questions raised about water, power, and community capacity.","deal":"$7.5 billion industrial revenue bond approved in February 2025 for expansion.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"band":"25-50 MW"},{"id":"67cfad8f63c2","cid":"67cfad8f63c2","canon":1,"dups":2,"ftype":"data_center","name":"98,695 sf data center","city":"Albuquerque","county":"Bernalillo","state":"NM","lat":35.053628,"lng":-106.66908,"cprec":"shared_centroid","status":"Construction","mw":10,"uquote":"Public Service Company of New Mexico (PNM), an investor-owned electric utility, provides electricity to the majority of Greater Albuquerque.","uscan":"https://live.abq.org/connect/utilities/","rto":"non-RTO","nerc":"WECC","op":"Oppidan Investment Company","spon":"Oppidan Investment Company","ay":2025,"oy":2025,"deal":"Oppidan acquired the Westpointe 40 Business Park site from Titan Development in September 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"live.abq.org","srcUrls":["https://live.abq.org/connect/utilities/"],"band":"10-25 MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"2302d9aa943e","cid":"2302d9aa943e","canon":0,"dups":1,"ftype":"data_center","name":"facebook","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":120,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked closely with the Public Service of New Mexico to develop a new renewable energy tariff that allows customers to purchase renewable resources.","uscan":"https://engineering.fb.com/2019/02/07/data-center-engineering/los-lunas-data-center/","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2025,"contro":"New Mexico Public Regulation Commission ruled Facebook could not pass $39 million transmission line cost to ratepayers; community concerns about water use.","deal":"$7.5 billion Industrial Revenue Bond approved by Los Lunas Village Council in February 2025 for expansion.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;engineering.fb.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://engineering.fb.com/2019/02/07/data-center-engineering/los-lunas-data-center/"],"band":"100-250 MW","lflag":"source_quality_reclassified stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"39ad49f01c07","cid":"39ad49f01c07","canon":0,"dups":1,"ftype":"data_center","name":"facebook","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":120,"pc":"Grid","pconf":"High","pquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. We support 11 new renewable energy projects and two battery storage projects in New Mexico, and helped create a renewable energy program for other customers looking to meet their renewable energy goals.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"The Public Service Company of New Mexico, which created an energy proposal to help attract the center, all released statements enthusiastically welcoming the company to New Mexico.","uscan":"https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"Community concerns about water use and a $39 million utility bill for a transmission line.","controScan":"https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/","deal":"$7.5 billion industrial revenue bond approved in February 2025 for expansion and an estimated $800 million budget for Phase 3 approved in December 2024.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;govtech.com;watereducationcolorado.org","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/"],"band":"100-250 MW","lflag":"source_quality_reclassified stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"d8e3ad9e5547","cid":"d8e3ad9e5547","canon":1,"dups":1,"ftype":"data_center","name":"Facebook","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":480,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2027,"contro":"Community concerns about water use, tax incentives, and a dispute over who should pay for a transmission line.","deal":"Industrial Revenue Bonds (IRBs) of up to $30 billion (2016), $40 billion (2021), and $7.5 billion (Feb 2025). Power Purchase Agreements (PPAs) with NextEra Energy Resources for 190MW solar and 168MW battery storage (2026-2028), and 150MW geothermal PPAs with XGS Energy and Sage Geosystems (June 2025, targeting 2030).","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"band":"250+ MW"},{"id":"8d1f30980456","cid":"8d1f30980456","canon":0,"dups":1,"ftype":"data_center","name":"Facebook","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":280,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta Platforms","tenant":"Meta","ay":2016,"oy":2025,"contro":"Community concerns about water use and tax incentive debates. New Mexico Public Regulation Commission ruled Facebook could not pass full cost of a $39 million dedicated transmission line to PNM ratepayers.","controScan":"https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/","deal":"The Los Lunas Village Council approved the issuance of a $7.5 billion industrial revenue bond in February 2025 to support expansion.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;watereducationcolorado.org","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/"],"band":"250+ MW","oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"b928bd45e695","cid":"b928bd45e695","canon":0,"dups":1,"ftype":"data_center","name":"Facebook","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.... We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2021,"deal":"Investment of nearly $2.5 billion+","dealScan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"lflag":"citation_artifact_removed stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"68c1133e66ab","cid":"68c1133e66ab","canon":0,"dups":1,"ftype":"data_center","name":"Facebook","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus. PNM then recovers the costs associated with these renewable energy contracts from Meta through a separate specialist contract.","pscan":"https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers. Community concerns about water use and impacts on local farms and businesses have also been raised.","deal":"$7.5 billion industrial revenue bond approved in February 2025 for expansion.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"energy-storage.news;datacenters.atmeta.com","srcUrls":["https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"lflag":"source_quality_reclassified stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"b41373ff3366","cid":"b41373ff3366","canon":0,"dups":1,"ftype":"data_center","name":"Facebook","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":320,"pc":"Grid","pconf":"High","pquote":"PNM will power the data center, and a subsidiary of the company will build solar arrays and eventually add wind power. Facebook will cover the costs of both investments. PNM also will provide backup power, should renewable energy be insufficient to meet the demands of the center.","pscan":"https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","uquote":"Earlier this year, Facebook struck a $45 million deal with the Public Service Company of New Mexico (PNM), which will build three new solar plants to power the data center complex.","uscan":"https://www.constructiondive.com/news/facebook-ups-investment-in-nm-data-center-to-1b/510954/","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2019,"contro":"Community concerns about water use and regulatory pushback on transmission line costs.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Los Lunas approved up to $40 billion in industrial revenue bonds for Facebook subsidiary Greater Kudu, LLC (March 2021) and a $45 million deal with PNM for solar plants (2017).","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"govtech.com;constructiondive.com;mmcginvest.com","srcUrls":["https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","https://www.constructiondive.com/news/facebook-ups-investment-in-nm-data-center-to-1b/510954/","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"250+ MW","oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"d7b17ae3d699","cid":"d7b17ae3d699","canon":1,"dups":1,"ftype":"data_center","name":"FACEBOOK - BUILDING 5","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":40,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","uquote":"Transmission line termination structures visible at the lower frame indicate direct interconnection to the regional grid — in this case, the Public Service Company of New Mexico (PNM) transmission network.","uscan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2021,"contro":"Water consumption concerns in an arid region.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"PNM approved for multiple Power Purchase Agreements (PPAs) for renewable energy, including 266 MW in 2018 and six new agreements filed in 2025.","dealScan":"https://cleantechnica.com/2018/10/23/facebook-los-lunas-data-center-boosted-by-100-megawatts-of-solar/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mmcginvest.com;cleantechnica.com","srcUrls":["https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","https://cleantechnica.com/2018/10/23/facebook-los-lunas-data-center-boosted-by-100-megawatts-of-solar/"],"band":"25-50 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"7da46266da02","cid":"13463eb2793f","canon":0,"dups":5,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":120,"pc":"Grid","pconf":"High","pquote":"Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus.","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2025,"contro":"Community concerns about water use and utility cost shifts.","deal":"$7.5 billion industrial revenue bond approved in February 2025; 150MW geothermal PPA with XGS Energy and 150MW with Sage Geosystems in June 2025.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf"],"band":"100-250 MW","lflag":"high_confidence_duplicate_consolidated stale_future_status_year","oy_stale":1},{"id":"465499d268e7","cid":"465499d268e7","canon":1,"dups":1,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":480,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. The campus draws power from a portfolio of renewable energy projects spanning six New Mexico counties and totaling 885 megawatts of contracted solar and wind capacity, supplemented by 100 megawatts of battery energy storage across two BESS projects. PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus. PNM then recovers the costs associated with these renewable energy contracts from Meta through a separate specialist contract.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"To that end, we worked closely with the Public Service of New Mexico to develop a new renewable energy tariff that allows customers to purchase renewable resources. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024.","uscan":"https://engineering.fb.com/2019/02/07/data-center-engineering/los-lunas-data-center/","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"contro":"Regulatory pushback on transmission line costs, community concerns about water consumption, energy demands, noise, pollution, and rising electric bills.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"$7.5 billion industrial revenue bond approved in February 2025 for expansion.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;engineering.fb.com;mmcginvest.com","lflag":"online_before_announced","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://engineering.fb.com/2019/02/07/data-center-engineering/los-lunas-data-center/","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"250+ MW"},{"id":"f9a5d8505d98","cid":"13463eb2793f","canon":0,"dups":5,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":120,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus. PNM then recovers the costs associated with these renewable energy contracts from Meta through a separate specialist contract.","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024.","uscan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta Platforms","tenant":"Meta","ay":2016,"oy":2019,"contro":"In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers. Community members have raised concerns about water consumption, energy demands, lack of community involvement, and health impacts from greenhouse gas emissions and air pollution. Critics also highlight \"nonstop noise, pollution... and rapidly rising electric bills.\"","deal":"$7.5 billion industrial revenue bond approved in February 2025 for expansion; 150-megawatt geothermal PPA with XGS Energy and 150-megawatt PPA with Sage Geosystems announced June 2025.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mmcginvest.com","srcUrls":["https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"100-250 MW","lflag":"citation_artifact_removed source_quality_reclassified high_confidence_duplicate_consolidated stale_future_status_year","oy_stale":1},{"id":"13463eb2793f","cid":"13463eb2793f","canon":0,"dups":5,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":120,"pc":"Grid","pconf":"High","pquote":"In keeping with our commitment to efficiency and to supporting our global operations with 100 percent renewable energy, we have worked with the utility and leading developers to bolster New Mexico's renewable energy market. We have signed commitments that will add more than 396 MW of new wind and solar resources to the New Mexico electric grid.... Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions.... PNM will power the data center, and a subsidiary of the company will build solar arrays and eventually add wind power. Facebook will cover the costs of both investments. PNM also will provide backup power, should renewable energy be insufficient to meet the demands of the data center.","pscan":"https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.... And in mid-August, the five-member state Public Regulation Commission unanimously approved PNM's proposal, first pitched in July, to bring the data center to New Mexico. PNM will power the data center, and a subsidiary of the company will build solar arrays and eventually add wind power.","uscan":"https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2024,"contro":"Community concerns about water use and the possible impacts on local farms and businesses. In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers, ordering the company to absorb a proportionate share.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Los Lunas agreed to give up property taxes for 30 years in exchange for annual payments from Facebook starting at $50,000 and going as high as $500,000. The village council in June also approved an ordinance allowing for the issuance of up to $30 billion in industrial revenue bonds to lure the facility to Los Lunas. Facebook struck a $45 million deal with the Public Service Company of New Mexico (PNM), which will build three new solar plants to power the data center complex.","dealScan":"https://www.constructiondive.com/news/facebook-ups-investment-in-nm-data-center-to-1b/510954/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"govtech.com;constructiondive.com;mmcginvest.com","srcUrls":["https://www.govtech.com/gov-experience/Facebook-Chooses-New-Mexico-for-Site-of-its-250-Million-Data-Center.html","https://www.constructiondive.com/news/facebook-ups-investment-in-nm-data-center-to-1b/510954/","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"100-250 MW","lflag":"citation_artifact_removed source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"57b456c15abc","cid":"57b456c15abc","canon":0,"dups":1,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Transmission line termination structures visible at the lower frame indicate direct interconnection to the regional grid — in this case, the Public Service Company of New Mexico (PNM) transmission network. Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus.","pscan":"https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","uconf":"High","uquote":"Transmission line termination structures visible at the lower frame indicate direct interconnection to the regional grid — in this case, the Public Service Company of New Mexico (PNM) transmission network. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2025,"contro":"In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers, ordering the company to absorb a proportionate share. The decision established a precedent — significant for New Mexico's expanding data center pipeline — that public utility customers need not fully subsidize the interconnection infrastructure of hyperscale private tenants.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Phase 3 approved by Village Council in December 2024 with an estimated budget of $800 million, bringing total campus investment to approximately $3.3 billion at completion. A $7.5 billion industrial revenue bond was approved in February 2025 to support expansion.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"energy-storage.news;datacenters.atmeta.com;mmcginvest.com","srcUrls":["https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"09134de54f97","cid":"13463eb2793f","canon":0,"dups":5,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":120,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2024,"contro":"In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers, ordering the company to absorb a proportionate share.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"$7.5 billion industrial revenue bond approved in February 2025","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;mmcginvest.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"100-250 MW","lflag":"high_confidence_duplicate_consolidated stale_future_status_year","oy_stale":1},{"id":"2de4052a44ba","cid":"5386a736e70c","canon":0,"dups":3,"ftype":"data_center","name":"FACEBOOK - VCN","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":320,"pc":"Grid","pconf":"High","pquote":"Meta's energy strategy at Los Lunas is perhaps the most technically ambitious dimension of the project. The campus draws power from a portfolio of renewable energy projects spanning six New Mexico counties and totaling 885 megawatts of contracted solar and wind capacity, supplemented by 100 megawatts of battery energy storage across two BESS projects.... PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024.","pscan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","uquote":"PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024.... We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"Water consumption concerns, tax incentive pushback, and a regulatory ruling against passing transmission line costs to ratepayers.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Industrial Revenue Bonds (IRBs) from Village of Los Lunas (December 2024); 150MW geothermal PPA with XGS Energy (June 2025); 150MW geothermal PPA with Sage Geosystems (June 2025); 2.5 GW of clean energy contracts with NextEra Energy Resources (December 2025).","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mmcginvest.com","srcUrls":["https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"250+ MW","lflag":"citation_artifact_removed source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"2434662cdd62","cid":"2434662cdd62","canon":1,"dups":1,"ftype":"data_center","name":"FACEBOOK - VCN ADMIN PLUMBING","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"Grid Operator. Continental Divide El COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/facebook-vcn-26e53ed8","ukey":"4265|NM","uname":"Continental Divide El Coop Inc","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","contro":"Community concerns about water use and the possible impacts on local farms and businesses.","controScan":"https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/","deal":"Los Lunas Village Council approved issuance and sale of industrial revenue bonds totaling $40 billion for Facebook subsidiary Greater Kudu, LLC to finance data center expansion.","dealScan":"https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;interconnection.fyi;watereducationcolorado.org","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.interconnection.fyi/data-center/project/facebook-vcn-26e53ed8","https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/"]},{"id":"3a48f525c950","cid":"3a48f525c950","canon":1,"dups":1,"ftype":"data_center","name":"Facebook Data Center","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":320,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"Public Service Company of New Mexico (PNM) is proposing two 50-MW solar facilities, one near Moriarty called Britton Solar Energy Center and the other northwest of Rio Rancho called Encino Solar Energy Center.... PNM will buy the electricity from these subsidiaries under purchased power agreements (PPAs) for delivery to Facebook.","uscan":"https://www.krwg.org/regional/2018-09-05/prc-agrees-to-fast-track-two-solar-projects-for-facebook-data-center-expansion","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers. Community members have raised concerns about water consumption, energy demands, lack of community involvement and health impacts from greenhouse gas emissions and air pollution.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"In June 2016, the Village of Los Lunas authorized up to $30 billion in Industrial Revenue Bonds (IRBs). The New Mexico Economic Development Department contributed a $10 million Local Economic Development Act (LEDA) grant. In December 2024, Phase 3 was approved through new IRBs with an estimated budget of $800 million. In June 2025, Meta announced a 150-megawatt geothermal power purchase agreement with XGS Energy and a parallel 150-megawatt agreement with Sage Geosystems.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;krwg.org;mmcginvest.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.krwg.org/regional/2018-09-05/prc-agrees-to-fast-track-two-solar-projects-for-facebook-data-center-expansion","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"250+ MW","lflag":"citation_artifact_removed stale_future_status_year","oy_stale":1},{"id":"6bae13a7ab76","cid":"6bae13a7ab76","canon":0,"dups":1,"ftype":"data_center","name":"Facebook Data Center","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico. PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024. PNM also will provide backup power, should renewable energy be insufficient to meet the demands of the center.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms (Facebook)","tenant":"Meta Platforms (Facebook)","ay":2016,"oy":2019,"contro":"Community concerns about water use and the New Mexico Public Regulation Commission ruling that Facebook could not pass the full cost of a transmission line to ratepayers.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Industrial Revenue Bonds (IRBs) authorized up to $30 billion in June 2016, additional IRBs of up to $7.5 billion across six series approved in December 2024, and Power Purchase Agreements (PPAs) for 50MW solar, 190MW solar, and 100MW/400MWh battery storage.","dealScan":"https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;energy-storage.news;mmcginvest.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"54e1a6998f09","cid":"54e1a6998f09","canon":1,"dups":1,"ftype":"data_center","name":"facebook fortis construction","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":885,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus. PNM then recovers the costs associated with these renewable energy contracts from Meta through a separate specialist contract.","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024.","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2025,"contro":"In 2019, the New Mexico Public Regulation Commission ruled that Facebook could not pass the full cost of a $39 million dedicated transmission line to PNM ratepayers. Community members have also raised concerns about water consumption, energy demands, noise, pollution, and rising electric bills.","deal":"$7.5 billion industrial revenue bond approved in February 2025 for expansion","dealScan":"https://bebeez.eu/2025/01/17/meta-plans-expansion-of-los-lunas-data-center-campus-in-new-mexico/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bebeez.eu","srcUrls":["https://bebeez.eu/2025/01/17/meta-plans-expansion-of-los-lunas-data-center-campus-in-new-mexico/"],"band":"250+ MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"f7774819d9b8","cid":"f7774819d9b8","canon":0,"dups":3,"ftype":"data_center","name":"Facebook VCN","city":"Chattanooga","county":"Hamilton","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"8c40cae37af0","cid":"f7774819d9b8","canon":0,"dups":3,"ftype":"data_center","name":"Facebook VCN","city":"Chattanooga","county":"Hamilton","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"16c27810ecbc","cid":"f7774819d9b8","canon":0,"dups":3,"ftype":"data_center","name":"Facebook VCN","city":"Chattanooga","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Construction","proc":"Dedicated PPA","pcp":"XGS Energy, Sage Geosystems, NextEra Energy Resources, Exus Renewables (via PNM)","pdt":"150 MW (XGS Energy geothermal, operational by 2030); 150 MW (Sage Geosystems geothermal); 885 MW total contracted solar and wind capacity; 100 MW battery storage; 20-year terms for some PPAs","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c3a192d803d6","cid":"c3a192d803d6","canon":1,"dups":1,"ftype":"data_center","name":"Facebook VCN - MSG-1A/1B","city":"Chattanooga","county":"Hamilton","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"cc9b308ea55a","cid":"cc9b308ea55a","canon":0,"dups":1,"ftype":"data_center","name":"Facebook/ Fortis construction","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":320,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.... We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta Platforms","tenant":"Meta","ay":2016,"oy":2025,"contro":"New Mexico Public Regulation Commission ruled Facebook could not pass full cost of a $39 million dedicated transmission line to PNM ratepayers in 2019. Ongoing concerns about water usage and tax incentives for data center expansions.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Phase 3 approved by Village Council in December 2024 through new Industrial Revenue Bonds for two additional buildings with an estimated budget of $800 million.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;mmcginvest.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"250+ MW","lflag":"citation_artifact_removed stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"e4f17c6032e0","cid":"e4f17c6032e0","canon":0,"dups":1,"ftype":"data_center","name":"Facebook/ Fortis Construction","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal. PNM is procuring these renewable resources from third-party developers on behalf of Meta to support its data centre campus. PNM then recovers the costs associated with these renewable energy contracts from Meta through a separate specialist contract.","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta Platforms","tenant":"Meta","ay":2016,"contro":"Water consumption and tax incentives have generated controversy.","deal":"$7.5 billion industrial revenue bond approved in February 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"421abbef1e80","cid":"421abbef1e80","canon":0,"dups":1,"ftype":"data_center","name":"Facebook/ Fortis Construction","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":400,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.... We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.... Instead of utilising behind-the-meter solar and storage, PNM has procured these renewable resources from third-party developers on behalf of Meta to support its data centre campus. PNM then recovers the costs associated with these renewable energy contracts from Meta through a separate specialist contract.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uconf":"High","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.... PNM will power the data center, and a subsidiary of the company will build solar arrays and eventually add wind power.... Investor-owned utility (IOU) Public Service Company of New Mexico (PNM) is seeking regulatory approval of offtake agreements associated with three hybrid battery energy storage system (BESS) projects in the Southwestern US state.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2027,"contro":"Community concerns about water use and impacts on local farms and businesses; New Mexico Public Regulation Commission ruled Facebook could not pass full cost of a $39 million dedicated transmission line to PNM ratepayers; concerns about energy demands, lack of community involvement and health impacts from greenhouse gas emissions and air pollution.","controScan":"https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/","deal":"$7.5 billion industrial revenue bond approved in February 2025 for expansion","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;watereducationcolorado.org","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://watereducationcolorado.org/fresh-water-news/briefly-facebook-data-center-water-use-scrutinized/"],"band":"250+ MW","lflag":"citation_artifact_removed,merged_duplicate"},{"id":"17440a8dc621","cid":"60235265611a","canon":0,"dups":2,"ftype":"data_center","name":"LVN - 1 Data Center","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Construction","mw":40,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2024,"contro":"Questions raised about water, power, and community capacity.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"Over $2.5 billion in direct investment in the data center campus.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;mmcginvest.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"band":"25-50 MW","oy_stale":1,"lflag":"stale_future_status_year"},{"id":"88e93bcb71dd","cid":"88e93bcb71dd","canon":1,"dups":1,"ftype":"data_center","name":"META LVN-1","city":"Chattanooga","county":"Hamilton","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"10fdf1e0590d","cid":"10fdf1e0590d","canon":1,"dups":2,"ftype":"data_center","name":"META VCN Phase 1","city":"Chattanooga","county":"Hamilton","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"84bcf212620f","cid":"84bcf212620f","canon":0,"dups":1,"ftype":"data_center","name":"META VCN Phase 1","city":"Chattanooga","county":"Hamilton","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"b466eddf8664","cid":"10fdf1e0590d","canon":0,"dups":2,"ftype":"data_center","name":"META VCN Phase 1","city":"Chattanooga","county":"Hamilton","state":"NM","lat":34.4,"lng":-106.1,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"5b5d42a6174e","cid":"5b5d42a6174e","canon":0,"dups":2,"ftype":"data_center","name":"NMT DATA CENTER -CAPACITY EXPANSION","city":"Socorro","county":"Socorro","state":"NM","lat":33.991658,"lng":-106.939136,"cprec":"distinct","status":"Construction","pc":"Grid","pconf":"Medium","pquote":"Electricity from the public utility grid is the primary energy source for most data centers. It supplies the power required for data center operations, including IT equipment, cooling systems, lighting, and building infrastructure. Large facilities often connect to medium‑ or high‑voltage lines to secure stable capacity and consistent delivery.","pscan":"https://opm-group.com/sources-of-energy-power-required-for-data-centers/","uconf":"High","uquote":"Electric utilities are provided by Socorro Electric Cooperative: 575-835-0560.","uscan":"https://www.socorronm.gov/city-services/public-utilities/","ukey":"17826|NM","uname":"Springer Electric Coop, Inc","rto":"non-RTO","nerc":"WECC","op":"New Mexico Tech","spon":"National Science Foundation","tenant":"New Mexico Tech","ay":2023,"oy":2025,"deal":"National Science Foundation Major Research Instrumentation (NSF-MRI) award (#2320162) awarded in 2023","dealScan":"https://www.nmt.edu/research/computing/nmthpc.php","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"opm-group.com;socorronm.gov;nmt.edu","srcUrls":["https://opm-group.com/sources-of-energy-power-required-for-data-centers/","https://www.socorronm.gov/city-services/public-utilities/","https://www.nmt.edu/research/computing/nmthpc.php"],"oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"7c4916ee4b24","cid":"5b5d42a6174e","canon":0,"dups":2,"ftype":"data_center","name":"NMT DATA CENTER -CAPACITY EXPANSION","city":"Socorro","county":"Socorro","state":"NM","lat":33.991658,"lng":-106.939136,"cprec":"distinct","status":"Construction","pc":"Grid","pconf":"High","pquote":"The most significant design challenge was in providing the new site infrastructure, which includes a medium voltage electrical service, a new sanitary sewer service, domestic water, and a critical tie in to the campus fiber backbone.","pscan":"https://www.mcclain-yu.com/nmt-data-center","uconf":"High","uquote":"Grid Operator. Socorro Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/nmt-data-center-capacity-expansion-17aeee95","ukey":"17826|NM","uname":"Springer Electric Coop, Inc","rto":"non-RTO","nerc":"WECC","op":"New Mexico Tech","spon":"New Mexico Tech","tenant":"New Mexico Tech","oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mcclain-yu.com;interconnection.fyi","srcUrls":["https://www.mcclain-yu.com/nmt-data-center","https://www.interconnection.fyi/data-center/project/nmt-data-center-capacity-expansion-17aeee95"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"c079f3c50c59","cid":"c079f3c50c59","canon":1,"dups":1,"ftype":"data_center","name":"NMT DATA CENTER -CAPACITY EXPANSION","city":"Socorro","county":"Socorro","state":"NM","lat":33.991658,"lng":-106.939136,"cprec":"distinct","status":"Construction","mw":2000,"pc":"Behind-the-Meter","pconf":"High","pquote":"Green Data CEO Jason Bak said it could be the world's largest \"renewable-led\" data center, powered by solar and supplied primarily by atmospheric water generation systems that extract moisture from the air. Our design reflects that commitment, it's built around solar and battery as primary power and uses atmospheric water generation, minimizing reliance on the region's land, grid and water resources,” Bak wrote.","uquote":"Residents first learned of Green Data's proposal to build in partnership with the local university, New Mexico Tech, in March, when company CEO Jason Bak spoke before the Socorro Electric Cooperative Board of Trustees.","rto":"non-RTO","nerc":"WECC","op":"Green Data","ay":2026,"oy":2030,"contro":"Significant community opposition, town hall disruptions, and a county moratorium under consideration due to concerns about water use, pressure on the electric grid, and environmental impact.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text large_project_duplicate_review","srcUrls":null,"srcDom":null},{"id":"56e76c7bdca6","cid":"56e76c7bdca6","canon":1,"dups":1,"ftype":"data_center","name":"UPS Store Data Center Room — Albuquerque, NM","city":"Albuquerque","county":"Bernalillo","state":"NM","lat":35.053628,"lng":-106.66908,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The Albuquerque data center is served by PNM's reliable electrical grid.","uconf":"High","uquote":"Public Service Company of New Mexico (PNM), an investor-owned electric utility, provides electricity to the majority of Greater Albuquerque.","uscan":"https://www.abq.org/utilities/","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"abq.org","srcUrls":["https://www.abq.org/utilities/"],"rawName":"(Building Commercial) Commercial - Alteration (Fees Due)  : Commercial ? Alterations Level 2 ? Interior Remodel to Existing UPS Store / 16th. Floor / Unit-Suite # ?Applicant Work Description: Build out a datacenter room on the 16th floor of 505 Marquette. Addition of 2 205kw UPSs, 2 Power panels, 2 Transformers, 32 Server racks, power distribution, and conveyance.","lflag":"display_name_normalized source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"1e4462d74fbf","cid":"67cfad8f63c2","canon":0,"dups":2,"ftype":"data_center","name":"98,695 sf data center","city":"Albuquerque","county":"Bernalillo","state":"NM","lat":35.053628,"lng":-106.66908,"cprec":"shared_centroid","status":"Proposed","mw":10,"pc":"Grid","pconf":"High","pquote":"Utility: Public Service Company of New Mexico (PNM) Power density minimum (W/sf) = 150 Generator configuration = N + 1.","pscan":"https://baxtel.com/data-center/connect-data-centers-albuquerque-nm","uquote":"Utility: Public Service Company of New Mexico (PNM)","uscan":"https://baxtel.com/data-center/connect-data-centers-albuquerque-nm","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Oppidan Investment Company","spon":"Oppidan Investment Company","ay":2025,"oy":2025,"deal":"Oppidan acquired the Westpointe 40 Business Park site from Titan Development in September 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/connect-data-centers-albuquerque-nm"],"band":"10-25 MW","lflag":"shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"0c1df5584911","cid":"0c1df5584911","canon":1,"dups":1,"ftype":"data_center","name":"103467 META Data Center VCN 3-6","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The campus draws power from a portfolio of renewable energy projects spanning six New Mexico counties and totaling 885 megawatts of contracted solar and wind capacity, supplemented by 100 megawatts of battery energy storage across two BESS projects. Our data centers' electricity use is matched with 100% clean and renewable energy — and our global operations have reached net-zero emissions.","uconf":"High","uquote":"PNM Resources, New Mexico's primary investor-owned utility, commissioned a dedicated substation to serve the campus in November 2024. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2016,"oy":2019,"contro":"New Mexico Public Regulation Commission ruled Facebook could not pass full cost of a $39 million transmission line to ratepayers; water usage is a contested resource.","controScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","deal":"$7.5 billion industrial revenue bond approved in February 2025; $800 million budget for Phase 3 approved in December 2024.","dealScan":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mmcginvest.com","srcUrls":["https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico"],"rawName":"103467 META  Data Center VCN 3-6","lflag":"source_quality_reclassified"},{"id":"60235265611a","cid":"60235265611a","canon":1,"dups":2,"ftype":"data_center","name":"LVN - 1 Data Center","city":"Los Lunas","county":"Valencia","state":"NM","lat":34.71684,"lng":-106.806582,"cprec":"shared_centroid","status":"Unknown","mw":40,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 885 megawatts of new renewable energy and 100 megawatts of battery storage in New Mexico. We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","uquote":"We worked with the Public Service Company of New Mexico (PNM) to meet our 100% clean and renewable energy goal.","ukey":"15473|NM","uname":"Public Service Co of NM","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2016,"oy":2019,"contro":"Questions raised about water, power, and community capacity.","deal":"Over $2.5 billion in direct investment in the Los Lunas Data Center campus.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;datacenterfrontier.com","dealScan":"https://www.datacenterfrontier.com/hyperscale-cloud/article/50756708/the-desert-becomes-a-data-center-metas-33-billion-bet-on-los-lunas-new-mexico","controScan":"https://www.datacenterfrontier.com/hyperscale-cloud/article/50756708/the-desert-becomes-a-data-center-metas-33-billion-bet-on-los-lunas-new-mexico","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Los-Lunas-Data-Center.pdf","https://www.datacenterfrontier.com/hyperscale-cloud/article/50756708/the-desert-becomes-a-data-center-metas-33-billion-bet-on-los-lunas-new-mexico"],"band":"25-50 MW"},{"id":"aaa9750730b3","cid":"aaa9750730b3","canon":1,"dups":1,"ftype":"data_center","name":"Contractor's Register Inc.","city":"Shrub Oak","county":"Westchester","state":"NY","lat":41.152686,"lng":-73.745753,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"NYISO","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"61f867cfda97","cid":"61f867cfda97","canon":1,"dups":1,"ftype":"data_center","name":"Cordiant Digital Infrastructure Limited","city":"New York","county":"New York","state":"NY","lat":40.776642,"lng":-73.970187,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Hudson IX owns its own power infrastructure at 60 Hudson Street. The company has a direct feed from the utility provider, ConEd, and has access to 15MW of power.","pscan":"https://www.cordiantcap.com/hudson-interxchange-announces-major-expansion-at-new-yorks-iconic-60-hudson-street-facility/","uquote":"The company has a direct feed from the utility provider, ConEd, and has access to 15MW of power.","uscan":"https://www.cordiantcap.com/hudson-interxchange-announces-major-expansion-at-new-yorks-iconic-60-hudson-street-facility/","rto":"NYISO","nerc":"NPCC","op":"Hudson Interxchange","spon":"Cordiant Digital Infrastructure Limited","ay":2022,"oy":2026,"deal":"Acquisition of DataGryd for $74 million in January 2022. Investment of $15 million for expansion. Anticipated additional $75 million of expansion capital.","dealScan":"https://thetechcapital.com/cordiant-digital-infrastructure-invests-554m-in-acquiring-data-centres-and-towers/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cordiantcap.com;thetechcapital.com","srcUrls":["https://www.cordiantcap.com/hudson-interxchange-announces-major-expansion-at-new-yorks-iconic-60-hudson-street-facility/","https://thetechcapital.com/cordiant-digital-infrastructure-invests-554m-in-acquiring-data-centres-and-towers/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"9c4ceead6e1a","cid":"9c4ceead6e1a","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"New York","county":"New York","state":"NY","lat":40.776642,"lng":-73.970187,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"100% uptime SLA supported by N and 2N UPS, N+1 generator.... Incoming Electrical Service Type: Dual Circuits. Electrical Distribution: Parallel Redundant. UPS Type: Static UPS. UPS Redundancy: 2N. PDU Redundancy: 2N. Generator Redundancy: N+1.","uconf":"High","uquote":"BUILDING CON-ED VAULT BELOW.","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","rto":"NYISO","nerc":"NPCC","op":"CoreSite","spon":"American Tower","oy":2009,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"7389969cf9ea","cid":"7389969cf9ea","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Orangeburg","county":"Rockland","state":"NY","lat":41.154628,"lng":-74.024662,"cprec":"shared_centroid","status":"Operational","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The Campus is served by an existing utility-owned substation providing 30MW of power (expandable to 45MW). The site's substation enables Databank to connect directly to the power grid; it also has plans to build a second substation for future growth.","pscan":"https://rcbizjournal.com/2025/06/30/data-centers-beyond-the-megawatt/","uconf":"High","uquote":"Orange and Rockland Utilities, Inc. (O&R) is an electric and gas utility headquartered in Pearl River, New York. Electric Utility, Orange and Rockland Utilities.","uscan":"https://der.nyserda.ny.gov/facilities/165/?project=180","ukey":"14154|NY","uname":"Orange & Rockland Utils Inc","rto":"NYISO","nerc":"NPCC","op":"DataBank","spon":"DigitalBridge","tenant":"CoreWeave","ay":2021,"oy":2025,"contro":"Community opposition to expansion plans citing environmental concerns (wetlands, drinking water reservoir contamination), electricity bills, and zoning issues. Rockland County Planning Department unanimously disapproved expansion application in December 2024.","deal":"Property acquired for $23 million in September 2021. Rockland IDA granted CoreWeave and DataBank tax benefits totaling up to $58 million.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"rcbizjournal.com;der.nyserda.ny.gov","srcUrls":["https://rcbizjournal.com/2025/06/30/data-centers-beyond-the-megawatt/","https://der.nyserda.ny.gov/facilities/165/?project=180"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"684ed1499911","cid":"684ed1499911","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"New York","county":"New York","state":"NY","lat":40.776642,"lng":-73.970187,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The local utility provides up to 1440 total kilowatts of power (1.4 Megawatts) and the UPS systems have a capacity of 1200 kilowatts and are arranged in a N+1 configuration. [...] On site generators are also configured in an N+1 arrangement, and can deliver up to 4000 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-new-york-data-center-nyc3/","uconf":"High","uquote":"Our service area includes all of New York City, and Westchester County, located directly north of New York City.","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","rto":"NYISO","nerc":"NPCC","op":"Digital Realty","spon":"Digital Realty Trust","oy":2015,"deal":"Telx acquisition in 2015","dealScan":"https://baxtel.com/data-center/32-ave-of-americas-digital-realty","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-new-york-data-center-nyc3/","https://baxtel.com/data-center/32-ave-of-americas-digital-realty"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded,merged_duplicate"},{"id":"abfe722b6b08","cid":"abfe722b6b08","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"New York","county":"New York","state":"NY","lat":40.776642,"lng":-73.970187,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The local utility provides up to 1440 total kilowatts of power (1.4 Megawatts) and the UPS systems have a capacity of 1200 kilowatts and are arranged in a N+1 configuration. This set up allows for up to 95 watts of power to be delivered per square foot. On site generators are also configured in an N+1 arrangement, and can deliver up to 4000 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-new-york-data-center-nyc3/","uconf":"High","uquote":"Con Edison's system serves customers in all five boroughs of New York City as well as Westchester County, located directly north of New York City.","uscan":"https://gridconnect.nyserda.ny.gov/nygc-home/utility-profiles-information/coned/","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","rto":"NYISO","nerc":"NPCC","op":"Digital Realty","spon":"Digital Realty","oy":2015,"deal":"Telx acquired by Digital Realty in 2015","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cloudandcolocation.com;gridconnect.nyserda.ny.gov","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-new-york-data-center-nyc3/","https://gridconnect.nyserda.ny.gov/nygc-home/utility-profiles-information/coned/"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"ae1b996d0162","cid":"ae1b996d0162","canon":1,"dups":1,"ftype":"data_center","name":"Evocative Data Centers","city":"New York","county":"New York","state":"NY","lat":40.776642,"lng":-73.970187,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"NYISO","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"042934a68a93","cid":"042934a68a93","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Fluidstack Lake Mariner","county":"Niagara","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Operational","mw":360,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The Lake Mariner site gets its power from the NYISO Zone A grid, which draws upon hydro power from Niagara Falls and nuclear energy from several plants in the region. The resulting power mix is 89 percent carbon-free as of the most recent NYISO data.","pscan":"https://datacenterrichness.substack.com/p/inside-an-accelerated-ai-data-center","uconf":"High","uquote":"Grid Operator: Niagara Mohawk Power Corp.","uscan":"https://www.interconnection.fyi/data-center/project/fluidstack-lake-mariner-68f1d803","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"TeraWulf","spon":"Google","tenant":"Fluidstack","ay":2025,"oy":2026,"deal":"TeraWulf signed three 10-year HPC colocation agreements with Fluidstack for 360 MW at Lake Mariner, valued at approximately $6.7 billion over ten years, with Google providing a $3.2 billion backstop of Fluidstack's lease obligations and acquiring a 14% equity stake in TeraWulf (announced August 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"datacenterrichness.substack.com;interconnection.fyi","srcUrls":["https://datacenterrichness.substack.com/p/inside-an-accelerated-ai-data-center","https://www.interconnection.fyi/data-center/project/fluidstack-lake-mariner-68f1d803"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"9adb9eefc7aa","cid":"9316e73e6486","canon":0,"dups":2,"ftype":"data_center","name":"JPMorgan Chase","city":"Orangeburg","county":"Rockland","state":"NY","lat":41.154628,"lng":-74.024662,"cprec":"shared_centroid","status":"Future / Expansion","mw":31,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"2025 NYISO Goldbook load and capacity report (Page 134 footnote #6. Project Sycamore “25.24 MW uprate of an existing 6.5 MW load facility, resulting in a total load of 31.74 MW.”)","uconf":"High","uquote":"Orange & Rockland Utilities is a major natural gas and electric distribution company based in Spring Valley, New York. [...] Today, Orange & Rockland Utilities provides natural gas and electric services to more than 300,000 residential and commercial customers in six counties around New York City and northern New Jersey.","uscan":"https://www.saveonenergy.com/utility/orange-and-rockland/","ukey":"14154|NY","uname":"Orange & Rockland Utils Inc","rto":"NYISO","nerc":"NPCC","op":"JPMorgan Chase","spon":"JPMorgan Chase","tenant":"JPMorgan Chase","ay":2017,"oy":2028,"contro":"Controversy over a $77 million tax break for the expansion, which is expected to create only one permanent job, and community concerns about rising electricity demand and utility bills.","controScan":"https://nysfocus.com/2026/04/20/data-center-tax-break-jpmorgan-chase","deal":"Rockland County Industrial Development Agency approved a nearly $77 million tax break for the expansion in 2024, and extended a 2017 property tax abatement (PILOT) from September 1, 2027, to December 1, 2044.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"saveonenergy.com;nysfocus.com","lflag":"status_adjusted_future_expansion source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.saveonenergy.com/utility/orange-and-rockland/","https://nysfocus.com/2026/04/20/data-center-tax-break-jpmorgan-chase"],"rawStatus":"Operational"},{"id":"9316e73e6486","cid":"9316e73e6486","canon":1,"dups":2,"ftype":"data_center","name":"JPMorgan Chase","city":"Orangeburg","county":"Rockland","state":"NY","lat":41.154628,"lng":-74.024662,"cprec":"shared_centroid","status":"Future / Expansion","mw":31,"pc":"Grid","pconf":"High","pquote":"The JP Morgan/Project Sycamore Orangetown consumes 31.74MWh (NYISO) or 45MWh per datacenter.","uconf":"High","uquote":"Orange and Rockland Utilities, Inc. (O&R) is an electric and gas utility headquartered in Pearl River, New York. O&R and its subsidiary, Rockland Electric Company, serve approximately 309,000 electric customers in seven counties in New York and northern New Jersey and approximately 140,000 gas customers in New York.... Orangeburg – A $24 million initiative which replaced two transformers at the Corporate Drive substation allowing the company to meet the growing electric demand in the area.... There is a question as to whether O&R can even power the project and as mentioned, it has yet to show this Board anything about its impact on the grid.","ukey":"14154|NY","uname":"Orange & Rockland Utils Inc","rto":"NYISO","nerc":"NPCC","op":"JPMorgan Chase","spon":"JPMorgan Chase","tenant":"JPMorgan Chase","ay":2024,"oy":2028,"contro":"Significant controversy over a $77 million tax break for an expansion expected to create only one permanent job, with concerns about utility prices, water supply, and noise.","controScan":"https://rocklandtruth.com/ny-77m.html","deal":"$76,715,000 in sales tax abatements approved in February 2024 for the expansion, extending a property tax abatement (PILOT) from September 1, 2027 to December 1, 2044.","dealScan":"https://nysfocus.com/2026/04/20/data-center-tax-break-jpmorgan-chase","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"nysfocus.com;rocklandtruth.com","lflag":"citation_artifact_removed status_adjusted_future_expansion source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://nysfocus.com/2026/04/20/data-center-tax-break-jpmorgan-chase","https://rocklandtruth.com/ny-77m.html"],"band":"25-50 MW","rawStatus":"Operational"},{"id":"de033318de3f","cid":"de033318de3f","canon":1,"dups":1,"ftype":"data_center","name":"Kyndryl","city":"Sterling Forest","county":"Orange","state":"NY","lat":41.40241,"lng":-74.306252,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"The site spends approximately $4.4M on utilities per year, which is a combination electrical energy and #2 fuel oil.... Dual Utility feeds. N+1 UPS backup. N+1 Generator backup.","pscan":"https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Case-Studies/On-Site-Power-Application/OEM-Kendryl-cs.pdf","uconf":"High","uquote":"Power Orange & Rockland.","uscan":"https://www.tuxedopark-ny.gov/mayors-welcome/pages/utilities","ukey":"14154|NY","uname":"Orange & Rockland Utils Inc","rto":"NYISO","nerc":"NPCC","op":"Kyndryl","spon":"Kyndryl","ay":1972,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"nyserda.ny.gov;tuxedopark-ny.gov","lflag":"online_before_announced operational_null_capacity citation_artifact_removed legacy_facility_year_review","srcUrls":["https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Publications/Case-Studies/On-Site-Power-Application/OEM-Kendryl-cs.pdf","https://www.tuxedopark-ny.gov/mayors-welcome/pages/utilities"]},{"id":"71191ab57e4f","cid":"71191ab57e4f","canon":1,"dups":1,"ftype":"data_center","name":"Kyndryl","city":"Armonk","county":"Westchester","state":"NY","lat":41.152686,"lng":-73.745753,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"NYISO","nerc":"NPCC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"62b3bb059225","cid":"62b3bb059225","canon":1,"dups":1,"ftype":"data_center","name":"Kyndryl","city":"Rochester","county":"Monroe","state":"NY","lat":43.250347,"lng":-77.700518,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Village of Fairport - (NY).","pscan":"https://www.interconnection.fyi/data-center/project/kyndryl-8e2a75ce","uquote":"Grid Operator: Village of Fairport - (NY).","uscan":"https://www.interconnection.fyi/data-center/project/kyndryl-8e2a75ce","ukey":"5930|NY","uname":"Village of Fairport - (NY)","rto":"NYISO","nerc":"NPCC","op":"Kyndryl","spon":"IBM","ay":2016,"oy":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/kyndryl-8e2a75ce"]},{"id":"fb65b05dd848","cid":"fb65b05dd848","canon":1,"dups":1,"ftype":"data_center","name":"Kyndryl","city":"Tuxedo Park","county":"Orange","state":"NY","lat":41.40241,"lng":-74.306252,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"The site spends approximately $4.4M on utilities per year, which is a combination electrical energy and #2 fuel oil.","uconf":"High","uquote":"The alternatively sourced power is seamlessly provided by Orange & Rockland.","ukey":"14154|NY","uname":"Orange & Rockland Utils Inc","rto":"NYISO","nerc":"NPCC","op":"Kyndryl","spon":"Kyndryl","ay":1972,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text legacy_facility_year_review","srcUrls":null,"srcDom":null},{"id":"5b6a40e8b352","cid":"5b6a40e8b352","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Somerset Load","county":"Niagara County","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Currently, the company has approval for a 250-megawatt power allocation, 90% hydropower from the New York Power Authority and the rest from NYSEG, with the potential to increase to 500 megawatts, pending approval from the state.","uconf":"High","uquote":"Currently, the company has approval for a 250-megawatt power allocation, 90% hydropower from the New York Power Authority and the rest from NYSEG, with the potential to increase to 500 megawatts, pending approval from the state.","ukey":"13511|NY","uname":"New York State Elec & Gas Corp","rto":"NYISO","nerc":"NPCC","op":"TeraWulf","spon":"TeraWulf","tenant":"Fluidstack","ay":2022,"oy":2025,"contro":"Noise concerns from data center operations.","deal":"$3.2 billion in financing for expansion, announced December 2025.","dealScan":"https://www.buildwcg.com/blog-posts/terawulf-lake-mariner-data-center-expansion","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"buildwcg.com","srcUrls":["https://www.buildwcg.com/blog-posts/terawulf-lake-mariner-data-center-expansion"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"f69a75aea731","cid":"f69a75aea731","canon":1,"dups":1,"ftype":"data_center","name":"Telehouse America","city":"New York","county":"New York","state":"NY","lat":40.776642,"lng":-73.970187,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"A single power feed of 4.15MVA in a N+2 configuration for enhanced reliability. Four static 750kVA generators, operating in a 3+1 configuration, totaling 3,000 kVA. Two 2.5MVA diesel-powered generators, ensuring 80 hours of full load power backup.","rto":"NYISO","nerc":"NPCC","op":"Telehouse America","spon":"KDDI","tenant":"Level 3 Communications","ay":2011,"oy":2011,"deal":"Acquisition of 60,000 sq ft data center space by Telehouse America in January 2011","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"ef9a95739b0e","cid":"ef9a95739b0e","canon":1,"dups":1,"ftype":"data_center","name":"Telehouse America","city":"Staten Island","county":"Richmond","state":"NY","lat":40.561263,"lng":-74.1399,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Redundant commercial power feeds (10mW total available); Six diesel-powered generators (5,625 total kva); N+1 configuration; Diverse power feeds from New York and New Jersey utilities along with backup systems minimize the risk of a power outage.","pscan":"https://cloudandcolocation.com/datacenters/telehouse-new-york-teleport-data-center/","uconf":"High","uquote":"Staten Island Service: Electric only; 172,000+ residential and commercial electric customers.","uscan":"https://www.coned.com/en/business-partners/service-territories","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","rto":"NYISO","nerc":"NPCC","op":"Telehouse America","spon":"KDDI","oy":1989,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;coned.com","srcUrls":["https://cloudandcolocation.com/datacenters/telehouse-new-york-teleport-data-center/","https://www.coned.com/en/business-partners/service-territories"],"lflag":"source_quality_reclassified legacy_facility_year_review"},{"id":"edfe4f534054","cid":"edfe4f534054","canon":0,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Hawthorne","county":"Westchester","state":"NY","lat":41.152686,"lng":-73.745753,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Other facility features include dual factor, biometrical access control with around-the-clock onsite security; dual utility service feeds with onsite TierPoint controlled substations; independent AB power distribution; N+1 backup generators; 2N chilled water configuration with N+1 CRAH deployment; all designed for supporting up to 350 watts per square foot of raised floor.","uconf":"High","uquote":"Power in Westchester County is transmitted and distributed by Consolidated Edison Company of New York (Con Ed) and New York State Electric and Gas (NYSEG).... Electric power is distributed and transmitted by Con Ed throughout most of Westchester and by New York State Electric and Gas in the northeast area of the County.","uscan":"https://planning.westchestercountyny.gov/images/archive/stories/DataBook/utilities.pdf","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","rto":"NYISO","nerc":"NPCC","op":"TierPoint","spon":"Argo Infrastructure Partners","ay":2017,"oy":2017,"deal":"TierPoint acquired Xand in 2014; $13 million expansion completed in January 2018.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"planning.westchestercountyny.gov","srcUrls":["https://planning.westchestercountyny.gov/images/archive/stories/DataBook/utilities.pdf"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded,merged_duplicate"},{"id":"bf54216e8454","cid":"bf54216e8454","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Hawthorne","county":"Westchester","state":"NY","lat":41.152686,"lng":-73.745753,"cprec":"shared_centroid","status":"Operational","mw":11,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utilities. 2N A-side and B-side power distribution design. Generators. Two redundant 2,000kW generators 9,000 gallons of fuel storage on site. Uptime Operations. 100% Uptime SLA. Utility Service. Two Pad mounted 2,000kVA transformers. Electrical. True 2N UPS system.","pscan":"https://web.tierpoint.com/hubfs/data-center/Data%20Center%20Spec%20Sheet%20-%20Hawthorne%20HWT2.pdf","uconf":"High","uquote":"Our service area includes all of New York City, and Westchester County, located directly north of New York City.","uscan":"https://www.coned.com/en/business-partners/service-territories","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","rto":"NYISO","nerc":"NPCC","op":"TierPoint","spon":"Argo Infrastructure Partners","tenant":"Hudson River HealthCare (HRHCare)","ay":2001,"oy":2018,"deal":"$13 million expansion completed January 9, 2018; TierPoint acquired Xand in 2014.","dealScan":"https://westfaironline.com/technology/tierpoint-expands-data-center-space-hawthorne/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"web.tierpoint.com;coned.com;westfaironline.com","srcUrls":["https://web.tierpoint.com/hubfs/data-center/Data%20Center%20Spec%20Sheet%20-%20Hawthorne%20HWT2.pdf","https://www.coned.com/en/business-partners/service-territories","https://westfaironline.com/technology/tierpoint-expands-data-center-space-hawthorne/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"3c931981f7d2","cid":"3c931981f7d2","canon":1,"dups":1,"ftype":"data_center","name":"Yahoo","city":"Lockport","county":"Niagara","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Operational","mw":23,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"It makes use of the prevailing winds from Lake Ontario and low-cost hydropower from the New York Power Authority to keep the 120-foot by 60-foot server buildings cool.","uquote":"The company also secured a “Green IT” U.S. Department of Energy grant through New York State Electric & Gas (NYSEG) for leadership in energy efficient design.","ukey":"13511|NY","uname":"New York State Elec & Gas Corp","rto":"NYISO","nerc":"NPCC","op":"Yahoo","spon":"H5 Data Centers","tenant":"Yahoo","ay":2008,"oy":2011,"deal":"Sale-leaseback of Lockport data center campus to H5 Data Centers for $49 million, closed December 30, 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"18088a996205","cid":"18088a996205","canon":1,"dups":1,"ftype":"data_center","name":"1 Gig Data Center East Fishkill, NY","county":"Dutchess County","state":"NY","lat":41.75477,"lng":-73.740041,"cprec":"distinct","status":"Proposed","mw":1000,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The USA TODAY Network found it listed with other large power users seeking approval from the New York Independent System Operator, the nonprofit that runs the state electrical grid.","uquote":"The Connecting Transmission Owner (“CTO”) is Consolidated Edison Inc. (“ConEd”). The Study will assess the impact of the Project on the base case power system including New York State Electric and Gas (“NYSEG”) and Central Hudson as identified Affected Transmission Owners.","uscan":"https://www.nyiso.com/documents/20142/56802634/03d_Q1738_SIS%20Scope_2-3-26-TPAS.pdf/23c43711-119f-f819-0f62-0d7775ff3eb6","rto":"NYISO","nerc":"NPCC","op":"Donovan Drive Holdings","spon":"Treetop Development","ay":2025,"oy":2028,"contro":"Significant community opposition, town supervisor dismissed reports of formal application, warehouse moratorium on site, concerns about electrical infrastructure.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"nyiso.com","srcUrls":["https://www.nyiso.com/documents/20142/56802634/03d_Q1738_SIS%20Scope_2-3-26-TPAS.pdf/23c43711-119f-f819-0f62-0d7775ff3eb6"],"lflag":"source_quality_reclassified utility_alias_corrected","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","reportedUtility":"Consolidated Edison Co-NY Inc"},{"id":"cb178db58c8d","cid":"cb178db58c8d","canon":1,"dups":1,"ftype":"data_center","name":"580 STAMP load increase","county":"Genesee County","state":"NY","lat":43.00091,"lng":-78.192778,"cprec":"distinct","status":"Proposed","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Our IT systems are powered by the area's reliable high voltage utility services; which means the site will utilize only a small number of backup generators (up to 12) strictly for life safety, security, and systems monitoring in the unlikely event of an outage.","pscan":"https://www.streamdatacenters.com/project-stamp/","uconf":"High","uquote":"We are working with National Grid, State Authorities, and NYISO (the operator of New York's Electrical Grid) to ensure this project won't affect residents' utility bills.","uscan":"https://www.streamdatacenters.com/project-stamp/","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"Stream Data Centers","oy":2027,"contro":"Legal challenge from Tonawanda Seneca Nation and Sierra Club, community opposition regarding environmental and economic impacts, noise, water usage, and electricity rates.","controScan":"https://www.wxxinews.org/local-news/2025-09-18/genesee-county-stamp-site-data-center-on-hold-as-expansion-gets-pursued","deal":"$6.3 billion data center approved by GCEDC, seeking $471.6 million in sales and mortgage tax exemptions (March 2025).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"streamdatacenters.com;wxxinews.org","srcUrls":["https://www.streamdatacenters.com/project-stamp/","https://www.wxxinews.org/local-news/2025-09-18/genesee-county-stamp-site-data-center-on-hold-as-expansion-gets-pursued"]},{"id":"683cc3c7c6a9","cid":"683cc3c7c6a9","canon":1,"dups":1,"ftype":"data_center","name":"Alcoa East Energy Allocation Project","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"Low","pquote":"Proposed Alcoa East Energy Allocation Project data center in St. Lawrence County, NY. Capacity: 100-250 MW.... Alcoa East Energy Allocation Project Data Center in St. Lawrence County, NY (100-250 MW) — Interconnection. fyi Data Center Tracker.","pscan":"https://www.interconnection.fyi/data-center/project/alcoa-east-energy-allocation-project-66962988","uconf":"High","uquote":"Grid Operator: New York Power Authority","uname":"New York Power Authority","rto":"NYISO","nerc":"NPCC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/alcoa-east-energy-allocation-project-66962988"],"lflag":"citation_artifact_removed nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"15296|NY","rawUname":"New York Power Authority","reportedUtility":"New York Power Authority"},{"id":"8a43716f4a5c","cid":"8a43716f4a5c","canon":1,"dups":1,"ftype":"data_center","name":"Arsenal Data Site 1000","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":1000,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"1730. Arconic Corporation. Arsenal Data Site 1000. 3/7/2025. 1000. 1000. L. St Lawrence. NY. E. Denniston Substation. NYPA. National Grid. 4. 5/31/2025. 03-2027.","pscan":"https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20%26%20Zoning%20Presentation%20-%20Final.pdf","uconf":"High","uquote":"1730. Arconic Corporation. Arsenal Data Site 1000. 3/7/2025. 1000. 1000. L. St Lawrence. NY. E. Denniston Substation. NYPA. National Grid. 4. 5/31/2025. 03-2027.","uscan":"https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20%26%20Zoning%20Presentation%20-%20Final.pdf","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"Arconic","spon":"Arconic","ay":2025,"oy":2027,"contro":"General opposition to large data centers in NY due to energy strain, environmental concerns, and limited local employment.","controScan":"https://www.thecooldown.com/green-business/halt-data-center-construction-new-york/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"stlawco.gov;thecooldown.com","srcUrls":["https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20%26%20Zoning%20Presentation%20-%20Final.pdf","https://www.thecooldown.com/green-business/halt-data-center-construction-new-york/"]},{"id":"7799284ce1d0","cid":"7799284ce1d0","canon":1,"dups":1,"ftype":"data_center","name":"Arsenal Data Site 250","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Type / Fuel Key:... L=Load","uconf":"High","uquote":"1728. Arconic Corporation. Arsenal Data Site 250. 3/7/2025. 250. 250. L. St Lawrence. NY. E. Denniston Substation. NYPA. National Grid.","uscan":"https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20%26%20Zoning%20Presentation%20-%20Final.pdf","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"Arconic","spon":"Arconic","ay":2025,"oy":2027,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stlawco.gov","srcUrls":["https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20%26%20Zoning%20Presentation%20-%20Final.pdf"],"lflag":"citation_artifact_removed"},{"id":"fd6cb89e4283","cid":"fd6cb89e4283","canon":1,"dups":1,"ftype":"data_center","name":"Arsenal Data Site 500","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Arsenal Data Site 500.... L. St Lawrence. NY. E. Denniston Substation. NYPA. National Grid. 4. 5/31/2025. 03-2027.","pscan":"https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20%26%20Zoning%20Presentation%20-%20Final.pdf","uquote":"1729. Arconic Corporation. Arsenal Data Site 500. 3/7/2025. 500. 500. L. St Lawrence. NY. E. Denniston Substation. NYPA. National Grid. 4. 5/31/2025. 03-2027.","uscan":"https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20%26%20Zoning%20Presentation%20-%20Final.pdf","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"Arconic","ay":2025,"oy":2027,"contro":"Community opposition and legislative proposals for moratoriums on data centers in New York due to concerns about water usage, noise, and strain on the electric grid.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stlawco.gov","srcUrls":["https://www.stlawco.gov/sites/default/files/Planning/Trainings/LGC%202025%20Planning%20%26%20Zoning%20Presentation%20-%20Final.pdf"],"lflag":"citation_artifact_removed"},{"id":"72c951aeacd1","cid":"72c951aeacd1","canon":1,"dups":1,"ftype":"data_center","name":"Bloomberg","city":"Orangeburg","county":"Rockland","state":"NY","lat":41.154628,"lng":-74.024662,"cprec":"shared_centroid","status":"Proposed","mw":4,"pc":"Grid","pconf":"High","pquote":"The property is adjacent to a utility substation supplied by subterranean 138kV transmission lines in a ring bus configuration. Up to four 13kV circuits are available to the property, supplied directly from the substation in concrete encased duct banks with a capacity of up to...","pscan":"https://www.datacenterknowledge.com/investing/bloomberg-plans-710-million-data-center-in-n-y-suburb","uquote":"A $30 million Orange & Rockland sub-station that went on line in 2011 was another incentive helped seal the deal with Bloomberg.","uscan":"https://rocklandtimes.com/2013/06/27/bloomberg-tops-off-new-datacenter/","ukey":"14154|NY","uname":"Orange & Rockland Utils Inc","rto":"NYISO","nerc":"NPCC","op":"Bloomberg","spon":"Bloomberg","tenant":"Bloomberg","ay":2013,"oy":2014,"contro":"Zoning dispute regarding data centers in the light industrial district, including the Bloomberg facility.","deal":"$840 million project received a 12-year PILOT program and sales tax exemptions for construction materials, mortgage tax, and furnishings/equipment.","dealScan":"https://rocklandtimes.com/2013/06/27/bloomberg-tops-off-new-datacenter/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;rocklandtimes.com","srcUrls":["https://www.datacenterknowledge.com/investing/bloomberg-plans-710-million-data-center-in-n-y-suburb","https://rocklandtimes.com/2013/06/27/bloomberg-tops-off-new-datacenter/"],"band":"< 10 MW","lflag":"shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"aa4ff246c06a","cid":"aa4ff246c06a","canon":1,"dups":1,"ftype":"data_center","name":"Brookhaven Logistics Center","county":"Suffolk County","state":"NY","lat":40.943554,"lng":-72.692218,"cprec":"distinct","status":"Proposed","mw":176,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The property, developed by Manhattan-based WF Industrial XII, would, if approved, continually draw some 176.6 megawatts of power from a local LIPA substation and have additional emergency backup capacity with diesel-fueled generators, according to the filing with the New York Independent System Operator, which manages the state power grid.","uconf":"High","uquote":"continually draw some 176.6 megawatts of power from a local LIPA substation","ukey":"11171|NY","uname":"Long Island Power Authority","rto":"NYISO","nerc":"NPCC","op":"WF Industrial XII / Wildflower","spon":"Barings","ay":2025,"oy":2027,"contro":"Community concern over fossil fuel demand and diesel generators.","deal":"$72M construction loan from Bank OZK (June 2023); $162M project with Brookhaven IDA incentives (April 2023)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"cec254e44808","cid":"cec254e44808","canon":1,"dups":1,"ftype":"data_center","name":"Broome County Tech Park","county":"Broome","state":"NY","lat":42.161977,"lng":-75.830283,"cprec":"distinct","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Broome County Tech Park is a energy project with 250 MW of capacity located in the county of Broome, NY. The project is currently active in the New York ISO interconnection queue. The project is owned by The Agency. Capacity. 250 MW. Technology. N/A. Proposed Completion... NYISO (all projects in NYISO). Project Type. Load. Utility. NYSEG.","pscan":"https://www.interconnection.fyi/project/nyiso-1752","uconf":"High","uquote":"Utility. NYSEG. Transmission Owner Short Name. NYSEG. Transmission Owner(s). New York State Electric and Gas.","uscan":"https://www.interconnection.fyi/project/nyiso-1752","ukey":"13511|NY","uname":"New York State Elec & Gas Corp","rto":"NYISO","nerc":"NPCC","op":"The Agency (Broome County Industrial Development Agency)","spon":"The Agency (Broome County Industrial Development Agency)","ay":2024,"contro":"The project has received criticism from residents and town officials in Maine, with the town board passing a resolution against zoning changes.","deal":"The IDA has set aside $3 million in funds for land acquisition and received a $500,000 FAST grant for site design and engineering.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://www.interconnection.fyi/project/nyiso-1752"]},{"id":"97471e0dfbc2","cid":"97471e0dfbc2","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cayuga Compute","county":"Tompkins County","state":"NY","lat":42.453006,"lng":-76.473483,"cprec":"distinct","status":"Proposed","mw":138,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The proposed data campus would repurpose one of Cayuga Lake's major industrial sites into an all-electric data center connected to New York Power Grid Zone C, where roughly 80 percent of power generation consists of zero-emission sources (hydro and nuclear, with growth from wind and solar). TeraWulf Chief Operating Officer Sean Farrell said the center would provide power to racks of high-performance computers using the New York State Energy and Gas grid.","uconf":"High","uquote":"Cayuga Compute, 45406, 150, 150, L, Tompkins, NY, C, Milliken substation 115kV, NYSEG, 4, 45473, 10-2025. Utility. NYSEG. Transmission Owner Short Name. NYSEG. Transmission Owner(s). New York State Electric and Gas.","ukey":"13511|NY","uname":"New York State Elec & Gas Corp","rto":"NYISO","nerc":"NPCC","op":"TeraWulf","spon":"TeraWulf","ay":2025,"oy":2026,"contro":"Community opposition regarding water usage, environmental impact, electric grid strain, noise, and a proposed (but withdrawn) construction moratorium.","deal":"80-year ground lease executed with Cayuga Operating Company LLC on August 14, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f099301ba712","cid":"f099301ba712","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cayuga Data","county":"Tompkins County","state":"NY","lat":42.453006,"lng":-76.473483,"cprec":"distinct","status":"Proposed","mw":138,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The proposed data campus would repurpose one of Cayuga Lake's major industrial sites into an all-electric data center connected to New York Power Grid Zone C, where roughly 80 percent of power generation consists of zero-emission sources (hydro and nuclear, with growth from wind and solar).","pscan":"https://cleancayugalake.org/wp-content/uploads/2025/12/Attachment_C_Independent_Assessment_of_the_Proposed_Cayuga_Data_Campus-_2.pdf","uconf":"High","uquote":"TeraWulf Chief Operating Officer Sean Farrell said the center would provide power to racks of high-performance computers using the New York State Energy and Gas grid.","ukey":"13511|NY","uname":"New York State Elec & Gas Corp","rto":"NYISO","nerc":"NPCC","op":"TeraWulf","spon":"TeraWulf","ay":2025,"oy":2026,"contro":"Community opposition, zoning dispute, environmental concerns, water use dispute, and lawsuit.","deal":"80-year lease for the site of the decommissioned Cayuga power station, announced August 2025","dealScan":"https://theithacan.org/62928/news/terawulf-tech-company-plans-to-build-ai-data-center-on-cayuga-lake/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cleancayugalake.org;theithacan.org","srcUrls":["https://cleancayugalake.org/wp-content/uploads/2025/12/Attachment_C_Independent_Assessment_of_the_Proposed_Cayuga_Data_Campus-_2.pdf","https://theithacan.org/62928/news/terawulf-tech-company-plans-to-build-ai-data-center-on-cayuga-lake/"],"lflag":"source_quality_reclassified"},{"id":"08978e951984","cid":"08978e951984","canon":1,"dups":1,"ftype":"data_center","name":"Data & Technology Campus","county":"Erie County","state":"NY","lat":42.752759,"lng":-78.778192,"cprec":"distinct","status":"Proposed","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Murawski said the facility would require about 300 megawatts of electricity, raising concerns about strain on the regional power system and potential costs to residents. “The unique thing about this site is the 345 kV transmission line, which is the second highest voltage line in the nation, sits right on our property,” Williams said.","uquote":"We are working with National Grid, State Authorities, and NYISO (the operator of New York's Electrical Grid) to ensure this project won't affect residents' utility bills.","uscan":"https://www.streamdatacenters.com/project-stamp/","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"Riverview Innovation & Technology Campus (RITC)","spon":"Jon Williams and John Yensan","ay":2019,"oy":2027,"contro":"Community opposition from the Clean Air Coalition of WNY due to concerns about energy use, noise, and pollution.","controScan":"https://baxtel.com/data-center/riverview-innovation-technology-campus-ritc","deal":"Proposed $2 billion investment","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"streamdatacenters.com;baxtel.com","srcUrls":["https://www.streamdatacenters.com/project-stamp/","https://baxtel.com/data-center/riverview-innovation-technology-campus-ritc"],"lflag":"source_quality_reclassified"},{"id":"2f7bf76005b9","cid":"2f7bf76005b9","canon":1,"dups":1,"ftype":"data_center","name":"Digihost load","county":"Niagara County","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Proposed","mw":50,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Digihost load is a energy project with 50.2 MW of capacity located in Niagara County, NY. The project is currently active in the New York ISO interconnection queue. The project is owned by Digihost Technologies, Inc.... Project Type. Load.","pscan":"https://www.interconnection.fyi/project/nyiso-1465","uconf":"High","uquote":"Transmission Owner Short Name. NM-NG. Transmission Owner(s). National Grid.","uscan":"https://www.interconnection.fyi/project/nyiso-1465","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"Digihost Technologies","spon":"Digihost Technologies","ay":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced citation_artifact_removed shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/project/nyiso-1465"]},{"id":"6ab5f1b2c488","cid":"6ab5f1b2c488","canon":1,"dups":1,"ftype":"data_center","name":"GLOBE DH 2","county":"Niagara County","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Proposed","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"GLOBE DH 2. LINE 197 AND 198. National Grid. 200. 10/17/2025. 11/30/2025. 06-2027. 9. A niagara falls. 1749.","pscan":"https://www.nysrc.org/wp-content/uploads/2026/02/9.1-DER-Report-Feb-2026-for-NYSRC-Exec-Committee-Final-Attachment-9.1.pdf","uconf":"High","uquote":"GLOBE DH 2. LINE 197 AND 198. National Grid. 200. 10/17/2025. 11/30/2025. 06-2027. 9. A niagara falls. 1749.","uscan":"https://www.nysrc.org/wp-content/uploads/2026/02/9.1-DER-Report-Feb-2026-for-NYSRC-Exec-Committee-Final-Attachment-9.1.pdf","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"GLOBE DH","ay":2025,"oy":2027,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nysrc.org","srcUrls":["https://www.nysrc.org/wp-content/uploads/2026/02/9.1-DER-Report-Feb-2026-for-NYSRC-Exec-Committee-Final-Attachment-9.1.pdf"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"42e4da1981fc","cid":"42e4da1981fc","canon":1,"dups":1,"ftype":"data_center","name":"Globe Digital Holdings - 1","county":"Niagara County","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. National Grid.","uquote":"Grid Operator. National Grid.","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","ay":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"f8b0caf4dcc5","cid":"f8b0caf4dcc5","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Greenidge 200 MW Data Center Project","county":"Yates County","state":"NY","lat":42.638237,"lng":-77.104324,"cprec":"distinct","status":"Proposed","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Initiated NYISO system impact study to access additional 200MW of power at the Dresden facility via grid interconnection;.","uconf":"High","uquote":"Greenidge 200 MW Data Center Project. NY State Electric & Gas (NYSEG) - Greenidge 115 kV Substation. NYSEG.","uscan":"https://www.nysrc.org/wp-content/uploads/2026/02/9.1-DER-Report-Feb-2026-for-NYSRC-Exec-Committee-Final-Attachment-9.1.pdf","ukey":"13511|NY","uname":"New York State Elec & Gas Corp","rto":"NYISO","nerc":"NPCC","op":"Greenidge Generation Holdings","spon":"Atlas Holdings","oy":2029,"contro":"Litigation and regulatory scrutiny regarding air permits and consistency with New York's Climate Leadership and Community Protection Act (CLCPA) for the Dresden facility.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nysrc.org","srcUrls":["https://www.nysrc.org/wp-content/uploads/2026/02/9.1-DER-Report-Feb-2026-for-NYSRC-Exec-Committee-Final-Attachment-9.1.pdf"],"lflag":"source_quality_reclassified"},{"id":"56cd7e14c45d","cid":"56cd7e14c45d","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Greenidge Load","county":"Yates County","state":"NY","lat":42.638237,"lng":-77.104324,"cprec":"distinct","status":"Proposed","mw":60,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Received a proposed Interconnection Agreement from NYSEG for the previously announced 60MW of non-curtailable power at the Dresden facility, which, if entered into, is expected to advance the Company's AI/HPC datacenter development plans;","pscan":"https://ir.greenidge.com/node/9316/pdf","uconf":"High","uquote":"Utility. NYSEG. Transmission Owner(s). New York State Electric and Gas.","uscan":"https://www.interconnection.fyi/project/nyiso-0776","ukey":"13511|NY","uname":"New York State Elec & Gas Corp","rto":"NYISO","nerc":"NPCC","op":"Greenidge Generation","spon":"Atlas Holdings","tenant":"Greenidge Generation Holdings","ay":2018,"contro":"Greenidge Generation LLC faced significant controversy and litigation regarding its air permits for its Bitcoin mining operations, with the DEC denying renewals due to inconsistency with New York's Climate Leadership and Community Protection Act (CLCPA). However, in November 2025, Greenidge and the NYSDEC reached an agreement on a new Title V Air Permit, ending years of litigation and including required emissions reductions.","controScan":"https://insideclimatenews.org/news/17082024/greenidge-sues-new-york-environmental-regulators-dresden-power-plant/","deal":"Proposed Interconnection Agreement from NYSEG for 60MW of non-curtailable power, received May 2026.","dealScan":"https://ir.greenidge.com/node/9316/pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"ir.greenidge.com;interconnection.fyi;insideclimatenews.org","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://ir.greenidge.com/node/9316/pdf","https://www.interconnection.fyi/project/nyiso-0776","https://insideclimatenews.org/news/17082024/greenidge-sues-new-york-environmental-regulators-dresden-power-plant/"]},{"id":"99d005980a57","cid":"99d005980a57","canon":1,"dups":1,"ftype":"data_center","name":"Hudson Valley Data Center","county":"Rockland County","state":"NY","lat":41.154628,"lng":-74.024662,"cprec":"shared_centroid","status":"Proposed","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"1714. Hudson Valley Data Center. G. Orange & Rockland Utilities Inc. ConEd. 25.","pscan":"https://www.nyiso.com/documents/20142/56802634/03d_Q1738_SIS%20Scope_2-3-26-TPAS.pdf/23c43711-119f-f819-0f62-0d7775ff3eb6","uquote":"1714. Hudson Valley Data Center. G. Orange & Rockland Utilities Inc. ConEd. 25.","uscan":"https://www.nyiso.com/documents/20142/56802634/03d_Q1738_SIS%20Scope_2-3-26-TPAS.pdf/23c43711-119f-f819-0f62-0d7775ff3eb6","ukey":"14154|NY","uname":"Orange & Rockland Utils Inc","rto":"NYISO","nerc":"NPCC","ay":2024,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"nyiso.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.nyiso.com/documents/20142/56802634/03d_Q1738_SIS%20Scope_2-3-26-TPAS.pdf/23c43711-119f-f819-0f62-0d7775ff3eb6"]},{"id":"612f6cc42e42","cid":"612f6cc42e42","canon":1,"dups":1,"ftype":"data_center","name":"Incremental Load Request for Remington Factory Redevelopment","county":"Herkimer County","state":"NY","lat":43.571009,"lng":-74.841097,"cprec":"distinct","status":"Proposed","mw":400,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The purpose of this Interconnection System Impact Study (“SIS” or “Study”) is to evaluate the impact of the proposed interconnection of Incremental Load Request for Remington Factory Redevelopment (“Project”), which is being developed by Turin Management LLC (“Eligible Customer”), on the reliability of the New York State Transmission System (“NYSTS”).","uquote":"The Connecting Transmission Owner (“CTO”) is New York Power Authority (“NYPA”).","uname":"New York Power Authority","rto":"NYISO","nerc":"NPCC","op":"Turin Management","spon":"Turin Management","ay":2026,"oy":2028,"contro":"Community opposition regarding large-scale AI data center development and its impact on the Mohawk Valley.","deal":"Herkimer County IDA awarded a $500,000 grant from Empire State Development (ESD) for predevelopment work (April 2026); Turin Management LLC purchased the property for $2.1 million (June 2025).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"15296|NY","rawUname":"New York Power Authority","reportedUtility":"New York Power Authority","srcUrls":null,"srcDom":null},{"id":"f3e9f7f9f2e7","cid":"f3e9f7f9f2e7","canon":1,"dups":1,"ftype":"data_center","name":"Kenwood Tech Center","county":"Albany","state":"NY","lat":42.58824,"lng":-73.97401,"cprec":"distinct","status":"Proposed","mw":180,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"'Interconnection' means that this data center would be drawing power from National Grid.","uconf":"High","uquote":"'Interconnection' means that this data center would be drawing power from National Grid.","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"EKG Group","spon":"Guild Ventures","ay":2025,"oy":2028,"contro":"Significant community opposition, petitions, rallies, and a proposed state bill for a three-year moratorium on hyperscale data centers due to concerns about power grid, water supplies, land use, environment, and quality of life.","controScan":"https://518ish.substack.com/p/the-cloud-hovers-over-kenwood-commons","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"518ish.substack.com","srcUrls":["https://518ish.substack.com/p/the-cloud-hovers-over-kenwood-commons"]},{"id":"d177eba0e35a","cid":"d177eba0e35a","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Lake Mariner Data II","county":"Niagara County","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The Lake Mariner site gets its power from the NYISO Zone A grid, which draws upon hydro power from Niagara Falls and nuclear energy from several plants in the region. The resulting power mix is 89 percent carbon-free as of the most recent NYISO data.","pscan":"https://datacenterrichness.substack.com/p/inside-an-accelerated-ai-data-center","uconf":"High","uquote":"Lake Mariner Data II. Kintigh 345kV Substation. NYSEG. 250. 1/23/2024 TBD.","uscan":"https://www.nysrc.org/wp-content/uploads/2025/11/8.1-DER-Report-Nov-2025-for-NYSRC-Exec-Committee-Attachment-8.1.pdf","ukey":"13511|NY","uname":"New York State Elec & Gas Corp","rto":"NYISO","nerc":"NPCC","op":"TeraWulf","spon":"TeraWulf","ay":2024,"contro":"Noise complaints from residents regarding fans used to cool buildings at the Lake Mariner Data Center.","controScan":"https://www.govtech.com/artificial-intelligence/new-somerset-n-y-data-center-buildings-would-house-ai","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterrichness.substack.com;nysrc.org;govtech.com","lflag":"online_before_announced shared_coordinate_precision_downgraded","srcUrls":["https://datacenterrichness.substack.com/p/inside-an-accelerated-ai-data-center","https://www.nysrc.org/wp-content/uploads/2025/11/8.1-DER-Report-Nov-2025-for-NYSRC-Exec-Committee-Attachment-8.1.pdf","https://www.govtech.com/artificial-intelligence/new-somerset-n-y-data-center-buildings-would-house-ai"]},{"id":"1f15024cb1d3","cid":"1f15024cb1d3","canon":1,"dups":1,"ftype":"data_center","name":"New York State Artificial Intelligence Data Center","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"New York State Artificial Intelligence Data Center is a energy project located in St. Lawrence County, NY. The project is currently withdrawn in the New York ISO interconnection queue.... Utility. NM-NG.","pscan":"https://www.interconnection.fyi/project/nyiso-1719","uconf":"High","uquote":"Utility. NM-NG.... (all projects with T.O. National Grid)","uscan":"https://www.interconnection.fyi/project/nyiso-1719","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"ZeroC Data Centers","spon":"ZeroC Data Centers","ay":2024,"contro":"Project withdrawn from NYISO interconnection queue.","controScan":"https://www.interconnection.fyi/project/nyiso-1719","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://www.interconnection.fyi/project/nyiso-1719"]},{"id":"4f05c570e12d","cid":"4f05c570e12d","canon":1,"dups":1,"ftype":"data_center","name":"North Country Data Center","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":435,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Power is sourced from transmission lines connecting into the Moses-Saunders hydroelectric dam, responsibly consuming clean energy from the grid at market rates without preferential treatment.","pscan":"https://www.nccs.one/massena","uquote":"With close proximity and a direct connection to the St. Lawrence Hydroelectric Facility operated by New York Power Authority (“NYPA”), among other regional clean energy sources, the NCCS Site has a plentiful and consistent supply of clean, affordable power, a key ingredient to clean hydrogen development.","uname":"New York Power Authority","rto":"NYISO","nerc":"NPCC","op":"North Country Colocation Services (NCCS)","spon":"North Country Data Center (NCDC)","ay":2020,"oy":2024,"contro":"Community opposition regarding environmental impact, water usage, noise, and strain on the electric grid.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nccs.one","srcUrls":["https://www.nccs.one/massena"],"rawUkey":"15296|NY","rawUname":"New York Power Authority","reportedUtility":"New York Power Authority","lflag":"nonrate_utility_link_removed nonretail_eia861_not_rate_utility stale_future_status_year","oy_stale":1},{"id":"3cdfc335da6b","cid":"3cdfc335da6b","canon":1,"dups":1,"ftype":"data_center","name":"North East Data LLC Data Center","county":"Niagara County","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Proposed","mw":50,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Harnessing the Hydroelectric Power of America's Greatest Waterfall. From dirty coal to a data center powered by clean energy, Blockfusion is transforming computing to be sustainable.","pscan":"https://old.blockfusion.com/our-story/","uconf":"High","uquote":"Harnessing the Hydroelectric Power of America's Greatest Waterfall.... The State will build a new zero-emission advanced nuclear facility, as Governor Kathy Hochul has directed the New York Power Authority to construct in Upstate New York, and further buildout can provide additional benefits.","uscan":"https://old.blockfusion.com/our-story/","uname":"New York Power Authority","rto":"NYISO","nerc":"NPCC","op":"Blockfusion USA","spon":"Blockfusion USA","ay":2018,"oy":2021,"contro":"Community opposition due to noise, zoning disputes, and regulatory pushback leading to a settlement agreement with the City of Niagara Falls.","controScan":"https://www.govtech.com/products/niagara-falls-n-y-crypto-mine-may-use-nuclear-power","deal":"Blockfusion announced plans to go public through a merger with Blue Acquisition Corp., a SPAC, valuing Blockfusion at approximately $450 million (November 2025).","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"old.blockfusion.com;govtech.com","srcUrls":["https://old.blockfusion.com/our-story/","https://www.govtech.com/products/niagara-falls-n-y-crypto-mine-may-use-nuclear-power"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded nonrate_utility_link_removed nonretail_eia861_not_rate_utility stale_future_status_year","rawUkey":"15296|NY","rawUname":"New York Power Authority","reportedUtility":"New York Power Authority","oy_stale":1},{"id":"4408724e9146","cid":"4408724e9146","canon":1,"dups":1,"ftype":"data_center","name":"Orangeburg Expansion Phase 2","county":"Orange County","state":"NY","lat":41.40241,"lng":-74.306252,"cprec":"distinct","status":"Proposed","mw":20,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The county noted that the project does not plan to use renewable energy sources or Battery Energy Storage Systems (BESSs) and said, “Considering the significant energy use of both phases, the applicant must implement measures such as onsite energy production and BESSs, to reduce the impact that this datacenter will have on the energy grid.”","pscan":"https://rcbizjournal.com/2026/03/31/real-estate-roundup-databank-phase-ii-headwinds-five-story-multi-family-proposed-for-former-avon-enamel-building-airmont-fitness-center-building-to-become-yeshiva/","uconf":"High","uquote":"Project Sycamore Orangeburg is a energy project with 22.3 MW of capacity located in Rockland County, NY. The project is currently active in the New York ISO interconnection queue. The project is owned by Project Sycamore - Orangeburg.... T.O. Orange and Rockland","uscan":"https://www.interconnection.fyi/project/nyiso-1713","ukey":"14154|NY","uname":"Orange & Rockland Utils Inc","rto":"NYISO","nerc":"NPCC","op":"DataBank","tenant":"CoreWeave","ay":2024,"contro":"Rockland County Planning Department unanimously disapproved the application in December 2024, citing disruption of wetlands, high energy usage, lack of parking, and fire safety issues. Local residents also expressed concerns about noise, diesel exhaust, and harm to Lake Tappan.","controScan":"https://rcbizjournal.com/2025/07/20/orangetown-set-to-review-massive-expansion-of-databanks-orangeburg-data-center/","deal":"Rockland IDA granted CoreWeave and Databank tax benefits totaling up to $58,000,000 for the Orangeburg campus.","dealScan":"https://datacentercrisis.org/f/fight-massive-datacenter-expansion-by-lake-tappan-reservoir","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"rcbizjournal.com;interconnection.fyi;datacentercrisis.org","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://rcbizjournal.com/2026/03/31/real-estate-roundup-databank-phase-ii-headwinds-five-story-multi-family-proposed-for-former-avon-enamel-building-airmont-fitness-center-building-to-become-yeshiva/","https://www.interconnection.fyi/project/nyiso-1713","https://datacentercrisis.org/f/fight-massive-datacenter-expansion-by-lake-tappan-reservoir","https://rcbizjournal.com/2025/07/20/orangetown-set-to-review-massive-expansion-of-databanks-orangeburg-data-center/"]},{"id":"508dbbc91c7e","cid":"508dbbc91c7e","canon":1,"dups":1,"ftype":"data_center","name":"Pontoon Bridge Road Data Center","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The Pontoon Bridge Road Data Center is a proposed 250 MW generation project located in St. Lawrence County, New York. Developed by American Data Center Partners LLC, the project is interconnected to the NYPA utility via the Haverstock-Adirondack 345kV transmission lines.","pscan":"https://www.infrasure.ai/project/nyiso-1745-pontoon-bridge-road-data-center","uquote":"The Pontoon Bridge Road Data Center. Haverstock-Adirondack 345kV transmission lines. NYPA. 250. 10/9/2025. 10/31/2025. 10-2026.","uscan":"https://www.nysrc.org/wp-content/uploads/2026/01/8.1-DER-Report-for-Jan-2026-for-NYSRC-Exec-Committee-Attachment-8.1.pdf","rto":"NYISO","nerc":"NPCC","op":"American Data Center Partners","spon":"American Data Center Partners","ay":2025,"oy":2026,"contro":"Concerns raised about local infrastructure, traffic, noise, electric-grid capacity, air-quality, and water demand; call for public discussion.","controScan":"https://watertownpost.com/massena-faces-massive-data-center-power-requests-in-nyiso-queue/","deal":"Land sale involving American Data Centers Partners, LLC at 466 Pontoon Bridge Road.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"infrasure.ai;nysrc.org;watertownpost.com","srcUrls":["https://www.infrasure.ai/project/nyiso-1745-pontoon-bridge-road-data-center","https://www.nysrc.org/wp-content/uploads/2026/01/8.1-DER-Report-for-Jan-2026-for-NYSRC-Exec-Committee-Attachment-8.1.pdf","https://watertownpost.com/massena-faces-massive-data-center-power-requests-in-nyiso-queue/"],"lflag":"source_quality_reclassified"},{"id":"b30cfa1182e5","cid":"b30cfa1182e5","canon":1,"dups":1,"ftype":"data_center","name":"Proposed Datacenters at 450 Broadway, Buchanan, NY, 10511","county":"Westchester County","state":"NY","lat":41.152686,"lng":-73.745753,"cprec":"shared_centroid","status":"Proposed","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"With an anticipated load of 200 MW, the project requires converting the site from a power producer to a high-demand customer, anchored by a dual-feed connection to a nearby Con Edison substation.","pscan":"https://www.chasolutions.com/projects/indian-point-data-center-campus-redevelopment/","uconf":"High","uquote":"Utility. ConEd. Transmission Owner Short Name. ConEd. Transmission Owner(s). Consolidated Edison.","uscan":"https://www.interconnection.fyi/project/nyiso-1717","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","rto":"NYISO","nerc":"NPCC","op":"Holtec Decommissioning International (HDI)","spon":"Holtec Decommissioning International (HDI)","ay":2024,"oy":2024,"contro":"Community opposition due to concerns about energy use, water consumption, noise, and utility costs.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"chasolutions.com;interconnection.fyi","srcUrls":["https://www.chasolutions.com/projects/indian-point-data-center-campus-redevelopment/","https://www.interconnection.fyi/project/nyiso-1717"],"lflag":"shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"e7c53c2a91a7","cid":"e7c53c2a91a7","canon":1,"dups":1,"ftype":"data_center","name":"Ranalli SuperDC","county":"Onondaga County","state":"NY","lat":43.006516,"lng":-76.196134,"cprec":"distinct","status":"Proposed","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The development has requested a grid interconnection capacity of up to 300 MW from the New York Independent System Operator.","pscan":"https://www.blackridgeresearch.com/blog/latest-list-upcoming-data-centers-in-newyork-city-state-nyc-united-states-us","uconf":"High","uquote":"Ranalli SuperDC. Clay to Pannell ckts PC-1 and PC-2. NYPA. 300. 5/7/2025. 8/31/2025. 05-2028. 20. C. Onondaga. 1746. OOWWTP Expansion Program. National Grid's 115kV lines: Clay-Teall LN#11 and Clay-Woodard LN#17. National Grid. 50. 10/15/2025. 10/31/2025","uscan":"https://www.nysrc.org/wp-content/uploads/2026/01/8.1-DER-Report-for-Jan-2026-for-NYSRC-Exec-Committee-Attachment-8.1.pdf","uname":"New York Power Authority","rto":"NYISO","nerc":"NPCC","op":"Ranalli Super DC","spon":"James Ranalli / Ranalli Super DC","ay":2026,"oy":2028,"contro":"Community opposition and a 6-month moratorium on data centers approved by Lysander town board due to concerns about noise, utility grid upgrades, water consumption, and property values.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"blackridgeresearch.com;nysrc.org","srcUrls":["https://www.blackridgeresearch.com/blog/latest-list-upcoming-data-centers-in-newyork-city-state-nyc-united-states-us","https://www.nysrc.org/wp-content/uploads/2026/01/8.1-DER-Report-for-Jan-2026-for-NYSRC-Exec-Committee-Attachment-8.1.pdf"],"lflag":"source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"15296|NY","rawUname":"New York Power Authority","reportedUtility":"New York Power Authority"},{"id":"8ef05a85509c","cid":"8ef05a85509c","canon":1,"dups":1,"ftype":"data_center","name":"SDC St. Lawrence","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":120,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"SDC St. Lawrence. Moses-Reynolds MRG-1 and Moses-Reynolds MRG-2 at 115kV. NYPA. 120.","pscan":"https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-3-31-24.xlsx/0ea2f207-844b-b94e-803e-c9a1a70558f9","uconf":"High","uquote":"SDC St. Lawrence. Moses-Reynolds MRG-1 and Moses-Reynolds MRG-2 at 115kV. NYPA. 120.","rto":"NYISO","nerc":"NPCC","op":"Sabey Data Center Properties","spon":"Sabey Data Center Properties","ay":2021,"oy":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"nyiso.com","srcUrls":["https://www.nyiso.com/documents/20142/1394430/NYISO-Interconnection-Queue-3-31-24.xlsx/0ea2f207-844b-b94e-803e-c9a1a70558f9"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"9511da941dcc","cid":"9511da941dcc","canon":1,"dups":1,"ftype":"data_center","name":"St Lawrence Data and Agricultural Center","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"St Lawrence Data and Agricultural Center is a energy project with 200 MW of capacity located in St. Lawrence County, NY. The project is currently active in the New York ISO interconnection queue. The project is owned by ZeroC Data Centers, LLC.","pscan":"https://www.interconnection.fyi/project/nyiso-1213","uquote":"St Lawrence Data and Agricultural Center. Dennison 115kV substation. NM-NG. 200. 6/28/2021 01-2026. 19. D. St. Lawrence. 0979. North Country Data Center. Reynolds 115kV. NYPA. 176. 1/22/2020 12-2024. 20. D. St. Lawrence. 1315. SDC St. Lawrence. Moses... (all projects with T.O. National Grid)","uscan":"https://www.nysrc.org/wp-content/uploads/2025/11/8.1-DER-Report-Nov-2025-for-NYSRC-Exec-Committee-Attachment-8.1.pdf","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"ZeroC Data Centers","spon":"ZeroC Data Centers","ay":2021,"oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;nysrc.org","srcUrls":["https://www.interconnection.fyi/project/nyiso-1213","https://www.nysrc.org/wp-content/uploads/2025/11/8.1-DER-Report-Nov-2025-for-NYSRC-Exec-Committee-Attachment-8.1.pdf"],"lflag":"citation_artifact_removed"},{"id":"68555e524b32","cid":"68555e524b32","canon":1,"dups":1,"ftype":"data_center","name":"St. Lawrence Infrastructure 1","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":860,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"St. Lawrence Infrastructure 1. NYPA HA-2, 345kV Transmission Line. NYPA.","uconf":"High","uquote":"St. Lawrence Infrastructure 1. NYPA HA-2, 345kV Transmission Line. NYPA.","uname":"New York Power Authority","rto":"NYISO","nerc":"NPCC","ay":2025,"oy":2029,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"15296|NY","rawUname":"New York Power Authority","reportedUtility":"New York Power Authority","srcUrls":null,"srcDom":null},{"id":"3ebafa26d7b1","cid":"3ebafa26d7b1","canon":1,"dups":1,"ftype":"data_center","name":"St. Lawrence Infrastructure 2","county":"St. Lawrence County","state":"NY","lat":44.488112,"lng":-75.074311,"cprec":"shared_centroid","status":"Proposed","mw":1935,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The intent is to track the growth of Co-Located Solar / Storage, Energy Storage, Solar, Wind, and Offshore Wind (OSW) projects in the NYISO Interconnection Queue, looking to identify trends and patterns by zone and in total for the state.","pscan":"https://www.nysrc.org/wp-content/uploads/2025/11/8.1-DER-Report-Nov-2025-for-NYSRC-Exec-Committee-Attachment-8.1.pdf","uquote":"Lawrence Infrastructure 2. NYPA's 230kV Moses Massena 1 (MMS-1). NYPA. 1,935.","rto":"NYISO","nerc":"NPCC","oy":2030,"contro":"Concerns about grid capacity, water usage, noise, and regulatory pushback related to large data centers in St. Lawrence County.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"nysrc.org","srcUrls":["https://www.nysrc.org/wp-content/uploads/2025/11/8.1-DER-Report-Nov-2025-for-NYSRC-Exec-Committee-Attachment-8.1.pdf"],"lflag":"source_quality_reclassified"},{"id":"509a49309943","cid":"509a49309943","canon":1,"dups":1,"ftype":"data_center","name":"T5 Data Centers","city":"Briarcliff Manor","county":"Westchester","state":"NY","lat":41.152686,"lng":-73.745753,"cprec":"shared_centroid","status":"Proposed","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"As requested we have reviewed the Special Permit Application submitted by Skae Power Solutions (the “Applicant”) for the addition of four (4) new outdoor diesel-powered electrical generators and replacement of two existing chillers at the existing data center facility (“Facility”) at 333 South Highland Avenue located within the CT-5 zoning district in the Village of Briarcliff Manor, NY (the “Project Site”).... - The proposed project is a modification of an existing use to provide back-up power during a power outage.","uquote":"As the primary utility provider in the Briarcliff Manor area, the distribution of electricity is carried by Con Edison.","ukey":"4226|NY","uname":"Consolidated Edison Co-NY Inc","rto":"NYISO","nerc":"NPCC","op":"T5 Data Centers","spon":"T5 Data Centers","ay":2014,"oy":2014,"contro":"Special Permit Application for addition of diesel generators and replacement of chillers, subject to Planning Board and Board of Trustees review, with questions on zoning compliance and fire services.","deal":"Development partnership with Lincoln Rackhouse (2014)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed shared_coordinate_precision_downgraded stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"dadbf4acab81","cid":"dadbf4acab81","canon":1,"dups":1,"ftype":"data_center","name":"WNY STAMP","county":"Genesee County","state":"NY","lat":43.00091,"lng":-78.192778,"cprec":"distinct","status":"Proposed","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Our IT systems are powered by the area's reliable high voltage utility services; which means the site will utilize only a small number of backup generators (up to 12) strictly for life safety, security, and systems monitoring in the unlikely event of an outage. Our project connects directly to the 345kV Bulk Power System. This is a different network than the residential neighborhoods, which connect to lower-voltage local streets.","pscan":"https://www.streamdatacenters.com/project-stamp/","uquote":"We are working with National Grid, State Authorities, and NYISO (the operator of New York's Electrical Grid) to ensure this project won't affect residents' utility bills.","uscan":"https://www.streamdatacenters.com/project-stamp/","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","op":"Stream Data Centers","spon":"Apollo Global Management","ay":2025,"contro":"Widespread opposition from residents, environmental advocates, and the Tonawanda Seneca Nation due to environmental concerns, power usage, and encroachment on reservation land, including litigation challenging the environmental review process.","controScan":"https://www.wnyea.org/rethink-stamp.html","deal":"$1.46 billion in taxpayer subsidies for a nearly $20 billion project, as of March/April 2026.","dealScan":"https://www.wgrz.com/article/money/business/sides-continue-to-feud-over-massive-data-center-project-proposed-for-genesee-county/71-3d3190ef-e985-4f74-b747-7669e0b19691","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"streamdatacenters.com;wgrz.com;wnyea.org","lflag":"online_before_announced","srcUrls":["https://www.streamdatacenters.com/project-stamp/","https://www.wgrz.com/article/money/business/sides-continue-to-feud-over-massive-data-center-project-proposed-for-genesee-county/71-3d3190ef-e985-4f74-b747-7669e0b19691","https://www.wnyea.org/rethink-stamp.html"]},{"id":"d58b0579cf9d","cid":"d58b0579cf9d","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Wulf Compute Data Center II","county":"Niagara County","state":"NY","lat":43.272672,"lng":-78.812943,"cprec":"shared_centroid","status":"Proposed","mw":360,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"TeraWulf leads in sustainable bitcoin mining and HPC hosting, with the Lake Mariner Facility's energy sourced from predominantly zero-carbon resources, primarily hydro and nuclear power, per NYISO.","pscan":"https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-25-000018/wulf-20241231.htm","uconf":"High","uquote":"The Company has an agreement in place with the Power Authority of the State of New York (“NYPA”) for 90 MW of high-load factor power to support its bitcoin mining operations (the “PPA”).","uscan":"https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-25-000018/wulf-20241231.htm","uname":"New York Power Authority","rto":"NYISO","nerc":"NPCC","op":"TeraWulf","spon":"Google","tenant":"Fluidstack","ay":2024,"oy":2026,"deal":"Google provided an incremental backstop of $1.4 billion in support of project-related debt financing, increasing its total backstop to approximately $3.2 billion, announced August 18, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"investors.terawulf.com","srcUrls":["https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001083301-25-000018/wulf-20241231.htm"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"15296|NY","rawUname":"New York Power Authority","reportedUtility":"New York Power Authority"},{"id":"d9b657580d2f","cid":"d9b657580d2f","canon":1,"dups":1,"ftype":"data_center","name":"Olean Digital Data Center","county":"Cattaraugus","state":"NY","lat":42.239099,"lng":-78.662332,"cprec":"distinct","status":"Cancelled","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. National Grid.","uquote":"Grid Operator. National Grid.","ukey":"13573|NY","uname":"Niagara Mohawk Power Corp.","rto":"NYISO","nerc":"NPCC","ay":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0f3ba3608814","cid":"0f3ba3608814","canon":1,"dups":1,"ftype":"data_center","name":"Apple","city":"Newton","county":"Catawba","state":"NC","lat":35.661883,"lng":-81.214906,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Hybrid","pconf":"Medium","pquote":"The 200-acre array of photovoltaic solar panels serves as a supplement to its utility power feed from Duke Energy as well as fuel cells from Bloom Energy that use biogas from nearby landfills to generate electricity.","proc":"Tariff (utility)","pcp":"Duke Energy","pdt":"3.8 to 4.4 cents per kWh (as of 2009 reporting)","uquote":"The utility company that supplies power to Apple's Maiden, North Carolina, data center has pulled a paper from its website that bragged about Apple's energy-guzzling ways. The paper was a puff piece talking about the reasons that Apple chose to hook its iCloud data center up to Duke Energy's power grid.","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Apple","spon":"Apple","tenant":"Apple","ay":2009,"oy":2010,"contro":"Environmental concerns regarding energy sources and local community complaints about construction impacts.","controScan":"https://www.datacenterknowledge.com/sustainability/greenpeace-apple-s-power-dirty-dangerous-","deal":"$1 billion initial investment (2009); $175 million expansion (2025); $448 million incremental commitment (2021); $7.3 million in incentives from Maiden and Catawba County (2009)","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/sustainability/greenpeace-apple-s-power-dirty-dangerous-"],"lflag":"coordinate_cluster_reclassified"},{"id":"17eafe635529","cid":"17eafe635529","canon":1,"dups":1,"ftype":"data_center","name":"Apple Inc.","city":"Maiden","county":"Catawba","state":"NC","lat":35.661883,"lng":-81.214906,"cprec":"shared_centroid","status":"Operational","mw":100,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"California-based Apple promotes its 500,000-square-foot data center in Maiden, N.C., by saying it runs “100 percent” on renewable energy even though the facility continues to get all of its electricity from Duke Energy, a public utility that primarily generates electricity using coal, nuclear power, and natural gas. Apple owns a 20-megawatt solar farm and a 10-megawatt fuel cell system adjacent to the data center, but the electricity generated by the solar farm and fuel cell system is sold to Duke and does not provide power for the building.","pscan":"https://www.carolinajournal.com/analysts-call-apple-renewable-energy-claims-lies/","uconf":"High","uquote":"The utility company that supplies power to Apple's Maiden, North Carolina, data center has pulled a paper from its website that bragged about Apple's energy-guzzling ways. The paper was a puff piece talking about the reasons that Apple chose to hook its iCloud data center up to Duke Energy's power grid.","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Apple","spon":"Apple","tenant":"Apple","ay":2009,"oy":2010,"contro":"Community complaints about construction impact (noise, storm-water runoff, road damage), state environmental fine for hazardous material documentation, and criticism from environmental groups regarding reliance on non-renewable energy sources.","controScan":"https://www.wcnc.com/article/news/goldner-data-center-tsr-do-not-publish/275-2b098576-5153-4f91-8957-086f1163568c","deal":"Apple committed an incremental $448 million for construction, improvements, and equipment at its Maiden data center in April 2021. Additionally, a $175 million expansion was permitted by Catawba County in April 2025.","dealScan":"https://hickoryrecord.com/news/local/business/development/article_33ef7402-999f-402a-907d-176aee2c3ca4.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"carolinajournal.com;hickoryrecord.com;wcnc.com","srcUrls":["https://www.carolinajournal.com/analysts-call-apple-renewable-energy-claims-lies/","https://hickoryrecord.com/news/local/business/development/article_33ef7402-999f-402a-907d-176aee2c3ca4.html","https://www.wcnc.com/article/news/goldner-data-center-tsr-do-not-publish/275-2b098576-5153-4f91-8957-086f1163568c"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"15ffde95c8f2","cid":"15ffde95c8f2","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Lenoir","county":"Caldwell","state":"NC","lat":35.966396,"lng":-81.51254,"cprec":"distinct","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Google signs a carbon-free energy agreement with Duke Energy. Alphabet subsidiary Google has contracted for 61 MW of solar power with Duke Energy, the largest utility in the US, to power its North Carolina data centers.","uconf":"High","uquote":"Google signs a carbon-free energy agreement with Duke Energy.","uscan":"https://datacenters.google/locations/north-carolina/","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Google","spon":"Google","tenant":"Google","ay":2007,"oy":2008,"contro":"Lawsuit challenging incentives (2007); withdrawal from grant (2008); Unfair Labor Practice charges (2022).","controScan":"https://www.alphabetworkersunion.org/press/awu-cwa-files-two-unfair-labor-practice-charges-against-google-data-center-contractors","deal":"$1.2 billion initial investment (2007); $600 million expansion (2013); 61 MW solar PPA with Duke Energy (2015); $600 million upgrade (2024); $1 billion expansion (2026).","dealScan":"https://news.constructconnect.com/google-plans-1-billion-expansion-of-north-carolina-data-center-campus","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.google;news.constructconnect.com;alphabetworkersunion.org","srcUrls":["https://datacenters.google/locations/north-carolina/","https://news.constructconnect.com/google-plans-1-billion-expansion-of-north-carolina-data-center-campus","https://www.alphabetworkersunion.org/press/awu-cwa-files-two-unfair-labor-practice-charges-against-google-data-center-contractors"]},{"id":"d56e959ec4bb","cid":"d56e959ec4bb","canon":1,"dups":1,"ftype":"data_center","name":"Mapletree Industrial Trust","city":"Charlotte","county":"Mecklenburg","state":"NC","lat":35.246862,"lng":-80.833832,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Duke Energy Carolinas.","pscan":"https://www.interconnection.fyi/data-center/project/mapletree-industrial-trust-9674b37b","uconf":"High","uquote":"Grid Operator. Duke Energy Carolinas.","uscan":"https://www.interconnection.fyi/data-center/project/mapletree-industrial-trust-9674b37b","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Mapletree Industrial Trust","spon":"Mapletree Investments Pte","ay":2021,"deal":"Acquisition of 29 data centers, including 1400 Cross Beam Drive, Charlotte, from Sila Realty Trust, Inc. for US$1,320 million, agreement dated May 20, 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/mapletree-industrial-trust-9674b37b"]},{"id":"acb8722215e9","cid":"acb8722215e9","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corporation, CLT04","city":"Conover","county":"Catawba","state":"NC","lat":35.661883,"lng":-81.214906,"cprec":"shared_centroid","status":"Future / Expansion","mw":240,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"We purchase electricity from local power utilities. In addition, we add carbon-free energy through power purchase agreements (PPAs) and other long-term contracts. In 2025, we met our goal of matching 100% of our electricity consumption with renewable energy. Once generated, carbon-free electricity goes onto the power grid, mixing with all other kinds of energy.","uquote":"Grid Operator: Duke Energy Carolinas.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-clt04-ef45d3ad","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2027,"contro":"Neighborhood pushback regarding fan and generator noise, heavy water use for cooling, and added strain on the power system. Concerns about rising electricity bills and dwindling water supplies have led to a 'community first' initiative from Microsoft.","deal":"Microsoft committed to invest a minimum of $1 billion in the phased development of four data centers in Catawba County over 10 years, with Catawba County approving grants of property and refunding $16 million in property tax revenues over ten years. A PPA with Duke Energy for 1500 MW was also reported on Feb 10, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"status_adjusted_future_expansion source_quality_reclassified coordinate_cluster_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corporation-clt04-ef45d3ad"],"rawStatus":"Operational"},{"id":"2df1887f195a","cid":"2df1887f195a","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corporation, CLT10","city":"Maiden","county":"Catawba","state":"NC","lat":35.661883,"lng":-81.214906,"cprec":"shared_centroid","status":"Future / Expansion","mw":48,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Duke Energy has signed deals with Microsoft and Compass to power expansive data center complexes under construction in North Carolina as the artificial intelligence boom supercharges the demand for electricity.","pscan":"https://subscriber.politicopro.com/article/eenews/2026/02/12/duke-to-power-microsoft-data-center-in-north-carolina-00776346","uconf":"High","uquote":"Duke Energy has signed deals with Microsoft and Compass to power expansive data center complexes under construction in North Carolina as the artificial intelligence boom supercharges the demand for electricity.","uscan":"https://subscriber.politicopro.com/article/eenews/2026/02/12/duke-to-power-microsoft-data-center-in-north-carolina-00776346","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2027,"contro":"Community opposition regarding noise, water usage, power needs, and utility costs; project delays.","deal":"$1 billion investment announced in 2022, property tax grants from Catawba County, and power purchase agreement with Duke Energy.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-to-invest-1b-in-data-center-builds-in-north-carolina","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"subscriber.politicopro.com;datacenterknowledge.com","lflag":"status_adjusted_future_expansion source_quality_reclassified coordinate_cluster_reclassified","srcUrls":["https://subscriber.politicopro.com/article/eenews/2026/02/12/duke-to-power-microsoft-data-center-in-north-carolina-00776346","https://www.datacenterknowledge.com/hyperscalers/microsoft-to-invest-1b-in-data-center-builds-in-north-carolina"],"rawStatus":"Operational"},{"id":"0b767da70487","cid":"0b767da70487","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corporation, CLT17","city":"Newton","county":"Catawba","state":"NC","lat":35.661883,"lng":-81.214906,"cprec":"shared_centroid","status":"Future / Expansion","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Duke Energy Carolinas. Our datacenters in North Carolina will be designed for our backup generators to use a renewable biofuel that reduces net carbon emissions.","pscan":"https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-North-Carolina.pdf","uconf":"High","uquote":"Grid Operator: Duke Energy Carolinas. Duke Energy has signed deals with Microsoft and Compass to power expansive data center complexes under construction in North Carolina as the artificial intelligence boom supercharges the demand for electricity.","uscan":"https://subscriber.politicopro.com/article/eenews/2026/02/12/duke-to-power-microsoft-data-center-in-north-carolina-00776346","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2027,"contro":"Community opposition due to concerns about noise, water usage, and power needs.","deal":"Microsoft committed $1 billion investment in Catawba County, with Catawba County approving grants of property and $16 million in property tax refunds over 10 years.","dealScan":"https://www.wsoctv.com/news/local/microsofts-new-plan-aims-cover-data-center-utility-costs/IXJ3WKHOWZGU7EZHU5PEMTSMC4/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"local.microsoft.com;subscriber.politicopro.com;wsoctv.com","lflag":"status_adjusted_future_expansion coordinate_cluster_reclassified","srcUrls":["https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-North-Carolina.pdf","https://subscriber.politicopro.com/article/eenews/2026/02/12/duke-to-power-microsoft-data-center-in-north-carolina-00776346","https://www.wsoctv.com/news/local/microsofts-new-plan-aims-cover-data-center-utility-costs/IXJ3WKHOWZGU7EZHU5PEMTSMC4/"],"rawStatus":"Operational"},{"id":"8adead7a9c69","cid":"8adead7a9c69","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Charlotte","county":"Mecklenburg","state":"NC","lat":35.246862,"lng":-80.833832,"cprec":"distinct","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"For your Charlotte colocation and other data center needs, consider TierPoint's Center Park Dr facility located on the area's second priority power grid.","uquote":"Your Charlotte electric utility is provided by Duke Energy.","uscan":"https://makeamovetoday.com/blog/charlotte-nc-utilities/","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"TierPoint","spon":"Argo Infrastructure Partners","oy":2003,"contro":"Charlotte residents and city council are debating a moratorium on data center development due to concerns about water use, power consumption, noise, and environmental impact.","controScan":"https://www.bisnow.com/charlotte/news/data-center-community-relations/charlotte-residents-data-center-moratorium-134739","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"makeamovetoday.com;bisnow.com","srcUrls":["https://makeamovetoday.com/blog/charlotte-nc-utilities/","https://www.bisnow.com/charlotte/news/data-center-community-relations/charlotte-residents-data-center-moratorium-134739"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"a114b1235a61","cid":"a114b1235a61","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Forest City","county":"Rutherford","state":"NC","lat":35.402747,"lng":-81.919582,"cprec":"distinct","status":"Proposed","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"We worked with Duke Energy to meet our 100% clean and renewable energy goal for the Forest City Data Center.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Forest-City-Data-Center.pdf","uconf":"High","uquote":"We worked with Duke Energy to meet our 100% clean and renewable energy goal for the Forest City Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Forest-City-Data-Center.pdf","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2012,"deal":"Initial investment of $450 million announced in 2010","dealScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-plans-north-carolina-data-center","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;datacenterknowledge.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Forest-City-Data-Center.pdf","https://www.datacenterknowledge.com/hyperscalers/facebook-plans-north-carolina-data-center"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"ca0b6b96dccf","cid":"ca0b6b96dccf","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Conove","county":"Catawba","state":"NC","lat":35.661883,"lng":-81.214906,"cprec":"shared_centroid","status":"Proposed","mw":48,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The campus plan include a Duke Energy Substation. Duke Energy is lining up resources to handle the wave of new demand. The company recently rolled out a 103 billion dollar, five-year capital plan that executives say is aimed in part at serving fast-growing data center loads. Duke has already signed multiple electric service agreements that lock in future data center usage, a move that analysts say will heavily influence when and how projects like Microsoft's Catawba campuses actually plug into the grid.","uquote":"The campus plan include a Duke Energy Substation. Duke Energy is lining up resources to handle the wave of new demand.","ukey":"5416|NC","uname":"Duke Energy Carolinas, LLC","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2025,"contro":"Community opposition regarding noise, water use, and strain on the power system; project delays.","deal":"Microsoft plans to invest a minimum of $1 billion in Catawba County over 10 years, with incentive grants approved by local governments.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text coordinate_cluster_reclassified stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"1e5400ae3ba7","cid":"1e5400ae3ba7","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Crusoe Energy","city":"Williston","county":"Williams","state":"ND","lat":48.355765,"lng":-103.501333,"cprec":"distinct","status":"Proposed","mw":37.5,"band":"25-50 MW","proc":"Co-located generation","pcp":"WPX Energy Williston, LLC","rto":"MISO","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"c7df651c126c","cid":"c7df651c126c","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Hilliard","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"In Hilliard, the local utility, AEP, will temporarily use fuel cells to power part of our data center operations while larger Ohio power infrastructure upgrades are completed.” The Ohio Power Siting Board has approved the project despite local opposition under Ohio's \"behind-the-meter\" power law (HB 15), which allows on-site energy generation for data centers while bypassing local zoning review.","pscan":"https://stopohiodatacenters.org/franklin-county","proc":"Co-located generation","pcp":"Ohio Power Company (AEP Ohio)","pdt":"72.9-megawatt, six-year agreement (with Bloom Energy for fuel cells)","uconf":"High","uquote":"a subsidiary of utility company American Electric Power wants to build the fuel cells to deliver 73 megawatts of power for one of Amazon's two Hilliard megacampuses. American Electric Power, which will own the natural gas-powered fuel cells, delivered a letter to City leaders Oct. 20 that withdraws its application to the City's Planning & Zoning Commission based on State law exempting the project from local review.","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon.com Incorporated","tenant":"Amazon Web Services","ay":2022,"oy":2025,"contro":"Lawsuit and community opposition regarding 228 natural gas-powered fuel cells (73 MW) and 158 backup diesel generators due to environmental and health concerns, noise, and bypassing local zoning review.","controScan":"https://www.10tv.com/article/news/local/hilliard-residents-concerns-amazon-data-center-diesel-generators/530-ccb1ea66-fad0-403b-9baf-76110d65f2fd","deal":"Ohio offered a 15-year, 100% property tax abatement in 2019. $300 million investment for the first phase of a data center campus in Hilliard.","dealScan":"https://www.industrialinfo.com/iirenergy/industry-news/article/amazon-furthers-investment-in-ohio-data-centers--337343","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"stopohiodatacenters.org;industrialinfo.com;10tv.com","srcUrls":["https://stopohiodatacenters.org/franklin-county","https://www.industrialinfo.com/iirenergy/industry-news/article/amazon-furthers-investment-in-ohio-data-centers--337343","https://www.10tv.com/article/news/local/hilliard-residents-concerns-amazon-data-center-diesel-generators/530-ccb1ea66-fad0-403b-9baf-76110d65f2fd"],"lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"49730|OH","rawUname":"American PowerNet","reportedUtility":"AEP Ohio / Ohio Power Co","ukey":"14006|OH"},{"id":"10d9161760d8","cid":"10d9161760d8","canon":1,"dups":2,"ftype":"data_center","name":"Amazon","city":"Johnstown","county":"Licking","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Future / Expansion","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"AEP Ohio","pdt":"minimum 85% of subscribed capacity, minimum 8-year contract after 4-year ramp-up for new contracts above 25 MW","uquote":"AEP Ohio, the Columbus utility that serves Amazon, said earlier this year that it received 30 gigawatts of service requests from data centers alone — an amount that would put the region's demand for electricity close to New York City's. Much of that demand comes from the wealthy suburban enclave of New Albany, Ohio, where Meta, Microsoft, Google, and QTS are all constructing major data center projects. The site of Intel's future semiconductor chip plant is in neighboring Johnstown, Ohio.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2020,"oy":2030,"deal":"$21.8 million land acquisition in April 2020","dealScan":"https://baxtel.com/data-center/amazon-3180-beech-rd-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"status_adjusted_future_expansion source_quality_reclassified utility_alias_corrected","srcUrls":["https://baxtel.com/data-center/amazon-3180-beech-rd-campus"],"rawStatus":"Operational","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"89325d00a7ab","cid":"89325d00a7ab","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Plain City","county":"Madison","state":"OH","lat":39.896607,"lng":-83.400885,"cprec":"distinct","status":"Operational","mw":65,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Amazon intends to take service from AES Ohio at 345 kV with an expected Commercial Operations Date of September 15, 2026.","uconf":"High","uquote":"Amazon plans to build a large data center in AES Ohio's service territory in Ohio.","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon AWS","spon":"Amazon.com Incorporated","tenant":"Amazon Web Services","ay":2024,"oy":2026,"deal":"AES Ohio agreement with Amazon to shield utility customers from $22.8 million in project costs for the first phase.","dealScan":"https://www.utilitydive.com/news/ohio-ratepayer-occ-ferc-amazon-data-center-aes/733169/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"utilitydive.com","srcUrls":["https://www.utilitydive.com/news/ohio-ratepayer-occ-ferc-amazon-data-center-aes/733169/"]},{"id":"3f5fe5ea7aec","cid":"3f5fe5ea7aec","canon":1,"dups":1,"ftype":"data_center","name":"Ark Data Centers","city":"Canton","county":"Stark","state":"OH","lat":40.814131,"lng":-81.365667,"cprec":"distinct","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Our Canton, Ohio Data Center is a 5,600 square-foot, redundant 1.5 MW facility that provides secure data storage space in a state-of-the-art environment, saving customers the expense associated with owning, operating and maintaining such a facility independently. Generation, Utility, Three 500kW Diesel Generators (N+1). Grid Distribution, Single Utility Feed.","uquote":"Grid Operator: Village of Beach City - (OH).","rto":"PJM","nerc":"RFC","op":"Ark Data Centers","spon":"Carlyle Group","deal":"Carter Validus Mission Critical REIT II acquired the Canton Data Center for approximately $9.4 million on October 3, 2018.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"27dd9eca17b0","cid":"27dd9eca17b0","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Lewis Center","county":"Delaware","state":"OH","lat":40.278941,"lng":-83.007462,"cprec":"shared_centroid","status":"Operational","mw":35,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Our Lewis Center, Ohio campus features a state-of-the-art single-story data center, just minutes away from major companies like Amazon, Nationwide Insurance, and Cardinal Health. With 27,000 sq/ft and 8 MW of utility power, our facility is designed to meet the needs of Fortune 500 retail, healthcare, and global enterprise clients.","uquote":"Utility Provider: American Electric.","uscan":"https://baxtel.com/data-center/centersquare-columbus-cmh1","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Csquare","spon":"Brookfield Infrastructure","ay":2024,"deal":"Centersquare acquired 10 data centers across the United States and Canada for $1 billion, announced September 30, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","srcUrls":["https://baxtel.com/data-center/centersquare-columbus-cmh1"],"rawUkey":"49730|OH","rawUname":"American PowerNet","reportedUtility":"AEP Ohio / Ohio Power Co","ukey":"14006|OH"},{"id":"b2c2e08fa77d","cid":"b2c2e08fa77d","canon":0,"dups":1,"ftype":"data_center","name":"Cologix","city":"Columbus","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The initial phase is built on a concurrently maintainable design with 2N power and N+1 cooling. Future expansion, that is already underway, will deliver a distributed redundant N+1 power configuration allowing customers to also choose scalable power solutions.","uquote":"30 MW utility available on campus. AEP Ohio. Alternative Feed Service (AFS). 2N diverse feeds from discrete substations.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Cologix","spon":"Stonepeak Infrastructure Partners","tenant":"Google Cloud","ay":2016,"oy":2018,"deal":"Construction of COL3, a $130M+ facility, announced in September 2016.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected,merged_duplicate","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","srcUrls":null,"srcDom":null},{"id":"e8ecb37e6ade","cid":"e8ecb37e6ade","canon":1,"dups":1,"ftype":"data_center","name":"Cologix","city":"Columbus","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Operational","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Cologix's Delaware operation will be powered from the conventional electric grid, but Tiemeier said Cologix has struck a deal with American Electric Power and Bloom Energy to generate at least some power for the Johnstown operations.","pscan":"https://regionalplanning.co.delaware.oh.us/wp-content/uploads/sites/17/2025/06/ORA-Cologix-starts-work-06.18.25.pdf","uquote":"Power options: redundant power loop from AEP substation.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Cologix","spon":"Stonepeak Infrastructure Partners","ay":2024,"oy":2026,"contro":"AEP Ohio paused approvals for new data center projects in March 2023 due to grid capacity concerns, and multiple Ohio municipalities have enacted moratoriums on data centers due to concerns over electricity prices, noise, and environmental impact.","controScan":"https://signalohio.org/ohio-data-center-boom-faces-political-resistence/","deal":"$525 million asset-backed securitization (ABS) closed on July 21, 2025, backed by its COL4 data center in Columbus, Ohio.","dealScan":"https://convergedigest.com/cologix-raises-525-million-to-expand-hyperscale-edge-infrastructure/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"regionalplanning.co.delaware.oh.us;convergedigest.com;signalohio.org","srcUrls":["https://regionalplanning.co.delaware.oh.us/wp-content/uploads/sites/17/2025/06/ORA-Cologix-starts-work-06.18.25.pdf","https://convergedigest.com/cologix-raises-525-million-to-expand-hyperscale-edge-infrastructure/","https://signalohio.org/ohio-data-center-boom-faces-political-resistence/"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"a38bdf2275ac","cid":"a38bdf2275ac","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Mason","county":"Warren","state":"OH","lat":39.425663,"lng":-84.16994,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The site has a total of 1.7 MW of power available with up to 75 watts per sq. ft. from dedicated primary circuits. With scalability as a focal point, the facility offers multiple levels of redundancy available within the same footprint. In CyrusOne's CIN3 data center, your mission-critical environment is guarded and monitored 24 hours a day, 365 days a year. Cabinet and cage security options are also available with individual locks and biometric scanners.","uquote":"electricity and natural gas. Duke Energy. Duke Energy's service territory includes southwestern Ohio, northern Kentucky, southern Indiana, and the Carolinas.","ukey":"3542|OH","uname":"Duke Energy Ohio Inc","rto":"PJM","nerc":"RFC","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","deal":"Acquisition of CyrusOne by funds managed by KKR and Global Infrastructure Partners for approximately $15 billion (March 2022)","dealScan":"https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"global-infra.com","srcUrls":["https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/"],"lflag":"coordinate_cluster_reclassified"},{"id":"4f5a98550a64","cid":"4f5a98550a64","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Hamilton","county":"Butler","state":"OH","lat":39.439747,"lng":-84.565734,"cprec":"distinct","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"This green data center utilizes power from the city that is 45% from a non-carbon source. The site has 4.8 MW total available power with up to 100 watts per square feet from dedicated primary circuits. Power failures are protected by a diesel generator with 500 gallons per tank plus an added 30,000 gallon fuel storage capacity onsite.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-hamilton-data-center/","uquote":"Grid Operator. Duke Energy Ohio and Kentucky.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-6bc7a0cf","ukey":"3542|OH","uname":"Duke Energy Ohio Inc","rto":"PJM","nerc":"RFC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2007,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-hamilton-data-center/","https://www.interconnection.fyi/data-center/project/cyrusone-6bc7a0cf"]},{"id":"2ca87d70d31b","cid":"2ca87d70d31b","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Cleveland","county":"Cuyahoga","state":"OH","lat":41.555037,"lng":-81.604957,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Our CLE1 facility in downtown Cleveland is conveniently located in the renovated Euclid corridor, home to the nation's first commercially available 100 gigabit fiber network. This carrier hotel provides onsite direct connectivity to world-class network carriers with many cross-connection and peering options. 7,440 IT Square Feet; 0.4MW Critical IT Load; 16 Onsite Carriers. Power. N+1 Power Design; 0.4MW Critical IT Load; 120V, 208V, 3P AC Power; Available DC Power. Cooling. N+1 Cooling Design; 5kW+ Cab Density Air. Interconnection. 16 Onsite Carriers; Yes Carrier Hotel. Platforms. Cabinets & Cages Colocation; In-Region DataBank Cloud.","uconf":"High","uquote":"The utility company for Cleveland, OH residents is Cleveland Public Power.","uscan":"https://www.chooseenergy.com/electricity-rates/ohio/cleveland/","ukey":"3755|OH","uname":"Cleveland Electric Illum Co","rto":"PJM","nerc":"RFC","op":"DataBank","spon":"DigitalBridge, TJC","deal":"Acquisition of the facility from 365 Data Centers in January 2017","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"chooseenergy.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.chooseenergy.com/electricity-rates/ohio/cleveland/"]},{"id":"e58011ba673f","cid":"e58011ba673f","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Lancaster","county":"Fairfield","state":"OH","lat":39.747694,"lng":-82.626685,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Targets 24/7 carbon-free energy operations; Partnered with local solar and wind initiatives to offset usage; AI-driven optimization for cooling and load balancing; Connectivity: Connected to Google's global backbone; Direct fiber access to Atlanta, Charlotte, and Ashburn interconnection hubs. Multi-megawatt design with 2N power redundancy and backup generators. Environmentally, Google aims to power its data centers with carbon-free energy 24/7 by 2030 and is partnering with EDP Renewables North America on a 500-megawatt solar energy project.","uconf":"Medium","uquote":"Grid Operator: American Electric Power.","uscan":"https://www.interconnection.fyi/data-center/project/google-b095581c","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2023,"oy":2024,"contro":"Community opposition regarding being 'worst neighbors ever' and broader concerns in Ohio about data center energy costs and environmental impact.","deal":"Google is investing $2.3 billion in Ohio in 2024, further expanding its data centers in Columbus, Lancaster, and New Albany.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/google-b095581c"],"rawUkey":"49730|OH","rawUname":"American PowerNet","reportedUtility":"AEP Ohio / Ohio Power Co","ukey":"14006|OH"},{"id":"a616fd54cffe","cid":"a616fd54cffe","canon":1,"dups":1,"ftype":"data_center","name":"Google New Albany","county":"Licking","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"AEP Ohio has a big new customer.... AEP will be providing electric service to Google for its new 400-acre data center in New Albany, Ohio.","pscan":"https://www.aepohiowire.com/aep-to-power-googles-new-data-center/","uconf":"High","uquote":"Thanks to a new business development partnership, AEP will be providing electric service to Google for its new 400-acre data center in New Albany, Ohio.","uscan":"https://www.aepohiowire.com/aep-to-power-googles-new-data-center/","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2019,"oy":2020,"contro":"The facility benefits from a controversial 100% sales tax exemption for 15 years, worth an estimated $43.5 million, and 100% property tax abatement for 15 years, which has drawn scrutiny and led to a state-wide freeze on new data center tax exemptions.","deal":"Initial $600 million investment announced in 2019. Subsequent expansions include a $1 billion investment in August 2021, an additional $1.7 billion in August 2023, and another $2.3 billion in June 2024. The facility also received a 100%, 15-year exemption from data center sales tax worth $43.5 million and 100% property tax abatement for 15 years.","dealScan":"https://www.wosu.org/news/2019-02-14/google-building-600-million-data-center-in-new-albany","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"aepohiowire.com;wosu.org","srcUrls":["https://www.aepohiowire.com/aep-to-power-googles-new-data-center/","https://www.wosu.org/news/2019-02-14/google-building-600-million-data-center-in-new-albany"],"lflag":"citation_artifact_removed source_quality_reclassified utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"6086458c6c1b","cid":"6086458c6c1b","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers","city":"Cincinnati","county":"Hamilton","state":"OH","lat":39.196927,"lng":-84.544187,"cprec":"distinct","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Cincinnati Data Center Highlights: [...] 2 MWs of newly-installed UPS-backed power; Three (3) existing 2.25 MW generators and dual electrical feeds.","uconf":"High","uquote":"H5 Data Centers' Cincinnati data center is supported by diverse Duke Energy utility feeds and boasts some of the lowest power costs on the East Coast.","uscan":"https://h5datacenters.com/cincinnati-II-data-center.html","ukey":"3542|OH","uname":"Duke Energy Ohio Inc","rto":"PJM","nerc":"RFC","op":"H5 Data Centers","spon":"H5 Data Centers","oy":2021,"deal":"Acquisition of 925 Dalton Avenue facility by H5 Data Centers on December 13, 2021","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"h5datacenters.com","srcUrls":["https://h5datacenters.com/cincinnati-II-data-center.html"],"lflag":"source_quality_reclassified"},{"id":"3fb62172a64e","cid":"3fb62172a64e","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers","city":"Cleveland","county":"Cuyahoga","state":"OH","lat":41.555037,"lng":-81.604957,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Diverse utility feeds from The Illuminating Company's power grid. Concurrently maintainable, Tier III data center design. 2N UPS distribution. 2N emergency generator farm designed for 48-hour runtime.","uquote":"The Illuminating Company (a FirstEnergy Company) provides the Cleveland data center with more than 10 MWs of redundant, reliable and affordable power (average annual costs per kWh of less than $0.06) from diverse substations.","ukey":"13998|OH","uname":"Ohio Edison Co","rto":"PJM","nerc":"RFC","op":"H5 Data Centers","ay":2017,"oy":2017,"contro":"Expansion plans involve evicting small businesses and demolishing storefronts; Cleveland City Council is considering a moratorium on new data center permits.","controScan":"https://clevelandmagazine.com/articles/downtown-cleveland-s-largest-data-center-plans-major-expansion/","deal":"Acquisition of Cleveland Technology Center from ByteGrid in 2017; Land acquisition by H5 affiliate CLE-Infrastructure LLC in January 2025 for an undisclosed sum.","dealScan":"https://baxtel.com/data-center/h5-cleveland-technology-center-ctc","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;clevelandmagazine.com","srcUrls":["https://baxtel.com/data-center/h5-cleveland-technology-center-ctc","https://clevelandmagazine.com/articles/downtown-cleveland-s-largest-data-center-plans-major-expansion/"]},{"id":"a2c7c6f1d137","cid":"a2c7c6f1d137","canon":1,"dups":1,"ftype":"data_center","name":"Kyndryl","city":"Columbus","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. American Electric Power.","pscan":"https://www.interconnection.fyi/data-center/project/kyndryl-d3b4d1de","uconf":"High","uquote":"Grid Operator. American Electric Power.","uscan":"https://www.interconnection.fyi/data-center/project/kyndryl-d3b4d1de","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Kyndryl","spon":"Kyndryl","ay":2007,"oy":1990,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/kyndryl-d3b4d1de"],"rawUkey":"49730|OH","rawUname":"American PowerNet","reportedUtility":"AEP Ohio / Ohio Power Co","ukey":"14006|OH"},{"id":"28331cca9d0e","cid":"28331cca9d0e","canon":1,"dups":1,"ftype":"data_center","name":"Meta Prometheus","county":"Licking","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Operational","mw":1000,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"The Prometheus project plans to start in “island mode.” It will run on its own natural gas plant, separate from the grid, with an option to connect later. Meta is pursuing $3 billion in construction loans to finance a new data center campus in Ohio, with plans to generate power on-site using natural gas. The deal represents another major hyperscaler opting for behind-the-meter generation rather than traditional utility interconnection. Meta announced deals with three nuclear energy companies Vistra, Oklo and TerraPower to fuel its new data center supercluster Prometheus in New Albany, Ohio.","proc":"Dedicated PPA","pcp":"Vistra","pdt":"20-year nuclear energy agreements, more than 2.1 GW","uquote":"AEP Ohio and an affiliate of data giant Meta are asking the Public Utilities Commission of Ohio to allow a Meta data center to use electricity from an unused substation built for the stalled Intel project in New Albany. Grid Pressure in Central Ohio: Meta's accelerated builds add major load to Ohio's grid—impacting AEP Ohio and PJM planning cycles.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2025,"oy":2026,"contro":"Public backlash to higher electric and water bills, concerns over radiation risks from nuclear power sources, and a citizen-led campaign for a statewide ban on hyperscale data center construction.","deal":"Banks including Natixis, MUFG, and SocGen have begun syndicating US$3 billion in loans for Meta-backed data center and power assets in New Albany, Ohio, as the company expands infrastructure for AI. Meta announced deals with three nuclear energy companies Vistra, Oklo and TerraPower to fuel its new data center supercluster Prometheus in New Albany, Ohio.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","srcUrls":null,"srcDom":null},{"id":"c4ce12d7d081","cid":"c4ce12d7d081","canon":1,"dups":1,"ftype":"data_center","name":"Retail Finance International Holdings","city":"Kettering","county":"Montgomery","state":"OH","lat":39.753736,"lng":-84.290591,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4eaaf2d50a5e","cid":"4eaaf2d50a5e","canon":1,"dups":1,"ftype":"data_center","name":"Stratacache","city":"Dayton","county":"Montgomery","state":"OH","lat":39.753736,"lng":-84.290591,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Additionally, dual grid power feeds, structural resiliency against environmental factors and uninterruptable power systems allow the complex to operate effectively for weeks without commercial power, the release said. It also has three diesel generators, complete with underground fuel tanks, and dual utility feeds.","pscan":"https://www.datacenterknowledge.com/investing/digital-signage-firm-buys-former-eds-data-center-in-dayton","rto":"PJM","nerc":"RFC","op":"Stratacache","ay":2016,"deal":"Acquisition of former EDS data center by Stratacache in September 2016.","dealScan":"https://www.digitalsignagetoday.com/news/stratacache-acquires-new-data-global-network-operations-facility/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;digitalsignagetoday.com","lflag":"online_before_announced","srcUrls":["https://www.datacenterknowledge.com/investing/digital-signage-firm-buys-former-eds-data-center-in-dayton","https://www.digitalsignagetoday.com/news/stratacache-acquires-new-data-global-network-operations-facility/"]},{"id":"0f5b53a6038a","cid":"0f5b53a6038a","canon":1,"dups":1,"ftype":"data_center","name":"ALIGNED CMH CONESVILLE","city":"Plano","county":"COSHOCTON","state":"OH","lat":40.29671,"lng":-81.930109,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The location is selected for its robust electric grid, scalable land footprint and low seismic risk, offering access to major network fiber routes and low-latency links to markets such as Chicago, Detroit, New York, Philadelphia and Toronto.","uconf":"High","uquote":"Aligned will develop a 197-acre parcel adjacent to the former AEP Conesville Power Plant.","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","ay":2025,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected coordinate_cluster_reclassified","rawUkey":"59799|OH","rawUname":"American Power & Gas","reportedUtility":"AEP Ohio / Ohio Power Co","ukey":"14006|OH","srcUrls":null,"srcDom":null},{"id":"da66aab83711","cid":"da66aab83711","canon":1,"dups":2,"ftype":"data_center","name":"ALIGNED DATA CENTER","city":"Sandusky","county":"ERIE","state":"OH","lat":41.394143,"lng":-82.586835,"cprec":"shared_centroid","status":"Proposed","mw":96,"pc":"Behind-the-Meter","pconf":"High","pquote":"One of the most unusual aspects of this project is how it will be powered. Instead of relying on the local electrical grid, the data center will generate its own electricity on-site. Aligned plans to install 15 massive natural gas engines capable of producing 282 megawatts — more than the city of Sandusky typically uses.","pscan":"https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","proc":"Co-located generation","pcp":"Aligned Data Centers","pdt":"15 massive natural gas engines capable of producing 282 megawatts","uconf":"High","uquote":"“The project is in Perkins Township, and I've been in contact with those Perkins Township officials as well as FirstEnergy because the energy grid is a big question mark for data centers.”","uscan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"Aligned Data Centers","ay":2023,"oy":2026,"contro":"Community members have expressed concerns about utility usage (water, sewer, electricity), potential increases in utility bills, energy demand, use of agricultural land, noise pollution, water use and disposal, and national security. A state study commission has been formed, and a petition drive to ban new data centers is underway.","controScan":"https://sanduskyregister.com/news/963024/new-panel-studying-data-centers-includes-local-sen/","deal":"Capital investment of at least $202 million, approved for tax credit assistance by the Ohio Department of Development on September 26, 2023.","dealScan":"https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"staytunedsandusky.com;sanduskyregister.com;northeastohioregion.com","srcUrls":["https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","https://sanduskyregister.com/news/716256/data-center-questions-answered/","https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","https://sanduskyregister.com/news/963024/new-panel-studying-data-centers-includes-local-sen/"],"band":"50-100 MW","lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"f4b53f075c55","cid":"da66aab83711","canon":0,"dups":2,"ftype":"data_center","name":"ALIGNED DATA CENTER","city":"SANDUSKY","county":"ERIE","state":"OH","lat":41.394143,"lng":-82.586835,"cprec":"shared_centroid","status":"Proposed","mw":96,"pc":"Behind-the-Meter","pconf":"High","pquote":"One of the most unusual aspects of this project is how it will be powered. Instead of relying on the local electrical grid, the data center will generate its own electricity on-site. Aligned plans to install 15 massive natural gas engines capable of producing 282 megawatts — more than the city of Sandusky typically uses.","pscan":"https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","proc":"Tariff (utility)","pcp":"FirstEnergy","uquote":"By megawatt hours sold, the largest electricity supplier in Erie County is Ohio Edison. You will continue to receive one monthly bill from your local utility, Ohio Edison.","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"AI Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners (GIP)","ay":2023,"oy":2025,"contro":"Community members expressed concerns about utility usage (water, sewer, electricity) and potential impacts on utility bills and rates. Opponents also complained about energy and water use by data centers and their job creation vs. tax breaks.","deal":"Investment of at least $202 million announced in 2023 for the first phase of development.","dealScan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"staytunedsandusky.com;sanduskyregister.com","srcUrls":["https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","https://sanduskyregister.com/news/716256/data-center-questions-answered/"],"band":"50-100 MW","lflag":"source_quality_reclassified utility_alias_corrected stale_future_status_year coordinate_cluster_reclassified","ukey":"13998|OH","uname":"Ohio Edison Co","reportedUtility":"Ohio Edison Co","oy_stale":1},{"id":"9eff95ee0a85","cid":"9eff95ee0a85","canon":0,"dups":2,"ftype":"data_center","name":"ALIGNED DATA CENTERS","city":"Sandusky","county":"ERIE","state":"OH","lat":41.394143,"lng":-82.586835,"cprec":"shared_centroid","status":"Proposed","mw":96,"pc":"Behind-the-Meter","pconf":"High","pquote":"Instead of relying on the local electrical grid, the data center will generate its own electricity on-site. Aligned plans to install 15 massive natural gas engines capable of producing 282 megawatts — more than the city of Sandusky typically uses.","pscan":"https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","proc":"Co-located generation","pcp":"Aligned Data Centers","pdt":"15 massive natural gas engines capable of producing 282 megawatts","uconf":"High","uquote":"I've been in contact with those Perkins Township officials as well as FirstEnergy because the energy grid is a big question mark for data centers.","uscan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2023,"oy":2025,"contro":"Community concerns regarding utility usage, environmental impact, and job creation; proposed state study and petition to ban data centers.","controScan":"https://advertiser-tribune.com/news/853477/state-data-center-study-may-be-drawing-nearer/","deal":"Ohio Department of Development approved tax credit assistance for an investment of at least $202 million (September 26, 2023).","dealScan":"https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"staytunedsandusky.com;sanduskyregister.com;northeastohioregion.com;advertiser-tribune.com","srcUrls":["https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","https://sanduskyregister.com/news/716256/data-center-questions-answered/","https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","https://advertiser-tribune.com/news/853477/state-data-center-study-may-be-drawing-nearer/"],"band":"50-100 MW","lflag":"source_quality_reclassified stale_future_status_year coordinate_cluster_reclassified,merged_duplicate","oy_stale":1},{"id":"24a7a718010b","cid":"24a7a718010b","canon":1,"dups":1,"ftype":"data_center","name":"ALIGNED DATA CENTERS","county":"ERIE","state":"OH","lat":41.394143,"lng":-82.586835,"cprec":"shared_centroid","status":"Proposed","mw":200,"pc":"Grid","pconf":"High","pquote":"Ohio offers abundant and affordable power, and a skilled workforce, making the region attractive for new data center development. The planned workloads at this location could be performed elsewhere in the United States, but the size of the site, potential for significant power, make this site attractive over the alternatives. A robust electric grid with a history of high uptime and resilience. Total planned critical power capacity of up to 200 MW, supporting large-scale cloud and AI operations. Engineered for high-density and liquid-cooling readiness, ensuring future-proof scalability for advanced workloads. Redundant 2N or N+1 electrical configurations across critical systems, delivering industry-leading uptime and operational resilience. Built with sustainable infrastructure, leveraging renewable energy and water-efficient cooling to minimize environmental impact.","pscan":"https://aligneddc.com/northeast-ohio-data-centers/","uquote":"Grid Operator: FirstEnergy. The overview: “The project is in Perkins Township, and I've been in contact with those Perkins Township officials as well as FirstEnergy because the energy grid is a big question mark for data centers.”","uscan":"https://www.interconnection.fyi/data-center/project/aligned-data-centers-55f59ab0","ukey":"13998|OH","uname":"Ohio Edison Co","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","ay":2023,"oy":2026,"contro":"Community members expressed concerns about utility usage (water, sewer, electricity) and potential impacts on residents and utility bills. Opponents have complained about energy use and water use by data centers and said they don't provide enough jobs to justify the tax breaks such centers often receive.","controScan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","deal":"Ohio Department of Development (ODOD) approved the project for tax credit assistance; Aligned intends to invest at least $202 million.","dealScan":"https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"aligneddc.com;interconnection.fyi;northeastohioregion.com;sanduskyregister.com","srcUrls":["https://aligneddc.com/northeast-ohio-data-centers/","https://www.interconnection.fyi/data-center/project/aligned-data-centers-55f59ab0","https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","https://sanduskyregister.com/news/716256/data-center-questions-answered/"],"band":"100-250 MW","lflag":"coordinate_cluster_reclassified"},{"id":"f5273e8abd1c","cid":"9eff95ee0a85","canon":0,"dups":2,"ftype":"data_center","name":"ALIGNED DATA CENTERS","city":"Sandusky","county":"ERIE","state":"OH","lat":41.394143,"lng":-82.586835,"cprec":"shared_centroid","status":"Proposed","mw":96,"pc":"Behind-the-Meter","pconf":"High","pquote":"One of the most unusual aspects of this project is how it will be powered. Instead of relying on the local electrical grid, the data center will generate its own electricity on-site. Aligned plans to install 15 massive natural gas engines capable of producing 282 megawatts — more than the city of Sandusky typically uses.","pscan":"https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","proc":"Co-located generation","pcp":"Aligned Data Centers (self-generation)","pdt":"15 massive natural gas engines, 282 megawatts","uquote":"I've been in contact with those Perkins Township officials as well as FirstEnergy because the energy grid is a big question mark for data centers.","uscan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2023,"oy":2026,"contro":"Community concerns over utility usage (water, sewer, electricity) and potential impact on utility bills/rates. Broader state-level opposition regarding energy/water use, job creation vs. tax breaks, and a proposed ballot initiative to ban data center construction.","controScan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","deal":"Ohio Department of Development approved tax credit assistance for a $202 million investment (September 26, 2023).","dealScan":"https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"staytunedsandusky.com;sanduskyregister.com;northeastohioregion.com","srcUrls":["https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","https://sanduskyregister.com/news/716256/data-center-questions-answered/","https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/"],"band":"50-100 MW","lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"81fa64e29ed9","cid":"81fa64e29ed9","canon":0,"dups":1,"ftype":"data_center","name":"ALIGNED DATA CENTERS","county":"ERIE","state":"OH","lat":41.394143,"lng":-82.586835,"cprec":"shared_centroid","status":"Proposed","mw":96,"pc":"Grid","pconf":"Medium","pquote":"“The project is in Perkins Township, and I've been in contact with those Perkins Township officials as well as FirstEnergy because the energy grid is a big question mark for data centers.”","uquote":"“The project is in Perkins Township, and I've been in contact with those Perkins Township officials as well as FirstEnergy because the energy grid is a big question mark for data centers.”","ukey":"13998|OH","uname":"Ohio Edison Co","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"Aligned Data Centers","ay":2023,"oy":2026,"contro":"Community concerns about utility usage and rates; proposed state study on data center impacts; petition drive to ban data centers in Ohio.","deal":"Ohio Department of Development approved tax credit assistance and a 75 percent, 15-year data center tax exemption for a $202 million investment, announced September 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text coordinate_cluster_reclassified,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"fe4a7e985814","cid":"4cc8cc3b099f","canon":0,"dups":2,"ftype":"data_center","name":"ALIGNED DATA CENTERS","city":"Sandusky","county":"ERIE","state":"OH","lat":41.394143,"lng":-82.586835,"cprec":"shared_centroid","status":"Proposed","mw":282,"pc":"Behind-the-Meter","pconf":"High","pquote":"Instead of relying on the local electrical grid, the data center will generate its own electricity on-site. Aligned plans to install 15 massive natural gas engines capable of producing 282 megawatts — more than the city of Sandusky typically uses.","pscan":"https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","proc":"Tariff (utility)","pcp":"FirstEnergy","uquote":"Grid Operator: FirstEnergy.","uscan":"https://www.interconnection.fyi/data-center/project/aligned-data-centers-55f59ab0","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"BlackRock, MGX, AI Infrastructure Partnership (AIP)","ay":2023,"oy":2026,"contro":"Community concerns about utility usage, energy demand, water use, noise pollution, and legislative actions for a data center study and potential ban on tax breaks.","controScan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","deal":"$202,000,000 capital investment and tax credit assistance approved by Ohio Department of Development in September 2023.","dealScan":"https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"staytunedsandusky.com;interconnection.fyi;northeastohioregion.com;sanduskyregister.com","srcUrls":["https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","https://www.interconnection.fyi/data-center/project/aligned-data-centers-55f59ab0","https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","https://sanduskyregister.com/news/716256/data-center-questions-answered/"],"band":"250+ MW","lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"4cc8cc3b099f","cid":"4cc8cc3b099f","canon":1,"dups":2,"ftype":"data_center","name":"ALIGNED DATA CENTERS","city":"Sandusky","county":"ERIE","state":"OH","lat":41.394143,"lng":-82.586835,"cprec":"shared_centroid","status":"Proposed","mw":282,"pc":"Behind-the-Meter","pconf":"High","pquote":"Instead of relying on the local electrical grid, the data center will generate its own electricity on-site. Aligned plans to install 15 massive natural gas engines capable of producing 282 megawatts — more than the city of Sandusky typically uses.","pscan":"https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","proc":"Tariff (utility)","pcp":"FirstEnergy","uquote":"“The project is in Perkins Township, and I've been in contact with those Perkins Township officials as well as FirstEnergy because the energy grid is a big question mark for data centers.”","uscan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"BlackRock, MGX (via AI Infrastructure Partnership)","ay":2023,"oy":2026,"contro":"Community concerns regarding utility usage (water, sewer, electricity), potential impact on utility bills, energy demand, noise pollution, and water use. Proposed state question to ban new data centers.","controScan":"https://sanduskyregister.com/news/716256/data-center-questions-answered/","deal":"Aligned Data Centers plans to invest at least $202 million in the first phase of development (announced September 2023). Aligned Data Centers was acquired by BlackRock and MGX for $40 billion (October 11, 2025).","dealScan":"https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"staytunedsandusky.com;sanduskyregister.com;northeastohioregion.com","srcUrls":["https://www.staytunedsandusky.com/p/giant-building-on-kbi-site-just-the","https://sanduskyregister.com/news/716256/data-center-questions-answered/","https://northeastohioregion.com/news/aligned-data-centers-plans-new-data-center-campus-in-erie-county/"],"band":"250+ MW","lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"bea02aeba335","cid":"bea02aeba335","canon":1,"dups":1,"ftype":"data_center","name":"ALIGNED DATA CENTERS","city":"Twinsburg","county":"Summit","state":"OH","lat":41.121847,"lng":-81.534928,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. FirstEnergy.","uquote":"Grid Operator. FirstEnergy.","ukey":"13998|OH","uname":"Ohio Edison Co","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","spon":"BlackRock and MGX","ay":2026,"oy":2026,"contro":"Twinsburg City Council unanimously adopted an emergency 12-month moratorium on accepting or issuing permits for data centers as principal uses.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c6b37ade8afb","cid":"c6b37ade8afb","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Hilliard","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","mw":73,"band":"50-100 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The system will operate behind the meter, meaning its power will be used directly by Amazon rather than distributed to the electrical grid.","proc":"Co-located generation","pcp":"Ohio Power Company (AEP Ohio)","pdt":"72.9-megawatt facility","uquote":"The project is a proposed 72.9-megawatt solid oxide fuel cell (SOFC) electric generation facility at 4186 Scioto Darby Creek Road, within Amazon's 142-acre data -center campus. It will occupy about 6.4 acres and be constructed, owned, and operated by Ohio Power Company (AEP Ohio) to serve Amazon's onsite electricity demand.","rto":"PJM","nerc":"RFC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2022,"oy":2027,"contro":"Significant community and local government opposition, including lawsuits and appeals, regarding the fuel cell system and diesel generators due to environmental and health concerns, and state override of local zoning.","controScan":"https://stopohiodatacenters.org/franklin-county","deal":"Hilliard offered Amazon a 15-year, 100% property tax abatement in 2019. The first phase of a data center campus in Hilliard involves a $300 million investment.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"stopohiodatacenters.org","srcUrls":["https://stopohiodatacenters.org/franklin-county"],"lflag":"source_quality_reclassified utility_alias_corrected,merged_duplicate","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"cd2535aed0cb","cid":"10d9161760d8","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Johnstown","county":"Licking","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"AEP Ohio, the Columbus utility that serves Amazon, said earlier this year that it received 30 gigawatts of service requests from data centers alone — an amount that would put the region's demand for electricity close to New York City's. Much of that demand comes from the wealthy suburban enclave of New Albany, Ohio, where Meta, Microsoft, Google, and QTS are all constructing major data center projects. The site of Intel's future semiconductor chip plant is in neighboring Johnstown, Ohio.","uconf":"High","uquote":"AEP Ohio, the Columbus utility that serves Amazon, said earlier this year that it received 30 gigawatts of service requests from data centers alone — an amount that would put the region's demand for electricity close to New York City's. Much of that demand comes from the wealthy suburban enclave of New Albany, Ohio, where Meta, Microsoft, Google, and QTS are all constructing major data center projects. The site of Intel's future semiconductor chip plant is in neighboring Johnstown, Ohio.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2020,"deal":"Land purchase of 112 acres for $21.8 million in April 2020.","dealScan":"https://baxtel.com/data-center/amazon-3180-beech-rd-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://baxtel.com/data-center/amazon-3180-beech-rd-campus"],"rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"ceb8836d261b","cid":"ceb8836d261b","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Washington Township","county":"Madison","state":"OH","lat":39.896607,"lng":-83.400885,"cprec":"distinct","status":"Proposed","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"AEP Ohio","pdt":"10-year contracts, requiring commitment to cover at least 85% of anticipated energy use, with specific agreements for transmission line extensions and upgrade costs.","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","srcUrls":null,"srcDom":null},{"id":"b559bc79e933","cid":"b559bc79e933","canon":1,"dups":1,"ftype":"data_center","name":"CITI MIDWEST DATA CENTER","city":"Delaware","county":"DELAWARE","state":"OH","lat":40.278941,"lng":-83.007462,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"CitiCorp is building a 300,000 square foot data center near Columbus Ohio.... Ohio officials have approved an incentive package for CitiCorp North America, which is building a 300,000 square foot, $465 million data center near Columbus, according to Columbus Business First.","pscan":"https://www.datacenterknowledge.com/business/citicorp-plans-huge-ohio-data-center","uconf":"High","uquote":"AEP Ohio | Utilities.... 311 London Road. Delaware, OH 43015. (800) 672-2231. AEP Ohio · About · Rep Info · Map. About. Provides reliable, affordable energy.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"CitiCorp North America","spon":"CitiCorp North America","tenant":"CitiCorp North America","ay":2006,"deal":"$465 million investment with tax abatements from Liberty Township (72% on real property for 15 years, 60% on equipment for 2 years), approved April 2006.","dealScan":"https://www.datacenterknowledge.com/business/citicorp-plans-huge-ohio-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"online_before_announced citation_artifact_removed shared_coordinate_precision_downgraded utility_alias_corrected","srcUrls":["https://www.datacenterknowledge.com/business/citicorp-plans-huge-ohio-data-center"],"rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"af63e7d4c993","cid":"af63e7d4c993","canon":0,"dups":1,"ftype":"data_center","name":"CITI MIDWEST DATA CENTER","city":"Delaware","county":"DELAWARE","state":"OH","lat":40.278941,"lng":-83.007462,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Services included, commissioning for two new 2MW generators, data hall HVAC units, and the expansion of the Building Automation System. Additionally, commissioning services are provided for an ongoing project to replace primary UPS systems, maintenance/swing UPS systems, and critical subcomponents, including automatic static transfer switches, smart breakers, and remote power panels.","pscan":"https://tlc-engineers.com/RUNCLOUD-7G-WAF-BLOCKED","uconf":"High","uquote":"AEP Energy is proud to offer competitive electricity rates to those living in the area. AEP Ohio | Utilities.... 311 London Road. Delaware, OH 43015.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Citigroup","spon":"Citigroup","tenant":"Citigroup","ay":2006,"deal":"Ohio officials approved an incentive package for CitiCorp North America, including a 72 percent abatement on real property taxes for 15 years and a 60 percent abatement on equipment for two years (April 2006).","dealScan":"https://www.datacenterknowledge.com/business/citicorp-plans-huge-ohio-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"tlc-engineers.com;datacenterknowledge.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected,merged_duplicate","srcUrls":["https://tlc-engineers.com/RUNCLOUD-7G-WAF-BLOCKED","https://www.datacenterknowledge.com/business/citicorp-plans-huge-ohio-data-center"],"rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"178f519de242","cid":"178f519de242","canon":1,"dups":1,"ftype":"data_center","name":"CMH098 CAMPUS","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","uquote":"New Albany has emerged as a strategic hub thanks to its robust talent pool, forward-thinking local leadership, and strong utility partnerships, such as with AEP Ohio.","uscan":"https://www.enerdatics.com/insights/amazon-web-services-opens-two-new-data-centers-in-new-albany-amid-3-5-billion-ohio-expansion","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon.com","tenant":"Amazon Web Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"enerdatics.com","srcUrls":["https://www.enerdatics.com/insights/amazon-web-services-opens-two-new-data-centers-in-new-albany-amid-3-5-billion-ohio-expansion"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"702cd9b0f938","cid":"702cd9b0f938","canon":1,"dups":1,"ftype":"data_center","name":"CMH18 DATA CENTER","city":"Hebron","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"AEP Ohio's data center tariff (effective July 23, 2025) governs all new contracts above 25 MW. The county hosts dedicated transmission upgrades for the Microsoft, Cologix, and existing Meta/Google/Amazon campuses.","pscan":"https://stopohiodatacenters.org/licking-county","uconf":"High","uquote":"AEP Ohio's data center tariff (effective July 23, 2025) governs all new contracts above 25 MW.","uscan":"https://stopohiodatacenters.org/licking-county","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"oy":2026,"contro":"Microsoft put its data center construction plans on hold in April 2025. Residents expressed concerns about heavy truck traffic, water usage, and noise.","controScan":"https://baxtel.com/data-center/microsoft-hebron","deal":"Microsoft announced a $1 billion capital investment across three data center campuses in Licking County (New Albany, Heath, Hebron) in October 2024. The company agreed not to take real-estate tax abatements at Heath or Hebron.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"stopohiodatacenters.org;baxtel.com","srcUrls":["https://stopohiodatacenters.org/licking-county","https://baxtel.com/data-center/microsoft-hebron"],"rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","lflag":"utility_alias_corrected"},{"id":"23cddcbd2921","cid":"291c897ea478","canon":0,"dups":8,"ftype":"data_center","name":"CMH205 CAMPUS","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio.... Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.”","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio.... Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.”","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"deal":"Land purchase of 589.843 acres for over $102 million, effective Dec. 30, 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"large_project_duplicate_review unlinked_source_text citation_artifact_removed high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"69ab248b5e09","cid":"47ac4715511d","canon":0,"dups":4,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":250,"pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.” The interconnection and operation of the Data Center will require construction of significant new additions to the AES Ohio transmission system.","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.”","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"contro":"Community opposition regarding tax incentives and regulatory pushback on energy costs.","deal":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million on December 30, 2024. AWS committed a $5 billion investment in Fayette County by 2030, facilitated by a 30-year, 100 percent tax exemption through a Community Reinvestment Area (CRA) Agreement.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"b7ba26a8172c","cid":"291c897ea478","canon":0,"dups":8,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"pc":"Hybrid","pconf":"High","pquote":"A separate gas-powered generation plant is also planned for Jefferson Township to provide off-grid power specifically for servers and computer systems. The proposed Fayette to Customer West 345kV Transmission Line Project is a necessary upgrade to support 1.5 gigawatts of load growth in the Jeffersonville, Ohio area.","pscan":"https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","proc":"Tariff (utility)","pcp":"AES Ohio","pdt":"1.5 gigawatts of load growth, initial service by 2026, additional support by 2031","uquote":"The proposed Project involves necessary upgrades to serve a new data center customer near AES Ohio's Fayette Substation in Jeffersonville, Ohio.","uscan":"https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"deal":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million (effective Dec. 30, 2024). AWS plans to invest $5 billion into Fayette County by 2030. Fayette County Commissioners approved a 30-year, 100 percent tax exemption via a Community Reinvestment Area (CRA) Agreement.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"aes-ohio.com","srcUrls":["https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"291c897ea478","cid":"291c897ea478","canon":1,"dups":8,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026. The Data Center will be built and become operational in several phases.” The proposed Project involves necessary upgrades to serve a new data center customer near AES Ohio's Fayette Substation in Jeffersonville, Ohio. Filings confirm a 1.5 GW load request tied to AES Ohio's Fayette Substation, with initial service expected by 2026.","uconf":"High","uquote":"Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026. AES Ohio is proposing Fayette to Customer West 345kV Transmission line project, located in Jefferson Township, Fayette County, Ohio.","uscan":"https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"contro":"Community opposition and regulatory pushback regarding tax abatements and electricity costs. The Office of the Ohio Consumer Counsel (OCC) filed a protest to the AES Ohio request for approval of the service agreement, to protect other electric consumers, with the FERC. Ohio House Bill 710 proposes to prohibit state and local governments from awarding incentives of any kind for a data center.","deal":"Amazon Web Services (AWS) plans to invest $5 billion in Fayette County by 2030. Amazon Data Services, Inc. purchased 589.843 acres in Jefferson Township for over $102 million, effective Dec. 30, 2024. Fayette County Commissioners approved a Community Reinvestment Area (CRA) Agreement with AWS, providing a 30-year, 100 percent tax exemption for new structures.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"aes-ohio.com","srcUrls":["https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project"],"lflag":"large_project_duplicate_review citation_artifact_removed source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated","pscan":"https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","proc":"Tariff (utility)","pcp":"AES Ohio","pdt":"1.5 gigawatts of load growth, initial service by 2026, additional support by 2031"},{"id":"71e0ee3c7688","cid":"291c897ea478","canon":0,"dups":8,"ftype":"data_center","name":"CMH205 DATA CENTER","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2025,"oy":2026,"contro":"The Office of the Ohio Consumer Counsel (OCC) filed a protest to the AES Ohio request for approval of the service agreement, to protect other electric consumers, with the FERC. The OCC wants to protect residential customers in Ohio from being on the hook for tens of millions in transmission investment costs to serve Amazon.","deal":"AWS plans to invest $5 billion into Fayette County by 2030 as part of a larger $10 billion investment across the state. Amazon Data Services, Inc. purchased 590 acres in Jefferson Township, Ohio for $102.4 million in 2025 for a data center campus.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"78b26b5150c1","cid":"291c897ea478","canon":0,"dups":8,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.”","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"deal":"$5 billion investment by AWS in Fayette County by 2030, and a 30-year, 100 percent tax exemption via a Community Reinvestment Area (CRA) Agreement.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"481602494724","cid":"481602494724","canon":0,"dups":1,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.”","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.”","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"contro":"Concerns over tax abatements, environmental impact, and a planned gas-powered generation plant for off-grid power.","deal":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million on Dec. 30, 2024, as part of a $5 billion investment commitment.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"1265a31f1a3b","cid":"47ac4715511d","canon":0,"dups":4,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","ay":2025,"oy":2026,"contro":"Regulatory concerns regarding utility agreement impact on customer rates and broader grid reliability concerns due to data center expansion; controversy over tax abatements.","deal":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million in early 2025. AWS committed a $5 billion investment into Fayette County by 2030 as part of a broader $10 billion data center expansion across Ohio.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"3ee5ee81068f","cid":"47ac4715511d","canon":0,"dups":4,"ftype":"data_center","name":"CMH205 DATA CENTER","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":250,"pc":"Hybrid","pconf":"High","pquote":"Lade noted that these facilities often bring their own power solutions. For example, a new AES power station in Jefferson Township was constructed to support the Honda/LG battery plant and upcoming AWS data centers. A separate gas-powered generation plant is also planned for Jefferson Township to provide off-grid power specifically for servers and computer systems.... According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026. The Data Center will be built and become operational in several phases.”","proc":"Tariff (utility)","pcp":"AES Ohio","pdt":"1.5 GW load request, subject to Ohio Data Center Tariff terms (e.g., 85% minimum capacity for up to 12 years)","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…... The proposed Project involves necessary upgrades to serve a new data center customer near AES Ohio's Fayette Substation in Jeffersonville, Ohio.","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"deal":"AWS committed $5 billion investment into Fayette County by 2030. Amazon Data Services, Inc. purchased 590 acres in Jefferson Township, Ohio for $102.4 million in 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text citation_artifact_removed high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"43f64b3e2ead","cid":"c6033f05eafd","canon":0,"dups":2,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Hilliard","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","proc":"Co-located generation","pcp":"Ohio Power Company (AEP Ohio)","pdt":"72.9-megawatt, 6-year agreement","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","srcUrls":null,"srcDom":null},{"id":"47ac4715511d","cid":"47ac4715511d","canon":0,"dups":4,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":250,"pc":"Grid","pconf":"High","pquote":"Filings confirm a 1.5 GW load request tied to AES Ohio's Fayette Substation, with initial service expected by 2026.","uquote":"AES Ohio is proposing Fayette to Customer West 345kV Transmission line project, located in Jefferson Township, Fayette County, Ohio. The proposed Project involves necessary upgrades to serve a new data center customer near AES Ohio's Fayette Substation in Jeffersonville, Ohio.","uscan":"https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"contro":"30-year, 100 percent tax exemption approved; planned gas-powered generation for off-grid power.","deal":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million in January 2025; AWS to inject $5 billion into Fayette County by 2030.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"aes-ohio.com","srcUrls":["https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project"],"band":"250+ MW","lflag":"citation_artifact_removed source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated,merged_duplicate","proc":"Tariff (utility)","pcp":"AES Ohio","pdt":"1.5 GW load request, subject to Ohio Data Center Tariff terms (e.g., 85% minimum capacity for up to 12 years)"},{"id":"994c960299f5","cid":"291c897ea478","canon":0,"dups":8,"ftype":"data_center","name":"CMH205 DATA CENTER","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026. The Data Center will be built and become operational in several phases.”","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","ay":2025,"oy":2026,"contro":"Fayette County Commissioners approved a Community Reinvestment Area (CRA) Agreement with AWS for a 30-year, 100 percent tax exemption. A separate gas-powered generation plant is also planned for Jefferson Township to provide off-grid power specifically for servers and computer systems.","deal":"AWS plans to invest $5 billion into Fayette County by 2030 as part of a larger $10 billion expansion across Ohio. Amazon Data Services, Inc. purchased 590 acres in Jefferson Township, Ohio for $102.4 million in 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"large_project_duplicate_review unlinked_source_text high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"49bff1985b68","cid":"291c897ea478","canon":0,"dups":8,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.” The proposed Fayette to Customer West 345kV Transmission Line Project is a necessary upgrade to support 1.5 gigawatts of load growth in the Jeffersonville, Ohio area.","pscan":"https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.”","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"contro":"Industry groups, including Amazon, opposed an AEP Ohio proposal to the Public Utilities Commission (PUC) requiring data centers to pay for at least 85% of expected energy needs, citing higher costs and more regulation.","deal":"Amazon Data Services, Inc. purchased 589.843 acres in Jefferson Township for over $102 million, with land sale documents effective Dec. 30, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"aes-ohio.com","srcUrls":["https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project"],"lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"8faa5b8c3f78","cid":"291c897ea478","canon":0,"dups":8,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026. The Data Center will be built and become operational in several phases.”","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio. Amazon intends to take service from AES Ohio…\"","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2026,"deal":"Amazon Data Services, Inc. purchased 589.843 acres in Jefferson Township for over $102 million, effective Dec. 30, 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"c6033f05eafd","cid":"c6033f05eafd","canon":1,"dups":2,"ftype":"data_center","name":"CMH205 DATA CENTER","city":"Hilliard","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","proc":"Co-located generation","pcp":"Ohio Power Company (AEP Ohio) / Amazon Data Services, Inc.","pdt":"72.9-megawatt, six-year agreement","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","srcUrls":null,"srcDom":null},{"id":"05340b2fdcda","cid":"05340b2fdcda","canon":1,"dups":1,"ftype":"data_center","name":"CMH220 CAMPUS","city":"Jeffersonville","county":"FAYETTE","state":"OH","lat":39.555246,"lng":-83.461893,"cprec":"shared_centroid","status":"Proposed","mw":1500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio.... Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.” The proposed Fayette to Customer West 345kV Transmission Line Project is a necessary upgrade to support 1.5 gigawatts of load growth in the Jeffersonville, Ohio area.","pscan":"https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","uquote":"According to a filing dated Oct. 23, 2024, “Amazon plans to build a large data center in AES Ohio's service territory in Ohio.... Amazon intends to take service from AES Ohio…with an expected Commercial Operations Date of September 15, 2026.” AES Ohio is proposing Fayette to Customer West 345kV Transmission line project, located in Jefferson Township, Fayette County, Ohio.","uscan":"https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2025,"oy":2026,"contro":"Community Reinvestment Area (CRA) Agreement provides a 30-year, 100 percent tax exemption for new structures. Large technology companies including Amazon opposed a PUCO settlement designed to protect consumers from high infrastructure costs caused by data centers.","controScan":"https://www.occ.ohio.gov/factsheet/quick-facts-data-centers-ohio","deal":"Amazon Web Services (AWS) announced a $5 billion investment into Fayette County by 2030. Amazon Data Services, Inc. purchased 589.843 acres for over $102 million, with land sale documents effective Dec. 30, 2024.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aes-ohio.com;occ.ohio.gov","srcUrls":["https://www.aes-ohio.com/Fayette-Customer-West-345kV-Transmission-Line-Project","https://www.occ.ohio.gov/factsheet/quick-facts-data-centers-ohio"],"lflag":"large_project_duplicate_review citation_artifact_removed"},{"id":"3bee686c129a","cid":"3bee686c129a","canon":0,"dups":1,"ftype":"data_center","name":"CMH72","city":"Hilliard","county":"FRANKLIN","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","mw":72,"pc":"Behind-the-Meter","pconf":"High","pquote":"The system will operate behind the meter, meaning its power will be used directly by Amazon rather than distributed to the electrical grid.","proc":"Co-located generation","pcp":"Ohio Power Company (AEP Ohio)","pdt":"72.9-megawatt, six-year agreement","uquote":"It will occupy about 6.4 acres and be constructed, owned, and operated by Ohio Power Company (AEP Ohio) to serve Amazon's onsite electricity demand.","rto":"PJM","nerc":"RFC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2022,"oy":2027,"contro":"Community opposition and Hilliard City Council appeal regarding fuel cell installation and emergency diesel generators, citing environmental and health concerns.","controScan":"https://www.youtube.com/watch?v=XUBDBO7cT2U","deal":"Community Reinvestment Act (CRA) agreement with Hilliard for property tax abatements, requiring Amazon to invest $200 million by Dec. 31, 2026.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=XUBDBO7cT2U"],"band":"50-100 MW","lflag":"source_quality_reclassified utility_alias_corrected,merged_duplicate","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"5b76f888b887","cid":"5b76f888b887","canon":0,"dups":1,"ftype":"data_center","name":"CMH72","city":"Hilliard","county":"FRANKLIN","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","mw":72,"pc":"Behind-the-Meter","pconf":"High","pquote":"The system will operate behind the meter, meaning its power will be used directly by Amazon rather than distributed to the electrical grid. If built, the fuel cells and diesel generator array would give the company enough private, “behind the meter” electricity to power a small city.","proc":"Co-located generation","pcp":"Ohio Power Company (AEP Ohio), Bloom Energy Corporation","pdt":"72.9-megawatt, six-year agreement with Bloom Energy","uconf":"High","uquote":"It will occupy about 6.4 acres and be constructed, owned, and operated by Ohio Power Company (AEP Ohio) to serve Amazon's onsite electricity demand.","uscan":"https://www.franklincountyohio.gov/Agency-Directory/Data-Center","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Data Services","ay":2022,"oy":2027,"contro":"Significant community and city opposition due to environmental and health concerns from 158 diesel backup generators and 228 natural gas fuel cells. The City of Hilliard has filed an appeal against the Ohio EPA's permit.","deal":"Community Reinvestment Act (CRA) agreement with the City of Hilliard for property tax abatement, requiring a $200 million investment by Dec. 31, 2026. Amazon will cover all project costs for the fuel cell facility under a private agreement with AEP Ohio.","dealScan":"https://www.franklincountyohio.gov/Agency-Directory/Data-Center","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"franklincountyohio.gov","srcUrls":["https://www.franklincountyohio.gov/Agency-Directory/Data-Center"],"band":"50-100 MW","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"12fa5e7a24c4","cid":"12fa5e7a24c4","canon":1,"dups":1,"ftype":"data_center","name":"CMH72","city":"Hilliard","county":"FRANKLIN","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","mw":401,"pc":"Grid","pconf":"Medium","pquote":"In some instances, such as in Franklin County, the local utility will deploy fuel cells as an interim solution to power a small portion of our overall data center operations while we await completion of larger scale transmission and distribution upgrades in Ohio.”","pscan":"https://www.10tv.com/article/news/local/boomtown-ohio/hilliard-residents-raise-concerns-proposed-amazon-fuel-cells-data-center/530-8a5b5a00-45bd-4731-81a9-af6840ee2a01","uquote":"The project is a proposed 72.9-megawatt solid oxide fuel cell (SOFC) electric generation facility at 4186 Scioto Darby Creek Road, within Amazon's 142-acre data -center campus. It will occupy about 6.4 acres and be constructed, owned, and operated by Ohio Power Company (AEP Ohio) to serve Amazon's onsite electricity demand.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","ay":2022,"oy":2027,"contro":"Significant community opposition and regulatory pushback due to environmental concerns (CO2 emissions from fuel cells and diesel generators) and lack of local review. The City of Hilliard appealed the Ohio EPA's air permit and requested an air quality study.","deal":"Community Reinvestment Act (CRA) agreement with the City of Hilliard for property tax abatement, requiring Amazon to make a total investment of $200 million by Dec. 31, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"10tv.com","srcUrls":["https://www.10tv.com/article/news/local/boomtown-ohio/hilliard-residents-raise-concerns-proposed-amazon-fuel-cells-data-center/530-8a5b5a00-45bd-4731-81a9-af6840ee2a01"],"band":"250+ MW","lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"03a03bc9550f","cid":"03a03bc9550f","canon":0,"dups":1,"ftype":"data_center","name":"CMH72","city":"Hilliard","county":"FRANKLIN","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","mw":73,"pc":"Hybrid","pconf":"High","pquote":"Amazon Web Services (AWS) is installing 228 natural gas-powered fuel cells at their data center on Scioto Darby Creek Road in Hilliard, Ohio. Ohio EPA has issued a draft permit that would allow the company to operate 158 emergency generators at the data center. The generators would be fueled by ultra-low-sulfur diesel or hydrogenated vegetable oil diesel.","pscan":"https://hilliardcleanair.org/","proc":"Co-located generation","pcp":"Ohio Power Company (AEP Ohio)","pdt":"72.9-megawatt fuel cell facility; Amazon to cover all project costs under a private agreement; AEP has a six-year agreement with Bloom Energy for the fuel cells.","uquote":"American Electric Power, which will own the natural gas-powered fuel cells, delivered a letter to City leaders Oct. 20 that withdraws its application to the City's Planning & Zoning Commission based on State law exempting the project from local review. American Electric Power (AEP)","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","ay":2022,"oy":2026,"contro":"Community opposition and regulatory pushback regarding the adjacent AEP Fuel Cell Facility concerning emissions, health risks, and state law overriding local review.","deal":"American Electric Power (AEP) will own the natural gas-powered fuel cells for the AWS data center, with Ohio Power Siting Board (OPSB) approval effective Sept. 22, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"hilliardcleanair.org","srcUrls":["https://hilliardcleanair.org/"],"band":"50-100 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected,merged_duplicate","rawUkey":"49730|OH","rawUname":"American PowerNet","reportedUtility":"AEP Ohio / Ohio Power Co","ukey":"14006|OH"},{"id":"dc0e47fcd38e","cid":"dc0e47fcd38e","canon":1,"dups":1,"ftype":"data_center","name":"CONESVILLE DATA CENTER CMH02","city":"Conesville","county":"COSHOCTON","state":"OH","lat":40.29671,"lng":-81.930109,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"After the contractors leave, the construction jobs finish and the dust settles, the facility will rely heavily on local resources — demanding massive amounts of water and power. There's a strange irony in the amount of buzz about a project that, when finished, won't do much more than literally buzz. Industrial fans will cool thousands of servers that won't employ much more than a handful of people. The Conesville site was once known as a producer, a regional asset that produced power for its customers and provided a livelihood for hundreds of families. Today we are being asked to appreciate and celebrate it as a consumer. This isn't just a simple change in industry; it's a shift in our role as a county. We've moved from being an engine for the region into being a utility closet for an out-of-state corporation. Sure, it's taxable income and a use for the land, but that revenue comes at a cost. These types of facilities consume millions of gallons of water per day just to keep their servers cool.","pscan":"https://www.yourohionews.com/coshocton/conesville-data-center-raises-concerns-for-reader/1033782","uquote":"Grid Operator. Frontier Power Company.","uscan":"https://www.interconnection.fyi/data-center/project/conesville-data-center-cmh02-6d5ce530","rto":"PJM","nerc":"RFC","op":"Aligned Data Centers","ay":2025,"oy":2026,"contro":"Community concerns regarding resource consumption (water, power) and limited long-term job creation.","controScan":"https://www.yourohionews.com/coshocton/conesville-data-center-raises-concerns-for-reader/1033782","deal":"$58,752,504 from the All Ohio Future Fund approved on July 22, 2025, for site preparation, roadwork, and utility upgrades.","dealScan":"https://www.ohiohouse.gov/members/melanie-miller/news/hiner-applauds-approval-of-all-ohio-future-funding-for-conesville-industrial-park-in-coshocton-135947","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"yourohionews.com;interconnection.fyi;ohiohouse.gov","srcUrls":["https://www.yourohionews.com/coshocton/conesville-data-center-raises-concerns-for-reader/1033782","https://www.interconnection.fyi/data-center/project/conesville-data-center-cmh02-6d5ce530","https://www.ohiohouse.gov/members/melanie-miller/news/hiner-applauds-approval-of-all-ohio-future-funding-for-conesville-industrial-park-in-coshocton-135947"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"235ce5163870","cid":"235ce5163870","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Lebanon","county":"Warren","state":"OH","lat":39.425663,"lng":-84.16994,"cprec":"shared_centroid","status":"Proposed","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"He said the site's electric demand was expected to grow from about 5.9 megawatts this year to nearly 26 megawatts in coming years.","uquote":"Grid Operator. Duke Energy Ohio and Kentucky.","ukey":"3542|OH","uname":"Duke Energy Ohio Inc","rto":"PJM","nerc":"RFC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2023,"oy":2024,"deal":"Ohio Tax Credit Authority approved a 75%, 10-year Data Center Tax Exemption and a 2.389%, 15-year Job Creation Tax Credit on December 11, 2023, for a roughly $90,000,000 investment.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text stale_future_status_year coordinate_cluster_reclassified","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"63258d1e75c7","cid":"63258d1e75c7","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE","county":"WARREN","state":"OH","lat":39.425663,"lng":-84.16994,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Duke Energy Ohio and Kentucky","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"3542|OH","uname":"Duke Energy Ohio Inc","reportedUtility":"Duke Energy Ohio Inc","lflag":"utility_alias_corrected unlinked_source_text coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"ae0e04eafd01","cid":"c2778569cc80","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE LLC","city":"Lebanon","county":"WARREN","state":"OH","lat":39.425663,"lng":-84.16994,"cprec":"shared_centroid","status":"Proposed","mw":26,"pc":"Grid","pconf":"High","pquote":"He also emphasized that municipal ownership of the electric utility allows the city to retain a kilowatt‑hour tax share that benefits the general fund.","uquote":"The City of Lebanon owns and operates its own electric utility containing generation, transmission and distribution facilities.","uscan":"https://www.lebanonohio.gov/residents/business/economic_development/utilities.php","ukey":"10830|OH","uname":"City of Lebanon - (OH)","rto":"PJM","nerc":"RFC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2023,"deal":"$90,000,000 investment and a 75%, 10-year Data Center Tax Credit approved on December 11, 2023.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"lebanonohio.gov","lflag":"online_before_announced coordinate_cluster_reclassified","srcUrls":["https://www.lebanonohio.gov/residents/business/economic_development/utilities.php"],"band":"25-50 MW"},{"id":"7a731003c62d","cid":"7a731003c62d","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE LLC","county":"WARREN","state":"OH","lat":39.425663,"lng":-84.16994,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"coordinate_cluster_reclassified"},{"id":"c2778569cc80","cid":"c2778569cc80","canon":1,"dups":3,"ftype":"data_center","name":"CYRUSONE LLC","city":"Lebanon","county":"WARREN","state":"OH","lat":39.425663,"lng":-84.16994,"cprec":"shared_centroid","status":"Proposed","mw":26,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"He said the site's electric demand was expected to grow from about 5.9 megawatts this year to nearly 26 megawatts in coming years.","uquote":"The five investor-owned EDCs are AEP Ohio (central, south, east and northwest Ohio), Duke Energy Ohio (Cincinnati / southwest), The Illuminating Company (Cleveland metro), Ohio Edison (Akron / Youngstown) and Toledo Edison (NW Ohio).","uscan":"https://callmepower.com/oh","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2023,"oy":2025,"contro":"Residents have raised questions regarding the city's ability to provide power as commercial parks and data centers expand, specifically fearing impacts on environmental standards and local rates.","deal":"TCA approved a 2.389%, 15-year Job Creation Tax Credit and a 75%, 10-year Data Center Tax Exemption for this project (December 11, 2023). The expansion is a roughly $90,000,000 investment.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"callmepower.com","srcUrls":["https://callmepower.com/oh"],"lflag":"source_quality_reclassified utility_alias_corrected stale_future_status_year coordinate_cluster_reclassified","rawUkey":"3542|OH","rawUname":"Duke Energy Ohio Inc","reportedUtility":"AEP Ohio / Ohio Power Co","oy_stale":1},{"id":"840191008628","cid":"840191008628","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE LLC","city":"Lebanon","county":"WARREN","state":"OH","lat":39.425663,"lng":-84.16994,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Low","pquote":"He said the site's electric demand was expected to grow from about 5.9 megawatts this year to nearly 26 megawatts in coming years.","uquote":"Grid Operator. Duke Energy Ohio and Kentucky.","ukey":"3542|OH","uname":"Duke Energy Ohio Inc","rto":"PJM","nerc":"RFC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2024,"deal":"75%, 10-year Data Center Tax Exemption approved on December 11, 2023","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text coordinate_cluster_reclassified,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"19c2ccc926c8","cid":"c2778569cc80","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE LLC","city":"Lebanon","county":"WARREN","state":"OH","lat":39.425663,"lng":-84.16994,"cprec":"shared_centroid","status":"Proposed","mw":26,"pc":"Grid","pconf":"High","pquote":"The City of Lebanon owns and operates its own electric municipal utility, containing generation, transmission, and distribution facilities. The city's daily demand is met by purchasing bulk power from American Electric Power (AEP).","uquote":"The City of Lebanon owns and operates its own electric municipal utility, containing generation, transmission, and distribution facilities. The city's daily demand is met by purchasing bulk power from American Electric Power (AEP).","rto":"PJM","nerc":"RFC","op":"CyrusOne","spon":"KKR, Global Infrastructure Partners (GIP)","ay":2023,"oy":2025,"deal":"Ohio Tax Credit Authority approved a 75%, 10-year Data Center Tax Exemption and a 2.389%, 15-year Job Creation Tax Credit on December 11, 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected stale_future_status_year coordinate_cluster_reclassified","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"a613c035c226","cid":"07cbc70438f3","canon":0,"dups":3,"ftype":"data_center","name":"DATA CENTER CAMPUS BUILDING A-H","county":"UNION","state":"OH","lat":40.295901,"lng":-83.367042,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded generic_unsourced_permit_record","rawName":"DATA CENTER CAMPUS BUILDING A-H","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"b9a8c49446be","cid":"07cbc70438f3","canon":0,"dups":3,"ftype":"data_center","name":"DATA CENTER CAMPUS BUILDING A-H","county":"UNION","state":"OH","lat":40.295901,"lng":-83.367042,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded generic_unsourced_permit_record","rawName":"DATA CENTER CAMPUS BUILDING A-H","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"07cbc70438f3","cid":"07cbc70438f3","canon":0,"dups":3,"ftype":"data_center","name":"DATA CENTER CAMPUS BUILDING A-H","county":"UNION","state":"OH","lat":40.295901,"lng":-83.367042,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded generic_unsourced_permit_record","rawName":"DATA CENTER CAMPUS BUILDING A-H","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"7ef2f24de7b9","cid":"7ef2f24de7b9","canon":1,"dups":1,"ftype":"data_center","name":"EDGECONNEX NORTH SITE","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","pc":"Behind-the-Meter","pconf":"Medium","pquote":"The facilities from EdgeConneX, the PowerConneX New Albany Energy Centers, are natural gas-fired power generation facilities to be located in the Licking County portion of the New Albany International Business Park. The projects are being explored to provide a reliable, cost-effective, and efficient source of power for its data center operations while reducing dependence on external energy sources.","proc":"Co-located generation","pcp":"PowerConneX (an EdgeConneX affiliate)","pdt":"120 megawatts (Phase 1)","uconf":"Medium","uquote":"Simplified infrastructure planning for AEP: Provides its own power solution, relieving AEP of the infrastructure burden.","rto":"PJM","nerc":"RFC","op":"EdgeConneX","spon":"EdgeConneX","contro":"Residents concerned about water/electrical usage, noise/traffic; local authorities denied annexation for more land.","controScan":"https://614now.com/2026/hot-topics/proposed-680-acre-data-center-in-central-ohio-denied-by-local-authorities-after-concerned-residents-push-back","deal":"EdgeConneX acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre, located just north of the site at 3356 Clover Valley Rd NW.","dealScan":"https://baxtel.com/data-centers/edgeconnex","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;614now.com","srcUrls":["https://baxtel.com/data-centers/edgeconnex","https://614now.com/2026/hot-topics/proposed-680-acre-data-center-in-central-ohio-denied-by-local-authorities-after-concerned-residents-push-back"],"lflag":"source_quality_reclassified utility_alias_corrected","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"a2f01d208732","cid":"a2f01d208732","canon":1,"dups":1,"ftype":"data_center","name":"GEOPETRO LLC","city":"Columbiana","county":"COLUMBIANA","state":"OH","lat":40.770073,"lng":-80.778455,"cprec":"distinct","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"7db025d44fea","cid":"7db025d44fea","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Lockbourne","county":"Pickaway","state":"OH","lat":39.648947,"lng":-83.052827,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Designed to run on 24/7 carbon-free energy (CFE) with solar and wind offsets. On-site substation and backup generators ensure power continuity.","uconf":"High","uquote":"AEP Ohio (Electric)","uscan":"https://www.lockbourneohio.us/helpful-links/","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2021,"oy":2024,"deal":"Columbus City Council approved $54.3 million in tax incentives and a 15-year, 100% property tax abatement on an estimated $300 million investment in March 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"lockbourneohio.us","srcUrls":["https://www.lockbourneohio.us/helpful-links/"],"lflag":"source_quality_reclassified utility_alias_corrected stale_future_status_year","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","oy_stale":1},{"id":"468f105bff76","cid":"468f105bff76","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"New Albany","county":"Licking","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":250,"pc":"Grid","pconf":"High","pquote":"Ohio sits inside the PJM Interconnection, the largest electricity grid operator in North America. Access to reliable, high-capacity grid infrastructure is the single most important location factor for data centers, and Ohio is well-positioned in that regard.","pscan":"https://ocj.com/2026/05/ohios-ai-boom-an-economists-perspective-on-data-centers/","uquote":"The infrastructure brought to New Albany by American Electric Power (AEP) set the stage for more tech firms to follow, Scott McAfee, a spokesperson for New Albany's economic development department, told Construction Dive.","uscan":"https://www.constructiondive.com/news/google-starts-construction-on-600m-data-center-in-unlikely-burgeoning-tech/566813/","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Google","spon":"Google","tenant":"Google","ay":2019,"oy":2026,"contro":"Tax abatements and incentives for data centers in Ohio have drawn criticism amidst rising electricity prices and concerns over water usage.","controScan":"https://signalohio.org/ohio-data-center-boom-faces-political-resistence/","deal":"Initial $600 million investment announced in 2019. Additional $2.3 billion investment in Ohio data centers (including New Albany) announced in June 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"ocj.com;constructiondive.com;signalohio.org","srcUrls":["https://ocj.com/2026/05/ohios-ai-boom-an-economists-perspective-on-data-centers/","https://www.constructiondive.com/news/google-starts-construction-on-600m-data-center-in-unlikely-burgeoning-tech/566813/","https://signalohio.org/ohio-data-center-boom-faces-political-resistence/"],"band":"250+ MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"49730|OH","rawUname":"American PowerNet","reportedUtility":"AEP Ohio / Ohio Power Co","ukey":"14006|OH"},{"id":"cb9c7486d512","cid":"cb9c7486d512","canon":1,"dups":1,"ftype":"data_center","name":"HARRISON & JUG STREET DATA CENTER","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Crediting the existing infrastructure in the business park, including 300 megawatt redundant power, triple feed electric capabilities and robust fiber optic networks, DBT-DATA had its eye on a New Albany location for some time.","uconf":"High","uquote":"The City of New Albany, AEP Ohio and New Albany Company set the stage for the expansion of this sector by investing in the critical elements that support business growth,” concluded Tolson.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"DBT Data","spon":"DBT Data","ay":2022,"deal":"DBT-DATA purchased 93 acres in the New Albany International Business Park on August 31, 2022, for approximately $21 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","srcUrls":null,"srcDom":null},{"id":"35386dabbbb9","cid":"35386dabbbb9","canon":1,"dups":1,"ftype":"data_center","name":"HONDA OHIO DATA CENTER","city":"Raymond","county":"UNION","state":"OH","lat":40.295901,"lng":-83.367042,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Union Rural Electric Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/honda-ohio-data-center-6532471c","uconf":"High","uquote":"Grid Operator. Union Rural Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/honda-ohio-data-center-6532471c","ukey":"19501|OH","uname":"Union Rural Electric Coop, Inc","rto":"PJM","nerc":"RFC","op":"Honda","spon":"Honda","ay":2016,"oy":2017,"deal":"$53 million investment announced November 2016","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/honda-ohio-data-center-6532471c"],"lflag":"shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"6ca56dcc8bbd","cid":"6ca56dcc8bbd","canon":1,"dups":1,"ftype":"data_center","name":"INDUSTRIAL PARKWAY DATA CENTER CAMPUS","county":"UNION","state":"OH","lat":40.295901,"lng":-83.367042,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"The project includes five data center buildings, an electrical substation, and two fuel cell facilities.","rto":"PJM","nerc":"RFC","op":"Active Infrastructure","spon":"BA Mitchell Owner","tenant":"AWS","ay":2025,"contro":"Zoning Inspector unlawfully refused to accept and process the application.","controScan":"https://iworq-upload.s3.amazonaws.com/JEROMETOWNSHIP/601/28897394-Notice%20of%20Appeal%20-%200%20Mitchell-Dewitt%20Road.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"iworq-upload.s3.amazonaws.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://iworq-upload.s3.amazonaws.com/JEROMETOWNSHIP/601/28897394-Notice%20of%20Appeal%20-%200%20Mitchell-Dewitt%20Road.pdf"]},{"id":"d919b006190b","cid":"d919b006190b","canon":0,"dups":1,"ftype":"data_center","name":"INDUSTRIAL PARKWAY DATA CENTER CAMPUS","county":"UNION","state":"OH","lat":40.295901,"lng":-83.367042,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"AEP Ohio","pdt":"Minimum 85% of contracted capacity for up to 12 years, including a 4-year ramp-up period.","uquote":"AES Ohio and URE are working with data centers to manage the burden on our 13-state PJM grid.","uscan":"https://www.growunioncountyohio.com/data-center-resources","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon","oy":2027,"contro":"Multiple data center proposals and utility infrastructure discussions have sparked intense public debate in Union County, and the Marysville community has raised many questions.","controScan":"https://marysvillematters.substack.com/p/senator-reineke-hints-data-centers","deal":"Estimated investment of approximately $1 billion.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"growunioncountyohio.com;marysvillematters.substack.com","srcUrls":["https://www.growunioncountyohio.com/data-center-resources","https://marysvillematters.substack.com/p/senator-reineke-hints-data-centers"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected,merged_duplicate","rawUkey":"4922|OH","rawUname":"Dayton Power & Light Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"ad906606eaf8","cid":"ad906606eaf8","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Pataskala","county":"Licking","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":200,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Meta is pursuing $3 billion in construction loans to finance a new data center campus in Ohio, with plans to generate power on-site using natural gas. The deal represents another major hyperscaler opting for behind-the-meter generation rather than traditional utility interconnection.","pscan":"https://energy.media/climate_deals/meta-seeks-3b-loan-for-ohio-data-center-project/","proc":"Co-located generation","pcp":"Will-Power OH (The Williams Companies)","pdt":"200 MW","uconf":"High","uquote":"Utility Provider: American Electric Power (AEP).","uscan":"https://baxtel.com/data-center/meta-new-albany-ohio","rto":"PJM","nerc":"RFC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2025,"oy":2026,"contro":"Public backlash to higher electric and water bills is rising, with many people demanding American Electric Power of Ohio drop its case before the Public Utilities Commission of Ohio, which could lead to high rates. Meta's Prometheus requires over one gigawatt of power to operate. The company also just purchased another 429 acres in New Albany and Jersey Township near Prometheus, signaling more investment in the future.","controScan":"https://www.wosu.org/2026-01-19/data-center-giants-meta-and-microsoft-try-to-offset-rising-utility-rates-as-costs-rise-for-consumers","deal":"$3 billion in construction loans for a new data center campus in Ohio, with plans to generate power on-site using natural gas. Meta also announced agreements with TerraPower, Oklo and Vistra for nuclear power for its Prometheus AI data center that is being built in New Albany, Ohio (announced January 9, 2026).","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"energy.media;baxtel.com;wosu.org","srcUrls":["https://energy.media/climate_deals/meta-seeks-3b-loan-for-ohio-data-center-project/","https://baxtel.com/data-center/meta-new-albany-ohio","https://www.wosu.org/2026-01-19/data-center-giants-meta-and-microsoft-try-to-offset-rising-utility-rates-as-costs-rise-for-consumers"],"lflag":"source_quality_reclassified utility_alias_corrected","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"b719b241f3d3","cid":"2df5fa613abd","canon":0,"dups":2,"ftype":"data_center","name":"MICROSOFT CMH02 DATA CENTER","city":"Johnstown","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"2df5fa613abd","cid":"2df5fa613abd","canon":1,"dups":2,"ftype":"data_center","name":"MICROSOFT CMH02 DATA CENTER","city":"Johnstown","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b2a2dde7e3b3","cid":"b2a2dde7e3b3","canon":0,"dups":1,"ftype":"data_center","name":"MICROSOFT CMH02 DATA CENTER","city":"JOHNSTOWN","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"5135579541c0","cid":"5135579541c0","canon":1,"dups":1,"ftype":"data_center","name":"MILLER RD DATA CENTER","city":"New Albany","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"AEP Ohio","uquote":"The event was attended by New Albany Mayor Sloan Spalding, New Albany officials, leaders from the economic development community, local electric utility provider AEP and key project partners.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon.com","tenant":"Amazon","ay":2023,"oy":2030,"deal":"Amazon is planning to invest $3.5 billion by 2030 to establish new data centers in the area. New Albany City Council approved agreements with Amazon web services to help build five new data centers worth $3.5 billion. Under the agreement, Amazon gets 15 years of 100% tax breaks and an additional 15 years of a 75% discount on taxes. Amazon will spend $1.8 billion on buildings and $1.7 billion on equipment. The five new data centers and related buildings are described as the 'Phase 1 Project' of Amazon's $7.8 billion development in central Ohio.","dealScan":"https://baxtel.com/data-center/amazon-miller-rd-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/amazon-miller-rd-campus"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"b3df81b6ebd5","cid":"b3df81b6ebd5","canon":0,"dups":1,"ftype":"data_center","name":"NEW ALBANY DATA CENTER","city":"New Albany","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","proc":"Co-located generation","pcp":"PowerConneX (EdgeConneX affiliate)","pdt":"120 megawatts","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"218832960adc","cid":"218832960adc","canon":1,"dups":1,"ftype":"data_center","name":"NEW ALBANY DATA CENTER","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":144,"pc":"Grid","pconf":"High","pquote":"The Public Utilities Commission of Ohio (PUCO) today approved a rate arrangement between New Albany Data Center and AEP Ohio.","uconf":"High","uquote":"The Public Utilities Commission of Ohio (PUCO) today approved a rate arrangement between New Albany Data Center and AEP Ohio.","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Lincoln Rackhouse","spon":"Lincoln Property and Harrison Street","ay":2022,"oy":2025,"deal":"Lincoln Property Co. and Harrison Street acquired 190 acres of land in May 2022. New Albany Data Center is investing $500 million to construct its Silicon Heartland Datacenter Campus. A rate arrangement between New Albany Data Center and AEP Ohio was approved by PUCO on February 7, 2024, where NADC will lease substation and associated equipment for an eight-year term. A 15-year, 100% real estate tax abatement was secured.","dealScan":"https://www.globest.com/2022/05/19/jv-acquires-190-acres-for-data-center-and-industrial-campus/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"globest.com","srcUrls":["https://www.globest.com/2022/05/19/jv-acquires-190-acres-for-data-center-and-industrial-campus/"],"band":"100-250 MW","lflag":"source_quality_reclassified utility_alias_corrected stale_future_status_year","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","oy_stale":1},{"id":"0b8eed24c81f","cid":"0b8eed24c81f","canon":1,"dups":2,"ftype":"data_center","name":"OPPIDAN BOWLING GREEN DATA CENTER","city":"Bowling Green","county":"WOOD","state":"OH","lat":41.360183,"lng":-83.622682,"cprec":"distinct","status":"Proposed","mw":5,"pc":"Grid","pconf":"High","pquote":"As for electricity, the small data center will average about 6 megawatts, or 8 megawatts during peak periods.","uquote":"Grid Operator: Hancock-wood Electric COOP INC.","ukey":"8034|OH","uname":"Hancock-Wood Electric Coop Inc","rto":"PJM","nerc":"RFC","op":"Oppidan","spon":"Oppidan Investment Company","ay":2024,"oy":2026,"deal":"100% tax abatement for 10 years; Construction value $25,000,000 - $49,999,999 (bid date Sep 8, 2023)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a39915953669","cid":"0b8eed24c81f","canon":0,"dups":2,"ftype":"data_center","name":"OPPIDAN BOWLING GREEN DATA CENTER","city":"BOWLING GREEN","county":"WOOD","state":"OH","lat":41.360183,"lng":-83.622682,"cprec":"distinct","status":"Proposed","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"As for electricity, the small data center will average about 6 megawatts, or 8 megawatts during peak periods. The data center should be a steady electric customer for the city, unlike other plants that operate on shifts rather than round the clock.","uconf":"High","uquote":"The data center should be a steady electric customer for the city, unlike other plants that operate on shifts rather than round the clock.","ukey":"2054|OH","uname":"City of Bowling Green - (OH)","rto":"PJM","nerc":"RFC","op":"Oppidan","spon":"Oppidan Investment Company","ay":2023,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ef5ac8e8065f","cid":"ef5ac8e8065f","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"New Albany","county":"Lucas","state":"OH","lat":41.682321,"lng":-83.468903,"cprec":"distinct","status":"Proposed","mw":222,"pc":"Grid","pconf":"High","pquote":"QTS will fund 100% of energy infrastructure improvements in partnership with American Electric Power at no cost to ratepayers.","pscan":"https://mercercountyoutlook.net/2026/05/29/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/","uquote":"QTS will fund 100% of energy infrastructure improvements in partnership with American Electric Power at no cost to ratepayers.","uscan":"https://mercercountyoutlook.net/2026/05/29/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"QTS Data Centers","spon":"Blackstone","ay":2023,"oy":2025,"deal":"$1.5 billion investment announced in October 2023","dealScan":"https://www.constructiondive.com/news/ohio-data-center-new-albany-construction-qts/697970/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mercercountyoutlook.net;constructiondive.com","srcUrls":["https://mercercountyoutlook.net/2026/05/29/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/","https://www.constructiondive.com/news/ohio-data-center-new-albany-construction-qts/697970/"],"band":"100-250 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected stale_future_status_year","rawUkey":"49730|OH","rawUname":"American PowerNet","reportedUtility":"AEP Ohio / Ohio Power Co","ukey":"14006|OH","oy_stale":1},{"id":"a1dfbda88563","cid":"a1dfbda88563","canon":1,"dups":1,"ftype":"data_center","name":"QTS NAL 2","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":78,"pc":"Grid","pconf":"High","pquote":"At a time when businesses seek every competitive advantage to fuel growth, New Albany, Ohio offers abundant, reliable and affordable sources of power and water. Billions of dollars in infrastructure investment have enabled the city and utility systems to easily accommodate growth.... American Electric Power. 765,000-volt transmission system, country's largest, located in New Albany; Triple feed electric capabilities; Redundant power systems; More than 500 MW capacity; 345 kV and 138 kV enhancements available.","uquote":"AEP Ohio and Ohio Power Company representatives plan power upgrades to support the electric service needs of an AEP customer's substation in the City of New Albany, Licking County. The Badger Station Project to construct a new 5-acre substation and multiple 138-kV transmission tie lines connecting Badger Station to a customer substation.","uscan":"https://www.aeptransmission.com/ohio/docs/BadgerStation_PublicNotice_V4.pdf","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"QTS Data Centers","spon":"Blackstone Group","tenant":"Meta","ay":2023,"oy":2025,"deal":"Community Reinvestment Area Agreement with QTS NAL TX II, LLC approved on November 21, 2023","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"aeptransmission.com","srcUrls":["https://www.aeptransmission.com/ohio/docs/BadgerStation_PublicNotice_V4.pdf"],"band":"50-100 MW","lflag":"citation_artifact_removed source_quality_reclassified utility_alias_corrected stale_future_status_year","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co","oy_stale":1},{"id":"14f7fddecc7e","cid":"14f7fddecc7e","canon":1,"dups":1,"ftype":"data_center","name":"R&L CARRIERS DATA CENTER","city":"Wilmington","county":"CLINTON","state":"OH","lat":39.416681,"lng":-83.804583,"cprec":"distinct","status":"Proposed","uquote":"Grid Operator. Village of Blanchester - (OH).","uscan":"https://www.interconnection.fyi/data-center/project/r-l-data-center-parking-lot-80381558","rto":"PJM","nerc":"RFC","op":"R&L Carriers","spon":"R&L Carriers","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/r-l-data-center-parking-lot-80381558"]},{"id":"08c5c9dff748","cid":"08c5c9dff748","canon":1,"dups":1,"ftype":"data_center","name":"R&L DATA CENTER PARKING LOT","city":"Wilmington","county":"CLINTON","state":"OH","lat":39.416681,"lng":-83.804583,"cprec":"distinct","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b4f9c4c9fc71","cid":"b4f9c4c9fc71","canon":1,"dups":1,"ftype":"data_center","name":"SIDNEY DATA CENTER CAMPUS","county":"SHELBY","state":"OH","lat":40.33668,"lng":-84.204142,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Sidney sits in the Dayton Power & Light (AES Ohio) and AEP Ohio overlap corridor. Project Galaxy's specific power supplier and tariff terms have not been fully disclosed; AEP Ohio's 85% data center tariff (effective July 23, 2025) likely governs.","pscan":"https://stopohiodatacenters.org/shelby-county","uquote":"Sidney sits in the Dayton Power & Light (AES Ohio) and AEP Ohio overlap corridor. Project Galaxy's specific power supplier and tariff terms have not been fully disclosed; AEP Ohio's 85% data center tariff (effective July 23, 2025) likely governs.","uscan":"https://stopohiodatacenters.org/shelby-county","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon","ay":2025,"oy":2030,"contro":"Community opposition regarding water usage, tax abatements, and transparency; townships considering moratoriums on data center developments.","controScan":"https://hs.getobedio.com/blog/aws-data-center-campus-in-sidney-ohio-clears-final-infrastructure-approvals-locking-in-8m-of-private-road-funding","deal":"$3 billion project with a 30-year, 100% real-property tax abatement and a $50 million PILOT payment over 15 years, approved October 2025. Up to $8.0 million private contribution for road reconstruction.","dealScan":"https://stopohiodatacenters.org/shelby-county","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"stopohiodatacenters.org;hs.getobedio.com","srcUrls":["https://stopohiodatacenters.org/shelby-county","https://hs.getobedio.com/blog/aws-data-center-campus-in-sidney-ohio-clears-final-infrastructure-approvals-locking-in-8m-of-private-road-funding"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"7aa3315bc582","cid":"8a3a545e461a","canon":0,"dups":5,"ftype":"data_center","name":"SMART FARMS DATA CENTER DEVELOPMENT","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":400,"pc":"Grid","pconf":"High","pquote":"Planned 100 MW AEP service with double-circuit 34.5kV distribution adjacent to the site, nearby 138kV and 345kV transmission lines, and a clear path for new on-site substations to support phased campus development.","pscan":"https://karis.com/properties/smart-farm","uquote":"Utility. AEP.","uscan":"https://karis.com/properties/smart-farm","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Karis Critical / Karis Cold","spon":"Karis Critical / Karis Cold","ay":2026,"oy":2031,"contro":"Request to Ohio Environmental Protection Agency to bulldoze wetlands and streams.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"karis.com","srcUrls":["https://karis.com/properties/smart-farm"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"e076006707b5","cid":"8a3a545e461a","canon":0,"dups":5,"ftype":"data_center","name":"SMART FARMS DATA CENTER DEVELOPMENT","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":400,"pc":"Grid","pconf":"High","pquote":"Planned 100 MW AEP service with double-circuit 34.5kV distribution adjacent to the site, nearby 138kV and 345kV transmission lines, and a clear path for new on-site substations to support phased campus development.","pscan":"https://karis.com/properties/smart-farm","uquote":"Utility. AEP. Power. Planned 100 MW AEP service with double-circuit 34.5kV distribution adjacent to the site","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","spon":"Karis Critical / Karis Cold","ay":2026,"oy":2031,"contro":"Proposal to bulldoze wetlands and streams requiring Ohio EPA request and mitigation.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"karis.com","srcUrls":["https://karis.com/properties/smart-farm"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"8a3a545e461a","cid":"8a3a545e461a","canon":1,"dups":5,"ftype":"data_center","name":"SMART FARMS DATA CENTER DEVELOPMENT","city":"Jersey Township","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":400,"pc":"Grid","pconf":"High","pquote":"Planned 100 MW AEP service with double-circuit 34.5kV distribution adjacent to the site, nearby 138kV and 345kV transmission lines, and a clear path for new on-site substations to support phased campus development.","pscan":"https://karis.com/properties/smart-farm","uquote":"Utility. AEP.","uscan":"https://karis.com/properties/smart-farm","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Karis Critical","ay":2026,"oy":2031,"contro":"Regional opposition to data centers, operator's previous project rejection, request to Ohio EPA to bulldoze wetlands and streams, statewide ballot initiative to prohibit data centers over 25MW, and proposed general wastewater permit for data centers facing opposition.","controScan":"https://farmoffice.osu.edu/blog-tags/data-centers","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"karis.com;farmoffice.osu.edu","srcUrls":["https://karis.com/properties/smart-farm","https://farmoffice.osu.edu/blog-tags/data-centers"],"band":"250+ MW","lflag":"source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated utility_alias_corrected","spon":"Karis Critical / Karis Cold","uconf":"High","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"aa187cc9c8ff","cid":"8a3a545e461a","canon":0,"dups":5,"ftype":"data_center","name":"SMART FARMS DATA CENTER DEVELOPMENT","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":400,"pc":"Grid","pconf":"High","pquote":"Planned 100 MW AEP service with double-circuit 34.5kV distribution adjacent to the site, nearby 138kV and 345kV transmission lines, and a clear path for new on-site substations to support phased campus development.","pscan":"https://karis.com/properties/smart-farm","uconf":"High","uquote":"Utility. AEP.","uscan":"https://karis.com/properties/smart-farm","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Karis Critical","spon":"Karis Cold","ay":2026,"oy":2031,"contro":"Request to Ohio EPA to bulldoze wetlands and streams, requiring mitigation.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"karis.com","srcUrls":["https://karis.com/properties/smart-farm"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"e470b603486d","cid":"e470b603486d","canon":1,"dups":1,"ftype":"data_center","name":"SMART FARMS DATA CENTER DEVELOPMENT","city":"Columbus","county":"Franklin","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"29677d932522","cid":"8a3a545e461a","canon":0,"dups":5,"ftype":"data_center","name":"SMART FARMS DATA CENTER DEVELOPMENT","city":"Jersey Township","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":400,"pc":"Grid","pconf":"High","pquote":"Planned 100 MW AEP service with double-circuit 34.5kV distribution adjacent to the site, nearby 138kV and 345kV transmission lines, and a clear path for new on-site substations to support phased campus development.","pscan":"https://karis.com/properties/smart-farm","uconf":"High","uquote":"Planned 100 MW AEP service with double-circuit 34.5kV distribution adjacent to the site, nearby 138kV and 345kV transmission lines, and a clear path for new on-site substations to support phased campus development.","uscan":"https://karis.com/properties/smart-farm","ukey":"14006|OH","uname":"AEP Ohio / Ohio Power Co","rto":"PJM","nerc":"RFC","op":"Karis Critical","ay":2026,"oy":2031,"contro":"Proposal includes bulldozing wetlands and streams; regional opposition to data center development.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"karis.com","srcUrls":["https://karis.com/properties/smart-farm"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated utility_alias_corrected","rawUkey":"14006|OH","rawUname":"Ohio Power Co","reportedUtility":"AEP Ohio / Ohio Power Co"},{"id":"ddd4eac93425","cid":"ddd4eac93425","canon":0,"dups":1,"ftype":"data_center","name":"SOUTH SITE DATA CENTER","city":"NEW ALBANY","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":68,"proc":"Co-located generation","pcp":"Will-Power OH, LLC","pdt":"200 megawatts","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"33eed6340dff","cid":"2907f29a1947","canon":0,"dups":2,"ftype":"data_center","name":"SOUTH SITE DATA CENTER","city":"NEW ALBANY","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"15a7c067282b","cid":"15a7c067282b","canon":1,"dups":1,"ftype":"data_center","name":"SOUTH SITE DATA CENTER","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","mw":200,"pc":"Behind-the-Meter","pconf":"High","pquote":"The Socrates South Power Generation Project will operate “behind-the-meter,” to serve the electric load of an adjacent data center and will not be physically connected to the electric power grid.","rto":"PJM","nerc":"RFC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","oy":2026,"deal":"Williams (WMB) is investing $1.6B into Project Socrates (North and South combined) for power generation facilities, backed by 10-year extendable contracts.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c712c503e4de","cid":"c712c503e4de","canon":0,"dups":1,"ftype":"data_center","name":"SOUTH SITE DATA CENTER","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","op":"Burr Computer Environments","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"2907f29a1947","cid":"2907f29a1947","canon":0,"dups":2,"ftype":"data_center","name":"SOUTH SITE DATA CENTER","city":"New Albany","county":"LICKING","state":"OH","lat":40.091505,"lng":-82.483435,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"0f51a2796cd9","cid":"0f51a2796cd9","canon":1,"dups":1,"ftype":"data_center","name":"STANDARD POWER COSHOCTON","city":"Coshocton","county":"COSHOCTON","state":"OH","lat":40.29671,"lng":-81.930109,"cprec":"shared_centroid","status":"Proposed","mw":1300,"pc":"Grid","pconf":"High","pquote":"According to a regulatory filing from AES Ohio, the proposed operator has requested an initial electricity load of 100MW in 2028, rising to 1.3GW by 2032.","pscan":"https://baxtel.com/data-center/standard-power-coshocton-oh","uquote":"According to a regulatory filing from AES Ohio, the proposed operator has requested an initial electricity load of 100MW in 2028, rising to 1.3GW by 2032.","uscan":"https://baxtel.com/data-center/standard-power-coshocton-oh","ukey":"4922|OH","uname":"Dayton Power & Light Co","rto":"PJM","nerc":"RFC","op":"Standard Power","spon":"Standard Power","ay":2025,"oy":2028,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/standard-power-coshocton-oh"],"band":"250+ MW","lflag":"coordinate_cluster_reclassified"},{"id":"99cf35609af8","cid":"99cf35609af8","canon":1,"dups":1,"ftype":"data_center","name":"STANDARD POWER NOVA LLC","city":"Coshocton","county":"COSHOCTON","state":"OH","lat":40.29671,"lng":-81.930109,"cprec":"shared_centroid","status":"Proposed","mw":50,"pc":"Grid","pconf":"High","pquote":"“This site's legacy is that it needed a lot of energy for its previous function as a papermill and it also requires a lot of energy to do its new function with blockchain technology. We can leverage existing infrastructure for these new types of applications.”","pscan":"https://frontier-companies.com/coshoctons-standard-power-center-powers-blockchain-mining-for-ohio/","uquote":"Grid Operator. Frontier Power Company.","uscan":"https://www.interconnection.fyi/data-center/project/standard-power-coshocton-d2b81a0e","rto":"PJM","nerc":"RFC","op":"Standard Power","spon":"Standard Power","ay":2019,"oy":2023,"deal":"$13M Early Stage VC funding","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"frontier-companies.com;interconnection.fyi","srcUrls":["https://frontier-companies.com/coshoctons-standard-power-center-powers-blockchain-mining-for-ohio/","https://www.interconnection.fyi/data-center/project/standard-power-coshocton-d2b81a0e"],"band":"50-100 MW","lflag":"citation_artifact_removed stale_future_status_year coordinate_cluster_reclassified","oy_stale":1},{"id":"9c9463628348","cid":"9405e6065a1f","canon":0,"dups":2,"ftype":"data_center","name":"TJX CORPORATE TECHNOLOGY CENTER","city":"New Albany","county":"FRANKLIN","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. FirstEnergy.","uconf":"High","uquote":"Grid Operator. FirstEnergy.","ukey":"13998|OH","uname":"Ohio Edison Co","rto":"PJM","nerc":"RFC","op":"TJX","ay":2016,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9405e6065a1f","cid":"9405e6065a1f","canon":1,"dups":2,"ftype":"data_center","name":"TJX CORPORATE TECHNOLOGY CENTER","city":"New Albany","county":"FRANKLIN","state":"OH","lat":39.969875,"lng":-83.009086,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: FirstEnergy.","pscan":"https://www.interconnection.fyi/data-center/project/tjx-corporate-technology-center-16be5e3f","uconf":"High","uquote":"Grid Operator: FirstEnergy.","uscan":"https://www.interconnection.fyi/data-center/project/tjx-corporate-technology-center-16be5e3f","ukey":"13998|OH","uname":"Ohio Edison Co","rto":"PJM","nerc":"RFC","op":"TJX","ay":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/tjx-corporate-technology-center-16be5e3f"]},{"id":"66b4bb97db92","cid":"66b4bb97db92","canon":1,"dups":1,"ftype":"data_center","name":"VERIZON WIRELESS TWINSBURG DATA CENTER","city":"Twinsburg","county":"SUMMIT","state":"OH","lat":41.121847,"lng":-81.534928,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. FirstEnergy.","pscan":"https://www.interconnection.fyi/data-center/project/verizon-wireless-twinsburg-data-center-f13b4afe","uquote":"Grid Operator. FirstEnergy.","uscan":"https://www.interconnection.fyi/data-center/project/verizon-wireless-twinsburg-data-center-f13b4afe","ukey":"13998|OH","uname":"Ohio Edison Co","rto":"PJM","nerc":"RFC","op":"Verizon Wireless","spon":"Verizon Communications","tenant":"Verizon Wireless","ay":2016,"contro":"Twinsburg City Council adopted a 12-month moratorium on accepting or issuing permits for data centers due to public concerns about water, noise, and zoning impacts.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/verizon-wireless-twinsburg-data-center-f13b4afe"]},{"id":"57ae3b8447e2","cid":"57ae3b8447e2","canon":0,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Tulsa","county":"Tulsa","state":"OK","lat":36.120318,"lng":-95.941813,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"8443c1f46c12","cid":"8443c1f46c12","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Tulsa","county":"Tulsa","state":"OK","lat":36.120318,"lng":-95.941813,"cprec":"distinct","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"SPP","nerc":"MRO","op":"DXC Technology","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4dc83217ffb9","cid":"4dc83217ffb9","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Pryor","county":"Mayes","state":"OK","lat":36.303804,"lng":-95.235638,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Google can't directly use the wind power generated in Minco in the data center it is building in Pryor, Oklahoma, about 180 miles away. But the power purchase offsets the impact of the Google data center on the local power grid - effectively substituting a megawatt of renewable energy for each megawatt Google draws from the grid to power its data center.","pscan":"https://www.datacenterknowledge.com/sustainability/google-buys-wind-power-to-green-oklahoma-grid","uconf":"High","uquote":"Gary Demasi, Director of the Global Infrastructure team at Google, said the company has been working with GRDA since its Oklahoma data center opened its doors in 2010.","uscan":"https://www.datacenterknowledge.com/hyperscalers/google-provisions-wind-power-in-oklahoma","uname":"Grand River Dam Authority","rto":"SPP","nerc":"MRO","op":"Google Cloud","spon":"Google Cloud","tenant":"Google Cloud","ay":2007,"oy":2011,"contro":"Concerns regarding water usage and potential impact on utility costs for residents.","deal":"Google purchased a former Gatorade plant in Pryor for potential data center use (September 2013). Google bought 240 megawatts of wind power to support Oklahoma operations (September 2013). Google announced a $600 million expansion (February 2019).","dealScan":"https://www.datacenterknowledge.com/hyperscalers/google-buys-former-gatorade-plant-near-oklahoma-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.datacenterknowledge.com/sustainability/google-buys-wind-power-to-green-oklahoma-grid","https://www.datacenterknowledge.com/hyperscalers/google-provisions-wind-power-in-oklahoma","https://www.datacenterknowledge.com/hyperscalers/google-buys-former-gatorade-plant-near-oklahoma-data-center"],"rawUkey":"7490|OK","rawUname":"Grand River Dam Authority","reportedUtility":"Grand River Dam Authority"},{"id":"86c4a87ef075","cid":"86c4a87ef075","canon":0,"dups":1,"ftype":"data_center","name":"Google","city":"Pryor","county":"Mayes","state":"OK","lat":36.303804,"lng":-95.235638,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Google can't directly use the wind power generated in Amarillo in the data center in Pryor. But the power purchase offsets the impact of the Google data center on the local power grid – effectively substituting a megawatt of renewable energy for each megawatt Google draws from the grid to power its data center.","pscan":"https://www.datacenterknowledge.com/hyperscalers/google-buys-former-gatorade-plant-near-oklahoma-data-center","uconf":"High","uquote":"Local officials have informed the Grand River Dam Authority that the new tenant would require as much as 15 megawatts of power, and the authority would likely need to spend about $3.5 million for a new substation and other improvements.","uscan":"https://www.datacenterknowledge.com/hyperscalers/google-planning-oklahoma-data-center","uname":"Grand River Dam Authority","rto":"SPP","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","ay":2007,"oy":2011,"contro":"Concerns over water usage and potential impact on local water supply. The Pryor center used more than 1.1 billion gallons of water in one year.","deal":"Google signed a 15-year, fixed-price power purchase agreement with Enlight Renewable Energy's U.S. subsidiary Clēnera Holdings for 200MWac of solar generation from the Solstice project in LeFlore County, Oklahoma, with construction targeted for 2028 and commercial operations expected in 2029. Additionally, Google announced a $9 billion investment in Oklahoma cloud and AI infrastructure, including expansion of the Pryor facility, in August 2025.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility,merged_duplicate","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/google-buys-former-gatorade-plant-near-oklahoma-data-center","https://www.datacenterknowledge.com/hyperscalers/google-planning-oklahoma-data-center"],"rawUkey":"7490|OK","rawUname":"Grand River Dam Authority","reportedUtility":"Grand River Dam Authority"},{"id":"978a73c73d10","cid":"978a73c73d10","canon":1,"dups":1,"ftype":"data_center","name":"Google Pryor (North)","county":"Mayes","state":"OK","lat":36.303804,"lng":-95.235638,"cprec":"distinct","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Google will buy solar capacity from Leeward Energy to meet power demands. The wind farm will provide energy for the Southwest Power Pool, the regional grid that serves Google's Oklahoma data center.","pscan":"https://www.publicradiotulsa.org/local-regional/2025-08-13/google-announces-new-investments-in-oklahoma-data-centers","uconf":"Medium","uquote":"Grand River Dam Authority CEO Dan Sullivan said in a statement that the expansion of Google into Oklahoma allows the state an opportunity to add renewable energy at a lower cost to residents.","uscan":"https://maip.com/news/article/google-announces-new-investment-in-oklahoma-as-part-of-13b-expansion-across-the-u.s","uname":"Grand River Dam Authority","rto":"SPP","nerc":"MRO","op":"Google Cloud","spon":"Google","tenant":"Google","oy":2026,"contro":"Concerns over water usage and general community opposition to data center expansion in Oklahoma.","deal":"Long-term PPA with Leeward Renewable Energy for over 700 MW in solar projects in Oklahoma (announced January 2025). Google also committed $1.5 million to a regenerative project with Indigo Ag to replenish 200 million gallons of water over seven years (announced August 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"publicradiotulsa.org;maip.com","srcUrls":["https://www.publicradiotulsa.org/local-regional/2025-08-13/google-announces-new-investments-in-oklahoma-data-centers","https://maip.com/news/article/google-announces-new-investment-in-oklahoma-as-part-of-13b-expansion-across-the-u.s"],"lflag":"source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"7490|OK","rawUname":"Grand River Dam Authority","reportedUtility":"Grand River Dam Authority"},{"id":"d241ca8a4572","cid":"d241ca8a4572","canon":1,"dups":1,"ftype":"data_center","name":"Reliance Industries","city":"Kingfisher","county":"Kingfisher","state":"OK","lat":35.949436,"lng":-97.934557,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"52eb543fa279","cid":"52eb543fa279","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Oklahoma City","county":"Oklahoma","state":"OK","lat":35.554611,"lng":-97.409401,"cprec":"distinct","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The power to data center is fed from two different substations through two different entry points with a total capacity of 5,000kVA. Immediate power failure is protected by a redundant and diverse 2N+1 redundant UPS system design supporting a 3,000kW critical load, in an event of utility power loss. 4 x 2 MW Cummins standby diesel generators provide backup power to the entire facility during a power outage with 30,000 gallons of onsite fuel storage.","pscan":"https://cloudandcolocation.com/datacenters/tierpoint-oklahoma-dc2-data-center/","uquote":"Electricity in the Oklahoma City region is provided by OGE Energy Corp., Canadian Valley Electric Cooperative, City of Stroud, Edmond Electric, Kingfisher Public Works Authority, Oklahoma Electric Cooperative, Public Service Company of Oklahoma, and Stillwater Electric Utility.","rto":"SPP","nerc":"MRO","op":"TierPoint","spon":"Argo Infrastructure Partners","ay":2014,"oy":2016,"deal":"$250 million term loan closed on July 14, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/tierpoint-oklahoma-dc2-data-center/"],"lflag":"source_quality_reclassified"},{"id":"1b75341ab48f","cid":"1b75341ab48f","canon":1,"dups":1,"ftype":"data_center","name":"Tonaquint Data Centers","city":"Oklahoma City","county":"Oklahoma","state":"OK","lat":35.554611,"lng":-97.409401,"cprec":"distinct","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Strategically located near Will Rogers World Airport, the EdgeX facility utilizes the same electrical grid that powers the airport and is designed to withstand tornado-force winds of up to 310 mph, positioning it to provide 100% uptime. Reliable commercial power from OG&E with a primary and secondary substation totaling 8 Megawatts and expanding to an additional 2.5 MW by the end of 2024. 8MW primary and secondary commercial power substations from Oklahoma Gas and Electric. Five 2,000 kW diesel generators with housing for an additional unit. Five Schneider Electric Galaxy VX 1250 kW UPS systems. Fuel storage with a minimum 48-hour run time, two 15,000-gallon on-site tanks.","pscan":"https://valorc3.com/oklahoma-city-data-center/","uquote":"Reliable commercial power from OG&E with a primary and secondary substation totaling 8 Megawatts and expanding to an additional 2.5 MW by the end of 2024. 8MW primary and secondary commercial power substations from Oklahoma Gas and Electric.","uscan":"https://valorc3.com/oklahoma-city-data-center/","ukey":"14063|OK","uname":"Oklahoma Gas & Electric Co","rto":"SPP","nerc":"MRO","op":"ValorC3 Data Centers","spon":"CVC DIF Capital Partners","ay":2023,"oy":2024,"deal":"Acquisition of EdgeX Data Centers by Tonaquint in late 2023","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"valorc3.com","srcUrls":["https://valorc3.com/oklahoma-city-data-center/"],"lflag":"source_quality_reclassified"},{"id":"81f70a84dfdf","cid":"81f70a84dfdf","canon":1,"dups":1,"ftype":"data_center","name":"Philcade","city":"Tulsa","county":"Tulsa","state":"OK","lat":36.120318,"lng":-95.941813,"cprec":"distinct","status":"Proposed","mw":10,"band":"10-25 MW","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6c842af4aaf7","cid":"6c842af4aaf7","canon":0,"dups":2,"ftype":"data_center","name":"(data center)","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","uquote":"Primary provider: Portland General Electric (PGE)","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","contro":"Hillsboro is facing a power drought and a moratorium on Enterprise Zone approvals for data centers due to rapid growth and concerns about power and water usage.","controScan":"https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","srcUrls":["https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/"],"band":"10-25 MW","lflag":"merged_duplicate"},{"id":"d49f4c7854ef","cid":"dc6df1a0e3ad","canon":0,"dups":2,"ftype":"data_center","name":"(data center)","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","pscan":"https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","uquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","uscan":"https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT","ay":2021,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"datacenters.ragingwire.com","lflag":"online_before_announced","srcUrls":["https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/"],"band":"25-50 MW"},{"id":"805abce43361","cid":"805abce43361","canon":1,"dups":1,"ftype":"data_center","name":"(data center)","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":54,"pc":"Grid","pconf":"High","pquote":"Oregon-based Portland General Electric and GridCARE successfully completed their first joint project to accelerate large load interconnections using flexibility for data centers in Hillsboro, Oregon. This will result in over 80 MW of incremental capacity available for data center load in 2026, part of a total of more than 400 MW that will be energized by 2029.... The city says power for data centers is primarily provided and monitored by PGE.","pscan":"https://www.publicpower.org/periodical/article/oregon-utility-gridcare-complete-project-accelerate-large-load-interconnections-using-flexibility","uconf":"High","uquote":"Oregon-based Portland General Electric and GridCARE successfully completed their first joint project to accelerate large load interconnections using flexibility for data centers in Hillsboro, Oregon.... The city says power for data centers is primarily provided and monitored by PGE.","uscan":"https://www.publicpower.org/periodical/article/oregon-utility-gridcare-complete-project-accelerate-large-load-interconnections-using-flexibility","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","oy":2026,"contro":"Community opposition, rising utility rates, and legislative action (POWER Act, HB 4084 moratorium) due to data center expansion.","deal":"Flexential acquired Hillsboro 4 and Hillsboro 5 data centers on May 28, 2026, in the largest real estate transaction in the company's history.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"publicpower.org","srcUrls":["https://www.publicpower.org/periodical/article/oregon-utility-gridcare-complete-project-accelerate-large-load-interconnections-using-flexibility"],"band":"50-100 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"1c7fb2b1cd04","cid":"6c842af4aaf7","canon":0,"dups":2,"ftype":"data_center","name":"(data center)","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","uconf":"High","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","oy":2015,"contro":"Moratorium on Enterprise Zone approvals for data centers and concerns about power drought in Hillsboro.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"dc6df1a0e3ad","cid":"dc6df1a0e3ad","canon":0,"dups":2,"ftype":"data_center","name":"(data center)","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","uconf":"High","uquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT","ay":2020,"oy":2020,"contro":"General community opposition in Hillsboro regarding data center tax breaks, water usage, and rising electricity bills.","controScan":"https://www.kgw.com/article/tech/hillsboro-residents-rally-against-data-centers/283-0d999c4d-ef92-423c-a93a-ef5c68c549bb","deal":"RagingWire acquired the building from SunPower in September 2019 for $63.5 million.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"kgw.com","srcUrls":["https://www.kgw.com/article/tech/hillsboro-residents-rally-against-data-centers/283-0d999c4d-ef92-423c-a93a-ef5c68c549bb"],"band":"25-50 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"a302f122f007","cid":"a302f122f007","canon":1,"dups":1,"ftype":"data_center","name":"Adobe","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Tax \"enterprise zone\" incentives put in place at the time for access to low-cost, high percent large hydroelectric power content (among the highest in the US in 2011 when it was selected), with the potential for transitioning to 100% renewable energy over the life of the facility. This was the major reason for selection of the site, along with Oregon's mild climate conducive to energy efficiency, relative safety and security of the area (meaning it's not in a flood zone nor prone to major annual temperature differentials), and for a reliable local power and communications grid that is a legacy of the Washington County chip industry.","pscan":"https://www.adobe.com/corporate-responsibility/sustainability/data-centers.html","uquote":"At the time it was for all energy, now the potential is for green tariffs or other products with the local utility, Portland General Electric.","uscan":"https://www.adobe.com/corporate-responsibility/sustainability/data-centers.html","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Adobe","spon":"Adobe","tenant":"Adobe","ay":2011,"oy":2013,"contro":"Community opposition in Hillsboro regarding data centers due to tax breaks, water usage, and limited economic benefit. Adobe is explicitly named as one of the companies with data centers in the area.","deal":"Benefits from 'enterprise zone' tax incentives in Hillsboro, Oregon.","dealScan":"https://www.adobe.com/corporate-responsibility/sustainability/data-centers.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"adobe.com","srcUrls":["https://www.adobe.com/corporate-responsibility/sustainability/data-centers.html"]},{"id":"6b1bf0b9e093","cid":"6b1bf0b9e093","canon":1,"dups":2,"ftype":"data_center","name":"Aligned Data Center PDX01","city":"HILLSBORO","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":72,"pc":"Grid","pconf":"High","pquote":"The site is situated on a 27-acre campus in a low-seismic-risk zone of the Pacific Northwest and benefits from abundant access to renewable hydro- and wind-based electricity supplied by the local utility.","uquote":"Last month, it announced the successful use of its software by utility Portland General Electric (PGE) to bring 80 megawatts of data center load online next year in Hillsboro, Oregon.","uscan":"https://www.canarymedia.com/articles/data-centers/oregon-utility-tries-out-a-faster-cheaper-way-to-power-data-centers","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"BlackRock, MGX, Macquarie Asset Management","tenant":"Hyperscale, Enterprise, Cloud","ay":2023,"oy":2026,"contro":"Community opposition and protests regarding data center expansion, tax breaks, water usage, and energy demand in Hillsboro. A moratorium on data center tax breaks was passed, and the City of Hillsboro has paused new data center applications.","deal":"Aligned Data Centers is being sold to BlackRock and MGX in a $40 billion deal. Partnership with Calibrant Energy to deploy a 31 MW / 62 MWh battery energy storage system, planned to be operational in 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"canarymedia.com","srcUrls":["https://www.canarymedia.com/articles/data-centers/oregon-utility-tries-out-a-faster-cheaper-way-to-power-data-centers"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"840dd6db1d16","cid":"6b1bf0b9e093","canon":0,"dups":2,"ftype":"data_center","name":"Aligned Data Center PDX01","city":"HILLSBORO","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":72,"pc":"Grid","pconf":"High","pquote":"The site is situated on a 27-acre campus in a low-seismic-risk zone of the Pacific Northwest and benefits from abundant access to renewable hydro- and wind-based electricity supplied by the local utility.","uquote":"By partnering with the local utility, Portland General Electric (PGE), and on-site energy solutions provider, Calibrant Energy, we developed a Battery Energy Storage System (BESS) that will benefit both our customers and the local energy ecosystem.","uscan":"https://aligneddc.com/blog/solving-for-speed-to-power-at-scale/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"BlackRock, MGX, AI Infrastructure Partnership (AIP)","ay":2023,"oy":2026,"contro":"Community opposition regarding water usage, rising power rates, environmental impacts, and property tax abatements. Grid constraints also noted.","deal":"Partnership with Calibrant Energy for a 31 MW, 62 MWh Battery Energy Storage System (BESS) to accelerate facility online date (announced Oct 2025).","dealScan":"https://www.datacenterknowledge.com/energy-power-supply/aligned-to-deploy-first-of-its-kind-data-center-battery-storage-project","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aligneddc.com;datacenterknowledge.com","srcUrls":["https://aligneddc.com/blog/solving-for-speed-to-power-at-scale/","https://www.datacenterknowledge.com/energy-power-supply/aligned-to-deploy-first-of-its-kind-data-center-battery-storage-project"],"band":"50-100 MW"},{"id":"786077d95c47","cid":"786077d95c47","canon":1,"dups":2,"ftype":"data_center","name":"Aligned Data Centers (PDX) PropCo, LLC","city":"HILLSBORO","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":108,"pc":"Grid","pconf":"High","pquote":"Aligned's Hillsboro campus has access to abundant power, with 120 MW of utility capacity and utility rates at a fraction of the cost per kWh of comparable West Coast data center markets, lowering customers' total cost of ownership. The site is situated on a 27-acre campus in a low-seismic-risk zone of the Pacific Northwest and benefits from abundant access to renewable hydro- and wind-based electricity supplied by the local utility.","uconf":"High","uquote":"By partnering with the local utility, Portland General Electric (PGE), and on-site energy solutions provider, Calibrant Energy, we developed a Battery Energy Storage System (BESS) that will benefit both our customers and the local energy ecosystem.","uscan":"https://aligneddc.com/blog/solving-for-speed-to-power-at-scale/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"BlackRock, MGX, AI Infrastructure Partnership","ay":2023,"oy":2026,"contro":"Grid constraints threatened to delay delivery; state-imposed moratorium on Enterprise Zone applications for data centers.","controScan":"https://aligneddc.com/blog/solving-for-speed-to-power-at-scale/","deal":"Partnership with Calibrant Energy for a 31 MW, 62 MWh Battery Energy Storage System (BESS) to be operational in 2026.","dealScan":"https://www.datacenterknowledge.com/energy-power-supply/aligned-to-deploy-first-of-its-kind-data-center-battery-storage-project","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aligneddc.com;datacenterknowledge.com","srcUrls":["https://aligneddc.com/blog/solving-for-speed-to-power-at-scale/","https://www.datacenterknowledge.com/energy-power-supply/aligned-to-deploy-first-of-its-kind-data-center-battery-storage-project"],"band":"100-250 MW"},{"id":"a4d1e804aa21","cid":"786077d95c47","canon":0,"dups":2,"ftype":"data_center","name":"Aligned Data Centers (PDX) PropCo, LLC","city":"HILLSBORO","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":108,"pc":"Grid","pconf":"High","pquote":"Aligned's Hillsboro campus has access to abundant power, with 120 MW of utility capacity and utility rates at a fraction of the cost per kWh of comparable West Coast data center markets, lowering customers' total cost of ownership.","pscan":"https://aligneddc.com/press-release/aligned-data-centers-expands-into-pacific-northwest-with-new-hillsboro-campus-to-support-hyperscale-large-enterprise-demand/","uconf":"High","uquote":"Last month, it announced the successful use of its software by utility Portland General Electric (PGE) to bring 80 megawatts of data center load online next year in Hillsboro, Oregon.","uscan":"https://www.canarymedia.com/articles/data-centers/oregon-utility-tries-out-a-faster-cheaper-way-to-power-data-centers","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"AI Infrastructure Partnership (AIP), MGX, BlackRock's Global Infrastructure Partners (GIP)","ay":2023,"oy":2026,"contro":"Community opposition and scrutiny over tax breaks; statewide moratorium on data center tax breaks effective June 2026.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"Partnership with Calibrant Energy for a 31 MW, 62 MWh Battery Energy Storage System (BESS) to accelerate interconnection, planned operational in 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"aligneddc.com;canarymedia.com;hillsboronewstimes.com","srcUrls":["https://aligneddc.com/press-release/aligned-data-centers-expands-into-pacific-northwest-with-new-hillsboro-campus-to-support-hyperscale-large-enterprise-demand/","https://www.canarymedia.com/articles/data-centers/oregon-utility-tries-out-a-faster-cheaper-way-to-power-data-centers","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"100-250 MW"},{"id":"5e836b867f78","cid":"5e836b867f78","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Boardman","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Amazon.com alleges that a Berkshire Hathaway-owned utility in Oregon is failing to provide sufficient power for four new data center facilities, highlighting the strain rapid expansion of technology facilities is putting on the electric grid.","pscan":"https://subscriber.politicopro.com/article/eenews/2025/11/05/amazon-says-berkshire-utility-failing-to-power-4-data-centers-00635145","uconf":"High","uquote":"Amazon's purchase of the Oregon solar project comes after the tech giant and e-commerce behemoth filed a complaint with Oregon state regulators against PacificCorp last year, claiming the utility was not providing it with adequate electric power for its data centers.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2008,"oy":2011,"contro":"Lawsuit and settlement over nitrate groundwater pollution; local opposition regarding water usage and environmental impact; investigation into local officials' conduct related to tax incentives.","controScan":"https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","deal":"Amazon agreed to pay $20.5 million to settle a lawsuit over nitrate-contaminated groundwater in Morrow County (April 1, 2026).","dealScan":"https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"subscriber.politicopro.com;kgw.com;opb.org","srcUrls":["https://subscriber.politicopro.com/article/eenews/2025/11/05/amazon-says-berkshire-utility-failing-to-power-4-data-centers-00635145","https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70","https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/"],"lflag":"source_quality_reclassified"},{"id":"f0f873cf380b","cid":"f0f873cf380b","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Boardman","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"A 10-megawatt power substation is being built adjacent to the new data center in Boardman, the Oregonian reports. The paper said a $320,000 Oregon Department of Transportation grant was awarded to the port to connect the data center to local utilities.","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2018,"oy":2018,"contro":"Morrow County officials faced ethics complaints and a civil complaint from the Oregon Department of Justice regarding tax breaks and a fiber-optic provider related to Amazon's data centers. There have also been concerns about nitrate pollution and community pushback on energy and water consumption.","deal":"Amazon's property tax breaks in Morrow County were worth nearly $70 million in 2024 and are projected to cumulatively exceed $1 billion. Amazon also secured an $83 million deal in January 2026 to acquire the Sunstone solar power project in Oregon to power its data centers.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"lagrandeobserver.com","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"],"lflag":"merged_duplicate"},{"id":"305784f5fe99","cid":"305784f5fe99","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Boardman","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power....AWS data centers in Oregon are already powered with at least 95% renewable energy. Amazon's energy supply from our utilities, combined with our renewable energy procurement across the United States, has enabled several AWS data center regions—including Oregon—to be powered with at least 95% renewable energy.","pscan":"https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2008,"oy":2008,"contro":"Morrow County officials faced ethics charges and a lawsuit for profiting from land deals and tax breaks for Amazon data centers. Amazon also faced fines from the Oregon Department of Environmental Quality for air and water quality violations and settled a lawsuit over nitrate pollution.","deal":"Amazon received $1 billion in tax breaks over 15 years from Morrow County, the port, and the city of Boardman in May 2023. Amazon also acquired the Sunstone solar power project near Pendleton, Oregon, for $83 million in January 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aboutamazon.com;lagrandeobserver.com","srcUrls":["https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"],"lflag":"merged_duplicate"},{"id":"523a087d6825","cid":"305784f5fe99","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Boardman","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston. It said that enables the company to choose some renewable power for its installations.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2008,"oy":2011,"contro":"Environmental concerns regarding carbon emissions and nitrate-contaminated groundwater, as well as alleged conflicts of interest and improper profit by local officials related to tax incentives and land deals for Amazon's data centers.","controScan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","deal":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved in January 2026. Amazon paid $20.5 million to settle a lawsuit over nitrate-contaminated groundwater in Morrow County, reported in March/April 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"lagrandeobserver.com","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"fc327ce07135","cid":"4c8d022ddf82","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Boardman","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston. It said that enables the company to choose some renewable power for its installations.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2008,"oy":2011,"contro":"Lawsuit alleging local officials profited from a broadband deal related to Amazon's data centers; general opposition regarding water/energy consumption and tax breaks.","controScan":"https://www.opb.org/article/2026/03/04/oregon-attorney-general-lawsuit-morrow-county-broadband-deal/","deal":"Port of Morrow commissioners approved tax breaks for Amazon with an estimated value of $1 billion (May 2023).","dealScan":"https://www.commondreams.org/news/amazon-oregon","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"lagrandeobserver.com;commondreams.org;opb.org","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.commondreams.org/news/amazon-oregon","https://www.opb.org/article/2026/03/04/oregon-attorney-general-lawsuit-morrow-county-broadband-deal/"]},{"id":"4c8d022ddf82","cid":"4c8d022ddf82","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Boardman","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"After a dozen years operating data centers in Eastern Oregon, Amazon says it has a deal to buy renewable energy to help power them. The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2008,"oy":2011,"contro":"Lawsuit and settlement over nitrate-contaminated groundwater; fine for environmental violations; controversy over local officials profiting from broadband deal related to data center boom.","deal":"Acquisition of Sunstone solar power project for $83 million (January 2026); renewable energy power deal with Umatilla Electric Cooperative (April 2023); $20.5 million settlement for groundwater contamination (March 2026).","dealScan":"https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"lagrandeobserver.com;opb.org","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"fb962a75ca38","cid":"fb962a75ca38","canon":1,"dups":2,"ftype":"data_center","name":"Amazon","city":"Hermiston","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration. Amazon says its calculations show its Oregon data centers already are “powered with at least 95% renewable energy.” The company maintains that large, clean-energy projects it has built in California and Arizona are compensating for the rapid increase in the carbon impact of its operations near Boardman and Hermiston. “We're adding renewable energy to the same grid where we operate,” said Charley Daitch, director of energy and water for Amazon Web Services, the company's data center business.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","contro":"Concerns over water usage, carbon emissions, tax subsidies, and a $20.5 million settlement for nitrate pollution in Morrow and Umatilla counties.","deal":"25-year water service agreement with Hermiston City Council (Feb 24, 2025); AWS paying $18 million for Aquifer Recovery & Storage project (Feb 24, 2025); $20.5 million settlement for nitrate pollution allegations (March 31, 2026).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"lagrandeobserver.com","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"60f5fe6df943","cid":"60f5fe6df943","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Hermiston","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"HES buys its wholesale power from the Bonneville Power Administration (BPA) and in turn sells it to its customers in Hermiston.","uconf":"High","uquote":"Welcome to your locally owned municipal electric utility owned by the City of Hermiston doing business as Hermiston Energy Services (HES).","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2012,"contro":"Environmental violations, water supply concerns, utility power dispute.","controScan":"https://www.youtube.com/watch?v=y-2_8-z_1_o","deal":"25-year water service agreement with City of Hermiston (approved Feb 24, 2025); AWS to provide $8 million for RV park construction (Oct 13, 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"hermiston.or.us;youtube.com","lflag":"online_before_announced source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility,merged_duplicate","pscan":"https://www.hermiston.or.us/hes/page/power-supply","uscan":"https://www.hermiston.or.us/hes","dealScan":"https://www.hermiston.or.us/hes/page/hermiston-water-service-agreement-aws-faq","srcUrls":["https://www.hermiston.or.us/hes/page/power-supply","https://www.hermiston.or.us/hes","https://www.hermiston.or.us/hes/page/hermiston-water-service-agreement-aws-faq","https://www.youtube.com/watch?v=y-2_8-z_1_o"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"64cd4015bbf0","cid":"fb962a75ca38","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Hermiston","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The rural area's power utility became one of the state's big polluters beginning in 2018. By 2020 its carbon emissions had doubled. In 2021, it doubled again. The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually... because of one of those customers: Amazon.","pscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","uconf":"High","uquote":"AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the region.","uscan":"https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2012,"contro":"Concerns over water usage and energy impact; lobbying against clean energy bill; community opposition to land annexation for data centers.","deal":"2025 water service agreement with City of Hermiston for $18 million, and 2019 15-year tax break for up to $40 million.","dealScan":"https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"governing.com;assets.aboutamazon.com;hermistonherald.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/"]},{"id":"934b8058751a","cid":"934b8058751a","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Umatilla","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties. This agreement creates an innovative solution that safely and reliably powers data centers in the region and keeps Amazon on a path to achieving 100 percent renewable energy by 2025.","uconf":"High","uquote":"Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","ay":2010,"oy":2012,"contro":"Nitrate groundwater contamination lawsuit and community opposition to proposed nuclear reactors.","deal":"$20.5M settlement with Amazon Data Services Inc. over nitrate contamination (March 31, 2026). Power Purchase Agreement (PPA) with Avangrid for 57 MWdc (41 MWac) Oregon Trail Solar facility, expected operations 2027 (October 1, 2025).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6a1600fd18ea","cid":"6a1600fd18ea","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Umatilla","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory. In rural Oregon, a small electric utility called Umatilla Electric Cooperative used to rely mainly on clean hydropower.... But when large data centers came to the area—built by companies like Amazon—demand for power soared, and the utility had to find sources other than hydro. Over the past decade, the utility's carbon emissions per megawatt hour have increased by 543%. The agreement allows Amazon to take on the responsibility of selecting the energy supply that powers its data center operations, including from renewable energy resources.","uconf":"High","uquote":"Recently, Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2011,"oy":2011,"contro":"Nitrate contamination lawsuit, opposition to nuclear power plans, lobbying against clean energy bill.","deal":"Agreement with Umatilla Electric Cooperative for energy supply (April 24, 2023); $20.5 million settlement for nitrate pollution lawsuit (April 1, 2026); Purchase of over 200,000 MWh/year from 90 MW wind farm (February 22, 2024); Partnership with Energy Northwest for nuclear reactors (October 2024); Strategic Investment Program and Long Term Rural Enterprise agreements for tax breaks.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"5387b9189b4a","cid":"6a1600fd18ea","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Umatilla","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Data centers need huge volumes of electricity to power and cool their computers, and the regional utility, the Umatilla Electric Cooperative, now relies primarily on power generated by fossil fuels to meet Amazon's needs.","pscan":"https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/","uconf":"High","uquote":"Data centers need huge volumes of electricity to power and cool their computers, and the regional utility, the Umatilla Electric Cooperative, now relies primarily on power generated by fossil fuels to meet Amazon's needs.","uscan":"https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2012,"oy":2012,"contro":"Allegations of nitrate groundwater contamination and opposition to nuclear reactor plans.","deal":"$20.5M settlement with Amazon Data Services Inc. over nitrate contamination, filed March 31, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bendbulletin.com","srcUrls":["https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/"],"lflag":"source_quality_reclassified"},{"id":"91a0d61c6f9c","cid":"305784f5fe99","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Boardman","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Amazon says its calculations show its Oregon data centers already are “powered with at least 95% renewable energy.” The company maintains that large, clean-energy projects it has built in California and Arizona are compensating for the rapid increase in the carbon impact of its operations near Boardman and Hermiston. “We're adding renewable energy to the same grid where we operate,” said Charley Daitch, director of energy and water for Amazon Web Services, the company's data center business.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon Data Services","tenant":"Amazon","ay":2008,"oy":2011,"contro":"Amazon's data centers in Boardman have been associated with environmental violations, including fines for air and water quality issues, and a $20.5 million settlement for nitrate pollution in groundwater. Additionally, there have been controversies surrounding tax incentives and alleged 'unjust enrichment' involving former county officials.","controScan":"https://www.youtube.com/watch?v=iJv19jwGtlY","deal":"Amazon received court approval to acquire the Sunstone solar power project near Pendleton, Oregon, for $83 million (January 2026). In May, Amazon won an additional set of tax breaks, valued at $1 billion over 15 years, from Morrow County, the port and city of Boardman.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"lagrandeobserver.com;youtube.com","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.youtube.com/watch?v=iJv19jwGtlY"]},{"id":"cf379625a728","cid":"cf379625a728","canon":1,"dups":1,"ftype":"data_center","name":"Amazon - PDX80","city":"HERMISTON","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","uquote":"Data centers need huge volumes of electricity to power and cool their computers, and the regional utility, the Umatilla Electric Cooperative, now relies primarily on power generated by fossil fuels to meet Amazon's needs.","uscan":"https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","contro":"Amazon is one of 17 total defendants in a lawsuit filed in U.S. District Court in February 2024 by several Morrow County residents who cannot drink their nitrate-contaminated water, with Amazon agreeing to pay $20.5 million to settle.","deal":"A 25-year water service agreement between the City of Hermiston and Amazon Web Services was approved on February 24, 2025, with AWS covering all construction costs.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;bendbulletin.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/"]},{"id":"5852a0110cf0","cid":"e22df727d6a2","canon":0,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Boardman","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"A 10-megawatt power substation is being built adjacent to the new data center in Boardman, the Oregonian reports. The paper said a $320,000 Oregon Department of Transportation grant was awarded to the port to connect the data center to local utilities.","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2018,"oy":2018,"contro":"Lawsuit and settlement over nitrate pollution in local groundwater.","deal":"$20.5 million settlement for nitrate pollution lawsuit (recent)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c04b491ab9dd","cid":"e22df727d6a2","canon":0,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Boardman","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2008,"contro":"Amazon agreed to pay $20.5 million to settle a lawsuit claiming its data center operations contributed to nitrate pollution in local groundwater, and was fined over $10,000 by the Oregon Department of Environmental Quality for environmental violations.","controScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","deal":"Morrow County approved a deal worth about $1 billion in tax breaks for Amazon's data centers in May 2023.","dealScan":"https://www.opb.org/article/2023/05/19/amazon-data-center-oregon-morrow-county/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"opb.org;tricitiesbusinessnews.com","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.opb.org/article/2023/05/19/amazon-data-center-oregon-morrow-county/","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities"]},{"id":"88ddb281d73c","cid":"07db4c961608","canon":0,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Hermiston","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.","pscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uconf":"High","uquote":"Grid Operator. Bonneville Power Administration.","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2012,"contro":"Amazon Data Services filed a complaint with the Oregon Public Utility Commission against PacifiCorp for failing to provide adequate electric service. Additionally, a $20.5 million settlement was reached over allegations of nitrate groundwater contamination from ADS's data center operations in Morrow and Umatilla counties.","controScan":"https://elkhornmediagroup.com/amazon-files-complain-with-puc-alleging-pacific-power-has-not-met-its-obligations/","deal":"A $20.5 million settlement was reached with Amazon Data Services, Inc. over alleged nitrate groundwater contamination (March 31, 2026). Amazon also received court approval for an $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon (January 26, 2026).","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"opb.org;elkhornmediagroup.com","lflag":"online_before_announced operational_null_capacity nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","https://elkhornmediagroup.com/amazon-files-complain-with-puc-alleging-pacific-power-has-not-met-its-obligations/"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"e22df727d6a2","cid":"e22df727d6a2","canon":1,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Boardman","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2008,"contro":"Lawsuit alleging 'unjust enrichment' by local officials tied to Amazon's tax incentives and fiber contracts; fines for air and water quality violations; $20.5 million settlement over nitrate pollution.","controScan":"https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute","deal":"Renewable energy supply deal with Umatilla Electric Cooperative (April 2023); $83 million acquisition of Sunstone solar power project (January 2026); $20.5 million settlement for groundwater contamination (March 2026).","dealScan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"lagrandeobserver.com;govtech.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute"]},{"id":"1c770326aaf5","cid":"e22df727d6a2","canon":0,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"BOARDMAN","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","pscan":"https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","uconf":"High","uquote":"Amazon lodged a complaint last week with the Public Utility Commission of Oregon alleging that Portland-based PacifiCorp breached obligations that date back to 2021 to provide sufficient power for the projects.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2008,"oy":2011,"contro":"Amazon Data Services, Inc. has faced civil penalties for environmental violations, including failing to collect required monitoring data for a wastewater permit and beginning construction of a wastewater pond without DEQ approval. Additionally, there is an ongoing lawsuit by the Oregon Attorney General alleging that former Morrow County officials improperly profited from the sale of a broadband company, Windwave Communications, which provided services to Amazon's data centers, while negotiating tax breaks. Amazon also lodged a complaint against PacifiCorp for failing to provide sufficient power for its data centers.","controScan":"https://www.oregon.gov/deq/nr/202508amazon.pdf","deal":"Morrow County officials approved a deal for Amazon to pay almost $40 million in fees over 15 years on five new data centers, in exchange for property tax exemptions totaling over $1 billion. Amazon also secured an $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, after the original developer filed for bankruptcy.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"eastoregonian.com;oregon.gov","lflag":"operational_null_capacity","srcUrls":["https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","https://www.oregon.gov/deq/nr/202508amazon.pdf"]},{"id":"afbd517bdbca","cid":"6b228a754c37","canon":0,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Umatilla","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon's energy supply from our utilities, combined with our renewable energy procurement across the United States, has enabled several AWS data center Regions—including its US West (Oregon) Region—to be powered with at least 95% renewable energy.","pscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","uscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2011,"oy":2012,"contro":"Class-action lawsuit and $20.5 million settlement over alleged nitrate groundwater contamination.","deal":"$20.5 million settlement for nitrate contamination (March 31, 2026); Agreement with Umatilla Electric Cooperative for energy supply (April 4, 2023).","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"aboutamazon.com","lflag":"operational_null_capacity","srcUrls":["https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy"]},{"id":"0d0e024a8f72","cid":"07db4c961608","canon":0,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"HERMISTON","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.","pscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uconf":"High","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2013,"contro":"Environmental violations and settlement; dispute with PacifiCorp over power supply.","deal":"25-year water service agreement with City of Hermiston (February 24, 2025) for $18 million; $20.5 million settlement for groundwater contamination (March 31, 2026).","dealScan":"https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"opb.org;hermistonherald.com","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"bd7b3e0b1500","cid":"07db4c961608","canon":0,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"HERMISTON","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.","pscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uconf":"High","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years.","uscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2012,"contro":"Local backlash over environmental and public health impacts due to water usage and nitrate pollution; Amazon fined by Oregon Department of Environmental Quality and settled allegations for $20.5 million.","deal":"Hermiston City Council approved a 25-year water service agreement with Amazon Data Services (Feb 2025); Amazon acquired the Sunstone solar power project for $83 million (Jan 2026); Amazon signed a Power Purchase Agreement (PPA) with Avangrid for the Oregon Trail Solar facility (Oct 2025).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"opb.org","lflag":"online_before_announced operational_null_capacity nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"fda91e80fd6a","cid":"6b228a754c37","canon":0,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"UMATILLA","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"All of the electricity consumed by Amazon's operations, including its data centers, was matched with 100% renewable energy in 2023. [...] Recently, AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the region. The agreement allows Amazon to assume the responsibility of selecting the energy supply that powers its data center operations, including from renewable energy resources.","pscan":"https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","uconf":"High","uquote":"Recently, AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the region.","uscan":"https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2011,"oy":2011,"contro":"Nitrate contamination of groundwater in Morrow and Umatilla counties linked to data center operations.","deal":"$20.5 million settlement over nitrate groundwater contamination (March 31, 2026)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"assets.aboutamazon.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf"]},{"id":"7a1ca5d45f79","cid":"e22df727d6a2","canon":0,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Boardman","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon Data Services, Inc. operates PDX-4, a data center (electronic data processing center), that houses computer systems and associated components, such as telecommunications and data storage systems. The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). A 10-megawatt power substation is being built adjacent to the new data center in Boardman, the Oregonian reports. The paper said a $320,000 Oregon Department of Transportation grant was awarded to the port to connect the data center to local utilities.","pscan":"https://www.datacenterknowledge.com/hyperscalers/amazon-building-large-data-center-in-oregon","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2008,"oy":2013,"contro":"Lawsuit over nitrate-contaminated water, environmental violations, community opposition regarding water usage and airport impact.","deal":"$20.5 million settlement for nitrate contamination (April 1, 2026); $83 million acquisition of Sunstone solar power project (January 26, 2026).","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;lagrandeobserver.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/amazon-building-large-data-center-in-oregon","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"6b228a754c37","cid":"6b228a754c37","canon":1,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Umatilla","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Recently, Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties. This agreement creates an innovative solution that safely and reliably powers data centers in the region and keeps Amazon on a path to achieving 100 percent renewable energy by 2025.","uconf":"High","uquote":"Recently, Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2011,"contro":"Settlement reached over alleged nitrate groundwater contamination; opposition to tax breaks; lobbying against clean energy bill; dispute with PacifiCorp over power supply; opposition to nuclear reactor plans.","deal":"Agreement with Umatilla Electric Cooperative (April 2023); acquisition of Sunstone solar project for $83 million (January 2026); long-term tax abatement deals with local governments.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"318b2da0d400","cid":"07db4c961608","canon":0,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"HERMISTON","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"AWS data centers in Oregon are already powered with at least 95% renewable energy. Amazon's energy supply from our utilities, combined with our renewable energy procurement across the United States, has enabled several AWS data center regions—including Oregon—to be powered with at least 95% renewable energy.","pscan":"https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","uscan":"https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2022,"contro":"Oregon Department of Environmental Quality fined Amazon Data Services, Inc. for failing to collect required monitoring data, constructing a wastewater pond without approval, and violating engine operating hours at its PDX-80 and PDX-109 facilities in Hermiston.","controScan":"https://www.oregon.gov/deq/nr/202508amazon.pdf","deal":"Long-term tax abatement approved by Hermiston City Council on Sept. 26, 2022, for new campuses.","dealScan":"https://hermistonherald.com/2022/09/29/hermiston-gives-amazon-tax-deal-to-build-new-data-centers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"aboutamazon.com;hermistonherald.com;oregon.gov","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","https://hermistonherald.com/2022/09/29/hermiston-gives-amazon-tax-deal-to-build-new-data-centers/","https://www.oregon.gov/deq/nr/202508amazon.pdf"]},{"id":"153c8cdf8715","cid":"e22df727d6a2","canon":0,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"BOARDMAN","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon says it has a deal to buy renewable energy to help power them. The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2008,"oy":2011,"contro":"Community opposition regarding water and air pollution, potential harm to airport operations, and a $20.5 million settlement for nitrate pollution. Additionally, a civil complaint was filed by the Oregon Department of Justice alleging public officials profited from Amazon's tax breaks.","deal":"Oregon Department of Transportation grant of $320,000 (2008); renewable energy procurement deal with Umatilla Electric Cooperative (April 11, 2023); $20.5 million settlement for nitrate pollution lawsuit (recent, prior to April 14, 2026).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"lagrandeobserver.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"ae878a5f4252","cid":"6b228a754c37","canon":0,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Umatilla","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Data centers need huge volumes of electricity to power and cool their computers, and the regional utility, the Umatilla Electric Cooperative, now relies primarily on power generated by fossil fuels to meet Amazon's needs.","pscan":"https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/","uconf":"High","uquote":"Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2012,"contro":"Settlement over alleged nitrate groundwater contamination.","deal":"$20.5 million settlement with Amazon Data Services Inc. over nitrate groundwater contamination, announced March 31, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bendbulletin.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/"]},{"id":"8839f8f5c025","cid":"6b228a754c37","canon":0,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Umatilla","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Data centers need huge volumes of electricity to power and cool their computers, and the regional utility, the Umatilla Electric Cooperative, now relies primarily on power generated by fossil fuels to meet Amazon's needs.","pscan":"https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region","uscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","oy":2013,"contro":"Class-action lawsuit and settlement over alleged nitrate groundwater contamination.","deal":"$20.5 million settlement with Amazon Data Services Inc. over alleged nitrate groundwater contamination, announced March 31, 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"bendbulletin.com;aboutamazon.com","lflag":"operational_null_capacity","srcUrls":["https://bendbulletin.com/2024/02/09/amazon-will-start-buying-clean-power-for-oregon-data-centers/","https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy"]},{"id":"c20d136a888b","cid":"e22df727d6a2","canon":0,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"BOARDMAN","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","oy":2013,"contro":"Oregon Department of Justice filed a civil complaint alleging that several Morrow County officials abused their authority and breached public trust in deals related to Amazon's data centers, and Amazon's data centers have been linked to a worsening nitrate crisis in Oregon.","deal":"Amazon received court approval to acquire the Sunstone solar power project near Pendleton, Oregon, for an $83 million all-cash bid in January 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f70cc67a0d3f","cid":"e22df727d6a2","canon":0,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Boardman","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"After a dozen years operating data centers in Eastern Oregon, Amazon says it has a deal to buy renewable energy to help power them. The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston. It said that enables the company to choose some renewable power for its installations.... The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).","pscan":"https://baxtel.com/data-center/amazon-bombing-range-pdx-178","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2018,"oy":2018,"contro":"Amazon will pay $20.5 million to settle a lawsuit claiming its data centers contributed to nitrate pollution in local groundwater in Morrow County. Additionally, Amazon was fined $10,000 for environmental violations at data centers in Hermiston and Boardman by the Oregon Department of Environmental Quality for air and water quality risks.","deal":"Amazon will pay $20.5 million to settle a lawsuit over nitrate-contaminated groundwater in Morrow County (March 31, 2026 / April 1, 2026).","dealScan":"https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;kgw.com","lflag":"operational_null_capacity citation_artifact_removed","srcUrls":["https://baxtel.com/data-center/amazon-bombing-range-pdx-178","https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70"]},{"id":"1eb758d4792f","cid":"e22df727d6a2","canon":0,"dups":9,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"BOARDMAN","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon says it has been pursuing renewable energy for its Oregon data centers for some time but has only now been able to secure contracts to provide it. The company says its wholesale power contracts prevent it from saying how much renewable energy it's buying. So the impact of its new deal with Umatilla Electric won't be clear until next year, when the utility discloses updated information about its 2023 energy mix to Oregon regulators.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2008,"oy":2022,"contro":"Lawsuit over nitrate-contaminated water and environmental violations.","controScan":"https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70","deal":"$20.5 million settlement for nitrate contamination lawsuit (April 2026)","dealScan":"https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"lagrandeobserver.com;kgw.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70"]},{"id":"07db4c961608","cid":"07db4c961608","canon":1,"dups":5,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Hermiston","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.... That might be the situation in Hermiston, which already has an enormous draw on the city's electrical grid to satisfy the needs of the local computer data center. It sips up lots of watts.","pscan":"https://hermistonherald.com/2024/04/25/umatilla-county-data-centers-say-please-pass-the-megawatts/","uconf":"High","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years.","uscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2012,"contro":"Tax break opposition, water quality violations, and a $20.5 million settlement over alleged nitrate groundwater contamination.","deal":"Long-term tax abatement approved Sept 26, 2022, including annual fees and a $5 million Community Development Contribution. A 25-year water service agreement approved Feb 24, 2025, with AWS covering construction costs. An $8 million contribution from AWS for an RV park project. A $20.5 million settlement reached March 31, 2026, over alleged nitrate groundwater contamination.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"hermistonherald.com;opb.org","lflag":"online_before_announced operational_null_capacity citation_artifact_removed source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://hermistonherald.com/2024/04/25/umatilla-county-data-centers-say-please-pass-the-megawatts/","https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"7da3f3b0d2bc","cid":"7da3f3b0d2bc","canon":1,"dups":2,"ftype":"data_center","name":"Amazon PDX202","city":"BOARDMAN","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"After a dozen years operating data centers in Eastern Oregon, Amazon says it has a deal to buy renewable energy to help power them. The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2024,"oy":2023,"contro":"Morrow County officials faced ethics charges for potential conflict of interest related to tax breaks and land sales for Amazon data centers, including PDX202. Amazon also settled a lawsuit for nitrate pollution and was fined for air and water quality violations.","controScan":"https://www.governing.com/politics/oregon-county-officials-benefited-personally-from-amazon-deal","deal":"Agreement for services to the PDX 202 site (prior to May 2023).","dealScan":"https://www.portofmorrow.com/sites/portofmorrow.com/files/Files/commissioner-meetings/5.10.23%20Regular%20Commission%20Meeting%20Minutes.pdf","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"lagrandeobserver.com;portofmorrow.com;governing.com","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.portofmorrow.com/sites/portofmorrow.com/files/Files/commissioner-meetings/5.10.23%20Regular%20Commission%20Meeting%20Minutes.pdf","https://www.governing.com/politics/oregon-county-officials-benefited-personally-from-amazon-deal"]},{"id":"b84b8be6eadd","cid":"7da3f3b0d2bc","canon":0,"dups":2,"ftype":"data_center","name":"Amazon PDX202","city":"BOARDMAN","county":"Morrow County","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-pdx202-83b1f935","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2024,"contro":"Morrow County officials faced ethics charges and a lawsuit for allegedly profiting from deals with Amazon data centers, including undervalued land sales and a broadband company serving Amazon.","controScan":"https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute","deal":"Amazon started working with Umatilla Electric Cooperative to choose electricity supply for its data center operations near Boardman and Hermiston (announced April 2023).","dealScan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"interconnection.fyi;lagrandeobserver.com;govtech.com","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-pdx202-83b1f935","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute"]},{"id":"3a563d2f0a6d","cid":"3a563d2f0a6d","canon":1,"dups":3,"ftype":"data_center","name":"Amazon Web Services PDX-071","city":"Hermiston","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-web-services-pdx-071-585ed6ff","uconf":"High","uquote":"Grid Operator: PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-web-services-pdx-071-585ed6ff","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon.com","tenant":"Amazon Web Services","ay":2025,"oy":2025,"contro":"Community concerns regarding water usage for data centers in Hermiston.","controScan":"https://hermistonherald.com/2025/08/26/hermiston-takes-steps-to-accommodate-massive-data-centers/","deal":"25-year water service agreement with Hermiston City Council (Feb 24, 2025); Amazon's $83 million acquisition of Sunstone solar power project (Jan 2026).","dealScan":"https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"interconnection.fyi;hermistonherald.com","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-web-services-pdx-071-585ed6ff","https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","https://hermistonherald.com/2025/08/26/hermiston-takes-steps-to-accommodate-massive-data-centers/"]},{"id":"bf502a6a90aa","cid":"3a563d2f0a6d","canon":0,"dups":3,"ftype":"data_center","name":"Amazon Web Services PDX-071","city":"Hermiston","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.","pscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uconf":"High","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services","uscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon.com","tenant":"Amazon Web Services","contro":"Amazon filed a complaint with Oregon state regulators against PacificCorp claiming inadequate electric power for its data centers.","deal":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved in January 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"opb.org","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"e9b91742263e","cid":"3a563d2f0a6d","canon":0,"dups":3,"ftype":"data_center","name":"Amazon Web Services PDX-071","city":"Hermiston","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. PacifiCorp.","uquote":"Grid Operator. PacifiCorp.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","deal":"Water service agreement with City of Hermiston, approved Feb 24, 2025, with AWS funding an $18 million project.","dealScan":"https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hermistonherald.com","lflag":"operational_null_capacity","srcUrls":["https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/"]},{"id":"f180e001b3fc","cid":"f180e001b3fc","canon":1,"dups":1,"ftype":"data_center","name":"Apple","city":"Prineville","county":"Crook","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Oregon's Direct Access provision allows the direct wholesale purchase of renewable energy. With Direct Access, Apple can use its ample wind capacity and the firming capability of the hydro facility to opt out of reliance on the grid mix.","pscan":"https://www.utilitydive.com/news/apple-buys-hydro-plant-near-data-center/251752/","uconf":"High","uquote":"On the power front, the Bonneville Power Administration and Pacific Power announced plans to accelerate the completion of the Ponderosa substation in Prineville, which will add 400 megawatts of electric capacity.","uscan":"https://www.datacenterknowledge.com/modular-data-centers/apple-expansion-boosts-prineville-data-center-ecosystem","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Apple","spon":"Apple","tenant":"Apple","ay":2012,"oy":2013,"contro":"Central assessment tax uncertainty, housing shortage, electricity shortfall, water usage concerns.","deal":"200 MW PPA for Montague Wind Power Project (commercial operation Oct 24, 2019); 56 MW PPA from Avangrid Renewables (Solar Star Oregon II); Acquisition of 3-5 MW 45 Mile Hydroelectric Plant (transferred Dec 2013); $8.7 million funding for Aquifer Storage and Recovery system.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"utilitydive.com;datacenterknowledge.com","srcUrls":["https://www.utilitydive.com/news/apple-buys-hydro-plant-near-data-center/251752/","https://www.datacenterknowledge.com/modular-data-centers/apple-expansion-boosts-prineville-data-center-ecosystem"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration","lflag":"nonrate_utility_link_removed nonretail_eia861_not_rate_utility"},{"id":"0337ed929fae","cid":"0337ed929fae","canon":1,"dups":1,"ftype":"data_center","name":"Apple Data Center","city":"Prineville","county":"Crook County","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":270,"pc":"Grid","pconf":"High","pquote":"At Prineville, we have access to enough local renewable energy sources to completely meet the needs of the facility. To achieve this goal, we're working with two local utilities as well as a number of renewable energy generation providers to develop and purchase power from local wind, solar, and micro-hydro resources.","uquote":"On the power front, the Bonneville Power Administration and Pacific Power announced plans to accelerate the completion of the Ponderosa substation in Prineville, which will add 400 megawatts of electric capacity.","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Apple","spon":"Apple","tenant":"Apple","ay":2012,"oy":2013,"contro":"Controversy over central assessment tax, water usage, electricity crunch, and housing shortage due to construction.","controScan":"https://www.datacenterknowledge.com/business/report-flood-of-data-center-builders-causes-housing-shortage-in-prineville","deal":"Apple agreed to invest $250 million and pay an annual $150,000 'project fee' in lieu of property taxes (April 2012). Apple signed a deal to purchase 200 MW of power from Montague Wind Power Project and 56 MW from Solar Star Oregon II. Apple acquired the 45 Mile Hydroelectric Plant (April 2014). Apple is funding an $8.7 million Aquifer Storage and Recovery (ASR) system project.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/business/report-flood-of-data-center-builders-causes-housing-shortage-in-prineville"],"band":"250+ MW","lflag":"source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"ac9b37d210aa","cid":"ac9b37d210aa","canon":1,"dups":1,"ftype":"data_center","name":"Apple Inc.","city":"PRINEVILLE","county":"Crook County","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":35,"pc":"Hybrid","pconf":"High","pquote":"Since 2014, all of Apple's data centers have been powered by 100 percent renewable energy.... In Prineville, Oregon, the company signed a 200-megawatt power purchase agreement for an Oregon wind farm, the Montague Wind Power Project, set to come online by the end of 2019.... Apple has acquired a hydroelectric power facility not far from its data center in Prineville, Oregon, according to reports in local media. The deal could provide additional renewable energy for the Apple server farm in Prineville.... Oregon's Direct Access provision allows the direct wholesale purchase of renewable energy through Direct Access, and Apple is using this program to opt out of the default grid mix and directly access enough local renewable wind energy to power the entire facility.","pscan":"https://www.apple.com/newsroom/2018/04/apple-now-globally-powered-by-100-percent-renewable-energy/","proc":"Dedicated PPA","pcp":"Avangrid Renewables","pdt":"200.85 MW (Montague Wind) and 69.9 MWdc (Gala Solar)","rto":"non-RTO","nerc":"WECC","op":"Apple","spon":"Apple","tenant":"Apple","ay":2012,"oy":2013,"contro":"Controversial central assessment tax and housing shortage for construction workers; water usage concerns.","controScan":"https://www.datacenterknowledge.com/hyperscalers/report-apple-resuming-oregon-data-center-expansion-following-end-of-controversial-tax","deal":"Investment of $250 million and $150,000 annual project fee in lieu of property taxes (April 2012); Acquisition of 45 Mile Hydroelectric Plant (April 2014); Power Purchase Agreements for 200.85 MW Montague Wind Farm (Oct 2019) and 69.9 MWdc Gala Solar (Oct 2017).","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"apple.com;datacenterknowledge.com","srcUrls":["https://www.apple.com/newsroom/2018/04/apple-now-globally-powered-by-100-percent-renewable-energy/","https://www.datacenterknowledge.com/hyperscalers/report-apple-resuming-oregon-data-center-expansion-following-end-of-controversial-tax"],"band":"25-50 MW","lflag":"citation_artifact_removed"},{"id":"eb99d0f719d1","cid":"5fbf2002e09c","canon":0,"dups":4,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"71bb317e4c33","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Amazon Wind Farm Oregon–Leaning Juniper IIA","pdt":"more than 200,000-megawatt hours (MWh) of clean power each year from a 90-megawatt (MW) capacity wind farm","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"114a8cc34c73","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"508bbcbb0cdc","cid":"508bbcbb0cdc","canon":1,"dups":1,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","uconf":"Medium","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","contro":"Nitrate pollution and $20.5 million settlement","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"53e011c7f123","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5fbf2002e09c","cid":"5fbf2002e09c","canon":0,"dups":4,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon's energy supply from our utilities, combined with our renewable energy procurement across the United States, has enabled several AWS data center Regions—including its US West (Oregon) Region—to be powered with at least 95% renewable energy.","pscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","uscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon","contro":"Amazon settled a lawsuit for $20.5 million regarding nitrate-contaminated water and was fined over $10,000 for air and water quality violations related to its data centers in Morrow County.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"aboutamazon.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy"]},{"id":"f63abe04112d","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"465b381679db","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Amazon Wind Farm Oregon–Leaning Juniper IIA","pdt":"more than 200,000-megawatt hours (MWh) of clean power each year from a Gilliam County-based 90-megawatt (MW) capacity wind farm","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"794e187588ab","cid":"794e187588ab","canon":0,"dups":1,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Avangrid","pdt":"more than 200,000-megawatt hours (MWh) of clean power each year from a Gilliam County-based 90-megawatt (MW) capacity wind farm","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"fa9439a7003c","cid":"5fbf2002e09c","canon":0,"dups":4,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power. Furthermore, emergency generator engines cannot be used for peak shaving, non-emergency demand response or to generate income by supplying power to the electric grid or other entities.","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2021,"contro":"Lawsuit and settlement regarding nitrate pollution from Amazon data centers in Morrow County.","deal":"$20.5 million settlement for nitrate pollution, recently agreed to pay.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"lagrandeobserver.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"7424493ab33d","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Avangrid","pdt":"more than 200,000-megawatt hours (MWh) of clean power each year from a Gilliam County-based 90-megawatt (MW) capacity wind farm","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e6d054d04263","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5c4370e7e1ef","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Avangrid","pdt":"more than 200,000-megawatt hours (MWh) of clean power each year from a Gilliam County-based 90-megawatt (MW) capacity wind farm","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e42ff8f3a51c","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Umatilla Electric Cooperative","pdt":"Helps Amazon achieve 100% renewable energy by 2025","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"78e1388ca290","cid":"465b381679db","canon":0,"dups":10,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Avangrid","pdt":"more than 200,000-megawatt hours (MWh) of clean power each year from a Gilliam County-based 90-megawatt (MW) capacity wind farm","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"054487a398ea","cid":"5fbf2002e09c","canon":0,"dups":4,"ftype":"data_center","name":"AWS Environmental - PDX01","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Amazon Web Services Environmental facility PDX109, which is operated by Amazon Data Services Inc. is located at 75242 Gar Swanson Road in Boardman. For additional information and to view the air quality permit and related documents in person at a DEQ office, contact the Eastern Region Air Quality Permit Coordinator to schedule a review appointment call 541-633-2021 or toll-free at 866-863-6668. This permit regulates emissions from diesel fuel combustion in the emergency generators during routine maintenance checks, readiness testing and other approved non-emergency uses. The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).","pscan":"https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","contro":"Nitrate contamination of groundwater linked to data center water use; opposition to connecting data centers to gas pipeline; controversy over tax breaks.","controScan":"https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/","deal":"Amazon secured an $83 million contract to develop a large-scale solar and battery storage facility in Oregon in January 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"eastoregonian.com;lagrandeobserver.com;hillsboroherald.com","lflag":"operational_null_capacity","srcUrls":["https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/"]},{"id":"ec179f35ed59","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets).","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"High","uquote":"Recently, Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","oy":2013,"contro":"Nitrate pollution in local groundwater, leading to a $20.5 million settlement.","controScan":"https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","deal":"Settlement of $20.5 million for nitrate pollution, announced March 31, 2026.","dealScan":"https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;opb.org","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/"]},{"id":"d48849502f58","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). The principal use of the facility is the storage, management, and dissemination of electronic data.","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","oy":2013,"contro":"Fined for environmental violations and implicated in nitrate groundwater contamination.","controScan":"https://www.youtube.com/watch?v=iJv19jwGtlY","deal":"Amazon paid a $20.5 million settlement over northeast Oregon nitrate pollution on March 31, 2026.","dealScan":"https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"oregon.gov;lagrandeobserver.com;opb.org;youtube.com","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","https://www.youtube.com/watch?v=iJv19jwGtlY"]},{"id":"cf1a782c8190","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). The principal use of the facility is the storage, management, and dissemination of electronic data. To date, the facility has installed 98 emergency engine-generator sets. Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services","oy":2013,"contro":"Environmental violations and nitrate pollution settlement.","controScan":"https://www.youtube.com/watch?v=iJv19jwGtlY","deal":"$20.5 million settlement for nitrate pollution (March 31, 2026); $10,400 fine for air and water quality violations (October 03, 2025).","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.youtube.com/watch?v=iJv19jwGtlY"]},{"id":"3b18d315f83b","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon Data Services, Inc. operates PDX-4, a data center (electronic data processing center), that houses computer systems and associated components, such as telecommunications and data storage systems. The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). The principal use of the facility is the storage, management, and dissemination of electronic data. To date, the facility has installed 98 emergency engine-generator sets.","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2013,"contro":"Lawsuit and settlement over nitrate pollution in groundwater, and allegations of local officials profiting from data center deals.","controScan":"https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute","deal":"$20.5 million settlement for groundwater contamination (March 2026); renewable energy power purchase agreement with Umatilla Electric Cooperative (April 2023).","dealScan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"oregon.gov;lagrandeobserver.com;govtech.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute"]},{"id":"f2fc8a3d9116","cid":"f2fc8a3d9116","canon":1,"dups":1,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power. AWS data centers in Oregon are already powered with at least 95% renewable energy. Amazon's energy supply from our utilities, combined with our renewable energy procurement across the United States, has enabled several AWS data center regions—including Oregon—to be powered with at least 95% renewable energy.","pscan":"https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston. The energy cooperative that serves Amazon in Morrow and Umatilla counties","uscan":"https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","oy":2013,"contro":"Environmental violations, including air contaminant discharge permit violations and a $20.5 million settlement for contributing to nitrate pollution in local groundwater, and ongoing class-action lawsuit regarding water contamination.","controScan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","deal":"Amazon announced a deal to buy renewable energy from Umatilla Electric Cooperative for its data centers in Boardman and Hermiston (April 2023).","dealScan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"aboutamazon.com;bendbulletin.com;lagrandeobserver.com;oregon.gov","lflag":"operational_null_capacity","srcUrls":["https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx"]},{"id":"f7399188563b","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). The principal use of the facility is the storage, management, and dissemination of electronic data. To date, the facility has installed 98 emergency engine-generator sets.","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2013,"deal":"Power supply deal with Umatilla Electric Cooperative (date not specified, reported April 2023)","dealScan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;lagrandeobserver.com","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"3f489cedbe42","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets).","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2013,"contro":"Amazon to pay $20.5 million settlement over nitrate pollution in groundwater; fined $10,000 for environmental violations.","deal":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved by U.S. Bankruptcy Court in January 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"lagrandeobserver.com","lflag":"operational_null_capacity","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"884b6b9b7a8b","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). The principal use of the facility is the storage, management, and dissemination of electronic data. To date, the facility has installed 98 emergency engine-generator sets.","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2013,"contro":"Amazon paid a $20.5 million settlement related to contaminated groundwater in northeast Oregon, and the facility is subject to Cleaner Air Oregon regulations.","controScan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","deal":"$20.5 million settlement over groundwater contamination (March 31, 2026)","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;lagrandeobserver.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"7e7d40410b59","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2013,"contro":"Nitrate-contaminated well water used for cooling, returned concentrated, and sprayed onto farmland, leading to health concerns and environmental fines.","deal":"Power purchase agreement with Umatilla Electric Cooperative for renewable energy.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"lflag":"operational_null_capacity","pscan":"https://www.oregon.gov/deq/wq/Pages/Amazon-Data-Services-PDX4.aspx","srcUrls":["https://www.oregon.gov/deq/wq/Pages/Amazon-Data-Services-PDX4.aspx"],"srcDom":"oregon.gov"},{"id":"2d14dd44a1c9","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"After a dozen years operating data centers in Eastern Oregon, Amazon says it has a deal to buy renewable energy to help power them. The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston. It said that enables the company to choose some renewable power for its installations.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","oy":2013,"contro":"Nitrate pollution and toxic air contaminant emissions concerns, leading to state fines and a settlement.","deal":"Amazon paid $20.5 million to settle allegations of nitrate pollution from its data centers in Morrow County (March 2026).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"lagrandeobserver.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"ddc3c21a16d0","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). The principal use of the facility is the storage, management, and dissemination of electronic data. To date, the facility has installed 98 emergency engine-generator sets. Air pollutants are emitted by diesel fuel combustion in the emergency generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","uconf":"Medium","uquote":"Amazon says it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston. Umatilla Electric Cooperative serves electricity to 3 counties in Oregon including counties like Umatilla County, Union County, and Morrow County.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","oy":2013,"contro":"Nitrate-contaminated well water used for cooling servers, returned more concentrated, and sprayed onto farmland, contributing to groundwater pollution; DEQ risk assessment and permit revisions.","controScan":"https://hillsboroherald.com/2025/12/05/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"oregon.gov;lagrandeobserver.com;hillsboroherald.com","lflag":"operational_null_capacity","pscan":"https://www.oregon.gov/deq/wq/Pages/Amazon-Data-Services-PDX4.aspx","uscan":"https://www.lagrandeobserver.com/news/local/amazon-strikes-power-deal-for-data-centers/article_39144322-d871-11ed-941f-178650383748.html","srcUrls":["https://www.oregon.gov/deq/wq/Pages/Amazon-Data-Services-PDX4.aspx","https://www.lagrandeobserver.com/news/local/amazon-strikes-power-deal-for-data-centers/article_39144322-d871-11ed-941f-178650383748.html","https://hillsboroherald.com/2025/12/05/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/"]},{"id":"d32f20c4c212","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). The principal use of the facility is the storage, management, and dissemination of electronic data. To date, the facility has installed 98 emergency engine-generator sets.","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2013,"contro":"Nitrate-contaminated well water linked to Amazon data centers, leading to a class-action lawsuit and settlement.","controScan":"https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/","deal":"$20.5 million settlement with northeast Oregonians over contaminated groundwater (March 31, 2026)","dealScan":"https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"oregon.gov;lagrandeobserver.com;opb.org;hillsboroherald.com","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/"]},{"id":"76e6b68810aa","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2008,"oy":2013,"contro":"Lawsuits and ethics complaints against local officials for improperly profiting from deals with Amazon data centers, and concerns about water pollution linked to Amazon AWS PDX4.","deal":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved in January 2026, to supply power to its Oregon data centers.","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"lflag":"operational_null_capacity,merged_duplicate","pscan":"https://www.oregon.gov/deq/FilterPermitsRegs/Pages/Amazon-Data-Services-PDX4.aspx","uscan":"https://www.lagrandeobserver.com/news/amazon-strikes-power-deal-for-data-centers/article_42b32292-d87f-11ed-8419-3b1076625828.html","dealScan":"https://www.costar.com/article/1739794025/amazon-strikes-power-deal-for-data-centers","controScan":"https://www.opb.org/article/2026/03/04/oregon-attorney-general-lawsuit-morrow-county-broadband-deal-amazon-data-centers/","srcUrls":["https://www.oregon.gov/deq/FilterPermitsRegs/Pages/Amazon-Data-Services-PDX4.aspx","https://www.lagrandeobserver.com/news/amazon-strikes-power-deal-for-data-centers/article_42b32292-d87f-11ed-8419-3b1076625828.html","https://www.costar.com/article/1739794025/amazon-strikes-power-deal-for-data-centers","https://www.opb.org/article/2026/03/04/oregon-attorney-general-lawsuit-morrow-county-broadband-deal-amazon-data-centers/"],"srcDom":"oregon.gov;lagrandeobserver.com;costar.com;opb.org"},{"id":"f8ef8c00acd6","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","pscan":"https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2021,"contro":"Amazon data centers in Boardman have faced opposition regarding a gas pipeline connection, ethics charges against former public officials for conflicts of interest related to tax breaks and land sales, and fines for environmental violations concerning air and water quality.","controScan":"https://www.youtube.com/watch?v=iJv19jwGtlY","deal":"Amazon received $1 billion in tax breaks over 15 years from Morrow County, the port, and the city of Boardman. Amazon also made an $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, to supply power to its Oregon data centers.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"eastoregonian.com;lagrandeobserver.com;youtube.com","lflag":"operational_null_capacity","srcUrls":["https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.youtube.com/watch?v=iJv19jwGtlY"]},{"id":"171b69b10ff0","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon Data Services, Inc. operates PDX-4, a data center (electronic data processing center), that houses computer systems and associated components, such as telecommunications and data storage systems. The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets).","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","oy":2013,"contro":"Nitrate pollution in local groundwater linked to Amazon data centers, including PDX4, and a $20.5 million settlement.","controScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","deal":"Amazon agreed to pay $20.5 million to settle a lawsuit related to nitrate pollution from its data centers in the Port of Morrow.","dealScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"oregon.gov;lagrandeobserver.com;tricitiesbusinessnews.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities"]},{"id":"6f44eab7baf9","cid":"76e6b68810aa","canon":0,"dups":15,"ftype":"data_center","name":"AWS Environmental - PDX04","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). The principal use of the facility is the storage, management, and dissemination of electronic data.","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","oy":2013,"contro":"Lawsuit regarding nitrate-contaminated well water used for cooling, returned more concentrated, and sprayed onto farmland, leading to groundwater pollution.","controScan":"https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/","deal":"$20.5 million settlement over nitrate pollution, agreed to recently as of April 2026.","dealScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"oregon.gov;lagrandeobserver.com;tricitiesbusinessnews.com;hillsboroherald.com","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/"]},{"id":"3457972499ab","cid":"3457972499ab","canon":1,"dups":1,"ftype":"data_center","name":"AWS Environmental - PDX170","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e7f6a9b6de0e","cid":"e7f6a9b6de0e","canon":0,"dups":1,"ftype":"data_center","name":"AWS Environmental - PDX170","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"bd7d0c1a2ef7","cid":"f1879543c3aa","canon":0,"dups":2,"ftype":"data_center","name":"AWS Environmental - PDX194","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. PacifiCorp.","uconf":"High","uquote":"Grid Operator. PacifiCorp.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f1879543c3aa","cid":"f1879543c3aa","canon":1,"dups":2,"ftype":"data_center","name":"AWS Environmental - PDX194","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/aws-environmental-pdx194-c2b1b076","uconf":"High","uquote":"Grid Operator. PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/aws-environmental-pdx194-c2b1b076","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","contro":"Water contamination concerns in Umatilla County related to Amazon data centers.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/aws-environmental-pdx194-c2b1b076"]},{"id":"cf5153c87d10","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.","pscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston.","uscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","deal":"Water service agreement with the City of Hermiston approved on February 24, 2025, for 25 years, with AWS covering all construction costs for aquifer storage and recovery wells and infrastructure.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"opb.org","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"9f09a1e1a4fa","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Attracted by cheap power, plentiful land and proximity to the Columbia River's water supply, Amazon Web Services has built dozens of data centers across Umatilla and Morrow counties, with Hermiston becoming the latest community they've expanded into.","pscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uconf":"High","uquote":"Grid Operator. Bonneville Power Administration.","uscan":"https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2012,"oy":2024,"contro":"Oregon Department of Environmental Quality issued a civil penalty of $10,400 for violations of the Water Pollution Control Facility (WPCF) permit and for beginning construction of a new wastewater pond without DEQ approval at the PDX-80 Facility in 2024.","deal":"AWS will provide the city of Hermiston $8 million to construct a 20-acre RV park for contractors and employees, with preference for those working for the company.","dealScan":"https://www.tricitiesbusinessnews.com/articles/hermiston-ugb-aws","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"opb.org;interconnection.fyi;tricitiesbusinessnews.com","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","https://www.tricitiesbusinessnews.com/articles/hermiston-ugb-aws"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"2696aa5c3693","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.","pscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years.","uscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","oy":2012,"deal":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved by U.S. Bankruptcy Court for the Southern District of Texas in January 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"opb.org","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"6602ae09f2e2","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory.","pscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","uscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2012,"contro":"Amazon Data Services Inc. settled a class-action lawsuit for $20.5 million over alleged nitrate groundwater contamination in Morrow and Umatilla counties. Additionally, the Oregon Department of Environmental Quality (DEQ) issued a civil penalty of $10,400 to the PDX-80 Facility for violations of its Water Pollution Control Facility (WPCF) permit and for beginning construction of a new wastewater pond without DEQ approval.","deal":"Hermiston City Council approved a 25-year water service agreement with Amazon Data Services on February 24, 2025, for additional data centers, with AWS paying the full $18 million project cost for the Aquifer Recovery & Storage project.","dealScan":"https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aboutamazon.com;hermistonherald.com","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/"]},{"id":"d438f3df49b3","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Data centers' power demands have upended Oregon's fight against global warming, exposing the limitations of the state's electrical grid and the state's hope to move toward clean power. But the company says the regional power grid doesn't have the capacity to carry that electricity from wind farms and solar arrays to its data centers near Boardman and Hermiston. Grid Operator: Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","uquote":"Umatilla Electric Cooperative (UEC) and Hermiston Energy Services (HES) announced they are working with Amazon Web Services (AWS) to donate funds to support local electric utility customers, food banks, and students impacted by COVID-19. The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","uscan":"https://eastoregonian.com/2024/02/18/ucc-now-among-the-states-biggest-polluters-due-to-amazon-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","contro":"Controversies include elevated nitrate levels in drinking water linked to data center water consumption, fines for air and water quality violations, and concerns over greenhouse gas emissions and tax breaks.","controScan":"https://eastoregonian.com/2024/02/18/ucc-now-among-the-states-biggest-polluters-due-to-amazon-data-centers/","deal":"25-year water service agreement with Hermiston City Council (Feb 2025); Amazon's $83 million acquisition of Sunstone solar power project (Jan 2026).","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;eastoregonian.com","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","https://eastoregonian.com/2024/02/18/ucc-now-among-the-states-biggest-polluters-due-to-amazon-data-centers/"]},{"id":"0bfbf137cf3e","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"AWS data centers in Oregon are already powered with at least 95% renewable energy. Amazon's energy supply from our utilities, combined with our renewable energy procurement across the United States, has enabled several AWS data center regions—including Oregon—to be powered with at least 95% renewable energy.","pscan":"https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","uscan":"https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2012,"contro":"Oregon Department of Environmental Quality fined Amazon more than $10,000 for violations to air and water quality at data centers in Hermiston and Boardman.","controScan":"https://www.youtube.com/watch?v=iJv19jwGtlY","deal":"Water service agreement with the City of Hermiston approved Feb 24, 2025, with AWS covering $18 million in construction costs for an aquifer storage and recovery project.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aboutamazon.com;youtube.com","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.aboutamazon.com/news/aws/committed-to-our-communities-the-economic-impact-of-awss-15-6-billion-investment-in-oregon","https://www.youtube.com/watch?v=iJv19jwGtlY"]},{"id":"65eedc214c11","cid":"65eedc214c11","canon":1,"dups":1,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Attracted by cheap power, plentiful land and proximity to the Columbia River's water supply, Amazon Web Services has built dozens of data centers across Umatilla and Morrow counties, with Hermiston becoming the latest community they've expanded into. Besides water, data centers need lots of electricity. [...] Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. Recently, AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the region.","uconf":"High","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. Recently, AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the region.","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","contro":"Environmental violations and water usage concerns. The Oregon Department of Environmental Quality fined Amazon for violations to air and water quality at its Hermiston and Boardman data centers. Community opposition also raised concerns about water supply.","controScan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","deal":"AWS is funding an underground water storage project for Hermiston costing $18 million, and an RV park project for $8 million.","dealScan":"https://www.tricitiesbusinessnews.com/articles/hermiston-ugb-aws","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"tricitiesbusinessnews.com;opb.org","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.tricitiesbusinessnews.com/articles/hermiston-ugb-aws","https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/"]},{"id":"aa52ea972f27","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon has capitalized on hundreds of millions of dollars in local tax breaks to subsidize a constellation of enormous, power-hungry data centers around the cities of Boardman and Hermiston, areas where the regional power grid has little access to renewable energy.","pscan":"https://eastoregonian.com/2024/02/18/ucc-now-among-the-states-biggest-polluters-due-to-amazon-data-centers/","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years.","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","contro":"Fined for environmental violations, linked to nitrate contamination, and concerns over carbon footprint.","deal":"25-year water service agreement with Hermiston, AWS to pay construction costs and provide $8M for RV park.","dealScan":"https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"eastoregonian.com;hermistonherald.com","lflag":"operational_null_capacity nonrate_utility_link_removed nonretail_eia861_not_rate_utility,merged_duplicate","srcUrls":["https://eastoregonian.com/2024/02/18/ucc-now-among-the-states-biggest-polluters-due-to-amazon-data-centers/","https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"2cc3e7c3e6b8","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","uconf":"High","uquote":"Grid Operator. Bonneville Power Administration.","uscan":"https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2011,"contro":"Concerns raised regarding water usage, energy consumption, and tax breaks for Amazon's data centers in the Eastern Oregon region.","controScan":"https://www.tricitiesbusinessnews.com/articles/hermiston-data-center-study","deal":"25-year water service agreement with Amazon Data Services approved by Hermiston City Council on February 24, 2025, with AWS covering construction costs.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;tricitiesbusinessnews.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.interconnection.fyi/data-center/project/aws-environmental-pdx80-ec739bf1","https://www.tricitiesbusinessnews.com/articles/hermiston-data-center-study"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"c9f1576895df","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025. UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory.","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","contro":"Amazon was fined more than $10,000 by the Oregon Department of Environmental Quality for violations to air and water quality at its data centers in Hermiston and Boardman.","controScan":"https://www.youtube.com/watch?v=iJv19jwGtlY","deal":"Amazon partnered with Umatilla Electric Cooperative (UEC) for an energy supply agreement (April 4, 2023). The Hermiston City Council approved a 25-year water service agreement with Amazon Data Services (February 24, 2025).","dealScan":"https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"hermistonherald.com;youtube.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","https://www.youtube.com/watch?v=iJv19jwGtlY"]},{"id":"fb4f22344183","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Amazon's announcement follows reporting by The Oregonian on how the company's growing footprint in Eastern Oregon has contributed to an enormous surge in regional carbon emissions, and an unsuccessful push by climate activists and state lawmakers to require large data centers to transition to clean power. Amazon says it has been pursuing renewable energy for its Oregon data centers for some time but has only now been able to secure contracts to provide it.... AWS data centers in Oregon are already powered with at least 95% renewable energy.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","contro":"The Hermiston facility violated its water pollution control permit several times in 2024, including building a wastewater pond without permission and failing to monitor its recycled water for runoff limits.","controScan":"https://www.thecooldown.com/green-business/amazon-data-center-violations-oregon/","deal":"A 25-year water service agreement between the City of Hermiston and Amazon Web Services was approved on February 24, 2025, with AWS covering all construction costs for an aquifer storage and recovery project, estimated at $18 million.","dealScan":"https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"lagrandeobserver.com;hermistonherald.com;thecooldown.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://hermistonherald.com/2025/02/26/hermiston-makes-water-service-deal-with-amazon/","https://www.thecooldown.com/green-business/amazon-data-center-violations-oregon/"]},{"id":"1d78f60288db","cid":"aa52ea972f27","canon":0,"dups":11,"ftype":"data_center","name":"AWS Environmental - PDX80","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Bonneville Power Administration supplies hydroelectric power, and AWS claims 95% renewable energy sourcing for the region. Hermiston runs its own electricity utility, Hermiston Energy Services, which recently hiked its rates by 20% over the next three years. But Morgan said any increased power costs from data centers would be spread out across a region, rather than just born in Hermiston. That's because Hermiston Energy Services gets its power through a much larger supplier, the Bonneville Power Administration.","pscan":"https://www.mmcginvest.com/post/aws-at-scale-inside-the-largest-private-infrastructure-buildout-the-world-has-ever-seen","uconf":"High","uquote":"Hermiston runs its own electricity utility, Hermiston Energy Services","uscan":"https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2012,"contro":"Oregon Department of Environmental Quality fined Amazon more than $10,000 for violations to air and water quality at its data centers in Hermiston and Boardman. A Rolling Stone investigation in November 2025 linked AWS's groundwater withdrawals to worsening nitrate contamination and a cluster of rare cancers in nearby communities.","controScan":"https://www.youtube.com/watch?v=iJv19jwGtlY","deal":"A 25-year water service agreement with Amazon Data Services was approved by the Hermiston City Council on February 24, 2025, with AWS covering all construction costs associated with the agreement.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"mmcginvest.com;opb.org;youtube.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.mmcginvest.com/post/aws-at-scale-inside-the-largest-private-infrastructure-buildout-the-world-has-ever-seen","https://www.opb.org/article/2025/09/10/hermiston-oregon-data-center-amazon-eastern-ai-technology-power/","https://www.youtube.com/watch?v=iJv19jwGtlY"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"c9f9527bdb9e","cid":"789ec8da77fa","canon":0,"dups":8,"ftype":"data_center","name":"AWS Environmental - PDX90","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","pscan":"https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","uquote":"Grid Operator. Bonneville Power Administration.","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","contro":"Amazon data centers in Boardman were fined for environmental violations, including an emergency fire pump running for over 55 hours, and faced a lawsuit regarding nitrate pollution in local groundwater.","controScan":"https://www.blivenlawfirm.com/blog/rolling-stone-exposes-oregon-water-crisis/","deal":"Amazon made a deal to buy renewable energy from Umatilla Electric Cooperative (April 2023) and an $83 million bid for the Sunstone solar power project (January 2026).","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"eastoregonian.com;blivenlawfirm.com","lflag":"operational_null_capacity nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","https://www.blivenlawfirm.com/blog/rolling-stone-exposes-oregon-water-crisis/"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"c670c0739492","cid":"789ec8da77fa","canon":0,"dups":8,"ftype":"data_center","name":"AWS Environmental - PDX90","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","contro":"Protests against connecting data centers to a gas pipeline; settlement over nitrate pollution; ethics complaints and lawsuit regarding tax breaks and land deals for Amazon data centers in Morrow County.","controScan":"https://www.governing.com/politics/oregon-county-officials-benefited-personally-from-amazon-deal","deal":"Amazon won an additional set of tax breaks, valued at $1 billion over 15 years, from Morrow County, the port and city of Boardman in May.","dealScan":"https://www.governing.com/politics/oregon-county-officials-benefited-personally-from-amazon-deal","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"lagrandeobserver.com;governing.com","lflag":"operational_null_capacity","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.governing.com/politics/oregon-county-officials-benefited-personally-from-amazon-deal"]},{"id":"99ef85e2a7f4","cid":"789ec8da77fa","canon":0,"dups":8,"ftype":"data_center","name":"AWS Environmental - PDX90","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","contro":"Oregon Department of Environmental Quality fined Amazon $10,400 for violating pollution control permits at a Boardman data center in 2023 due to an emergency fire pump running for over 55 hours. Additionally, Amazon agreed to pay $20.5 million to settle a lawsuit claiming its data center operations at the Port of Morrow contributed to nitrate pollution in local groundwater.","controScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","deal":"Amazon acquired the Sunstone solar power project near Pendleton, Oregon, for $83 million in January 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"lagrandeobserver.com;tricitiesbusinessnews.com","lflag":"operational_null_capacity","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities"]},{"id":"f5f9bc053df4","cid":"789ec8da77fa","canon":0,"dups":8,"ftype":"data_center","name":"AWS Environmental - PDX90","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/aws-environmental-pdx90-1e86754f","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","uscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","contro":"Lawsuit settlement over nitrate pollution related to existing data center operations at the Port of Morrow.","deal":"Agreement with Umatilla Electric Cooperative for power supply (April 2023).","dealScan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;aboutamazon.com","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/aws-environmental-pdx90-1e86754f","https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy"]},{"id":"d6616b3ca9ed","cid":"789ec8da77fa","canon":0,"dups":8,"ftype":"data_center","name":"AWS Environmental - PDX90","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uconf":"Medium","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","contro":"Amazon was fined $10,400 by the Oregon Department of Environmental Quality for violating pollution control permits at a Boardman data center in 2023, where an emergency fire pump ran for over 55 hours after construction work triggered the system, violating the air contaminant discharge permit.","deal":"Amazon announced a deal to buy renewable energy from Umatilla Electric Cooperative for its data center operations near Boardman and Hermiston.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"789ec8da77fa","cid":"789ec8da77fa","canon":1,"dups":8,"ftype":"data_center","name":"AWS Environmental - PDX90","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"“We're adding renewable energy to the same grid where we operate,” said Charley Daitch, director of energy and water for Amazon Web Services, the company's data center business.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","oy":2012,"contro":"Widespread nitrate contamination in Morrow County linked to Amazon's data centers, leading to a federal class action lawsuit.","controScan":"https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/","deal":"AWS committed to purchase 200,000 megawatt hours of clean power each year from a Gilliam County wind farm (announced October 31, 2024).","dealScan":"https://northeastoregonnow.com/aws-announces-area-nonprofits-facilities-to-receive-solar-power/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"lagrandeobserver.com;northeastoregonnow.com;hillsboroherald.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://northeastoregonnow.com/aws-announces-area-nonprofits-facilities-to-receive-solar-power/","https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/"]},{"id":"9662402f4d5a","cid":"789ec8da77fa","canon":0,"dups":8,"ftype":"data_center","name":"AWS Environmental - PDX90","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","pscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","uconf":"High","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","contro":"Amazon was fined over $10,000 for environmental violations at its data centers in Hermiston and Boardman, related to air and water quality.","controScan":"https://www.youtube.com/watch?v=iJv19jwGtlY","deal":"Amazon has a deal with Umatilla Electric Cooperative to choose electricity supply for its data center operations in Boardman and Hermiston (announced April 2023).","dealScan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"lagrandeobserver.com;youtube.com","lflag":"operational_null_capacity","srcUrls":["https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","https://www.youtube.com/watch?v=iJv19jwGtlY"]},{"id":"fcca6b8f46b2","cid":"789ec8da77fa","canon":0,"dups":8,"ftype":"data_center","name":"AWS Environmental - PDX90","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Air pollutants are emitted by diesel-fueled emergency backup generators and fire pump engines, which are activated during a loss of utility power. The generators are solely intended for emergency backup power.","pscan":"https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","uquote":"The Seattle company announced recently it has started working with the local power utility, Umatilla Electric Cooperative, to choose the electricity supply for its huge data center operations near the communities of Boardman and Hermiston.","uscan":"https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","contro":"Amazon agreed to pay $20.5 million to settle a lawsuit claiming its data center operations contributed to nitrate pollution in local groundwater.","deal":"$20.5 million settlement for nitrate pollution lawsuit (April 2026)","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"eastoregonian.com;lagrandeobserver.com","lflag":"operational_null_capacity","srcUrls":["https://eastoregonian.com/2025/03/27/oregon-deq-seeks-public-input-on-proposed-air-quality-permit-for-amazon-data-services-in-boardman/","https://lagrandeobserver.com/2023/04/11/amazon-strikes-power-deal-for-data-centers/"]},{"id":"fa4003384194","cid":"fa4003384194","canon":1,"dups":1,"ftype":"data_center","name":"CC01-2 Facebook Data Center","city":"Prineville","county":"Crook County","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid. Critics of the contract between Facebook and Pacific Power say the electrical company relies heavily on coal-burning plants in its electricity supply grid, and the social networking Web site should set an example by choosing a cleaner source of energy to power its data center.","uconf":"High","uquote":"Utility Provider: Pacific Power. We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. Critics of the contract between Facebook and Pacific Power say the electrical company relies heavily on coal-burning plants in its electricity supply grid.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2011,"oy":2012,"contro":"Dispute over property taxes and environmental concerns regarding the use of coal energy from the utility provider.","deal":"Tax deal allowing property tax deferrals for 15 years in exchange for annual lump sum payments to the city.","dealScan":"https://www.heraldnet.com/2015/08/27/town-approves-deal-for-facebook-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"heraldnet.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.heraldnet.com/2015/08/27/town-approves-deal-for-facebook-data-center/"]},{"id":"425a5f56476e","cid":"73477a5cdc4b","canon":0,"dups":2,"ftype":"data_center","name":"Crane Data Center","city":"Forest Grove","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":100,"pc":"Grid","pconf":"High","pquote":"Crane's scalable state-of-the-art data center offers multiple fiber paths, sustainable technologies, and redundant power transmission feeds that provide access to renewable energy.... Redundant transmission feeds with committed utility power and future substation on campus.... Power Infrastructure: Dual 2N UPS configuration with redundant substations; N+1 backup generators and sustainable energy grid sourcing; Supports rack densities up to 45kW, optimized for HPC, AI, and enterprise compute.... The site features an onsite 115kV substation with 2N feeds into the BPA's transmission grid, providing highly reliable power. Backup power is ensured through N+1 configured generators with HVO fuel, offering over 72 hours of backup capacity.","pscan":"https://www.cranedc.com/data-centers/oregon-data-center","uquote":"On the electricity side, Forest Grove Light & Power Director Keith Hormann said safeguards are in place to ensure local ratepayers won't experience rate hikes or be on the hook for power system upgrades.... And PGE hasn't put its dirty taint in Forest Grove yet. FG runs their own electric.","rto":"non-RTO","nerc":"WECC","op":"Crane Data Centers","spon":"Principal Asset Management","ay":2023,"oy":2026,"contro":"Community opposition regarding noise, light pollution, traffic, property values, and wetlands impact; city council appeal.","deal":"Development partnership announced January 16, 2023, between Crane Data Centers Inc. and Principal Asset Management for a 100+ MW campus. BMO Capital Markets Corp. and Compo Capital Advisors acted as strategic and financial advisors to Crane.","dealScan":"https://www.prnewswire.com/news-releases/crane-and-principal-asset-managementsm-to-develop-100-mw-data-center-campus-in-growing-portland-market-301721546.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cranedc.com;prnewswire.com","srcUrls":["https://www.cranedc.com/data-centers/oregon-data-center","https://www.prnewswire.com/news-releases/crane-and-principal-asset-managementsm-to-develop-100-mw-data-center-campus-in-growing-portland-market-301721546.html"],"band":"100-250 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified","ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co"},{"id":"26d3c3002416","cid":"26d3c3002416","canon":0,"dups":1,"ftype":"data_center","name":"Crane Data Center","city":"Forest Grove","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"The site features an onsite 115kV substation with 2N feeds into the BPA's transmission grid, providing highly reliable power. Backup power is ensured through N+1 configured generators with HVO fuel, offering over 72 hours of backup capacity. Redundant transmission feeds with committed utility power and future substation on campus.","pscan":"https://www.cranedc.com/data-centers/oregon-data-center","uconf":"High","uquote":"On the electricity side, Forest Grove Light & Power Director Keith Hormann said safeguards are in place to ensure local ratepayers won't experience rate hikes or be on the hook for power system upgrades.","uscan":"https://hillsboronewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/","rto":"non-RTO","nerc":"WECC","op":"Crane Data Centers","spon":"Principal Asset Management","ay":2023,"oy":2026,"contro":"Significant pushback from neighbors concerned about proximity to homes, environmental impacts, and potential increases in power and utility rates. The Forest Grove City Council approved the development after residents appealed the planning commission's earlier decision.","controScan":"https://hillsboronewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/","deal":"Development partnership between Crane Data Centers Inc. and Principal Asset Management announced January 16, 2023.","dealScan":"https://www.cranedc.com/blog/portland-dc-press-release","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cranedc.com;hillsboronewstimes.com","srcUrls":["https://www.cranedc.com/data-centers/oregon-data-center","https://hillsboronewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/","https://www.cranedc.com/blog/portland-dc-press-release"],"band":"10-25 MW","lflag":"merged_duplicate"},{"id":"73477a5cdc4b","cid":"73477a5cdc4b","canon":1,"dups":2,"ftype":"data_center","name":"Crane Data Center","city":"Forest Grove","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":100,"pc":"Grid","pconf":"High","pquote":"Redundant power transmission feeds with committed utility power and future substation on campus. The site features an onsite 115kV substation with 2N feeds into the BPA's transmission grid, providing highly reliable power. N+1 backup generators and sustainable energy grid sourcing. Data center powered by low cost, renewable energy, utilizing sources like wind and solar to minimize environmental impact. Target PUE < 1.25, powered predominantly by hydroelectric and renewable energy.","uconf":"High","uquote":"On the electricity side, Forest Grove Light & Power Director Keith Hormann said safeguards are in place to ensure local ratepayers won't experience rate hikes or be on the hook for power system upgrades.","rto":"non-RTO","nerc":"WECC","op":"Crane Data Centers","spon":"Principal Asset Management","ay":2023,"oy":2026,"contro":"Residents voiced fears regarding noise, light pollution, traffic, property values, and disruption to wetlands and migratory bird paths. The facility is in an enterprise zone, exempting it from local property taxes for five years.","deal":"Partnership with Principal Asset Management for a 100+ MW data center campus, announced January 16, 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4599b84fbc9f","cid":"4599b84fbc9f","canon":1,"dups":1,"ftype":"data_center","name":"Data Center West Coast LLC","city":"HILLSBORO","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"9381cc1afa95","cid":"78f272c82600","canon":0,"dups":2,"ftype":"data_center","name":"dba: H5 Data Centers","city":"PORTLAND","county":"MULTNOMAH","state":"OR","lat":45.547711,"lng":-122.417363,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"Power · N+1 UPS power; 2 MW Generator Backup power; 48-hour diesel runtime. Electrical System that includes: N+1 redundant UPS system. 2MW of utility power dedicated to the facility. Backup power generation provided by a 2MW diesel generator with automatic transfer. 3,000 gallons of diesel fuel on-site.","pscan":"https://h5datacenters.com/portland-data-center.html","uquote":"Grid Operator: Portland General Electric.","uscan":"https://www.interconnection.fyi/data-center/project/dba-h5-data-centers-1e3f0b86","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"H5 Data Centers","ay":2021,"deal":"Acquisition of seven vXchnge data centers, including Portland, by H5 Data Centers on January 31, 2021.","dealScan":"https://h5datacenters.com/h5-data-centers-announces-acquisition-of-seven-data-centers-from-vXchnge.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"h5datacenters.com;interconnection.fyi","lflag":"online_before_announced coordinate_cluster_reclassified","srcUrls":["https://h5datacenters.com/portland-data-center.html","https://www.interconnection.fyi/data-center/project/dba-h5-data-centers-1e3f0b86","https://h5datacenters.com/h5-data-centers-announces-acquisition-of-seven-data-centers-from-vXchnge.html"],"band":"< 10 MW"},{"id":"ce057074c40b","cid":"ce057074c40b","canon":1,"dups":1,"ftype":"data_center","name":"dba: H5 Data Centers","city":"PORTLAND","county":"MULTNOMAH","state":"OR","lat":45.547711,"lng":-122.417363,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"2MW of utility power dedicated to the facility.","pscan":"https://baxtel.com/data-center/h5-portland","uquote":"Grid Operator: Portland General Electric.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"H5 Fund IV","spon":"H5 Data Centers","deal":"Acquisition of seven vXchnge data centers, including Portland, by H5 Data Centers in January 2022. Financial terms not disclosed.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/h5-portland"],"band":"< 10 MW","lflag":"coordinate_cluster_reclassified"},{"id":"78f272c82600","cid":"78f272c82600","canon":0,"dups":2,"ftype":"data_center","name":"dba: H5 Data Centers","city":"PORTLAND","county":"MULTNOMAH","state":"OR","lat":45.547711,"lng":-122.417363,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"2MW of utility power dedicated to the facility. N+1 UPS power. 2 MW Generator Backup power. 48-hour diesel runtime.","pscan":"https://h5datacenters.com/portland-data-center.html","uconf":"High","uquote":"Development Name. dba: H5 Data Centers. Status. Operational. City. PORTLAND. County. MULTNOMAH. State. Oregon. Address. 1233 NW 12TH AVE. ZIP Code. 97209. Business Information. Developer. Contact sales for developer/owner information. Operator. H5 Fund IV, LLC. Grid Operator. Portland General Electric.","uscan":"https://www.interconnection.fyi/data-center/project/dba-h5-data-centers-1e3f0b86","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"H5 Data Centers","spon":"H5 Data Centers","ay":2022,"deal":"Acquisition of seven data centers from vXchnge, including Portland, announced January 31, 2022, for an undisclosed price.","dealScan":"https://www.hostingseekers.com/blog/h5-data-center-acquired-seven-data-centers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"h5datacenters.com;interconnection.fyi;hostingseekers.com","lflag":"online_before_announced coordinate_cluster_reclassified,merged_duplicate","srcUrls":["https://h5datacenters.com/portland-data-center.html","https://www.interconnection.fyi/data-center/project/dba-h5-data-centers-1e3f0b86","https://www.hostingseekers.com/blog/h5-data-center-acquired-seven-data-centers/"],"band":"< 10 MW"},{"id":"36aad43c6a35","cid":"36aad43c6a35","canon":1,"dups":2,"ftype":"data_center","name":"dba: Hillsboro 4/5 Data Center Facility","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":54,"pc":"Grid","pconf":"High","pquote":"PGE announced plans to invest $6.5 billion in clean energy and grid modernization over the next five years, which could drive data center development. Oregon passed the POWER Act, establishing a new customer class for data centers starting at 20 MW.","uquote":"Hoodline reported that the Oregon commission ordered Portland General Electric to file new data center rates this month, a development that has focused more scrutiny on utility and grid impacts from concentrated data center growth.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","tenant":"CoreWeave","oy":2022,"contro":"State-imposed moratorium on Enterprise Zone approvals for data centers in Hillsboro, effective June 6, 2026, and discussions about tax abatements and water usage.","deal":"Flexential acquired Hillsboro 4 and Hillsboro 5 data centers from T5 Data Centers on May 28, 2026, in the largest real estate transaction in the company's history.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"97942339d44d","cid":"36aad43c6a35","canon":0,"dups":2,"ftype":"data_center","name":"dba: Hillsboro 4/5 Data Center Facility","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":54,"pc":"Grid","pconf":"High","pquote":"Local debates over water use and grid capacity mean policy and rate changes are now firmly part of the business calculus for operators expanding in Hillsboro.","uconf":"High","uquote":"Hoodline reported that the Oregon commission ordered Portland General Electric to file new data center rates this month, a development that has focused more scrutiny on utility and grid impacts from concentrated data center growth.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","tenant":"CoreWeave","oy":2022,"contro":"Community opposition regarding data center tax breaks, water usage, and electricity bills.","controScan":"https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/","deal":"Flexential acquired Hillsboro 4 and Hillsboro 5 from T5 Data Centers on May 28, 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","srcUrls":["https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"7626e09fd0c4","cid":"7626e09fd0c4","canon":0,"dups":1,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Portland General Electric (PGE)","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","tenant":"CoreWeave","deal":"Peak 10 acquired ViaWest for approximately US$1.675 billion in August 2017.","dealScan":"https://baxtel.com/data-center/flexential-hillsboro-1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity utility_alias_corrected,merged_duplicate","srcUrls":["https://baxtel.com/data-center/flexential-hillsboro-1"],"ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co"},{"id":"c34f550aefc0","cid":"c34f550aefc0","canon":0,"dups":2,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Portland General Electric (PGE)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text,merged_duplicate","ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co","srcUrls":null,"srcDom":null},{"id":"0ee3f236cb2a","cid":"32388b28e246","canon":0,"dups":8,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program. For Flexential, Oregon is also a gold-level partner in PGE's Clean Wind program, which guarantees access to a reliable renewable energy source.","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","oy":1999,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"be529def170e","cid":"c34f550aefc0","canon":0,"dups":2,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Portland General Electric (PGE)","uquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"32388b28e246","cid":"32388b28e246","canon":1,"dups":8,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program. For Flexential, Oregon is also a gold-level partner in PGE's Clean Wind program, which guarantees access to a reliable renewable energy source.","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","tenant":"Lumen","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"d029038ca635","cid":"32388b28e246","canon":0,"dups":8,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Connected to PGE Sunset Reliability Center with redundant power grids","pscan":"https://baxtel.com/data-center/flexential-hillsboro-1","uconf":"High","uquote":"Connected to PGE Sunset Reliability Center with redundant power grids","uscan":"https://baxtel.com/data-center/flexential-hillsboro-1","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","oy":1999,"deal":"Peak10 acquired ViaWest for $1.67 billion in August 2017, leading to the formation of Flexential.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/flexential-hillsboro-1"],"band":"< 10 MW"},{"id":"9e5a1b1f5129","cid":"32388b28e246","canon":0,"dups":8,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","uquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"pscan":"https://www.hillsboro-oregon.gov/our-city/departments/economic-development/infrastructure-utilities","uscan":"https://www.hillsboro-oregon.gov/our-city/departments/economic-development/infrastructure-utilities","srcUrls":["https://www.hillsboro-oregon.gov/our-city/departments/economic-development/infrastructure-utilities"],"srcDom":"hillsboro-oregon.gov","band":"< 10 MW"},{"id":"0276e8b36f08","cid":"32388b28e246","canon":0,"dups":8,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"Medium","pquote":"Cloudflare has blamed its November 2 service disruption on a power failure at a Flexential data center in Hillsboro, Oregon. \"On November 2 at 08:50 UTC, Portland General Electric (PGE), the utility company that services PDX-...\"","pscan":"https://baxtel.com/data-center/flexential-carson-i-ii","uquote":"Portland General Electric (PGE), the utility company that services PDX-...","uscan":"https://baxtel.com/data-center/flexential-carson-i-ii","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","contro":"Power failure reported by Cloudflare","controScan":"https://baxtel.com/data-center/flexential-carson-i-ii","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/flexential-carson-i-ii"],"band":"< 10 MW"},{"id":"9a5ebe3007ce","cid":"32388b28e246","canon":0,"dups":8,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Four 480 Volt utility power feeds; 8.5 megawatt diesel power generation capacity; Automatic power switching; 3,960 kVA UPS system capacity; Redundant battery strings; Multiple redundant power distribution paths; Branch Circuit Monitoring Systems; Connected to PGE Sunset Reliability Center with redundant power grids; Diesel fuel priority with PGE's Dispatchable Standby Generation Program DSG guaranteeing 24x7 availability.","pscan":"https://baxtel.com/data-center/flexential-hillsboro-1","uquote":"Connected to PGE Sunset Reliability Center with redundant power grids","uscan":"https://baxtel.com/data-center/flexential-hillsboro-1","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/flexential-hillsboro-1"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"07bbb3ed4c11","cid":"32388b28e246","canon":0,"dups":8,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Connected to PGE Sunset Reliability Center with redundant power grids; Diesel fuel priority with PGE's Dispatchable Standby Generation Program DSG guaranteeing 24x7 availability.","pscan":"https://baxtel.com/data-center/flexential-hillsboro-1","uconf":"High","uquote":"Connected to PGE Sunset Reliability Center with redundant power grids","uscan":"https://baxtel.com/data-center/flexential-hillsboro-1","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","oy":1999,"deal":"Peak10 acquired ViaWest for $1.67 billion in August 2017, leading to the formation of Flexential. GI Partners and Morgan Stanley Infrastructure Partners made a combined $1 billion primary equity investment in Flexential in November 2024 and August 2025.","dealScan":"https://baxtel.com/data-center/flexential-hillsboro-1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/flexential-hillsboro-1"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"0d3ba96714ae","cid":"32388b28e246","canon":0,"dups":8,"ftype":"data_center","name":"dba: Hillsboro-1 Data Center, aka Bldg C-100","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Four 480 Volt utility power feeds; 8.5 megawatt diesel power generation capacity; Automatic power switching; 3,960 kVA UPS system capacity; Redundant battery strings; Multiple redundant power distribution paths; Branch Circuit Monitoring Systems; Connected to PGE Sunset Reliability Center with redundant power grids; Diesel fuel priority with PGE's Dispatchable Standby Generation Program DSG guaranteeing 24x7 availability.","uconf":"High","uquote":"Connected to PGE Sunset Reliability Center with redundant power grids","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners, Hamilton Lane","deal":"Peak 10 (backed by GI Partners) acquired ViaWest for approximately $1.7 billion in August 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"061643ff53d5","cid":"061643ff53d5","canon":1,"dups":6,"ftype":"data_center","name":"dba: Hillsboro-2 data center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program.","uquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, GI Data Infrastructure, Hamilton Lane, Morgan Stanley Infrastructure Partners","contro":"Community opposition to data centers in Hillsboro due to concerns about tax breaks, water usage, and power rates. A state-mandated moratorium on new data center tax breaks is effective June 6, 2026, and the City of Hillsboro paused new data center applications after May 7, 2026.","deal":"Flexential raised approximately $1 billion from GI Partners, GI Data Infrastructure, Hamilton Lane and Morgan Stanley Infrastructure Partners for expansion.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"29ed590487c3","cid":"061643ff53d5","canon":0,"dups":6,"ftype":"data_center","name":"dba: Hillsboro-2 data center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Flexential Portland - Hillsboro 2 Data Center... It has access to 18.0 MW of power.... Our Generation 4 Portland - Hillsboro 2 data center is purpose-built to accommodate power densities of over 1,500 watts per square foot, with 24-foot ceilings, proprietary and highly efficient cooling units and a pressurized raised floor.","uquote":"PGE announced plans to invest $6.5 billion in clean energy and grid modernization over the next five years, which could drive data center development.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","deal":"Peak10 acquired ViaWest for $1.67 billion in August 2017, leading to the creation of Flexential, which operates Hillsboro 2.","dealScan":"https://baxtel.com/data-center/flexential-hillsboro-2","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/flexential-hillsboro-2"],"band":"10-25 MW","lflag":"citation_artifact_removed"},{"id":"ecca2cf49386","cid":"061643ff53d5","canon":0,"dups":6,"ftype":"data_center","name":"dba: Hillsboro-2 data center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program. Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","uquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program. Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","oy":2015,"contro":"General community opposition to data centers in Hillsboro due to power and water usage concerns, and a statewide moratorium on data center tax abatements.","deal":"Peak 10 acquired ViaWest for $1.675 billion in August 2017, leading to the formation of Flexential. Morgan Stanley Infrastructure Partners made a strategic investment in Flexential in October 2024, becoming a co-control investor alongside GI Partners. GI Partners also closed a continuation vehicle for Flexential in 2025/2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b7d9250c5f31","cid":"061643ff53d5","canon":0,"dups":6,"ftype":"data_center","name":"dba: Hillsboro-2 data center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program. Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","uquote":"Power. Portland General Electric www.portlandgeneral.com.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","oy":2015,"deal":"Flexential raised approximately $1 billion in primary equity from GI Partners, Morgan Stanley Infrastructure Partners, and Hamilton Lane to fund development (August 2025)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7c229290c483","cid":"061643ff53d5","canon":0,"dups":6,"ftype":"data_center","name":"dba: Hillsboro-2 data center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program. Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","uconf":"High","uquote":"Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","oy":2015,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3a88a9a18984","cid":"061643ff53d5","canon":0,"dups":6,"ftype":"data_center","name":"dba: Hillsboro-2 data center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program.","uquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","oy":2015,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4371399d9cdd","cid":"077f9c1a2ca8","canon":0,"dups":5,"ftype":"data_center","name":"dba: Hillsboro-3 Data Center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"With 36 MW located within the Hillsboro campus, Hillsboro 3 can deliver more than 1,500 watts per square foot of power for your most intensive applications.... Distributed redundant 4:3 UPS. Fault tolerant electrical and mechanical systems. 36 MW critical load UPS capacity. 1,500 W/SF power density. N+2 cooling redundancy. Hot/cold aisle configuration. 100% power SLA. Designed for 1.3 PUE.","uquote":"In an exchange on April 1, 2026, at 3:03 PM, PGE Communications representative John Farmer finally confirmed the scale of the hidden commitment: “In 2025 and the first part of 2026, PGE executed five contracts with data center customers for 430 MW.”","uscan":"https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Legacy Investing, and Invesco Real Estate","tenant":"CoreWeave","ay":2020,"oy":2020,"contro":"Widespread community opposition in Hillsboro regarding data center tax breaks, energy demand, and water usage, leading to a statewide moratorium on new tax exemptions.","controScan":"https://www.kgw.com/article/tech/hillsboro-residents-rally-against-data-centers/283-0d999c4d-ef92-423c-a93a-ef5c68c549bb","deal":"Refinancing arranged by JLL Capital Markets in May 2022 for a newly constructed, 358,000-square-foot, Tier III data center. A seven-year, fixed-rate, non-recourse loan was placed with a life company.","dealScan":"https://www.jll.com/en-us/newsroom/portland-data-center-facility-refinanced","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"hillsboroherald.com;jll.com;kgw.com","srcUrls":["https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/","https://www.jll.com/en-us/newsroom/portland-data-center-facility-refinanced","https://www.kgw.com/article/tech/hillsboro-residents-rally-against-data-centers/283-0d999c4d-ef92-423c-a93a-ef5c68c549bb"],"band":"25-50 MW","lflag":"citation_artifact_removed utility_alias_corrected","ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co"},{"id":"d308506f85e3","cid":"077f9c1a2ca8","canon":0,"dups":5,"ftype":"data_center","name":"dba: Hillsboro-3 Data Center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Additionally, the market offers 100% renewable energy options for power generation, offering cheaper and more competitive costs than other markets.","pscan":"https://www.jll.com/en-us/newsroom/portland-data-center-facility-refinanced","uquote":"In an exchange on April 1, 2026, at 3:03 PM, PGE Communications representative John Farmer finally confirmed the scale of the hidden commitment: “In 2025 and the first part of 2026, PGE executed five contracts with data center customers for 430 MW.”","uscan":"https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Legacy Investing, and Invesco Real Estate","ay":2020,"oy":2021,"contro":"Community opposition and controversy regarding data center tax abatements, energy demand, and water usage in Hillsboro.","controScan":"https://forestgrovenewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"Refinancing arranged by JLL Capital Markets in May 2022 for a seven-year, fixed-rate, non-recourse loan.","dealScan":"https://www.jll.com/en-us/newsroom/portland-data-center-facility-refinanced","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"jll.com;hillsboroherald.com;forestgrovenewstimes.com","srcUrls":["https://www.jll.com/en-us/newsroom/portland-data-center-facility-refinanced","https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/","https://forestgrovenewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"e879d3f7dced","cid":"077f9c1a2ca8","canon":0,"dups":5,"ftype":"data_center","name":"dba: Hillsboro-3 Data Center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program. Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","uquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids...","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","ay":2020,"oy":2020,"contro":"Community opposition regarding data center tax breaks, water usage, rising power rates, and land use in Hillsboro, leading to a statewide moratorium on tax breaks.","controScan":"https://www.kgw.com/article/tech/hillsboro-residents-rally-against-data-centers/283-0d999c4d-ef92-423c-a93a-ef5c68c549bb","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"kgw.com","srcUrls":["https://www.kgw.com/article/tech/hillsboro-residents-rally-against-data-centers/283-0d999c4d-ef92-423c-a93a-ef5c68c549bb"],"band":"25-50 MW"},{"id":"9c217b868175","cid":"077f9c1a2ca8","canon":0,"dups":5,"ftype":"data_center","name":"dba: Hillsboro-3 Data Center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"“We have partnered with Flexential since its initial project in 1999 in delivering cost-effective, reliable and sustainable power to enable its customers to grow their digital infrastructure deployments in the Portland region,” Dain Nestel, director of growth and commercialization at Portland General Electric, in the company's press release.","pscan":"https://oregonbusiness.com/19649-flexential-to-open-fourth-data-center-in-hillsboro/","uquote":"Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","ay":2020,"oy":2020,"contro":"General community opposition in Hillsboro regarding data center tax breaks, water usage, and energy demand, leading to a statewide moratorium on new data center tax breaks.","controScan":"https://www.kgw.com/article/tech/hillsboro-residents-rally-against-data-centers/283-0d999c4d-ef92-423c-a93a-ef5c68c549bb","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"oregonbusiness.com;kgw.com","srcUrls":["https://oregonbusiness.com/19649-flexential-to-open-fourth-data-center-in-hillsboro/","https://www.kgw.com/article/tech/hillsboro-residents-rally-against-data-centers/283-0d999c4d-ef92-423c-a93a-ef5c68c549bb"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"077f9c1a2ca8","cid":"077f9c1a2ca8","canon":1,"dups":5,"ftype":"data_center","name":"dba: Hillsboro-3 Data Center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"With 36 MW located within the Hillsboro campus, Hillsboro 3 can deliver more than 1,500 watts per square foot of power for your most intensive applications. This allows you to realize cost savings, even in a high-density compute-intensive environment due to our highly efficient built-in liquid cooling capabilities. Flexential is committed to data center sustainability.","uquote":"In Hillsboro, power for data centers is primarily provided and monitored by Portland General Electric (PGE).","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Flexential","ay":2020,"oy":2020,"contro":"Residents have rallied against data centers in Hillsboro, raising concerns about tax breaks, energy demand, and impacts on local communities. The Oregon Legislature approved HB 4084, placing a moratorium on data center applications starting in June 2026, which led to a rush of applications.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f99a35d0114a","cid":"9df16b76a930","canon":0,"dups":3,"ftype":"data_center","name":"dba: PORL01","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Portland General Electric (PGE)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co","srcUrls":null,"srcDom":null},{"id":"2fc2e44049bc","cid":"9df16b76a930","canon":0,"dups":3,"ftype":"data_center","name":"dba: PORL01","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"4a24f3882d33","cid":"4a24f3882d33","canon":1,"dups":1,"ftype":"data_center","name":"dba: PORL01","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Access to reliable and cost-effective regional utility power, The campus offers the robust Hillsboro Data Center Ring connectivity, along with ample power availability and sustainable grid mix options.","uquote":"In Hillsboro, power for data centers is primarily provided and monitored by Portland General Electric (PGE).","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"STACK Infrastructure","spon":"Blue Owl Capital","contro":"Oregon passed the POWER Act (HB 3546) that ensures big energy users, like data centers, pay for the additional demand they place on Oregon's electric grid. The 2026 Oregon Legislature approved HB 4084 modifying the state enterprise zone laws to place a moratorium on data center applications starting in June 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9df16b76a930","cid":"9df16b76a930","canon":0,"dups":3,"ftype":"data_center","name":"dba: PORL01","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Portland General Electric (PGE)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text,merged_duplicate","ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co","srcUrls":null,"srcDom":null},{"id":"db12ff0927fa","cid":"db12ff0927fa","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"9f24e21a88c3","cid":"00ba775c81ba","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"00ba775c81ba","cid":"00ba775c81ba","canon":1,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"ff452fa1ff02","cid":"ff452fa1ff02","canon":1,"dups":1,"ftype":"data_center","name":"Edge ConneX Data Center","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"The EdgeConneX Portland campus offers on-ramps to all major cloud services and is located in the key suburb of Hillsboro, the premier emerging cluster on the West Coast.... Portland has rapidly grown to a primary data center market for the United States, with considerable renewable energy available and excellent connectivity regionally and to coastal landings for pan- Pacific linkage.","uquote":"Grid Operator: Portland General Electric.","uscan":"https://www.interconnection.fyi/data-center/project/edge-connex-data-center-430f8a50","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","oy":2015,"contro":"Hillsboro residents and local groups have protested against data center expansion, citing concerns about power access limitations, rising power and water rates, tax breaks, and the conversion of farmland into industrial sites. A newer EdgeConneX facility (POR03) is reportedly completed but idle due to power grid limitations, with full operation not expected until 2030.","controScan":"https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/","deal":"EdgeConneX was acquired by EQT Infrastructure in 2020.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;hillsboroherald.com","srcUrls":["https://www.interconnection.fyi/data-center/project/edge-connex-data-center-430f8a50","https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/"],"band":"< 10 MW","lflag":"citation_artifact_removed"},{"id":"e1c91eb9f0dd","cid":"e1c91eb9f0dd","canon":0,"dups":1,"ftype":"data_center","name":"EdgeconneX POR03 Data Center, Sunset Corporate Park, LLC","city":"HILLSBORO","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"Portland offers the right ingredients for the most significant deployments, from low-cost renewable energy and plenty of fiber to low taxes and international connectivity.","uconf":"High","uquote":"Grid Operator: Portland General Electric.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","contro":"Community opposition regarding power and water usage, tax breaks, and grid readiness delays. The City of Hillsboro has paused new data center applications.","controScan":"https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/","deal":"EQT Infrastructure acquired EdgeConneX in 2020 for $2.6 billion. Sixth Street acquired a minority stake in EdgeConneX in September 2024.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","srcUrls":["https://hillsboroherald.com/hillsboro-may-be-out-of-power-the-high-cost-of-the-data-center-gold-rush/"],"band":"< 10 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"7c202f883732","cid":"7c202f883732","canon":1,"dups":1,"ftype":"data_center","name":"EdgeconneX POR03 Data Center, Sunset Corporate Park, LLC","city":"HILLSBORO","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Future / Expansion","mw":21,"pc":"Grid","pconf":"High","pquote":"buildings like EdgeConneX POR03 (planned for 21 MW) end up structurally finished but effectively “dead” on the vine, waiting for a grid that won't be ready until 2030. The Herald has a source who stated that the newest Edge ConneX facility is being completed and will sit idle until PGE can provide power.","uconf":"High","uquote":"buildings like EdgeConneX POR03 (planned for 21 MW) end up structurally finished but effectively “dead” on the vine, waiting for a grid that won't be ready until 2030. The Herald has a source who stated that the newest Edge ConneX facility is being completed and will sit idle until PGE can provide power.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","ay":2021,"oy":2030,"contro":"Grid capacity issues causing delays; facility structurally finished but awaiting power until 2030.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text status_adjusted_future_expansion","band":"10-25 MW","rawStatus":"Operational","srcUrls":null,"srcDom":null},{"id":"d9f4c170674a","cid":"d9f4c170674a","canon":0,"dups":1,"ftype":"data_center","name":"Flexential","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program. Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","uconf":"High","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program. For Flexential, Oregon is also a gold-level partner in PGE's Clean Wind program, which guarantees access to a reliable renewable energy source.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","oy":2013,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"49bfc5716c33","cid":"49bfc5716c33","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","uconf":"High","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, GI Data Infrastructure, Hamilton Lane, Morgan Stanley Infrastructure Partners","oy":2024,"contro":"Community opposition and protests against data center development and tax breaks in Hillsboro.","deal":"Acquisition of Hillsboro 4 and Hillsboro 5 data centers from T5 Data Centers, closed May 28, 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5768b376a596","cid":"5768b376a596","canon":0,"dups":1,"ftype":"data_center","name":"Flexential","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program. Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","uquote":"Our data centers in Hillsboro are connected to the PGE Sunset Reliability Center's redundant power grids and have a high 24/7 diesel fuel priority with PGE's Dispatchable Standby Generation program. Flexential Oregon is a gold level partner in the Portland General Electric Clean Wind program, which guarantees a reliable and renewable source of clean energy.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","contro":"Local opposition and scrutiny regarding data center tax breaks, water/power usage, and job creation in Hillsboro.","deal":"Acquisition of Hillsboro 4 and Hillsboro 5 data centers by Flexential on May 28, 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"6ebc16457edf","cid":"6ebc16457edf","canon":1,"dups":1,"ftype":"data_center","name":"Flexential Building (H3)","city":"HILLSBORO","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"Legacy Investing, ; Invesco Real Estate","ay":2020,"oy":2022,"contro":"Community opposition to data center expansion in Hillsboro due to power/water rates and land use. A Flexential facility (PDX01) experienced a major power failure in March 2024 due to incorrectly set breaker coordination settings.","controScan":"https://hillsboroherald.com/hillsboro-makes-national-data-centers-news-as-council-calls-executive-session-to-discuss-legal-matters/","deal":"Sale and leaseback transaction with Legacy Investing, LLC and Invesco Real Estate for the development of Hillsboro 3, announced April 7, 2021.","dealScan":"https://www.prnewswire.com/news-releases/flexential-partners-with-legacy-investing-llc-for-development-of-state-of-the-art-facility-in-hillsboro-301263653.html","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"prnewswire.com;hillsboroherald.com","srcUrls":["https://www.prnewswire.com/news-releases/flexential-partners-with-legacy-investing-llc-for-development-of-state-of-the-art-facility-in-hillsboro-301263653.html","https://hillsboroherald.com/hillsboro-makes-national-data-centers-news-as-council-calls-executive-session-to-discuss-legal-matters/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"91657683afce","cid":"280a6a9f8431","canon":0,"dups":2,"ftype":"data_center","name":"Flexential Colorado Corp","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Portland General Electric (PGE)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co","srcUrls":null,"srcDom":null},{"id":"4023143b0076","cid":"4023143b0076","canon":1,"dups":1,"ftype":"data_center","name":"Flexential Colorado Corp.","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":113,"pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","uconf":"High","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential Colorado","spon":"GI Partners, Morgan Stanley","tenant":"CoreWeave","ay":2013,"oy":2013,"contro":"Community opposition to data centers in Hillsboro regarding tax breaks, energy demand, and water usage; withdrawal of Senate Bill 1586 due to opposition; Hillsboro City Council to evaluate options to pause data center development; one-year moratorium on data center tax breaks effective June 6, 2026.","controScan":"https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/","deal":"Acquisition of Hillsboro 4 and Hillsboro 5 data centers by Flexential, closed May 28, 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","srcUrls":["https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"280a6a9f8431","cid":"280a6a9f8431","canon":0,"dups":2,"ftype":"data_center","name":"Flexential Colorado Corp.","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Portland General Electric (PGE)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text,merged_duplicate","ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co","srcUrls":null,"srcDom":null},{"id":"a89c303dbe09","cid":"a89c303dbe09","canon":0,"dups":1,"ftype":"data_center","name":"Flexential Colorado Corp.","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program. For Flexential, Oregon is also a gold-level partner in PGE's Clean Wind program, which guarantees access to a reliable renewable energy source.","uquote":"Grid Operator. Portland General Electric.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","tenant":"CoreWeave","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"1e0af945001d","cid":"1e0af945001d","canon":1,"dups":1,"ftype":"data_center","name":"Flexential Corp","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":113,"pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program. For Flexential, Oregon is also a gold-level partner in PGE's Clean Wind program, which guarantees access to a reliable renewable energy source.","uconf":"High","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","tenant":"CoreWeave","ay":2025,"oy":2026,"contro":"Community opposition regarding tax breaks, power consumption, and job creation; protests held.","controScan":"https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/","deal":"Acquisition of Hillsboro 4 and Hillsboro 5 data centers in May 2026, marking the largest real estate transaction in company history.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","srcUrls":["https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/"],"band":"100-250 MW"},{"id":"7b9c94b771fd","cid":"dee30f8ba834","canon":0,"dups":2,"ftype":"data_center","name":"Google","city":"The Dalles","county":"Wasco","state":"OR","lat":45.164536,"lng":-121.165069,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Earlier this year, Google entered an agreement with Avangrid for more than 100 megawatts of clean energy that will help enable the upgrade and repower of the Leaning Juniper IIB facility in nearby Gilliam County. When online, the facility will supply the energy to Google's data centers in The Dalles.","uconf":"High","uquote":"Northern Wasco County People's Utility District Sales and Fixed Capital 2004 to 2022.","uscan":"https://www.technostatecraft.com/p/how-google-is-reshaping-a-small-oregon","ukey":"13788|OR","uname":"Northern Wasco County PUD","rto":"non-RTO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","ay":2006,"oy":2026,"contro":"Water usage disputes, lawsuit over data transparency, land use controversy related to reservoir expansion, and tax abatements.","controScan":"https://www.govtech.com/analytics/the-dalles-ore-settles-lawsuit-over-google-data-centers","deal":"Water rights agreement and $28.5 million water infrastructure investment (November 2021/December 2022); 100 MW clean energy agreement with Avangrid (2025); Strategic Investment Program tax abatement agreements (2021).","dealScan":"https://www.govtech.com/analytics/the-dalles-ore-settles-lawsuit-over-google-data-centers","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"technostatecraft.com;govtech.com","lflag":"operational_null_capacity source_quality_reclassified coordinate_cluster_reclassified","srcUrls":["https://www.technostatecraft.com/p/how-google-is-reshaping-a-small-oregon","https://www.govtech.com/analytics/the-dalles-ore-settles-lawsuit-over-google-data-centers"]},{"id":"883d01222822","cid":"883d01222822","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"The Dalles","county":"Wasco","state":"OR","lat":45.164536,"lng":-121.165069,"cprec":"shared_centroid","status":"Operational","mw":215,"pc":"Grid","pconf":"High","pquote":"Earlier this year, Google entered an agreement with Avangrid for more than 100 megawatts of clean energy that will help enable the upgrade and repower of the Leaning Juniper IIB facility in nearby Gilliam County. When online, the facility will supply the energy to Google's data centers in The Dalles.","pscan":"https://oregonbusiness.com/google-advances-commitment-to-the-dalles-launching-sustainable-water-storage-system/","uquote":"Northern Wasco PUD provides power service in The Dalles, 15-Mile-Celilo, Rowena, Mill Creek, Dufur, Tygh Valley, and Wamic.","uscan":"https://www.wascocountyor.gov/businesses/building_a_business/utilities.php","ukey":"13788|OR","uname":"Northern Wasco County PUD","rto":"non-RTO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","ay":2006,"oy":2026,"contro":"Significant controversy over water usage, secrecy, and tax abatements, including a lawsuit and community opposition to a proposed land transfer for reservoir expansion.","controScan":"https://www.sierraclub.org/sierra/data-centers-are-hogging-town-s-water","deal":"Water rights agreement and infrastructure investment of $28.5 million (2021), and property tax abatements.","dealScan":"https://columbiacommunityconnection.com/the-dalles/google-gets-another-go-second-data-center-garners-td-city-approval","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"oregonbusiness.com;wascocountyor.gov;columbiacommunityconnection.com;sierraclub.org","srcUrls":["https://oregonbusiness.com/google-advances-commitment-to-the-dalles-launching-sustainable-water-storage-system/","https://www.wascocountyor.gov/businesses/building_a_business/utilities.php","https://columbiacommunityconnection.com/the-dalles/google-gets-another-go-second-data-center-garners-td-city-approval","https://www.sierraclub.org/sierra/data-centers-are-hogging-town-s-water"],"band":"100-250 MW","lflag":"coordinate_cluster_reclassified"},{"id":"dee30f8ba834","cid":"dee30f8ba834","canon":0,"dups":2,"ftype":"data_center","name":"Google","city":"The Dalles","county":"Wasco","state":"OR","lat":45.164536,"lng":-121.165069,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Northern Wasco PUD provides power service in The Dalles, 15-Mile-Celilo, Rowena, Mill Creek, Dufur, Tygh Valley, and Wamic. NWPUD is a locally controlled, non-profit utility that focuses on providing exceptional service at the lowest cost.... The PUD purchases the majority of its power from the federal Bonneville Power Administration, which serves several dozen public utilities in the Northwest with low-cost electricity.... Earlier this year, Google entered an agreement with Avangrid for more than 100 megawatts of clean energy that will help enable the upgrade and repower of the Leaning Juniper IIB facility in nearby Gilliam County. When online, the facility will supply the energy to Google's data centers in The Dalles.","uconf":"High","uquote":"Northern Wasco PUD provides power service in The Dalles, 15-Mile-Celilo, Rowena, Mill Creek, Dufur, Tygh Valley, and Wamic.... Northern Wasco County People's Utility District (NWCPUD) is a customer-owned utility that provides nearly 25,000 people and businesses with electricity in Wasco County, Oregon.","ukey":"13788|OR","uname":"Northern Wasco County PUD","rto":"non-RTO","nerc":"WECC","op":"Google","spon":"Google","tenant":"Google","ay":2006,"oy":2026,"contro":"Significant controversy exists regarding Google's water usage for its data centers in The Dalles, leading to a lawsuit between the City of The Dalles and The Oregonian over public records requests for water consumption data. There is also ongoing debate and community opposition concerning the city's efforts to expand its water reservoir, with critics alleging it is primarily to meet Google's growing water demands, impacting natural resources and potentially threatening endangered fish.","deal":"In November 2021, The Dalles City Council approved a $28.5 million deal with Google to provide water for the tech company to cool two new data centers there.... Google has agreed to pay up to 50 percent of property taxes on the structure once it is operable through fees and property taxes.... Earlier this year, Google entered an agreement with Avangrid for more than 100 megawatts of clean energy that will help enable the upgrade and repower of the Leaning Juniper IIB facility in nearby Gilliam County.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text citation_artifact_removed coordinate_cluster_reclassified,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"aa4df560c400","cid":"aa4df560c400","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers","city":"Portland","county":"Multnomah","state":"OR","lat":45.547711,"lng":-122.417363,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"2MW of utility power dedicated to the facility. Backup power generation provided by a 2MW diesel generator with automatic transfer.","pscan":"https://baxtel.com/data-center/h5-portland","uquote":"Portland General Electric (PGE) is an electrical utility based in Portland in the U.S. state of Oregon.","uscan":"https://tethys.pnnl.gov/organization/portland-general-electric-company","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"H5 Data Centers","spon":"H5 Data Centers","ay":2021,"oy":2022,"deal":"Acquisition of seven data centers from vXchnge, announced January 31, 2021.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;tethys.pnnl.gov","srcUrls":["https://baxtel.com/data-center/h5-portland","https://tethys.pnnl.gov/organization/portland-general-electric-company"],"band":"< 10 MW","lflag":"coordinate_cluster_reclassified"},{"id":"03b41a4a9bc7","cid":"03b41a4a9bc7","canon":1,"dups":1,"ftype":"data_center","name":"Industrial Load","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","proc":"Tariff (utility)","pcp":"Portland General Electric (PGE)","pdt":"2 cents per kilowatt hour","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"15248|OR","uname":"Portland General Electric Co","reportedUtility":"Portland General Electric Co","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"809dbf2ad445","cid":"2cfbd5ca7c93","canon":0,"dups":3,"ftype":"data_center","name":"Microsoft Hillsboro-9820","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Portland General Electric.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-hillsboro-9820-87d4fed2","uconf":"High","uquote":"Grid Operator. Portland General Electric.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-hillsboro-9820-87d4fed2","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-hillsboro-9820-87d4fed2"]},{"id":"2cfbd5ca7c93","cid":"2cfbd5ca7c93","canon":1,"dups":3,"ftype":"data_center","name":"Microsoft Hillsboro-9820","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Portland General Electric.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-hillsboro-9820-87d4fed2","uconf":"High","uquote":"Grid Operator: Portland General Electric.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-hillsboro-9820-87d4fed2","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"contro":"Hillsboro has seen a moratorium on Enterprise Zone approvals for data centers since March 2026, with 17 applications submitted prior to the June 6, 2026 effective date.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-hillsboro-9820-87d4fed2"]},{"id":"0c1ce7a123b5","cid":"2cfbd5ca7c93","canon":0,"dups":3,"ftype":"data_center","name":"Microsoft Hillsboro-9820","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Portland General Electric.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-hillsboro-9820-87d4fed2","uconf":"High","uquote":"Grid Operator: Portland General Electric.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"oy":2024,"contro":"Residents are protesting data center development in Hillsboro due to concerns about power, water usage, and tax breaks.","controScan":"https://www.kgw.com/video/tech/why-hillsboro-residents-are-pushing-back-against-data-centers/283-0a58c0a0-11da-4127-92da-478c92d47a9d","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;kgw.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-hillsboro-9820-87d4fed2","https://www.kgw.com/video/tech/why-hillsboro-residents-are-pushing-back-against-data-centers/283-0a58c0a0-11da-4127-92da-478c92d47a9d"]},{"id":"bc1a190108be","cid":"bc1a190108be","canon":1,"dups":1,"ftype":"data_center","name":"NTT -HI1 Data Center","city":"HILLSBORO","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders. Industrial rates continue to fall below the national average. Read about how PGE helped sustain Hillsboro's role as an economic engine for Oregon. PGE is the largest investor-owned utility in Oregon, and also owns major transmission rights to the Pacific Intertie—the West Coast electrical superhighway.","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","uscan":"https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT Group","oy":2020,"contro":"Hillsboro residents are questioning the city's handling of data center tax breaks after officials approved agreements that could extend exemptions decades into the future — just a month before a statewide moratorium on new incentives takes effect.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"NTT Global Data Centers recently signed agreements with the city of Hillsboro that could see exemptions extend through 2051, related to enterprise zone tax abatements.","dealScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"hillsboroherald.com;hillsboronewstimes.com","srcUrls":["https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"8e89441d2c3c","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Fed by reliable, low-cost Portland General Electric.","uquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE)","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT DATA","oy":2020,"contro":"Hillsboro residents are questioning the city's handling of data center tax breaks after officials approved agreements that could extend exemptions decades into the future","deal":"Tax abatement agreements with the city of Hillsboro that could see exemptions extend through 2051.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3ab658e7b526","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","uconf":"High","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT","oy":2020,"contro":"Controversy over tax breaks and infrastructure strain for NTT's data center campus in Hillsboro.","controScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","deal":"City of Hillsboro signed six consecutive five-year contracts for property tax exemptions for NTT Global Data Centers campus on April 27, 2026.","dealScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","srcUrls":["https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"5fa018494251","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Hillsboro data center clients will benefit from the reliability and low power rates of Portland General Electric (PGE), and also benefit from the region's typically mild temperatures.","pscan":"https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT DATA","ay":2020,"oy":2020,"contro":"Community opposition and controversy over tax breaks and environmental impacts, including a statewide moratorium on data center tax breaks.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"Tax abatement agreements for NTT Global Data Centers in Hillsboro extending through 2051, signed in March-April 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"services.global.ntt;hillsboronewstimes.com","srcUrls":["https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"25-50 MW"},{"id":"8e46e7fb7e48","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"36MW of critical IT load, N+1 distributed redundancy for each vault, diverse power distribution to data hall and renewable energy options available.","uconf":"High","uquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT","oy":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"08f4467ec806","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Hillsboro HI1, the first of five data centers on our expansive 126MW campus, offers 36MW of critical IT load and 138,000 square feet of data floor space. Certified by Cleaner Air Oregon, this facility prioritizes sustainability while delivering high-performance solutions. Whether you need cabinets, customizable cages, private suites, or dedicated vaults, our experienced in-house team will tailor a solution that meets your IT infrastructure needs, ensuring optimal space utilization and performance.","uquote":"Power. Portland General Electric www.portlandgeneral.com.","uscan":"https://fidelityportland.com/FNTRSPortland/media/FNT-RS-Portland/2023-04-fntpdx-utilitysheet-hillsboro_1.pdf","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT","ay":2021,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fidelityportland.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://fidelityportland.com/FNTRSPortland/media/FNT-RS-Portland/2023-04-fntpdx-utilitysheet-hillsboro_1.pdf"],"band":"25-50 MW"},{"id":"1d6e63e7678e","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","uquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE)","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT","ay":2020,"oy":2020,"contro":"Community opposition and scrutiny over tax incentives and a moratorium on further data center expansion in Hillsboro.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"Land acquisition for 216MW expansion, bringing total planned capacity to 354MW (announced May 2025).","dealScan":"https://services.global.ntt/en-us/newsroom/ntt-data-expands-global-data-center-footprint-with-land-acquisitions-across-seven-strategic-markets","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"services.global.ntt;hillsboronewstimes.com","srcUrls":["https://services.global.ntt/en-us/newsroom/ntt-data-expands-global-data-center-footprint-with-land-acquisitions-across-seven-strategic-markets","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"ea6b464da614","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Hillsboro data center clients will benefit from the reliability and low power rates of Portland General Electric (PGE), and also benefit from the region's typically mild temperatures.","pscan":"https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","uscan":"https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT DATA","ay":2020,"oy":2020,"contro":"Community opposition and scrutiny over long-term property tax abatements for data centers, including NTT Global Data Centers, ahead of a statewide moratorium on new tax exemptions.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"Six consecutive five-year enterprise zone agreements for property tax abatements, signed April 27, 2026, extending tax-free status until 2051.","dealScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"services.global.ntt;hillsboroherald.com;hillsboronewstimes.com","srcUrls":["https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"25-50 MW"},{"id":"fa176162798b","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.... 36MW of critical IT load, N+1 distributed redundancy for each vault, diverse power distribution to data hall and renewable energy options available.","uconf":"High","uquote":"Hillsboro data center clients will benefit from the reliability and low power rates of Portland General Electric (PGE)...... Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE)...","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT","ay":2020,"oy":2020,"contro":"Oregon regulators approved new rules requiring large data centers to pay more directly for grid infrastructure upgrades and associated costs, addressing concerns about rising electricity costs for residential and small business customers.","deal":"NTT Ltd. announced on February 5, 2020, the construction of a new Pacific Northwest data center campus in Hillsboro, Oregon, planning five data centers totaling 144 megawatts of critical IT load on a 47-acre property.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"949629279a20","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","pscan":"https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","uconf":"High","uquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","uscan":"https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"Nippon Telegraph and Telephone (NTT)","oy":2020,"contro":"Community opposition regarding tax breaks, water usage, and environmental impact; NTT Global Data Centers is involved in controversial tax abatement agreements.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"City of Hillsboro signed six consecutive five-year tax abatement contracts (HIL11-A through HIL11-F) on April 27, 2026, for NTT Global Data Centers' campus, extending tax-free status until 2051.","dealScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenters.ragingwire.com;hillsboroherald.com;hillsboronewstimes.com","srcUrls":["https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"10512bbd6a4f","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","pscan":"https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","uquote":"Hillsboro data center clients will benefit from the reliability and low power rates of Portland General Electric (PGE)","uscan":"https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT / NTT DATA","ay":2020,"oy":2020,"contro":"Community opposition and moratorium petition regarding data center tax breaks and strain on local utilities.","controScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","deal":"Five new enterprise zone agreements for property tax exemptions through 2051, signed April 27, 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.ragingwire.com;services.global.ntt;hillsboroherald.com","srcUrls":["https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/"],"band":"25-50 MW"},{"id":"616634241ede","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"36MW of critical IT load, N+1 distributed redundancy for each vault, diverse power distribution to data hall and renewable energy options available. Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/hillsboro-hi1-data-center","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","uscan":"https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT Group","oy":2020,"contro":"Controversy over property tax exemptions for data centers, including NTT Global Data Centers, extending through 2051.","controScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","deal":"Six consecutive five-year enterprise zone contracts for property tax exemptions for NTT Global Data Centers, signed on April 27, 2026, extending through 2051.","dealScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"services.global.ntt;hillsboroherald.com","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/hillsboro-hi1-data-center","https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/"],"band":"25-50 MW"},{"id":"98fa48ff4a90","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","pscan":"https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","uconf":"High","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","uscan":"https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT DATA","ay":2020,"oy":2020,"contro":"Community opposition and scrutiny over long-term property tax exemptions for data centers, including those operated by NTT Global Data Centers, extending through 2051. Concerns about water usage and energy demand.","controScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","deal":"Six consecutive five-year enterprise zone agreements (HIL11-A through HIL11-F) signed on April 27, 2026, for the 6000 NW Jackson School Road campus, providing property tax exemptions through 2051.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"hillsboroherald.com","srcUrls":["https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"fed1ef713100","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","pscan":"https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","uquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","uscan":"https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT","oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"datacenters.ragingwire.com","srcUrls":["https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"0cb16bcc72f4","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Hillsboro data center clients will benefit from the reliability and low power rates of Portland General Electric (PGE), and also benefit from the region's typically mild temperatures.","pscan":"https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","uquote":"Hillsboro data center clients will benefit from the reliability and low power rates of Portland General Electric (PGE), and also benefit from the region's typically mild temperatures.","uscan":"https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT Group","ay":2020,"oy":2020,"contro":"Community opposition and scrutiny over long-term property tax abatements, energy demand, and water usage for data centers in Hillsboro, including those operated by NTT Global Data Centers.","deal":"City of Hillsboro signed six consecutive five-year contracts (HIL11-A through HIL11-F) on April 27, 2026, for property tax exemptions extending to 2051 for NTT Global Data Centers' campus at 6000 NW Jackson School Road.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.global.ntt","srcUrls":["https://services.global.ntt/en-us/newsroom/ntt-ltd-to-expand-us-data-center-footprint-to-hillsboro-oregon"],"band":"25-50 MW"},{"id":"4f21cc967b93","cid":"4f21cc967b93","canon":1,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.... 36MW of critical IT load, N+1 distributed redundancy for each vault, diverse power distribution to data hall and renewable energy options available.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/hillsboro-hi1-data-center","uconf":"High","uquote":"Our Hillsboro Data Center Campus is powered by Portland General Electric (PGE), which has a reputation for reliability, low rates and full redundancy at every level of the power network.","uscan":"https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT Group","ay":2020,"oy":2020,"contro":"Community opposition and a moratorium petition regarding data center tax breaks and infrastructure strain.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"City of Hillsboro signed six consecutive five-year Enterprise Zone (EZ) agreements on April 27, 2026, for property tax exemptions extending through 2051.","dealScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"services.global.ntt;datacenters.ragingwire.com;hillsboroherald.com;hillsboronewstimes.com","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/hillsboro-hi1-data-center","https://datacenters.ragingwire.com/ntt-hillsboro-hi1-data-center/","https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"25-50 MW","lflag":"citation_artifact_removed"},{"id":"11a7cfb4b5f5","cid":"4f21cc967b93","canon":0,"dups":16,"ftype":"data_center","name":"NTT Global Data Centers HI, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.... Hillsboro data center clients will benefit from the reliability and low power rates of Portland General Electric (PGE), and also benefit from the region's typically mild temperatures.... diverse power distribution to data hall and renewable energy options available.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/hillsboro-hi1-data-center","uconf":"High","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.... Hillsboro data center clients will benefit from the reliability and low power rates of Portland General Electric (PGE), and also benefit from the region's typically mild temperatures.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT Group / NTT DATA","ay":2020,"oy":2020,"contro":"Community opposition and scrutiny over long-term property tax abatements for data centers, including those operated by NTT Global Data Centers, extending through 2051.","controScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","deal":"Six consecutive five-year enterprise zone tax abatement contracts (HIL11-A through HIL11-F) signed on April 27, 2026, for NTT Global Data Centers' campus at 6000 NW Jackson School Road, extending tax-free status through 2051.","dealScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"services.global.ntt;hillsboroherald.com","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/hillsboro-hi1-data-center","https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/"],"band":"25-50 MW","lflag":"citation_artifact_removed"},{"id":"5489338f9894","cid":"5489338f9894","canon":0,"dups":1,"ftype":"data_center","name":"OR1 Data Center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The site's selection in 2011 was heavily influenced by \"enterprise zone\" tax incentives and the potential for transitioning to 100% renewable energy. Its location in Hillsboro offers relative safety and security, benefiting from a reliable local power and communications grid, a legacy of the Washington County chip industry. OR1 was designed with future photovoltaic generation installations in mind, and Adobe is actively exploring this option.","uconf":"High","uquote":"At the time it was for all energy, now the potential is for green tariffs or other products with the local utility, Portland General Electric.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Adobe","spon":"Adobe","tenant":"Adobe","ay":2011,"oy":2013,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"eab0ebb172fd","cid":"d9761fcbaca9","canon":0,"dups":2,"ftype":"data_center","name":"OR1 Data Center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"At the time it was for all energy, now the potential is for green tariffs or other products with the local utility, Portland General Electric. OR1 was designed configured for future photovoltaic generation installations. Adobe is presently looking at this option as the data center is becoming 100% provisioned, there is historical data on consumption, and onsite generation is more economically feasible now more than ever.","pscan":"https://www.adobe.com/corporate-responsibility/sustainability/data-centers.html","uconf":"High","uquote":"At the time it was for all energy, now the potential is for green tariffs or other products with the local utility, Portland General Electric.","uscan":"https://www.adobe.com/corporate-responsibility/sustainability/data-centers.html","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Adobe","spon":"Adobe","tenant":"Adobe","ay":2011,"oy":2013,"contro":"Adobe, as an operator in Hillsboro, is implicitly part of the broader community opposition and scrutiny over data center tax breaks, energy demand, and water usage in Hillsboro, which led to a statewide moratorium on tax breaks.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"adobe.com","srcUrls":["https://www.adobe.com/corporate-responsibility/sustainability/data-centers.html"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"d9761fcbaca9","cid":"d9761fcbaca9","canon":1,"dups":2,"ftype":"data_center","name":"OR1 Data Center","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Adobe's Hillsboro, Oregon data center (OR1), operational since 2013, was strategically chosen for its access to low-cost, high-percentage hydroelectric power and Oregon's favorable climate, conducive to energy efficiency. The site's selection in 2011 was heavily influenced by \"enterprise zone\" tax incentives and the potential for transitioning to 100% renewable energy.","uconf":"High","uquote":"At the time it was for all energy, now the potential is for green tariffs or other products with the local utility, Portland General Electric.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Adobe","spon":"Adobe","tenant":"Adobe","ay":2011,"oy":2013,"contro":"Local opposition to data centers in Hillsboro due to concerns over tax breaks, energy demand, and water usage, leading to a state-imposed moratorium on data center tax breaks.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4bfa6a04c772","cid":"7de65d968f53","canon":0,"dups":4,"ftype":"data_center","name":"Oracle America, Inc.","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"In Hillsboro, power for data centers is primarily provided and monitored by Portland General Electric (PGE).... To protect ratepayers, Oracle either funds the necessary power grid upgrades or we build our own on-site power generation sources to help maintain or reduce residents' energy costs.","pscan":"https://www.oracle.com/data-centers/","uconf":"High","uquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region... In Hillsboro, power for data centers is primarily provided and monitored by Portland General Electric (PGE).","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Oracle America","spon":"Landmark Dividend","tenant":"Oracle","oy":2001,"contro":"Community opposition and protests against data centers in Hillsboro regarding tax breaks, energy demand, and water usage. A state-mandated moratorium on new data center tax breaks is effective June 6.","controScan":"https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/","deal":"Single-tenant data center in Hillsboro, Oregon, sold for $31.75 million in January 2024.","dealScan":"https://www.connectcre.com/stories/oracle-occupied-data-center-in-oregon-sells-for-32m/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"oracle.com;connectcre.com;hillsboroherald.com","lflag":"operational_null_capacity citation_artifact_removed","srcUrls":["https://www.oracle.com/data-centers/","https://www.connectcre.com/stories/oracle-occupied-data-center-in-oregon-sells-for-32m/","https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/"]},{"id":"0a3e74b8d3b5","cid":"7de65d968f53","canon":0,"dups":4,"ftype":"data_center","name":"Oracle America, Inc.","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","uconf":"High","uquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Oracle America","spon":"Landmark Dividend","tenant":"Oracle America","deal":"Sale of a 91,000 sq ft Oracle-occupied data center for $31.75 million in January 2024.","dealScan":"https://www.connectcre.com/stories/oracle-occupied-data-center-in-oregon-sells-for-32m/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"connectcre.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.connectcre.com/stories/oracle-occupied-data-center-in-oregon-sells-for-32m/"]},{"id":"dc6d9deb75c4","cid":"7de65d968f53","canon":0,"dups":4,"ftype":"data_center","name":"Oracle America, Inc.","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","uconf":"High","uquote":"Hillsboro's power is reliable and affordable. Portland General Electric (PGE) provides electrical service to the region and has three high-reliability substations (Shute, Sunset, and West Union) in Hillsboro's industrial district, ensuring full redundancy at each level of the power network-from transmission lines to substation transformers and feeders.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Oracle America","spon":"Landmark Dividend","tenant":"Oracle America","oy":2001,"deal":"Data center building sold for $31.75 million in January 2024, with Oracle remaining the sole tenant.","dealScan":"https://baxtel.com/data-center/oracle-hillsboro-1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://baxtel.com/data-center/oracle-hillsboro-1"]},{"id":"7de65d968f53","cid":"7de65d968f53","canon":1,"dups":4,"ftype":"data_center","name":"Oracle America, Inc.","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"In Hillsboro, power for data centers is primarily provided and monitored by Portland General Electric (PGE).","uconf":"High","uquote":"In Hillsboro, power for data centers is primarily provided and monitored by Portland General Electric (PGE).","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Oracle America","spon":"Landmark Dividend","tenant":"Oracle America","oy":2001,"contro":"Widespread community opposition and scrutiny regarding data center tax breaks, energy demand, and water usage in Hillsboro.","deal":"Sale of the facility to an unnamed institutional client for $31.75 million in January 2024.","dealScan":"https://baxtel.com/data-center/oracle-hillsboro-1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://baxtel.com/data-center/oracle-hillsboro-1"]},{"id":"c2bd17e6ebaf","cid":"c2bd17e6ebaf","canon":1,"dups":1,"ftype":"data_center","name":"OVHcloud","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Powered by the Pacific Northwest's energy grid, known for renewable energy sources; Redundant electrical infrastructure; UPS-backed power systems and generator backup.","uquote":"Grid Operator. Portland General Electric.","uscan":"https://www.interconnection.fyi/data-center/project/ovhcloud-3f5ba945","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"OVHcloud","spon":"OVH Groupe","ay":2017,"oy":2017,"deal":"Acquisition of OVHcloud (Data Center Facility in Oregon, United States) by OVH Groupe on 23-Feb-2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/ovhcloud-3f5ba945"]},{"id":"66d46f32052d","cid":"9a3354370bb5","canon":0,"dups":4,"ftype":"data_center","name":"PDX 109","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"To operate the site, ADS requires a continuous electrical supply. ADS works closely with local and regional utilities, including the Umatilla Electric Cooperative (UEC), to secure this supply. Despite these efforts, at the time of this application ADS is limited to 40 MW of electricity at PDX109, which is significantly less than nameplate capacity at the site. The ability to serve the nameplate capacity for ADS needs in the region is several years away and will require significant infrastructure upgrades. Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","uconf":"High","uquote":"ADS works closely with local and regional utilities, including the Umatilla Electric Cooperative (UEC), to secure this supply.","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2021,"contro":"Lawsuit settlement regarding nitrate pollution in local groundwater from existing data center operations.","controScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","deal":"Settlement of $20.5 million for a lawsuit regarding nitrate pollution (date not specified, but 'recently agreed').","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;tricitiesbusinessnews.com","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities"]},{"id":"76273ae5638d","cid":"9a3354370bb5","canon":0,"dups":4,"ftype":"data_center","name":"PDX 109","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","uconf":"High","uquote":"Umatilla Electric Cooperative serves electricity to 3 counties in Oregon including counties like Umatilla County, Union County, and Morrow County.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2021,"contro":"Lawsuit settlement regarding nitrate pollution from existing data center operations.","controScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","deal":"Amazon agreed to pay $20.5 million to settle a lawsuit regarding nitrate pollution from existing data center operations (as of April 14, 2026).","dealScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;tricitiesbusinessnews.com","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities"]},{"id":"ce6c5d3d776c","cid":"ce6c5d3d776c","canon":1,"dups":1,"ftype":"data_center","name":"PDX 109","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":40,"pc":"Grid","pconf":"High","pquote":"ADS works closely with local and regional utilities, including the Umatilla Electric Cooperative (UEC), to secure this supply. Despite these efforts, at the time of this application ADS is limited to 40 MW of electricity at PDX109, which is significantly less than nameplate capacity at the site. The ability to serve the nameplate capacity for ADS needs in the region is several years away and will require significant infrastructure upgrades. Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations. The PDX109 site air permit currently authorizes ADS to operate 112 emergency generators, for a total capacity of approximately 266 megawatts (MW).","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","uquote":"ADS works closely with local and regional utilities, including the Umatilla Electric Cooperative (UEC), to secure this supply.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2021,"contro":"Lawsuit regarding nitrate pollution in local groundwater from existing data center operations.","deal":"$20.5 million settlement for nitrate pollution lawsuit (date not specified, but 'recently agreed')","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"oregon.gov","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf"],"band":"25-50 MW"},{"id":"96bb343eb203","cid":"9a3354370bb5","canon":0,"dups":4,"ftype":"data_center","name":"PDX 109","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"To operate the site, ADS requires a continuous electrical supply. ADS works closely with local and regional utilities, including the Umatilla Electric Cooperative (UEC), to secure this supply. Despite these efforts, at the time of this application ADS is limited to 40 MW of electricity at PDX109, which is significantly less than nameplate capacity at the site. The ability to serve the nameplate capacity for ADS needs in the region is several years away and will require significant infrastructure upgrades. Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","uconf":"High","uquote":"ADS works closely with local and regional utilities, including the Umatilla Electric Cooperative (UEC), to secure this supply.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2021,"oy":2023,"contro":"Oregon Legislators, Climate Solutions, Green Energy Institute, and Northwest Environmental Defense Center expressed deep concern and urged DEQ to reject Amazon's permit application for PDX 109 due to proposed gas fuel cells. Additionally, Amazon Data Services Inc. reached a $20.5 million settlement over allegations that its data center operations in Morrow and Umatilla counties contributed to nitrate contamination.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9a3354370bb5","cid":"9a3354370bb5","canon":0,"dups":4,"ftype":"data_center","name":"PDX 109","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations. The PDX109 site air permit currently authorizes ADS to operate 112 emergency generators, for a total capacity of approximately 266 megawatts (MW). Drawing G1. 1 presents a site plan including the site boundary. Figure 1-1 presents the site boundaries of ADS-owned properties within five miles of PDX109. Drawing G1. 1 and Figure 1-1 are in Appendix B. This site houses networked computer servers that store, process and distribute large amounts of data. Energy is used to power both the IT hardware (e.g. servers, drives and network devices) and the supporting infrastructure such as HVAC systems and cooling equipment. Electricity is distributed from the electrical substation transformers to the uninterruptable power supply system. The uninterruptible power supply system is used to provide backup power to keep the equipment running in case of a power outage. Power distribution units distribute power to the various equipment in the data center, while also providing monitoring capabilities to ensure efficient power utilization. The servers use the majority of the electricity at the site. The amount of electricity required to power servers depends on their size, configuration, and workload.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","uconf":"High","uquote":"UEC. Umatilla Electric Cooperative.","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2008,"oy":2021,"contro":"Lawsuit and settlement over nitrate pollution from existing data center operations.","controScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","deal":"Settlement of $20.5 million for nitrate pollution from existing data center operations (reported January 26, 2026).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;tricitiesbusinessnews.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX109-BAERassessment.pdf","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities"]},{"id":"6da48f3f8a01","cid":"6da48f3f8a01","canon":1,"dups":1,"ftype":"data_center","name":"PDX 178","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Umatilla Electric Cooperative (UEC)","rto":"non-RTO","nerc":"WECC","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon AWS","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"dac2690f2948","cid":"cb2839102590","canon":0,"dups":2,"ftype":"data_center","name":"PDX 178","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"A 10-megawatt power substation is being built adjacent to the new data center in Boardman, the Oregonian reports. The paper said a $320,000 Oregon Department of Transportation grant was awarded to the port to connect the data center to local utilities.","pscan":"https://www.datacenterknowledge.com/hyperscalers/amazon-building-large-data-center-in-oregon","uconf":"High","uquote":"Umatilla Electric Cooperative serves electricity to 3 counties in Oregon including counties like Umatilla County, Union County, and Morrow County. The organization is an electricity cooperative. Currently, 16,772 consumers are provided electricity by the provider.... Cities Umatilla Electric Cooperative Has Coverage: Boardman, OR","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2012,"contro":"Nitrate pollution from Amazon's data centers in Morrow County has been reported, with water leaving the facilities being more concentrated with pollutants.","controScan":"https://www.business-humanrights.org/en/latest-news/united-states-investigation-links-amazon-data-centers-to-worsening-nitrate-crisis-in-oregon-incl-company-comments/","deal":"Amazon agreed to pay $20.5 million to settle a lawsuit over nitrate pollution from its existing data center operations at the Port of Morrow.","dealScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;tricitiesbusinessnews.com;business-humanrights.org","lflag":"online_before_announced operational_null_capacity citation_artifact_removed","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/amazon-building-large-data-center-in-oregon","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","https://www.business-humanrights.org/en/latest-news/united-states-investigation-links-amazon-data-centers-to-worsening-nitrate-crisis-in-oregon-incl-company-comments/"]},{"id":"cb2839102590","cid":"cb2839102590","canon":0,"dups":2,"ftype":"data_center","name":"PDX 178","city":"Boardman","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Portland and the broader Oregon data center market benefit from one of the most compelling power advantages in the country: access to low-cost, renewable hydroelectric energy from the Bonneville Power Administration and the Columbia River basin. Data centers and other large industrial power users in Oregon will soon pay more to access electricity through Portland General Electric.","uquote":"A 10-megawatt power substation is being built adjacent to the new data center in Boardman, the Oregonian reports. The paper said a $320,000 Oregon Department of Transportation grant was awarded to the port to connect the data center to local utilities. Data centers and other large industrial power users in Oregon will soon pay more to access electricity through Portland General Electric.","uscan":"https://www.datacenterknowledge.com/hyperscalers/amazon-building-large-data-center-in-oregon","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2012,"contro":"Yes","controScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","deal":"Lawsuit regarding nitrate pollution settlement and a lawsuit concerning local officials profiting from a broadband deal related to Amazon's expansion.","dealScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;tricitiesbusinessnews.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/amazon-building-large-data-center-in-oregon","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities"]},{"id":"4efa1eb3562d","cid":"6965bdc92976","canon":0,"dups":4,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":261,"pc":"Grid","pconf":"High","pquote":"Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uquote":"UEC Umatilla Electric Cooperative","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2018,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"oregon.gov","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf"],"band":"250+ MW"},{"id":"bdf7e4121a07","cid":"6965bdc92976","canon":0,"dups":4,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":261,"pc":"Grid","pconf":"Medium","pquote":"Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uquote":"UEC Umatilla Electric Cooperative","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","oy":2018,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"oregon.gov","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf"],"band":"250+ MW"},{"id":"1ad5166d566d","cid":"1ad5166d566d","canon":0,"dups":6,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","uconf":"High","uquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually... because of one of those customers: Amazon.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2018,"contro":"Lawsuit by Oregon AG alleging former officials improperly profited from sale of broadband company with Amazon contracts; community concerns over water usage and tax breaks.","controScan":"https://www.opb.org/article/2026/03/04/oregon-attorney-general-lawsuit-morrow-county-broadband-deal/","deal":"Morrow County officials approved an estimated $1 billion in tax breaks for AWS data centers over 15 years.","dealScan":"https://www.kgw.com/article/news/local/technology/data-centers-proliferate-conflict-local-communities/283-258e1eea-a896-4f17-a833-c74947181901","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"kgw.com;opb.org","lflag":"operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://www.kgw.com/article/news/local/technology/data-centers-proliferate-conflict-local-communities/283-258e1eea-a896-4f17-a833-c74947181901","https://www.opb.org/article/2026/03/04/oregon-attorney-general-lawsuit-morrow-county-broadband-deal/"]},{"id":"632ca1ec398a","cid":"1ad5166d566d","canon":0,"dups":6,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations. The SOFC will be used in addition to electricity provided by utility.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uconf":"High","uquote":"UEC Umatilla Electric Cooperative","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2018,"contro":"Lawsuits and civil complaints regarding tax breaks for Amazon's data centers and nitrate contamination of water in Morrow County.","deal":"Settlement of over $20.5 million by Amazon to address nitrate-contaminated water in Morrow County (April 2026).","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"oregon.gov","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf"]},{"id":"ff156dbe3fb6","cid":"1ad5166d566d","canon":0,"dups":6,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The SOFC will be used in addition to electricity provided by utility. Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uconf":"High","uquote":"UEC Umatilla Electric Cooperative","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","oy":2018,"contro":"Lawsuit regarding nitrate pollution in local groundwater.","deal":"Settlement of $20.5 million to address nitrate-contaminated water in Morrow County (April 2026).","dealScan":"https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;kgw.com","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70"]},{"id":"89ee1bee9769","cid":"1ad5166d566d","canon":0,"dups":6,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"This permit modification requests approval to install solid oxide fuel cells (SOFC) as a continuous power source with a capacity of 24.3 megawatts (MW). The SOFC will be used in addition to electricity provided by utility.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uquote":"UEC Umatilla Electric Cooperative Page 6 PAGE 2 1 INTRODUCTION Amazon Data Services, Inc.","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2018,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"oregon.gov","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf"]},{"id":"41df5158ede0","cid":"6965bdc92976","canon":0,"dups":4,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":261,"pc":"Grid","pconf":"High","pquote":"This permit modification requests approval to install solid oxide fuel cells (SOFC) as a continuous power source with a capacity of 24.3 megawatts (MW). The SOFC will be used in addition to electricity provided by utility. [...] Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uconf":"High","uquote":"UEC Umatilla Electric Cooperative [...] Amazon Data Services, Inc. (ADS) owns and operates the PDX062 data center in Boardman, Oregon (PDX-. 62) under Oregon Department of Environmental Quality (Oregon DEQ) Standard Air Contaminant Discharge. Permit (ACDP) No. 25-0029-ST-01 issued April 20, 2018.","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2018,"oy":2018,"contro":"Lawsuit regarding nitrate pollution from Amazon's data center operations in the Port of Morrow area; allegations of public officials profiting from Amazon's local data centers.","controScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","deal":"Settlement of $20.5 million for nitrate pollution from existing data center operations (date not specified, but 'recently agreed')","dealScan":"https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;tricitiesbusinessnews.com","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","https://www.tricitiesbusinessnews.com/articles/amazon-plans-another-data-center-southwest-of-tri-cities"],"band":"250+ MW"},{"id":"9ccfc8d2d263","cid":"1ad5166d566d","canon":0,"dups":6,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uquote":"UEC Umatilla Electric Cooperative","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","oy":2013,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"oregon.gov","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf"]},{"id":"6965bdc92976","cid":"6965bdc92976","canon":1,"dups":4,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":261,"pc":"Grid","pconf":"High","pquote":"The SOFC will be used in addition to electricity provided by utility. Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations.","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uquote":"UEC Umatilla Electric Cooperative","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2008,"oy":2018,"contro":"Lawsuit alleging 'unjust enrichment' by local officials related to Amazon's tax breaks and a telecom business acquisition; worsening nitrate crisis due to water usage.","controScan":"https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute","deal":"Property tax breaks worth nearly $70 million annually, cumulatively over $1 billion. Oregon Department of Transportation grant of $320,000 for connecting to local utilities.","dealScan":"https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;govtech.com","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","https://www.govtech.com/public-safety/oregon-county-grapples-with-aftermath-of-data-center-dispute"],"band":"250+ MW"},{"id":"3ff2ea91fd99","cid":"1ad5166d566d","canon":0,"dups":6,"ftype":"data_center","name":"PDX 62","city":"BOARDMAN","county":"MORROW","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"This permit modification requests approval to install solid oxide fuel cells (SOFC) as a continuous power source with a capacity of 24.3 megawatts (MW). The SOFC will be used in addition to electricity provided by utility. Electrical power systems are designed to be fully redundant so that in the event of a disruption, diesel-fired emergency generators provide back-up power for uninterrupted continuous datacenter operations. The PDX062 site air permit currently authorizes ADS to operate 107 emergency generators and two fire pumps, for a total capacity of approximately 261.5 megawatts (MW).","pscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","uconf":"High","uquote":"UEC Umatilla Electric Cooperative","uscan":"https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2018,"oy":2022,"contro":"Amazon paid a $20.5 million settlement related to nitrate pollution from its data center facilities in the area.","controScan":"https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","deal":"Settlement of $20.5 million paid by Amazon for nitrate pollution (March 2026)","dealScan":"https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;opb.org","lflag":"operational_null_capacity","srcUrls":["https://www.oregon.gov/deq/ghgp/Documents/AmazonPDX062-BAERassessment.pdf","https://www.opb.org/article/2026/03/31/amazon-fine-northeast-oregon-boardman-nitrate-pollution-well/"]},{"id":"b1a2624810e7","cid":"b1a2624810e7","canon":1,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"PacifiCorp","uquote":"Grid Operator. PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732"]},{"id":"d52fdd2819d0","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uquote":"Grid Operator: PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732"]},{"id":"ee008c458dbb","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. PacifiCorp. The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uconf":"High","uquote":"Grid Operator. PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732"]},{"id":"235b09a3c251","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system). Grid Operator. PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uquote":"Grid Operator. PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732"]},{"id":"e07f91900300","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uconf":"High","uquote":"Grid Operator: PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","ay":2012,"contro":"Community concerns over water usage and electricity rates; one city councilor voted against land annexation for data centers.","controScan":"https://www.opb.org/article/2025/09/10/hermiston-data-centers-amazon-first-look/","deal":"AWS provided $8 million for an RV park for contractors and employees (October 2025); Amazon is funding an underground water storage project.","dealScan":"https://www.tricitiesbusinessnews.com/articles/hermiston-ugb-aws","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"interconnection.fyi;tricitiesbusinessnews.com;opb.org","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","https://www.tricitiesbusinessnews.com/articles/hermiston-ugb-aws","https://www.opb.org/article/2025/09/10/hermiston-data-centers-amazon-first-look/"]},{"id":"2d027a5c8deb","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uconf":"High","uquote":"Grid Operator. PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732"]},{"id":"1f5654624553","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uconf":"Medium","uquote":"Grid Operator. PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732"]},{"id":"73e80aa47e93","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uconf":"High","uquote":"Grid Operator. PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","contro":"Community concerns regarding data centers' effects on water supply and electricity rates in Hermiston.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732"]},{"id":"c2a58a9b4a1e","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uquote":"Grid Operator: PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"oy":2019,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732"]},{"id":"56761318793f","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. PacifiCorp.","pscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","uconf":"High","uquote":"Grid Operator. PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","contro":"Concerns over data centers' effects on the water supply and electricity rates, and massive water needs.","controScan":"https://www.opb.org/article/2025/09/10/hermiston-data-centers-amazon-first-look/","deal":"Amazon has committed $980,000 to help launch or expand more than 120 community-focused projects in Morrow and Umatilla counties. Amazon is also funding an underground storage project capable of storing up to 1.2 billion gallons of potable water.","dealScan":"https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"interconnection.fyi;aboutamazon.com;opb.org","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx-63-e4fe2732","https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news","https://www.opb.org/article/2025/09/10/hermiston-data-centers-amazon-first-look/"]},{"id":"8b86d50c561f","cid":"b1a2624810e7","canon":0,"dups":11,"ftype":"data_center","name":"PDX 63","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).","uquote":"Grid Operator. PacifiCorp.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2012,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c3e30d9c6a4c","cid":"c3e30d9c6a4c","canon":1,"dups":1,"ftype":"data_center","name":"PDX-1 and PDX-4 Data Centers - Phase 2","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025. The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets).","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2013,"contro":"Lawsuit over nitrate pollution in groundwater; lawsuit against county officials for profiting from Amazon's expansion; concerns about energy and water consumption.","controScan":"https://www.technostatecraft.com/p/amazons-energy-empire-in-the-pacific","deal":"Settlement of $20.5 million for nitrate pollution (April 14, 2026); acquisition of Sunstone solar project for $83 million (January 2026); tax breaks worth over $1 billion cumulatively.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;technostatecraft.com","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://www.technostatecraft.com/p/amazons-energy-empire-in-the-pacific"]},{"id":"af1293bf56d5","cid":"af1293bf56d5","canon":1,"dups":1,"ftype":"data_center","name":"PDX-2 Data Center - Phase 2","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).","pscan":"https://baxtel.com/data-center/amazon-pdx2","uconf":"High","uquote":"Energy Utilities:... Pacific Power","uscan":"https://energyinfo.oregon.gov/counties/2018/12/31/morrow-county","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2024,"oy":2024,"contro":"Lawsuit and settlement over nitrate-contaminated water; opposition regarding water and air pollution, and impact on airport operations.","controScan":"https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70","deal":"Settlement of lawsuit for $20.5 million to address nitrate-contaminated water (April 1, 2026)","dealScan":"https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"baxtel.com;energyinfo.oregon.gov;kgw.com","srcUrls":["https://baxtel.com/data-center/amazon-pdx2","https://energyinfo.oregon.gov/counties/2018/12/31/morrow-county","https://www.kgw.com/article/tech/science/environment/amazon-20m-morrow-county-nitrate-contaminated-water-crisis/283-84b156c8-4acf-4242-a682-ecab1b5dcd70"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"950a942db73c","cid":"4836460d1bf6","canon":0,"dups":3,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Recently, Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties. This agreement creates an innovative solution that safely and reliably powers data centers in the region and keeps Amazon on a path to achieving 100 percent renewable energy by 2025.","uconf":"High","uquote":"Recently, Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2011,"oy":2012,"contro":"Amazon Data Services filed a complaint with the Oregon Public Utility Commission alleging PacifiCorp breached obligations to provide power for new facilities in Oregon.","controScan":"https://www.kgw.com/article/money/business/amazon-charges-pacificorp-failing-power-data-centers/283-091f8e8a-be97-4cf1-a679-e8cc54706004","deal":"Agreement with Umatilla Electric Cooperative to select energy supply for data center operations (2023)","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"kgw.com","lflag":"operational_null_capacity","srcUrls":["https://www.kgw.com/article/money/business/amazon-charges-pacificorp-failing-power-data-centers/283-091f8e8a-be97-4cf1-a679-e8cc54706004"]},{"id":"4836460d1bf6","cid":"4836460d1bf6","canon":1,"dups":3,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.... Amazon's energy supply from our utilities, combined with our renewable energy procurement across the United States, has enabled several AWS data center Regions—including its US West (Oregon) Region—to be powered with at least 95% renewable energy.","pscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","uscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2011,"oy":2012,"contro":"Controversy over Amazon's plans to build nuclear reactors to power data centers in Umatilla and Morrow counties, with opposition from tribes and environmentalists.","deal":"Agreement with Umatilla Electric Cooperative for power supply and renewable energy procurement announced in April 2023.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"aboutamazon.com","lflag":"operational_null_capacity citation_artifact_removed","srcUrls":["https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy"]},{"id":"8aa6ca1ed183","cid":"8aa6ca1ed183","canon":0,"dups":2,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Data centers need huge volumes of electricity to power and cool their computers, and the regional utility, the Umatilla Electric Cooperative, now relies primarily on power generated by fossil fuels to meet Amazon's needs. AWS data centers in Oregon are already powered with at least 95% renewable energy.","pscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","uconf":"High","uquote":"Recently, AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the Region.","uscan":"https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","contro":"Amazon's plans to build nuclear reactors to power data centers in Umatilla and Morrow counties face opposition from tribes and environmentalists. Amazon Data Services filed a complaint against PacifiCorp for allegedly breaching obligations to provide power for new facilities. Amazon's data centers are linked to a surge in carbon emissions from Umatilla Electric Cooperative.","controScan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","deal":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved by U.S. Bankruptcy Court for the Southern District of Texas (January 26, 2026).","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"aboutamazon.com;assets.aboutamazon.com;governing.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter"]},{"id":"0de4a1ca2977","cid":"bc68a5516c73","canon":0,"dups":6,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"In planning for growth, the build-out of this 230 kV transmission connection between the Bonneville Power Administration's (BPA) McNary substation and Umatilla Electric Cooperative's (UEC) Wanapa substation will support industrial areas around the region. This will also provide additional renewable and traditional power sources to both areas thus improving connectivity and resiliency within UEC's transmission power grid.","pscan":"https://www.umatillaelectric.com/news-releases/understanding-the-mcnary-to-wanapa-project/","uquote":"Energy Utilities: Umatilla Electric Cooperative. Hermiston Energy Services. Columbia Basin Electric Cooperative. Pacific Power. Cascade Natural Gas.","uscan":"https://energyinfo.oregon.gov/counties/2018/12/31/umatilla-county","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon AWS","spon":"Amazon AWS","tenant":"Amazon AWS","contro":"Nitrate-contaminated well water in Morrow and Umatilla counties linked to Amazon data centers.","controScan":"https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"umatillaelectric.com;energyinfo.oregon.gov;hillsboroherald.com","lflag":"operational_null_capacity","srcUrls":["https://www.umatillaelectric.com/news-releases/understanding-the-mcnary-to-wanapa-project/","https://energyinfo.oregon.gov/counties/2018/12/31/umatilla-county","https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/"]},{"id":"17ba050eeebf","cid":"bc68a5516c73","canon":0,"dups":6,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","rto":"non-RTO","nerc":"WECC","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"8be8035a8db9","cid":"8aa6ca1ed183","canon":0,"dups":2,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The energy cooperative that serves Amazon in Morrow and Umatilla counties is exempt from Oregon's renewable energy requirements but investor-owned utilities like PacifiCorp are not. Last year, Amazon agreed to buy more than 200,000 megawatt-hours of electricity annually from an Avangrid wind farm in Gilliam County.","pscan":"https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/","uconf":"High","uquote":"The energy cooperative that serves Amazon in Morrow and Umatilla counties is exempt from Oregon's renewable energy requirements but investor-owned utilities like PacifiCorp are not.","uscan":"https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","oy":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bendbulletin.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/"]},{"id":"ca4d81484a72","cid":"3b1683e3b6c8","canon":0,"dups":5,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","uconf":"High","uquote":"Recently, AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the region.","uscan":"https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2012,"contro":"Groundwater pollution in the Umatilla basin, with Amazon Data Services settling nitrate pollution claims.","deal":"Amazon Data Services agreed to pay $20.5 million to resolve nitrate pollution claims.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"assets.aboutamazon.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf"]},{"id":"05ab2143d73a","cid":"3b1683e3b6c8","canon":0,"dups":5,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","pscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","uquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","uscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","contro":"Nitrate-contaminated well water used for cooling servers, then returned more concentrated and sprayed onto farmland, contributing to groundwater pollution in the Lower Umatilla Basin.","controScan":"https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"governing.com;hillsboroherald.com","lflag":"operational_null_capacity","srcUrls":["https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","https://hillsboroherald.com/the-precedent-is-flint-rolling-stone-links-amazon-data-centers-to-poisoned-oregon-wells-hillsboro-should-pay-attention/"]},{"id":"9b52e65e5c37","cid":"bc68a5516c73","canon":0,"dups":6,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","pscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","uquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","uscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon","ay":2012,"contro":"Amazon's data centers are linked to high carbon emissions from Umatilla Electric Cooperative, leading to controversy and lobbying against clean energy rules.","controScan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"governing.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter"]},{"id":"1d403d3d1375","cid":"3b1683e3b6c8","canon":0,"dups":5,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025. UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory.","pscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region.","uscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","deal":"Partnership with Umatilla Electric Cooperative (UEC) for power supply (April 2023)","dealScan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"aboutamazon.com","lflag":"operational_null_capacity","srcUrls":["https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy"]},{"id":"08d621004387","cid":"3b1683e3b6c8","canon":0,"dups":5,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","pscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","uconf":"High","uquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","uscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon","contro":"Nitrate-contaminated well water used for cooling and carbon emissions from power utility.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"governing.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter"]},{"id":"3b1683e3b6c8","cid":"3b1683e3b6c8","canon":0,"dups":5,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"All of the electricity consumed by Amazon's operations, including its data centers, was matched with 100% renewable energy in 2023. Renewable hydro power available from McNary dam; Onsite substation to be built ​for consistent/reliable power; Redundant electrical systems to eliminate downtime; Alternative renewable energy also provided in the mix (solar, wind, etc...)","pscan":"https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","uconf":"High","uquote":"Recently, AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the region.","uscan":"https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2012,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"assets.aboutamazon.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://assets.aboutamazon.com/f3/72/dde3b928482ca81451615a0f9541/aws-eastern-oregon-economic-impact-study-factsheet-10182024-final-version-5-1.pdf"]},{"id":"bc68a5516c73","cid":"bc68a5516c73","canon":0,"dups":6,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The rural area's power utility became one of the state's big polluters beginning in 2018. By 2020 its carbon emissions had doubled. In 2021, it doubled again. The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","pscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","uconf":"High","uquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","uscan":"https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon","contro":"Lawsuit and community opposition regarding nitrate-contaminated well water used for cooling servers and returned to farmland, exacerbating groundwater pollution.","deal":"Settlement of $20.5 million by Amazon Data Services for nitrate pollution claims.","dealScan":"https://capitalpress.com/2026/04/24/farms-food-processors-dispute-conspiracy-to-pollute-umatilla-groundwater/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"governing.com;capitalpress.com","lflag":"operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://www.governing.com/resilience/oregons-rural-power-utility-has-become-a-big-polluter","https://capitalpress.com/2026/04/24/farms-food-processors-dispute-conspiracy-to-pollute-umatilla-groundwater/"]},{"id":"7547047cb591","cid":"bc68a5516c73","canon":0,"dups":6,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"The rural area's power utility became one of the state's big polluters beginning in 2018. By 2020 its carbon emissions had doubled. In 2021, it doubled again. The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","uconf":"High","uquote":"The Umatilla Electric Cooperative is responsible for 1.8 million tons of carbon emissions annually, according to newly released state data, even though it has just 16,000 customers. It's now the third-largest emitter of greenhouse gases among all Oregon utilities because of one of those customers: Amazon.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon AWS","contro":"Yes","deal":"Tax breaks","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b3bf9dde48a8","cid":"4836460d1bf6","canon":0,"dups":3,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory. Amazon's energy supply from our utilities, combined with our renewable energy procurement across the United States, has enabled several AWS data center Regions—including its US West (Oregon) Region—to be powered with at least 95% renewable energy.","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c5e437a6723e","cid":"c5e437a6723e","canon":0,"dups":1,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Amazon Wind Farm Oregon–Leaning Juniper IIA","pdt":"more than 200,000-megawatt hours (MWh) of clean power each year from a Gilliam County-based 90-megawatt (MW) capacity wind farm","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"298ce8714c4d","cid":"bc68a5516c73","canon":0,"dups":6,"ftype":"data_center","name":"PDX02","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"All of the electricity consumed by Amazon's operations, including its data centers, was matched with 100% renewable energy in 2023.","uconf":"High","uquote":"Recently, AWS partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative that serves AWS in Umatilla and Morrow counties—to create an innovative solution that safely and reliably powers our data centers in the region.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon AWS","spon":"Amazon AWS","tenant":"Amazon AWS","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"afef606a2df3","cid":"afef606a2df3","canon":1,"dups":1,"ftype":"data_center","name":"PDX1&4 Data Centers","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Amazon Data Services, Inc. operates PDX-4, a data center (electronic data processing center), that houses computer systems and associated components, such as telecommunications and data storage systems. The facility includes data communications equipment, security systems, environmental controls, and backup emergency power supplies (engine-generator sets). To date, the facility has installed 98 emergency engine-generator sets.","pscan":"https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","uconf":"Medium","uquote":"Grid Operator: Bonneville Power Administration.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-pdx202-83b1f935","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2013,"contro":"Morrow County data centers, including Amazon's, have faced controversy regarding tax incentives, water usage, and nitrate pollution.","deal":"$20.5 million settlement for nitrate pollution lawsuit (recent, as of April 2026).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;interconnection.fyi","srcUrls":["https://www.oregon.gov/deq/aq/cao/er/pages/amazon-pdx4datacenter.aspx","https://www.interconnection.fyi/data-center/project/amazon-pdx202-83b1f935"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration","lflag":"nonrate_utility_link_removed nonretail_eia861_not_rate_utility"},{"id":"bf8ae82cae6f","cid":"b9ccea892ffa","canon":0,"dups":5,"ftype":"data_center","name":"PDX130","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","uconf":"High","uquote":"Recently, we partnered with Umatilla Electric Cooperative (UEC)—the electric cooperative serving AWS in Umatilla and Morrow Counties—to create an innovative solution that safely and reliably powers our data centers in the region and keeps Amazon on a path to achieving 100% renewable energy by 2025.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2017,"contro":"Rezoning required for data center park","controScan":"https://www.datacenterknowledge.com/hyperscalers/amazon-looks-to-build-ninth-oregon-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/amazon-looks-to-build-ninth-oregon-data-center"]},{"id":"615f86bd6e03","cid":"b9ccea892ffa","canon":0,"dups":5,"ftype":"data_center","name":"PDX130","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory.","pscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","uquote":"UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory.","uscan":"https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"aboutamazon.com","lflag":"operational_null_capacity","srcUrls":["https://www.aboutamazon.com/news/aws/data-center-oregon-renewable-energy"]},{"id":"b9ccea892ffa","cid":"b9ccea892ffa","canon":1,"dups":5,"ftype":"data_center","name":"PDX130","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.... Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties. This agreement creates an innovative solution that safely and reliably powers data centers in the region and keeps Amazon on a path to achieving 100 percent renewable energy by 2025.","uconf":"High","uquote":"Amazon announced an agreement with Umatilla Electric Cooperative (UEC), the electric cooperative that serves Amazon Web Services (AWS) in Umatilla and Morrow counties.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"77a97883cdac","cid":"b9ccea892ffa","canon":0,"dups":5,"ftype":"data_center","name":"PDX130","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/pdx130-a775b1b0","uquote":"Grid Operator. Bonneville Power Administration.","uscan":"https://www.interconnection.fyi/data-center/project/pdx130-a775b1b0","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://www.interconnection.fyi/data-center/project/pdx130-a775b1b0"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"82b816b6e9e9","cid":"b9ccea892ffa","canon":0,"dups":5,"ftype":"data_center","name":"PDX130","city":"UMATILLA","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The agreement allows Amazon to take on the responsibility of selecting the energy supply that powers its data center operations, including from renewable energy resources. UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory.","uconf":"High","uquote":"UEC continues to be an essential partner and provider of reliable utility service to AWS data centers in UEC's service territory.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","deal":"Energy supply agreement with Umatilla Electric Cooperative in April 2023","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"01d9de8a41ee","cid":"01d9de8a41ee","canon":1,"dups":1,"ftype":"data_center","name":"PDX138","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Umatilla Electric Cooperative","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"57c1aa7f4b5b","cid":"57c1aa7f4b5b","canon":0,"dups":2,"ftype":"data_center","name":"PDX138","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration. Permit Status. Authority Review Completed.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-0b6ffb5b","uconf":"High","uquote":"Welcome to your locally owned municipal electric utility owned by the City of Hermiston doing business as Hermiston Energy Services (HES).","uname":"TerraForm US Energy Services, LLC","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity nonrate_utility_link_removed nonretail_eia861_not_rate_utility,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-0b6ffb5b"],"rawUkey":"60981|OR","rawUname":"TerraForm US Energy Services, LLC","reportedUtility":"TerraForm US Energy Services, LLC"},{"id":"3e792b997893","cid":"57c1aa7f4b5b","canon":0,"dups":2,"ftype":"data_center","name":"PDX138","city":"HERMISTON","county":"UMATILLA","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Hermiston Energy Services","rto":"non-RTO","nerc":"WECC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2023,"oy":2025,"contro":"Public comments raised concerns about tax exemptions for Amazon's data centers.","controScan":"https://mccmeetings.blob.core.usgovcloudapi.net/hrmstnor-pubu/MEET-Packet-3d5851f098bf404eabce4b29bf1d2e1e.pdf","deal":"Long-Term Rural Enterprise Zone (LTREZ) agreement with annual payments in lieu of taxes, starting at $2 million per year and increasing to $4 million per year, plus additional annual fees and public safety/student success fees, beginning in 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mccmeetings.blob.core.usgovcloudapi.net","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://mccmeetings.blob.core.usgovcloudapi.net/hrmstnor-pubu/MEET-Packet-3d5851f098bf404eabce4b29bf1d2e1e.pdf"]},{"id":"822ba304d80a","cid":"b5bfc2db3083","canon":0,"dups":3,"ftype":"data_center","name":"Prineville 5MW Data Center","city":"Prineville","county":"Crook County","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8","uquote":"Grid Operator. Bonneville Power Administration.","uscan":"https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","spon":"Oppidan","ay":2024,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration","lflag":"nonrate_utility_link_removed nonretail_eia861_not_rate_utility"},{"id":"b5bfc2db3083","cid":"b5bfc2db3083","canon":1,"dups":3,"ftype":"data_center","name":"Prineville 5MW Data Center","city":"Prineville","county":"Crook County","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8","uquote":"Grid Operator. Bonneville Power Administration.","uscan":"https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration","lflag":"nonrate_utility_link_removed nonretail_eia861_not_rate_utility"},{"id":"be8d9781bdcd","cid":"b5bfc2db3083","canon":0,"dups":3,"ftype":"data_center","name":"Prineville 5MW Data Center","city":"Prineville","county":"Crook County","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8","uquote":"Grid Operator. Bonneville Power Administration.","uscan":"https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/prineville-5mw-data-center-91491cb8"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration","lflag":"nonrate_utility_link_removed nonretail_eia861_not_rate_utility"},{"id":"05ac9d18e151","cid":"fe320bacfe9d","canon":0,"dups":5,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","oy":2011,"contro":"Controversy over property tax abatements and water usage.","controScan":"https://www.widatacenterfacts.org/topics/prineville-case-study","deal":"Meta is paying for a second injection well for the city's water storage recovery system, with projected costs between $1 million and $3.2 million, expected to be completed by the end of 2024.","dealScan":"https://bluemountaineagle.com/2024/05/10/prineville-doubles-down-on-water-conservation-with-tech-giant-backed-project/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;bluemountaineagle.com;widatacenterfacts.org","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://bluemountaineagle.com/2024/05/10/prineville-doubles-down-on-water-conservation-with-tech-giant-backed-project/","https://www.widatacenterfacts.org/topics/prineville-case-study"],"band":"25-50 MW"},{"id":"e28fa81bdb42","cid":"fe320bacfe9d","canon":0,"dups":5,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. This includes supporting two new renewable energy projects in Oregon. Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Dispute over property taxes and questions from residents about the impact of data centers.","deal":"Investment of $210 million for the first phase (reported January 2012)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf"],"band":"25-50 MW"},{"id":"82c1a93426b0","cid":"f3325b5cd69f","canon":0,"dups":6,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":1289,"pc":"Grid","pconf":"High","pquote":"Pacific Power, a utility owned by PacifiCorp, will provide the electricity\" in Prineville, Matt writes. \"While Pacific Power gets some hydropower from BPA, its primary power-generation fuel is coal, according to Jason Carr, the manager of the Prineville office of economic development for Central Oregon.\" \"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid.\"","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uconf":"High","uquote":"We worked with Pacific Power, a division of. PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. \"Pacific Power, a utility owned by PacifiCorp, will provide the electricity\" in Prineville, Matt writes.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Dispute over property taxes and questions from some Prineville residents about the impact of data centers on the small community (2012); housing shortage due to construction workers (2016).","controScan":"https://www.datacenterknowledge.com/business/report-flood-of-data-center-builders-causes-housing-shortage-in-prineville","deal":"Initial investment of $210 million for the first phase (Jan 2012); total investment of more than $2 billion for the 11-building campus (March 2021).","dealScan":"https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;datacenterknowledge.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","https://www.datacenterknowledge.com/business/report-flood-of-data-center-builders-causes-housing-shortage-in-prineville"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"e1da2e79d2af","cid":"f3325b5cd69f","canon":0,"dups":6,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":1289,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid. We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. This includes supporting two new renewable energy projects in Oregon.","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Dispute over property taxes and questions from residents about the impact of data centers.","deal":"PPA with Pacific Power for 437MW of new solar developments, including two projects totaling 100MW in the Prineville area (July 20, 2018).","dealScan":"https://www.pv-tech.org/pacific-power-to-support-facebooks-prineville-data-center-with-437mw-of-sol/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"pv-tech.org","srcUrls":["https://www.pv-tech.org/pacific-power-to-support-facebooks-prineville-data-center-with-437mw-of-sol/"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"fed9e227af98","cid":"ed33f70bdd76","canon":0,"dups":4,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. This includes supporting two new renewable energy projects in Oregon.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Housing shortage due to construction workers; tax abatements leading to no tax revenue for the county.","controScan":"https://www.datacenterknowledge.com/business/report-flood-of-data-center-builders-causes-housing-shortage-in-prineville","deal":"Land acquisition of 240 acres from Crook County for $5.4 million in 2017 for new buildings; $200 million investment for a third data center announced in 2015.","dealScan":"https://baxtel.com/data-center/facebook-prineville","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;baxtel.com;datacenterknowledge.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://baxtel.com/data-center/facebook-prineville","https://www.datacenterknowledge.com/business/report-flood-of-data-center-builders-causes-housing-shortage-in-prineville"]},{"id":"5e34ad843f2e","cid":"ed33f70bdd76","canon":0,"dups":4,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"deal":"Land acquisition from Crook County for $5.4 million in 2017","dealScan":"https://baxtel.com/data-center/facebook-prineville","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;baxtel.com","lflag":"operational_null_capacity","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://baxtel.com/data-center/facebook-prineville"]},{"id":"c2ac7fda755f","cid":"ed33f70bdd76","canon":0,"dups":4,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Dispute over property taxes, community impact, and water usage concerns due to drought.","deal":"Meta is paying for a second injection well for the city's water storage recovery system, with projected costs between $1 million and $3.2 million (2024).","dealScan":"https://bluemountaineagle.com/2024/05/10/prineville-doubles-down-on-water-conservation-with-tech-giant-backed-project/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bluemountaineagle.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://bluemountaineagle.com/2024/05/10/prineville-doubles-down-on-water-conservation-with-tech-giant-backed-project/"]},{"id":"bb4d2a0c6d72","cid":"bb4d2a0c6d72","canon":0,"dups":1,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":28,"pc":"Grid","pconf":"High","pquote":"Our Prineville Data Center is supported by 100% renewable energy, including two solar projects located right here in Oregon. We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","pscan":"https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","uquote":"Pacific Power, a utility owned by PacifiCorp, will provide the electricity in Prineville.","uscan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Property tax abatements, housing shortages, and recent layoffs have been reported.","controScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","deal":"Initial investment of $210 million (January 30, 2012); 100 MW solar PPA with Invenergy and Pacific Power (July 19, 2018); total campus investment of over $2 billion (March 18, 2021).","dealScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;datacenterknowledge.com","srcUrls":["https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center"],"band":"25-50 MW","lflag":"merged_duplicate"},{"id":"39f73163ffbc","cid":"f3325b5cd69f","canon":0,"dups":6,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":1289,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid.","uconf":"High","uquote":"We worked with Pacific Power, a division of. PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Dispute over property taxes and questions from residents about impact.","controScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","deal":"Investment of more than $2 billion for the campus (as of March 2021).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"dc35b194de7d","cid":"f3325b5cd69f","canon":0,"dups":6,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":1289,"pc":"Grid","pconf":"High","pquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. This includes supporting two new renewable energy projects in Oregon. Pacific Power, a utility owned by PacifiCorp, will provide the electricity\" in Prineville.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. Pacific Power, a utility owned by PacifiCorp, will provide the electricity\" in Prineville.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Disputes over property taxes and tax abatements, concerns from residents about the impact on the community, housing shortages due to construction, and a petition citing concerns about electricity demand, water scarcity, land use for solar farms, and seismic activity.","controScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","deal":"Initial investment of $210 million for the first phase (January 2012). Total investment in the campus reached over $2 billion (March 2021). Partnership with Invenergy and Pacific Power for 100 MW of solar power (July 2018) and 437 MW of solar (July 2018) to support 100% renewable energy goals.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;datacenterknowledge.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center"],"band":"250+ MW","lflag":"large_project_duplicate_review high_confidence_duplicate_consolidated"},{"id":"fe320bacfe9d","cid":"fe320bacfe9d","canon":0,"dups":5,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. This includes supporting two new renewable energy projects in Oregon.","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Disputes over property tax abatements, water usage, and housing shortages due to construction.","controScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","deal":"PPA with Invenergy and Pacific Power for 100 megawatts of solar energy, announced July 2018.","dealScan":"https://www.invenergy.com/news/invenergy-partners-with-pacific-power-to-support-facebook-s-clean-energy-goals","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"invenergy.com;datacenterknowledge.com","srcUrls":["https://www.invenergy.com/news/invenergy-partners-with-pacific-power-to-support-facebook-s-clean-energy-goals","https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center"],"band":"25-50 MW","lflag":"merged_duplicate"},{"id":"854d1909288e","cid":"854d1909288e","canon":0,"dups":2,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":380,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uconf":"High","uquote":"Pacific Power, a utility owned by PacifiCorp, will provide the electricity in Prineville. We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","uscan":"https://www.datacenterknowledge.com/sustainability/facebook-s-green-data-center-powered-by-coal-","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"contro":"Dispute over property taxes, community questions about impact, and housing shortage due to construction workers.","controScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","deal":"Facebook announced an additional $750 million investment in its Prineville facility in September 2018, bringing total investment to $2 billion.","dealScan":"https://www.constructiondive.com/news/facebook-ups-oregon-data-center-investment-to-2b/533161/","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"datacenters.atmeta.com;datacenterknowledge.com;constructiondive.com","lflag":"online_before_announced duplicate_cluster_canonical high_confidence_duplicate_consolidated,merged_duplicate","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://www.datacenterknowledge.com/sustainability/facebook-s-green-data-center-powered-by-coal-","https://www.constructiondive.com/news/facebook-ups-oregon-data-center-investment-to-2b/533161/","https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center"],"band":"250+ MW"},{"id":"6822e4172b7e","cid":"6822e4172b7e","canon":0,"dups":1,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"The 28 megawatts of utility power for the 300,000 square foot first phase isn't extraordinary for a data center of that size.","pscan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2010,"oy":2011,"contro":"Dispute over property taxes and environmental concerns regarding coal energy, as well as recent layoffs due to expiring contracts.","controScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","deal":"Initial investment of $210 million for the first phase (Jan 2012); total investment in the complex reached $2 billion (Sep 2018).","dealScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center"],"band":"25-50 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"3d6ab39260fa","cid":"f3325b5cd69f","canon":0,"dups":6,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":1289,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid. We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. This includes supporting two new renewable energy projects in Oregon.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Layoffs due to expiring contract with a vendor.","controScan":"https://www.opb.org/article/2026/04/30/prineville-data-center-meta-layoffs/","deal":"Investment of more than $2 billion for an 11-building campus (announced by March 2021). Supporting two new renewable energy projects in Oregon.","dealScan":"https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;opb.org","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","https://www.opb.org/article/2026/04/30/prineville-data-center-meta-layoffs/"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"3d8a334ef202","cid":"fe320bacfe9d","canon":0,"dups":5,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. The 28 megawatts of utility power for the 300,000 square foot first phase isn't extraordinary for a data center of that size.","pscan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Dispute over property taxes and questions from residents about impact; ongoing concerns about tax revenue and job creation.","controScan":"https://www.widatacenterfacts.org/topics/prineville-case-study","deal":"Initial investment of $210 million for the first phase (2012 reporting).","dealScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenterknowledge.com;datacenters.atmeta.com;widatacenterfacts.org","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://www.widatacenterfacts.org/topics/prineville-case-study"],"band":"25-50 MW"},{"id":"ed33f70bdd76","cid":"ed33f70bdd76","canon":0,"dups":4,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid.","uconf":"High","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Dispute over property taxes due to 15-year tax abatement, concerns about water usage, strain on local power grid, and limited job creation.","controScan":"https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center","deal":"Investment of more than $2 billion in the 11-building campus (announced by March 2021). Partnership with Pacific Power to build 437 MW of new solar projects (announced July 2018).","dealScan":"https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;datacenterknowledge.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","https://www.datacenterknowledge.com/hyperscalers/facebook-has-spent-210-million-on-oregon-data-center"]},{"id":"c4284fa52a0f","cid":"854d1909288e","canon":0,"dups":2,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":380,"pc":"Grid","pconf":"High","pquote":"The 28 megawatts of utility power for the 300,000 square foot first phase isn't extraordinary for a data center of that size. We worked with Pacific Power, a division of. PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uquote":"We worked with Pacific Power, a division of. PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2010,"oy":2011,"contro":"Dispute over property taxes and questions from residents about impact; 15-year tax abatement resulted in $0 property tax paid by Facebook and Apple, foregoing $29M for local government as of 2024.","controScan":"https://www.widatacenterfacts.org/topics/prineville-case-study","deal":"Initial investment of $210 million for the first phase (2012); $200 million for a third data center (2015); acquisition of 240 acres for $5.4 million (2017).","dealScan":"https://baxtel.com/data-center/facebook-prineville","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;baxtel.com;widatacenterfacts.org","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://baxtel.com/data-center/facebook-prineville","https://www.widatacenterfacts.org/topics/prineville-case-study"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"f3325b5cd69f","cid":"f3325b5cd69f","canon":1,"dups":6,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":1289,"pc":"Grid","pconf":"High","pquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. This includes supporting two new renewable energy projects in Oregon.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2010,"oy":2011,"contro":"Milestone Technologies announced permanent layoffs of 66 workers at a Prineville data center tied to Meta due to an expiring contract, though Meta plans to rehire the majority of staff through a different firm.","controScan":"https://www.youtube.com/watch?v=cjJlRYSti5A","deal":"Meta's total investment in its Prineville data center complex reached $2 billion by September 2018.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;youtube.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","https://www.youtube.com/watch?v=cjJlRYSti5A"],"band":"250+ MW","lflag":"large_project_duplicate_review duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","dealScan":"https://datacenters.atmeta.com/2021/03/facebooks-prineville-data-center-is-growing-again/","uconf":"High"},{"id":"d33fe2a140de","cid":"fe320bacfe9d","canon":0,"dups":5,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 977 megawatts of new renewable energy to PacifiCorp's grid.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uquote":"We worked with Pacific Power, a division of PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2010,"oy":2011,"contro":"Dispute over property taxes due to 15-year tax abatements, community concerns about housing shortages and electricity grid strain.","deal":"Facebook partnered with Pacific Power to support the Prineville Data Center with 437MW of new solar developments, including two projects totaling 100MW in the Prineville area (July 20, 2018).","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"3511d5cb5ca2","cid":"3511d5cb5ca2","canon":0,"dups":1,"ftype":"data_center","name":"Prineville Data Center","city":"PRINEVILLE","county":"CROOK","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Pacific Power, a utility owned by PacifiCorp, will provide the electricity\" in Prineville, Matt writes. \"While Pacific Power gets some hydropower from BPA, its primary power-generation fuel is coal, according to Jason Carr, the manager of the Prineville office of economic development for Central Oregon.\"... \"We worked with Pacific Power, a division of. PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center. This includes supporting two new renewable energy projects in Oregon.\"","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","uconf":"High","uquote":"\"Pacific Power, a utility owned by PacifiCorp, will provide the electricity\"... \"We worked with Pacific Power, a division of. PacificCorp, to meet our 100% clean and renewable energy goal for the Prineville Data Center.\"","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2010,"oy":2011,"contro":"Dispute over property taxes and questions about community impact; housing shortage due to construction workers.","controScan":"https://www.datacenterknowledge.com/business/report-flood-of-data-center-builders-causes-housing-shortage-in-prineville","deal":"Land acquisition from Crook County for $5.4 million in 2017.","dealScan":"https://baxtel.com/data-center/facebook-prineville","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;baxtel.com;datacenterknowledge.com","lflag":"operational_null_capacity citation_artifact_removed,merged_duplicate","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Prineville-Data-Center.pdf","https://baxtel.com/data-center/facebook-prineville","https://www.datacenterknowledge.com/business/report-flood-of-data-center-builders-causes-housing-shortage-in-prineville"]},{"id":"500cf1ca5e48","cid":"500cf1ca5e48","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels. “This is the first building we've built where the day we commissioned that building, we were 100% renewable, and will remain so for as long as we're there, which is going to be an awfully long time,” Baillie said.","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone","tenant":"global software-as-a-service provider","ay":2020,"oy":2020,"contro":"Protests against data centers in Hillsboro due to concerns about tax breaks, energy demand, and water usage. QTS tax accounts were brought under the Enterprise Zone tax waiver program.","deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion, including debt, with the transaction closing on August 31, 2021.","dealScan":"https://www.blackstone.com/news/press/blackstone-funds-complete-acquisition-of-qts-realty-trust/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"blackstone.com","srcUrls":["https://www.blackstone.com/news/press/blackstone-funds-complete-acquisition-of-qts-realty-trust/"],"lflag":"source_quality_reclassified"},{"id":"58b21377d62b","cid":"58b21377d62b","canon":1,"dups":1,"ftype":"data_center","name":"QTS Hillsboro Data Center","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels. “This is the first building we've built where the day we commissioned that building, we were 100% renewable, and will remain so for as long as we're there, which is going to be an awfully long time,” Baillie said.... QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Realty Trust","spon":"Blackstone","tenant":"Global software-as-a-service provider, Meta","ay":2017,"oy":2020,"contro":"Community opposition and protests regarding tax breaks, energy demand, water usage, and impacts on local communities. A one-year moratorium on data center tax breaks was passed in March 2026.","deal":"Blackstone acquired QTS Realty Trust for $10 billion (2021). PPA with Meta and Avangrid/PGE for 120MW solar project (December 6, 2024).","dealScan":"https://baxtel.com/news/data-centers/qts-hillsboro-2","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/news/data-centers/qts-hillsboro-2"],"band":"10-25 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"17d4707c35ba","cid":"0f6a2838eb92","canon":0,"dups":7,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Realty Trust","spon":"Blackstone","tenant":"global software-as-a-service provider","ay":2020,"oy":2020,"contro":"Community opposition and protests regarding tax breaks, energy demand, and water usage for data centers in Hillsboro.","deal":"Land acquisition in Hillsboro for $26 million in October 2017.","dealScan":"https://www.datacenterknowledge.com/data-center-construction/qts-buys-land-for-data-center-construction-in-three-us-markets","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"prnewswire.com;hillsboronewstimes.com;datacenterknowledge.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","https://www.datacenterknowledge.com/data-center-construction/qts-buys-land-for-data-center-construction-in-three-us-markets"],"band":"10-25 MW"},{"id":"748ec7291dca","cid":"96cc0c192ed2","canon":0,"dups":6,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone Group","ay":2020,"oy":2020,"deal":"Blackstone Group acquired QTS Realty Trust for approximately $10 billion on August 31, 2021.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e0e5250ccfa5","cid":"0f6a2838eb92","canon":0,"dups":7,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Realty Trust","spon":"Blackstone Group","tenant":"global software-as-a-service provider","ay":2017,"oy":2020,"contro":"Community opposition and protests regarding tax breaks and environmental impacts (water/power usage) of data centers in Hillsboro, including QTS facilities.","controScan":"https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/","deal":"Blackstone Group acquired QTS Realty Trust, Inc. for approximately $10 billion on August 31, 2021.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"prnewswire.com;hillsboronewstimes.com;hillsboroherald.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/"],"band":"10-25 MW"},{"id":"4c4ea9932985","cid":"96cc0c192ed2","canon":0,"dups":6,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Consistent with its corporate commitment to provide 100% renewable power across all of its data centers by 2025, QTS anticipates having 100% renewable energy available for customers upon opening its Hillsboro facility in mid-2020.","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone","tenant":"a global software-as-a-service provider","ay":2020,"oy":2020,"tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboronewstimes.com","srcUrls":["https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"2d62b3903304","cid":"0f6a2838eb92","canon":0,"dups":7,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels. QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","pscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Realty Trust","spon":"Blackstone Group","ay":2020,"oy":2020,"contro":"Controversy regarding data center power costs and the \"POWER Act\" in Oregon, with accusations that Portland General Electric is trying to skirt the law by passing costs to residential customers.","controScan":"https://www.opb.org/article/2025/12/15/utility-watchdogs-accuse-pge-of-skirting-new-law-meant-to-make-data-centers-pay-for-rising-demand/","deal":"QTS Realty Trust was acquired by companies affiliated with the Blackstone Group Inc. for approximately $10 billion on August 31, 2021.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"hillsboronewstimes.com;opb.org","srcUrls":["https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","https://www.opb.org/article/2025/12/15/utility-watchdogs-accuse-pge-of-skirting-new-law-meant-to-make-data-centers-pay-for-rising-demand/"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"b2c5732de154","cid":"b2c5732de154","canon":0,"dups":2,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Located at 4951 NE North Huffman Street, and the first of its kind to run entirely on renewable energy, this facility marks the first newly completed data center in the QTS portfolio of data centers operating on 100% renewable power.","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Data Centers","spon":"Blackstone","ay":2020,"oy":2020,"contro":"Local community opposition and legislative scrutiny regarding tax breaks, water usage, and rising power rates due to data center growth in Hillsboro.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion, announced June 7, 2021, and completed June 21, 2024.","dealScan":"https://www.executivegov.com/articles/blackstone-completes-acquisition-of-qts-realty-trust-ceo-chad-williams-quoted","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"hillsboronewstimes.com;executivegov.com","srcUrls":["https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","https://www.executivegov.com/articles/blackstone-completes-acquisition-of-qts-realty-trust-ceo-chad-williams-quoted","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"band":"10-25 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"ceff7cce45a2","cid":"0f6a2838eb92","canon":0,"dups":7,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels. “This is the first building we've built where the day we commissioned that building, we were 100% renewable,... “","pscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","uconf":"High","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Realty Trust","spon":"Blackstone","tenant":"global software-as-a-service provider","ay":2020,"oy":2020,"contro":"Community opposition and protests regarding tax breaks, energy demand, and water usage for data centers in Hillsboro, including QTS, and an application for an air permit for diesel-fired emergency generators.","deal":"Blackstone acquired QTS Realty Trust for $10 billion in August 2021. QTS pre-leased 4.5 MW of the first phase to a global Software-as-a-Service provider in early 2020. A PPA was signed with Avangrid and Portland General Electric for a 120MW solar project with Meta and QTS in December 2024.","dealScan":"https://www.datacenterknowledge.com/operations-and-management/blackstone-s-10b-deal-to-buy-data-center-giant-qts-the-context","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"hillsboronewstimes.com;datacenterknowledge.com","srcUrls":["https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","https://www.datacenterknowledge.com/operations-and-management/blackstone-s-10b-deal-to-buy-data-center-giant-qts-the-context"],"band":"10-25 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"ea95bd9a6d4f","cid":"b2c5732de154","canon":0,"dups":2,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"This highly automated QTS data center at Oregon is powered by 100% renewable energy.","pscan":"https://datacenterlocations.com/qts/","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Data Centers","spon":"Blackstone","tenant":"global software-as-a-service provider","ay":2020,"oy":2020,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion, including debt, on August 31, 2021. Joint Petition of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC to Increase Green Tariff Customer Supply Option Capacity by an additional 250 MW, filed September 17, 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"datacenterlocations.com","srcUrls":["https://datacenterlocations.com/qts/"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"e3e7eca2d817","cid":"96cc0c192ed2","canon":0,"dups":6,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Utilizing renewable sourced power. QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone","ay":2017,"oy":2020,"contro":"Community opposition and controversy regarding tax breaks, energy demand, and water usage for data centers in Hillsboro, including QTS facilities.","deal":"Land acquisition for $26 million (October 2017); QTS Realty Trust acquired by Blackstone for approximately $10 billion (August 2021); Multi-year agreement to purchase renewable energy certificates from Three Peaks Power, LLC solar facility through Calpine Energy Solutions (April 2021).","dealScan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html"],"band":"10-25 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"96fd4a8d256c","cid":"96cc0c192ed2","canon":0,"dups":6,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","uconf":"High","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone","ay":2020,"oy":2020,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion, including debt, on August 31, 2021. QTS pre-leased 100% of the first phase (4.5 MW) to a global software-as-a-service provider in 2020. Joint Petition with Portland General Electric Company to Increase Green Tariff Customer Supply Option Capacity (250 MW) filed September 17, 2021.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboronewstimes.com","srcUrls":["https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/"],"band":"10-25 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"96cc0c192ed2","cid":"96cc0c192ed2","canon":0,"dups":6,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels. “This is the first building we’ve built where the day we commissioned that building, we were 100% renewable,...”.","pscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone Group","ay":2020,"oy":2020,"contro":"Community opposition and protests regarding tax breaks, energy demand, and impacts on local communities. State leaders passed a one-year moratorium on data center tax breaks.","deal":"Blackstone Group acquired QTS Realty Trust for approximately $10 billion on August 31, 2021. Avangrid and Portland General Electric (PGE) signed a Power Purchase Agreement (PPA) with QTS and Meta for energy from a 120MW solar energy project on December 6, 2024.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboronewstimes.com","srcUrls":["https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/"],"band":"10-25 MW","lflag":"citation_artifact_removed source_quality_reclassified,merged_duplicate"},{"id":"dae9775f62d6","cid":"0f6a2838eb92","canon":0,"dups":7,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels. “This is the first building we've built where the day we commissioned that building, we were 100% renewable,...”. Additionally, QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. QTS proposes to install additional diesel-fired emergency generators each rated at 2,250 kilowatts of electric capacity.","pscan":"https://www.oregon.gov/deq/aq/cao/nwr/pages/qts.aspx","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Realty Trust","spon":"Blackstone Group","ay":2020,"oy":2020,"deal":"QTS Realty Trust acquired by Blackstone Group on August 31, 2021","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oregon.gov;hillsboronewstimes.com","srcUrls":["https://www.oregon.gov/deq/aq/cao/nwr/pages/qts.aspx","https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/"],"band":"10-25 MW","lflag":"citation_artifact_removed"},{"id":"0f6a2838eb92","cid":"0f6a2838eb92","canon":0,"dups":7,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Realty Trust","spon":"Blackstone Group","ay":2020,"oy":2020,"contro":"Community opposition and protests regarding data center tax abatements and environmental impacts (water, power rates) in Hillsboro, with the QTS site specifically mentioned in the context of Enterprise Zone tax waivers.","controScan":"https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/","deal":"Land acquisition in Hillsboro for $26 million (October 27, 2017). Power Purchase Agreement (PPA) with Avangrid and Portland General Electric (PGE) for energy from a 120MW solar energy project (December 06, 2024).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","srcUrls":["https://hillsboroherald.com/hillsboro-data-center-protest-shows-growing-unrest-over-millions-of-tax-giveaways/"],"band":"10-25 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"ca34987270c6","cid":"0f6a2838eb92","canon":0,"dups":7,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS Realty Trust","spon":"Blackstone","tenant":"Global Software-as-a-Service provider (unnamed), Facebook","ay":2020,"oy":2020,"contro":"Controversy over generous property tax abatements for data centers; Oregon Legislature considering limits on large energy use facilities due to impact on power systems.","controScan":"https://hillsboroherald.com/oregon-legislature-moves-to-limit-data-centers-threat-to-our-power-systems-but-rates-remain-highly-inequitable/","deal":"Proposed offering of Secured Data Center Revenue Term Notes, Series 2025-1, by QTS Issuer ABS I, LLC and QTS Co-Issuer ABS I, LLC, related to tenant leases including HIL1 (Hillsboro 1) as of March 31, 2025.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"prnewswire.com;hillsboronewstimes.com;hillsboroherald.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","https://hillsboroherald.com/oregon-legislature-moves-to-limit-data-centers-threat-to-our-power-systems-but-rates-remain-highly-inequitable/"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"56856c15889f","cid":"56856c15889f","canon":1,"dups":1,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":250,"pc":"Grid","pconf":"High","pquote":"QTS proposes to install and operate four emergency generators for a data center to be constructed at 4950 NE Huffman Street in Hillsboro. Air pollution emissions are associated with operation of new emergency generators. QTS worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels. QTS has committed to procuring 100% of its energy from renewable sources by 2025, through an annual reconciliation of RECs.","pscan":"https://edocs.puc.state.or.us/efdocs/HAA/um1953haa14249.pdf","uquote":"Joint Petition of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC to Increase Green Tariff Customer Supply Option Capacity.","uscan":"https://edocs.puc.state.or.us/efdocs/HAA/um1953haa14249.pdf","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone Group","ay":2020,"oy":2020,"contro":"Legislative efforts in Oregon to create a separate rate class for large energy users like data centers due to concerns over rising residential electricity rates.","controScan":"https://hillsboroherald.com/oregon-legislature-moves-to-limit-data-centers-threat-to-our-power-systems-but-rates-remain-highly-inequitable/","deal":"Blackstone Group acquired QTS Realty Trust for approximately $10 billion on August 31, 2021.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"edocs.puc.state.or.us;hillsboroherald.com","srcUrls":["https://edocs.puc.state.or.us/efdocs/HAA/um1953haa14249.pdf","https://hillsboroherald.com/oregon-legislature-moves-to-limit-data-centers-threat-to-our-power-systems-but-rates-remain-highly-inequitable/"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"534d33dfe3d0","cid":"96cc0c192ed2","canon":0,"dups":6,"ftype":"data_center","name":"QTS Investment Properties Hillsboro, LLC","city":"Hillsboro","county":"WASHINGTON","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"QTS Hillsboro – Purchases renewable energy certificates equal to at least the expected electricity needs of the facility from Three Peaks Power, LLC solar facility in Utah through Calpine Energy Solutions. With the purchase, QTS now offers one of the industry's first true zero water cooling solutions powered by 100% renewable energy.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"Sean Baillie, executive vice president for connectivity strategy at QTS, says the company worked with its power provider, Portland General Electric, to ensure each building will be powered without the use of fossil fuels.","uscan":"https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"QTS","spon":"Blackstone","tenant":"global software-as-a-service provider","ay":2020,"oy":2020,"contro":"Community opposition and protests regarding data center tax abatements and rapid expansion.","deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion, including debt, on August 31, 2021.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"prnewswire.com;hillsboronewstimes.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://hillsboronewstimes.com/2020/06/22/new-qts-data-center-in-hillsboro-powered-by-renewables/"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"d8fe988d60d4","cid":"d8fe988d60d4","canon":1,"dups":1,"ftype":"data_center","name":"Sabey Umatilla Data Center","city":"Umatilla","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Future / Expansion","mw":150,"pc":"Grid","pconf":"High","pquote":"As of 2020, Oregon reported a 40% renewable utility power fuel mix with a target to hit 100% by 2040. Sabey will procure/invest in carbon free energy in time to meet the Company's net-zero target by 2029 in Umatilla and across the SDC portfolio, 11 years ahead of Oregon's target.","uquote":"Grid Operator: PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/sabey-umatilla-data-center-f69b2cfa","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Sabey Data Centers","spon":"National Real Estate Advisors","ay":2023,"oy":2027,"deal":"Sabey Data Centers acquired 60 acres of land for $3 million and plans a $950 million development. The company also secured a 15-year property tax break from Umatilla County and City, requiring an investment of at least $200 million and annual fees for community projects, approved on August 15, 2023.","dealScan":"https://eastoregonian.com/2023/11/07/sabey-data-centers-comes-to-umatilla/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;eastoregonian.com","lflag":"status_adjusted_future_expansion source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/sabey-umatilla-data-center-f69b2cfa","https://eastoregonian.com/2023/11/07/sabey-data-centers-comes-to-umatilla/"],"band":"100-250 MW","rawStatus":"Operational"},{"id":"e75fff0e63e1","cid":"e75fff0e63e1","canon":1,"dups":1,"ftype":"data_center","name":"Showers Development, LLC","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"3cb23f89d3c0","cid":"3cb23f89d3c0","canon":0,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Consistent with STACK's commitment to sustainability, the new facility will be powered by 100% renewable energy to help clients reduce greenhouse gas footprint of operations and support corporate sustainability goals. The facility will be less than a quarter- mile from a new 34.5kV substation, with power supplied by Portland General Electric","pscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-delivers-first-phase-of-its-scalable-and-sustainable-flagship-84mw-portland-campus/","uconf":"High","uquote":"The facility will be less than a quarter- mile from a new 34.5kV substation, with power supplied by Portland General Electric","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"STACK Infrastructure","spon":"IPI Partners","tenant":"Opus Interactive","contro":"Moratorium petition launched by Hillsboro councilor citing residential rate increases, school-district revenue loss from tax abatements, and water/noise/environmental concerns.","controScan":"https://www.realclear.ai/case-studies/stack-hillsboro-oregon","deal":"$4B green-labeled financing in March 2025 covering Portland, Stafford, and Toronto.","dealScan":"https://www.realclear.ai/case-studies/stack-hillsboro-oregon","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"stackinfra.com;realclear.ai","srcUrls":["https://www.stackinfra.com/about/news-press/press-releases/stack-delivers-first-phase-of-its-scalable-and-sustainable-flagship-84mw-portland-campus/","https://www.realclear.ai/case-studies/stack-hillsboro-oregon"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"5d973bdb1e3c","cid":"5d973bdb1e3c","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":84,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The new facility will be powered by 100% renewable energy to help clients reduce greenhouse gas footprint of operations and support corporate sustainability goals.","pscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-delivers-first-phase-of-its-scalable-and-sustainable-flagship-84mw-portland-campus/","uconf":"High","uquote":"The facility will be less than a quarter-mile from a new 34.5kV substation, with power supplied by Portland General Electric","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"STACK Infrastructure","spon":"Blue Owl","ay":2020,"oy":2021,"contro":"A Hillsboro councilor has launched a moratorium petition, residential rates are up ~50%, and the Governor's advisory committee is drafting policy recommendations regarding data center development and tax abatements.","controScan":"https://www.realclear.ai/case-studies/stack-hillsboro-oregon","deal":"$4B green-labeled financing in March 2025","dealScan":"https://www.realclear.ai/case-studies/stack-hillsboro-oregon","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"stackinfra.com;realclear.ai","srcUrls":["https://www.stackinfra.com/about/news-press/press-releases/stack-delivers-first-phase-of-its-scalable-and-sustainable-flagship-84mw-portland-campus/","https://www.realclear.ai/case-studies/stack-hillsboro-oregon"]},{"id":"b310daa3754b","cid":"b310daa3754b","canon":0,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Consistent with STACK's commitment to sustainability, the new facility will be powered by 100% renewable energy to help clients reduce greenhouse gas footprint of operations and support corporate sustainability goals.","pscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-delivers-first-phase-of-its-scalable-and-sustainable-flagship-84mw-portland-campus/","uconf":"High","uquote":"The facility will be less than a quarter-mile from a new 34.5kV substation, with power supplied by Portland General Electric.","uscan":"https://www.stackinfra.com/wp-content/uploads/2020/11/STACK_PR_POR03-Groundbreaking_FINAL.pdf","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"STACK Infrastructure","spon":"IPI Partners","tenant":"Opus Interactive","ay":2020,"oy":2022,"contro":"Moratorium petition circulating and protests over tax breaks, energy demand, and water usage.","controScan":"https://www.realclear.ai/case-studies/stack-hillsboro-oregon","deal":"$4 billion green financing secured in March 2025 for Portland, Stafford (VA), and Toronto campuses.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"stackinfra.com;realclear.ai","srcUrls":["https://www.stackinfra.com/about/news-press/press-releases/stack-delivers-first-phase-of-its-scalable-and-sustainable-flagship-84mw-portland-campus/","https://www.stackinfra.com/wp-content/uploads/2020/11/STACK_PR_POR03-Groundbreaking_FINAL.pdf","https://www.realclear.ai/case-studies/stack-hillsboro-oregon"],"lflag":"merged_duplicate"},{"id":"487a5e418a8e","cid":"487a5e418a8e","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure, Inc.","city":"Hillsboro","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Future / Expansion","mw":230,"pc":"Grid","pconf":"High","pquote":"The facility will be less than a quarter-mile from a new 34.5kV substation, with power supplied by Portland General Electric, and is located on the Wave Business Hillsboro Data Center Ring, which offers exceptional high-count fiber connectivity and transpacific subsea cable access. Consistent with STACK's commitment to sustainability, the new facility will be powered by 100% renewable energy to help clients reduce greenhouse gas footprint of operations and support corporate sustainability goals.","pscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-delivers-first-phase-of-its-scalable-and-sustainable-flagship-84mw-portland-campus/","uconf":"High","uquote":"The facility will be less than a quarter-mile from a new 34.5kV substation, with power supplied by Portland General Electric, and is located on the Wave Business Hillsboro Data Center Ring, which offers exceptional high-count fiber connectivity and transpacific subsea cable access. Located in Hillsboro adjacent to PGE's Shute Substation, the campus features direct access to extensive fiber, benefits from Hillsboro's Enterprise Zone and its property tax abatement policies, and sustainable power practices with 100% renewable energy delivered across STACK facilities.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"STACK Infrastructure","spon":"IPI Partners","tenant":"Opus Interactive","ay":2020,"oy":2027,"contro":"Moratorium petition, rising residential electricity rates, school district revenue loss from tax abatements, water usage, and heat islands.","deal":"$4B green financing in March 2025","dealScan":"https://www.realclear.ai/case-studies/stack-hillsboro-oregon","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"stackinfra.com;realclear.ai","lflag":"status_adjusted_future_expansion","srcUrls":["https://www.stackinfra.com/about/news-press/press-releases/stack-delivers-first-phase-of-its-scalable-and-sustainable-flagship-84mw-portland-campus/","https://www.realclear.ai/case-studies/stack-hillsboro-oregon"],"band":"100-250 MW","rawStatus":"Operational"},{"id":"86992c9ee96f","cid":"86992c9ee96f","canon":1,"dups":1,"ftype":"data_center","name":"T5 at Portland IV Data Center","city":"HILLSBORO","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program. For Flexential, Oregon is also a gold-level partner in PGE's Clean Wind program, which guarantees access to a reliable renewable energy source.","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, GI Data Infrastructure, Hamilton Lane, Morgan Stanley Infrastructure Partners","tenant":"CoreWeave","ay":2022,"oy":2022,"contro":"State-imposed moratorium on Enterprise Zone approvals for data centers in Hillsboro; local debates over water use and grid capacity.","deal":"Flexential acquired Hillsboro 4 and Hillsboro 5 data centers from T5 Data Centers on May 28, 2026.","dealScan":"https://www.prnewswire.com/news-releases/flexential-secures-strategic-real-estate-ownership-in-hillsboro-oregon-with-acquisition-of-two-data-center-properties-302783801.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/flexential-secures-strategic-real-estate-ownership-in-hillsboro-oregon-with-acquisition-of-two-data-center-properties-302783801.html"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"37253cab6be4","cid":"37253cab6be4","canon":1,"dups":1,"ftype":"data_center","name":"200 MW Data Center Load","county":"Crook County","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"7121893017d7","cid":"7121893017d7","canon":1,"dups":1,"ftype":"data_center","name":"200 MW Data Center, Phase 2","county":"Crook County","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"5c9a4cb8f58d","cid":"5c9a4cb8f58d","canon":1,"dups":1,"ftype":"data_center","name":"300 MW Data Center Load Served from Grizzly","county":"Jefferson County","state":"OR","lat":44.645151,"lng":-121.178632,"cprec":"distinct","status":"Proposed","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"300 MW Data Center Load Served from Grizzly, L0650, -, OR, Jefferson County, Active.","pscan":"https://www.interconnection.fyi/projects/transmission-owner/bonneville-power-administration","uquote":"300 MW Data Center Load Served from Grizzly, L0650, -, OR, Jefferson County, Active.... BPA Transmission Services provides services for interconnection to the Federal Columbia River Transmission System (FCRTS) through its Open Access Transmission Tariff (OATT) and applicable Transmission Business Practices.","uscan":"https://www.interconnection.fyi/projects/transmission-owner/bonneville-power-administration","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/projects/transmission-owner/bonneville-power-administration"],"lflag":"citation_artifact_removed source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"06de9eb54905","cid":"06de9eb54905","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":108,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Aligned's Hillsboro campus has access to abundant power, with 120 MW of utility capacity and utility rates at a fraction of the cost per kWh of comparable West Coast data center markets, lowering customers' total cost of ownership.","pscan":"https://aligneddc.com/press-release/aligned-data-centers-expands-into-pacific-northwest-with-new-hillsboro-campus-to-support-hyperscale-large-enterprise-demand/","uconf":"High","uquote":"By partnering with the local utility, Portland General Electric (PGE), and on-site energy solutions provider, Calibrant Energy, we developed a Battery Energy Storage System (BESS) that will benefit both our customers and the local energy ecosystem.","uscan":"https://aligneddc.com/blog/solving-for-speed-to-power-at-scale/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"Nvidia, BlackRock, Microsoft, xAI (consortium)","ay":2023,"oy":2026,"contro":"Grid constraints and interconnection delays, community opposition to data centers in Hillsboro, and a state moratorium on Enterprise Zone approvals for data centers.","controScan":"https://aligneddc.com/blog/solving-for-speed-to-power-at-scale/","deal":"Partnership with Calibrant Energy for a 31 MW, 62 MWh Battery Energy Storage System (BESS) to accelerate interconnection (announced October 2025). Acquisition of Aligned Data Centers by a consortium including Nvidia, BlackRock, Microsoft, and xAI for $40 billion (announced October 2025).","dealScan":"https://www.datacenterknowledge.com/energy-power-supply/aligned-to-deploy-first-of-its-kind-data-center-battery-storage-project","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"aligneddc.com;datacenterknowledge.com","srcUrls":["https://aligneddc.com/press-release/aligned-data-centers-expands-into-pacific-northwest-with-new-hillsboro-campus-to-support-hyperscale-large-enterprise-demand/","https://aligneddc.com/blog/solving-for-speed-to-power-at-scale/","https://www.datacenterknowledge.com/energy-power-supply/aligned-to-deploy-first-of-its-kind-data-center-battery-storage-project"]},{"id":"1edd92f58a83","cid":"1edd92f58a83","canon":1,"dups":1,"ftype":"data_center","name":"Cascade Renewable Transmission Project - HVDC","county":"Wasco County","state":"OR","lat":45.164536,"lng":-121.165069,"cprec":"shared_centroid","status":"Proposed","mw":1100,"band":"250+ MW","uquote":"The line would extend about 100 miles in total, connecting the Bonneville Power Administration (BPA) Big Eddy substation near The Dalles, Oregon, with the Portland General Electric (PGE) Harborton substation in Portland, Oregon.","uscan":"https://efsec.wa.gov/facilities/cascade-renewable-transmission","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"PowerBridge","spon":"Sun2o Partners, , NextEra Energy Transmission","ay":2025,"contro":"Environmental concerns regarding dredging and impacts to aquatic species, and potential harm to tribal treaty-protected fishing rights and sovereignty.","deal":"$1.5 billion project cost","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"efsec.wa.gov","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified coordinate_cluster_reclassified","srcUrls":["https://efsec.wa.gov/facilities/cascade-renewable-transmission"],"rawUkey":"1738|OR","rawUname":"Bonneville Power Administration","reportedUtility":"Portland General Electric Co"},{"id":"b9fb9ccdf0da","cid":"b9fb9ccdf0da","canon":0,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"0be64645b1e5","cid":"0be64645b1e5","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":21,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Portland has rapidly grown to a primary data center market for the United States, with considerable renewable energy available and excellent connectivity regionally and to coastal landings for pan-Pacific linkage.... many of whom are interested in the renewable energy available throughout Oregon thanks to plentiful hydropower. This leads to a much lower cost of power for dense deployments, perfect for those contemplating rollouts of artificial intelligence as part of their platforms.","uconf":"High","uquote":"In Hillsboro, power for data centers is primarily provided and monitored by Portland General Electric (PGE).... PGE's territory includes the Portland suburb of Hillsboro, long a global hub for chipmaker Intel.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"EdgeConneX","spon":"EQT Infrastructure","tenant":"Hyperscalers (AWS, Microsoft, Google, Oracle)","ay":2020,"oy":2025,"contro":"Moratorium on data center applications and power grid constraints.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"fa7924b6c44e","cid":"fa7924b6c44e","canon":0,"dups":2,"ftype":"data_center","name":"Flexential","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":27,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset...","uconf":"High","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset...","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, Morgan Stanley","ay":2025,"contro":"Community opposition and moratorium on data center applications in Hillsboro.","controScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","deal":"Land parcel acquisition for Hillsboro 6 in September 2025.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified,merged_duplicate","srcUrls":["https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/"]},{"id":"7ec555313a4e","cid":"fa7924b6c44e","canon":0,"dups":2,"ftype":"data_center","name":"Flexential","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":27,"pc":"Grid","pconf":"High","pquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program. For Flexential, Oregon is also a gold-level partner in PGE's Clean Wind program, which guarantees access to a reliable renewable energy source.","uconf":"High","uquote":"That infrastructure is powered by Portland General Electric (PGE)'s Sunset Reliability Center and benefits from redundant power grid access and priority fuel delivery under the utility's Dispatchable Standby Generation program.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners, GI Data Infrastructure, Hamilton Lane, Morgan Stanley Infrastructure Partners","ay":2025,"contro":"Concerns raised about high power consumption versus low job creation.","controScan":"https://hillsboroherald.com/flexentials-new-hillsboro-6-data-center-marks-a-shift-from-jobs-to-joules/","deal":"Flexential raised approximately $1 billion from GI Partners, GI Data Infrastructure, Hamilton Lane and Morgan Stanley Infrastructure Partners to support expansion (within 12 months prior to Sept 2025).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"hillsboroherald.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://hillsboroherald.com/flexentials-new-hillsboro-6-data-center-marks-a-shift-from-jobs-to-joules/"],"band":"25-50 MW"},{"id":"eaafc6344c32","cid":"eaafc6344c32","canon":1,"dups":1,"ftype":"data_center","name":"Keeler Substation","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"cd61608908a7","cid":"cd61608908a7","canon":1,"dups":1,"ftype":"data_center","name":"Longhorn-McNary 230 kV Loop","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","uquote":"The proposed action is in response to a Umatilla Electric Cooperative (UEC) 230-kV interconnection request (L0482) and would increase local area capacity for future load and generation service.","uscan":"https://www.bpa.gov/-/media/Aep/environmental-initiatives/categorical-exclusions/cx-2023/20230426-cx-longhorn-substation-construction.pdf","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"bpa.gov","srcUrls":["https://www.bpa.gov/-/media/Aep/environmental-initiatives/categorical-exclusions/cx-2023/20230426-cx-longhorn-substation-construction.pdf"]},{"id":"ce0f8a6878b6","cid":"ce0f8a6878b6","canon":1,"dups":1,"ftype":"data_center","name":"Marion-Chemawa","county":"Marion","state":"OR","lat":44.900898,"lng":-122.57626,"cprec":"distinct","status":"Proposed","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"941605686563","cid":"941605686563","canon":1,"dups":1,"ftype":"data_center","name":"McNary 230 kV Looped","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","proc":"Tariff (utility)","pcp":"Umatilla Electric Cooperative","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"c9677a2d2fd1","cid":"c9677a2d2fd1","canon":1,"dups":1,"ftype":"data_center","name":"McNary 230 kV Substation","county":"Linn","state":"OR","lat":44.488898,"lng":-122.537208,"cprec":"distinct","status":"Proposed","mw":1250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Project Type. Load.","pscan":"https://www.interconnection.fyi/project/bpa-l0585","uquote":"Utility. Umatilla Electric Cooperative.","uscan":"https://www.interconnection.fyi/project/bpa-l0585","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","ay":2023,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/project/bpa-l0585"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"acedae24d925","cid":"acedae24d925","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Prineville","county":"Crook","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"Pacific Power","uquote":"Utility Provider: Pacific Power. Ownership: Meta owns the building.","ukey":"14354|OR","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9ad2bf6f2fe8","cid":"9ad2bf6f2fe8","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Hillsboro","county":"Washington","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":216,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","pscan":"https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","uconf":"High","uquote":"Primary provider: Portland General Electric (PGE), offering diverse energy sources including significant hydroelectric generation.","uscan":"https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","op":"NTT Global Data Centers","spon":"NTT DATA","ay":2026,"oy":2027,"contro":"Community opposition and scrutiny over data center tax incentives and their impact on local resources, with NTT Global Data Centers involved in agreements extending tax exemptions through 2051, ahead of a statewide moratorium.","controScan":"https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/","deal":"Six consecutive five-year enterprise zone agreements (HIL11-A through HIL11-F) signed on April 27, 2026, extending property tax exemptions through 2051.","dealScan":"https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"hillsboroherald.com;hillsboronewstimes.com","srcUrls":["https://hillsboroherald.com/data-centers-expand-again-in-hillsboro-oregon-as-ntt-acquires-massive-expansion-capacity/","https://hillsboroherald.com/hillsboro-tax-breaks-for-data-centers-through-2051/","https://hillsboronewstimes.com/2026/05/08/hillsboro-data-center-tax-incentives-spark-scrutiny-before-statewide-moratorium/"],"lflag":"source_quality_reclassified"},{"id":"a9e091046bb2","cid":"a9e091046bb2","canon":1,"dups":1,"ftype":"data_center","name":"NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2)","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Proposed NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2) data center in Washington County, OR. Capacity: 250+ MW.","pscan":"https://www.interconnection.fyi/data-center/project/nw-hillsboro-north-plains-semiconductor-plants-pro-9687aa29","uquote":"To support this effort the City began preliminary planning for the growth and development of the Hillsboro Technology Park Site in partnership with Washington County, Clean Water Services, Portland General Electric and the Oregon Department of Transportation.","ukey":"15248|OR","uname":"Portland General Electric Co","rto":"non-RTO","nerc":"WECC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/nw-hillsboro-north-plains-semiconductor-plants-pro-9687aa29"]},{"id":"0980a82da61d","cid":"0980a82da61d","canon":1,"dups":1,"ftype":"data_center","name":"Six Mile Canyon Substation","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Proposed","mw":1000,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Six Miles Canyon 500 kV substation is a new 500/230 kV substation on mile 56 of the Ashe – Slatt 500 kV line, with the line looped in and out of the substation. Proposed to interconnect UEC load in the West of Boardman area.","pscan":"https://www.bpa.gov/-/media/Aep/transmission/attachment-k/Planning_Meeting_II_2024.pdf","uquote":"Utility. Umatilla Electric Cooperative.","uscan":"https://www.interconnection.fyi/project/bpa-l0510","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","op":"Bonneville Power Administration","spon":"Bonneville Power Administration","ay":2021,"oy":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"bpa.gov;interconnection.fyi","srcUrls":["https://www.bpa.gov/-/media/Aep/transmission/attachment-k/Planning_Meeting_II_2024.pdf","https://www.interconnection.fyi/project/bpa-l0510"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"b3e2e88cfc25","cid":"b3e2e88cfc25","canon":1,"dups":1,"ftype":"data_center","name":"Steelhead 230 kV","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"0e71de5fdfae","cid":"0e71de5fdfae","canon":1,"dups":1,"ftype":"data_center","name":"Two Rivers 230 kV","county":"Umatilla County","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","proc":"Tariff (utility)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"8140203cc9ca","cid":"8140203cc9ca","canon":1,"dups":1,"ftype":"data_center","name":"West Hillsboro Data Center Project (Phase 1)","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"fc49ecbf3914","cid":"fc49ecbf3914","canon":1,"dups":1,"ftype":"data_center","name":"Baldwin Data Center","county":"Crook","state":"OR","lat":44.163054,"lng":-120.371585,"cprec":"shared_centroid","status":"Cancelled","mw":75,"band":"50-100 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"a060aaa22836","cid":"a060aaa22836","canon":1,"dups":1,"ftype":"data_center","name":"Birch Data Center","county":"Yamhill County","state":"OR","lat":45.247827,"lng":-123.316399,"cprec":"distinct","status":"Cancelled","mw":175,"band":"100-250 MW","proc":"Dedicated PPA","pcp":"Copia Power (in partnership with Carlyle and Birch)","pdt":"~800MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6636f8505f82","cid":"6636f8505f82","canon":1,"dups":1,"ftype":"data_center","name":"Umatilla County Data Center (cancelled)","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Cancelled","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Data Center","lflag":"generic_name_normalized generic_unsourced_record","srcUrls":null,"srcDom":null},{"id":"b0183f42717b","cid":"b0183f42717b","canon":1,"dups":1,"ftype":"data_center","name":"Industrial Load Phase 2","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Cancelled","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"e0578168cd9a","cid":"e0578168cd9a","canon":1,"dups":1,"ftype":"data_center","name":"Lake Street Data Center","county":"Washington County","state":"OR","lat":45.553542,"lng":-123.097615,"cprec":"shared_centroid","status":"Cancelled","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"449898963fce","cid":"449898963fce","canon":1,"dups":1,"ftype":"data_center","name":"Maverick Data Center","county":"Morrow","state":"OR","lat":45.425496,"lng":-119.602311,"cprec":"shared_centroid","status":"Cancelled","mw":37.5,"band":"25-50 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"3d45236517da","cid":"3d45236517da","canon":1,"dups":1,"ftype":"data_center","name":"Pacific West Coast Cable","county":"Columbia County","state":"OR","lat":45.941932,"lng":-123.081079,"cprec":"distinct","status":"Cancelled","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"788662abc159","cid":"788662abc159","canon":1,"dups":1,"ftype":"data_center","name":"Sixmile Canyon 500kV Substation","county":"Umatilla","state":"OR","lat":45.5912,"lng":-118.73388,"cprec":"shared_centroid","status":"Cancelled","mw":1050,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Six Miles Canyon 500 kV substation is a new 500/230 kV substation on mile 56 of the Ashe – Slatt 500 kV line, with the line looped in and out of the substation. Proposed to interconnect UEC load in the West of Boardman area.","uconf":"High","uquote":"Proposed to interconnect UEC load in the West of Boardman area.","ukey":"19325|OR","uname":"Umatilla Electric Coop Assn","rto":"non-RTO","nerc":"WECC","ay":2022,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e3eb7f8d109c","cid":"e3eb7f8d109c","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Berwick","county":"Columbia","state":"PA","lat":41.045517,"lng":-76.40426,"cprec":"distinct","status":"Operational","mw":48,"band":"25-50 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Amazon will power its data center with energy directly from the nuclear power plant instead of the grid.","pscan":"https://pennsnortheast.com/news/article/amazon-web-services-purchases-talen-energy-s-data-center-campus-in-northeastern-pa-for-650m","proc":"Dedicated PPA","pcp":"Talen Energy","pdt":"decade-long PPA, 960 megawatts","uquote":"Amazon Web Services (AWS) has significantly increased its footprint in Pennsylvania by acquiring a nuclear-powered data center campus for $650 million. This acquisition from Talen Energy encompasses the 1,200-acre Cumulus data center campus adjacent to the Susquehanna Steam Electric Station in Berwick, Pennsylvania. AWS has ambitious plans to boost the campus's capacity to 960 megawatts, powered by electricity from Talen under a decade-long Power Purchase Agreement (PPA).","rto":"PJM","nerc":"RFC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon","ay":2025,"oy":2023,"contro":"The 'behind the meter' connection to the nuclear power plant has drawn federal scrutiny and was held up by the Federal Energy Regulatory Commission (FERC). There are also concerns about water usage and the impact on utility bills.","controScan":"https://www.spotlightpa.org/news/2025/06/amazon-data-centers-pennsylvania-nuclear-power-investment/","deal":"Amazon Web Services acquired the Cumulus data center campus from Talen Energy for $650 million in March 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"pennsnortheast.com;spotlightpa.org","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://pennsnortheast.com/news/article/amazon-web-services-purchases-talen-energy-s-data-center-campus-in-northeastern-pa-for-650m","https://www.spotlightpa.org/news/2025/06/amazon-data-centers-pennsylvania-nuclear-power-investment/"]},{"id":"b70983f05e78","cid":"b70983f05e78","canon":1,"dups":1,"ftype":"data_center","name":"CSL Limited","city":"King of Prussia","county":"Montgomery","state":"PA","lat":40.209999,"lng":-75.370201,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"PJM","nerc":"RFC","op":"CSL Behring","spon":"CSL Limited","tenant":"CSL Behring","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1fbb5beb21e2","cid":"1fbb5beb21e2","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Pittsburgh","county":"Allegheny","state":"PA","lat":40.469757,"lng":-79.980451,"cprec":"distinct","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"databank has three 480 Volt commercial utility feeds a single one megawatt feed for the Legacy facility. and the new expansion space is configured for dual 2.5 megawatts of A and B. service each A and B service has 1.5 megawatts of UPS capacity pit-1 currently has three caterpillar emergency generators a single one megawatt diesel generator for the Legacy facility. and two 2.5 megawatt diesel generators for the expansion facility","pscan":"https://www.youtube.com/watch?v=9ZcFzmBFwFE","uconf":"High","uquote":"Utility power delivered through new 2N transformers served by DQL 23kVA primary utility power service.","ukey":"5487|PA","uname":"Duquesne Light Co","rto":"PJM","nerc":"RFC","op":"DataBank","spon":"DigitalBridge, Swiss Life Asset Management AG, EDF Invest, Northleaf Capital Partners, Ardian, AustralianSuper","tenant":"Pittsburgh Internet Exchange (PIT-IX)","ay":2017,"oy":2018,"deal":"Acquisition of Pittsburgh facility from 365 Data Centers in January 2017","dealScan":"https://www.databank.com/resources/press-releases/databank-announces-data-center-acquisitions-cleveland-and-pittsburgh/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"youtube.com;databank.com","srcUrls":["https://www.youtube.com/watch?v=9ZcFzmBFwFE","https://www.databank.com/resources/press-releases/databank-announces-data-center-acquisitions-cleveland-and-pittsburgh/"]},{"id":"dac68af86d0b","cid":"dac68af86d0b","canon":1,"dups":1,"ftype":"data_center","name":"Directlink Technologies","city":"Bernville","county":"Berks","state":"PA","lat":40.413957,"lng":-75.92686,"cprec":"distinct","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"We offer our clients clean, uninterruptible power supplies, with backup generators; reliable network connections with sufficient bandwidth; redundant heating, cooling, and fire detection systems.","pscan":"https://marketplace.upstack.com/companies/direct-ltx","uconf":"High","uquote":"The Direct LTx campus was founded in the 1970s as the regional headquarters for the GPU (later Met-Ed) electrical utility.","uscan":"https://www.directltx.com/history","rto":"PJM","nerc":"RFC","op":"Direct LTx","spon":"Eunice Boscov","ay":2005,"oy":2006,"deal":"Albert and Eunice Boscov purchased the campus in 2005 and invested over $20 million in upgrades.","dealScan":"https://www.directltx.com/history","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;directltx.com","srcUrls":["https://marketplace.upstack.com/companies/direct-ltx","https://www.directltx.com/history"]},{"id":"4e221a71c9b9","cid":"4e221a71c9b9","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Collegeville","county":"Montgomery","state":"PA","lat":40.209999,"lng":-75.370201,"cprec":"shared_centroid","status":"Operational","mw":7,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center features a 2(N+1) fault-tolerant uninterruptible power supply configuration with 7.2 megawatts of UPS critical load capacity, as well as N+1 redundant, energy-efficient cooling, and connectivity to more than 80 carriers.","uconf":"High","uquote":"Grid Operator. PECO Energy Company.","uscan":"https://www.interconnection.fyi/data-center/project/flexential-75f0eff7","ukey":"14940|PA","uname":"PECO Energy Co","rto":"PJM","nerc":"RFC","op":"Flexential","spon":"GI Partners, Hamilton Lane, Morgan Stanley Infrastructure Partners","tenant":"University of Pennsylvania's Penn Advanced Research Computing Center (PARCC)","oy":2025,"deal":"$1.4 billion ABS financing package backed by 28 data centers (March 09, 2026)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/flexential-75f0eff7"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"796c76ba77f6","cid":"796c76ba77f6","canon":1,"dups":1,"ftype":"data_center","name":"Susquehanna International Group","city":"Bala Cynwyd","county":"Philadelphia","state":"PA","lat":40.009376,"lng":-75.133346,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: PECO Energy Company. The projects range from feasibility studies, to departmental renovations, to HVAC infrastructure upgrades in their data centers.","uconf":"High","uquote":"Grid Operator: PECO Energy Company. PECO, the electric utility serving Philadelphia and the surrounding suburbs, says it has been signing agreements with data centers to do that since late 2025.","ukey":"14940|PA","uname":"PECO Energy Co","rto":"PJM","nerc":"RFC","op":"Susquehanna International Group","spon":"Susquehanna International Group","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"ee7ba73bfb39","cid":"ee7ba73bfb39","canon":1,"dups":1,"ftype":"data_center","name":"The Vanguard Group","city":"Philadelphia","county":"Philadelphia","state":"PA","lat":40.009376,"lng":-75.133346,"cprec":"shared_centroid","status":"Operational","mw":13,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"In 2024, we continued to use 100% renewable electricity globally in owned and leased buildings where Vanguard has operational control, an outcome we first achieved in 2021. Where possible, our buildings are powered by on-site renewable electricity or direct renewable electricity from the utility supplier.","rto":"PJM","nerc":"RFC","op":"The Vanguard Group","spon":"The Vanguard Group","tenant":"The Vanguard Group","deal":"Proposed sale of the facility for approximately $14.5 million, expected to close in Q3 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"9b47fe15f2d1","cid":"9b47fe15f2d1","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Philadelphia","county":"Philadelphia","state":"PA","lat":40.009376,"lng":-75.133346,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Philadelphia data center provides reliable and fault tolerant N+1 redundant power infrastructure and can offer 100% SLA on power. The power to data center is delivered through dual commercial power feeds. Immediate power failure is protected by a redundant and diverse N+1 UPS system for critical load, in an event of utility power loss. Diesel generators in N+1 redundant configuration provide backup power to the entire facility during a power outage, with onsite fuel storage.","pscan":"https://cloudandcolocation.com/datacenters/tierpoint-philadelphia-data-center/","uconf":"High","uquote":"PECO Energy Company is the largest electric distribution company in Pennsylvania. In PA's deregulated market, PECO delivers electricity and maintains the grid while customers can choose a competitive third-party supplier (TPS) for their energy supply. If you don't choose a supplier, you receive PECO's \"Price to Compare\" default service rate. Service area. PECO's territory covers the city of Philadelphia and surrounding suburban counties: Bucks, Chester, Delaware, Montgomery, and parts of York County.","uscan":"https://www.electricchoice.com/utilities/peco/","ukey":"14940|PA","uname":"PECO Energy Co","rto":"PJM","nerc":"RFC","op":"TierPoint","spon":"Argo Infrastructure Partners","ay":2010,"oy":2010,"deal":"TierPoint acquired Philadelphia Technology Park in June 2014 for an undisclosed price.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;electricchoice.com","srcUrls":["https://cloudandcolocation.com/datacenters/tierpoint-philadelphia-data-center/","https://www.electricchoice.com/utilities/peco/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"b11a7388df32","cid":"c719296f2be2","canon":0,"dups":2,"ftype":"data_center","name":"TierPoint","city":"Bethlehem","county":"Northampton","state":"PA","lat":40.752791,"lng":-75.307447,"cprec":"distinct","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"A-side and B-side power distribution design; Two redundant 600kW generators and one 1000kw generator on-site with minimum of 48 hours of runtime; 100% uptime SLA.","uquote":"Two utility companies operate in Bethlehem: PPL Electric Utilities: Call 1-800-342-5775.","uscan":"https://www.chooseenergy.com/electricity-rates/pennsylvania/bethlehem/","ukey":"14715|PA","uname":"PPL Electric Utilities Corp","rto":"PJM","nerc":"RFC","op":"TierPoint","spon":"Argo Infrastructure Partners","tenant":"St. Luke's University Health Network","deal":"Acquisition of Windstream in December 2015","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"chooseenergy.com","srcUrls":["https://www.chooseenergy.com/electricity-rates/pennsylvania/bethlehem/"],"lflag":"source_quality_reclassified"},{"id":"c719296f2be2","cid":"c719296f2be2","canon":1,"dups":2,"ftype":"data_center","name":"TierPoint","city":"Bethlehem","county":"Northampton","state":"PA","lat":40.752791,"lng":-75.307447,"cprec":"distinct","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility Service: Pad mounted 1000kva transformer for Utility 1; 1500VA transformer for Utility 2.","pscan":"https://web.tierpoint.com/hubfs/data-center/pa-bethleham-data-center-spec-sheet.pdf","uquote":"Two utility companies operate in Bethlehem: PPL Electric Utilities: Call 1-800-342-5775.","uscan":"https://www.chooseenergy.com/electricity-rates/pennsylvania/bethlehem/","ukey":"14715|PA","uname":"PPL Electric Utilities Corp","rto":"PJM","nerc":"RFC","op":"TierPoint","spon":"Argo Infrastructure Partners","deal":"Acquisition of Windstream's data center assets by TierPoint in October 2015 for $575 million.","dealScan":"https://baxtel.com/data-center/windstream-bethlehem","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"web.tierpoint.com;chooseenergy.com;baxtel.com","srcUrls":["https://web.tierpoint.com/hubfs/data-center/pa-bethleham-data-center-spec-sheet.pdf","https://www.chooseenergy.com/electricity-rates/pennsylvania/bethlehem/","https://baxtel.com/data-center/windstream-bethlehem"]},{"id":"3fc2991cef4c","cid":"3fc2991cef4c","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Norristown","county":"Montgomery","state":"PA","lat":40.209999,"lng":-75.370201,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Valley Forge data center provides reliable and fault tolerant power infrastructure and can offer 100% SLA on power. Immediate power failure is protected by a redundant and diverse UPS system for critical load, in an event of utility power loss. Diesel generators in N+1 redundant configuration provide backup power to the entire facility during a power outage, with onsite fuel storage. Utility Service. Pad mounted 3,360kVA transformer for Utility 1; 3,750kVA transformer for Utility 2;. Dual 3,360 kVA transformers for A/B feed Utility 3.","pscan":"https://cloudandcolocation.com/datacenters/tierpoint-valley-forge-data-center/","uconf":"High","uquote":"Grid Operator. PECO Energy Company.","ukey":"14940|PA","uname":"PECO Energy Co","rto":"PJM","nerc":"RFC","op":"TierPoint","spon":"TierPoint, Pennsylvania Two","oy":2005,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/tierpoint-valley-forge-data-center/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"87027c482495","cid":"87027c482495","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers","city":"Philadelphia","county":"Philadelphia","state":"PA","lat":40.009376,"lng":-75.133346,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"fc063034518a","cid":"fc063034518a","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Boyers","county":"Butler","state":"PA","lat":40.913847,"lng":-79.918978,"cprec":"distinct","status":"Proposed","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"three separate utility substations in a grid design provide two diverse utility feeds to the data cent's fully redundant service entrances. our generator system has a present capacity of 21.5 megawws to support a block redundant configuration generators can run at full load for 72 hours before needing refueling. all Iron Mountain data centers are powered by 100% renewable energy our green power pass gives customers the ability to include the power they consume at any of our global data centers as green power in their sustainability reporting concurrently maintainable WPA1 meets tier 3 standards. and is designed to the highest efficiency standards with peees of 1.3.","pscan":"https://www.youtube.com/watch?v=pNjrHrHbmbw","uconf":"High","uquote":"Benefit from reliable First Energy utility services with redundant feeds and powered by 100% matched renewable energy, supporting sustainable data center operations in a secure underground environment.","uname":"FirstEnergy Pennsylvania Electric Co","rto":"PJM","nerc":"RFC","op":"Iron Mountain","spon":"Iron Mountain","tenant":"leading hyperscale enterprise software provider","ay":2013,"oy":2008,"deal":"2.4 megawatt lease signed with a leading hyperscale enterprise software provider, expected to commence in Q1 2022 with a ten-year term.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"online_before_announced nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected stale_future_status_year","srcUrls":["https://www.youtube.com/watch?v=pNjrHrHbmbw"],"rawUkey":"9949|PA","rawUname":"Just Energy","reportedUtility":"FirstEnergy Pennsylvania Electric Co","ukey":"66101|PA","oy_stale":1},{"id":"bf02e075e4f4","cid":"bf02e075e4f4","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Breinigsville","county":"Lehigh","state":"PA","lat":40.614241,"lng":-75.590627,"cprec":"distinct","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"PPL (Pennsylvania Power & Light)","pdt":"10-year commitment for large-load data centers (for expansion)","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","ukey":"14715|PA","uname":"PPL Electric Utilities Corp","reportedUtility":"PPL Electric Utilities Corp","srcUrls":null,"srcDom":null},{"id":"bd365c15c2db","cid":"bd365c15c2db","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Moncks Corner","county":"Berkeley","state":"SC","lat":33.2077,"lng":-79.953655,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Google is powering a new era of innovation by securing historic levels of clean energy, collaborating to design better markets, and investing in energy-efficient technologies. A rainwater retention pond sits outside one of our data centers in South Carolina.","pscan":"https://datacenters.google/energy/","uconf":"High","uquote":"Utility Provider: Santee Cooper.","uscan":"https://baxtel.com/data-center/google-berkeley-county-south-carolina","rto":"non-RTO","nerc":"SERC","op":"Google","spon":"Google","tenant":"Google","ay":2007,"oy":2008,"contro":"Water usage controversy, with environmental groups opposing Google's request to increase groundwater withdrawal.","deal":"$9 billion investment in South Carolina from 2026 to 2027 to expand cloud and AI infrastructure, including the Berkeley County campus, announced October 13, 2025.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.google;baxtel.com","lflag":"operational_null_capacity","srcUrls":["https://datacenters.google/energy/","https://baxtel.com/data-center/google-berkeley-county-south-carolina"]},{"id":"c7d9c269f8fe","cid":"c7d9c269f8fe","canon":1,"dups":1,"ftype":"data_center","name":"US Earth Resources Observation and Science Center","city":"Garretson","county":"Minnehaha","state":"SD","lat":43.667472,"lng":-96.795726,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Electric power is furnished through 42 miles of underground conduit terminating in the Main- tenance, Garage and Substation Building. [...] Uninterrupted Power Supply (UPS) and generator backup power.","uconf":"High","uquote":"Sioux Valley Energy is a member-owned cooperative providing electric service to residents in Garretson, SD and surrounding areas.","ukey":"17267|SD","uname":"Sioux Valley SW Elec Coop","rto":"MISO","nerc":"MRO","op":"U.S. Geological Survey","spon":"U.S. Department of the Interior","oy":1973,"contro":"Farmers were worried about potential electrical effects and land price issues during the establishment of the center.","controScan":"https://www.usgs.gov/centers/eros/news/eros-50th-history-1966-1979-how-sioux-falls-ingenuity-secured-center","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"usgs.gov","srcUrls":["https://www.usgs.gov/centers/eros/news/eros-50th-history-1966-1979-how-sioux-falls-ingenuity-secured-center"],"lflag":"legacy_facility_year_review"},{"id":"29150c2300b6","cid":"ac81e03698f7","canon":0,"dups":2,"ftype":"data_center","name":"Flexential","city":"Franklin","county":"Williamson","state":"TN","lat":35.894807,"lng":-86.898068,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The critical infrastructure is protected by a redundant UPS system on the loss of utility power that is backed up by redundant 3 MW diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/flexential-franklin-data-center/","uquote":"Electricity. Middle Tennessee Electric: 615-794-3561.","uscan":"https://franklinis.com/utilities/","ukey":"12470|TN","uname":"Middle Tennessee E M C","rto":"non-RTO","nerc":"SERC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","oy":2016,"deal":"$20M Acquisition of New Flexential Nashville Data Center (2016)","dealScan":"https://www.five9sdigital.com/news/five-9s-digital-advises-on-the-acquisition-of-nashville-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;franklinis.com;five9sdigital.com","srcUrls":["https://cloudandcolocation.com/datacenters/flexential-franklin-data-center/","https://franklinis.com/utilities/","https://www.five9sdigital.com/news/five-9s-digital-advises-on-the-acquisition-of-nashville-data-center/"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"ac81e03698f7","cid":"ac81e03698f7","canon":1,"dups":2,"ftype":"data_center","name":"Flexential","city":"Franklin","county":"Williamson","state":"TN","lat":35.894807,"lng":-86.898068,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"6 MW critical power for high-density workloads. The critical infrastructure is protected by a redundant UPS system on the loss of utility power that is backed up by redundant 3 MW diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/flexential-franklin-data-center/","uconf":"Medium","uquote":"Middle Tennessee Electric is a cooperative that operates in Tennessee. Franklin. 2156 Edward Curd Ln., Franklin, TN 37067.","uscan":"https://mte.com/Contact","ukey":"12470|TN","uname":"Middle Tennessee E M C","rto":"non-RTO","nerc":"SERC","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners","oy":2016,"deal":"$20M acquisition of 100% leased Flexential data center in Franklin, TN in 2016.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;mte.com","srcUrls":["https://cloudandcolocation.com/datacenters/flexential-franklin-data-center/","https://mte.com/Contact"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"6f99539378e5","cid":"6f99539378e5","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Brentwood","county":"Williamson","state":"TN","lat":35.894807,"lng":-86.898068,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"N+1 UPS redundancy. 1.49 MW critical load UPS capacity. 150 W/SF power density. N+1 cooling redundancy. Hot/cold aisle configuration. 100% power SLA. 1.85 PUE rating.","rto":"non-RTO","nerc":"SERC","op":"Flexential","spon":"GI Partners","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"2358e2e14c6f","cid":"2358e2e14c6f","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Clarksville","county":"Montgomery","state":"TN","lat":36.500354,"lng":-87.380887,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"The roughly 1,300 acre site will be powered 100 percent by renewable energy thanks to an arrangement with the Tennessee Valley Authority (TVA). Through the agreement, Google will be able to scout new renewable energy projects and work with TVA to bring the power onto the electrical grid.","uconf":"High","uquote":"The Tennessee Valley Authority (TVA) will provide electricity.","uname":"Tennessee Valley Authority","rto":"non-RTO","nerc":"SERC","op":"Google","spon":"Google","tenant":"Google","ay":2015,"oy":2019,"contro":"The deal involved non-disclosure agreements with government entities, leading to a lack of transparency regarding the project's details and tax breaks.","controScan":"https://tcog.info/washington-post-story-details-google-techniques-to-keep-economic-development-deals-secret/","deal":"Initial investment of $600 million announced in December 2015. An additional investment of more than $25 million was announced in April 2022.","dealScan":"https://mainstreetmediatn.com/articles/mainstreetnashville/google-announces-25-million-expansion-in-clarksville/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mainstreetmediatn.com;tcog.info","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed nonretail_eia861_not_rate_utility","srcUrls":["https://mainstreetmediatn.com/articles/mainstreetnashville/google-announces-25-million-expansion-in-clarksville/","https://tcog.info/washington-post-story-details-google-techniques-to-keep-economic-development-deals-secret/"],"rawUkey":"18642|TN","rawUname":"Tennessee Valley Authority","reportedUtility":"Tennessee Valley Authority"},{"id":"66c6878a033e","cid":"66c6878a033e","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Gallatin","county":"Sumner","state":"TN","lat":36.472423,"lng":-86.458405,"cprec":"distinct","status":"Operational","mw":300,"pc":"Grid","pconf":"High","pquote":"We worked with Tennessee Valley Authority to meet our 100% clean and renewable energy goal for the Gallatin Data Center.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Gallatin-Data-Center.pdf","uquote":"We worked with Tennessee Valley Authority to meet our 100% clean and renewable energy goal for the Gallatin Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Gallatin-Data-Center.pdf","uname":"Tennessee Valley Authority","rto":"non-RTO","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2020,"oy":2024,"contro":"Concerns raised about water use and electricity costs in the region due to data center proliferation.","deal":"Over $1.5 billion investment.","dealScan":"https://www.gallatingetsit.com/newsroom/metas-data-centers-in-gallatin-are-up-and-running","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;gallatingetsit.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Gallatin-Data-Center.pdf","https://www.gallatingetsit.com/newsroom/metas-data-centers-in-gallatin-are-up-and-running"],"band":"250+ MW","rawUkey":"18642|TN","rawUname":"Tennessee Valley Authority","reportedUtility":"Tennessee Valley Authority","lflag":"nonrate_utility_link_removed nonretail_eia861_not_rate_utility"},{"id":"2c21faab124b","cid":"2c21faab124b","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint","city":"Franklin","county":"Williamson","state":"TN","lat":35.894807,"lng":-86.898068,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Engineered for reliability with 2N A-side and B-side power distribution, two redundant 2,250kW Kohler generators ensure a minimum 48-hour runtime—backed by a 100% uptime SLA.","rto":"non-RTO","nerc":"SERC","op":"TierPoint","spon":"Argo Infrastructure Partners","ay":2012,"oy":2017,"deal":"Windstream sold its data center business to TierPoint in 2015. TierPoint announced a $20 million data center investment in Nashville in 2017, part of a total $45 million investment in the complex.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"8fcd8ed18d65","cid":"8fcd8ed18d65","canon":1,"dups":1,"ftype":"data_center","name":"xAI Colossus 1","county":"Shelby","state":"TN","lat":35.184553,"lng":-89.894612,"cprec":"distinct","status":"Operational","mw":150,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"The company began operations at its first site, Colossus 1, in June of 2024 and used as many as 35 unpermitted gas turbines to power the facility. xAI removed its unpermitted turbines at the Colossus 1 data center after SELC, on behalf of the NAACP, sent a notice of intent to sue under the Clean Air Act. The company obtained permits for its remaining 15 turbines. The city was also able to provide the large amounts of electricity and water needed to operate the supercomputer. At full capacity, the system was expected to require 150 megawatts of electricity and millions of gallons of water per day. xAI Supercomputer Power Use Approved by TVA Board in Memphis, (Nov. 7, 2024).","pscan":"https://www.tba.org/?pg=Hastings2025AIX","proc":"Co-located generation","pcp":"xAI (self-generation)","pdt":"up to 247.2 MW (permitted capacity)","uconf":"High","uquote":"Throughout the process, our team has worked closely with local elected officials, Memphis Light, Gas and Water (MLGW), and the Tennessee Valley Authority (TVA).","rto":"non-RTO","nerc":"SERC","op":"xAI","spon":"SpaceX","tenant":"Anthropic","ay":2024,"oy":2024,"contro":"Community opposition and legal action over unpermitted gas turbines and environmental concerns, including an intent to sue under the Clean Air Act.","deal":"SpaceX affiliate acquired the 785,000-square-foot property for $185 million (May 26, 2026); Anthropic agreed to rent all compute capacity (May 6, 2026).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"tba.org","srcUrls":["https://www.tba.org/?pg=Hastings2025AIX"]},{"id":"38e193394fb0","cid":"38e193394fb0","canon":1,"dups":1,"ftype":"data_center","name":"xAI Colossus 2","county":"Shelby","state":"TN","lat":35.184553,"lng":-89.894612,"cprec":"distinct","status":"Operational","mw":1000,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Colossus 2's power is primarily self-generated via gas turbines in Southaven, Mississippi, with plans to scale significantly through the Solaris partnership by Q2 2027, supported by grid connections and Tesla Megapacks.","proc":"Co-located generation","pcp":"xAI (self-generation via gas turbines)","pdt":"Up to 495 MW from gas turbines","uquote":"Throughout the process, our team has worked closely with local elected officials, Memphis Light, Gas and Water (MLGW), and the Tennessee Valley Authority (TVA).","rto":"non-RTO","nerc":"SERC","op":"xAI","spon":"xAI","tenant":"xAI","ay":2025,"oy":2025,"contro":"Lawsuit filed by NAACP and environmental groups over unpermitted gas turbines causing air pollution.","deal":"Land acquisition for $80 million in March 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fb048fa3368f","cid":"fb048fa3368f","canon":1,"dups":1,"ftype":"data_center","name":"(100% VACANT)TEXAS UTILITIES","city":"MESQUITE","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c96be697a7c9","cid":"c96be697a7c9","canon":1,"dups":1,"ftype":"data_center","name":"**UNOCC SHELL 1/1/22** KDC","city":"RICHARDSON","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":25,"pc":"Grid","pconf":"High","pquote":"The substation is adjacent to the project and owned and maintained by ONCOR. The power will be served by two non-shared dedicated 12.5 MW electrical feeds from two separate substation transformers.","pscan":"https://kdc-realestate.files.svdcdn.com/production/team/KDC-Richardson-Data-Center-d2.pdf?dm=1737567867","uquote":"The substation is adjacent to the project and owned and maintained by ONCOR.","uscan":"https://kdc-realestate.files.svdcdn.com/production/team/KDC-Richardson-Data-Center-d2.pdf?dm=1737567867","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"KDC","spon":"KDC","ay":2018,"oy":2019,"deal":"10-year, 50 percent City of Richardson business personal property tax abatement (announced November 2018)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"kdc-realestate.files.svdcdn.com","srcUrls":["https://kdc-realestate.files.svdcdn.com/production/team/KDC-Richardson-Data-Center-d2.pdf?dm=1737567867"],"band":"25-50 MW","rawName":"**UNOCC SHELL 1/1/22**     KDC","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"009f7631ccd5","cid":"009f7631ccd5","canon":1,"dups":1,"ftype":"data_center","name":"100 1/2 W RIVERSIDE DR","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Austin Energy","pscan":"https://www.interconnection.fyi/data-center/project/100-1-2-w-riverside-dr-d869f332","uquote":"Grid Operator: Austin Energy","uscan":"https://www.interconnection.fyi/data-center/project/100-1-2-w-riverside-dr-d869f332","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","oy":1992,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/100-1-2-w-riverside-dr-d869f332"]},{"id":"4431d8d51471","cid":"4431d8d51471","canon":1,"dups":1,"ftype":"data_center","name":"Spear Street Capital Data Center Decomissioning 10000 Energy Drive","city":"Spring","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"b53ed644efe2","cid":"b53ed644efe2","canon":1,"dups":1,"ftype":"data_center","name":"10000 SPECTRUM DR","city":"AUSTIN","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"This location is a support facility for the manufacturing operations; this site also houses the IT and R&D divisions and a Data Center.","pscan":"https://services.austintexas.gov/edims/document.cfm?id=359254","uquote":"Williamson County in eastern Austin metro hosts the densest concentration via the Samsung Oncor Effect: Samsung's $40 billion Taylor advanced semiconductor manufacturing campus drove Oncor (Texas's largest electric utility) to build major transmission infrastructure across eastern Williamson County, which subsequently opened the door for hyperscale data center operators that need reliable multi-hundred-megawatt power access. Skybox Austin I is situated on a twenty-acre campus in the heart of Texas' Silicon Prairie, located in Oncor's deregulated power territory","uscan":"https://austinio.com/datacenter-b2b-austin.php","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Applied Materials","spon":"Applied Materials","tenant":"Applied Materials","oy":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"services.austintexas.gov;austinio.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://services.austintexas.gov/edims/document.cfm?id=359254","https://austinio.com/datacenter-b2b-austin.php"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"3f26afef0177","cid":"3f26afef0177","canon":1,"dups":1,"ftype":"data_center","name":"108 CHICON ST","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"bfe3f82d4689","cid":"bfe3f82d4689","canon":1,"dups":1,"ftype":"data_center","name":"11400 BURNET RD","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Austin Energy requests authorization to issue a rebate to the IBM Corporation in an amount not to exceed $66,089 for Energy Efficient Lighting Upgrades in accordance with the City of Austin's Commercial Rebate Program guidelines.","pscan":"https://services.austintexas.gov/edims/document.cfm?id=182327","uquote":"Austin Energy requests authorization to issue a rebate to the IBM Corporation in an amount not to exceed $66,089 for Energy Efficient Lighting Upgrades in accordance with the City of Austin's Commercial Rebate Program guidelines.","uscan":"https://services.austintexas.gov/edims/document.cfm?id=182327","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"IBM","spon":"Stonelake Capital Partners","tenant":"IBM","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.austintexas.gov","lflag":"operational_null_capacity","srcUrls":["https://services.austintexas.gov/edims/document.cfm?id=182327"]},{"id":"fdb7377cb0d6","cid":"fdb7377cb0d6","canon":1,"dups":1,"ftype":"data_center","name":"11921 N MOPAC EXPY SVRD NB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","ay":2000,"oy":2010,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"0d8e1e649f14","cid":"0d8e1e649f14","canon":1,"dups":1,"ftype":"data_center","name":"DLR 1210 Office Fit-Out","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Electrical service to the park is served by diverse substation feeders to our dedicated, privately owned, substation, which can deliver up to 100 MW of power.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw18","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Collins Technology Park Partners, c/o Digital Realty Trust","ay":2016,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-realty-dfw18"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"83d66e8766c0","cid":"83d66e8766c0","canon":1,"dups":1,"ftype":"data_center","name":"12100 SAMSUNG BLVD","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Austin Energy.","uconf":"High","uquote":"Grid Operator. Austin Energy.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Samsung Austin Semiconductor","spon":"Samsung Electronics","ay":2017,"oy":2022,"deal":"City of Austin Chapter 380 Agreement with Samsung Austin Semiconductor, LLC (Years 1-8 of 20 in compliance, Year 9 in review)","dealScan":"https://services.austintexas.gov/edims/document.cfm?id=266309","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.austintexas.gov","lflag":"operational_null_capacity","srcUrls":["https://services.austintexas.gov/edims/document.cfm?id=266309"]},{"id":"f3b2108edc4f","cid":"f3b2108edc4f","canon":1,"dups":1,"ftype":"data_center","name":"12365 RIATA TRACE PKWY","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Austin Energy is the nation's 8th largest publicly owned electric utility. We provide electric service to a population of almost one million.... Austin Energy is part of the Electric Reliability Council of Texas (ERCOT).","uconf":"High","uquote":"Approve issuance of a rebate to BRI 1868 Riata, LLC, for performing energy efficiency improvements at Riata Trace located at 12301, 12331, 12357 and 12365 Riata Trace Parkway, in an amount not to exceed $300,000.","uscan":"https://austintexas.legistar.com/LegislationDetail.aspx?ID=3977250&GUID=9D6D32FF-188A-4188-A26F-AE89675FD4DE","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"austintexas.legistar.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://austintexas.legistar.com/LegislationDetail.aspx?ID=3977250&GUID=9D6D32FF-188A-4188-A26F-AE89675FD4DE"]},{"id":"1cb790928b7d","cid":"1cb790928b7d","canon":1,"dups":1,"ftype":"data_center","name":"1300 PARK CENTER DR","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"High","pquote":"Total Power Capacity: Offers up to 8.5 MW of power capacity, supporting substantial IT loads within the facility","uquote":"Austin Energy has an obligation to serve customers in our service area... Your City of Austin Utility Departments & Services","uscan":"https://services.austintexas.gov/edims/document.cfm?id=464924","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.austintexas.gov","srcUrls":["https://services.austintexas.gov/edims/document.cfm?id=464924"],"band":"< 10 MW","lflag":"citation_artifact_removed"},{"id":"175eccb83002","cid":"175eccb83002","canon":1,"dups":1,"ftype":"data_center","name":"1300 S MOPAC EXPY SVRD SB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","uconf":"High","uquote":"Your utility bill includes charges for your City of Austin utility services, which may include electricity, water, wastewater, solid waste, drainage, and street service.","uscan":"https://www.austintexas.gov/services/pay-utility-bill","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Intel","spon":"Intel","tenant":"Intel","oy":1999,"deal":"Intel announced the sale of its 61-acre corporate campus in Southwest Austin in January 2023.","dealScan":"https://therealdeal.com/texas/austin/2023/01/24/intel-to-sell-61-acre-campus-in-southwest-austin/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"austintexas.gov;therealdeal.com","lflag":"operational_null_capacity","srcUrls":["https://www.austintexas.gov/services/pay-utility-bill","https://therealdeal.com/texas/austin/2023/01/24/intel-to-sell-61-acre-campus-in-southwest-austin/"]},{"id":"d2bbf1ce1785","cid":"d2bbf1ce1785","canon":1,"dups":1,"ftype":"data_center","name":"EXXONMOBILE - DATA CENTER ELECTRICAL","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","uquote":"Houston, Texas. Electric Delivery. Customer Service: 713-207-2222 or 800-332-7143; Report Downed Power Lines: 713-207-2222; Report Electricity Theft: 713-207-7225 or 877-570-5770; Report a Street Light Outage: 713-207-2222 or 800-332-7143; Find an Electric Service Provider: 866-PWR-4-TEX (We deliver but do not sell electricity); Call Before You Dig: 811.","uscan":"https://www.centerpointenergy.com/en-us/corporate/contact-us","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"ExxonMobil","spon":"ExxonMobil","tenant":"ExxonMobil","oy":2015,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centerpointenergy.com","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.centerpointenergy.com/en-us/corporate/contact-us"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"a77ddafb01f5","cid":"a77ddafb01f5","canon":1,"dups":1,"ftype":"data_center","name":"COH- DATA CENTER","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"Dual underground utility feeds provide 26 megawatts of power capacity, backed by N+1 generators, redundant UPS systems, and advanced cooling infrastructure capable of supporting high-density deployments and AI-driven workloads.","pscan":"https://netrality.com/media/houston-data-center-1301-fannin-spotlight-video/","uconf":"High","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Netrality Data Centers","spon":"Netrality Data Centers","tenant":"Multiple (e.g., Level3, XO Verizon, Internap)","oy":2023,"deal":"Netrality Properties acquired the 1301 Fannin Street building in 2015. Netrality also acquired INAP's colocation and meet-me-room assets at the site in June 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"netrality.com","srcUrls":["https://netrality.com/media/houston-data-center-1301-fannin-spotlight-video/"],"band":"25-50 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","dukey":"8901|TX"},{"id":"82d1f6ea58e7","cid":"82d1f6ea58e7","canon":1,"dups":1,"ftype":"data_center","name":"COH- DATA CENTER-PHASE II","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"Dual underground utility feeds provide 26 megawatts of power capacity, backed by N+1 generators, redundant UPS systems, and advanced cooling infrastructure capable of supporting high-density deployments and AI-driven workloads.","pscan":"https://netrality.com/media/houston-data-center-1301-fannin-spotlight-video/","uquote":"Two Diverse electrical feeds from Polk St. substation (redundancy)","rto":"ERCOT","nerc":"TRE","op":"Netrality Data Centers","spon":"Macquarie Asset Management","tenant":"INAP","ay":2015,"oy":2015,"deal":"Netrality acquired 1301 Fannin Street in 2015. Netrality Data Centers acquired Internap's colocation facilities at 1301 Fannin Street in Houston in June 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"netrality.com","srcUrls":["https://netrality.com/media/houston-data-center-1301-fannin-spotlight-video/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"6dd6f6af7e21","cid":"6dd6f6af7e21","canon":1,"dups":1,"ftype":"data_center","name":"EXXONMOBIL HOUSTON DATA CENTER EXPANSION","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","proc":"Co-located generation","pcp":"ExxonMobil","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b7b3c230740e","cid":"b7b3c230740e","canon":1,"dups":1,"ftype":"data_center","name":"1501 S MOPAC EXPY SVRD NB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"3df89590b057","cid":"3df89590b057","canon":1,"dups":1,"ftype":"data_center","name":"AWS remodel","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Karnes Electric COOP INC.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"645a282d927d","cid":"645a282d927d","canon":1,"dups":1,"ftype":"data_center","name":"1825 KRAMER LN","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Austin Energy recently energized a new substation to add energy capacity for rapidly growing parts of North Austin. The new Kramer Substation will increase reliability to existing circuits in that area and eventually feed a new mixed-use development in North Austin. Substations are an integral part of the electric system, connecting major, grid-scale equipment to power lines serving local areas. They are essential to powering homes and businesses.","uquote":"Austin Energy recently energized a new substation to add energy capacity for rapidly growing parts of North Austin. The new Kramer Substation will increase reliability to existing circuits in that area and eventually feed a new mixed-use development in North Austin.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Lumen Technologies","spon":"Lumen Technologies","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"19fe7e4d6b9f","cid":"19fe7e4d6b9f","canon":1,"dups":1,"ftype":"data_center","name":"1905 E 6TH ST","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Our Austin data center features dual power service, 2,000 KVA transformers and a back-up diesel generator. The immediate power failure is protected through redundant 500 kVA UPS system with automatic transfer of load to the backup diesel generator.","uconf":"High","uquote":"Austin Energy is a publicly owned utility providing electrical power to the city of Austin, Texas and surrounding areas.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"LOGIX Fiber Networks","spon":"O'Connor Capital Solutions (OCS)","deal":"Recapitalization with $45 million new investment from O'Connor Capital Solutions (OCS) in 2024.","dealScan":"https://hl.com/about-us/transactions/logix-fiber-networks/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"hl.com","lflag":"operational_null_capacity","srcUrls":["https://hl.com/about-us/transactions/logix-fiber-networks/"]},{"id":"e46d584bc864","cid":"e46d584bc864","canon":1,"dups":1,"ftype":"data_center","name":"2018 EXPANSION/ADDITION","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center would be next door to an Oncor electric substation.","pscan":"https://richardsoneconomicdevelopment.com/state-farm-is-doubling-its-richardson-data-center-with-plans-for-new-building/","uconf":"High","uquote":"The data center would be next door to an Oncor electric substation.","uscan":"https://richardsoneconomicdevelopment.com/state-farm-is-doubling-its-richardson-data-center-with-plans-for-new-building/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"State Farm Insurance","spon":"State Farm Insurance","ay":2018,"contro":"parking variance requested","controScan":"https://richardsoneconomicdevelopment.com/state-farm-is-doubling-its-richardson-data-center-with-plans-for-new-building/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"richardsoneconomicdevelopment.com","lflag":"online_before_announced operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://richardsoneconomicdevelopment.com/state-farm-is-doubling-its-richardson-data-center-with-plans-for-new-building/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"ec8c263efee1","cid":"ec8c263efee1","canon":1,"dups":1,"ftype":"data_center","name":"2019 DATA CENTER ADDITION","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Trinity Valley Electric Cooperative Inc.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8953af0d4573","cid":"8953af0d4573","canon":1,"dups":1,"ftype":"data_center","name":"2024 ADDITION","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"1715e6a20880","cid":"1715e6a20880","canon":1,"dups":1,"ftype":"data_center","name":"2128 W BRAKER LN","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"2f068d99e8e1","cid":"2f068d99e8e1","canon":1,"dups":1,"ftype":"data_center","name":"2400 GROVE BLVD","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"9b9463663b64","cid":"9b9463663b64","canon":1,"dups":1,"ftype":"data_center","name":"290 EJC DATA CENTER","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"709e47cb5302","cid":"709e47cb5302","canon":1,"dups":1,"ftype":"data_center","name":"DOLAN CARROLLTON DATA CENTER RENOVATION","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5980eb8b9390","cid":"5980eb8b9390","canon":1,"dups":1,"ftype":"data_center","name":"301 CONGRESS AVE","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"20a7b88a6904","cid":"20a7b88a6904","canon":1,"dups":1,"ftype":"data_center","name":"3301 HIBBETTS RD","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":20,"pc":"Grid","pconf":"High","pquote":"Redundant power systems, including UPS and backup generation to ensure uptime and resilience.","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/coreweave-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CoreWeave","spon":"CoreWeave","tenant":"CoreWeave","oy":2003,"deal":"CoreWeave announced a definitive agreement to acquire Core Scientific for ~$9 billion on July 7, 2025.","dealScan":"https://centexdatacenters.org/tracker/coreweave-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/coreweave-austin"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"e5056e955082","cid":"e5056e955082","canon":1,"dups":1,"ftype":"data_center","name":"3501 ED BLUESTEIN BLVD NB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Austin Energy","uquote":"Austin Energy is a publicly owned utility providing electrical power to the city of Austin, Texas and surrounding areas.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a4e988109726","cid":"a4e988109726","canon":1,"dups":1,"ftype":"data_center","name":"REALPAGE DATA CENTER","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"db18d3f23da2","cid":"db18d3f23da2","canon":1,"dups":1,"ftype":"data_center","name":"4501 FAIRVIEW DR","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"1e289fe9d41a","cid":"1e289fe9d41a","canon":1,"dups":1,"ftype":"data_center","name":"SWIFT ENERGY DATA CENTER RELOCATION","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","uquote":"Houston: Report an Outage: 713-207-2222.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"GREENSPOINT PLAZA PARTNERS","spon":"GREENSPOINT PLAZA PARTNERS","ay":2015,"oy":2015,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","uscan":"https://www.centerpointenergy.com/en-us/pages/contact-us.aspx","srcUrls":["https://www.centerpointenergy.com/en-us/pages/contact-us.aspx"],"srcDom":"centerpointenergy.com","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"5efafd93e298","cid":"5efafd93e298","canon":1,"dups":1,"ftype":"data_center","name":"5201 ROSS RD","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"1015|TX","uname":"Austin Energy","reportedUtility":"Austin Energy","srcUrls":null,"srcDom":null},{"id":"f45a5bf08e1d","cid":"f45a5bf08e1d","canon":1,"dups":1,"ftype":"data_center","name":"5300 RIATA PARK CT","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5d1391d21d94","cid":"5d1391d21d94","canon":1,"dups":1,"ftype":"data_center","name":"58% DC - SW BELL VIDEO TEXTRONICS","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"6b0411f07e95","cid":"6b0411f07e95","canon":1,"dups":1,"ftype":"data_center","name":"5900 E BEN WHITE BLVD SVRD WB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"0e6aadf2a7f5","cid":"0e6aadf2a7f5","canon":1,"dups":1,"ftype":"data_center","name":"5900 W SLAUGHTER LN","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"babf2b713210","cid":"babf2b713210","canon":1,"dups":1,"ftype":"data_center","name":"MERIDIAN INTEL","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e9a79803c303","cid":"e9a79803c303","canon":1,"dups":1,"ftype":"data_center","name":"NISD RICHLAND HILLS DATA CENTER","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Northside ISD will receive a $688991 payment from CPS Energy for the district's energy-management efforts: $389797 from demand-response participation and the remainder from equipment rebates collected for recent construction projects.... Contractor for generator and UPS replacement at Richland Hills Data/Support Services – Central Electric Ent. & Co.","pscan":"https://www.nisd.net/sites/default/files/attachments/board-06-27-23_0.pdf","uconf":"High","uquote":"Like most public school districts, Northside receives hundreds of thousands of dollars per year in incentives to reduce usage from CPS Energy, San Antonio's municipally owned electric and gas utility.","uscan":"https://sanantonioreport.org/reports-detail-energy-waste-in-northside-isd-citys-largest-school-district/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Northside Independent School District","spon":"Northside Independent School District","tenant":"Northside Independent School District","ay":2011,"deal":"Generator and UPS replacement approved June 2023 with Central Electric Ent. & Co. (RFCSP #2023-053)","dealScan":"https://www.nisd.net/sites/default/files/attachments/6.27-approved-minutes.pdf","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"nisd.net;sanantonioreport.org","lflag":"online_before_announced operational_null_capacity citation_artifact_removed utility_alias_corrected","srcUrls":["https://www.nisd.net/sites/default/files/attachments/board-06-27-23_0.pdf","https://sanantonioreport.org/reports-detail-energy-waste-in-northside-isd-citys-largest-school-district/","https://www.nisd.net/sites/default/files/attachments/6.27-approved-minutes.pdf"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"a3580969b8b1","cid":"a3580969b8b1","canon":1,"dups":1,"ftype":"data_center","name":"6110 TRADE CENTER DR","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Data center 1: Power backup provided by a 1.25MW generator being fed from a 4000 gallon diesel reservoir. Data center 2: Power backup provided by a 2MW generator fed from a 5000 gallon diesel reservoir.... Suite 100. • (2 Megawatt) 2000KW, 2500KVA, 480/277V, 4 wire standby diesel emergency generator. • Associated 5200-gallon fuel tank.","uconf":"High","uquote":"Austin Energy is the nation's 8th largest publicly owned electric utility. We provide electric service to a population of almost one million.... Provides electricity to the City of Austin.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Data Canopy","spon":"Metropolitan Partners Group","deal":"Intelishift acquired Data Canopy with a $50 million investment from Metropolitan Partners Group in June 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"56171cccea33","cid":"56171cccea33","canon":1,"dups":1,"ftype":"data_center","name":"6500 TRACOR LN","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c91b21b01db8","cid":"c91b21b01db8","canon":1,"dups":1,"ftype":"data_center","name":"701 E PARMER LN","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Austin Energy","uquote":"Austin Energy provides 95 MW of power.","uscan":"https://www.dpfacilities.com/markets/austin-tx/","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Dell","spon":"Dell","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"dpfacilities.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.dpfacilities.com/markets/austin-tx/"]},{"id":"9185f40c5516","cid":"9185f40c5516","canon":1,"dups":1,"ftype":"data_center","name":"7500 METRO CENTER DR","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":16,"pc":"Grid","pconf":"High","pquote":"This facility provides a total utility power capacity of 16 MW, making it a significant hub for colocation in Austin.","pscan":"https://inflect.com/building/7500-metro-center-drive-austin/digital-realty/datacenter/digital-realty-7500-metro-center","uquote":"Power provider: Austin Energy.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","ay":2000,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://inflect.com/building/7500-metro-center-drive-austin/digital-realty/datacenter/digital-realty-7500-metro-center"],"band":"10-25 MW"},{"id":"077c531acec4","cid":"077c531acec4","canon":1,"dups":1,"ftype":"data_center","name":"7501 E BEN WHITE BLVD SVRD EB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"1015|TX","uname":"Austin Energy","reportedUtility":"Austin Energy","srcUrls":null,"srcDom":null},{"id":"98ce7ec05ce7","cid":"98ce7ec05ce7","canon":1,"dups":1,"ftype":"data_center","name":"7600 N CAPITAL OF TEXAS HWY SB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Austin Energy.","pscan":"https://www.interconnection.fyi/data-center/project/7600-n-capital-of-texas-hwy-sb-d767737c","uconf":"High","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/7600-n-capital-of-texas-hwy-sb-d767737c","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","ay":2009,"oy":2015,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/7600-n-capital-of-texas-hwy-sb-d767737c"]},{"id":"e2c182650622","cid":"e2c182650622","canon":1,"dups":1,"ftype":"data_center","name":"8200 CAMERON RD","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"97efcad90f6b","cid":"97efcad90f6b","canon":1,"dups":1,"ftype":"data_center","name":"823 CONGRESS AVE","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"8ec6fe69a53b","cid":"8ec6fe69a53b","canon":1,"dups":1,"ftype":"data_center","name":"TELX FIRST FLOOR DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":4,"pc":"Grid","pconf":"High","pquote":"The local utility provides up to 6000 total kilowatts of power (6 Megawatts) and the UPS systems have a capacity of 1040 kilowatts and are arranged in an N+1 configuration. This set up allows for up to 125 watts of power to be delivered per square foot. On site generators are configured in an N+1 arrangement, and can deliver up to 3000 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-dallas-datacenter-dal2/","uquote":"Dallas' utility company is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","oy":2008,"deal":"Digital Realty acquired Telx for $1.886 billion, completed on October 12, 2015.","dealScan":"https://www.prnewswire.com/news-releases/digital-realty-completes-the-acquisition-of-telx-300157808.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;prnewswire.com","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-dallas-datacenter-dal2/","https://www.prnewswire.com/news-releases/digital-realty-completes-the-acquisition-of-telx-300157808.html"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"e26538ac008d","cid":"e26538ac008d","canon":1,"dups":1,"ftype":"data_center","name":"907 SECURITY ROW","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"High","pquote":"Design features include a dedicated on-site substation delivering dual fed underground power with fully redundant 2N electrical systems, secondary power with 2MW generators configured as N+1, and air cooled chillers with indirect refrigerant economization.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-dallas-campus-in-richardson-digital-realty","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty","oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-dallas-campus-in-richardson-digital-realty"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"407d5491cf29","cid":"407d5491cf29","canon":1,"dups":1,"ftype":"data_center","name":"9825 SPECTRUM DR","city":"AUSTIN","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","uquote":"Austin Energy is an enterprise department of the City of Austin. Community-owned since 1895, we provide electric power and retail energy services to the Greater Austin area.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"789627feef61","cid":"789627feef61","canon":1,"dups":1,"ftype":"data_center","name":"ARMC DATA CENTER EXPANSION","city":"Abilene","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Taylor Electric COOP INC - (TX).","uconf":"High","uquote":"Grid Operator: Taylor Electric COOP INC - (TX). Quick Links. American Electric Power Texas (AEP) Taylor Electric Cooperative AT&T Optimum (Formerly Suddenlink) Vexus Fiber Fiberlight Atmos Energy Corporation.","ukey":"27369|TX","uname":"Taylor Electric Coop Inc - (TX)","rto":"ERCOT","nerc":"TRE","op":"Hendrick Health","spon":"Hendrick Health","ay":2011,"oy":2011,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0acee04e3b4a","cid":"0acee04e3b4a","canon":1,"dups":1,"ftype":"data_center","name":"ADVANCED MICRO DEVICES/DATA CENTER B3","city":"E BEN WHIE BLVD","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"988748a36a82","cid":"988748a36a82","canon":1,"dups":1,"ftype":"data_center","name":"AIG DATA CENTER","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"2N A-side and B-side power distribution design; Eight 2.25MW Generators in an 2N configuration with minimum of 48 hours runtime; 100% uptime SLA.","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"TierPoint","spon":"Argo Infrastructure Partners","tenant":"Multiple (Colocation customers)","ay":2024,"oy":2003,"deal":"TierPoint acquired the facility in January 2024. The seller and purchase price were not disclosed.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681"],"band":"10-25 MW"},{"id":"abae2d373d80","cid":"abae2d373d80","canon":1,"dups":1,"ftype":"data_center","name":"AIG–FT. WORTH DATA CENTER–OFFICE DENSIFI","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Denton County Elec Coop, INC.... we have a 2N utility feed. um our our switch generator switch gear is 2N our uh generators are 2N plus one we have dual power coming into the building so for two substations. we feed that into our switch gear which then feeds into the PDUs at the same time utility and PDU power is on backing that up is our diesel generators. we have eight 2.5 megawatt diesel generators.","pscan":"https://www.youtube.com/watch?v=tNZRu2oMjDQ","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/aig-data-center-ii-51465200","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"EASTGREEN","spon":"EASTGREEN","tenant":"AIG","ay":2012,"oy":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;interconnection.fyi","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.youtube.com/watch?v=tNZRu2oMjDQ","https://www.interconnection.fyi/data-center/project/aig-data-center-ii-51465200"]},{"id":"23a448897c13","cid":"23a448897c13","canon":1,"dups":1,"ftype":"data_center","name":"AIG - FORT WORTH DATA CENTER","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"we have a 2N utility feed. um our our switch generator switch gear is 2N our uh generators are 2N plus one we have dual power coming into the building so for two substations. we feed that into our switch gear which then feeds into the PDUs at the same time utility and PDU power is on backing that up is our diesel generators. we have eight 2.5 megawatt diesel generators.","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"TierPoint","spon":"TierPoint","ay":2001,"oy":2003,"deal":"Acquired by American International Group (AIG) in 2002; Acquired by Tierpoint in 2023.","dealScan":"https://baxtel.com/data-center/tierpoint-fort-worth","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681","https://baxtel.com/data-center/tierpoint-fort-worth"]},{"id":"9bf10489bf0e","cid":"9bf10489bf0e","canon":1,"dups":1,"ftype":"data_center","name":"AIG FT. WORTH DATA CENTER - PARKING LOT","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":20,"pc":"Grid","pconf":"High","pquote":"we have a 2N utility feed. um our our switch generator switch gear is 2N our uh generators are 2N plus one we have dual power coming into the building so for two substations. we feed that into our switch gear which then feeds into the PDUs at the same time utility and PDU power is on backing that up is our diesel generators.","pscan":"https://www.youtube.com/watch?v=tNZRu2oMjDQ","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"TierPoint","spon":"TierPoint","ay":2003,"oy":2003,"deal":"Acquisition by Tierpoint in 2023","dealScan":"https://baxtel.com/data-center/tierpoint-fort-worth","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;interconnection.fyi;baxtel.com","srcUrls":["https://www.youtube.com/watch?v=tNZRu2oMjDQ","https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681","https://baxtel.com/data-center/tierpoint-fort-worth"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"d61ae02639fb","cid":"d61ae02639fb","canon":1,"dups":1,"ftype":"data_center","name":"AIG COMPUTER LAB","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"we have a 2N utility feed. um our our switch generator switch gear is 2N our uh generators are 2N plus one we have dual power coming into the building so for two substations. we feed that into our switch gear which then feeds into the PDUs at the same time utility and PDU power is on backing that up is our diesel generators. we have eight 2.5 megawatt diesel generators.","pscan":"https://www.youtube.com/watch?v=tNZRu2oMjDQ","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"TierPoint","spon":"TierPoint","ay":2003,"oy":2003,"deal":"Acquisition by AIG in 2002; Acquisition by TierPoint in 2023","dealScan":"https://baxtel.com/data-center/tierpoint-fort-worth","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;interconnection.fyi;baxtel.com","lflag":"operational_null_capacity","srcUrls":["https://www.youtube.com/watch?v=tNZRu2oMjDQ","https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681","https://baxtel.com/data-center/tierpoint-fort-worth"]},{"id":"8f0f9c1634a1","cid":"8f0f9c1634a1","canon":1,"dups":1,"ftype":"data_center","name":"ATT PLANO FOUNDRY INTERIOR FINISHOUT","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"AT&T","spon":"SIR REIT Plano (The RMR Group)","oy":2025,"deal":"Renovation/Alteration project with an estimated cost of $8,566,900, starting April 4, 2025, and completing September 30, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"38210632c3d7","cid":"38210632c3d7","canon":1,"dups":1,"ftype":"data_center","name":"Alcon Data Center TI","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"It utilizes energy efficient cooling technology, pretty much a necessity in Texas, intelligent low-voltage LED lighting, solar PV panel system that provides 100 Kw power for administrative areas, and storm water collection and rain harvesting.","pscan":"https://www.biospace.com/novartis-ag-opens-up-53-million-global-data-center-at-alcon-in-texas","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/alcon-data-center-e3498321","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Alcon Vision","spon":"Alcon Vision","tenant":"Alcon Vision","ay":2014,"oy":2015,"deal":"Fort Worth city granted 80% abatement on incremental real and personal property taxes for 10 years in 2014. Construction cost $53 million.","dealScan":"https://www.biospace.com/novartis-ag-opens-up-53-million-global-data-center-at-alcon-in-texas","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"biospace.com;interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.biospace.com/novartis-ag-opens-up-53-million-global-data-center-at-alcon-in-texas","https://www.interconnection.fyi/data-center/project/alcon-data-center-e3498321"]},{"id":"c62926737f28","cid":"6d894617703b","canon":0,"dups":2,"ftype":"data_center","name":"AWS Rockfish","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"1fed6e1b7696","cid":"1fed6e1b7696","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":60,"band":"50-100 MW","pc":"Hybrid","pconf":"High","pquote":"PowerSecure designed the central mission-critical electrical system, a 12.5 MW microgrid that provides 100% standby power with N+4 redundancy and parallels with the local utility grid to enhance stability and provide peak load management.","pscan":"https://powersecure.com/hubfs/Case%20Study%20PDFs/CaseStudy_aligned-data-center.pdf?hsLang=en","uconf":"High","uquote":"The transmission and distribution infrastructure, which remains regulated by the Public Utility Commission of Texas (PUCT), is owned and operated by Oncor Electric Delivery.","uscan":"https://www.planotexas.org/186/Utilities","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2015,"oy":2015,"deal":"12.5 MW microgrid financing through ERCOT Demand Response Program","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"powersecure.com;planotexas.org","srcUrls":["https://powersecure.com/hubfs/Case%20Study%20PDFs/CaseStudy_aligned-data-center.pdf?hsLang=en","https://www.planotexas.org/186/Utilities"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"c60ca5400b28","cid":"c60ca5400b28","canon":1,"dups":2,"ftype":"data_center","name":"ALIGNED DATA CENTERS (DFW) PROPCO LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Aligned's flagship campus in the Dallas-Fort Worth Metroplex is also home to our North American headquarters. The region's pro-business environment and abundant land and power make Dallas an ideal location for mission-critical infrastructure. consistency icon. Abundant Power. Access to a competitive energy market and robust power grid for large-scale, high-density deployments.","pscan":"https://aligneddc.com/dallas-data-centers/","uconf":"Medium","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/aligned-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2016,"deal":"Securitization of real estate and tenant lease payments for space and electrical capacity in seven operating wholesale turnkey data centers located in Plano, Texas (Series 2023-2 class A-2 note issuance).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aligneddc.com;baxtel.com","lflag":"online_before_announced operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://aligneddc.com/dallas-data-centers/","https://baxtel.com/data-center/aligned-plano"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"651566edd2d3","cid":"651566edd2d3","canon":1,"dups":1,"ftype":"data_center","name":"ALIGNED DATA CENTERS (PLANO) PROPCO, LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":96,"pc":"Grid","pconf":"High","pquote":"PowerSecure designed the central mission-critical electrical system, a 12.5 MW microgrid that provides 100% standby power with N+4 redundancy and parallels with the local utility grid to enhance stability and provide peak load management.","pscan":"https://powersecure.com/hubfs/Case%20Study%20PDFs/CaseStudy_aligned-data-center.pdf?hsLang=en","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/aligned-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Aligned Data Centers","spon":"Macquarie Asset Management","oy":2015,"deal":"Securitization of real estate and tenant lease payments for space and electrical capacity in five operating wholesale turnkey data centers, including Plano, Texas, dated November 14, 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"powersecure.com;baxtel.com","srcUrls":["https://powersecure.com/hubfs/Case%20Study%20PDFs/CaseStudy_aligned-data-center.pdf?hsLang=en","https://baxtel.com/data-center/aligned-plano"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"9d78bf8d4f3d","cid":"c60ca5400b28","canon":0,"dups":2,"ftype":"data_center","name":"ALIGNED DATA CENTERS DFW PROPCO LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/aligned-data-centers-dfw-propco-llc-05b0672e","uconf":"High","uquote":"The utility company for Plano is Oncor Electric Delivery. While you can choose your electricity provider in a deregulated market, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages. The utility company for Plano is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/plano/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2022,"oy":2023,"deal":"Acquisition of Aligned Data Centers by Artificial Intelligence Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners for approximately $40 billion, expected to close in H1 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;choosetexaspower.org","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.interconnection.fyi/data-center/project/aligned-data-centers-dfw-propco-llc-05b0672e","https://www.choosetexaspower.org/electricity-rates/plano/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"4d35d2982f36","cid":"4d35d2982f36","canon":1,"dups":1,"ftype":"data_center","name":"San Angelo Independent School District Data Center — San Angelo, TX","city":"San Angelo","county":"Tom Green","state":"TX","lat":31.398823,"lng":-100.463788,"cprec":"distinct","status":"Operational","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","op":"San Angelo Independent School District","spon":"San Angelo Independent School District","ay":2023,"contro":"The San Angelo ISD Board of Trustees voted 6 to 1 in favor of the recommendation to combine Alta Loma Elementary attendance boundaries with Fannin Elementary and repurpose or shutter Alta Loma Elementary, indicating one dissenting vote.","controScan":"https://www.saisd.org/news-item/~board/news/post/san-angelo-isd-board-of-trustees-vote-to-adjust-attendance-boundaries-as-part-of-the-sustainability-plan","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"saisd.org","lflag":"online_before_announced operational_null_capacity display_name_normalized source_quality_reclassified","srcUrls":["https://www.saisd.org/news-item/~board/news/post/san-angelo-isd-board-of-trustees-vote-to-adjust-attendance-boundaries-as-part-of-the-sustainability-plan"],"rawName":"San Angelo ISD Data Center Relocation, Electrical Repairs, Building Demolition, and Asbestos Abatem"},{"id":"1fbff661f3a4","cid":"1fbff661f3a4","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"DeSoto","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"While you can choose your electricity provider in a deregulated market, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages. The utility company for DeSoto is Oncor Electric Delivery.","pscan":"https://www.choosetexaspower.org/electricity-rates/desoto/","uquote":"The utility company for DeSoto is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/desoto/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2022,"oy":2024,"deal":"$6,000,000 investment, announced September 2022","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023000811","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"choosetexaspower.org;tdlr.texas.gov","srcUrls":["https://www.choosetexaspower.org/electricity-rates/desoto/","https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023000811"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_url_canonicalized delivery_utility_linked","dukey":"44372|TX"},{"id":"9f0bfe0fad5d","cid":"9f0bfe0fad5d","canon":1,"dups":2,"ftype":"data_center","name":"Amazon","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Karnes Electric COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/ale062-c25a8470","uquote":"Grid Operator. Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/ale062-c25a8470","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2020,"oy":2021,"deal":"Amazon filed plans in 2020 to build a 109,600-square-foot data center at 7400 Potranco Road.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/ale062-c25a8470"],"lflag":"source_quality_reclassified"},{"id":"876290cd38ff","cid":"9f0bfe0fad5d","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The normal operation of the ALE60 San Antonio Facility emergency generators will be for installation and periodic testing only. If local power is interrupted, the emergency generators will power the ALE61 San Antonio Facility such that there is no interruption in services to ADS customers; however, this usage of the emergency generators is not considered “normal operation” as it only occurs as a result of an emergency event (i.e., a power outage).","pscan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8724316&Rendition=Web","uquote":"KSAT reported that, in discussions this month, SAWS and CPS Energy characterized the buildout as manageable so far but called for tighter oversight on where centers are sited and how much on-site power generation they bring with them.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","oy":2021,"contro":"Bexar County is classified as serious nonattainment for the 2015 8-hour ozone standard (0.070 ppm). ADS is proposing to modify current air emissions from existing generators (EPNs EG1-EG15) based on a maximum operational schedule of 2,055 hours per year across all generators.","controScan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8724316&Rendition=Web","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"records.tceq.texas.gov","srcUrls":["https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8724316&Rendition=Web"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"1d9c1172f82a","cid":"1d9c1172f82a","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"It has access to 12.0 MW of power.... The utility currently provides power to 21 data centers in the area, she said. These contracts generate $110 million in revenue.","pscan":"https://sanantonioreport.org/risk-opportunity-san-antonio-water-electricity-data-centers/","uquote":"Officials at the publicly owned utility systems acknowledged that while data centers rely on a significant amount of water and electricity, they can also drive revenues to help fund the systems used by San Antonio residents. Local utilities are legally required to work with data centers if they are paying customers, said CPS Energy's Chief Strategy Officer Elaina Ball. The utility currently provides power to 21 data centers in the area, she said.","uscan":"https://sanantonioreport.org/risk-opportunity-san-antonio-water-electricity-data-centers/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon AWS","ay":2020,"contro":"Community opposition and regulatory pushback regarding water usage and zoning in the Edwards Aquifer recharge zone.","controScan":"https://centexdatacenters.org/tracker/aws-potranco-san-antonio","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"sanantonioreport.org;centexdatacenters.org","lflag":"online_before_announced citation_artifact_removed utility_alias_corrected,merged_duplicate","srcUrls":["https://sanantonioreport.org/risk-opportunity-san-antonio-water-electricity-data-centers/","https://centexdatacenters.org/tracker/aws-potranco-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"569c83e51ec2","cid":"569c83e51ec2","canon":1,"dups":1,"ftype":"data_center","name":"Amazon (FTW9)","city":"Coppell","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"b66c913482c4","cid":"b66c913482c4","canon":1,"dups":1,"ftype":"data_center","name":"Outbound Cross Dock: HOUz","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Amazon","spon":"Amazon","tenant":"Amazon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"57c35ba8ed99","cid":"57c35ba8ed99","canon":0,"dups":1,"ftype":"data_center","name":"Amazon - AUS3 - Alteration","city":"Waco","county":"McLennan","state":"TX","lat":31.549596,"lng":-97.201511,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Heart of Texas Electric COOP","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded generic_unsourced_permit_record unlinked_source_text","rawName":"Amazon - AUS3 - Alteration","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"db92cc88743b","cid":"db92cc88743b","canon":1,"dups":1,"ftype":"data_center","name":"Amazon OXD LS Retrofit HOU5","city":"Katy","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: San Bernard Electric Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-hou5-7ca9ad72","uquote":"Grid Operator: San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-hou5-7ca9ad72","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"WSRE CP Clay Owner","spon":"Walton Street Capital","tenant":"Amazon","oy":2023,"deal":"Walton Street Capital purchased the 805,601-square-foot Amazon sort center at 22525 Clay Road in Katy from Duke Realty, with JLL arranging a floating-rate acquisition loan with Wells Fargo Bank (announced February 9, 2021).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-hou5-7ca9ad72"]},{"id":"5d813064ce3a","cid":"5d813064ce3a","canon":1,"dups":1,"ftype":"data_center","name":"Amazon (FTW1)","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"d37030ebb677","cid":"d37030ebb677","canon":1,"dups":1,"ftype":"data_center","name":"Amazon (FTW8)","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5c8cb99d3c68","cid":"5c8cb99d3c68","canon":1,"dups":1,"ftype":"data_center","name":"Amazon (STX7)","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Amazon","spon":"CORNER RIDGE OWNER","tenant":"Amazon","oy":2021,"deal":"Construction cost of $750,000","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2021016025","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2021016025"]},{"id":"5dd3368a41d3","cid":"5dd3368a41d3","canon":1,"dups":1,"ftype":"data_center","name":"1301 Chalk Hill Zoo Fan","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Trinity Valley Elec COOP INC.","rto":"ERCOT","nerc":"TRE","op":"Amazon","spon":"Amazon","ay":2020,"oy":2020,"deal":"City of Dallas provided $2 million in economic development incentives (May 2020)","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/retail/amazon-opens-first-new-fulfillment-center-in-texas-since-coronavirus-outbreak-104399","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","lflag":"operational_null_capacity","srcUrls":["https://www.bisnow.com/dallas-ft-worth/news/retail/amazon-opens-first-new-fulfillment-center-in-texas-since-coronavirus-outbreak-104399"]},{"id":"b6fe04092cbb","cid":"b6fe04092cbb","canon":1,"dups":1,"ftype":"data_center","name":"Amazon DSX7","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"aabc020b2d96","cid":"aabc020b2d96","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON DAL6","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Amazon","spon":"Amazon","tenant":"Amazon","oy":2016,"deal":"Renovation/Alteration with an Estimated Cost: $8,200,000","dealScan":"https://www.tdlr.texas.gov/TABS/Projects/EABPRJB6815514","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized","srcUrls":["https://www.tdlr.texas.gov/TABS/Projects/EABPRJB6815514"]},{"id":"03ea74d0fbf2","cid":"03ea74d0fbf2","canon":1,"dups":1,"ftype":"data_center","name":"ANB DATA CENTER- 2014 RENOVATIONS","city":"Amarillo","county":"Potter","state":"TX","lat":35.398675,"lng":-101.893804,"cprec":"distinct","status":"Operational","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"593bf80c1a68","cid":"593bf80c1a68","canon":1,"dups":1,"ftype":"data_center","name":"INTEL AUSTIN FSO","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Austin Energy.","pscan":"https://www.interconnection.fyi/data-center/project/arboretum-plaza-one-2462f172","uconf":"High","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/arboretum-plaza-one-2462f172","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"OTR AND OHIO GENERAL PARTNERSHIP","spon":"OTR AND OHIO GENERAL PARTNERSHIP","ay":2016,"oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/arboretum-plaza-one-2462f172"]},{"id":"a28cf6b04eff","cid":"a28cf6b04eff","canon":1,"dups":1,"ftype":"data_center","name":"Arlington Data Center","city":"Arlington","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Denton County Elec Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/arlington-data-center-4af9dbd6","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/arlington-data-center-4af9dbd6","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"D.R. Horton","spon":"D.R. Horton","oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/arlington-data-center-4af9dbd6"]},{"id":"0b2918653869","cid":"0b2918653869","canon":1,"dups":1,"ftype":"data_center","name":"AT&T IDC INTERIOR FACELIFT","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Adding raised floor equipment area, necessary HVAC equipment and back-up generator.","uconf":"High","uquote":"The utility company for Allen is Oncor Electric Delivery. In the event of a power outage or electrical emergency, call your utility company, not your provider.","uscan":"https://www.choosetexaspower.org/electricity-rates/allen/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"AT&T SERVICES","spon":"AT&T SERVICES","ay":2012,"oy":2013,"deal":"$9.3M Renovation/Alteration (2012-2013)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.choosetexaspower.org/electricity-rates/allen/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"0451cc4688e6","cid":"0451cc4688e6","canon":1,"dups":1,"ftype":"data_center","name":"ATMOS DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Behind-the-Meter","pconf":"High","pquote":"Atmos Energy recently completed the installation of a natural gas-powered fuel cell at its corporate data center to generate high efficiency, grid-independent electricity with low emissions.","pscan":"https://www.atmosenergy.com/news/atmos-energy-installs-innovative-natural-gas-powered-fuel-cell-generate-high-efficiency-low/","proc":"Co-located generation","pcp":"Atmos Energy (self-generation)","pdt":"460-kilowatt fuel cell","rto":"ERCOT","nerc":"TRE","op":"Atmos Energy","spon":"Atmos Energy","tenant":"Atmos Energy","oy":2022,"deal":"Installation of a 460-kilowatt natural gas-powered fuel cell completed May 17, 2022.","dealScan":"https://www.atmosenergy.com/news/atmos-energy-installs-innovative-natural-gas-powered-fuel-cell-generate-high-efficiency-low/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"atmosenergy.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.atmosenergy.com/news/atmos-energy-installs-innovative-natural-gas-powered-fuel-cell-generate-high-efficiency-low/"]},{"id":"240519c4e884","cid":"240519c4e884","canon":1,"dups":1,"ftype":"data_center","name":"Element Critical","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":7,"pc":"Grid","pconf":"High","pquote":"Austin One is designed to support 7 MW of critical IT load, providing Element Critical the capability to support long-term customer demand in the growing Austin data center market. Element Critical plans to add approximately 6 MW of additional utility capacity over the next 1-2 years to meet Austin's growing demand for high-quality data center space.","uquote":"Grid Operator: Austin Energy.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Element Critical","spon":"26North Partners, Arctos, Mercuria, Safanad","ay":2021,"deal":"Element Critical launched a new U.S. data center platform backed by 26North Partners, Arctos, Mercuria, and Safanad in December 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"< 10 MW","srcUrls":null,"srcDom":null},{"id":"29fd3cd29b18","cid":"29fd3cd29b18","canon":1,"dups":1,"ftype":"data_center","name":"AUSTIN DATA CENTER","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Austin Energy","pscan":"https://www.interconnection.fyi/data-center/project/oracle-austin-data-center-b86c040d","uquote":"Grid Operator: Austin Energy","uscan":"https://www.interconnection.fyi/data-center/project/oracle-austin-data-center-b86c040d","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Oracle America","spon":"Oracle America","tenant":"Oracle America","ay":2014,"oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/oracle-austin-data-center-b86c040d"]},{"id":"b8c2cfd7a184","cid":"b8c2cfd7a184","canon":1,"dups":1,"ftype":"data_center","name":"GSA TIMPO DATA CENTER","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Karnes Electric COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/bank-of-american-plaza-85835f59","uquote":"Grid Operator. Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/bank-of-american-plaza-85835f59","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"TALCOTT II ALAMO LIMITED PARTNERSHIP","spon":"TALCOTT II ALAMO LIMITED PARTNERSHIP","ay":2010,"oy":2010,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/bank-of-american-plaza-85835f59"]},{"id":"ed5b79c8ab08","cid":"ed5b79c8ab08","canon":1,"dups":1,"ftype":"data_center","name":"UTSW DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"78f447e746f6","cid":"78f447e746f6","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Bitdeer Rockdale","city":"Rockdale","county":"Milam","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Operational","mw":563,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The mine in Rockdale has been paid to reduce electricity usage by the Electric Reliability Council of Texas during strains to the state's electrical grid by the general public. For example, Bitdeer's Rockdale site has a capacity of 580+ MWs, a 277v/480v config would yield us almost 6 MWs of power gained back from losses when compared to the next most efficient line.... For simplicity let's assume a mine is receiving power from the substation/grid provider at 13.8 kVa configuration.","pscan":"https://www.bitdeer.com/ko/news/the-future-of-industrial-scale-bitcoin-mining","uconf":"Medium","uquote":"Grid Operator. Heart of Texas Electric COOP.","uscan":"https://www.interconnection.fyi/data-center/project/bitdeer-rockdale-58d64d08","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"Bitdeer Technologies Group","oy":2026,"contro":"Concerns regarding the impact of bitcoin mining on the Texas electrical grid, electricity prices, and national security due to Chinese ownership.","deal":"Bitdeer Technologies announced its merger with special purpose acquisition company (SPAC) Blue Safari Group Acquisition Corp. in January 2022, valuing Bitdeer at approximately $4 billion.","dealScan":"https://www.rockdalereporter.com/breaking-news-news/bitcoin-miner-bitdeer-go-public-spac-merger-deal-values-company-around-4b","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"bitdeer.com;interconnection.fyi;rockdalereporter.com","srcUrls":["https://www.bitdeer.com/ko/news/the-future-of-industrial-scale-bitcoin-mining","https://www.interconnection.fyi/data-center/project/bitdeer-rockdale-58d64d08","https://www.rockdalereporter.com/breaking-news-news/bitcoin-miner-bitdeer-go-public-spac-merger-deal-values-company-around-4b"],"lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"685adaa0e1e3","cid":"685adaa0e1e3","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Black Pearl Data Center","city":"Wink","county":"Winkler","state":"TX","lat":31.832862,"lng":-103.054925,"cprec":"distinct","status":"Future / Expansion","mw":300,"pc":"Grid","pconf":"High","pquote":"Cipher Mining Inc. is focused on the development and operation of industrial-scale data centers for bitcoin mining and high-performance compute (\"HPC\") hosting. The Company operates two wholly-owned bitcoin mining data centers, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement withits electricity provider (the \"Odessa Facility\"), and a 300 MW data centerin Wink, Texas that draws powerfrom the power grid (the \"Black Pearl Facility\") and has equity investments in three partially-owned joint venture bitcoin mining data centers.","pscan":"https://interchange.puc.texas.gov/Documents/59029_60_1572333.PDF","uquote":"The campus sits in ERCOT Load Zone West, with Oncor as the transmission and distribution provider and a 138-kV interconnection feeding the site.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Cipher Mining Technologies","spon":"Cipher Mining","tenant":"Amazon Data Services","ay":2023,"oy":2027,"deal":"$2 billion senior secured notes offering by Black Pearl Compute LLC, due 2031, issued February 11, 2026.","dealScan":"https://www.davispolk.com/experience/black-pearl-compute-2-billion-notes-offering","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interchange.puc.texas.gov;davispolk.com","lflag":"utility_alias_corrected status_adjusted_future_expansion delivery_utility_linked","srcUrls":["https://interchange.puc.texas.gov/Documents/59029_60_1572333.PDF","https://www.davispolk.com/experience/black-pearl-compute-2-billion-notes-offering"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","rawStatus":"Operational","dukey":"44372|TX"},{"id":"7948dfc52816","cid":"7948dfc52816","canon":1,"dups":1,"ftype":"data_center","name":"BLUE BOX DATA CENTER","city":"Amarillo","county":"Potter","state":"TX","lat":35.398675,"lng":-101.893804,"cprec":"distinct","status":"Operational","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"26aee8b6281a","cid":"26aee8b6281a","canon":1,"dups":1,"ftype":"data_center","name":"BNSF FWDC EXPANSION","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"7bb2360b696a","cid":"7bb2360b696a","canon":1,"dups":1,"ftype":"data_center","name":"3rd Floor VA Data Center","city":"Arlington","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","ay":2019,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"fb8cdfe890d5","cid":"fb8cdfe890d5","canon":1,"dups":1,"ftype":"data_center","name":"BUCKNER DATA CENTER RENOVATION","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"0cef357e6f2e","cid":"0cef357e6f2e","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"29a9ff9523c5","cid":"29a9ff9523c5","canon":0,"dups":1,"ftype":"data_center","name":"DATA CENTER, PHASE II","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected generic_unsourced_permit_record unlinked_source_text delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","rawName":"DATA CENTER, PHASE II","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"667858be0bf6","cid":"667858be0bf6","canon":1,"dups":1,"ftype":"data_center","name":"Skybox-Austin 1-Data Center Upfit","city":"Pflugerville","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"The campus is served by dedicated redundant power feeds from two of the largest substations in the region. Power & Design Flexibility. Skybox Austin is supported by two diverse Oncor substations delivered via concrete encased underground duct banks. Located in Oncor deregulated power territory, Austin users now have access to robust renewable programs from the supplier of their choice, optimizing corporate sustainability initiates and offering competitive total cost of ownership in market.","uconf":"High","uquote":"Skybox Austin is supported by two diverse Oncor substations delivered via concrete encased underground duct banks. Located in Oncor deregulated power territory, Austin users now have access to robust renewable programs from the supplier of their choice, optimizing corporate sustainability initiates and offering competitive total cost of ownership in market.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Skybox Datacenters","spon":"Prologis","ay":2022,"oy":2023,"deal":"Pflugerville City Council approved an economic development performance agreement with Skybox and Prologis, expecting up to $548 million in capital expenditures and a 10-year expansion grant capped at $225,000 annually.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"c8da8ff8347d","cid":"c8da8ff8347d","canon":1,"dups":1,"ftype":"data_center","name":"SMU PLANO RECOVERY DATA CENTER","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","deal":"SMU sold the Plano campus in 2018.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"70c428530d44","cid":"70c428530d44","canon":1,"dups":1,"ftype":"data_center","name":"EDGECORE DATA CENTERS - COLD SHELL","city":"Richardson","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"62b424563e34","cid":"62b424563e34","canon":1,"dups":1,"ftype":"data_center","name":"ALTERNATE DATA CENTER","city":"Dfw Airport","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Airport Board unanimously adopted Resolution No. 2021-01-001 to approve ratification of Contract No. 5001001, for Oncor Discretionary Service Agreement - Integrated Operations Center Two-Way Feed Southwest Campus, with Oncor Electric Delivery, LLC, of Irving, Texas, in an amount not to exceed $121,646.47.","pscan":"https://apps.dfwairport.com/board/doc.php?docid=135010&date=Jan%207","uconf":"High","uquote":"The Airport Board unanimously adopted Resolution No. 2021-01-001 to approve ratification of Contract No. 5001001, for Oncor Discretionary Service Agreement - Integrated Operations Center Two-Way Feed Southwest Campus, with Oncor Electric Delivery, LLC, of Irving, Texas, in an amount not to exceed $121,646.47.","uscan":"https://apps.dfwairport.com/board/doc.php?docid=135010&date=Jan%207","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Dallas/Fort Worth International Airport Board","spon":"Dallas/Fort Worth International Airport Board","tenant":"Dallas/Fort Worth International Airport","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"apps.dfwairport.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://apps.dfwairport.com/board/doc.php?docid=135010&date=Jan%207"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"58c6b4653aa6","cid":"58c6b4653aa6","canon":1,"dups":1,"ftype":"data_center","name":"BUMC-DATA CENTER IMPROVEMENTS","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Trinity Valley Elec COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/bumc-main-street-annex-f3be797d","uconf":"Medium","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/bumc-main-street-annex-f3be797d","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"BAYLOR HEALTHCARE SYSTEM","spon":"BAYLOR HEALTHCARE SYSTEM","ay":2011,"oy":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/bumc-main-street-annex-f3be797d"]},{"id":"6c47e2c0fa45","cid":"6c47e2c0fa45","canon":1,"dups":1,"ftype":"data_center","name":"C1 DALLAS - ALLEN (LOT 1) LLC","city":"ALLEN","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electricity in the data center park is served by dual 238 kVA power lines and from three separate electrical substations owned by two different electrical providers.","pscan":"https://www.allenedc.com/developments/data-centers","uconf":"High","uquote":"Oncor Electric Delivery is Allen's utility","uscan":"https://www.choosetexaspower.org/electricity-rates/allen/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"C1 Dallas - Allen (LOT 1)","spon":"C1 Dallas - Allen (LOT 1)","ay":2024,"oy":2024,"deal":"$41,500,000 estimated cost for CyrusOne Allen Load Adder project (2022-2023)","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023002412","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"allenedc.com;choosetexaspower.org;tdlr.texas.gov","lflag":"operational_null_capacity utility_alias_corrected source_url_canonicalized delivery_utility_linked","srcUrls":["https://www.allenedc.com/developments/data-centers","https://www.choosetexaspower.org/electricity-rates/allen/","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023002412"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"21f072f66cd0","cid":"21f072f66cd0","canon":1,"dups":1,"ftype":"data_center","name":"C1 DALLAS - CARROLLTON LLC","city":"CARROLLTON","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/cyrusone-carrollton","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts (KKR) and Global Infrastructure Partners (GIP)","tenant":"North Texas Emergency Communications Center (NTECC) and colocation customers","oy":2012,"deal":"CyrusOne acquired by KKR and Global Infrastructure Partners for approximately $15 billion, closed March 2022.","dealScan":"https://www.govconwire.com/articles/kkr-gip-complete-15b-all-cash-purchase-of-cyrusone","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;govconwire.com","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton","https://www.govconwire.com/articles/kkr-gip-complete-15b-all-cash-purchase-of-cyrusone"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"0fc13128cd5d","cid":"0fc13128cd5d","canon":1,"dups":1,"ftype":"data_center","name":"Amazon River's Edge","city":"Tyler","county":"Smith","state":"TX","lat":32.377016,"lng":-95.270041,"cprec":"distinct","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"a7a755a0ac8c","cid":"a7a755a0ac8c","canon":1,"dups":1,"ftype":"data_center","name":"CAPITAL GROUP - DATA CENTER EXPANSION","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e6530eedff9e","cid":"e6530eedff9e","canon":1,"dups":1,"ftype":"data_center","name":"CARRIER-1 DATA CENTER EXPANSION","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Diverse path utility feeds. • 2 transformers with 3500 kVA capacity with expansion to 10MW. • 2 x 2 MW Cummins generator backup. • 3 x 600 Liebert kVA UPS in 2N+1 configuration.","pscan":"https://www.tier.net/incs/carrier1overview.pdf","uquote":"Utility Provider: Oncor.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Prime Data Centers","ay":2012,"oy":2014,"deal":"Acquisition of Carrier-1 by VPLS (later Evocative) on April 21, 2022; Acquisition of facility by Prime Data Centers in April 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"tier.net","srcUrls":["https://www.tier.net/incs/carrier1overview.pdf"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"bf590205c9fb","cid":"bf590205c9fb","canon":1,"dups":1,"ftype":"data_center","name":"LONE STAR COLLEGE DATA CENTER","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"This flexible design has modular battery backup capacity with a maximum capacity of 480KW. The modular UPS design with 99.7% efficient UPS's provide a significant reduction in wasted power while still providing our future capacity needs.","uquote":"The utility company for Houston is CenterPoint Energy.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Lone Star College System","spon":"Lone Star College System","tenant":"Lone Star College System","ay":2010,"oy":2010,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"4c8bd3a83243","cid":"4c8bd3a83243","canon":1,"dups":1,"ftype":"data_center","name":"CDI/COLO 4 DALLAS","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":11,"pc":"Grid","pconf":"High","pquote":"A total of 11.1 MW of utility power is served to data center to meet the power requirements for the future needs.","pscan":"https://cloudandcolocation.com/datacenters/tierpoint-dallas-data-center/","uconf":"Medium","uquote":"With main offices located in Dallas, Oncor Electricity provides electricity to 7.5 million customers and has a service area of over 400 communities across Texas, including major cities like Dallas, Fort Worth, Odessa, Killeen, Midland, Waco, Tyler and Wichita Falls.","uscan":"https://www.directenergy.com/en/learn/energy-basics/who-is-my-texas-electric-utility","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QuadraNet","spon":"Edge Centres","ay":2008,"oy":2008,"deal":"Acquisition of Colo4Dallas by Cequel Data Centers in July 2010; Acquisition of QuadraNet by Edge Centres LLC in April 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;directenergy.com","srcUrls":["https://cloudandcolocation.com/datacenters/tierpoint-dallas-data-center/","https://www.directenergy.com/en/learn/energy-basics/who-is-my-texas-electric-utility"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"6d505f70e1e6","cid":"6d505f70e1e6","canon":1,"dups":1,"ftype":"data_center","name":"U. OF TEXAS DATA CENTER @ CRB","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Behind-the-Meter","pconf":"High","pquote":"The university electric system has had 99.998 percent reliability for the last 40 years, largely due to the fact that its power is 100 percent self-produced as a microgrid, meaning it has the ability to be autonomous and disconnect from the main city grid, or “island.” All of the electricity UT uses is made on-campus, but the power is still continuously connected with Austin Energy under a standby 25-megawatt contract as backup.","pscan":"https://alcalde.texasexes.org/2018/06/how-ut-runs-the-largest-microgrid-in-the-us","uquote":"All of the electricity UT uses is made on-campus, but the power is still continuously connected with Austin Energy under a standby 25-megawatt contract as backup.","uscan":"https://alcalde.texasexes.org/2018/06/how-ut-runs-the-largest-microgrid-in-the-us","rto":"ERCOT","nerc":"TRE","op":"UNIVERSITY OF TEXAS AT AUSTIN","spon":"UNIVERSITY OF TEXAS AT AUSTIN","ay":2009,"oy":2010,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"alcalde.texasexes.org","srcUrls":["https://alcalde.texasexes.org/2018/06/how-ut-runs-the-largest-microgrid-in-the-us"],"band":"< 10 MW","ukey":"1015|TX","uname":"Austin Energy","reportedUtility":"Austin Energy","lflag":"utility_alias_corrected"},{"id":"6e843bb1cf36","cid":"6e843bb1cf36","canon":1,"dups":2,"ftype":"data_center","name":"CENTURY LINK (PREV LEVEL 3 COMM)","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"We have reliable AC UPS power, DC power, and backup generators in case of emergencies. Stay connected with diverse fiber connectivity and backhaul services, while enjoying the added security of alternate carrier networks.","rto":"ERCOT","nerc":"TRE","op":"Lumen Technologies","spon":"Lumen Technologies","deal":"Level 3 Communications was acquired by CenturyLink in 2016. CenturyLink rebranded to Lumen Technologies in 2020.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a67782fee693","cid":"6e843bb1cf36","canon":0,"dups":2,"ftype":"data_center","name":"CENTURY LINK (PREV LEVEL 3 COMM)","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"We have reliable AC UPS power, DC power, and backup generators in case of emergencies.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/lumen-dallas-1","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Lumen Technologies","spon":"Lumen Technologies","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/lumen-dallas-1"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"fbedd6854b69","cid":"fbedd6854b69","canon":1,"dups":1,"ftype":"data_center","name":"CHASE DATA CENTER","city":"CARROLLTON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"af12b01b990f","cid":"af12b01b990f","canon":1,"dups":1,"ftype":"data_center","name":"CHRISTUS ITC PHASE I","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The city utility also did not have sufficient infrastructure to support the facility by the accelerated completion date. They agreed to have power ready in time for the original completion date but could not guarantee service for the compressed construction schedule.","pscan":"https://www.dpr.com/projects/christus-data-center","uconf":"High","uquote":"The city utility also did not have sufficient infrastructure to support the facility by the accelerated completion date.","uscan":"https://www.dpr.com/projects/christus-data-center","uname":"BP Energy Company","rto":"ERCOT","nerc":"TRE","op":"CHRISTUS Health","spon":"CHRISTUS Health","tenant":"CHRISTUS Health","ay":2007,"contro":"City utility did not have sufficient infrastructure to support the facility by the accelerated completion date, requiring temporary solutions during construction.","controScan":"https://www.dpr.com/projects/christus-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"dpr.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility","srcUrls":["https://www.dpr.com/projects/christus-data-center"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"BP Energy Company"},{"id":"fc794487ec8f","cid":"fc794487ec8f","canon":1,"dups":1,"ftype":"data_center","name":"CINGULAR WIRELESS","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text delivery_utility_linked","rawName":"CINGULAR  WIRELESS","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"70048c760b5d","cid":"70048c760b5d","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Alborz","city":"Happy","county":"Randall","state":"TX","lat":34.962529,"lng":-101.895547,"cprec":"distinct","status":"Operational","mw":40,"band":"25-50 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Because the sole source of electricity for the Alborz Facility is the nearby wind farm, operating the Alborz miners involves frequent adjustments to the hashing power because of changes in the wind.","proc":"Co-located generation","pcp":"WindHQ (via Falvez Energy's Astra Wind Farm)","rto":"SPP","nerc":"MRO","op":"Canaan and WindHQ (Joint Venture)","spon":"Canaan (49%) and WindHQ (51%)","tenant":"Canaan and WindHQ (for Bitcoin mining)","ay":2022,"oy":2022,"deal":"Secured a $46.9 million loan from BlockFi Lending LLC in May 2022. Canaan Inc. acquired Cipher Mining's 49% stake in Alborz LLC (and other JVs) for approximately $39.75 million in an all-stock transaction on February 23, 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0d20081c47c1","cid":"0d20081c47c1","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Bear (JV)","county":"Andrews","state":"TX","lat":32.312258,"lng":-102.640206,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Hybrid","pconf":"High","pquote":"The Texas sites operate with electricity costs below $0.03 per kilowatt-hour and draw on wind-powered generation as well as grid demand-response capabilities within the ERCOT power market. Large-Scale, Low-Cost & Fully Operational Power Assets: The acquisition provides Canaan with a 49% stake in the joint venture and direct access to a total of 120 MW of fully operational power assets in West Texas with highly competitive average rates of sub-3 cents/kWh, leveraging the most competitive long-term power rates on the Texas grid for Bear and Chief, and off-grid wind power integration at Alboz. Our Bear data center (the “Bear Facility”) is located near Andrews, Texas and is also partially-owned through a joint venture with WindHQ. The Bear Facility is connected to the electrical grid.","proc":"Joint venture","pcp":"WindHQ LLC","pdt":"5-year purchase agreements, 120 MW combined capacity for ABC Projects (Alborz, Bear, Chief), average fixed price of $0.0273 per kilowatt-hour","rto":"SPP","nerc":"MRO","op":"Canaan","spon":"Canaan , WindHQ","ay":2022,"oy":2022,"deal":"Canaan Inc. acquired Cipher Mining's 49% equity interest in the joint venture (ABC Projects) for approximately US$39.75 million, funded by stock issuance, on February 23, 2026.","dealScan":"https://investor.canaan-creative.com/news-releases/news-release-details/canaan-inc-acquires-cipher-minings-interest-multiple-operational/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"investor.canaan-creative.com","srcUrls":["https://investor.canaan-creative.com/news-releases/news-release-details/canaan-inc-acquires-cipher-minings-interest-multiple-operational/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"397f830abfae","cid":"397f830abfae","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Black Pearl","county":"Winkler","state":"TX","lat":31.832862,"lng":-103.054925,"cprec":"distinct","status":"Operational","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The campus sits in ERCOT Load Zone West, with Oncor as the transmission and distribution provider and a 138-kV interconnection feeding the site.","uquote":"The campus sits in ERCOT Load Zone West, with Oncor as the transmission and distribution provider and a 138-kV interconnection feeding the site.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Cipher Mining","spon":"Cipher Mining","tenant":"Amazon Data Services (AWS)","ay":2023,"oy":2026,"deal":"$2.0 billion senior secured notes due 2031, issued February 11, 2026; 15-year triple-net lease with Amazon Data Services for 216 MW of critical IT load, valued at approximately $5.5B over the base term.","dealScan":"https://www.stocktitan.net/sec-filings/CIFR/8-k-cipher-mining-inc-reports-material-event-0877f507afdb.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"stocktitan.net","srcUrls":["https://www.stocktitan.net/sec-filings/CIFR/8-k-cipher-mining-inc-reports-material-event-0877f507afdb.html"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"e6aa971f2ffb","cid":"e6aa971f2ffb","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Chief (JV)","county":"Andrews","state":"TX","lat":32.312258,"lng":-102.640206,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The Chief Facility is a 10 megawatts (MW) data center that is connected to the local electrical grid.","pscan":"https://baxtel.com/data-center/canaan-bear","uconf":"High","uquote":"Oncor is the local electrical transmission line company in Andrews and it is their personnel that will typically connect/disconnect your services; however, you will need to go through your provider to initiate this process.","uscan":"https://www.cityofandrews.org/community/about_us/service_providers.php","uname":"Oncor Electric Delivery","rto":"SPP","nerc":"MRO","op":"Canaan and WindHQ","spon":"Canaan and WindHQ","ay":2022,"oy":2024,"deal":"Canaan Inc. acquired Cipher Mining's 49% equity interest in the joint venture (Alborz, Bear, and Chief Mountain LLC) for approximately US$39.75 million in an all-stock transaction on February 23, 2026.","dealScan":"https://investor.canaan-creative.com/news-releases/news-release-details/canaan-inc-acquires-cipher-minings-interest-multiple-operational/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"baxtel.com;cityofandrews.org;investor.canaan-creative.com","srcUrls":["https://baxtel.com/data-center/canaan-bear","https://www.cityofandrews.org/community/about_us/service_providers.php","https://investor.canaan-creative.com/news-releases/news-release-details/canaan-inc-acquires-cipher-minings-interest-multiple-operational/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified shared_coordinate_precision_downgraded delivery_utility_linked","dukey":"44372|TX"},{"id":"355a8af40071","cid":"355a8af40071","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Odessa","city":"Odessa","county":"Ector","state":"TX","lat":31.865301,"lng":-102.542507,"cprec":"distinct","status":"Operational","mw":207,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"“Because of our long-term, fixed price power contract at Odessa, we also have an advantage that few other bitcoin miners have — the flexibility to mine bitcoin or resell our power to the market, which can help mitigate the effects of falling bitcoin prices.”","pscan":"https://globalfintechseries.com/cryptocurrency/cipher-mining-commences-bitcoin-mining-at-odessa-data-center/","uquote":"Cost of revenue for the year ended December 31, 2024 was $62.4 million, compared with $50.3 million for the year ended December 31, 2023, and consisted primarily of power costs at the Odessa Facility. The Luminant Power Agreement provides for subsequent automatic annual renewal unless either party provides written notice to the other party of its intent to terminate the agreement at least six months prior to the expiration of the then current term.","rto":"SPP","nerc":"MRO","op":"Cipher Mining","spon":"Cipher Mining","oy":2022,"contro":"Dispute with Luminant over power payments.","deal":"Odessa power contract recorded as an asset valued at approximately $78.9 million as of September 30, 2022.","dealScan":"https://globalfintechseries.com/cryptocurrency/cipher-mining-commences-bitcoin-mining-at-odessa-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"globalfintechseries.com","srcUrls":["https://globalfintechseries.com/cryptocurrency/cipher-mining-commences-bitcoin-mining-at-odessa-data-center/"],"lflag":"source_quality_reclassified"},{"id":"c66bc789bd0e","cid":"c66bc789bd0e","canon":1,"dups":1,"ftype":"data_center","name":"CISCO SYSTEMS DATA CENTER","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"In our Allen data center, a new wind farm supplies 10 MW of power. On days when the sun doesn't shine or the wind doesn't blow, these facilities use power from the grid. We buy enough energy from renewable energy developments around the world to make up for these days. The Data Center has two separate (side A and side B) 10 MegaWatt feeds from two different electricity service providers.","pscan":"https://www.cisco.com/c/en/us/solutions/collateral/enterprise/cisco-on-cisco/cisco-it-dc-sustainability-wp.html","uquote":"Grid Operator: Denton County Elec Coop, INC. The Data Center has two separate (side A and side B) 10 MegaWatt feeds from two different electricity service providers.","uscan":"https://blogs.cisco.com/perspectives/a-tour-of-ciscos-allen-data-center","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Cisco Systems","spon":"Cisco Systems","tenant":"Cisco Systems","ay":2009,"oy":2011,"deal":"Cisco Systems plans to invest at least $184 million in the data center, with the city providing property tax abatements and road improvements (announced June 2009).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cisco.com;blogs.cisco.com","srcUrls":["https://www.cisco.com/c/en/us/solutions/collateral/enterprise/cisco-on-cisco/cisco-it-dc-sustainability-wp.html","https://blogs.cisco.com/perspectives/a-tour-of-ciscos-allen-data-center"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"6da803f8bd94","cid":"6da803f8bd94","canon":1,"dups":1,"ftype":"data_center","name":"CITI SOUTHWEST DATA CENTER KIOSK MODS","city":"Roanoke","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Citigroup has also publicly stated it contracted for Green-e certified renewable energy for 50 percent of the power needs at its Roanoke, Texas data center, indicating the site is a “key data center” in its footprint (organization level statement tied to the Roanoke facility).","uconf":"High","uquote":"Oncor is the Transmission and Distribution Utility (TDU) serving Roanoke and surrounding areas in Denton County. They own and maintain the power lines, meters, and infrastructure that deliver electricity to your home. While you choose your retail electricity provider, Oncor handles outages, meter readings, and power delivery.","uscan":"https://electricrates.org/texas/roanoke/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Citigroup","spon":"Citigroup","tenant":"Citigroup","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"electricrates.org","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://electricrates.org/texas/roanoke/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"c42b369ba552","cid":"c42b369ba552","canon":1,"dups":1,"ftype":"data_center","name":"Citigroup","city":"Roanoke","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Citigroup has also publicly stated it contracted for Green-e certified renewable energy for 50 percent of the power needs at its Roanoke, Texas data center, indicating the site is a “key data center” in its footprint (organization level statement tied to the Roanoke facility).","uconf":"High","uquote":"Electricity in Roanoke is all delivered by the Oncor Transmission and Distribution Utility. The wires and poles that deliver power to your home do not change when you switch electricity companies. Therefore the reliability of your service is not affected.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Citigroup","spon":"Citigroup","tenant":"Citigroup","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"0071de4d99cd","cid":"0071de4d99cd","canon":1,"dups":1,"ftype":"data_center","name":"CITY NTIONAL BANK DATA CENTER","city":"Sulphur Springs","county":"Hopkins","state":"TX","lat":33.148967,"lng":-95.565434,"cprec":"distinct","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"0f81a2c35f5e","cid":"0f81a2c35f5e","canon":1,"dups":1,"ftype":"data_center","name":"JOINT 911 EMERG. COMM.& INFOR.DATA CTR","city":"Baytown","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"City of Baytown","spon":"City of Baytown","oy":2015,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"acf8a37ab88c","cid":"acf8a37ab88c","canon":1,"dups":1,"ftype":"crypto_hpc","name":"CleanSpark Midland","city":"Midland","county":"Midland","state":"TX","lat":31.814269,"lng":-102.002454,"cprec":"distinct","status":"Operational","mw":175,"band":"100-250 MW","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"09354b797e48","cid":"09354b797e48","canon":1,"dups":1,"ftype":"data_center","name":"4200 LEELAND DATA CENTER MODIFICATIONS","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"City of Houston Public Works","spon":"City of Houston","ay":2019,"oy":2020,"deal":"Data Center Relocation project contract amount $41,888,144.60 (April 2019); PWE Water Customer Service Center Interior Renovation estimated value $250K (April 2020)","dealScan":"https://www.houstontx.gov/council/committees/tti/20190404/Houston_Public_Works_Data_Center_Replacements.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"houstontx.gov","lflag":"operational_null_capacity","srcUrls":["https://www.houstontx.gov/council/committees/tti/20190404/Houston_Public_Works_Data_Center_Replacements.pdf"]},{"id":"81e482b333f6","cid":"81e482b333f6","canon":1,"dups":1,"ftype":"data_center","name":"DFW II A","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"Power is supplied to the UPS systems through commercial power feeders and standby generators.","pscan":"https://baxtel.com/data-center/centersquare-allen-dfw2","uconf":"High","uquote":"Oncor Electric Delivery is Allen's utility... The utility company for Allen is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/allen/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Csquare","spon":"Brookfield Infrastructure Partners, Ontario Teachers' Pension Plan","ay":1999,"oy":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;choosetexaspower.org","srcUrls":["https://baxtel.com/data-center/centersquare-allen-dfw2","https://www.choosetexaspower.org/electricity-rates/allen/"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"7a8a09e4b5b3","cid":"7a8a09e4b5b3","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters","city":"Red Oak","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Operational","mw":180,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Oncor provides electricity via two on-campus substations.","uquote":"Oncor provides electricity via two on-campus substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"KKR","ay":2020,"oy":2024,"contro":"Significant community opposition and controversy regarding the expansion of the Compass Datacenters campus, including rezoning debates, concerns over noise, water usage, grid stress, traffic, light pollution, and declining property values.","deal":"$326 million refinancing agreement secured on October 29, 2025, backed by five hyperscale data centers.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"6d656c7db709","cid":"6d656c7db709","canon":1,"dups":1,"ftype":"data_center","name":"COMPASS DATACENTERS DFW 1 LLC","city":"ALLEN","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"Oncor provides electricity via two on-campus substations.","uquote":"Oncor provides electricity via two on-campus substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"Ontario Teachers' Pension Plan and Brookfield Infrastructure","tenant":"TierPoint and ScaleMatrix","oy":2016,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"184d1147ac61","cid":"184d1147ac61","canon":1,"dups":1,"ftype":"data_center","name":"COMPASS DATACENTERS DFW I LLC","city":"ALLEN","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"Oncor provides electricity via two on-campus substations.","uquote":"Oncor provides electricity via two on-campus substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"KKR, Brookfield Infrastructure, Ontario Teachers' Pension Plan","tenant":"TierPoint, ScaleMatrix","oy":2017,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"8f9e7b579301","cid":"8f9e7b579301","canon":1,"dups":1,"ftype":"data_center","name":"COMPASS DATACENTERS DFW II LLC","city":"ALLEN","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"Oncor provides electricity via two on-campus substations.","uquote":"Oncor provides electricity via two on-campus substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"KKR","oy":2018,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"6f90e6f9a455","cid":"6f90e6f9a455","canon":1,"dups":1,"ftype":"data_center","name":"COMPUCOM","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"9d0044615d4e","cid":"9d0044615d4e","canon":1,"dups":1,"ftype":"data_center","name":"Compute North","city":"Corpus Christi","county":"Nueces","state":"TX","lat":27.740032,"lng":-97.516214,"cprec":"shared_centroid","status":"Operational","mw":300,"uquote":"Grid Operator. San Patricio Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/compute-north-7cc827de","ukey":"16627|TX","uname":"San Patricio Electric Coop Inc","rto":"ERCOT","nerc":"TRE","ay":2022,"contro":"Compute North stopped paying the development company and owed $14.9 million at bankruptcy.","controScan":"https://www.binance.com/en/square/post/462957","deal":"Compute North filed for Chapter 11 bankruptcy in September 2022; the Corpus Christi facility was an in-development asset not sold in initial auction.","dealScan":"https://hashrateindex.com/blog/quantifying-compute-norths-363-asset-sale-who-bought-what-and-how-much-money-was-raised/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;hashrateindex.com;binance.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/compute-north-7cc827de","https://hashrateindex.com/blog/quantifying-compute-norths-363-asset-sale-who-bought-what-and-how-much-money-was-raised/","https://www.binance.com/en/square/post/462957"],"band":"250+ MW"},{"id":"ac42a936d600","cid":"ac42a936d600","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER INTERIOR RENOVATION","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","uquote":"The utility company for Plano is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/plano/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"PepsiCo","spon":"PepsiCo","tenant":"PepsiCo","oy":2009,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.choosetexaspower.org/electricity-rates/plano/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"76fded29cc3f","cid":"76fded29cc3f","canon":1,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus.","pscan":"https://www.interconnection.fyi/data-center/state/TX","uconf":"High","uquote":"FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.... Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity display_name_normalized citation_artifact_removed generic_permit_record possible_canonical_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/state/TX","https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"Construct new data center building/3rd Party Plan Review & Insp/Winston Services"},{"id":"d19e1ae05733","cid":"69d592b1dbfd","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"construct new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"69d592b1dbfd","cid":"69d592b1dbfd","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Denton County Elec Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","spon":"Winner","ay":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity display_name_normalized generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"construct new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc."},{"id":"132cc46c64b3","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Enbridge","pdt":"long-term PPA, 600 megawatt","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized unlinked_source_text generic_unsourced_permit_record","rawName":"Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"facdff27163d","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Co-located generation","pcp":"Fort Worth Power Core LLC","pdt":"980-megawatt electrical substation; natural gas power plants","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized unlinked_source_text generic_unsourced_permit_record","rawName":"Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"4cf6668969b8","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"87b8e52439a0","cid":"7aaeb55e3672","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Denton County Elec Coop, INC.","uconf":"High","uquote":"Grid Operator: Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Winner","spon":"Winner","ay":2016,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity unlinked_source_text display_name_normalized generic_permit_record","rawName":"Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.","srcUrls":null,"srcDom":null},{"id":"1411445a4cbc","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record unlinked_source_text","rawName":"Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"6594fd8a7719","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"f0f4f18b2471","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record unlinked_source_text","rawName":"Construct new data center/3rd party plan review and inspections/Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"fe4c3d635844","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record unlinked_source_text","rawName":"Construct new data center/3rd party plan review and inspections/Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"a071d3ef9246","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record unlinked_source_text","rawName":"Construct new data center/3rd party plan review and inspections/Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"7aaeb55e3672","cid":"7aaeb55e3672","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Denton County Elec Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Winner","spon":"Winner","ay":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity display_name_normalized generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"Construct new data center/3rd party plan review and inspections/Winston Services, Inc."},{"id":"5be2f99dd008","cid":"5be2f99dd008","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Denton County Elec Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","ay":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity display_name_normalized generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"Construct new foundation only for future data center building/3rd Party Plan Review & Insp/Winston Services"},{"id":"342335f0f9b9","cid":"342335f0f9b9","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Core Scientific Denton","city":"Denton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":394,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio. Denton Municipal Electric is Denton's municipally-owned electric provider since 1905 and is proud to supply the Denton community with safe, reliable, and 100% renewable energy. Austin-based Core Scientific has ditched its crypto mining plans in Denton and now will be dedicating 100% of its Denton data center to high-performance computing for artificial intelligence — with no option to act as a “dimmer switch” when wholesale electricity prices become too expensive.","uconf":"High","uquote":"On Tuesday night, the Denton City Council unanimously approved modifying the power purchase agreement between Core Scientific and Denton Municipal Electric. Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio.","uscan":"https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2021,"oy":2022,"contro":"Core Scientific filed for Chapter 11 bankruptcy in December 2022, citing liquidity issues. The facility also faced scrutiny regarding its energy consumption and the effectiveness of renewable energy credits.","deal":"$6.1 billion real property investment for expansion (November 20, 2024); $1.2 billion in contracted revenue with CoreWeave (February 26, 2025).","dealScan":"https://investors.corescientific.com/news-events/press-releases/detail/100/core-scientific-announces-approval-of-lease-amendments-with-the-city-of-denton-to-enable-high-performance-computing-expansion","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"keranews.org;investors.corescientific.com","srcUrls":["https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","https://investors.corescientific.com/news-events/press-releases/detail/100/core-scientific-announces-approval-of-lease-amendments-with-the-city-of-denton-to-enable-high-performance-computing-expansion"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Denton Municipal Electric (City of Denton)"},{"id":"929068472a1e","cid":"929068472a1e","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Core Scientific Pecos","city":"Pecos","county":"Reeves","state":"TX","lat":31.308366,"lng":-103.712706,"cprec":"distinct","status":"Future / Expansion","mw":300,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"In addition, Core Scientific has secured an incremental 300 MW of gross power capacity under contract with its utility provider. The Company has also developed a plan utilizing a scalable behind-the-meter solution, not included in its previously announced leasable power pipeline, that is expected to provide significant additional capacity.","proc":"Tariff (utility)","pcp":"utility provider","pdt":"300 MW","uconf":"High","uquote":"Grid Operator: Rio Grande Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/core-scientific-pecos-1a671050","ukey":"16057|TX","uname":"Rio Grande Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","ay":2026,"oy":2027,"deal":"$3.3 billion senior secured notes offering due 2030, completed May 2026","dealScan":"https://coinmarketcap.com/academy/article/core-scientific-converts-bitcoin-mine-into-15gw-ai-hub","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;coinmarketcap.com","lflag":"status_adjusted_future_expansion","srcUrls":["https://www.interconnection.fyi/data-center/project/core-scientific-pecos-1a671050","https://coinmarketcap.com/academy/article/core-scientific-converts-bitcoin-mine-into-15gw-ai-hub"],"rawStatus":"Operational"},{"id":"de2b76df531f","cid":"de2b76df531f","canon":1,"dups":1,"ftype":"data_center","name":"CORESPACE","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"The data center is a reliable power infrastructure located on hospital grid with 2.5 MW of utility power.... 2.5 Megawatts Hospital Grid Power. General Electric (GE) 2 x UPS's with eBoost Technology. 2012 Installed New Cummins Power Generation – Weekly Tests. 30-minute Diesel Refueling Agreements.","uquote":"Oncor Electric Utility is Dallas' utility company. While you can choose your electricity provider in a deregulated market, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages. Dallas' utility company is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CoreSpace","spon":"CoreSpace","oy":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/dallas/"],"band":"< 10 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"f79b2e190b79","cid":"f79b2e190b79","canon":1,"dups":1,"ftype":"data_center","name":"COREWEAVE INC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/coreweave-plano","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/coreweave-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CoreWeave","tenant":"Nvidia","ay":2023,"oy":2023,"deal":"$1.6 billion investment (announced July 25, 2023); 6-year Master Services Agreement with Lincoln Property Company for over $260 million for initial power installation; $141 million in tax incentives from City of Plano.","dealScan":"https://www.prnewswire.com/news-releases/coreweave-opens-new-texas-data-center-to-expand-access-to-high-performance-gpus-301884897.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;prnewswire.com","srcUrls":["https://baxtel.com/data-center/coreweave-plano","https://www.prnewswire.com/news-releases/coreweave-opens-new-texas-data-center-to-expand-access-to-high-performance-gpus-301884897.html"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"2521f9e82f46","cid":"2521f9e82f46","canon":1,"dups":1,"ftype":"data_center","name":"CRAC Unit on roof for existing Data Center","city":"AUSTIN","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"d8af18748d5e","cid":"d8af18748d5e","canon":1,"dups":1,"ftype":"data_center","name":"GTECH BACK UP DATA CENTER","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"315470fc590b","cid":"315470fc590b","canon":1,"dups":1,"ftype":"data_center","name":"CTP DATABANK","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"DataBank's stand-alone, 68,000 sqft facility in Richardson, TX features an on-campus dedicated power substation delivering 20MW of utility power.","pscan":"https://marketplace.upstack.com/data-centers/databank-data-center-richardson-dfw2","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/databank-north-dallas-dfw2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","oy":2013,"deal":"Databank leased a powered shell building from Digital Realty at its Digital Dallas campus in Richardson (2013)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;baxtel.com","srcUrls":["https://marketplace.upstack.com/data-centers/databank-data-center-richardson-dfw2","https://baxtel.com/data-center/databank-north-dallas-dfw2"],"band":"< 10 MW","rawName":"CTP  DATABANK","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"8df49db6bb3a","cid":"8df49db6bb3a","canon":1,"dups":1,"ftype":"data_center","name":"CTP DIGITAL REALTY DALLAS - DFW17","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Electrical service to the park is distributed from a dedicated, privately owned substation capable of delivering up to 100 MW of power. Telecommunications service is provided by nine different fiber providers currently located in the park.","uconf":"High","uquote":"Digital Realty: DFW17 data center in Dallas with 118 facilities nearby. Get pricing, specs, and colocation information from Digital Realty Trust... The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","uscan":"https://baxtel.com/data-center/digital-realty-dfw17","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-realty-dfw17"],"band":"< 10 MW","rawName":"CTP  DIGITAL REALTY DALLAS - DFW17","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"fd3e7cb1291f","cid":"fd3e7cb1291f","canon":1,"dups":1,"ftype":"data_center","name":"CTP DIGITAL REALTY DFW16","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Electrical service to the park is served by diverse substation feeders, to our dedicated, privately owned, substation with the ability to deliver up to 100 MW of power.... For teams that need high-density power and broad carrier choice, Digital Realty DFW16 offers a foundation with 12 MW of utility capacity.","uconf":"High","uquote":"This facility is a part of Digital Dallas Campus in Richardson.... The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","oy":2010,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","rawName":"CTP  DIGITAL REALTY DFW16","lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"4a2bdbaaca93","cid":"4a2bdbaaca93","canon":1,"dups":1,"ftype":"data_center","name":"CTP DIGITAL REALTY DFW28","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Electrical service to the park is served by diverse substation feeders, to our dedicated, privately owned, substation capable of delivering up to 100 MW of power. Power off the ERCOT grid is option 1. If that ever fails an arsenal of generators kick in.","pscan":"https://www.khou.com/article/news/local/power-hungry-inside-texas-data-center-boom/285-996b7c32-d1b5-4391-829f-17f36e7b789e","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw28","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"khou.com;baxtel.com","srcUrls":["https://www.khou.com/article/news/local/power-hungry-inside-texas-data-center-boom/285-996b7c32-d1b5-4391-829f-17f36e7b789e","https://baxtel.com/data-center/digital-realty-dfw28"],"band":"< 10 MW","rawName":"CTP  DIGITAL REALTY DFW28","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"33eb1703e52c","cid":"33eb1703e52c","canon":1,"dups":1,"ftype":"data_center","name":"CTP LINKEDIN","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":7,"pc":"Grid","pconf":"High","pquote":"Grid Operator. ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/ctp-digital-realty-dfw16-0958e03a","uconf":"High","uquote":"The utility company for Richardson is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/richardson/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"COLLINS TECHNOLOGY PARK PTNRS","tenant":"LinkedIn","ay":2013,"oy":2013,"deal":"$116 million, 11-year lease signed by LinkedIn in October 2013","dealScan":"https://www.datacenterknowledge.com/networking/linkedin-expands-with-texas-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"interconnection.fyi;choosetexaspower.org;datacenterknowledge.com","srcUrls":["https://www.interconnection.fyi/data-center/project/ctp-digital-realty-dfw16-0958e03a","https://www.choosetexaspower.org/electricity-rates/richardson/","https://www.datacenterknowledge.com/networking/linkedin-expands-with-texas-data-center"],"band":"< 10 MW","rawName":"CTP  LINKEDIN","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"111752816999","cid":"111752816999","canon":1,"dups":1,"ftype":"data_center","name":"CTP DIGITAL REALTY - DFW25","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Electrical service to the park is distributed from a dedicated, privately owned substation capable of delivering up to 100 MW of power. Telecommunications service is provided by nine different fiber providers currently located within the park.","uconf":"High","uquote":"Digital Realty: DFW25 data center in Dallas with 118 facilities nearby. Get pricing, specs, and colocation information from Digital Realty Trust... The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw25","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","oy":2012,"deal":"City of Richardson offered $5 million in incentives to Datacenter Park (campus where DFW25 is located) in 2010.","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/-5m-incentive-for-digital-realty-dallas-campus","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;datacenterknowledge.com","srcUrls":["https://baxtel.com/data-center/digital-realty-dfw25","https://www.datacenterknowledge.com/next-gen-data-centers/-5m-incentive-for-digital-realty-dallas-campus"],"band":"< 10 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"c65b38e742f5","cid":"c65b38e742f5","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":33,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The data centers' infrastructure combines multiple levels of technology and security, resulting in no single point of failure. The location is ideal for primary production systems backup and the synchronous data replication requirements of mission-critical applications. CyrusOne offers powered shells to provide customers with a fast time-to-market option, including fully redundant support systems, scalable power levels, and connectivity options. Key Features:... fed by dual independent utility feeds this facility's electrical power and cooling architectures use advanced components designed with N and 2n redundancies.","pscan":"https://www.youtube.com/watch?v=pzQjXSTQh0Q","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"two anchor tenants from the energy industry","ay":2009,"oy":2026,"deal":"Acquisition of CyrusOne by KKR and Global Infrastructure Partners for approximately $15 billion on March 25, 2022","dealScan":"https://www.moneycontroller.co.uk/finance-news/company/cyrusone-inc","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;centexdatacenters.org;moneycontroller.co.uk","srcUrls":["https://www.youtube.com/watch?v=pzQjXSTQh0Q","https://centexdatacenters.org/tracker/cyrusone-austin","https://www.moneycontroller.co.uk/finance-news/company/cyrusone-inc"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"414f7fcf4d00","cid":"414f7fcf4d00","canon":0,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The CyrusOne data centers diverse power is fed by two 400 MW capacity substation with dual underground, concrete encased feeds from electrical substations. The facility has 300 KVA dual input PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with a 3,300 gallon belly tank each plus an added 12,000 gallon external tank. Power failures are protected by multiple MGE 8000, 625 KVA UPS systems with battery backup.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-austin-data-center-met-center-ii/","uconf":"High","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2014,"oy":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;centexdatacenters.org","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-austin-data-center-met-center-ii/","https://centexdatacenters.org/tracker/cyrusone-austin"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"9525235a97ac","cid":"9525235a97ac","canon":0,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","proc":"Tariff (utility)","pcp":"CenterPoint Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"uname":"CenterPoint Energy Houston Electric","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected unlinked_source_text,merged_duplicate delivery_utility_linked","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"ec5f8fb842b7","cid":"ec5f8fb842b7","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":91,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The campus offers multiple layers of redundancy, from power distribution to cooling infrastructure, supported by 68 dedicated diesel generators and multiple UPS systems with battery backup.","pscan":"https://www.cyrusone.com/data-centers/north-america/houston-tx","uconf":"Medium","uquote":"Grid Operator. CenterPoint Energy.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","oy":2010,"deal":"Sale of four Houston data centers by CyrusOne to DataBank Holdings Ltd. for approximately $670 million in March 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/houston-tx"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"8901|TX"},{"id":"32661225d4e3","cid":"32661225d4e3","canon":0,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pdt":"Annual utility bills will total $120,600 in the first year and will increase by 3% every year.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"431be8379d63","cid":"431be8379d63","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":26,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"CyrusOne's 200,000-square-foot, DFW2 data center provides redundant power architecture, high-density capability, and an abundance of connectivity to many local and international companies. The CyrusOne Lewisville data center is built to top-tier standards offering 100% SLA on power, and provides comprehensive fault tolerance power design. A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville) connected to redundant 25MVA transformers. Fault tolerant Tier 4 electrical design.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-lewisville-dfw2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","deal":"$1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, nearing May 2026","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/cyrusone-lewisville-dfw2"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"85ce87aed72f","cid":"85ce87aed72f","canon":0,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The SAT1 data center boasts some of the lowest power costs in the country and can scale up to 20 megawatts of power from multiple substations.","pscan":"https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1","uquote":"Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2012,"oy":2012,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;centexdatacenters.org","srcUrls":["https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1","https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"2027f38d042f","cid":"2027f38d042f","canon":1,"dups":3,"ftype":"data_center","name":"CyrusOne","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"18 MW distributed redundant power configuration; 8 Detroit Diesel generators with 48-hour runtime at full load; 16 UPS systems with 7-minute battery backup. Power provider: CPS Energy / ERCOT.","pscan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","uquote":"Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2015,"deal":"Securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas, in a series 2024-1 note issuance (March 2024).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"c4894e6b4f2d","cid":"c4894e6b4f2d","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON DATA HALL 6","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"CenterPoint Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text delivery_utility_linked","uname":"CenterPoint Energy Houston Electric","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"e2c1854e35b7","cid":"e2c1854e35b7","canon":1,"dups":1,"ftype":"data_center","name":"EXXON LEASE SPACE BUILDOUT DATA HALL 6","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"DataBank's HOU3 data center is located on our Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290. It provides scalable, redundant power feeds and is located along a major fiber corridor providing access to the fastest and most reliable telecommunications networks in Houston.... Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uconf":"High","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","pscan":"https://databank.com/data-centers/houston/westway-park-campus/westway-park-iii-data-center/","uscan":"https://databank.com/data-centers/houston/westway-park-campus/westway-park-iii-data-center/","srcUrls":["https://databank.com/data-centers/houston/westway-park-campus/westway-park-iii-data-center/"],"srcDom":"databank.com","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"df4741e49957","cid":"df4741e49957","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON DATA HALL 7","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The campus offers multiple layers of redundancy, from power distribution to cooling infrastructure, supported by 68 dedicated diesel generators and multiple UPS systems with battery backup.","pscan":"https://www.cyrusone.com/data-centers/north-america/houston-tx","uconf":"High","uquote":"Grid Operator: CenterPoint Energy.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","deal":"CyrusOne Data Centers Issuer I LLC's series 2025-1 class A-2 note issuance is a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s 13 completed and operating data centers in Sterling, Va., San Antonio, Texas, and Houston. Two data centers in Houston will be added to the master trust at closing.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.cyrusone.com/data-centers/north-america/houston-tx"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"480ac0161800","cid":"480ac0161800","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE - LOBBY, HOUSTON","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"37ec7b034a3c","cid":"37ec7b034a3c","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE BELTWAY 8 DATA HALL 3","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":43,"pc":"Grid","pconf":"High","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures. use advanced components designed to deliver N. and 2N redundancies. and could provide at full build up to 96 megawatt of 100% uptime with uninterrupted. service in addition to being outside the flood zone. and having extra diesel fuel on site","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer (name not public)","ay":2013,"oy":2015,"deal":"Sale of Houston West I, II, III, and Galleria data centers to DataBank for approximately $670 million in March 2022.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w"],"band":"25-50 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"2bd8fc716afe","cid":"2bd8fc716afe","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE BELTWAY 8 DATA HALL 5","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures. use advanced components designed to deliver N. and 2N redundancies.","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uconf":"High","uquote":"Grid Operator. CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge Group","deal":"DataBank acquired four Houston data centers (including Houston West I, II, and III) from CyrusOne for $670 million in March 2022.","dealScan":"https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;interconnection.fyi;digitalbridge.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w","https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"233c850cf57b","cid":"233c850cf57b","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE BELTWAY 8 DATA HALL 4","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":48,"pc":"Grid","pconf":"High","pquote":"The campus offers multiple layers of redundancy, from power distribution to cooling infrastructure, supported by 68 dedicated diesel generators and multiple UPS systems with battery backup.","pscan":"https://www.cyrusone.com/data-centers/north-america/houston-tx","uquote":"Grid Operator. CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","oy":2009,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;interconnection.fyi","srcUrls":["https://www.cyrusone.com/data-centers/north-america/houston-tx","https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443"],"band":"25-50 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"19705f0c0f91","cid":"19705f0c0f91","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE - SAN ANTONIO","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Power provider: CPS Energy / ERCOT.","uconf":"High","uquote":"Water provider: SAWS; Power provider: CPS Energy / ERCOT.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2012,"contro":"Site on Edwards Aquifer recharge zone, raising concerns about water quality for Central Texans.","deal":"$575 million ABS deal dated February 10, 2025, involving 13 data centers including those in San Antonio.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"8086ea1f5fef","cid":"8086ea1f5fef","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE SAN ANTONIO PHASE 3","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"High-capacity utility power sourced from the regional Texas grid; Redundant electrical systems designed for continuous uptime; UPS-backed infrastructure ensuring stable power delivery; Backup generators supporting extended outage protection; Designed to support high-density and hyperscale environments.","uquote":"Power provider: CPS Energy / ERCOT.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2020,"oy":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"6d37fcbb0697","cid":"6d37fcbb0697","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE - SAN ANTONIO","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"CyrusOne's SAT1 data center in San Antonio can scale up to 20 MW of power from multiple substations. The facility provides extra layers of physical security including hurricane shutters, impact-resistant glazing, and extra diesel on-site, and is located outside of flood zones.","pscan":"https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1","uconf":"High","uquote":"Utility Provider: CPS Energy.","uscan":"https://baxtel.com/data-center/bexar-datacenter-san-antonio-sat1","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2012,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;baxtel.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1","https://baxtel.com/data-center/bexar-datacenter-san-antonio-sat1"],"band":"< 10 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"e94478879c55","cid":"e94478879c55","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON NDIVISION NOC & FIN","city":"Dallas","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"The purchase is equivalent to meeting... approximately 70% of the power requirements for its data center in Carrollton, Texas. The Carrollton facility has implemented high-efficiency chillers, LED lighting upgrades, and a renewable solar energy source to lower energy consumption and carbon emissions.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","ay":2012,"oy":2013,"contro":"Water stress and potential friction with local communities due to water usage, mitigated by water-free cooling.","deal":"$687.1 million Single Asset Single Borrower (SASB) CMBS loan for DFW1 data center, announced January 29, 2025.","dealScan":"https://www.cyrusone.com/media-coverage-press-releases/cyrusone-secures-687-1-million-commercial-mortgage-backed-security-cmbs-financing","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;cyrusone.com","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton","https://www.cyrusone.com/media-coverage-press-releases/cyrusone-secures-687-1-million-commercial-mortgage-backed-security-cmbs-financing"],"band":"50-100 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"d92d326eec77","cid":"d92d326eec77","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE GALLERIA BATH/BREAK RELOCATION","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1593a16d8f93","cid":"1593a16d8f93","canon":1,"dups":1,"ftype":"data_center","name":"Cyrusone - SAT TRP USAA","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"The data center has 2 x 200 MW of power substation providing power to the facility.... Power outages are protected by 2.25 MW dedicated diesel generators with a 5,000 gallon belly tank.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","uconf":"High","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and BlackRock (via GIP)","ay":2024,"contro":"Located on Edwards Aquifer recharge zone, raising concerns about water quality and overdraft for 2 million Central Texans downstream.","controScan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","deal":"CyrusOne Data Centers Issuer I LLC's series 2025-1 class A-2 note issuance, a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s 13 completed and operating data centers in Sterling, Va., San Antonio, Texas, and Houston, dated January 30, 2025.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"cloudandcolocation.com;cyrusone.com;centexdatacenters.org","lflag":"online_before_announced citation_artifact_removed utility_alias_corrected source_quality_reclassified","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio"],"band":"25-50 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"9e1c0ec4fd46","cid":"9e1c0ec4fd46","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Allen B1 - Conference & Breakroom","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":50,"pc":"Grid","pconf":"High","pquote":"Utility capacity – 50 MW; Utility Voltage – 24,900 (25 kV); # of Utility Feeders – 2 each (non-redundant); # of transformers on site – 26 Transformers (24 each @ 2.5 MW, 1 each @ 1 MW, 1 each at 2 MW); UPS configuration & capacity – Distributed redundant, with 4,500 kVA blocks (6 MW); Generator Power – 24 each 2.25 MW Diesel (Critical), 1 each 1.25 MW Diesel (House)","uquote":"CyrusOne Allen DFW3 Data Center in Collin County, TX... Grid Operator: Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2017,"oy":2018,"deal":"CyrusOne Inc. announced that the company will purchase 67 MW of renewable energy delivered to the electricity grid and equivalent renewable energy credits generated by Enel Green Power's 284 MW1 Azure Sky solar + storage project located in Haskell County, Texas. (January 26, 2021)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"f6967ff16677","cid":"f6967ff16677","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE ALLEN BUILDING 1","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid.... 100% Carbon-Free/Renewable Electricity","uconf":"High","uquote":"In Allen, Oncor Electric delivers electricity to all homes and businesses.","uscan":"https://www.chooseenergy.com/electricity-rates/texas/allen/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR & and Global Infrastructure Partners","ay":2017,"oy":2023,"deal":"$1.05B refinancing for DFW3 and DFW4 data centers, expected to close May 20, 2026","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"chooseenergy.com;bisnow.com","lflag":"operational_null_capacity citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.chooseenergy.com/electricity-rates/texas/allen/","https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"a279ebf6eb62","cid":"a279ebf6eb62","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE AUSTIN MET II BLDG 4 PHASE 1","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"The CyrusOne data centers diverse power is fed by two 400 MW capacity substation with dual underground, concrete encased feeds from electrical substations. The data center offers a high-density power configuration, supporting up to 250 watts per square foot. - It features a redundant power system with N+1 UPS configuration, ensuring uninterrupted power supply. - The facility is supported by multiple on-site generators, providing backup power in case of utility outages.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-austin-data-center-met-center-ii/","uquote":"Power provider: Austin Energy.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2015,"oy":2015,"contro":"Concerns over increased water draw on City of Austin Water for campus expansion.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"Acquisition of ~175,000 sq ft powered shell for AUS3 on April 2, 2015.","dealScan":"https://centexdatacenters.org/tracker/cyrusone-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;centexdatacenters.org","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-austin-data-center-met-center-ii/","https://centexdatacenters.org/tracker/cyrusone-austin"],"band":"< 10 MW"},{"id":"c9facf293aad","cid":"c9facf293aad","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE AUSTIN MET SPECTRA TENANT F/OUT","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"Power provider: Austin Energy.","pscan":"https://centexdatacenters.org/tracker/cyrusone-austin","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2015,"oy":2015,"contro":"Austin City Council adopted a resolution directing a data center environmental and water study, and the expansion of the campus may increase water draw without additional public review.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"CyrusOne was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.","dealScan":"https://baxtel.com/data-center/cyrusone-austin-iii","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"centexdatacenters.org;baxtel.com","srcUrls":["https://centexdatacenters.org/tracker/cyrusone-austin","https://baxtel.com/data-center/cyrusone-austin-iii"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"94c2978909fc","cid":"94c2978909fc","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE AUSTIN DATA CENTER III","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"The facility is supported by multiple on-site generators, providing backup power in case of utility outages.... fed by dual independent utility feeds this facility's electrical power and cooling architectures use advanced components designed to deliver system redundancies.","pscan":"https://www.youtube.com/watch?v=437H3Dv9ZJ4","uconf":"Medium","uquote":"Two on-site substations, each fed from a separate power source coming into the Austin-area electric grid.","uscan":"https://www.metcenter.com/mission-critical","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2015,"oy":2015,"contro":"Concerns regarding water demands due to evaporative cooling towers and expansion plans.","deal":"Acquisition of a ~175,000 sq ft powered shell in Austin's Met Center on April 2, 2015.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;metcenter.com","srcUrls":["https://www.youtube.com/watch?v=437H3Dv9ZJ4","https://www.metcenter.com/mission-critical"],"band":"10-25 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"ca23f83e6fec","cid":"ca23f83e6fec","canon":1,"dups":1,"ftype":"data_center","name":"Cyrusone Austin Met III Expansion II","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"fed by dual independent utility feeds this facility's electrical power and cooling architectures use advanced components designed to deliver system redundancies.","pscan":"https://www.youtube.com/watch?v=437H3Dv9ZJ4","uquote":"Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.","uscan":"https://baxtel.com/data-center/cyrusone-austin-iii","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2014,"oy":2026,"contro":"Austin City Council adopted Resolution 55 on April 24, 2025, directing city staff to partner with Austin Energy and Austin Water on a regional environmental study of data center energy and water impacts over the next decade.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"CyrusOne acquired a powered shell for AUS3 on April 2, 2015.","dealScan":"https://centexdatacenters.org/tracker/cyrusone-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;baxtel.com;centexdatacenters.org","srcUrls":["https://www.youtube.com/watch?v=437H3Dv9ZJ4","https://baxtel.com/data-center/cyrusone-austin-iii","https://centexdatacenters.org/tracker/cyrusone-austin"],"band":"10-25 MW"},{"id":"6e23e3830b8f","cid":"6e23e3830b8f","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Austin Met III Data Hall 4","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"The data center offers a high-density power configuration, supporting up to 250 watts per square foot. - It features a redundant power system with N+1 UPS configuration, ensuring uninterrupted power supply. - The facility is supported by multiple on-site generators, providing backup power in case of utility outages.","uquote":"Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.","uscan":"https://baxtel.com/data-center/cyrusone-austin-iii","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2015,"oy":2015,"contro":"Community opposition and city council resolution regarding data center water demands amid statewide drought.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/cyrusone-austin-iii"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"5fc43d6cf14a","cid":"5fc43d6cf14a","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Austin Met III 280 & 281 Interior Upfit","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"fed by dual independent utility feeds this facility's electrical power and cooling architectures use advanced components designed to deliver system redundancies. data center visitors pass through a monitored highsecurity gated entrance which requires key card access to prevent unauthorized. access.","pscan":"https://www.youtube.com/watch?v=437H3Dv9ZJ4","uquote":"Austin City Council adopted Resolution 55 on April 24, 2025, directing city staff to partner with Austin Energy and Austin Water on a regional environmental study of data center energy and water impacts over the next decade.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2015,"oy":2015,"contro":"Austin City Council adopted a resolution directing a data center environmental and water study due to concerns over water usage.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"Acquisition of a ~175,000 sq ft powered shell in Austin's Met Center on April 2, 2015.","dealScan":"https://centexdatacenters.org/tracker/cyrusone-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;centexdatacenters.org","srcUrls":["https://www.youtube.com/watch?v=437H3Dv9ZJ4","https://centexdatacenters.org/tracker/cyrusone-austin"],"band":"10-25 MW"},{"id":"32eb88b535eb","cid":"32eb88b535eb","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE BELTWAY 8","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"100% Renewable Energy Source. Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","pscan":"https://www.databank.com/data-centers/houston/","uconf":"High","uquote":"Houston-area electric utility CenterPoint Energy has a line of sight to 12.2 GW of “firmly committed” new load and expects the increased utilization of its system to reduce costs for residential and commercial customers Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","oy":2009,"deal":"DataBank acquired four CyrusOne Houston data centers for $670 million in March 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.databank.com/data-centers/houston/"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"c23e5f406dba","cid":"c23e5f406dba","canon":1,"dups":1,"ftype":"data_center","name":"Cyrusone Carrollton Data Center - Floater Yard 02","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Enel Green Power","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"ab7bab7b646a","cid":"ab7bab7b646a","canon":1,"dups":1,"ftype":"data_center","name":"Cyrusone Carrollton Data Center-DH6 Load Adder","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Enel Green Power","pdt":"67 MW","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16"]},{"id":"9719c779673e","cid":"9719c779673e","canon":1,"dups":1,"ftype":"data_center","name":"Cyrusone Carrollton Data Center-DH1 AHU Build-Out","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"In 2020, CyrusOne helped develop a renewable solar energy source that will cover a significant portion of our North Texas electricity needs. Together, these strategic upgrades have significantly lowered Carrollton's energy demand, fossil fuel reliance, and resulting carbon emissions, helping CyrusOne, as a company, make strides toward our goal to be climate neutral by 2030.","pscan":"https://www.cyrusone.com/resources/blogs/care-in-carrollton","uconf":"High","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","oy":2013,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;interconnection.fyi","srcUrls":["https://www.cyrusone.com/resources/blogs/care-in-carrollton","https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16"],"band":"50-100 MW"},{"id":"a5785146a298","cid":"a5785146a298","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Carrollton Data Center-Floater Yard 03","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"Data centers require large amounts of energy to remain fully operational 24/7, run IT equipment, and keep systems cool. These facilities contribute carbon to the atmosphere when the energy supplying them is directly or indirectly based on fossil fuels.","pscan":"https://www.cyrusone.com/resources/blogs/care-in-carrollton","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","oy":2000,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;baxtel.com","srcUrls":["https://www.cyrusone.com/resources/blogs/care-in-carrollton","https://baxtel.com/data-center/cyrusone-carrollton"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"1f3f50156414","cid":"1f3f50156414","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON MEZZANINE EXPANSION","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Enel Green Power","pdt":"67 MW of renewable energy, covering approximately 70% of power requirements","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2018,"oy":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"6d1ec4f35e41","cid":"6d1ec4f35e41","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON 911 DISPATCH CENTER","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"The power outrage is protected through a 750 KVA Mitsubishi UPS system with battery bank, and automatic transfer to 2.25 MW dedicated diesel generators for emergency power with a 5,000 gallon belly tank.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","ay":2014,"oy":2016,"contro":"The 911 dispatch center was \"overdue and over budget to the tune of $1 million\" due to \"technical issues\" with radio equipment.","controScan":"https://www.wfaa.com/article/news/empty-911-center-a-million-dollar-mess/287-32565293","deal":"Leasehold improvements for NTECC estimated at $1,800,000.00.","dealScan":"https://agendas.addisontx.gov/docs/2014/CM/20140422_404/383_2NTECC%20ILA%20with%20Cities%20for%20CyrusOne%20Lease65556.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"baxtel.com;agendas.addisontx.gov;wfaa.com","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton","https://agendas.addisontx.gov/docs/2014/CM/20140422_404/383_2NTECC%20ILA%20with%20Cities%20for%20CyrusOne%20Lease65556.pdf","https://www.wfaa.com/article/news/empty-911-center-a-million-dollar-mess/287-32565293"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"7d29b1b62dc5","cid":"7d29b1b62dc5","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON SITE SECURITY","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"fed by multiple separate power feeds. this massive campus is capable of providing 60 megawatts of power to the fully redundant Cyrus 1 electrical infrastructure. the facility's electrical power and cooling architectures use advanced components designed with N N plus1. and 2N parallel redundancies providing 100% uptime with uninterrupted. service.","pscan":"https://www.youtube.com/watch?v=FjtRE8xy-tY","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC), DataCanopy","ay":2012,"oy":2013,"deal":"CyrusOne purchased 67 MW of renewable energy from Enel Green Power's Azure Sky solar + storage project in Haskell County, Texas, in January 2021, covering approximately 70% of the Carrollton data center's power requirements. Additionally, in April 2022, CyrusOne signed a power purchase agreement with Gexa Energy for 40 MW (30 MW solar, 10 MW wind) to supply its North Texas data centers, including Carrollton, aiming for 85% renewable energy for its ERCOT deregulated load by the end of 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;baxtel.com","srcUrls":["https://www.youtube.com/watch?v=FjtRE8xy-tY","https://baxtel.com/data-center/cyrusone-carrollton"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"0500e1fc0373","cid":"0500e1fc0373","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA HALL 5","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"CyrusOne will purchase solar and wind power delivered to the electricity grid, acting as another important step in CyrusOne's transition to 100% sustainable power. This will result in approximately 85 percent of CyrusOne's ERCOT deregulated load in North Texas being supplied by renewable energy sources by the end of 2023. In 2020, CyrusOne helped develop a renewable solar energy source that will cover a significant portion of our North Texas electricity needs.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR","tenant":"North Texas Emergency Communications Center (NTECC)","deal":"CyrusOne Upsizes and Extends $8.0 Billion in Loan Facilities to Support Strategic Growth and Sustainability Goals (March 24, 2026); CyrusOne to purchase solar and wind power delivered to the electricity grid, including a solar offtake of 30 MW (~75,000 MWh) and wind offtake comprising 10 MW (~33,000 MWh) for North Texas facilities (April 20, 2022)","dealScan":"https://www.cyrusone.com/resources/press-releases/tag/press-release","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;cyrusone.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton","https://www.cyrusone.com/resources/press-releases/tag/press-release"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"ced71b5f8156","cid":"ced71b5f8156","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA HALL 4","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The purchase is equivalent to meeting 100% of the power requirements for CyrusOne's data center facility in Allen, Texas, and approximately 70% of the power requirements for its data center in Carrollton, Texas.","uconf":"High","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","deal":"CyrusOne purchased 67 MW of renewable energy from Enel Green Power's Azure Sky solar + storage project, covering approximately 70% of the Carrollton data center's power requirements (January 26, 2021).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fcef037fe74b","cid":"fcef037fe74b","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON OPERATIONS","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy. The diverse power is delivered by two independent circuits, while providing power density from 150-200+ watts per square feet. The power outrage is protected through a 750 KVA Mitsubishi UPS system with battery bank, and automatic transfer to 2.25 MW dedicated diesel generators for emergency power with a 5,000 gallon belly tank.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","tenant":"North Texas Emergency Communications Center (NTECC)","oy":2013,"deal":"CyrusOne acquired by funds managed by KKR and Global Infrastructure Partners (GIP) for approximately $15 billion on March 25, 2022.","dealScan":"https://www.cyrusone.com/hubfs/Website%20Documents%202025/2023_CyrusOne_Sustainability_Report.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;cyrusone.com","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton","https://www.cyrusone.com/hubfs/Website%20Documents%202025/2023_CyrusOne_Sustainability_Report.pdf"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"773ebf36ba56","cid":"773ebf36ba56","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON LEVEL 2 MEZZANINE","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor Electric Delivery (implied)","uquote":"Grid Operator: Cooke County Elec COOP ASSN.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16"],"rawUkey":"4262|TX","rawUname":"Cooke County Elec Coop Assn","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"1151ba5a16db","cid":"1151ba5a16db","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA HALL 1.A","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"each data hall is designed for fully redundant power availability. the distributed redundant electrical design enables multiple levels of redundancy within the same data hall therefore customers can choose their level of redundancy. either 2N N +1 or N.","uconf":"Medium","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","ay":2012,"oy":2013,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e74714fddd36","cid":"e74714fddd36","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA HALL 2/3","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Cooke County Elec COOP ASSN","pdt":"60 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b6df8fa45f2c","cid":"b6df8fa45f2c","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DH 5 SERVICE YARD","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"The data center is built to top-tier standards offering 100% SLA on power, and designed to deliver 60 megawatts of power capacity and has excellent power usage effectiveness (PUE). Multiple levels of power redundancy are available in N, 2N, and N+1 configuration. The diverse power is delivered by two independent circuits, while providing power outrage is protected through a 750 KVA Mitsubishi UPS system with battery bank, and automatic transfer to 2.25 MW dedicated diesel generators for emergency power with a 5,000 gallon belly tank.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-carrollton-data-center/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","deal":"Acquisition of CyrusOne by funds managed by KKR and Global Infrastructure Partners for approximately $15 billion in March 2022.","dealScan":"https://www.cyrusone.com/hubfs/Website%20Documents%202025/2023_CyrusOne_Sustainability_Report.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"cloudandcolocation.com;baxtel.com;cyrusone.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-carrollton-data-center/","https://baxtel.com/data-center/cyrusone-carrollton","https://www.cyrusone.com/hubfs/Website%20Documents%202025/2023_CyrusOne_Sustainability_Report.pdf"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"bc5b83381ba7","cid":"bc5b83381ba7","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DH 3 CAP EXP","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":10,"pc":"Hybrid","pconf":"Medium","pquote":"There are three data centers on the campus:... #3 is a LEED Silver certified, concurrently maintainable data center with 94,400 square feet of technical space and 10.75MW of available power from two local substations.... Additionally, the facility transitioned to 100% water-free cooling, reducing annual water use by 65% and becoming a net positive water campus.... The Carrollton facility has implemented high-efficiency chillers, LED lighting upgrades, and a renewable solar energy source to lower energy consumption and carbon emissions.... The purchase is equivalent to meeting... approximately 70% of the power requirements for its data center in Carrollton, Texas.","pscan":"https://baxtel.com/data-center/cyrusone-carrollton","proc":"Dedicated PPA","pcp":"Enel Green Power","pdt":"67 MW purchase, covering approximately 70% of power requirements for Carrollton facility","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts (KKR) and Global Infrastructure Partners (GIP)","tenant":"North Texas Emergency Communications Center (NTECC)","ay":2014,"oy":2014,"deal":"CyrusOne acquired by Kohlberg Kravis Roberts (KKR) and Global Infrastructure Partners (GIP) for approximately $15 billion.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton"],"band":"10-25 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"49ef55b507a1","cid":"49ef55b507a1","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA CENTER DH-2","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"Data centers require large amounts of energy to remain fully operational 24/7, run IT equipment, and keep systems cool. These facilities contribute carbon to the atmosphere when the energy supplying them is directly or indirectly based on fossil fuels. With Carrolton being CyrusOne's largest data center in the U.S., it demands more energy than smaller facilities; however, we have made upgrades to Carrolton to lower its energy needs and contribution of carbon emissions. [...] In 2020, CyrusOne helped develop a renewable solar energy source that will cover a significant portion of our North Texas electricity needs.","pscan":"https://www.cyrusone.com/resources/blogs/care-in-carrollton","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","tenant":"North Texas Emergency Communications Center (NTECC)","ay":2012,"oy":2012,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;interconnection.fyi","srcUrls":["https://www.cyrusone.com/resources/blogs/care-in-carrollton","https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"49ecb1ec998c","cid":"49ecb1ec998c","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA CENTER-FLOATER","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"even though the electricity consumed at DFW1 was the standard grid mix.","pscan":"https://www.cyrusone.com/hubfs/Website%20Documents%202025/2024_CyrusOne_Sustainability_Report.pdf","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","oy":2014,"contro":"The Carrollton facility is located in an area currently experiencing high water stress and is predicted to continue to face water shortages in the future.","controScan":"https://www.cyrusone.com/resources/blogs/care-in-carrollton","deal":"CyrusOne was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.","dealScan":"https://baxtel.com/data-center/cyrusone-carrollton","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"cyrusone.com;baxtel.com","srcUrls":["https://www.cyrusone.com/hubfs/Website%20Documents%202025/2024_CyrusOne_Sustainability_Report.pdf","https://baxtel.com/data-center/cyrusone-carrollton","https://www.cyrusone.com/resources/blogs/care-in-carrollton"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"82246b6621b6","cid":"82246b6621b6","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON-CLIENT ENTRANC PH II","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"CyrusOne's DFW1 data center... Hybrid cooling systems - indirect evaporative with redundant DX; 80% free cooling with no water on data center floor; Reinforced physical structure with concrete bollards; Steel-lined wall options and bullet resistant glass; Biometric and color-coded key card security; VESDA early smoke detection; Zonal dual-action interlocking dry-pipe system. Sustainability. Zero water consumption for cooling; Minimal water usage for humidification and facility maintenance; Highly efficient chillers and variable frequency drives; Energy-efficient CRAH units; Net Positive Water certified.","pscan":"https://www.cyrusone.com/data-centers/north-america/carrollton-texas","uconf":"High","uquote":"Oncor delivers electricity to Dallas, Fort Worth, and surrounding North, Central, and West Texas. Major cities and communities in the Oncor service territory include:... Carrollton.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","ay":2012,"oy":2014,"deal":"CyrusOne acquired by Kohlberg Kravis Roberts and Global Infrastructure Partners for $15 billion in March 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/carrollton-texas"],"band":"50-100 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"b728ae8801d0","cid":"b728ae8801d0","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA CENTER","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"The power outrage is protected through a 750 KVA Mitsubishi UPS system with battery bank, and automatic transfer to 2.25 MW dedicated diesel generators for emergency power with a 5,000 gallon belly tank. In 2020, CyrusOne helped develop a renewable solar energy source that will cover a significant portion of our North Texas electricity needs. DALLAS--(BUSINESS WIRE)--CyrusOne Inc. (NASDAQ: CONE), a premier global data center real estate investment trust (REIT), today announced that the company will purchase 67 MW of renewable energy delivered to the electricity grid and equivalent renewable energy credits generated by Enel Green Power's 284 MW1 Azure Sky solar + storage project located in Haskell County, Texas.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC), Wikimedia","ay":2012,"oy":2012,"deal":"Renewable energy purchase of 67 MW from Enel Green Power's Azure Sky solar + storage project (January 26, 2021)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton"],"band":"50-100 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"0a2332308185","cid":"0a2332308185","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA CENTER OFFICE","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"Over the past years, CyrusOne invested in efficiency upgrades and partnerships at Carrollton that significantly reduced its impact on the regional watershed, energy grid, and carbon emissions.","pscan":"https://www.cyrusone.com/resources/blogs/care-in-carrollton","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","tenant":"North Texas Emergency Communications Center (NTECC)","oy":2012,"deal":"On January 26, 2021, CyrusOne announced the purchase of 67 MW of renewable energy from Enel Green Power's 284 MW Azure Sky solar + storage project, equivalent to meeting approximately 70% of the power requirements for its Carrollton data center.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/resources/blogs/care-in-carrollton"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"ff6d595f2ea2","cid":"ff6d595f2ea2","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON DATA CENTER PHASE II","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/cyrusone-carrollton","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","deal":"CyrusOne acquired by KKR and Global Infrastructure Partners for approximately $15 billion (March 2022)","dealScan":"https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;global-infra.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton","https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"ccfdb3db20e1","cid":"ccfdb3db20e1","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON PHASE III DH 6","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"fed by multiple separate power feeds. this massive campus is capable of providing 60 megawatts of power to the fully redundant Cyrus 1 electrical infrastructure. Hybrid cooling systems - indirect evaporative with redundant DX","uconf":"High","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","tenant":"Enterprise (multi-tenant colocation)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"d35804cf23d1","cid":"d35804cf23d1","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON CUST/CLIENT ENTRANCE","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"CyrusOne's largest U.S. data center in Carrollton, Texas, has undergone significant sustainability improvements. These include efficiency upgrades and partnerships that have reduced the facility's impact on the regional watershed, energy grid, and carbon emissions.... The data center is built to top-tier standards offering 100% SLA on power, and designed to deliver 60 megawatts of power capacity and has excellent power usage effectiveness (PUE). Multiple levels of power redundancy are available in N, 2N, and N+1 configuration. The diverse power is delivered by two independent circuits, while providing power outrage is protected through a 750 KVA Mitsubishi UPS system with battery bank, and automatic transfer to 2.25 MW dedicated diesel generators for emergency power with a 5,000 gallon belly tank.","pscan":"https://www.cyrusone.com/resources/blogs/care-in-carrollton","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC), Wikimedia","ay":2012,"oy":2013,"deal":"CyrusOne acquired by KKR and Global Infrastructure Partners for approximately $15 billion (March 2022)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/resources/blogs/care-in-carrollton"],"band":"50-100 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"3c8f98a5a8c9","cid":"3c8f98a5a8c9","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE CARROLLTON TOUR PATH CORRIDOR","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":90,"pc":"Grid","pconf":"High","pquote":"fed by multiple separate power feeds. this massive campus is capable of providing 60 megawatts of power to the fully redundant Cyrus 1 electrical infrastructure. the facility's electrical power and cooling architectures use advanced components designed with N N plus1. and 2N parallel redundancies providing 100% uptime with uninterrupted. service.","pscan":"https://www.youtube.com/watch?v=FjtRE8xy-tY","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","ay":2012,"oy":2014,"deal":"CyrusOne was taken private by funds managed by KKR and Global Infrastructure Partners in March 2022 for approximately $15 billion including debt.","dealScan":"https://baxtel.com/data-center/cyrusone-carrollton","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;interconnection.fyi;baxtel.com","srcUrls":["https://www.youtube.com/watch?v=FjtRE8xy-tY","https://www.interconnection.fyi/data-center/project/cyrusone-carrollton-data-center-fd8d2f16","https://baxtel.com/data-center/cyrusone-carrollton"],"band":"50-100 MW"},{"id":"7d1810a9d875","cid":"352104914c99","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE GALLERIA","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Designed for high-density computing, our Houston Galleria colocation data center is equipped with a fully redundant power architecture to ensure the availability of mission-critical server environments and even sits on the same power ring as the Emergency Broadcasting Network.","pscan":"https://www.databank.com/data-centers/houston/4201-southwest-freeway/","uconf":"High","uquote":"CenterPoint Energy, Inc., headquartered in Houston, Texas, is a domestic energy delivery company that includes electric transmission & distribution, natural gas distribution and energy services operations.... Service Area: Houston.","uscan":"https://www.centerpointenergy.com/en-us/residential/services/electric-utility?sa=ho","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","deal":"DataBank acquired four Texas data centers from CyrusOne for $670M in March 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;centerpointenergy.com","srcUrls":["https://www.databank.com/data-centers/houston/4201-southwest-freeway/","https://www.centerpointenergy.com/en-us/residential/services/electric-utility?sa=ho"],"band":"< 10 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"352104914c99","cid":"352104914c99","canon":1,"dups":2,"ftype":"data_center","name":"CYRUSONE GALLERIA","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Multiple levels of redundancy available within same footprint (e.g. N, 2N); 13.5 MW of critical capacity; Dual input PDU's with static transfer switches; Backed by generator power; 3,300 belly tank each plus an added 6,000 gallon external tank for every generator.","pscan":"https://baxtel.com/data-center/databank-houston-galleria","uconf":"High","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","deal":"DataBank acquired four Houston data centers, including Houston Galleria, from CyrusOne for approximately $670 million, announced January 19, 2022.","dealScan":"https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;rebusinessonline.com","srcUrls":["https://baxtel.com/data-center/databank-houston-galleria","https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/"],"band":"< 10 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"1c7bb85bfef5","cid":"1c7bb85bfef5","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON DATA HALL 7","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The campus offers multiple layers of redundancy, from power distribution to cooling infrastructure, supported by 68 dedicated diesel generators and multiple UPS systems with battery backup.","pscan":"https://www.cyrusone.com/data-centers/north-america/houston-tx","uconf":"High","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","deal":"DataBank acquired four Houston-area data centers from CyrusOne for $670 million in January 2022.","dealScan":"https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;digitalbridge.com","lflag":"operational_null_capacity nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_not_in_eia861,merged_duplicate delivery_utility_linked","srcUrls":["https://www.cyrusone.com/data-centers/north-america/houston-tx","https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"578cbd8d5a73","cid":"578cbd8d5a73","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE BW8 BUILDING 2 DH 12 / 13","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pdt":"Annual utility bills will total $120,600 in the first year and will increase by 3% every year.","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"CyrusOne, hyperscale customer","deal":"DataBank acquired four Houston data center assets from CyrusOne for approximately $670 million, closed March 3, 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"71ef040d7ddb","cid":"71ef040d7ddb","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE LEWISVILLE DATA HALL 10","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Utility (e.g., Oncor, though not explicitly named for this specific facility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"23108df062b9","cid":"23108df062b9","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE LEWISVILLE LOBBY RENOVATION","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2008,"deal":"$1.05 billion refinancing deal for two existing data center buildings in Lewisville, nearing May 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"90ac053fe158","cid":"90ac053fe158","canon":1,"dups":1,"ftype":"data_center","name":"DATA HALL 9, BUILDING 7","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"6a534903d2e6","cid":"6a534903d2e6","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE LLC","city":"ALLEN","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":76,"pc":"Grid","pconf":"High","pquote":"Sustainability features include water-free cooling and the sourcing of renewable power, while robust security includes on-site security guards and anti-tailgating vehicle entry. Key Features: sq-ft. 976,000 sq. ft. Technical IT Space. megawatts. 50 MW. Total Megawatts IT Capacity... Sustainability. Zero water consumption for cooling; Minimal water usage for humidification and maintenance; Highly efficient chillers with variable frequency drives; Energy-efficient CRAH units; Net Positive Water certified; Water-Free Cooling technology; 100% Carbon-Free/Renewable Electricity; NWF Certified Wildlife Habitat","pscan":"https://www.cyrusone.com/data-centers/north-america/allen-texas","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (a subsidiary of BlackRock)","ay":2017,"oy":2025,"deal":"$1.05B fixed-rate, five-year CMBS loan for DFW3 and DFW4, expected to close May 20, 2026","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/allen-texas"],"band":"50-100 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"0de86e84b5c7","cid":"0de86e84b5c7","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE SAT BUILDING 3","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":27,"pc":"Grid","pconf":"High","pquote":"High-capacity utility power sourced from the regional Texas grid; Redundant electrical systems designed for continuous uptime; UPS-backed infrastructure ensuring stable power delivery; Backup generators supporting extended outage protection; Designed to support high-density and hyperscale environments.","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2020,"oy":2020,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"25-50 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"d64fc6dea048","cid":"d64fc6dea048","canon":1,"dups":1,"ftype":"data_center","name":"Cyrusone SAT V-Level 02 Fit-out","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"With some of the lowest power cost in the country, this San Antonio data center facility can scale up to 20 megawatts of power from multiple substations.","pscan":"https://dsi.us/showcase/cyrusone/","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2022,"deal":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance is a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas, with two new data centers in San Antonio added to the master trust at closing (March 5, 2024).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"dsi.us;cyrusone.com","srcUrls":["https://dsi.us/showcase/cyrusone/","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"95a8b34fb3b1","cid":"95a8b34fb3b1","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE SAT WESTOVER HILLS","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"The CyrusOne data center is built to top-tier standards offering 100% SLA on power, designed to deliver 20 megawatts of power capacity, and has excellent power usage effectiveness (PUE). Multiple levels of power redundancy are available in N, 2N, and N+1 configuration. The data center has 2 x 200 MW of power substation providing power to the facility.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","uquote":"Data centers don't have many workers relative to their size, yet Wender and others defend them as a source of tax revenue and of electricity payments to CPS Energy, the city-owned utility.","uscan":"https://sanantonioreport.org/with-ut-sale-cluster-of-data-centers-on-west-side-continues-to-grow/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2012,"tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;sanantonioreport.org","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","https://sanantonioreport.org/with-ut-sale-cluster-of-data-centers-on-west-side-continues-to-grow/"],"band":"< 10 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"de863a60d13d","cid":"de863a60d13d","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne SAT-Building 3 SN8-Phase 2","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"SAT3 forms part of a 36-megawatt IT capacity campus powered by an 18MW distributed redundant configuration. Backup systems include eight diesel generators with 48-hour full-load runtime and 16 UPS systems with battery backup.","uconf":"Medium","uquote":"Last year, major local data center operators formed a lobbying group called the Energy Forward Alliance to ensure CPS has the juice and infrastructure they need to keep expanding and building facilities. The group has met with CPS executives.","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2020,"oy":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","ukey":"16604|TX","srcUrls":null,"srcDom":null},{"id":"96e3f955bed8","cid":"96e3f955bed8","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE WEST 2","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"DataBank's HOU2 data center is on our Westway Park Campus, 20 minutes west of downtown Houston, just off Beltway 8 between I-10 and 290. It provides scalable, redundant power feeds and is located along a central fiber corridor, providing access to Houston's fastest and most reliable telecommunications networks. • N+1 Power Design • N+2 Cooling Design • 9 Megawatts of Critical IT Power • 25kW+ cooling per cabinet with Chilled Doors. [...] we maintain diverse utility feeds that provide 9.5 megawatt expandable to 18 megawws. from each of two substations. and 2.25 megawatt diesel generators.","pscan":"https://www.youtube.com/watch?v=o5Yg3bq1Utk","uconf":"High","uquote":"CyrusOne Data Center in Harris County, TX (50-100 MW) — Interconnection. fyi Data Center Tracker.... Address. 5170 Westway Park Blvd, Houston, TX 77041.... Grid Operator. CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge, AustralianSuper, Swiss Life Asset Management, EDF Invest, IMCO","oy":2022,"deal":"Sale of four Houston data centers (including West 2) from CyrusOne to DataBank for $670 million, closed March 2022.","dealScan":"https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;interconnection.fyi;rebusinessonline.com","srcUrls":["https://www.youtube.com/watch?v=o5Yg3bq1Utk","https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/"],"band":"< 10 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"1f8dcfda44f6","cid":"1f8dcfda44f6","canon":1,"dups":1,"ftype":"data_center","name":"DALLAS DATA CENTER EXPANSION","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"TotalEnergies","pdt":"1 GW of solar capacity – equivalent to 28 TWh of renewable electricity over 15 years","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6efc4bc9d9f5","cid":"6efc4bc9d9f5","canon":1,"dups":1,"ftype":"data_center","name":"LE CORDON BLEU","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"bc662e9cc6d5","cid":"bc662e9cc6d5","canon":1,"dups":1,"ftype":"data_center","name":"COLOGIX DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"With 2N redundancy on UPS from three different utility substations using two automatic transfer switches (ATSs), two back-up generator and redundant cooling systems, the Cologix Dallas facility offers unparalleled resiliency, redundancy and security compliance including SOC 1, SOC 2, HIPAA and PCI.","uconf":"High","uquote":"Power Feed Source: Dual power feeds from Oncor (electric)","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Cologix","spon":"Stonepeak Infrastructure Partners","tenant":"Charter Communications","ay":2010,"oy":2013,"deal":"Stonepeak Infrastructure Partners acquired a majority interest in Cologix (February 2, 2017)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"6fad70180caf","cid":"6fad70180caf","canon":1,"dups":1,"ftype":"data_center","name":"DALLAS IDC LOBBY REMODEL","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Fully Redundant, Data Grade Power. You do not have to worry about any power breakdowns either. Six (6) utility feeds; 4 2.0 megawatt generators; 3 1.5 megawatt generators with 3 day supply of fuel onsite; Two 1200 KVA & Four 800 KVA UPS Systems; Additional power options include 120V and 208V circuits, and diverse power source feeds.","pscan":"https://www.fastpcnet.net/dallas-data-center.html","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"GLOBAL WEBB","spon":"GLOBAL WEBB","ay":2017,"oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fastpcnet.net","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.fastpcnet.net/dallas-data-center.html"]},{"id":"7866b070b792","cid":"7866b070b792","canon":1,"dups":1,"ftype":"data_center","name":"Danik Data Center","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"67b9397549bd","cid":"67b9397549bd","canon":1,"dups":1,"ftype":"data_center","name":"Edged Energy Irving Data Center","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Unlike traditional data centers that consume massive amounts of water for cooling and strain the local energy grid, Edged Dallas consumes zero water and 74% less energy overhead than conventional facilities....UPS systems with N+1 redundancy; standby generators; Tier IV Final engines reducing NOₓ/particulate emissions; redundant A+B side power distribution.","pscan":"https://www.thermalworks.com/news/edged-irving-texas","uquote":"The event was attended by Mayor Stopfer, City of Irving and Dallas County officials, leaders from the economic development community, local utility provider Oncor and key project partners.","uscan":"https://www.thermalworks.com/news/edged-irving-texas","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Edged Energy","spon":"Endeavour","ay":2024,"oy":2025,"deal":"Investment of $35 million in the Dallas County project, September 2023 to January 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"thermalworks.com","srcUrls":["https://www.thermalworks.com/news/edged-irving-texas"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected generic_name_normalized delivery_utility_linked","rawName":"DATA CENTER","dukey":"44372|TX"},{"id":"80418c884b28","cid":"a43ba0cd3937","canon":0,"dups":2,"ftype":"data_center","name":"Irving Data Center","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_name_normalized generic_unsourced_record unlinked_source_text","rawName":"DATA CENTER","srcUrls":null,"srcDom":null},{"id":"a43ba0cd3937","cid":"a43ba0cd3937","canon":1,"dups":2,"ftype":"data_center","name":"Irving Data Center","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor Electric Delivery / Retail Electric Provider","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected generic_name_normalized generic_unsourced_record unlinked_source_text delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","rawName":"DATA CENTER","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"92b9cf1a35ca","cid":"92b9cf1a35ca","canon":0,"dups":1,"ftype":"data_center","name":"Richardson Data Center","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_name_normalized generic_unsourced_record,merged_duplicate","rawName":"DATA CENTER","srcUrls":null,"srcDom":null},{"id":"308826de6bee","cid":"308826de6bee","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Richardson Data Center","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":25,"pc":"Grid","pconf":"High","pquote":"Providing robust power and fiber connectivity on a secure site located within the Richardson Telecom Corridor, this location is home to the highest concentration of data centers in Texas.","pscan":"https://kdc.com/our-work/richardson-data-center","uquote":"Grid Operator: Grayson-collin Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-a26752cd","ukey":"7559|TX","uname":"Grayson-Collin Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2019,"deal":"CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.","dealScan":"https://baxtel.com/data-center/cyrusone-dallas-dfw6","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"kdc.com;interconnection.fyi;baxtel.com","srcUrls":["https://kdc.com/our-work/richardson-data-center","https://www.interconnection.fyi/data-center/project/cyrusone-a26752cd","https://baxtel.com/data-center/cyrusone-dallas-dfw6"],"band":"25-50 MW","rawName":"DATA CENTER","lflag":"generic_name_normalized"},{"id":"c20417eaf39b","cid":"c20417eaf39b","canon":1,"dups":1,"ftype":"data_center","name":"MANSFIELD ISD DATA CENTER RENOVATIONS","city":"Mansfield","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Mansfield Independent School District","spon":"Mansfield Independent School District","ay":2024,"oy":2025,"contro":"Ransomware attack in August 2022 caused system-wide outage.","controScan":"https://www.cbsnews.com/texas/news/mansfield-isd-investigating-cyberattack/","deal":"2024 Bond Package of $588.5 million approved May 4, 2024, including funds for Data Center Equipment and Technology Infrastructure.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cbsnews.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.cbsnews.com/texas/news/mansfield-isd-investigating-cyberattack/"]},{"id":"89fb039373b6","cid":"89fb039373b6","canon":1,"dups":1,"ftype":"data_center","name":"THIN-NOLOGY","city":"Pflugerville","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"Pflugerville offers everything that data centers are looking for: redundant power, low risk of disaster, affordable real estate and a deregulated energy market for cheaper electricity costs.","pscan":"https://www.pfdevelopment.com/community/company-profiles/p/item/144/thinnology","uquote":"The utility company for Pflugerville is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"THIN-NOLOGY","ay":2004,"oy":2013,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"pfdevelopment.com","srcUrls":["https://www.pfdevelopment.com/community/company-profiles/p/item/144/thinnology"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"bd0297a17021","cid":"bd0297a17021","canon":1,"dups":1,"ftype":"data_center","name":"TENARIS BAY CITY - BUILDING DC","city":"Bay City","county":"Matagorda","state":"TX","lat":28.77476,"lng":-96.001532,"cprec":"distinct","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Tenaris","spon":"Tenaris S.A.","tenant":"Tenaris","ay":2013,"oy":2017,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"086e7401065d","cid":"086e7401065d","canon":1,"dups":1,"ftype":"data_center","name":"HILL COUNTRY TELEPHONE COOP-DATA CENTER","city":"Ingram","county":"Kerr","state":"TX","lat":30.059953,"lng":-99.353339,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"A redundant, scalable, power protection system designed to provide high levels of availability was put in place. Through our state-of-the-art data center, with enhanced security features, backup power and diverse fiber routes for redundancy, your business will be secure and prepared.","pscan":"https://www.hctc.net/business/","uconf":"High","uquote":"Grid Operator. Kerrville Public Utility Board.","uscan":"https://www.interconnection.fyi/data-center/project/data-center-b5cab8ff","ukey":"28604|TX","uname":"Kerrville Public Utility Board","rto":"ERCOT","nerc":"TRE","op":"Hill Country Telephone Cooperative","spon":"Hill Country Telephone Cooperative","ay":2016,"oy":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"hctc.net;interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.hctc.net/business/","https://www.interconnection.fyi/data-center/project/data-center-b5cab8ff"]},{"id":"5d2ffaa80c12","cid":"0e954c307713","canon":0,"dups":2,"ftype":"crypto_hpc","name":"Saxet Energy Park","city":"Corpus Christi","county":"Nueces","state":"TX","lat":27.740032,"lng":-97.516214,"cprec":"shared_centroid","status":"Operational","mw":300,"pc":"Grid","pconf":"High","pquote":"The 115-acre plot, previously used for farming, will also host an enormous battery energy storage system. This facility is intended to ensure a steady power supply to our grid. The battery storage, linked to the grid, will optimize the abundant peak energy, mainly wind energy, during the evening and overnight. The battery will maintain a high charge and can feed energy back during peak demand times,” he explained. The site will operate in the attractive Load Zone South of the ERCOT grid, known for its abundance of renewable (wind) energy. The site benefits from access the low-cost power at the Load Zone South of the ERCOT real-time energy market delivering high mining profitability.","uconf":"High","uquote":"The utility company for Corpus Christi is AEP Texas Central. If your power goes out in Corpus Christi, you should contact AEP Texas, your local utility.","uscan":"https://www.choosetexaspower.org/electricity-rates/corpus-christi/","rto":"ERCOT","nerc":"TRE","op":"Peak Mining","spon":"Northern Data Group","tenant":"Peak Mining","ay":2023,"oy":2024,"deal":"$400 million Saxet Energy Park announced in 2023; Northern Data Group acquired project assets in December 2023; Peak Mining purchased a 300MW mining data center site in December 2023; Peak Mining secured an option for an additional $150m of MicroBT mining hardware; Peak Mining purchased a second 300MW data center location in May 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/corpus-christi/"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected shared_coordinate_precision_downgraded delivery_utility_linked","dukey":"3278|TX"},{"id":"e62443178e2a","cid":"e62443178e2a","canon":0,"dups":1,"ftype":"data_center","name":"Saxet Energy Park","city":"Corpus Christi","county":"Nueces","state":"TX","lat":27.740032,"lng":-97.516214,"cprec":"shared_centroid","status":"Operational","proc":"Co-located generation","pdt":"300MW (initial phase)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"0e954c307713","cid":"0e954c307713","canon":1,"dups":2,"ftype":"crypto_hpc","name":"Saxet Energy Park","city":"Corpus Christi","county":"Nueces","state":"TX","lat":27.740032,"lng":-97.516214,"cprec":"shared_centroid","status":"Operational","mw":300,"pc":"Grid","pconf":"High","pquote":"The battery energy storage system tied to the grid. Will take advantage of abundance of peak energy. Primarily, wind energy in the evening and the overnight hours and the battery will remain in a high state of charge and able to deliver energy back to the system during periods of peak demand,\" he said.... \"The battery storage, linked to the grid, will optimize the abundant peak energy, mainly wind energy, during the evening and overnight. The battery will maintain a high charge and can feed energy back during peak demand times,\" he explained.... Sabre56 is fully aligned with this vision and honored to couple our mining expertise with Bootstrap's infrastructure expertise and proficiency in the competitive ERCOT electricity market.","uconf":"High","uquote":"The utility company for Corpus Christi is AEP Texas Central. While you can choose your electricity provider in a deregulated market, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages.","uscan":"https://www.choosetexaspower.org/electricity-rates/corpus-christi/","rto":"ERCOT","nerc":"TRE","op":"Peak Mining","spon":"Northern Data Group","ay":2023,"oy":2024,"deal":"Northern Data Group, through its subsidiary Peak Mining, acquired the project assets in December 2023. Peak Mining also purchased a second 300MW ERCOT-approved site in Corpus Christi, Texas in May 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/corpus-christi/"],"band":"250+ MW","lflag":"citation_artifact_removed utility_alias_corrected shared_coordinate_precision_downgraded delivery_utility_linked","uname":"AEP Texas","reportedUtility":"AEP Texas","dukey":"3278|TX"},{"id":"07c3d55cd135","cid":"aae156a6520e","canon":0,"dups":2,"ftype":"data_center","name":"DATA CENTER EQUIPMENT & SUPPORT LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_unsourced_permit_record","rawName":"DATA CENTER EQUIPMENT & SUPPORT LLC","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"aae156a6520e","cid":"aae156a6520e","canon":0,"dups":2,"ftype":"data_center","name":"DATA CENTER EQUIPMENT & SUPPORT LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_unsourced_permit_record","rawName":"DATA CENTER EQUIPMENT & SUPPORT LLC","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"4a4fc1491059","cid":"4a4fc1491059","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER VINT HILL LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"36f22fe8b2f4","cid":"36f22fe8b2f4","canon":0,"dups":1,"ftype":"data_center","name":"DATA CENTER WAREHOUSE BUILDING","city":"CORPUS CHRISTI","county":"Nueces","state":"TX","lat":27.740032,"lng":-97.516214,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"AEP Texas","pdt":"1,000 MW of utility capacity","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected shared_coordinate_precision_downgraded unlinked_source_text generic_unsourced_permit_record delivery_utility_linked","uname":"AEP Texas","reportedUtility":"AEP Texas","rawName":"DATA CENTER WAREHOUSE BUILDING","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null,"dukey":"3278|TX"},{"id":"5b2dd743abcd","cid":"5b2dd743abcd","canon":1,"dups":1,"ftype":"data_center","name":"DATA FOUNDRY","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"Houston 2 is a purpose-built, dually fed data center that provides enterprise and organizational colocation for deployments of all sizes. The concurrently maintainable facility supports high-performance computing (HPC) and is powered by multiple diesel engine-generators. Houston 2 is a state-of-the-art facility built on 350,000 square-feet and has 60MW of power, 14+ neutral carriers, 8-layers of security, and has redundant power and cooling. Our 18-acre campus is built with enterprise scalability in mind.","pscan":"https://www.datafoundry.com/houston-2-data-center-virtual-tour/","uconf":"Medium","uquote":"CenterPoint Energy, Inc. P.O. Box 4981. Houston, TX 77210-4981. Electric Delivery. Customer Service/Report an Electric Power Outage 713-207-2222.","uscan":"https://www.centerpointenergy.com/en-us/corporate/contact-us/houston","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Switch","spon":"Switch","tenant":"Carrizo Oil & Gas","ay":2013,"oy":2015,"deal":"Switch acquired Data Foundry for $420 million in an all-cash transaction in May 2021.","dealScan":"https://www.datacenterknowledge.com/switches-routers/switch-to-acquire-texas-data-center-operator-data-foundry-for-420m","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datafoundry.com;centerpointenergy.com;datacenterknowledge.com","srcUrls":["https://www.datafoundry.com/houston-2-data-center-virtual-tour/","https://www.centerpointenergy.com/en-us/corporate/contact-us/houston","https://www.datacenterknowledge.com/switches-routers/switch-to-acquire-texas-data-center-operator-data-foundry-for-420m"],"band":"50-100 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"33ae73a5b213","cid":"33ae73a5b213","canon":0,"dups":1,"ftype":"data_center","name":"DATA FOUNDRY","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"N+1 Power Configurations supported by multiple fuel sources, including natural gas and diesel, provide excellent system redundancy and reliability. The Texas Interconnect, managed by the Electric Reliability Council of Texas (ERCOT), provides Texas with a reliable energy source that is independent of the Eastern and Western Interconnects.","uconf":"High","uquote":"This program is available to commercial customers within the CenterPoint Energy Houston Electric service territory. Site must be non-residential, non-transmission class (<69 kV) nor non-profit/government transmission class customer. Data centers are considered any space used to house IT systems infrastructure, such as network operations centers, server rooms, enterprise data centers and colocation facilities.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Data Foundry","spon":"Switch","deal":"Switch acquired Data Foundry for $420 million in May 2021","dealScan":"https://www.datacenterknowledge.com/switches-routers/switch-to-acquire-texas-data-center-operator-data-foundry-for-420m","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/switches-routers/switch-to-acquire-texas-data-center-operator-data-foundry-for-420m"],"band":"50-100 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"8901|TX"},{"id":"0e33d5754ede","cid":"0e33d5754ede","canon":1,"dups":1,"ftype":"data_center","name":"Houston 2 POD 2","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"Houston 2 is purpose-built to support even the most demanding power, security, and IT requirements, delivering network reliability and diverse utility feeds with a 185mph wind-rated structure and elevation above the 500-year floodplain. The concurrently maintainable facility supports high-performance computing (HPC) and is powered by multiple diesel engine-generators.","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Switch","spon":"Switch","ay":2014,"oy":2015,"deal":"Switch acquired Data Foundry for $420 million in May 2021","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"f85b0c85bfa6","cid":"f85b0c85bfa6","canon":1,"dups":1,"ftype":"data_center","name":"Houston 2 - POD 2 - Phase 1","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"Purpose-built to support power, security and IT requirements, Houston 2 delivers network reliability and diverse utility feeds, as well as a 185mph wind-rated structure and elevation above the 500-year floodplain. Connected to 2 distinct 400 MW substations; N+1 to 2N redundancy available. UPS. Each UPS room has two incoming power feeds; UPS feeds are routed via diverse paths; Multiple 750 kVA Powerware 9395 modules. Generators. Multiple 2.5 MW Caterpillar diesel generators; Generators fully enclosed in individual ventilated, air-conditioned bays; 50,000 gallons of fuel on site.","pscan":"https://www.imillerpr.com/news/data-foundry-completes-27000-square-foot-4mw-expansion-on-its-houston-2-data-center-campus/","rto":"ERCOT","nerc":"TRE","op":"Switch","spon":"Switch","tenant":"Carrizo Oil & Gas","ay":2014,"oy":2015,"deal":"Switch acquired Data Foundry for $420 million cash on May 3, 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"imillerpr.com","srcUrls":["https://www.imillerpr.com/news/data-foundry-completes-27000-square-foot-4mw-expansion-on-its-houston-2-data-center-campus/"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"326835581df0","cid":"326835581df0","canon":1,"dups":1,"ftype":"data_center","name":"HOUSTON 2","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"Houston 2 is a purpose-built, dually fed data center that provides enterprise and organizational colocation for deployments of all sizes. The concurrently maintainable facility supports high-performance computing (HPC) and is powered by multiple diesel engine-generators.... Dual underground, concrete-encased utility feeds; Closed-transition Automatic Transfer Switch (ATS); Fault tolerance and concurrent maintainability for single and dual-corded loads.","rto":"ERCOT","nerc":"TRE","op":"Switch","spon":"Switch","ay":2014,"oy":2015,"deal":"Switch acquired Data Foundry for $420 million in May 2021.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"ba70ce02d7e6","cid":"ba70ce02d7e6","canon":1,"dups":1,"ftype":"data_center","name":"DATA FOUNDRY TX ZONE E WORKSITE RECOVERY","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"The redundant power feeds are supplied by separate 400 MW substations, and each substation is powered by independent power plants on the ERCOT electric grid.","pscan":"https://cloudandcolocation.com/datacenters/data-foundry-texas-1-data-center/","uquote":"In 2016, Austin Energy, the City of Austin's municipal power authority conducted a consumer rate review in which Data Foundry participated in. After the rate review completed, new rates were to be imposed beginning January 1, 2017. Recognizing that the rates were excessive and discriminatory, Data Foundry sued Austin Energy in Texas District Court.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Data Foundry","spon":"Data Foundry","oy":2011,"contro":"Lawsuit against City of Austin / Austin Energy regarding excessive and discriminatory electricity rates.","deal":"Debt financing from JPMorgan Chase for construction costs (amount not specified, but facility investment was ~$150 million).","dealScan":"https://www.datacenterknowledge.com/business/data-foundry-opens-texas-1-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/data-foundry-texas-1-data-center/","https://www.datacenterknowledge.com/business/data-foundry-opens-texas-1-data-center"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"dfdceb2fabc3","cid":"dfdceb2fabc3","canon":1,"dups":1,"ftype":"data_center","name":"Texas 2 - POD 2","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"The concurrently maintainable facility supports high performance computing (HPC) and is powered by independent substations. Dually-fed, diverse electrical substations The facility is equipped with back-up generators and 40,000 gallons of underground fuel storage, and is designed to keep businesses online 24x7x365. These ATS units allow us to sync our generators to the electric utility, resulting in a seamless load transfer between utility power and onsite generation with virtually no voltage or frequency transients for maximum efficiency.","uconf":"Medium","uquote":"In 2016, Austin Energy, the City of Austin's municipal power...","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Switch","spon":"Switch","ay":2016,"oy":2017,"contro":"Legal dispute with City of Austin/Austin Energy regarding rates.","deal":"Switch acquired Data Foundry for $420 million in an all-cash transaction, expected to close by mid-2021.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4802ca0b5a07","cid":"4802ca0b5a07","canon":1,"dups":1,"ftype":"data_center","name":"Switch TX1 & TX2 Fit-Outs","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"The Texas Interconnect, managed by the Electric Reliability Council of Texas (ERCOT), provides Texas with a reliable energy source that is independent of the Eastern and Western Interconnects.","uconf":"High","uquote":"The City of Austin's municipally owned utility provides retail electricity to two Austin data centers owned by appellant Data Foundry, Inc.","ukey":"6427|TX","uname":"City of Floresville","rto":"ERCOT","nerc":"TRE","op":"Switch","spon":"Switch","ay":2016,"oy":2018,"contro":"Data Foundry sued the City of Austin over its pricing of electricity.","deal":"Switch acquired Data Foundry for $420 million in an all-cash transaction, announced May 3, 2021.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6506a25c7803","cid":"6506a25c7803","canon":1,"dups":1,"ftype":"data_center","name":"TEXAS 2","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"The site is dually fed by diverse power feeds from two independent substations. It also has diverse network entry along with two independent water cooling feeds. The facility is equipped with back-up generators and 40,000 gallons of underground fuel storage, and is designed to keep businesses online 24x7x365.","uquote":"Utility Provider: Austin Energy. In 2016, Austin Energy, the City of Austin's municipal power authority conducted a consumer rate review in which Data Foundry participated in.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Switch","spon":"Switch","ay":2016,"oy":2017,"contro":"Data Foundry sued Austin Energy over excessive and discriminatory electricity rates, winning an appeal in the Texas Supreme Court in 2021.","deal":"Switch acquired Data Foundry, Inc. for $420 million in an all-cash transaction, expected to close by mid-2021.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8a0d3fd72f13","cid":"8a0d3fd72f13","canon":1,"dups":1,"ftype":"data_center","name":"DATA FOUNDRY-TX 1 RENOVATION","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Texas 1's power system is fed from two independent substations and features an underground power feed enclosed end-to-end in a concrete duct bank.","uquote":"The City of Austin's municipally owned utility provides retail electricity to two Austin data centers owned by appellant Data Foundry, Inc.","rto":"ERCOT","nerc":"TRE","op":"Switch","spon":"Switch","ay":2010,"oy":2011,"contro":"Lawsuit over electricity pricing with the City of Austin.","deal":"Switch acquired Data Foundry for $420 million in an all-cash transaction, expected to close by mid-2021.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b6e298ab0085","cid":"b6e298ab0085","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":23,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"DataBank's Houston Westway Park I (HOU1) data center is located 20 minutes west of downtown Houston just off Beltway 8 between I-10 and 290. It is strategically positioned with access to significant and redundant utility power feeds and access to the fastest and most reliable telecommunications networks, as it is located along a major fiber corridor in Houston.","pscan":"https://marketplace.upstack.com/data-centers/databank-data-center-hou1-8799d704-ba99-475d-bec1-83a84767bc46","uconf":"High","uquote":"Your Houston utility company: CenterPoint Energy. CenterPoint Energy delivers electricity to homes across the Houston area.","uscan":"https://www.directenergy.com/en/residential/energy/texas/houston","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"IPI Partners","ay":2022,"oy":2009,"deal":"DataBank acquired four CyrusOne data centers in Houston for $670 million in March 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;directenergy.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://marketplace.upstack.com/data-centers/databank-data-center-hou1-8799d704-ba99-475d-bec1-83a84767bc46","https://www.directenergy.com/en/residential/energy/texas/houston"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"9dec0bc73c14","cid":"9dec0bc73c14","canon":1,"dups":1,"ftype":"data_center","name":"DataBank Data Hall 5","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"DataBank's Plano data center campus is situated within 20-30 minutes of most other DataBank Dallas colocation facilities. Our 16-acre campus is home to our flagship DFW3 data center and DFW8, a 126,000 square foot expansion. The campus is powered by dual feeds from an off-site Oncor substation and provides valuable metro connectivity via Data Center Interconnect (DCI) to our other Dallas data centers.","pscan":"https://www.databank.com/data-centers/dallas/plano-campus/","uconf":"High","uquote":"DataBank worked with its power delivery provider Oncor to add additional capacity to a 6-acre tract for the project, which is about 25 miles north of downtown Dallas.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge, AustralianSuper","deal":"DataBank announced a $2 billion equity raise led by AustralianSuper ($1.5 billion) and existing investors ($483 million) in October 2024.","dealScan":"https://dallasinnovates.com/dallas-based-databank-announces-2b-equity-raise-led-by-1-5b-from-australiansuper/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;dallasinnovates.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.databank.com/data-centers/dallas/plano-campus/","https://dallasinnovates.com/dallas-based-databank-announces-2b-equity-raise-led-by-1-5b-from-australiansuper/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"5c48cc4613db","cid":"5c48cc4613db","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":42,"pc":"Grid","pconf":"High","pquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.... DataBank's HOU2 data center... maintains diverse utility feeds that provide 9.5 megawatt expandable to 18 megawws. from each of two substations.","pscan":"https://www.youtube.com/watch?v=o5Yg3bq1Utk","uconf":"High","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge Group","ay":2022,"oy":2022,"deal":"DataBank acquired four Houston-area data centers from CyrusOne for $670 million, announced January 19, 2022.","dealScan":"https://www.databank.com/resources/press-releases/databank-to-acquire-four-houston-area-data-centers-from-cyrusone-for-670m/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"youtube.com;databank.com","srcUrls":["https://www.youtube.com/watch?v=o5Yg3bq1Utk","https://www.databank.com/data-centers/houston/","https://www.databank.com/resources/press-releases/databank-to-acquire-four-houston-area-data-centers-from-cyrusone-for-670m/"],"band":"25-50 MW","lflag":"citation_artifact_removed nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"55ed1bf06a4c","cid":"81907bbdb4fb","canon":0,"dups":2,"ftype":"data_center","name":"DATABANK","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"HOU5's power configuration is designed and built as 2N. and supplies 5.25 megawatts of critical IT. power the utility feeds are supported by multiple UPS's. and 13 diesel generators as backups should the primary utility feeds fail.","uconf":"High","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","oy":2022,"deal":"Acquisition of facility from CyrusOne by DataBank in March 2022.","dealScan":"https://baxtel.com/data-center/databank-houston-galleria","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;baxtel.com","srcUrls":["https://www.databank.com/data-centers/houston/","https://baxtel.com/data-center/databank-houston-galleria"],"band":"< 10 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"2383a0340641","cid":"2383a0340641","canon":0,"dups":1,"ftype":"data_center","name":"DATABANK","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":15,"pc":"Grid","pconf":"High","pquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","pscan":"https://www.databank.com/data-centers/houston/westway-park-campus/","uquote":"It is powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/westway-park-campus/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"IPI Partners","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/houston/westway-park-campus/"],"band":"10-25 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_not_in_eia861,merged_duplicate delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"ab2d1c08cde4","cid":"ab2d1c08cde4","canon":0,"dups":1,"ftype":"data_center","name":"DATABANK","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":4,"pc":"Grid","pconf":"High","pquote":"DataBank's HOU3 data center is located on our Westway Park Campus, 20 mins west of downtown Houston, just off Beltway 8 between I-10 and 290. It provides scalable, redundant power feeds and is located along a major fiber corridor providing access to the fastest and most reliable telecommunications networks in Houston. Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","pscan":"https://www.databank.com/data-centers/houston/","uconf":"High","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"IPI Partners","oy":2015,"deal":"DataBank announced plans to install a 3,150 kW rooftop solar array at its HOU3 data center in Houston, Texas, on May 12, 2026.","dealScan":"https://www.databank.com/resources/press-releases/databank-to-deploy-largest-rooftop-solar-array-in-houston-metro-area/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/houston/","https://www.databank.com/resources/press-releases/databank-to-deploy-largest-rooftop-solar-array-in-houston-metro-area/"],"band":"< 10 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_not_in_eia861,merged_duplicate delivery_utility_linked","dukey":"8901|TX"},{"id":"81907bbdb4fb","cid":"81907bbdb4fb","canon":0,"dups":2,"ftype":"data_center","name":"DATABANK","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Designed for high-density computing, our Houston Galleria colocation data center is equipped with a fully redundant power architecture to ensure the availability of mission-critical server environments and even sits on the same power ring as the Emergency Broadcasting Network. hou5's power configuration is designed and built as 2N. and supplies 5.25 megawatts of critical IT. power the utility feeds are supported by multiple UPS's. and 13 diesel generators as backups should the primary utility feeds fail.","uconf":"Medium","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"IPI Partners","oy":2007,"deal":"DataBank acquired four CyrusOne Houston data centers, including HOU5, for $670 million in March 2022.","dealScan":"https://www.databank.com/resources/press-releases/databank-completes-migration-of-cyrusone-houston-data-centers-and-customers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/houston/","https://www.databank.com/resources/press-releases/databank-completes-migration-of-cyrusone-houston-data-centers-and-customers/"],"band":"< 10 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_not_in_eia861,merged_duplicate delivery_utility_linked","dukey":"8901|TX"},{"id":"ad7c625797fc","cid":"ad7c625797fc","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK - FIRST FLOOR DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":7,"pc":"Grid","pconf":"High","pquote":"DFW1 is fed by diverse high-priority substations with multiple A/B diesel power generators, backing up all utility power feeds. Multiple utility feeds from the CBD grid.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/databank-downtown-dallas-dfw1","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge, AustralianSuper, Swiss Life Asset Management, EDF Invest, IMCO","tenant":"Cologlobal","oy":2000,"deal":"DataBank announced a $2.0 billion equity raise led by AustralianSuper ($1.5 billion commitment) on October 15, 2024.","dealScan":"https://www.databank.com/resources/press-releases/databank-announces-2-0-billion-equity-raise-led-by-1-5-billion-investment-from-australiansuper/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;databank.com","srcUrls":["https://baxtel.com/data-center/databank-downtown-dallas-dfw1","https://www.databank.com/resources/press-releases/databank-announces-2-0-billion-equity-raise-led-by-1-5-billion-investment-from-australiansuper/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"5fb30333f7c8","cid":"5fb30333f7c8","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK - LOBBY / WORK ROOM","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"cc0f866288c2","cid":"cc0f866288c2","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK - 3RD FLOOR PARTIAL REMODEL","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"Located in the former Federal Reserve Building in heart of the Dallas central business district, DataBank's downtown Dallas facility provides 28MW of on-site power in a True 2N design. DFW1 is fed by diverse high-priority substations with multiple A/B diesel power generators, backing up all utility power feeds and features a dual loop cooling system backed by on-site water storage.","pscan":"https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_DFW1_Q32020_v2.pdf","uquote":"DataBank worked with its power delivery provider Oncor to add additional capacity to a 6-acre tract for the project, which is about 25 miles north of downtown Dallas.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"Digital Bridge","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_DFW1_Q32020_v2.pdf"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"8ce97d877514","cid":"8ce97d877514","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK PHASE IV","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":4,"pc":"Grid","pconf":"High","pquote":"DataBank's DFW2 data center features 2N power design, N+1 cooling design, an on-site power substation, and complete power and cooling infrastructure redundancy. DataBank's stand-alone, 68,000 sqft facility in Richardson, TX features an on-campus dedicated power substation delivering 20MW of utility power.","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","ay":2012,"oy":2013,"deal":"DataBank leased a powered shell building from Digital Realty at its Digital Dallas campus in Richardson in 2012.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6e7f273434a2","cid":"6e7f273434a2","canon":1,"dups":1,"ftype":"data_center","name":"Databank DFW 3 Data Hall #3","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Grid","pconf":"High","pquote":"Diverse utility feeds provide more than 40MW of power. DFW3 is powered by dual feeds from an off-site Oncor substation.","pscan":"https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","uquote":"DFW3 is powered by dual feeds from an off-site Oncor substation.","uscan":"https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","ay":2020,"oy":2021,"deal":"Acquisition of Stream Data Centers' development by DataBank, announced June 13, 2017.","dealScan":"https://www.databank.com/resources/press-releases/databank-announces-construction-of-third-data-center-in-dallas/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","https://www.databank.com/resources/press-releases/databank-announces-construction-of-third-data-center-in-dallas/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"ab6a71a0f57e","cid":"ab6a71a0f57e","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK HOLDINGS LTD","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":54,"pc":"Grid","pconf":"High","pquote":"The campus is powered by dual feeds from an off-site Oncor substation and provides valuable metro connectivity via Data Center Interconnect (DCI) to our other Dallas data centers.","uquote":"The campus is powered by dual feeds from an off-site Oncor substation and provides valuable metro connectivity via Data Center Interconnect (DCI) to our other Dallas data centers.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Databank Holdings","spon":"AustralianSuper","ay":2017,"oy":2025,"deal":"DataBank announced a $2.0 billion equity raise led by AustralianSuper, which committed $1.5 billion, on October 15, 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"1a3e75506c02","cid":"1a3e75506c02","canon":1,"dups":1,"ftype":"data_center","name":"DataBank Plano Power Adder","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":40,"pc":"Grid","pconf":"High","pquote":"The campus is powered by dual feeds from an off-site Oncor substation and provides valuable metro connectivity via Data Center Interconnect (DCI) to our other Dallas data centers.","pscan":"https://www.databank.com/data-centers/dallas/plano-campus/","uconf":"High","uquote":"The campus is powered by dual feeds from an off-site Oncor substation and provides valuable metro connectivity via Data Center Interconnect (DCI) to our other Dallas data centers.","uscan":"https://www.databank.com/data-centers/dallas/plano-campus/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge, AustralianSuper, TJC, Swiss Life Asset Management AG, EDF Invest, Northleaf Capital Partners, IMCO","ay":2023,"oy":2025,"deal":"Construction of a three-story data center in Plano, Texas, costing $400 million (announced December 2023)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/dallas/plano-campus/"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"3fff74606f6d","cid":"3fff74606f6d","canon":1,"dups":1,"ftype":"data_center","name":"DATACENTER PARK HOUSTON GUARDHOSE","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"584c7171131d","cid":"584c7171131d","canon":1,"dups":1,"ftype":"data_center","name":"POWERED BASE BLDG.& TKF UNDERGROUND","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"High","pquote":"electrical service to the park served by diverse substation feeders, to our dedicated, privately owned, substation capable of delivering up to 100 MW of power @ N+l.","uquote":"The utility company for Richardson is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/richardson/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","oy":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/richardson/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"009609141e8a","cid":"009609141e8a","canon":0,"dups":1,"ftype":"data_center","name":"DB DATA CENTER PLANO LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text,merged_duplicate delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"b3382e728823","cid":"b3382e728823","canon":1,"dups":1,"ftype":"data_center","name":"DB DATA CENTER PLANO LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":13,"pc":"Grid","pconf":"High","pquote":"The campus is powered by dual feeds from an off-site Oncor substation and provides valuable metro connectivity via Data Center Interconnect (DCI) to our other Dallas data centers.","pscan":"https://www.databank.com/data-centers/dallas/plano-campus/","uconf":"High","uquote":"The campus is powered by dual feeds from an off-site Oncor substation","uscan":"https://www.databank.com/data-centers/dallas/plano-campus/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","oy":2018,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/dallas/plano-campus/"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"368c46054300","cid":"368c46054300","canon":1,"dups":1,"ftype":"data_center","name":"DEL VALLE ISD DATA CENTER EXPANSION","city":"Del Valle","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Del Valle ISD","spon":"Del Valle ISD","tenant":"Del Valle ISD","ay":2014,"oy":2018,"deal":"Bond passed in 2014 for extensive renovations and additions, including the Data Center expansion.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ae801baab68d","cid":"ae801baab68d","canon":1,"dups":1,"ftype":"data_center","name":"DELL DATA CENTER","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"1015|TX","uname":"Austin Energy","reportedUtility":"Austin Energy","srcUrls":null,"srcDom":null},{"id":"367c8e1deb72","cid":"367c8e1deb72","canon":1,"dups":1,"ftype":"data_center","name":"DELLRR56 MOBILE DATA CENTER","city":"Round Rock","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"21cf62e00a6a","cid":"21cf62e00a6a","canon":1,"dups":1,"ftype":"data_center","name":"Amazon DAL2","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e5a6a210b114","cid":"e5a6a210b114","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters DFW I-II, LLC","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"10.75MW of available power from two local substations.","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/compass-datacenter-dfw-ii-a-0683b64f","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"Compass Datacenters","tenant":"TierPoint, ScaleMatrix","ay":2020,"oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/compass-datacenter-dfw-ii-a-0683b64f"]},{"id":"9a077770e0b7","cid":"9a077770e0b7","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters DFW III-I, LLC","city":"Red Oak","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Operational","mw":262,"pc":"Grid","pconf":"High","pquote":"The petitioners in Docket Nos. 51545 and 49863, Compass Datacenters DFW III, LLC (Compass Datacenters) and Alamo Mission respectively, requested service from Red Oak.","pscan":"https://interchange.puc.texas.gov/Documents/56845_7_1428955.PDF","uquote":"The petitioners in Docket Nos. 51545 and 49863, Compass Datacenters DFW III, LLC (Compass Datacenters) and Alamo Mission respectively, requested service from Red Oak.","uscan":"https://interchange.puc.texas.gov/Documents/56845_7_1428955.PDF","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"Ontario Teachers' Pension Plan, Brookfield Infrastructure","ay":2019,"oy":2020,"contro":"Petition to amend Rockett Special Utility District's Certificate of Convenience and Necessity","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"interchange.puc.texas.gov","srcUrls":["https://interchange.puc.texas.gov/Documents/56845_7_1428955.PDF"],"band":"250+ MW"},{"id":"a2a4cef7b549","cid":"a2a4cef7b549","canon":1,"dups":1,"ftype":"data_center","name":"DFW1 (IRVING)","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":165,"pc":"Grid","pconf":"High","pquote":"Renewable sourced power available; LEED Gold Certified; Dedicated electric vehicle (EV) charging spots available on-site.","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Realty Trust","spon":"QTS Realty Trust","ay":2013,"deal":"QTS acquired the former Maxim semiconductor plant in 2013.","dealScan":"https://baxtel.com/data-center/qts-irving-dc4","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced","srcUrls":["https://baxtel.com/data-center/qts-irving-dc4"],"band":"100-250 MW"},{"id":"cc36a2fb77fc","cid":"cc36a2fb77fc","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL GARLAND FERRIS DATA CENTER","city":"GARLAND","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":10,"pc":"Grid","pconf":"Medium","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/prime-garland-tx","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/prime-garland-tx","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Mitsubishi","tenant":"Wells Fargo","ay":2022,"oy":2024,"deal":"City incentives including a rebate of development fees up to $500,000, a two-year rebate of 40% on business personal property taxes and a four-year rebate of 40% on real estate taxes. Joint venture with Mitsubishi Corp. where Mitsubishi acquired a 65% equity interest.","dealScan":"https://www.govtech.com/analytics/two-dallas-fort-worth-data-center-projects-gett-underway","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;govtech.com","srcUrls":["https://baxtel.com/data-center/prime-garland-tx","https://www.govtech.com/analytics/two-dallas-fort-worth-data-center-projects-gett-underway"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"055bb0c027af","cid":"055bb0c027af","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"3,375 kW of UPS Power served with dual utility feeds at 35 kV. Utility Power Capacity. • 8,000 (kW). UPS Power Capacity. • 3,375 (kW). UPS Redundancy. • 2N. Generator Power Capacity. • 8,000 (kW).","pscan":"https://baxtel.com/data-center/12001-12235-north-freeway-digital-realty","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/12001-12235-north-freeway-digital-realty"],"lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"aed73b072657","cid":"aed73b072657","canon":1,"dups":1,"ftype":"data_center","name":"10th Floor Renovation To Colocation Data Center","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The local utility provides up to 4500 total kilowatts of power (4.5 Megawatts) and the UPS systems have a capacity of 1450 kilowatts and are arranged in an N+1 configuration. This set up allows for up to 125 watts of power to be delivered per square foot. On site generators are configured in an N+1 arrangement, and can deliver up to 3890 kilowatts of power in the event of a utility power failure.","pscan":"https://cloudandcolocation.com/datacenters/digital-realty-dallas-datacenter/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw10","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","ay":2021,"oy":2025,"contro":"Digital Realty scaled back investment plans, jeopardizing its tax abatement with the city.","controScan":"https://therealdeal.com/texas/dallas/2025/06/10/digital-realty-cancels-104-million-dallas-data-center-project/","deal":"Modification of an economic incentive agreement received in 2021, with a pivot from a $104 million data center expansion to a $13 million renovation.","dealScan":"https://therealdeal.com/texas/dallas/2025/06/10/digital-realty-cancels-104-million-dallas-data-center-project/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cloudandcolocation.com;baxtel.com;therealdeal.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://cloudandcolocation.com/datacenters/digital-realty-dallas-datacenter/","https://baxtel.com/data-center/digital-realty-dfw10","https://therealdeal.com/texas/dallas/2025/06/10/digital-realty-cancels-104-million-dallas-data-center-project/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"85e7f72a5b9b","cid":"85e7f72a5b9b","canon":1,"dups":1,"ftype":"data_center","name":"Suite 220B Co-Blue","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"87e07dd8fd49","cid":"87e07dd8fd49","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty 908 Co-Blue Office","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":16,"pc":"Grid","pconf":"High","pquote":"With a power capacity of 16 MW, it ensures reliable and consistent energy supply to support critical operations.","pscan":"https://inflect.com/building/908-quality-way-richardson/digital-realty/datacenter/digital-realty-908-quality-way","uconf":"Medium","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-data-center-solutions-4699cb40","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"inflect.com;interconnection.fyi","srcUrls":["https://inflect.com/building/908-quality-way-richardson/digital-realty/datacenter/digital-realty-908-quality-way","https://www.interconnection.fyi/data-center/project/digital-realty-data-center-solutions-4699cb40"],"band":"10-25 MW"},{"id":"9ac2dc72ad62","cid":"9ac2dc72ad62","canon":1,"dups":1,"ftype":"data_center","name":"CHASE PAYMENTECH DRT CO-LO","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c7a19c03510c","cid":"c7a19c03510c","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL REALTY - DFW35","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"High","pquote":"Located on our 69-acre Digital Dallas campus, this expansive, multi-tenant facility has diverse substation feeders and a dedicated substation capable of 100 MW of power.","pscan":"https://www.digitalrealty.com/data-centers/americas/dallas/dfw35","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw35","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","ay":2009,"oy":2014,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalrealty.com;baxtel.com","srcUrls":["https://www.digitalrealty.com/data-centers/americas/dallas/dfw35","https://baxtel.com/data-center/digital-realty-dfw35"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"d699b374ddcd","cid":"d699b374ddcd","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty Suite 160","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"2f51c9457579","cid":"2f51c9457579","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty-Suite 260","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"Electrical service to the park is served by diverse substation feeders to our dedicated, privately owned, substation, which can deliver up to 100 MW of power.","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty","ay":2019,"oy":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5bc5716988ea","cid":"5bc5716988ea","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL REALTY DFW12","city":"CARROLLTON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"The 69-acre Digital Dallas data campus is situated along primary fiber routes and has the unique distinction of having the privately owned, on-site 138kV substation fed from two independent utility substations.","pscan":"https://baxtel.com/data-center/digital-realty-dfw12","uconf":"High","uquote":"The utility company for Carrollton is Oncor Electric Delivery. In the event of a power outage or electrical emergency, call your Carrollton utility company, not your provider. Here's how to contact Oncor: Call 1-888-313-4747. Text “OUT” to 66267. Report an outage online.","uscan":"https://www.choosetexaspower.org/electricity-rates/carrollton/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;choosetexaspower.org","srcUrls":["https://baxtel.com/data-center/digital-realty-dfw12","https://www.choosetexaspower.org/electricity-rates/carrollton/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"18d3529f3e61","cid":"18d3529f3e61","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL REALTY DFW14 - SOFTLAYER 1/2 OFFICE","city":"FARMERS BRANCH","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"Digital Realty will transition to 100% renewable energy by adjusting its power supply contracts, supporting its Texas load in the Dallas, Houston, and Austin markets with regionally sourced renewables.","pscan":"https://www.digitalrealty.com/about/newsroom/press-releases/123240/digital-realty-expands-renewable-energy-supplies","uconf":"High","uquote":"Oncor Electric is the utility responsible for delivering electricity to Farmers Branch.","uscan":"https://www.chooseenergy.com/electricity-rates/texas/farmers-branch/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"IBM Cloud","ay":2010,"oy":2010,"deal":"SoftLayer Technologies leased space for a new headquarters and data center in a Digital Realty Trust facility in Dallas (February 12, 2010). Digital Realty signed a new long-term power purchase agreement to source solar power for its Dallas-area data center portfolio from Pattern Energy's 82.5 MWac Phoenix Solar Project (October 11, 2022).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalrealty.com;chooseenergy.com","srcUrls":["https://www.digitalrealty.com/about/newsroom/press-releases/123240/digital-realty-expands-renewable-energy-supplies","https://www.chooseenergy.com/electricity-rates/texas/farmers-branch/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"96bcf1c4154d","cid":"96bcf1c4154d","canon":1,"dups":1,"ftype":"data_center","name":"907 SECURITY ROW SUITE 140","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"electrical service to the park served by diverse substation feeders, to our dedicated, privately owned, substation capable of delivering up to 100 MW of power @ N+l.... dedicated on-site substation delivering dual fed underground power with fully redundant 2N electrical systems, secondary power with 2MW generators configured as N+1","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw35","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-realty-dfw35"],"band":"< 10 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"64d57e987d19","cid":"64d57e987d19","canon":1,"dups":1,"ftype":"data_center","name":"907 SECURITY ROW SUITE 150","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Located on our 69-acre Digital Dallas campus, this expansive, multi-tenant facility has diverse substation feeders and a dedicated substation capable of 100 MW of power.","pscan":"https://www.digitalrealty.com/data-centers/americas/dallas/dfw35","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-dallas-campus-in-richardson-digital-realty","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty","oy":2014,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalrealty.com;baxtel.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.digitalrealty.com/data-centers/americas/dallas/dfw35","https://baxtel.com/data-center/digital-dallas-campus-in-richardson-digital-realty"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"8f7dc5333027","cid":"8f7dc5333027","canon":1,"dups":1,"ftype":"data_center","name":"907 SECURITY ROW SUITE 160","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"electrical service to the park served by diverse substation feeders, to our dedicated, privately owned, substation capable of delivering up to 100 MW of power @ N+l. Design features include a dedicated on-site substation delivering dual fed underground power with fully redundant 2N electrical systems, secondary power with 2MW generators configured as N+1, and air cooled chillers with indirect refrigerant economization. The building's utility provider is Oncor, which provides redundant access to electrical substations.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","oy":2014,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"1ef84be729b4","cid":"1ef84be729b4","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL REALTY TRUST-900 QUALITY WAY","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Electrical service to the park is distributed from a dedicated, privately owned substation capable of delivering up to 100 MW of power. Telecommunications service is provided by nine different fiber providers currently located in the park.... Electrical service to the park is distributed from a dedicated, privately owned substation capable of delivering up to 100 MW of power.... Our Texas and New Jersey portfolios attained 100% renewable coverage in 2024.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.... Information on electricity, gas, internet, and other services available in Richardson.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","oy":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"253226527301","cid":"253226527301","canon":1,"dups":1,"ftype":"data_center","name":"N. FREEWAY DATA CENTER","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"Medium","pquote":"UPS Redundancy: N+1 configuration for high availability; Cooling Redundancy: N+1, supporting consistent environmental performance; High-Density Ready: Optimized for reliability and scalable growth. In Texas, Digital Realty will transition to 100% renewable energy by adjusting its power supply contracts, supporting its Texas load in the Dallas, Houston, and Austin markets with regionally sourced renewables.","uconf":"High","uquote":"This program is available to commercial customers within the CenterPoint Energy Houston Electric service territory. Site must be: non-residential with electric distribution service provided by CenterPoint Energy; non-transmission class (<69 kV) or non-profit/government transmission class customer. Data centers are considered any space used to house IT systems infrastructure, such as network operations centers, server rooms, enterprise data centers, and colocation facilities.","uscan":"https://www.centerpointenergy.com/en-us/SaveEnergyandMoney/Pages/Data-Center-Energy-Efficiency-Program.aspx?sa=ho&au=bus","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","deal":"Acquisition of 12001 North Freeway property by Digital Realty in 2006 as part of a $71.8 million deal. Signed energy supply contracts for 100% renewable energy coverage in Texas starting January 1, 2024.","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-three-more-properties","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"centerpointenergy.com;datacenterknowledge.com","srcUrls":["https://www.centerpointenergy.com/en-us/SaveEnergyandMoney/Pages/Data-Center-Energy-Efficiency-Program.aspx?sa=ho&au=bus","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-three-more-properties"],"band":"< 10 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"af00e28f4b37","cid":"af00e28f4b37","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL REALTY TRUST DATA HALL EXPANSION","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"High","pquote":"3,375 kW of UPS Power served with dual utility feeds at 35 kV.","pscan":"https://baxtel.com/data-center/12001-12235-north-freeway-digital-realty","uconf":"High","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","tenant":"Level 3","deal":"Acquisition of 12001 North Freeway property in Houston as part of a $71.8 million deal in May 2006.","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-three-more-properties","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;datacenterknowledge.com","srcUrls":["https://baxtel.com/data-center/12001-12235-north-freeway-digital-realty","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-buys-three-more-properties"],"band":"< 10 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"f471ff4c4482","cid":"f471ff4c4482","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK PHASE 2","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"DataBank's DFW2 data center features 2N power design, N+1 cooling design, an on-site power substation, and complete power and cooling infrastructure redundancy.... 20MW of incoming utility power in a (2N) redundant configuration","pscan":"https://www.databank.com/data-centers/dallas/richardson/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/databank-north-dallas-dfw2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge, AustralianSuper, TJC, Swiss Life, IMCO","ay":2012,"oy":2012,"deal":"DataBank leased space from Digital Realty for a new data center in Richardson (June 2012)","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;baxtel.com","srcUrls":["https://www.databank.com/data-centers/dallas/richardson/","https://baxtel.com/data-center/databank-north-dallas-dfw2"],"band":"< 10 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"904b65179432","cid":"904b65179432","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK PHASE 3","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor","pdt":"20MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"6506e9de79d8","cid":"6506e9de79d8","canon":1,"dups":1,"ftype":"data_center","name":"SAVVIS DL2 DATA CENTER EXPANSION","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"The data center protects power failure with N+1 configured UPS system capable to provide backup for 9 minutes at full load. The secondary power source is provided by N+1 configured diesel generators with onsite fuel storage capacity with multiple fuel contracts.","pscan":"https://cloudandcolocation.com/datacenters/savvis-fort-worth-data-center-2/","uconf":"High","uquote":"Utility Provider: TXU.","uscan":"https://baxtel.com/data-center/centersquare-fort-worth-dfw1","uname":"TXU Energy Retail Co, LLC","rto":"ERCOT","nerc":"TRE","op":"Csquare","spon":"CyrusOne","deal":"CyrusOne completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.","dealScan":"https://baxtel.com/data-center/centersquare-fort-worth-dfw1","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/savvis-fort-worth-data-center-2/","https://baxtel.com/data-center/centersquare-fort-worth-dfw1"],"band":"10-25 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility","rawUkey":"19327|TX","rawUname":"TXU Energy Retail Co, LLC","reportedUtility":"TXU Energy Retail Co, LLC"},{"id":"ed33d325a199","cid":"ed33d325a199","canon":1,"dups":1,"ftype":"data_center","name":"TDA CARROLLTON DATA CENTER OFFICES","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/digital-realty-dfw12","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw12","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","oy":2010,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-realty-dfw12"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"f5127088b25f","cid":"f5127088b25f","canon":1,"dups":1,"ftype":"data_center","name":"DLR ALPHA ROAD STE 110","city":"Farmers Branch","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"Power: 3 megawatts local Oncor substation with second substation in close proximity. Carrier class 8 hour duration battery redundancy and power generator.","uconf":"High","uquote":"Power: 3 megawatts local Oncor substation","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"M&A Technology","spon":"M&A Technology","oy":2005,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"50bfa60ac419","cid":"50bfa60ac419","canon":1,"dups":1,"ftype":"data_center","name":"DLR ALPHA ROAD SUITE 100","city":"Farmers Branch","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"Power: 3 megawatts local Oncor substation with second substation in close proximity. Carrier class 8 hour duration battery redundancy and power generator.","uquote":"Power: 3 megawatts local Oncor substation with second substation in close proximity.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"M&A Technology","oy":2005,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"7a0c9b008f9f","cid":"7a0c9b008f9f","canon":1,"dups":1,"ftype":"data_center","name":"DLR ALPHA ROAD 2ND FLOOR RESTROOM RENOV","city":"Farmers Branch","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"Power: 3 megawatts local Oncor substation with second substation in close proximity. Carrier class 8 hour duration battery redundancy and power generator.","uquote":"Power: 3 megawatts local Oncor substation with second substation in close proximity.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"M&A Technology","spon":"M&A Technology","oy":2005,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"24a35b1eaa87","cid":"24a35b1eaa87","canon":1,"dups":1,"ftype":"data_center","name":"DLR MARSH LANE DATA CENTER STE. 120","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"UPS Power of 6,750 kW is served with dual utility feeds at 12.47kV. Utility Power: 2,500 kVA delivered by 480V service to each suite.... The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","oy":2009,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"05538a8269b5","cid":"05538a8269b5","canon":1,"dups":1,"ftype":"data_center","name":"DLR MARSH LANE DATA CENTER STE. 110","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"Utility Power: 2,500 kVA delivered by 480V service to each suite; Secondary Power; Suites 110, 130, 140, 150, 160; One (1) 2 MW generator and one (1) 2MW shared reserve generator; UPS Power; Four (4) 625 kVA UPS systems configured as 2N per suite","pscan":"https://baxtel.com/data-center/digital-realty-dfw12","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw12","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","ay":2008,"oy":2009,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-realty-dfw12"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"68b529bf99a4","cid":"68b529bf99a4","canon":1,"dups":1,"ftype":"data_center","name":"DLR MARSH LANE CENTER, STE. 100","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"High-performance power, optimized for reliability. UPS redundancy: 2N.","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/dlr-marsh-lane-data-center-1570d246","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","oy":2009,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/dlr-marsh-lane-data-center-1570d246"],"band":"10-25 MW"},{"id":"6ef229b2f8ab","cid":"6ef229b2f8ab","canon":1,"dups":1,"ftype":"data_center","name":"DLR MARSH LANE DATA CENTER STE. 140","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"Digital Realty, a leading global provider of carrier- and cloud-neutral data center, colocation, and interconnection solutions, is expanding its renewable energy capacity in Texas with a new long-term power purchase agreement to source solar power for the company's Dallas-area data center portfolio from Pattern Energy's 82.5 MWac Phoenix Solar Project located in Fannin County, Texas.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","ay":2009,"oy":2010,"deal":"Renovation/Alteration project of $5.0M, registered April 27, 2009","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"e0d58a2f9cc8","cid":"e0d58a2f9cc8","canon":1,"dups":1,"ftype":"data_center","name":"DLR MARSH LANE DATA CENTER-SUITE 120 GEN","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy. Utility Power Capacity. • 12,000 (kW).","pscan":"https://baxtel.com/data-center/digital-realty-dfw12","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-realty-dfw12","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty","deal":"$100K renovation/alteration project registered on April 27, 2009","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-realty-dfw12"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"af04ef05920b","cid":"af04ef05920b","canon":1,"dups":1,"ftype":"data_center","name":"DLR - SUITE 120 OFFICE RENOVATION","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Oncor Electric Delivery is Carrollton's utility. The DLR system monitored the real-time capacities of eight transmission lines for use in the daily operations and wholesale electricity market of both the transmission owner and the independent system operator, the Electric Reliability Council of Texas (ERCOT).","pscan":"https://www.energy.gov/sites/prod/files/2016/12/f34/Oncor_DLR_Case_Study_05-20-14_FINAL.pdf","uquote":"Oncor Electric Delivery is Carrollton's utility.","uscan":"https://www.choosetexaspower.org/electricity-rates/carrollton/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust","spon":"Digital Realty Trust","ay":2021,"oy":2022,"deal":"Renovation/Alteration project with an estimated cost of $500,000, started 12/30/2021 and completed 5/31/2022.","dealScan":"https://www.tdlr.texas.gov/TABS/Projects/TABS2022004127","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"energy.gov;choosetexaspower.org;tdlr.texas.gov","srcUrls":["https://www.energy.gov/sites/prod/files/2016/12/f34/Oncor_DLR_Case_Study_05-20-14_FINAL.pdf","https://www.choosetexaspower.org/electricity-rates/carrollton/","https://www.tdlr.texas.gov/TABS/Projects/TABS2022004127"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_url_canonicalized delivery_utility_linked","dukey":"44372|TX"},{"id":"7a8e6ad0872f","cid":"7a8e6ad0872f","canon":1,"dups":1,"ftype":"data_center","name":"CISCO DRT DATA CENTER","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"de1216b31261","cid":"de1216b31261","canon":1,"dups":1,"ftype":"data_center","name":"DNV GL DATA CENTER EXPANSION","city":"Katy","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"178bd6f0a66d","cid":"178bd6f0a66d","canon":1,"dups":1,"ftype":"crypto_hpc","name":"DPN Data Center","city":"Afton","county":"Lubbock","state":"TX","lat":33.611469,"lng":-101.819944,"cprec":"distinct","status":"Operational","mw":1600,"pc":"Grid","pconf":"High","pquote":"With this latest approval, Helios now has more than 1.6 GW of ERCOT-approved, utility-contracted capacity, positioning Galaxy among the largest and fastest-growing data center developers in North America.","pscan":"https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","uconf":"High","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity.","rto":"SPP","nerc":"MRO","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2021,"oy":2026,"contro":"Community concerns about water use, grid strain, and cost of electricity related to data center expansion in Dickens County.","controScan":"https://www.youtube.com/watch?v=Ku7DmNyCLos","deal":"Acquisition of data center from Argo Blockchain in late 2022 for approximately $65 million; $1.4 billion project financing facility closed August 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"galaxy.com;youtube.com","srcUrls":["https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","https://www.youtube.com/watch?v=Ku7DmNyCLos"],"band":"250+ MW","lflag":"large_project_duplicate_review delivery_utility_not_in_eia861 utility_alias_corrected source_quality_reclassified","uname":"AEP Texas","reportedUtility":"AEP Texas"},{"id":"3dce202cde56","cid":"3dce202cde56","canon":1,"dups":1,"ftype":"data_center","name":"DRIPPING SPRINGS ISD | HS DATA CENTER AD","city":"Dripping Springs","county":"Hays","state":"TX","lat":30.061225,"lng":-98.029267,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Dripping Springs TX has no available electricity plans. Many people in Texas have the power to choose their electricity provider, unfortunately Dripping Springs, Texas is not one of them. Dripping Springs is not yet deregulated","uconf":"High","uquote":"mypec.com. PO Box 100. Kyle, TX 78640-0100. 512-799-2024.","uscan":"https://cca.dstxchamber.com/Utilities__5007472_category.aspx","ukey":"14626|TX","uname":"Pedernales Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Dripping Springs Independent School District","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cca.dstxchamber.com","lflag":"operational_null_capacity source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://cca.dstxchamber.com/Utilities__5007472_category.aspx"]},{"id":"767c5620536e","cid":"767c5620536e","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"ERCOT","nerc":"TRE","op":"DXC Technology","spon":"Highland Capital Management (as of 2018)","oy":1997,"deal":"Sale of former EDS campus to Highland Capital in December 2018","dealScan":"https://richardsoneconomicdevelopment.com/new-richardson-office-building-lures-huge-tenant-from-planos-legacy-business-park/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"richardsoneconomicdevelopment.com","srcUrls":["https://richardsoneconomicdevelopment.com/new-richardson-office-building-lures-huge-tenant-from-planos-legacy-business-park/"],"lflag":"source_quality_reclassified"},{"id":"486cf2a0fecf","cid":"486cf2a0fecf","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/dxc-technology-bc6b9f32","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"DXC Technology","spon":"DXC Technology Services","ay":2006,"oy":2006,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/dxc-technology-bc6b9f32"]},{"id":"ee511da6d0bf","cid":"ee511da6d0bf","canon":1,"dups":1,"ftype":"data_center","name":"NVIDIA EXPANSION","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Nvidia","spon":"Nvidia","tenant":"Nvidia","ay":2012,"oy":2012,"deal":"$102K Renovation/Alteration project registered February 14, 2012","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b599ce1cedd2","cid":"b599ce1cedd2","canon":1,"dups":1,"ftype":"data_center","name":"ECTOR COUNTY ISD DATA CENTER REMODEL","city":"Odessa","county":"Ector","state":"TX","lat":31.865301,"lng":-102.542507,"cprec":"distinct","status":"Operational","rto":"SPP","nerc":"MRO","op":"Ector County Independent School District","spon":"Ector County Independent School District","tenant":"Ector County Independent School District","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"8dcee7e1d076","cid":"8dcee7e1d076","canon":1,"dups":1,"ftype":"data_center","name":"EDGE DATA CENTER- AUSTIN","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Table 1: Austin Energy service area data centers require approximately. 126 MW of power. Note: Power demand is unknown for data centers that do not have a demand value listed (represented by '-'). Data Center Name. Demand (MW).... American Tower Edge Data Center Austin. 0.096.","pscan":"https://repositories.lib.utexas.edu/bitstreams/678aadd2-3e2e-4214-a1ab-b399140e7b33/download","uquote":"This analysis was funded by Austin Energy through a master service agreement with the. University of Texas at Austin.... Table 1: Austin Energy service area data centers require approximately. 126 MW of power.... American Tower Edge Data Center Austin. 0.096.","uscan":"https://repositories.lib.utexas.edu/bitstreams/678aadd2-3e2e-4214-a1ab-b399140e7b33/download","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"American Tower","spon":"American Tower","oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"repositories.lib.utexas.edu","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://repositories.lib.utexas.edu/bitstreams/678aadd2-3e2e-4214-a1ab-b399140e7b33/download"]},{"id":"9c9f699e0ffd","cid":"9c9f699e0ffd","canon":1,"dups":1,"ftype":"data_center","name":"EDGED","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"The event was attended by Mayor Stopfer, City of Irving and Dallas County officials, leaders from the economic development community, local utility provider Oncor and key project partners.","pscan":"https://www.thermalworks.com/news/edged-irving-texas","uquote":"The event was attended by Mayor Stopfer, City of Irving and Dallas County officials, leaders from the economic development community, local utility provider Oncor and key project partners.","uscan":"https://www.thermalworks.com/news/edged-irving-texas","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Edged Energy","spon":"Endeavour","ay":2023,"oy":2025,"deal":"Investment of $35 million in the Dallas County project, September 2023 to January 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"thermalworks.com","srcUrls":["https://www.thermalworks.com/news/edged-irving-texas"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"056c15392ee9","cid":"056c15392ee9","canon":1,"dups":1,"ftype":"data_center","name":"APACHE DATA CENTER","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"35037828dfd6","cid":"35037828dfd6","canon":1,"dups":1,"ftype":"data_center","name":"ELLIOTT ELECTRIC DATA CENTER","city":"Nacogdoches","county":"Nacogdoches","state":"TX","lat":31.62056,"lng":-94.62025,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"Our rack space is equipped with dual power feeds. Each electric feed has its own UPS system, which are backed up by multiple generators.","pscan":"https://www.nacspace.com/","uconf":"High","uquote":"The utility company in Nacogdoches is Oncor Electric Delivery. Oncor Electric Delivery serves all residents inside the Nacogdoches city limits as well as parts of the county. Nacogdoches Electricity Utility Company: Oncor.","uscan":"https://www.chooseenergy.com/electricity-rates/texas/nacogdoches/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"NacSpace","spon":"Elliott Electric Supply","oy":2019,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"nacspace.com;chooseenergy.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.nacspace.com/","https://www.chooseenergy.com/electricity-rates/texas/nacogdoches/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"813faf20d092","cid":"813faf20d092","canon":1,"dups":1,"ftype":"data_center","name":"TW TELECOM DATA CENTER","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Houston data center 1 provides redundant and reliable power infrastructure. The entire critical infrastructure is protected by redundant UPS system on the immediate power failure. The redundant standby diesel generators provide the emergency power in the prolonged power outage with fuel storage onsite. The data center provides both AC and DC power to meet the power requirements with the provision of growth in future.","rto":"ERCOT","nerc":"TRE","op":"Lumen Technologies","spon":"Lumen Technologies","ay":1982,"oy":1982,"deal":"tw telecom acquired by Level 3 Communications for $7.3 billion (including debt) on October 31, 2014. Level 3 Communications acquired by CenturyLink in 2016. CenturyLink completed its $34 billion acquisition of Level 3 in November 2017.","dealScan":"https://grokipedia.com/page/TW_Telecom","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"grokipedia.com","lflag":"operational_null_capacity legacy_facility_year_review","srcUrls":["https://grokipedia.com/page/TW_Telecom"]},{"id":"c3d9f302fdca","cid":"c3d9f302fdca","canon":1,"dups":1,"ftype":"data_center","name":"EMPIRE CENTRAL DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":4,"pc":"Grid","pconf":"High","pquote":"4MW Critical IT Load and 4MW total utility power capacity (Expandable to 8MW)","pscan":"https://www.databank.com/data-centers/dallas/1100-empire-central-place/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/databank-dfw4-empire-central","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","deal":"Acquisition of the site by DataBank from Zayo in December 2020.","dealScan":"https://baxtel.com/data-center/databank-dfw4-empire-central","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;baxtel.com","srcUrls":["https://www.databank.com/data-centers/dallas/1100-empire-central-place/","https://baxtel.com/data-center/databank-dfw4-empire-central"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"9c97acd91533","cid":"9c97acd91533","canon":1,"dups":1,"ftype":"data_center","name":"ENSONO LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Ensono","spon":"KKR","deal":"KKR acquired Ensono, LP from Charlesbank Capital Partners and M/C Partners for USD 1.7 billion in 2021.","dealScan":"https://www.preqin.com/data/profile/asset/ensono-l-p-/168444","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"preqin.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.preqin.com/data/profile/asset/ensono-l-p-/168444"]},{"id":"2448c5a6de5b","cid":"2448c5a6de5b","canon":0,"dups":1,"ftype":"data_center","name":"ENSONO LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"db3587687e92","cid":"db3587687e92","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Equinix is funding and supporting advanced transmission system upgrades with utility partners, including new substations that will enhance grid reliability and emergency backup solutions that aim to benefit all ratepayers during power interruptions. Equinix is also investing in power solutions such as fuel cells and natural gas that are expected to enhance operations while adding capacity resources to the grids where it operates.","pscan":"https://newsroom.equinix.com/2025-08-14-Equinix-Collaborates-with-Leading-Alternative-Energy-Providers-to-Power-AI-Ready-Data-Center-Growth","uquote":"In Texas, CenterPoint Energy primarily serves the greater Houston metro area, connecting roughly 2.6 million customers to electricity and natural gas services.","uscan":"https://www.chooseenergy.com/utilities/centerpoint-energy-tx/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":1999,"deal":"Equinix completed its $3.6 billion acquisition of 29 Verizon data centers in May 2017.","dealScan":"https://totaltele.com/equinix-completes-3-6bn-verizon-data-centre-deal/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"newsroom.equinix.com;chooseenergy.com;totaltele.com","srcUrls":["https://newsroom.equinix.com/2025-08-14-Equinix-Collaborates-with-Leading-Alternative-Energy-Providers-to-Power-AI-Ready-Data-Center-Growth","https://www.chooseenergy.com/utilities/centerpoint-energy-tx/","https://totaltele.com/equinix-completes-3-6bn-verizon-data-centre-deal/"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"63995cd13299","cid":"63995cd13299","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":46,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Equinix DA11 offers average power density 5 - 12 kVA per cabinet. Feed incoming from two separate supplies. Backed by Parallel redundant N+2 two x 1,200 kVA UPS and 6 x 3000 kW diesel generators. Diverse utility feeds. UPS N+2redundancy. Power Generators N+2 redundancy.","uconf":"Medium","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da11","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2020,"oy":2020,"deal":"Investment of $142 million for the first phase, announced June 24, 2020.","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/104/equinix-expands-dallas-infomart-campus-with-new-142m-data","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;investor.equinix.com","srcUrls":["https://baxtel.com/data-center/equinix-dallas-da11","https://investor.equinix.com/news-events/press-releases/detail/104/equinix-expands-dallas-infomart-campus-with-new-142m-data"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"651e77477a39","cid":"651e77477a39","canon":1,"dups":1,"ftype":"data_center","name":"DA7 FLEX SPACE","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Utility Feeders: 2. UPS Configuration: Block Redundant. UPS Redundancy: N+1. Standby Power. Configuration: 5 x 2,500 kW diesel generators. Standby Power. Redundancy: N+1.","uconf":"High","uquote":"The utility company for Plano is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/plano/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2016,"oy":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.choosetexaspower.org/electricity-rates/plano/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"cbf216f00854","cid":"cbf216f00854","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX (US) ENTERPRISES INC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Power. Safeguard operations and prevent outages with enterprise-grade uninterruptible power supply (UPS) systems and built-in redundancy. N+1 Power redundancy. Incoming Electrical Service Type: Dual Circuits. Electrical Distribution: Block Redundant. UPS Type: Static UPS. UPS Redundancy: N+1. Generator Redundancy: N+1. With a power density of 5.0 – 10.0 kVA per cabinet and advanced cooling systems, DA7 supports the demanding needs of digital leaders, all while operating on 100% renewable energy, reflecting Equinix's commitment to sustainability.","uconf":"Medium","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2016,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"lflag":"online_before_announced operational_null_capacity utility_alias_corrected delivery_utility_linked","pscan":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7","uscan":"https://www.baxtel.com/data-centers/dallas-tx/equinix-dallas-da7-data-center","srcUrls":["https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7","https://www.baxtel.com/data-centers/dallas-tx/equinix-dallas-da7-data-center"],"srcDom":"equinix.com;baxtel.com","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"851f2f83228d","cid":"851f2f83228d","canon":1,"dups":1,"ftype":"data_center","name":"COLOGIX DAL3 (EQUINIX DATA CENTER)","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"2N uninterruptible power system (UPS) and generator 4 power feeds from 3 diverse utility substations Upstream and downstream automatic transfer switches (ATSs) On a priority feed with the Parkland Health Hospital System.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cologix-dal3","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Cologix","spon":"Stonepeak Infrastructure Partners","tenant":"Amazon Web Services, Microsoft Azure, Google Cloud Platform, IBM Cloud, Oracle FastConnect","ay":2019,"oy":2020,"deal":"Stonepeak Infrastructure Partners completed a $3.0 billion equity recapitalization of Cologix and Cologix completed a $1.65 billion asset-backed securitization in early 2022.","dealScan":"https://cologix.com/news/stonepeak-successfully-completes-3-0-billion-equity-recapitalization-portfolio-company-cologix/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;cologix.com","srcUrls":["https://baxtel.com/data-center/cologix-dal3","https://cologix.com/news/stonepeak-successfully-completes-3-0-billion-equity-recapitalization-portfolio-company-cologix/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"66086bfa959d","cid":"66086bfa959d","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX HO1-2 FOH","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":15,"pc":"Grid","pconf":"High","pquote":"The facility provides a reliable power system with a capacity of 15.8 MW, ensuring continuous operation of hosted equipment. - It includes multiple layers of redundancy, including N+1 configuration for power systems, to minimize the risk of downtime. Power. Safeguard operations and prevent outages with enterprise-grade uninterruptible power supply (UPS) systems and built-in redundancy. N+1 Power redundancy. Standby Power. Configuration. Two systems, each having 3 x. 2,000 kW diesel generators.","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2017,"oy":1999,"deal":"Acquisition of HO1 and 28 other data centers from Verizon on April 30, 2017","dealScan":"https://baxtel.com/data-center/equinix-houston-ho1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://baxtel.com/data-center/equinix-houston-ho1"],"band":"10-25 MW"},{"id":"ac2e030442d0","cid":"ac2e030442d0","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX LLC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"With a power density of 5.0 – 10.0 kVA per cabinet and advanced cooling systems, DA7 supports the demanding needs of digital leaders, all while operating on 100% renewable energy, reflecting Equinix's commitment to sustainability.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2016,"oy":2016,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"3872f42e34f3","cid":"3872f42e34f3","canon":1,"dups":1,"ftype":"data_center","name":"EVOCATIVE","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":10,"pc":"Grid","pconf":"High","pquote":"Evocative's Dallas data center is a first-class facility with 24/7/365 secure access, fully redundant environment systems, backup power, and connectivity to all major carriers. Located on the Texas power grid, the site offers a low PUE and more than 68,000 sq.ft. of raised floor space for your colocation needs.","pscan":"https://cloudscene.com/data-center/united-states-of-america/dallas/evocative-dallas-tx-dal4","uquote":"Utility Provider. Oncor.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Evocative","spon":"Crestline Investors","ay":2022,"deal":"Acquisition of Carrier-1's data center in Dallas, TX (DA4) by Evocative on April 16, 2022.","dealScan":"https://evocative.com/news/vpls-acquires-carrier-1-data-center-dallas/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudscene.com;evocative.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://cloudscene.com/data-center/united-states-of-america/dallas/evocative-dallas-tx-dal4","https://evocative.com/news/vpls-acquires-carrier-1-data-center-dallas/"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"a7a8612b28fd","cid":"a7a8612b28fd","canon":1,"dups":1,"ftype":"data_center","name":"EVODC MCKINNEY DATA CENTER LLC","city":"MCKINNEY","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"788de458e384","cid":"788de458e384","canon":1,"dups":1,"ftype":"data_center","name":"Evoque Data Center Pavement Repair","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"Utility Power (MW): 12 MW. UPS Power (MW): 7.2 MW.... Standby Power Config: N+1. Eight x 2.0 MW Diesel Generators.","uquote":"Oncor Electric Delivery is Allen's utility","uscan":"https://www.choosetexaspower.org/electricity-rates/allen/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Csquare","spon":"Brookfield Infrastructure Partners","oy":1999,"deal":"Evoque and Cyxtera merged and rebranded as Centersquare in April 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/allen/"],"band":"10-25 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"0724e85a3114","cid":"0724e85a3114","canon":1,"dups":1,"ftype":"data_center","name":"EX West Green Data Center Phase 2","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Karnes Electric COOP INC.","uconf":"High","uquote":"Grid Operator: Karnes Electric COOP INC.","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"COPT San Antonio II, L.P.","spon":"COPT San Antonio II, L.P.","ay":2023,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6dec5f6aef7e","cid":"6dec5f6aef7e","canon":1,"dups":2,"ftype":"data_center","name":"EX West Green Data Center","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Karnes Electric COOP INC. Karnes Electric Cooperative is continually monitoring the grid conditions from the Electricity Reliability Council of Texas (ERCOT).","pscan":"https://www.karnesec.org/our-cooperative/loadshed/","uconf":"High","uquote":"Grid Operator: Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/ex-west-green-data-center-ffc8a276","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"COPT San Antonio II, L.P.","spon":"COPT San Antonio II, L.P.","ay":2023,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"karnesec.org;interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.karnesec.org/our-cooperative/loadshed/","https://www.interconnection.fyi/data-center/project/ex-west-green-data-center-ffc8a276"]},{"id":"b3a7f4ecf20f","cid":"6dec5f6aef7e","canon":0,"dups":2,"ftype":"data_center","name":"EX WEST GREEN DATA CENTER","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Karnes Electric COOP INC.","uconf":"High","uquote":"Grid Operator: Karnes Electric COOP INC.","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"COPT San Antonio II, L.P.","spon":"Corporate Office Properties Trust / COPT Defense Properties","ay":2023,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"47ef9929f434","cid":"47ef9929f434","canon":1,"dups":1,"ftype":"data_center","name":"FIBERNET DATA CENTER","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"b5fd7ca358dc","cid":"b5fd7ca358dc","canon":1,"dups":1,"ftype":"data_center","name":"FHLB - DATA CENTER/LEASE CONVERSION","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Federal Home Loan Bank of Dallas","spon":"Federal Home Loan Bank of Dallas","tenant":"Federal Home Loan Bank of Dallas","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"d36c79cc062e","cid":"d36c79cc062e","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Denton County Electric Cooperative, Inc.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record unlinked_source_text","rawName":"finish out data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"aab4116775ad","cid":"aab4116775ad","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL REALTY AT MIDWAY ROAD","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","mw":10,"pc":"Grid","pconf":"High","pquote":"Power is served by two (2) sub-stations with diverse entry paths into the facility; Each substation is served by separate power generation plants","uquote":"In Carrollton, the utility company is Oncor Electric Delivery.","uscan":"https://www.chooseenergy.com/electricity-rates/texas/carrollton/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"VAZATA","oy":2000,"deal":"Acquisition by Digital Realty in 2006","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"chooseenergy.com","srcUrls":["https://www.chooseenergy.com/electricity-rates/texas/carrollton/"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"c4f90e283d3a","cid":"c4f90e283d3a","canon":1,"dups":1,"ftype":"data_center","name":"FSCU - Data Center","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"First Service Credit Union","spon":"First Service Credit Union","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c099d5644834","cid":"c099d5644834","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The Shiloh data center has a fully redundant and fault tolerant power infrastructure design that is concurrently maintainable, and offers 100% SLA on power. The power to the data center is fed through multiple medium voltage utility power feeds. A Redundant UPS system of 18 MW power capacity with redundant battery strings provides a backup power supply in case of utility power loss that is being backed up by a 29 MW, fully redundant diesel generators having 50,000 gallons of diesel fuel.","pscan":"https://cloudandcolocation.com/datacenters/flexential-plano-data-center/","uconf":"High","uquote":"Flexential Dallas (Plano). Year Built: 2016. Utility Provider: Oncor.","uscan":"https://baxtel.com/data-center/flexential-dallas-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Flexential","spon":"GI Partners","tenant":"CoreWeave","ay":2016,"oy":2025,"deal":"Sale-leaseback transaction with Legacy Investing and Invesco Real Estate for its 18 MW data center in Plano, Texas (August 2021)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/flexential-plano-data-center/","https://baxtel.com/data-center/flexential-dallas-plano"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"5027ec73a014","cid":"5027ec73a014","canon":1,"dups":1,"ftype":"data_center","name":"FLEXENTIAL CORP","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"Our Dallas - Richardson data center features a data center footprint exceeding 100,000 square feet as well as state of-the-art, 2(N+1) UPS power equipment and a powerful, highly efficient N+1 cooling system. We offer premium connectivity, including an industry leading 100 gigabit network backbone -- scalable to 400 Gbps, carrier hotel connectivity, Layer 2 access to 80 on-net carriers, proactive Layer 3 and Layer 4 distributed denial of service protection and a 100% network and bandwidth uptime commitment.","rto":"ERCOT","nerc":"TRE","op":"Flexential","spon":"GI Partners, GI Data Infrastructure, Hamilton Lane, Morgan Stanley Infrastructure Partners (MSIP)","oy":2010,"deal":"ViaWest was acquired by Peak 10 in June 2018, later rebranded as Flexential.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"83f4bd663216","cid":"83f4bd663216","canon":1,"dups":1,"ftype":"data_center","name":"FLEXENTIAL CORP","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"The power to the data center is fed through multiple medium voltage utility power feeds. A Redundant UPS system of 18 MW power capacity with redundant battery strings provides a backup power supply in case of utility power loss that is being backed up by a 29 MW, fully redundant diesel generators having 50,000 gallons of diesel fuel.","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/flexential-data-center-b3302d0c","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Flexential","spon":"Invesco Real Estate","tenant":"CoreWeave","ay":2016,"oy":2016,"deal":"Industrial asset sale to Invesco Real Estate on 08/09/2021","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/flexential-data-center-b3302d0c"],"band":"10-25 MW"},{"id":"f90eed5a81a2","cid":"f90eed5a81a2","canon":1,"dups":1,"ftype":"data_center","name":"Data Center Permit — Austin, TX","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"fly wheel fed from normal power and emergency power. Bypass panels will feed the High voltage panel in the data center which will feed 150 KVA transformer. Branch out to small NQD panels for branch circuits.","pscan":"https://www.interconnection.fyi/data-center/state/TX","rto":"ERCOT","nerc":"TRE","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity display_name_normalized generic_permit_record possible_canonical_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/state/TX"],"rawName":"fly wheel fed from normal power and emergency power. Bypass panels will feed the High voltage panel in the data center which will feed 150 KVA transformer. Branch out to small NQD panels for branch circuits."},{"id":"9a49b35af8da","cid":"32d091d49231","canon":0,"dups":3,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"1de87bff4774","cid":"7284fca35294","canon":0,"dups":8,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record unlinked_source_text","rawName":"FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"47fd20d4aaae","cid":"7284fca35294","canon":0,"dups":8,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record unlinked_source_text","rawName":"FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"e9bdf4a17ed6","cid":"7284fca35294","canon":0,"dups":8,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Denton County Elec Coop, INC.","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","spon":"Winner","ay":2016,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text display_name_normalized canonical_promoted_after_quarantine generic_permit_record possible_canonical_duplicate,merged_duplicate","rawName":"FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","srcUrls":null,"srcDom":null},{"id":"7284fca35294","cid":"7284fca35294","canon":0,"dups":8,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized utility_alias_corrected generic_unsourced_permit_record unlinked_source_text delivery_utility_linked","rawName":"FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"76be1a01e865","cid":"7284fca35294","canon":0,"dups":8,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"f48560bf89e1","cid":"7284fca35294","canon":0,"dups":8,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"dddfda5c890e","cid":"7284fca35294","canon":0,"dups":8,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC.","uquote":"Edged has contracted with Oncor, the region's transmission and","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text display_name_normalized utility_alias_corrected generic_unsourced_permit_record delivery_utility_linked","rawName":"FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"469fafa61c0b","cid":"7284fca35294","canon":0,"dups":8,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized utility_alias_corrected generic_unsourced_permit_record unlinked_source_text delivery_utility_linked","rawName":"FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"d051ddc65726","cid":"d051ddc65726","canon":1,"dups":1,"ftype":"data_center","name":"COMPASS DATACENTER","city":"Addison","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"4ef68af8548e","cid":"4ef68af8548e","canon":1,"dups":1,"ftype":"data_center","name":"GOOGLE","city":"MAIN STREET","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"6cc2e6b523b1","cid":"6cc2e6b523b1","canon":0,"dups":1,"ftype":"data_center","name":"Generator and Enclosure to Existing Data Center","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","uquote":"Commercial generator installations in Austin typically require multiple permits, including electrical permits from Austin Energy, building permits from the Development Services Department, and potentially environmental permits depending on the generator size and fuel type.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","ay":2014,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity unlinked_source_text generic_unsourced_permit_record","rawName":"Generator and Enclosure to Existing Data Center","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"ca46a9c3ad48","cid":"ca46a9c3ad48","canon":1,"dups":1,"ftype":"data_center","name":"GHC 9-1-1 DATA CENTER","city":"Huntsville","county":"Walker","state":"TX","lat":30.743163,"lng":-95.569825,"cprec":"distinct","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e96e063e4357","cid":"e96e063e4357","canon":1,"dups":1,"ftype":"data_center","name":"LANDMARK DATA CENTER","city":"Missouri City","county":"Fort Bend","state":"TX","lat":29.526602,"lng":-95.771015,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"f32444809e18","cid":"f32444809e18","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Red Oak","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","pscan":"https://baxtel.com/data-center/google-red-oak-tx","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/google-red-oak-tx","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2024,"oy":2025,"contro":"Community opposition to data center development in Red Oak, citing concerns over noise, traffic, air quality, water usage, property values, and strain on the power grid.","controScan":"https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef","deal":"$600 million investment announced in August 2024","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;wfaa.com","srcUrls":["https://baxtel.com/data-center/google-red-oak-tx","https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"869e809a9365","cid":"869e809a9365","canon":1,"dups":1,"ftype":"data_center","name":"INMAR Data Center Addition","city":"Grand Prairie","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"704077692ae2","cid":"704077692ae2","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Greenidge Angela","city":"Rosenberg","county":"Fort Bend","state":"TX","lat":29.526602,"lng":-95.771015,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"0649ef3f703a","cid":"0649ef3f703a","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Greenidge Carleen","city":"Pearland","county":"Brazoria","state":"TX","lat":29.167817,"lng":-95.434647,"cprec":"distinct","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"2a99a469efdc","cid":"2a99a469efdc","canon":1,"dups":1,"ftype":"crypto_hpc","name":"GREENIDGE, HUGO B III","city":"KILLEEN","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5e073a66aa5d","cid":"5e073a66aa5d","canon":1,"dups":1,"ftype":"crypto_hpc","name":"GREENIDGE, NATHALI","city":"CONROE","county":"Montgomery","state":"TX","lat":30.298801,"lng":-95.50295,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"cbeebd0d6a7e","cid":"cbeebd0d6a7e","canon":1,"dups":1,"ftype":"crypto_hpc","name":"GREENIDGE, THEO R","city":"MONTGOMERY","county":"Montgomery","state":"TX","lat":30.298801,"lng":-95.50295,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"8a5547fa006d","cid":"8a5547fa006d","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER BUILD-OUT","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The 2000 kW Kohler diesel generator with 4000 gallons fuel storage onsite provides the back up facility on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/windstream-hosted-solutions-houston-data-center/","uconf":"High","uquote":"Here in Houston, CenterPoint will be key to making it all work. CenterPoint Energy is the primary utility for the greater Houston area","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2000,"oy":2000,"deal":"KKR and GIP completed the acquisition of CyrusOne for approximately $15 billion on March 25, 2022.","dealScan":"https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;global-infra.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://cloudandcolocation.com/datacenters/windstream-hosted-solutions-houston-data-center/","https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"3b2b8fb9450f","cid":"3b2b8fb9450f","canon":1,"dups":1,"ftype":"data_center","name":"TTX Data Center","city":"Temple","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Polmer","spon":"Polmer","oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"fdbde319edb5","cid":"fdbde319edb5","canon":1,"dups":1,"ftype":"data_center","name":"H-P DATA CENTER BASE ACCT","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"f688e44018c4","cid":"f688e44018c4","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Center Renovations","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":4,"pc":"Grid","pconf":"High","pquote":"Utility power from CPS at rates below the national average.... San Antonio's power grid is served by CPS Energy, one of the largest municipally owned utilities in the United States.","pscan":"https://satc.org/data-center/","uconf":"High","uquote":"Utility power from CPS at rates below the national average.... San Antonio's power grid is served by CPS Energy, one of the largest municipally owned utilities in the United States.","uscan":"https://satc.org/data-center/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"H5 Data Centers","spon":"H5 Data Centers","ay":2018,"deal":"Acquisition of 85,000 square-foot carrier hotel at 100 Taylor Street in November 2018.","dealScan":"https://newswire.telecomramblings.com/2019/02/h5-data-centers-archeo-futurus-announce-launch-new-internet-exchange-san-antonio/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"satc.org;newswire.telecomramblings.com","lflag":"online_before_announced citation_artifact_removed utility_alias_corrected source_quality_reclassified","srcUrls":["https://satc.org/data-center/","https://newswire.telecomramblings.com/2019/02/h5-data-centers-archeo-futurus-announce-launch-new-internet-exchange-san-antonio/"],"band":"< 10 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"92adf6e0e19b","cid":"92adf6e0e19b","canon":1,"dups":1,"ftype":"data_center","name":"H5 Colocation Facility - 100 Taylor St","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"Utility power from CPS at rates below the national average.","pscan":"https://h5datacenters.com/san-antonio-colocation.html","uconf":"High","uquote":"Utility power from CPS at rates below the national average.","uscan":"https://h5datacenters.com/san-antonio-colocation.html","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"H5 Data Centers","spon":"H5 Data Centers","ay":2018,"deal":"Acquisition of 100 Taylor Street by H5 Data Centers on November 28, 2018.","dealScan":"https://h5datacenters.com/h5-announces-san-antonio-expansion.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"h5datacenters.com","lflag":"online_before_announced nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","srcUrls":["https://h5datacenters.com/san-antonio-colocation.html","https://h5datacenters.com/h5-announces-san-antonio-expansion.html"],"band":"< 10 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","ukey":"16604|TX"},{"id":"1503c1c7cac5","cid":"1503c1c7cac5","canon":1,"dups":1,"ftype":"data_center","name":"HCHD-HOLLY HALL-LEVEL2-DATA CENTER","city":"HOLLY HALL STREET","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Harris County Hospital District","spon":"Harris County Hospital District","oy":2012,"deal":"Renovation/Alteration project valued at $4.0M, completed June 13, 2012","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"108ea395ec1c","cid":"108ea395ec1c","canon":1,"dups":1,"ftype":"data_center","name":"HAYS SECONDARY DATA CENTER","city":"Kyle","county":"Hays","state":"TX","lat":30.061225,"lng":-98.029267,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"e0ee2332ddee","cid":"e0ee2332ddee","canon":1,"dups":1,"ftype":"data_center","name":"HCA FT WORTH RENOVATION-DATA CENTER","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"HCA Healthcare","spon":"Holt Lunsford","tenant":"HCA Healthcare","ay":2011,"oy":2011,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"4f2e948c0477","cid":"4f2e948c0477","canon":1,"dups":1,"ftype":"data_center","name":"HCL DATA CENTER RENOVATION","city":"Mesquite","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Trinity Valley Elec COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/hcl-data-center-def63cac","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/hcl-data-center-def63cac","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"EFH CG HOLDINGS COMPANY","spon":"EFH CG HOLDINGS COMPANY","ay":2010,"oy":2010,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/hcl-data-center-def63cac"]},{"id":"277703671328","cid":"277703671328","canon":1,"dups":1,"ftype":"data_center","name":"Facebook AUS111 Ph 1.5","city":"Pflugerville","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"a5705cbdbf22","cid":"a5705cbdbf22","canon":1,"dups":1,"ftype":"data_center","name":"NEW DATA CENTER","city":"El Paso","county":"El Paso","state":"TX","lat":31.76648,"lng":-106.241423,"cprec":"shared_centroid","status":"Future / Expansion","mw":1000,"pc":"Grid","pconf":"High","pquote":"Our El Paso data center's electricity use will be matched with 100% clean and renewable energy. And through our agreement with El Paso Electric, we've paid for new grid infrastructure required to connect the data center, including new transmission lines and substations.","pscan":"https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/","uquote":"And through our agreement with El Paso Electric, we've paid for new grid infrastructure required to connect the data center, including new transmission lines and substations.","uscan":"https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/","ukey":"5701|TX","uname":"El Paso Electric Co","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2023,"oy":2028,"contro":"Community opposition regarding water consumption, electricity demand, environmental impacts, utility costs, and economic incentives. City council voted to discourage future hyperscale data center development and incentives.","deal":"Initial $1.5 billion investment increased to over $10 billion. City approved a Chapter 380 Agreement in December 2023 providing an 80% city property tax rebate. Meta purchased over 1,000 acres of city-owned land for $8.5 million in 2023. El Paso Electric is planning to develop a 366 MW power plant to power Meta's data center.","dealScan":"https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"about.fb.com","lflag":"status_adjusted_future_expansion source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/"],"band":"250+ MW","rawStatus":"Operational"},{"id":"0830b27ffd8f","cid":"3642ec927417","canon":0,"dups":2,"ftype":"crypto_hpc","name":"HEWLETT PACKARD DATA CENTER","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":16,"proc":"Dedicated PPA","pcp":"SunEdison, Inc.","pdt":"12-year purchase agreement, 112 MWs","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2006,"oy":2024,"deal":"Core Scientific acquired this facility; CoreWeave leased data center space from Core Scientific.","dealScan":"https://baxtel.com/data-center/core-scientific-austin-tx","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/core-scientific-austin-tx"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"3642ec927417","cid":"3642ec927417","canon":1,"dups":2,"ftype":"crypto_hpc","name":"HEWLETT PACKARD DATA CENTER","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":16,"pc":"Grid","pconf":"High","pquote":"Power provider: Austin Energy.","pscan":"https://centexdatacenters.org/tracker/coreweave-austin","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/coreweave-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"CoreWeave","tenant":"CoreWeave","ay":2006,"oy":2024,"deal":"Core Scientific acquired the facility in 2024. CoreWeave leased 16 MW of capacity under an 8-year agreement valued at over $100 million (March 2024). CoreWeave announced a definitive agreement to acquire Core Scientific for ~$9 billion (July 7, 2025).","dealScan":"https://centexdatacenters.org/tracker/coreweave-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/coreweave-austin"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"9cf59961035b","cid":"9cf59961035b","canon":1,"dups":1,"ftype":"crypto_hpc","name":"SITE 1 CONTAINER SOLUTION","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":20,"pc":"Grid","pconf":"High","pquote":"The electrical and mechanical systems are engineered for resilience, featuring Powerware UPS for backup power, and Liebert CRAHU units for advanced cooling. The 12-year purchase agreement provides HP with 112 MWs which will be used to run the company's Texas operations, including its Austin data center, Houston data center and Plano data center.","pscan":"https://wiredre.com/texas-data-centers-to-be-powered-by-wind-farm-with-new-hp-deal/","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2006,"oy":2024,"deal":"Core Scientific acquired the facility in 2024. CoreWeave secured an 8-year lease agreement with Core Scientific for over $100 million in 2024.","dealScan":"https://baxtel.com/data-center/coreweave-austin-tx","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"wiredre.com;baxtel.com","srcUrls":["https://wiredre.com/texas-data-centers-to-be-powered-by-wind-farm-with-new-hp-deal/","https://baxtel.com/data-center/coreweave-austin-tx"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"c732a45fceb4","cid":"c732a45fceb4","canon":1,"dups":1,"ftype":"data_center","name":"CAPITAL GROUP - DATA CENTER","city":"DATAPOINT","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"3b62143b3449","cid":"3b62143b3449","canon":1,"dups":1,"ftype":"data_center","name":"HOME DEPOT DATA CENTER","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"HOME DEPOT USA","spon":"HOME DEPOT USA","tenant":"Home Depot","ay":2005,"oy":2005,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"cbd7e97eec3a","cid":"cbd7e97eec3a","canon":1,"dups":1,"ftype":"data_center","name":"HP AUSTIN CONSOLIDATION","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The company is also implementing smart cooling technologies that optimize airflow for cooling of the data centers, leading to utility cost savings of up to 25 percent.","pscan":"https://www.datacenterknowledge.com/business/hp-s-data-center-mega-consolidation","uconf":"High","uquote":"HEWLETT-PACKARD AUSTIN DATA CENTER in Travis County, TX... Operational HEWLETT-PACKARD AUSTIN DATA CENTER... Austin Energy. Permit Status. Project Closed. Permit...","uscan":"https://www.interconnection.fyi/data-center/project/hewlett-packard-austin-data-center-b36af4f4","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Hewlett-Packard","spon":"Hewlett-Packard","tenant":"Hewlett-Packard","ay":2006,"oy":2008,"deal":"Acquisition of three buildings in Freescale Semiconductor campus for $16.3 million in January 2006.","dealScan":"https://www.datacenterknowledge.com/business/h-p-purchases-austin-complex-for-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;interconnection.fyi","lflag":"operational_null_capacity citation_artifact_removed","srcUrls":["https://www.datacenterknowledge.com/business/hp-s-data-center-mega-consolidation","https://www.interconnection.fyi/data-center/project/hewlett-packard-austin-data-center-b36af4f4","https://www.datacenterknowledge.com/business/h-p-purchases-austin-complex-for-data-center"]},{"id":"956e600eba3b","cid":"956e600eba3b","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Hut 8 King Mountain (JV)","city":"McCamey","county":"Upton","state":"TX","lat":31.353816,"lng":-102.041546,"cprec":"distinct","status":"Operational","mw":280,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The King Mountain JV has 280 MW of self-mining and hosting operations colocated behind-the-meter at a wind farm in McCamey, Texas. The site is positioned in West Texas, a major U.S. energy corridor with access to large-scale generation resources, including wind and grid-connected power infrastructure. Hut 8 reports 280 MW of capacity under management at King Mountain, and earlier transaction materials described the site as supporting hosting and managed infrastructure operations powered by a mix of sources including wind and nuclear.","rto":"ERCOT","nerc":"TRE","op":"Hut 8","spon":"King Mountain Joint Venture (Hut 8 and a Fortune 200 renewable energy producer)","tenant":"Marathon Digital Holdings (NASDAQ:MARA)","deal":"Acquisition of 50% membership interest by Hut 8 in December 2022 from Compute North bankruptcy; part of the Hut 8 and US Bitcoin Corp merger completed November 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"098b223db93a","cid":"098b223db93a","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Hut 8 Salt Creek","county":"Culberson","state":"TX","lat":31.445908,"lng":-104.526945,"cprec":"distinct","status":"Operational","mw":63,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Connected to the Rio Grande Electric Cooperative power grid, according to third-party facility data","uquote":"Connected to the Rio Grande Electric Cooperative power grid, according to third-party facility data","ukey":"16057|TX","uname":"Rio Grande Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Hut 8","spon":"Hut 8","ay":2024,"oy":2024,"deal":"Purchase of 63 MW substation and 1.9 acres of land for approximately $7.1 million on December 31, 2023. Financing of capital expenditures for the site using Bitcoin reserves announced February 27, 2024.","dealScan":"https://cryptorank.io/news/feed/b8678-hut-8-breaks-ground-on-new-mining-site-with-btc-reserve-despite-lawsuits","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cryptorank.io","srcUrls":["https://cryptorank.io/news/feed/b8678-hut-8-breaks-ground-on-new-mining-site-with-btc-reserve-despite-lawsuits"],"lflag":"source_quality_reclassified"},{"id":"aa41efdebfaa","cid":"aa41efdebfaa","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Hut 8 Vega","city":"Vega","county":"Oldham","state":"TX","lat":35.401921,"lng":-102.59762,"cprec":"distinct","status":"Operational","mw":175,"band":"100-250 MW","proc":"Dedicated PPA","pdt":"205 megawatts","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f9dc1323e8b4","cid":"f9dc1323e8b4","canon":1,"dups":1,"ftype":"data_center","name":"HUTTO DATA CENTER 1 LLC","city":"DENVER","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","mw":600,"pc":"Grid","pconf":"High","pquote":"Skybox Datacenters LLC and Prologis Inc. are ensuring their Skybox Datacenters PowerCampus Austin will have plenty of power through an agreement with Oncor Electric Delivery to build a 600-megawatt substation near their facility at the Hutto Megasite.","uquote":"Skybox Datacenters LLC and Prologis Inc. are ensuring their Skybox Datacenters PowerCampus Austin will have plenty of power through an agreement with Oncor Electric Delivery to build a 600-megawatt substation near their facility at the Hutto Megasite.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Skybox Datacenters and Prologis","spon":"Skybox Datacenters and Prologis","ay":2023,"oy":2024,"deal":"Chapter 312 incentives agreement with Hutto City Council for at least $10 billion capital investment, approved July 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"74434317ec2b","cid":"74434317ec2b","canon":1,"dups":1,"ftype":"data_center","name":"HUTTO DATA CENTER 2 LLC","city":"DENVER","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"cd56069c9957","cid":"cd56069c9957","canon":1,"dups":1,"ftype":"data_center","name":"HUTTO DATA CENTER 3 LLC","city":"DENVER","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The site is adjacent to a 345 kV transmission corridor and will offer two private 300 megawatt (MW) dedicated substations, making it one of the most scalable data center campuses in the United States.","pscan":"https://baxtel.com/data-center/skybox-hutto-3","uquote":"Prologis sold in November to Oncor Electric Delivery Company LLC.","uscan":"https://williamsoncountytxedp.com/multibillion-dollar-data-center-campus-proposed-in-williamson-county-secures-incentives/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Skybox Datacenters","spon":"Prologis , Rugen Street Capital, Bandera Ventures","oy":2026,"contro":"Hutto residents aired concerns over PowerCampus water and power demands at a public session.","controScan":"https://centexdatacenters.org/tracker/skybox-prologis-hutto","deal":"Construction estimated cost of $283,046,463","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"baxtel.com;williamsoncountytxedp.com;centexdatacenters.org","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://baxtel.com/data-center/skybox-hutto-3","https://williamsoncountytxedp.com/multibillion-dollar-data-center-campus-proposed-in-williamson-county-secures-incentives/","https://centexdatacenters.org/tracker/skybox-prologis-hutto"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"3efc454dd024","cid":"3efc454dd024","canon":0,"dups":1,"ftype":"data_center","name":"HUTTO DATA CENTER CAMPUS LLC","city":"DENVER","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Austin Energy","pscan":"https://www.interconnection.fyi/data-center/project/skybox-5df0e31e","uquote":"Grid Operator. Austin Energy","uscan":"https://www.interconnection.fyi/data-center/project/skybox-5df0e31e","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"HUTTO DATA CENTER CAMPUS","spon":"Skybox Datacenters, and Prologis","tenant":"Google","ay":2022,"oy":2024,"deal":"Tax abatement agreement with City of Hutto for 50% exemption of taxable value of tangible personal property for 10 years, approved July 20, 2023, tied to a minimum capital investment of $10 billion within ten years.","dealScan":"https://www.taylorpress.net/article/5465,city-approves-incentives-for-10b-game-changer-development","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;taylorpress.net","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/skybox-5df0e31e","https://www.taylorpress.net/article/5465,city-approves-incentives-for-10b-game-changer-development"]},{"id":"b64560b0b5d7","cid":"50189ba427a7","canon":0,"dups":4,"ftype":"data_center","name":"HUTTO DATA CENTER CAMPUS LLC","city":"DENVER","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","mw":600,"pc":"Grid","pconf":"High","pquote":"“The project will offer 600 megawatts through two private substations — making it one of the most scalable data center campuses in the United States.”","uquote":"An updated timeline has not been given for construction, but the site was last month annexed into and zoned by the city of Hutto, along with 62 acres that San Francisco-based Prologis sold in November to Oncor Electric Delivery Company LLC.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Skybox Datacenters and Prologis","tenant":"Google","ay":2023,"oy":2024,"contro":"Hutto residents aired concerns over water and power demands.","deal":"Chapter 312 incentives agreement with Hutto City Council for at least $10 billion capital investment (July 2023).","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text utility_alias_corrected high_confidence_duplicate_consolidated delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"50189ba427a7","cid":"50189ba427a7","canon":1,"dups":4,"ftype":"data_center","name":"HUTTO DATA CENTER CAMPUS LLC","city":"DENVER","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","mw":600,"pc":"Grid","pconf":"High","pquote":"The site is adjacent to a 345 kV transmission corridor and will offer two private 300 megawatt (MW) dedicated substations, making it one of the most scalable data center campuses in the United States.","pscan":"https://baxtel.com/data-center/skybox-hutto-3","uquote":"An updated timeline has not been given for construction, but the site was last month annexed into and zoned by the city of Hutto, along with 62 acres that San Francisco-based Prologis sold in November to Oncor Electric Delivery Company LLC.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Skybox Datacenters, and Prologis","tenant":"Google","ay":2023,"oy":2024,"contro":"Hutto residents aired concerns over PowerCampus water and power demands.","deal":"City Council approved a 50% tax abatement agreement for a minimum capital investment of at least $10 billion, effective July 21, 2023.","dealScan":"https://www.taylorpress.net/article/5465,city-approves-incentives-for-10b-game-changer-development","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"baxtel.com;taylorpress.net;centexdatacenters.org","srcUrls":["https://baxtel.com/data-center/skybox-hutto-3","https://www.taylorpress.net/article/5465,city-approves-incentives-for-10b-game-changer-development","https://centexdatacenters.org/tracker/skybox-prologis-hutto"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized delivery_utility_linked","controScan":"https://centexdatacenters.org/tracker/skybox-prologis-hutto","uconf":"High","dukey":"44372|TX"},{"id":"9e4116877264","cid":"50189ba427a7","canon":0,"dups":4,"ftype":"data_center","name":"HUTTO DATA CENTER CAMPUS LLC","city":"DENVER","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","mw":600,"pc":"Grid","pconf":"High","pquote":"“The project will offer 600 megawatts through two private substations — making it one of the most scalable data center campuses in the United States.”","uconf":"High","uquote":"“Prologis sold in November to Oncor Electric Delivery Company LLC.”","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Skybox Datacenters and Prologis","tenant":"Google","ay":2023,"oy":2024,"contro":"Community concerns regarding water consumption, power demand, and infrastructure strain.","deal":"Chapter 312 tax abatement approved in July 2023; $10 billion+ capital investment; $163 million data center broke ground in 2024; $125 million data center (Building 2) filed in August 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text utility_alias_corrected high_confidence_duplicate_consolidated delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"4dd362c89bb8","cid":"4dd362c89bb8","canon":1,"dups":1,"ftype":"data_center","name":"IBC TESORO DATA CENTER REMODEL","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"4766cff6c9c9","cid":"4766cff6c9c9","canon":1,"dups":1,"ftype":"data_center","name":"RENOVATE MEGA LAB RAISED FLOOR B. 045-2N","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"9a2d3b5cd81a","cid":"9a2d3b5cd81a","canon":1,"dups":1,"ftype":"data_center","name":"WATSON LAB EXPANSION PROJECT #AU14DS01","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Austin Energy is a member of the Electric Reliability Council of Texas (ERCOT). Austin Energy is the Qualified Scheduling Entity (QSE) for Austin Energy's load and generation. As the QSE, Austin Energy bids and offers its load and generation into the nodal ERCOT market for its wholesale activities.","uquote":"Grid Operator: Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/ibm-building-903-4-floor-d529fb78","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"IBM","spon":"IBM","tenant":"IBM","ay":2014,"oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/ibm-building-903-4-floor-d529fb78"]},{"id":"e943a2ce4941","cid":"e943a2ce4941","canon":1,"dups":1,"ftype":"data_center","name":"IBM BELLEVIEW DALLAS DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"fd76e215ab3d","cid":"fd76e215ab3d","canon":1,"dups":1,"ftype":"data_center","name":"IBM BELLEVIEW DALLAS DATA CENTER, 4TH","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"IBM","spon":"IBM","tenant":"IBM","ay":2012,"oy":2013,"deal":"Renovation/Alteration project with estimated cost of $1,055,000, completed February 2013.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/EABPRJB2817237","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/EABPRJB2817237"]},{"id":"33a537a683ec","cid":"33a537a683ec","canon":1,"dups":1,"ftype":"data_center","name":"FIT-UP PAISED FLOOR LAB B045-2E","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"IBM","spon":"IBM","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"666765fb4855","cid":"666765fb4855","canon":1,"dups":1,"ftype":"data_center","name":"ZCOLO - DATA CENTER RENOVATION","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DataBank","ay":2014,"oy":2015,"deal":"DataBank acquired zColo's US and UK data center assets from Zayo Group Holdings in December 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"15a2d3330b57","cid":"15a2d3330b57","canon":1,"dups":1,"ftype":"data_center","name":"CBEYOND DATA CENTER EXPANSION","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"High","pquote":"The building is supplied by five independent electric feeds to three separate electrical substations.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da11","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2012,"oy":2013,"deal":"Equinix acquired the Infomart building for $800 million in April 2018. Equinix completed a $140 million expansion in 2020. Equinix announced plans for a $180 million expansion in March 2023.","dealScan":"https://therealdeal.com/texas/dallas/2023/03/30/equinix-plans-180m-expansion-of-the-infomart/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;therealdeal.com","srcUrls":["https://baxtel.com/data-center/equinix-dallas-da11","https://therealdeal.com/texas/dallas/2023/03/30/equinix-plans-180m-expansion-of-the-infomart/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"639378049da4","cid":"639378049da4","canon":1,"dups":1,"ftype":"data_center","name":"INFOMART LOBBY RENOVATION","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The building's hospital-grade electrical power is supplied by five independent electric feeds to three separate electrical substations, providing a very reliable source that has never experienced a 100% outage. The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy. Tenants, still including Bank of America, rely on the building's multiple layers of back-up, including battery power if all four electrical feeds go down, and 10 emergency generators to further power the building that can last several weeks without new fuel.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tenant":"Multiple","ay":2000,"deal":"Equinix acquired Infomart Dallas from ASB Real Estate Investments for US$800 million in April 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"7c43687d46ef","cid":"7c43687d46ef","canon":1,"dups":1,"ftype":"data_center","name":"Informart Seventh Floor Alterations (EQ DA-99)","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor Electric Delivery","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2023,"oy":2023,"deal":"Renovation/Alteration project with an estimated cost of $750,000, started 4/3/2023 and completed 8/18/2023.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023010222","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity utility_alias_corrected source_url_canonicalized generic_permit_record delivery_utility_linked","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023010222"],"rawUkey":"18976|TX","rawUname":"Trinity Valley Elec Coop Inc","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"f110f9308955","cid":"f110f9308955","canon":1,"dups":1,"ftype":"data_center","name":"CFISD ISC DATA CENTER REMODEL","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Ciena's 6500 Packet-Optical Platform offers reliable high-capacity connectivity between CFISD's six main hubs and three data centers through Phonoscope LIGHTWAVE's extensive dark fiber network footprint. The network will also provide reliable connections between CFISD's educational campuses and its three data centers, one of which is a collocation facility located outside of the district and used to back up. Manage daily network and datacenter operations to support core business and education goals.","uconf":"High","uquote":"CFISD has leveraged incentive programs and cost-saving strategies to maximize financial efficiency while reducing its environmental footprint. The district has capitalized on multiple energy rebate programs, securing more than $3 million in funding since 2006 through the SCORE (School Conserving Resources) initiative. Additional financial achievements include:... $700,000+ from Demand Response ERCOT & CenterPoint incentives since 2020.","uscan":"https://www.cfisd.net/cfisd-news-details/~board/2024-2025-cfisd-district-news/post/cfisd-wins-energy-management-awards-at-tema-conference","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Cypress-Fairbanks Independent School District (CFISD)","spon":"Cypress-Fairbanks Independent School District (CFISD)","tenant":"Cypress-Fairbanks Independent School District (CFISD)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cfisd.net","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.cfisd.net/cfisd-news-details/~board/2024-2025-cfisd-district-news/post/cfisd-wins-energy-management-awards-at-tema-conference"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"cd54dcb9b5a4","cid":"cd54dcb9b5a4","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","ay":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"interior renovation of existing data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"417474c900d0","cid":"417474c900d0","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Denton County Elec Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Winner","spon":"Winner","ay":2016,"oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity display_name_normalized source_quality_reclassified generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"interior renovation of existing data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc."},{"id":"2a6c953011fa","cid":"2a6c953011fa","canon":1,"dups":1,"ftype":"data_center","name":"INTERNAP 11TH FL. DATA CTR. PHASE 1 EXP.","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":3,"pc":"Grid","pconf":"Medium","pquote":"The datacenter at 1301 Fannin Street, Houston, operated by INAP, is designed to meet various business needs with robust infrastructure. It offers a power capacity of 3.4 MW, ensuring reliable and continuous operation for hosted equipment. The facility is equipped with a diverse power feed, providing redundancy and stability.","pscan":"https://inflect.com/building/1301-fannin-street-houston/inap/datacenter/inap-1301-fannin-street","uconf":"High","uquote":"CenterPoint Energy Houston Electric LLC is the TDU serving the greater Houston metropolitan area. Operating within the ERCOT deregulated market, CenterPoint delivers electricity, maintains power lines and infrastructure, reads meters, and restores service after outages.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Evocative Data Centers","spon":"Netrality Data Centers","deal":"Sale of Houston colocation business from INAP to Netrality Data Centers on June 2, 2020. Acquisition of INAP data centers by Evocative Data Centers in 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","srcUrls":["https://inflect.com/building/1301-fannin-street-houston/inap/datacenter/inap-1301-fannin-street"],"band":"< 10 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"4e665b6964d7","cid":"4e665b6964d7","canon":1,"dups":1,"ftype":"crypto_hpc","name":"IREN Childress (Horizon 1-4)","city":"Childress","county":"Childress","state":"TX","lat":34.524624,"lng":-100.208166,"cprec":"distinct","status":"Operational","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The Childress campus is strategically positioned in West Texas with access to renewable energy and is directly connected to the ERCOT power grid via on-site substations owned by IREN.","uquote":"Childress began as a purpose-built Bitcoin mining facility in 2022 under a 600MW binding connection agreement with AEP Texas.","uscan":"https://northwiseproject.com/iren-stock-childress/","rto":"SPP","nerc":"MRO","op":"IREN","spon":"IREN","tenant":"Microsoft","ay":2025,"oy":2026,"contro":"Class-action lawsuit alleging misrepresentation of HPC capabilities and inadequate infrastructure.","deal":"$9.7 billion multi-year GPU cloud infrastructure agreement with Microsoft, announced November 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"northwiseproject.com","srcUrls":["https://northwiseproject.com/iren-stock-childress/"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"20404|TX"},{"id":"3eaa51928318","cid":"3eaa51928318","canon":1,"dups":1,"ftype":"data_center","name":"IRON MOUNTAIN DATA CENTER","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"RPD Energy (formerly Renewable Power Direct)","pdt":"over 25,000 megawatt-hours (MWh) of green energy each year over the next three years (for Texas and Illinois facilities combined)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8b1966f22cd5","cid":"8b1966f22cd5","canon":1,"dups":1,"ftype":"data_center","name":"Jam Data Center LLC","city":"Sugar Land","county":"Fort Bend","state":"TX","lat":29.526602,"lng":-95.771015,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"ad04f494ba20","cid":"ad04f494ba20","canon":1,"dups":1,"ftype":"data_center","name":"META Planning + Design","city":"Katy","county":"Fort Bend","state":"TX","lat":29.526602,"lng":-95.771015,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"5f773c262e6d","cid":"5f773c262e6d","canon":1,"dups":1,"ftype":"data_center","name":"KBR LEVEL 26 DATA CENTER DECOMMISSIONING","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"KBR","spon":"KBR","ay":2016,"oy":2017,"deal":"Renovation/Alteration project with an estimated value of $1.0M, registered November 4, 2016, closed February 1, 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"381553e6fb0a","cid":"381553e6fb0a","canon":1,"dups":1,"ftype":"data_center","name":"KCI DATA CENTER UPGRADE","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"09ca585ff144","cid":"09ca585ff144","canon":1,"dups":1,"ftype":"data_center","name":"LANCASTER DATA CENTER CAMPUS LAN 01","city":"LANCASTER","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Ultimately, the campus will include three buildings and be powered by a private on-site substation, which can produce up to 300 megawatts.","pscan":"https://www.connectcre.com/stories/skybox-building-phase-i-of-1m-sf-lancaster-data-center/","uquote":"The Skybox PowerCampus is Located at Oncor's deregulated power territory, Lancaster, TX. As the largest energy delivery company in Texas, Oncor works closely with retail electric providers (REPs), electric aggregators, brokers, consultants, and commercial consumers in Southern Dallas County.","uscan":"https://baxtel.com/data-center/prime-dfw01-02","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Skybox Datacenters","spon":"Bandera Ventures, Principal Asset Management","ay":2024,"oy":2026,"deal":"Construction of the 270,900-square-foot facility is estimated to cost about $85 million. The campus is a partnership with Dallas developer Bandera Ventures and Principal Asset Management.","dealScan":"https://www.wfaa.com/article/money/business/data-center-campus-dallas-texas-lancaster/287-992b1077-17a4-4e2c-ba05-62bbea5061e5","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"connectcre.com;baxtel.com;wfaa.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.connectcre.com/stories/skybox-building-phase-i-of-1m-sf-lancaster-data-center/","https://baxtel.com/data-center/prime-dfw01-02","https://www.wfaa.com/article/money/business/data-center-campus-dallas-texas-lancaster/287-992b1077-17a4-4e2c-ba05-62bbea5061e5"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"42ed1c92cb9a","cid":"42ed1c92cb9a","canon":1,"dups":1,"ftype":"crypto_hpc","name":"LANCIUM - MEP BUILDING 1 & 2","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Lancium, Blue Owl Capital, Primary Digital Infrastructure, SoftBank, OpenAI, Oracle, MGX","tenant":"OpenAI","ay":2021,"oy":2025,"contro":"Traffic and noise concerns from residents; tenant protesting property value.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$3.4 billion joint venture for AI data center development (October 15, 2024); $600 million debt financing (October 16, 2025)","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"1caa79785d4f","cid":"1caa79785d4f","canon":1,"dups":2,"ftype":"crypto_hpc","name":"LANCIUM ABILENE II LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","pc":"Hybrid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. In addition to the 1.2 GW grid interconnection, Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization. The campus will also leverage abundant proximate wind resources and incentivize new greenfield renewable power development. The data center will also feature natural gas turbines to power its back-up power supply.","proc":"Co-located generation","pcp":"Lancium","uconf":"High","uquote":"The utility company for Abilene is AEP Texas North.","uscan":"https://www.choosetexaspower.org/electricity-rates/abilene/","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"Lancium","ay":2021,"oy":2025,"contro":"Community opposition regarding increased traffic and noise, and controversy over property tax abatements.","controScan":"https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas","deal":"$600 million debt financing package closed October 16, 2025, for Lancium's Clean Campus development.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"choosetexaspower.org;lonestarleft.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.choosetexaspower.org/electricity-rates/abilene/","https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas"],"uname":"AEP Texas","reportedUtility":"AEP Texas","dukey":"20404|TX"},{"id":"0b30256c1600","cid":"1caa79785d4f","canon":0,"dups":2,"ftype":"crypto_hpc","name":"LANCIUM ABILENE II LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uconf":"High","uquote":"In Abilene, the utility company is AEP Texas North. They maintain power lines, handle outages, and deliver electricity to your home, no matter which electricity provider you choose.","uscan":"https://justenergy.com/electricity-rates/abilene-texas/","rto":"ERCOT","nerc":"TRE","op":"Lancium","tenant":"Oracle, Microsoft, OpenAI","contro":"Neighborhood residents frustrated by traffic and noise from the data center project.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;justenergy.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://justenergy.com/electricity-rates/abilene-texas/","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"uname":"AEP Texas","reportedUtility":"AEP Texas","dukey":"20404|TX"},{"id":"4c458cffa352","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Seamless 1.2GW grid interconnect; Onsite gas generation complete by 2025; Grid power backup elevates reliability.","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blackstone, Shell","tenant":"Oracle, Microsoft","ay":2022,"oy":2025,"contro":"Community concerns regarding power supply, reliability, and noise.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package announced October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;youtube.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=qHq2VP7ETo4"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"302ade52222a","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Crusoe Energy Systems","ay":2022,"oy":2025,"contro":"Neighborhood residents frustrated by traffic and noise","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package on October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"e1691f0ef8c7","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Lancium's campuses also include large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","proc":"Dedicated PPA","pcp":"Lancium","pdt":"1.2 GW contracted for AI data centers","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blue Owl Capital, Primary Digital Infrastructure, SBI Holdings, Hanwha Solutions","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Community concerns regarding power supply, reliability, noise, and water usage.","deal":"$600 million debt financing package closed October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"e36c1e477e32","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SBI Holdings, Hanwha Solutions","tenant":"Crusoe, Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community concerns regarding power supply, reliability, and noise.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package (October 16, 2025)","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"c528f1f49a3f","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Tenant protesting property value","controScan":"https://www.youtube.com/watch?v=G6qRevIepZs","deal":"$600 million debt financing package, October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=G6qRevIepZs"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"890be4ed5867","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blackstone, Shell","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Neighborhood residents frustrated by traffic and noise; property value protests; concerns about tax abatements.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package closed October 16, 2025; $3.4 billion joint-venture announced October 15, 2024; over $1 billion in capital raised from strategic partners.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;youtube.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"9fd9240863ce","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"deal":"$600 million debt financing package closed October 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"f202caafb0a2","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Our Abilene campus features a 1.2GW interconnect, which has been fully approved by ERCOT and undergone a rigorous, formal review process in collaboration with transmission service providers. Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blackstone, Shell","tenant":"Crusoe Energy Systems , Oracle, Microsoft, OpenAI","ay":2021,"oy":2025,"contro":"Tenant protesting property value; community concerns about power supply, reliability, and noise.","deal":"$2.4 billion investment over 20 years (announced Dec 2021); $600 million debt financing (Oct 2025)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"6612a1339c9f","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, OpenAI","ay":2021,"oy":2025,"contro":"Neighborhood residents frustrated by traffic and noise; tenant protesting property value.","controScan":"https://www.youtube.com/watch?v=G6qRevIepZs","deal":"$600 million debt financing package closed October 16, 2025; $2.4 billion partnership announced December 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;youtube.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=G6qRevIepZs"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"a9969fdbf6c7","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"Lancium designs, builds, and operates power infrastructure that is fully ERCOT-approved and integrates grid interconnections with behind-the-meter resources to optimize reliability and economics. This approach allows each campus to function as a grid-supportive asset, not a strain on the system. The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","proc":"Co-located generation","pcp":"Lancium","pdt":"1.2 GW campus capacity","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, OpenAI","ay":2021,"oy":2025,"contro":"Community frustration over increased traffic and noise from construction; tenant protesting property value.","controScan":"https://www.youtube.com/watch?v=G6qRevIepZs","deal":"$600 million debt financing package closed on October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=G6qRevIepZs"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"9b0c739f62ef","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Neighborhood residents frustrated by traffic; man injured by construction truck takes legal action; tenant protesting property value.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package closed October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"03a4d6837b50","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization. Develop gas generation to provide bridge power until grid connections come online.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, Crusoe, OpenAI","ay":2021,"oy":2025,"contro":"Neighborhood residents frustrated by traffic and noise.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package closed on October 16, 2025, arranged by Santander Corporate & Investment Banking and Cantor Fitzgerald.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;youtube.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"254a8804a824","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Community concerns regarding power supply, reliability, and noise.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package closed October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"1b96f1a42d11","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Neighborhood residents frustrated by traffic and noise; tenant protesting property value.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package closed on October 16, 2025; amendment to initial financial agreement on July 31, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"acedac1b3ff9","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization. The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Lancium is an energy technology and infrastructure company uniquely positioned to catalyze and enable the AI data center demand mega-trend, with the integration and orchestration of grid interconnects and behind the meter generation and storage resources, to ensure campuses are assets to the grid.","proc":"Co-located generation","pcp":"Lancium (developer of onsite generation) and ERCOT (grid connection)","pdt":"1.2 GW","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Lancium Abilene","spon":"SoftBank, OpenAI, Oracle, MGX, Blue Owl Capital, Primary Digital Infrastructure, SBI Holdings, Hanwha Solutions","tenant":"Oracle, Microsoft, Crusoe, OpenAI","ay":2021,"oy":2025,"contro":"Community opposition due to increased traffic and noise; tenant protesting property value; property tax abatement controversy.","controScan":"https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas","deal":"$600 million debt financing package closed on October 16, 2025; $3.4 billion joint-venture announced October 15, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"lonestarleft.com","srcUrls":["https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"7bb1987b0902","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"Lancium designs, builds, and operates power infrastructure that is fully ERCOT-approved and integrates grid interconnections with behind-the-meter resources to optimize reliability and economics.","pscan":"https://abileneaidatacenter.com/","proc":"Co-located generation","uconf":"High","uquote":"The remaining property being annexed is owned by AEP Texas, Inc.","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, OpenAI, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Community opposition regarding traffic and noise; tenant protesting property value.","controScan":"https://www.youtube.com/watch?v=G6qRevIepZs","deal":"$2.4 billion investment over 20 years (announced Dec 2021); $600 million debt financing (Oct 2025); $3.4 billion joint venture with Crusoe, Blue Owl Capital, and Primary Digital Infrastructure (Oct 2024).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"abileneaidatacenter.com;youtube.com","srcUrls":["https://abileneaidatacenter.com/","https://www.youtube.com/watch?v=G6qRevIepZs"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"20404|TX"},{"id":"3f80c3c9c6d2","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"Lancium is an energy technology and infrastructure company uniquely positioned to catalyze and enable the AI data center demand mega-trend, with the integration and orchestration of grid interconnects and behind the meter generation and storage resources, to ensure campuses are assets to the grid. Lancium's power plan for their campuses includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization. The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup.","proc":"Co-located generation","pcp":"Lancium","pdt":"1.2 GW capacity","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium Abilene","spon":"SoftBank, OpenAI, Oracle, MGX, Blue Owl Capital , Primary Digital Infrastructure","tenant":"Oracle, Microsoft, OpenAI","ay":2021,"oy":2025,"contro":"Community concerns regarding power supply, reliability, and noise; protest of property value by a tenant.","deal":"$600 million debt financing package (October 16, 2025); $3.4 billion joint-venture (October 15, 2024)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"ecfa431299c8","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"Lancium is a power infrastructure company that builds grid interconnections, owns land, and provides power management services to AI data center developers. Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/lancium-abilene-llc-5f859c84","uquote":"AEP Texas, Inc. Electric transmission","rto":"ERCOT","nerc":"TRE","op":"Lancium Abilene","spon":"Blackstone","tenant":"OpenAI, Oracle","ay":2021,"oy":2026,"deal":"$600 million debt financing from Cantor Fitzgerald, October 8, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/lancium-abilene-llc-5f859c84"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"20404|TX"},{"id":"374072f3764d","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, Crusoe, OpenAI","ay":2022,"oy":2025,"contro":"Community concerns about power supply, reliability, and noise were addressed by Lancium's CEO.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package closed on October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"b68269404507","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Lancium's power plan for their campuses includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","proc":"Dedicated PPA","pcp":"Lancium","pdt":"1.2 GW contracted for AI data centers; Oracle 15-year tenant, Microsoft 20-year tenant","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle, Microsoft, Crusoe","ay":2021,"oy":2025,"contro":"Community opposition due to increased traffic and noise, and concerns about property tax abatements.","controScan":"https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas","deal":"$600 million debt financing package (October 16, 2025); $3.4 billion joint-venture (October 15, 2024)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;lonestarleft.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"68c276b5743a","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup Our Abilene campus features a 1.2GW interconnect, which has been fully approved by ERCOT and undergone a rigorous, formal review process in collaboration with transmission service providers. This ensures that our operations support grid reliability with no negative impact to local communities. Lancium is actively developing multiple gigawatt-scale AI Data center campuses. Our flagship campus project is Stargate 1 located in Abilene, TX. This campus anchors our broader vision for scalable, energy-efficient AI infrastructure. Seamless 1.2GW grid interconnect. Onsite gas generation complete by 2025. Lancium's end-to-end solutions include land acquisition, grid interconnect, site engineering, renewables interconnect, and power orchestration. In addition to the 1.2 GW grid interconnection, Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blackstone, Shell","tenant":"Oracle, Microsoft, OpenAI, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Community concerns about power supply, reliability, and noise.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package closed on October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;youtube.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=qHq2VP7ETo4"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"53d736b8fbca","cid":"53d736b8fbca","canon":1,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Lancium's power plan for their campuses includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization. Seamless 1.2GW grid interconnect; Onsite gas generation complete by 2025.","proc":"Co-located generation","pcp":"Lancium","pdt":"1.2 GW campus capacity","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium Abilene","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, OpenAI, Crusoe Energy Systems","oy":2025,"contro":"Increased traffic and noise for local residents; tenant protesting property value.","controScan":"https://www.youtube.com/watch?v=G6qRevIepZs","deal":"$600 million debt financing package closed on October 16, 2025.","dealScan":"https://www.prnewswire.com/news-releases/lancium-secures-600-million-debt-financing-to-advance-clean-campus-development-starting-with-1-2-gw-abilene-site-302585635.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"youtube.com;mortenson.com;prnewswire.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.prnewswire.com/news-releases/lancium-secures-600-million-debt-financing-to-advance-clean-campus-development-starting-with-1-2-gw-abilene-site-302585635.html","https://www.youtube.com/watch?v=G6qRevIepZs"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized delivery_utility_linked","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uname":"AEP Texas","dukey":"20404|TX"},{"id":"712bd8a5ae34","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX (Stargate initiative backers)","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community opposition due to increased traffic and noise; property tax abatement controversy.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package closed October 16, 2025","dealScan":"https://www.prnewswire.com/news-releases/lancium-secures-600-million-debt-financing-to-advance-clean-campus-development-starting-with-1-2-gw-abilene-site-302585635.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"youtube.com;mortenson.com;prnewswire.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.prnewswire.com/news-releases/lancium-secures-600-million-debt-financing-to-advance-clean-campus-development-starting-with-1-2-gw-abilene-site-302585635.html","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"f200f27de608","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Neighborhood residents frustrated by traffic and noise","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package on October 16, 2025; $3.4 billion Joint Venture for AI Data Center Development on October 15, 2024","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"037826c17048","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. In addition to the 1.2 GW grid interconnection, Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, SBI Holdings, Hanwha Solutions, MGX","tenant":"Oracle, Microsoft, OpenAI","ay":2021,"oy":2025,"contro":"Community concerns regarding power supply, reliability, and noise.","deal":"$2.4 billion investment over 20 years announced December 21, 2021; $600 million debt financing closed October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"6088e82f5908","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Public concerns regarding power supply, reliability, noise, and water usage.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing secured on October 16, 2025. $3.4 billion joint venture for AI data center development announced October 15, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"34582371ad1d","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. In addition to the 1.2 GW grid interconnection, Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization. The campus will also leverage abundant proximate wind resources and incentivize new greenfield renewable power development. The data center will also feature natural gas turbines to power its back-up power supply.","proc":"Co-located generation","pcp":"Lancium","pdt":"1.2GW interconnect, onsite gas generation complete by 2025","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blue Owl Capital , Primary Digital Infrastructure","tenant":"Oracle, Microsoft, OpenAI","ay":2021,"oy":2025,"contro":"Concerns about power supply, reliability, noise, and a tenant protesting property value.","controScan":"https://www.youtube.com/watch?v=G6qRevIepZs","deal":"$600 million debt financing (October 16, 2025); $3.4 billion joint-venture (October 15, 2024); Chapter 312 Tax Abatement Agreement (December 17, 2021)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;youtube.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=G6qRevIepZs"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"3978601eb000","cid":"53d736b8fbca","canon":0,"dups":28,"ftype":"crypto_hpc","name":"LANCIUM ABILENE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uconf":"High","uquote":"The utility company for Abilene is AEP Texas North. In the event of a power outage or electrical emergency, call your utility company, not your provider.","uscan":"https://www.choosetexaspower.org/electricity-rates/abilene/","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2026,"contro":"Neighborhood residents frustrated by traffic from Lancium data center project in Abilene","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package, October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;choosetexaspower.org","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.choosetexaspower.org/electricity-rates/abilene/","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"20404|TX"},{"id":"f65c56dc2f1a","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Increased traffic and noise disrupting local residents.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing closed October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mortenson.com;youtube.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"a5e961da2de8","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. Lancium's campuses also include large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community concerns regarding power supply, reliability, and noise.","deal":"$600 million debt financing package closed on October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"41d12f247b5d","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Concerns raised about impact on city's power supply, reliability, and noise.","deal":"$600 million debt financing package closed on October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"344bc05fbe4d","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"Lancium","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community opposition regarding increased traffic and noise. Concerns about water consumption.","controScan":"https://www.youtube.com/watch?v=O4XC2XG1AXk","deal":"$600 million debt financing package closed on October 16, 2025.","tier":4,"tlbl":"Blog/social","srcCt":2,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.youtube.com/watch?v=O4XC2XG1AXk"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"9b1daf3a8564","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2021,"oy":2025,"contro":"Neighborhood residents frustrated by increased traffic and noise; tenant protesting property value; tax abatement controversy.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package closed October 16, 2025.","tier":4,"tlbl":"Blog/social","srcCt":2,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"fb2e1dad1160","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community discussions and concerns regarding the facility's potential impact on the city's power supply, reliability, and noise.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package closed October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"5e0d15a4c54a","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid, directly which is through our substations. There is natural gas, um there for 9 and 10 and for reliability. Lancium's power plan for the site includes large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium ABILENE REAL ESTATE","spon":"Blue Owl Capital, Primary Digital Infrastructure, SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community opposition due to increased traffic and noise; tenant protesting property value; tax abatement controversy.","deal":"$600 million debt financing package closed October 16, 2025; $3.4 billion joint-venture announced October 15, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"38ff5d2c946c","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. Lancium's campuses also include large-scale behind-the-meter battery storage and solar resources, which serve to ensure grid reliability, and economic and carbon optimization.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"Lancium","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community opposition due to increased traffic and noise.","deal":"$600 million debt financing package (October 16, 2025); $3.4 billion joint-venture with Blue Owl Capital and Primary Digital Infrastructure (October 15, 2024)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"81eb6962a3c3","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"deal":"$600 million debt financing (October 16, 2025)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"89ad6951efae","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"Lancium, SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community questions regarding power supply, reliability, and noise.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package closed October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"1160d2d3f1a6","cid":"1160d2d3f1a6","canon":1,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. Our Abilene campus features a 1.2GW interconnect, which has been fully approved by ERCOT and undergone a rigorous, formal review process in collaboration with transmission service providers. Onsite gas generation complete by 2025.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle, Microsoft, Crusoe","ay":2021,"oy":2025,"contro":"Community opposition due to increased traffic and noise; property tax abatement controversy.","controScan":"https://www.youtube.com/watch?v=G6qRevIepZs","deal":"$600 million debt financing package closed October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=G6qRevIepZs"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uconf":"High"},{"id":"38097d7ee75f","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2022,"oy":2025,"contro":"Community concerns about power supply, reliability, and noise.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package, October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"e0da677dd2df","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX, Crusoe","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Concerns about power supply, reliability, and noise.","controScan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","deal":"$600 million debt financing package closed October 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"f6e9a8f97d80","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability.","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2022,"oy":2025,"contro":"Community concerns regarding power supply, reliability, and noise.","deal":"$600 million debt financing package closed October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"52eb1816672c","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft","ay":2021,"oy":2025,"contro":"Community opposition regarding increased traffic and noise; tenant protesting property value; concerns about rising costs and city infrastructure strain.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing, October 16, 2025","tier":4,"tlbl":"Blog/social","srcCt":2,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"78bdcb90bccc","cid":"1160d2d3f1a6","canon":0,"dups":16,"ftype":"crypto_hpc","name":"LANCIUM ABILENE REAL ESTATE LLC","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, Microsoft, Crusoe","ay":2021,"oy":2025,"deal":"$600 million debt financing package, October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"e46c64296065","cid":"e46c64296065","canon":1,"dups":1,"ftype":"data_center","name":"LEVEL 3","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"N+1 Electrical Design and Distribution. 99.999 % SLA on Power. Redundant UPS in N+1 Configuration. Battery Backup. Diesel Generators in N+1 Redundancy.","pscan":"https://cloudandcolocation.com/datacenters/level-3-communications-dallas-data-center/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/lumen-dallas-1","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Lumen Technologies","spon":"Lumen Technologies","oy":2000,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/level-3-communications-dallas-data-center/","https://baxtel.com/data-center/lumen-dallas-1"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"da77b3ed2ce8","cid":"da77b3ed2ce8","canon":1,"dups":1,"ftype":"data_center","name":"Office/Warehouse Data Center Load Increase — Austin, TX","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized","rawName":"Load Increase (Interior/Exterior Service Yard) to an existing Office/Warehouse Bldg. (Data Center)","srcUrls":null,"srcDom":null},{"id":"f0f158729acf","cid":"f0f158729acf","canon":1,"dups":1,"ftype":"data_center","name":"LOWE'S DATA CENTER EXPANSION","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Lowe's center would employ just 25 workers, but use substantial power that would funnel revenue to the city through its utility, CPS Energy.","pscan":"https://www.datacenterknowledge.com/business/lowe-s-chooses-san-antonio-for-data-center","uconf":"High","uquote":"Lowe's center would employ just 25 workers, but use substantial power that would funnel revenue to the city through its utility, CPS Energy.","uscan":"https://www.datacenterknowledge.com/business/lowe-s-chooses-san-antonio-for-data-center","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Lowe's","spon":"Lowe's","tenant":"Lowe's","ay":2006,"oy":2007,"deal":"$126 million investment contingent on a 10-year tax abatement (June 2006)","dealScan":"https://www.datacenterknowledge.com/business/lowe-s-chooses-san-antonio-for-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.datacenterknowledge.com/business/lowe-s-chooses-san-antonio-for-data-center"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"fde14d212bcf","cid":"fde14d212bcf","canon":1,"dups":1,"ftype":"data_center","name":"LOWES DATA CENTER 10K EXPANSION","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"CPS Energy","uquote":"The Lowe's center would employ just 25 workers, but use substantial power that would funnel revenue to the city through its utility, CPS Energy.","uscan":"https://www.datacenterknowledge.com/business/lowe-s-chooses-san-antonio-for-data-center","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Lowe's Companies","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.datacenterknowledge.com/business/lowe-s-chooses-san-antonio-for-data-center"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"16532d8cfb73","cid":"16532d8cfb73","canon":1,"dups":1,"ftype":"data_center","name":"GUHN ROAD EMERGENCY GENERATOR FUEL TANK","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"A. THIS DATA CENTER IS RUNNING ON NORMAL POWER AND TEMPORARY EMERGENCY POWER. B. THIS CONTRACTOR TO COORDINATE WITH MDACC TO KEEP THE FACILITY ON TEMPORARY EMERGENCY POWER UNTIL THE SECOND TRANSFORMER AND NEW PARALLELING GEAR ARE INSTALLED AND ENERGIZED. C. COORDINATE WITH CENTERPOINT ENERGY TO EXTEND. THE EXISTING OVERHEAD LINE, INSTALL NEW SERVICE. POLE AND PAD MOUNTED TRANSFORMER.","uconf":"High","uquote":"B. COORDINATE WITH CENTERPOINT ENERGY TO EXTEND. THE EXISTING OVERHEAD LINE, INSTALL NEW SERVICE. POLE AND PAD MOUNTED TRANSFORMER.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"The University of Texas MD Anderson Cancer Center","spon":"The University of Texas MD Anderson Cancer Center","tenant":"The University of Texas MD Anderson Cancer Center","oy":2012,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected generic_permit_record delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"ee58f166e9ab","cid":"ee58f166e9ab","canon":1,"dups":1,"ftype":"data_center","name":"DCG DATA CENTER UPDATE CAMERA SYSTEM","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","uquote":"COORDINATE WITH CENTERPOINT ENERGY TO EXTEND. THE EXISTING OVERHEAD LINE, INSTALL NEW SERVICE. POLE AND PAD MOUNTED TRANSFORMER.","uscan":"https://www4.mdanderson.org/procurement/bids/fileViewer.cfm?id=307","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"M.D. Anderson Cancer Center","spon":"The University of Texas System","tenant":"M.D. Anderson Cancer Center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"www4.mdanderson.org","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://www4.mdanderson.org/procurement/bids/fileViewer.cfm?id=307"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"c2298077aef6","cid":"c2298077aef6","canon":0,"dups":1,"ftype":"data_center","name":"DATA CENTER - GENERATOR #2","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_unsourced_permit_record","rawName":"DATA CENTER - GENERATOR #2","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"28d76efc6ab5","cid":"28d76efc6ab5","canon":1,"dups":1,"ftype":"crypto_hpc","name":"MARA Holdings Garden City","city":"Garden City","county":"Glasscock","state":"TX","lat":31.868006,"lng":-101.521494,"cprec":"distinct","status":"Operational","mw":200,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"Our Bitcoin mining data center in Garden City, Texas, draws renewable energy from an adjacent wind farm and supports over 25 dedicated team members.... Power Type. Wind. Grid.","pscan":"https://www.mara.com/operations","proc":"Co-located generation","pcp":"Adjacent wind farm","rto":"ERCOT","nerc":"TRE","op":"Marathon Digital Holdings","spon":"Marathon Digital Holdings","tenant":"Marathon Digital Holdings","ay":2024,"oy":2023,"deal":"Acquisition of Bitcoin mining site from Applied Digital Corporation for $96.8 million, closed April 1, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mara.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.mara.com/operations"]},{"id":"d72c4c142cbd","cid":"d72c4c142cbd","canon":1,"dups":1,"ftype":"crypto_hpc","name":"MARA Holdings Granbury","city":"Granbury","county":"Hood","state":"TX","lat":32.430149,"lng":-97.831677,"cprec":"distinct","status":"Operational","mw":300,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The facility is behind the meter, and derives all its electrical power from the Wolf Hollow Gas plant, a 1,115 MW generation facility owned by Constellation Energy.","pscan":"https://www.gem.wiki/Compute_North_Hood_County_facility","proc":"Co-located generation","pcp":"Constellation Energy","pdt":"290 MW capacity","uquote":"Marathon operates its bitcoin mining facility behind-the-meter at the Wolf Hollow gas plant in Granbury. The gas plant is a 1,115 megawatt combined-cycle gas and steam turbine generation facility, with plans to bring an additional 300 megawatts of gas-fired generation online.","rto":"ERCOT","nerc":"TRE","op":"MARA Holdings","spon":"MARA Holdings","ay":2022,"oy":2022,"contro":"Residents filed lawsuits against Marathon Digital Holdings due to excessive noise pollution causing health issues and property value concerns.","deal":"Marathon Digital Holdings acquired two operational Bitcoin mining sites, including Granbury, from subsidiaries of Generate Capital for $178.6 million, closing in January 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"gem.wiki","srcUrls":["https://www.gem.wiki/Compute_North_Hood_County_facility"],"lflag":"source_quality_reclassified"},{"id":"702685f73d53","cid":"702685f73d53","canon":1,"dups":1,"ftype":"crypto_hpc","name":"MARA Holdings Hansford Wind Farm","county":"Hansford","state":"TX","lat":36.272847,"lng":-101.35693,"cprec":"distinct","status":"Operational","mw":114,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"MARA will develop and operate a behind-the-meter data center powered entirely by the site's 114 MW of wind capacity at zero-marginal energy cost.","proc":"Co-located generation","pcp":"MARA Holdings (self-owned)","pdt":"Acquisition of 114 MW wind farm (price not disclosed)","rto":"SPP","nerc":"MRO","op":"MARA Holdings","spon":"MARA Holdings","tenant":"MARA Holdings, (Bitcoin mining)","ay":2024,"oy":2025,"deal":"Acquisition of wind farm for $240 million, announced December 3, 2024, closed February 18, 2025.","dealScan":"https://www.notebookcheck.net/Crypto-miner-acquires-a-240-million-wind-farm-to-secure-low-energy-prices.935641.0.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"notebookcheck.net","srcUrls":["https://www.notebookcheck.net/Crypto-miner-acquires-a-240-million-wind-farm-to-secure-low-energy-prices.935641.0.html"],"lflag":"source_quality_reclassified"},{"id":"1492a15587b8","cid":"1492a15587b8","canon":1,"dups":1,"ftype":"crypto_hpc","name":"MARA HOLDINGS INC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5c651a53ac27","cid":"5c651a53ac27","canon":1,"dups":1,"ftype":"data_center","name":"NEXTERA ENERGY RESOURCES","city":"Bruni","county":"Webb","state":"TX","lat":27.760799,"lng":-99.340752,"cprec":"distinct","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"ae63265e417f","cid":"ae63265e417f","canon":1,"dups":1,"ftype":"data_center","name":"RENOVATION FOR MEDSTAR DATA CENTER","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"4607109475b8","cid":"4607109475b8","canon":1,"dups":1,"ftype":"data_center","name":"SAXON MORTGAGE DATA CENTER RENOVATION","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"68b604fd8a81","cid":"68b604fd8a81","canon":1,"dups":1,"ftype":"data_center","name":"MERIPLEX DC EQUIPMENT UPGRADE","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5493422983de","cid":"5493422983de","canon":1,"dups":1,"ftype":"data_center","name":"MET CENTER (ERCOT DATA CENTER)","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","op":"ERCOT","spon":"ERCOT","tenant":"ERCOT","oy":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3bdea375bbd6","cid":"3bdea375bbd6","canon":1,"dups":1,"ftype":"data_center","name":"MET CENTER 11","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":16,"pc":"Grid","pconf":"High","pquote":"The site has diverse underground electrical ductbanks from a nearby substation.","uquote":"The site has diverse underground electrical ductbanks from a nearby substation.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty","oy":2000,"deal":"Acquisition of a six-building portfolio from MetCenter Business Park (date not specified, but Digital Realty announced relocation of HQ to Austin in Jan 2021)","dealScan":"https://centexdatacenters.org/tracker/digital-realty-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/digital-realty-austin"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"42429b570c6f","cid":"42429b570c6f","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":729,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The facility operated entirely on 100% clean and renewable energy, contributing to the development of nearly 1,919 MW of new renewable energy in Texas.","pscan":"https://www.dpr.com/projects/facebook-fort-worth-data-center","uconf":"High","uquote":"Multiple 345-kV and 138-kV transmission lines served by Oncor Electric Delivery & Brazos Electric; Four substations with multiple sites for future substations; Texas is one of the lowest-cost power markets in the country.","uscan":"https://www.alliancetexas.com/data-center","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Meta","spon":"Meta","tenant":"Meta","ay":2015,"oy":2017,"deal":"Investment of more than $1.5 billion (announced by December 2020)","dealScan":"https://datacenters.atmeta.com/2020/12/expanding-facebooks-fort-worth-data-center-by-approximately-170000-square-feet/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"dpr.com;alliancetexas.com;datacenters.atmeta.com","srcUrls":["https://www.dpr.com/projects/facebook-fort-worth-data-center","https://www.alliancetexas.com/data-center","https://datacenters.atmeta.com/2020/12/expanding-facebooks-fort-worth-data-center-by-approximately-170000-square-feet/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"42c52e8bd8a8","cid":"42c52e8bd8a8","canon":0,"dups":1,"ftype":"data_center","name":"Meta","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The facility operated entirely on 100% clean and renewable energy, contributing to the development of nearly 1,919 MW of new renewable energy in Texas. Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 1,919 megawatts of new renewable energy in Texas.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Fort-Worth-Data-Center.pdf","uconf":"Medium","uquote":"Grid Operator: United Electric COOP Service INC - (TX).","uscan":"https://www.interconnection.fyi/data-center/project/meta-ab4cee68","ukey":"19490|TX","uname":"United Electric Coop Service Inc - (TX)","rto":"ERCOT","nerc":"TRE","op":"Meta","spon":"Meta","tenant":"Meta","ay":2015,"oy":2023,"deal":"Fort Worth approved financial incentives up to $147 million and Tarrant County approved a 10-year tax abatement (July 07, 2015). Meta also announced a deal to purchase 100% of power from a 600 MW Enbridge solar plant in Texas, involving a $900 million investment (July 24, 2025).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;interconnection.fyi","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Fort-Worth-Data-Center.pdf","https://www.interconnection.fyi/data-center/project/meta-ab4cee68"],"lflag":"merged_duplicate"},{"id":"cf03b9c30ec5","cid":"cf03b9c30ec5","canon":1,"dups":1,"ftype":"data_center","name":"Meta Temple","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Operational","mw":152,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The site will be supported by 100% renewable energy and is slated for LEED Gold certification by the U.S. Green Building Council.","pscan":"https://jedunn.com/projects/meta-temple-data-center/","uquote":"Grid Operator. Heart of Texas Electric COOP.","uscan":"https://www.interconnection.fyi/data-center/project/meta-temple-f7dc40d2","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"Meta","spon":"Meta","tenant":"Meta","ay":2022,"oy":2026,"contro":"Community opposition citing intensive water and energy usage, noise pollution, and displacement.","deal":"Initial investment of $800 million announced in 2022. PPA with ENGIE North America for 260 MW solar project in late 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"jedunn.com;interconnection.fyi","srcUrls":["https://jedunn.com/projects/meta-temple-data-center/","https://www.interconnection.fyi/data-center/project/meta-temple-f7dc40d2"],"lflag":"source_quality_reclassified"},{"id":"5f14c2af72ea","cid":"5f14c2af72ea","canon":0,"dups":1,"ftype":"data_center","name":"DATA CENTER EXPANSION","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_unsourced_permit_record","rawName":"DATA CENTER EXPANSION","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"e407ae8464a7","cid":"e407ae8464a7","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON HOUDINI - UTX2","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"7b762264c161","cid":"7b762264c161","canon":1,"dups":1,"ftype":"data_center","name":"MICRON DATA CENTER","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"60db5cf13d4b","cid":"60db5cf13d4b","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Castroville","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"f54fe88a51b7","cid":"6a5d26600ba3","canon":0,"dups":2,"ftype":"data_center","name":"Microsoft","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The far West Side's cheap and plentiful electricity, thanks to the numerous substations that CPS Energy has there, has made it a desirable location for data centers.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","oy":2008,"contro":"Lawsuit and mechanic's lien filed by contractor Rogers-O'Brien Construction LLC for $34.2 million over unpaid work.","deal":"$250 million investment for expansion with a 15-year Chapter 380 Tax Reimbursement, approved March 2014.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-lines-up-incentives-for-250-million-san-antonio-expansion","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;datacenterknowledge.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.datacenterknowledge.com/hyperscalers/microsoft-lines-up-incentives-for-250-million-san-antonio-expansion"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"921f78e80bec","cid":"921f78e80bec","canon":0,"dups":2,"ftype":"data_center","name":"Microsoft","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"CPS Energy has been encouraging companies to build the high-powered facilities in other parts of the metro area to spread out the utility's power loads and prevent congestion on its distribution system.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","oy":2005,"contro":"Lawsuit over unpaid construction work and community concerns regarding tree removal and utility strain.","deal":"City Council approved a 15-year Chapter 380 tax reimbursement for Microsoft of 40% of city property taxes on real and personal property investment of $250 million in 2013.","dealScan":"https://sanantonioreport.org/microsoft-data-centers-san-antonio-region/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;sanantonioreport.org","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://sanantonioreport.org/microsoft-data-centers-san-antonio-region/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"d75173570e14","cid":"d75173570e14","canon":0,"dups":2,"ftype":"data_center","name":"Microsoft","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"CPS Energy, the city-owned utility, has faced pressure from the Energy Forward Alliance — a coalition of data center companies and their stakeholders that formed late last year — to build more infrastructure and expand capacity.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2005,"contro":"Community opposition regarding tree removal and utility grid impact; lawsuit from contractor.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","deal":"Microsoft acquired a 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-chevron","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"azure.microsoft.com;baxtel.com;windowscentral.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified,merged_duplicate","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://baxtel.com/data-center/microsoft-san-antonio-chevron","https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"6a5d26600ba3","cid":"6a5d26600ba3","canon":0,"dups":2,"ftype":"data_center","name":"Microsoft","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","uconf":"High","uquote":"San Antonio is prepared for that growth and is working to stay ahead of demand, said CPS Energy's Ben Jordan, the utility's interim senior director of integrated system planning. The publicly-owned utility plays an integral part in building out enough state-level infrastructure to support Texas's continued growth.","uscan":"https://sanantonioreport.org/microsoft-doubles-down-on-data-centers-texas-business/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2005,"contro":"Lawsuit over unpaid work and community opposition regarding tree removal.","deal":"Acquisition of 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"sanantonioreport.org","lflag":"online_before_announced utility_alias_corrected,merged_duplicate","srcUrls":["https://sanantonioreport.org/microsoft-doubles-down-on-data-centers-texas-business/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"fa91470b9c77","cid":"921f78e80bec","canon":0,"dups":2,"ftype":"data_center","name":"Microsoft","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The far West Side's cheap and plentiful electricity, thanks to the numerous substations that CPS Energy has there, has made it a desirable location for data centers.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft (Azure)","oy":2009,"contro":"Lawsuit over unpaid construction work and community opposition regarding tree removal for expansion.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","deal":"Microsoft announced a $1.5 billion investment to expand data center operations in San Antonio, Texas (March 2025).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;windowscentral.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"cfdde3de4ad2","cid":"cfdde3de4ad2","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Chevron/SN7 Colo 1","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"For instance, severe winter weather events in Texas in 2021 caused substantial pressure on the Texas energy grid. Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"5200 Rogers Road is separated from Microsoft's data centers at 5150 Rogers Road and 3823 Wiseman Boulevard–both already completely built out–by a City Public Service substation.","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft Azure, Chevron","ay":2019,"oy":2020,"contro":"Lawsuit by contractor Rogers-O'Brien Construction for $34 million over a problem-plagued new data center project.","controScan":"https://www.enr.com/articles/49521-contractor-rogers-obrien-seeks-34m-from-microsoft-over-data-center","deal":"Acquisition from Chevron for $80 million in 2017; seven-year agreement with Chevron for cloud hosting in 2017; $44 million finish-out for COLO 1.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;enr.com","lflag":"operational_null_capacity source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.enr.com/articles/49521-contractor-rogers-obrien-seeks-34m-from-microsoft-over-data-center"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","ukey":"16604|TX"},{"id":"5b3c5fdd63a7","cid":"5b3c5fdd63a7","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft SN7 Phase 2","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"City Public Service (CPS Energy)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"62195b1ec5b8","cid":"62195b1ec5b8","canon":0,"dups":1,"ftype":"data_center","name":"DATA CENTER FINISH OUT - SUITE 220","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_unsourced_permit_record","rawName":"DATA CENTER FINISH OUT - SUITE 220","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"71606628fbee","cid":"71606628fbee","canon":1,"dups":1,"ftype":"data_center","name":"MMP Amazon Go Locations","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Amazon","tenant":"Houston Astros / Minute Maid Park","ay":2022,"oy":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"0763b2c073f8","cid":"0763b2c073f8","canon":1,"dups":1,"ftype":"data_center","name":"TECHNOLOGY SERVICES DATA CENTER PHASE 1","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Utility (e.g., Oncor)","rto":"ERCOT","nerc":"TRE","op":"City of Plano","spon":"City of Plano","tenant":"City of Plano","ay":2012,"deal":"$4.8M Renovation/Alteration project registered July 11, 2012","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity unlinked_source_text utility_alias_corrected delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"0cb38bc0af5a","cid":"0cb38bc0af5a","canon":1,"dups":1,"ftype":"data_center","name":"NEDDERMAN HALL DATA CENTER RMS 114 & 115","city":"Arlington","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"The University of Texas at Arlington","tenant":"Yahoo!","deal":"Servers donated by Yahoo!","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ae60e3e80365","cid":"ae60e3e80365","canon":1,"dups":1,"ftype":"data_center","name":"NEISD DATA CENTER HVAC RENOVATION","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"CPS Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"51e94cede322","cid":"51e94cede322","canon":1,"dups":1,"ftype":"data_center","name":"HNTB","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"Power is delivered through dual underground utility feeds, providing 26 megawatts of utility capacity.","pscan":"https://netrality.com/blog/houston-data-centers-critical-hub/","uconf":"High","uquote":"The utility company for Houston is CenterPoint Energy.","uscan":"https://www.choosetexaspower.org/electricity-rates/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Netrality Data Centers","spon":"Macquarie Asset Management","tenant":"Exxon Mobil","ay":2015,"oy":2023,"deal":"Netrality acquired 1301 Fannin Street in February 2015. INAP sold its colocation business at 1301 Fannin to Netrality in June 2020. Netrality announced an expansion project for 2.5 MW of critical capacity in May 2023. Netrality secured a $380 million sustainability-linked loan in November 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"netrality.com;choosetexaspower.org","srcUrls":["https://netrality.com/blog/houston-data-centers-critical-hub/","https://www.choosetexaspower.org/electricity-rates/houston/"],"band":"25-50 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"a0ac313418af","cid":"a0ac313418af","canon":1,"dups":1,"ftype":"data_center","name":"Netrality Data Centers Level 9 & Level 13.5","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"Dual underground utility feeds provide 26 megawatts of power capacity, backed by N+1 generators, redundant UPS systems, and advanced cooling infrastructure capable of supporting high-density deployments and AI-driven workloads.","pscan":"https://netrality.com/media/houston-data-center-1301-fannin-spotlight-video/","uquote":"Current name: CenterPoint Energy Substation","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Netrality Data Centers","spon":"Macquarie Asset Management","ay":2015,"oy":2015,"deal":"Macquarie Infrastructure Partners IV acquired Netrality Data Centers on September 6, 2019.","dealScan":"https://netrality.com/news/macquarie-infrastructure-partners-buys-netrality-data-centers/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"netrality.com","srcUrls":["https://netrality.com/media/houston-data-center-1301-fannin-spotlight-video/","https://netrality.com/news/macquarie-infrastructure-partners-buys-netrality-data-centers/"],"band":"25-50 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"d8cd292084cb","cid":"d8cd292084cb","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Data Center — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":200,"pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid; Redundant electrical systems designed for continuous uptime; UPS-backed infrastructure ensuring stable power delivery; Backup generators planned for extended outage protection; Designed to support high-density and hyperscale deployments.","uquote":"Oncor will provide power infrastructure to the site, ensuring grid resilience as CyrusOne scales operations.","uscan":"https://convergedigest.com/cyrusone-breaks-ground-on-70mw-data-center-in-fort-worth/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2024,"oy":2026,"deal":"New facility construction estimated cost $200,000,000","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025001810","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"convergedigest.com;tdlr.texas.gov","srcUrls":["https://convergedigest.com/cyrusone-breaks-ground-on-70mw-data-center-in-fort-worth/","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025001810"],"band":"100-250 MW","rawName":"NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION\nTO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF\nBUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE\nFLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.","lflag":"display_name_normalized utility_alias_corrected source_url_canonicalized delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"a75539225edb","cid":"a75539225edb","canon":1,"dups":1,"ftype":"data_center","name":"GCCISD | NEW DATA CENTER","city":"Baytown","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Maintain network connectivity, including firewall, routers, switches, SAN, UPS, wireless, and wired connectivity.","uconf":"High","uquote":"Baytown is served by CenterPoint as the local TDU. The Baytown utility company is CenterPoint Energy. CenterPoint Energy is the primary utility for the greater Houston area, maintaining the poles and wires and handles outage restorations for millions of residents.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Goose Creek Consolidated Independent School District","spon":"Goose Creek Consolidated Independent School District","tenant":"Goose Creek Consolidated Independent School District","ay":2013,"oy":2018,"deal":"Part of $267 million bond program passed in May 2013; data center project estimated at $11.1M.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"909ab307f648","cid":"909ab307f648","canon":1,"dups":1,"ftype":"data_center","name":"NOKIA SIEMENS NETWORKS DATA CENTER 1W","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"50cd8b7051f9","cid":"50cd8b7051f9","canon":1,"dups":1,"ftype":"data_center","name":"Nppi Data Center","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/7600-n-capital-of-texas-hwy-sb-d767737c","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/7600-n-capital-of-texas-hwy-sb-d767737c"]},{"id":"fff7cffbc792","cid":"fff7cffbc792","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":52,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Our Dallas TX1 Data Center at 2008 Lookout Drive, Garland, Texas has been recognized by Datacenter Dynamics as one of the 'most beautiful data centers in the world'. With a total of 230,000ft² and 16MW of critical IT load, Dallas TX1 is directly connected to a dense fiber network and fed with dual, redundant power feeds.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/dallas-tx-1-data-center","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/ntt-dallas-tx1","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"NTT Global Data Centers Americas","spon":"NTT","ay":2017,"oy":2026,"deal":"TX4 expansion construction cost of $42 million (September 2024 - April 2026)","dealScan":"https://baxtel.com/data-center/ntt-tx4","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"services.global.ntt;baxtel.com","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/dallas-tx-1-data-center","https://baxtel.com/data-center/ntt-dallas-tx1","https://baxtel.com/data-center/ntt-tx4"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"8d72822627dd","cid":"8d72822627dd","canon":1,"dups":1,"ftype":"data_center","name":"NTT GLOBAL - 2023 NEW CONSTR-- EXCESS LAND","city":"GARLAND","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Dallas TX1 is equipped with direct connections to a dense fiber network and dual redundant power feeds for maximum reliability.... The center features dual, redundant power feeds, carrier-neutral connectivity with two diverse fiber entry points, and two Carrier-Meet-Me-Rooms, ensuring robust and flexible network access.... Power. 36MW of critical IT load, N+1 distributed redundancy for each 6MW vault, diverse power distribution to data hall.","uconf":"High","uquote":"NTT TX3 - Data Center... Application Date. 2023... Operator. NTT Global... City. Garland. County. Dallas. State. Texas... Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/ntt-tx3-data-center-7334c9e6","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"NTT Global Data Centers America","spon":"NTT Global Data Centers America","ay":2024,"oy":2026,"deal":"$42 million construction project, announced April 2024","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/ntt-tx3-data-center-7334c9e6"],"band":"25-50 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"8365dab4a872","cid":"8365dab4a872","canon":1,"dups":1,"ftype":"data_center","name":"NTT GLOBAL DATA CENTERS -- 2023 ADDN BLDG 1","city":"GARLAND","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/ntt-tx4","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/ntt-tx4","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"NTT Global Centers of America","spon":"NTT","oy":2024,"deal":"$110,000,000 construction cost (2022-2024)","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023003319","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;tdlr.texas.gov","lflag":"operational_null_capacity utility_alias_corrected source_url_canonicalized delivery_utility_linked","srcUrls":["https://baxtel.com/data-center/ntt-tx4","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023003319"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"dc3711c79ba8","cid":"dc3711c79ba8","canon":1,"dups":1,"ftype":"data_center","name":"NTT GLOBAL DATA CENTERS -- 2023 ADDN BLDG 2","city":"GARLAND","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our Dallas TX1 Data Center at 2008 Lookout Drive, Garland, Texas... is directly connected to a dense fiber network and fed with dual, redundant power feeds....Power infrastructure is meticulously designed 4/3 UPS blocks in 2 MW increments, delivering 6 MW through a distributed redundant system. Each vault integrates its own generator and UPS modules, ensuring operational reliability.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/dallas-tx-1-data-center","uquote":"Having that reliability, support and service from Garland Power & Light has been very valuable to our operations.","uscan":"https://www.bisnow.com/dallas-ft-worth/news/data-center/data-center-development-garland-texas-city-of-garland-texas-studiob-120693","uname":"Alliance Power Company, LLC.","rto":"ERCOT","nerc":"TRE","op":"NTT Global Data Centers","spon":"NTT Group","ay":2023,"oy":2024,"deal":"$25 million tenant improvement project, announced June 2023","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"services.global.ntt;bisnow.com","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/dallas-tx-1-data-center","https://www.bisnow.com/dallas-ft-worth/news/data-center/data-center-development-garland-texas-city-of-garland-texas-studiob-120693"],"band":"25-50 MW","lflag":"citation_artifact_removed nonrate_utility_link_removed energy_supplier_not_serving_utility","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Alliance Power Company, LLC."},{"id":"e73f2f94a6e7","cid":"e73f2f94a6e7","canon":1,"dups":1,"ftype":"data_center","name":"Data Center TX2 - Tenant Improvements","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"A Garland Power and Light electrical substation, center, powers data center buildings Dallas TX3, left, and TX2, on the NTT Data center campus in Garland.","uquote":"A Garland Power and Light electrical substation, center, powers data center buildings Dallas TX3, left, and TX2, on the NTT Data center campus in Garland.","uname":"Garland Power & Light (City of Garland)","rto":"ERCOT","nerc":"TRE","op":"NTT Global Data Centers","spon":"NTT Communications","oy":2024,"deal":"$25 million tenant improvement project, part of a $50 million expansion for TX2 and TX3, completed by 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Garland Power & Light (City of Garland)","ukey":"6958|TX","srcUrls":null,"srcDom":null},{"id":"3cbbe6923ae7","cid":"3cbbe6923ae7","canon":1,"dups":1,"ftype":"data_center","name":"Data Center TX3 - Tenant Improvements","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"A Garland Power and Light electrical substation, center, powers data center buildings Dallas TX3, left, and TX2, on the NTT Data center campus in Garland.","uquote":"Having that reliability, support and service from Garland Power & Light has been very valuable to our operations.","uscan":"https://www.bisnow.com/dallas-ft-worth/news/data-center/data-center-development-garland-texas-city-of-garland-texas-studiob-120693","uname":"Garland Power & Light (City of Garland)","rto":"ERCOT","nerc":"TRE","op":"NTT Global","spon":"NTT Group","oy":2024,"deal":"$25,000,000 tenant improvement project, started 2023, completed 2024","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023022537","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"bisnow.com;tdlr.texas.gov","srcUrls":["https://www.bisnow.com/dallas-ft-worth/news/data-center/data-center-development-garland-texas-city-of-garland-texas-studiob-120693","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023022537"],"band":"25-50 MW","lflag":"source_url_canonicalized nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Garland Power & Light (City of Garland)","ukey":"6958|TX"},{"id":"e01bed8593d3","cid":"e01bed8593d3","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Austin, TX","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"OF MECHANICAL ELECTRICAL AND PLUMBING ENGINEERING ASSOCIATED WITH ADDING A DATA CENTER INSIDE THE EXISTING CLIENTS FACILITY. ALL WALLS CEILINGS DOORS ARE EXISTING.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"a3239e0d4453","cid":"a3239e0d4453","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Iris - Childress Data Center","city":"Childress","county":"Childress","state":"TX","lat":34.524624,"lng":-100.208166,"cprec":"distinct","status":"Operational","mw":750,"pc":"Grid","pconf":"High","pquote":"The Childress campus is strategically positioned in West Texas with access to renewable energy and is directly connected to the ERCOT power grid via on-site substations owned by IREN.","pscan":"https://cleanview.co/","uquote":"The original foundation was a 600MW binding connection agreement executed in January 2022 with AEP Texas, a subsidiary of American Electric Power.","rto":"SPP","nerc":"MRO","op":"IREN","spon":"IREN","tenant":"Microsoft","ay":2022,"oy":2025,"deal":"Five-year, $9.7 billion AI cloud contract with Microsoft signed in November 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cleanview.co","srcUrls":["https://cleanview.co/"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"20404|TX"},{"id":"8dcdc0c4e05b","cid":"8dcdc0c4e05b","canon":1,"dups":1,"ftype":"data_center","name":"NATIONSTAR-DATA CENTER EXPANSION","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"794d7df36e33","cid":"794d7df36e33","canon":1,"dups":1,"ftype":"data_center","name":"Office/Warehouse (Wayport Data Center)","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"f5209fd5c6dd","cid":"f5209fd5c6dd","canon":1,"dups":1,"ftype":"data_center","name":"MICROSOFT HOUSTON","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"ccb133e3b3c8","cid":"ccb133e3b3c8","canon":1,"dups":1,"ftype":"data_center","name":"ONRAMP DATA CENTER","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Austin II data center uses OnRamp's Redundant Isolated Path Power Architecture to deliver 2N power to customers from utility to rack. The data center is on ERCOT power grid that is separate from the other two major power grids in the US. 100% of power for OnRamp's Austin data center comes from renewable energy such as wind power.","pscan":"https://www.datacenterknowledge.com/business/onramp-completes-second-austin-data-center","uconf":"High","uquote":"AUSTIN ENERGY SYSTEM CONTROL CENTER 2500 Montopolis Drive. (Council District 3)","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"LightEdge","spon":"Anschutz","ay":2013,"oy":2014,"deal":"Lightedge acquired OnRamp in July 2018","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"operational_null_capacity","srcUrls":["https://www.datacenterknowledge.com/business/onramp-completes-second-austin-data-center"]},{"id":"852802e654d7","cid":"852802e654d7","canon":1,"dups":1,"ftype":"data_center","name":"OpenAI Stargate Abilene","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Operational","mw":300,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Power is currently supplied by a mix of on-site natural gas and grid power, which includes local wind power.","pscan":"https://epochai.substack.com/p/openai-stargate-where-the-us-sites","proc":"Co-located generation","pcp":"Crusoe","pdt":"350-megawatt, gas-fired power plant","rto":"ERCOT","nerc":"TRE","op":"OpenAI","spon":"SoftBank","tenant":"OpenAI","ay":2025,"oy":2026,"contro":"Mixed community reception, concerns about water usage and housing, and a lucrative tax agreement with the City of Abilene and Taylor County.","controScan":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","deal":"JPMorgan Chase agreed to lend $2.3 billion to OpenAI and its partners for the Stargate data center projects in Abilene, Texas on May 22, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"epochai.substack.com;texasstandard.org","srcUrls":["https://epochai.substack.com/p/openai-stargate-where-the-us-sites","https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/"],"lflag":"source_quality_reclassified"},{"id":"c827d9516fd4","cid":"c827d9516fd4","canon":1,"dups":1,"ftype":"data_center","name":"OPUS- 3 DATA CENTER 100% UNOCC","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","op":"Opus-3 Data Center","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text delivery_utility_linked","rawName":"OPUS- 3 DATA CENTER  100% UNOCC","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"b0d3b9ef760a","cid":"b0d3b9ef760a","canon":1,"dups":1,"ftype":"data_center","name":"ORACLE PAVILION","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Today's video provides a look inside a data center in Austin, Texas where Oracle (ORCL) hosts its outsourcing operations. The facility is a Tier IV data center with 42,000 square feet of raised floor space, backed by an electrical infrastructure including 6,000 batteries and five 2-megawatt generators. Oracle VP of Global Information Technology Mitchell McGovern gives an overview of the facility, which features storage of 80,000 gallons of diesel fuel and 50,000 gallons of water.","pscan":"https://www.datacenterknowledge.com/operations-and-management/video-oracle-austin-data-center-tour","uconf":"High","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/oracle-austin-data-center-b86c040d","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Oracle America","spon":"Oracle America","tenant":"Oracle America","ay":2002,"oy":2008,"deal":"Acquisition of 11400 N. Lamar building from AT&T in 2002 for data center build-out.","dealScan":"https://www.globest.com/2002/06/19/oracle-tickets-120000-sf-north-austin-acquisition-for-data-center/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;interconnection.fyi;globest.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.datacenterknowledge.com/operations-and-management/video-oracle-austin-data-center-tour","https://www.interconnection.fyi/data-center/project/oracle-austin-data-center-b86c040d","https://www.globest.com/2002/06/19/oracle-tickets-120000-sf-north-austin-acquisition-for-data-center/"]},{"id":"990602e0abee","cid":"990602e0abee","canon":1,"dups":1,"ftype":"data_center","name":"ORACLE WAREHOUSE EXPANSION","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Austin Energy.","pscan":"https://www.interconnection.fyi/data-center/project/oracle-austin-data-center-b86c040d","uconf":"High","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/oracle-austin-data-center-b86c040d","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Oracle America","spon":"Oracle America","tenant":"Oracle","ay":2014,"oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/oracle-austin-data-center-b86c040d"]},{"id":"16225712219a","cid":"16225712219a","canon":1,"dups":1,"ftype":"data_center","name":"ORACLE DATA CENTER","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Austin Energy.","pscan":"https://www.interconnection.fyi/data-center/project/oracle-daf6907f","uconf":"Medium","uquote":"Grid Operator: Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/oracle-daf6907f","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Oracle","spon":"Oracle","tenant":"Oracle","ay":2016,"oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/oracle-daf6907f"]},{"id":"53bbd179e19f","cid":"53bbd179e19f","canon":1,"dups":1,"ftype":"data_center","name":"#21244 - New Data Center","city":"Castle Hills","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Pape-Dawson Consulting Engineers","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"7317607703d2","cid":"7317607703d2","canon":1,"dups":1,"ftype":"data_center","name":"DELL PC-1 DATA CENTER REMODEL","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Future / Expansion","pc":"Grid","pconf":"High","pquote":"Dell Computers, Inc. – PC1 is located at 1404 Park Center Drive, Austin, Texas 78753. Comments: Dell Computers, Inc – PC1 is located at 1404 Park Center Drive. It contains approximately 50,000 square feet of data center “raised floor” space where these energy efficiency measures were installed. Dell PC1 has also participated in a grant assessment study funded by the State Energy Conservation Office and administered by Austin Energy. Austin Energy's Energy Efficiency Services requests authorization to issue a rebate to Dell Computers, Inc. in the amount of $92,853.30 on the installation of High Efficiency LED Lighting, Automatic Lighting Controls, and Server Virtualization in accordance with the City of Austin's Commercial Rebate Program guidelines. This program is one element of Austin Energy's comprehensive Energy Resource Plan, approved in December 2003 by City Council, designed to reduce local air pollution through energy conservation, to reduce peak demand, and to assist customers in reducing electric consumption.","pscan":"https://services.austintexas.gov/edims/document.cfm?id=149618","uquote":"Dell PC1 has also participated in a grant assessment study funded by the State Energy Conservation Office and administered by Austin Energy. Austin Energy's Energy Efficiency Services requests authorization to issue a rebate to Dell Computers, Inc. in the amount of $92,853.30 on the installation of High Efficiency LED Lighting, Automatic Lighting Controls, and Server Virtualization in accordance with the City of Austin's Commercial Rebate Program guidelines.","uscan":"https://services.austintexas.gov/edims/document.cfm?id=149618","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Dell Technologies","spon":"Dell Technologies","tenant":"Dell Technologies","oy":2027,"deal":"$2 million renovation planned (April 2026); $390,000 renovation (July 2024 - Jan 2025); $100,000 renovation (Nov 2018 - Feb 2019); $92,853.30 rebate from Austin Energy (March 2011)","dealScan":"https://services.austintexas.gov/edims/document.cfm?id=149618","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.austintexas.gov","lflag":"operational_null_capacity status_adjusted_future_expansion","srcUrls":["https://services.austintexas.gov/edims/document.cfm?id=149618"],"rawStatus":"Operational"},{"id":"d79a0d4a7874","cid":"d79a0d4a7874","canon":1,"dups":1,"ftype":"data_center","name":"PARKING GARAGE/DATA CENTER","city":"San Marcos","county":"Hays","state":"TX","lat":30.061225,"lng":-98.029267,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"24096ec0b771","cid":"24096ec0b771","canon":1,"dups":1,"ftype":"data_center","name":"Apple CL2","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Co-located generation","pcp":"Austin Energy","pdt":"10-year period, combined 1.145 MW-AC solar installations","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"1015|TX","uname":"Austin Energy","reportedUtility":"Austin Energy","srcUrls":null,"srcDom":null},{"id":"a06ffa59ae7a","cid":"a06ffa59ae7a","canon":1,"dups":1,"ftype":"crypto_hpc","name":"PATRIOT BANK DATA CENTER BUILD OUT","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"d3fc526a5c46","cid":"d3fc526a5c46","canon":1,"dups":1,"ftype":"data_center","name":"PEC Control and Data Center","city":"Leander","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Pedernales Electric Cooperative is a not-for-profit rural electric distribution, utility cooperative headquartered in Johnson City, Texas, US, set up in 1938.","uconf":"High","uquote":"Pedernales Electric Cooperative is a not-for-profit rural electric distribution, utility cooperative headquartered in Johnson City, Texas, US, set up in 1938.","ukey":"14626|TX","uname":"Pedernales Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Pedernales Electric Cooperative","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"aab205ebd801","cid":"aab205ebd801","canon":1,"dups":1,"ftype":"data_center","name":"DART SECONDARY DATA CENTER","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"b281b6aaece6","cid":"b281b6aaece6","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"plumbing permit for FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"ad7a89a8edeb","cid":"ad7a89a8edeb","canon":1,"dups":1,"ftype":"data_center","name":"POD 2 DATA CENTER AREA.","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"1015|TX","uname":"Austin Energy","reportedUtility":"Austin Energy","srcUrls":null,"srcDom":null},{"id":"afad97751761","cid":"afad97751761","canon":1,"dups":1,"ftype":"data_center","name":"AMAZON","city":"Farmers Branch","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"32ff30c6898a","cid":"32ff30c6898a","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":165,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uconf":"High","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","tenant":"Enterprise, Hyperscaler","ay":2013,"oy":2014,"deal":"Blackstone acquired QTS for $10 billion in August 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/"]},{"id":"aa6ed2e31c45","cid":"aa6ed2e31c45","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":90,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"CPS Energy, a municipal utility, serves as the sole electricity provider for the San Antonio area. The City of San Antonio owns its electric and gas utilities through CPS Energy. Texas Gov. Greg Abbott signed a law in June that empowers the state's grid operator to remotely disconnect data centers and other large energy users if the grid is under extreme stress. The large load requests in the ERCOT queue—189 gigawatts—equal about 40 percent of the nation's estimated electricity consumption for 2025, according to the U.S. Energy Information Administration.","pscan":"https://www.2turniton.com/city-guides/texas/san-antonio/","uquote":"CPS Energy, a municipal utility, serves as the sole electricity provider for the San Antonio area.","uscan":"https://www.2turniton.com/city-guides/texas/san-antonio/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2021,"contro":"San Antonio District 6 Councilmember Ric Galvan is requesting that City Council examine the rapid growth of data centers in San Antonio and seek to limit their drain on local resources.","deal":"$800 million refinancing deal in May 2023","dealScan":"https://baxtel.com/news/qts-realty-secures-a-800m-data-center-refinancing-contract","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"2turniton.com;baxtel.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://www.2turniton.com/city-guides/texas/san-antonio/","https://baxtel.com/news/qts-realty-secures-a-800m-data-center-refinancing-contract"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"31d15d62baa8","cid":"31d15d62baa8","canon":1,"dups":1,"ftype":"data_center","name":"QTS FTW Office Modification","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility is designed and built as a 100 percent concurrently maintainable data center and provides reliable, uninterrupted power provided by an on-site 140MVA dual-fed substation.","pscan":"https://www.prnewswire.com/news-releases/qts-dallas-fort-worth-facility-exemplifies-companys-approach-to-data-center-resiliency-300024344.html","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2022,"oy":2023,"deal":"Expansion project with an estimated cost of $43,894,400, started May 2022 and completed June 2023.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2022015450","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"prnewswire.com;tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized","srcUrls":["https://www.prnewswire.com/news-releases/qts-dallas-fort-worth-facility-exemplifies-companys-approach-to-data-center-resiliency-300024344.html","https://www.tdlr.texas.gov/TABS/Search/Print/TABS2022015450"]},{"id":"d71642f91ae2","cid":"d71642f91ae2","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW DC2 DH2.1","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uconf":"High","uquote":"Oncor Electric Delivery is the largest transmission and distribution utility in Texas, providing essential grid maintenance and emergency repairs for Dallas, Fort Worth, and the surrounding regions.","uscan":"https://justenergy.com/electricity-rates/dallas-texas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2013,"oy":2014,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion in an all-cash transaction, announced June 7, 2021, and completed August 31, 2021.","dealScan":"https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;justenergy.com;blackstone.com","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://justenergy.com/electricity-rates/dallas-texas/","https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"815d021423bd","cid":"815d021423bd","canon":1,"dups":1,"ftype":"data_center","name":"QTS ECU 1,075,000 SF","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":165,"pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","uquote":"The utility company for Irving is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2013,"oy":2014,"deal":"QTS purchased a 700,000 square foot former semiconductor plant in February 2013.","dealScan":"https://www.datacenterknowledge.com/operations-and-management/qts-enters-dallas-market-buys-700-000-sf-facility","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/operations-and-management/qts-enters-dallas-market-buys-700-000-sf-facility"],"band":"100-250 MW","rawName":"QTS    ECU 1,075,000 SF","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"c8b79a6a33e4","cid":"c8b79a6a33e4","canon":0,"dups":1,"ftype":"data_center","name":"QTS ECU 1,075,000 SF","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uconf":"High","uquote":"Oncor Electric Delivery is the largest transmission and distribution utility in Texas, providing essential grid maintenance and emergency repairs for Dallas, Fort Worth, and the surrounding regions.","uscan":"https://justenergy.com/electricity-rates/irving-texas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2013,"oy":2014,"deal":"QTS acquired by Blackstone funds for approximately $10 billion in August 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;justenergy.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://justenergy.com/electricity-rates/irving-texas/"],"rawName":"QTS    ECU 1,075,000 SF","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"eac23ff8f699","cid":"eac23ff8f699","canon":1,"dups":1,"ftype":"data_center","name":"PROJECT LONESTAR PHASE 2","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":42,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/qts-dfw2-dc2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2026,"deal":"$220 million construction project announced January 2024","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"prnewswire.com;baxtel.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://baxtel.com/data-center/qts-dfw2-dc2"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"7edc70ffbac7","cid":"7edc70ffbac7","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW - BUILDING 1 FRONT ENTRY","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw-building-1-9b93e386","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2017,"oy":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://www.interconnection.fyi/data-center/project/qts-dfw-building-1-9b93e386"],"band":"50-100 MW"},{"id":"99bc81a6d890","cid":"99bc81a6d890","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW-DATA CENTER 2","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uconf":"Medium","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/qts-dfw2-dc2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","tenant":"Enterprise tenants","ay":2013,"oy":2014,"deal":"QTS purchased a 700,000 square foot former semiconductor plant in Irving, TX in 2013 to convert into a data center.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://baxtel.com/data-center/qts-dfw2-dc2"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"00c3f0dfb5d9","cid":"00c3f0dfb5d9","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW LEVEL 1 OFFICE","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","oy":2018,"deal":"Acquisition of former Maxim semiconductor manufacturing facility in 2013.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf"],"band":"50-100 MW"},{"id":"b20a48b90b45","cid":"b20a48b90b45","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW LEVEL 3 OFFICE","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","oy":2018,"deal":"Blackstone acquired QTS for approximately $10 billion in August 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"a1c0348b3c9f","cid":"a1c0348b3c9f","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW UPS RS","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":43,"pc":"Grid","pconf":"High","pquote":"The QTS Irving 1 DC3 facility will provide our customers with an additional 43.5MW of power, on-site substation power, and diverse campus fiber entrances with a redundant campus conduit system. The campus is 100% green capable utilizing clean wind energy and provides 43 megawatts of critical power capacity. The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power. The four locations join QTS data centers in Irving, TX... currently powered by renewable energy and support the Company's commitment to procure 100% of the power required for all of its data centers from renewable sources by 2025.","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","oy":2023,"deal":"Blackstone acquired QTS Realty Trust on August 31, 2021.","dealScan":"https://baxtel.com/data-center/qts-dfw2-dc3","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8","https://baxtel.com/data-center/qts-dfw2-dc3"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"02615b7642d2","cid":"02615b7642d2","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW DC2 DATA HALL 2.2","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","uconf":"High","uquote":"The utility company for Irving is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2021,"oy":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"201ce4d28a5f","cid":"201ce4d28a5f","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW DH1.7","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Trinity Valley Elec COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8","uconf":"High","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2016,"oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8"]},{"id":"3c40041de73e","cid":"3c40041de73e","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW DH1.6","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":43,"pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QUALITY INVESTMENT PROPERTIES IRVING","spon":"Blackstone","ay":2016,"oy":2017,"deal":"QTS is spending an estimated $32 million on demolition to add mechanical, engineering, and plumbing galleries and data halls, as well as to modify floors and ceilings (January 2024)","dealScan":"https://dallasexpress.com/realestate/qts-plans-dfw-data-center-expansion/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;dallasexpress.com","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://dallasexpress.com/realestate/qts-plans-dfw-data-center-expansion/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"392b4b03d797","cid":"392b4b03d797","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW UPS HJKL","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"QTS Irving 1 DC3 facility will provide our customers with an additional 43.5MW of power, on-site substation power, and diverse campus fiber entrances with a redundant campus conduit system.","uconf":"High","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS (Quality Technology Services)","spon":"Blackstone","ay":2016,"oy":2017,"deal":"QTS acquired by Blackstone in 2021 for $10 billion","dealScan":"https://dallasexpress.com/realestate/microsoft-and-qts-building-over-1m-sq-ft-of-data-center-space/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;dallasexpress.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8","https://dallasexpress.com/realestate/microsoft-and-qts-building-over-1m-sq-ft-of-data-center-space/"]},{"id":"a3079cb686ae","cid":"a3079cb686ae","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW CUB EXPANSION PHASE 1","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":43,"pc":"Grid","pconf":"High","pquote":"QTS Dallas is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.... Power - 2 separate 138kV feeds - On-site redundant substation (140MVA total) - Parallel redundant N+1 generator farm - 36MW of UPS power","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uconf":"High","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2016,"oy":2017,"deal":"Irving City Council approved a 50% property tax reduction for QTS's plan to construct three buildings, requiring QTS to invest around $350 million in the property before January 2029.","dealScan":"https://dallasexpress.com/realestate/microsoft-and-qts-building-over-1m-sq-ft-of-data-center-space/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;dallasexpress.com","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://www.interconnection.fyi/data-center/project/qts-dfw-buildings-3-4-1506b7d8","https://dallasexpress.com/realestate/microsoft-and-qts-building-over-1m-sq-ft-of-data-center-space/"],"band":"25-50 MW","lflag":"citation_artifact_removed"},{"id":"24a12675cc62","cid":"24a12675cc62","canon":1,"dups":1,"ftype":"data_center","name":"FTW1 Trident","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"Oncor Electric Delivery provides electricity delivery service throughout the following areas in Texas: Dallas. Fort Worth. Plano. Arlington. Irving. Waco. Midland. Odessa. Killeen. Temple. Tyler. Denton. McKinney. Frisco.","uscan":"https://www.electricchoice.com/utilities/oncor/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","tenant":"Health Care Service (HCSC)","ay":2017,"deal":"QTS acquired the facility for approximately $50 million on January 30, 2017. The Fort Worth property was valued at $481 million as part of a $3.46 billion commercial mortgage-backed securities offering by Blackstone-owned data centers, expected to close in mid-December 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"prnewswire.com;electricchoice.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://www.electricchoice.com/utilities/oncor/"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"5f5e6315e978","cid":"5f5e6315e978","canon":1,"dups":1,"ftype":"data_center","name":"FTW1 Trident Expansion","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone Group","tenant":"Health Care Service (HCSC)","ay":2024,"oy":2026,"deal":"$220 million investment for FTW1 DC2 expansion (announced Jan 2024)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"d1a8ed4ed621","cid":"d1a8ed4ed621","canon":1,"dups":1,"ftype":"data_center","name":"QTS FTW1 DH1&5","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"The electric utility company- aka TDU (Transmission & Distribution Utility)- for the Fort Worth area is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","deal":"$3.46 billion commercial mortgage-backed securities offering, Fort Worth property value jumped 182% to $481 million (November 14, 2025)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"2ccb386335c2","cid":"2ccb386335c2","canon":1,"dups":1,"ftype":"data_center","name":"FTW1 DH1&5 Fit-out","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":42,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","uconf":"High","uquote":"Your Fort Worth utility company: Oncor. Oncor delivers electricity to homes across the Fort Worth area. Oncor maintains poles, wires and outage response; Direct Energy provides electricity plans and rates, billing, and associated customer support and perks.","uscan":"https://www.directenergy.com/en/residential/energy/texas/fort-worth","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2026,"deal":"Construction project for $220 million, announced January 2024","dealScan":"https://therealdeal.com/texas/dallas/2024/01/29/blackstones-qts-to-build-220m-data-center-in-north-fort-worth/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"directenergy.com;therealdeal.com","srcUrls":["https://www.directenergy.com/en/residential/energy/texas/fort-worth","https://therealdeal.com/texas/dallas/2024/01/29/blackstones-qts-to-build-220m-data-center-in-north-fort-worth/"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"3463ea5fcdae","cid":"3463ea5fcdae","canon":1,"dups":1,"ftype":"data_center","name":"QTS FORT WORTH I DC2 LLC","city":"FORT WORTH","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":42,"pc":"Grid","pconf":"High","pquote":"The scope includes construction, build-out of four 10.5MW data halls, coordination and tie-in of the medium voltage loop to an in-progress substation, and expansion of telecom fiber loop. The low voltage system on the house electrical side also includes redundancy through a backup 1.5MW generator and dual fed network racks and cooling also utilizing the four reserve lineups.","pscan":"https://www.apexperience.net/qts-ftw1-dc2","uconf":"High","uquote":"QTS is developing a 363,500 square-foot data center in a two-story building, featuring office and shell data hall space, in Fort Worth.... The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/qts-dfw2-dc2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2026,"deal":"Construction project with an estimated cost of $220,000,000, announced March 2024.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024010121","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"apexperience.net;baxtel.com;tdlr.texas.gov","srcUrls":["https://www.apexperience.net/qts-ftw1-dc2","https://baxtel.com/data-center/qts-dfw2-dc2","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024010121"],"band":"25-50 MW","lflag":"citation_artifact_removed utility_alias_corrected source_url_canonicalized delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"6e91ef2ba8fc","cid":"6e91ef2ba8fc","canon":1,"dups":1,"ftype":"data_center","name":"QTS Fort Worth Tape Storage","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"a provider in Texas","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3914f93d6bf6","cid":"3914f93d6bf6","canon":1,"dups":1,"ftype":"data_center","name":"QTS INVESTMENTS PROPERTIES FOR","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":70,"pc":"Grid","pconf":"High","pquote":"On-site substation with expansion capability","uconf":"High","uquote":"The utility servicing Fort Worth is Oncor Electric Delivery. The utility company for Fort Worth is Oncor Electric Delivery. Oncor Electric Delivery Company LLC is the largest regulated electric distribution company in Texas, serving approximately 4 million homes and businesses across 120+ counties. It operates in the ERCOT deregulated market, meaning customers choose their Retail Electric Provider (REP) while Oncor delivers the power, maintains the grid, reads meters, and restores outages.","uscan":"https://www.electricchoice.com/utilities/oncor/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2017,"oy":2026,"deal":"Blackstone acquired QTS for approximately $10 billion in August 2021. QTS plans a $220 million expansion project near the AllianceTexas development, and a $130 million expansion of its existing campus at 14100 Park Vista Blvd.","dealScan":"https://insider.govtech.com/texas/news/a-220m-data-center-project-will-open-in-north-fort-worth","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"qtsdatacenters.com;electricchoice.com;insider.govtech.com","pscan":"https://qtsdatacenters.com/data-centers/us/texas/fort-worth/","srcUrls":["https://qtsdatacenters.com/data-centers/us/texas/fort-worth/","https://www.electricchoice.com/utilities/oncor/","https://insider.govtech.com/texas/news/a-220m-data-center-project-will-open-in-north-fort-worth"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"8c07e41b02b4","cid":"8c07e41b02b4","canon":0,"dups":1,"ftype":"data_center","name":"QTS INVESTMENTS PROPERTIES FOR","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":70,"pc":"Grid","pconf":"High","pquote":"On-site substation with expansion capability","uquote":"The utility company for Fort Worth is Oncor Electric Delivery. Your Fort Worth utility company: Oncor. Oncor delivers electricity to homes across the Fort Worth area.","uscan":"https://www.choosetexaspower.org/electricity-rates/fort-worth/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2026,"deal":"$130 million investment to expand the existing data center campus at 14100 Park Vista Blvd. in Fort Worth, Texas, announced April 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/fort-worth/"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"7c9001302f79","cid":"7c9001302f79","canon":0,"dups":1,"ftype":"data_center","name":"QTS INVESTMENTS PROPERTIES FOR","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":70,"pc":"Grid","pconf":"High","pquote":"On-site substation with expansion capability. Grid Operator: ERCOT.","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-ftw1-dc2-c5cca6ad","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Investment Properties Fort Worth","spon":"Blackstone","ay":2015,"oy":2026,"deal":"$130 million investment for expansion at 14100 Park Vista Blvd, Fort Worth, Texas, mentioned in April 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-ftw1-dc2-c5cca6ad"],"band":"50-100 MW","lflag":"merged_duplicate"},{"id":"771136ef9c42","cid":"771136ef9c42","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW DC2 DH2.3 Interior Upfit","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Power - 2 separate 138kV feeds - On-site redundant substation (140MVA total) - Parallel redundant N+1 generator farm - 48 hours on-site diesel fuel storage Multiple refueling contracts - 36MW of UPS power - Flexible block redundant static UPS - Able to meet N+1 or 2N distribution","uconf":"High","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf"]},{"id":"680a95f223ab","cid":"680a95f223ab","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW DC2 DH2.4 and DH2.5 Upfit","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uconf":"High","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2021,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf"],"band":"50-100 MW"},{"id":"29f3e9f377d7","cid":"29f3e9f377d7","canon":1,"dups":1,"ftype":"data_center","name":"DFW B1-L1 Fitness Center","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2013,"oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf"],"band":"50-100 MW"},{"id":"ddbd568429b2","cid":"ddbd568429b2","canon":1,"dups":1,"ftype":"data_center","name":"QTS PROCUREMENT LLC","city":"MCKINNEY","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e5740de03ac7","cid":"3c5236d7bd86","canon":0,"dups":3,"ftype":"data_center","name":"QTS SAT2-DC1","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":45,"pc":"Grid","pconf":"High","pquote":"The QTS SAT2-DC1 project is a three story data center located at the corner of Ingram Road and Potranco Road in San Antonio, Texas. The facility is 338,721 square feet an can support 45MW of critical power. The day one build will be 9MW.","pscan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021007232","uquote":"San Antonio's electricity is primarily provided by CPS Energy, also known historically as City Public Service. CPS Energy is a municipally-owned electric utility, the largest of its kind in Texas, serving the city of San Antonio and the broader Bexar County area.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2021,"oy":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021007232"],"band":"25-50 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified source_url_canonicalized"},{"id":"b86081b6c603","cid":"b86081b6c603","canon":1,"dups":1,"ftype":"data_center","name":"Rackspace","city":"Grapevine","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center is equipped with a fully redundant power infrastructure. It features diverse utility feeds, on-site diesel generators, and UPS systems, ensuring continuous power supply to the hosted equipment. This N+1 power redundancy helps to maintain zero downtime in case of power failures.","pscan":"https://inflect.com/building/801-industrial-boulevard-grapevine/rackspace/datacenter/dfw1","uconf":"High","uquote":"Grapevine. Compare Electricity Plans in Oncor's Service Area by ZIP Code. If you live in a deregulated city in Oncor Electric Delivery's service area, you can choose your REP and electricity plan.","uscan":"https://www.powerwizard.com/texas-electric-utilities/oncor-electric-delivery/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Rackspace Technology","spon":"Rackspace Technology","oy":2000,"contro":"Power outages in 2007 and 2009.","controScan":"https://www.datacenterknowledge.com/cloud/rackspace-cloud-will-expand-in-dallas","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"inflect.com;powerwizard.com;datacenterknowledge.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://inflect.com/building/801-industrial-boulevard-grapevine/rackspace/datacenter/dfw1","https://www.powerwizard.com/texas-electric-utilities/oncor-electric-delivery/","https://www.datacenterknowledge.com/cloud/rackspace-cloud-will-expand-in-dallas"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"12324cdcdd2a","cid":"12324cdcdd2a","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC","rto":"ERCOT","nerc":"TRE","ay":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity display_name_normalized generic_unsourced_permit_record unlinked_source_text","rawName":"Remodel existing data center & generator yard. PB17-04753/3rd Party Plan Review & Insp/Winston Services","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"94b5ad219ebe","cid":"94b5ad219ebe","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"source and generator backup power) used primarily to provide data center services to applicant's parent company and parent's affiliates. Grid Operator. Denton County Elec Coop, INC.","pscan":"https://www.tarrantcountytx.gov/content/dam/main/OpenBooks/2026_transparency_stars/tax-abatement-agreements/130032_WinnerLLCAbatementAgreement_accessible.pdf","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Winner","spon":"Winner","ay":2016,"deal":"Tax abatement agreement between Tarrant County and Winner LLC (2019)","dealScan":"https://www.tarrantcountytx.gov/content/dam/main/OpenBooks/2026_transparency_stars/tax-abatement-agreements/130032_WinnerLLCAbatementAgreement_accessible.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"tarrantcountytx.gov;interconnection.fyi","lflag":"online_before_announced operational_null_capacity display_name_normalized generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.tarrantcountytx.gov/content/dam/main/OpenBooks/2026_transparency_stars/tax-abatement-agreements/130032_WinnerLLCAbatementAgreement_accessible.pdf","https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"Remodel existing data center.  reconfiguring a small portion of the office space, finishing out of a portion of the existing data hall shell space, installation of the 6 new generators with associated chases/ventilation, and the fit out of the battery/UPS rooms/3rd Party Plan Review & Inspections/\nWinston Services, Inc."},{"id":"c25564b028b3","cid":"c25564b028b3","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Remodel existing data center/office space / 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"ec60217a67e7","cid":"ec60217a67e7","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","ay":2019,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Remodel existing data center/third party plan review and inspections, Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"c9e8be131bb1","cid":"c9e8be131bb1","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Remodel existing warehouse to expand existing data center room; add new MDF room within the existing footprint/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"c5a0a24933b6","cid":"c5a0a24933b6","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Denton County Elec Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","uconf":"High","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","spon":"Winner","ay":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity display_name_normalized generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"remodel lobby security area of office/data center/third party plan review and inspections, Winston Services, Inc."},{"id":"e89244a31535","cid":"e89244a31535","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","ay":2018,"oy":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Remodel of data center in existing building PB18-09278 / 3rd party plan review and inspections / winston services","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"ead4ef270ffe","cid":"e89244a31535","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Oncor","pdt":"$146.7 million in rebates over 20 years (including franchise fee)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized utility_alias_corrected unlinked_source_text generic_unsourced_permit_record delivery_utility_linked","rawName":"Remodel of data center in existing building. PB18-09278 / 3rd party plan review and inspections / Winston Services","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"998a18e9dd49","cid":"998a18e9dd49","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Remodel of existing corridor & installation of transformers in existing data center/third party plan review and inspections/Winston Services","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"93c6545c41c8","cid":"93c6545c41c8","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"installation of the 6 new generators with associated chases/ventilation, and the fit out of the battery/UPS rooms","pscan":"https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/issued-permits-report/permits-issued-building-monthly-september-2019.pdf","uconf":"Medium","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/new-data-center-3rd-party-plan-review-inspections--3b41d857","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"fortworthtexas.gov;interconnection.fyi","lflag":"operational_null_capacity display_name_normalized generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.fortworthtexas.gov/files/assets/public/v/2/development-services/documents/issued-permits-report/permits-issued-building-monthly-september-2019.pdf","https://www.interconnection.fyi/data-center/project/new-data-center-3rd-party-plan-review-inspections--3b41d857"],"rawName":"Remodel of existing data center/3rd Party Plan Review & Insp/Winston Services"},{"id":"ab2785b1e010","cid":"ab2785b1e010","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Remodel to add additional data equipment in existing data center/3rd Party Plan Review & Insp/Winston Services","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"d624d10047fa","cid":"d624d10047fa","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"renovate data center including updating MEP and generators/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"c2a234b42cfc","cid":"d624d10047fa","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","uquote":"Power. Multiple 345-kV and 138-kV transmission lines served by Oncor Electric Delivery & Brazos Electric; Four substations with multiple sites for future substations; Texas is one of the lowest-cost power markets in the country.","uscan":"https://www.alliancetexas.com/data-center","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","ay":2019,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"alliancetexas.com","lflag":"online_before_announced operational_null_capacity display_name_normalized utility_alias_corrected source_quality_reclassified canonical_promoted_after_quarantine generic_permit_record possible_canonical_duplicate,merged_duplicate delivery_utility_linked","srcUrls":["https://www.alliancetexas.com/data-center"],"rawName":"Renovate data center including updating MEP and generators/3rd Party Plan Review and Inspections/Winston Services, Inc.","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"e3afda166a81","cid":"e3afda166a81","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Server-Room Renovation — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity display_name_normalized generic_unsourced_permit_record","rawName":"Renovate existing data center to downsize server room, provide new office and new open work area.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"df1c753e4e9f","cid":"df1c753e4e9f","canon":1,"dups":1,"ftype":"data_center","name":"RICE UNIVERSITY CHILLER ADDITION","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Hybrid","pconf":"High","pquote":"These facilities generate 25% of Rice's electricity, 98% of heating and cooling, and 20% of the campus domestic water. These utility services are provided through three miles of tunnels and hundreds of miles of pipe, both buried and in tunnels throughout the campus. The plants also serve as distribution points for the remaining 75% of Rice's electricity and another 80% of domestic water.","proc":"Co-located generation","pcp":"Rice University (internal utility operations)","pdt":"$3 million (for chiller addition)","uconf":"High","uquote":"In Houston, the utility company is CenterPoint Energy — they maintain the lines, handle outages, and keep the energy flowing safely.","uscan":"https://www.powerwizard.com/electricity-rates/texas/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Rice University","spon":"Rice University","tenant":"Rice University","ay":2006,"oy":2007,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"powerwizard.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.powerwizard.com/electricity-rates/texas/houston/"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"7b38ff78ab73","cid":"7b38ff78ab73","canon":1,"dups":1,"ftype":"data_center","name":"RICHARDSON DATA CENTER","city":"Richardson","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":25,"pc":"Grid","pconf":"High","pquote":"The KDC Richardson Data Center location at 1510 E. Lookout. Drive in Richardson (Dallas County) was chosen for the robust power (25 MWs dedicated to the site and expandable) and rich fiber (20+ fiber providers to the site).... • 188 MVA onsite dedicated electrical substation.... • Substation is adjacent to the project and owned and maintained by Oncor.","uquote":"It contains an onsite electrical substation that is owned and maintained by ONCOR.... The substation is adjacent to the project and owned and maintained by ONCOR","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"CyrusOne","ay":2018,"oy":2019,"deal":"10-year, 50 percent City of Richardson business personal property tax abatement (announced 2018); CyrusOne invested $79.8 million to retrofit (2024-2025)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"c4c62f08fbc0","cid":"c4c62f08fbc0","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Riot Platforms Corsicana","city":"Corsicana","county":"Navarro","state":"TX","lat":32.048448,"lng":-96.476909,"cprec":"distinct","status":"Operational","mw":250,"band":"250+ MW","proc":"Tariff (utility)","pcp":"MEMS Industrial Supply","pdt":"requirements contract for retail power","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2e60e4680a09","cid":"2e60e4680a09","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Riot Platforms Rockdale","city":"Rockdale","county":"Milam","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Operational","mw":700,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Strategically positioned in Central Texas, the Rockdale site benefits from direct access to the ERCOT power grid, offering scalable energy capacity, competitive power pricing, and the flexibility required for large-scale compute operations. Now fully owned and operated by Riot, the Rockdale Site features a 700 MW interconnection to the grid, dedicated water supply, and fiber connectivity. In May 2020, Whinstone entered into a 10-year power supply agreement with TXU Energy to \"provide the delivery of a fixed amount of electricity by TXU to Whinstone (via the transmission facility owned by Oncor\".","pscan":"https://www.bitcoinenergysource.com/post/rockdale-tx-riot-blockchain","uconf":"High","uquote":"In May 2020, Whinstone entered into a 10-year power supply agreement with TXU Energy to \"provide the delivery of a fixed amount of electricity by TXU to Whinstone (via the transmission facility owned by Oncor\".","uscan":"https://www.bitcoinenergysource.com/post/rockdale-tx-riot-blockchain","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"AMD","ay":2020,"oy":2020,"contro":"Environmental concerns regarding energy consumption and carbon emissions; community complaints about energy prices and quality of life; lawsuit against the DOE regarding data collection.","deal":"Land acquisition for $96.0 million (Jan 2026); Data Center Lease with AMD for initial 25 MW, expandable to 200 MW, with expected contract value of $311.0 million over 10 years (Jan 2026), expanded to 50 MW with expected $636 million over 10 years (May 2026); $20 million settlement with SBI Crypto (March 2026).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bitcoinenergysource.com","srcUrls":["https://www.bitcoinenergysource.com/post/rockdale-tx-riot-blockchain"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified shared_coordinate_precision_downgraded delivery_utility_linked","dukey":"44372|TX"},{"id":"13932e5e0514","cid":"13932e5e0514","canon":1,"dups":1,"ftype":"data_center","name":"Evoque Data Center Solutions","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Evoque Data Center Solutions","spon":"Brookfield Infrastructure Partners","ay":2019,"oy":2019,"deal":"Interior Finish-out of Existing Office Space with an Estimated Cost: $360,000 (2019)","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2019018997","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2019018997"]},{"id":"5a9d1c9bd157","cid":"5a9d1c9bd157","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER RENOVATION","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Grid","pconf":"High","pquote":"The data center has 2 MW of utility power that is provided by CBC power grid with double redundancy to prevent any single failure from affecting power. The system is protected by redundant UPS system in N+1 configuration on the sudden power failure. Fault tolerant A/B power distribution is supplied by UPS infrastructure. The emergency power is provided by Caterpillar diesel generator with 96 hours of fuel supply that is housed in dedicated, fence, and secure enclosure.","pscan":"https://cloudandcolocation.com/datacenters/hosting-com-dallas-data-center/","uquote":"Electric service in Dallas city is provided by Oncor Electric Delivery.","uscan":"https://whoismyutility.com/texas/dallas","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Data Canopy","spon":"Intelishift / Metropolitan Partners Group","ay":2012,"oy":2012,"deal":"Hosting.com acquired by Ntirety on August 31, 2009; Data Canopy acquired Ntirety's colocation business in June 2023, facilitated by a $50 million growth capital investment from Metropolitan Partners Group.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;whoismyutility.com","srcUrls":["https://cloudandcolocation.com/datacenters/hosting-com-dallas-data-center/","https://whoismyutility.com/texas/dallas"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected generic_permit_record delivery_utility_linked","dukey":"44372|TX"},{"id":"fd72a5bb13cf","cid":"fd72a5bb13cf","canon":1,"dups":1,"ftype":"data_center","name":"Sabey Data Centers","city":"Round Rock","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Future / Expansion","mw":84,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"On-site power supply backed by a substantial substation (on-site 200 MW substation referenced for campus feed) with diverse feeds. Redundant mechanical and electrical systems; Building A has ~30 MW critical capacity, Building B planned for additional ~54 MW.","uconf":"High","uquote":"The utility company for Round Rock is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/round-rock/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Sabey Data Centers","spon":"Sabey and National Real Estate Advisors","tenant":"Texas Advanced Computing Center (TACC)","ay":2025,"oy":2027,"deal":"colocation partnership with Texas Advanced Computing Center (TACC) for Horizon supercomputer","dealScan":"https://sabeydatacenters.com/news/tacc-selects-sabey-data-centers-in-round-rock-as-colocation-partner-for-new-supercomputer","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"choosetexaspower.org;sabeydatacenters.com","lflag":"utility_alias_corrected status_adjusted_future_expansion source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.choosetexaspower.org/electricity-rates/round-rock/","https://sabeydatacenters.com/news/tacc-selects-sabey-data-centers-in-round-rock-as-colocation-partner-for-new-supercomputer"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","rawStatus":"Operational","dukey":"44372|TX"},{"id":"f3e998afeb1b","cid":"f3e998afeb1b","canon":1,"dups":1,"ftype":"data_center","name":"SABEY, DAVID & RAINA WRIGHT-SABEY","city":"ROUND ROCK","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Future / Expansion","mw":84,"pc":"Grid","pconf":"High","pquote":"A data center project cannot move forward unless Oncor, the electricity distributer for Round Rock residents, confirms that the requested power capacity exists and the facility operator signs a binding contract to take and pay for that full load. This means that Oncor—not the City—secures the electricity and verifies that serving the project will not impact existing residential customers.","uquote":"A data center project cannot move forward unless Oncor, the electricity distributer for Round Rock residents, confirms that the requested power capacity exists and the facility operator signs a binding contract to take and pay for that full load.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Sabey Data Centers","spon":"Sabey , National Real Estate Advisors","tenant":"Texas Advanced Computing Center (TACC)","ay":2022,"oy":2027,"deal":"Round Rock City Council approved an economic incentive agreement in 2022, including zoning approvals and a performance-based incentive package, supporting Sabey's commitment to investing at least $185 million in property improvements and $5 million in new equipment.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected status_adjusted_future_expansion delivery_utility_linked","band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","rawStatus":"Operational","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"955f2cd2b512","cid":"955f2cd2b512","canon":1,"dups":1,"ftype":"data_center","name":"SACU DATA CENTER - TOYOTA BRANCH","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"e9c2d2188175","cid":"e9c2d2188175","canon":1,"dups":1,"ftype":"data_center","name":"same location as Existing on the lot of an Existing Data Center.","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"Multiple energy suppliers and renewable energy generators","pdt":"100% renewable energy coverage starting January 1, 2024","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3ffb41554a06","cid":"3ffb41554a06","canon":1,"dups":1,"ftype":"data_center","name":"MICROSOFT SAT 09","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The far West Side's cheap and plentiful electricity, thanks to the numerous substations that CPS Energy has there, has made it a desirable location for data centers.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2017,"contro":"Lawsuit and mechanic's lien filed by contractor for $34.2 million due to alleged payment issues and project delays.","deal":"Mechanic's lien filed by Rogers-O'Brien Construction for $34.2 million in March 2020, followed by a lawsuit filed June 3, 2020.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"azure.microsoft.com","lflag":"online_before_announced operational_null_capacity utility_alias_corrected source_quality_reclassified","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"05c94aac65bb","cid":"05c94aac65bb","canon":1,"dups":1,"ftype":"data_center","name":"MICROSOFT SAT10","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"CPS Energy (implied local utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"487c4e6b482c","cid":"487c4e6b482c","canon":1,"dups":1,"ftype":"data_center","name":"SAT 80 - Package 1","city":"Castroville","county":"Medina","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2024,"deal":"Project investment of $135,000,000 (estimated cost) for new construction, started 2022, completed 2024.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023024471","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized coordinate_cluster_reclassified","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023024471"]},{"id":"f80c8bbed154","cid":"f80c8bbed154","canon":1,"dups":1,"ftype":"data_center","name":"SAT 81 - Package 2","city":"Castroville","county":"Medina","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","uconf":"High","uquote":"The City of Castroville's Electrical Department is responsible for maintaining and operating the city's electric utility system. Castroville Utilities is headquartered in Castroville, Texas and it provides electricity in the citizens located there. The largest electricity provider in the city based on megawatt hours sold is Castroville Utilities.","uname":"City of Castroville Electrical Department","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft (for its own cloud services) / Colocation","oy":2024,"contro":"Community members expressed concerns about increased traffic due to data center developments, including SAT 81, in the area.","deal":"New construction project with an estimated cost of $95,000,000, started July 2022.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023024474","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_not_in_eia861 coordinate_cluster_reclassified","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023024474"],"rawUkey":"56286|TX","rawUname":"Frontier Utilities, LLC","reportedUtility":"City of Castroville Electrical Department"},{"id":"65397af79299","cid":"65397af79299","canon":1,"dups":1,"ftype":"data_center","name":"SAT14 - Phase 1","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Power provider: CPS Energy / ERCOT.","pscan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","uconf":"High","uquote":"Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","ay":2021,"oy":2022,"contro":"Dispute with an adjacent subdivision over tree removal during site preparation; located on Edwards Aquifer recharge zone, raising concerns about water usage.","controScan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","deal":"TDLR permit filed July 6, 2021, for Phase 1 with an estimated cost of $154,900,000.","dealScan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"dbaca4795874","cid":"dbaca4795874","canon":1,"dups":1,"ftype":"data_center","name":"Seaboard Marine","county":"Gaines","state":"TX","lat":32.743942,"lng":-102.631561,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"e875c96847a5","cid":"e875c96847a5","canon":1,"dups":1,"ftype":"data_center","name":"Serverfarm","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Secured power access to unused grid capacity will fully energize two existing buildings prior to future expansion of the sites. Houston's established energy infrastructure offers the reliable grid power needed to scale data centers quickly and efficiently. With on-site substations and available capacity, Serverfarm can sustainably meet the demand for data center capacity at a scale previously unseen in the region. The CTX1 data center campus spans across nearly half a million sq ft in two buildings with secured customer capacity to scale to 100MW using available, existing grid power.","uconf":"Medium","uquote":"Grid Operator. San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/serverfarm-23aa812f","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Serverfarm","spon":"Manulife Investment Management","ay":2024,"contro":"Local opposition to data centers is spreading across Texas due to concerns over water use, grid strain, noise, and industrialization of rural areas.","controScan":"https://www.youtube.com/watch?v=BWwfyjD-byI","deal":"Serverfarm acquired two Houston data center campuses in September 2024, funded by equity commitments from Manulife Investment Management. Serverfarm secured a $3.0 billion credit facility in December 2025 to accelerate construction of multiple hyperscale data center campuses across North America, including Houston.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;youtube.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/serverfarm-23aa812f","https://www.youtube.com/watch?v=BWwfyjD-byI"]},{"id":"33af3ffb990b","cid":"33af3ffb990b","canon":1,"dups":1,"ftype":"data_center","name":"Serverfarm","city":"Hockley","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Future / Expansion","mw":60,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"CTX1 spans nearly half a million sq ft across two buildings, with secured capacity to scale to 200MW using existing grid power.","pscan":"https://www.serverfarmllc.com/data-center-campus/","uconf":"Medium","uquote":"Grid Operator: CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/serverfarm-e864506f","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Serverfarm","spon":"Manulife Investment Management","ay":2025,"oy":2027,"deal":"Acquisition of two Houston, Texas data center campuses by Serverfarm, backed by Manulife Investment Management, in September 2024.","dealScan":"https://www.serverfarmllc.com/news/houston-acquisition-press-release/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"serverfarmllc.com;interconnection.fyi","lflag":"utility_alias_corrected status_adjusted_future_expansion delivery_utility_linked","srcUrls":["https://www.serverfarmllc.com/data-center-campus/","https://www.interconnection.fyi/data-center/project/serverfarm-e864506f","https://www.serverfarmllc.com/news/houston-acquisition-press-release/"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","rawStatus":"Operational","dukey":"8901|TX"},{"id":"8b685b4e6118","cid":"8b685b4e6118","canon":1,"dups":1,"ftype":"data_center","name":"Sharka Data Center - Phase 2","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"SB Energy Global, Elawan, Engie, Grupo Cobra, X-ELIO","pdt":"942MW PPA with SB Energy Global (part of 1.2GW solar projects), 375MW from other solar projects","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2018,"oy":2020,"contro":"Secrecy surrounding Google's identity and the tax abatement deal caused public controversy.","deal":"Midlothian City Council approved a 100% personal property tax abatement and 85% improvement tax abatement over 10 years for the data center development (announced June 2018).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c5013005cfc1","cid":"c5013005cfc1","canon":1,"dups":1,"ftype":"data_center","name":"Sharka Data Center Building 1 Spoke","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"AES Corp., Enel North America, Intersect Clearway, Engie, SB Energy, Ørsted and X-Elio","pdt":"more than 6,200 megawatts","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","ay":2019,"oy":2020,"deal":"$850,000 renovation/alteration project, started August 2019, completed March 2020","dealScan":"https://www.tdlr.texas.gov/TABS/Projects/TABS2019018578","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized","srcUrls":["https://www.tdlr.texas.gov/TABS/Projects/TABS2019018578"]},{"id":"a98c685e093d","cid":"a98c685e093d","canon":1,"dups":1,"ftype":"data_center","name":"Sharka Data Center Building 2 Spoke","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Google's CFE percentage in the ERCOT grid region, which powers its Texas data centers, nearly doubled from 41 percent in 2022 to 79 percent in 2023.","pscan":"https://www.fox4news.com/news/google-new-ai-data-centers-texas","uconf":"High","uquote":"Midlothian is in Ellis County, served by Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2020,"oy":2020,"deal":"$850,000 renovation/alteration completed in 2020","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"fox4news.com;electricchoice.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","uscan":"https://www.electricchoice.com/electricity-prices-by-state/texas/midlothian/","srcUrls":["https://www.fox4news.com/news/google-new-ai-data-centers-texas","https://www.electricchoice.com/electricity-prices-by-state/texas/midlothian/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"f3f6c2b12a4f","cid":"f3f6c2b12a4f","canon":1,"dups":1,"ftype":"data_center","name":"Sharka Data Center - Building 4","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"SB Energy, Engie, Elawan, Grupo Cobra, X-ELIO, TotalEnergies/Clearway","pdt":"Multiple PPAs, including 1.2 GW from SB Energy solar projects and 1 GW from TotalEnergies solar projects over 15 years, and 375 MW from other solar projects.","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2024,"oy":2025,"deal":"$350,000,000 investment for new construction, announced March 2024","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2024013301","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","lflag":"operational_null_capacity source_url_canonicalized","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2024013301"]},{"id":"a28cabf1fdbe","cid":"a28cabf1fdbe","canon":1,"dups":1,"ftype":"data_center","name":"SHARKA DATA CENTER","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Phase 3 of Google's Midlothian data center campus features a 288,600-square-foot Data Center, two 14,000-square-foot Modular Electric Buildings, Generators, and a Substation.","pscan":"https://baxtel.com/data-center/google-midlothian-3","uconf":"Medium","uquote":"Grid Operator. Hilco Electric Cooperative, Inc.","uscan":"https://www.interconnection.fyi/data-center/project/sharka-data-center-b6349051","ukey":"8620|TX","uname":"HILCO Electric Cooperative, Inc.","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2018,"oy":2019,"deal":"Google is investing $880 million in Sharka Data Center – Building 5, with construction starting January 2026 and completing February 2027.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://baxtel.com/data-center/google-midlothian-3","https://www.interconnection.fyi/data-center/project/sharka-data-center-b6349051"]},{"id":"9e67bf5a4e41","cid":"9e67bf5a4e41","canon":1,"dups":1,"ftype":"data_center","name":"SHC DATA CENTER REVISIONS","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"50dfc74e060b","cid":"50dfc74e060b","canon":1,"dups":1,"ftype":"data_center","name":"Fugro Data Center","city":"Katy","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":48,"pc":"Grid","pconf":"High","pquote":"Skybox Houston Campus is powered by a large loop-fed 400 MVA substation, ensuring fault-tolerant and maintainable power solutions for each user.","rto":"ERCOT","nerc":"TRE","op":"Skybox Datacenters","spon":"Bandera Ventures","tenant":"NRG Energy, DownUnder GeoSolutions (DUG)","ay":2014,"oy":2014,"deal":"NRG Energy long-term lease (Jan 2016), DUG 15MW capacity lease (Oct 2018)","dealScan":"https://www.prnewswire.com/news-releases/skybox-datacenters-push-energy-efficiency-with-houston-first-300206719.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/skybox-datacenters-push-energy-efficiency-with-houston-first-300206719.html"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"7a41996a041c","cid":"7a41996a041c","canon":1,"dups":1,"ftype":"data_center","name":"SKYBOX DATACENTER - PFLUGERVILLE (FUTURE","city":"PFLUGERVILLE","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"The facility receives power from two diverse Oncor substations via concrete-encased underground duct banks and is positioned in deregulated Texas territory allowing tenants to select renewable energy suppliers.","pscan":"https://centexdatacenters.org/tracker/skybox-austin-1","uquote":"The center will be a 30-megawatt facility, will be supported by two substations and is supplied by Oncor.","uscan":"https://www.kvue.com/article/money/economy/boomtown-2040/dallas-based-data-center-company-facility-pflugerville/269-f97110b1-9dbf-4642-bbf4-945e2fc9a966","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Skybox Datacenters","spon":"Prologis","ay":2022,"oy":2025,"contro":"Community concerns regarding water usage and grid impact.","deal":"Pflugerville City Council approved an economic development performance agreement (EDPA) with Austin Data Center 1, LLC (Skybox/Prologis joint venture) on March 8, 2022, for an intended capital investment of up to $548 million, including a grant of up to $1.58 million over 10 years.","dealScan":"https://www.pfdevelopment.com/news/p/item/41439/skybox-datacenters-to-build-new-datacenter-in-pflugerville","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"centexdatacenters.org;kvue.com;pfdevelopment.com","srcUrls":["https://centexdatacenters.org/tracker/skybox-austin-1","https://www.kvue.com/article/money/economy/boomtown-2040/dallas-based-data-center-company-facility-pflugerville/269-f97110b1-9dbf-4642-bbf4-945e2fc9a966","https://www.pfdevelopment.com/news/p/item/41439/skybox-datacenters-to-build-new-datacenter-in-pflugerville"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"3b1803556384","cid":"3b1803556384","canon":1,"dups":1,"ftype":"data_center","name":"SMU DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"This program has contributed greatly to savings and budget stability in the volatile power market regulated by ERCOT, the Electricity Reliability Council of Texas.","uconf":"Medium","uquote":"Grid Resilience: Dive into grid modernization with experts from Oncor, ERCOT, and EPRI, who will discuss the challenges of integrating massive data center loads while ensuring reliability and affordability for the community.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Southern Methodist University","spon":"Southern Methodist University","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"37e86a253087","cid":"37e86a253087","canon":1,"dups":1,"ftype":"data_center","name":"SMU DATA CENTER GENERATOR","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Co-located generation","pcp":"Southern Methodist University","uquote":"Grid Resilience: Dive into grid modernization with experts from Oncor, ERCOT, and EPRI, who will discuss the challenges of integrating massive data center loads while ensuring reliability and affordability for the community.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Southern Methodist University","spon":"Southern Methodist University","tenant":"Southern Methodist University","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected generic_permit_record delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"e43a6e02d0b7","cid":"e43a6e02d0b7","canon":1,"dups":1,"ftype":"data_center","name":"SMU TENNIS & DATA CENTER","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","rawName":"SMU TENNIS &  DATA CENTER","srcUrls":null,"srcDom":null},{"id":"08fecec167f8","cid":"08fecec167f8","canon":1,"dups":1,"ftype":"data_center","name":"MICROSOFT SN-4 COOLING RETROFIT","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Construction of a central utility building housing watercooled centrifugal chillers and associated m..., The central utility building will have water-cooled centrifugal chillers, along with other mechanical and electrical infrastructure, so existing data centers will have expanded cooling capacity., Grid Operator: Karnes Electric COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/sn-4-central-utility-building-fc1e438f","uconf":"High","uquote":"Grid Operator: Karnes Electric COOP INC.","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2017,"oy":2017,"deal":"$50.0M construction project in 2017","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/sn-4-central-utility-building-fc1e438f"]},{"id":"f8943afb9e06","cid":"f8943afb9e06","canon":1,"dups":1,"ftype":"data_center","name":"SOFT LAYER/ MAVERICKS PRACTICE FACILITY","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"6336732272b1","cid":"6336732272b1","canon":1,"dups":1,"ftype":"data_center","name":"Soluna Holdings Dorothy 1A","city":"Silverton","county":"Briscoe","state":"TX","lat":34.525172,"lng":-101.205893,"cprec":"distinct","status":"Operational","mw":25,"band":"25-50 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"“Energizing Project Dorothy allows us to finally demonstrate to investors the financial results that can be achieved by using ultra low cost, behind the meter, curtailed power co-located at a wind farm.”","pscan":"https://www.solunacomputing.com/news/ercot-grants-soluna-green-light-to-energize-project-dorothy-data-center/","proc":"Co-located generation","pdt":"$53 million acquisition of Briscoe Wind Farm, 150 megawatts","uquote":"“Selling an estimated 1,188.9 megawatt hours a year, Southwestern Public Service Company is the largest vendor in the city.” “We track 4 utilities in Briscoe County. American Electric Power Texas has the most customers out with 0 power outages. See the complete utility list below. American Electric Power Texas has the highest percentage of customers affected at 0% without power.... Xcel Energy.... Swisher Electric Coop.... Greenbelt Electric Coop.”","rto":"SPP","nerc":"MRO","op":"Soluna Holdings","spon":"Soluna Holdings","tenant":"Blockware, Canaan","ay":2023,"oy":2023,"deal":"Soluna acquired Spring Lane Capital's equity interest in Project Dorothy 1A for $16.5 million on April 16, 2026, financed partly by a $12 million unsecured promissory note.","dealScan":"https://www.solunacomputing.com/news/dorothy-1a-acquisition/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"solunacomputing.com","srcUrls":["https://www.solunacomputing.com/news/ercot-grants-soluna-green-light-to-energize-project-dorothy-data-center/","https://www.solunacomputing.com/news/dorothy-1a-acquisition/"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"80032ccbb4ef","cid":"80032ccbb4ef","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Soluna Holdings Dorothy 1B","city":"Silverton","county":"Briscoe","state":"TX","lat":34.525172,"lng":-101.205893,"cprec":"distinct","status":"Operational","mw":25,"band":"25-50 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The campus is powered behind-the-meter by the 150MW Briscoe Wind Farm, which Soluna acquired for $53 million as the first leg of the consolidation.","proc":"Co-located generation","pcp":"Soluna Holdings (owner of Briscoe Wind Farm)","pdt":"$53 million acquisition of Briscoe Wind Farm","rto":"SPP","nerc":"MRO","op":"Soluna Holdings","spon":"Soluna Holdings","tenant":"Sazmining, Blockware","ay":2023,"oy":2023,"deal":"Acquisition of remaining 49% equity interest from Navitas Global for approximately $8.8 million, closed May 19, 2026","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"afe6501199bb","cid":"afe6501199bb","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Soluna Holdings Dorothy 2","city":"Silverton","county":"Briscoe","state":"TX","lat":34.525172,"lng":-101.205893,"cprec":"distinct","status":"Operational","mw":48,"band":"25-50 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Built behind the meter at a 150 MW wind farm, Project Dorothy converts curtailed renewable energy into productive computing power for Bitcoin mining and AI.","proc":"Co-located generation","pcp":"Briscoe Wind Farm (owned by Soluna Holdings)","pdt":"$53 million acquisition of 150 MW wind farm","rto":"SPP","nerc":"MRO","op":"Soluna Holdings","spon":"Soluna Holdings","tenant":"Bitcoin Hosting customers","ay":2024,"oy":2025,"deal":"Acquisition of 150 MW Briscoe Wind Farm for $53.0 million (April 2, 2026)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a61cf3c0cba9","cid":"a61cf3c0cba9","canon":1,"dups":1,"ftype":"data_center","name":"SOUTHERN UNION ARDMORE","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"utility power to data center is supplied by CenterPoint Energy. The critical infrastructure is protected by 2 x 1,200 kVA UPS consisting of four 400 kVA modules in 2N+1 redundant configurations on the utility power loss. The emergency power to the data center is provided by 1×1400 kW, 1×1350 kW, diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/southern-union-houston-data-center/","uconf":"High","uquote":"Utility from Centerpoint Energy.","uscan":"https://cloudandcolocation.com/datacenters/southern-union-houston-data-center/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Energy Transfer Partners","spon":"Energy Transfer Partners","deal":"Acquisition of Southern Union Company by Energy Transfer Partners in March 2012.","dealScan":"https://ir.energytransfer.com/news-releases/news-release-details/energy-transfer-equity-acquire-southern-union-company/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;ir.energytransfer.com","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://cloudandcolocation.com/datacenters/southern-union-houston-data-center/","https://ir.energytransfer.com/news-releases/news-release-details/energy-transfer-equity-acquire-southern-union-company/"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"3db7e2cab1d1","cid":"3db7e2cab1d1","canon":1,"dups":1,"ftype":"data_center","name":"Meta Source LLC","city":"Southlake","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"84101d39dc53","cid":"84101d39dc53","canon":1,"dups":1,"ftype":"data_center","name":"SOUTHWEST AIRLINES DATA CENTER","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"a Southwest Airline spokesperson confirmed that the airline had to resolve a technology issue that was caused by a power outage at one of its facilities in Dallas Texas.","pscan":"https://www.youtube.com/watch?v=N1hosaK6ErA","uconf":"High","uquote":"GRANTEE acknowledges Oncor has existing overhead electrical facilities in the area. GRANTEE shall be responsible for coordinating and facilitating the relocation/burial of Oncor facilities at GRANTEE's expense to facilitate the construction of the pedestrian bridge.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Southwest Airlines","spon":"Southwest Airlines","tenant":"Southwest Airlines","oy":2012,"contro":"Power outage caused significant flight delays and cancellations in May 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;citysecretary2.dallascityhall.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","uscan":"https://citysecretary2.dallascityhall.com/resolutions/2017/08-09-17/17-1183.pdf","srcUrls":["https://www.youtube.com/watch?v=N1hosaK6ErA","https://citysecretary2.dallascityhall.com/resolutions/2017/08-09-17/17-1183.pdf"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"a027bd551928","cid":"3a5a290f407a","canon":0,"dups":2,"ftype":"data_center","name":"ORACLE RENOVATION PROJECT","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"3a5a290f407a","cid":"3a5a290f407a","canon":1,"dups":2,"ftype":"data_center","name":"ORACLE RENOVATION PROJECT","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"bb4bb5052263","cid":"bb4bb5052263","canon":1,"dups":1,"ftype":"data_center","name":"TRG DATACENTER","city":"Spring","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Power is supplied via multiple substations in the area, with dual power distribution buses and physically separate cooling distribution. Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uconf":"High","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage. Electricity for the site is confirmed to be provided by Houston-based CentrePoint Energy. CenterPoint Energy will serve as power supplier.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"TRG Datacenters","spon":"Tallvine Partners","oy":2018,"deal":"Tallvine Partners acquired TRG Datacenters in 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"5227155586e6","cid":"5227155586e6","canon":1,"dups":1,"ftype":"data_center","name":"SPRINT E SOLUTIONS INTERNET CTR/BLUE CROSS BLUE SH","city":"RICHARDSON","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"81927fd39a5c","cid":"81927fd39a5c","canon":1,"dups":1,"ftype":"data_center","name":"SSFCU 306 Data Center","city":"New Braunfels","county":"Comal","state":"TX","lat":29.812377,"lng":-98.258129,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"f962b045b8a2","cid":"f962b045b8a2","canon":1,"dups":1,"ftype":"data_center","name":"STACK INFRASTRUCTURE INC","city":"PLANO","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":80,"pc":"Grid","pconf":"High","pquote":"Utility power sourced from the Texas regional grid; Access to abundant and scalable power resources; Redundant electrical systems designed for continuous uptime.","uquote":"Utility power sourced from the Texas regional grid; Access to abundant and scalable power resources; Redundant electrical systems designed for continuous uptime.","rto":"ERCOT","nerc":"TRE","op":"STACK Infrastructure","spon":"Blue Owl Digital Infrastructure (via IPI Partners)","oy":2019,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6a66aac8871c","cid":"6a66aac8871c","canon":1,"dups":1,"ftype":"data_center","name":"STATE FARM DATA CENTER","city":"RICHARDSON","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":11,"pc":"Grid","pconf":"High","pquote":"The data center would be next door to an Oncor electric substation. The facility is fed by two, 12.5 MW feeds and is directly next to a substation and a data center owned and operated by State Farm.","uconf":"High","uquote":"The data center would be next door to an Oncor electric substation.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DigiCo Infrastructure REIT","spon":"HMC Capital","tenant":"State Farm","ay":2014,"oy":2015,"deal":"Acquisition by DigiCo Infrastructure REIT for $248 million in January 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"add632166c25","cid":"add632166c25","canon":1,"dups":1,"ftype":"data_center","name":"STRATITSPHERE POD A BUILD OUT","city":"Katy","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"With the ability to expand up to 18 megawatts of power, three megawatts of power was added","uconf":"High","uquote":"non-residential with electric distribution service provided by CenterPoint Energy","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"StratITsphere Data Center Solutions","spon":"StratITsphere Data Center Solutions","ay":2011,"oy":2013,"deal":"Alpheus Communications acquired StratITsphere's retail colocation business unit, including a long-term lease of data center space at 1510 Primewest Parkway, Katy, Texas, on August 6, 2014.","dealScan":"https://www.bankstreet.com/app/uploads/2025/10/alpheus_stratitsphere_acquisition_08_06_2014.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bankstreet.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.bankstreet.com/app/uploads/2025/10/alpheus_stratitsphere_acquisition_08_06_2014.pdf"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"c5f51784c98d","cid":"c5f51784c98d","canon":1,"dups":1,"ftype":"data_center","name":"STRATITSPHERE POD C BUILDOUT","city":"Katy","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"Houston data center is a reliable power infrastructure sitting on the hospital power grid. The 9 MW of utility power is delivered to facility with 9 MW for expansion. The data center provides A/B diverse power feeds, A/B UPS, A/B diesel generators, and A/B power to the rack.","pscan":"https://cloudandcolocation.com/datacenters/stratitsphere-houston-data-center-echo/","rto":"ERCOT","nerc":"TRE","op":"StratITsphere Data Center Solutions","spon":"EdgeConneX","tenant":"Alpheus","oy":2013,"deal":"Alpheus acquired StratITsphere's retail colocation business in August 2014.","dealScan":"https://www.datacenterknowledge.com/colocation/houston-provider-stratitsphere-sells-retail-colo-business-to-alpheus","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/stratitsphere-houston-data-center-echo/","https://www.datacenterknowledge.com/colocation/houston-provider-stratitsphere-sells-retail-colo-business-to-alpheus"],"band":"< 10 MW"},{"id":"0c2cf64544cd","cid":"0c2cf64544cd","canon":1,"dups":1,"ftype":"data_center","name":"SDC DFW VI","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Grid","pconf":"High","pquote":"The facility was powered by two 20 MW underground utility feeds from two substations, and served by four diverse fiber routes for redundant connectivity.","uconf":"High","uquote":"Our 16-acre campus is home to our flagship DFW3 data center and DFW8, a 126,000 square foot expansion. It is powered by dual feeds from an off-site Oncor substation totaling 40MW of power and provides valuable metro connectivity to our other Dallas data centers.","uscan":"https://www.databank.com/data-centers/dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"AustralianSuper","ay":2016,"oy":2017,"deal":"Sale of facility from Stream Data Centers to DataBank in 2Q 2017","dealScan":"https://img.datacenterfrontier.com/files/base/ebm/datacenterfrontier/document/2022/09/1663627608010-dcfreportdallasdatacentermarketv3.pdf?dl=1663627608010-dcfreportdallasdatacentermarketv3.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;img.datacenterfrontier.com","srcUrls":["https://www.databank.com/data-centers/dallas/","https://img.datacenterfrontier.com/files/base/ebm/datacenterfrontier/document/2022/09/1663627608010-dcfreportdallasdatacentermarketv3.pdf?dl=1663627608010-dcfreportdallasdatacentermarketv3.pdf"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"3e2d530c5815","cid":"3e2d530c5815","canon":1,"dups":1,"ftype":"data_center","name":"Stream Data Centers","city":"Wilmer","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center benefits from a new on-site Oncor substation, ensuring reliable utility power and robust fiber infrastructure. The campus features dual dedicated underground 40 MW utility feeds, pre-designed to support the full capacity of the campus, and offers 100% renewable power options at competitive transmission rates.","uconf":"High","uquote":"The data center benefits from a new on-site Oncor substation, ensuring reliable utility power and robust fiber infrastructure. Stream's South Dallas-area campus in Wilmer, TX is being constructed on an expansive site, which is supported by a new on-site Oncor substation. The buying power of the deregulated Texas energy market combined with the reliable infrastructure of Oncor, the state's largest transmission and distribution utility.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Funds","ay":2022,"oy":2023,"deal":"Apollo Funds agreed to acquire a majority interest in Stream Data Centers from Stream Realty Partners, expected to be completed later in 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"f1aba54a50a7","cid":"f1aba54a50a7","canon":1,"dups":1,"ftype":"data_center","name":"Stream Data Centers","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":43,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The facility has two utility power feeds from a 95 MW on-site Oncor substation, with low utility pricing and Texas-sourced renewable energy.","pscan":"https://baxtel.com/data-center/stream-dfwa-1","uconf":"High","uquote":"The facility has two utility power feeds from a 95 MW on-site Oncor substation, with low utility pricing and Texas-sourced renewable energy.","uscan":"https://baxtel.com/data-center/stream-dfwa-1","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Funds","tenant":"Hyperscaler","ay":2018,"oy":2020,"deal":"Acquisition of Stream Data Centers by Apollo Funds completed on November 3, 2025, with Principal Asset Management acquiring a minority interest.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/stream-dfwa-1"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"af59afda4e6a","cid":"af59afda4e6a","canon":1,"dups":1,"ftype":"data_center","name":"DFW 07 - Phase 3","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":43,"pc":"Grid","pconf":"High","pquote":"Slated to hold 75,000 square feet of data hall space, the facility is designed to support 15MW of 2N critical load with dual 40MW utility feeds from an on-site substation provided by Oncor.","pscan":"https://www.streamdatacenters.com/news/construction-commences-on-stream-data-centers-dfw-vii-hyperscale-facility-in-the-dallas-market/","uconf":"High","uquote":"Slated to hold 75,000 square feet of data hall space, the facility is designed to support 15MW of 2N critical load with dual 40MW utility feeds from an on-site substation provided by Oncor.","uscan":"https://www.streamdatacenters.com/news/construction-commences-on-stream-data-centers-dfw-vii-hyperscale-facility-in-the-dallas-market/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Funds","ay":2018,"oy":2020,"deal":"Apollo-managed funds to acquire a majority interest in Stream Data Centers from Stream Realty Partners, expected to be completed in 2025.","dealScan":"https://dallasinnovates.com/nyc-based-apollo-acquires-majority-stake-in-dallas-stream-data-centers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"streamdatacenters.com;dallasinnovates.com","srcUrls":["https://www.streamdatacenters.com/news/construction-commences-on-stream-data-centers-dfw-vii-hyperscale-facility-in-the-dallas-market/","https://dallasinnovates.com/nyc-based-apollo-acquires-majority-stake-in-dallas-stream-data-centers/"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"6be95be30ee1","cid":"6be95be30ee1","canon":1,"dups":1,"ftype":"data_center","name":"OLR ZGD1","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":43,"pc":"Grid","pconf":"High","pquote":"The expanded building, now coded DFWA1, is powered by two utility power feeds from a 95 MW on-site Oncor substation, with aggressive utility pricing and renewable energy sourced in-state.","pscan":"https://www.streamdatacenters.com/locations/dallas-data-centers/","uquote":"Slated to hold 75,000 square feet of data hall space, the facility is designed to support 15MW of 2N critical load with dual 40MW utility feeds from an on-site substation provided by Oncor.","uscan":"https://www.streamdatacenters.com/news/construction-commences-on-stream-data-centers-dfw-vii-hyperscale-facility-in-the-dallas-market/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Funds","ay":2018,"oy":2020,"deal":"Acquisition of Stream Data Centers by Apollo-managed funds, completed November 2025.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/locations/dallas-data-centers/","https://www.streamdatacenters.com/news/construction-commences-on-stream-data-centers-dfw-vii-hyperscale-facility-in-the-dallas-market/"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"e3afe2424983","cid":"e3afe2424983","canon":1,"dups":1,"ftype":"data_center","name":"STREAM DC","city":"GARLAND","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":43,"pc":"Grid","pconf":"High","pquote":"Stream Data Centers' complex in Garland, Texas, (also known as DFW VII) is a 43 MW facility that also houses an on-site Oncor substation, providing reliable and low-cost renewable power.","uquote":"Two (2) 40 MW utility feeds from a new on-site Oncor substation offering power at competitive transmission rates, and options for renewable energy.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"SDC DFW VII, L.P.","tenant":"A major cloud customer","ay":2018,"oy":2020,"deal":"Stream Data Centers plans to invest $15,000,000.00 to build out 138,000 square feet of new space in Garland, announced February 10, 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"1f436358672e","cid":"1f436358672e","canon":1,"dups":1,"ftype":"data_center","name":"STREAM DC 2022 ADDN","city":"GARLAND","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":43,"pc":"Grid","pconf":"High","pquote":"Two (2) 40 MW utility feeds from a new on-site Oncor substation offering power at competitive transmission rates, and options for renewable energy.","uquote":"Two (2) 40 MW utility feeds from a new on-site Oncor substation offering power at competitive transmission rates.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Global Management","ay":2018,"oy":2022,"deal":"Stream Data Centers acquired by Apollo Global Management on August 6, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"81fdff2a2f31","cid":"81fdff2a2f31","canon":1,"dups":1,"ftype":"data_center","name":"STREAM HOUSTON PRIVATE DATA CENTER I","city":"The Woodlands","county":"Montgomery","state":"TX","lat":30.298801,"lng":-95.50295,"cprec":"shared_centroid","status":"Operational","mw":7,"pc":"Grid","pconf":"High","pquote":"Dual underground utility power feeds from two substations.","pscan":"https://www.streamdatacenters.com/locations/houston-the-woodlands/","uconf":"High","uquote":"Grid Operator: Sam Houston Electric COOP INC.","ukey":"16613|TX","uname":"Sam Houston Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Global Management","ay":2012,"oy":2013,"deal":"Apollo-managed funds completed the acquisition of a majority interest in Stream Data Centers on November 3, 2025.","dealScan":"https://www.apollo.com/insights-news/pressreleases/2025/11/apollo-funds-complete-acquisition-of-stream-data-centers-3179224","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"streamdatacenters.com;apollo.com","srcUrls":["https://www.streamdatacenters.com/locations/houston-the-woodlands/","https://www.apollo.com/insights-news/pressreleases/2025/11/apollo-funds-complete-acquisition-of-stream-data-centers-3179224"],"band":"< 10 MW","lflag":"shared_coordinate_precision_downgraded"},{"id":"4396c7263148","cid":"4396c7263148","canon":1,"dups":1,"ftype":"data_center","name":"MSFT SAT20 Office Build Out","city":"San Antonio","county":"Cameron","state":"TX","lat":26.102923,"lng":-97.478958,"cprec":"distinct","status":"Operational","mw":10,"pc":"Grid","pconf":"High","pquote":"With dual utility feeds, top-notch infrastructure, and a 185 mph wind-rated building, tenants enjoy reliable power and high resilience.","uconf":"High","uquote":"Power is provided by the nation's largest municipal utility, CPS Energy.","uscan":"https://www.streamdatacenters.com/locations/san-antonio-ii/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Funds","ay":2013,"oy":2014,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/locations/san-antonio-ii/"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"58e6f882197e","cid":"58e6f882197e","canon":1,"dups":1,"ftype":"data_center","name":"SC-III DATA CENTER","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"CPS Energy","pdt":"334 MW (substation capacity)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity utility_alias_corrected unlinked_source_text","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"c1f0a3bbd2b1","cid":"c1f0a3bbd2b1","canon":1,"dups":1,"ftype":"data_center","name":"T5@DALLAS WHOLESALE DATA CENTER","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":22,"pc":"Grid","pconf":"High","pquote":"It has dual primary power feeds connected to two separate substations, and is concurrently maintainable (mechanically and electrically) and fault tolerant (electrically).","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/stack-dallas-fort-worth-dfw01","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"T5 Data Centers","spon":"T5 Data Centers","ay":2011,"oy":2012,"deal":"T5 Data Centers completed a $113 million loan to expand its T5@Dallas Data Center in Plano, Texas, which will ultimately deliver 22.5 megawatts of critical IT load power and house 247,000 square feet of space (reported in 2014).","dealScan":"https://www.datacenterknowledge.com/investing/t5-data-centers-lines-up-113-million-to-expand-dallas-facility","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;datacenterknowledge.com","srcUrls":["https://baxtel.com/data-center/stack-dallas-fort-worth-dfw01","https://www.datacenterknowledge.com/investing/t5-data-centers-lines-up-113-million-to-expand-dallas-facility"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"cf830c1ee68e","cid":"cf830c1ee68e","canon":1,"dups":1,"ftype":"data_center","name":"T5@DALLAS WHOLESALE DATA CENTER PHASE I","city":"Dallas","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":22,"pc":"Grid","pconf":"High","pquote":"The data center has dedicated power feeds, and redundant 2.5 MWs of Caterpillar generators. The entire electrical and mechanical infrastructure is configured in N+1 redundancy with an optional 2N UPS capability that keeps the critical system up and running. The data center has a highly efficient chilled water cooling system with water side, delivering PUE of 1.45. The data center is a carrier neutral facility, and has superior connectivity to all major US metro markets.","pscan":"https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/t5-dallas-wholesale-data-center-c32165d4","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"T5 Data Centers","spon":"Iconiq Capital / IPI Partners","ay":2011,"oy":2012,"deal":"$113 million debt financing for expansion in May 2013","dealScan":"https://www.datacenterknowledge.com/investing/t5-data-centers-lines-up-113-million-to-expand-dallas-facility","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","https://www.interconnection.fyi/data-center/project/t5-dallas-wholesale-data-center-c32165d4","https://www.datacenterknowledge.com/investing/t5-data-centers-lines-up-113-million-to-expand-dallas-facility"],"band":"10-25 MW"},{"id":"b3bdb85d0251","cid":"b3bdb85d0251","canon":1,"dups":1,"ftype":"data_center","name":"T5@DALLAS WHOLESALE DATA CENTER PHASE II","city":"Dallas","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":22,"pc":"Grid","pconf":"High","pquote":"The data center has dedicated power feeds, and redundant 2.5 MWs of Caterpillar generators. The entire electrical and mechanical infrastructure is configured in N+1 redundancy with an optional 2N UPS capability that keeps the critical system up and running.","pscan":"https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","uconf":"Medium","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/t5-dallas-wholesale-data-center-c32165d4","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"T5 Data Centers","spon":"ICONIQ Capital","ay":2011,"oy":2013,"deal":"$113 million debt financing for expansion in May 2013","dealScan":"https://www.datacenterknowledge.com/investing/t5-data-centers-lines-up-113-million-to-expand-dallas-facility","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","https://www.interconnection.fyi/data-center/project/t5-dallas-wholesale-data-center-c32165d4","https://www.datacenterknowledge.com/investing/t5-data-centers-lines-up-113-million-to-expand-dallas-facility"],"band":"10-25 MW"},{"id":"8c9b3b1a9af1","cid":"8c9b3b1a9af1","canon":1,"dups":1,"ftype":"data_center","name":"MHMRTC DATA CENTER FINISH-OUT","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"a400442abd19","cid":"a400442abd19","canon":1,"dups":1,"ftype":"data_center","name":"TCU WORTH HILLS DATA CENTER","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"TXU (current, as of 2024-2029)","pdt":"expect to save $3.0 Million over 5 years (2024-2029)","rto":"ERCOT","nerc":"TRE","op":"Texas Christian University","spon":"Texas Christian University","ay":2014,"deal":"$6.2M Renovation/Alteration","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"31081053826e","cid":"31081053826e","canon":1,"dups":1,"ftype":"data_center","name":"Temple Data Center","city":"Unknown","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Longhorn Data Center, a 135,000-square-foot confidential data center in Temple, Texas, was completed in October 2023. Consisting of data server halls and critical operational spaces, this facility was designed to ensure cost efficiency and optimized performance for the owner. Burns & McDonnell contracted Southland to handle the electrical installations, which required careful scheduling, coordination, and precision to meet the high demands of a mission-critical facility.","uconf":"High","uquote":"Meta Temple Data Center in Bell County, TX (100-250 MW)... Grid Operator. Heart of Texas Electric COOP.","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"TEMPLE GREEN DATA","spon":"TEMPLE GREEN DATA","ay":2021,"oy":2023,"deal":"New construction project with an estimated value of $70.0M.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"51994a3e2b27","cid":"51994a3e2b27","canon":1,"dups":1,"ftype":"data_center","name":"Temple Data Center NCB","city":"Temple","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Heart of Texas Electric COOP.","pscan":"https://www.interconnection.fyi/data-center/project/temple-data-center-ncb-95175656","uconf":"High","uquote":"Grid Operator. Heart of Texas Electric COOP.","uscan":"https://www.interconnection.fyi/data-center/project/temple-data-center-ncb-95175656","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"Polmer","spon":"Polmer","ay":2022,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/temple-data-center-ncb-95175656"]},{"id":"8a0517a4514f","cid":"8a0517a4514f","canon":1,"dups":2,"ftype":"data_center","name":"TEMPLE GREEN DATA LLC","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"NetZero Energy LLC","pdt":"up to 225 MW over a 10-year initial term with two 5-year extension options","rto":"ERCOT","nerc":"TRE","deal":"Acquisition of Temple site from Rhodium Enterprises for $40.6 million in cash, December 2024.","dealScan":"https://www.binance.com/en/square/post/12-30-2024-rhodium-enterprises-sells-texas-mining-facility-amid-leadership-changes-18248711627450","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"binance.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.binance.com/en/square/post/12-30-2024-rhodium-enterprises-sells-texas-mining-facility-amid-leadership-changes-18248711627450"]},{"id":"dce40b4c58cc","cid":"8a0517a4514f","canon":0,"dups":2,"ftype":"data_center","name":"TEMPLE GREEN DATA LLC","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"NetZero Energy LLC","pdt":"sufficient energy to operate our second Texas site at pre-determined maximum amounts during the term of the Datacenter Lease (initial term of ten years with options to extend for up to two five-year periods)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"60a659f32333","cid":"60a659f32333","canon":1,"dups":1,"ftype":"data_center","name":"TEMPLE GREEN DATA LLC","city":"TEMPLE","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Operational","mw":225,"pc":"Grid","pconf":"High","pquote":"As of September 30, 2021, all of our energy provided by our electricity providers comes from the Electric Reliability Council of Texas (“ERCOT”) grid pursuant to contracts between each of our electricity providers and ERCOT, which has a blend of energy sources, many of which are non-carbon emitting.","uquote":"ONCOR ELECTRIC DELIVERY COMPANY, LLC. EASEMENT AND RIGHT OF WAY. DOCUMENT NO. 2022014479. O.P.R.B.C.TX.","uscan":"https://cms3.revize.com/revize/bellcountytx/county_government/county_clerk/docs/plats/M/MORIAH%20SUBDIVISION%20-%20PHASE%201.pdf","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"TEMPLE GREEN DATA","spon":"Rowan Digital Infrastructure","ay":2021,"oy":2022,"contro":"Former tenant Rhodium Enterprises Inc. filed for Chapter 11 bankruptcy due to disputes over power access, hosting economics, energy credits, and weather-related disruptions at the Temple site.","controScan":"https://theenergymag.com/news/2024-12-29/rhodium-temple-bitcoin-mine-ceo","deal":"Temple Green Data LLC purchased Rhodium's power agreements and infrastructure buildout for $40.6 million in cash, as approved by a court update on November 26, 2024.","dealScan":"https://theenergymag.com/news/2024-12-29/rhodium-temple-bitcoin-mine-ceo","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cms3.revize.com;theenergymag.com","srcUrls":["https://cms3.revize.com/revize/bellcountytx/county_government/county_clerk/docs/plats/M/MORIAH%20SUBDIVISION%20-%20PHASE%201.pdf","https://theenergymag.com/news/2024-12-29/rhodium-temple-bitcoin-mine-ceo"],"band":"100-250 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"50f15c81d823","cid":"50f15c81d823","canon":1,"dups":1,"ftype":"data_center","name":"INFOSYS - PLANO DATA CENTER","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The requirement for standalone and uninterrupted operation of servers required that new dedicated infrastructure be added, including new electrical service, UPS, standalone Chilled Water Cooling System with air cooled chillers and an emergency generator for back-up power.","uconf":"High","uquote":"The utility company for Plano is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/plano/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Infosys","spon":"Infosys","tenant":"Infosys","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","lflag":"operational_null_capacity utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.choosetexaspower.org/electricity-rates/plano/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"e6b519e65ada","cid":"e6b519e65ada","canon":1,"dups":1,"ftype":"data_center","name":"TESORO DATA CENTER REMODEL","city":"Schertz","county":"Guadalupe","state":"TX","lat":29.582671,"lng":-97.948995,"cprec":"distinct","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"2c1e6f295851","cid":"2c1e6f295851","canon":0,"dups":1,"ftype":"data_center","name":"DATA CENTER EXPANSION","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity generic_unsourced_permit_record","rawName":"DATA CENTER EXPANSION","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"8c5ad5591730","cid":"8c5ad5591730","canon":1,"dups":1,"ftype":"data_center","name":"BAB BUILDING DATA CENTER MODIFICATIONS","city":"Pasadena","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"d41fb239be02","cid":"d41fb239be02","canon":1,"dups":1,"ftype":"data_center","name":"Dell PC1 Data Center","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Austin Energy's Energy Efficiency Services requests authorization to issue a rebate to Dell Computers, Inc. in the amount of $92,853.30 on the installation of High Efficiency LED Lighting, Automatic Lighting Controls, and Server Virtualization in accordance with the City of Austin's Commercial Rebate Program guidelines. This program is one element of Austin Energy's comprehensive Energy Resource Plan, approved in December 2003 by City Council, designed to reduce local air pollution through energy conservation, to reduce peak demand, and to assist customers in reducing electric consumption. Dell Computers, Inc. is located at 1404 Park Center Drive in Austin, Texas.","pscan":"https://services.austintexas.gov/edims/document.cfm?id=149618","uquote":"Austin Energy's Energy Efficiency Services requests authorization to issue a rebate to Dell Computers, Inc. in the amount of $92,853.30 on the installation of High Efficiency LED Lighting, Automatic Lighting Controls, and Server Virtualization in accordance with the City of Austin's Commercial Rebate Program guidelines.","uscan":"https://services.austintexas.gov/edims/document.cfm?id=149618","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Dell Technologies","spon":"Dell Technologies","tenant":"Dell Technologies","oy":2010,"deal":"Austin Energy rebate of $92,853.30 for energy efficient equipment, March 2011","dealScan":"https://services.austintexas.gov/edims/document.cfm?id=149618","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.austintexas.gov","lflag":"operational_null_capacity display_name_normalized","srcUrls":["https://services.austintexas.gov/edims/document.cfm?id=149618"],"rawName":"the Dell PC1 Data Center located at 1404 Park Center Drive. Each unit is a like for like replacement rated at 165kVA.   All feeders and branch circuits are to remain and be reused. The units will be replaced one at a time."},{"id":"7d2cdf6f433d","cid":"7d2cdf6f433d","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER INC.","city":"Addison","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"ec0cabe1c0a8","cid":"ec0cabe1c0a8","canon":1,"dups":1,"ftype":"data_center","name":"Project Boom Data Center Substation — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":200,"pc":"Grid","pconf":"High","pquote":"By leveraging existing high-voltage transmission infrastructure and substation capacity adjacent to DFW7, CyrusOne and Eolian have achieved accelerated time-to-market for the strategic site. This innovative collaboration co-locates large-scale data center capacity at an existing grid-scale battery energy storage site.","uconf":"High","uquote":"Interconnection Agreement between Oncor Electric Delivery Company LLC and Chisholm Grid, LLC.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Eolian L.P. (backed by Global Infrastructure Partners, now part of BlackRock)","ay":2023,"oy":2026,"deal":"Collaborative infrastructure deployment between CyrusOne and Eolian L.P. announced January 2026, involving Eolian modernizing and upgrading one of Texas' first utility-scale BESS systems.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","rawName":"The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres.","lflag":"unlinked_source_text display_name_normalized utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"e0d2ebd81857","cid":"e0d2ebd81857","canon":0,"dups":1,"ftype":"data_center","name":"THE WEBB AT LBJ","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Most of our properties contain fully redundant electrical supply systems, multiple power feeds, above-standard electrical HVAC systems, raised floor areas to accommodate computer cables and below-floor cooling systems, extensive in-building communications cabling and high-level security systems.","uconf":"High","uquote":"Most of the Dallas/Fort Worth metropolitan area is served by Oncor","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","oy":1999,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected,merged_duplicate delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"f6bb2aebc3be","cid":"f6bb2aebc3be","canon":1,"dups":1,"ftype":"data_center","name":"THE WEBB AT LBJ","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":10,"pc":"Grid","pconf":"High","pquote":"NEW UTILITY CO. PAD MOUNT. TRANSFORMER. NEW. 500KW. GENSET.","uconf":"High","uquote":"DALLAS POWER & LIGHT COMPANY EASEMENT VOL 67124 PG 1920 D.R.D.C.T","ukey":"13830|TX","uname":"Nueces Electric Cooperative","rto":"ERCOT","nerc":"TRE","op":"Csquare","spon":"Brookfield Infrastructure Partners","oy":2024,"deal":"Evoque Data Centers acquired the Dallas office property at 11830 Webb Chapel Road for $205,000,000 (around 2022).","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"116186367421","cid":"116186367421","canon":1,"dups":1,"ftype":"data_center","name":"Woodlands Data Center C118","city":"The Woodlands","county":"Grimes","state":"TX","lat":30.543231,"lng":-95.988082,"cprec":"distinct","status":"Operational","proc":"Tariff (utility)","pcp":"CenterPoint Energy","uconf":"High","uquote":"The utility company for The Woodland is CenterPoint Energy.","uscan":"https://www.choosetexaspower.org/electricity-rates/the-woodlands/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Disney","spon":"Disney","tenant":"Disney Streaming Technology","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.choosetexaspower.org/electricity-rates/the-woodlands/"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"a9d3589ec078","cid":"a9d3589ec078","canon":1,"dups":1,"ftype":"data_center","name":"TI Amazon AUS5 Kyle Tx","city":"Kyle","county":"Hays","state":"TX","lat":30.061225,"lng":-98.029267,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"412f149c8ca2","cid":"412f149c8ca2","canon":1,"dups":1,"ftype":"data_center","name":"TIERPOINT (FORMERLY COLO 4)","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":11,"pc":"Grid","pconf":"High","pquote":"A total of 11.1 MW of utility power is served to data center to meet the power requirements for the future needs.","pscan":"https://cloudandcolocation.com/datacenters/tierpoint-dallas-data-center/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/tierpoint-dallas-colo4","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"TierPoint","spon":"Argo Infrastructure Partners","ay":2008,"oy":2000,"deal":"Argo Infrastructure Partners increased its ownership stake to represent a majority interest in TierPoint in July 2024, bringing its total commitment to nearly $700 million since 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","lflag":"online_before_announced utility_alias_corrected delivery_utility_linked","srcUrls":["https://cloudandcolocation.com/datacenters/tierpoint-dallas-data-center/","https://baxtel.com/data-center/tierpoint-dallas-colo4"],"band":"10-25 MW","rawName":"TIERPOINT     (FORMERLY COLO 4)","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"2edeedc09bb0","cid":"2edeedc09bb0","canon":1,"dups":1,"ftype":"data_center","name":"TierPoint DFW Data Center Expansion","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Utilities. 12MW of 2N A-side and B-side power distribution design. Generators. Eight 2.25MW Generators in an 2N configuration w/ a total of 40k gallons of fuel storage. Utility Service. Two (2) 25KV A-Side / B-Side utility feeds with Eight (8) 2,500kVa transformers.","pscan":"https://web.tierpoint.com/hubfs/TP-Facility_Fact_Sheet-DFW-WEB.pdf","uconf":"High","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"TierPoint","spon":"Argo Infrastructure Partners","ay":2024,"oy":2025,"deal":"Acquisition of data center in Fort Worth, TX (January 8, 2024); $500 million asset-backed securities issuance (April 9, 2025) on a portfolio of 33 data centers, including two data centers (one in Dallas and one in St. Louis) newly added to that portfolio.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"web.tierpoint.com;interconnection.fyi","srcUrls":["https://web.tierpoint.com/hubfs/TP-Facility_Fact_Sheet-DFW-WEB.pdf","https://www.interconnection.fyi/data-center/project/aig-data-center-iii-91612681"],"band":"< 10 MW"},{"id":"0ab21b4b11e7","cid":"0ab21b4b11e7","canon":1,"dups":1,"ftype":"data_center","name":"TIERPOINT TEXAS LLC","city":"ALLEN","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Engineered for reliability with 2N A-side and B-side power distribution, two redundant 2-Megawatt Cummins generators, each with a minimum 48-hour runtime, and backed by a 100% uptime SLA. The data center is equipped with a power system that includes dual independent feeds, providing a total of 3.6 MW of critical power. Our carrier-neutral facility, provides access to the internet bandwidth and connectivity services of your choice. Multiple, diverse fiber feeds, and DWDM connection to the Infomart facility and our Dallas DAL facility. Electricity in the data center park is served by dual 238 kVA power lines and from three separate electrical substations owned by two different electrical providers.","pscan":"https://www.allenedc.com/developments/data-centers","uconf":"High","uquote":"Cities Oncor Electric Has Coverage... Allen, TX.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"TierPoint","spon":"TierPoint","ay":2016,"oy":2017,"deal":"Secured Data Center Revenue Term Notes, Series 2025-1 and Series 2025-2, as of November 30, 2024 (data file date)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"allenedc.com","lflag":"operational_null_capacity citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.allenedc.com/developments/data-centers"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"1c95034abeba","cid":"1c95034abeba","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER RENOVATION","city":"Tomball","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. San Bernard Electric Coop, INC.","uquote":"Grid Operator. San Bernard Electric Coop, INC.","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"COMMUNITY HEALTH SYSTEMS PSC","spon":"COMMUNITY HEALTH SYSTEMS PSC","ay":2012,"oy":2012,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text generic_permit_record","srcUrls":null,"srcDom":null},{"id":"7b239b00b12e","cid":"7b239b00b12e","canon":1,"dups":1,"ftype":"data_center","name":"TOTAL - DATA CENTER EXPANSION LVL 1","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: San Bernard Electric Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/total-f9cafbb1","uconf":"High","uquote":"Grid Operator: San Bernard Electric Coop, INC.","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"BROOKFIELD OFFICE PROPERTIES","spon":"BROOKFIELD OFFICE PROPERTIES","ay":2012,"oy":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/total-f9cafbb1"]},{"id":"6a4c45432440","cid":"6a4c45432440","canon":1,"dups":1,"ftype":"data_center","name":"UNITRIN SHADOW DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"1e32194d0849","cid":"1e32194d0849","canon":1,"dups":1,"ftype":"data_center","name":"Data Center Building TX11","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"Vantage Data Centers TX11 - San Antonio Data Center is located at 14720 Omicron Dr, San Antonio, Texas 78245, USA. The data center is 242667 sqft. The gross colocation space is not available for this data center. It has access to 32.0 MW of power.","uconf":"High","uquote":"San Antonio is served by CPS Energy, a regulated municipal utility... Unlike most of Texas, the San Antonio area is not part of the deregulated retail electricity market — there are no competitive REPs to choose from. The city-owned utility — like other electric providers across the state — is up against an unprecedented surge in demand as data centers and other large load customers flock to the region. A data center is seen under construction along Lambda Drive near Omicron Drive in this 2023 file photo. The far West Side area was an early magnet for such development in San Antonio.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"Vantage Data Centers","ay":2023,"oy":2026,"contro":"Concerns raised by San Antonio District 6 Councilman Ric Galvan regarding the impact of data center expansion on the electric grid, water supply, and neighborhoods.","deal":"Project cost estimated at approximately US$96 million; land purchased in July 2023 from the University of Texas System Board of Regents.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected generic_permit_record","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"4f9aa2815581","cid":"4f9aa2815581","canon":1,"dups":1,"ftype":"data_center","name":"NTT GDCA-PDC TX2","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"A Garland Power and Light electrical substation, center, powers data center buildings Dallas TX3, left, and TX2, on the NTT Data center campus in Garland.","uquote":"A Garland Power and Light electrical substation, center, powers data center buildings Dallas TX3, left, and TX2, on the NTT Data center campus in Garland.","uname":"Garland Power & Light (City of Garland)","rto":"ERCOT","nerc":"TRE","op":"NTT DATA","spon":"NTT Communications","oy":2024,"deal":"NTT Data unveils its ambitious $50 million expansion plan for TX2 and TX3, with two distinct tenant improvement projects, each carrying an estimated price tag of $25 million, projected to be completed by 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Garland Power & Light (City of Garland)","ukey":"6958|TX","srcUrls":null,"srcDom":null},{"id":"1894e88693cb","cid":"1894e88693cb","canon":1,"dups":1,"ftype":"data_center","name":"NTT GDCA-PDC TX3","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"The center features dual, redundant power feeds, carrier-neutral connectivity with two diverse fiber entry points, and two Carrier-Meet-Me-Rooms, ensuring robust and flexible network access.","uquote":"“During the historic winter storm in 2021, we didn't lose power. Having that reliability, support and service from Garland Power & Light has been very valuable to our operations.”","uname":"Alliance Power Company, LLC.","rto":"ERCOT","nerc":"TRE","op":"NTT Global Data Centers Americas","spon":"NTT","ay":2023,"oy":2024,"contro":"Public backlash over heavy demands for water and power in Texas, with NTT TX3 shown in overhead view of construction.","deal":"NTT Data unveiled a $50 million expansion plan for TX2 and TX3, with each project estimated at $25 million, projected to be completed by 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Alliance Power Company, LLC.","srcUrls":null,"srcDom":null},{"id":"0ad1ea4851bc","cid":"0ad1ea4851bc","canon":1,"dups":1,"ftype":"data_center","name":"USAA B-SERVICE DATA CENTER EXPANSION","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Karnes Electric COOP INC.","rto":"ERCOT","nerc":"TRE","ay":2014,"oy":2014,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"248fe3fcb2eb","cid":"248fe3fcb2eb","canon":1,"dups":1,"ftype":"data_center","name":"UTSA MS BLDG RESEARCH DATA CENTER","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Karnes Electric COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/utsa-multidisciplinary-studies-building-dc2c20b1","uquote":"Grid Operator. Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/utsa-multidisciplinary-studies-building-dc2c20b1","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"UTSA","spon":"UTSA","ay":2011,"oy":2012,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/utsa-multidisciplinary-studies-building-dc2c20b1"]},{"id":"cf407c24a4e0","cid":"cf407c24a4e0","canon":1,"dups":1,"ftype":"data_center","name":"UTSA RESEARCH DATA CENTER PACKAGE","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Karnes Electric COOP INC.","rto":"ERCOT","nerc":"TRE","op":"UTSA","spon":"UTSA","ay":2011,"oy":2012,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"d8350d9dff08","cid":"d8350d9dff08","canon":1,"dups":1,"ftype":"data_center","name":"Valero HQ Stabilization and Data Center Construction","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Karnes Electric COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/valero-energy-building-a-149e7422","uconf":"High","uquote":"Grid Operator. Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/valero-energy-building-a-149e7422","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Valero Energy","spon":"Valero Energy","ay":2019,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/valero-energy-building-a-149e7422"]},{"id":"3fc7e26f43dd","cid":"3fc7e26f43dd","canon":1,"dups":1,"ftype":"data_center","name":"VALERO HQ DATA CENTER CRAHU REPLACEMENT","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Karnes Electric COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/valero-energy-building-a-149e7422","uquote":"Grid Operator. Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/valero-energy-building-a-149e7422","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Valero Energy","spon":"Valero Energy","ay":2019,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/valero-energy-building-a-149e7422"]},{"id":"3a191d4220f8","cid":"3a191d4220f8","canon":1,"dups":1,"ftype":"data_center","name":"VOL EXPANSION PHASE 3","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"d431f27686b9","cid":"d431f27686b9","canon":1,"dups":1,"ftype":"data_center","name":"VLAB RELOCATION FROM 4055 CORP DR","city":"Carrollton","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"15e21119ba3c","cid":"15e21119ba3c","canon":1,"dups":1,"ftype":"data_center","name":"WIRELINE NETWORK DATA CENTER BUILDOUT","city":"Arlington","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The datacenter is equipped with a reliable power infrastructure, ensuring continuous operation. It features multiple levels of redundancy, including N+1 UPS systems and on-site generators. This setup guarantees that the facility can maintain its operations even in the event of power outages.","pscan":"https://inflect.com/building/1025-north-irving-street-arlington/verizon/datacenter/arlington","uconf":"High","uquote":"For residents in Tarrant County, the TDSP is Oncor Electric Delivery. The utility company for Arlington is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Verizon","spon":"Verizon","tenant":"Verizon","ay":1930,"oy":1970,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified legacy_facility_year_review delivery_utility_linked","srcUrls":["https://inflect.com/building/1025-north-irving-street-arlington/verizon/datacenter/arlington"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"246644bb7ece","cid":"246644bb7ece","canon":1,"dups":1,"ftype":"data_center","name":"A NEW DATA CENTER FOR DFW AIRPORT","city":"Dfw Airport","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Verizon","spon":"Verizon","tenant":"DFW Airport Board","deal":"Lease agreement with Verizon for data center space, including periodic maintenance.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"138d83e0d52e","cid":"138d83e0d52e","canon":1,"dups":1,"ftype":"data_center","name":"VERIZON - CHILLER REPLACEMENT & CONTROLS UPGRADE","city":"Lubbock","county":"Lubbock","state":"TX","lat":33.611469,"lng":-101.819944,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"In 2024, Lubbock finalized the switch from a municipal energy provider, Lubbock Power & Light, to the commercial electricity market for its residents, after becoming fully integrated to the statewide grid managed by the Electric Reliability Council of Texas, or ERCOT in 2024.","uconf":"High","uquote":"In 2024, Lubbock finalized the switch from a municipal energy provider, Lubbock Power & Light, to the commercial electricity market for its residents, after becoming fully integrated to the statewide grid managed by the Electric Reliability Council of Texas, or ERCOT in 2024.","rto":"SPP","nerc":"MRO","op":"Verizon Wireless","spon":"Verizon","tenant":"Verizon Wireless","ay":2010,"oy":2010,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"da3e135d4afa","cid":"da3e135d4afa","canon":1,"dups":1,"ftype":"data_center","name":"VERIZON WIRELESS RESTROOM EXPANSION","city":"Southlake","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","uquote":"Oncor Electric Delivery is the utility company in Southlake.","uscan":"https://www.chooseenergy.com/electricity-rates/texas/southlake/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Verizon","spon":"Verizon","tenant":"Verizon","ay":2022,"oy":2023,"deal":"New construction of first phase of Data Hall masterplan with an estimated cost of $187,675,500 (2022-2023).","dealScan":"https://www.tdlr.texas.gov/TABS/Projects/TABS2022014205","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"chooseenergy.com;tdlr.texas.gov","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified source_url_canonicalized delivery_utility_linked","srcUrls":["https://www.chooseenergy.com/electricity-rates/texas/southlake/","https://www.tdlr.texas.gov/TABS/Projects/TABS2022014205"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"8098a90cab32","cid":"8098a90cab32","canon":1,"dups":1,"ftype":"data_center","name":"VESGRO CORP - 2020 RENOVATION","city":"IRVING","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","op":"Vesgro , c/o Lone Star Data Partners","spon":"Vesgro , c/o Lone Star Data Partners","ay":2021,"oy":2025,"deal":"Acquisition of 113,406-sf property by Vesgro Corp. in August 2021. Renovation/Alteration project valued at $6.3M, registered April 25, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"11e3e196b3f2","cid":"11e3e196b3f2","canon":1,"dups":1,"ftype":"data_center","name":"VIAWEST SHILOH DATA CENTER","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","mw":18,"pc":"Grid","pconf":"High","pquote":"The Shiloh data center has a fully redundant and fault tolerant power infrastructure design that is concurrently maintainable, and offers 100% SLA on power. The power to the data center is fed through multiple medium voltage utility power feeds. A Redundant UPS system of 18 MW power capacity with redundant battery strings provides a backup power supply in case of utility power loss that is being backed up by a 29 MW, fully redundant diesel generators having 50,000 gallons of diesel fuel.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/flexential-dallas-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Flexential","spon":"GI Partners, Morgan Stanley Infrastructure Partners, Hamilton Lane, GI Data Infrastructure","oy":2016,"deal":"GI Partners closed a continuation vehicle and strategic investment from GI Data Infrastructure in Flexential, anchored by funds managed by Hamilton Lane, and a prior investment from Morgan Stanley Infrastructure Partners, bringing total primary equity raised to approximately $1 billion (August 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/flexential-dallas-plano"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"3836f594b527","cid":"3836f594b527","canon":1,"dups":1,"ftype":"data_center","name":"VIRTBIZ INTERNET SERVICES","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electricity is supplied to VIRTBIZ DAL1 via two independent electrical service entrances to allow for true A/B power. Electricity is provided via both the Dallas CBD and the Baylor Hospital grids. In addition, the entire datacenter is connected to UPS backup with an automatic transfer switch to start and connect our Caterpillar diesel generator. We store enough fuel onsite for 24 hours of generator service, and maintain a safety refueling period of 6 hours.","uconf":"High","uquote":"Electricity is provided via both the Dallas CBD and the Baylor Hospital grids.","rto":"ERCOT","nerc":"TRE","op":"VIRTBIZ Internet Services","spon":"VIRTBIZ Internet Services","ay":2007,"oy":2007,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"065cd6407e56","cid":"49dfa24500a0","canon":0,"dups":2,"ftype":"data_center","name":"WACO DATA CENTER","city":"Waco","county":"McLennan","state":"TX","lat":31.549596,"lng":-97.201511,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"reportedly running on 100% renewable energy using sources like wind. and solar power","pscan":"https://www.youtube.com/watch?v=V_04vor59nM","uconf":"High","uquote":"Oncor Electric Delivery: Waco's utility company. While you can choose your electricity provider in a deregulated market, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore electricity during power outages. The utility company for Waco is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DataBank","oy":2009,"deal":"Acquired by DataBank in 2020","dealScan":"https://www.youtube.com/watch?v=V_04vor59nM","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"operational_null_capacity utility_alias_corrected shared_coordinate_precision_downgraded delivery_utility_linked","srcUrls":["https://www.youtube.com/watch?v=V_04vor59nM"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"49dfa24500a0","cid":"49dfa24500a0","canon":1,"dups":2,"ftype":"data_center","name":"WACO DATA CENTER","city":"Waco","county":"McLennan","state":"TX","lat":31.549596,"lng":-97.201511,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The W-ITG is located on a power grid separate from Texas' major city systems, providing an advantage during potential blackouts and brownouts. It incorporates dual transformer commercial power feeds and multi-carrier fiber availability for operating capacity and redundancy.","uconf":"High","uquote":"Grid Operator. Heart of Texas Electric COOP. Permit Status. Project Closed. Permit Details. Contact sales for permit type, permit ID, and dates. Timeline. Application Date. 2010. Approval Date. 2010. Proposed Operational Date. 2011. Actual Operational Date. 2011. Technical Details. Hyperscaler. No. Want more details? View the full public records profile for this project. View more details on datacenter.fyi.","uscan":"https://www.interconnection.fyi/data-center/project/waco-data-center-ff194826","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","ay":2009,"oy":2009,"deal":"DataBank acquired the Waco site as part of a $1.43 billion deal for Zayo's zColo data center assets in December 2020.","dealScan":"https://baxtel.com/data-center/databank-waco-act1","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","lflag":"operational_null_capacity shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/waco-data-center-ff194826","https://baxtel.com/data-center/databank-waco-act1"]},{"id":"ad9a17a5ac22","cid":"ad9a17a5ac22","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTERS UPS UPGRADE","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","deal":"Active Data Center Upgrade project involving replacement of UPS units and battery systems.","dealScan":"https://www.beckgroup.com/projects/active-data-center-upgrade/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"beckgroup.com","lflag":"operational_null_capacity source_quality_reclassified generic_permit_record","srcUrls":["https://www.beckgroup.com/projects/active-data-center-upgrade/"]},{"id":"cb94ed3f6df7","cid":"cb94ed3f6df7","canon":1,"dups":1,"ftype":"data_center","name":"ENTERPRISE PRODUCTS PARTNERS-DATA CENTER","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"66ef64ed267e","cid":"66ef64ed267e","canon":1,"dups":1,"ftype":"data_center","name":"WTX MODULAR DATA CENTER","city":"Richardson","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Operational","rto":"ERCOT","nerc":"TRE","spon":"BRACEBRIDGE C/O BOA","ay":2011,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"04a0ba20da24","cid":"04a0ba20da24","canon":1,"dups":1,"ftype":"data_center","name":"X Energy Corporation","city":"Monahans","county":"Ward","state":"TX","lat":31.513069,"lng":-103.105113,"cprec":"distinct","status":"Operational","mw":37.5,"band":"25-50 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"68869b99fa61","cid":"68869b99fa61","canon":1,"dups":1,"ftype":"data_center","name":"XC NETWORKS (ECU, ASSOC LAND)","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","uquote":"If you live in Dallas, your utility company is Oncor Electric Delivery.","uscan":"https://www.chooseenergy.com/electricity-rates/texas/dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"BORDERCOMM PARTNERS","spon":"BORDERCOMM PARTNERS","oy":1984,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"chooseenergy.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified legacy_facility_year_review delivery_utility_linked","srcUrls":["https://www.chooseenergy.com/electricity-rates/texas/dallas/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"d980768f2147","cid":"d980768f2147","canon":1,"dups":1,"ftype":"data_center","name":"ZAYO COLOCATION","city":"DALLAS","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"The data center has AC and DC power distribution. In the event of a power failure, the facility is protected by UPS systems and an immediate shift of the power load to a N+1 configured, 350 kw diesel generator.","pscan":"https://cloudandcolocation.com/datacenters/zcolo-zayo-group-llc-dallas-data-center-2/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","uscan":"https://baxtel.com/data-center/digital-realty-dfw10","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge, AustralianSuper, Swiss Life Asset Managers, TJC, IMCO","oy":2014,"deal":"Zayo acquired CoreXchange, a data center and managed services provider in Dallas, Texas, on March 6, 2014. DataBank acquired all data center assets from Zayo Group in 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/zcolo-zayo-group-llc-dallas-data-center-2/","https://baxtel.com/data-center/digital-realty-dfw10"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"1c845d4f3e08","cid":"1c845d4f3e08","canon":1,"dups":1,"ftype":"data_center","name":"ZCOLO","county":"McLennan","state":"TX","lat":31.549596,"lng":-97.201511,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"It is located on a separate part of the power grid from other major Texas metroplexes, providing an operational advantage during rolling blackouts and power generation system failures. It features a true 2N power standard with dual redundant power paths from generator to cabinet facility and incorporates dual transformer commercial power feeds.","pscan":"https://datacentercatalog.com/usa/zcolo-700-austin-ave","uconf":"High","uquote":"Waco Electricity Utility Company: Oncor. While Just Energy manages your electricity plan and billing, your local utility company is responsible for the physical delivery of power and maintaining the electrical grid in your area. Oncor Electric Delivery is the largest transmission and distribution utility in Texas, providing essential grid maintenance and emergency repairs for Dallas, Fort Worth, and the surrounding regions.","uscan":"https://justenergy.com/electricity-rates/waco-texas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Zayo Group / zColo","spon":"Digital Bridge Holdings","ay":2009,"oy":2009,"deal":"Zayo Group acquired Clearview International for $18.9 million in April 2016; DataBank acquired zColo data center assets from Zayo Group for $1.43 billion in December 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"datacentercatalog.com;justenergy.com","lflag":"operational_null_capacity utility_alias_corrected shared_coordinate_precision_downgraded delivery_utility_linked","srcUrls":["https://datacentercatalog.com/usa/zcolo-700-austin-ave","https://justenergy.com/electricity-rates/waco-texas/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"0dff80717d0a","cid":"0dff80717d0a","canon":1,"dups":1,"ftype":"data_center","name":"FTW4 Data Center","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Fort-Worth-Data-Center.pdf","uconf":"High","uquote":"Oncor, the largest energy delivery company in Texas, played a pivotal role in transforming a regional reliability project into a statewide mega-expansion—one that will drive up Texans' energy bills while benefiting the company financially.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","deal":"Client collaborated to erect a 200MW wind farm 90 miles from site (implied around 2015-2017).","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Fort-Worth-Data-Center.pdf"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"e0c96dd36a9e","cid":"e0c96dd36a9e","canon":1,"dups":1,"ftype":"data_center","name":"5MW Temple Data Center","city":"Temple","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Construction","mw":5,"rto":"ERCOT","nerc":"TRE","op":"Oppidan","spon":"Oppidan","ay":2025,"oy":2026,"deal":"$31 million project, scheduled for development between July 2025 and October 2026","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6a7c58555e66","cid":"6a7c58555e66","canon":1,"dups":1,"ftype":"data_center","name":"7000 BURLESON RD","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Construction","mw":1,"pc":"Grid","pconf":"High","pquote":"1.6 MW. Critical IT Workload.... 1.6 MW. Total Generator Capacity.","uquote":"Austin Energy, the city's largest utility provider, supplies electricity to businesses...","uscan":"https://brightlio.com/austin-colocation-and-data-centers/","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"LightEdge Solutions","spon":"The Anschutz","deal":"LightEdge acquired OnRamp in July 2018.","dealScan":"https://lightedge.com/acquisition/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"brightlio.com;lightedge.com","srcUrls":["https://brightlio.com/austin-colocation-and-data-centers/","https://lightedge.com/acquisition/"],"band":"< 10 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"57fc1a70ea8a","cid":"57fc1a70ea8a","canon":1,"dups":1,"ftype":"data_center","name":"ACCESS CONTROL FOR DATA CENTERS","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6d894617703b","cid":"6d894617703b","canon":1,"dups":2,"ftype":"data_center","name":"AWS Rockfish","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","pcp":"CPS Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2e64c5c752c4","cid":"6192773b7fb1","canon":0,"dups":2,"ftype":"data_center","name":"AWS Rockfish","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Amazon Data Services, Inc. (ADS) owns and operates the ALE60 data center in Bexar County, Texas.... If local power is interrupted, the emergency generators will power the ALE61 San Antonio Facility such that there is no interruption in services to ADS customers; however, this usage of the emergency generators is not considered “normal operation” as it only occurs as a result of an emergency event (i.e., a power outage).","pscan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8724316&Rendition=Web","uquote":"Grid Operator: Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/ale061-929dfcf0","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2020,"oy":2021,"deal":"Construction cost of $55,950,000, completed December 2021","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021001485","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"records.tceq.texas.gov;interconnection.fyi;tdlr.texas.gov","srcUrls":["https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8724316&Rendition=Web","https://www.interconnection.fyi/data-center/project/ale061-929dfcf0","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021001485"],"lflag":"citation_artifact_removed source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"6192773b7fb1","cid":"6192773b7fb1","canon":0,"dups":2,"ftype":"data_center","name":"AWS Rockfish","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","pcp":"CPS Energy","uconf":"Medium","uquote":"Grid Operator: Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/ale062-c25a8470","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Amazon Data Services","spon":"Amazon Data Services","ay":2020,"oy":2021,"contro":"Community concerns regarding water usage and location within the Edwards Aquifer recharge zone for data centers in the Potranco Road corridor.","deal":"New construction with an estimated cost of $55,950,000.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2021003295","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;tdlr.texas.gov","srcUrls":["https://www.interconnection.fyi/data-center/project/ale062-c25a8470","https://www.tdlr.texas.gov/TABS/Search/Print/TABS2021003295"],"rawUkey":"10009|TX","rawUname":"Karnes Electric Coop Inc","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified source_url_canonicalized stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"4df768236e87","cid":"4df768236e87","canon":1,"dups":1,"ftype":"data_center","name":"CHALICE","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"The DFW-04 data center will feature, [...] A dedicated on-site substation.","pscan":"https://reserve76.com/blog/nvidia-backed-lambda-to-occupy-dollar700m-ai-data-center-in-plano","uconf":"High","uquote":"The utility company for Plano is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Aligned Data Centers","spon":"Macquarie Asset Management","tenant":"Lambda","ay":2025,"oy":2026,"deal":"Lambda Inc. to occupy a $700 million data center, partnership announced May 7, 2025.","dealScan":"https://www.planotexas.org/259/Current-News?contentId=fc42f8d3-9dab-4c31-897f-d15a890cb904","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"reserve76.com;planotexas.org","srcUrls":["https://reserve76.com/blog/nvidia-backed-lambda-to-occupy-dollar700m-ai-data-center-in-plano","https://www.planotexas.org/259/Current-News?contentId=fc42f8d3-9dab-4c31-897f-d15a890cb904"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"327b87bd7082","cid":"327b87bd7082","canon":1,"dups":1,"ftype":"data_center","name":"DE GAULLE","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"PowerSecure designed the central mission-critical electrical system, a 12.5 MW microgrid that provides 100% standby power with N+4 redundancy and parallels with the local utility grid to enhance stability and provide peak load management. Moreover, the financial benefits yielded by enrolling the 12.5 MWs in the Energy Reliability Council of Texas (ERCOT) Demand Response Program provided 100% of the financing for the microgrid.","pscan":"https://powersecure.com/hubfs/Case%20Study%20PDFs/CaseStudy_aligned-data-center.pdf?hsLang=en","rto":"ERCOT","nerc":"TRE","op":"Aligned Data Centers","spon":"Artificial Intelligence Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners","tenant":"Lambda","ay":2025,"oy":2026,"deal":"Acquisition of Aligned Data Centers for $40 billion by AIP, MGX, and BlackRock's Global Infrastructure Partners (expected to close H1 2026); $700 million investment for DFW-04 facility.","dealScan":"https://dallasinnovates.com/north-texas-aligned-data-centers-to-be-acquired-for-40-billion-by-blackrock-nvidia-xai-microsoft-and-others/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"powersecure.com;dallasinnovates.com","srcUrls":["https://powersecure.com/hubfs/Case%20Study%20PDFs/CaseStudy_aligned-data-center.pdf?hsLang=en","https://dallasinnovates.com/north-texas-aligned-data-centers-to-be-acquired-for-40-billion-by-blackrock-nvidia-xai-microsoft-and-others/"],"lflag":"source_quality_reclassified"},{"id":"640346598a7e","cid":"640346598a7e","canon":1,"dups":1,"ftype":"data_center","name":"Amazon (AFW1)","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"0fc69d3a6e89","cid":"0fc69d3a6e89","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Interior Offices Build-Out","city":"Humble","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","pcp":"San Bernard Electric Coop, INC.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"582ca661cece","cid":"582ca661cece","canon":1,"dups":1,"ftype":"data_center","name":"Amazon (DDX2)","city":"Mckinney","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"fd7ba93e6367","cid":"fd7ba93e6367","canon":1,"dups":1,"ftype":"data_center","name":"Amazon (PTX3)","city":"College Station","county":"Brazos","state":"TX","lat":30.656713,"lng":-96.302394,"cprec":"distinct","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"60f54b189439","cid":"60f54b189439","canon":1,"dups":1,"ftype":"data_center","name":"Amazon (SAT6)","city":"San Marcos","county":"Hays","state":"TX","lat":30.061225,"lng":-98.029267,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"7e6e8d1ffae7","cid":"7e6e8d1ffae7","canon":1,"dups":1,"ftype":"data_center","name":"Amazon HOU3","city":"Brookshire","county":"Waller","state":"TX","lat":30.01359,"lng":-95.982149,"cprec":"distinct","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"11d5a4f375d9","cid":"11d5a4f375d9","canon":1,"dups":1,"ftype":"data_center","name":"Lumien temp Communications facility","city":"Corpus Christi","county":"Nueces","state":"TX","lat":27.740032,"lng":-97.516214,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3cd641a18665","cid":"3cd641a18665","canon":1,"dups":1,"ftype":"data_center","name":"QTX5","city":"Corpus Christi","county":"Nueces","state":"TX","lat":27.740032,"lng":-97.516214,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"dbd60e030c9a","cid":"dbd60e030c9a","canon":1,"dups":1,"ftype":"data_center","name":"American Tower Data Center","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"American Tower is leveraging existing global network infrastructure to extend computing to the “network edge.” We bring the benefits of today's centralized data centers to regional offices and key customer regions. Our Edge Data Center capabilities provide the digital infrastructure to create a more distributed, consistent, and interoperable experience for end customers.... As of May 2026, San Antonio City Council is actively discussing restrictions on where data centers can be built within city limits. Council members have formally cited water and power consumption as the driving concerns.","uconf":"High","uquote":"San Antonio is different. CPS Energy is municipally owned and reports directly to San Antonio City Council.... According to reporting by the San Antonio Express-News, CPS has been managing rapidly growing interconnection requests tied to data center development.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"American Tower","spon":"American Tower","oy":2024,"contro":"San Antonio City Council is actively discussing restrictions and amendments to zoning codes for new data centers due to concerns about water and power consumption.","deal":"$15 million investment for construction, announced before August 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected stale_future_status_year","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"b33bf5da1139","cid":"b33bf5da1139","canon":1,"dups":1,"ftype":"data_center","name":"ARDC RESTROOM ADA/TAS RENOVATIONS","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","op":"The University of Texas System","spon":"The University of Texas System","tenant":"UT academic and health institutions","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b2c84fe25e50","cid":"b2c84fe25e50","canon":1,"dups":1,"ftype":"data_center","name":"DALLAS IDC PHASE 4 BUILDOUT","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"41ad5b28e8cd","cid":"41ad5b28e8cd","canon":1,"dups":1,"ftype":"data_center","name":"APPLE CAPSTONE ROOM 3204 NxNW","city":"Austin","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"The new campus will include 50 acres of preserved open space and, like all Apple facilities worldwide, its workspaces will be powered by 100 percent renewable energy.","pscan":"https://www.apple.com/newsroom/2018/12/apple-to-build-new-campus-in-austin-and-add-jobs-across-the-us/","uconf":"High","uquote":"Grid Operator. Austin Energy.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Apple","spon":"Apple","tenant":"Apple","ay":2018,"oy":2026,"contro":"Growing political issue in Central Texas and across the state regarding water usage and strain on the power grid by data centers.","controScan":"https://www.youtube.com/watch?v=ScLINGEceMI","deal":"$1 billion campus investment announced in December 2018; $21 million award from Texas Enterprise Fund over ten years.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"apple.com;youtube.com","srcUrls":["https://www.apple.com/newsroom/2018/12/apple-to-build-new-campus-in-austin-and-add-jobs-across-the-us/","https://www.youtube.com/watch?v=ScLINGEceMI"],"lflag":"source_quality_reclassified"},{"id":"c80f14f529fe","cid":"c80f14f529fe","canon":1,"dups":1,"ftype":"data_center","name":"BBT Midland Data Center","city":"Midland","county":"Midland","state":"TX","lat":31.814269,"lng":-102.002454,"cprec":"distinct","status":"Construction","mw":5,"pc":"Behind-the-Meter","pconf":"Medium","pquote":"FO Permian providing off-grid energy solutions and BBT building a new data center to house AI equipment.... in partnership with the BBT Midland data center we at FOP permian partners over the last two years have been doing two things. one we've been convincing. data center and tech companies to not look at the grid. but look at private. power where you can generate your own power or partner. with power providers that can provide that","pscan":"https://www.youtube.com/watch?v=kNyjAJZTf3o","uquote":"The utility company for Midland is Oncor Electric Delivery.","rto":"SPP","nerc":"MRO","op":"Big Bend Telephone Company","spon":"Big Bend Telephone Company","ay":2021,"oy":2022,"tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=kNyjAJZTf3o"],"band":"< 10 MW","lflag":"citation_artifact_removed utility_alias_corrected stale_future_status_year delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","oy_stale":1,"dukey":"44372|TX"},{"id":"1dbf09c19225","cid":"1dbf09c19225","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Build-out interior of Data Center / 3rd Party Plan Review & Inspections / Winston Services","lflag":"display_name_normalized utility_alias_corrected generic_unsourced_permit_record unlinked_source_text delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"c9cdfb53a5d3","cid":"c9cdfb53a5d3","canon":1,"dups":1,"ftype":"data_center","name":"Education Building - Data Center","city":"El Paso","county":"El Paso","state":"TX","lat":31.76648,"lng":-106.241423,"cprec":"shared_centroid","status":"Construction","rto":"non-RTO","nerc":"WECC","op":"University of Texas at El Paso","spon":"University of Texas at El Paso","tenant":"University of Texas at El Paso","ay":2025,"oy":2026,"deal":"Project estimated cost of $3,000,000","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"dcd8b65a0512","cid":"dcd8b65a0512","canon":1,"dups":1,"ftype":"data_center","name":"COMAL ISD DATA CENTER RELOCATION","city":"New Braunfels","county":"Comal","state":"TX","lat":29.812377,"lng":-98.258129,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"New Braunfels Utilities provides electric service to the majority of the city.","uquote":"New Braunfels Utilities provides electric service to the majority of the city.","rto":"ERCOT","nerc":"TRE","op":"Comal Independent School District","spon":"Comal Independent School District","tenant":"Comal Independent School District","ay":2021,"oy":2024,"deal":"Bond 2021 approved $34.5 million for teacher and student instructional technology in November 2021.","dealScan":"https://www.comalisd.org/apps/pages/bond_at_work","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"comalisd.org","srcUrls":["https://www.comalisd.org/apps/pages/bond_at_work"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"10f9b7d051c5","cid":"10f9b7d051c5","canon":1,"dups":1,"ftype":"data_center","name":"Willis Data Center","city":"Willis","county":"Montgomery","state":"TX","lat":30.298801,"lng":-95.50295,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","op":"Comcast of Houston","spon":"Comcast of Houston","oy":2025,"deal":"Construction cost of $7,500,000","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2024025831","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2024025831"],"lflag":"shared_coordinate_precision_downgraded source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"976f196dab37","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc.","lflag":"display_name_normalized generic_unsourced_permit_record unlinked_source_text","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"0478663f4350","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","proc":"Dedicated PPA","pcp":"Multiple renewable energy project partners","pdt":"1,919 megawatts of new renewable energy in Texas","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Construct new data center/3rd party plan review and inspections/Winston Services, Inc.","lflag":"display_name_normalized unlinked_source_text generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"1e1c1a896b69","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC.","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","spon":"Winner","ay":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced display_name_normalized source_quality_reclassified canonical_promoted_after_quarantine generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"Construct new data center/3rd party plan review and inspections/Winston Services, Inc."},{"id":"8b690f722a6c","cid":"8b690f722a6c","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Core Scientific - Denton, TX","city":"Denton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Construction","mw":394,"pc":"Grid","pconf":"High","pquote":"Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio. On Tuesday night, the Denton City Council unanimously approved modifying the power purchase agreement between Core Scientific and Denton Municipal Electric.","pscan":"https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","uconf":"High","uquote":"On Tuesday night, the Denton City Council unanimously approved modifying the power purchase agreement between Core Scientific and Denton Municipal Electric. Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio.","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2024,"oy":2027,"contro":"Initial skepticism due to secretive nature and large energy footprint as a crypto mine; company filed for Chapter 11 bankruptcy in 2022.","deal":"$1.2 billion expansion agreement with CoreWeave announced February 26, 2025; $6.1 billion real property investment projected November 20, 2024; proposed offering of $3.3 billion senior secured notes due 2031 announced April 21, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"keranews.org","srcUrls":["https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power"],"band":"250+ MW","lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Denton Municipal Electric (City of Denton)"},{"id":"7e0659541ef9","cid":"7e0659541ef9","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Core Scientific Denton Data Center North Parcel Guard Station","city":"Denton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Construction","mw":394,"pc":"Grid","pconf":"High","pquote":"Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio.","uquote":"Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2024,"oy":2027,"deal":"$6.1 billion real property investment (Nov 20, 2024); $1.2 billion expansion with CoreWeave (March 03 2025); $3.3 billion Senior Secured Notes offering (April 21 2026)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Denton Municipal Electric (City of Denton)","srcUrls":null,"srcDom":null},{"id":"0e3f95e393d2","cid":"0e3f95e393d2","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Core Scientific Denton Data Center North Parcel Tech Building","city":"Denton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Construction","mw":394,"pc":"Grid","pconf":"High","pquote":"Core Scientific's Denton, Texas data center currently operates 125 megawatts of bitcoin mining with total contracted power of approximately 300 megawatts. The Denton City Council's approval increases the leased land to approximately 78 acres and the Company's access to power to 394 MW.","uconf":"High","uquote":"Denton City Council's approval of amendments to the Company's Power Purchase Agreements and land leases.","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2022,"oy":2025,"deal":"$6.1 billion real property investment (announced Nov 2024); $1.2 billion contracted revenue with CoreWeave (announced Feb 2025)","dealScan":"https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"investors.corescientific.com","srcUrls":["https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site"],"band":"250+ MW","lflag":"source_quality_reclassified utility_alias_corrected stale_future_status_year","rawUkey":"5063|TX","rawUname":"City of Denton - (TX)","reportedUtility":"Denton Municipal Electric (City of Denton)","oy_stale":1},{"id":"6e28fb6bd6c0","cid":"6e28fb6bd6c0","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Core Scientific Denton Data Center South Parcel Guard Station","city":"Denton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Construction","mw":130,"pc":"Grid","pconf":"High","pquote":"Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio. Core Scientific is also responsible for costs associated with improved interconnection infrastructure that is expected to include the construction of two new on-site substations.","uquote":"On Tuesday night, the Denton City Council unanimously approved modifying the power purchase agreement between Core Scientific and Denton Municipal Electric.","uscan":"https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2021,"oy":2023,"deal":"$1.2 billion expansion agreement with CoreWeave announced February 26, 2025, and $6.1 billion real property investment approved November 20, 2024","dealScan":"https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"keranews.org;investors.corescientific.com","srcUrls":["https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site"],"band":"100-250 MW","lflag":"source_quality_reclassified utility_alias_corrected stale_future_status_year","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Denton Municipal Electric (City of Denton)","oy_stale":1},{"id":"200cea36f943","cid":"200cea36f943","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Core Scientific Denton Data Center South Parcel Tech Building","city":"Denton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Construction","mw":394,"pc":"Grid","pconf":"High","pquote":"Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio. Core Scientific is also responsible for costs associated with improved interconnection infrastructure that is expected to include the construction of two new on-site substations.","uconf":"High","uquote":"On Tuesday night, the Denton City Council unanimously approved modifying the power purchase agreement between Core Scientific and Denton Municipal Electric.","uscan":"https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2021,"oy":2027,"contro":"Core Scientific filed for Chapter 11 bankruptcy in December 2022 and subsequently pivoted its Denton data center from crypto mining to high-performance computing for AI.","deal":"Core Scientific priced $3.3 billion aggregate principal amount of senior secured notes due 2031 on May 6, 2026.","dealScan":"https://www.stocktitan.net/sec-filings/CORZ/8-k-core-scientific-inc-tx-reports-material-event-3eb1b25059a7.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"keranews.org;stocktitan.net","srcUrls":["https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","https://www.stocktitan.net/sec-filings/CORZ/8-k-core-scientific-inc-tx-reports-material-event-3eb1b25059a7.html"],"band":"250+ MW","lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Denton Municipal Electric (City of Denton)"},{"id":"674c18bde527","cid":"674c18bde527","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Coreweave Helios","county":"Dickens","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Construction","mw":800,"pc":"Grid","pconf":"High","pquote":"The site benefits from access to Texas's ERCOT grid, with a mix of wind, solar, and natural gas resources, providing the scale and redundancy needed for large-scale AI operations. The filings show the Helios campus combining ERCOT transmission access, phased AI deployment, and hundreds of megawatts of private backup-generation infrastructure.","pscan":"https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2024,"oy":2026,"deal":"$1.4 billion project financing facility closed on August 15, 2025; Galaxy provided $350 million equity requirement.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"20404|TX"},{"id":"44c6fa7d51cc","cid":"44c6fa7d51cc","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE ALLEN CLOUDCENTER","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid.","uconf":"High","uquote":"In Allen, the utility company is Oncor. They maintain power lines, handle outages, and deliver electricity to your home, no matter which electricity provider you choose.","uscan":"https://justenergy.com/electricity-rates/allen-texas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR & and Global Infrastructure Partners (a subsidiary of BlackRock)","tenant":"Undisclosed cloud and information technology services company","ay":2017,"oy":2024,"deal":"$1.05B refinancing loan for DFW3 and DFW4, expected to close May 20, 2026","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"justenergy.com;bisnow.com","srcUrls":["https://justenergy.com/electricity-rates/allen-texas/","https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"fcdbdabdc933","cid":"fcdbdabdc933","canon":1,"dups":1,"ftype":"data_center","name":"Level 2 Tenant Office Fit-Out","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Utility capacity – 50 MW; Utility Voltage – 24,900 (25 kV); # of Utility Feeders – 2 each (non-redundant); # of transformers on site – 26 Transformers (24 each @ 2.5 MW, 1 each @ 1 MW, 1 each at 2 MW); UPS configuration & capacity – Distributed redundant, with 4,500 kVA blocks (6 MW); Generator Power – 24 each 2.25 MW Diesel (Critical), 1 each 1.25 MW Diesel (House); Electrical capacity allowed per cabinet – 150 to 180 watts p/SF (average density)","uconf":"Medium","uquote":"Grid Operator. Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2025,"deal":"Refinancing of $1.05B fixed-rate, five-year loan for DFW3 and DFW4, expected to close May 2026.","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","srcUrls":["https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"5ae72228f318","cid":"5ae72228f318","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Houston West 3 Data Hall Fitout-Project durden","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","mw":43,"pc":"Grid","pconf":"High","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures. use advanced components designed to deliver N. and 2N redundancies. and could provide at full build up to 96 megawatt of 100% uptime with uninterrupted. service in addition to being outside the flood zone. and having extra diesel fuel on site this facility has extra layers of physical. security including impact resistant.","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uquote":"Grid Operator. San Bernard Electric Coop, INC.","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge Group","tenant":"Hyperscale customer","ay":2013,"oy":2014,"deal":"Sale of four Houston data centers, including Houston West III, from CyrusOne to DataBank for approximately $670 million, announced January 2022 and closed March 2022.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w"],"band":"25-50 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"c9987733e2c5","cid":"c9987733e2c5","canon":1,"dups":1,"ftype":"data_center","name":"ZHU1","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","mw":43,"pc":"Grid","pconf":"Medium","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures. use advanced components designed to deliver N. and 2N redundancies. and could provide at full build up to 96 megawatt of 100% uptime with uninterrupted. service in addition to being outside the flood zone. and having extra diesel fuel on site this facility has extra layers of physical. security including impact resistant.","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uquote":"Grid Operator. San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer","ay":2013,"oy":2014,"deal":"Sale of four Houston data centers by CyrusOne to DataBank for approximately $670 million, closed March 3, 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;interconnection.fyi","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w","https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9"],"band":"25-50 MW","oy_stale":1,"lflag":"stale_future_status_year"},{"id":"22ac2688d110","cid":"b37b5bf4dd23","canon":0,"dups":2,"ftype":"data_center","name":"Edged Data Centers Fort Worth Data Center","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"The data center has received approval from ERCOT, the state's power grid operator.","uconf":"High","uquote":"Edged has contracted with Oncor, the region's transmission and distribution utility, for a dedicated electricity substation to serve the Fort Worth campus.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Edged Data Centers","spon":"Endeavor","oy":2027,"contro":"Community opposition and tax abatement withdrawal","controScan":"https://www.keranews.org/news/2026-05-18/as-fort-worth-prepares-to-hold-robust-discussions-on-growing-data-centers-residents-rally-together","deal":"Withdrew application for 50% tax break on April 30","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"keranews.org","srcUrls":["https://www.keranews.org/news/2026-05-18/as-fort-worth-prepares-to-hold-robust-discussions-on-growing-data-centers-residents-rally-together"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified generic_name_normalized delivery_utility_linked","rawName":"Data Center","dukey":"44372|TX"},{"id":"b37b5bf4dd23","cid":"b37b5bf4dd23","canon":1,"dups":2,"ftype":"data_center","name":"Edged Data Centers Fort Worth Data Center","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"The company has contracted with Oncor for a dedicated electricity substation and plans to use its proprietary waterless ThermalWorks cooling system.","uconf":"High","uquote":"The company has contracted with Oncor for a dedicated electricity substation and plans to use its proprietary waterless ThermalWorks cooling system.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Edged Data Centers","spon":"Endeavor","ay":2025,"oy":2027,"contro":"Community opposition regarding energy consumption, noise pollution, and land use.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected generic_name_normalized generic_duplicate_review delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","rawName":"Data Center","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"8c646fc26856","cid":"8c646fc26856","canon":1,"dups":1,"ftype":"data_center","name":"Edged Energy Fort Worth Data Center","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Edged has contracted with Oncor, the region's transmission and...","uquote":"Edged has contracted with Oncor, the region's transmission and...","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Edged Energy","spon":"Endeavour","ay":2025,"oy":2027,"contro":"Community opposition, withdrawn tax abatement application, city council delayed vote.","deal":"$300 million estimated cost for initial phase, $1 billion for full campus buildout. Tax abatement application withdrawn.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected generic_name_normalized generic_duplicate_review delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","rawName":"Data Center","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"1dec61bc6465","cid":"1dec61bc6465","canon":1,"dups":1,"ftype":"data_center","name":"Edged Fort Worth Data Center","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Edged has contracted with Oncor, the region's transmission and distribution utility, for a dedicated electricity substation to serve the Fort Worth campus","uconf":"High","uquote":"Edged has contracted with Oncor, the region's transmission and distribution utility, for a dedicated electricity substation to serve the Fort Worth campus","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Edged","spon":"Endeavour","ay":2025,"oy":2027,"contro":"Community opposition regarding energy consumption, noise pollution, and land use; withdrawal of tax abatement application.","deal":"Land acquisition from RMB Capital in July 2025; withdrawal of a 50% tax abatement application (estimated $18.2 million over 10 years) in May 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected generic_name_normalized generic_duplicate_review delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","rawName":"Data Center","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"ae90e44b80f7","cid":"ae90e44b80f7","canon":1,"dups":1,"ftype":"data_center","name":"Ezell Drive Campus","city":"De Soto","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":9,"rto":"ERCOT","nerc":"TRE","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2022,"oy":2024,"deal":"Investment of $6,000,000 for new construction, announced September 2022.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023000811","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023000811"],"band":"< 10 MW","lflag":"source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"2e42857aa666","cid":"2e42857aa666","canon":1,"dups":1,"ftype":"data_center","name":"Bastrop Project","city":"Elgin","county":"Bastrop","state":"TX","lat":30.100772,"lng":-97.310639,"cprec":"distinct","status":"Construction","pc":"Grid","pconf":"High","pquote":"A data center project outside Austin, Texas, initially proposed two years ago near a planned private airport site, appears to be a Bitcoin mining facility. Bastrop Project One, an active high-density cryptocurrency mining facility developed by Kevin Hsu (founder of Ocean Blockchain and AcroHash) in Elgin, Bastrop County, features a 150,000-square-foot footprint.","pscan":"https://theenergymag.com/news/2025-01-20/austin-data-center-bitcoin-mining","uconf":"High","uquote":"Streetlight/Power Outage - Oncor. 888.313.4747.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Ocean Blockchain / AcroHash","spon":"CENTRAL TEXAS AIRPORT","tenant":"Kevin Hsu (Ocean Blockchain / AcroHash)","ay":2022,"oy":2024,"deal":"Privately funded project with an estimated cost of $10,000,000","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023010309","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"theenergymag.com;tdlr.texas.gov","srcUrls":["https://theenergymag.com/news/2025-01-20/austin-data-center-bitcoin-mining","https://www.tdlr.texas.gov/TABS/Search/Print/TABS2023010309"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_url_canonicalized stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"516ed46bbea9","cid":"516ed46bbea9","canon":0,"dups":1,"ftype":"data_center","name":"DATA CENTER - INSTALL 2 PUMPS & HEAT EXCHANGER & ASSOCIATE PIPING","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","ay":2019,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced generic_unsourced_permit_record","rawName":"DATA CENTER - INSTALL 2 PUMPS & HEAT EXCHANGER & ASSOCIATE PIPING","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"f91a4564cb56","cid":"f91a4564cb56","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER ELECTRICAL INFRASTRUCTURE UPGRADE","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Grid Operator. Trinity Valley Elec COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/data-center-electrical-infrastructure-upgrade-24f7e4b0","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/data-center-electrical-infrastructure-upgrade-24f7e4b0","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","ay":2019,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced generic_permit_record","srcUrls":["https://www.interconnection.fyi/data-center/project/data-center-electrical-infrastructure-upgrade-24f7e4b0"]},{"id":"2bf003358dd8","cid":"2bf003358dd8","canon":1,"dups":1,"ftype":"data_center","name":"Datacenter Office Remodel Phase I","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6c653cbbf1e7","cid":"6c653cbbf1e7","canon":1,"dups":1,"ftype":"data_center","name":"PRIME DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":12,"pc":"Grid","pconf":"High","pquote":"UTILITY PROVIDER. Oncor.... SUSTAINABILITY. Committed to 100% renewable.","uquote":"UTILITY PROVIDER. Oncor.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Prime Data Centers","spon":"Snowhawk , Nuveen, Ares Management, Siemens, Macquarie Group","ay":2024,"oy":2025,"deal":"$22 million project cost, May 2024","dealScan":"https://baxtel.com/data-center/prime-dfw01-02","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/prime-dfw01-02"],"band":"10-25 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","oy_stale":1,"dukey":"44372|TX"},{"id":"050e961845b6","cid":"050e961845b6","canon":1,"dups":1,"ftype":"data_center","name":"TMobile Dallas Data Hall 0500 Expansion","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"9664713c3fbe","cid":"9664713c3fbe","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty-Project Gold Garland","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":16,"pc":"Grid","pconf":"High","pquote":"Besides being part of the metroplex, Garland is attractive for big data center builds because it can leverage Garland Power and Light, its municipally owned utility (one of a handful in the state), to offer operators low energy rates.","pscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-cranks-up-the-volume-in-garland-texas","uquote":"Besides being part of the metroplex, Garland is attractive for big data center builds because it can leverage Garland Power and Light, its municipally owned utility (one of a handful in the state), to offer operators low energy rates.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-cranks-up-the-volume-in-garland-texas","uname":"Garland Power & Light (City of Garland)","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty","ay":2023,"oy":2024,"deal":"$59.4 million investment (February 2023)","dealScan":"https://baxtel.com/data-center/digital-realty-1505-ferris","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;baxtel.com","srcUrls":["https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-cranks-up-the-volume-in-garland-texas","https://baxtel.com/data-center/digital-realty-1505-ferris"],"band":"10-25 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected stale_future_status_year","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Garland Power & Light (City of Garland)","ukey":"6958|TX","oy_stale":1},{"id":"09cef095edce","cid":"09cef095edce","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty-Project Gold Lewisville-PBB","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Construction","mw":8,"pc":"Grid","pconf":"High","pquote":"The facility is equipped with diverse utility feeds to enhance power redundancy. ASSOCIATED SITE AND UTILITY INFRASTRUCTURE INCLUDING A GENERATOR YARD, GUARD HOUSE AND VISITOR CENTER.","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-project-gold-lewisville-3dd7ed54","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"Digital Lewisville","spon":"Digital Realty","ay":2022,"oy":2024,"deal":"Initial construction estimated at $59,400,000 (filed August 2022); suite fit-out estimated at $40,000,000 (filed August 2023).","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022026326","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;tdlr.texas.gov","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-realty-project-gold-lewisville-3dd7ed54","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022026326"],"band":"< 10 MW","lflag":"source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"de99d53a4fe4","cid":"de99d53a4fe4","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty-Project Gold Lewisville-Suite Fit Out DH01 & DH02","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Construction","mw":8,"pc":"Grid","pconf":"High","pquote":"The data center at 2501 Edmonds Lane, Lewisville, operated by Digital Realty, is a robust facility designed to meet various IT needs. It offers a total power capacity of 8.0 MW, ensuring reliable and uninterrupted operation for hosted equipment. The facility is equipped with diverse utility feeds to enhance power redundancy.","uquote":"The campus currently has 16.5 megawatts of capacity from Texas New Mexico Power (TNMP) via a high-voltage utility-owned onsite substationy. NMP is in the process of adding two transformers at the site, which will provide approximately 67 megawatts of additional power.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-acquires-huge-dallas-campus","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Lewisville","ay":2022,"oy":2024,"deal":"Construction of shell building estimated at $59,400,000 (announced August 2022); Tenant finish out of two data hall suites estimated at $40,000,000 (announced August 2023)","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-acquires-huge-dallas-campus"],"band":"< 10 MW","uname":"Texas-New Mexico Power","reportedUtility":"Texas-New Mexico Power","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"40051|TX"},{"id":"df19e165aa02","cid":"df19e165aa02","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty 950 Operations Center","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","proc":"Dedicated PPA","pcp":"Pattern Energy (Phoenix Solar Project), Bearkat Wind Energy II","pdt":"12-year PPA, 160,000MWh solar per year, 262,800MWh wind per year","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"00bd5d551204","cid":"00bd5d551204","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty 907 S110 EFO","city":"Richardson","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":12,"pc":"Grid","pconf":"High","pquote":"electrical service to the park served by diverse substation feeders, to our dedicated, privately owned, substation capable of delivering up to 100 MW of power @ N+l.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-dallas-campus-in-richardson-digital-realty","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty","deal":"$5 million in incentives from the city of Richardson in March 2010","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-dallas-campus-in-richardson-digital-realty"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"d25feeeee7e1","cid":"d25feeeee7e1","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty - Project Gold Lewisville","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Construction","mw":8,"pc":"Grid","pconf":"High","pquote":"The data center at 2501 Edmonds Lane, Lewisville, operated by Digital Realty, is a robust facility designed to meet various IT needs. It offers a total power capacity of 8.0 MW, ensuring reliable and uninterrupted operation for hosted equipment. The facility is equipped with diverse utility feeds to enhance power redundancy....associated site and utility infrastructure including a generator yard, guard house and visitor center.","pscan":"https://inflect.com/building/2501-edmonds-lane-lewisville/digital-realty/datacenter/dfw44","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-project-gold-lewisville-3dd7ed54","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty, Mitsubishi","ay":2022,"oy":2024,"deal":"Joint venture with Mitsubishi Corp. for 65% equity share (initial $200 million) in two data centers, Lewisville being one, announced March 5, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"inflect.com;interconnection.fyi","srcUrls":["https://inflect.com/building/2501-edmonds-lane-lewisville/digital-realty/datacenter/dfw44","https://www.interconnection.fyi/data-center/project/digital-realty-project-gold-lewisville-3dd7ed54"],"band":"< 10 MW","lflag":"citation_artifact_removed source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"d914e07dd4f6","cid":"d914e07dd4f6","canon":1,"dups":1,"ftype":"data_center","name":"NCS Interior Improvements","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4be714325f93","cid":"4be714325f93","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty-Project Gold Garland PBB","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":16,"pc":"Grid","pconf":"High","pquote":"A generator room located on the ground floor provides provisions for eight generators dedicated to providing emergency power.","pscan":"https://www.gilbaneco.com/projects/digital-realty-trust-data-center/","uconf":"High","uquote":"Besides being part of the metroplex, Garland is attractive for big data center builds because it can leverage Garland Power and Light, its municipally owned utility (one of a handful in the state), to offer operators low energy rates.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-cranks-up-the-volume-in-garland-texas","uname":"Garland Power & Light (City of Garland)","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Mitsubishi","ay":2023,"oy":2024,"deal":"Joint venture with Mitsubishi Corp. (65% equity interest) and Digital Realty (35% interest) for two pre-leased data centers. Project estimated cost $59.4 million.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"gilbaneco.com;datacenterknowledge.com","srcUrls":["https://www.gilbaneco.com/projects/digital-realty-trust-data-center/","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-cranks-up-the-volume-in-garland-texas"],"band":"10-25 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected stale_future_status_year","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Garland Power & Light (City of Garland)","ukey":"6958|TX","oy_stale":1},{"id":"de54c18380e3","cid":"de54c18380e3","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty-Project Gold Garland-Suite Fit Out DH01 & DH02","city":"Garland","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":16,"pc":"Grid","pconf":"High","pquote":"Besides being part of the metroplex, Garland is attractive for big data center builds because it can leverage Garland Power and Light, its municipally owned utility (one of a handful in the state), to offer operators low energy rates.","pscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-cranks-up-the-volume-in-garland-texas","uquote":"Besides being part of the metroplex, Garland is attractive for big data center builds because it can leverage Garland Power and Light, its municipally owned utility (one of a handful in the state), to offer operators low energy rates.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-cranks-up-the-volume-in-garland-texas","uname":"Garland Power & Light (City of Garland)","rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Digital Realty, Mitsubishi","tenant":"Wells Fargo","ay":2023,"oy":2024,"deal":"Garland City Council approved a 50% tax rebate for 20 years and a four-year, 40% rebate on business personal property and real estate taxes as part of an economic development agreement with Digital Realty. The data centers project is a joint venture with the Mitsubishi Corp. Mitsubishi acquired a 65% equity interest in the venture while Digital Realty will manage the development and daily operations of the ventures and maintains a 35% interest.","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center/digital-realty-could-spend-up-to-19b-on-data-center-campus-in-garland-125883","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;bisnow.com","srcUrls":["https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-cranks-up-the-volume-in-garland-texas","https://www.bisnow.com/dallas-ft-worth/news/data-center/digital-realty-could-spend-up-to-19b-on-data-center-campus-in-garland-125883"],"band":"10-25 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected stale_future_status_year","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Garland Power & Light (City of Garland)","ukey":"6958|TX","oy_stale":1},{"id":"f7116c446e57","cid":"f7116c446e57","canon":1,"dups":1,"ftype":"data_center","name":"DPS DATA CENTER","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Grid Operator. Austin Energy.","pscan":"https://www.interconnection.fyi/data-center/project/dps-headquarters-building-a-d204db3a","uconf":"High","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/dps-headquarters-building-a-d204db3a","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Texas Department of Public Safety","spon":"State of Texas","tenant":"Texas Department of Public Safety","ay":2015,"oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/dps-headquarters-building-a-d204db3a"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"edc62cbec1a2","cid":"edc62cbec1a2","canon":1,"dups":1,"ftype":"data_center","name":"DFW Data Center Interior Fit-out","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":24,"pc":"Grid","pconf":"High","pquote":"The event was attended by Mayor Stopfer, City of Irving and Dallas County officials, leaders from the economic development community, local utility provider Oncor and key project partners.","pscan":"https://www.thermalworks.com/news/edged-irving-texas","uquote":"The event was attended by Mayor Stopfer, City of Irving and Dallas County officials, leaders from the economic development community, local utility provider Oncor and key project partners.","uscan":"https://www.thermalworks.com/news/edged-irving-texas","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Edged","spon":"Endeavour","ay":2023,"oy":2024,"contro":"Residents expressed concern about environmental impacts, leading city staff to recommend denying the conditional use permit.","deal":"Privately funded project with an estimated cost of $35,000,000, running from September 2023 to January 2025.","dealScan":"https://baxtel.com/data-center/edged-energy-dallas-tx","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"thermalworks.com;baxtel.com","srcUrls":["https://www.thermalworks.com/news/edged-irving-texas","https://baxtel.com/data-center/edged-energy-dallas-tx"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"a05eb5e9305f","cid":"a05eb5e9305f","canon":1,"dups":1,"ftype":"data_center","name":"Equinix DA11-3","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Scope of Work: AN ADDITION (4-STORY OFFICE AND 4-STORY DATA CENTER) TO AN EXISTING DATA CENTER. SCOPE INCLUDES WALLS, DOORS, CEILINGS, LIGHTING FIXTURES, PLUMBING, MECHANICAL EQUIPMENT, SITEWORK, LANDSCAPING, GENERATORS, GENERATOR ENCLOSURES AND ROOF DUNNAGE.","uconf":"Medium","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2019,"oy":2025,"deal":"Construction investment of $180,000,000 (estimated) / $186,000,000","dealScan":"https://investor.equinix.com/sec-filings/all-sec-filings/content/0001628280-24-005350/eqix-20231231.htm","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"investor.equinix.com","srcUrls":["https://investor.equinix.com/sec-filings/all-sec-filings/content/0001628280-24-005350/eqix-20231231.htm"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"8344c70c0035","cid":"8344c70c0035","canon":0,"dups":1,"ftype":"data_center","name":"EX West Green Data Center","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Grid Operator: Karnes Electric COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/ex-west-new-mmr-s-acf4a813","uconf":"High","uquote":"Grid Operator: Karnes Electric COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/ex-west-new-mmr-s-acf4a813","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"COPT San Antonio II","spon":"COPT San Antonio II","ay":2024,"oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/ex-west-new-mmr-s-acf4a813"],"oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"06450e05a22c","cid":"06450e05a22c","canon":1,"dups":1,"ftype":"data_center","name":"DALLAS DATA CENTER","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"421b2ff56400","cid":"421b2ff56400","canon":1,"dups":1,"ftype":"data_center","name":"FLEXENTIAL PLANO EXPANSION","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Construction","mw":13,"pc":"Grid","pconf":"High","pquote":"The power to the data center is fed through multiple medium voltage utility power feeds. A Redundant UPS system of 18 MW power capacity with redundant battery strings provides a backup power supply in case of utility power loss that is being backed up by a 29 MW, fully redundant diesel generators having 50,000 gallons of diesel fuel.","pscan":"https://cloudandcolocation.com/datacenters/flexential-plano-data-center/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/flexential-dallas-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Flexential","spon":"Invesco Real Estate","tenant":"CoreWeave","ay":2025,"oy":2025,"deal":"Agreement with CoreWeave for a 13 MW deployment announced April 29, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/flexential-plano-data-center/","https://baxtel.com/data-center/flexential-dallas-plano"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"32d091d49231","cid":"32d091d49231","canon":0,"dups":3,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","lflag":"display_name_normalized generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"af7f61da3194","cid":"af7f61da3194","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenter","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"2bdb0a2ba7b6","cid":"2bdb0a2ba7b6","canon":1,"dups":1,"ftype":"data_center","name":"Goodnight","county":"Armstrong","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Construction","mw":1030,"pc":"Hybrid","pconf":"High","pquote":"Crusoe has added natural-gas turbines and battery storage to the power mix for its multibillion-dollar Project Goodnight data center development in the Texas Panhandle, according to newly amended Armstrong County tax abatement filings.... Crusoe filed for a permit in January to build the 933-megawatt power plant on the site of the Goodnight campus, which showed the facility would operate off the grid and provide energy to at least two buildings on the campus, according to Cleanview.... The site will rely on the ERCOT grid, supplemented by the 265.5 MW Goodnight Wind Farm (already operating in Armstrong County) through a renewable-energy purchase agreement.","pscan":"https://baxtel.com/data-center/crusoe-goodnight-campus","proc":"Co-located generation","pcp":"Crusoe Energy","pdt":"933 MW","uconf":"High","uquote":"Grid Operator. Greenbelt Electric Coop, INC.","ukey":"7561|TX","uname":"Greenbelt Electric Coop, Inc","rto":"SPP","nerc":"MRO","op":"Google","spon":"Google","ay":2025,"oy":2027,"contro":"Controversy regarding environmental impact and Google's sustainability pledges due to a planned gas-fired power plant.","controScan":"https://e360.yale.edu/digest/google-natural-gas-data-center","deal":"Crusoe agreed to sell the Project Goodnight data center development to Google. The project involves up to $29B in capital investment.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;e360.yale.edu","srcUrls":["https://baxtel.com/data-center/crusoe-goodnight-campus","https://e360.yale.edu/digest/google-natural-gas-data-center"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"170e94c1a668","cid":"170e94c1a668","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Center - Colo 4 Buildout","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","mw":1,"pc":"Grid","pconf":"High","pquote":"2N UPS Power; Generator-backed utility power; 48-hour diesel runtime. Utility power from CPS at rates below the national average.","pscan":"https://h5datacenters.com/san-antonio-colocation.html","uquote":"Utility power from CPS at rates below the national average. San Antonio's power grid is served by CPS Energy, one of the largest municipally owned utilities in the United States.","uscan":"https://satc.org/data-center/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"H5 Data Centers","ay":2023,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"h5datacenters.com;satc.org","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://h5datacenters.com/san-antonio-colocation.html","https://satc.org/data-center/"],"band":"< 10 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"f8dedc87849b","cid":"f8dedc87849b","canon":1,"dups":1,"ftype":"data_center","name":"Chevron L8 Data Center Revision","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","op":"Chevron USA","spon":"Chevron USA","oy":2025,"deal":"Renovation/Alteration project with an estimated cost of $750,000","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025012139","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025012139"],"lflag":"source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"70a52889bf59","cid":"70a52889bf59","canon":1,"dups":1,"ftype":"data_center","name":"INTEL 471","city":"Frisco","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"1af16d260127","cid":"1af16d260127","canon":1,"dups":1,"ftype":"data_center","name":"QTS Data Centers Floor 7 Interior Improvements","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Our Irving and Fort Worth data centers operated uninterrupted throughout the impacted period. We are evaluating the impact of the disruptions to the Texas power grid but do not believe the events will have a material adverse impact on our financial statements because we have utilized power purchase agreements to hedge our utility costs in Texas.","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3984e9858214","cid":"3984e9858214","canon":1,"dups":1,"ftype":"data_center","name":"La Meta Office","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"8e0771a7af93","cid":"8e0771a7af93","canon":1,"dups":1,"ftype":"data_center","name":"Meta Office","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b4e196fc597c","cid":"b4e196fc597c","canon":1,"dups":1,"ftype":"data_center","name":"569717 Facebook-META","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","mw":200,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 1,919 megawatts of new renewable energy in Texas. We worked with multiple partners to meet our 100% clean and renewable energy goal for our operations in Texas, including the Fort Worth Data Center. This includes supporting nine new renewable energy projects in Texas.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Fort-Worth-Data-Center.pdf","uquote":"Multiple 345-kV and 138-kV transmission lines served by Oncor Electric Delivery & Brazos Electric","uscan":"https://www.alliancetexas.com/data-center","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2015,"oy":2023,"deal":"$1 billion project announced July 2015, with up to $147 million in incentives","dealScan":"https://www.datacenterknowledge.com/hyperscalers/reports-1b-facebook-data-center-project-underway-in-texas","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;alliancetexas.com;datacenterknowledge.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Fort-Worth-Data-Center.pdf","https://www.alliancetexas.com/data-center","https://www.datacenterknowledge.com/hyperscalers/reports-1b-facebook-data-center-project-underway-in-texas"],"band":"100-250 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"49403605616c","cid":"49403605616c","canon":1,"dups":1,"ftype":"data_center","name":"Polk Admin Building Interior Renovation","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"bea13d45de81","cid":"bea13d45de81","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Microsoft SN1 X-ARCHIVE","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-aae5c33c","uconf":"High","uquote":"Because San Antonio is located in the geographic center of Texas, CPS Energy will have to play a large part in upping the transmission capacity of electricity within the state as data centers continue to pop up across the state, said Elaina Ball, the utility's chief strategy officer.","uscan":"https://sanantonioreport.org/texas-is-being-overrun-by-data-centers-can-the-states-electric-grid-handle-it/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","deal":"Acquisition of 34-acre, 202,000 sq ft center from Chevron for $80 million in 2017.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;sanantonioreport.org","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-aae5c33c","https://sanantonioreport.org/texas-is-being-overrun-by-data-centers-can-the-states-electric-grid-handle-it/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"59ad83473136","cid":"59ad83473136","canon":1,"dups":1,"ftype":"data_center","name":"Amazon DHX3-Remodel","city":"Sugar Land","county":"Fort Bend","state":"TX","lat":29.526602,"lng":-95.771015,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","op":"Amazon (former); Texas Logistic & Fulfillment Services (current)","oy":2021,"deal":"Texas Logistic & Fulfillment Services LLC took over the former Amazon facility in Sugar Land, TX, converting the 300,000-square-foot site into a climate-controlled 3PL hub in June 2025.","dealScan":"https://racklify.com/news/texas-logistic-fulfillment-takes-over/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"racklify.com","srcUrls":["https://racklify.com/news/texas-logistic-fulfillment-takes-over/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"93ff283d7708","cid":"93ff283d7708","canon":1,"dups":1,"ftype":"data_center","name":"VCHNGE DATA CENTER RENOVATION","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"1cdfc230f4b1","cid":"1cdfc230f4b1","canon":1,"dups":1,"ftype":"data_center","name":"ACS Hicks Field Data Center — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"A privately owned substation will be built for the development, which is close to an existing Oncor substation.","uconf":"High","uquote":"A privately owned substation will be built for the development, which is close to an existing Oncor substation.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"ACS DC HICKS FIELD ROAD","spon":"ACS Group","oy":2027,"deal":"Estimated cost of $280,000,000 for the building (TDLR filing, 2026). City of Fort Worth approved a 10-year economic development agreement with tax incentives for the broader campus in April 2025, with a proposed capital investment of $2.167 billion.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026008166","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026008166"],"rawName":"NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT.  EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE.  EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF.  SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.","lflag":"display_name_normalized utility_alias_corrected source_url_canonicalized delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"0df999e37fb5","cid":"0df999e37fb5","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION\nTO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF\nBUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE\nFLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.","lflag":"display_name_normalized generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"74671184a975","cid":"74671184a975","canon":1,"dups":2,"ftype":"data_center","name":"ACS Group Data Center — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Utility plans call for a privately owned substation next to the campus that will tie into Oncor's grid.","uconf":"High","uquote":"A privately owned substation will be built for the development, which is close to an existing Oncor substation.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"ACS Group","spon":"ACS DC HICKS FIELD ROAD","ay":2025,"oy":2027,"deal":"Fort Worth City Council approved a 10-year economic development agreement with ACS Group in April 2025, including tax abatements up to 70% on business personal property.","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION\nTO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF\nBUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE\nFLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.","lflag":"unlinked_source_text display_name_normalized utility_alias_corrected possible_canonical_duplicate delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"0e46a69607aa","cid":"0e46a69607aa","canon":1,"dups":1,"ftype":"data_center","name":"QTS Investment Properties Fort Worth Data Center — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Our Fort Worth location has significant power and space to support customer growth.... 70 MW+ of critical campus capacity; On-site substation with expansion capability;","uconf":"High","uquote":"Grid Operator: Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Investment Properties Fort Worth","spon":"Blackstone","ay":2022,"oy":2026,"deal":"QTS filed for a $100 million project (QTS FTW1 DC2) and a $43.89 million project (QTS FTW1 DC1 Expansion) in 2022. Later reports indicate a $220 million project for a new two-story building of over 471,000 square feet, with construction scheduled to start in March and completion in early 2026.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2022015521","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2022015521"],"rawName":"New Data Center / 3rd Party Plan Review & Inspections / Winston Services","lflag":"display_name_normalized citation_artifact_removed source_url_canonicalized"},{"id":"e0f4a990dd74","cid":"e0f4a990dd74","canon":1,"dups":1,"ftype":"data_center","name":"OpenAI Stargate Shackelford","county":"Shackelford","state":"TX","lat":32.74382,"lng":-99.347005,"cprec":"distinct","status":"Construction","mw":1400,"pc":"Behind-the-Meter","pconf":"High","pquote":"Oracle and OpenAI are planning a massive new data center in Shackelford County, Texas, dubbed \"Stargate,\" that will be powered by its own on-site natural gas plant. This approach, known as a \"microgrid,\" will use hundreds of natural gas generators to generate all the electricity the data center needs, bypassing the public power grid.","pscan":"https://baxtel.com/data-center/openai-stargate-shackelford-county-frontier-campus","proc":"Co-located generation","pcp":"Voltagrid (in partnership with Vantage Data Centers)","pdt":"700 megawatts (initial phase), ultimately 1.4 gigawatts","rto":"ERCOT","nerc":"TRE","op":"OpenAI","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"OpenAI, Oracle","ay":2025,"oy":2026,"deal":"Vantage Data Centers committed over $25 billion for the Frontier mega-campus (Shackelford County) (announced August 2025)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/openai-stargate-shackelford-county-frontier-campus"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"15ea0514753d","cid":"15ea0514753d","canon":1,"dups":1,"ftype":"data_center","name":"Oppidan 5MW Data Center","city":"El Paso","county":"El Paso","state":"TX","lat":31.76648,"lng":-106.241423,"cprec":"shared_centroid","status":"Construction","mw":5,"uquote":"Grid Operator. Rio Grande Electric Coop, INC.","ukey":"16057|TX","uname":"Rio Grande Electric Coop, Inc","rto":"non-RTO","nerc":"WECC","op":"Oppidan","spon":"Oppidan","ay":2024,"oy":2026,"deal":"$27.1 million project cost, privately funded","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"dc7fd1f75f47","cid":"dc7fd1f75f47","canon":1,"dups":1,"ftype":"data_center","name":"AREP Powerhouse Las Colinas","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":200,"pc":"Grid","pconf":"High","pquote":"Power Architecture: 2N utility feeds from diverse substations; Redundant UPS systems and on-site backup generation; Designed for low PUE with high-efficiency load balancing.","uconf":"High","uquote":"The site has immediate access to permanent power from an existing adjacent substation, serviced by Oncor, the largest energy delivery company in Texas.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"PowerHouse Data Centers","spon":"Harrison Street, American Real Estate Partners (AREP)","ay":2024,"oy":2025,"deal":"Land purchase of 50 acres in Irving-Las Colinas by Harrison Street and PowerHouse Data Centers, announced May 15, 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text utility_alias_corrected stale_future_status_year delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"oy_stale":1,"dukey":"44372|TX"},{"id":"ca653152baf2","cid":"ca653152baf2","canon":1,"dups":1,"ftype":"data_center","name":"ACS Group Fort Worth Data Center","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"A privately owned substation will be built for the development, which is close to an existing Oncor substation.","uconf":"High","uquote":"A privately owned substation will be built for the development, which is close to an existing Oncor substation.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"ACS Group","spon":"ACS Group","ay":2025,"oy":2031,"deal":"$2.1 billion development, economic development agreement approved April 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected display_name_normalized delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","rawName":"Preliminary grading permit for a new construction data center","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"ceb90cf63f71","cid":"ceb90cf63f71","canon":1,"dups":1,"ftype":"data_center","name":"QUALITY TECH SERVICES DFW DC3","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":43,"pc":"Grid","pconf":"High","pquote":"Power delivery is a cornerstone, with 43 MW of critical IT load powered by utility feeds, diesel generators, and UPS systems for seamless failover.","pscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uconf":"High","uquote":"Power Reliability: Backed by Oncor Electric Delivery's robust grid, with scalable utility power supporting up to 75 MW across the campus.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2025,"oy":2027,"deal":"$350 million construction cost, announced April 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"checkmarkpro.com","srcUrls":["https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"592f5dde329e","cid":"592f5dde329e","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW1-Building 1-Level 3 Office Upfit","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":75,"pc":"Grid","pconf":"High","pquote":"All Quality Data Centers provide mission critical electrical, mechanical, and high capacity network systems. QTS's trained staff includes facility and electrical maintenance engineers, data center operations experts, network architects and security officers committed to providing on-site 24x7x365 support and operations for our facilities. This crucial design philosophy is built into our product to minimize service disruption and ensure the highest level of customer service available. We start with fully-redundant high-density power and cooling capacities, add fully integrated UPS systems, link site-wide security and fire protection systems, and enable comprehensive visibility through our customer portal to provide secure, dependable state-of-the-art data center infrastructure for our customers' web services.","uconf":"High","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw1-building-1-eebdbf07","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2022,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw1-building-1-eebdbf07"],"band":"50-100 MW","oy_stale":1,"lflag":"stale_future_status_year"},{"id":"10cc889a0f7d","cid":"10cc889a0f7d","canon":1,"dups":1,"ftype":"data_center","name":"QTS Data Center","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation.","pscan":"https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","uquote":"The site has immediate access to permanent power from an existing adjacent substation, serviced by energy firm Oncor.","uscan":"https://baxtel.com/data-center/powerhouse-irving-dc3","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2025,"deal":"$152 million construction investment (August 2024 - November 2025)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/qts-quality-technology-services-dallas-data-center/","https://baxtel.com/data-center/powerhouse-irving-dc3"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"68915cbb53d3","cid":"68915cbb53d3","canon":1,"dups":2,"ftype":"data_center","name":"QTS FTW1 DC2","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","mw":42,"pc":"Grid","pconf":"High","pquote":"The QTS-FTW1-DC2 data center includes a ground up, two-story 325,000-sf data center on the existing QTS campus in Fort Worth, TX. The scope includes construction, build-out of four 10.5MW data halls, coordination and tie-in of the medium voltage loop to an in-progress substation, and expansion of telecom fiber loop. The low voltage system on the house electrical side also includes redundancy through a backup 1.5MW generator and dual fed network racks and cooling also utilizing the four reserve lineups.","uconf":"Medium","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-ftw1-dc2-c5cca6ad","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2026,"deal":"Construction cost of $220,000,000","dealScan":"https://dallasexpress.com/realestate/qts-plans-dfw-data-center-expansion/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;dallasexpress.com","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-ftw1-dc2-c5cca6ad","https://dallasexpress.com/realestate/qts-plans-dfw-data-center-expansion/"],"band":"25-50 MW"},{"id":"b59215565212","cid":"b59215565212","canon":1,"dups":1,"ftype":"data_center","name":"DFW B1-L3 Dev Office","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Grid Operator: Trinity Valley Elec COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/qts-dfw1-building-1-eebdbf07","uconf":"High","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw1-building-1-eebdbf07","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2022,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw1-building-1-eebdbf07"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"b8a5227b844b","cid":"b8a5227b844b","canon":1,"dups":1,"ftype":"data_center","name":"REPLACING COOLING UNITS FOR DATA CENTER.","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","ay":2018,"deal":"Permit for $1,100,000 on 2018-03-06","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"823942496c0a","cid":"823942496c0a","canon":1,"dups":1,"ftype":"data_center","name":"MICROSOFT SAT11-14","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"In this region, we will fulfill that commitment through power purchase agreements with. Allianz, Anson, Ercot, Keechi, Las. Lomas, Leeward RE, Old 300,. Primergy, and RWE.","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2018,"oy":2023,"deal":"Construction estimated cost: $62,000,000","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/EABPRJB8824650","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/EABPRJB8824650"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"abe53a39e167","cid":"abe53a39e167","canon":1,"dups":1,"ftype":"data_center","name":"SAT14 - Phase 2","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Power provider: CPS Energy / ERCOT.","pscan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","uconf":"High","uquote":"Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2021,"oy":2026,"contro":"A dispute with an adjacent subdivision over tree removal during construction drew community attention.","controScan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","deal":"Construction project with an estimated cost of $26,800,000.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"centexdatacenters.org;tdlr.texas.gov","srcUrls":["https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_url_canonicalized"},{"id":"f8c920f670dc","cid":"f8c920f670dc","canon":1,"dups":1,"ftype":"data_center","name":"SAT14 - Phase 3","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"Medium","pquote":"Power provider: CPS Energy / ERCOT","pscan":"https://centexdatacenters.org/tracker/stream-san-antonio-iii","uquote":"Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/stream-san-antonio-iii","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","ay":2021,"oy":2026,"contro":"Dispute with Stonegate Hill subdivision over tree removal; San Antonio City Council granted Tree Preservation Ordinance exception.","deal":"Land acquisition by Microsoft for 33.55 acres on Dec 23, 2020. Estimated cost for Phase 3 is $31,300,000.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/stream-san-antonio-iii"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"1624a3c32f6e","cid":"1624a3c32f6e","canon":1,"dups":1,"ftype":"data_center","name":"SAT14 - Phase 4","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Infrastructure. Water provider: SAWS; Power provider: CPS Energy / ERCOT.","pscan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","uconf":"High","uquote":"Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","ay":2020,"oy":2026,"contro":"Dispute with subdivision over tree removal and water use concerns.","controScan":"https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio","deal":"SAT14-Phase 3 project with an estimated cost of $31,300,000, including a fourth colocation center.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/microsoft-wiseman-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"ea2d49cd330a","cid":"ea2d49cd330a","canon":1,"dups":1,"ftype":"data_center","name":"SAT15","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"Medium","pquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","pscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2026,"contro":"Located on Edwards Aquifer recharge zone, affecting water quality for 2 million Central Texans downstream.","controScan":"https://centexdatacenters.org/tracker/microsoft-westover-san-antonio","deal":"Microsoft invested $215.9 million for construction (August 2022).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"idc-a.org;centexdatacenters.org","srcUrls":["https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://centexdatacenters.org/tracker/microsoft-westover-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"248b897b05e6","cid":"248b897b05e6","canon":1,"dups":1,"ftype":"data_center","name":"SAT40","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","mw":60,"pc":"Grid","pconf":"High","pquote":"We've committed to achieving 100% renewable energy coverage globally by 2025. In this region, we will fulfill that commitment through power purchase agreements with Allianz, Anson, Ercot, Keechi, Las Lomas, Leeward RE, Old 300, Primergy, and RWE. Our backup generators at our datacenters in Texas use a renewable biofuel that reduces net carbon emissions compared to traditional petroleum-based diesel.","pscan":"https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Texas.pdf","uquote":"Stream's third San Antonio campus is scheduled to support 1.5 million square feet of data center space with a $400M investment, supporting 200 MW at full build. The first facility on the new campus, SATB1 (a.k.a. San Antonio III), is fully-leased with 300,000 initial square feet of turnkey data center space and an on-site 334 MW CPS substation.","uscan":"https://www.streamdatacenters.com/locations/san-antonio-iii/","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2023,"oy":2023,"contro":"City Council approved a variance to allow Microsoft to remove trees from the Stone Hill neighborhood to clear its path for another data center.","deal":"Construction project with an estimated cost of $175,900,000, filed March 2023.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"local.microsoft.com;streamdatacenters.com","srcUrls":["https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Texas.pdf","https://www.streamdatacenters.com/locations/san-antonio-iii/"],"band":"50-100 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected stale_future_status_year","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","ukey":"16604|TX","oy_stale":1},{"id":"82797d413a00","cid":"82797d413a00","canon":1,"dups":1,"ftype":"data_center","name":"SAT82 Data Center","city":"Castroville","county":"Medina","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Backup generators at the site will use renewable biofuels, and the building will rely heavily on air-cooled chillers, which require little to no water for cooling.","pscan":"https://myneighborhoodnews.com/microsoft-to-build-400m-data-center-in-castroville-bringing-jobs-and-growth-to-far-west-san-antonio","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"oy":2028,"contro":"Community members voiced concerns over Microsoft's presence in the area, worrying about worsened traffic and the massive amount of water that data centers use.","deal":"$482.6 million construction cost, filed July 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"myneighborhoodnews.com","srcUrls":["https://myneighborhoodnews.com/microsoft-to-build-400m-data-center-in-castroville-bringing-jobs-and-growth-to-far-west-san-antonio"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"1817922a7aa9","cid":"1817922a7aa9","canon":1,"dups":1,"ftype":"data_center","name":"SAT93","city":"Medina","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","uquote":"Serviced by the Medina Electric Cooperative (MEC) and East Medina County SUD, the site is well positioned to support significant capacity growth and accelerated delivery proximate to existing data center development.","uscan":"https://www.tract.com/project/medina-technology-park/","ukey":"12268|TX","uname":"Medina Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2025,"oy":2028,"contro":"Concerns over water usage in a drought-stricken area and potential noise for local residents.","deal":"Microsoft investment of $350 million per building (SAT93 and SAT94)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"tract.com","srcUrls":["https://www.tract.com/project/medina-technology-park/"],"lflag":"source_quality_reclassified"},{"id":"0ffea7f3131b","cid":"0ffea7f3131b","canon":1,"dups":1,"ftype":"data_center","name":"SAT94","city":"Medina","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"Medium","pquote":"CPS Energy and the San Antonio Water System told city councilmembers last week there were more than 20 data centers in the area, and more are coming. But top-ranking executives of both utilities expressed confidence in keeping up with the demands of the data center industry. The grid and water system serving those data center campuses are the same ones serving Toyota's assembly plant, Port San Antonio's defense and aerospace tenants, and thousands of smaller manufacturers along the I-35 corridor.","uconf":"High","uquote":"Microsoft's SAT93 data center in Medina County, Texas, is a 245,000 sq ft single-story facility developed alongside SAT94 on County Road 381, with $26M investment, powered by Medina Electric Cooperative, and scheduled for construction from 2027 to 2029.","uscan":"https://baxtel.com/data-center/bexar-datacenter-san-antonio-sat1","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2025,"oy":2029,"contro":"Community concerns regarding water consumption and electricity usage; county commissioners lack regulatory authority.","controScan":"https://devinenews.com/county-commissioners-lack-authority-to-regulate-data-centers-lutz-says/","deal":"$26,000,000 construction cost, filed March 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;devinenews.com","srcUrls":["https://baxtel.com/data-center/bexar-datacenter-san-antonio-sat1","https://devinenews.com/county-commissioners-lack-authority-to-regulate-data-centers-lutz-says/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"8dbbeda4c469","cid":"8dbbeda4c469","canon":1,"dups":1,"ftype":"data_center","name":"serverfarm - Project Longhorn","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","mw":60,"pc":"Grid","pconf":"High","pquote":"Houston's established energy infrastructure offers the reliable grid power needed to scale data centers quickly and efficiently. With on-site substations and available capacity, Serverfarm can sustainably meet the demand for data center capacity at a scale previously unseen in the region.","pscan":"https://www.serverfarmllc.com/htx1-houston-data-center/","uquote":"Grid Operator. San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/serverfarm-23aa812f","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Serverfarm","spon":"Manulife Investment Management","ay":2025,"oy":2027,"deal":"Acquisition of two Houston data center campuses by Serverfarm, funded by Manulife Investment Management, September 10, 2024.","dealScan":"https://www.serverfarmllc.com/press-releases/manulife-backed-serverfarm-acquires-two-data-centers-providing-over-500mw-of-new-potential-capacity-in-the-houston-market/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"serverfarmllc.com;interconnection.fyi","srcUrls":["https://www.serverfarmllc.com/htx1-houston-data-center/","https://www.interconnection.fyi/data-center/project/serverfarm-23aa812f","https://www.serverfarmllc.com/press-releases/manulife-backed-serverfarm-acquires-two-data-centers-providing-over-500mw-of-new-potential-capacity-in-the-houston-market/"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"ef6a5d6ca9ec","cid":"ef6a5d6ca9ec","canon":1,"dups":1,"ftype":"data_center","name":"serverfarm - El Dorado PHASE III","city":"Hockley","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"4fbc1b0437c0","cid":"4fbc1b0437c0","canon":1,"dups":1,"ftype":"data_center","name":"serverfarm - CTX2","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","mw":60,"pc":"Grid","pconf":"High","pquote":"Once completed, the full build-out will span almost 500,000 sq. ft. spanning across two buildings with secured customer capacity to scale to 100MW using available existing grid power.","rto":"ERCOT","nerc":"TRE","op":"Serverfarm","spon":"Manulife Investment Management","ay":2025,"oy":2027,"deal":"New construction project valued at $137.0M (registered March 14, 2025); Part of a $3.0 billion credit facility closed in December 2025 for hyperscale campus development.","dealScan":"https://www.serverfarmllc.com/press-releases/manulife-im-backed-serverfarm-secures-3-0-billion-credit-facility-to-accelerate-hyperscale-campus-development-across-north-america/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"serverfarmllc.com","srcUrls":["https://www.serverfarmllc.com/press-releases/manulife-im-backed-serverfarm-secures-3-0-billion-credit-facility-to-accelerate-hyperscale-campus-development-across-north-america/"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"3ea47f768e49","cid":"3ea47f768e49","canon":1,"dups":1,"ftype":"data_center","name":"serverfarm - HTX2","city":"Hockley","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"The HOU2 data center campus spans nearly half a million square feet in two buildings and has secured customer capacity to scale to 100MW using available, existing grid power.","uquote":"Grid Operator: CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/serverfarm-e864506f","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Serverfarm","spon":"Manulife Investment Management","oy":2026,"deal":"$137,000,000 estimated cost for new construction","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/serverfarm-e864506f"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"8901|TX"},{"id":"37e8b204639b","cid":"37e8b204639b","canon":1,"dups":1,"ftype":"data_center","name":"serverfarm - Project Longhorn - Phase 2","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","mw":60,"pc":"Grid","pconf":"High","pquote":"Houston's strong energy infrastructure and reliable grid access also ensure the scalability needed for data center operations. With existing power capacity and on-site substations, Serverfarm can quickly scale its facilities to meet increasing demand while focusing on sustainability and innovation. The critical power system is organized into multiple identical load groups that are fully stick‑built on site. Each load group includes a 3,000 kVA transformer, a 3,300 kW 480V generator, 4,000A 480V switchgear, dual 1,000 kW UPS modules, and all associated distribution components.","uquote":"Grid Operator: San Bernard Electric Coop, INC.","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Serverfarm","spon":"Serverfarm","ay":2025,"oy":2027,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4dffa379ed1c","cid":"4dffa379ed1c","canon":1,"dups":1,"ftype":"data_center","name":"MDN Sharka Data Center - Building 3","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Phase 3 of Google's Midlothian data center campus features a 288,600-square-foot Data Center, two 14,000-square-foot Modular Electric Buildings, Generators, and a Substation.","pscan":"https://baxtel.com/data-center/google-midlothian-3","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Sharka","tenant":"Google","oy":2025,"deal":"10 year tax abatement agreement approved by Ellis County in July 2018","dealScan":"https://baxtel.com/data-center/google-midlothian-3","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/google-midlothian-3"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"5ba5df5d9233","cid":"5ba5df5d9233","canon":1,"dups":1,"ftype":"data_center","name":"SMU DATA CENTER POWER UPGRADE ADD PANELING GEAR FOR SIDE A","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Construction","mw":1,"pc":"Grid","pconf":"High","pquote":"A natural gas and electricity hedging program has protected the university against price volatility and major weather events for budget stability. This program has contributed greatly to savings and budget stability in the volatile power market regulated by ERCOT, the Electricity Reliability Council of Texas.","pscan":"https://assets.new.siemens.com/siemens/assets/api/uuid:0c4b61d6-d648-41f7-b0d2-615597b10963/Case-Study-SMU.pdf","uconf":"High","uquote":"Grid Resilience: Dive into grid modernization with experts from Oncor, ERCOT, and EPRI, who will discuss the challenges of integrating massive data center loads while ensuring reliability and affordability for the community.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Southern Methodist University","spon":"Southern Methodist University","tenant":"Southern Methodist University","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"assets.new.siemens.com","srcUrls":["https://assets.new.siemens.com/siemens/assets/api/uuid:0c4b61d6-d648-41f7-b0d2-615597b10963/Case-Study-SMU.pdf"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"b9780dfcc507","cid":"b9780dfcc507","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft SN1-SN2 UPS Replacement and Power Harvest","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"High","pquote":"Our backup generators at our datacenters in Texas use a renewable biofuel that reduces net carbon emissions compared to traditional petroleum-based diesel.","pscan":"https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Texas.pdf","uconf":"High","uquote":"Some of the companies operating data centers in Bexar County include: Microsoft Corp. Valero Energy; Frost Bank; Christus Health; Lowe's; Amazon.","uscan":"https://insider.govtech.com/texas/news/san-antonio-preps-for-tenfold-increase-in-electricity-demand-from-data-centers","uname":"BP Energy Company","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"local.microsoft.com;insider.govtech.com","srcUrls":["https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Texas.pdf","https://insider.govtech.com/texas/news/san-antonio-preps-for-tenfold-increase-in-electricity-demand-from-data-centers"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"BP Energy Company","lflag":"nonrate_utility_link_removed energy_supplier_not_serving_utility"},{"id":"5a86eedacb2c","cid":"5a86eedacb2c","canon":1,"dups":1,"ftype":"data_center","name":"SPC Site Work - Vantage Data Center -TX-22 Site Work Only-5207 ROGERS RD","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Karnes Electric COOP INC.","uquote":"Grid Operator: Karnes Electric COOP INC.","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"Vantage Data Centers Development","ay":2025,"oy":2027,"contro":"Neighbors are worried about noise, air quality and heavy utility use; site is on the Edwards Aquifer recharge zone.","deal":"$272,150,000 project investment, announced 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7b3cd2f81842","cid":"7b3cd2f81842","canon":1,"dups":1,"ftype":"data_center","name":"T-Mobile McAllen Data Center Ph2","city":"Mcallen","county":"Hidalgo","state":"TX","lat":26.396384,"lng":-98.18099,"cprec":"distinct","status":"Construction","pc":"Grid","pconf":"High","pquote":"Grid Operator. Magic Valley Electric COOP INC.","uquote":"Grid Operator. Magic Valley Electric COOP INC.","ukey":"11501|TX","uname":"Magic Valley Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"T-Mobile","spon":"T-Mobile","tenant":"T-Mobile","ay":2025,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"64cb7a220e09","cid":"64cb7a220e09","canon":1,"dups":1,"ftype":"data_center","name":"T5@DALLAS EXPANSION","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Construction","mw":22,"pc":"Grid","pconf":"High","pquote":"The data center has dedicated power feeds, and redundant 2.5 MWs of Caterpillar generators. The entire electrical and mechanical infrastructure is configured in N+1 redundancy with an optional 2N UPS capability that keeps the critical system up and running.","pscan":"https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/t5-dallas-wholesale-data-center-c32165d4","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"T5 Data Centers","spon":"T5 Data Centers","ay":2013,"oy":2015,"deal":"Loan for $113 million to expand its data center, led by JP Morgan Chase Bank, Wells Fargo Bank, RBS Citizens Financial Group, and Raymond James (May 15, 2013)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","srcUrls":["https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","https://www.interconnection.fyi/data-center/project/t5-dallas-wholesale-data-center-c32165d4"],"band":"10-25 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"de9b724dfff5","cid":"de9b724dfff5","canon":1,"dups":1,"ftype":"data_center","name":"TRG Datacenters Phase II Expansion","city":"Spring","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Construction","mw":24,"pc":"Grid","pconf":"High","pquote":"HOU2 will add 24 megawatts of utility capacity to meet strong demand from both existing and prospective customers. Four different substations in the area supplying power, owned medium voltage infrastructure with spare parts. Dual power distribution buses, physically separated power & cooling paths. Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uconf":"High","uquote":"The HOU2 groundbreaking took place on November 14, 2025, and featured industry leaders and project partners such as CenterPoint Energy, Walker Engineering, HTS, Thomas Craig Construction and Encore Concrete Construction.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"TRG Datacenters","spon":"Tallvine Partners","ay":2025,"oy":2026,"deal":"Secured financial backing from Tallvine Partners in 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"4810394c99b1","cid":"4810394c99b1","canon":1,"dups":1,"ftype":"data_center","name":"TWC MOPAC DATA CENTER","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Construction","pc":"Grid","pconf":"Medium","pquote":"Austin Energy is an enterprise department of the City of Austin. Community-owned since 1895, we provide electric power and retail energy services to the Greater Austin area. The Austin City Council sets rates and terms and conditions of service. Austin Energy is part of the Electric Reliability Council of Texas (ERCOT).","uquote":"Austin Energy is an enterprise department of the City of Austin. Community-owned since 1895, we provide electric power and retail energy services to the Greater Austin area.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Texas Workforce Commission","spon":"Texas Workforce Commission","oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a15bb1c96875","cid":"a15bb1c96875","canon":1,"dups":1,"ftype":"data_center","name":"UHS Data Center","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","proc":"Tariff (utility)","pcp":"CPS Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"410f8836b47d","cid":"410f8836b47d","canon":1,"dups":1,"ftype":"data_center","name":"Shared Data Center Capacity Enhancement","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Construction","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"92d236723778","cid":"12b39d545275","canon":0,"dups":3,"ftype":"data_center","name":"Vantage Data Centers","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","mw":32,"pc":"Grid","pconf":"High","pquote":"Utility feeds and mechanical systems are designed for redundancy and high availability, consistent with enterprise-grade operations.","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, , Silver Lake, PSP Investments, IMCO, AustralianSuper","ay":2023,"oy":2026,"deal":"$96 million project cost","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"d972a9904df3","cid":"d972a9904df3","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX21 - lvl 1 IFO-Phase 3","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","mw":16,"pc":"Grid","pconf":"High","pquote":"The TX21 facility is positioned in one of the fastest-growing data center markets in the southern United States, supported by strong fiber infrastructure, stable power delivery, and a business-friendly environment.","uquote":"“Our city cannot afford to wait until resource demands outpace our infrastructure,” Galvan said in a public statement, calling for a meeting of the minds among City Council, CPS Energy and San Antonio Water System leadership planned sometime after February 11.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, , Silver Lake","ay":2023,"oy":2025,"contro":"Neighbors are worried about noise, air quality and heavy utility use, leading to public comment hearings with state regulators.","deal":"Project estimated cost of $157,000,000 (December 2023)","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024005974","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024005974"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"b48ccfab8905","cid":"b48ccfab8905","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX21 Core and Shell +16MW Fit-Out","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Construction","mw":16,"pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","uquote":"Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","oy":2025,"contro":"Public hearing by Texas Commission on Environmental Quality; concerns about water and power strain; located on Edwards Aquifer recharge zone.","deal":"$157,000,000 project investment","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx22-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"083d0e01bef3","cid":"083d0e01bef3","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Addition to existing data center building / 3rd party plan review and inspections / winston services","lflag":"display_name_normalized generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"3b64eeb3df0d","cid":"3b64eeb3df0d","canon":1,"dups":1,"ftype":"data_center","name":"PROJECT EAGLE","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"138f0e1ff6c4","cid":"138f0e1ff6c4","canon":1,"dups":1,"ftype":"data_center","name":"DEMO POD 5-10-2017","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"94fe37fdd040","cid":"94fe37fdd040","canon":1,"dups":1,"ftype":"data_center","name":"Magma Suite 275-C","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/aligned-plano","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/aligned-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Aligned Energy","spon":"Macquarie Asset Management","oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/aligned-plano"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"c797d7cacf08","cid":"c797d7cacf08","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters LLC","city":"Red Oak","county":"Ellis County","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Addressing concerns about the Texas power grid, Fuller cited Senate Bill 6, which allows large energy users such as data centers to be curtailed during emergencies that threaten grid reliability.","pscan":"https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef","uconf":"High","uquote":"Oncor provides electricity via two on-campus substations.","uscan":"https://www.connectcre.com/stories/compass-datacenters-lands-refi-on-5-red-oak-facilities-to-add-three-more/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"Brookfield Infrastructure and Ontario Teachers' Pension Plan","ay":2026,"contro":"Significant community opposition regarding noise, traffic, air quality, water usage, property values, and strain on the power grid. The planning and zoning board recommended denial, but the city council approved it.","controScan":"https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef","deal":"Tax abatement of $2.82 million over the next decade approved by Red Oak City Council on May 12, 2026.","dealScan":"https://www.dallasobserver.com/news/red-oak-data-center-meets-community-resistance-40674118/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"wfaa.com;connectcre.com;dallasobserver.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef","https://www.connectcre.com/stories/compass-datacenters-lands-refi-on-5-red-oak-facilities-to-add-three-more/","https://www.dallasobserver.com/news/red-oak-data-center-meets-community-resistance-40674118/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"2e37ec0063d4","cid":"2e37ec0063d4","canon":1,"dups":1,"ftype":"data_center","name":"DataBank Datacenters LLC","city":"Red Oak","county":"Ellis County","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Proposed","mw":480,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Power Infrastructure: A dedicated 400MW on-site substation from Oncor, expandable to 800MW, provides N+1 redundancy with 120/208V and 240/415V AC options. This ensures reliable, scalable power delivery, with commitments to 100% renewable sources.","pscan":"https://checkmarkpro.com/assets/Case-Study-DataBank-DFW-11.pdf","uconf":"High","uquote":"The Phase 1 design of the site will feature 4 buildings and a 400MW sub-station from Oncor that can deliver up to 240MW of critical IT power with the ability to increase this in Phase 2 for a total of 480MW across all 8 buildings.","uscan":"https://www.databank.com/resources/press-releases/databank-announces-development-of-480mw-data-center-campus-in-south-dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank Datacenters","spon":"AustralianSuper","tenant":"Oracle","ay":2024,"oy":2026,"contro":"Significant community opposition regarding rezoning, noise, power grid strain, water usage, traffic, light pollution, and declining property values.","deal":"$2 billion construction loan closed on April 21, 2026, led by MUFG Bank, for the first three buildings.","dealScan":"https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"checkmarkpro.com;databank.com;theaiconsultingnetwork.com","srcUrls":["https://checkmarkpro.com/assets/Case-Study-DataBank-DFW-11.pdf","https://www.databank.com/resources/press-releases/databank-announces-development-of-480mw-data-center-campus-in-south-dallas/","https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"5c3888970ea0","cid":"5c3888970ea0","canon":1,"dups":1,"ftype":"data_center","name":"GM Financial Data Center Power Upgrades","city":"Arlington","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","op":"GM Financial","spon":"GM Financial","ay":2025,"oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"65eb1651fa57","cid":"65eb1651fa57","canon":1,"dups":1,"ftype":"data_center","name":"USTX02 - WTX Control Room","city":"Richardson","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","op":"Bank of America","spon":"FIA Card Services","tenant":"Bank of America","ay":2023,"oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"31904d3409cd","cid":"31904d3409cd","canon":1,"dups":1,"ftype":"data_center","name":"Main Lobby & Office Upgrades RTX","city":"Richardson","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","op":"NationsBanc Corporate Center","spon":"NationsBanc Corporate Center","ay":2023,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"3ca72e4387ad","cid":"3ca72e4387ad","canon":1,"dups":1,"ftype":"data_center","name":"USTX02 - UPS 5A & 5B","city":"Richardson","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Scope of Work: Removal of existing liquid cell batteries, replacement of UPS equipment and new ion lithium battery systems; Type of Funds: This project is privately funded, on private land for private use.","uquote":"Oncor Electric Delivery Company LLC is a regulated electric transmission and distribution utility that serves 10 million Texans in 400 cities and 100 counties in the state.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Bank of America","spon":"Bank of America","tenant":"Bank of America","ay":2023,"oy":2024,"deal":"Renovation/Alteration project with an estimated cost of $14,200,000 for UPS equipment and lithium battery systems, started 2023, completed 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"uscan":"https://www.oncor.com/about-us","srcUrls":["https://www.oncor.com/about-us"],"srcDom":"oncor.com","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"d27965dd954f","cid":"d27965dd954f","canon":1,"dups":1,"ftype":"data_center","name":"SH 249 Retail Development","city":"Cypress","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","op":"Al Maknojia","spon":"Al Maknojia","ay":2022,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"2cc153dd9e25","cid":"2cc153dd9e25","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Childress Data Center Campus Upgrades","city":"Childress","county":"Childress","state":"TX","lat":34.524624,"lng":-100.208166,"cprec":"distinct","status":"Proposed","mw":750,"pc":"Grid","pconf":"High","pquote":"In Childress, that ceiling sits at 750MW of grid-connected capacity, a level secured through staged expansion and formal integration into ERCOT's transmission framework. IREN's Childress data center is located in Childress County, Texas, on a 420-acre site. It operates entirely on renewable energy, showcasing a commitment to sustainability. The facility has a current power capacity of 350MW, with an additional 400MW under construction, aiming for a total of 750MW. It is strategically connected to the ERCOT electricity grid via a 345kV transmission line, enabling efficient energy use.","pscan":"https://northwiseproject.com/iren-stock-childress/","uquote":"The original foundation was a 600MW binding connection agreement executed in January 2022 with AEP Texas, a subsidiary of American Electric Power.","uscan":"https://northwiseproject.com/iren-stock-childress/","rto":"SPP","nerc":"MRO","op":"IREN","spon":"IREN","tenant":"Microsoft","oy":2026,"deal":"Five-year, $9.7 billion AI cloud contract with Microsoft covering 200MW, including an upfront prepayment of approximately $1.9 billion. NVIDIA's $680M annualized commitment (separate 60MW allocation).","dealScan":"https://northwiseproject.com/iren-stock-childress/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"northwiseproject.com","srcUrls":["https://northwiseproject.com/iren-stock-childress/"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"20404|TX"},{"id":"e2073c93c66e","cid":"e2073c93c66e","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Barber Lake","city":"Colorado City","county":"Mitchell","state":"TX","lat":32.304117,"lng":-100.924392,"cprec":"distinct","status":"Proposed","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The site features 300 MW of front-of-the-meter capacity, a newly constructed, fully energized, high-to-mid voltage substation, and all necessary regulatory approvals. As part of the transaction, Cipher has acquired the 250 acres of land surrounding the substation and completed agreements necessary to participate in the ERCOT market.","uconf":"Medium","uquote":"Grid Operator. Taylor Electric COOP INC - (TX).","uscan":"https://www.interconnection.fyi/data-center/project/cipher-mining-barber-lake-d5ad5c3a","ukey":"27369|TX","uname":"Taylor Electric Coop Inc - (TX)","rto":"ERCOT","nerc":"TRE","op":"Cipher Digital","spon":"Cipher Digital (owner), Google (backer of tenant obligations, equity stake via warrants)","tenant":"Fluidstack, Amazon Web Services (AWS)","ay":2024,"oy":2026,"deal":"Site acquisition for $67.5M (Sept 2024); $1.4B senior secured notes offering (Nov 2025); $3B (later $3.8B) 10-year AI hosting agreement with Fluidstack (Sept 2025); $5.5B 15-year lease agreement with AWS (Nov 2025); $333M additional senior secured notes (Nov 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cipher-mining-barber-lake-d5ad5c3a"],"lflag":"source_quality_reclassified"},{"id":"81fe47de7850","cid":"81fe47de7850","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining McLennan (Riesel)","city":"Riesel","county":"McLennan","state":"TX","lat":31.549596,"lng":-97.201511,"cprec":"shared_centroid","status":"Proposed","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Cipher has applied to use electricity from the state power grid. Cipher applied to be in the first batch of new data centers permitted to connect with Texas' power grid, managed by the Electric Reliability Council of Texas.","pscan":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","uquote":"Grid Operator: Heart of Texas Electric COOP.","uscan":"https://www.interconnection.fyi/data-center/project/cipher-mining-mclennan-riesel-3f168dc1","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"Cipher Digital","spon":"Cipher Digital","ay":2024,"contro":"Community opposition and lack of transparency concerns from local officials.","controScan":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","deal":"Land acquisition through discreet land deals in October 2025 and purchase options in 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"wacobridge.org;interconnection.fyi","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","https://www.interconnection.fyi/data-center/project/cipher-mining-mclennan-riesel-3f168dc1"]},{"id":"4200a2db39fa","cid":"4200a2db39fa","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Mikeska","city":"Doole","county":"McCulloch","state":"TX","lat":31.205477,"lng":-99.359856,"cprec":"distinct","status":"Proposed","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"We began life as a developer of bitcoin mining sites, and that's really put us in a very strong position to be ahead of everyone in terms of building up a land bank of very attractive sites because that business requires a lot of power and the power has to be cheap.... Texas built its own electric system called ERCOT, and its structure is the reason miners and AI compute companies choose it over every other region.","uquote":"Grid Operator. Central Texas Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cipher-mining-mikeska-f72bc5dd","ukey":"3282|TX","uname":"Central Texas Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Cipher Digital","spon":"SoftBank Group","ay":2024,"oy":2028,"deal":"$50 million PIPE investment from SoftBank Group Corp. on January 30, 2025","dealScan":"https://www.globenewswire.com/news-release/2025/01/30/3018432/0/en/cipher-mining-announces-50-million-pipe-investment-from-softbank-group.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;globenewswire.com","srcUrls":["https://www.interconnection.fyi/data-center/project/cipher-mining-mikeska-f72bc5dd","https://www.globenewswire.com/news-release/2025/01/30/3018432/0/en/cipher-mining-announces-50-million-pipe-investment-from-softbank-group.html"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"01542b8ff9a5","cid":"01542b8ff9a5","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Milsing","city":"Singleton","county":"Fisher","state":"TX","lat":32.740473,"lng":-100.40312,"cprec":"distinct","status":"Proposed","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Cipher leverages ERCOT's low-cost energy grid and programs like the Four Coincident Peak (4CP) to manage electricity usage during high-demand periods.... Power: Pending load studies plus ERCOT LFL approval.","pscan":"https://hypertechinvest.com/p/my-new-data-center-position-15f","uquote":"Grid Operator. Taylor Electric COOP INC - (TX).","ukey":"27369|TX","uname":"Taylor Electric Coop Inc - (TX)","rto":"ERCOT","nerc":"TRE","op":"Cipher Mining","spon":"Cipher Mining","ay":2025,"oy":2028,"deal":"Acquisition of rights to Milsing Site in December 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"hypertechinvest.com","srcUrls":["https://hypertechinvest.com/p/my-new-data-center-position-15f"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"c5c45121ad44","cid":"c5c45121ad44","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Reveille","city":"Cotulla","county":"La Salle","state":"TX","lat":28.351098,"lng":-99.096774,"cprec":"distinct","status":"Proposed","mw":70,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Cipher leverages ERCOT's low-cost energy grid and programs like the Four Coincident Peak (4CP) to manage electricity usage during high-demand periods.","pscan":"https://bitcoinminingstock.io/blog/cipher-mining-will-it-be-another-standout-bitcoin-miner-this-cycle/","uconf":"Medium","uquote":"Grid Operator. Medina Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cipher-mining-reveille-41e3a859","ukey":"12268|TX","uname":"Medina Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Cipher Digital","spon":"Cipher Digital","ay":2024,"oy":2027,"deal":"Acquisition of Reveille data center site in Cotulla, Texas, for $2.5 million in 2024.","dealScan":"https://baxtel.com/data-center/cipher-digital-reveille-tx","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"bitcoinminingstock.io;interconnection.fyi;baxtel.com","srcUrls":["https://bitcoinminingstock.io/blog/cipher-mining-will-it-be-another-standout-bitcoin-miner-this-cycle/","https://www.interconnection.fyi/data-center/project/cipher-mining-reveille-41e3a859","https://baxtel.com/data-center/cipher-digital-reveille-tx"]},{"id":"f822c6b61f70","cid":"f822c6b61f70","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Stingray","city":"Andrews","county":"Andrews","state":"TX","lat":32.312258,"lng":-102.640206,"cprec":"shared_centroid","status":"Proposed","mw":100,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The site features up to 100 MW of front-of-the-meter capacity and all necessary regulatory approvals, 250 acres of land adjacent to the transmission assets, and a completed facility extension agreement with ONCOR.","pscan":"https://www.globenewswire.com/news-release/2024/11/26/2987553/0/en/cipher-mining-announces-acquisition-of-new-site-in-west-texas-adding-100-mw-of-capacity-to-its-growing-portfolio-of-power-and-data-center-development-opportunities.html","uquote":"The site features up to 100 MW of front-of-the-meter capacity and all necessary regulatory approvals, 250 acres of land adjacent to the transmission assets, and a completed facility extension agreement with ONCOR.","uscan":"https://www.globenewswire.com/news-release/2024/11/26/2987553/0/en/cipher-mining-announces-acquisition-of-new-site-in-west-texas-adding-100-mw-of-capacity-to-its-growing-portfolio-of-power-and-data-center-development-opportunities.html","uname":"Oncor Electric Delivery","rto":"SPP","nerc":"MRO","op":"Cipher Digital","spon":"Cipher Digital","ay":2024,"oy":2026,"deal":"Acquisition of Stingray site for $4.1 million cash payment and a $1.5/MWh variable fee for initial five years, announced November 26, 2024.","dealScan":"https://www.globenewswire.com/news-release/2024/11/26/2987553/0/en/cipher-mining-announces-acquisition-of-new-site-in-west-texas-adding-100-mw-of-capacity-to-its-growing-portfolio-of-power-and-data-center-development-opportunities.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"globenewswire.com","srcUrls":["https://www.globenewswire.com/news-release/2024/11/26/2987553/0/en/cipher-mining-announces-acquisition-of-new-site-in-west-texas-adding-100-mw-of-capacity-to-its-growing-portfolio-of-power-and-data-center-development-opportunities.html"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified shared_coordinate_precision_downgraded delivery_utility_linked","dukey":"44372|TX"},{"id":"ee8f427d9631","cid":"ee8f427d9631","canon":1,"dups":1,"ftype":"data_center","name":"Vallies ELT-1","city":"Red Oak","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"Vallies","ay":2022,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected unlinked_source_text stale_future_status_year delivery_utility_linked","srcUrls":null,"srcDom":null,"oy_stale":1,"dukey":"44372|TX"},{"id":"8b9815244e04","cid":"8b9815244e04","canon":1,"dups":1,"ftype":"data_center","name":"CoreWeave","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","uconf":"High","uquote":"The utility company for Plano is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/plano/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CoreWeave","spon":"CoreWeave","tenant":"Nvidia","ay":2023,"oy":2023,"deal":"$1.6 billion investment announced July 25, 2023; $141 million in tax incentives and abatements from the City of Plano; 6-year Master Services Agreement with Lincoln Property Company for over $260 million for the initial 30 MW installation.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/plano/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"2e0b1a9cf933","cid":"2e0b1a9cf933","canon":1,"dups":1,"ftype":"data_center","name":"CoreWeave, LLC","city":"Fort Stockton","county":"Pecos County","state":"TX","lat":30.773298,"lng":-102.718153,"cprec":"shared_centroid","status":"Proposed","mw":300,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Beyond traditional utility contracts, Core Scientific is developing an innovative behind-the-meter power solution on over 200 acres of newly secured land to support long-term growth.","pscan":"https://baxtel.com/data-center/core-scientific-pecos-tx","rto":"ERCOT","nerc":"TRE","op":"CoreWeave","spon":"CoreWeave","ay":2026,"oy":2027,"deal":"CoreWeave acquires Core Scientific in an all-stock transaction (announced May 28, 2026).","dealScan":"https://www.coreweave.com/newsroom","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;coreweave.com","srcUrls":["https://baxtel.com/data-center/core-scientific-pecos-tx","https://www.coreweave.com/newsroom"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"dd096281b972","cid":"dd096281b972","canon":0,"dups":1,"ftype":"crypto_hpc","name":"LLANO BUILDING 1 & 2","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","pc":"Behind-the-Meter","pconf":"High","pquote":"Crusoe filed for a permit in January to build the 933-megawatt power plant on the site of the Goodnight campus, which showed the facility would operate off the grid and provide energy to at least two buildings on the campus, according to Cleanview.","pscan":"https://e360.yale.edu/digest/google-natural-gas-data-center","proc":"Dedicated PPA","pcp":"Serena's Goodnight Wind Farm","pdt":"265.5 MW","uconf":"Medium","uquote":"Grid Operator: Swisher Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/crusoe-energy-systems-llc-9a8fced5","rto":"SPP","nerc":"MRO","op":"Crusoe Energy Systems","spon":"Google","tenant":"Google","ay":2025,"oy":2028,"contro":"Controversy over a planned 933-megawatt gas-fired power plant at the Google data center campus that would generate up to 4.5 million tons of carbon dioxide annually.","controScan":"https://e360.yale.edu/digest/google-natural-gas-data-center","deal":"Google's $40 billion investment in Texas data centers, announced in 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"e360.yale.edu;interconnection.fyi","srcUrls":["https://e360.yale.edu/digest/google-natural-gas-data-center","https://www.interconnection.fyi/data-center/project/crusoe-energy-systems-llc-9a8fced5"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"96051ad30596","cid":"8a6a0698f869","canon":0,"dups":2,"ftype":"data_center","name":"Goodnight Data Center Phase 2","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":500,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"The gigawatt-scale campus, developed in partnership with Google, will leverage 933 megawatts of off-grid fossil gas turbines; the latter will emit more emissions than the average coal plant.... But one phase of that same data center campus will also co-locate behind the meter with an onshore wind farm, and Crusoe's bid for regulatory approval of that deal has made Goodnight the test case for ensuring such arrangements don't hurt ratepayers in Texas.","pscan":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","proc":"Co-located generation","pcp":"Crusoe Energy","pdt":"933 MW natural gas power plant","uquote":"FGE Goodnight I, LLC's wind unit GOODNIT1 (265.5 MW) would serve the large load customer Crusoe Energy Systems LLC in the retail delivery service territory of Greenbelt Electric Cooperative.","ukey":"7561|TX","uname":"Greenbelt Electric Coop, Inc","rto":"SPP","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","ay":2024,"oy":2030,"contro":"Controversy over reliance on off-grid fossil gas turbines and environmental impact; regulatory scrutiny of co-located data centers.","controScan":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","deal":"Crusoe agreed to sell the campus to Google (Dec 2025); Crusoe sold a co-located portion to Ensign Infrastructure (March 2026); Crusoe and Serena Energy proposed a net metering arrangement for wind power (Oct 2025).","dealScan":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"latitudemedia.com","srcUrls":["https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/"],"lflag":"citation_artifact_removed source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"b6e69b2c5321","cid":"2027f38d042f","canon":0,"dups":3,"ftype":"data_center","name":"CyrusOne","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Both buildings would be outfitted for a utility capacity of 18 megawatts.","uconf":"High","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2023,"deal":"Land acquisition in September 2023","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"f48610804a35","cid":"2027f38d042f","canon":0,"dups":3,"ftype":"data_center","name":"CyrusOne","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","pscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","uconf":"High","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR","ay":2023,"oy":2025,"deal":"Estimated construction cost of $15,000,000","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected stale_future_status_year","oy_stale":1},{"id":"3e9f8de5d1e2","cid":"3e9f8de5d1e2","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Carrollton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","proc":"Dedicated PPA","pcp":"Enel Green Power","pdt":"67 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5cd1d1d7c81c","cid":"5cd1d1d7c81c","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Richardson","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The site includes an adjacent ONCOR substation, ensuring a robust and reliable power supply.","uquote":"The site includes an adjacent ONCOR substation, ensuring a robust and reliable power supply.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2024,"oy":2025,"deal":"$79.8 million data-center redevelopment, announced May 2024","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected stale_future_status_year delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"oy_stale":1,"dukey":"44372|TX"},{"id":"64f11b639ced","cid":"64f11b639ced","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Planned high-capacity utility power sourced from the Texas grid.","uconf":"High","uquote":"Oncor Electric Delivery is Allen's utility","uscan":"https://www.choosetexaspower.org/electricity-rates/allen/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/allen/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"ea438317a246","cid":"ea438317a246","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne - SATV - 1.5MW Load Adder","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6565c16f319a","cid":"6565c16f319a","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Allen Load Adder","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Utility capacity – 50 MW; Utility Voltage – 24,900 (25 kV) # of Utility Feeders – 2 each (non-redundant) # of transformers on site – 26 Transformers (24 each @ 2.5 MW, 1 each @ 1 MW, 1 each at 2 MW) UPS configuration & capacity – Distributed redundant, with 4,500 kVA blocks (6 MW) Generator Power – 24 each 2.25 MW Diesel (Critical), 1 each 1.25 MW Diesel (House) Electrical capacity allowed per cabinet – 150 to 180 watts p/SF (average density).","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-dallas-dfw6","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2022,"oy":2023,"deal":"Refinancing deal for $1.05 billion for the DFW3 campus, reported May 1, 2026. Estimated cost of $41,500,000 for the Load Adder addition, reported October 4, 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/cyrusone-dallas-dfw6"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"9dd79009ce32","cid":"9dd79009ce32","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Allen DH2 Fit Up","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Utility capacity – 50 MW, 100% Carbon-Free/Renewable Electricity","pscan":"https://www.cyrusone.com/data-centers/north-america/allen-texas","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2022,"oy":2023,"deal":"Estimated cost of $41,500,000 for additions to existing building, filed 2022.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023002412","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;tdlr.texas.gov","srcUrls":["https://www.cyrusone.com/data-centers/north-america/allen-texas","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023002412"],"lflag":"source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"ff69cf05013b","cid":"ff69cf05013b","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Houston West 3-Expansion","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"7e30ba50536a","cid":"7e30ba50536a","canon":1,"dups":1,"ftype":"data_center","name":"ZHU1 Wave 2","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","mw":43,"pc":"Grid","pconf":"High","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures. use advanced components designed to deliver N. and 2N redundancies. and could provide at full build up to 96 megawatt of 100% uptime with uninterrupted. service","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uquote":"Grid Operator. San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"DataBank","tenant":"Hyperscale customer","ay":2013,"oy":2015,"deal":"Sale of four Houston data center assets, including Houston West III, from CyrusOne to DataBank for approximately $670 million in March 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;interconnection.fyi","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w","https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9"],"band":"25-50 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"c36d12547e6d","cid":"c36d12547e6d","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Houston West 4 - Office Fit-Out","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pdt":"Annual utility bills will total $120,600 in the first year and will increase by 3% every year.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"45c284005943","cid":"45c284005943","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne SAT III SN8 Elevator Addition","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"regional Texas grid (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"c2426de5c424","cid":"c2426de5c424","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne SAT VI - DH 130 & 230 N Fitout","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":18,"pc":"Grid","pconf":"High","pquote":"The data center has 2 x 200 MW of power substation providing power to the facility.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including... representatives of CPS Energy.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2021,"oy":2022,"contro":"Site is on the Edwards Aquifer recharge zone, raising concerns about water quality for 2 million Central Texans downstream.","deal":"$50 million estimated cost for TDLR permit TABS2021014441 filed April 29, 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"096e6ae2a87a","cid":"096e6ae2a87a","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne-SAT VI TRP 2","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":18,"pc":"Grid","pconf":"High","pquote":"With some of the lowest power cost in the country, this San Antonio data center facility can scale up to 20 megawatts of power from multiple substations.","pscan":"https://dsi.us/showcase/cyrusone/","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2021,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"dsi.us;cyrusone.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://dsi.us/showcase/cyrusone/","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"3021e7b91345","cid":"3021e7b91345","canon":1,"dups":1,"ftype":"data_center","name":"Lowe's UPS Modernization","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"41bf33d72684","cid":"41bf33d72684","canon":1,"dups":1,"ftype":"data_center","name":"Wuliger Way Data Center","city":"North Richland Hills","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Cooke County Elec COOP ASSN.","uconf":"High","uquote":"Grid Operator. Cooke County Elec COOP ASSN.","ukey":"4262|TX","uname":"Cooke County Elec Coop Assn","rto":"ERCOT","nerc":"TRE","op":"6409 wuliger way","spon":"6409 wuliger way","ay":2026,"oy":2026,"deal":"Privately funded project with an estimated cost of $3,600,000, registered on 3/6/2026.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026014340","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026014340"],"lflag":"source_url_canonicalized"},{"id":"4bb11ac25680","cid":"4bb11ac25680","canon":1,"dups":1,"ftype":"data_center","name":"Data Center THM1A","city":"Lueders","county":"Jones","state":"TX","lat":32.743709,"lng":-99.87443,"cprec":"distinct","status":"Proposed","rto":"ERCOT","nerc":"TRE","op":"GN DC1","spon":"GN DC1","ay":2025,"oy":2027,"contro":"A 600-acre data center proposed for Jones County faces early opposition, with concerns raised about water usage, light pollution, noise pollution, and lack of additional jobs. Jones County Commissioners also approved a new zoning ordinance outlining requirements for data center development to mitigate potential harmful effects.","controScan":"https://www.youtube.com/watch?v=o_CpVQRH77k","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=o_CpVQRH77k"],"lflag":"source_quality_reclassified"},{"id":"4cd6506d73e0","cid":"4cd6506d73e0","canon":1,"dups":1,"ftype":"data_center","name":"Data Center THM2A","city":"Haskell","county":"Haskell","state":"TX","lat":33.175964,"lng":-99.730774,"cprec":"distinct","status":"Proposed","pc":"Hybrid","pconf":"Medium","pquote":"The Haskell County data centers will be built directly alongside a new solar and battery energy storage plant, creating an industrial park in partnership with Intersect and TPG Rise Climate.","uquote":"Grid Operator: Tri-county Electric Coop, INC (TX).","uscan":"https://www.interconnection.fyi/data-center/project/data-center-2-3943b0a7","ukey":"19159|TX","uname":"Tri-County Electric Coop, Inc (TX)","rto":"ERCOT","nerc":"TRE","op":"Homebound Group","spon":"Homebound Group","ay":2025,"oy":2028,"contro":"Mixed reactions from residents, with some expressing caution about the impact on the small-town feel.","controScan":"https://www.youtube.com/watch?v=Pu7dU9Y97II","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;youtube.com","srcUrls":["https://www.interconnection.fyi/data-center/project/data-center-2-3943b0a7","https://www.youtube.com/watch?v=Pu7dU9Y97II"]},{"id":"d77258c8310c","cid":"d77258c8310c","canon":1,"dups":1,"ftype":"data_center","name":"Project Pumpkin 2A","city":"Miami","county":"Roberts","state":"TX","lat":35.838596,"lng":-100.836682,"cprec":"distinct","status":"Proposed","pc":"Behind-the-Meter","pconf":"High","pquote":"filings show the company now plans to supply 840 MW of behind-the-meter data center load at the site. The facilities will ultimately export excess generation to the ERCOT grid through a newly constructed 345 kV switchyard known as the Ghost Town Station.","pscan":"https://newprojectmedia.com/origination-intersect-power-pursuing-840-mw-data-center-conversion-at-former-green-hydrogen-project-in-tx-panhandle/","proc":"Co-located generation","pcp":"Intersect Power","pdt":"840 MW","rto":"SPP","nerc":"MRO","op":"Intersect Power","spon":"Intersect Power","ay":2026,"oy":2027,"contro":"Gray County Commissioners Court postponed a vote on a tax abatement request after a public hearing.","controScan":"https://newprojectmedia.com/origination-intersect-power-pursuing-840-mw-data-center-conversion-at-former-green-hydrogen-project-in-tx-panhandle/","deal":"Tax abatement request for 100% property tax relief for 10 years per phase; estimated USD 1bn capital investment per phase.","dealScan":"https://newprojectmedia.com/origination-intersect-power-pursuing-840-mw-data-center-conversion-at-former-green-hydrogen-project-in-tx-panhandle/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"newprojectmedia.com","srcUrls":["https://newprojectmedia.com/origination-intersect-power-pursuing-840-mw-data-center-conversion-at-former-green-hydrogen-project-in-tx-panhandle/"],"lflag":"source_quality_reclassified"},{"id":"919033727467","cid":"919033727467","canon":1,"dups":2,"ftype":"data_center","name":"Data Center Project","city":"Cameron","county":"Milam County","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Proposed","mw":1200,"pc":"Grid","pconf":"Medium","pquote":"Strategically situated in Central Texas between Austin and College Station, the Milam Data Center benefits from proximity to major power generation assets, robust fiber connectivity, and a business environment favorable to high-capacity data center operations.","uconf":"High","uquote":"Development Name. Data Center Project. Status. Proposed. City. Cameron. County. Milam County. State. Texas. Business Information. Developer. Contact sales for developer/owner information. Grid Operator. Heart of Texas Electric COOP.","uscan":"https://www.interconnection.fyi/data-center/project/data-center-project-63029124","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"SB Energy","spon":"SoftBank Group , OpenAI, Oracle","tenant":"OpenAI","ay":2025,"oy":2027,"deal":"$3 billion investment for the facility and a July 2025 agreement between OpenAI and Oracle to establish up to 4.5 gigawatts of additional Stargate capacity.","dealScan":"https://baxtel.com/data-center/openai-stargate-milam-county-tx","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","srcUrls":["https://www.interconnection.fyi/data-center/project/data-center-project-63029124","https://baxtel.com/data-center/openai-stargate-milam-county-tx"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified shared_coordinate_precision_downgraded generic_permit_record"},{"id":"6894ecc2d4c5","cid":"919033727467","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Project","city":"Cameron","county":"Milam County","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Proposed","mw":1200,"pc":"Grid","pconf":"High","pquote":"Energy Source: Connected to the Texas grid (ERCOT) with integration of renewable power procurement via solar and wind PPAs.","uconf":"High","uquote":"Grid Operator. Heart of Texas Electric COOP.","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"SB Energy","spon":"SoftBank Group","tenant":"OpenAI","ay":2025,"oy":2026,"deal":"Milam County Tax Abatement Agreement with SE DC DevCo, LLC (June 2025)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text shared_coordinate_precision_downgraded generic_permit_record","srcUrls":null,"srcDom":null},{"id":"1ce56ca04ef8","cid":"1ce56ca04ef8","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Showroom Building","city":"La Marque","county":"Galveston","state":"TX","lat":29.233453,"lng":-94.888456,"cprec":"distinct","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Data Center Showroom Building","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","lflag":"generic_unsourced_permit_record","srcUrls":null,"srcDom":null},{"id":"833635b50c81","cid":"833635b50c81","canon":1,"dups":1,"ftype":"data_center","name":"SWITCH TEXAS 2 - TENANT FIT-OUT","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The Texas Interconnect, managed by the Electric Reliability Council of Texas (ERCOT), provides Texas with a reliable energy source that is independent of the Eastern and Western Interconnects.","uconf":"High","uquote":"Grid Operator: Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/data-foundry-llc-a59a6905","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Data Foundry","spon":"Switch","ay":2023,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/data-foundry-llc-a59a6905"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"345d9d20bb7f","cid":"345d9d20bb7f","canon":1,"dups":1,"ftype":"data_center","name":"TX2 POD2 Capacity Expansion","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Texas 2 was built adjacent to Texas 1 on Data Foundry's 40-acre campus called the Data Ranch, a property with dual substations and diverse power feeds. Together, the two data centers will total 455,000 square feet with 60 megawatts of power capacity to meet IT security and uptime needs of a business community that continues to flourish. The facility is equipped with back-up generators and 40,000 gallons of underground fuel storage, and is designed to keep businesses online 24x7x365.","uconf":"High","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/data-foundry-llc-a59a6905","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Data Foundry","spon":"Data Foundry","ay":2023,"oy":2024,"deal":"$5.0M renovation project for AUS02 POD2 TI, registered Oct 2023","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/data-foundry-llc-a59a6905"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"9bb0538b93ee","cid":"9bb0538b93ee","canon":1,"dups":1,"ftype":"data_center","name":"AUS02 POD2 TI","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Proposed","uquote":"Grid Operator. Austin Energy.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"Data Foundry","spon":"Switch","ay":2023,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"db456273d80d","cid":"db456273d80d","canon":1,"dups":1,"ftype":"data_center","name":"Databank Plano DFW-3: Building Connection","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Our 16-acre campus is home to our flagship DFW3 data center and DFW8, a 126,000 square foot expansion. The campus is powered by dual feeds from an off-site Oncor substation and provides valuable metro connectivity via Data Center Interconnect (DCI) to our other Dallas data centers.","pscan":"https://www.databank.com/data-centers/dallas/plano-campus/","uconf":"Medium","uquote":"Our 16-acre campus is home to our flagship DFW3 data center and DFW8, a 126,000 square foot expansion. The campus is powered by dual feeds from an off-site Oncor substation and provides valuable metro connectivity via Data Center Interconnect (DCI) to our other Dallas data centers.","uscan":"https://www.databank.com/data-centers/dallas/plano-campus/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","ay":2024,"oy":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/dallas/plano-campus/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"aa75fa7607c0","cid":"aa75fa7607c0","canon":1,"dups":1,"ftype":"data_center","name":"Databank HU3 4MW Fitout","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","mw":4,"pc":"Grid","pconf":"High","pquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds. DataBank plans to install a 3.15MW rooftop solar array at its Houston HOU3 data center, adding onsite generation capacity as AI-related electricity demand intensifies pressure on US power markets. The system's levelized cost of energy will match current utility rates, effectively serving as a day-one energy hedge against price volatility while decreasing reliance on renewable energy certificates from external sources.","pscan":"https://www.databank.com/resources/press-releases/databank-to-deploy-largest-rooftop-solar-array-in-houston-metro-area/","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","ay":2026,"deal":"DataBank announced plans to install a 3,150 kW rooftop solar array at its HOU3 data center on May 12, 2026.","dealScan":"https://www.databank.com/resources/press-releases/databank-to-deploy-largest-rooftop-solar-array-in-houston-metro-area/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","lflag":"online_before_announced nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","srcUrls":["https://www.databank.com/resources/press-releases/databank-to-deploy-largest-rooftop-solar-array-in-houston-metro-area/","https://www.databank.com/data-centers/houston/"],"band":"< 10 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"b8571c5014f8","cid":"b8571c5014f8","canon":1,"dups":1,"ftype":"data_center","name":"DHO7- ADTA","city":"Katy","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"77e2bddc863f","cid":"77e2bddc863f","canon":1,"dups":1,"ftype":"data_center","name":"Phase 2 Data Center Finish Out","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":48,"rto":"ERCOT","nerc":"TRE","op":"Digital Realty","spon":"Mitsubishi , Digital Realty","tenant":"S&P 100 investment grade customer","ay":2024,"oy":2024,"deal":"Joint venture between Digital Realty and Mitsubishi Corporation for two data centers in Dallas metro area, with Mitsubishi acquiring 65% equity interest for approximately $200 million. Total budget for the first phase is approximately $400 million, potentially increasing to $800 million for 48 MW.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"9a7624975f51","cid":"9a7624975f51","canon":1,"dups":1,"ftype":"data_center","name":"Edged DFW Data Center","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":24,"pc":"Grid","pconf":"High","pquote":"Edged has contracted with Oncor for a dedicated electricity substation and plans to use its proprietary waterless ThermalWorks cooling system.","uconf":"Medium","uquote":"Edged has contracted with Oncor for a dedicated electricity substation and plans to use its proprietary waterless ThermalWorks cooling system.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Edged Energy","spon":"Endeavour","ay":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text utility_alias_corrected citation_artifact_removed delivery_utility_linked","band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"13417af039fc","cid":"13417af039fc","canon":1,"dups":1,"ftype":"data_center","name":"EMPIRE CENTER DATA CENTER D2 D3","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"437b033c2695","cid":"437b033c2695","canon":1,"dups":1,"ftype":"data_center","name":"Evocative DAL6 Infrastructure Upgrades","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":32,"pc":"Grid","pconf":"High","pquote":"Power: Electric Utility Provider: Oncor; Power Feeds: (4) 3 MW feeds,; Redundant Power Feed: Yes, Redundant feeds from 2 substations; Generator: (4) 2MW Generators, N+1 design expandable to 11; UPS: (4) 1.2 MW.","uquote":"Power: Electric Utility Provider: Oncor;","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Evocative","spon":"Mapletree","ay":2025,"oy":2027,"deal":"Evocative acquired the DAL6 data center in Dallas, Texas in 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"99af46fbbdc6","cid":"99af46fbbdc6","canon":1,"dups":1,"ftype":"data_center","name":"Final Grading for Data Center","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Denton County Elec Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/new-construction-single-story-data-center-with-two-0cafb078","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/new-construction-single-story-data-center-with-two-0cafb078","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"ACS DC HICKS FIELD ROAD","spon":"ACS DC HICKS FIELD ROAD","ay":2025,"oy":2027,"deal":"Construction project with an estimated value of $280.0M.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/new-construction-single-story-data-center-with-two-0cafb078"]},{"id":"fc67c0b440d5","cid":"fc67c0b440d5","canon":1,"dups":1,"ftype":"data_center","name":"Flexential Plano","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":13,"pc":"Grid","pconf":"High","pquote":"With power and cooling that meets the specific engineering requirements of CoreWeave's cloud platform, this advanced data center positions CoreWeave to support enterprises that need accelerated advanced AI model development and deployment. 100% SLA on power, cooling, network and bandwidth.","uquote":"Oncor's territory stretches across much of North, Central, and West Texas — from the Dallas–Fort Worth metroplex south to Waco and west to Midland-Odessa. It also covers cities like Tyler, Killeen, Temple, Denton, and McKinney. Cities & counties served. Oncor Electric Delivery provides electricity delivery service throughout the following areas in Texas:... Plano.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Flexential","spon":"Flexential","tenant":"CoreWeave","ay":2025,"oy":2025,"deal":"Agreement between Flexential and CoreWeave for a 13 MW deployment announced April 29, 2025.","dealScan":"https://www.prnewswire.com/news-releases/flexential-to-support-coreweaves-ai-cloud-expansion-with-13-mw-high-density-deployment-302440025.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/flexential-to-support-coreweaves-ai-cloud-expansion-with-13-mw-high-density-deployment-302440025.html"],"band":"10-25 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","oy_stale":1,"dukey":"44372|TX"},{"id":"6b31e63fa4dd","cid":"6b31e63fa4dd","canon":1,"dups":1,"ftype":"data_center","name":"Flexential Plano Battery Replacement","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":13,"pc":"Grid","pconf":"High","pquote":"The Shiloh data center has a fully redundant and fault tolerant power infrastructure design that is concurrently maintainable, and offers 100% SLA on power. The power to the data center is fed through multiple medium voltage utility power feeds. A Redundant UPS system of 18 MW power capacity with redundant battery strings provides a backup power supply in case of utility power loss that is being backed up by a 29 MW, fully redundant diesel generators having 50,000 gallons of diesel fuel.","pscan":"https://cloudandcolocation.com/datacenters/flexential-plano-data-center/","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/flexential-data-center-b3302d0c","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Flexential","spon":"GI Partners","tenant":"CoreWeave","ay":2025,"oy":2025,"deal":"Agreement between Flexential and CoreWeave for a 13 MW deployment in Plano, Texas, announced April 22, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","srcUrls":["https://cloudandcolocation.com/datacenters/flexential-plano-data-center/","https://www.interconnection.fyi/data-center/project/flexential-data-center-b3302d0c"],"band":"10-25 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"363a78188be9","cid":"363a78188be9","canon":1,"dups":1,"ftype":"data_center","name":"CoreWeave Plano","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":30,"rto":"ERCOT","nerc":"TRE","op":"CoreWeave","spon":"Lincoln Property Company / Lincoln Rackhouse","tenant":"Nvidia","ay":2023,"oy":2023,"deal":"$1.6 billion investment announced July 25, 2023; Tax rebate agreement with Plano City Council approved July 24, 2023, for minimum $800 million/year in improvements; 6-year Master Services Agreement with Lincoln Property Company for over $260 million for initial 30 MW installation.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"9163fd334cba","cid":"32d091d49231","canon":0,"dups":3,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Denton County Elec Coop, INC.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.","lflag":"display_name_normalized generic_unsourced_permit_record unlinked_source_text","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"8ff1a2d804b8","cid":"8ff1a2d804b8","canon":1,"dups":1,"ftype":"data_center","name":"GTDC Battery Room Buildout","city":"Georgetown","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"The Georgetown project involves \"fitting out existing equipment rooms\" at a 304,700-square-foot facility, and the Roanoke project involves \"converting existing battery rooms into a data hall and data hall support.\"","pscan":"https://baxtel.com/news/citigroup-is-equipping-two-of-its-data-centers-in-texas-with-battery-rooms","uquote":"The City of Georgetown Electric Utility's policies require all large electric users to fully pay for the infrastructure costs associated with serving their facility.","uscan":"https://georgetowntexas.gov/government/city_management/faqs_on_data_centers.php","ukey":"20230|TX","uname":"Weatherford Mun Utility System","rto":"ERCOT","nerc":"TRE","op":"Citigroup","spon":"Citigroup","ay":2023,"oy":2023,"deal":"$500,000 renovation project for 'GTDC Battery Room Buildout', started March 2023, completed December 2023.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023007691","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"baxtel.com;georgetowntexas.gov;tdlr.texas.gov","srcUrls":["https://baxtel.com/news/citigroup-is-equipping-two-of-its-data-centers-in-texas-with-battery-rooms","https://georgetowntexas.gov/government/city_management/faqs_on_data_centers.php","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023007691"],"lflag":"source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"858ff1ca507e","cid":"858ff1ca507e","canon":1,"dups":4,"ftype":"data_center","name":"Goodnight Data Center Phase 1","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":530,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Improvements includes \"behind the meter uses\" for wind or solar generated power such as data centers or similar uses of renewable generated electrical power, as well as data center or other uses supplied with power directly or as a back-up from the ERCOT power grid or other sources. The gigawatt-scale campus, developed in partnership with Google, will leverage 933 megawatts of off-grid fossil gas turbines; the latter will emit more emissions than the average coal plant.... But one phase of that same data center campus will also co-locate behind the meter with an onshore wind farm","pscan":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","proc":"Co-located generation","pcp":"Crusoe Energy","pdt":"933 MW natural gas power plant","uquote":"Grid Operator: Swisher Electric Coop, INC.","ukey":"20948|TX","uname":"Wise Electric Coop Inc","rto":"SPP","nerc":"MRO","op":"GN DC1","spon":"Google","tenant":"Google","ay":2024,"oy":2027,"contro":"Controversy over the use of 933 megawatts of off-grid fossil gas turbines, which will emit more emissions than the average coal plant, and Google's shift from its clean energy pledges.","deal":"Crusoe agreed to sell the project to Google (reported December 2025), part of Google's announced $40 billion investment in Texas data centers (November 2025). Phase 1 capital investment is approximately $14.6 billion.","dealScan":"https://www.distilled.earth/p/google-is-weighing-natural-gas-without","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"latitudemedia.com;interconnection.fyi;distilled.earth","srcUrls":["https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","https://www.interconnection.fyi/data-center/project/goodnight-e797452b","https://www.distilled.earth/p/google-is-weighing-natural-gas-without"],"lflag":"citation_artifact_removed source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized","uscan":"https://www.interconnection.fyi/data-center/project/goodnight-e797452b","controScan":"https://www.distilled.earth/p/google-is-weighing-natural-gas-without"},{"id":"08c9e467faff","cid":"858ff1ca507e","canon":0,"dups":4,"ftype":"data_center","name":"Goodnight Data Center Phase 1","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":530,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Improvements includes \"behind the meter uses\" for wind or solar generated power such as data centers or similar uses of renewable generated electrical power, as well as data center or other uses supplied with power directly or as a back-up from the ERCOT power grid or other sources.... Crusoe filed for a permit in January to build the 933-megawatt power plant on the site of the Goodnight campus, which showed the facility would operate off the grid and provide energy to at least two buildings on the campus, according to Cleanview.","proc":"Co-located generation","pcp":"Crusoe Energy","pdt":"933 MW","rto":"SPP","nerc":"MRO","op":"GN DC1","spon":"Google","ay":2024,"oy":2027,"contro":"Environmental controversy regarding a planned 933MW natural gas power plant on-site, which would operate off the grid and generate significant carbon emissions.","controScan":"https://www.distilled.earth/p/google-is-weighing-natural-gas-without","deal":"Acquisition by Google from Crusoe Energy Systems, LLC, part of Google's announced USD 40bn Texas investment program (November/December 2025).","dealScan":"https://www.distilled.earth/p/google-is-weighing-natural-gas-without","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"distilled.earth","srcUrls":["https://www.distilled.earth/p/google-is-weighing-natural-gas-without"],"lflag":"citation_artifact_removed source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"edbe94f5d882","cid":"edbe94f5d882","canon":1,"dups":1,"ftype":"crypto_hpc","name":"LLANO BUILDING 1 & 2","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":100,"pc":"Behind-the-Meter","pconf":"High","pquote":"Crusoe filed for a permit in January to build the 933-megawatt power plant on the site of the Goodnight campus, which showed the facility would operate off the grid and provide energy to at least two buildings on the campus, according to Cleanview.","proc":"Dedicated PPA","pcp":"Serena's Goodnight Wind Farm","pdt":"265.5 MW (in part)","uconf":"High","uquote":"Grid Operator: Swisher Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/gn-dc1-llc-4bd06275","rto":"SPP","nerc":"MRO","op":"Crusoe Energy Systems","spon":"Google / Alphabet","tenant":"Google","ay":2024,"oy":2026,"contro":"Environmental concerns regarding a planned 933-megawatt gas-fired power plant on the Goodnight campus that would generate up to 4.5 million tons of carbon dioxide annually.","deal":"Tax Abatement Agreement with Armstrong County and GN DC1, LLC, dated November 12, 2024, with payments of $1.35 million per year for each building starting June/July 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/gn-dc1-llc-4bd06275"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"033ac3307721","cid":"858ff1ca507e","canon":0,"dups":4,"ftype":"crypto_hpc","name":"Goodnight Data Center Phase 1","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":530,"band":"250+ MW","pc":"Hybrid","pconf":"Medium","pquote":"The gigawatt-scale campus, developed in partnership with Google, will leverage 933 megawatts of off-grid fossil gas turbines; the latter will emit more emissions than the average coal plant.... But one phase of that same data center campus will also co-locate behind the meter with an onshore wind farm, and Crusoe's bid for regulatory approval of that deal has made Goodnight the test case for ensuring such arrangements don't hurt ratepayers in Texas.... Crusoe filed for a permit in January to build the 933-megawatt power plant on the site of the Goodnight campus, which showed the facility would operate off the grid and provide energy to at least two buildings on the campus, according to Cleanview.... The site will rely on the ERCOT grid, supplemented by the 265.5 MW Goodnight Wind Farm (already operating in Armstrong County) through a renewable-energy purchase agreement.","proc":"Co-located generation","pcp":"Crusoe Energy","pdt":"933 MW natural gas power plant","rto":"SPP","nerc":"MRO","op":"Crusoe Energy Systems","spon":"Google","tenant":"Google","ay":2024,"oy":2027,"contro":"Environmental concerns over 4.5 million tons of CO2 emissions from an off-grid gas plant and regulatory pushback regarding co-located data centers and grid emergency curtailment rules.","controScan":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","deal":"Crusoe agreed to sell the project to Google, which is incorporating it into a USD 40bn Texas investment program (announced December 15, 2025). Phase 1 capital investment is $14.6 billion.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"latitudemedia.com","srcUrls":["https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/"],"lflag":"citation_artifact_removed source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"76d6d8308173","cid":"2fab4e2476f7","canon":0,"dups":2,"ftype":"crypto_hpc","name":"PHASE 2 SECOND TAX ABATEMENT AGREEMENT","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Phase 2, referred to as \"Goodnight Data Center Phase 2 will consume up to 500MW of electrical energy. Each Building Improvement and its related Data Center Equipment Improvements of Phase 2 is anticipated to consist of 4 x 25MW data halls along with the associated cooling, networking, power delivery, and other systems.","uconf":"High","uquote":"Grid Operator: Greenbelt Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/goodnight-e797452b","ukey":"7561|TX","uname":"Greenbelt Electric Coop, Inc","rto":"SPP","nerc":"MRO","op":"Crusoe Energy Systems","spon":"Crusoe Energy Systems","ay":2024,"oy":2026,"contro":"Project scaled back from original plan","controScan":"https://www.youtube.com/watch?v=0ArY36w7eqY","deal":"Phase 2 Second Tax Abatement Agreement with Armstrong County, Texas, approved November 12, 2024","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;youtube.com","srcUrls":["https://www.interconnection.fyi/data-center/project/goodnight-e797452b","https://www.youtube.com/watch?v=0ArY36w7eqY"],"lflag":"source_quality_reclassified"},{"id":"8a6a0698f869","cid":"8a6a0698f869","canon":1,"dups":2,"ftype":"crypto_hpc","name":"Goodnight Data Center Phase 2","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":500,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"The gigawatt-scale campus, developed in partnership with Google, will leverage 933 megawatts of off-grid fossil gas turbines; the latter will emit more emissions than the average coal plant. Project filings indicate that Crusoe's Claude campus will be powered in part by energy purchased from Serena's Goodnight Wind Farm, located in Armstrong County, the very same region as Claude.","proc":"Co-located generation","pcp":"Crusoe Energy","pdt":"933 MW","uquote":"Project filings indicate that Crusoe's Claude campus will be powered in part by energy purchased from Serena's Goodnight Wind Farm and Crusoe filed for a permit in January to build the 933-megawatt power plant on the site of the Goodnight campus, which showed the facility would operate off the grid and provide energy to at least two buildings on the campus.","uscan":"https://e360.yale.edu/digest/google-natural-gas-data-center","rto":"SPP","nerc":"MRO","op":"Crusoe Energy, Google","spon":"Crusoe Energy, Google","tenant":"Google","ay":2024,"oy":2030,"contro":"Environmental concerns regarding natural gas power plant emissions; regulatory debate over co-located data centers and grid response.","controScan":"https://e360.yale.edu/digest/google-natural-gas-data-center","deal":"Acquisition by Google from Crusoe Energy; partnership with Google; sale of a portion to Ensign Infrastructure.","dealScan":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"latitudemedia.com;e360.yale.edu","srcUrls":["https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","https://e360.yale.edu/digest/google-natural-gas-data-center"],"lflag":"source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated","pscan":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","ukey":"7561|TX","uname":"Greenbelt Electric Coop, Inc"},{"id":"193a6fdb5744","cid":"193a6fdb5744","canon":0,"dups":1,"ftype":"data_center","name":"LLANO BUILDING 1 & 2","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"High","pquote":"Improvements includes \"behind the meter uses\" for wind or solar generated power such as data centers or similar uses of renewable generated electrical power, as well as data center or other uses supplied with power directly or as a back-up from the ERCOT power grid or other sources. Crusoe has added natural-gas turbines and battery storage to the power mix for its multibillion-dollar Project Goodnight data center development in the Texas Panhandle, according to newly amended Armstrong County tax abatement filings.","proc":"Dedicated PPA","pcp":"Serena's Goodnight Wind Farm","pdt":"265.5 MW","uconf":"High","uquote":"Grid Operator. Swisher Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/gn-dc1-llc-4bd06275","ukey":"20948|TX","uname":"Wise Electric Coop Inc","rto":"SPP","nerc":"MRO","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2028,"contro":"Concerns about water usage were addressed by the county judge, stating the center will use a closed-loop cooling system for minimal water consumption.","controScan":"https://www.youtube.com/watch?v=LGk5Cb5ZQWw","deal":"Google acquired the project from Crusoe Energy Systems and is incorporating it into its $40 billion Texas investment program (announced November 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;youtube.com","srcUrls":["https://www.interconnection.fyi/data-center/project/gn-dc1-llc-4bd06275","https://www.youtube.com/watch?v=LGk5Cb5ZQWw"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"2fab4e2476f7","cid":"2fab4e2476f7","canon":1,"dups":2,"ftype":"crypto_hpc","name":"PHASE 2 SECOND TAX ABATEMENT AGREEMENT","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The project is strategically located within the SPP grid territory, leveraging access to affordable power and renewable energy sources, including a potential supply agreement with Serena's Goodnight Wind Farm.... \"Building Improvements\" means Improvements that are buildings and any internal and external systems related to the operation of the buildings to perform the function of housing equipment that performs data center operations, including but not limited to building heating and cooling systems, power delivery systems and interconnections, power generation equipment, and any other ancillary equipment or structures necessary for the operation, maintenance, or repair of the buildings and systems.","uconf":"High","uquote":"Grid Operator. Greenbelt Electric Coop, INC.","ukey":"7561|TX","uname":"Greenbelt Electric Coop, Inc","rto":"SPP","nerc":"MRO","op":"Crusoe Energy Systems","spon":"Crusoe Energy Systems","ay":2024,"oy":2027,"contro":"Project scaled back from original plan","controScan":"https://www.youtube.com/watch?v=0ArY36w7eqY","deal":"Phase 2 Second Tax Abatement Agreement with Armstrong County, effective November 12, 2024, for up to $29B in capital investment for the overall campus.","dealScan":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Phase%202%20Tax%20Abatement%20Agreement.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"co.armstrong.tx.us;youtube.com","srcUrls":["https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Phase%202%20Tax%20Abatement%20Agreement.pdf","https://www.youtube.com/watch?v=0ArY36w7eqY"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"bb99cf34bb4c","cid":"858ff1ca507e","canon":0,"dups":4,"ftype":"crypto_hpc","name":"Goodnight Data Center Phase 1","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":530,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"The gigawatt-scale campus, developed in partnership with Google, will leverage 933 megawatts of off-grid fossil gas turbines; the latter will emit more emissions than the average coal plant. But one phase of that same data center campus will also co-locate behind the meter with an onshore wind farm, and Crusoe's bid for regulatory approval of that deal has made Goodnight the test case for ensuring such arrangements don't hurt ratepayers in Texas.","proc":"Co-located generation","pcp":"Crusoe Energy","pdt":"933 MW","uquote":"Grid Operator: Greenbelt Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/goodnight-e797452b","ukey":"7561|TX","uname":"Greenbelt Electric Coop, Inc","rto":"SPP","nerc":"MRO","op":"Crusoe Energy","spon":"Crusoe Energy","tenant":"Google","ay":2024,"oy":2027,"contro":"Controversy over 933 MW off-grid fossil gas turbines and their emissions, and debate over managing co-located data centers under state rules.","deal":"Tax Abatement Agreement with Armstrong County, Texas, for an initial capital investment of approximately $14,600,000,000.00 for Phase 1, dated November 12, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/goodnight-e797452b"],"lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"6ec077dfbc5e","cid":"6ec077dfbc5e","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Google's CFE percentage in the ERCOT grid region, which powers its Texas data centers, nearly doubled from 41 percent in 2022 to 79 percent in 2023.","pscan":"https://houston.innovationmap.com/google-texas-engie-solar-power-2668987288.html","uconf":"High","uquote":"Oncor Electric is the main utility company in Midlothian.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2027,"deal":"$880 million investment for Sharka Data Center – Building 5, announced December 2025","dealScan":"https://therealdeal.com/texas/2025/12/10/google-to-build-880-million-data-center-outside-dallas/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"houston.innovationmap.com;therealdeal.com","srcUrls":["https://houston.innovationmap.com/google-texas-engie-solar-power-2668987288.html","https://therealdeal.com/texas/2025/12/10/google-to-build-880-million-data-center-outside-dallas/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"0c86d88c02b5","cid":"0c86d88c02b5","canon":1,"dups":1,"ftype":"data_center","name":"Alamo Mission LLC (Google)","city":"Midlothian","county":"Ellis County","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Proposed","proc":"Dedicated PPA","pcp":"SB Energy Global","pdt":"942MW PPA, projects online by mid-2024","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ebafcd0aed48","cid":"ebafcd0aed48","canon":1,"dups":1,"ftype":"data_center","name":"Alamo Mission LLC (Google)","city":"Red Oak","county":"Ellis County","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Proposed","proc":"Dedicated PPA","pcp":"Engie, Elawan, Grupo Cobra, X-ELIO","pdt":"375 MW of carbon-free energy capacity","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"04140c24c20f","cid":"04140c24c20f","canon":1,"dups":1,"ftype":"data_center","name":"HH BT Data Center","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","uquote":"Grid Operator. San Bernard Electric Coop, INC.","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Harris County Hospital District","spon":"Harris County Hospital District","ay":2025,"oy":2027,"deal":"$2.5 billion bond package approved in 2023 for Harris Health's strategic facilities plan, including Ben Taub Hospital expansion.","dealScan":"https://www.harrishealth.org/SiteCollectionDocuments/bt-land-expansion/Ben%20Taub%20Land%20Acquisition%20FAQs-11-24-2025.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"harrishealth.org","srcUrls":["https://www.harrishealth.org/SiteCollectionDocuments/bt-land-expansion/Ben%20Taub%20Land%20Acquisition%20FAQs-11-24-2025.pdf"]},{"id":"a085c6e90787","cid":"a085c6e90787","canon":1,"dups":1,"ftype":"data_center","name":"Silver Basin Digital, LLC","city":"Fort Stockton","county":"Pecos County","state":"TX","lat":30.773298,"lng":-102.718153,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"High","pquote":"Joint Application for Net Metering Approval by West Texas Solar Project II LLC and Silver Basin Digital Infrastructure LLC, Docket No. 59115, Joint Application for Net Metering Approval (Dec. 12, 2025).","pscan":"https://interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=59115&ItemMatch=Equal&DocumentType=ALL&SortBy=FileStamp&SortOrder=Descending","proc":"Co-located generation","pcp":"West Texas Solar Project II LLC","uconf":"High","uquote":"Texas-New Mexico Power Company's (\"TNMP\") Objection to Crusoe Energy Systems LLC, CyrusOne, LLC, and Hut8 Corp's Joint Motion to Intervene at 3-4 (Jan. 6,2026).","uscan":"https://interchange.puc.texas.gov/Documents/58964_175_1574105.PDF","rto":"ERCOT","nerc":"TRE","op":"Silver Basin Digital","ay":2025,"deal":"Tax Abatement Agreement with Pecos County approved on December 8, 2025","dealScan":"https://www.co.pecos.tx.us/regular_session_agenda-20251208/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"interchange.puc.texas.gov;co.pecos.tx.us","lflag":"online_before_announced utility_alias_corrected shared_coordinate_precision_downgraded delivery_utility_linked","srcUrls":["https://interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=59115&ItemMatch=Equal&DocumentType=ALL&SortBy=FileStamp&SortOrder=Descending","https://interchange.puc.texas.gov/Documents/58964_175_1574105.PDF","https://www.co.pecos.tx.us/regular_session_agenda-20251208/"],"uname":"Texas-New Mexico Power","reportedUtility":"Texas-New Mexico Power","dukey":"40051|TX"},{"id":"018d17cc5eb4","cid":"018d17cc5eb4","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Hut 8 Project 2","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":1000,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Hut 8 and AEP Texas have executed an interconnection agreement for 1,000 MW of utility capacity for the campus, with initial energization expected in Q1 2027.","pscan":"https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html","uconf":"High","uquote":"Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas.","uscan":"https://news.bitcoin.com/hut-8-surges-30-after-landing-second-ai-data-center-lease-worth-9-8-billion/","rto":"ERCOT","nerc":"TRE","op":"Hut 8","spon":"Hut 8","tenant":"Confidential high-investment-grade company","ay":2025,"oy":2027,"contro":"Community concerns about environmental and local impact; Nueces County commissioners discussed a proposed Data Center Reinvestment Zone.","deal":"15-year, $9.8 billion triple-net lease for 352 MW of IT capacity with a high-investment-grade tenant, announced May 6, 2026.","dealScan":"https://thenextweb.com/news/hut-8-beacon-point-9-8-billion-ai-lease-texas","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"prnewswire.com;news.bitcoin.com;thenextweb.com","srcUrls":["https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html","https://news.bitcoin.com/hut-8-surges-30-after-landing-second-ai-data-center-lease-worth-9-8-billion/","https://thenextweb.com/news/hut-8-beacon-point-9-8-billion-ai-lease-texas"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"delivery_utility_not_in_eia861 utility_alias_corrected source_quality_reclassified"},{"id":"37a3712cf674","cid":"37a3712cf674","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Hut 8 Project 3","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":180,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Project 3, Texas, Electric Reliability Council of Texas (ERCOT), 180 MW.","rto":"ERCOT","nerc":"TRE","op":"Hut 8","spon":"Hut 8","ay":2025,"deal":"Part of a larger expansion announced August 26, 2025, reclassifying 1,530 MW of capacity from exclusivity to development.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"e93f12e959c2","cid":"e93f12e959c2","canon":1,"dups":1,"ftype":"data_center","name":"INTERNAP SECURITY FENCING RENOVATION","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"512cb48b5bf0","cid":"512cb48b5bf0","canon":1,"dups":1,"ftype":"crypto_hpc","name":"IREN Sweetwater 1","county":"Nolan","state":"TX","lat":32.312338,"lng":-100.418108,"cprec":"distinct","status":"Proposed","mw":1400,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Energization marks the connection of the site's high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus.","pscan":"https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-announces-successful-energization-sweetwater-1","uconf":"High","uquote":"IREN Sweetwater 1 Data Center in Nolan County, TX (250+ MW) - Interconnection.fyi lists \"Grid Operator: Taylor Electric COOP INC - (TX)\".","uscan":"https://www.interconnection.fyi/data-center/project/iren-sweetwater-1-8d9cdcbd","ukey":"13830|TX","uname":"Nueces Electric Cooperative","rto":"ERCOT","nerc":"TRE","op":"IREN Limited","spon":"IREN Limited","ay":2022,"oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"irisenergy.gcs-web.com;interconnection.fyi","srcUrls":["https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-announces-successful-energization-sweetwater-1","https://www.interconnection.fyi/data-center/project/iren-sweetwater-1-8d9cdcbd"]},{"id":"58e64e8db615","cid":"58e64e8db615","canon":1,"dups":1,"ftype":"crypto_hpc","name":"IREN Sweetwater 2","county":"Fisher","state":"TX","lat":32.740473,"lng":-100.40312,"cprec":"distinct","status":"Proposed","mw":600,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"With direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions.","pscan":"https://iren.com/data-centers/sweetwater","uquote":"On March 17, 2025, IREN Limited announced the signing of a 600MW grid connection agreement with AEP Texas Inc. for its Sweetwater 2 project in West Texas.","rto":"ERCOT","nerc":"TRE","op":"IREN","spon":"IREN","ay":2025,"oy":2027,"deal":"600MW grid connection agreement with AEP Texas Inc. signed on March 17, 2025, involving $4.1 million non-refundable connection costs and $26.9 million in refundable deposits.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"iren.com","srcUrls":["https://iren.com/data-centers/sweetwater"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"20404|TX"},{"id":"a1aef8ddbf6a","cid":"a1aef8ddbf6a","canon":1,"dups":1,"ftype":"data_center","name":"Kroozin at SH-249 (data center)","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: San Bernard Electric Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/kroozin-data-center-d01ba3a0","uconf":"High","uquote":"Grid Operator: San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/kroozin-data-center-d01ba3a0","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Altaf Makanojiya","spon":"Altaf Makanojiya","oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/kroozin-data-center-d01ba3a0"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"f1947b3642b4","cid":"f1947b3642b4","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Resolution 11-25 - Tax Abatement Chapter 312 (Lancium/Stargate)","city":"Abilene","county":"Taylor County","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Proposed","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"The campus is equipped with Lancium's proprietary Smart Response technology, which adjusts power consumption to enhance grid reliability while leveraging low-cost renewable energy sources like wind and solar. Industry reports indicate that, in Abilene, Texas, the Stargate Project will include up to 29 GE Vernova LM2500XPRESS gas turbines capable of generating roughly 986 megawatts (MW) of electricity. Permits have also been filed for a 360 MW natural gas plant, serving as both primary and backup power. Seamless 1.2GW grid interconnect. Onsite gas generation complete by 2025.","proc":"Co-located generation","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle, OpenAI","ay":2021,"oy":2026,"contro":"A planned 600 MW expansion was scaled back, and the project has caused local disruption with some concerns about its continuation.","deal":"$3.4 billion joint venture (Crusoe, Blue Owl Capital, Primary Digital Infrastructure) on October 15, 2024; $2.3 billion loan (JPMorgan Chase to OpenAI/partners) on May 22, 2025; $600 million debt financing (Lancium) on October 16, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified"},{"id":"f9cc18b81cc9","cid":"f9cc18b81cc9","canon":1,"dups":1,"ftype":"data_center","name":"McAllen Data Center","city":"Mcallen","county":"Hidalgo","state":"TX","lat":26.396384,"lng":-98.18099,"cprec":"distinct","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"02ccbbfc11c5","cid":"02ccbbfc11c5","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Temple","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Proposed","mw":152,"pc":"Grid","pconf":"High","pquote":"Meta builds and operates some of the world's most sustainable data centers, which are supported by 100% renewable energy.... The company adds new renewable energy to each data center's local grid. Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. The Temple Data Center will be supported by 100% renewable energy from right here in Texas. Meta has agreed to purchase all energy output from ENGIE North America's 260-MW Sypert Branch solar project in Texas when it comes online in late 2025, the companies announced Thursday.","pscan":"https://www.utilitydive.com/news/engie-meta-solar-energy-data-center-purchase-agreement-power/731649/","uquote":"Meta is proud to work alongside the City of Temple, Texas – City Government, the Temple Economic Development Corporation, Bell County, Texas, the Temple College Official Page, Oncor, Temple Chamber of Commerce and all the partners that helped Meta get to today.","uscan":"https://datacenters.atmeta.com/2023/10/ramping-up-construction-on-the-temple-data-center/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Meta","spon":"Meta","tenant":"Meta","ay":2022,"oy":2026,"contro":"Temple-area residents are opposed to data center development, citing intensive water and energy usage, noise pollution, and displacement as potential negative impacts.","deal":"Initial investment of more than $800 million announced March 31, 2022. Power Purchase Agreement (PPA) with ENGIE North America for 260-MW Sypert Branch solar project, announced October 31, 2024.","dealScan":"https://www.utilitydive.com/news/engie-meta-solar-energy-data-center-purchase-agreement-power/731649/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"utilitydive.com;datacenters.atmeta.com","srcUrls":["https://www.utilitydive.com/news/engie-meta-solar-energy-data-center-purchase-agreement-power/731649/","https://datacenters.atmeta.com/2023/10/ramping-up-construction-on-the-temple-data-center/"],"band":"100-250 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"48a2aacf6bfa","cid":"a14979ea224e","canon":0,"dups":6,"ftype":"data_center","name":"Microsoft","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators.","uconf":"High","uquote":"CPS Energy has been encouraging companies to build the high-powered facilities in other parts of the metro area to spread out the utility's power loads and prevent congestion on its distribution system.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2025,"contro":"Community opposition regarding tree removal and environmental impact.","deal":"Land acquisition of 90 acres (around September 2025).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"5b4fb7f5c13e","cid":"a14979ea224e","canon":0,"dups":6,"ftype":"data_center","name":"Microsoft","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The far West Side's cheap and plentiful electricity, thanks to the numerous substations that CPS Energy has there, has made it a desirable location for data centers.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"azure.microsoft.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"f27df49c9664","cid":"74671184a975","canon":0,"dups":2,"ftype":"data_center","name":"ACS Group Data Center — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","proc":"Joint venture","pcp":"Fort Worth Power Core LLC","uquote":"Edged has contracted with Oncor, the region's transmission and...","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"ACS Group","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT.  EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE.  EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF.  SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.","lflag":"unlinked_source_text display_name_normalized utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"cc1c99fb4797","cid":"cc1c99fb4797","canon":0,"dups":1,"ftype":"data_center","name":"CyrusOne Data Center — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Type of Funds: This project is privately funded, on private land for private use.","pscan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025001810","uconf":"Medium","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/new-construction-single-story-data-center-with-two-0cafb078","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"CyrusOne","ay":2024,"oy":2026,"deal":"New construction with an estimated cost of $200,000,000","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025001810","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"tdlr.texas.gov;interconnection.fyi","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025001810","https://www.interconnection.fyi/data-center/project/new-construction-single-story-data-center-with-two-0cafb078"],"rawName":"NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT.  EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE.  EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF.  SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.","lflag":"display_name_normalized source_url_canonicalized,merged_duplicate"},{"id":"eb9823fb91fa","cid":"0df999e37fb5","canon":0,"dups":2,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION\nTO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF\nBUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE\nFLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.","lflag":"display_name_normalized generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"9b5869a74ba4","cid":"9b5869a74ba4","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","uquote":"Grid Operator. Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"lflag":"online_before_announced display_name_normalized generic_permit_record possible_canonical_duplicate,merged_duplicate","uscan":"https://interconnection.fyi/data-centers/texas/new-data-center-3rd-party-plan-review-inspections-winston-services","srcUrls":["https://interconnection.fyi/data-centers/texas/new-data-center-3rd-party-plan-review-inspections-winston-services"],"srcDom":"interconnection.fyi","rawName":"New Data Center / 3rd Party Plan Review & Inspections / Winston Services"},{"id":"e1a5a178498b","cid":"e1a5a178498b","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Phase 1 scope includes building out new data center on 2nd level of existing building. Mechanical Pump room associated with Data room and upgrades to the main electrical room as needed for new data center and phase 2 work.","lflag":"display_name_normalized generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"5a8287451931","cid":"5a8287451931","canon":1,"dups":1,"ftype":"data_center","name":"Poolside Inc.","city":"Fort Stockton","county":"Pecos County","state":"TX","lat":30.773298,"lng":-102.718153,"cprec":"shared_centroid","status":"Proposed","mw":2000,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The site sits in the Permian Basin, the country's most active natural gas hub, and will generate its own electricity instead of relying on the Texas grid.","pscan":"https://cryptorank.io/news/feed/df9af-poolside-to-build-gas-powered-ai-campus","proc":"Co-located generation","rto":"ERCOT","nerc":"TRE","op":"Poolside","spon":"Nvidia","ay":2025,"oy":2027,"contro":"Partnership with CoreWeave for anchor tenancy collapsed.","deal":"Poolside is in a $2 billion fundraising round (announced October 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cryptorank.io","srcUrls":["https://cryptorank.io/news/feed/df9af-poolside-to-build-gas-powered-ai-campus"],"lflag":"large_project_duplicate_review source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"e2246866c76f","cid":"e2246866c76f","canon":1,"dups":1,"ftype":"data_center","name":"New Data Center Project","city":"Port Arthur","county":"Jefferson","state":"TX","lat":29.854,"lng":-94.149331,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Port of Port Arthur New Data Center Generator Project (the “Project”), consisting of the furnishing of all materials, equipment, tools, labor, supervision services, and performing all operations in connection with the purchase and installation of an emergency generator and associated items for the building located at 501 Houston Avenue, Port Arthur, Texas, and other related work.","pscan":"https://portpa.com/new-data-center-generator-project/","uconf":"High","uquote":"The Public Utility Commission of Texas approved Entergy Texas' proposal to build two highly efficient natural gas power plants that will provide enough reliable electricity capable of powering more than 300,000 homes and support the region's rapid growth, according to an Entergy press release submitted in September 2025.","ukey":"55937|TX","uname":"Entergy Texas Inc.","rto":"ERCOT","nerc":"TRE","op":"Port of Port Arthur Navigation District","spon":"Port of Port Arthur Navigation District","ay":2023,"oy":2027,"deal":"$400,000 renovation project announced in 2023.","dealScan":"https://www.tdlr.texas.gov/TABS/Projects/TABS2024010377","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"portpa.com;tdlr.texas.gov","srcUrls":["https://portpa.com/new-data-center-generator-project/","https://www.tdlr.texas.gov/TABS/Projects/TABS2024010377"],"lflag":"source_url_canonicalized"},{"id":"ff5322266e0e","cid":"ff5322266e0e","canon":1,"dups":1,"ftype":"data_center","name":"Prime DC 3MW Buildout","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":12,"pc":"Grid","pconf":"Medium","pquote":"Utility Provider. Oncor.","uquote":"Utility Provider. Oncor.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Prime Data Centers","spon":"Prime Data Centers","ay":2023,"oy":2024,"deal":"Construction project valued at $22,000,000.00 announced February 22, 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text utility_alias_corrected stale_future_status_year delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"oy_stale":1,"dukey":"44372|TX"},{"id":"372f4abe0e77","cid":"372f4abe0e77","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","mw":42,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"Medium","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-ftw1-dc2-c5cca6ad","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2025,"deal":"$220 million project","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"prnewswire.com;interconnection.fyi","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://www.interconnection.fyi/data-center/project/qts-ftw1-dc2-c5cca6ad"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"9e1d90e4485e","cid":"9e1d90e4485e","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW DC1 Level 3 Office Suite","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Trinity Valley Elec COOP INC.","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"5a1e19985758","cid":"5a1e19985758","canon":1,"dups":1,"ftype":"data_center","name":"QTS FTW Office TI","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","mw":200,"pc":"Grid","pconf":"High","pquote":"Power provided by Oncor Electric. Oncor Electric is the largest energy company in Texas.","pscan":"https://assets.ctfassets.net/o03ihmgd94o7/1kqwOEUvcEGJiiZQeZMok1/d682986d73fcf91f22dbf2fae466a306/Powered_Data_Center_Land_Site_-_Dallas.pdf","uquote":"Power Provider: Oncor Electric.","uscan":"https://assets.ctfassets.net/o03ihmgd94o7/1kqwOEUvcEGJiiZQeZMok1/d682986d73fcf91f22dbf2fae466a306/Powered_Data_Center_Land_Site_-_Dallas.pdf","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2026,"deal":"$220 million project announced in January 2024","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"assets.ctfassets.net","srcUrls":["https://assets.ctfassets.net/o03ihmgd94o7/1kqwOEUvcEGJiiZQeZMok1/d682986d73fcf91f22dbf2fae466a306/Powered_Data_Center_Land_Site_-_Dallas.pdf"],"band":"100-250 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"14b2cf6f6b77","cid":"14b2cf6f6b77","canon":1,"dups":1,"ftype":"data_center","name":"QTS Destination DFW Rotunda","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"588aab8438a5","cid":"588aab8438a5","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW UPS MN BLDG 3 & 4","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","proc":"Dedicated PPA","pcp":"a provider in Texas","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"104eea11eadc","cid":"104eea11eadc","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW DH 1.2 6MW","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"665ee654bf58","cid":"665ee654bf58","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW1 - DC3 Office Upfit","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":43,"pc":"Grid","pconf":"High","pquote":"QTS's Irving location already boasted 140 MWs of critical on-site power capacity and up to 48 hours of fuel reserves on-site to meet customer requirements during grid events.","pscan":"https://cdn.featuredcustomers.com/CustomerCaseStudy.document/090919_QTS_Case_Study_V1_1.pdf","uconf":"Medium","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw1-dc3-c0a580a0","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cdn.featuredcustomers.com;interconnection.fyi","srcUrls":["https://cdn.featuredcustomers.com/CustomerCaseStudy.document/090919_QTS_Case_Study_V1_1.pdf","https://www.interconnection.fyi/data-center/project/qts-dfw1-dc3-c0a580a0"],"band":"25-50 MW","oy_stale":1,"lflag":"stale_future_status_year"},{"id":"bf6f9b60375c","cid":"bf6f9b60375c","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW1 - DC3 - Level 1","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":43,"pc":"Grid","pconf":"High","pquote":"The new QTS Irving 1 DC3 facility will provide our customers with an additional 43.5MW of power, on-site substation power, and diverse campus fiber entrances with a redundant campus conduit system.","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2023,"oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"e7a0ce5c21aa","cid":"e7a0ce5c21aa","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW20 - COLO EFO","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":43,"pc":"Grid","pconf":"High","pquote":"The new QTS Irving 1 DC3 facility will provide our customers with an additional 43.5MW of power, on-site substation power, and diverse campus fiber entrances with a redundant campus conduit system.","uconf":"High","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","oy":2023,"deal":"City of Irving 50% property tax abatement (December 2024)","dealScan":"https://dallasexpress.com/realestate/microsoft-and-qts-building-over-1m-sq-ft-of-data-center-space/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"dallasexpress.com","srcUrls":["https://dallasexpress.com/realestate/microsoft-and-qts-building-over-1m-sq-ft-of-data-center-space/"],"band":"25-50 MW","oy_stale":1,"lflag":"stale_future_status_year"},{"id":"118eeffacd3f","cid":"118eeffacd3f","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW1 DC3 - Admin Security","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":43,"pc":"Grid","pconf":"High","pquote":"The new QTS Irving 1 DC3 facility will provide our customers with an additional 43.5MW of power, on-site substation power, and diverse campus fiber entrances with a redundant campus conduit system.","uconf":"Medium","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw1-dc3-c0a580a0","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2025,"deal":"50% property tax reduction for QTS if it occupies at least 500,000 square feet by 2028 and invests around $350 million before January 2029.","dealScan":"https://dallasexpress.com/realestate/microsoft-and-qts-building-over-1m-sq-ft-of-data-center-space/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;dallasexpress.com","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw1-dc3-c0a580a0","https://dallasexpress.com/realestate/microsoft-and-qts-building-over-1m-sq-ft-of-data-center-space/"],"band":"25-50 MW","oy_stale":1,"lflag":"stale_future_status_year"},{"id":"4c87a67b7e7b","cid":"4c87a67b7e7b","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW1-DC4","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"QTS Irving is a mega data center campus featuring 700,000 square feet of total current space with 147+ MW of critical power capacity.... The data center is a fully fault tolerant facility with dual fed power and dedicated onsite 140 MW power substation.","uconf":"High","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2023,"oy":2024,"deal":"Construction cost of $65,000,000 (estimated) for new construction, announced 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf"],"lflag":"citation_artifact_removed source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"646c65b4fd7d","cid":"646c65b4fd7d","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW2 DC2","city":"Wilmer","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"utility power supporting up to 75 MW across the campus.","pscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw2-dc2-6a2e700f","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Dallas I","spon":"Blackstone","ay":2025,"oy":2026,"deal":"$300 million construction cost, announced April 2025","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025016366","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"checkmarkpro.com;interconnection.fyi;tdlr.texas.gov","srcUrls":["https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","https://www.interconnection.fyi/data-center/project/qts-dfw2-dc2-6a2e700f","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025016366"],"lflag":"source_url_canonicalized"},{"id":"ab995b9fcad2","cid":"ab995b9fcad2","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW2 DC3","city":"Wilmer","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":43,"pc":"Grid","pconf":"High","pquote":"Power delivery is a cornerstone, with 43 MW of critical IT load powered by utility feeds, diesel generators, and UPS systems for seamless failover.","pscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uconf":"High","uquote":"Power Reliability: Backed by Oncor Electric Delivery's robust grid, with scalable utility power supporting up to 75 MW across the campus.","uscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2025,"oy":2027,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"checkmarkpro.com","srcUrls":["https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"232afe7566f0","cid":"232afe7566f0","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW2-DC1","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"TVEC provides transmission electric service in the Electric Reliability Council of Texas (ERCOT) region under certificate of convenience and necessity number (CCN) 30094. Grid-connected projects, on the other hand, are directly tied to the ERCOT transmission or distribution system. Grid Operator. Trinity Valley Elec COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/qts-dfw2-dc1-f54bb7dd","uconf":"High","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw2-dc1-f54bb7dd","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Dallas I","spon":"Blackstone","ay":2024,"oy":2025,"deal":"Construction cost estimated at $288,000,000","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025000600","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;tdlr.texas.gov","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw2-dc1-f54bb7dd","https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025000600"],"lflag":"source_url_canonicalized stale_future_status_year","oy_stale":1},{"id":"1ecb2af33c65","cid":"1ecb2af33c65","canon":1,"dups":1,"ftype":"data_center","name":"QTS DFW2-DC4","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Trinity Valley Elec COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/qts-dfw2-dc4-a0150bb0","uconf":"High","uquote":"Grid Operator. Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw2-dc4-a0150bb0","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Dallas I","spon":"Blackstone","ay":2025,"oy":2027,"deal":"Estimated construction cost of $175,000,000","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw2-dc4-a0150bb0"]},{"id":"96c4667194c6","cid":"96c4667194c6","canon":1,"dups":1,"ftype":"data_center","name":"QTS FTW1 DH1&5 Phase 2","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Our data center campus features. Campus Footprint. 52. acre campus. power. Powering the campus. 70 MW+ of critical campus capacity; 12 adjacent acres for future expansion; Leasable customer office space; Flexible workspaces available for customer requests, including conference rooms. Design. Delivering a world class experience. 200 MW gross campus planned potential; On-site substation with expansion capability; Energy efficient, LEED Certified. Critical Campus Capacity. 70. MW+.","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"deal":"Commercial Remodel of Existing Data Hall for $16,300,000 (reported June 2024)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2daa1f53d8ef","cid":"2daa1f53d8ef","canon":1,"dups":1,"ftype":"data_center","name":"QTS FTW1 DC1 Expansion","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","mw":42,"pc":"Grid","pconf":"High","pquote":"Power - 2 separate 24.9kV feeds - On-site redundant substation (50 MVA total with expansion to 200 MVA) - Parallel redundant N+1 generators - 96 hours of onsite fuel storage with multiple fuel contract - 8MW of UPS power","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-ftw1-dc1-expansion-6e4c53b7","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Investment Properties Fort Worth","spon":"Blackstone","ay":2024,"oy":2026,"deal":"$220 million project cost","dealScan":"https://insider.govtech.com/texas/news/a-220m-data-center-project-will-open-in-north-fort-worth","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;insider.govtech.com","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-ftw1-dc1-expansion-6e4c53b7","https://insider.govtech.com/texas/news/a-220m-data-center-project-will-open-in-north-fort-worth"],"band":"25-50 MW"},{"id":"cf9207dc962c","cid":"cf9207dc962c","canon":1,"dups":1,"ftype":"data_center","name":"QTS FTW1 DC1 Expansion Data Hall Build Out","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Quality Technology Services","spon":"Blackstone","ay":2025,"oy":2026,"deal":"$130 million investment for expansion, April 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f816ec2305a0","cid":"f816ec2305a0","canon":0,"dups":1,"ftype":"data_center","name":"QTS FTW1 DC1 Expansion","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Power - 2 separate 24.9kV feeds - On-site redundant substation (50 MVA total with expansion to 200 MVA) - Parallel redundant N+1 generators - 96 hours of onsite fuel storage with multiple fuel contract - 8MW of UPS power - Block redundant static UPS design to N+1.","uconf":"High","uquote":"Grid Operator: Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Investment Properties Fort Worth","spon":"Blackstone","ay":2022,"oy":2023,"deal":"$43,894,400 estimated cost for expansion, filed in 2022.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2022015450","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Print/TABS2022015450"],"lflag":"source_quality_reclassified source_url_canonicalized stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"e60d691615f4","cid":"68915cbb53d3","canon":0,"dups":2,"ftype":"data_center","name":"QTS FTW1 DC2","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","mw":42,"pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2026,"deal":"220000000.0","dealScan":"https://insider.govtech.com/texas/news/a-220m-data-center-project-will-open-in-north-fort-worth","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"insider.govtech.com","srcUrls":["https://insider.govtech.com/texas/news/a-220m-data-center-project-will-open-in-north-fort-worth"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"62c0bbb6bfd5","cid":"62c0bbb6bfd5","canon":1,"dups":1,"ftype":"data_center","name":"DFW1 Campus Enclosure","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Trinity Valley Elec COOP INC.","pscan":"https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf","uconf":"High","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2025,"oy":2026,"deal":"$8,000,000 construction cost, privately funded.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026003168","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;tdlr.texas.gov","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-irving-dallas-1f098abf","https://www.tdlr.texas.gov/TABS/Search/Print/TABS2026003168"],"lflag":"source_url_canonicalized"},{"id":"90d272a08fbe","cid":"90d272a08fbe","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","ay":2019,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced display_name_normalized generic_unsourced_permit_record","rawName":"Remodel existing data hall in existing data center/3rd Party Plan Review and Inspections/Winston Services, Inc.","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"4c3cca79e189","cid":"4c3cca79e189","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Remodel to accommodate addition to existing data center building / 3rd party plan review and inspections / winston services","lflag":"display_name_normalized generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"3974a0a437aa","cid":"3974a0a437aa","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Replace UPS at existing Data Center / 3rd Party Plan Review & Inspections / Winston Services","lflag":"display_name_normalized generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"e1fb074d6fbe","cid":"b02c90a8e062","canon":0,"dups":2,"ftype":"crypto_hpc","name":"data center proposal","city":"Cameron","county":"Milam County","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Proposed","mw":700,"pc":"Grid","pconf":"High","pquote":"Now fully owned and operated by Riot, the Rockdale Site features a 700 MW interconnection to the grid, dedicated water supply, and fiber connectivity.","pscan":"https://www.riotplatforms.com/riot-announces-fee-simple-acquisition-of-land-and-first-data-center-lease-with-amd-at-the-rockdale-site/","uconf":"High","uquote":"In May 2020, Whinstone entered into a 10-year power supply agreement with TXU Energy to \"provide the delivery of a fixed amount of electricity by TXU to Whinstone (via the transmission facility owned by Oncor\".","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"AMD","ay":2026,"oy":2026,"contro":"Public hearing on Tax Abatement Agreement with Riot Rockdale Reinvestment Zone.","controScan":"https://cms2.revize.com/revize/milamcountytx/SKM_C550i25110716530.pdf?t=202511071704530&t=202511071704530","deal":"Fee simple acquisition of 200 acres for $96.0 million (January 2026); Data Center Lease with AMD for initial 25 MW, expected to generate approximately $311.0 million in contract revenue over 10 years (January 2026).","dealScan":"https://www.riotplatforms.com/riot-announces-fee-simple-acquisition-of-land-and-first-data-center-lease-with-amd-at-the-rockdale-site/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"riotplatforms.com;cms2.revize.com","srcUrls":["https://www.riotplatforms.com/riot-announces-fee-simple-acquisition-of-land-and-first-data-center-lease-with-amd-at-the-rockdale-site/","https://cms2.revize.com/revize/milamcountytx/SKM_C550i25110716530.pdf?t=202511071704530&t=202511071704530"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified shared_coordinate_precision_downgraded generic_permit_record delivery_utility_linked","dukey":"44372|TX"},{"id":"e83f23e4158a","cid":"e83f23e4158a","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Riot Rockdale, LLC-data center","city":"Cameron","county":"Milam County","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Proposed","mw":700,"pc":"Grid","pconf":"High","pquote":"The Rockdale Site includes a 700MW power connection to the grid, as well as dedicated water and fibre infrastructure. Riot plans to convert the full 700MW to support data centre use.","uconf":"High","uquote":"In May 2020, Whinstone entered into a 10-year power supply agreement with TXU Energy to \"provide the delivery of a fixed amount of electricity by TXU to Whinstone (via the transmission facility owned by Oncor\". The long term supply contract remains in place following RIOT's acquisition of Whinstone in April 2021.","uscan":"https://www.bitcoinenergysource.com/post/rockdale-tx-riot-blockchain","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"AMD","ay":2020,"oy":2023,"contro":"Environmental concerns regarding fossil fuel energy use, noise pollution, and strain on the power grid.","controScan":"https://www.greenpeace.org/usa/riot-platforms-the-company-behind-the-most-energy-intensive-bitcoin-mine-in-the-u-s/","deal":"Land acquisition for $96.0 million (January 2026); Data Center Lease and Services Agreement with AMD for an initial 25 MW, expected to generate $311.0 million in contract revenue over 10 years (January 2026), with an additional 25 MW in April 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"bitcoinenergysource.com;greenpeace.org","srcUrls":["https://www.bitcoinenergysource.com/post/rockdale-tx-riot-blockchain","https://www.greenpeace.org/usa/riot-platforms-the-company-behind-the-most-energy-intensive-bitcoin-mine-in-the-u-s/"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified shared_coordinate_precision_downgraded citation_artifact_removed stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"b02c90a8e062","cid":"b02c90a8e062","canon":1,"dups":2,"ftype":"crypto_hpc","name":"data center proposal","city":"Cameron","county":"Milam County","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Proposed","mw":700,"pc":"Grid","pconf":"High","pquote":"Now fully owned and operated by Riot, the Rockdale Site features a 700 MW interconnection to the grid, dedicated water supply, and fiber connectivity.","pscan":"https://www.riotplatforms.com/riot-announces-fee-simple-acquisition-of-land-and-first-data-center-lease-with-amd-at-the-rockdale-site/","uquote":"Among the big winners was Riot Platforms, a bitcoin miner that said it had been paid $31.7 million in August by the Electricity Reliability Council of Texas, the state's grid operator, and the company's retail electricity provider TXU Energy, for using less electricity.","uname":"TXU Energy Retail Co, LLC","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"AMD","ay":2026,"oy":2026,"contro":"Community opposition and environmental concerns related to energy consumption; litigation with SBI Crypto.","controScan":"https://www.foley.com/news/2026/02/foley-represents-riot-platforms-on-rockdale-land-acquisition-and-landmark-1-billion-data-center-lease-with-amd/","deal":"Fee simple acquisition of 200 acres of land for $96.0 million (Jan 16, 2026); Data Center Lease with AMD for 25 MW, potential $311.0 million in contract revenue (Jan 16, 2026).","dealScan":"https://www.riotplatforms.com/riot-announces-fee-simple-acquisition-of-land-and-first-data-center-lease-with-amd-at-the-rockdale-site/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"riotplatforms.com;foley.com","srcUrls":["https://www.riotplatforms.com/riot-announces-fee-simple-acquisition-of-land-and-first-data-center-lease-with-amd-at-the-rockdale-site/","https://www.foley.com/news/2026/02/foley-represents-riot-platforms-on-rockdale-land-acquisition-and-landmark-1-billion-data-center-lease-with-amd/"],"band":"250+ MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded nonrate_utility_link_removed energy_supplier_not_serving_utility generic_permit_record","rawUkey":"19327|TX","rawUname":"TXU Energy Retail Co, LLC","reportedUtility":"TXU Energy Retail Co, LLC"},{"id":"32a81c77c66b","cid":"32a81c77c66b","canon":0,"dups":1,"ftype":"data_center","name":"data center proposal","city":"Cameron","county":"Milam County","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Proposed","proc":"Joint venture","pcp":"SB Energy","pdt":"1.2 GW facility, OpenAI and SoftBank Group each investing $500 million in SB Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text generic_unsourced_permit_record","rawName":"data center proposal","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"fc41f80a7c88","cid":"fc41f80a7c88","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Riot Rockdale Reinvestment Zone","city":"Rockdale","county":"Milam County","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Proposed","mw":700,"pc":"Grid","pconf":"High","pquote":"Strategically positioned in Central Texas, the Rockdale site benefits from direct access to the ERCOT power grid, offering scalable energy capacity, competitive power pricing, and the flexibility required for large-scale compute operations.","uconf":"High","uquote":"Electricity (ownership of poles and wires) Oncor Electric. Report a street light outage.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"AMD","ay":2020,"oy":2023,"contro":"Environmental concerns regarding energy consumption and carbon emissions.","controScan":"https://www.greenpeace.org/usa/riot-platforms-the-company-behind-the-most-energy-intensive-bitcoin-mine-in-the-u-s/","deal":"Acquisition of Whinstone US; Data Center Lease with AMD.","dealScan":"https://matrixbcg.com/blogs/brief-history/riotplatforms","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"matrixbcg.com;greenpeace.org","srcUrls":["https://matrixbcg.com/blogs/brief-history/riotplatforms","https://www.greenpeace.org/usa/riot-platforms-the-company-behind-the-most-energy-intensive-bitcoin-mine-in-the-u-s/"],"band":"250+ MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified shared_coordinate_precision_downgraded stale_future_status_year delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","oy_stale":1,"dukey":"44372|TX"},{"id":"3a1005f2da52","cid":"3a1005f2da52","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft SAT82 Data Center","city":"Castroville","county":"Medina","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Local officials and utility planners say all this steel and concrete comes with real infrastructure strings attached. CPS Energy is moving ahead with roughly $1.3 billion in transmission and generation upgrades to handle rapidly growing data center power loads, while county residents are asking pointed questions about water use and road wear tied to heavy construction traffic.","uconf":"High","uquote":"CPS Energy is moving ahead with roughly $1.3 billion in transmission and generation upgrades to handle rapidly growing data center power loads","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Colocation tenants","ay":2026,"oy":2028,"contro":"Community concerns regarding water usage, traffic, and strain on energy grid.","controScan":"https://longbridge.com/en/news/272187274","deal":"$400 million investment announced January 2026","dealScan":"https://longbridge.com/en/news/272187274","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"longbridge.com","srcUrls":["https://longbridge.com/en/news/272187274"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified coordinate_cluster_reclassified"},{"id":"8cf1e8d35244","cid":"8cf1e8d35244","canon":1,"dups":1,"ftype":"data_center","name":"SAT89/90 Data Center","city":"Castroville","county":"Medina","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Proposed","mw":120,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Medina Electric Coop, INC.","uquote":"Grid Operator: Medina Electric Coop, INC.","ukey":"12268|TX","uname":"Medina Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2025,"oy":2027,"contro":"Community members voiced concerns over water usage and traffic.","deal":"$765 million investment, announced March 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"ba96f945402a","cid":"ba96f945402a","canon":1,"dups":1,"ftype":"data_center","name":"Stream Data Centers - DFWC1","city":"Wilmer","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Proposed","mw":48,"pc":"Grid","pconf":"High","pquote":"The Wilmer site represents the first portion of Stream's second hyperscale campus, a 56-hectare (140-acre) development set to cover 13 ha (1.4 million sq ft) and support 240 MW. Plans also call for an Oncor substation of up to 372 MW.","uquote":"Plans also call for an Oncor substation of up to 372 MW.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo-managed funds","oy":2027,"deal":"$300 million investment, filed plans September 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"85f47ca2ac1c","cid":"85f47ca2ac1c","canon":1,"dups":1,"ftype":"data_center","name":"SE DC DevCo, LLC (SB Energy/Stargate) - Chapter 312 Tax Abatement","city":"Cameron","county":"Milam County","state":"TX","lat":30.791242,"lng":-96.984395,"cprec":"shared_centroid","status":"Proposed","mw":1200,"pc":"Grid","pconf":"High","pquote":"Two of the Stargate sites in the Southwest – Project Ludicrous in Abilene, Texas44 and the SoftBank Group Corp Milam Data Center in Milam County, Texas45 – will plug into ERCOT, Texas's public grid.","rto":"ERCOT","nerc":"TRE","op":"SB Energy","spon":"SoftBank Group , OpenAI, Oracle","tenant":"OpenAI","ay":2025,"oy":2028,"contro":"Concerns about destabilizing grids, increasing utility bills, threatening water supplies, and lack of transparency in project approval.","deal":"OpenAI and SoftBank Group jointly committed US$1bn to SB Energy (January 12, 2026); Capital investment estimated to be over $3,000,000,000 for the facility.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"large_project_duplicate_review unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"6882f0ec6214","cid":"6882f0ec6214","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Second Improvements","city":"Claude","county":"Armstrong County","state":"TX","lat":34.964179,"lng":-101.356636,"cprec":"shared_centroid","status":"Proposed","mw":530,"pc":"Behind-the-Meter","pconf":"High","pquote":"Crusoe filed for a permit in January to build the 933-megawatt power plant on the site of the Goodnight campus, which showed the facility would operate off the grid and provide energy to at least two buildings on the campus, according to Cleanview.","proc":"Dedicated PPA","pcp":"Serena's Goodnight Wind Farm","pdt":"265.5 MW","rto":"SPP","nerc":"MRO","op":"Crusoe Energy","spon":"Google","tenant":"Google","ay":2024,"oy":2026,"contro":"Controversy regarding Google's partnership with Crusoe Energy for a gas-fired power plant, which could generate significant carbon emissions, contradicting Google's clean energy pledges.","deal":"Second Tax Abatement Agreement between Armstrong County, Texas and GN DC1, LLC (November 12, 2024). The overall campus has an estimated capital investment of up to $29 billion.","dealScan":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Second%20Abatement%20Agreement%20Phase%202.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"co.armstrong.tx.us","srcUrls":["https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Second%20Abatement%20Agreement%20Phase%202.pdf"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"1aebfe396012","cid":"1aebfe396012","canon":1,"dups":1,"ftype":"data_center","name":"Sharka Data Center - Building 5","city":"Midlothian","county":"Ellis","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Proposed","proc":"Dedicated PPA","pcp":"SB Energy","pdt":"942 MW PPA","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2027,"deal":"$880 million investment, December 8, 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"910ae8d9a8ca","cid":"910ae8d9a8ca","canon":1,"dups":1,"ftype":"data_center","name":"Skybox","city":"Hutto","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Proposed","mw":600,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The project includes a private substation for reliable power, critical for hyperscale computing.... The site will feature two private 300MW dedicated substations, making it one of the most scalable data center campuses in the United States.","uconf":"High","uquote":"along with 62 acres that San Francisco-based Prologis sold in November to Oncor Electric Delivery Company LLC.... Cost: Oncor's di erent rate classes are based on usage type and service voltage.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Skybox Datacenters and Prologis","tenant":"Google","ay":2023,"oy":2024,"contro":"Hutto residents have aired concerns over the PowerCampus's cumulative water consumption, power demand, and infrastructure strain.","controScan":"https://centexdatacenters.org/tracker/skybox-prologis-hutto","deal":"Hutto City Council approved a Chapter 312 tax abatement agreement and a $10 billion capital investment commitment in July 2023.","dealScan":"https://centexdatacenters.org/tracker/skybox-prologis-hutto","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/skybox-prologis-hutto"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"38336fb8cd70","cid":"38336fb8cd70","canon":1,"dups":1,"ftype":"data_center","name":"Skybox","city":"Pflugerville","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","uquote":"The center will be a 30-megawatt facility, will be supported by two substations and is supplied by Oncor.","uscan":"https://www.kvue.com/article/money/economy/boomtown-2040/dallas-based-data-center-company-facility-pflugerville/269-f97110b1-9dbf-4642-bbf4-945e2fc9a966","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"kvue.com","srcUrls":["https://www.kvue.com/article/money/economy/boomtown-2040/dallas-based-data-center-company-facility-pflugerville/269-f97110b1-9dbf-4642-bbf4-945e2fc9a966"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"1dc072533243","cid":"1dc072533243","canon":1,"dups":1,"ftype":"data_center","name":"Hou1 DH5(unfinished), Phase 1","city":"Katy","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","mw":4,"pc":"Grid","pconf":"High","pquote":"CENTERPOINT PREMIUM ROLLOVER SERVICE DELIVERS TRUE SUBSTATION LEVEL REDUNDANCY.... All testing and operation of the IGSDs are managed by CenterPoint with oversight by Skybox. Only datacenter in the United States that allows full dedicated data hall customers to purchase power directly off the open market, using their own separate meter.","pscan":"https://marketplace.upstack.com/data-centers/element-critical-data-center-htx1","uquote":"CENTERPOINT PREMIUM ROLLOVER SERVICE DELIVERS TRUE SUBSTATION LEVEL REDUNDANCY.... All testing and operation of the IGSDs are managed by CenterPoint with oversight by Skybox.","uscan":"https://www.skyboxdatacenters.com/images/Skybox-Houston-One-Offering.pdf","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Element Critical","ay":2025,"oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;skyboxdatacenters.com","srcUrls":["https://marketplace.upstack.com/data-centers/element-critical-data-center-htx1","https://www.skyboxdatacenters.com/images/Skybox-Houston-One-Offering.pdf"],"band":"< 10 MW","lflag":"citation_artifact_removed nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"e4036b3d1fbc","cid":"e4036b3d1fbc","canon":1,"dups":1,"ftype":"data_center","name":"06-23 Smith County IT Data Center Improvements","city":"Tyler","county":"Smith","state":"TX","lat":32.377016,"lng":-95.270041,"cprec":"distinct","status":"Proposed","rto":"ERCOT","nerc":"TRE","op":"Smith County","ay":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced","srcUrls":null,"srcDom":null},{"id":"5b8a703274e6","cid":"5b8a703274e6","canon":1,"dups":1,"ftype":"data_center","name":"Soluna Holdings Project Annie","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Soluna Holdings, Inc.,, a developer of green data centers for intensive computing applications, including Bitcoin mining and AI, announced today that it has signed a term sheet for power for Project Annie, a new 75 MW data center co-located with a 114 MW solar farm in northeast Texas.","proc":"Dedicated PPA","pcp":"a new power partner–a leader in renewable energy and sustainable infrastructure","pdt":"74 MW data center, 114 MW solar farm","rto":"ERCOT","nerc":"TRE","op":"Soluna Holdings","spon":"Soluna Holdings","ay":2025,"deal":"Signed a term sheet for power for Project Annie, a new 75 MW data center co-located with a 114 MW solar farm in northeast Texas, announced May 22, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"a92865b29443","cid":"a92865b29443","canon":1,"dups":1,"ftype":"data_center","name":"Soluna Holdings Project Fei","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":100,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Project Fei is a 100 MW data center co-located with a 240 MW utility-scale solar farm, Soluna's second solar-based project to date.","proc":"Co-located generation","pcp":"a global leader in energy infrastructure investment","pdt":"100 MW data center co-located with a 240 MW utility-scale solar farm","rto":"ERCOT","nerc":"TRE","op":"Soluna Holdings","ay":2025,"deal":"Signed a term sheet for power for Project Fei","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"fc15aa9f8fd5","cid":"fc15aa9f8fd5","canon":1,"dups":1,"ftype":"data_center","name":"Soluna Holdings Project Gladys","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":150,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Project Gladys, a 150 MW facility, will be co-located with a 226 MW wind farm and developed in partnership with a prominent U.S.-based independent power producer (IPP) managing over $40 billion in assets and more than 80 energy facilities nationwide.","pscan":"https://www.solunacomputing.com/news/1gw/","proc":"Dedicated PPA","pcp":"a prominent U.S.-based independent power producer (IPP)","rto":"ERCOT","nerc":"TRE","op":"Soluna Holdings","spon":"U.S.-based independent power producer (IPP)","ay":2025,"deal":"Partnership with a U.S.-based independent power producer (IPP) managing over $40 billion in assets, and a signed term sheet for power.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"solunacomputing.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.solunacomputing.com/news/1gw/"]},{"id":"598bdd9aa4bc","cid":"598bdd9aa4bc","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Soluna Holdings Project Hedy","county":"Cameron","state":"TX","lat":26.102923,"lng":-97.478958,"cprec":"distinct","status":"Proposed","mw":120,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"A critical element of the company's approach is its behind-the-meter integration with renewable power plants. Rather than waiting years in interconnection queues or paying for expensive transmission infrastructure, the company's facilities draw power directly from the generation source.","pscan":"https://www.datacenterknowledge.com/sustainability/soluna-expands-wind-powered-data-center-portfolio-with-project-hedy","proc":"Co-located generation","pcp":"unnamed multinational conglomerate","rto":"ERCOT","nerc":"TRE","op":"Soluna Holdings","spon":"Soluna Holdings","tenant":"Soluna Holdings, (for Bitcoin mining and AI applications)","ay":2025,"deal":"Term sheet agreement for power for a new 120 MW data center co-located with a 200 MW wind farm, signed April 2025.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.datacenterknowledge.com/sustainability/soluna-expands-wind-powered-data-center-portfolio-with-project-hedy"]},{"id":"c2c62bf0caaa","cid":"c2c62bf0caaa","canon":1,"dups":1,"ftype":"data_center","name":"Soluna Holdings Project Kati","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":166,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Powered entirely by the Las Majadas wind energy project, Project Kati represents one of Soluna's largest sites to date and is designed to scale efficiently to support large industrial compute workloads.","pscan":"https://www.solunacomputing.com/news/energization-of-project-kati-1/","rto":"ERCOT","nerc":"TRE","op":"Soluna Holdings","spon":"Spring Lane Capital, Generate Capital","tenant":"Galaxy, Cormint","ay":2025,"oy":2026,"deal":"Financing from Spring Lane Capital for $20 million (June 11, 2025); Credit facility from Generate Capital for up to $100 million (September 16, 2025)","dealScan":"https://www.solunacomputing.com/news/20m-spring-lane-capital/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"solunacomputing.com","srcUrls":["https://www.solunacomputing.com/news/energization-of-project-kati-1/","https://www.solunacomputing.com/news/20m-spring-lane-capital/"],"lflag":"source_quality_reclassified"},{"id":"3bdaf850b48b","cid":"3bdaf850b48b","canon":1,"dups":1,"ftype":"data_center","name":"Soluna Holdings Project Rosa","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":187,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Project Rosa will be strategically co-located with a 240 MW wind farm in Texas, enabling the project to directly harness a substantial share of renewable energy.","pscan":"https://www.solunacomputing.com/news/soluna-signs-term-sheet-with-renewable-energy-leader-for-new-data-center-project/","proc":"Dedicated PPA","rto":"ERCOT","nerc":"TRE","op":"Soluna Holdings","spon":"Soluna Holdings","ay":2024,"deal":"Land purchase agreement secured on February 25, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"solunacomputing.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.solunacomputing.com/news/soluna-signs-term-sheet-with-renewable-energy-leader-for-new-data-center-project/"]},{"id":"b464094a14de","cid":"b464094a14de","canon":1,"dups":1,"ftype":"data_center","name":"SWDC Battery Room Buildout","city":"Roanoke","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Citigroup has also publicly stated it contracted for Green-e certified renewable energy for 50 percent of the power needs at its Roanoke, Texas data center, indicating the site is a “key data center” in its footprint (organization level statement tied to the Roanoke facility).","uconf":"High","uquote":"Oncor is the Transmission and Distribution Utility (TDU) serving Roanoke and surrounding areas in Denton County. They own and maintain the power lines, meters, and infrastructure that deliver electricity to your home.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Citigroup","spon":"Citigroup","ay":2023,"oy":2023,"deal":"$500,000 renovation project in 2023","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023007688","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023007688"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_url_canonicalized stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"54920c6ae3f2","cid":"54920c6ae3f2","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","op":"STACK Infrastructure","spon":"IPI Partners","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"46f9bef9fde9","cid":"46f9bef9fde9","canon":0,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"11f4fd9538d6","cid":"11f4fd9538d6","canon":1,"dups":1,"ftype":"data_center","name":"TAMU West Campus Data Center - 2B","city":"College Station","county":"Brazos","state":"TX","lat":30.656713,"lng":-96.302394,"cprec":"distinct","status":"Proposed","proc":"Co-located generation","pcp":"Texas A&M University","pdt":"5 megawatts of power","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f6a8fe879af7","cid":"f6a8fe879af7","canon":1,"dups":1,"ftype":"crypto_hpc","name":"TeraWulf Abernathy","city":"Abernathy","county":"Hale","state":"TX","lat":34.068436,"lng":-101.822888,"cprec":"distinct","status":"Proposed","mw":168,"band":"100-250 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Lyntegar Electric Coop, INC.","uquote":"Grid Operator: Lyntegar Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/terawulf-abernathy-21afc41b","ukey":"11364|TX","uname":"Lyntegar Electric Coop, Inc","rto":"SPP","nerc":"MRO","op":"TeraWulf","spon":"TeraWulf, Fluidstack","tenant":"Fluidstack","ay":2025,"oy":2026,"deal":"Joint venture between TeraWulf (51%) and Fluidstack (49%) announced October 28, 2025. Google provided a $1.3 billion long-term lease backing for Fluidstack's obligations. Project-level financing of $1.3 billion in 7.250% Senior Secured Notes due 2030 completed on December 29, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/terawulf-abernathy-21afc41b"],"lflag":"source_quality_reclassified"},{"id":"6c7d473be7c9","cid":"6c7d473be7c9","canon":1,"dups":2,"ftype":"data_center","name":"Meta Dental","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"1bf91a599023","cid":"1bf91a599023","canon":0,"dups":3,"ftype":"data_center","name":"Project Boom Data Center Substation — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","proc":"Co-located generation","pcp":"Eolian L.P.","pdt":"200 Megawatt Data Center Campus, 100MW BESS site","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres.","lflag":"display_name_normalized unlinked_source_text possible_canonical_duplicate,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"b1cb76ba292b","cid":"1bf91a599023","canon":0,"dups":3,"ftype":"data_center","name":"Project Boom Data Center Substation — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","proc":"Co-located generation","pcp":"Eolian, L.P.","pdt":"200MW data centre campus","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres.","lflag":"display_name_normalized unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"05ec7fe9c3ca","cid":"05ec7fe9c3ca","canon":1,"dups":1,"ftype":"data_center","name":"TRG Datacenters Phase 3","city":"Spring","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","mw":24,"pc":"Grid","pconf":"High","pquote":"HOU2 will add 24 megawatts of utility capacity through a purpose-built, 110,000-square-foot facility designed to deliver move-in-ready IT capacity as early as Q4 2026.","uquote":"CenterPoint Energy will serve as power supplier.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"TRG Datacenters","spon":"Tallvine Partners","ay":2025,"oy":2026,"deal":"Financial backing secured from Tallvine Partners in 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","srcUrls":null,"srcDom":null,"dukey":"8901|TX"},{"id":"21dd83de3eff","cid":"21dd83de3eff","canon":1,"dups":1,"ftype":"data_center","name":"Temple Data Center","city":"Temple","county":"Bell","state":"TX","lat":31.04275,"lng":-97.481268,"cprec":"shared_centroid","status":"Proposed","proc":"Dedicated PPA","pcp":"ENGIE North America","pdt":"260-MW Sypert Branch solar project, coming online in late 2025","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"21741df2c2a0","cid":"21741df2c2a0","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTER (TX12)","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":96,"pc":"Grid","pconf":"Medium","pquote":"The Vantage Data Centers TX12 Expansion is not standard commercial construction, it's a mission-critical data center designed for 24-hour operation, zero downtime, and precision engineering.... Scope: Install high-voltage cabling, standby generators, switchgear, and uninterruptible-power systems that keep servers running 24/7.... Power provider: CPS Energy / ERCOT","pscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","uconf":"Medium","uquote":"Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"Vantage Data Centers","ay":2025,"oy":2027,"contro":"Located on Edwards Aquifer Recharge Zone, raising concerns about water quality and overdraft for 2 million Central Texans downstream.","controScan":"https://centexdatacenters.org/tracker/vantage-tx12-san-antonio","deal":"Project investment of $276.8 million; Land acquisition from University of Texas System Board of Regents in July 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","https://centexdatacenters.org/tracker/vantage-tx12-san-antonio"],"band":"50-100 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"c61808638b8e","cid":"c61808638b8e","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX22","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":96,"pc":"Grid","pconf":"Medium","pquote":"Grid Operator. ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/vantage-data-center-tx2-cc7c952a","uconf":"High","uquote":"Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"Retained Vantage Data Centers Development","ay":2025,"oy":2027,"contro":"Concerns regarding water supply strain and location on Edwards Aquifer recharge zone.","deal":"Project investment of approximately $272 million","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;centexdatacenters.org","srcUrls":["https://www.interconnection.fyi/data-center/project/vantage-data-center-tx2-cc7c952a","https://centexdatacenters.org/tracker/vantage-tx22-san-antonio"],"band":"50-100 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"914f244a1b71","cid":"914f244a1b71","canon":0,"dups":1,"ftype":"data_center","name":"Urban Forestry Permit for Data Center Phase 2","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Urban Forestry Permit for Data Center Phase 2","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","lflag":"generic_unsourced_permit_record","srcUrls":null,"srcDom":null},{"id":"12b39d545275","cid":"12b39d545275","canon":1,"dups":3,"ftype":"data_center","name":"Vantage Data Centers","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The far West Side of San Antonio has become a hub for data centers due to its access to power and fiber infrastructure and its flat topography.","uquote":"“Our city cannot afford to wait until resource demands outpace our infrastructure,” Galvan said in a public statement, calling for a meeting of the minds among City Council, CPS Energy and San Antonio Water System leadership planned sometime after February 11.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","ay":2023,"oy":2026,"contro":"Community opposition regarding noise, air quality, water use, and grid strain for data centers in San Antonio.","deal":"Project cost estimated at approximately US$96 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"f131608fdcd7","cid":"12b39d545275","canon":0,"dups":3,"ftype":"data_center","name":"Vantage Data Centers","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Utility feeds and mechanical systems are designed for redundancy and high availability, consistent with enterprise-grade operations.","uconf":"High","uquote":"Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/vantage-tx12-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, , Silver Lake, AustralianSuper, PSP Investments","ay":2023,"oy":2026,"contro":"Community opposition regarding noise, air quality, and water usage for Vantage's planned data centers in San Antonio.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx12-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"838a50e27c58","cid":"838a50e27c58","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX21 Tenant Fit-out","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Proposed","mw":16,"pc":"Grid","pconf":"High","pquote":"The Texas Comptroller describes these facilities as “energy intensive,” because they are “continuously running cooling units and fans to prevent servers from overheating.” Places that support artificial intelligence (AI) applications, such as Vantage, use an even larger amount than normal, the agency explains. Our standard generators are 2.75MW diesel engines with 5,000-gallon belly tanks, closely coupled to each of the five IT distributed redundant blocks, supporting a full IT load for an uninterrupted 24 hours. We have partnered with regional electrical utilities to explore their renewable energy products to provide optionality for our customers.","uquote":"“Our city cannot afford to wait until resource demands outpace our infrastructure,” Galvan said in a public statement, calling for a meeting of the minds among City Council, CPS Energy and San Antonio Water System leadership planned sometime after February 11.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge, Silver Lake","ay":2023,"oy":2025,"contro":"Community opposition regarding noise, air quality, and heavy utility use.","deal":"Project cost of $157,000,000","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text utility_alias_corrected stale_future_status_year","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"414ba260f517","cid":"414ba260f517","canon":0,"dups":1,"ftype":"crypto_hpc","name":"Whinstone US Inc.","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":400,"pc":"Grid","pconf":"High","pquote":"In May 2020, Whinstone entered into a 10-year power supply agreement with TXU Energy to \"provide the delivery of a fixed amount of electricity by TXU to Whinstone (via the transmission facility owned by Oncor\". The long term supply contract remains in place following RIOT's acquisition of Whinstone in April 2021.","pscan":"https://www.bitcoinenergysource.com/post/rockdale-tx-riot-blockchain","uquote":"In May 2020, Whinstone entered into a 10-year power supply agreement with TXU Energy to \"provide the delivery of a fixed amount of electricity by TXU to Whinstone (via the transmission facility owned by Oncor\".","uscan":"https://www.bitcoinenergysource.com/post/rockdale-tx-riot-blockchain","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"Rhodium Enterprises , GMO","ay":2019,"oy":2020,"contro":"Lawsuits and disputes with tenants (Rhodium Enterprises Inc., GMO) over hosting and energy agreements, and alleged diversion of revenue.","deal":"Riot Blockchain acquired Whinstone US, Inc. for $80 million cash plus 11.8 million shares of Riot common stock, totaling approximately $651 million, in May 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"bitcoinenergysource.com","srcUrls":["https://www.bitcoinenergysource.com/post/rockdale-tx-riot-blockchain"],"band":"250+ MW","rawUkey":"19327|TX","rawUname":"TXU Energy Retail Co, LLC","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year,merged_duplicate delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"27a5ce51e998","cid":"27a5ce51e998","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Whinstone US, Inc.","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Proposed","mw":450,"pc":"Grid","pconf":"High","pquote":"In May 2020, Whinstone entered into a 10-year power supply agreement with TXU Energy to \"provide the delivery of a fixed amount of electricity by TXU to Whinstone (via the transmission facility owned by Oncor\". The long term supply contract remains in place following RIOT's acquisition of Whinstone in April 2021.","uquote":"In May 2020, Whinstone entered into a 10-year power supply agreement with TXU Energy to \"provide the delivery of a fixed amount of electricity by TXU to Whinstone (via the transmission facility owned by Oncor\".","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"Riot Platforms","ay":2019,"oy":2020,"contro":"Multiple lawsuits and disputes regarding hosting and energy agreements, including Whinstone US Inc. suing Imperium Investment Holding LLC and Rhodium Enterprises Inc. for securities fraud, and GMO filing a lawsuit against Whinstone for breach of contract and improper removal of mining machines.","deal":"Whinstone US, Inc. was acquired by Riot Blockchain, Inc. for approximately EUR 67 million in cash and 11.8 million shares of common stock on May 27, 2021. Whinstone also entered into a 10-year power supply agreement with TXU Energy in May 2020.","dealScan":"https://northerndata.de/en/investor-relations/news/northern-data-ag-successfully-closed-the-sale-of-its-texas-data-center-to-riot-blockchain-inc","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"northerndata.de","srcUrls":["https://northerndata.de/en/investor-relations/news/northern-data-ag-successfully-closed-the-sale-of-its-texas-data-center-to-riot-blockchain-inc"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year delivery_utility_linked","oy_stale":1,"dukey":"44372|TX"},{"id":"a36169f3cb56","cid":"a36169f3cb56","canon":1,"dups":1,"ftype":"data_center","name":"Whole Foods Market - Montrose Amazon Prime Now","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","op":"Whole Foods Market","spon":"Amazon","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4b03ae1adbbd","cid":"4b03ae1adbbd","canon":0,"dups":1,"ftype":"data_center","name":"ACS Group Data Center — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"A privately owned substation will be built for the development, which is close to an existing Oncor substation.","uquote":"Grid Operator: Denton County Elec Coop, INC.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"ACS Group","spon":"ACS Group","ay":2025,"oy":2034,"deal":"$2.1 billion data center development, economic development agreement approved April 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"X TEAM /// A new 2-story data center building at 251,303 SF located in Fort Worth, TX. The building is programmed for administrative space  limited to 14,993 SF, 2 data halls of 25,075 SF each and accessory support spaces to make up the balance of the building footprint.","lflag":"unlinked_source_text display_name_normalized utility_alias_corrected possible_canonical_duplicate,merged_duplicate delivery_utility_linked","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"7f1e11a5dec5","cid":"7f1e11a5dec5","canon":1,"dups":1,"ftype":"data_center","name":"X TEAM /// Data hall build out of an existing data center","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"A privately owned substation will be built for the development, which is close to an existing Oncor substation.","uconf":"High","uquote":"A privately owned substation will be built for the development, which is close to an existing Oncor substation.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"ACS Group","spon":"ACS Group","ay":2025,"oy":2031,"deal":"Economic development agreement with the City of Fort Worth approved in April 2025, including performance-based grants and a 10-year tax abatement.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"8ce3ada44f5d","cid":"8ce3ada44f5d","canon":1,"dups":1,"ftype":"data_center","name":"X TEAM /// Expansion of an existing Data Center building","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Denton County Elec Coop, INC.","uconf":"High","uquote":"Grid Operator: Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","ay":2025,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ed8b3acbcb35","cid":"6c7d473be7c9","canon":0,"dups":2,"ftype":"data_center","name":"Meta Dental","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Proposed","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"bffb56e5eabd","cid":"bffb56e5eabd","canon":1,"dups":1,"ftype":"data_center","name":"12301 RESEARCH BLVD SVRD NB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Cancelled","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4387a7713301","cid":"4387a7713301","canon":1,"dups":1,"ftype":"data_center","name":"7401 E BEN WHITE BLVD SVRD EB","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Cancelled","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"99199b98588f","cid":"99199b98588f","canon":1,"dups":1,"ftype":"data_center","name":"Winston Services Data Center — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Cancelled","pc":"Grid","pconf":"High","pquote":"The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus.","pscan":"https://www.interconnection.fyi/data-center/state/TX","uconf":"High","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Winston Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/state/TX","https://www.interconnection.fyi/data-center/project/foundation-only-permit-for-new-data-center-with-me-fcf59201"],"rawName":"Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.","lflag":"display_name_normalized"},{"id":"0d42fc53b15f","cid":"976f196dab37","canon":0,"dups":12,"ftype":"data_center","name":"Data Center Permit — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Cancelled","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.","lflag":"display_name_normalized generic_unsourced_permit_record","quarantine":1,"quarantineReason":"Generic permit/scope-style record with no resolved source URL and no identified operator/sponsor; hidden from default canonical views.","srcUrls":null,"srcDom":null},{"id":"4d63c8a455b8","cid":"4d63c8a455b8","canon":1,"dups":1,"ftype":"data_center","name":"Cyrusone LLC Reinvestment Zone","city":"Houston","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Cancelled","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"145ec4f44a88","cid":"145ec4f44a88","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Hut 8 Cedarvale","county":"Ward","state":"TX","lat":31.513069,"lng":-103.105113,"cprec":"distinct","status":"Cancelled","mw":215,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The site will be able to pull power directly from the ERCOT grid when the wind farm is not generating power. The site operates adjacent to a wind farm and is connected to the ERCOT grid, providing Hut 8 with access to some of the lowest-cost wholesale power in North America, according to the firm.","uconf":"High","uquote":"Electricity in Ward County is all delivered by the Oncor Transmission and Distribution Utility.","uscan":"https://comparepower.com/electricity-rates/texas/ward-county-electricity-rates-energy-plans/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Hut 8","spon":"Ionic Digital (formerly Celsius Network 's mining operations)","tenant":"Ionic Digital","ay":2023,"oy":2024,"deal":"Hut 8 signed a four-year managed services agreement with Ionic Digital on February 1, 2024, with expected earnings of $81,504,800 in cash payments.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"comparepower.com","srcUrls":["https://comparepower.com/electricity-rates/texas/ward-county-electricity-rates-energy-plans/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"4d55802a9e7b","cid":"4d55802a9e7b","canon":0,"dups":1,"ftype":"data_center","name":"Project Boom Data Center Substation — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Cancelled","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX.","lflag":"display_name_normalized possible_canonical_duplicate,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"4decb192e0eb","cid":"1bf91a599023","canon":0,"dups":3,"ftype":"data_center","name":"Project Boom Data Center Substation — Fort Worth, TX","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Cancelled","proc":"Co-located generation","pcp":"Fort Worth Power Core LLC","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres.","lflag":"display_name_normalized unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"01e1a3eeae81","cid":"01e1a3eeae81","canon":1,"dups":1,"ftype":"crypto_hpc","name":"1102 McKinzie LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":600,"pc":"Grid","pconf":"High","pquote":"Much has changed since the initial IDAs were established between Bootstrap Energy and the City in 2022, especially for a large cryptomining operation powered by two 300-megawatt substations.","pscan":"https://www.texasenvironment.org/news-room/bitcoin-mining-site-quietly-begins-pulling-water-amid-corpus-christi-drought","uconf":"High","uquote":"AEP Texas Central covers Corpus Christi, the Rio Grande Valley (McAllen, Brownsville, Harlingen), Victoria, and Laredo. AEP Texas, headquartered in Corpus Christi, encompasses the AEP service territory in the Electric Reliability Council of Texas (ERCOT). In Corpus Christi, your utility company is AEP Texas Central.","rto":"ERCOT","nerc":"TRE","op":"1102 McKinzie","spon":"Northern Data AG","tenant":"Bitcoin Mining","ay":2023,"oy":2024,"contro":"Water usage amid drought restrictions for cooling hardware.","controScan":"https://www.texasenvironment.org/news-room/bitcoin-mining-site-quietly-begins-pulling-water-amid-corpus-christi-drought","deal":"Peak Mining (by Northern Data Group) acquired Bootstrap's site in December 2023.","dealScan":"https://www.texasenvironment.org/news-room/bitcoin-mining-site-quietly-begins-pulling-water-amid-corpus-christi-drought","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"texasenvironment.org;electricchoice.com","uscan":"https://www.electricchoice.com/utilities/aep-texas/","srcUrls":["https://www.texasenvironment.org/news-room/bitcoin-mining-site-quietly-begins-pulling-water-amid-corpus-christi-drought","https://www.electricchoice.com/utilities/aep-texas/"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"delivery_utility_not_in_eia861 utility_alias_corrected source_quality_reclassified"},{"id":"1ca775bc4d1e","cid":"1ca775bc4d1e","canon":1,"dups":1,"ftype":"crypto_hpc","name":"1242 McKinzie LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":300,"pc":"Grid","pconf":"High","pquote":"The site comes with an ERCOT-approved interconnect of 300MW.","pscan":"https://northerndata.de/en/investor-relations/news/northern-data-groups-peak-mining-purchases-a-second-300mw-data-center-location-in-corpus-christi-texas","uquote":"Along the westernmost edge of the northern boundary is an American Electric Power substation.","ukey":"17698|TX","uname":"Southwestern Electric Power Co","rto":"ERCOT","nerc":"TRE","op":"Peak Mining","spon":"Northern Data Group","tenant":"Peak Mining","ay":2024,"oy":2025,"contro":"Controversy over water usage during drought and unpaid PILOT payments.","controScan":"https://www.texasenvironment.org/news-room/bitcoin-mining-site-quietly-begins-pulling-water-amid-corpus-christi-drought","deal":"Peak Mining (Northern Data Group) purchased a second 300MW data center location in Corpus Christi, Texas on May 24, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"northerndata.de;texasenvironment.org","srcUrls":["https://northerndata.de/en/investor-relations/news/northern-data-groups-peak-mining-purchases-a-second-300mw-data-center-location-in-corpus-christi-texas","https://www.texasenvironment.org/news-room/bitcoin-mining-site-quietly-begins-pulling-water-amid-corpus-christi-drought"],"band":"250+ MW"},{"id":"377edb7bdbbf","cid":"377edb7bdbbf","canon":1,"dups":1,"ftype":"crypto_hpc","name":"182126 Crusoe Energy System Longhorn Data Center (initial, 400428)","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"408b0fd2da4c","cid":"408b0fd2da4c","canon":1,"dups":1,"ftype":"crypto_hpc","name":"182126 Crusoe Energy System Longhorn Data Center (initial, 400428)","city":"Abilene","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":360,"pc":"Behind-the-Meter","pconf":"High","pquote":"The purpose of the equipment is to generate power for onsite use only for data centers and computing.","pscan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","proc":"Co-located generation","pcp":"Crusoe Energy Systems LLC","pdt":"upwards of 350 MW","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle","ay":2024,"oy":2025,"contro":"Community concerns over water and energy use; winter weather disrupted cooling systems.","deal":"$2.3 billion loan from J.P. Morgan for a 206 MW data center project, January 24, 2025","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"records.tceq.texas.gov;mortenson.com","srcUrls":["https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"537fa9c7a869","cid":"537fa9c7a869","canon":0,"dups":1,"ftype":"crypto_hpc","name":"182126 Crusoe Energy System Longhorn Data Center (initial, 400428)","county":"Content Information","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Behind-the-Meter","pconf":"High","pquote":"The purpose of the equipment is to generate power for onsite use only for data centers and computing.","proc":"Co-located generation","pcp":"Crusoe Energy Systems LLC","pdt":"Initial 350 MW on-site gas plant, new 900 MW on-site power plant for Microsoft campus, total projected capacity across full Abilene site to 2.1 GW","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle, OpenAI","ay":2024,"oy":2025,"contro":"Regulatory pushback regarding ERCOT's adjusted load forecast and co-located loads","controScan":"https://interchange.puc.texas.gov/Documents/55999_126_1496643.PDF","deal":"$15 billion joint venture with Blue Owl Capital and Primary Digital Infrastructure, announced May 21, 2025","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"interchange.puc.texas.gov","srcUrls":["https://interchange.puc.texas.gov/Documents/55999_126_1496643.PDF"],"band":"100-250 MW","lflag":"merged_duplicate"},{"id":"3766decb67ae","cid":"4cd301a2edd7","canon":0,"dups":2,"ftype":"crypto_hpc","name":"182126 Crusoe Energy System Longhorn Data Center (initial, 400428)","county":"Content Information","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Behind-the-Meter","pconf":"High","pquote":"Behind-the-meter dedicated on-site energy infrastructure: The 900MW on-site power plant provides dedicated energy, paired with an MV BESS system, which is designed to enhance operational reliability and grid resilience.","pscan":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","proc":"Co-located generation","pcp":"Crusoe Energy Systems (self-generation)","pdt":"upwards of 350 MW","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle, Microsoft","ay":2024,"oy":2025,"contro":"Regulatory pushback regarding co-located data centers and grid management in Texas.","deal":"$15 billion joint venture with Blue Owl Capital and Primary Digital Infrastructure, May 21, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"crusoe.ai;mortenson.com","srcUrls":["https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"4cd301a2edd7","cid":"4cd301a2edd7","canon":1,"dups":2,"ftype":"crypto_hpc","name":"182126 Crusoe Energy System Longhorn Data Center (initial, 400428)","county":"Content Information","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Behind-the-Meter","pconf":"High","pquote":"The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. Primoris is thrilled to partner with Crusoe on this groundbreaking project by providing data center developers with off-grid natural gas solutions to address their scalable and dispatchable power needs.","proc":"Co-located generation","pdt":"1.2 GW capacity","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy System","spon":"Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle Cloud Infrastructure","ay":2024,"oy":2025,"contro":"Regulatory pushback on co-location rules for large data centers in Texas.","controScan":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/","deal":"$15 billion joint venture with Blue Owl Capital and Primary Digital Infrastructure (May 2025)","dealScan":"https://www.crusoe.ai/","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"crusoe.ai;mortenson.com;latitudemedia.com","srcUrls":["https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","https://www.mortenson.com/projects/abilene-data-center-development","https://www.crusoe.ai/","https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated","pscan":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","uconf":"High","pcp":"Crusoe Energy Systems (self-generation)"},{"id":"0417692e44fe","cid":"0417692e44fe","canon":1,"dups":1,"ftype":"data_center","name":"182267 Abilene Data Center Campus Master Association (Initial, 401169)","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Crusoe Energy Systems LLC","pdt":"360.5 MW (for Unit 1)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6d90200340ba","cid":"6d90200340ba","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Abilene DC 3 LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":336,"pc":"Hybrid","pconf":"High","pquote":"Lancium designs, builds, and operates power infrastructure that is fully ERCOT-approved and integrates grid interconnections with behind-the-meter resources to optimize reliability and economics. This approach allows each campus to function as a grid-supportive asset, not a strain on the system. All Lancium Clean Campuses require closed-loop cooling systems that ensure minimal environmental impact. The Abilene AI data center connects directly to the ERCOT grid, allowing us to draw from the region's robust and growing supply of renewable energy, including wind, which often goes underutilized in the area. To support grid stability, the Abilene campus uses GE Vernova's modern natural gas turbines for backup power.","pscan":"https://www.oracle.com/data-centers/abilene/","proc":"Co-located generation","pcp":"Crusoe Energy Systems, LLC","pdt":"Approximately 360.5 MW (from gas turbines)","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe","spon":"Crusoe","tenant":"OpenAI, Oracle","ay":2024,"oy":2026,"contro":"OpenAI and Oracle paused expansion plans due to financing issues and changes to forecasted demand, with Meta Platforms considering leasing the planned expansion.","deal":"$3.4 billion in financing from Blue Owl Capital for Stargate Abilene; 85% tax abatement over 10 years from the City of Abilene and Taylor County.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oracle.com;mortenson.com","srcUrls":["https://www.oracle.com/data-centers/abilene/","https://www.mortenson.com/projects/abilene-data-center-development"],"band":"250+ MW"},{"id":"b47f9b204d27","cid":"b47f9b204d27","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Abilene DC 4, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The Abilene AI data center connects directly to the ERCOT grid, allowing us to draw from the region's robust and growing supply of renewable energy, including wind, which often goes underutilized in the area. To support grid stability, the Abilene campus uses GE Vernova's modern natural gas turbines for backup power.","pscan":"https://www.oracle.com/data-centers/abilene/","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Oracle, OpenAI, SoftBank, Blue Owl Capital","tenant":"Oracle, Microsoft, OpenAI","oy":2026,"contro":"Community concerns about power supply and water usage; reports of abandoned expansion plans due to financing and changing needs.","deal":"$3.4B in financing from Blue Owl Capital for the Stargate campus; Oracle 15-year tenancy, Microsoft 20-year tenancy.","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"oracle.com;mortenson.com;infrastructureresearch.substack.com","srcUrls":["https://www.oracle.com/data-centers/abilene/","https://www.mortenson.com/projects/abilene-data-center-development","https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed"]},{"id":"8416b94aee9e","cid":"8416b94aee9e","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Abilene DC 5 LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":140,"pc":"Hybrid","pconf":"High","pquote":"The data centers, located on the Lancium Clean Campus, uses high-efficiency cooling and onsite power generation to strengthen — not strain — local resources, with a commitment to pay our own way on energy and ensure these costs are not passed on to residents. we actually built a a gas plant on site about a 350 megawatt gas plant to help. support. um the load and and generation requirements. needed uh to power that AI factory Instead of defaulting to solely natural gas, it taps into excess renewable energy, aligning AI’s expansion with a low-carbon strategy.","pscan":"https://abileneaidatacenter.com/","proc":"Co-located generation","pcp":"Crusoe Energy Systems LLC","pdt":"900 MW of on-site generation","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Crusoe Energy Systems","tenant":"OpenAI, Oracle","ay":2024,"oy":2025,"contro":"Public outcry mounts over concerns about water and power usage.","controScan":"https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137","deal":"$11.6 billion debt and equity financing secured by Crusoe in May 2025.","dealScan":"https://baxtel.com/data-center/crusoe-abilene-5","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"abileneaidatacenter.com;mortenson.com;baxtel.com;kvue.com","srcUrls":["https://abileneaidatacenter.com/","https://www.mortenson.com/projects/abilene-data-center-development","https://baxtel.com/data-center/crusoe-abilene-5","https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"0928266366b6","cid":"0928266366b6","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Abilene DC 6 LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":100,"pc":"Grid","pconf":"High","pquote":"The Abilene AI data center connects directly to the ERCOT grid, allowing us to draw from the region's robust and growing supply of renewable energy, including wind, which often goes underutilized in the area. To support grid stability, the Abilene campus uses GE Vernova's modern natural gas turbines for backup power.","pscan":"https://www.oracle.com/data-centers/abilene/","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Blue Owl Capital, SoftBank","tenant":"OpenAI, Oracle","oy":2025,"deal":"$3.4B in financing from Blue Owl Capital","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"oracle.com;mortenson.com;infrastructureresearch.substack.com","srcUrls":["https://www.oracle.com/data-centers/abilene/","https://www.mortenson.com/projects/abilene-data-center-development","https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed"],"band":"100-250 MW"},{"id":"96d35eadf83a","cid":"96d35eadf83a","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Abilene DC 7 LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":100,"pc":"Hybrid","pconf":"High","pquote":"The Abilene AI data center connects directly to the ERCOT grid, allowing us to draw from the region's robust and growing supply of renewable energy, including wind, which often goes underutilized in the area. To support grid stability, the Abilene campus uses GE Vernova's modern natural gas turbines for backup power. The application said the facility housing the turbines will be used for \"primary and backup power\" for \"data centers and computing. \" Its use will be \"onsite only,\" meaning the power generated by the turbines won't be available to the local grid.","pscan":"https://www.oracle.com/data-centers/abilene/","proc":"Co-located generation","pcp":"Crusoe Energy Systems LLC (operator of gas plant), Lancium (involved in power plan including battery/solar)","pdt":"350 megawatt gas plant, large-scale behind-the-meter battery storage and solar resources","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle, OpenAI","ay":2025,"oy":2026,"contro":"Tax abatement agreement with the City of Abilene and Taylor County; concerns about air pollution, water consumption, and strain on the local grid.","controScan":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","deal":"$3.4 billion joint venture with Crusoe Energy and Blue Owl funds (January 2025); $2.3 billion construction loan arranged by JPMorgan Chase (January 2025); $7.1 billion construction loan for second phase (May 2025).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"oracle.com;texasstandard.org","srcUrls":["https://www.oracle.com/data-centers/abilene/","https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/"],"band":"100-250 MW"},{"id":"1ddd5315aa6e","cid":"1ddd5315aa6e","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Abilene DC 8 LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":150,"pc":"Behind-the-Meter","pconf":"High","pquote":"The project includes a 900 MW behind-the-meter power plant paired with battery storage, designed to enhance reliability and mitigate grid constraints.","pscan":"https://www.datacenterknowledge.com/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft","proc":"Co-located generation","pcp":"Crusoe Energy Systems LLC","pdt":"350 megawatt gas plant (initial), 900MW on-site power plant (expanded)","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Blue Owl Capital, Primary Digital Infrastructure","tenant":"Oracle, OpenAI, Microsoft","ay":2024,"oy":2026,"deal":"$15 billion joint venture for 1.2 gigawatt AI data center, announced May 22, 2025","dealScan":"https://www.sunya.ai/news/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-second-phase-of-15-billion-joint-venture-to-fund-ai-data-center-in-abilene-texas","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;sunya.ai","srcUrls":["https://www.datacenterknowledge.com/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft","https://www.sunya.ai/news/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-second-phase-of-15-billion-joint-venture-to-fund-ai-data-center-in-abilene-texas"],"band":"100-250 MW"},{"id":"f3ba6d972f0d","cid":"f3ba6d972f0d","canon":1,"dups":1,"ftype":"data_center","name":"Alamo Mission LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"Low","pquote":"The region south of Dallas has gained interest from data center builders because two major power lines run through it.","pscan":"https://therealdeal.com/texas/2025/12/10/google-to-build-880-million-data-center-outside-dallas/","uquote":"PETITION OF ALAMO MISSION LLC TO AMEND ROCKETT SPECIAL UTILITY DISTRICT'S WATER CERTIFICATE OF CONVENIENCE AND NECESSITY IN ELLIS COUNTY BY EXPEDITED RELEASE.","uscan":"https://interchange.puc.texas.gov/Search/Filings?ControlNumber=49863","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2019,"oy":2027,"contro":"Water rights dispute with Rockett Special Utility District","deal":"$880 million investment for a new facility at Midlothian campus (Sharka Data Center – Building 5)","dealScan":"https://therealdeal.com/texas/2025/12/10/google-to-build-880-million-data-center-outside-dallas/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"therealdeal.com;interchange.puc.texas.gov","srcUrls":["https://therealdeal.com/texas/2025/12/10/google-to-build-880-million-data-center-outside-dallas/","https://interchange.puc.texas.gov/Search/Filings?ControlNumber=49863"]},{"id":"4529030488a0","cid":"4529030488a0","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers (Plano) Propco, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":96,"pc":"Grid","pconf":"High","pquote":"Redundancy architecture built to Tier III standards, including dual utility feeds and 2N or concurrently maintainable systems supporting high availability.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/aligned-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Aligned Data Centers","spon":"Artificial Intelligence Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners","tenant":"Lambda","ay":2015,"oy":2026,"deal":"Acquisition of Aligned Data Centers for $40 billion by Artificial Intelligence Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners, announced October 15, 2025.","dealScan":"https://www.planotexas.org/259/Current-News?contentId=fc42f8d3-9dab-4c31-897f-d15a890cb904","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;planotexas.org","srcUrls":["https://baxtel.com/data-center/aligned-plano","https://www.planotexas.org/259/Current-News?contentId=fc42f8d3-9dab-4c31-897f-d15a890cb904"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"8f5fb31451d4","cid":"8f5fb31451d4","canon":1,"dups":1,"ftype":"data_center","name":"ALIGNED PLANO DFW04","city":"PLANO","county":"COLLIN","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The new 44-acre facility will have an onsite substation and will feature Aligned's proprietary air and liquid cooling technologies.","pscan":"https://rebusinessonline.com/aligned-partners-with-lambda-on-700m-data-center-project-in-plano/","uconf":"High","uquote":"Aligned DFW-02 is the second building of Aligned's Plano Data center campus.... The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/aligned-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Aligned Data Centers","spon":"Artificial Intelligence Infrastructure Partnership (AIP), MGX Fund Management Limited, BlackRock's Global Infrastructure Partners (GIP)","tenant":"Lambda","ay":2025,"oy":2026,"deal":"$700 million investment reported by The Dallas Morning News (May 08 2025)","dealScan":"https://rebusinessonline.com/aligned-partners-with-lambda-on-700m-data-center-project-in-plano/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rebusinessonline.com;baxtel.com","srcUrls":["https://rebusinessonline.com/aligned-partners-with-lambda-on-700m-data-center-project-in-plano/","https://baxtel.com/data-center/aligned-plano"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"d5777347ae2c","cid":"d5777347ae2c","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Behind-the-Meter","pconf":"High","pquote":"Amazon has secured a 20-year Power Purchase Agreement for carbon-free, \"behind-the-meter\" electricity, with the initial phase of development submitted to the Texas interconnection queue in February 2026.","pscan":"https://baxtel.com/data-center/amazon-project-spectrum","proc":"Dedicated PPA","pcp":"Vistra","pdt":"20-year PPA, 1,200 megawatts","uconf":"High","uquote":"Vistra Corp., the Irving-based electricity retail and generating company which operates the Comanche Peak Nuclear Power Plant, owns the land on which Amazon would build a data center, and would provide the energy for that facility.","rto":"ERCOT","nerc":"TRE","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2026,"oy":2027,"contro":"Community opposition regarding noise, pollution, and energy strains causing rate increases.","controScan":"https://interchange.puc.texas.gov/Documents/58561_105_1569036.PDF","deal":"$5 billion data center campus; 20-year Power Purchase Agreement; $2.5 million payment to county upon groundbreaking and $300,000 per building annually.","dealScan":"https://baxtel.com/data-center/amazon-project-spectrum","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;interchange.puc.texas.gov","srcUrls":["https://baxtel.com/data-center/amazon-project-spectrum","https://interchange.puc.texas.gov/Documents/58561_105_1569036.PDF"]},{"id":"22e7d671f47c","cid":"22e7d671f47c","canon":0,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Dedicated PPA","pcp":"Vistra","pdt":"20-year PPA, 1,200 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"a21b0569a529","cid":"a21b0569a529","canon":1,"dups":1,"ftype":"data_center","name":"AMAZONCOM SERVICES DSX9","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","op":"AMAZONCOM SERVICES DSX9","ay":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced state_centroid_only","srcUrls":null,"srcDom":null},{"id":"e8d403a9a454","cid":"e8d403a9a454","canon":1,"dups":1,"ftype":"data_center","name":"Austin Data Center 2 LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":24,"pc":"Grid","pconf":"High","pquote":"Power provided by Oncor Electric via LCRA","uquote":"Power provided by Oncor Electric via LCRA","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Design","spon":"Prologis","tenant":"Google","ay":2023,"oy":2026,"deal":"$125 million investment covering interior improvements to a 235,730-square-foot facility, filed in August 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text state_centroid_only utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"eb32b4a3321d","cid":"eb32b4a3321d","canon":1,"dups":1,"ftype":"crypto_hpc","name":"BARBER LAKE DATA CENTER","city":"COLORADO CITY","county":"MITCHELL","state":"TX","lat":32.304117,"lng":-100.924392,"cprec":"distinct","status":"Unknown","mw":300,"pc":"Grid","pconf":"High","pquote":"The site features 300 MW of front-of-the-meter capacity, a newly constructed, fully energized, high-to-mid voltage substation, and all necessary regulatory approvals. As part of the transaction, Cipher has acquired the 250 acres of land surrounding the substation and completed agreements necessary to participate in the ERCOT market.","uquote":"Grid Operator: Taylor Electric COOP INC - (TX).","uscan":"https://www.interconnection.fyi/data-center/project/cipher-mining-barber-lake-d5ad5c3a","ukey":"27369|TX","uname":"Taylor Electric Coop Inc - (TX)","rto":"ERCOT","nerc":"TRE","op":"Cipher Digital","spon":"Cipher Digital","tenant":"Fluidstack (Google-backed)","ay":2024,"oy":2026,"deal":"Acquisition of Barber Lake site by Cipher Mining for $67.5 million cash and variable fee on September 24, 2024. $1.4 billion offering of senior secured notes for construction on November 4, 2025. 10-year HPC colocation agreement with Fluidstack for 300 MW, with Google providing a $1.4 billion backstop.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cipher-mining-barber-lake-d5ad5c3a"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"f43eaf2ec570","cid":"f43eaf2ec570","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Bitdeer Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The mine in Rockdale has been paid to reduce electricity usage by the Electric Reliability Council of Texas during strains to the state's electrical grid by the general public. Bitdeer, another big bitcoin miner in Texas, also released a statement saying it too was paid to reduce power usage at its Texas mining center.","uconf":"High","uquote":"Grid Operator. Heart of Texas Electric COOP.","uscan":"https://www.interconnection.fyi/data-center/project/bitdeer-rockdale-58d64d08","ukey":"55982|TX","uname":"Heart of Texas Electric Coop","rto":"ERCOT","nerc":"TRE","op":"Bitdeer","spon":"BIT Mining Limited","ay":2019,"oy":2026,"contro":"Controversy regarding bitcoin miners' impact on the Texas electric grid and payments from ERCOT for reducing power usage.","deal":"BIT Mining Limited invested $25.74 million to jointly construct and operate the data center (May 21, 2021).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/bitdeer-rockdale-58d64d08"],"lflag":"source_quality_reclassified"},{"id":"188ccf72b941","cid":"188ccf72b941","canon":1,"dups":1,"ftype":"data_center","name":"C1 Dallas - Allen (LOT 1) LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Utility capacity – 50 MW; Utility Voltage – 24,900 (25 kV); # of Utility Feeders – 2 each (non-redundant); # of transformers on site – 26 Transformers (24 each @ 2.5 MW, 1 each @ 1 MW, 1 each at 2 MW); UPS configuration & capacity – Distributed redundant, with 4,500 kVA blocks (6 MW); Generator Power – 24 each 2.25 MW Diesel (Critical), 1 each 1.25 MW Diesel (House)","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digico-dallas-dal1","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2022,"oy":2023,"deal":"Construction project for 'CyrusOne Allen Load Adder' with an estimated cost of $41,500,000, registered on 2022-10-04.","dealScan":"https://www.tdlr.texas.gov/TABS/Projects/TABS2023002412","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;tdlr.texas.gov","srcUrls":["https://baxtel.com/data-center/digico-dallas-dal1","https://www.tdlr.texas.gov/TABS/Projects/TABS2023002412"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_url_canonicalized delivery_utility_linked","dukey":"44372|TX"},{"id":"196603b10e62","cid":"196603b10e62","canon":1,"dups":1,"ftype":"data_center","name":"C1 Richardson LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The site includes an adjacent ONCOR substation, ensuring a robust and reliable power supply.","uquote":"The site includes an adjacent ONCOR substation, ensuring a robust and reliable power supply.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2025,"deal":"Retrofit project with an estimated cost of $79,800,000, completed by June 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text state_centroid_only utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"ebdf35a0050f","cid":"ebdf35a0050f","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Barber Lake LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":300,"pc":"Grid","pconf":"High","pquote":"The Barber Lake Site has ERCOT interconnection approval of up to 300 MW and includes an energized substation.","pscan":"https://materials.proxyvote.com/default.aspx?docHostID=9ErSsf7hLRoltEjt2na16fcE2mzELpUWif5B8t6qiw0=&encr=Y","uconf":"High","uquote":"Grid Operator. Taylor Electric COOP INC - (TX).","uscan":"https://www.interconnection.fyi/data-center/project/cipher-mining-barber-lake-d5ad5c3a","ukey":"13830|TX","uname":"Nueces Electric Cooperative","rto":"ERCOT","nerc":"TRE","op":"Cipher Barber Lake","spon":"Cipher Mining","tenant":"Fluidstack USA II","ay":2024,"oy":2026,"deal":"Acquisition of Barber Lake site for $67.5 million cash payment in September 2024. $1.4 billion senior secured notes due 2030 issued in November 2025. Additional $333 million senior secured notes due 2030 issued in November 2025. Fluidstack lease agreement (300 MW total) with Google LLC as backstop for Fluidstack's obligations.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"materials.proxyvote.com;interconnection.fyi","srcUrls":["https://materials.proxyvote.com/default.aspx?docHostID=9ErSsf7hLRoltEjt2na16fcE2mzELpUWif5B8t6qiw0=&encr=Y","https://www.interconnection.fyi/data-center/project/cipher-mining-barber-lake-d5ad5c3a"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"d3660de2861c","cid":"d3660de2861c","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Black Pearl LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":300,"pc":"Grid","pconf":"High","pquote":"The Black Pearl Facility has received approvals for 300 MW of interconnection and has entered into agreements necessary to participate in the ERCOT market. The campus sits in ERCOT Load Zone West, with Oncor as the transmission and distribution provider and a 138-kV interconnection feeding the site.","pscan":"https://northwiseproject.com/cifr-stock-black-pearl-site/","uquote":"The campus sits in ERCOT Load Zone West, with Oncor as the transmission and distribution provider and a 138-kV interconnection feeding the site.","uscan":"https://northwiseproject.com/cifr-stock-black-pearl-site/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Cipher Digital","spon":"Cipher Digital","tenant":"Amazon Data Services / Amazon Web Services","ay":2024,"oy":2026,"deal":"$2.0 billion senior secured notes offering due 2031, completed February 2026","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"northwiseproject.com","srcUrls":["https://northwiseproject.com/cifr-stock-black-pearl-site/"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"2c34df602e8c","cid":"2c34df602e8c","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Cipher Mining Technologies Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":207,"pc":"Grid","pconf":"High","pquote":"Beyond Bitcoin mining, Cipher also participates in grid curtailment programs to optimize profitability. Similar to Riot Platforms, Cipher leverages ERCOT's low-cost energy grid and programs like the Four Coincident Peak (4CP) to manage electricity usage during high-demand periods. In Q3 2024, Cipher reported $1.4M in power sales, generated by selling electricity to ERCOT when profitable. Because of our long-term, fixed price power contract at Odessa, we also have an advantage that few other bitcoin miners have — the flexibility to mine bitcoin or resell our power to the market, which can help mitigate the effects of falling bitcoin prices.","rto":"ERCOT","nerc":"TRE","op":"Cipher Mining Technologies","spon":"Cipher Mining","tenant":"Cipher Mining Technologies","oy":2022,"deal":"Power contract recorded as an asset valued at approximately $78.9 million as of September 30, 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"cb47428aeb89","cid":"cb47428aeb89","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE Reinvestment Zone","city":"San Antonio","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2013,"deal":"Tax Abatement Agreement with CyrusOne, Inc. granting a fifty percent (50%), six (6) year abatement of ad valorem real and personal property taxes within the CyrusOne Reinvestment Zone for an investment of approximately $120 million, approved September 5, 2013.","dealScan":"https://webapp9.sanantonio.gov/FileNetArchive/%7BACAFF2AF-7085-4C6A-B02B-D91E2A8B5BBA%7D/%7BACAFF2AF-7085-4C6A-B02B-D91E2A8B5BBA%7D.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"webapp9.sanantonio.gov","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://webapp9.sanantonio.gov/FileNetArchive/%7BACAFF2AF-7085-4C6A-B02B-D91E2A8B5BBA%7D/%7BACAFF2AF-7085-4C6A-B02B-D91E2A8B5BBA%7D.pdf"]},{"id":"0a07345b4b8b","cid":"0a07345b4b8b","canon":1,"dups":1,"ftype":"data_center","name":"CLOUDBURST DATA CENTERS","city":"NEW BRAUNFELS","county":"COMAL","state":"TX","lat":29.812377,"lng":-98.258129,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Behind-the-Meter","pconf":"High","pquote":"CloudBurst has secured a long-term natural gas supply agreement with Energy Transfer's Oasis Pipeline, providing up to 450,000 MMBtu per day, enough to generate more than 1.8GW of on-site power for the campus.... The natural gas supply would be sufficient to generate up to approximately 1.2 gigawatts of direct, or “behind-the-meter” electric power for a period of at least 10 years starting with Phase 1 of the data center facilities.","pscan":"https://cloudburstdc.com/press-releases/","proc":"Co-located generation","pcp":"Energy Transfer LP","pdt":"10-year supply deal, 450,000 MMBtu/day of natural gas, 1.2 GW of on-site electricity","rto":"ERCOT","nerc":"TRE","op":"CloudBurst Data Centers","spon":"CloudBurst Data Centers","ay":2025,"oy":2026,"contro":"Community opposition, water scarcity concerns, and initial denial of tax abatement by Guadalupe County Commissioners Court.","deal":"Long-term natural gas supply agreement with Energy Transfer LP for up to 450,000 MMBtu per day, announced February 10, 2025.","dealScan":"https://cloudburstdc.com/press-releases/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudburstdc.com","srcUrls":["https://cloudburstdc.com/press-releases/"],"band":"250+ MW","lflag":"citation_artifact_removed source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"11b37367978e","cid":"11b37367978e","canon":1,"dups":1,"ftype":"data_center","name":"Collins Technology Park Partners LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":6,"pc":"Grid","pconf":"High","pquote":"electrical service to the park distributed via a dedicated, privately owned, substation capable of delivering up to 100 MW of power.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/digital-dallas-campus-in-richardson-digital-realty","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Digital Realty Trust, L.P.","spon":"Digital Realty Trust, L.P.","ay":2009,"oy":2010,"deal":"Acquisition of 60% of Collins Technology Park through a joint venture with Skyrise Properties (September 17, 2009)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-dallas-campus-in-richardson-digital-realty"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"bacbdc1dc402","cid":"bacbdc1dc402","canon":0,"dups":1,"ftype":"data_center","name":"Compass Datacenters DFW III Campus","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":180,"pc":"Grid","pconf":"High","pquote":"Oncor provides electricity via two on-campus substations.","uconf":"High","uquote":"Oncor provides electricity via two on-campus substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"Ontario Teachers' Pension Plan, Brookfield Infrastructure Partners","tenant":"Hyperscale tenant","ay":2020,"oy":2024,"contro":"Community opposition regarding rezoning for an 800-acre campus, citing concerns over transparency, noise, traffic, air quality, water usage, property values, and strain on the power grid. The city council approved the rezoning despite the opposition.","controScan":"https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef","deal":"$326 million refinancing agreement secured in October 2025, backed by five hyperscale data centers.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wfaa.com","srcUrls":["https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef"],"band":"100-250 MW","rawName":"Compass Datacenters DFW IIIA, LLC\n\t\t\tCompass Datacenters DFW III, LLC\n\t\t\tCompass Datacenters DFW IIIB, LLC\n \t\t\tCompass Datacenters DFW IIIC, LLC\n \t\t\tCompass Datacenters DFW IIID, LLC\n\t\t\tCompass Datacenters DFW IIIE, LLC Data Center","lflag":"display_name_normalized utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"29ae68d9be2b","cid":"29ae68d9be2b","canon":1,"dups":1,"ftype":"data_center","name":"Compass Datacenters DFW III Campus","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":360,"pc":"Grid","pconf":"High","pquote":"Oncor provides electricity via two on-campus substations. The building's utility provider is Oncor, which provides redundant access to electrical substations.","pscan":"https://baxtel.com/data-center/compass-red-oak-v","uconf":"High","uquote":"Oncor provides electricity via two on-campus substations. The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/compass-red-oak-v","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","spon":"Ontario Teachers' Pension Plan and Brookfield Infrastructure Partners","tenant":"Unnamed hyperscaler","ay":2019,"oy":2026,"deal":"$326 million refinancing agreement for five hyperscale data centers in Red Oak, Texas, secured around October 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/compass-red-oak-v"],"band":"250+ MW","rawName":"Compass Datacenters DFW IIIJ, LLC\n\t\t\tCompass Datacenters DFW III, LLC\n\t\t\tCompass Datacenters DFW IIIF, LLC\n\t\t\tCompass Datacenters DFW IIIG, LLC\n\t\t\tCompass Datacenters DFW IIIH, LLC\n\t\t\tCompass Datacenters DFW III-I, LLC Data Center","lflag":"display_name_normalized utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"313b20abf821","cid":"313b20abf821","canon":1,"dups":1,"ftype":"data_center","name":"City of Allen Compass Datacenters Reinvestment Zone #33","city":"Allen","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":42,"pc":"Grid","pconf":"High","pquote":"Oncor provides electricity via two on-campus substations.","uconf":"High","uquote":"Oncor provides electricity via two on-campus substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","tenant":"TierPoint, ScaleMatrix","ay":2016,"oy":2017,"deal":"Tax Abatement Agreement, executed 2016-11-15, effective 2018-01-01, expiring 2027-12-31","dealScan":"https://comptroller.texas.gov/economy/development/search-tools/ch312/abatements-details.php?id=000003699","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"comptroller.texas.gov","srcUrls":["https://comptroller.texas.gov/economy/development/search-tools/ch312/abatements-details.php?id=000003699"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"e5d339d774de","cid":"e5d339d774de","canon":1,"dups":1,"ftype":"data_center","name":"COPT San Antonio LP Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"86068c5370c1","cid":"86068c5370c1","canon":1,"dups":3,"ftype":"crypto_hpc","name":"CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS","city":"Denton","county":"Denton County","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":394,"pc":"Grid","pconf":"High","pquote":"On Tuesday night, the Denton City Council unanimously approved modifying the power purchase agreement between Core Scientific and Denton Municipal Electric. Denton Municipal Electric is Denton's municipally-owned electric provider since 1905 and is proud to supply the Denton community with safe, reliable, and 100% renewable energy.","pscan":"https://www.cityofdenton.com/m/newsflash/Home/Detail/922?arc=1599","uquote":"On Tuesday night, the Denton City Council unanimously approved modifying the power purchase agreement between Core Scientific and Denton Municipal Electric.","uscan":"https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2022,"oy":2027,"contro":"Increased ERCOT load shed requirement and ongoing transmission system impact assessments and approvals.","controScan":"https://www.cityofdenton.com/m/newsflash/Home/Detail/922?arc=1599","deal":"$1.2 billion expansion agreement with CoreWeave (February 26, 2025); $6.1 billion real property investment projected (November 20, 2024); $3.3 billion senior secured notes offering (April 21, 2026).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cityofdenton.com;keranews.org","srcUrls":["https://www.cityofdenton.com/m/newsflash/Home/Detail/922?arc=1599","https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power"],"band":"250+ MW","lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Denton Municipal Electric (City of Denton)"},{"id":"d77ee5017d26","cid":"86068c5370c1","canon":0,"dups":3,"ftype":"crypto_hpc","name":"CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS","city":"DENTON","county":"DENTON","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":394,"pc":"Grid","pconf":"High","pquote":"Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio.","uconf":"High","uquote":"Denton Municipal Electric is Denton's municipally-owned electric provider since 1905 and is proud to supply the Denton community with safe, reliable, and 100% renewable energy.","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2021,"oy":2027,"contro":"Core Scientific went bankrupt after selling the city of Denton, Texas on a crypto mine that doubled its energy footprint. Now, emerging from bankruptcy, the company has convinced the city to support its even larger AI supercomputer. CoreWeave's supplier, Core Scientific, “has been flagging delays to its collaborations with CoreWeave since at least February,” citing pushed-back construction timelines for “design enhancements to further optimize GPU performance.”","deal":"The new agreement brings an additional $1.2 billion in contracted revenue across Core Scientific's Denton TX location, solidifying Core Scientific's position as a premier provider of application-specific data centers for HPC workloads. The deal between Core Scientific and the City of Denton includes the lease of 78.85 acres of City-owned land, located near the Denton Energy Center, to Core Scientific for private use, and provisions that Core Scientific is responsible for costs associated with the electrical interconnection infrastructure.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Denton Municipal Electric (City of Denton)","srcUrls":null,"srcDom":null},{"id":"6cef98fc6db0","cid":"86068c5370c1","canon":0,"dups":3,"ftype":"crypto_hpc","name":"CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS","city":"Denton","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":394,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Once final build-out is completed, the required power will increase the demand on Denton Municipal Electric's (DME) system, and will be included in DME's 100% renewable energy portfolio.","pscan":"https://www.cityofdenton.com/m/newsflash/Home/Detail/922?arc=1599","uquote":"On Tuesday night, the Denton City Council unanimously approved modifying the power purchase agreement between Core Scientific and Denton Municipal Electric.","uscan":"https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tenant":"CoreWeave","ay":2021,"oy":2027,"contro":"Initial secrecy and large energy footprint led to skepticism; Core Scientific went bankrupt; expansion is projected to double the city's electricity needs and increase ERCOT load shed requirement.","deal":"$6.1 billion real property investment for expansion, approved November 20, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cityofdenton.com;keranews.org","srcUrls":["https://www.cityofdenton.com/m/newsflash/Home/Detail/922?arc=1599","https://www.keranews.org/news/2024-11-21/goodbye-crypto-hello-ai-denton-data-center-is-changing-focus-planning-to-grow-and-use-more-power"],"lflag":"source_quality_reclassified utility_alias_corrected","rawUkey":"5078|TX","rawUname":"Denton County Elec Coop, Inc","reportedUtility":"Denton Municipal Electric (City of Denton)"},{"id":"039b47d55c30","cid":"039b47d55c30","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Core Scientific Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","op":"Core Scientific","spon":"Core Scientific","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"0f6bc159c914","cid":"0f6bc159c914","canon":1,"dups":1,"ftype":"data_center","name":"Core42 Holding US LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","op":"Core42 Holding US","spon":"G42","oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"28e87f34ac7c","cid":"28e87f34ac7c","canon":1,"dups":1,"ftype":"data_center","name":"Coreweave Compute Acquisition Co V LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Denton Municipal Electric","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only utility_alias_corrected unlinked_source_text","ukey":"5063|TX","uname":"Denton Municipal Electric (City of Denton)","reportedUtility":"Denton Municipal Electric (City of Denton)","srcUrls":null,"srcDom":null},{"id":"5e37a540d46c","cid":"5e37a540d46c","canon":1,"dups":2,"ftype":"data_center","name":"Coreweave, Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":30,"pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","pscan":"https://baxtel.com/data-center/coreweave-plano","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/coreweave-plano","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CoreWeave","spon":"CoreWeave","tenant":"CoreWeave","ay":2023,"oy":2023,"deal":"$1.6 billion investment in the data center; 6-year Master Services Agreement with Lincoln Property Company for over $260 million for initial 30 MW installation; approximately $141 million in tax benefits from City of Plano","dealScan":"https://www.prnewswire.com/news-releases/coreweave-opens-new-texas-data-center-to-expand-access-to-high-performance-gpus-301884897.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;prnewswire.com","srcUrls":["https://baxtel.com/data-center/coreweave-plano","https://www.prnewswire.com/news-releases/coreweave-opens-new-texas-data-center-to-expand-access-to-high-performance-gpus-301884897.html"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"d24d88b26c4a","cid":"5e37a540d46c","canon":0,"dups":2,"ftype":"data_center","name":"Coreweave, Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":30,"pc":"Grid","pconf":"High","pquote":"CoreWeave's facility is equipped to handle up to 30 megawatts of critical IT load, structured in multiple phases to allow for necessary electrical and mechanical upgrades.","uquote":"The utility company for Plano is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/plano/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CoreWeave","spon":"CoreWeave","tenant":"Nvidia","ay":2023,"oy":2023,"deal":"$1.6 billion investment by CoreWeave (announced July 2023); 6-year Master Services Agreement with Lincoln Property Company for over $260 million for initial 30 MW installation.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","srcUrls":["https://www.choosetexaspower.org/electricity-rates/plano/"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"c4dc2e076b8b","cid":"c4dc2e076b8b","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Crusoe Data Center Project","county":"Wilbarger County","state":"TX","lat":34.08492,"lng":-99.24244,"cprec":"distinct","status":"Unknown","pc":"Behind-the-Meter","pconf":"Medium","pquote":"The data center will use advanced air-cooling technology, limiting water consumption to only critical campus operations like kitchens. It will be co-located with — or built alongside — new clean power developed by AES.","uquote":"Grid Operator. Southwestern Public Service Company.","uscan":"https://www.interconnection.fyi/data-center/project/crusoe-energy-system-llc-01b4ce2b","rto":"SPP","nerc":"MRO","op":"Crusoe Energy System","spon":"Crusoe Energy System","tenant":"Google","deal":"Agreement with AES for new clean power development (date not specified)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/crusoe-energy-system-llc-01b4ce2b"]},{"id":"eacfb2f822bf","cid":"eacfb2f822bf","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE DALLAS CARROLLTON","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":90,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Over the past years, CyrusOne invested in efficiency upgrades and partnerships at Carrollton that significantly reduced its impact on the regional watershed, energy grid, and carbon emissions. In 2020, CyrusOne helped develop a renewable solar energy source that will cover a significant portion of our North Texas electricity needs.","pscan":"https://www.cyrusone.com/resources/blogs/care-in-carrollton","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","oy":2012,"deal":"Land purchased in December 2010 for $23.4 million","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/resources/blogs/care-in-carrollton"]},{"id":"bae4dbc117c8","cid":"bae4dbc117c8","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE DALLAS CARROLLTON","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":90,"pc":"Grid","pconf":"High","pquote":"The purchase is equivalent to meeting 100% of the power requirements for CyrusOne's data center facility in Allen, Texas, and approximately 70% of the power requirements for its data center in Carrollton, Texas. Additionally, CyrusOne will retire project-specific renewable attributes from Azure Sky solar + storage equal to 100% of the power usage at its Dallas headquarters.","uconf":"High","uquote":"CyrusOne Carrollton data center in Dallas with 93 facilities nearby. Get pricing, specs, and colocation information from CyrusOne... The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","oy":2012,"deal":"$687.1 million commercial mortgage-backed security issuance (between July 2024 and July 2025)","dealScan":"https://dallasinnovates.com/cyrusone-taps-former-equinix-exec-as-its-first-chief-strategy-officer-to-lead-data-center-growth/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;dallasinnovates.com","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton","https://dallasinnovates.com/cyrusone-taps-former-equinix-exec-as-its-first-chief-strategy-officer-to-lead-data-center-growth/"],"band":"50-100 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"51fa09b3e893","cid":"5c591c6265e3","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE DALLAS CARROLLTON","city":"CARROLLTON","county":"DENTON","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":90,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","tenant":"North Texas Emergency Communications Center (NTECC), Wikimedia Foundation","ay":2012,"oy":2013,"deal":"Wikimedia Foundation chose CyrusOne facility in Dallas-Fort Worth region of Texas as its new data center.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"5c591c6265e3","cid":"5c591c6265e3","canon":1,"dups":2,"ftype":"data_center","name":"CYRUSONE DALLAS CARROLLTON","city":"Carrollton","county":"Denton County","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":90,"pc":"Grid","pconf":"High","pquote":"fed by multiple separate power feeds. this massive campus is capable of providing 60 megawatts of power to the fully redundant Cyrus 1 electrical infrastructure.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-carrollton","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","tenant":"North Texas Emergency Communications Center (NTECC)","ay":2012,"oy":2013,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/cyrusone-carrollton"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"25973ecef352","cid":"032dd762b8aa","canon":0,"dups":4,"ftype":"data_center","name":"CYRUSONE HOUSTON GALLERIA","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Designed for high density computing, the Houston Galleria data center is equipped with fully-redundant power architecture to ensure the availability of mission critical server environments.","pscan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-galleria","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","deal":"Sale of four Houston data centers, including Houston Galleria, from CyrusOne to DataBank Holdings Ltd. for approximately $670 million, announced January 2022 and closed March 2022.","dealScan":"https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;rebusinessonline.com","srcUrls":["https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-galleria","https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/"],"lflag":"source_quality_reclassified"},{"id":"032dd762b8aa","cid":"032dd762b8aa","canon":0,"dups":4,"ftype":"data_center","name":"CYRUSONE HOUSTON GALLERIA","city":"HOUSTON","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Designed for high density computing, the Houston Galleria data center is equipped with fully-redundant power architecture to ensure the availability of mission critical server environments. The site sits on the same redundant power ring as the Emergency Broadcasting Network. Multiple levels of redundancy available within same footprint (e.g. N, 2N); 13.5 MW of critical capacity; Dual input PDU's with static transfer switches; Backed by generator power; 3,300 belly tank each plus an added 6,000 gallon external tank for every generator.","pscan":"https://baxtel.com/data-center/databank-houston-galleria","uconf":"High","uquote":"CenterPoint Energy is the TDSP in Houston and the surrounding areas, including Angleton, Alvin, Cypress, Galveston, Pasadena and Richmond.... CenterPoint Energy maintains all the wires, poles and electric infrastructure in the 5,000-square-mile Houston metropolitan area.","uscan":"https://www.greenmountainenergy.com/en/providers-centerpoint","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","ay":2009,"oy":2009,"deal":"CyrusOne sold four Houston data centers, including Houston Galleria, to DataBank for $670 million. The agreement was entered into on January 19, 2022, and the acquisition closed on March 3, 2022.","dealScan":"https://www.prnewswire.com/news-releases/databank-closes-670m-acquisition-of-four-cyrusone-data-centers-301494609.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"baxtel.com;greenmountainenergy.com;prnewswire.com","srcUrls":["https://baxtel.com/data-center/databank-houston-galleria","https://www.greenmountainenergy.com/en/providers-centerpoint","https://www.prnewswire.com/news-releases/databank-closes-670m-acquisition-of-four-cyrusone-data-centers-301494609.html"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"dcb983802daa","cid":"032dd762b8aa","canon":0,"dups":4,"ftype":"data_center","name":"CYRUSONE HOUSTON GALLERIA","city":"Houston","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Designed for high density computing, the Houston Galleria data center is equipped with fully-redundant power architecture to ensure the availability of mission critical server environments.... The site sits on the same redundant power ring as the Emergency Broadcasting Network.","pscan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-galleria","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","deal":"DataBank acquired four Houston data centers, including Houston Galleria, from CyrusOne for $670 million. The agreement was announced in January 2022 and the migration completed in November 2022.","dealScan":"https://www.databank.com/resources/press-releases/databank-completes-migration-of-cyrusone-houston-data-centers-and-customers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"marketplace.upstack.com;databank.com","srcUrls":["https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-galleria","https://www.databank.com/resources/press-releases/databank-completes-migration-of-cyrusone-houston-data-centers-and-customers/"],"lflag":"citation_artifact_removed source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"6641c9edfe21","cid":"6641c9edfe21","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON GALLERIA","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"24b8a4b1720c","cid":"24b8a4b1720c","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON GALLERIA","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":5,"pc":"Grid","pconf":"High","pquote":"Designed for high-density computing, our Houston Galleria colocation data center is equipped with a fully redundant power architecture to ensure the availability of mission-critical server environments and even sits on the same power ring as the Emergency Broadcasting Network. [...] 100% Renewable Energy Source.","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","oy":1999,"deal":"DataBank acquired four Houston data centers, including Houston Galleria, from CyrusOne for $670 million in March 2022.","dealScan":"https://www.databank.com/news/databank-completes-migration-of-cyrusone-houston-data-centers-and-customers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"databank.com","pscan":"https://databank.com/data-centers/houston/houston-galleria-data-center/","srcUrls":["https://databank.com/data-centers/houston/houston-galleria-data-center/","https://www.databank.com/data-centers/houston/","https://www.databank.com/news/databank-completes-migration-of-cyrusone-houston-data-centers-and-customers/"],"band":"< 10 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"4efa7c8578de","cid":"032dd762b8aa","canon":0,"dups":4,"ftype":"data_center","name":"CYRUSONE HOUSTON GALLERIA","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":5,"pc":"Grid","pconf":"High","pquote":"Designed for high density computing, the Houston Galleria data center is equipped with fully-redundant power architecture to ensure the availability of mission critical server environments.... The site sits on the same redundant power ring as the Emergency Broadcasting Network.... Multiple levels of redundancy available within same footprint (e.g. N, 2N); 13.5 MW of critical capacity; Dual input PDU's with static transfer switches; Backed by generator power; 3,300 belly tank each plus an added 6,000 gallon external tank for every generator.","pscan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-galleria","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge Holdings","oy":1969,"deal":"DataBank acquired four Houston data centers, including Houston Galleria, from CyrusOne for approximately $670 million. Agreement announced January 19, 2022, closed March 2022.","dealScan":"https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;rebusinessonline.com","srcUrls":["https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-galleria","https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/"],"band":"< 10 MW","lflag":"citation_artifact_removed source_quality_reclassified legacy_facility_year_review"},{"id":"cc0e45115a3f","cid":"cc0e45115a3f","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON GALLERIA","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":13,"pc":"Grid","pconf":"High","pquote":"Designed for high density computing, the Houston Galleria data center is equipped with fully-redundant power architecture to ensure the availability of mission critical server environments. With numerous carriers available on site, there are multiple solutions for connectivity requirements, inclusive of CyrusOne's National Internet Exchange. The site sits on the same redundant power ring as the Emergency Broadcasting Network.","pscan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-galleria","uconf":"Medium","uquote":"Critical Load designation from CentrePoint Energy ensures priority restoration in the event of any outage.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","ay":2022,"oy":2022,"deal":"Sale of four Houston data centers, including Houston Galleria, from CyrusOne to DataBank for approximately $670 million, announced January 2022.","dealScan":"https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;rebusinessonline.com","srcUrls":["https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-galleria","https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/"],"band":"10-25 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"9710e9b127bd","cid":"9710e9b127bd","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":91,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures. use advanced components designed to deliver N. and 2N redundancies. [...] each data hall is designed for fully redundant power availability. the distributed redundant electrical design enables multiple levels of redundancy. within the same data hall therefore customers can choose their level of redundancy. either N or 2N redundancies.","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uconf":"Medium","uquote":"Grid Operator: San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"DataBank","tenant":"Hyperscale (for Houston West III) and energy companies","ay":2009,"deal":"Sale of Houston West I, II, and III (and Houston Galleria) by CyrusOne to DataBank for approximately $670 million, announced January 2022, closed March 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;interconnection.fyi","lflag":"online_before_announced source_quality_reclassified,merged_duplicate","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w","https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9"]},{"id":"a1662372d5a2","cid":"5ed33dd0fda6","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"HOUSTON","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":91,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The campus offers multiple layers of redundancy, from power distribution to cooling infrastructure, supported by 68 dedicated diesel generators and multiple UPS systems with battery backup.","pscan":"https://www.cyrusone.com/data-centers/north-america/houston-tx","uquote":"Grid Operator. San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;interconnection.fyi","srcUrls":["https://www.cyrusone.com/data-centers/north-america/houston-tx","https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9"],"lflag":"source_quality_reclassified"},{"id":"5c720ee4ab99","cid":"5c720ee4ab99","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":31,"pc":"Grid","pconf":"High","pquote":"The facility features a redundant 2N architecture and will support power densities of at least 250 watts per square foot across the entire data center footprint.... fed by dual independent feeds this facility's electrical power and cooling architectures. use advanced components designed to deliver N. and 2N redundancies.","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uquote":"Grid Operator: San Bernard Electric Coop, INC.... San Bernard Electric Cooperative is continually monitoring the grid conditions from the Electricity Reliability Council of Texas (ERCOT).","uscan":"https://www.sbec.org/critical-care","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"Databank Holdings","spon":"DigitalBridge","tenant":"Energy company, Hyperscale customer","ay":2009,"oy":2009,"deal":"Sale of Houston West I, II, and III (and Houston Galleria) from CyrusOne to DataBank Holdings Ltd. for approximately $670 million, closed in March 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;sbec.org","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w","https://www.sbec.org/critical-care"],"band":"25-50 MW","lflag":"citation_artifact_removed source_quality_reclassified,merged_duplicate"},{"id":"0eeb87c8e17d","cid":"0eeb87c8e17d","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":96,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The facility features a redundant 2N architecture and will support power densities of at least 250 watts per square foot across the entire data center footprint. Built to sustain strong hurricanes, the facility is outside the FEMA 500 year flood plain and has a reinforced roof, concrete walls and hurricane shutters, the company said.","pscan":"https://www.datacenterknowledge.com/operations-and-management/cyrusone-opens-new-houston-data-center","uquote":"Grid Operator: CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"KKR and Global Infrastructure Partners","tenant":"Hyperscale customer","ay":2009,"oy":2009,"deal":"Sale of four Houston data centers (including Houston West I, II and III) by CyrusOne to DataBank for approximately $670 million, closed in March 2022.","dealScan":"https://www.databank.com/resources/press-releases/databank-closes-670m-acquisition-of-four-cyrusone-data-centers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenterknowledge.com;interconnection.fyi;databank.com","srcUrls":["https://www.datacenterknowledge.com/operations-and-management/cyrusone-opens-new-houston-data-center","https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","https://www.databank.com/resources/press-releases/databank-closes-670m-acquisition-of-four-cyrusone-data-centers/"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"8901|TX"},{"id":"d49bfc115ae6","cid":"aa083096f0df","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":42,"pc":"Grid","pconf":"Medium","pquote":"Located along a major fiber corridor in Houston, the Houston West Campus is strategically positioned with access to significant and redundant utility power feeds and access to the fastest and most reliable telecommunications networks.","pscan":"https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","uconf":"High","uquote":"CyrusOne Data Center in Harris County, TX (50-100 MW)... Grid Operator. CenterPoint Energy.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer","oy":2009,"deal":"CyrusOne sold its four Houston data center assets (including Houston West I, II, and III) to DataBank Holdings Ltd. for approximately $670 million. The agreement was announced on January 19, 2022, and the transaction closed by the end of Q1 2022.","dealScan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-west-iii","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"digitalbridge.com;marketplace.upstack.com","srcUrls":["https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","https://marketplace.upstack.com/data-centers/cyrusone-data-center-houston-west-iii"],"band":"25-50 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"8a244dd87449","cid":"8a244dd87449","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":12,"pc":"Grid","pconf":"High","pquote":"The Houston West Campus is strategically positioned with access to significant and redundant utility power feeds and access to the fastest and most reliable telecommunications networks.","pscan":"https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","uquote":"Grid Operator. CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer","oy":2010,"deal":"Sale of Houston West I, II and III and Houston Galleria data centers from CyrusOne to DataBank for approximately $670 million, announced January 2022 and closed March 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"digitalbridge.com;interconnection.fyi","srcUrls":["https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443"],"band":"10-25 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"8901|TX"},{"id":"b2f6c2657576","cid":"b2f6c2657576","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":42,"pc":"Grid","pconf":"High","pquote":"CyrusOne's Houston West campus is strategically positioned with access to significant and redundant utility power feeds and access to the fastest and most reliable telecommunications networks.","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uconf":"Medium","uquote":"Grid Operator: CenterPoint Energy","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer","ay":2009,"oy":2022,"deal":"Sale of four Houston data centers (including Houston West I, II, and III) from CyrusOne to DataBank for approximately $670 million, announced January 19, 2022, and closed by March 2022.","dealScan":"https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;interconnection.fyi;rebusinessonline.com","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w","https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","https://rebusinessonline.com/cyrusone-agrees-to-sell-four-data-centers-in-houston-for-670m/"],"band":"25-50 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"5ed33dd0fda6","cid":"5ed33dd0fda6","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":91,"pc":"Grid","pconf":"High","pquote":"CyrusOne's Houston data center is strategically positioned with access to significant and redundant utility power feeds.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-houston-data-center-greenspoint/","uquote":"Grid Operator: San Bernard Electric Coop, INC.","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"Hyperscale customer","oy":2022,"deal":"CyrusOne sold its four Houston data center assets, including Houston West I, II and III, to DataBank Holdings Ltd. for approximately $670 million, announced January 19, 2022, and closed March 3, 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-houston-data-center-greenspoint/"],"band":"50-100 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"aa083096f0df","cid":"aa083096f0df","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":42,"band":"25-50 MW","pc":"Grid","pconf":"Medium","pquote":"CyrusOne's Houston West III data center is a third-phase of the Houston West data centers. It is strategically positioned with access to significant and redundant utility power feeds and access to the fastest and most reliable telecommunications networks.","pscan":"https://www.youtube.com/watch?v=YHm1mstc07w","uquote":"Grid Operator. San Bernard Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9","ukey":"16638|TX","uname":"San Bernard Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer","ay":2010,"oy":2022,"deal":"Sale of four Houston data centers (including Houston West I, II, and III) by CyrusOne to DataBank for approximately $670 million, announced January 2022 and closed March 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;interconnection.fyi","srcUrls":["https://www.youtube.com/watch?v=YHm1mstc07w","https://www.interconnection.fyi/data-center/project/cyrusone-houston-west-3-47296dc9"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"33bee6bcbab7","cid":"aa083096f0df","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":42,"pc":"Grid","pconf":"High","pquote":"Additionally, one of the facilities being acquired – the Houston West Campus – is the region’s primary interconnection point, with over 30 fiber networks, 3,500 cross connects and public cloud on-ramps from AWS and Google. Located along a major fiber corridor in Houston, the Houston West Campus is strategically positioned with access to significant and redundant utility power feeds and access to the fastest and most reliable telecommunications networks.","pscan":"https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","uconf":"High","uquote":"Grid Operator: CenterPoint Energy.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer","ay":2009,"oy":2009,"deal":"DataBank acquired four Houston data centers (including Houston West I, II, and III) from CyrusOne for $670 million in March 2022.","dealScan":"https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"digitalbridge.com","srcUrls":["https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone"],"band":"25-50 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"4c1dfea7b566","cid":"4c1dfea7b566","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":42,"pc":"Grid","pconf":"High","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures. use advanced components designed to deliver N. and 2N redundancies. Located along a major fiber corridor in Houston, the Houston West Campus is strategically positioned with access to significant and redundant utility power feeds and access to the fastest and most reliable telecommunications networks.","pscan":"https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","uquote":"Grid Operator: CenterPoint Energy. The Houston West Campus is strategically positioned with access to significant and redundant utility power feeds.","uscan":"https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Databank Holdings","spon":"DigitalBridge Group","tenant":"Hyperscale customer","ay":2009,"oy":2009,"deal":"DataBank acquired Houston West I, II, and III (and Houston Galleria) from CyrusOne for approximately $670 million, announced January 19, 2022, and closed in March 2022.","dealScan":"https://www.databank.com/resources/press-releases/databank-completes-migration-of-cyrusone-houston-data-centers-and-customers/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalbridge.com;databank.com","srcUrls":["https://www.digitalbridge.com/news/2022-01-19-digitalbridge-databank-to-acquire-houston-area-data-centers-from-cyrusone","https://www.databank.com/resources/press-releases/databank-completes-migration-of-cyrusone-houston-data-centers-and-customers/"],"band":"25-50 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected,merged_duplicate delivery_utility_linked","dukey":"8901|TX"},{"id":"7afa0c41e46e","cid":"7afa0c41e46e","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE HOUSTON WEST","city":"Austin","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6e7de9888108","cid":"6e7de9888108","canon":1,"dups":1,"ftype":"data_center","name":"Reinvestment Zone #99 City of Houston (Dean Foods)","city":"Houston","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Redundancy is built into every layer, from N+1 and N+2 cooling configurations to 68 diesel generators and multiple UPS systems with battery backup.","uquote":"Grid Operator. CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","ay":2017,"deal":"Tax abatement and Chapter 380 Economic Development Agreement with City of Houston (undated, referencing 2017 investment target); DataBank acquired CyrusOne's Houston data centers for $670M in March 2022.","dealScan":"https://www.houstontx.gov/ecodev/abatements/southernfoods.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;houstontx.gov","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-e6dfd443","https://www.houstontx.gov/ecodev/abatements/southernfoods.pdf"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"f8ae7ae6520c","cid":"f8ae7ae6520c","canon":1,"dups":3,"ftype":"data_center","name":"Cyrusone LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Dedicated PPA","pcp":"Calpine Corporation (a Constellation unit)","pdt":"400-megawatt (MW) power supply agreement","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"52eea8e4ef57","cid":"f8ae7ae6520c","canon":0,"dups":3,"ftype":"data_center","name":"CyrusOne LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Calpine Corporation","pdt":"400 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ce6fe34aa987","cid":"f8ae7ae6520c","canon":0,"dups":3,"ftype":"data_center","name":"CyrusOne LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Calpine Corporation","pdt":"400 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b84248351d80","cid":"bd3921906fd8","canon":0,"dups":6,"ftype":"data_center","name":"CYRUSONE SAN ANTONIO V FACILITY","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power provider: CPS Energy / ERCOT.","pscan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","uquote":"Power provider: CPS Energy / ERCOT.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","contro":"The facility is located on the Edwards Aquifer Recharge Zone, raising concerns about water quality and usage for 2 million Central Texans downstream.","deal":"CyrusOne offered $575 million in ABS notes in February 2025, collateralized by real property interests in 13 data centers, including those in San Antonio.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"bd7e9511e528","cid":"bd3921906fd8","canon":0,"dups":6,"ftype":"data_center","name":"CYRUSONE SAN ANTONIO V FACILITY","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":18,"pc":"Grid","pconf":"High","pquote":"Power provider: CPS Energy / ERCOT.","pscan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2024,"deal":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments, included two new data centers in San Antonio added to the master trust at closing (March 05, 2024).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"centexdatacenters.org;cyrusone.com","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"b237bc3ba786","cid":"bd3921906fd8","canon":0,"dups":6,"ftype":"data_center","name":"CYRUSONE SAN ANTONIO V FACILITY","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":18,"pc":"Grid","pconf":"High","pquote":"With some of the lowest power cost in the country, this San Antonio data center facility can scale up to 20 megawatts of power from multiple substations. The data center has 2 x 200 MW of power substation providing power to the facility. The data center has power density from 150-200+ watts per square feet. Power outages are protected by 2.25 MW dedicated diesel generators with a 5,000 gallon belly tank.","pscan":"https://dsi.us/showcase/cyrusone/","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2025,"oy":2026,"deal":"CyrusOne offers $575 million in ABS, on Virginia and Texas data centers (February 2025)","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"dsi.us;cyrusone.com","srcUrls":["https://dsi.us/showcase/cyrusone/","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"bd3921906fd8","cid":"bd3921906fd8","canon":1,"dups":6,"ftype":"data_center","name":"CYRUSONE SAN ANTONIO V FACILITY","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":18,"pc":"Grid","pconf":"High","pquote":"Power provider: CPS Energy / ERCOT. The CyrusOne data center is built to top-tier standards offering 100% SLA on power, designed to deliver 20 megawatts of power capacity, and has excellent power usage effectiveness (PUE). Multiple levels of power redundancy are available in N, 2N, and N+1 configuration. The data center has 2 x 200 MW of power substation providing power to the facility.","uquote":"Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","deal":"CyrusOne offers $575 million in ABS, on Virginia and Texas data centers, dated February 10, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"ec29df77f60f","cid":"bd3921906fd8","canon":0,"dups":6,"ftype":"data_center","name":"CYRUSONE SAN ANTONIO V FACILITY","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":18,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","pscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","contro":"Located on Edwards Aquifer Recharge Zone, raising concerns about water quality for 2 million Central Texans downstream.","controScan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","deal":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments, added two new San Antonio data centers to the master trust at closing (March 5, 2024).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;centexdatacenters.org","srcUrls":["https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"b4882a5d0ac8","cid":"bd3921906fd8","canon":0,"dups":6,"ftype":"data_center","name":"CYRUSONE SAN ANTONIO V FACILITY","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":18,"pc":"Grid","pconf":"High","pquote":"With some of the lowest power cost in the country, this San Antonio data center facility can scale up to 20 megawatts of power from multiple substations.","pscan":"https://dsi.us/showcase/cyrusone/","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR, Global Infrastructure Partners, BlackRock","contro":"Located on Edwards Aquifer Recharge Zone, raising water quality concerns and calls for public attention.","controScan":"https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio","deal":"Part of CyrusOne's asset-backed securities (ABS) program, which includes San Antonio assets and raised $2.6 billion by May 2024, and also included in Series 2024-1 and 2025-1 securitization deals.","dealScan":"https://www.cyrusone.com/resources/press-releases/cyrusone-closes-1-175-billion-abs-issuance","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"dsi.us;cyrusone.com;centexdatacenters.org","srcUrls":["https://dsi.us/showcase/cyrusone/","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","https://www.cyrusone.com/resources/press-releases/cyrusone-closes-1-175-billion-abs-issuance","https://centexdatacenters.org/tracker/cyrusone-sat6-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"51ffbf995978","cid":"51ffbf995978","canon":1,"dups":3,"ftype":"data_center","name":"CYRUSONE SAT II-IV","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":36,"pc":"Grid","pconf":"High","pquote":"The data center has 2 x 200 MW of power substation providing power to the facility. The data center has power density from 150-200+ watts per square feet. Power outages are protected by 2.25 MW dedicated diesel generators with a 5,000 gallon belly tank.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","uconf":"High","uquote":"San Antonio's power grid is served by CPS Energy","uscan":"https://satc.org/data-center/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2015,"deal":"Securitization deal (Series 2024-1) including SAT3 and SAT4, dated March 5, 2024","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;satc.org","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","https://satc.org/data-center/"],"band":"25-50 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"56f0f0f92be3","cid":"51ffbf995978","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE SAT II-IV","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":36,"pc":"Grid","pconf":"High","pquote":"18 MW distributed redundant power configuration; 8 Detroit Diesel generators with 48-hour runtime at full load; 16 UPS systems with 7-minute battery backup","pscan":"https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4","uconf":"High","uquote":"CPS Energy is preparing for a tenfold increase in electricity demand from San Antonio data centers.... The CyrusOne San Antonio Data Center is located along Lambda Drive near Omicron Drive, where data and tech centers are proliferating on the far west side.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","deal":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments for space and electrical capacity in eight completed and operating data centers, including two in San Antonio, as of March 5, 2024.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4"],"band":"25-50 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"52281142decc","cid":"51ffbf995978","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE SAT II-IV","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The data center has 2 x 200 MW of power substation providing power to the facility. The data center has power density from 150-200+ watts per square feet. Power outages are protected by 2.25 MW dedicated diesel generators with a 5,000 gallon belly tank.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cloudandcolocation.com;cyrusone.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"73e0a463a208","cid":"73e0a463a208","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE SAT II-IV","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"1e413d5ad3a3","cid":"1e413d5ad3a3","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE WEST CAMPUS EXPANSION","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":6,"pc":"Grid","pconf":"High","pquote":"The campus offers multiple layers of redundancy, from power distribution to cooling infrastructure, supported by 68 dedicated diesel generators and multiple UPS systems with battery backup.","pscan":"https://www.cyrusone.com/data-centers/north-america/houston-tx","uconf":"High","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer (unnamed)","ay":2014,"oy":2015,"deal":"DataBank acquired four Houston data center assets, including the Houston West Campus, from CyrusOne for approximately $670 million, with the transaction expected to close by the end of the first quarter of 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;databank.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/houston-tx","https://www.databank.com/data-centers/houston/"],"band":"< 10 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_not_in_eia861,merged_duplicate delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"685e331a1632","cid":"685e331a1632","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE WEST CAMPUS EXPANSION","city":"Houston","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":100,"pc":"Grid","pconf":"High","pquote":"“There are redundant backup power systems, generators, all sorts of stuff.”","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Global Infrastructure Partners (GIP), KKR","ay":2013,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"100-250 MW","srcUrls":null,"srcDom":null},{"id":"b5dc39814b51","cid":"b5dc39814b51","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE WEST CAMPUS EXPANSION","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"680843e07588","cid":"680843e07588","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE WEST CAMPUS EXPANSION","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":42,"pc":"Grid","pconf":"High","pquote":"The campus offers multiple layers of redundancy, from power distribution to cooling infrastructure, supported by 68 dedicated diesel generators and multiple UPS systems with battery backup.","pscan":"https://www.cyrusone.com/data-centers/north-america/houston-tx","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","oy":2015,"deal":"DataBank acquired four Houston-area data centers from CyrusOne for $670 million, closing in March 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/houston-tx"],"band":"25-50 MW","lflag":"merged_duplicate"},{"id":"6b06e5b6775b","cid":"680843e07588","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE WEST CAMPUS EXPANSION","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":42,"pc":"Grid","pconf":"High","pquote":"Located along a major fiber corridor in Houston, the Houston West Campus is strategically positioned with access to significant and redundant utility power feeds and access to the fastest and most reliable telecommunications networks.","uconf":"High","uquote":"Powered by an off-site Center Point Energy substation providing multiple 25MW feeds.","uscan":"https://www.databank.com/data-centers/houston/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","tenant":"Hyperscale customer","ay":2013,"oy":2015,"deal":"DataBank acquired four Houston data centers from CyrusOne for $670 million on March 3, 2022.","dealScan":"https://www.prnewswire.com/news-releases/databank-closes-670m-acquisition-of-four-cyrusone-data-centers-301494609.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;prnewswire.com","srcUrls":["https://www.databank.com/data-centers/houston/","https://www.prnewswire.com/news-releases/databank-closes-670m-acquisition-of-four-cyrusone-data-centers-301494609.html"],"band":"25-50 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"d55d017482cb","cid":"d55d017482cb","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE WEST CAMPUS EXPANSION","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"23947ea876ca","cid":"23947ea876ca","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"Allen","county":"Collin County","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":21,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid.","uconf":"High","uquote":"CyrusOne Allen DFW3 Data Center in Collin County, TX - Interconnection.fyi... Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-allen-dfw3-ae73848b","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2017,"oy":2018,"deal":"CyrusOne is slated to land the $1.05B fixed-rate, five-year loan for its adjacent DFW3 and DFW4 data centers on Chelsea Boulevard in Allen. The mortgage is expected to close on May 20.","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;bisnow.com","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-allen-dfw3-ae73848b","https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"lflag":"citation_artifact_removed,merged_duplicate"},{"id":"09efc0483092","cid":"09efc0483092","canon":1,"dups":2,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":76,"pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid. Utility capacity – 50 MW; Utility Voltage – 24,900 (25 kV); # of Utility Feeders – 2 each (non-redundant).","uconf":"Medium","uquote":"Grid Operator: Denton County Elec Coop, INC.","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (a subsidiary of BlackRock)","ay":2017,"oy":2025,"deal":"$1.05B CMBS loan refinancing for DFW3 and DFW4, expected to close May 20, 2026","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","srcUrls":["https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"band":"50-100 MW"},{"id":"5e9d724f9a49","cid":"3a221e2791b5","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"Allen","county":"COLLIN","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":50,"pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid and 100% Carbon-Free/Renewable Electricity.","uconf":"High","uquote":"Oncor Electric Delivery is Allen's utility. While you can choose your electricity provider in a deregulated market, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages. The utility company for Allen is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/allen/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2017,"oy":2018,"deal":"$1.05B CMBS refinancing for DFW3 and DFW4, expected to close May 20, 2026.","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"choosetexaspower.org;bisnow.com","srcUrls":["https://www.choosetexaspower.org/electricity-rates/allen/","https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"1c7fa4812235","cid":"3a221e2791b5","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":50,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid.... 100% Carbon-Free/Renewable Electricity.","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR & and Global Infrastructure Partners (a subsidiary of BlackRock)","ay":2017,"oy":2025,"deal":"$1.05B CMBS loan refinancing for DFW3 and DFW4, expected to close May 20, 2026","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","srcUrls":["https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"75b1221cf35a","cid":"0ba244b7d8b3","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":76,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The purchase is equivalent to meeting 100% of the power requirements for CyrusOne's data center facility in Allen, Texas, and approximately 70% of the power requirements for its data center in Carrollton, Texas.... 100% Carbon-Free/Renewable Electricity.","pscan":"https://www.cyrusone.com/data-centers/north-america/allen-texas","uconf":"High","uquote":"The utility company for Allen is Oncor Electric Delivery. In the event of a power outage or electrical emergency, call your utility company, not your provider. Here's how to contact Oncor: Call 1-888-313-4747; Text “OUT” to 66267; Report an outage online. All utility companies charge a transmission and distribution utility (TDU) fee for delivering electricity.","uscan":"https://www.choosetexaspower.org/electricity-rates/allen/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR & and Global Infrastructure Partners (a subsidiary of BlackRock)","tenant":"hyperscale tenants","ay":2017,"oy":2025,"deal":"$1.05B refinancing for DFW3 and DFW4 data centers, negotiated with Wells Fargo, Barclays, Citi, Goldman Sachs, and Morgan Stanley, expected to close May 20, 2026.","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"cyrusone.com;choosetexaspower.org;bisnow.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/allen-texas","https://www.choosetexaspower.org/electricity-rates/allen/","https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"3a221e2791b5","cid":"3a221e2791b5","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"ALLEN","county":"COLLIN","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":50,"pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid. Utility capacity – 50 MW Generator Power – 24 each 2.25 MW Diesel (Critical), 1 each 1.25 MW Diesel (House) The purchase is equivalent to meeting 100% of the power requirements for CyrusOne's data center facility in Allen, Texas","uquote":"In Allen, Oncor Electric delivers electricity to all homes and businesses. The utility company for Allen is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR & and Global Infrastructure Partners (a subsidiary of BlackRock)","ay":2017,"oy":2018,"deal":"$1.05B CMBS refinancing for DFW3 and DFW4, expected to close May 20, 2026","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","srcUrls":["https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"cc7450604dcd","cid":"cc7450604dcd","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":50,"pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid.","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-allen-dfw3-ae73848b","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2017,"oy":2018,"deal":"$1.05B refinancing for DFW3 and DFW4 data centers, expected to close May 20, 2026","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;bisnow.com","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-allen-dfw3-ae73848b","https://www.bisnow.com/dallas-ft-worth/news/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372"],"band":"50-100 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"a6c7c3838878","cid":"a6c7c3838878","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-ALLEN","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":50,"pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid; Redundant electrical systems designed for continuous uptime; UPS-backed infrastructure ensuring stable power delivery; Backup generator systems planned for extended outage protection; Designed to support high-density and hyperscale workloads.","uconf":"Medium","uquote":"Grid Operator: Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-allen-dfw3-ae73848b","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2017,"oy":2018,"deal":"CyrusOne is slated to land a $1.05B fixed-rate, five-year CMBS loan for its adjacent DFW3 and DFW4 data centers on Chelsea Boulevard in Allen, with the mortgage expected to close on May 20, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-allen-dfw3-ae73848b"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"0ba244b7d8b3","cid":"0ba244b7d8b3","canon":1,"dups":3,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"Allen","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":76,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid. 100% Carbon-Free/Renewable Electricity.","uconf":"Medium","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-allen-dfw3-ae73848b","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2017,"oy":2018,"deal":"$1.05B refinancing for DFW3 and DFW4 data centers, expected to close May 20, 2026","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-allen-dfw3-ae73848b"],"lflag":"source_quality_reclassified"},{"id":"f20c6ada12c0","cid":"0ba244b7d8b3","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"ALLEN","county":"COLLIN","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":76,"pc":"Grid","pconf":"High","pquote":"Sustainability features include water-free cooling and the sourcing of renewable power, while robust security includes on-site security guards and anti-tailgating vehicle entry.","pscan":"https://www.cyrusone.com/data-centers/north-america/allen-texas","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-dallas-dfw6","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR & , Global Infrastructure Partners (a BlackRock company)","ay":2017,"oy":2018,"deal":"$1.05B CMBS loan refinancing for DFW3 and DFW4, expected to close May 20, 2026","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;baxtel.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/allen-texas","https://baxtel.com/data-center/cyrusone-dallas-dfw6"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"58f7bcc8dbf3","cid":"09efc0483092","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE-ALLEN","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":76,"pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid.","uquote":"The utility company for Allen is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (a subsidiary of BlackRock)","ay":2017,"oy":2025,"deal":"$1.05 billion refinancing deal for DFW3 and DFW4, expected to close May 20, 2026","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"acd26c8ff687","cid":"acd26c8ff687","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE-AUSTIN II & AUSTIN III","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":21,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The CyrusOne data centers diverse power is fed by two 400 MW capacity substation with dual underground, concrete encased feeds from electrical substations. The facility has 300 KVA dual input PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with a 3,300 gallon belly tank each plus an added 12,000 gallon external tank.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-austin-data-center-met-center-ii/","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2009,"oy":2014,"contro":"Austin City Council adopted a resolution directing an environmental and water study for data centers, which could affect the CyrusOne Austin campus due to its use of evaporative cooling towers and planned expansions.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;centexdatacenters.org","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-austin-data-center-met-center-ii/","https://centexdatacenters.org/tracker/cyrusone-austin"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"e1c2b92f7d10","cid":"c35b18abc8de","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE-AUSTIN II & AUSTIN III","city":"AUSTIN","county":"TRAVIS","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":33,"pc":"Grid","pconf":"High","pquote":"fed by dual independent utility feeds this facility's electrical power and cooling architectures use advanced components designed to deliver system redundancies. The facility is supported by multiple on-site generators, providing backup power in case of utility outages.","pscan":"https://inflect.com/building/7100-metropolis-drive-austin/cyrusone/datacenter/cyrusone-austin-3","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2014,"oy":2014,"contro":"Austin City Council directed a regional environmental and water study affecting data centers in the Austin metro.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"CyrusOne acquired a powered shell for AUS3 in April 2015.","dealScan":"https://centexdatacenters.org/tracker/cyrusone-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"inflect.com;centexdatacenters.org","srcUrls":["https://inflect.com/building/7100-metropolis-drive-austin/cyrusone/datacenter/cyrusone-austin-3","https://centexdatacenters.org/tracker/cyrusone-austin"],"band":"25-50 MW"},{"id":"b80fd950f5ff","cid":"3bfd1a98869a","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE-AUSTIN II & AUSTIN III","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"78b9b6a00ab9","cid":"78b9b6a00ab9","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-AUSTIN II & AUSTIN III","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"1015|TX","uname":"Austin Energy","reportedUtility":"Austin Energy","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e3f1c49e3b89","cid":"e3f1c49e3b89","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE-AUSTIN II & AUSTIN III","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":27,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Two on-site substations, each fed from a separate power source coming into the Austin-area electric grid. Underground electrical infrastructure with dual feeds from separate substations.","pscan":"https://www.metcenter.com/mission-critical","uconf":"High","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2009,"oy":2015,"contro":"Austin City Council adopted a resolution directing a data center environmental and water study, and Inside Climate News covered Texas data center water demands amid statewide drought, impacting the CyrusOne Austin Campus.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"CyrusOne was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in an approximately $15 billion all-cash transaction including debt.","dealScan":"https://baxtel.com/data-center/cyrusone-austin-iii","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"metcenter.com;centexdatacenters.org;baxtel.com","srcUrls":["https://www.metcenter.com/mission-critical","https://centexdatacenters.org/tracker/cyrusone-austin","https://baxtel.com/data-center/cyrusone-austin-iii"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"c35b18abc8de","cid":"c35b18abc8de","canon":1,"dups":2,"ftype":"data_center","name":"CYRUSONE-AUSTIN II & AUSTIN III","city":"AUSTIN","county":"TRAVIS","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":33,"pc":"Grid","pconf":"High","pquote":"fed by dual independent utility feeds this facility's electrical power and cooling architectures use advanced components designed to deliver system redundancies.; Two 400 MW capacity substations with dual underground, concrete encased feeds from electrical substations; The facility is supported by multiple on-site generators, providing backup power in case of utility outages.","uquote":"Power provider: Austin Energy","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2011,"oy":2011,"contro":"Austin City Council adopted a resolution directing a data center environmental and water study for the Austin metro area. The expansion of the CyrusOne Austin campus is noted to incrementally increase water draw on City of Austin Water.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"CyrusOne acquired a powered shell for Austin III in Austin's Met Center on April 2, 2015.","dealScan":"https://www.datacenterknowledge.com/operations-and-management/cyrusone-buys-its-third-and-biggest-austin-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"centexdatacenters.org;datacenterknowledge.com","srcUrls":["https://centexdatacenters.org/tracker/cyrusone-austin","https://www.datacenterknowledge.com/operations-and-management/cyrusone-buys-its-third-and-biggest-austin-data-center"],"band":"25-50 MW","lflag":"citation_artifact_removed"},{"id":"3bfd1a98869a","cid":"3bfd1a98869a","canon":1,"dups":2,"ftype":"data_center","name":"CYRUSONE-AUSTIN II & AUSTIN III","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Austin Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"1015|TX","uname":"Austin Energy","reportedUtility":"Austin Energy","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"81c60bbb07f8","cid":"81c60bbb07f8","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-AUSTIN II AND AUSTIN III","city":"AUSTIN","county":"TRAVIS","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":100,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The CyrusOne data centers diverse power is fed by two 400 MW capacity substation with dual underground, concrete encased feeds from electrical substations. The facility has 300 KVA dual input PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with a 3,300 gallon belly tank each plus an added 12,000 gallon external tank. Power failures are protected by multiple MGE 8000, 625 KVA UPS systems with battery backup.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-austin-data-center-met-center-ii/","uconf":"High","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2014,"oy":2027,"contro":"Austin City Council adopted Resolution 55 on April 24, 2025, directing city staff to partner with Austin Energy and Austin Water on a regional environmental study of data center energy and water impacts over the next decade.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"CyrusOne acquired a ~175,000 sq ft powered shell at Austin's Met Center (7100 Metropolis Drive) on April 2, 2015, to establish AUS3.","dealScan":"https://centexdatacenters.org/tracker/cyrusone-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;centexdatacenters.org","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-austin-data-center-met-center-ii/","https://centexdatacenters.org/tracker/cyrusone-austin"],"lflag":"source_quality_reclassified"},{"id":"b2ce2aa5f9bb","cid":"2b5ac9ad618e","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE-AUSTIN II AND AUSTIN III","city":"Austin","county":"Travis County","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":33,"pc":"Grid","pconf":"High","pquote":"Two - 400MW capacity substations with dual underground, concrete encased feeds from electrical substations. The data center offers a high-density power configuration, supporting up to 250 watts per square foot. - It features a redundant power system with N+1 UPS configuration, ensuring uninterrupted power supply. - The facility is supported by multiple on-site generators, providing backup power in case of utility outages.","pscan":"https://baxtel.com/data-center/cyrusone-austin-iii","uconf":"High","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2011,"oy":2011,"contro":"Austin City Council adopted Resolution 55 on April 24, 2025, directing city staff to partner with Austin Energy and Austin Water on a regional environmental study of data center energy and water impacts over the next decade.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"CyrusOne announced on April 2, 2015 the purchase of a ~175,000 sq ft powered shell at Austin's Met Center (7100 Metropolis Drive) to establish AUS3.","dealScan":"https://centexdatacenters.org/tracker/cyrusone-austin","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;centexdatacenters.org","srcUrls":["https://baxtel.com/data-center/cyrusone-austin-iii","https://centexdatacenters.org/tracker/cyrusone-austin"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"2b5ac9ad618e","cid":"2b5ac9ad618e","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE-AUSTIN II AND AUSTIN III","city":"Austin","county":"Travis County","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":33,"pc":"Grid","pconf":"High","pquote":"fed by dual independent utility feeds this facility's electrical power and cooling architectures use advanced components designed to deliver system redundancies. The facility is supported by multiple on-site generators, providing backup power in case of utility outages. Incoming Electrical Service Type. Dual Circuits. Two - 400MW capacity substations with dual underground, concrete encased feeds from electrical substations","pscan":"https://baxtel.com/data-center/cyrusone-austin-iii","uquote":"The MetCenter park features two on-site electric substations each with the capacity to reach 400 megawatts fed from separate power sources Switch Inc. reportedly intends to build a 300,000-square-foot (27,870 sqm) data center alongside a new Austin Energy substation.","uscan":"https://baxtel.com/data-center/cyrusone-austin-iii","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2014,"oy":2027,"contro":"Austin City Council adopts resolution directing data center environmental and water study amid statewide drought concerns.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"CyrusOne was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;centexdatacenters.org","srcUrls":["https://baxtel.com/data-center/cyrusone-austin-iii","https://centexdatacenters.org/tracker/cyrusone-austin"],"band":"25-50 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"4a8ad08934f6","cid":"4a8ad08934f6","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE-AUSTIN II AND AUSTIN III","city":"AUSTIN","county":"TRAVIS","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":27,"pc":"Grid","pconf":"High","pquote":"The new Austin facility will be located at the MetCenter II, which features two separate on-site electric substations and the potential to expand to 400 megawatts of capacity from separate power sources feeding the local grid.","pscan":"https://www.datacenterknowledge.com/operations-and-management/major-expansion-in-austin-for-cyrusone","uquote":"Power provider: Austin Energy.","uscan":"https://centexdatacenters.org/tracker/cyrusone-austin","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","ay":2011,"oy":2012,"contro":"Water demands amid statewide drought; Austin City Council directing environmental and water study.","controScan":"https://centexdatacenters.org/tracker/cyrusone-austin","deal":"Acquisition of powered shell for Austin III (April 2, 2015); Acquisition of 22 acres of land for expansion (January 7, 2014).","dealScan":"https://www.datacenterknowledge.com/operations-and-management/cyrusone-buys-its-third-and-biggest-austin-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;centexdatacenters.org","srcUrls":["https://www.datacenterknowledge.com/operations-and-management/major-expansion-in-austin-for-cyrusone","https://centexdatacenters.org/tracker/cyrusone-austin","https://www.datacenterknowledge.com/operations-and-management/cyrusone-buys-its-third-and-biggest-austin-data-center"],"band":"25-50 MW","lflag":"merged_duplicate"},{"id":"7a84ae193d37","cid":"7a84ae193d37","canon":0,"dups":1,"ftype":"data_center","name":"CYRUSONE-AUSTIN II AND AUSTIN III","city":"Austin","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","mw":21,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"CyrusOne Austin II Data Center... Two 400 MW capacity substations with dual underground, concrete encased feeds from electrical substations. Scalable 2.25MW MTU generators dedicated to each power leg- 48-hour belly tank with each generator at full-load (longer run times at partial load).","pscan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-austin-ii","uconf":"High","uquote":"Power provider: Austin Energy.","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2014,"oy":2015,"contro":"Austin City Council adopted Resolution 55 on April 24, 2025, directing city staff to partner with Austin Energy and Austin Water on a regional environmental study of data center energy and water impacts over the next decade. The resolution requires an initial report by October 2025 and annual follow-up reports, directly affecting CyrusOne and other operators in the Austin metro.","deal":"CyrusOne acquired a powered shell for AUS3 in Austin's Met Center on April 2, 2015; financial terms were not disclosed.","dealScan":"https://www.datacenterknowledge.com/operations-and-management/cyrusone-buys-its-third-and-biggest-austin-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"marketplace.upstack.com;datacenterknowledge.com","srcUrls":["https://marketplace.upstack.com/data-centers/cyrusone-data-center-austin-ii","https://www.datacenterknowledge.com/operations-and-management/cyrusone-buys-its-third-and-biggest-austin-data-center"],"lflag":"merged_duplicate"},{"id":"7d90e0ed5beb","cid":"7d90e0ed5beb","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-AUSTIN II AND AUSTIN III","city":"CARROLLTON","county":"DENTON","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"392c7253a3c1","cid":"37c9a7ac7229","canon":0,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Lewisville","county":"Denton County","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-lewisville-dfw2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reinforcing the value of its established assets while positioning the company for continued expansion across the region.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/cyrusone-lewisville-dfw2"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"72b3700e81f6","cid":"37c9a7ac7229","canon":0,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Lewisville","county":"DENTON","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"pc":"Grid","pconf":"High","pquote":"The facility features a fault tolerant power design, two independent power grids, high-efficiency cooling and 36/48-inch raised floor design.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-lewisville-dfw2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR","deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville (May 04 2026).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/cyrusone-lewisville-dfw2"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"37c9a7ac7229","cid":"37c9a7ac7229","canon":1,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. The facility features a fault tolerant power design, two independent power grids, high-efficiency cooling and 36/48-inch raised floor design.","pscan":"https://www.cyrusone.com/data-centers/north-america/lewisville-texas","uconf":"Medium","uquote":"The campus currently has 16.5 megawatts of capacity from Texas New Mexico Power (TNMP) via a high-voltage utility-owned onsite substationy.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-acquires-huge-dallas-campus","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2008,"deal":"$1.05 billion refinancing deal in May 2026","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;datacenterknowledge.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/lewisville-texas","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-acquires-huge-dallas-campus"],"uname":"Texas-New Mexico Power","reportedUtility":"Texas-New Mexico Power","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"40051|TX"},{"id":"b6ffc37b085b","cid":"37c9a7ac7229","canon":0,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Lewisville","county":"Denton County","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The facility features a fault tolerant power design, two independent power grids, high-efficiency cooling and 36/48-inch raised floor design.","pscan":"https://www.cyrusone.com/data-centers/north-america/lewisville-texas","uquote":"The campus currently has 16.5 megawatts of capacity from Texas New Mexico Power (TNMP) via a high-voltage utility-owned onsite substationy.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-acquires-huge-dallas-campus","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","oy":2012,"deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reported May 4, 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;datacenterknowledge.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/lewisville-texas","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-acquires-huge-dallas-campus"],"uname":"Texas-New Mexico Power","reportedUtility":"Texas-New Mexico Power","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"40051|TX"},{"id":"ca4b3df51a92","cid":"37c9a7ac7229","canon":0,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-lewisville-dfw2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR","deal":"$1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville (May 2026)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","https://baxtel.com/data-center/cyrusone-lewisville-dfw2"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"effd22fc24e4","cid":"37c9a7ac7229","canon":0,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"LEWISVILLE","county":"DENTON","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uconf":"High","uquote":"Oncor Electric Delivery is Lewisville's utility. While you can choose your electricity provider in a deregulated market, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages. The utility company for Lewisville is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/lewisville/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reported May 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;choosetexaspower.org","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","https://www.choosetexaspower.org/electricity-rates/lewisville/"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"1ef6ec203a18","cid":"1ef6ec203a18","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Dallas","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":26,"pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uquote":"The campus currently has 16.5 megawatts of capacity from Texas New Mexico Power (TNMP) via a high-voltage utility-owned onsite substationy.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-acquires-huge-dallas-campus","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville (May 2026)","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-acquires-huge-dallas-campus"],"band":"25-50 MW","uname":"Texas-New Mexico Power","reportedUtility":"Texas-New Mexico Power","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"40051|TX"},{"id":"1864ee90c1e9","cid":"1864ee90c1e9","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":26,"pc":"Grid","pconf":"High","pquote":"The facility features a fault tolerant power design, two independent power grids, high-efficiency cooling and 36/48-inch raised floor design.","uquote":"Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville) connected to redundant 25MVA transformers.","uscan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-dallas-lewisville","ukey":"13830|TX","uname":"Nueces Electric Cooperative","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2008,"deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"marketplace.upstack.com","srcUrls":["https://marketplace.upstack.com/data-centers/cyrusone-data-center-dallas-lewisville"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"f038436e6198","cid":"f038436e6198","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":26,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uconf":"High","uquote":"Oncor Electric Delivery is Lewisville's utility","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2008,"deal":"$1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville (May 2026)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"0590984e43cf","cid":"37c9a7ac7229","canon":0,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Lewisville","county":"Denton","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uquote":"Texas-New Mexico Power Company (TNMP) is the smallest of the five TDUs operating in the ERCOT deregulated market. Unlike other TDUs with large contiguous territories, TNMP serves scattered pockets of communities across Texas. TNMP does not sell electricity — customers choose a REP for their energy supply. Cities & counties served. Texas-New Mexico Power provides electricity delivery service throughout the following areas in Texas: Lewisville.","uscan":"https://www.electricchoice.com/utilities/tnmp/","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, dated May 04, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;electricchoice.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","https://www.electricchoice.com/utilities/tnmp/"],"uname":"Texas-New Mexico Power","reportedUtility":"Texas-New Mexico Power","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"40051|TX"},{"id":"5869bdc99fef","cid":"37c9a7ac7229","canon":0,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"LEWISVILLE","county":"DENTON","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-lewisville-dfw2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR","deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reinforcing the value of its established assets while positioning the company for continued expansion across the region.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","https://baxtel.com/data-center/cyrusone-lewisville-dfw2"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"6604e7bcf68b","cid":"37c9a7ac7229","canon":0,"dups":9,"ftype":"data_center","name":"CYRUSONE-LEWISVILLE","city":"Lewisville","county":"Denton County","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":26,"pc":"Grid","pconf":"High","pquote":"A total of 20 MW power is fed through 3 dedicated power substation providing redundant feeds, and also features two independent power grids. Power failure is protected by MGE 8000, 625 KVA UPS system with battery bank. The facility has dual PDUs with static transfer switches, and 2.25 MW dedicated diesel generators for emergency power with 3,300 gallons belly tank each plus an added 6,000 gallons external tank for every two generators.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","uconf":"Medium","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/cyrusone-lewisville-dfw2","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","deal":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reported May 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-lewisville-data-center/","https://baxtel.com/data-center/cyrusone-lewisville-dfw2"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"a33f73a7cfe3","cid":"d8adb8f61ec8","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE-SAN ANTONIO I","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"With some of the lowest power costs in the country, this San Antonio data center facility can scale up to 20 megawatts of power from multiple substations. CyrusOne's San Antonio Data Center I is positioned centrally in Texas, away from natural disaster zones, and touts some of the most seismically stable soil in the U.S. The stable power grid makes it an ideal place to locate the high performance computing facilities for which CyrusOne is known.... The data center has 2 x 200 MW of power substation providing power to the facility. The data center has power density from 150-200+ watts per square feet. Power outages are protected by 2.25 MW dedicated diesel generators with a 5,000 gallon belly tank.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2012,"deal":"CyrusOne Inc. acquired by KKR and Global Infrastructure Partners for approximately $15 billion on March 25, 2022.","dealScan":"https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"cloudandcolocation.com;cyrusone.com;global-infra.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/"],"lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"f91aa800f5e6","cid":"f91aa800f5e6","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-SAN ANTONIO I","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":20,"pc":"Grid","pconf":"High","pquote":"CyrusOne's San Antonio Data Center I is positioned centrally in Texas, away from natural disaster zones, and touts some of the most seismically stable soil in the U.S. The stable power grid makes it an ideal place to locate the high performance computing facilities for which CyrusOne is known.","pscan":"https://marketplace.upstack.com/data-centers/cyrusone-data-center-san-antonio-i","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2012,"deal":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments for space and electrical capacity in eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas, in March 2024.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"marketplace.upstack.com;cyrusone.com","srcUrls":["https://marketplace.upstack.com/data-centers/cyrusone-data-center-san-antonio-i","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"d8adb8f61ec8","cid":"d8adb8f61ec8","canon":0,"dups":2,"ftype":"data_center","name":"CYRUSONE-SAN ANTONIO I","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":9,"pc":"Grid","pconf":"High","pquote":"CyrusOne's SAT1 data center in San Antonio can scale up to 20 MW of power from multiple substations. The data center has 2 x 200 MW of power substation providing power to the facility. Power outages are protected by 2.25 MW dedicated diesel generators with a 5,000 gallon belly tank.","pscan":"https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1","uconf":"Medium","uquote":"The groundbreaking ceremony [for CyrusOne's fifth data center campus in San Antonio] was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"Multiple (colocation)","ay":2012,"oy":2012,"deal":"CyrusOne offers $575 million in ABS, on Virginia and Texas data centers, with collateral underpinning CyrusOne, 2025-1's notes consisting of real property interests in 13 data centers located in Northern Virginia, San Antonio and Houston (February 10, 2025).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"< 10 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"be5532cf0ef7","cid":"be5532cf0ef7","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE-SAN ANTONIO I","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":9,"pc":"Grid","pconf":"High","pquote":"CyrusOne's 110,000-sq. ft. SAT1 data center was the city's first enterprise colocation facility. The SAT1 data center boasts some of the lowest power costs in the country and can scale up to 20 megawatts of power from multiple substations. The facility provides extra layers of physical security including hurricane shutters, impact-resistant glazing, and extra diesel on-site, and is located outside of flood zones.","pscan":"https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","tenant":"Microsoft, Microsoft Azure","ay":2012,"oy":2012,"deal":"CyrusOne offered $575 million in asset-backed securities (ABS) on February 10, 2025, collateralized by real property interests in 13 data centers, including those in San Antonio.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"< 10 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"3af315838836","cid":"e5048247eca2","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE-SAN ANTONIO II","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The data center has 2 x 200 MW of power substation providing power to the facility. The data center has power density from 150-200+ watts per square feet. Power outages are protected by 2.25 MW dedicated diesel generators with a 5,000 gallon belly tank.","uquote":"The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2015,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"e5048247eca2","cid":"e5048247eca2","canon":1,"dups":3,"ftype":"data_center","name":"CYRUSONE-SAN ANTONIO II","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":36,"pc":"Grid","pconf":"High","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures use advanced components designed to deliver N. and 2N redundancies. The data center has 2 x 200 MW of power substation providing power to the facility.","pscan":"https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","uconf":"High","uquote":"A new group has concerns about the city-owned utility's capacity to handle coming projects in data, other business. The groundbreaking ceremony was attended by a prestigious group of city and county officials and partners including Bexar County Judge Peter Sakai, District 6 Councilwoman Melissa Cabello Havrda, District 7 Councilwoman Marina Aldrete Gavito, Greater San Antonio Chamber CEO Jeff Webster, Greater SATX Senior Vice President Sarah Morales, and representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2015,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cloudandcolocation.com;cyrusone.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyrusone-san-antonio-data-center/","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"band":"25-50 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"d945a2f4ebdc","cid":"e5048247eca2","canon":0,"dups":3,"ftype":"data_center","name":"CYRUSONE-SAN ANTONIO II","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"fed by dual independent feeds this facility's electrical power and cooling architectures use advanced components designed to deliver N. and 2N redundancies.","pscan":"https://www.youtube.com/watch?v=ac2H9lQvqMk","uquote":"representatives of CPS Energy.","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"CyrusOne","oy":2015,"deal":"CyrusOne Data Centers Issuer I LLC's data center revenue notes series 2024-1","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"youtube.com;cyrusone.com","srcUrls":["https://www.youtube.com/watch?v=ac2H9lQvqMk","https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-fifth-data-center-campus-in-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"daf2c1db170d","cid":"aebbcd4a7544","canon":0,"dups":2,"ftype":"data_center","name":"DATABANK DFW3","city":"Plano","county":"Collin County","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":13,"pc":"Grid","pconf":"High","pquote":"DFW3 is powered by dual feeds from an off-site Oncor substation. The facility currently delivers 20MW of power and provides valuable metro connectivity (via Data Center Interconnect) to DataBank's other Dallas data centers, which are just 20-30 minutes away.","pscan":"https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","uquote":"Located on a 16-acre campus at 8375 Dominion Parkway in Plano, DFW3 is powered by dual feeds from an off-site Oncor substation.","uscan":"https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"Digital Bridge","ay":2017,"oy":2018,"deal":"Acquisition of Stream Data Centers' development by DataBank on June 13, 2017","dealScan":"https://www.databank.com/resources/press-releases/databank-announces-construction-of-third-data-center-in-dallas/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","https://www.databank.com/resources/press-releases/databank-announces-construction-of-third-data-center-in-dallas/"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"c11378cc0ded","cid":"c11378cc0ded","canon":1,"dups":1,"ftype":"data_center","name":"DATABANK DFW3","city":"PLANO","county":"COLLIN","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":15,"pc":"Grid","pconf":"High","pquote":"DFW3 is powered by dual feeds from an off-site Oncor substation.","pscan":"https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","uquote":"Located on a 16-acre campus at 8375 Dominion Parkway in Plano, DFW3 is powered by dual feeds from an off-site Oncor substation.","uscan":"https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DigitalBridge","ay":2017,"oy":2018,"deal":"Acquisition of Stream Data Centers' development in Legacy Business Park, announced June 13, 2017.","dealScan":"https://www.databank.com/resources/press-releases/databank-announces-construction-of-third-data-center-in-dallas/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","https://www.databank.com/resources/press-releases/databank-announces-construction-of-third-data-center-in-dallas/"],"band":"10-25 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"aebbcd4a7544","cid":"aebbcd4a7544","canon":0,"dups":2,"ftype":"data_center","name":"DATABANK DFW3","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":13,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Diverse utility feeds provide more than 40MW of power, and security measures include full perimeter fencing, round-the-clock on-site security personnel and dual-factor authentication (card and biometric) on exterior entry and all data center entrances.","pscan":"https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_DFW3_Q32020_v1.pdf","uquote":"Located on a 16-acre campus at 8375 Dominion Parkway in Plano, DFW3 is powered by dual feeds from an off-site Oncor substation.","uscan":"https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"Digital Bridge","ay":2017,"oy":2018,"deal":"Acquisition of Stream Data Centers' latest development in Legacy Business Park, announced June 13, 2017.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/wp-content/uploads/2020/10/DB_DCTR_DFW3_Q32020_v1.pdf","https://www.databank.com/resources/press-releases/databank-to-expand-flagship-dfw3-data-center-in-dallas/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"92ffe3ec9554","cid":"92ffe3ec9554","canon":0,"dups":2,"ftype":"data_center","name":"DB Data Center Red Oak, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":60,"pc":"Grid","pconf":"High","pquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","pscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","uscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"AustralianSuper","tenant":"Oracle","oy":2027,"deal":"DataBank secured a $2 billion construction loan in April 2026 from a group of banks led by MUFG Bank Ltd. for the first three data centers (DFW9, DFW10, DFW11) at its Red Oak campus.","dealScan":"https://www.bisnow.com/dallas-ft-worth/news/data-center-development/databank-secures-2b-construction-loan-for-red-oak-data-centers-134226","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;bisnow.com","srcUrls":["https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","https://www.bisnow.com/dallas-ft-worth/news/data-center-development/databank-secures-2b-construction-loan-for-red-oak-data-centers-134226"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"27533ce103a1","cid":"27533ce103a1","canon":0,"dups":1,"ftype":"data_center","name":"DB Data Center Red Oak, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","uconf":"High","uquote":"The first phase of the campus will feature four buildings and a 400MW substation from Oncor, capable of delivering up to 240MW of critical IT power.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"AustralianSuper","tenant":"Oracle","oy":2027,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text state_centroid_only utility_alias_corrected,merged_duplicate delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"f9cba9c30553","cid":"92ffe3ec9554","canon":0,"dups":2,"ftype":"data_center","name":"DB Data Center Red Oak, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":60,"pc":"Grid","pconf":"High","pquote":"Developing DFW13 amid rapid AI growth presented several hurdles: ✓ Power Availability: Texas's grid strains under Data Center loads. Solution: Secured a dedicated 400MW substation with expansion provisions, partnering with local utilities for renewable integration (e.g., solar offsets targeting 20% of consumption).","pscan":"https://checkmarkpro.com/assets/Case-Study-Data-Bank-DFW13-Red-Oak.pdf","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"AustralianSuper","ay":2026,"oy":2029,"contro":"Community opposition regarding noise, power grid strain, water usage, and declining property values for data center projects in Red Oak, including DataBank's campus.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"checkmarkpro.com","srcUrls":["https://checkmarkpro.com/assets/Case-Study-Data-Bank-DFW13-Red-Oak.pdf"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"89e4af0e6f8c","cid":"89e4af0e6f8c","canon":1,"dups":1,"ftype":"data_center","name":"DB Data Center Red Oak, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":480,"pc":"Grid","pconf":"High","pquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","pscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","uscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"AustralianSuper (equity), MUFG Bank (debt)","tenant":"Oracle","ay":2024,"oy":2026,"deal":"$2 billion construction loan in April 2026","dealScan":"https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;theaiconsultingnetwork.com","srcUrls":["https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"6f13b1378ab0","cid":"6f13b1378ab0","canon":1,"dups":1,"ftype":"data_center","name":"DDH (North America) Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"cdc4982cb416","cid":"cdc4982cb416","canon":1,"dups":1,"ftype":"data_center","name":"DDI Garland, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"3525413de48e","cid":"3525413de48e","canon":1,"dups":1,"ftype":"data_center","name":"DDI Lewisville, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","op":"DDI Lewisville","spon":"Digital Realty Trust","tenant":"Wells Fargo Bank National Association","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"7056108fcd34","cid":"7056108fcd34","canon":1,"dups":1,"ftype":"data_center","name":"DFW33220N, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":96,"pc":"Grid","pconf":"High","pquote":"AUS2 and its future neighbors are each expected to pull up to 96 megawatts of power, enough to energize a small town or large industrial facility.","rto":"ERCOT","nerc":"TRE","op":"EdgeConneX","spon":"EdgeConneX","ay":2024,"oy":2026,"deal":"10-year property tax break from Bastrop County effective December 9, 2024; Estimated cost of $440,000,000 for this facility (part of a $1.44 billion campus)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"11405345b934","cid":"11405345b934","canon":1,"dups":1,"ftype":"data_center","name":"DFW7 DFW8","city":"FORT WORTH","county":"TARRANT","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the Texas grid; Redundant electrical systems designed for continuous uptime; UPS-backed infrastructure","uquote":"distinguished attendees including U.S. Congressman Marc Veasey, Fort Worth Mayor Mattie Parker, Oncor Chief Operating Officer Jim Greer, and Clune CEO David Hall and Vice President Tyler Stevenson.... “By delivering the energy infrastructure needed to support major projects like this, Oncor is helping fuel economic development, attract new businesses and create opportunities that benefit the entire community. We look forward to providing the resilient and reliable service needed to support CyrusOne's operations today and as they scale in the future.”","uscan":"https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-new-fort-worth-data-center-campus","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"CyrusOne","spon":"CyrusOne","ay":2025,"oy":2026,"deal":"$200 million facility","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-new-fort-worth-data-center-campus"],"band":"50-100 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"86e7197d76f9","cid":"86e7197d76f9","canon":1,"dups":1,"ftype":"data_center","name":"Digital Garland Campbell, L.P. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":48,"pc":"Grid","pconf":"High","pquote":"Garland Power and Light has been a strong partner in recruiting both data center projects as they are able to provide reliable electricity at competitive rates and operational terms. GP&L is one of only a handful of municipally-owned electric utility providers in Texas and this provides Garland with a significant competitive advantage in securing this kind of investment.","uconf":"High","uquote":"Garland Power and Light has been a strong partner in recruiting both data center projects as they are able to provide reliable electricity at competitive rates and operational terms.","uname":"Garland Power & Light (City of Garland)","rto":"ERCOT","nerc":"TRE","op":"Digital Garland Campbell, L.P.","spon":"Digital Realty Trust, L.P.","tenant":"LinkedIn","ay":2017,"oy":2027,"deal":"Garland approved a deal with Digital Realty to develop a $1 billion data center campus (August 2018) and an incentive agreement for a datacenter campus on 45 acres at President George Bush Turnpike & Holford Road, including a 50% sales tax rebate for 20 years and a 4-year, 40% rebate on business personal property and real estate taxes per phase (September 17, 2024).","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text state_centroid_only nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Garland Power & Light (City of Garland)","ukey":"6958|TX","srcUrls":null,"srcDom":null},{"id":"c5e0385cc4ed","cid":"c5e0385cc4ed","canon":1,"dups":1,"ftype":"data_center","name":"EGUS","city":"EL PASO","county":"EL PASO","state":"TX","lat":31.76648,"lng":-106.241423,"cprec":"shared_centroid","status":"Unknown","mw":250,"band":"250+ MW","proc":"Co-located generation","pcp":"El Paso Electric (EPE) / McCloud Generation (built by Enchanted Rock)","pdt":"366MW plant for an initial five-year 'bridge period', with Meta covering all costs (plant estimated at $473M)","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7ccf799aa816","cid":"7ccf799aa816","canon":0,"dups":1,"ftype":"data_center","name":"EGUS","city":"EL PASO","county":"EL PASO","state":"TX","lat":31.76648,"lng":-106.241423,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"El Paso Electric (EPE)","pdt":"366MW plant, initial five-year \"bridge period\"","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"f33d7d833753","cid":"f33d7d833753","canon":1,"dups":1,"ftype":"data_center","name":"El Paso Datacenter","city":"HOCKLEY","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":17.5,"band":"10-25 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c004d96e2049","cid":"ca2f762508c2","canon":0,"dups":2,"ftype":"data_center","name":"El Paso Datacenter","city":"El Paso","county":"El Paso","state":"TX","lat":31.76648,"lng":-106.241423,"cprec":"shared_centroid","status":"Unknown","mw":1000,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"El Paso Electric (EPE) plans to supply the data center through McCloud Generation, a 366MW plant with 813 modular gas generators located next to the site, according to a filing with the Public Utility Commission of Texas (PUCT). Starting in 2027, the plant would power the data center exclusively for an initial five-year \"bridge period\" and remain separate from EPE's transmission system, with all costs recovered from Meta under a commission-approved rate.","pscan":"https://www.argusmedia.com/en/news-and-insights/latest-market-news/2810465-meta-funds-el-paso-nat-gas-plant-as-interim-power-fix","proc":"Co-located generation","pcp":"El Paso Electric (EPE) / McCloud Generation","pdt":"366MW plant for an initial five-year 'bridge period', with all costs recovered from Meta","uquote":"El Paso Electric (EPE) plans to supply the data center through McCloud Generation, a 366MW plant with 813 modular gas generators located next to the site, according to a filing with the Public Utility Commission of Texas (PUCT).","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2025,"oy":2027,"contro":"Community opposition and regulatory pushback regarding water use, electricity demand, environmental impact, and tax incentives.","controScan":"https://www.youtube.com/watch?v=Bjwyl2YC8ZY","deal":"Meta increased its investment to more than $10 billion (March 2026). The City of El Paso approved an incentive package and land sale agreement for $8.5 million in December 2023, including tax abatements for an initial $800 million investment.","dealScan":"https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"argusmedia.com;datacenters.atmeta.com;youtube.com","srcUrls":["https://www.argusmedia.com/en/news-and-insights/latest-market-news/2810465-meta-funds-el-paso-nat-gas-plant-as-interim-power-fix","https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/","https://www.youtube.com/watch?v=Bjwyl2YC8ZY"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"ca2f762508c2","cid":"ca2f762508c2","canon":1,"dups":2,"ftype":"data_center","name":"El Paso Datacenter","city":"El Paso","county":"El Paso County","state":"TX","lat":31.76648,"lng":-106.241423,"cprec":"shared_centroid","status":"Unknown","mw":1000,"pc":"Behind-the-Meter","pconf":"High","pquote":"El Paso Electric is planning to develop a 366 megawatt power plant made up of over 800 small gas generators to power Meta's data center. The utility will build more generation in the coming years to meet 1 gigawatt of total demand from Meta's facility. The McCloud gas plant will be exclusively connected to the data center for the first five years, according to regulatory filings.","pscan":"https://www.texastribune.org/2026/01/26/texas-el-paso-meta-data-center-natural-gas-power-plant/","proc":"Co-located generation","pcp":"El Paso Electric (via McCloud Generation)","pdt":"366MW plant, initial five-year 'bridge period'","uquote":"Meta said it is coordinating with El Paso Electric to meet the facility's power demands and plans to add enough renewable energy generation to offset 100% of the data center's electricity use.","uscan":"https://www.connectcre.com/stories/meta-increasing-investment-in-el-paso-data-center-to-10b/","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2023,"oy":2027,"contro":"Community opposition and regulatory pushback regarding water use, electricity demand, air pollution, utility rates, and tax incentives.","deal":"Meta Platforms is working on a roughly $13 billion financing package for a data center in El Paso, Texas, led by Morgan Stanley and JPMorgan Chase, reported May 5, 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"texastribune.org;connectcre.com","srcUrls":["https://www.texastribune.org/2026/01/26/texas-el-paso-meta-data-center-natural-gas-power-plant/","https://www.connectcre.com/stories/meta-increasing-investment-in-el-paso-data-center-to-10b/"],"band":"250+ MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"f741b43f3aa5","cid":"f741b43f3aa5","canon":1,"dups":3,"ftype":"data_center","name":"EQUINIX 2323 BRYAN STREET DALLAS","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Dallas DA4 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center has single utility feed, and two power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 0.48 kV of utility voltage. The immediate power failure is protected by 4 x 275 kVA UPS system in N+1 configuration. The standby power is provided by 1 x 1,550 kW diesel generators in N configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da4/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da4","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Digital Realty Trust","ay":2021,"oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da4/","https://baxtel.com/data-center/equinix-dallas-da4"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"0516003af9a9","cid":"f741b43f3aa5","canon":0,"dups":3,"ftype":"data_center","name":"EQUINIX 2323 BRYAN STREET DALLAS","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":1,"pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and two power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 0.48 kV of utility voltage. The immediate power failure is protected by 4 x 275 kVA UPS system in N+1 configuration. The standby power is provided by 1 x 1,550 kW diesel generators in N configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da4/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da4/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"5f3cc3eef699","cid":"f741b43f3aa5","canon":0,"dups":3,"ftype":"data_center","name":"EQUINIX 2323 BRYAN STREET DALLAS","city":"DALLAS","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":1,"pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and two power transformers. The immediate power failure is protected by 4 x 275 kVA UPS system in N+1 configuration. The standby power is provided by 1 x 1,550 kW diesel generators in N configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da4/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da4","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da4/","https://baxtel.com/data-center/equinix-dallas-da4"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"b0a22cd49ef4","cid":"b0a22cd49ef4","canon":1,"dups":2,"ftype":"data_center","name":"EQUINIX BRYAN STREET","city":"DALLAS","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":1,"pc":"Grid","pconf":"High","pquote":"Dallas DA4 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center provides electrical capacity of 2.4 kVA per cabinet. The data center has single utility feed, and two power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 0.48 kV of utility voltage. The immediate power failure is protected by 4 x 275 kVA UPS system in N+1 configuration. The standby power is provided by 1 x 1,550 kW diesel generators in N configuration.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da4","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/equinix-dallas-da4"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"f8a371754b4b","cid":"b0a22cd49ef4","canon":0,"dups":2,"ftype":"data_center","name":"EQUINIX BRYAN STREET","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1,"pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and two power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 0.48 kV of utility voltage. The immediate power failure is protected by 4 x 275 kVA UPS system in N+1 configuration. The standby power is provided by 1 x 1,550 kW diesel generators in N configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da4/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da4","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da4/","https://baxtel.com/data-center/equinix-dallas-da4"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"ef7f00138a13","cid":"ef7f00138a13","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX DA9","city":"Austin","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"8140b84c9d16","cid":"8140b84c9d16","canon":0,"dups":2,"ftype":"data_center","name":"EQUINIX DA9","city":"Irving","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Incoming Electrical Service Type: Dual Circuits. Electrical Distribution: Isolated Redundant. UPS Type: Static UPS. UPS Redundancy: N+1. Generator Redundancy: N+1. Number Of Generators: 2.","pscan":"https://marketplace.upstack.com/data-centers/equinix-data-center-irving-da9-frmr-vz","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da9","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2017,"deal":"Acquisition of DA9 (formerly Verizon DFW1) as part of Equinix's $3.8 billion acquisition of 29 Verizon data centers in May 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;baxtel.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","srcUrls":["https://marketplace.upstack.com/data-centers/equinix-data-center-irving-da9-frmr-vz","https://baxtel.com/data-center/equinix-dallas-da9"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"3e370bb7c8e3","cid":"8140b84c9d16","canon":0,"dups":2,"ftype":"data_center","name":"EQUINIX DA9","city":"Irving","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Power. Safeguard operations and prevent outages with enterprise-grade uninterruptible power supply (UPS) systems and built-in redundancy. N+1 Power redundancy. Generator Redundancy: N+1.","uconf":"High","uquote":"The utility company for Irving is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/irving/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2017,"deal":"Acquisition of 29 data centers from Verizon for U.S. $3.6 billion in May 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"choosetexaspower.org","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.choosetexaspower.org/electricity-rates/irving/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"12a56b6aee06","cid":"12a56b6aee06","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX DA9","city":"Irving","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/equinix-da9-ba99d8be","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da9","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":2017,"deal":"Equinix acquired 29 data centers from Verizon for U.S. $3.6 billion in May 2017, including DA9 (formerly Verizon DFW1).","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"interconnection.fyi;baxtel.com;investor.equinix.com","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-da9-ba99d8be","https://baxtel.com/data-center/equinix-dallas-da9","https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"ce63d102946c","cid":"d655da9739a6","canon":0,"dups":4,"ftype":"data_center","name":"EQUINIX HO1","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":15,"pc":"Grid","pconf":"High","pquote":"Utility Feeders. 2. UPS Configuration. Isolated Redundant. UPS Redundancy. N+1. Standby Power. Configuration. Two systems, each having 3 x. 2,000 kW diesel generators. Standby Power. Redundancy. 2 x (N+1).","uconf":"High","uquote":"Greenspoint Service Area. 2301 West Gears Road. Houston, TX 77067. 713.945.4636. Serving: Aldine, Bammel, Jersey Village, Spring, Satsuma, Westfield.","uscan":"https://www.centerpointenergy.com/en-us/Documents/service-centers.pdf","uname":"Chariot Energy","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","deal":"Equinix acquires Verizon's portfolio of 29 data centers on April 30, 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centerpointenergy.com","srcUrls":["https://www.centerpointenergy.com/en-us/Documents/service-centers.pdf"],"band":"10-25 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"Chariot Energy"},{"id":"29c82202e625","cid":"d655da9739a6","canon":0,"dups":4,"ftype":"data_center","name":"EQUINIX HO1","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":15,"pc":"Grid","pconf":"High","pquote":"Equinix Houston Data Centers... Our International Business Exchange™ (IBX®) data center in the Greater Houston area offers more than 76,500 square feet (7,100 square meters) of colocation space.... Utility Feeders. 2. UPS Configuration. Isolated Redundant. UPS Redundancy. N+1. Standby Power. Configuration. Two systems, each having 3 x. 2,000 kW diesel generators. Standby Power. Redundancy. 2 x (N+1). Cooling Configuration Air-cooled DX CRACs. Cooling Redundancy N+2.... 100% Wind RECs from Texas and Oklahoma vPPAs and wind/solar Green-e RECs from USA and Canada; LED.","uconf":"High","uquote":"Greenspoint Service Area. 2301 West Gears Road. Houston, TX 77067. 713.945.4636. Serving: Aldine, Bammel, Jersey Village, Spring, Satsuma, Westfield.","uscan":"https://www.centerpointenergy.com/en-us/Documents/service-centers.pdf","uname":"Chariot Energy","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":1999,"deal":"Equinix acquired HO1 as part of a portfolio of 29 data centers from Verizon in 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centerpointenergy.com","srcUrls":["https://www.centerpointenergy.com/en-us/Documents/service-centers.pdf"],"band":"10-25 MW","lflag":"citation_artifact_removed source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"Chariot Energy"},{"id":"d655da9739a6","cid":"d655da9739a6","canon":1,"dups":4,"ftype":"data_center","name":"EQUINIX HO1","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility Feeders. 2. UPS Configuration. Isolated Redundant. UPS Redundancy. N+1. Standby Power. Configuration. Two systems, each having 3 x. 2,000 kW diesel generators.","uconf":"High","uquote":"CenterPoint Energy Houston Electric LLC is the TDU serving the greater Houston metropolitan area. Operating within the ERCOT deregulated market, CenterPoint delivers electricity, maintains power lines and infrastructure, reads meters, and restores service after outages. CenterPoint does not sell electricity — customers choose a Retail Electric Provider (REP) for their energy supply and billing. CenterPoint Energy is the TDSP in Houston and the surrounding areas, including Angleton, Alvin, Cypress, Galveston, Pasadena and Richmond.... CenterPoint Energy maintains all the wires, poles and electric infrastructure in the 5,000-square-mile Houston metropolitan area. CenterPoint Energy's Greenspoint Service Area, located at 2301 West Gears Road, Houston, TX 77067, serves Aldine. The Equinix HO1 data center is located at 1515 Aldine Meadows Road, Houston, TX 77032.","uscan":"https://www.electricchoice.com/utilities/centerpoint/","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":1999,"deal":"Acquisition of HO1 from Verizon in 2017","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"electricchoice.com","srcUrls":["https://www.electricchoice.com/utilities/centerpoint/"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"d49fa3d39f9d","cid":"d49fa3d39f9d","canon":0,"dups":1,"ftype":"data_center","name":"EQUINIX HO1","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":1,"pc":"Grid","pconf":"High","pquote":"Utility Feeders. 2. UPS Configuration. Isolated Redundant. UPS Redundancy. N+1. Standby Power. Configuration. Two systems, each having 3 x. 2,000 kW diesel generators. Standby Power. Redundancy. 2 x (N+1).","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","deal":"Acquisition of Verizon's portfolio of 29 data centers by Equinix on April 30, 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"2acc045e9851","cid":"d655da9739a6","canon":0,"dups":4,"ftype":"data_center","name":"EQUINIX HO1","city":"Houston","county":"Harris","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":15,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power. Safeguard operations and prevent outages with enterprise-grade uninterruptible power supply (UPS) systems and built-in redundancy. N+1 Power redundancy.... 100% Wind RECs from Texas and Oklahoma vPPAs and wind/solar Green-e RECs from USA and Canada","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":2017,"deal":"Acquisition of 29 data centers from Verizon Communications Inc. for U.S. $3.6 billion, completed May 1, 2017.","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"investor.equinix.com","srcUrls":["https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"2d121cc3fef4","cid":"2d121cc3fef4","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX HO1","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","proc":"Dedicated PPA","pcp":"Invenergy LLC and NextEra Energy Resources, LLC","pdt":"Combined 225 MW of capacity (100 MW from Invenergy in Texas, 125 MW from NextEra Energy Resources in Oklahoma) by end of 2016","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b7ea2fd65ac6","cid":"b7ea2fd65ac6","canon":1,"dups":1,"ftype":"data_center","name":"Dallas State of Texas Enterprise Zone Tract 1130100000 Block 481130100001107","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"693761504424","cid":"693761504424","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"HOUSTON","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":14,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Feed incoming from two separate supplies. Backed by Parallel redundant N+2 two x 1,200 kVA UPS and 6 x 3000 kW diesel generators.","pscan":"https://www.clouvider.com/dallas-equinix-da11-equinix-datacenter/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da11","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2020,"oy":2020,"deal":"Equinix invested $142 million in the first phase of DA11, announced June 2020.","dealScan":"https://datacenterplanet.com/data-center/equinix-opens-142m-dallas-infomart-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"clouvider.com;baxtel.com;datacenterplanet.com","srcUrls":["https://www.clouvider.com/dallas-equinix-da11-equinix-datacenter/","https://baxtel.com/data-center/equinix-dallas-da11","https://datacenterplanet.com/data-center/equinix-opens-142m-dallas-infomart-data-center/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"148553022a16","cid":"148553022a16","canon":0,"dups":1,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The building is supplied by five independent electric feeds to three separate electrical substations. The data center has single utility feed, and three 2,500 kVA power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 480V of utility voltage. The immediate power failure is protected by 2 x 900 kVA and 1 x 1,000 kVA UPS system in blocked redundant topology. The standby power is provided by 3 x 2,500 kW diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da2/","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tenant":"Google Cloud Platform, Microsoft Azure, Oracle","ay":2000,"oy":2000,"deal":"Acquisition of Infomart building by Equinix for $800 million in 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da2/"],"lflag":"merged_duplicate"},{"id":"315e12ac9745","cid":"315e12ac9745","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Leesburg","county":"Dallas","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Dallas DA2 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center has single utility feed, and three 2,500 kVA power transformers. The immediate power failure is protected by 2 x 900 kVA and 1 x 1,000 kVA UPS system in blocked redundant topology. The standby power is provided by 3 x 2,500 kW diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da2/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da2/","https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"e1996a7fa583","cid":"826c2e8e0cd5","canon":0,"dups":6,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The agreement with Invenergy includes the purchase of wind energy from the Wake Wind Energy Facility located in Floyd and Crosby Counties, Texas. This agreement will provide 100 MW of capacity resulting in approximately 457,000 MWhs of clean and renewable energy generated annually in Texas and delivered into the Electric Reliability Council of Texas (ERCOT) regional electricity grid.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2016,"oy":2016,"deal":"Equinix Inc acquired the Infomart building and its data centers for $800 million in April 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"b9cd1c7248b1","cid":"826c2e8e0cd5","canon":0,"dups":6,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":3,"pc":"Grid","pconf":"High","pquote":"Dallas DA1 data center is N+1 power infrastructure, and offer 99.999% SLA on power.... The data center has single utility feed, and four power transformer.... The immediate power failure is protected by distributed redundant 2,250 kVA UPS power in N+1 configuration. The standby power is provided by 3 x 1,500 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2000,"oy":2000,"deal":"Acquisition of Infomart building by Equinix Inc for $800 million in April 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy"],"band":"< 10 MW","lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"feb928491ab2","cid":"feb928491ab2","canon":0,"dups":1,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"DALLAS","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":51,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The building's hospital-grade electrical power is supplied by five independent electric feeds to three separate electrical substations, providing a very reliable source that has never experienced a 100% outage. Dallas DA2 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center has single utility feed, and three 2,500 kVA power transformers. The data center provides AC power, and DC power to customer's equipment. The facility has 480V of utility voltage. The immediate power failure is protected by 2 x 900 kVA and 1 x 1,000 kVA UPS system in blocked redundant topology. The standby power is provided by 3 x 2,500 kW diesel generators.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tenant":"Multiple colocation tenants","ay":2018,"oy":1985,"deal":"$800 million acquisition of Infomart Dallas by Equinix from ASB Real Estate Investments, announced February 14, 2018, completed April 2, 2018.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text utility_alias_corrected legacy_facility_year_review,merged_duplicate delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"a118038c5711","cid":"a118038c5711","canon":0,"dups":5,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":1985,"oy":2000,"deal":"Equinix acquired the Infomart Dallas building from ASB Real Estate Investments for $800 million in a debt and cash transaction, completed on April 2, 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified legacy_facility_year_review,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"9e583950d3c2","cid":"9e583950d3c2","canon":1,"dups":2,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"DALLAS","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":60,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Equinix's Dallas metro data centers deliver AI-ready infrastructure with high-performance interconnection and scalable colocation in one of the South Central US's key digital hubs. Support your low-latency, compute-intensive AI workloads close to major enterprise, cloud and network ecosystems.... 100% Renewable Energy Coverage.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2018,"deal":"Equinix acquired the Infomart Dallas from ASB Real Estate Investments for $800 million in 2018.","dealScan":"https://newsroom.equinix.com/2018-02-14-Equinix-to-Acquire-the-Infomart-Dallas-in-800-Million-Deal","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;newsroom.equinix.com","lflag":"online_before_announced citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","https://newsroom.equinix.com/2018-02-14-Equinix-to-Acquire-the-Infomart-Dallas-in-800-Million-Deal"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"a8ca26ead53f","cid":"826c2e8e0cd5","canon":0,"dups":6,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":3,"pc":"Grid","pconf":"High","pquote":"Dallas DA1 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center provides electrical capacity of 2.4 kVA per cabinet. The data center has single utility feed, and four power transformer. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 480V of utility voltage. The immediate power failure is protected by distributed redundant 2,250 kVA UPS power in N+1 configuration. The standby power is provided by 3 x 1,500 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","uquote":"Dallas-based Oncor has received 80 GW in service requests from large commercial and industrial customers, such as data centers, CEO Allen Nye said on Aug. 6, 2024.","uscan":"https://www.utilitydive.com/news/oncor-data-center-industrial-earnings-sempra/723779/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2000,"oy":2000,"deal":"Equinix acquired the Infomart Dallas from ASB Real Estate Investments in an $800 million debt and cash transaction, completed on April 2, 2018.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;utilitydive.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","https://www.utilitydive.com/news/oncor-data-center-industrial-earnings-sempra/723779/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"68239b9bdbc9","cid":"826c2e8e0cd5","canon":0,"dups":6,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"DALLAS","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":3,"pc":"Grid","pconf":"High","pquote":"Dallas DA1 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center provides electrical capacity of 2.4 kVA per cabinet. The data center has single utility feed, and four power transformer. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 480V of utility voltage. The immediate power failure is protected by distributed redundant 2,250 kVA UPS power in N+1 configuration. The standby power is provided by 3 x 1,500 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","uconf":"High","uquote":"Dallas-based Oncor has received 80 GW in service requests from large commercial and industrial customers, such as data centers, CEO Allen Nye said on Aug. 6, 2024.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":2000,"deal":"Equinix completed the acquisition of the Infomart Dallas building from ASB Real Estate Investments for US$800 million on April 2, 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"bcf452b9c0bc","cid":"a118038c5711","canon":0,"dups":5,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"DALLAS","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Equinix DA11 offers average power density 5 - 12 kVA per cabinet. Feed incoming from two separate supplies. Backed by Parallel redundant N+2 two x 1,200 kVA UPS and 6 x 3000 kW diesel generators.... Diverse utility feeds. UPS N+2redundancy. Power Generators N+2 redundancy.","pscan":"https://www.clouvider.com/dallas-equinix-da11-equinix-datacenter/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da11","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":2000,"deal":"Equinix acquired the Infomart Dallas building from ASB Real Estate Investments for $800 million, completed April 2, 2018.","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/227/equinix-completes-acquisition-of-infomart-dallas","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"clouvider.com;baxtel.com;investor.equinix.com","srcUrls":["https://www.clouvider.com/dallas-equinix-da11-equinix-datacenter/","https://baxtel.com/data-center/equinix-dallas-da11","https://investor.equinix.com/news-events/press-releases/detail/227/equinix-completes-acquisition-of-infomart-dallas"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"0e24aa75d271","cid":"a118038c5711","canon":0,"dups":5,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","uconf":"High","uquote":"Site: Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy. Short Code: DA11. Year Built: 2020. Utility Provider: Oncor.","uscan":"https://baxtel.com/data-center/equinix-dallas-da11","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","deal":"Equinix acquired the Infomart Dallas, which houses several Equinix data centers at 1950 North Stemmons Freeway, for $800 million in April 2018.","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/227/equinix-completes-acquisition-of-infomart-dallas","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"baxtel.com;investor.equinix.com","srcUrls":["https://baxtel.com/data-center/equinix-dallas-da11","https://investor.equinix.com/news-events/press-releases/detail/227/equinix-completes-acquisition-of-infomart-dallas"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"e3761e89a7b2","cid":"a118038c5711","canon":0,"dups":5,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"DALLAS","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Equinix DA11 offers average power density 5 - 12 kVA per cabinet. Feed incoming from two separate supplies. Backed by Parallel redundant N+2 two x 1,200 kVA UPS and 6 x 3000 kW diesel generators.","pscan":"https://www.clouvider.com/dallas-equinix-da11-equinix-datacenter/","uconf":"High","uquote":"Oncor Electric Utility is Dallas' utility company","uscan":"https://www.choosetexaspower.org/electricity-rates/dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":2020,"deal":"Equinix acquired the building at 1990 N. Stemmons Freeway for $800m, followed by a $142m addition in 2020 and a $180m expansion.","dealScan":"https://baxtel.com/data-center/equinix-dallas-da11","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"clouvider.com;choosetexaspower.org;baxtel.com","srcUrls":["https://www.clouvider.com/dallas-equinix-da11-equinix-datacenter/","https://www.choosetexaspower.org/electricity-rates/dallas/","https://baxtel.com/data-center/equinix-dallas-da11"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"0e880394b094","cid":"0e880394b094","canon":0,"dups":1,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":2,"pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and four power transformer. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 480V of utility voltage. The immediate power failure is protected by distributed redundant 2,250 kVA UPS power in N+1 configuration. The standby power is provided by 3 x 1,500 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":2000,"deal":"Equinix acquired the Infomart Dallas building for US$800 million on April 3, 2018.","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/227/equinix-completes-acquisition-of-infomart-dallas","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"cloudandcolocation.com;baxtel.com;investor.equinix.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","https://baxtel.com/data-center/infomart-dallas-equinix-dallas-1950-n-stemmons-fwy","https://investor.equinix.com/news-events/press-releases/detail/227/equinix-completes-acquisition-of-infomart-dallas"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"a9705641fc47","cid":"826c2e8e0cd5","canon":0,"dups":6,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":3,"pc":"Grid","pconf":"High","pquote":"Dallas DA1 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center has single utility feed, and four power transformer. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 480V of utility voltage. The immediate power failure is protected by distributed redundant 2,250 kVA UPS power in N+1 configuration. The standby power is provided by 3 x 1,500 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","uquote":"The electricity provider serving Dallas city, Texas is Oncor Electric Delivery.","uscan":"https://whoismyutility.com/texas/dallas","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2016,"oy":2016,"deal":"Equinix acquired the Infomart building for $800 million in April 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;whoismyutility.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","https://whoismyutility.com/texas/dallas"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"5c29fcf9355a","cid":"5c29fcf9355a","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":3,"pc":"Grid","pconf":"High","pquote":"The building is supplied by five independent electric feeds to three separate electrical substations.","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/equinix-dallas-da11","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","ay":2019,"oy":2019,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/equinix-dallas-da11"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"e07320c5c78e","cid":"9e583950d3c2","canon":0,"dups":2,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":60,"pc":"Grid","pconf":"High","pquote":"Dallas DA6 data center is N+1 power infrastructure, and offer 99.999% SLA on power. The data center has single utility feed, and single power transformer. The facility has 13.2 kV of utility voltage.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da6/","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","ay":2014,"oy":2014,"deal":"In April 2018, ASB sold the Infomart building and their data centers located in the building to Equinix Inc for $800 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da6/"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"472a085a9381","cid":"472a085a9381","canon":0,"dups":1,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Dallas DA1 data center is N+1 power infrastructure... The data center has single utility feed, and four power transformer. The data center provides AC power, and DC power to customer's equipment. The facility has three phase, 480V of utility voltage. The immediate power failure is protected by distributed redundant 2,250 kVA UPS power in N+1 configuration. The standby power is provided by 3 x 1,500 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","uconf":"High","uquote":"Oncor Electric Utility is Dallas' utility company","uscan":"https://www.choosetexaspower.org/electricity-rates/dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tenant":"Google Cloud, IBM Cloud, Amazon AWS","ay":2000,"oy":2000,"deal":"Equinix acquired the Infomart Dallas from ASB Real Estate Investments for US$800 million in a debt and cash transaction, completed on April 2, 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;choosetexaspower.org","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-dallas-data-center-da1/","https://www.choosetexaspower.org/electricity-rates/dallas/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"826c2e8e0cd5","cid":"826c2e8e0cd5","canon":0,"dups":6,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"DALLAS","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":3,"pc":"Grid","pconf":"High","pquote":"The building is supplied by five independent electric feeds to three separate electrical substations.","uconf":"High","uquote":"If you live in Dallas, your utility company is Oncor Electric Delivery.","uscan":"https://www.chooseenergy.com/electricity-rates/texas/dallas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","tenant":"Multiple (e.g., AT&T, Level 3 Communications, Adobe, AOL, Comcast, China Telecom, Sprint, Time Warner Cable, Walmart, Google Cloud Platform, Microsoft Azure, Oracle, Voxility, Lumen Technologies, Verizon)","oy":2000,"deal":"Equinix acquired the Infomart Dallas building for $800 million in April 2018.","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/227/equinix-completes-acquisition-of-infomart-dallas","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"chooseenergy.com;investor.equinix.com","srcUrls":["https://www.chooseenergy.com/electricity-rates/texas/dallas/","https://investor.equinix.com/news-events/press-releases/detail/227/equinix-completes-acquisition-of-infomart-dallas"],"band":"< 10 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"49e1913f1e46","cid":"a118038c5711","canon":0,"dups":5,"ftype":"data_center","name":"EQUINIX N STEMMONS FREEWAY DALLAS","city":"Dallas","county":"Dallas County","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Equinix DA11 offers average power density 5 - 12 kVA per cabinet. Feed incoming from two separate supplies. Backed by Parallel redundant N+2 two x 1,200 kVA UPS and 6 x 3000 kW diesel generators.... Diverse utility feeds.","pscan":"https://www.clouvider.com/dallas-equinix-da11-equinix-datacenter/","uconf":"Medium","uquote":"Utility Provider: Oncor.","uscan":"https://baxtel.com/data-center/equinix-dallas-da11","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Equinix","spon":"Equinix","oy":2020,"deal":"Equinix invested $142 million in the expansion for DA11, opened June 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"clouvider.com;baxtel.com","srcUrls":["https://www.clouvider.com/dallas-equinix-da11-equinix-datacenter/","https://baxtel.com/data-center/equinix-dallas-da11"],"lflag":"citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"30de2f0d6e4b","cid":"d67cbb159525","canon":0,"dups":3,"ftype":"data_center","name":"Fermi Campus Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":11000,"pc":"Behind-the-Meter","pconf":"High","pquote":"We are building a private power campus for AI-centric customers—developing and leasing large-scale, grid-independent energy generation and high-performance computing facilities purpose-built for the hyperscale era.","pscan":"https://www.stocktitan.net/sec-filings/FRMI/10-k-fermi-inc-files-annual-report-e45e25f0963c.html","proc":"Co-located generation","pdt":"11 GW planned capacity","rto":"ERCOT","nerc":"TRE","op":"Fermi","spon":"Fermi","ay":2025,"oy":2027,"contro":"Boardroom dispute, CEO termination, class action lawsuit, tenant agreement termination.","deal":"IPO in October 2025, raising $746 million; Macquarie Term Loan for $100 million on August 29, 2025; MUFG Equipment Financing in February 2026; Keystone Master Loan Agreement in February 2026.","dealScan":"https://www.distilled.earth/p/the-worlds-largest-planned-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"stocktitan.net;distilled.earth","srcUrls":["https://www.stocktitan.net/sec-filings/FRMI/10-k-fermi-inc-files-annual-report-e45e25f0963c.html","https://www.distilled.earth/p/the-worlds-largest-planned-data-center"],"band":"250+ MW","rawName":"Fermi Inc.\t\n            Fermi Equipment Holdco, LLC \n\t\t\tFirebird Equipment Holdco, LLC \n\t\t\tFermi Campus 1 LLC Data Center","lflag":"large_project_duplicate_review display_name_normalized source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"d67cbb159525","cid":"d67cbb159525","canon":1,"dups":3,"ftype":"data_center","name":"Fermi Campus Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":11000,"pc":"Behind-the-Meter","pconf":"High","pquote":"Project Matador is a 17GW private power and AI campus on 7,570 acres in the Texas Panhandle, engineered to deliver private power on a hyperscaler's timeline.","pscan":"https://fermiamerica.com/","proc":"Co-located generation","pdt":"11 GW total capacity (planned), with potential expansion to 17 GW","uconf":"High","uquote":"Xcel Energy, a publicly traded energy company based in Minnesota, signed a deal this month to provide 200 MW of power to the campus, starting with 86 MW in January. • “SPS” means the Southwestern Public Service Company, a subsidiary of Xcel Energy Inc.","uscan":"https://www.bisnow.com/national/news/data-center-development/rick-perrys-fermi-loses-150m-in-construction-funding-from-prospective-tenant-132330","rto":"ERCOT","nerc":"TRE","op":"Fermi","spon":"MUFG, Macquarie, Toby Neugebauer, Rick Perry","ay":2025,"oy":2027,"contro":"CEO fired and sued company, class-action lawsuit against Fermi, community opposition due to water and pollution concerns, major tenant backed out.","deal":"IPO in October 2025, raising $682M; $100M (expandable to $250M) senior secured loan from Macquarie on August 29, 2025; Equipment Supply Loan Financing Agreement with MUFG on February 10, 2026.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"fermiamerica.com;bisnow.com;distilled.earth","srcUrls":["https://fermiamerica.com/","https://www.bisnow.com/national/news/data-center-development/rick-perrys-fermi-loses-150m-in-construction-funding-from-prospective-tenant-132330","https://www.distilled.earth/p/the-worlds-largest-planned-data-center"],"band":"250+ MW","rawName":"Fermi Inc.\t\n            Fermi Equipment Holdco, LLC \n\t\t\tFirebird Equipment Holdco, LLC \n\t\t\tFermi Campus 1, LLC\n\t\t\tFermi Warehouse, LLC\n\t\t\tFermi High Voltage Warehouse, LLC\n\t\t\tFermi Turbine Warehouse, LLC\n\t\t\tFermi Mobile Gen, LLC Data Center","lflag":"large_project_duplicate_review display_name_normalized source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized","dealScan":"https://www.distilled.earth/p/the-worlds-largest-planned-data-center"},{"id":"07155a34b1a7","cid":"d67cbb159525","canon":0,"dups":3,"ftype":"data_center","name":"Fermi Campus Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":11000,"pc":"Behind-the-Meter","pconf":"High","pquote":"Fermi America's 11GW private HyperGrid™ campus delivers behind-the-meter power to America's leading AI companies in months, not years. Nuclear power at scale with natural gas, solar, and battery bridge. Texas-built. BYOP-ready.","pscan":"https://fermiamerica.com/","uquote":"Another 86 MW is expected to be delivered by January from Xcel Energy subsidiary Southwestern Public Service Company.","rto":"ERCOT","nerc":"TRE","op":"Fermi (d/b/a Fermi America)","spon":"Fermi","ay":2025,"oy":2027,"contro":"Class action lawsuit filed, CEO fired and sued the company, prospective tenant backed out, community opposition due to environmental concerns (water, greenhouse gas emissions).","deal":"IPO in October 2025; $165 million senior-secured equipment loan from CSG Investments, Inc. (March 2026); $500 million turbine warehouse facility with MUFG Bank (February 2026); $200 million facility from Keystone National Group and Cape Commercial Finance (February 2026); natural gas supply agreement with Energy Transfer (October 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fermiamerica.com","srcUrls":["https://fermiamerica.com/"],"band":"250+ MW","rawName":"Fermi Inc.\t\n            Fermi Equipment Holdco, LLC \n\t\t\tFirebird Equipment Holdco, LLC \n\t\t\tFermi Campus 1, LLC\n\t\t\tFermi Warehouse, LLC\n\t\t\tFermi High Voltage Warehouse, LLC\n\t\t\tFermi Turbine Warehouse, LLC Data Center","lflag":"large_project_duplicate_review display_name_normalized source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"bf4b1f4b2776","cid":"bf4b1f4b2776","canon":1,"dups":1,"ftype":"data_center","name":"Fort Blocks LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Hybrid","pconf":"High","pquote":"Fort Blocks LLC is developing a data hosting and distribution facility in Pecos County, Texas. The site is reported to be at one of the phases of the Sherbino Wind Farm. According to Cormint's power marketer registration, Sherbino I Wind Farm LLC is an affiliate of Cormint. \"Cormint's mission is to support renewable energy without sacrificing grid stability, adding Bitcoin mining loads to renewable generation sites is the first step in this vision for the future,\" the company has stated. Fort Blocks LLC will purchase and sell electric energy at wholesale in the market administered by the Electric Reliability Council of Texas.","proc":"Dedicated PPA","pcp":"Sherbino I Wind Farm LLC","rto":"ERCOT","nerc":"TRE","op":"Fort Blocks (a subsidiary of Cormint Data Systems )","spon":"Cormint Data Systems","tenant":"Cormint Data Systems","ay":2022,"oy":2022,"deal":"Economic development agreement with Pecos County, effective 11/22/2021, expiring 12/31/2042.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"ea1cdfe0e3d8","cid":"ea1cdfe0e3d8","canon":1,"dups":1,"ftype":"data_center","name":"Fort Haskell LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Intersect and TPG Rise Climate","rto":"ERCOT","nerc":"TRE","op":"Fort Haskell","spon":"Fort Haskell","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3077bc496994","cid":"3077bc496994","canon":0,"dups":2,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Grid","pconf":"High","pquote":"The filings show the Helios campus combining ERCOT transmission access, phased AI deployment, and hundreds of megawatts of private backup-generation infrastructure.","pscan":"https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai","uconf":"High","uquote":"Galaxy's transmission interconnection provider will be Wind Energy Transmission Texas, LLC (\"WETT\"), who facilitated the LLIS studies.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital Holdings","tenant":"CoreWeave","ay":2022,"oy":2026,"deal":"$1.4 billion project financing facility closed August 2025","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai"],"band":"100-250 MW","lflag":"merged_duplicate"},{"id":"bc0e0efc67c1","cid":"da1967cb5256","canon":0,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":1600,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"With this latest approval, Helios now has more than 1.6 GW of ERCOT-approved, utility-contracted capacity, positioning Galaxy among the largest and fastest-growing data center developers in North America.","pscan":"https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","uconf":"High","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity.","uscan":"https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2025,"oy":2026,"deal":"$1.4 billion project financing facility closed on August 15, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"galaxy.com;prnewswire.com","srcUrls":["https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"20404|TX"},{"id":"83a7e7befa9e","cid":"da1967cb5256","canon":0,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":1600,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Galaxy has completed a Large Load Interconnection Study and received approval from the Electric Reliability Council of Texas (ERCOT) for an additional 830 megawatts (MW) of power at its Helios data center campus in West Texas – doubling total approved power capacity to over 1.6 gigawatts (GW). The filings show the Helios campus combining ERCOT transmission access, phased AI deployment, and hundreds of megawatts of private backup-generation infrastructure.","pscan":"https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai","uconf":"High","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (“AEP”) for this additional capacity. Galaxy's transmission interconnection provider will be Wind Energy Transmission Texas, LLC (“WETT”), who facilitated the LLIS studies.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2022,"oy":2026,"deal":"$1.4 billion project financing facility closed on August 15, 2025","dealScan":"https://www.sedarplus.ca/csa-party/records/document.html?id=fa2bffefd8f5f46fbd0620a65ec6f422e3aee010326c8422be3539cd805c5027","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;sedarplus.ca","srcUrls":["https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai","https://www.sedarplus.ca/csa-party/records/document.html?id=fa2bffefd8f5f46fbd0620a65ec6f422e3aee010326c8422be3539cd805c5027"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"20404|TX"},{"id":"a841bc35c70c","cid":"da1967cb5256","canon":0,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":1600,"pc":"Grid","pconf":"High","pquote":"Galaxy has completed a Large Load Interconnection Study and received approval from the Electric Reliability Council of Texas (ERCOT) for an additional 830 megawatts (MW) of power at its Helios data center campus in West Texas – doubling total approved power capacity to over 1.6 gigawatts (GW).","pscan":"https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","uconf":"High","uquote":"Galaxy's transmission interconnection provider will be Wind Energy Transmission Texas, LLC (\"WETT\"), who facilitated the LLIS studies.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2022,"oy":2026,"deal":"$1.4 billion project financing facility closed in August 2025","dealScan":"https://baxtel.com/data-center/galaxy-helios","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"galaxy.com;baxtel.com","srcUrls":["https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","https://baxtel.com/data-center/galaxy-helios"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"e3d434bc4089","cid":"da1967cb5256","canon":0,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":1600,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The filings show the Helios campus combining ERCOT transmission access, phased AI deployment, and hundreds of megawatts of private backup-generation infrastructure.","uconf":"High","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital Holdings","tenant":"CoreWeave","ay":2024,"oy":2026,"deal":"$1.4 billion senior secured term loan facility closed on August 15, 2025, arranged by Deutsche Bank.","dealScan":"https://theenergymag.com/news/2025-08-15/galaxy-bitcoin-ai-loan-helios","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"theenergymag.com","srcUrls":["https://theenergymag.com/news/2025-08-15/galaxy-bitcoin-ai-loan-helios"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"20404|TX"},{"id":"5799eef22547","cid":"5799eef22547","canon":0,"dups":1,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":252,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Galaxy has completed a Large Load Interconnection Study and received approval from the Electric Reliability Council of Texas (ERCOT) for an additional 830 megawatts (MW) of power at its Helios data center campus in West Texas – doubling total approved power capacity to over 1.6 gigawatts (GW).","uconf":"High","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2025,"oy":2026,"deal":"$1.4 billion project financing facility closed August 15, 2025","dealScan":"https://www.publicpower.org/periodical/article/company-closes-14-billion-project-financing-facility-texas-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"publicpower.org","srcUrls":["https://www.publicpower.org/periodical/article/company-closes-14-billion-project-financing-facility-texas-data-center"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"20404|TX"},{"id":"7af6b2c29aa9","cid":"da1967cb5256","canon":0,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":1600,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Galaxy has completed a Large Load Interconnection Study and received approval from the Electric Reliability Council of Texas (ERCOT) for an additional 830 megawatts (MW) of power at its Helios data center campus in West Texas – doubling total approved power capacity to over 1.6 gigawatts (GW).","pscan":"https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","uconf":"High","uquote":"Galaxy's transmission interconnection provider will be Wind Energy Transmission Texas, LLC (\"WETT\"), who facilitated the LLIS studies.","uscan":"https://investor.galaxy.com/news-releases/news-release-details/galaxy-completes-ercot-interconnection-studies-and-secures","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2022,"oy":2026,"deal":"$1.4 billion project financing facility closed on August 15, 2025, and acquisition of Helios from Argo Blockchain for $65 million in late 2022.","dealScan":"https://www.sedarplus.ca/csa-party/records/document.html?id=fa2bffefd8f5f46fbd0620a65ec6f422e3aee010326c8422be3539cd805c5027","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"galaxy.com;investor.galaxy.com;sedarplus.ca","srcUrls":["https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","https://investor.galaxy.com/news-releases/news-release-details/galaxy-completes-ercot-interconnection-studies-and-secures","https://www.sedarplus.ca/csa-party/records/document.html?id=fa2bffefd8f5f46fbd0620a65ec6f422e3aee010326c8422be3539cd805c5027"],"lflag":"high_confidence_duplicate_consolidated"},{"id":"da1967cb5256","cid":"da1967cb5256","canon":1,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":1600,"pc":"Grid","pconf":"High","pquote":"The site included a 125,000 sq ft building and associated electrical infrastructure with 180 MW capacity, operating under the ERCOT Deregulated power efficiency system. Galaxy has completed a Large Load Interconnection Study and received approval from the Electric Reliability Council of Texas (ERCOT) for an additional 830 megawatts (MW) of power at its Helios data center campus in West Texas – doubling total approved power capacity to over 1.6 gigawatts (GW). The filings show the Helios campus combining ERCOT transmission access, phased AI deployment, and hundreds of megawatts of private backup-generation infrastructure.","pscan":"https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai","uquote":"Galaxy's transmission interconnection provider will be Wind Energy Transmission Texas, LLC (\"WETT\"), who facilitated the LLIS studies. Galaxy Digital's Helios campus in Dickens County sits near transmission infrastructure developed during the CREZ era, including Wind Energy Transmission Texas' (WETT) Cottonwood switching station and associated 345-kV corridors.","uscan":"https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital Holdings","tenant":"CoreWeave","ay":2020,"oy":2026,"deal":"Acquisition of Helios from Argo Blockchain for $65 million in late 2022. $1.4 billion project financing facility closed in August 2025. 15-year lease agreement with CoreWeave.","dealScan":"https://www.thetexasspur.com/news/galaxy-inks-major-deal-dickens-helios-host-services-coreweave","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;thetexasspur.com","srcUrls":["https://www.datacenterknowledge.com/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai","https://www.thetexasspur.com/news/galaxy-inks-major-deal-dickens-helios-host-services-coreweave"],"band":"250+ MW","lflag":"large_project_duplicate_review duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized delivery_utility_linked","uname":"AEP Texas","uconf":"High","dukey":"20404|TX"},{"id":"abd30d8ff5ef","cid":"da1967cb5256","canon":0,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":1600,"pc":"Grid","pconf":"High","pquote":"Galaxy has completed a Large Load Interconnection Study and received approval from the Electric Reliability Council of Texas (ERCOT) for an additional 830 megawatts (MW) of power at its Helios data center campus in West Texas – doubling total approved power capacity to over 1.6 gigawatts (GW).","pscan":"https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","uquote":"Galaxy's transmission interconnection provider will be Wind Energy Transmission Texas, LLC (\"WETT\"), who facilitated the LLIS studies.","uscan":"https://investor.galaxy.com/news-releases/news-release-details/galaxy-completes-ercot-interconnection-studies-and-secures","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2022,"oy":2026,"deal":"Galaxy Digital secures $1.4 billion financing for Helios AI data center development (August 13, 2025)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"galaxy.com;investor.galaxy.com","srcUrls":["https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","https://investor.galaxy.com/news-releases/news-release-details/galaxy-completes-ercot-interconnection-studies-and-secures"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"e86a4f1c0e54","cid":"3077bc496994","canon":0,"dups":2,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The site included a 125,000 sq ft building and associated electrical infrastructure with 180 MW capacity, operating under the ERCOT Deregulated power efficiency system.","pscan":"https://baxtel.com/data-center/galaxy-helios","uconf":"High","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2025,"oy":2026,"deal":"Galaxy Helios I LLC plans to invest $800,000,000.00 to build out 147,457 square feet of new space in Afton, announced April 10, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/galaxy-helios"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"20404|TX"},{"id":"eb031a623097","cid":"da1967cb5256","canon":0,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I","city":"AFTON","county":"DICKENS","state":"TX","lat":33.615363,"lng":-100.787617,"cprec":"shared_centroid","status":"Unknown","mw":1600,"pc":"Grid","pconf":"High","pquote":"Galaxy has completed a Large Load Interconnection Study and received approval from the Electric Reliability Council of Texas (ERCOT) for an additional 830 megawatts (MW) of power at its Helios data center campus in West Texas – doubling total approved power capacity to over 1.6 gigawatts (GW).","uconf":"High","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity.","uscan":"https://investor.galaxy.com/news-releases/news-release-details/galaxy-completes-ercot-interconnection-studies-and-secures","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2024,"oy":2026,"deal":"$1.4 billion project financing facility closed on August 15, 2025.","dealScan":"https://baxtel.com/data-center/galaxy-helios","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"investor.galaxy.com;baxtel.com","srcUrls":["https://investor.galaxy.com/news-releases/news-release-details/galaxy-completes-ercot-interconnection-studies-and-secures","https://baxtel.com/data-center/galaxy-helios"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"20404|TX"},{"id":"b8ed0a04097e","cid":"b8ed0a04097e","canon":1,"dups":1,"ftype":"data_center","name":"GALAXY HELIOS I","city":"Fort Stockton","county":"Pecos","state":"TX","lat":30.773298,"lng":-102.718153,"cprec":"shared_centroid","status":"Unknown","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"AEP Texas Inc.","pdt":"over 1.6 gigawatts","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected shared_coordinate_precision_downgraded unlinked_source_text delivery_utility_linked","srcUrls":null,"srcDom":null,"dukey":"20404|TX"},{"id":"c2cdfcf1ae53","cid":"da1967cb5256","canon":0,"dups":9,"ftype":"crypto_hpc","name":"GALAXY HELIOS I Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1600,"pc":"Grid","pconf":"High","pquote":"The facility features advanced design elements including 100% uninterruptible power supply, battery backup, and hyperscale-grade electrical topologies like distributed and block redundant systems. Helios now has more than 1.6 GW of ERCOT-approved, utility-contracted capacity","pscan":"https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity. Galaxy's transmission interconnection provider will be Wind Energy Transmission Texas, LLC (\"WETT\"), who facilitated the LLIS studies.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2025,"oy":2026,"deal":"$1.4 billion project financing facility closed on August 15, 2025","dealScan":"https://www.prnewswire.com/news-releases/galaxy-closes-1-4-billion-project-financing-facility-to-accelerate-helios-ai-datacenter-development-302530804.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"galaxy.com;prnewswire.com","srcUrls":["https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","https://www.prnewswire.com/news-releases/galaxy-closes-1-4-billion-project-financing-facility-to-accelerate-helios-ai-datacenter-development-302530804.html"],"band":"250+ MW","lflag":"large_project_duplicate_review delivery_utility_not_in_eia861 utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated","uname":"AEP Texas","reportedUtility":"AEP Texas"},{"id":"bd6f5fa5a451","cid":"bd6f5fa5a451","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Galaxy Helios II LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1600,"pc":"Grid","pconf":"High","pquote":"With this latest approval, Helios now has more than 1.6 GW of ERCOT-approved, utility-contracted capacity, positioning Galaxy among the largest and fastest-growing data center developers in North America.","pscan":"https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","uquote":"In connection with LLIS completion and study approval, Galaxy has also executed a service agreement with AEP Texas Inc. (\"AEP\") for this additional capacity.","rto":"ERCOT","nerc":"TRE","op":"Galaxy Digital","spon":"Galaxy Digital","tenant":"CoreWeave","ay":2024,"oy":2026,"deal":"$1.4 billion project financing facility closed August 15, 2025","dealScan":"https://www.sedarplus.ca/csa-party/records/document.html?id=fa2bffefd8f5f46fbd0620a65ec6f422e3aee010326c8422be3539cd805c5027","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"galaxy.com;sedarplus.ca","srcUrls":["https://www.galaxy.com/newsroom/secures-ercot-approval-at-helios-data-center","https://www.sedarplus.ca/csa-party/records/document.html?id=fa2bffefd8f5f46fbd0620a65ec6f422e3aee010326c8422be3539cd805c5027"],"band":"250+ MW","lflag":"large_project_duplicate_review delivery_utility_not_in_eia861 utility_alias_corrected source_quality_reclassified","uname":"AEP Texas","reportedUtility":"AEP Texas"},{"id":"63abc2758dfa","cid":"63abc2758dfa","canon":0,"dups":1,"ftype":"data_center","name":"Data Center Permit — Austin, TX","city":"AUSTIN","county":"Travis","state":"TX","lat":30.239513,"lng":-97.69127,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Austin Energy","uquote":"Grid Operator. Austin Energy.","uscan":"https://www.interconnection.fyi/data-center/project/generator-for-building-d-data-center-and-install-4-3b905675","ukey":"1015|TX","uname":"Austin Energy","rto":"ERCOT","nerc":"TRE","ay":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced display_name_normalized generic_permit_record possible_canonical_duplicate,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/generator-for-building-d-data-center-and-install-4-3b905675"],"rawName":"generator for building D data center and install (4) split systems AC units for data center and UPS room."},{"id":"fb8535cb5bf2","cid":"fb8535cb5bf2","canon":1,"dups":1,"ftype":"crypto_hpc","name":"GN DC1, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1030,"pc":"Hybrid","pconf":"High","pquote":"Improvements includes \"behind the meter uses\" for wind or solar generated power such as data centers or similar uses of renewable generated electrical power, as well as data center or other uses supplied with power directly or as a back-up from the ERCOT power grid or other sources.","pscan":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Phase%201%20Tax%20Abatement%20Agreement%20-%20Signed.pdf","proc":"Co-located generation","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Crusoe Energy Systems","ay":2024,"oy":2026,"deal":"Tax Abatement Agreement with Armstrong County, Texas, for an initial capital investment of approximately $14.6 billion for Phase 2, approved November 12, 2024.","dealScan":"https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Phase%202%20Tax%20Abatement%20Agreement.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"co.armstrong.tx.us","srcUrls":["https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Phase%201%20Tax%20Abatement%20Agreement%20-%20Signed.pdf","https://www.co.armstrong.tx.us/upload/page/5361/docs/2024/NOV/Phase%202%20Tax%20Abatement%20Agreement.pdf"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"6484b23c76d3","cid":"6484b23c76d3","canon":1,"dups":1,"ftype":"data_center","name":"HP DATA CENTER","city":"HOCKLEY","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":410,"pc":"Grid","pconf":"High","pquote":"Houston's established energy infrastructure offers the reliable grid power needed to scale data centers quickly and efficiently. With on-site substations and available capacity, Serverfarm can sustainably meet the demand for data center capacity at a scale previously unseen in the region.","pscan":"https://www.serverfarmllc.com/htx1-houston-data-center/","uquote":"Grid Operator. CenterPoint Energy.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Serverfarm","spon":"Manulife Investment Management","ay":2006,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"serverfarmllc.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://www.serverfarmllc.com/htx1-houston-data-center/"],"band":"250+ MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","dukey":"8901|TX"},{"id":"f0648785382d","cid":"f0648785382d","canon":0,"dups":1,"ftype":"data_center","name":"HP DATA CENTER","city":"HOCKLEY","county":"HARRIS","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Houston's established energy infrastructure offers the reliable grid power needed to scale data centers quickly and efficiently. With on-site substations and available capacity, Serverfarm can sustainably meet the demand for data center capacity at a scale previously unseen in the region.","uconf":"High","uquote":"Grid Operator. CenterPoint Energy. Permit Status. Approved. Permit Details. Contact sales for permit type, permit ID, and dates. Timeline. Application Date. 2009. Approval Date. 2016.","uscan":"https://www.interconnection.fyi/data-center/project/serverfarm-e864506f","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"Serverfarm","spon":"Manulife Investment Management","ay":2006,"oy":2006,"deal":"Serverfarm acquired two data centers in Houston, Texas in 2024.","dealScan":"https://baxtel.com/data-center/serverfarm-houston-htx1","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","srcUrls":["https://www.interconnection.fyi/data-center/project/serverfarm-e864506f","https://baxtel.com/data-center/serverfarm-houston-htx1"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected,merged_duplicate delivery_utility_linked","dukey":"8901|TX"},{"id":"c3d11cc35809","cid":"50189ba427a7","canon":0,"dups":4,"ftype":"data_center","name":"Hutto Data Center Campus LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":600,"pc":"Grid","pconf":"High","pquote":"The project will offer 600 megawatts through two private substations — making it one of the most scalable data center campuses in the United States. The Texas deregulated power market, managed by ERCOT, gives developers more flexibility in securing power agreements than heavily regulated states.","uquote":"San Francisco-based Prologis sold in November to Oncor Electric Delivery Company LLC.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Skybox Datacenters , Prologis","tenant":"Google","ay":2023,"oy":2024,"contro":"Hutto residents aired concerns over water and power demands, and potential noise and vibrations from data centers.","controScan":"https://centexdatacenters.org/tracker/skybox-prologis-hutto","deal":"Development Agreement with City of Hutto (May 4, 2023) and Chapter 312 incentives agreement for at least $10 billion capital investment.","dealScan":"https://www.huttotx.gov/DocumentCenter/View/3529/Hutto-Data-Center-Campus-LLC--May-4-2023pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"huttotx.gov;centexdatacenters.org","srcUrls":["https://www.huttotx.gov/DocumentCenter/View/3529/Hutto-Data-Center-Campus-LLC--May-4-2023pdf","https://centexdatacenters.org/tracker/skybox-prologis-hutto"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"44372|TX"},{"id":"6b12d4ace90b","cid":"6b12d4ace90b","canon":1,"dups":2,"ftype":"crypto_hpc","name":"IE US Development Holdings 3 Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":750,"pc":"Grid","pconf":"High","pquote":"Located on a 576-acre freehold site, the facility boasts dual, physically diverse fiber paths and is directly connected to the ERCOT power grid via on-site substations owned by IREN.","pscan":"https://iren.com/data-centers/childress","uconf":"High","uquote":"Childress began as a purpose-built Bitcoin mining facility in 2022 under a 600MW binding connection agreement with AEP Texas. By July 2024, following ERCOT network studies and grid integration approvals, that capacity expanded to 750MW.","uscan":"https://northwiseproject.com/iren-stock-childress/","rto":"ERCOT","nerc":"TRE","op":"IREN (Iris Energy Limited)","spon":"Iris Energy Limited","ay":2022,"oy":2023,"deal":"Tax Abatement Agreement with Childress County (Feb 14, 2022); Amended and Restated Tax Abatement Agreement with Clarendon College/Childress County (Oct 14, 2024)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"iren.com;northwiseproject.com","srcUrls":["https://iren.com/data-centers/childress","https://northwiseproject.com/iren-stock-childress/"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"delivery_utility_not_in_eia861 utility_alias_corrected source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated"},{"id":"20180f3fecf1","cid":"6b12d4ace90b","canon":0,"dups":2,"ftype":"crypto_hpc","name":"IE US Development Holdings 3 Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":750,"pc":"Grid","pconf":"High","pquote":"Grid-connected for continuous and reliable service and powered by 100% renewable energy (*from clean or renewable energy sources or through the purchase of RECs).","pscan":"https://iren.com/","uconf":"High","uquote":"Sweetwater's Local Utility Provider is Oncor Electric. While Sweetwater, TX residents have the power to choose your own electricity provider, you cannot pick your utility company. In Sweetwater your utility is Oncor Electric Delivery.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Iris Energy Limited","spon":"Iris Energy Limited","oy":2023,"deal":"Tax Abatement Agreement with Childress County, Texas, for an estimated capital investment of $197,500,000.00 (February 14, 2022)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"iren.com;energybot.com","uscan":"https://www.energybot.com/electricity-rates/texas/sweetwater/","srcUrls":["https://iren.com/","https://www.energybot.com/electricity-rates/texas/sweetwater/"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"44372|TX"},{"id":"a08f675d80a2","cid":"a08f675d80a2","canon":1,"dups":1,"ftype":"data_center","name":"IE US Development Holdings 5 Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"685bfbaebd97","cid":"685bfbaebd97","canon":1,"dups":1,"ftype":"crypto_hpc","name":"IE US DEVELOPMENT HOLDINGS 7 INC. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"Medium","pquote":"IREN's next-generation data centers are purpose-built for high-performance, power-dense compute. Grid-connected for continuous and reliable service and powered by 100% renewable energy (*from clean or renewable energy sources or through the purchase of RECs).","pscan":"https://iren.com/","rto":"ERCOT","nerc":"TRE","op":"IE US DEVELOPMENT HOLDINGS 7","spon":"Iris Energy Limited (IREN)","tenant":"IE US HARDWARE 1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"iren.com","srcUrls":["https://iren.com/"],"lflag":"source_quality_reclassified"},{"id":"3da1dc2442fd","cid":"3da1dc2442fd","canon":1,"dups":1,"ftype":"data_center","name":"Ionic Digital Cedarvale LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":234,"pc":"Grid","pconf":"High","pquote":"For Ionic Digital, the agreement with Nscale presents a pivot in its business model: rather than solely relying on bitcoin mining, the company is monetizing its energy and infrastructure assets to host AI workloads. Under the agreement, the Texas site leased from Ionic Digital currently supports around 240 MW of power, and Microsoft retains the option to expand that to another 700 MW starting in late 2027. The campus may eventually scale up to 1.2 GW of power consumption—on par with some of the largest AI compute campuses currently planned. ERCOT projects that peak electricity demand could approach 218 gigawatts by 2031, driven in large part by data centers among other large-load users.","pscan":"https://theenergymag.com/news/market-news/nscale-ai-microsoft-ionic","uconf":"High","uquote":"Electricity in Ward County is all delivered by the Oncor Transmission and Distribution Utility. Electricity in Barstow is all delivered by the Oncor Transmission and Distribution Utility.","uscan":"https://comparepower.com/electricity-rates/texas/barstow-electricity-rates-energy-plans/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Nscale","spon":"Ionic Digital","tenant":"Nscale (for Microsoft AI services)","ay":2025,"oy":2025,"deal":"10-year, triple-net lease agreement between Ionic Digital and Nscale for approximately $2 billion, announced October 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"theenergymag.com;comparepower.com","srcUrls":["https://theenergymag.com/news/market-news/nscale-ai-microsoft-ionic","https://comparepower.com/electricity-rates/texas/barstow-electricity-rates-energy-plans/"],"band":"100-250 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"e3c0c93ef6ad","cid":"e3c0c93ef6ad","canon":1,"dups":1,"ftype":"data_center","name":"JDM III SF Dallas DC LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","ay":2015,"deal":"Tax Credit/Rebate in 2015","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"874e16b41b54","cid":"874e16b41b54","canon":1,"dups":1,"ftype":"data_center","name":"KAFFIR SWITCH","city":"TULIA","county":"SWISHER","state":"TX","lat":34.526319,"lng":-101.743865,"cprec":"distinct","status":"Unknown","rto":"SPP","nerc":"MRO","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"635fe317bc64","cid":"635fe317bc64","canon":1,"dups":1,"ftype":"data_center","name":"Lancaster Data Center Campus LP","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":300,"pc":"Grid","pconf":"High","pquote":"The campus will boast up to 300 megawatts (MW) of power supported by a private onsite substation, with up to one million-square-feet of data center space.... Skybox describes the site as being supported by a private onsite substation and located in Oncor's deregulated power territory, giving users access to 100% renewable power programs from the supplier of their choice.","uquote":"The first phase of the project, which sits adjacent to an Oncor Electric delivery site, will use 150 megawatts of power.... The Skybox PowerCampus is Located at Oncor's deregulated power territory, Lancaster, TX.... Skybox describes the site as being supported by a private onsite substation and located in Oncor's deregulated power territory, giving users access to 100% renewable power programs from the supplier of their choice.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Skybox Datacenters","spon":"Bandera Ventures and Principal Asset Management","tenant":"Hyperscale clients","ay":2023,"oy":2026,"deal":"Lancaster Data Center Campus, LP has 3 documented construction projects in Texas public records, with a combined value of $471.4M. The largest project is 'Skybox - Lancaster 1 Initial Improvements' for $214.3M, dated 2025-01-27. Work on the first building of the PowerCampus Dallas is estimated to cost about $85 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text state_centroid_only citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"5dda26e2992d","cid":"5dda26e2992d","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Lancium LLC Abilene DC 1, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, OpenAI","ay":2021,"oy":2025,"contro":"Increased traffic and noise, property value protest, driving safety concerns.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package (October 16, 2025)","tier":4,"tlbl":"Blog/social","srcCt":2,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","rawName":"Lancium LLC\n\t\tAbilene DC 1, LLC Data Center","lflag":"large_project_duplicate_review source_quality_reclassified"},{"id":"bd3bbb60d1a7","cid":"bd3bbb60d1a7","canon":1,"dups":2,"ftype":"crypto_hpc","name":"Lancium LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"SoftBank, OpenAI, Oracle, MGX","tenant":"Oracle, OpenAI","ay":2021,"oy":2025,"contro":"Neighborhood residents frustrated by traffic and noise; man injured by construction truck takes legal action.","controScan":"https://www.youtube.com/watch?v=KiNSOIBcb_k","deal":"$600 million debt financing package closed October 16, 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://www.youtube.com/watch?v=KiNSOIBcb_k"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified"},{"id":"bf54240fa189","cid":"bd3bbb60d1a7","canon":0,"dups":2,"ftype":"crypto_hpc","name":"Lancium LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Lancium","spon":"Lancium","tenant":"Oracle, Microsoft, Crusoe Energy Systems","ay":2022,"oy":2025,"deal":"US$2.4 billion private capital investment over 20 years for the Clean Compute Campus","dealScan":"https://baxtel.com/data-center/lancium-abilene","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"youtube.com;mortenson.com;baxtel.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://baxtel.com/data-center/lancium-abilene"],"band":"250+ MW"},{"id":"2305a4dd46ad","cid":"2305a4dd46ad","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Lancium Turkey LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","rto":"ERCOT","nerc":"TRE","op":"Lancium Turkey","oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c36389c6c066","cid":"c36389c6c066","canon":1,"dups":2,"ftype":"data_center","name":"Lonestar Dream Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":36,"pc":"Grid","pconf":"High","pquote":"The Tarbush data center is situated within the ERCOT West Hub, a major hub for renewable energy production in Texas. Texas' wealth of renewable energy and a flexible power grid has played a pivotal role in the company's strategic decision to further invest in capacity in Texas.","uconf":"High","uquote":"Pecos is served by Texas New Mexico Power Co. (TNMP), a transmission and distribution service provider that delivers power to approximately 236,000 homes and businesses on behalf of retail electric providers in Texas.","uscan":"https://www.pecosedc.com/local-data/utility-infrastructure","rto":"ERCOT","nerc":"TRE","op":"Lonestar Dream","tenant":"Genesis Digital Assets Limited (GDA)","ay":2024,"oy":2024,"deal":"Strategic hosting arrangement with Genesis Digital Assets Limited (GDA) for 36 MW of power capacity, announced April 3, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"pecosedc.com","srcUrls":["https://www.pecosedc.com/local-data/utility-infrastructure"],"band":"25-50 MW","uname":"Texas-New Mexico Power","reportedUtility":"Texas-New Mexico Power","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"40051|TX"},{"id":"57a646063b47","cid":"c36389c6c066","canon":0,"dups":2,"ftype":"data_center","name":"Lonestar Dream Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":36,"pc":"Grid","pconf":"High","pquote":"The Tarbush data center is situated within the ERCOT West Hub, a major hub for renewable energy production in Texas. Texas' wealth of renewable energy and a flexible power grid has played a pivotal role in the company's strategic decision to further invest in capacity in Texas.","rto":"ERCOT","nerc":"TRE","op":"Lonestar Dream","spon":"China Green Agriculture","tenant":"Genesis Digital Assets Limited","ay":2021,"oy":2024,"contro":"ICE raid on bitcoin mining site targeting Bitmain-affiliated ASIC repair center and detaining workers.","deal":"Strategic hosting arrangement between Genesis Digital Assets Limited and Lonestar Dream, Inc. for 36 MW capacity (April 3, 2024).","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7bcf6082cfee","cid":"7bcf6082cfee","canon":0,"dups":1,"ftype":"data_center","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. But the campuses with capital aren't waiting. They're going behind the meter — building their own gas turbines, on-site fuel, battery storage. The data centers, located on the Lancium Clean Campus, uses high-efficiency cooling and onsite power generation to strengthen — not strain — local resources, with a commitment to pay our own way on energy and ensure these costs are not passed on to residents.","proc":"Co-located generation","pcp":"Crusoe Energy Systems / Abilene DC I, LLC","pdt":"Upwards of 350 MW (gas turbines), 1.2 GW (total data center capacity)","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Abilene DC I","spon":"OpenAI, Oracle, SoftBank","tenant":"OpenAI","ay":2024,"oy":2025,"contro":"Community concerns regarding road conditions, traffic collisions, noise, air pollution from natural gas, water consumption, and strain on the local grid.","controScan":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","deal":"$3.4B in financing from Blue Owl Capital; tax abatement agreement with City of Abilene and Taylor County (85% abatement over 10 years)","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"mortenson.com;infrastructureresearch.substack.com;texasstandard.org","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"77fa7a1a026f","cid":"11f16a994226","canon":0,"dups":4,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":360,"pc":"Hybrid","pconf":"High","pquote":"The Abilene AI data center connects directly to the ERCOT grid, allowing us to draw from the region's robust and growing supply of renewable energy, including wind, which often goes underutilized in the area. To support grid stability, the Abilene campus uses GE Vernova's modern natural gas turbines for backup power.","pscan":"https://www.oracle.com/data-centers/abilene/","proc":"Co-located generation","pcp":"Crusoe Energy Systems","pdt":"upwards of 350 MW","uquote":"AEP Texas is the incumbent electric utility service for Abilene, owning and maintaining local power lines.","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Oracle, OpenAI, SoftBank","tenant":"Oracle, OpenAI, Microsoft","ay":2024,"oy":2025,"contro":"Concerns about road wear and tear, air pollution from natural gas, water consumption, and strain on the local grid.","controScan":"https://www.youtube.com/watch?v=Dpf5l0S8nvI","deal":"$11.6 billion in debt and equity secured in May 2025 to expand the site.","dealScan":"https://baxtel.com/data-center/crusoe-abilene-9","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"oracle.com;baxtel.com;youtube.com","srcUrls":["https://www.oracle.com/data-centers/abilene/","https://baxtel.com/data-center/crusoe-abilene-9","https://www.youtube.com/watch?v=Dpf5l0S8nvI"],"band":"250+ MW","uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected high_confidence_duplicate_consolidated delivery_utility_linked","dukey":"20404|TX"},{"id":"dc9b46dd77b5","cid":"11f16a994226","canon":0,"dups":4,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":360,"pc":"Behind-the-Meter","pconf":"High","pquote":"The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. Primoris is thrilled to partner with Crusoe on this groundbreaking project by providing data center developers with off-grid natural gas solutions to address their scalable and dispatchable power needs. The purpose of the equipment is to generate power for onsite use only for data centers and computing.","pscan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","proc":"Co-located generation","pcp":"Crusoe Energy Systems","pdt":"upwards of 350 MW","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"OpenAI, Oracle, SoftBank","tenant":"OpenAI, Oracle, Microsoft","ay":2024,"oy":2025,"contro":"Community concerns regarding noise, pollution from natural gas, water consumption, increased traffic, and rising housing costs. There was also a controversial tax abatement agreement with the City of Abilene and Taylor County.","controScan":"https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas","deal":"$3.4B in financing from Blue Owl Capital; 85% property tax abatement over 10 years from City of Abilene and Taylor County for a $3.5 billion project","dealScan":"https://www.youtube.com/watch?v=Dpf5l0S8nvI","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"records.tceq.texas.gov;youtube.com;lonestarleft.com","srcUrls":["https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","https://www.youtube.com/watch?v=Dpf5l0S8nvI","https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"478587fe4a5b","cid":"b14600f0acaa","canon":0,"dups":8,"ftype":"data_center","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Grid","pconf":"High","pquote":"The Abilene AI data center connects directly to the ERCOT grid, allowing us to draw from the region's robust and growing supply of renewable energy, including wind, which often goes underutilized in the area. To support grid stability, the Abilene campus uses GE Vernova's modern natural gas turbines for backup power.","pscan":"https://www.oracle.com/data-centers/abilene/","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Oracle","spon":"Oracle","tenant":"OpenAI","ay":2024,"oy":2025,"contro":"Community opposition due to concerns over water and energy use, noise, and tax breaks.","controScan":"https://www.argusmedia.com/en/news-and-insights/latest-market-news/2832636-local-opposition-builds-to-texas-data-centers","deal":"$3.4B in financing from Blue Owl Capital (for Stargate Abilene project)","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"oracle.com;mortenson.com;argusmedia.com","srcUrls":["https://www.oracle.com/data-centers/abilene/","https://www.mortenson.com/projects/abilene-data-center-development","https://www.argusmedia.com/en/news-and-insights/latest-market-news/2832636-local-opposition-builds-to-texas-data-centers"],"band":"250+ MW","lflag":"large_project_duplicate_review high_confidence_duplicate_consolidated"},{"id":"69b544838db6","cid":"b14600f0acaa","canon":0,"dups":8,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":1200,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Abilene DC 1, LLC (Abilene DC) dba Crusoe Energy Systems, LLC (Crusoe), has submitted the following modification application for a standard permit for electric generating units for the Longhorn Data Center in Abilene within Taylor County, Texas. The purpose of the equipment is to generate power for onsite use only for data centers and computing.","pscan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","proc":"Co-located generation","pcp":"Crusoe Energy Systems, LLC","pdt":"350 MW gas plant","uquote":"The utility company for Abilene is AEP Texas North.","uscan":"https://www.choosetexaspower.org/electricity-rates/abilene/","rto":"ERCOT","nerc":"TRE","op":"Abilene DC I","spon":"Oracle, OpenAI, SoftBank","tenant":"Oracle, Crusoe Energy Systems","ay":2025,"oy":2025,"contro":"Concerns about air pollution, water consumption, strain on the local grid, and a lucrative tax abatement.","controScan":"https://www.youtube.com/watch?v=Dpf5l0S8nvI","deal":"$3.4 billion financing from Blue Owl Capital; $3.5 billion project cost; 85% property tax abatement over 10 years from City of Abilene and Taylor County.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"records.tceq.texas.gov;choosetexaspower.org;youtube.com","srcUrls":["https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","https://www.choosetexaspower.org/electricity-rates/abilene/","https://www.youtube.com/watch?v=Dpf5l0S8nvI"],"lflag":"large_project_duplicate_review utility_alias_corrected high_confidence_duplicate_consolidated delivery_utility_linked","uname":"AEP Texas","reportedUtility":"AEP Texas","dukey":"20404|TX"},{"id":"b14600f0acaa","cid":"b14600f0acaa","canon":0,"dups":8,"ftype":"data_center","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Grid","pconf":"High","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Abilene Data Center Campus Master Association","spon":"Oracle, OpenAI, SoftBank, Blue Owl Capital","tenant":"Oracle, Microsoft, OpenAI","ay":2024,"oy":2025,"contro":"Community concerns over road wear and tear, noise, air pollution from natural gas, water consumption, and strain on the local grid. Reports of difficulty between OpenAI and Oracle over financing and capacity forecasts, and Oracle's reported reliability issues with primary builder Crusoe.","controScan":"https://www.industrialinfo.com/news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568","deal":"City of Abilene and Taylor County tax abatement agreement for 85% over 10 years; $3.4B in financing from Blue Owl Capital; multi-billion dollar deal between Lancium and Crusoe Energy; OpenAI and Oracle agreement to develop up to 4.5 gigawatts of additional Stargate capacity.","dealScan":"https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"youtube.com;mortenson.com;arrington.house.gov;industrialinfo.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://www.mortenson.com/projects/abilene-data-center-development","https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf","https://www.industrialinfo.com/news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568"],"band":"250+ MW","lflag":"large_project_duplicate_review duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized,merged_duplicate delivery_utility_linked","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","uname":"AEP Texas","proc":"Co-located generation","pcp":"Crusoe Energy Systems, LLC","pdt":"350 MW gas plant","dukey":"20404|TX"},{"id":"efc9d2c80409","cid":"b3ac6c4490c7","canon":0,"dups":5,"ftype":"data_center","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Behind-the-Meter","pconf":"High","pquote":"The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. Primoris is thrilled to partner with Crusoe on this groundbreaking project by providing data center developers with off-grid natural gas solutions to address their scalable and dispatchable power needs.","proc":"Co-located generation","pcp":"Crusoe Energy Systems","pdt":"upwards of 350 MW","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Abilene DC 1","spon":"Abilene Data Center Campus Master Association","tenant":"Oracle, OpenAI","ay":2024,"oy":2025,"contro":"Complaints about road wear, light pollution, potential air pollution from natural gas, water consumption, and strain on the local grid. Also, reported difficulties between OpenAI and Oracle regarding financing and capacity forecasts, and reliability issues with primary builder Crusoe.","deal":"$3.4 billion data center development announced by Crusoe in November, with financing from Blue Owl Capital.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"band":"100-250 MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"82d46fdec4b9","cid":"82d46fdec4b9","canon":0,"dups":1,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":350,"pc":"Behind-the-Meter","pconf":"High","pquote":"The purpose of the equipment is to generate power for onsite use only for data centers and computing.","pscan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","proc":"Co-located generation","pcp":"Crusoe Energy Systems","pdt":"upwards of 350 MW","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Oracle, OpenAI","tenant":"OpenAI","ay":2024,"oy":2025,"contro":"Community opposition to data centers","controScan":"https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137","deal":"Multi-billion dollar deal between Lancium and Crusoe Energy","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"records.tceq.texas.gov;kvue.com","srcUrls":["https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137"],"band":"250+ MW","lflag":"merged_duplicate"},{"id":"d182614a1549","cid":"b3ac6c4490c7","canon":0,"dups":5,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Behind-the-Meter","pconf":"High","pquote":"The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. Primoris is thrilled to partner with Crusoe on this groundbreaking project by providing data center developers with off-grid natural gas solutions to address their scalable and dispatchable power needs.","proc":"Co-located generation","pcp":"Crusoe Energy Systems","pdt":"upwards of 350 MW","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Oracle, SoftBank, OpenAI","tenant":"OpenAI","ay":2024,"oy":2025,"contro":"Difficulty between OpenAI and Oracle over financing and capacity forecasts; Oracle reliability issues with Crusoe.","controScan":"https://www.industrialinfo.com/news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568","deal":"$3.4B in financing from Blue Owl Capital for Stargate Abilene campus.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"industrialinfo.com","srcUrls":["https://www.industrialinfo.com/news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568"],"band":"100-250 MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"7787bfed9c7a","cid":"b14600f0acaa","canon":0,"dups":8,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":1200,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. Primoris is thrilled to partner with Crusoe on this groundbreaking project by providing data center developers with off-grid natural gas solutions to address their scalable and dispatchable power needs.","proc":"Co-located generation","pdt":"350 MW on-site gas plant","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe","spon":"OpenAI, Oracle, SoftBank, Blue Owl Capital","tenant":"OpenAI, Oracle, Microsoft","ay":2024,"oy":2026,"contro":"Community opposition regarding tax abatements, water usage, air pollution from natural gas, noise, and strain on local infrastructure.","controScan":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","deal":"$3.4B in financing from Blue Owl Capital for Stargate Abilene (2025); Multi-billion dollar deal between Lancium and Crusoe Energy (July 2024); Microsoft agreement for 900 MW AI factory campus (March 27, 2026)","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"mortenson.com;infrastructureresearch.substack.com;texasstandard.org","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development","https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/"],"lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"16aafa77bca6","cid":"b14600f0acaa","canon":0,"dups":8,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"The data centers, located on the Lancium Clean Campus, uses high-efficiency cooling and onsite power generation to strengthen — not strain — local resources, with a commitment to pay our own way on energy and ensure these costs are not passed on to residents. Lancium designs, builds, and operates power infrastructure that is fully ERCOT-approved and integrates grid interconnections with behind-the-meter resources to optimize reliability and economics. This approach allows each campus to function as a grid-supportive asset, not a strain on the system. The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup. we actually built a a gas plant on site about a 350 megawatt gas plant to help. support. um the load and and generation requirements. needed uh to power that AI factory.","pscan":"https://www.youtube.com/watch?v=cH7tiy7s17A","proc":"Co-located generation","pcp":"Crusoe Energy Systems / Abilene DC 1, LLC","pdt":"upwards of 350 MW","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Crusoe","spon":"Oracle, OpenAI","tenant":"OpenAI, Oracle, Microsoft","ay":2024,"oy":2026,"contro":"Community concerns regarding traffic, noise, air pollution from natural gas, water usage, and a tax abatement agreement.","deal":"$3.4B in financing from Blue Owl Capital. OpenAI and Oracle entered an agreement to develop up to 4.5 gigawatts of additional Stargate capacity. Lancium struck a multi-billion dollar deal with Crusoe Energy.","dealScan":"https://thedailytexan.com/2024/08/16/abilene-embraces-tech-revolution-with-new-ai-data-centre/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;thedailytexan.com","srcUrls":["https://www.youtube.com/watch?v=cH7tiy7s17A","https://thedailytexan.com/2024/08/16/abilene-embraces-tech-revolution-with-new-ai-data-centre/"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"53835c9c8e6c","cid":"b14600f0acaa","canon":0,"dups":8,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Hybrid","pconf":"High","pquote":"Some may be hybrids like the Stargate project near Abilene, which will draw power from its own natural gas generator as well as from the grid. The campus name on the state's power station tracker is Longhorn Data Center. The operating permit lists 62 emergency backup generators, 170 MW of total backup capacity, 28 of them powered by Baudouin engines that have a sparse distribution network in the U.S. consisting “largely of marine engine shops” (per Hunterbrook Media's reporting). The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. Primoris is thrilled to partner with Crusoe on this groundbreaking project by providing data center developers with off-grid natural gas solutions to address their scalable and dispatchable power needs.","proc":"Co-located generation","pcp":"Crusoe Energy Systems, Lancium","pdt":"upwards of 350 MW (initial power plant)","rto":"ERCOT","nerc":"TRE","op":"Abilene DC 1, (dba Crusoe Energy Systems, )","spon":"Oracle, SoftBank, Crusoe, OpenAI","tenant":"OpenAI","ay":2025,"oy":2025,"contro":"Financing and capacity forecast disputes between OpenAI and Oracle; reliability issues with builder Crusoe; public outcry over water and power usage.","controScan":"https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137","deal":"$3.4B in financing from Blue Owl Capital","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"infrastructureresearch.substack.com;kvue.com","srcUrls":["https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137"],"band":"250+ MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"2bf22dd4bbd1","cid":"b14600f0acaa","canon":0,"dups":8,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":1200,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Primoris is thrilled to partner with Crusoe on this groundbreaking project by providing data center developers with off-grid natural gas solutions to address their scalable and dispatchable power needs.","proc":"Co-located generation","pcp":"Crusoe Energy Systems LLC","pdt":"upwards of 350 MW (initial phase)","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Blue Owl Capital, Primary Digital Infrastructure, SoftBank, OpenAI, Oracle","tenant":"Oracle, OpenAI, Microsoft","ay":2025,"oy":2026,"contro":"Local opposition due to concerns over water use, grid strain, noise, air quality, and property tax abatements.","deal":"JPMorgan Chase closed a $7.12 billion financing package on May 21, 2025, for a $15 billion joint venture including Blue Owl Capital, Crusoe, and Primary Digital Infrastructure. JPMorgan previously originated $2.3 billion in January 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mortenson.com","srcUrls":["https://www.mortenson.com/projects/abilene-data-center-development"],"lflag":"large_project_duplicate_review source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"b3ac6c4490c7","cid":"b3ac6c4490c7","canon":0,"dups":5,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Behind-the-Meter","pconf":"High","pquote":"The purpose of the equipment is to generate power for onsite use only for data centers and computing. The data centers, located on the Lancium Clean Campus, uses high-efficiency cooling and onsite power generation to strengthen — not strain — local resources, with a commitment to pay our own way on energy and ensure these costs are not passed on to residents. Our energy management expertise, the integration of incremental storage and solar generation resources behind-the-meter at the campus, and Crusoe's design approach will combine to deliver the maximum amount of green energy at the lowest possible cost, while bringing significant benefits to the Abilene community.”","pscan":"https://www.crusoe.ai/resources/newsroom/crusoe-200mw-ai-data-center","proc":"Co-located generation","pcp":"Crusoe Energy Systems","pdt":"upwards of 350 MW","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Lancium","tenant":"OpenAI","ay":2024,"oy":2025,"contro":"Public outcry over concerns about water and power usage.","controScan":"https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137","deal":"$3.4B in financing from Blue Owl Capital (January 2025)","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"crusoe.ai;mortenson.com;infrastructureresearch.substack.com;kvue.com","srcUrls":["https://www.crusoe.ai/resources/newsroom/crusoe-200mw-ai-data-center","https://www.mortenson.com/projects/abilene-data-center-development","https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137"],"band":"100-250 MW","lflag":"source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized,merged_duplicate"},{"id":"64b26d69ed02","cid":"b3ac6c4490c7","canon":0,"dups":5,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Behind-the-Meter","pconf":"High","pquote":"The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. Primoris is thrilled to partner with Crusoe on this groundbreaking project by providing data center developers with off-grid natural gas solutions to address their scalable and dispatchable power needs.","proc":"Co-located generation","pcp":"Crusoe Energy Systems, LLC","pdt":"Upwards of 350 MW","rto":"ERCOT","nerc":"TRE","op":"Crusoe Technologies","spon":"Oracle, OpenAI, SoftBank","tenant":"OpenAI","ay":2024,"oy":2025,"contro":"Project has caused disruption in the area and concerns about inflated economic impact estimates.","controScan":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/","deal":"$3.4 billion in financing from Blue Owl Capital","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"infrastructureresearch.substack.com;texasstandard.org","srcUrls":["https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/"],"band":"100-250 MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"11f16a994226","cid":"11f16a994226","canon":0,"dups":4,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":360,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The purpose of the equipment is to generate power for onsite use only for data centers and computing. The power plant portion of the project, referred to as Project Longhorn, features five, first of its kind Solar Titan™ 350 turbines and five General Electric LM2500XPRESS turbines, capable of supplying upwards of 350 MW of power from an on-site location. But the campuses with capital aren't waiting. They're going behind the meter — building their own gas turbines, on-site fuel, battery storage.","pscan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","proc":"Co-located generation","pcp":"Crusoe Energy Systems (Abilene DC 1, LLC)","pdt":"360.5 MW onsite generation capacity","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","uscan":"https://www.mortenson.com/projects/abilene-data-center-development","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"OpenAI, Oracle, SoftBank, Blue Owl Capital","tenant":"OpenAI, Oracle, Microsoft","ay":2024,"oy":2025,"contro":"The project is tied to a property tax abatement of up to 85% from the City of Abilene and Taylor County, leading to concerns about local economic impact. There are also broader community concerns in Texas regarding data centers' water and electricity usage, noise, and industrialization of rural areas.","deal":"$3.4 billion in financing from Blue Owl Capital for the Stargate Abilene project.","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"records.tceq.texas.gov;mortenson.com;baxtel.com;youtube.com","srcUrls":["https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8600163&Rendition=Web","https://www.mortenson.com/projects/abilene-data-center-development","https://baxtel.com/data-center/crusoe-abilene-9","https://www.youtube.com/watch?v=Dpf5l0S8nvI"],"dealScan":"https://baxtel.com/data-center/crusoe-abilene-9","controScan":"https://www.youtube.com/watch?v=Dpf5l0S8nvI","uname":"AEP Texas","lflag":"duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized,merged_duplicate delivery_utility_linked","dukey":"20404|TX"},{"id":"27516fe738f2","cid":"b14600f0acaa","canon":0,"dups":8,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Grid","pconf":"Medium","pquote":"The vast majority of the power of the site will come from the grid. directly which is through our substations. There is natural gas. um there for 9 and 10 and for reliability. and backup.","pscan":"https://www.youtube.com/watch?v=qHq2VP7ETo4","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Abilene DC 1, dba Crusoe Energy Systems","spon":"Abilene Data Center Campus Master Association","tenant":"Oracle, Microsoft, OpenAI","ay":2024,"oy":2026,"contro":"Local opposition regarding water and electricity usage, noise, and industrialization of rural areas.","deal":"$3.4B in financing from Blue Owl Capital for Stargate Abilene. Multi-billion dollar deal between Lancium and Crusoe Energy. Agreement between OpenAI and Oracle to develop up to 4.5 gigawatts of additional Stargate capacity.","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":4,"tlbl":"Blog/social","srcCt":2,"srcDom":"youtube.com;infrastructureresearch.substack.com","srcUrls":["https://www.youtube.com/watch?v=qHq2VP7ETo4","https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"9a41d4a9e594","cid":"9a41d4a9e594","canon":1,"dups":1,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":2100,"pc":"Hybrid","pconf":"High","pquote":"The facility will have a total power capacity of 1.2 GW, with on-site power generation and renewable energy sources, including West Texas wind farms, supporting its operations. [...] dedicated solar farm on campus for daytime loads; and 360 MW of on-site natural gas turbines for firm backup power. New high-voltage transmission infrastructure and substation upgrades are being planned. ERCOT's challenge will be delivering 1+ GW of capacity to a single location without destabilizing the local grid. Our Abilene campus features a 1.2GW interconnect, which has been fully approved by ERCOT and undergone a rigorous, formal review process in collaboration with transmission service providers.","proc":"Co-located generation","pcp":"Crusoe Energy Systems LLC","pdt":"about a 350 megawatt gas plant","uconf":"High","uquote":"Mortenson also built said transmission line for AEP along with the interconnect expansions for AEP for the connection of the project substation.","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"SoftBank, OpenAI, Oracle, Microsoft","tenant":"Microsoft, OpenAI, Oracle","ay":2024,"oy":2027,"contro":"Local opposition due to concerns over water consumption, power grid strain, noise, road wear from heavy trucks, potential air pollution from natural gas power generation, and an 85% property tax abatement.","controScan":"https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas","deal":"$3.4B in financing from Blue Owl Capital; 85% property tax abatement over 10 years from City of Abilene and Taylor County.","dealScan":"https://www.youtube.com/watch?v=Dpf5l0S8nvI","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"youtube.com;lonestarleft.com","srcUrls":["https://www.youtube.com/watch?v=Dpf5l0S8nvI","https://www.lonestarleft.com/p/abilene-is-paying-the-price-for-texas"],"band":"250+ MW","lflag":"source_quality_reclassified large_project_duplicate_review"},{"id":"7c2e57552bf8","cid":"b3ac6c4490c7","canon":0,"dups":5,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Hybrid","pconf":"High","pquote":"Some may be hybrids like the Stargate project near Abilene, which will draw power from its own natural gas generator as well as from the grid.","pscan":"https://news.constructconnect.com/renewable-energy-is-key-to-powering-texas-data-centers","proc":"Co-located generation","pcp":"Crusoe Energy Systems, LLC","pdt":"1.2 GW","rto":"ERCOT","nerc":"TRE","op":"Crusoe Energy Systems","spon":"Oracle, OpenAI, SoftBank","ay":2024,"oy":2025,"contro":"Public outcry over water and power usage; uncertainty regarding expansion plans.","controScan":"https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137","deal":"$3.4B in financing from Blue Owl Capital for Stargate Abilene project","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"news.constructconnect.com;infrastructureresearch.substack.com;kvue.com","srcUrls":["https://news.constructconnect.com/renewable-energy-is-key-to-powering-texas-data-centers","https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","https://www.kvue.com/article/tech/texas-local-governments-pause-data-centers/269-2e7bbd7b-0666-459f-b1c1-d649aefdf137"],"band":"100-250 MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"3d02732cfd99","cid":"11f16a994226","canon":0,"dups":4,"ftype":"crypto_hpc","name":"LONGHORN DATA CENTER","city":"ABILENE","county":"TAYLOR","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":360,"pc":"Behind-the-Meter","pconf":"High","pquote":"The purpose of the equipment is to generate power for onsite use only for data centers and computing.... They're going behind the meter — building their own gas turbines, on-site fuel, battery storage.... Our energy management expertise, the integration of incremental storage and solar generation resources behind-the-meter at the campus, and Crusoe's design approach will combine to deliver the maximum amount of green energy at the lowest possible cost, while bringing significant benefits to the Abilene community.","proc":"Co-located generation","pcp":"Crusoe Energy Systems / Abilene DC 1, LLC","pdt":"upwards of 350 MW","rto":"ERCOT","nerc":"TRE","op":"Crusoe","spon":"Crusoe","tenant":"OpenAI","ay":2024,"oy":2025,"contro":"Community concerns over water and power usage, noise, traffic, and general disruption.","controScan":"https://www.youtube.com/watch?v=2XZaHsqzBPc","deal":"$3.4B in financing from Blue Owl Capital for Stargate Abilene","dealScan":"https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","tier":4,"tlbl":"Blog/social","srcCt":2,"srcDom":"infrastructureresearch.substack.com;youtube.com","srcUrls":["https://infrastructureresearch.substack.com/p/the-shadow-grid-is-real-and-its-filed","https://www.youtube.com/watch?v=2XZaHsqzBPc"],"band":"250+ MW","lflag":"citation_artifact_removed source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"e954b972136d","cid":"0c2755d9ed13","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"CPS Energy has been encouraging companies to build the high-powered facilities in other parts of the metro area to spread out the utility's power loads and prevent congestion on its distribution system. We are working with local utility providers to ensure our systems are ready for a range of circumstances. Microsoft operates datacenters in the counties of Bexar and Medina, in the Greater San Antonio area. Aligned with Microsoft's global commitments and our Datacenter Community Pledge, we have created the Community-First Infrastructure Initiative as a concrete step toward being a good neighbor where we build and operate. We'll pay our way to ensure our datacenters don't increase your electricity prices.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2008,"oy":2008,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"azure.microsoft.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"82cdd46607af","cid":"82cdd46607af","canon":0,"dups":1,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":50,"pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uquote":"San Antonio is prepared for that growth and is working to stay ahead of demand, said CPS Energy's Ben Jordan, the utility's interim senior director of integrated system planning.","uscan":"https://sanantonioreport.org/microsoft-doubles-down-on-data-centers-texas-business/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2005,"oy":2008,"contro":"Lawsuit over unpaid work and community opposition regarding tree removal and water/power usage.","controScan":"https://www.bisnow.com/national/news/data-center-development/microsoft-project-continues-san-antonio-rise-major-data-center-hub-132675","deal":"Microsoft announced a $1.5 billion investment to expand its data center operations in San Antonio, Texas (March 7, 2025).","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"azure.microsoft.com;sanantonioreport.org;bisnow.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://sanantonioreport.org/microsoft-doubles-down-on-data-centers-texas-business/","https://www.bisnow.com/national/news/data-center-development/microsoft-project-continues-san-antonio-rise-major-data-center-hub-132675"],"band":"50-100 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"7991ef67a8dd","cid":"a14979ea224e","canon":0,"dups":6,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The Microsoft project was the first time San Antonio used its CPS Energy Community Infrastructure and Economic Development Fund, established by the City of San Antonio and CPS Energy, the city's power utility. The fund was established as a means to enhance infrastructure for the benefit of economic development. Nearly $5.2 million from this fund was used to purchase five unique transformers for Microsoft's use on-site. These transformers created the power infrastructure Microsoft required.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","oy":2025,"deal":"Investment of $215.9 million for 245,000 sq ft facility (Year Built: 2025)","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;baxtel.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://baxtel.com/data-center/microsoft-san-antonio-sat15"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"c31713c3d95b","cid":"d75173570e14","canon":0,"dups":2,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uquote":"and with CPS Energy planning to spend $1.3 billion on power infrastructure upgrades over the next five years the stage is set for even more tech growth for San Antonio this means more tech jobs more demand for industrial space and a bigger role in cloud and AI infrastructure.","uscan":"https://www.youtube.com/shorts/T4bySdECRJw","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","contro":"San Antonio City Council is considering measures to track and regulate data center water usage due to high water stress in the region.","controScan":"https://www.bisnow.com/national/news/data-center-development/microsoft-project-continues-san-antonio-rise-major-data-center-hub-132675","deal":"Microsoft acquired a 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million.","dealScan":"https://baxtel.com/data-center/bexar-datacenter-san-antonio-sat1","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"azure.microsoft.com;youtube.com;baxtel.com;bisnow.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.youtube.com/shorts/T4bySdECRJw","https://baxtel.com/data-center/bexar-datacenter-san-antonio-sat1","https://www.bisnow.com/national/news/data-center-development/microsoft-project-continues-san-antonio-rise-major-data-center-hub-132675"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"62081e7c0b22","cid":"0c2755d9ed13","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","uconf":"High","uquote":"CPS Energy, the city-owned utility, has faced pressure from the Energy Forward Alliance — a coalition of data center companies and their stakeholders that formed late last year — to build more infrastructure and expand capacity.","uscan":"https://therealdeal.com/texas/san-antonio/2024/08/12/microsoft-plans-483m-data-center-in-san-antonio-suburb/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft Azure","oy":2009,"deal":"Acquisition of 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million.","dealScan":"https://baxtel.com/data-center/bexar-datacenter-san-antonio-sat1","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"therealdeal.com;baxtel.com","srcUrls":["https://therealdeal.com/texas/san-antonio/2024/08/12/microsoft-plans-483m-data-center-in-san-antonio-suburb/","https://baxtel.com/data-center/bexar-datacenter-san-antonio-sat1"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"bbe70800f96b","cid":"a14979ea224e","canon":0,"dups":6,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"the far West Side's cheap and plentiful electricity, thanks to the numerous substations that CPS Energy has there, has made it a desirable location for data centers.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2014,"oy":2016,"contro":"Community opposition and City Council vote regarding removal of 2,642 trees for a new data center; lawsuit from Rogers-O'Brien Construction LLC for $34.2 million over work on SAT 9/10 Facility.","deal":"$250 million capital investment for data center expansion, proposed in 2014.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-lines-up-incentives-for-250-million-san-antonio-expansion","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;datacenterknowledge.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.datacenterknowledge.com/hyperscalers/microsoft-lines-up-incentives-for-250-million-san-antonio-expansion"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"615a5ddf697f","cid":"a14979ea224e","canon":0,"dups":6,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","uconf":"High","uquote":"CPS Energy has been encouraging companies to build the high-powered facilities in other parts of the metro area to spread out the utility's power loads and prevent congestion on its distribution system.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2014,"contro":"Lawsuit over unpaid construction work and community opposition regarding tree removal for a new data center.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","deal":"$215.9 million investment for 245,000 sq ft facility (SAT15)","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;windowscentral.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://baxtel.com/data-center/microsoft-san-antonio-sat15","https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"e6e247b562e7","cid":"e6e247b562e7","canon":0,"dups":1,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","uconf":"High","uquote":"5200 Rogers Road is separated from Microsoft's data centers at 5150 Rogers Road and 3823 Wiseman Boulevard–both already completely built out–by a City Public Service substation.","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2007,"oy":2020,"deal":"Tax Abatement Agreement for an investment of approximately $550 million, approved January 2007.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected,merged_duplicate","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","ukey":"16604|TX","srcUrls":null,"srcDom":null},{"id":"f12b3d242b5f","cid":"0c2755d9ed13","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uquote":"The far West Side's cheap and plentiful electricity, thanks to the numerous substations that CPS Energy has there, has made it a desirable location for data centers.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","oy":2005,"contro":"Lawsuit over unpaid construction work and community opposition regarding tree removal and potential impact on electricity prices.","deal":"Microsoft acquired the 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;baxtel.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://baxtel.com/data-center/microsoft-san-antonio-sat15"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"ec5fe2d29e7a","cid":"0c2755d9ed13","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"We'll pay our way to ensure our datacenters don't increase your electricity prices. The datacenter is equipped with robust power infrastructure to support continuous operations. It has multiple power feeds to ensure redundancy and minimize the risk of downtime.","uquote":"CPS Energy is the municipal electric utility serving the city of San Antonio, Texas. Acquired by the city in 1942, CPS Energy serves over 840,750 electricity customers and more than 352,585 natural gas customers in its 1,566-square-mile (4,060 km 2) service area, which includes Bexar County and portions of its 7 surrounding counties.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","oy":2024,"deal":"Microsoft invested $215.9 million for its SAT15 data center (245,000 sq ft) and plans to spend $215 million on SAT16 at the 3555 Westover Link campus in San Antonio, Bexar County.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/microsoft-san-antonio-sat15"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"97410a4cff9d","cid":"0c2755d9ed13","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"CPS Energy has been encouraging companies to build the high-powered facilities in other parts of the metro area to spread out the utility's power loads and prevent congestion on its distribution system.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2005,"oy":2009,"contro":"Lawsuit over unpaid construction work and controversy over tree removal.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","deal":"Lawsuit for $34.2 million in March 2020; $215.9 million investment for SAT15.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"azure.microsoft.com;baxtel.com;windowscentral.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://baxtel.com/data-center/microsoft-san-antonio-sat15","https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"a4af9b5a4c6f","cid":"0c2755d9ed13","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"CPS Energy has been encouraging companies to build the high-powered facilities in other parts of the metro area to spread out the utility's power loads and prevent congestion on its distribution system.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2009,"contro":"Community opposition regarding tree removal for a new data center in San Antonio; lawsuit over unpaid construction work at a different Microsoft San Antonio data center.","controScan":"https://www.enr.com/articles/49521-contractor-rogers-obrien-seeks-34m-from-microsoft-over-data-center","deal":"Microsoft announced a $1.5 billion investment to expand its data center operations in San Antonio, Texas, in March 2025.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;enr.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.enr.com/articles/49521-contractor-rogers-obrien-seeks-34m-from-microsoft-over-data-center"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"a14979ea224e","cid":"a14979ea224e","canon":1,"dups":6,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm. Our backup generators at our datacenters in Texas use a renewable biofuel that reduces net carbon emissions compared to traditional petroleum-based diesel. In this region, we will fulfill that commitment through power purchase agreements with Allianz, Anson, Ercot, Keechi, Las Lomas, Leeward RE, Old 300, Primergy, and RWE.","uconf":"High","uquote":"The far West Side's cheap and plentiful electricity, thanks to the numerous substations that CPS Energy has there, has made it a desirable location for data centers. CPS Energy has been encouraging companies to build the high-powered facilities in other parts of the metro area to spread out the utility's power loads and prevent congestion on its distribution system.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2005,"oy":2026,"contro":"Tree removal controversy and lawsuit over unpaid construction work.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","deal":"$1.5 billion investment announced March 2025 for expansion; 90 acres acquired September 2025; 158 acres purchased in 2015; 34-acre center acquired for $80 million in 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"windowscentral.com","srcUrls":["https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"0c2755d9ed13","cid":"0c2755d9ed13","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The far West Side's cheap and plentiful electricity, thanks to the numerous substations that CPS Energy has there, has made it a desirable location for data centers.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2005,"oy":2008,"contro":"Lawsuit over unpaid construction work for SAT 9/10 Facility at 15434 Lambda Drive (2020); Community opposition and City Council vote regarding tree removal for a new data center (2022); Ongoing concerns about power and water supply strain.","deal":"Acquisition of a 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;baxtel.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://baxtel.com/data-center/microsoft-san-antonio-sat15"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"63c0f2f1901e","cid":"b27fe485416b","canon":0,"dups":4,"ftype":"data_center","name":"Microsoft Corporation Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Crusoe","pdt":"900 megawatts","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"085dda2141b5","cid":"9890854b045e","canon":0,"dups":3,"ftype":"data_center","name":"Microsoft Corporation Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Our backup generators at our datacenters in Texas use a renewable biofuel that reduces net carbon emissions compared to traditional petroleum-based diesel. This customized agreement will allow Microsoft, one of the world's largest purchasers of renewable energy, to match ERCOT data center load with clean power.","pscan":"https://www.engie-na.com/engie-to-supply-microsoft-data-centers-in-texas-with-24x7-renewable-energy-matching-program/","uconf":"High","uquote":"Microsoft's SAT93 data center in Medina County, Texas, is a 245,000 sq ft single-story facility developed alongside SAT94 on County Road 381, with $26M investment, powered by Medina Electric Cooperative, and scheduled for construction from 2027 to 2029.","uscan":"https://baxtel.com/data-center/microsoft-san-antonio-sat16","ukey":"13830|TX","uname":"Nueces Electric Cooperative","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2025,"deal":"PPA with ENGIE for renewable energy, announced September 20, 2023.","dealScan":"https://www.engie-na.com/engie-to-supply-microsoft-data-centers-in-texas-with-24x7-renewable-energy-matching-program/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"engie-na.com;baxtel.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.engie-na.com/engie-to-supply-microsoft-data-centers-in-texas-with-24x7-renewable-energy-matching-program/","https://baxtel.com/data-center/microsoft-san-antonio-sat16"]},{"id":"00f660534809","cid":"b27fe485416b","canon":0,"dups":4,"ftype":"data_center","name":"Microsoft Corporation Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Dedicated PPA","pcp":"RWE","pdt":"two 15-year Power Purchase Agreements, 446 megawatts","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8b70c6bbb1e1","cid":"b27fe485416b","canon":0,"dups":4,"ftype":"data_center","name":"Microsoft Corporation Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Chevron and Engine No. 1","pdt":"$7 billion power plant, 2,500 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9890854b045e","cid":"9890854b045e","canon":1,"dups":3,"ftype":"data_center","name":"Microsoft Corporation Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"In this region, we will fulfill that commitment through power purchase agreements with Allianz, Anson, Ercot, Keechi, Las Lomas, Leeward RE, Old 300, Primergy, and RWE. Our backup generators at our datacenters in Texas use a renewable biofuel that reduces net carbon emissions compared to traditional petroleum-based diesel.","pscan":"https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Texas.pdf","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2007,"oy":2015,"deal":"Tax Phase-In Agreement executed by the City and Microsoft (2007)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"local.microsoft.com","srcUrls":["https://local.microsoft.com/wp-content/uploads/2025/10/Microsoft-datacenters-in-Texas.pdf"]},{"id":"b27fe485416b","cid":"b27fe485416b","canon":0,"dups":4,"ftype":"data_center","name":"Microsoft Corporation Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Dedicated PPA","pcp":"RWE","pdt":"two 15-year Power Purchase Agreements, 446 MW combined capacity","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"9d5fdc9120f0","cid":"9890854b045e","canon":0,"dups":3,"ftype":"data_center","name":"Microsoft Corporation Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Chevron and Engine No. 1","pdt":"$7 billion natural gas-fired power plant, 2,500 megawatts","rto":"ERCOT","nerc":"TRE","op":"Microsoft","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e9e06bd9082c","cid":"e9e06bd9082c","canon":0,"dups":1,"ftype":"data_center","name":"MICROSOFT SAT 8990 DATA CENTER PROJECT SITE","city":"CASTROVILLE","county":"MEDINA","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Unknown","mw":120,"pc":"Grid","pconf":"Medium","pquote":"CPS Energy is moving ahead with roughly $1.3 billion in transmission and generation upgrades to handle rapidly growing data center power loads. If SAT89 and SAT90 follow the SAT40 design, each site is expected to have a 60 MW power capacity.","uquote":"CPS Energy is moving ahead with roughly $1.3 billion in transmission and generation upgrades to handle rapidly growing data center power loads.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","ay":2025,"oy":2027,"contro":"Community concerns regarding water use and road wear due to heavy construction traffic.","deal":"$765 million construction investment, announced March 2025.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025012765","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025012765"],"band":"100-250 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_url_canonicalized coordinate_cluster_reclassified,merged_duplicate"},{"id":"a6ddf80bb79f","cid":"a6ddf80bb79f","canon":0,"dups":2,"ftype":"data_center","name":"MICROSOFT SAT 8990 DATA CENTER PROJECT SITE","city":"CASTROVILLE","county":"MEDINA","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"We've committed to achieving 100% renewable energy coverage globally by 2025. In this region, we will fulfill that commitment through power purchase agreements with Allianz, Anson, Ercot, Keechi, Las Lomas, Leeward RE, Old 300, Primergy, and RWE.","uconf":"High","uquote":"The City of Castroville's Electrical Department is responsible for maintaining and operating the city's electric utility system. The City of Castroville has been issued Certificate # 30027 for electric.","uname":"City of Castroville Electrical Department","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft (and colocation tenants)","ay":2025,"oy":2027,"contro":"Community concerns regarding light, dust, noise, smoke, potential for flooding/runoff, and extensive water use in a water-stressed area.","controScan":"https://sanantonioreport.org/medina-county-farmland-data-centers-strain/","deal":"Construction investment of $765 million (announced March 2025)","dealScan":"https://baxtel.com/data-center/microsoft-sat89","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"castrovilletx.gov;baxtel.com;sanantonioreport.org","uscan":"https://www.castrovilletx.gov/209/Electric","srcUrls":["https://www.castrovilletx.gov/209/Electric","https://baxtel.com/data-center/microsoft-sat89","https://sanantonioreport.org/medina-county-farmland-data-centers-strain/"],"rawUkey":"56286|TX","rawUname":"Frontier Utilities, LLC","reportedUtility":"City of Castroville Electrical Department","lflag":"nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected delivery_utility_not_in_eia861 coordinate_cluster_reclassified,merged_duplicate"},{"id":"07a624a194f2","cid":"07a624a194f2","canon":1,"dups":1,"ftype":"data_center","name":"MICROSOFT SAT 8990 DATA CENTER PROJECT SITE","city":"CASTROVILLE","county":"MEDINA","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"Medium","pquote":"Backup generators at the site will use renewable biofuels, and the building will rely heavily on air-cooled chillers, which require little to no water for cooling. In fact, across the region, Microsoft has shifted most of its facilities away from potable water usage, choosing instead to source recycled water through providers like SAWS, Yancey Water, and the East Medina County Special Utility District.","pscan":"https://myneighborhoodnews.com/microsoft-to-build-400m-data-center-in-castroville-bringing-jobs-and-growth-to-far-west-san-antonio","uconf":"High","uquote":"The superintendent for the East Medina County Special Utility District, Bruce Alexander, said that the utility is working with Microsoft to determine the terms of a “non-standard service agreement” to provide water service.","uscan":"https://sanantonioreport.org/medina-county-farmland-data-centers-strain/","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","oy":2027,"contro":"Community concerns regarding dust, noise, smoke from burning trees, potential for flooding and runoff, and extensive water usage in a water-stressed area.","controScan":"https://www.ksat.com/news/local/2025/10/03/the-impact-of-billion-dollar-data-centers-in-water-stressed-medina-county/","deal":"Construction of two single-story data center buildings with an estimated cost of $765,000,000, with a start date of June 1, 2025, and completion date of July 31, 2027.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"myneighborhoodnews.com;sanantonioreport.org;ksat.com","srcUrls":["https://myneighborhoodnews.com/microsoft-to-build-400m-data-center-in-castroville-bringing-jobs-and-growth-to-far-west-san-antonio","https://sanantonioreport.org/medina-county-farmland-data-centers-strain/","https://www.ksat.com/news/local/2025/10/03/the-impact-of-billion-dollar-data-centers-in-water-stressed-medina-county/"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"8cfbca7ac0df","cid":"a6ddf80bb79f","canon":0,"dups":2,"ftype":"data_center","name":"MICROSOFT SAT 8990 DATA CENTER PROJECT SITE","city":"CASTROVILLE","county":"MEDINA","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The Castroville site was selected due to its favorable characteristics, including flat terrain and access to power and fiber infrastructure.","uconf":"High","uquote":"Additionally, a 138 kV line will be built from the new Rio Medina to connect with CPS Energy's transmission system.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2025,"oy":2027,"contro":"Concerns over water usage, noise, and traffic from data centers in the region.","deal":"Construction investment of $765 million, announced March 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected coordinate_cluster_reclassified","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"50d1f67cbc6f","cid":"6665ccb3d2a4","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2026,"contro":"Controversy over the removal of 2,642 trees for a new data center in San Antonio, leading to local political and community concern.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","deal":"Investment of $215.9 million for new construction.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"azure.microsoft.com;idc-a.org;baxtel.com;windowscentral.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://baxtel.com/data-center/microsoft-san-antonio-sat15","https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"222a9f60de26","cid":"6665ccb3d2a4","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2026,"contro":"Tree removal controversy and exception to San Antonio's Tree Preservation Ordinance for a data center at Westover Link.","controScan":"https://sanantonioreport.org/microsoft-data-centers-san-antonio-region/","deal":"Construction investment of $215.9 million (announced August 2022).","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"azure.microsoft.com;idc-a.org;baxtel.com;sanantonioreport.org","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://baxtel.com/data-center/microsoft-san-antonio-sat15","https://sanantonioreport.org/microsoft-data-centers-san-antonio-region/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"313fc13f5693","cid":"313fc13f5693","canon":0,"dups":1,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2026,"contro":"Microsoft was granted an exception to San Antonio's Tree Preservation Ordinance to remove 2,642 trees for the data center, despite concerns from local politicians and community members.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","deal":"Investment of $215.9 million for construction, announced August 2022.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"azure.microsoft.com;baxtel.com;windowscentral.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://baxtel.com/data-center/microsoft-san-antonio-sat15","https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"655c54a579d2","cid":"655c54a579d2","canon":1,"dups":3,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-aae5c33c","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2026,"contro":"San Antonio is located in an extremely high baseline water stress region, requiring attention to water use and effluent strategies.","controScan":"https://ceowatermandate.org/wp-content/uploads/2018/01/Water_Risk_Monetizer_Microsoft_Case_Study.pdf","deal":"Microsoft invested $215.9 million for this 245,000 sq ft facility, with a TDLR permit filed on August 18, 2022.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"interconnection.fyi;idc-a.org;baxtel.com;ceowatermandate.org","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-aae5c33c","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://baxtel.com/data-center/microsoft-san-antonio-sat15","https://ceowatermandate.org/wp-content/uploads/2018/01/Water_Risk_Monetizer_Microsoft_Case_Study.pdf"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"94e8ca6068a6","cid":"6665ccb3d2a4","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","oy":2026,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;idc-a.org","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"9c5abd1b547a","cid":"6665ccb3d2a4","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","oy":2026,"contro":"Controversy over tree removal for data center development.","deal":"Project estimated cost of $215.9 million.","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"azure.microsoft.com;idc-a.org;baxtel.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://baxtel.com/data-center/microsoft-san-antonio-sat15"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"6665ccb3d2a4","cid":"6665ccb3d2a4","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","oy":2026,"contro":"Community opposition regarding tree removal for construction.","deal":"$215.9 million investment for construction, filed August 2022.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"azure.microsoft.com;idc-a.org","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"df167063ace2","cid":"655c54a579d2","canon":0,"dups":3,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2026,"contro":"Located on Edwards Aquifer Recharge Zone, in an extremely high baseline water stress region, raising concerns about water use and impact on water quality.","controScan":"https://centexdatacenters.org/tracker/microsoft-westover-san-antonio","deal":"Investment of $215.9 million (announced August 2022).","dealScan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"azure.microsoft.com;idc-a.org;centexdatacenters.org","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://centexdatacenters.org/tracker/microsoft-westover-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"152d9d171d36","cid":"6665ccb3d2a4","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","oy":2026,"contro":"Controversy over tree removal for a new data center on the far west side of San Antonio, requiring an exception to the city's Tree Preservation Ordinance.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","deal":"New construction with an estimated cost of $215,900,000.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022026535","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"azure.microsoft.com;idc-a.org;tdlr.texas.gov;windowscentral.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022026535","https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_url_canonicalized"},{"id":"7cf357c0d938","cid":"6665ccb3d2a4","canon":0,"dups":7,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"Medium","pquote":"Across our global infrastructure, it's not unusual for us to work with a heightened operational awareness, due to external factors. For instance, severe winter weather events in Texas in 2021 caused substantial pressure on the Texas energy grid. Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2026,"contro":"Community concern and City Council vote regarding tree removal for a new data center.","controScan":"https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"azure.microsoft.com;idc-a.org;windowscentral.com","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://www.windowscentral.com/curious-tale-microsoft-data-center-vs-2600-trees-and-san-antonio-hoa"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"ed8522463478","cid":"655c54a579d2","canon":0,"dups":3,"ftype":"data_center","name":"MICROSOFT SAT15","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft was able to remove its San Antonio datacenter from using grid power. Although Microsoft's onsite substations were designed with redundancy, we were able to quickly transition to our tertiary redundant systems—generators. These systems kept the datacenters running, with zero impact to our cloud customers, while the utility grid could ensure residential homes stayed warm.","pscan":"https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","uconf":"High","uquote":"The new facility, built on an existing Microsoft data center site, will be constructed in collaboration with CPS Energy.","uscan":"https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2022,"oy":2024,"contro":"San Antonio is in an extremely high baseline water stress region, and Microsoft's data center water use requires attention and strategies to comply with San Antonio Water System (SAWS) requirements, including drought restrictions.","controScan":"https://ceowatermandate.org/wp-content/uploads/2018/01/Water_Risk_Monetizer_Microsoft_Case_Study.pdf","deal":"Investment of $215.9 million for a 245,000 sq ft facility (announced August 2022)","dealScan":"https://baxtel.com/data-center/microsoft-san-antonio-sat15","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"azure.microsoft.com;idc-a.org;baxtel.com;ceowatermandate.org","srcUrls":["https://azure.microsoft.com/en-us/blog/learn-how-microsoft-datacenter-operations-prepare-for-energy-issues/","https://www.idc-a.org/news/Microsoft-Plans-to-Build-a-New-Data-Center-in-San-Antonio-Texas","https://baxtel.com/data-center/microsoft-san-antonio-sat15","https://ceowatermandate.org/wp-content/uploads/2018/01/Water_Risk_Monetizer_Microsoft_Case_Study.pdf"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"6011f2a345f7","cid":"6011f2a345f7","canon":1,"dups":1,"ftype":"data_center","name":"Milam County DC, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1200,"pc":"Behind-the-Meter","pconf":"High","pquote":"A massive, solar-fueled data center hub is on its way to Central Texas, if someone steps in to lease it. SB Energy paved the way for a $3 billion data center outside Rosebud, about 70 miles northeast of Austin, the Austin Business Journal reported. [...] The company, owned by SoftBank Group, plans to build multiple data center buildings spanning 1.5 million square feet on 595 acres adjacent to its Orion Solar Belt project, one of the largest solar installations in the country.","pscan":"https://therealdeal.com/texas/austin/2025/06/10/softbank-groups-sb-energy-plans-3-billion-texas-data-center/","proc":"Co-located generation","pcp":"SB Energy","pdt":"1.2 GW, initial facilities expected to come online starting in 2026","uquote":"Amendment No. 1 to the Generation Interconnection Agreement between Oncor Electric Delivery Company LLC and Ben Milam Solar 2 LLC (Mandorla Solar aka Orion II).","rto":"ERCOT","nerc":"TRE","op":"Milam County DC","spon":"SoftBank Group","tenant":"OpenAI","ay":2025,"oy":2026,"contro":"Residents' environmental concerns regarding light and noise were addressed by the facility's design.","controScan":"https://therealdeal.com/texas/austin/2025/06/10/softbank-groups-sb-energy-plans-3-billion-texas-data-center/","deal":"Milam County held a public hearing on a Tax Abatement Agreement with SE DC DevCo, LLC for a data center project with an estimated capital investment of over $3,000,000,000.","dealScan":"https://therealdeal.com/texas/austin/2025/06/10/softbank-groups-sb-energy-plans-3-billion-texas-data-center/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"therealdeal.com","srcUrls":["https://therealdeal.com/texas/austin/2025/06/10/softbank-groups-sb-energy-plans-3-billion-texas-data-center/"],"band":"250+ MW","lflag":"large_project_duplicate_review utility_alias_corrected delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"a5e34f1b2a7f","cid":"a5e34f1b2a7f","canon":1,"dups":1,"ftype":"data_center","name":"Edmondson Ranch Reinmvestment Zone NO.1","county":"Sterling County","state":"TX","lat":31.835773,"lng":-101.054911,"cprec":"distinct","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b9c5d66c9d1d","cid":"b9c5d66c9d1d","canon":1,"dups":2,"ftype":"data_center","name":"Nexus Hubbard Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":612,"pc":"Behind-the-Meter","pconf":"High","pquote":"Nexus is revolutionizing the hyperscale market, focused on delivering future-proof and sustainable campuses at an accelerated speed, which will be achieved in part through its robust behind-the-meter power generation strategy.","proc":"Co-located generation","pcp":"Nexus Hubbard Power, LLC (self-generation)","pdt":"~7 GW at full buildout, 600-612 MW initial phase","rto":"ERCOT","nerc":"TRE","op":"Nexus Data Centers","spon":"Transition Equity Partners","tenant":"Anthropic","ay":2025,"oy":2026,"contro":"Community questions and regulatory review regarding emissions, noise, and water usage.","controScan":"https://lakelander.com/2026/02/19/commissioners-approve-hubbard-data-center-reinvestment-zone/","deal":"Strategic equity investment from Transition Equity Partners, LLC (TEP) in December 2025; Google backing Anthropic's multi-billion dollar project.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"lakelander.com","srcUrls":["https://lakelander.com/2026/02/19/commissioners-approve-hubbard-data-center-reinvestment-zone/"],"band":"250+ MW","rawName":"Nexus Data Centers, LLC\n\t\t\tNexus Land Holdings, LLC\n\t\t\tNexus Hubbard Power, LLC","lflag":"display_name_normalized source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated"},{"id":"25512871e14f","cid":"b9c5d66c9d1d","canon":0,"dups":2,"ftype":"data_center","name":"Nexus Hubbard Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":612,"pc":"Behind-the-Meter","pconf":"High","pquote":"\"Behind-the-meter\" means the power plant is not connected to the ERCOT grid; electrons move from the turbines directly to the on-site data center through private infrastructure. Nexus has publicly cited speed-to-market as the reason: bypassing ERCOT's large-load interconnection queue (backlogged at roughly 233 GW of pending requests) and the rate-base oversight that comes with traditional utility generation.","proc":"Co-located generation","pcp":"Nexus Hubbard Power, LLC","pdt":"612.93MW (initial phase)","rto":"ERCOT","nerc":"TRE","op":"Nexus Data Centers","spon":"Transition Equity Partners","ay":2025,"oy":2026,"contro":"Nexus withdrew its county tax abatement request after Hill County Commissioners Court heard concerns from residents.","controScan":"https://lakelander.com/2026/04/17/nexus-pulls-out-of-county-tax-abatement-negotiations/","deal":"Strategic equity investment from Transition Equity Partners, LLC (TEP) on December 09, 2025. Industrial Water Purchase Agreement (WPA) with AirJoule Technologies on December 04, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"lakelander.com","srcUrls":["https://lakelander.com/2026/04/17/nexus-pulls-out-of-county-tax-abatement-negotiations/"],"band":"250+ MW","rawName":"Nexus Data Centers, LLC\n\t\t\tNexus Land Holdings, LLC\n\t\t\tNexus Hubbard Power, LLC\n\t\t\tNexus Data Centers Hubbard, LLC","lflag":"display_name_normalized source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"8ac13bceabcd","cid":"1e201c7a174d","canon":0,"dups":2,"ftype":"data_center","name":"NTT Global Data Centers TX, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":124,"pc":"Grid","pconf":"High","pquote":"Our Dallas TX1 Data Center at 2008 Lookout Drive, Garland, Texas... With a total of 230,000ft² and 16MW of critical IT load, Dallas TX1 is directly connected to a dense fiber network and fed with dual, redundant power feeds.... The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","pscan":"https://baxtel.com/data-center/ntt-tx4","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/ntt-tx4","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"NTT Global Data Centers Americas","spon":"NTT Group","ay":2017,"oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/ntt-tx4"],"band":"100-250 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"1e201c7a174d","cid":"1e201c7a174d","canon":0,"dups":2,"ftype":"data_center","name":"NTT Global Data Centers TX, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":124,"pc":"Grid","pconf":"High","pquote":"Our Dallas TX1 Data Center at 2008 Lookout Drive, Garland, Texas has been recognized by Datacenter Dynamics as one of the 'most beautiful data centers in the world'. With a total of 230,000ft² and 16MW of critical IT load, Dallas TX1 is directly connected to a dense fiber network and fed with dual, redundant power feeds.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/dallas-tx-1-data-center","uquote":"A Garland Power and Light electrical substation, center, powers data center buildings Dallas TX3, left, and TX2, on the NTT Data center campus in Garland.","uname":"Garland Power & Light (City of Garland)","rto":"ERCOT","nerc":"TRE","op":"NTT Global Data Centers Americas","spon":"NTT Group","ay":2024,"oy":2026,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.global.ntt","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/dallas-tx-1-data-center"],"band":"100-250 MW","rawUkey":"49818|TX","rawUname":"Alliance Power Company, LLC.","reportedUtility":"Garland Power & Light (City of Garland)","lflag":"nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected,merged_duplicate","ukey":"6958|TX"},{"id":"f23b7763dbea","cid":"f23b7763dbea","canon":1,"dups":1,"ftype":"data_center","name":"NTT Global Data Centers TX, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":160,"pc":"Grid","pconf":"High","pquote":"Dallas TX1 is equipped with direct connections to a dense fiber network and dual redundant power feeds for maximum reliability.","uquote":"Shane Shepard, director of economic development for Lancaster, said NTT is still considering several factors including an ERCOT capacity study, decisions from Oncor and state legislative activities before it closes on the property.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"NTT Global Data Centers TX","spon":"NTT Group","ay":2024,"oy":2028,"contro":"Regulatory considerations for new facility development","deal":"Lancaster City Council approved an economic development agreement on Dec. 9, 2024, including incentives and job creation requirements.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text state_centroid_only utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"104592c20936","cid":"104592c20936","canon":1,"dups":1,"ftype":"data_center","name":"Ocean Blockchain LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","op":"Ocean Blockchain","tenant":"Kevin Hsu","ay":2023,"oy":2024,"deal":"$10 million in private funding","dealScan":"https://theenergymag.com/news/2025-01-20/austin-data-center-bitcoin-mining","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"theenergymag.com","srcUrls":["https://theenergymag.com/news/2025-01-20/austin-data-center-bitcoin-mining"],"lflag":"source_quality_reclassified"},{"id":"94b1029dcba1","cid":"94b1029dcba1","canon":1,"dups":1,"ftype":"data_center","name":"Polmer LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The project is supported by 100% renewable energy commitments.","uconf":"Medium","uquote":"In addition to the economic agreement, Polmer entered into a tax abatement, and water and wastewater agreement with the city,","ukey":"6427|TX","uname":"City of Floresville","rto":"ERCOT","nerc":"TRE","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2021,"oy":2027,"deal":"$800 million capital commitment for Phase 1, with a 10-year, 75% ad valorem tax abatement agreement (announced December 2021)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"9c8be4cf201d","cid":"9c8be4cf201d","canon":1,"dups":1,"ftype":"data_center","name":"Poolside LF Phase 1 DC OPS LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":2000,"pc":"Behind-the-Meter","pconf":"High","pquote":"We've secured a 2 GW behind-the-meter AI campus on 568 acres of development-ready land.","pscan":"https://poolside.ai/blog/announcing-project-horizon","proc":"Co-located generation","pcp":"Poolside","pdt":"2 GW capacity","rto":"ERCOT","nerc":"TRE","op":"Poolside","spon":"Nvidia","ay":2025,"oy":2027,"contro":"Partnership with CoreWeave unraveled due to Poolside failing to deploy its first chip cluster within the agreed timeline.","deal":"Poolside is in the midst of a $2 billion fundraising round.","dealScan":"https://jupiterisland.capital/climate_deals/ai-startup-poolside-partners-with-coreweave-on-2-gw-texas-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"poolside.ai;jupiterisland.capital","srcUrls":["https://poolside.ai/blog/announcing-project-horizon","https://jupiterisland.capital/climate_deals/ai-startup-poolside-partners-with-coreweave-on-2-gw-texas-data-center/"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified"},{"id":"0207e9ee7d42","cid":"78d25244fe85","canon":0,"dups":3,"ftype":"data_center","name":"QTS 2&3","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Key features include advanced redundancy, efficient cooling systems, and a commitment to sustainability through Water-Free Technologies and Clean Energy Integration.... utility power supporting up to 75 MW across the campus.","pscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2025,"oy":2027,"deal":"$650 million construction costs for two data centers (DFW2 DC2 and DFW2 DC3) announced April 2025","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"checkmarkpro.com","srcUrls":["https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"78d25244fe85","cid":"78d25244fe85","canon":1,"dups":3,"ftype":"data_center","name":"QTS 2&3","county":"DallasCounty","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Power delivery is a cornerstone, with 43 MW of critical IT load powered by utility feeds, diesel generators, and UPS systems for seamless failover.","pscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/qts-dfw2-dc3","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2025,"oy":2027,"deal":"Construction costs of approximately $650 million for two projects (DFW2 DC2 and DFW2 DC3) announced in April 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"checkmarkpro.com;baxtel.com","srcUrls":["https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","https://baxtel.com/data-center/qts-dfw2-dc3"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"cf2a917b0c4b","cid":"ab3d910e883c","canon":0,"dups":2,"ftype":"data_center","name":"QTS 2&3","city":"Wilmer","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":43,"pc":"Grid","pconf":"High","pquote":"Power delivery is a cornerstone, with 43 MW of critical IT load powered by utility feeds, diesel generators, and UPS systems for seamless failover.","pscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uquote":"Power Reliability: Backed by Oncor Electric Delivery's robust grid, with scalable utility power supporting up to 75 MW across the campus.","uscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2025,"oy":2027,"deal":"Construction of DFW2-DC3 with an estimated cost of $350 million, announced April 2025.","dealScan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"checkmarkpro.com","srcUrls":["https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"aaa9396f39b1","cid":"aaa9396f39b1","canon":0,"dups":1,"ftype":"data_center","name":"QTS 2&3","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Power delivery is a cornerstone, with 43 MW of critical IT load powered by utility feeds, diesel generators, and UPS systems for seamless failover.","pscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uconf":"High","uquote":"The buying power of the deregulated Texas energy market combined with the reliable infrastructure of Oncor, the state's largest transmission and distribution utility.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone Group","ay":2025,"oy":2027,"deal":"QTS plans to spend an estimated $650 million on construction costs for the two projects (DFW2 DC2 and DFW2 DC3).","dealScan":"https://insider.govtech.com/texas/news/dallas-county-to-house-650m-data-centers","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"checkmarkpro.com;insider.govtech.com","srcUrls":["https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","https://insider.govtech.com/texas/news/dallas-county-to-house-650m-data-centers"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"0949fdee78f0","cid":"78d25244fe85","canon":0,"dups":3,"ftype":"data_center","name":"QTS 2&3","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT","pscan":"https://www.interconnection.fyi/data-center/project/qts-2-3-6453a7be","uconf":"High","uquote":"Power Reliability: Backed by Oncor Electric Delivery's robust grid, with scalable utility power supporting up to 75 MW across the campus.","uscan":"https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2025,"oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;checkmarkpro.com","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-2-3-6453a7be","https://www.checkmarkpro.com/assets/Uploads/Knowledge-Center/Files/CASE-STUDY-QTS-Data-Center-Wilmer-Texas.pdf"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"ab3d910e883c","cid":"ab3d910e883c","canon":1,"dups":2,"ftype":"data_center","name":"QTS 2&3","city":"Wilmer","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":43,"pc":"Grid","pconf":"High","pquote":"Power delivery is a cornerstone, with 43 MW of critical IT load powered by utility feeds, diesel generators, and UPS systems for seamless failover.","uquote":"Power Reliability: Backed by Oncor Electric Delivery's robust grid, with scalable utility power supporting up to 75 MW across the campus.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2025,"oy":2027,"deal":"Construction projects totaling $650 million (DC2: $300 million, DC3: $350 million) announced April 2025.","dealScan":"https://baxtel.com/data-center/qts-dfw2-dc3","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/qts-dfw2-dc3"],"band":"25-50 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"c2944e4214ab","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","county":"Denton County","state":"TX","lat":33.205132,"lng":-97.12114,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"While you can choose your Fort Worth electricity provider, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages. The utility company for Fort Worth is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/fort-worth/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2013,"oy":2026,"deal":"$220 million expansion project with anticipated delivery date of April 1, 2026. Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center (April 22, 2021).","dealScan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"prnewswire.com;choosetexaspower.org","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://www.choosetexaspower.org/electricity-rates/fort-worth/"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"169ba7d353cc","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"FORT WORTH","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"Multiple 345-kV and 138-kV transmission lines served by Oncor Electric Delivery & Brazos Electric.","uscan":"https://www.alliancetexas.com/data-center","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2024,"oy":2026,"deal":"$220 million project for a new data center in North Fort Worth announced January 2024","dealScan":"https://therealdeal.com/texas/dallas/2024/01/29/blackstones-qts-to-build-220m-data-center-in-north-fort-worth/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"prnewswire.com;alliancetexas.com;therealdeal.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://www.alliancetexas.com/data-center","https://therealdeal.com/texas/dallas/2024/01/29/blackstones-qts-to-build-220m-data-center-in-north-fort-worth/"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"525e238b62d0","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.executivegov.com/articles/qts-announces-four-additional-data-centers-powered-by-renewable-energy","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone Group","tenant":"Health Care Service (HCSC)","ay":2013,"oy":2026,"deal":"Acquisition of HCSC data center for approximately $50 million on January 30, 2017. New facility (DC2) project with an estimated cost of $220 million, announced January 2024.","dealScan":"https://therealdeal.com/texas/dallas/2024/01/29/blackstones-qts-to-build-220m-data-center-in-north-fort-worth/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"executivegov.com;therealdeal.com","srcUrls":["https://www.executivegov.com/articles/qts-announces-four-additional-data-centers-powered-by-renewable-energy","https://therealdeal.com/texas/dallas/2024/01/29/blackstones-qts-to-build-220m-data-center-in-north-fort-worth/"],"lflag":"source_quality_reclassified"},{"id":"80d96adb2294","cid":"80d96adb2294","canon":1,"dups":1,"ftype":"data_center","name":"QTS FORT WORTH","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"CPS Energy","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"35223d467d30","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","county":"Tarrant County","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2013,"oy":2014,"deal":"QTS acquires Health Care Services Corporation data center in Fort Worth (2016)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"c572e6873610","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"FORT WORTH","county":"TARRANT","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"While you can choose your Fort Worth electricity provider, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages. The utility company for Fort Worth is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/fort-worth/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","tenant":"Health Care Services","ay":2013,"oy":2014,"deal":"QTS Realty Trust acquired a Dallas data center campus from Health Care Services Corp. for about $50 million (January 30, 2017). QTS also plans to expand its existing data center campus at 14100 Park Vista Blvd. in Fort Worth, Texas, with an investment of $130 million (April 22, 2025).","dealScan":"https://www.datacenterknowledge.com/operations-and-management/qts-buys-large-dallas-data-center-from-insurer-hcsc","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"prnewswire.com;choosetexaspower.org;datacenterknowledge.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://www.choosetexaspower.org/electricity-rates/fort-worth/","https://www.datacenterknowledge.com/operations-and-management/qts-buys-large-dallas-data-center-from-insurer-hcsc"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"01a6dddf119b","cid":"236ec7f15a96","canon":0,"dups":3,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","county":"Tarrant County","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","tenant":"Health Care Service (HCSC)","ay":2017,"oy":2026,"deal":"QTS purchased the existing 8 gross megawatt facility for approximately $50 million on January 30, 2017. QTS also plans to expand its existing data center campus at 14100 Park Vista Blvd. in Fort Worth, Texas, with an investment of $130 million.","dealScan":"https://www.prnewswire.com/news-releases/qts-expands-in-dallas-with-acquisition-of-53-acre-mega-data-center-campus-from-health-care-service-corporation-300398907.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-expands-in-dallas-with-acquisition-of-53-acre-mega-data-center-campus-from-health-care-service-corporation-300398907.html"],"lflag":"source_quality_reclassified"},{"id":"236ec7f15a96","cid":"236ec7f15a96","canon":0,"dups":3,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","county":"Tarrant County","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"Power - 2 separate 24.9kV feeds - On-site redundant substation (50 MVA total with expansion to 200 MVA) - Parallel redundant N+1 generators - 96 hours of onsite fuel storage with multiple fuel contract - 8MW of UPS power - Block redundant static UPS design to N+1. QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"Medium","uquote":"Oncor is a regulated electric transmission and distribution service provider that serves 10 million customers across Texas.","uscan":"https://business.fortworthchamber.com/list/member/oncor-electric-delivery-1211","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","tenant":"Health Care Service (HCSC)","ay":2017,"oy":2025,"deal":"Acquisition of facility from Health Care Service Corporation for approximately $50 million on January 30, 2017. Blackstone-owned QTS Data Centers wants to build a $220 million facility in North Fort Worth, marking its second project in the Alliance area.","dealScan":"https://therealdeal.com/texas/dallas/2024/01/29/blackstones-qts-to-build-220m-data-center-in-north-fort-worth/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"prnewswire.com;business.fortworthchamber.com;therealdeal.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://business.fortworthchamber.com/list/member/oncor-electric-delivery-1211","https://therealdeal.com/texas/dallas/2024/01/29/blackstones-qts-to-build-220m-data-center-in-north-fort-worth/"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"03eaf7146396","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","county":"Tarrant County","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","uconf":"High","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.","uscan":"https://baxtel.com/data-center/qts-dfw2-dc1","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","tenant":"Health Care Service (HCSC)","ay":2017,"oy":2026,"deal":"Acquisition of 8 gross megawatt facility for approximately $50 million on January 30, 2017. $220 million investment for QTS Fort Worth DC2 with construction completed early 2026. $130 million expansion of existing campus.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/qts-dfw2-dc1"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"893d1dcd4d34","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"Oncor Electric Delivery provides electricity delivery service throughout the following areas in Texas: Dallas. Fort Worth. Plano. Arlington. Irving. Waco. Midland. Odessa. Killeen. Temple. Tyler. Denton. McKinney. Frisco.","uscan":"https://www.electricchoice.com/utilities/oncor/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone Group","tenant":"Health Care Service (HCSC)","ay":2014,"oy":2026,"deal":"Acquired existing 8 gross megawatt facility for approximately $50 million in January 2017. Included in a $3.46 billion CMBS refinancing of a QTS portfolio in November 2025, with the Fort Worth property valued at $481 million.","dealScan":"https://www.prnewswire.com/news-releases/qts-expands-in-dallas-with-acquisition-of-53-acre-mega-data-center-campus-from-health-care-service-corporation-300398907.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"prnewswire.com;electricchoice.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://www.electricchoice.com/utilities/oncor/","https://www.prnewswire.com/news-releases/qts-expands-in-dallas-with-acquisition-of-53-acre-mega-data-center-campus-from-health-care-service-corporation-300398907.html"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"d0a146087fd4","cid":"236ec7f15a96","canon":0,"dups":3,"ftype":"data_center","name":"QTS FORT WORTH","city":"FORT WORTH","county":"Tarrant","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","tenant":"Health Care Service (HCSC)","ay":2017,"oy":2025,"deal":"Expansion of existing data center campus with an investment of $130 million to expand by nearly 169,000 square feet (April 2025).","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b124ecf718ee","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","county":"Tarrant County","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","pscan":"https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","uconf":"High","uquote":"While you can choose your Fort Worth electricity provider, your utility company is determined by your address and cannot be changed. Utilities deliver electricity, maintain power lines, and restore service during power outages. The utility company for Fort Worth is Oncor Electric Delivery.","uscan":"https://www.choosetexaspower.org/electricity-rates/fort-worth/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2017,"oy":2026,"deal":"Acquisition of facility from HCSC for $50 million (January 30, 2017); $130 million expansion investment (April 22, 2025); $220 million project for QTS Fort Worth DC2 (January 2024)","dealScan":"https://www.prnewswire.com/news-releases/qts-expands-in-dallas-with-acquisition-of-53-acre-mega-data-center-campus-from-health-care-service-corporation-300398907.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"prnewswire.com;choosetexaspower.org","srcUrls":["https://www.prnewswire.com/news-releases/qts-announces-four-additional-data-centers-powered-by-renewable-energy-301274899.html","https://www.choosetexaspower.org/electricity-rates/fort-worth/","https://www.prnewswire.com/news-releases/qts-expands-in-dallas-with-acquisition-of-53-acre-mega-data-center-campus-from-health-care-service-corporation-300398907.html"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"4f38265f25ea","cid":"b124ecf718ee","canon":0,"dups":9,"ftype":"data_center","name":"QTS FORT WORTH","city":"FORT WORTH","county":"TARRANT","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","tenant":"Health Care Service (HCSC)","ay":2017,"oy":2026,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion in an all-cash transaction in August 2021.","dealScan":"https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"blackstone.com","srcUrls":["https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"1ccf10b39e5c","cid":"1ccf10b39e5c","canon":1,"dups":1,"ftype":"data_center","name":"QTS FORT WORTH","city":"Fort Worth","county":"Tarrant County","state":"TX","lat":32.772119,"lng":-97.291224,"cprec":"shared_centroid","status":"Unknown","mw":200,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"QTS Fort Worth – Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center.","uconf":"High","uquote":"Oncor Electric Equipment Delivery Company is the largest transmission and distribution electric utility in Texas. Their service territory encompasses east, west, and north-central Texas, including Dallas, Denison, Fort Worth, Killeen, Midland, Odessa, Round Rock, Sherman, Temple, Tyler, Waco, and Wichita Falls.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone Group","ay":2013,"oy":2014,"deal":"Acquisition of facility for approximately $50 million (January 30, 2017); $220 million project for DC2 expansion (January 29, 2024); $130 million expansion investment (April 22, 2025).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"90635d0b0c7b","cid":"90635d0b0c7b","canon":1,"dups":1,"ftype":"data_center","name":"City of Fort Worth Reinvestment Zone #67","city":"Fort Worth","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":70,"pc":"Grid","pconf":"High","pquote":"On-site redundant substation (50 MVA total with expansion to 200 MVA)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2022,"oy":2025,"deal":"QTS plans to expand its existing data center campus at 14100 Park Vista Blvd. in Fort Worth, Texas, with an investment of $130 million, reported April 22, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f7372e976084","cid":"f7372e976084","canon":1,"dups":1,"ftype":"data_center","name":"QTS Irving DC3, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":43,"pc":"Grid","pconf":"High","pquote":"The new QTS Irving 1 DC3 facility will provide our customers with an additional 43.5MW of power, on-site substation power, and diverse campus fiber entrances with a redundant campus conduit system.","uquote":"Grid Operator: Trinity Valley Elec COOP INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dfw1-dc3-c0a580a0","ukey":"18976|TX","uname":"Trinity Valley Elec Coop Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dfw1-dc3-c0a580a0"],"band":"25-50 MW"},{"id":"593cb0dcef1b","cid":"593cb0dcef1b","canon":1,"dups":1,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":90,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Electricity prices in San Antonio are among the lowest in the U.S. Power is provided by the nation's largest municipal utility, CPS Energy.","pscan":"https://www.streamdatacenters.com/locations/san-antonio-ii/","uquote":"Power is provided by the nation's largest municipal utility, CPS Energy.","uscan":"https://www.streamdatacenters.com/locations/san-antonio-ii/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS","spon":"Blackstone","ay":2021,"oy":2021,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/locations/san-antonio-ii/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"911884caff13","cid":"dac08294b4c9","canon":0,"dups":6,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":90,"pc":"Grid","pconf":"High","pquote":"QTS San Antonio is a strategic location in North America that connects to the east and west coasts, Canada, Mexico, and Central and South America with planned 90 MW of critical power capacity.","uquote":"While this method benefits large load users, including San Antonio's CPS Energy, one of the nation's largest city-owned utility companies, it exposes the utility's residential customers to higher net costs and is less fair, attorneys for CPS Energy submitted to the PUC.","uscan":"https://www.sacurrent.com/news/texas-news/texas-grid-operators-and-regulators-iron-out-new-rules-for-data-centers/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2021,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion in August 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"sacurrent.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://www.sacurrent.com/news/texas-news/texas-grid-operators-and-regulators-iron-out-new-rules-for-data-centers/"],"band":"50-100 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"7a160e8eacc6","cid":"7a160e8eacc6","canon":1,"dups":1,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"Duluth","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":90,"pc":"Grid","pconf":"Medium","pquote":"Grid Operator. ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/qts-san-antonio-ii-ef3e2eb8","uconf":"High","uquote":"San Antonio's electricity is primarily provided by CPS Energy, also known historically as City Public Service. CPS Energy is a municipally-owned electric utility, the largest of its kind in Texas, serving the city of San Antonio and the broader Bexar County area.","uscan":"https://digitalenergyby5.com/blog/electric-company-san-antonio/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2021,"oy":2024,"deal":"Acquisition of QTS Realty Trust by Blackstone funds for approximately $10 billion in August 2021.","dealScan":"https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;digitalenergyby5.com;blackstone.com","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-san-antonio-ii-ef3e2eb8","https://digitalenergyby5.com/blog/electric-company-san-antonio/","https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/"],"band":"50-100 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"857c9e65f15d","cid":"857c9e65f15d","canon":1,"dups":1,"ftype":"data_center","name":"QTS SAN ANTONIO II","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":90,"pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/qts-san-antonio-ii-49242de4","uconf":"High","uquote":"San Antonio's electricity is primarily provided by CPS Energy, also known historically as City Public Service. CPS Energy is a municipally-owned electric utility, the largest of its kind in Texas, serving the city of San Antonio and the broader Bexar County area. Unlike deregulated energy markets elsewhere in Texas, San Antonio electricity operates under a regulated structure, with CPS Energy holding a monopoly within its service area.","uscan":"https://digitalenergyby5.com/blog/electric-company-san-antonio/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","deal":"Blackstone acquired QTS for approximately $10 billion in August 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;digitalenergyby5.com","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-san-antonio-ii-49242de4","https://digitalenergyby5.com/blog/electric-company-san-antonio/"],"band":"50-100 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected"},{"id":"8056e1377b53","cid":"dac08294b4c9","canon":0,"dups":6,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":90,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"QTS San Antonio is a strategic location in North America that connects to the east and west coasts, Canada, Mexico, and Central and South America with planned 90 MW of critical power capacity.","uquote":"While this method benefits large load users, including San Antonio's CPS Energy, one of the nation's largest city-owned utility companies, it exposes the utility's residential customers to higher net costs and is less fair, attorneys for CPS Energy submitted to the PUC.","uscan":"https://www.sacurrent.com/news/texas-news/texas-grid-operators-and-regulators-iron-out-new-rules-for-data-centers/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion in August 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"sacurrent.com","srcUrls":["https://www.sacurrent.com/news/texas-news/texas-grid-operators-and-regulators-iron-out-new-rules-for-data-centers/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"1079f4a47f47","cid":"dac08294b4c9","canon":0,"dups":6,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":90,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Powering the campus. 90 MW+; Customizable space and power with exponential growth opportunity.","uquote":"San Antonio is different. CPS Energy is municipally owned and reports directly to San Antonio City Council.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2021,"oy":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"dac08294b4c9","cid":"dac08294b4c9","canon":0,"dups":6,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":90,"pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/qts-san-antonio-ii-49242de4","uconf":"High","uquote":"The City of San Antonio owns its electric and gas utilities through CPS Energy, and its water and sewer utilities through SAWS.","uscan":"https://www.sa.gov/Directory/Departments/Finance/About/Divisions/Public-Utilities","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2021,"oy":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;sa.gov","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-san-antonio-ii-49242de4","https://www.sa.gov/Directory/Departments/Finance/About/Divisions/Public-Utilities"],"band":"50-100 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"6fcefed4343b","cid":"6fcefed4343b","canon":0,"dups":1,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"QTS' renewable power procurement strategy prioritizes sourcing power through innovative agreements that support the development of net new renewable energy in the markets where it does business.","pscan":"https://www.executivegov.com/articles/qts-announces-four-additional-data-centers-powered-by-renewable-energy","uquote":"While this method benefits large load users, including San Antonio's CPS Energy, one of the nation's largest city-owned utility companies, it exposes the utility's residential customers to higher net costs and is less fair, attorneys for CPS Energy submitted to the PUC.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"executivegov.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified,merged_duplicate","srcUrls":["https://www.executivegov.com/articles/qts-announces-four-additional-data-centers-powered-by-renewable-energy"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"857be6855ce7","cid":"dac08294b4c9","canon":0,"dups":6,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":90,"pc":"Grid","pconf":"High","pquote":"QTS San Antonio is a strategic location in North America that connects to the east and west coasts, Canada, Mexico, and Central and South America with planned 90 MW of critical power capacity.","uquote":"The utility provides power to the city of San Antonio, and bidders have until 8 January 2026 to submit proposals for the RFP.","uscan":"https://www.pv-tech.org/cps-energy-issues-request-for-proposals-600mw-texas-solar-capacity/","uname":"BP Energy Company","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"pv-tech.org","lflag":"online_before_announced source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility","srcUrls":["https://www.pv-tech.org/cps-energy-issues-request-for-proposals-600mw-texas-solar-capacity/"],"band":"50-100 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"BP Energy Company"},{"id":"5bf6a76886f4","cid":"dac08294b4c9","canon":0,"dups":6,"ftype":"data_center","name":"QTS SAN ANTONIO II","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":90,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","uconf":"High","uquote":"San Antonio's electricity is primarily provided by CPS Energy, also known historically as City Public Service. CPS Energy is a municipally-owned electric utility, the largest of its kind in Texas, serving the city of San Antonio and the broader Bexar County area. Unlike deregulated energy markets elsewhere in Texas, San Antonio electricity operates under a regulated structure, with CPS Energy holding a monopoly within its service area. CPS Energy owns the wires, generates or buys the power, and bills you directly.","uscan":"https://digitalenergyby5.com/blog/electric-company-san-antonio/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","ay":2021,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion in an all-cash transaction, expected to close in the second half of 2021.","dealScan":"https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"digitalenergyby5.com;blackstone.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://digitalenergyby5.com/blog/electric-company-san-antonio/","https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"3c5236d7bd86","cid":"3c5236d7bd86","canon":1,"dups":3,"ftype":"data_center","name":"QTS SAT2 DC1","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":45,"pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/qts-san-antonio-ii-ef3e2eb8","uquote":"The effort by San Antonio's city-owned utility is a microcosm of trends in the energy sector, she said, which have state grid operator the Electric Reliability Council of Texas also grappling with sharp growth in both commercial and residential demand.","uname":"BP Energy Company","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","oy":2022,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion in August 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-san-antonio-ii-ef3e2eb8"],"band":"25-50 MW","lflag":"source_quality_reclassified nonrate_utility_link_removed energy_supplier_not_serving_utility","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"BP Energy Company"},{"id":"ee4a6be28526","cid":"3c5236d7bd86","canon":0,"dups":3,"ftype":"data_center","name":"QTS SAT2 DC1","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":45,"pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Bandera Electric Coop, INC.","pscan":"https://www.interconnection.fyi/data-center/project/qts-55419bc5","uquote":"Grid Operator: Bandera Electric Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/qts-55419bc5","ukey":"1175|TX","uname":"Bandera Electric Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"QTS Data Centers","spon":"Blackstone","oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-55419bc5"],"band":"25-50 MW"},{"id":"e13cc9cd18bf","cid":"e13cc9cd18bf","canon":1,"dups":7,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":480,"pc":"Grid","pconf":"High","pquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.... 100% Renewable Energy Source.","uconf":"High","uquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.... The first phase of the campus will feature four buildings and a 400MW substation from Oncor, capable of delivering up to 240MW of critical IT power.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"AustralianSuper, DigitalBridge, TJC , Swiss Life Asset Management, EDF Invest, Ardian France, Northleaf Capital Partners","tenant":"Oracle","oy":2026,"contro":"General community opposition to data center expansion in Red Oak, with concerns about electrical grid stress, noise, water usage, traffic, light pollution, and declining property values. DataBank's project is part of this broader context of data center development in the area.","deal":"$2.0 billion construction loan secured on April 21, 2026, led by MUFG Bank, Ltd. for the first three data centers. $2.0 billion equity raise announced October 15, 2024, led by AustralianSuper.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"81ee32578f9a","cid":"e13cc9cd18bf","canon":0,"dups":7,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":480,"pc":"Grid","pconf":"High","pquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","pscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","uscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DataBank","tenant":"Oracle","ay":2023,"oy":2026,"deal":"$2 billion construction loan secured on April 21, 2026","dealScan":"https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","https://www.databank.com/resources/press-releases/databank-secures-2-0b-of-construction-financing-for-first-three-data-centers-on-new-south-dallas-campus/"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"b02781dd4ab8","cid":"e13cc9cd18bf","canon":0,"dups":7,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":480,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","pscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uconf":"High","uquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","uscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DataBank","tenant":"Oracle","oy":2026,"contro":"Significant community opposition to an 830-acre data center project proposed by Compass Datacenters, citing concerns over traffic, noise, water runoff, light pollution, strain on the power grid, and declining property values.","controScan":"https://www.dallasobserver.com/news/red-oak-data-center-meets-community-resistance-40674118/","deal":"DataBank closed a $2 billion construction loan on April 21, 2026, led by MUFG Bank, to fund the first three buildings (DFW9, DFW10, and DFW11).","dealScan":"https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"databank.com;theaiconsultingnetwork.com;dallasobserver.com","srcUrls":["https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026","https://www.dallasobserver.com/news/red-oak-data-center-meets-community-resistance-40674118/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"0aa8c4e70e40","cid":"e13cc9cd18bf","canon":0,"dups":7,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":480,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The Phase 1 design of the site will feature 4 buildings and a 400MW sub-station from Oncor, capable of delivering up to 240MW of critical IT power with ability to increase this in Phase 2 for a total of 480MW across all 8 buildings.","pscan":"https://www.databank.com/data-centers/dallas/red-oak-campus/","uconf":"High","uquote":"The first phase of the campus will feature four buildings and a 400MW substation from Oncor, capable of delivering up to 240MW of critical IT power.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DataBank","tenant":"Oracle","ay":2024,"oy":2026,"contro":"Community opposition regarding noise, traffic, water usage, property values, and strain on the power grid due to rapid data center expansion in Red Oak, which includes DataBank's project.","controScan":"https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef","deal":"$2 billion construction loan closed on April 21, 2026, led by MUFG Bank.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com;wfaa.com","srcUrls":["https://www.databank.com/data-centers/dallas/red-oak-campus/","https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"de2e46598899","cid":"e13cc9cd18bf","canon":0,"dups":7,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":480,"pc":"Grid","pconf":"High","pquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","pscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uconf":"High","uquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","uscan":"https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","tenant":"Oracle","ay":2024,"oy":2026,"deal":"DataBank closed a $2 billion construction loan on April 21, 2026, to fund the first three buildings (DFW9, DFW10, and DFW11).","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"2cdba9b8e0f3","cid":"2cdba9b8e0f3","canon":0,"dups":1,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":60,"pc":"Grid","pconf":"High","pquote":"100% Renewable Energy Source.","pscan":"https://www.databank.com/data-centers/dallas/red-oak-campus/dfw9/","uconf":"High","uquote":"The initial phase, scheduled for mid-2026 completion, includes four buildings with a 400-megawatt substation from Oncor delivering up to 240 megawatts of critical IT power.","uscan":"https://www.databank.com/resources/news/databank-set-to-construct-its-largest-data-center-campus-in-texas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"AustralianSuper","tenant":"Oracle","ay":2024,"oy":2026,"contro":"Community opposition regarding noise, pollution, property values, water usage, and strain on the power grid.","controScan":"https://www.youtube.com/watch?v=SaMNziZlS1k","deal":"$2 billion construction loan on April 21, 2026","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"databank.com;youtube.com","srcUrls":["https://www.databank.com/data-centers/dallas/red-oak-campus/dfw9/","https://www.databank.com/resources/news/databank-set-to-construct-its-largest-data-center-campus-in-texas/","https://www.youtube.com/watch?v=SaMNziZlS1k"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"407d806cdb8a","cid":"e13cc9cd18bf","canon":0,"dups":7,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":480,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","uconf":"High","uquote":"Construction is already underway, powered by a 400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DataBank","tenant":"Oracle","ay":2024,"oy":2026,"deal":"$2 billion construction loan secured on April 21, 2026","dealScan":"https://www.constructionowners.com/news/databank-lands-2b-for-texas-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"constructionowners.com","srcUrls":["https://www.constructionowners.com/news/databank-lands-2b-for-texas-data-center"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"584d0f2b82f3","cid":"584d0f2b82f3","canon":0,"dups":1,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Oncor","pdt":"400MW Oncor substation delivering up to 240MW of critical IT power in Phase 1 and scaling to 480MW at full buildout","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected unlinked_source_text,merged_duplicate delivery_utility_linked","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"34fe0e07b0df","cid":"0368a57f668d","canon":0,"dups":2,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"Medium","pquote":"Residents raised concerns regarding noise, potential strain on the power grid, and the project's proximity to schools.","pscan":"https://www.fox4news.com/news/red-oak-data-center-city-council-protest","uconf":"High","uquote":"Oncor Electric Delivery- Oncor Electric Delivery Company is Texas's largest regulated electric delivery business and the sixth largest in the United States. It supplies electricity to approximately 10 million consumers in a service area of over 400 communities in east, west and north-central Texas.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","ay":2026,"contro":"Significant community opposition due to concerns over noise, pollution, declining property values, water runoff and management, light pollution, and proximity to homes.","controScan":"https://www.cbsnews.com/texas/news/red-oak-community-fight-against-another-data-center-getting-approved-north-texas/","deal":"Tax abatement of $2.82 million over the next decade, approved by the council.","dealScan":"https://www.dallasobserver.com/news/red-oak-data-center-meets-community-resistance-40674118/","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"fox4news.com;redoaktx.org;dallasobserver.com;cbsnews.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified delivery_utility_linked","uscan":"https://www.redoaktx.org/799/Utilities-Providers","srcUrls":["https://www.fox4news.com/news/red-oak-data-center-city-council-protest","https://www.redoaktx.org/799/Utilities-Providers","https://www.dallasobserver.com/news/red-oak-data-center-meets-community-resistance-40674118/","https://www.cbsnews.com/texas/news/red-oak-community-fight-against-another-data-center-getting-approved-north-texas/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"c5058942e706","cid":"e13cc9cd18bf","canon":0,"dups":7,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":480,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The initial phase of the Red Oak campus includes four buildings with a 400-megawatt substation from power company Oncor with the capacity to deliver up to 240 megawatts of critical information technology power, or the power needed to operate and funnel energy to potential tenants, Ooley said.","uconf":"High","uquote":"The initial phase of the Red Oak campus includes four buildings with a 400-megawatt substation from power company Oncor with the capacity to deliver up to 240 megawatts of critical information technology power...","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","spon":"DataBank","tenant":"Oracle","ay":2024,"oy":2026,"deal":"$2 billion construction loan closed on April 21, 2026","dealScan":"https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"theaiconsultingnetwork.com","srcUrls":["https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"39a012eb6dfc","cid":"39a012eb6dfc","canon":0,"dups":1,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","mw":180,"pc":"Grid","pconf":"High","pquote":"The first phase of the campus will feature four buildings and a 400MW substation from Oncor, capable of delivering up to 240MW of critical IT power.","uconf":"High","uquote":"The first phase of the campus will feature four buildings and a 400MW substation from Oncor, capable of delivering up to 240MW of critical IT power.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"DataBank","tenant":"Oracle","ay":2025,"oy":2026,"deal":"DataBank closed a $2 billion construction loan on April 21, 2026, to fund the first three buildings (DFW9, DFW10, and DFW11).","dealScan":"https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"theaiconsultingnetwork.com","srcUrls":["https://www.theaiconsultingnetwork.com/blog/databank-2b-red-oak-dallas-data-center-oracle-cre-investors-2026"],"band":"100-250 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected,merged_duplicate delivery_utility_linked","dukey":"44372|TX"},{"id":"0368a57f668d","cid":"0368a57f668d","canon":0,"dups":2,"ftype":"data_center","name":"RED OAK DATACENTER","city":"RED OAK","county":"ELLIS","state":"TX","lat":32.346878,"lng":-96.79694,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Addressing concerns about the Texas power grid, Fuller cited Senate Bill 6, which allows large energy users such as data centers to be curtailed during emergencies that threaten grid reliability.","pscan":"https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef","uconf":"Medium","uquote":"The building's utility provider is Oncor, which provides redundant access to electrical substations.","uscan":"https://baxtel.com/data-center/compass-red-oak-i","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Compass Datacenters","ay":2026,"contro":"Significant community opposition regarding noise, pollution, strain on power grid, water usage, traffic, light pollution, and declining property values. The Red Oak City Council approved the project despite the outcry.","controScan":"https://www.cbsnews.com/texas/news/red-oak-community-fight-against-another-data-center-getting-approved-north-texas/","deal":"Tax abatement approved by Red Oak City Council and Ellis County for Compass Datacenters' Red Oak campus development.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"wfaa.com;baxtel.com;cbsnews.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","srcUrls":["https://www.wfaa.com/article/news/local/red-oak-residents-pack-council-meeting-oppose-proposed-data-center-campus/287-dc2d997c-1af1-4167-aff8-22a4e7d8d3ef","https://baxtel.com/data-center/compass-red-oak-i","https://www.cbsnews.com/texas/news/red-oak-community-fight-against-another-data-center-getting-approved-north-texas/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"630c266e7966","cid":"630c266e7966","canon":1,"dups":1,"ftype":"data_center","name":"Rellis Campus Data and Research Center LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Bryan Texas Utilities","rto":"ERCOT","nerc":"TRE","op":"RELLIS Campus Data and Research Center","spon":"THE TEXAS A&M UNIVERSITY SYSTEM","ay":2024,"oy":2024,"contro":"Developer filed for Chapter 11 bankruptcy in November 2025, causing uncertainties about completion and progress.","controScan":"https://standardsmichigan.com/rellis-data-and-research-center/","deal":"Chapter 11 bankruptcy filing by RELLIS Campus Data and Research Center LLC on November 5, 2025, reporting $10 million to $50 million in assets and liabilities.","dealScan":"https://bondoro.com/rellis-campus-data-and-research-center-filing-alert/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"bondoro.com;standardsmichigan.com","srcUrls":["https://bondoro.com/rellis-campus-data-and-research-center-filing-alert/","https://standardsmichigan.com/rellis-data-and-research-center/"],"lflag":"source_quality_reclassified utility_alias_corrected","ukey":"2442|TX","uname":"Bryan Texas Utilities (City of Bryan)","reportedUtility":"Bryan Texas Utilities (City of Bryan)"},{"id":"e4cb2810ad15","cid":"e4cb2810ad15","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Riot Corsicana, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"MEMS Industrial Supply (MEMSIS)","pdt":"requirements contract; electric power invoiced based on market price for electric power at the ERCOT North Load Zone, plus a retail adder","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"28bce537c10d","cid":"28bce537c10d","canon":1,"dups":1,"ftype":"crypto_hpc","name":"RZ 24-102","county":"Navarro County","state":"TX","lat":32.048448,"lng":-96.476909,"cprec":"distinct","status":"Unknown","mw":1000,"pc":"Grid","pconf":"High","pquote":"The facility taps into Riot's long-term energy relationships and continues their pattern of building at grid-edge locations where power availability and scalability align with industrial-scale mining. The facility would generate even more carbon emissions and increase demand on the already-strained Texas electrical grid. there's a pre-existing substation. um that gave us the opportunity to have to build our our 1 gawatt substation here","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"AMD","ay":2022,"oy":2024,"contro":"Criticized by Greenpeace for energy consumption and increased demand on the Texas electrical grid.","controScan":"https://www.greenpeace.org/usa/riot-platforms-the-company-behind-the-most-energy-intensive-bitcoin-mine-in-the-u-s/","deal":"AMD partnership for up to 200MW capacity, with 50MW of compute capacity by May 2027.","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"greenpeace.org","srcUrls":["https://www.greenpeace.org/usa/riot-platforms-the-company-behind-the-most-energy-intensive-bitcoin-mine-in-the-u-s/"],"band":"250+ MW","lflag":"large_project_duplicate_review source_quality_reclassified"},{"id":"d9664ce54856","cid":"d9664ce54856","canon":0,"dups":1,"ftype":"crypto_hpc","name":"Riot Platforms, Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Dedicated PPA","pcp":"TXU Energy","pdt":"345 MW total: 130 MW through April 30, 2030; 65 MW through April 30, 2030; 150 MW through October 31, 2027","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"de3d069563f9","cid":"de3d069563f9","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Riot Platforms, Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":700,"pc":"Grid","pconf":"High","pquote":"The facility taps into Riot's long-term energy relationships and continues their pattern of building at grid-edge locations where power availability and scalability align with industrial-scale mining.","uconf":"High","uquote":"Electricity (ownership of poles and wires) Oncor Electric.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tenant":"AMD","ay":2020,"oy":2023,"deal":"Data Center Lease with AMD for 25 MW, with an initial term of 10 years, expected to generate approximately $311.0 million in contract revenue, announced January 16, 2026. AMD later exercised an option for an additional 25 MW, bringing total contracted capacity to 50 MW.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"uscan":"https://www.rockdaletx.gov/151/Utility-Providers","srcUrls":["https://www.rockdaletx.gov/151/Utility-Providers"],"srcDom":"rockdaletx.gov","band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"a900dc70db54","cid":"a900dc70db54","canon":0,"dups":1,"ftype":"crypto_hpc","name":"Riot Platforms, Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Dedicated PPA","pcp":"TXU Energy Retail Company, LLC","pdt":"345 MW of long-term, fixed-price power, in multiple blocks: 130 MW contracted in May 2020, through April 30, 2030; 65 MW contracted in March 2022, through April 30, 2030; and 150 MW contracted in November 2022, through October 31, 2027","rto":"ERCOT","nerc":"TRE","op":"Riot Platforms","spon":"Riot Platforms","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"f819c7820805","cid":"e5cdf8acedf3","canon":0,"dups":2,"ftype":"data_center","name":"ROUND ROCK","city":"ROUND ROCK","county":"WILLIAMSON","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected unlinked_source_text delivery_utility_linked","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"e5cdf8acedf3","cid":"e5cdf8acedf3","canon":1,"dups":2,"ftype":"data_center","name":"ROUND ROCK","city":"ROUND ROCK","county":"WILLIAMSON","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Oncor","pdt":"binding contract to take and pay for full load","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected unlinked_source_text delivery_utility_linked","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"ed8061ad394c","cid":"ed8061ad394c","canon":1,"dups":1,"ftype":"data_center","name":"Rowan Cinco LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":300,"pc":"Grid","pconf":"High","pquote":"AEP Texas will be the power provider for the project. Rowan plans to power the Cinco campus primarily with hydroelectric, solar and wind generation.","uquote":"AEP Texas will be the power provider for the project.","rto":"ERCOT","nerc":"TRE","op":"Rowan Digital Infrastructure","spon":"Quinbrook Infrastructure Partners","ay":2025,"oy":2027,"deal":"$550 million construction financing secured on February 11, 2026","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text state_centroid_only delivery_utility_not_in_eia861 utility_alias_corrected","uname":"AEP Texas","reportedUtility":"AEP Texas","srcUrls":null,"srcDom":null},{"id":"e7f43bb3d200","cid":"e7f43bb3d200","canon":1,"dups":1,"ftype":"data_center","name":"Rowan Temple LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":300,"pc":"Grid","pconf":"High","pquote":"Operations are expected in 2027, with power secured through a partnership with Oncor, further establishing Temple as a central hub for digital innovation in one of the nation's fastest-growing regions.","uquote":"Power capacity is secured through Oncor.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Rowan Digital Infrastructure","spon":"Quinbrook Infrastructure Partners","ay":2025,"oy":2027,"contro":"Community opposition regarding water and energy usage, noise pollution, and displacement; some residents sought to remove city leaders from office.","controScan":"https://www.bisnow.com/austin-san-antonio/news/data-center/sustainable-developer-bringing-data-center-campus-to-temple-134759","deal":"$3 billion in debt financing secured in May 2026; $15.8 million in financial incentives approved in October 2025.","dealScan":"https://www.bisnow.com/austin-san-antonio/news/data-center/sustainable-developer-bringing-data-center-campus-to-temple-134759","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","srcUrls":["https://www.bisnow.com/austin-san-antonio/news/data-center/sustainable-developer-bringing-data-center-campus-to-temple-134759"],"band":"250+ MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"44372|TX"},{"id":"c7a2214045e0","cid":"c7a2214045e0","canon":1,"dups":2,"ftype":"data_center","name":"SATB","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Grid","pconf":"High","pquote":"The first facility on the new campus, SATB1 (a.k.a. San Antonio III), is fully-leased with 300,000 initial square feet of turnkey data center space and an on-site 334 MW CPS substation.... Power is provided by the nation's largest municipal utility, CPS Energy.","pscan":"https://www.streamdatacenters.com/locations/san-antonio-iii/","uconf":"High","uquote":"The first facility on the new campus, SATB1 (a.k.a. San Antonio III), is fully-leased with 300,000 initial square feet of turnkey data center space and an on-site 334 MW CPS substation.... Power is provided by the nation's largest municipal utility, CPS Energy.","uscan":"https://www.streamdatacenters.com/locations/san-antonio-iii/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","ay":2024,"oy":2026,"deal":"$400M investment","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/locations/san-antonio-iii/"],"band":"100-250 MW","lflag":"citation_artifact_removed utility_alias_corrected duplicate_cluster_canonical high_confidence_duplicate_consolidated","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","spon":"Stream Data Centers","dealScan":"https://www.streamdatacenters.com/locations/san-antonio-iii/"},{"id":"674b3186478f","cid":"674b3186478f","canon":0,"dups":1,"ftype":"data_center","name":"SATB","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":40,"pc":"Grid","pconf":"High","pquote":"The first facility on the new campus, SATB1 (a.k.a. San Antonio III), is fully-leased with 300,000 initial square feet of turnkey data center space and an on-site 334 MW CPS substation.","pscan":"https://www.streamdatacenters.com/locations/san-antonio/","uquote":"an on-site 334 MW CPS substation. Electricity prices in San Antonio are among the lowest in the U.S. Power is provided by the nation's largest municipal utility, CPS Energy.","uscan":"https://www.streamdatacenters.com/locations/san-antonio-iii/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","oy":2026,"deal":"Stream's third San Antonio campus is scheduled to support 1.5 million square feet of data center space with a $400M investment. Construction Volume: ~$700M for SATB1.","dealScan":"https://www.streamdatacenters.com/locations/san-antonio-iii/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/locations/san-antonio/","https://www.streamdatacenters.com/locations/san-antonio-iii/"],"band":"25-50 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"175b69885e2f","cid":"c7a2214045e0","canon":0,"dups":2,"ftype":"data_center","name":"SATB","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Grid","pconf":"High","pquote":"The first facility on the new campus, SATB1 (a.k.a. San Antonio III), is fully-leased with 300,000 initial square feet of turnkey data center space and an on-site 334 MW CPS substation.","pscan":"https://www.streamdatacenters.com/locations/san-antonio-iii/","uconf":"High","uquote":"The first facility on the new campus, SATB1 (a.k.a. San Antonio III), is fully-leased with 300,000 initial square feet of turnkey data center space and an on-site 334 MW CPS substation.","uscan":"https://www.streamdatacenters.com/locations/san-antonio-iii/","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Stream Data Centers","ay":2024,"oy":2026,"deal":"$400M investment for campus","dealScan":"https://www.streamdatacenters.com/locations/san-antonio-iii/","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"streamdatacenters.com","srcUrls":["https://www.streamdatacenters.com/locations/san-antonio-iii/"],"band":"100-250 MW","lflag":"source_quality_reclassified high_confidence_duplicate_consolidated nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","ukey":"16604|TX"},{"id":"edc954e8e6ca","cid":"edc954e8e6ca","canon":1,"dups":1,"ftype":"data_center","name":"SDC - Austin LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":84,"pc":"Grid","pconf":"High","pquote":"On-site power supply backed by a substantial substation (on-site 200 MW substation referenced for campus feed) with diverse feeds.","uquote":"A data center project cannot move forward unless Oncor, the electricity distributer for Round Rock residents, confirms that the requested power capacity exists and the facility operator signs a binding contract to take and pay for that full load.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Sabey Data Centers","spon":"Sabey and National Real Estate Advisors","tenant":"Texas Advanced Computing Center (TACC)","ay":2022,"oy":2024,"deal":"Securitization of real estate and tenant lease payments for SDC Austin Condo Unit I data center in January 2025 as part of Sabey Data Center Issuer LLC's series 2025-1 class A-2 data center revenue notes.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text state_centroid_only utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"4188dbb671f6","cid":"4188dbb671f6","canon":1,"dups":1,"ftype":"data_center","name":"SDC DFW VII LP Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":43,"pc":"Grid","pconf":"High","pquote":"Slated to hold 75,000 square feet of data hall space, the facility is designed to support 15MW of 2N critical load with dual 40MW utility feeds from an on-site substation provided by Oncor.","uquote":"Slated to hold 75,000 square feet of data hall space, the facility is designed to support 15MW of 2N critical load with dual 40MW utility feeds from an on-site substation provided by Oncor.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Funds","tenant":"major cloud customer","ay":2018,"oy":2020,"deal":"Majority interest acquisition of Stream Data Centers by Apollo Funds, August 06, 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text state_centroid_only utility_alias_corrected delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"c52da675ebb0","cid":"c52da675ebb0","canon":1,"dups":1,"ftype":"data_center","name":"SDC DFW VIII, L.P. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":90,"pc":"Grid","pconf":"High","pquote":"Up to 90 MW critical load capacity, supported by a dedicated on-site Oncor substation capable of 142.5 MVA. The campus features dual dedicated underground 40 MW utility feeds, pre-designed to support the full capacity of the campus, and offers 100% renewable power options at competitive transmission rates.","uquote":"supported by a dedicated on-site Oncor substation capable of 142.5 MVA.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"SDC DFW VIII, L.P.","ay":2025,"oy":2027,"deal":"Construction cost of $167,294,155 (estimated) for 'Project Fir' owned by SDC DFW VIII, L.P., with a start date of 11/4/2025 and completion date of 12/1/2027.","dealScan":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026004027","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"tdlr.texas.gov","srcUrls":["https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026004027"],"band":"50-100 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_url_canonicalized delivery_utility_linked","dukey":"44372|TX"},{"id":"4e886af04b4a","cid":"4e886af04b4a","canon":1,"dups":1,"ftype":"data_center","name":"SDC DFW-VII DATA CENTER PHASE 2","city":"GARLAND","county":"DALLAS","state":"TX","lat":32.766987,"lng":-96.778424,"cprec":"shared_centroid","status":"Unknown","mw":43,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Two (2) 40 MW utility feeds from a new on-site Oncor substation offering power at competitive transmission rates.","pscan":"https://www.prnewswire.com/news-releases/stream-data-centers-announces-new-dallas-area-hyperscale-data-center-development-300631340.html","uconf":"High","uquote":"Two (2) 40 MW utility feeds from a new on-site Oncor substation offering power at competitive transmission rates.","uscan":"https://www.prnewswire.com/news-releases/stream-data-centers-announces-new-dallas-area-hyperscale-data-center-development-300631340.html","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo-managed funds","ay":2018,"oy":2020,"deal":"Apollo-managed funds acquired a majority interest in Stream Data Centers from Stream Realty Partners, completed November 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/stream-data-centers-announces-new-dallas-area-hyperscale-data-center-development-300631340.html"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"2bffdb6f41cd","cid":"2bffdb6f41cd","canon":1,"dups":1,"ftype":"data_center","name":"SDC SA III, L.P. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":200,"pc":"Grid","pconf":"High","pquote":"The campus includes an on-site 334 MW CPS Energy substation. Phase 1 (40 MW, 300,000 sq ft) was scheduled for occupancy Q2 2025; full campus completion anticipated 2027.... Power provider: CPS Energy / ERCOT","pscan":"https://centexdatacenters.org/tracker/stream-san-antonio-iii","uquote":"The campus includes an on-site 334 MW CPS Energy substation.... Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/stream-san-antonio-iii","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Stream Data Centers","spon":"Apollo Global Management","ay":2024,"oy":2025,"contro":"Concerns raised about water use in Edwards Aquifer recharge zone; San Antonio City Council initiated data center zoning review.","controScan":"https://centexdatacenters.org/tracker/stream-san-antonio-iii","deal":"Acquisition of majority interest in Stream Data Centers by Apollo Global Management (announced August 7, 2025).","dealScan":"https://baxtel.com/data-center/stream-san-antonio-iii","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"centexdatacenters.org;baxtel.com","srcUrls":["https://centexdatacenters.org/tracker/stream-san-antonio-iii","https://baxtel.com/data-center/stream-san-antonio-iii"],"band":"100-250 MW","lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"5aa576dac647","cid":"1e5255a83cb0","canon":0,"dups":3,"ftype":"data_center","name":"SENTRY GATEWAY DATA CENTER","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","uquote":"Working with CPS (Energy) and adding another campus to the two projects we've previously delivered in this strategic market will allow us to service the growing needs of our hyperscale clients,” Oisin O Murchu, vice president of development, said in a statement. Or it might be in the territory of one of Texas's municipally owned utilities, like Austin or San Antonio. CPS is preparing for a tenfold increase in energy demand from data centers, and it's trying to direct companies to different parts of the San Antonio area to spread out its load.","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text nonrate_utility_link_removed energy_supplier_not_serving_utility utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","ukey":"16604|TX","srcUrls":null,"srcDom":null},{"id":"c74bc0c99376","cid":"1e5255a83cb0","canon":0,"dups":3,"ftype":"data_center","name":"SENTRY GATEWAY DATA CENTER","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","uquote":"Local utilities are legally required to work with data centers if they are paying customers, said CPS Energy's Chief Strategy Officer Elaina Ball.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"1e5255a83cb0","cid":"1e5255a83cb0","canon":1,"dups":3,"ftype":"data_center","name":"SENTRY GATEWAY DATA CENTER","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","uquote":"San Antonio is different. CPS Energy is municipally owned and reports directly to San Antonio City Council.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"776dc76afd94","cid":"776dc76afd94","canon":1,"dups":1,"ftype":"data_center","name":"SF HOUC, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The qualifying owner, operator or occupant can claim the sales tax exemption on the purchase of electricity that is necessary and essential to the operation of the qualified data center.","rto":"ERCOT","nerc":"TRE","op":"SF HOUC","spon":"SF HOUC","ay":2024,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"622ec6d93314","cid":"622ec6d93314","canon":1,"dups":1,"ftype":"data_center","name":"SF HOUH LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":10,"pc":"Grid","pconf":"High","pquote":"Houston's established energy infrastructure offers the reliable grid power needed to scale data centers quickly and efficiently. With on-site substations and available capacity, Serverfarm can sustainably meet the demand for data center capacity at a scale previously unseen in the region. Grid Operator. CenterPoint Energy.","pscan":"https://www.interconnection.fyi/data-center/project/serverfarm-e864506f","uquote":"Grid Operator. CenterPoint Energy.","uscan":"https://www.interconnection.fyi/data-center/project/serverfarm-e864506f","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"SF HOUH","spon":"SF HOUH","ay":2009,"oy":2024,"deal":"Change in ownership from Hp Enterprise Services LLC to Sf Houh, LLC on September 20, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/serverfarm-e864506f"],"band":"10-25 MW","rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"8901|TX"},{"id":"f70e8cc34178","cid":"f70e8cc34178","canon":0,"dups":1,"ftype":"data_center","name":"SF HOUH LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Houston's established energy infrastructure offers the reliable grid power needed to scale data centers quickly and efficiently. With on-site substations and available capacity, Serverfarm can sustainably meet the demand for data center capacity at a scale previously unseen in the region.","pscan":"https://www.serverfarmllc.com/htx1-houston-data-center/","uconf":"High","uquote":"Grid Operator: CenterPoint Energy.","uname":"CenterPoint Energy Houston Electric","rto":"ERCOT","nerc":"TRE","op":"SF HOUH","spon":"SF HOUH","ay":2009,"oy":2024,"deal":"Change in Ownership on September 20, 2024","dealScan":"https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8197921&Rendition=Web","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"serverfarmllc.com;records.tceq.texas.gov","srcUrls":["https://www.serverfarmllc.com/htx1-houston-data-center/","https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8197921&Rendition=Web"],"rawUkey":"62862|TX","rawUname":"Chariot Energy","reportedUtility":"CenterPoint Energy Houston Electric","lflag":"utility_alias_corrected,merged_duplicate delivery_utility_linked","dukey":"8901|TX"},{"id":"d58afc87d808","cid":"d58afc87d808","canon":1,"dups":1,"ftype":"data_center","name":"Sharka LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Google's CFE percentage in the ERCOT grid region, which powers its Texas data centers, nearly doubled from 41 percent in 2022 to 79 percent in 2023.","pscan":"https://houston.innovationmap.com/google-texas-engie-solar-power-2668987288.html","uconf":"High","uquote":"Electricity in Midlothian is all delivered by the Oncor Transmission and Distribution Utility. Oncor, Texas' largest electricity transmission and distribution company, serves more than 13 million customers in the Lone Star State. KDC and Oncor Electric Delivery Company, LLC hosted a ribbon-cutting ceremony to celebrate the completion of the new distribution center at Midlothian's Railport Business Park. Oncor is a regulated electric transmission and distribution company based in Texas. The new distribution center for Oncor, the state's largest electricity transmission and distribution company, is located within Midlothian's Railport Business Park.","uscan":"https://rebusinessonline.com/kdc-delivers-422000-sf-distribution-center-for-oncor-in-midlothian-texas/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Google","spon":"Google","tenant":"Google","ay":2019,"oy":2027,"contro":"Residents of Midlothian, TX, questioned 'What the Heck Is Sharka LLC?' after the mysterious developer received tax incentives, and Google's use of subsidiaries to keep its intentions out of public view was seen as 'pretty one-sided' by experts.","deal":"$880 million investment for Sharka Data Center – Building 5 (announced Dec 2025); $350 million estimated cost for Sharka Data Center - Building 4 (registered March 2024); more than $10 million in tax incentives (prior to Oct 2019).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"houston.innovationmap.com;rebusinessonline.com","srcUrls":["https://houston.innovationmap.com/google-texas-engie-solar-power-2668987288.html","https://rebusinessonline.com/kdc-delivers-422000-sf-distribution-center-for-oncor-in-midlothian-texas/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"67c6f0a21370","cid":"67c6f0a21370","canon":1,"dups":1,"ftype":"data_center","name":"SI DFW02A, LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":36,"pc":"Grid","pconf":"High","pquote":"STACK's DFW02 campus in Lancaster, TX spans 193 acres in south Dallas' premier power corridor, where scalable land and committed power converge to support AI/ML and cloud demand, at speed and scale.... DFW02 is designed to meet evolving demand for high-density, high-performance deployments.... The DFW02A Data Center is part of the DFW02 South Dallas Campus, a hyperscale development by STACK Infrastructure located in Lancaster, Texas, within the Dallas–Fort Worth metro area.... Dedicated on-site substation supporting large-scale deployments; Critical systems designed with N+1 resiliency; Minimum 24-hour on-site fuel... Powered by 100% renewable energy","uquote":"Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments. Spanning 1.5 million sq ft (139,355 sqm) across six data center buildings, the campus will feature an on-site substation from utility provider Oncor.","uscan":"https://baxtel.com/data-center/stack-dfw02-campus","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"STACK Infrastructure","spon":"IPI Partners","ay":2024,"oy":2027,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/stack-dfw02-campus"],"band":"25-50 MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"c79100e6bbc9","cid":"c79100e6bbc9","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Silver Basin Digital Infrastructure LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":180,"proc":"Co-located generation","pcp":"West Texas Solar Project II LLC","pdt":"180 MW, net metering approval","uquote":"TNMP has made an appearance in that docket and stated that TNMP is \"the retail utility with the legal authority to provide retail electric delivery service to the netted Silver Basin Load\"","rto":"ERCOT","nerc":"TRE","op":"Silver Basin Digital Infrastructure","spon":"Hut 8","deal":"Joint Application for Net Metering Approval by West Texas Solar Project II LLC and Silver Basin Digital Infrastructure LLC, Docket No. 59115 (Dec. 12, 2025)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text state_centroid_only utility_alias_corrected delivery_utility_linked","uname":"Texas-New Mexico Power","reportedUtility":"Texas-New Mexico Power","srcUrls":null,"srcDom":null,"dukey":"40051|TX"},{"id":"1a39e3520ef4","cid":"1a39e3520ef4","canon":1,"dups":1,"ftype":"data_center","name":"Switch, LTD Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Dedicated PPA","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"62038a4c8598","cid":"3c70313261c7","canon":0,"dups":2,"ftype":"data_center","name":"T5 DATA CENTERS","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":22,"pc":"Grid","pconf":"High","pquote":"The data center has dedicated power feeds, and redundant 2.5 MWs of Caterpillar generators. The entire electrical and mechanical infrastructure is configured in N+1 redundancy with an optional 2N UPS capability that keeps the critical system up and running.","pscan":"https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","uconf":"Medium","uquote":"Grid Operator. Denton County Elec Coop, INC.","uscan":"https://www.interconnection.fyi/data-center/project/t5-dallas-wholesale-data-center-c32165d4","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"T5 Data Centers","spon":"ICONIQ Capital","ay":2011,"oy":2012,"deal":"$113 million loan in May 2013; Equity recapitalization with ICONIQ Capital, LLC in September 2016","dealScan":"https://www.globenewswire.com/news-release/2016/09/19/1179236/0/en/t5-data-centers-completes-equity-recapitalization-of-t5-dallas-and-t5-portland.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;globenewswire.com","srcUrls":["https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","https://www.interconnection.fyi/data-center/project/t5-dallas-wholesale-data-center-c32165d4","https://www.globenewswire.com/news-release/2016/09/19/1179236/0/en/t5-data-centers-completes-equity-recapitalization-of-t5-dallas-and-t5-portland.html"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"3c70313261c7","cid":"3c70313261c7","canon":1,"dups":2,"ftype":"data_center","name":"T5 DATA CENTERS","city":"Plano","county":"Collin","state":"TX","lat":33.194494,"lng":-96.579428,"cprec":"shared_centroid","status":"Unknown","mw":22,"pc":"Grid","pconf":"High","pquote":"The data center has dedicated power feeds, and redundant 2.5 MWs of Caterpillar generators. The entire electrical and mechanical infrastructure is configured in N+1 redundancy with an optional 2N UPS capability that keeps the critical system up and running.","pscan":"https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","uquote":"Grid Operator: Denton County Elec Coop, INC.","ukey":"5078|TX","uname":"Denton County Elec Coop, Inc","rto":"ERCOT","nerc":"TRE","op":"T5 Data Centers","spon":"T5 PARTNERS","ay":2011,"oy":2012,"deal":"Debt financing of $113 million in May 2013 led by JP Morgan Chase Bank, with investments from Wells Fargo Bank, RBS Citizens Financial Group, and Raymond James, to expand the Dallas data center.","dealScan":"https://www.datacenterknowledge.com/investing/t5-data-centers-lines-up-113-million-to-expand-dallas-facility","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/t5-data-centers-dallas-data-center/","https://www.datacenterknowledge.com/investing/t5-data-centers-lines-up-113-million-to-expand-dallas-facility"],"band":"10-25 MW"},{"id":"f4cebdc4aab3","cid":"f4cebdc4aab3","canon":1,"dups":1,"ftype":"data_center","name":"Technical Review - 159280 Equinix LLC (478, Initial, 309396)","city":"CASTROVILLE","county":"MEDINA","state":"TX","lat":29.353661,"lng":-99.111085,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"ab625b311ffe","cid":"ab625b311ffe","canon":1,"dups":1,"ftype":"data_center","name":"Temple Green Data LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"Oncor","rto":"ERCOT","nerc":"TRE","ay":2021,"oy":2023,"deal":"Datacenter Lease entered into on August 31, 2021, with Riot Blockchain, Inc.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text state_centroid_only utility_alias_corrected delivery_utility_linked","uname":"Oncor Electric Delivery","reportedUtility":"Oncor Electric Delivery","srcUrls":null,"srcDom":null,"dukey":"44372|TX"},{"id":"dea89ffdbeb5","cid":"dea89ffdbeb5","canon":1,"dups":2,"ftype":"data_center","name":"Tesla, Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":500,"pc":"Grid","pconf":"High","pquote":"Megapacks act as a buffer, smoothing out supply irregularities and providing backup capacity during grid events.","pscan":"https://www.basenor.com/blogs/news/giga-texas-cortex-2-megapack-expansion-accelerates","uquote":"According to the project's interconnection agreement, the Giga Texas comprises 68 Tesla Megapacks connecting to the ERCOT grid via Lower Colorado River Authority's (LCRA's) Hornsby 345kV substation.","uscan":"https://www.energy-storage.news/ercot-clears-480mw-of-bess-for-operations-in-august-including-tesla-owned-unit-at-factory/","rto":"ERCOT","nerc":"TRE","op":"Tesla","spon":"Tesla","tenant":"Tesla","ay":2024,"oy":2026,"contro":"Delays and internal management issues","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"basenor.com;energy-storage.news","srcUrls":["https://www.basenor.com/blogs/news/giga-texas-cortex-2-megapack-expansion-accelerates","https://www.energy-storage.news/ercot-clears-480mw-of-bess-for-operations-in-august-including-tesla-owned-unit-at-factory/"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"d8b23ee0d8e0","cid":"dea89ffdbeb5","canon":0,"dups":2,"ftype":"data_center","name":"Tesla, Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":500,"pc":"Grid","pconf":"High","pquote":"According to the project's interconnection agreement, the Giga Texas comprises 68 Tesla Megapacks connecting to the ERCOT grid via Lower Colorado River Authority’s (LCRA’s) Hornsby 345kV substation.... Megapacks act as a buffer, smoothing out supply irregularities and providing backup capacity during grid events.","pscan":"https://www.basenor.com/blogs/news/giga-texas-cortex-2-megapack-expansion-accelerates","uquote":"According to the project's interconnection agreement, the Giga Texas comprises 68 Tesla Megapacks connecting to the ERCOT grid via Lower Colorado River Authority’s (LCRA’s) Hornsby 345kV substation.","uscan":"https://www.energy-storage.news/ercot-clears-480mw-of-bess-for-operations-in-august-including-tesla-owned-unit-at-factory/","rto":"ERCOT","nerc":"TRE","op":"Tesla","spon":"Tesla","tenant":"Tesla","ay":2021,"oy":2026,"contro":"Construction delays and management changes","deal":"ERCOT interconnection request (queue no. 23INR0239) in April 2021","dealScan":"https://www.energy-storage.news/ercot-clears-480mw-of-bess-for-operations-in-august-including-tesla-owned-unit-at-factory/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"basenor.com;energy-storage.news","srcUrls":["https://www.basenor.com/blogs/news/giga-texas-cortex-2-megapack-expansion-accelerates","https://www.energy-storage.news/ercot-clears-480mw-of-bess-for-operations-in-august-including-tesla-owned-unit-at-factory/"],"band":"250+ MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"bccb47e7695a","cid":"bccb47e7695a","canon":1,"dups":1,"ftype":"data_center","name":"Equinix Permit 147414 — San Antonio, TX","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":37.5,"band":"25-50 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"TRV.PERMIT147414.EQUINIX LLC(511).PROJECT270924.147414.270924.TRV_WITHDRAW.docx / Original","lflag":"display_name_normalized","srcUrls":null,"srcDom":null},{"id":"1b89c9f7bb03","cid":"1b89c9f7bb03","canon":1,"dups":1,"ftype":"data_center","name":"TRV.PERMIT147414.EQUINIX LLC(511).PROJECT280276.","city":"Houston","county":"Harris County","state":"TX","lat":29.857273,"lng":-95.393037,"cprec":"shared_centroid","status":"Unknown","mw":17.5,"band":"10-25 MW","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"282b61530400","cid":"282b61530400","canon":1,"dups":1,"ftype":"data_center","name":"U.S. Data Lone Star, Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"4ca526b4651e","cid":"4ca526b4651e","canon":1,"dups":1,"ftype":"data_center","name":"UPS and Data Center","city":"AUSTIN","county":"Williamson","state":"TX","lat":30.649082,"lng":-97.605065,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"1e9a1d761c7e","cid":"1e9a1d761c7e","canon":1,"dups":5,"ftype":"data_center","name":"VANTAGE DATA CENTER TX1","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":32,"pc":"Grid","pconf":"High","pquote":"Utility feeds and mechanical systems are designed for redundancy and high availability, consistent with enterprise-grade operations. Power provider: CPS Energy / ERCOT.","pscan":"https://centexdatacenters.org/tracker/vantage-tx12-san-antonio","uquote":"Power provider: CPS Energy / ERCOT. Water provider: SAWS","uscan":"https://centexdatacenters.org/tracker/vantage-tx12-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge and Silver Lake","ay":2023,"oy":2026,"contro":"Environmental concerns regarding water usage and location on the Edwards Aquifer recharge zone, and potential impacts on air quality and electricity.","controScan":"https://www.kens5.com/article/news/community/texas-san-antonios-data-center-economy-skyline/273-82d28bd3-34c2-48bb-a493-cd24008bc9cc","deal":"Land acquisition from University of Texas System Board of Regents in July 2023; project cost estimated at $96 million.","dealScan":"https://baxtel.com/data-center/vantage-san-antonio-tx11","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"centexdatacenters.org;baxtel.com;kens5.com","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx12-san-antonio","https://baxtel.com/data-center/vantage-san-antonio-tx11","https://www.kens5.com/article/news/community/texas-san-antonios-data-center-economy-skyline/273-82d28bd3-34c2-48bb-a493-cd24008bc9cc"],"band":"25-50 MW","rawUkey":"62987|TX","rawUname":"Octopus Energy LLC","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"4e4957471d75","cid":"1e9a1d761c7e","canon":0,"dups":5,"ftype":"data_center","name":"VANTAGE DATA CENTER TX1","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/vantage-data-center-tx1-1051745b","uconf":"High","uquote":"Water provider: SAWS; Power provider: CPS Energy / ERCOT.","uscan":"https://centexdatacenters.org/tracker/vantage-tx12-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge, Silver Lake","ay":2023,"oy":2026,"contro":"Community concerns regarding water and power strain from data center development in San Antonio's Westside, including the Omicron Drive area.","deal":"Project cost estimated at $96 million, with land acquired in July 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;centexdatacenters.org","srcUrls":["https://www.interconnection.fyi/data-center/project/vantage-data-center-tx1-1051745b","https://centexdatacenters.org/tracker/vantage-tx12-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"c6b51656e201","cid":"c6b51656e201","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTER TX1","city":"Santa Clara","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Grid Operator. ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/vantage-data-center-tx1-1051745b","uconf":"High","uquote":"San Antonio's electricity is primarily provided by CPS Energy, also known historically as City Public Service. CPS Energy is a municipally-owned electric utility, the largest of its kind in Texas, serving the city of San Antonio and the broader Bexar County area. Unlike deregulated energy markets elsewhere in Texas, San Antonio electricity operates under a regulated structure, with CPS Energy holding a monopoly within its service area.","uscan":"https://digitalenergyby5.com/blog/electric-company-san-antonio/","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","ay":2025,"contro":"Concerns from residents and local officials regarding power and water supply strain, and location on Edwards Aquifer recharge zone.","controScan":"https://centexdatacenters.org/tracker/vantage-tx12-san-antonio","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;digitalenergyby5.com;centexdatacenters.org","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/vantage-data-center-tx1-1051745b","https://digitalenergyby5.com/blog/electric-company-san-antonio/","https://centexdatacenters.org/tracker/vantage-tx12-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"66cdd2364b47","cid":"1e9a1d761c7e","canon":0,"dups":5,"ftype":"data_center","name":"VANTAGE DATA CENTER TX1","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":32,"pc":"Grid","pconf":"Medium","pquote":"Utility feeds and mechanical systems are designed for redundancy and high availability, consistent with enterprise-grade operations.","uconf":"High","uquote":"“Our city cannot afford to wait until resource demands outpace our infrastructure,” Galvan said in a public statement, calling for a meeting of the minds among City Council, CPS Energy and San Antonio Water System leadership planned sometime after February 11.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","ay":2023,"oy":2026,"contro":"Community opposition regarding noise, air quality, and heavy utility use for Vantage's data center plans in San Antonio.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"db95a45cd6e4","cid":"1e9a1d761c7e","canon":0,"dups":5,"ftype":"data_center","name":"VANTAGE DATA CENTER TX1","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":32,"pc":"Grid","pconf":"High","pquote":"Utility feeds and mechanical systems are designed for redundancy and high availability, consistent with enterprise-grade operations. Positioned in a strategic data-centre corridor near major fiber and power infrastructure, this campus is designed to support growing demand for hyperscale, colocation and cloud infrastructure in the U.S. South-Central market.","uquote":"“Our city cannot afford to wait until resource demands outpace our infrastructure,” Galvan said in a public statement, calling for a meeting of the minds among City Council, CPS Energy and San Antonio Water System leadership planned sometime after February 11.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"Silver Lake","ay":2023,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"583f5c046b6e","cid":"1e9a1d761c7e","canon":0,"dups":5,"ftype":"data_center","name":"VANTAGE DATA CENTER TX1","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Positioned in a strategic data-centre corridor near major fiber and power infrastructure, this campus is designed to support growing demand for hyperscale, colocation and cloud infrastructure in the U.S. South-Central market. Utility feeds and mechanical systems are designed for redundancy and high availability, consistent with enterprise-grade operations.","uconf":"High","uquote":"“Our city cannot afford to wait until resource demands outpace our infrastructure,” Galvan said in a public statement, calling for a meeting of the minds among City Council, CPS Energy and San Antonio Water System leadership planned sometime after February 11.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper and PSP Investments","oy":2026,"contro":"Public hearing held by Texas Commission on Environmental Quality for Vantage's planned data center on the city's West side.","deal":"Project cost estimated at approximately US$96 million, construction began December 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"81717fdfe985","cid":"81717fdfe985","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTER TX1","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","proc":"Tariff (utility)","pcp":"CPS Energy","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper and PSP Investments","ay":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced utility_alias_corrected unlinked_source_text","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"ad4251d29c33","cid":"ad4251d29c33","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTER TX1","city":"Bexar County","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Vantage Data Centers TX12 - San Antonio Data Center... It has access to 96.0 MW of power. Vantage Data Centers TX11 - San Antonio Data Center... It has access to 32.0 MW of power. Utility feeds and mechanical systems are designed for redundancy and high availability, consistent with enterprise-grade operations.","uconf":"High","uquote":"“Our city cannot afford to wait until resource demands outpace our infrastructure,” Galvan said in a public statement, calling for a meeting of the minds among City Council, CPS Energy and San Antonio Water System leadership planned sometime after February 11.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group","ay":2023,"oy":2027,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"uscan":"https://www.mysanantonio.com/business/article/data-centers-san-antonio-21294316.php","srcUrls":["https://www.mysanantonio.com/business/article/data-centers-san-antonio-21294316.php"],"srcDom":"mysanantonio.com","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)"},{"id":"bd1710b7761d","cid":"bd1710b7761d","canon":0,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTER TX2","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Power provider: CPS Energy / ERCOT","pscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","uconf":"High","uquote":"Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"VANTAGE DATA CENTER TX2","ay":2025,"oy":2026,"contro":"Site is on the Edwards Aquifer recharge zone, raising concerns about water quality.","controScan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","deal":"Land acquisition of 31 acres in August 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx22-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"0c09bb3e4869","cid":"0c09bb3e4869","canon":0,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTER TX2","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The draft operating permit (Application No. 38600, draft Permit No. O4790) and a TCEQ Statement of Basis list a field of diesel emergency generators at the site. The filing identifies 65 stationary reciprocating internal combustion engines and classifies the proposal as a Title V major source for nitrogen oxides, or NOx, which triggers a closer technical review by the agency.","uconf":"High","uquote":"Water provider: SAWS; Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge and Silver Lake","ay":2025,"oy":2026,"contro":"Neighbors are worried about noise, air quality and heavy utility use; site is on Edwards Aquifer recharge zone.","controScan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","deal":"Vantage Data Centers acquired 89 acres of land in 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx22-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"7112d67a45b6","cid":"7112d67a45b6","canon":0,"dups":2,"ftype":"data_center","name":"VANTAGE DATA CENTER TX2","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"Medium","pquote":"San Antonio's strong power infrastructure, abundant land availability, and geographic proximity to major U.S. network routes make it an ideal location for large-scale data center operations.... Power and water supply strain remain top of mind for San Antonio leaders who want more information about the data center boom hitting San Antonio, Texas and the U.S. – information often aloof or missing from public record.... As we wrote last week, Belmares informed attendees of how San Antonio's local utilities are making room for data centers—even inviting them to build their own power plants when local supplies are insufficient.","uconf":"High","uquote":"Development Name. Vantage Data Centers TX22. Operational Name. TX22. Status. Proposed. City. San Antonio. County. Bexar. State. Texas. Address. 5207 Rogers Road, San Antonio, TX 78251. ZIP Code. 78251. Business Information. Developer. Contact sales for developer/owner information. Operator. Retained Vantage Data Centers Development. Owner. Retained Vantage Data Centers Development. Grid Operator. Karnes Electric COOP INC.","ukey":"10009|TX","uname":"Karnes Electric Coop Inc","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","ay":2023,"oy":2026,"contro":"Community opposition and regulatory scrutiny regarding noise, air quality, heavy utility use (electricity and water), and location on the Edwards Aquifer recharge zone.","deal":"$157 million project investment, construction began late 2023","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"433f8d078fe2","cid":"433f8d078fe2","canon":0,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTER TX2","city":"San Antonio","county":"Bexar County","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":16,"pc":"Grid","pconf":"High","pquote":"The draft operating permit (Application No. 38600, draft Permit No. O4790) and a TCEQ Statement of Basis list a field of diesel emergency generators at the site. The filing identifies 65 stationary reciprocating internal combustion engines and classifies the proposal as a Title V major source for nitrogen oxides, or NOx, which triggers a closer technical review by the agency.","uconf":"High","uquote":"Water provider: SAWS; Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge and Silver Lake","ay":2023,"oy":2025,"contro":"Neighbors are battling the server plan due to concerns over diesel emergency generators and nitrogen oxide emissions, classifying it as a Title V major source for NOx.","deal":"Construction project with an estimated cost of $157 million, slated to begin in December 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx22-san-antonio"],"band":"10-25 MW","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"3472a478a39b","cid":"7112d67a45b6","canon":0,"dups":2,"ftype":"data_center","name":"VANTAGE DATA CENTER TX2","city":"SAN ANTONIO","county":"BEXAR","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Vantage Data Centers TX22... Power provider: CPS Energy / ERCOT","pscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","uconf":"High","uquote":"Vantage Data Centers TX22... Water provider: SAWS; Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper and PSP Investments","ay":2025,"oy":2026,"contro":"Community opposition regarding noise, air quality, heavy utility use, and impact on Edwards Aquifer recharge zone.","deal":"$157 million project investment for TX21, slated to begin December 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx22-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"7b8a86f59bfc","cid":"7b8a86f59bfc","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTER TX2","city":"San Antonio","county":"Bexar","state":"TX","lat":29.448671,"lng":-98.520147,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The TX22 facility is strategically designed for carrier neutrality and network resilience, offering exceptional connectivity for local and national workloads: Multiple fiber entry points and diverse routing ensure redundancy and low-latency performance. Supports dark fiber, cross-connects, and private interconnections, enabling hybrid and multi-cloud architectures. Located in a rapidly expanding San Antonio corridor with direct access to major power and fiber networks.","uconf":"High","uquote":"Water provider: SAWS; Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, , Silver Lake","ay":2023,"oy":2027,"contro":"Community opposition regarding noise, air quality, and heavy utility use, leading to a public hearing by the Texas Commission on Environmental Quality.","deal":"Vantage TX21: $157 million project (construction began December 2023); Vantage TX22: $272 million investment (construction scheduled to start October 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx22-san-antonio"],"rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"9d1e2b2d5918","cid":"9d1e2b2d5918","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX11, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":32,"pc":"Grid","pconf":"High","pquote":"Utility feeds and mechanical systems are designed for redundancy and high availability, consistent with enterprise-grade operations.","uconf":"High","uquote":"The City of San Antonio owns its electric and gas utilities through CPS Energy, and its water and sewer utilities through SAWS. CPS Energy (formerly City Public Service Board of San Antonio) is the municipal electric utility serving the city of San Antonio, Texas. San Antonio's electricity is primarily provided by CPS Energy, also known historically as City Public Service. CPS Energy is a municipally-owned electric utility, the largest of its kind in Texas, serving the city of San Antonio and the broader Bexar County area. CPS Energy proposes to construct an approximate five-mile 138kV transmission line extension to a new substation (Omicron) in the western part of Bexar County. The proposed project is needed to increase the load-serving capability of the far western portion of the CPS Energy transmission system to accommodate increasing customer load growth in the area, including new large customer loads.","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","ay":2023,"oy":2026,"deal":"Tax Credit/Rebate in 2024","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text state_centroid_only utility_alias_corrected","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","srcUrls":null,"srcDom":null},{"id":"e0fb9f0b76dd","cid":"e0fb9f0b76dd","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX21, LLC Vantage Data Centers TX22, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Power provider: CPS Energy / ERCOT","pscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","uconf":"High","uquote":"Power provider: CPS Energy / ERCOT","uscan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","ukey":"16604|TX","uname":"CPS Energy (City of San Antonio)","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, and Silver Lake","ay":2023,"oy":2027,"contro":"Located on Edwards Aquifer Recharge Zone, potential water impact; TCEQ hearing for operating permit.","controScan":"https://centexdatacenters.org/tracker/vantage-tx22-san-antonio","deal":"TX21: $157 million project investment (late 2023); TX22: $272 million project investment (October 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"centexdatacenters.org","srcUrls":["https://centexdatacenters.org/tracker/vantage-tx22-san-antonio"],"rawName":"Vantage Data Centers TX21, LLC\n              Vantage Data Centers TX22, LLC","rawUkey":"540|TX","rawUname":"BP Energy Company","reportedUtility":"CPS Energy (City of San Antonio)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"cd5f54c1362e","cid":"cd5f54c1362e","canon":0,"dups":2,"ftype":"data_center","name":"VANTAGE DATA CENTERS TX301","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"VoltaGrid","pdt":"1.4 GW campus capacity","uquote":"AEP Texas North is a Transmission and Distribution Utility (TDU) operating within the ERCOT grid serving Abilene in Taylor County.","uscan":"https://electricrates.org/texas/abilene/","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake","oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"electricrates.org","srcUrls":["https://electricrates.org/texas/abilene/"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate delivery_utility_linked","dukey":"20404|TX"},{"id":"d848aee05d22","cid":"cd5f54c1362e","canon":0,"dups":2,"ftype":"data_center","name":"VANTAGE DATA CENTERS TX301","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"VoltaGrid","pdt":"700-megawatt microgrid, scaling to 1.4 gigawatts","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9d1b2aa0024c","cid":"9d1b2aa0024c","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTERS TX301","city":"ABILENE","county":"Taylor","state":"TX","lat":32.297126,"lng":-99.89043,"cprec":"shared_centroid","status":"Unknown","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. ERCOT.","pscan":"https://www.interconnection.fyi/data-center/project/vantage-data-centers-tx301-b1741481","uconf":"High","uquote":"AEP Texas is the incumbent electric utility service for Abilene, owning and maintaining local power lines.","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group","oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;developabilene.com","uscan":"https://developabilene.com/why-abilene-texas/abilene-utility-service/","srcUrls":["https://www.interconnection.fyi/data-center/project/vantage-data-centers-tx301-b1741481","https://developabilene.com/why-abilene-texas/abilene-utility-service/"],"uname":"AEP Texas","reportedUtility":"AEP Texas","lflag":"utility_alias_corrected delivery_utility_linked","dukey":"20404|TX"},{"id":"6365f1769c96","cid":"6365f1769c96","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX301, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"Grid Operator. ERCOT.","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers TX301","spon":"DigitalBridge and Silver Lake","ay":2026,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"e2e0d478ac2d","cid":"e2e0d478ac2d","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX302, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers TX302","tenant":"Oracle America Cloud Services","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"e2c2ecdaf5d1","cid":"e2c2ecdaf5d1","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX303, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Liberty Power Innovations (LPI)","pdt":"up to one gigawatt (1GW) of power agreements within the next five years, including a reservation of 400 megawatts (MW) of 2027 power generation capacity","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers TX303","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e0fde5ddd901","cid":"e0fde5ddd901","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX304, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Liberty Power Innovations (LPI)","pdt":"up to one gigawatt (1GW) of power agreements within the next five years, including a reservation of 400 megawatts (MW) of 2027 power generation capacity","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"de5b27682d33","cid":"de5b27682d33","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX305, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"2a1879aa0a70","cid":"2a1879aa0a70","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX306, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"643ba345b826","cid":"643ba345b826","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX307, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1400,"pc":"Grid","pconf":"High","pquote":"Multiple diverse power feeds and N+1 redundancies across all mechanical and electrical systems will ensure continuous and reliable operations. Our baseline approach includes using renewable energy whenever possible, limiting carbon footprints and maintaining energy efficient operations with industry-leading PUEs, in addition to our commitment to reach net zero carbon emissions by 2030.","uconf":"High","uquote":"Oracle and OpenAI's next big AI bet for Project Stargate is literally off the grid. The companies have plans for a new data center in Shackelford County, Texas, that will be powered by hundreds of natural gas generators, bypassing the strained U.S. power grid so it can come online faster. The new installation, known as a \"microgrid,\" will enable the site to generate its own electricity, eliminating the need for service from a local utility.","rto":"ERCOT","nerc":"TRE","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","tenant":"Oracle, OpenAI","ay":2025,"oy":2026,"deal":"Vantage Data Centers announced an investment of over $25 billion to develop the Frontier campus in Shackelford County, Texas (August 19, 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"uscan":"https://www.businessinsider.com/openai-building-natural-gas-microgrid-at-new-texas-data-center-2025-10","srcUrls":["https://www.businessinsider.com/openai-building-natural-gas-microgrid-at-new-texas-data-center-2025-10"],"srcDom":"businessinsider.com","band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"3361a5198404","cid":"3361a5198404","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX308, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","proc":"Co-located generation","pcp":"Liberty Power Innovations (LPI), a Liberty Energy company","pdt":"up to 1 gigawatt (1GW) of power agreements within the next five years, including a reservation of 400 megawatts (MW) of 2027 power generation capacity","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f91e1963425a","cid":"f91e1963425a","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX309, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"6b0fd26ce18a","cid":"6b0fd26ce18a","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers TX310, LLC","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"c0a2fbca42ac","cid":"c0a2fbca42ac","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Whinstone US Inc. Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":750,"pc":"Grid","pconf":"High","pquote":"Whinstone is the owner and operator of North America's largest Bitcoin hosting facility, with 300 MW in developed capacity and an attractive long-term power purchase agreement. Instead, the state's electricity operator, the Electric Reliability Council of Texas (ERCOT), began to pay Whinstone — for having agreed to quit buying power amid heightened demand.","uconf":"High","uquote":"Electricity in Rockdale is all delivered by the Oncor Transmission and Distribution Utility.; Electricity (ownership of poles and wires) Oncor Electric.","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Riot Blockchain","spon":"Riot Blockchain","tenant":"Riot Blockchain, (self-mining), institutional clients for Bitcoin mining","ay":2019,"oy":2020,"contro":"Lawsuits with SBI Crypto and Rhodium Enterprises, dispute with GMO","controScan":"https://coingeek.com/sbi-crypto-sues-texas-data-center-for-deception/","deal":"Acquisition of Whinstone US Inc. by Riot Blockchain, Inc. for approximately $651 million in April/May 2021","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"coingeek.com","srcUrls":["https://coingeek.com/sbi-crypto-sues-texas-data-center-for-deception/"],"band":"250+ MW","lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"358bb403f052","cid":"358bb403f052","canon":1,"dups":1,"ftype":"data_center","name":"Winner LLC d/b/a Ernst LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","pc":"Grid","pconf":"High","pquote":"The incentive agreement calls for the company to receive $146.7 million in rebates over 20 years from real and business personal property taxes and a franchise fee with Oncor.","pscan":"https://fortworthbusiness.com/real-estate/facebook-said-to-be-data-center-company-planned-for-alliance/","uconf":"High","uquote":"The incentive agreement calls for the company to receive $146.7 million in rebates over 20 years from real and business personal property taxes and a franchise fee with Oncor.","uscan":"https://fortworthbusiness.com/real-estate/facebook-said-to-be-data-center-company-planned-for-alliance/","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2015,"oy":2017,"deal":"Fort Worth City Council approved an incentive agreement for $146.7 million in rebates over 20 years (May 2015); Tarrant County approved a 10-year tax abatement (July 2015); Total project investment of $1 billion.","dealScan":"https://fortworthbusiness.com/real-estate/facebook-said-to-be-data-center-company-planned-for-alliance/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fortworthbusiness.com","srcUrls":["https://fortworthbusiness.com/real-estate/facebook-said-to-be-data-center-company-planned-for-alliance/"],"rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","lflag":"utility_alias_corrected source_quality_reclassified delivery_utility_linked","dukey":"44372|TX"},{"id":"0e01ca3b423f","cid":"0e01ca3b423f","canon":1,"dups":1,"ftype":"data_center","name":"WTDM OZB LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","rto":"ERCOT","nerc":"TRE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"state_centroid_only","srcUrls":null,"srcDom":null},{"id":"5c570d2d424d","cid":"5c570d2d424d","canon":1,"dups":1,"ftype":"data_center","name":"Wurldwide LLC DBA Statue LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":1000,"proc":"Tariff (utility)","pcp":"El Paso Electric","rto":"ERCOT","nerc":"TRE","op":"Meta Platforms","spon":"Meta Platforms","tenant":"Meta Platforms","ay":2023,"oy":2025,"deal":"Meta is investing $10 billion to build a massive data center campus. El Paso city and county approved Chapter 380 and Chapter 312 tax abatement agreements with Wurldwide LLC, a Meta subsidiary, in December 2023, providing 80% city and county property tax abatements for up to 5 phases over 35 years.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"large_project_duplicate_review unlinked_source_text state_centroid_only","srcUrls":null,"srcDom":null},{"id":"5d902f3818b6","cid":"5d902f3818b6","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Zephyr Infrastructure LLC Data Center","state":"TX","lat":31.5,"lng":-99.3,"cprec":"shared_centroid","status":"Unknown","mw":206,"pc":"Grid","pconf":"High","pquote":"Load serving feeders with a peak demand of 4 Page 6 DocuSign Envelope ID: 341AC0C2-E9E8-4C3D-AE26-1 E6FFE628BC9 up to 206 MW (approximately) connect to the GIF 34.5-kV bus (the \"Load Facilities\").","pscan":"https://interchange.puc.texas.gov/Documents/35077_1878_1413712.PDF","uquote":"Find attached the Fifth Amendment to the Standard Generation Interconnection Agreement between Oncor Electric Delivery Company LLC and Canadian Breaks, LLC (Canadian Breaks Wind) (13INR0026), dated June 27, 2024, for filing at the Public Utility Commission pursuant to Substantive Rule 25.195(h).... (e) Large Load Retail Customer Information: Company Name: Zephyr Infrastructure LLC.","uscan":"https://interchange.puc.texas.gov/Documents/35077_1878_1413712.PDF","uname":"Oncor Electric Delivery","rto":"ERCOT","nerc":"TRE","op":"Zephyr Infrastructure","spon":"Hut 8","tenant":"American Bitcoin","ay":2025,"deal":"Oldham County tax abatement agreement for approximately $160,000,000.00 (March 10, 2025); Put Option Agreement with American Bitcoin Corp. (March 31, 2025)","dealScan":"https://www.co.oldham.tx.us/upload/page/4526/2025/NOTICE_OF_TAX_ABATEMENT_CONSIDERATION.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interchange.puc.texas.gov;co.oldham.tx.us","lflag":"online_before_announced citation_artifact_removed utility_alias_corrected source_quality_reclassified delivery_utility_linked","srcUrls":["https://interchange.puc.texas.gov/Documents/35077_1878_1413712.PDF","https://www.co.oldham.tx.us/upload/page/4526/2025/NOTICE_OF_TAX_ABATEMENT_CONSIDERATION.pdf"],"band":"100-250 MW","rawUkey":"13830|TX","rawUname":"Nueces Electric Cooperative","reportedUtility":"Oncor Electric Delivery","dukey":"44372|TX"},{"id":"e65ac784a4ab","cid":"e65ac784a4ab","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"West Jordan","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Operational","mw":162,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The facility offers an impressive on-site substation for incoming electrical service, ensuring consistent and reliable power availability.","pscan":"https://cloudandcolocation.com/datacenters/aligned-energy-west-jordan-data-center-slc-01-building-b/","uquote":"Grid Operator. PacifiCorp.","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"AI Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners (GIP)","tenant":"Unidentified hyperscaler","ay":2018,"oy":2021,"deal":"Sale of Aligned Data Centers to a consortium including AI Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners (GIP) for an implied enterprise value of approximately $40 billion (September 2024).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/aligned-energy-west-jordan-data-center-slc-01-building-b/"],"lflag":"source_quality_reclassified"},{"id":"82a1cf59acec","cid":"82a1cf59acec","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"West Valley City","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Even data centers on the Wasatch Front that have already tapped into Utah's existing power grid have received state approval to install hundreds of diesel-fueled generators in the last five years, including QTS, Meta, and the National Security Agency in Utah County; and eBay, Aligned, DataBank, Oracle, and Novva in Salt Lake County. Those generators would only run during blackouts and other emergencies when their campuses can't get enough grid power, according to permit applications.","uconf":"High","uquote":"Aligned Data Centers in Salt Lake County, UT (100-250 MW)... Grid Operator: PacifiCorp.","uscan":"https://www.interconnection.fyi/data-center/project/aligned-data-centers-dd8399da","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2021,"oy":2022,"deal":"Acquisition of Aligned Data Centers by a consortium including BlackRock, MGX, and AI Infrastructure Partnership for $40 billion, announced October 2025, expected to close H1 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/aligned-data-centers-dd8399da"],"lflag":"citation_artifact_removed"},{"id":"c23c6dd83d39","cid":"c23c6dd83d39","canon":1,"dups":1,"ftype":"data_center","name":"Blue Cross Blue Shield","city":"Salt Lake City","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"87c8555f0fe1","cid":"87c8555f0fe1","canon":1,"dups":1,"ftype":"crypto_hpc","name":"Crusoe Energy","city":"Upalco","county":"Duchesne","state":"UT","lat":40.289393,"lng":-110.429584,"cprec":"distinct","status":"Operational","mw":19,"band":"10-25 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Natural gas will be routed to a maximum of ten (10) generator engines, which use the gas as fuel to generate electricity for small data centers that will also be located onsite.","proc":"Co-located generation","pcp":"Ovintiv","rto":"non-RTO","nerc":"WECC","op":"Crusoe Energy Systems, Incorporated","ay":2023,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"693ef582c97b","cid":"693ef582c97b","canon":1,"dups":1,"ftype":"data_center","name":"eBay","city":"South Jordan","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Operational","mw":18,"band":"10-25 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The Utah facility is using 30 Bloom Energy Servers as the primary power source for its entire IT load, using the utility grid for backup power should the Bloom units fail. It is powered by electricity generated on-site, and the grid is the backup plan. Our newest data center is the first in the world to use Bloom Energy Servers™ as the primary, on-site power source, instead of the traditional electric utility grid.","proc":"Co-located generation","pcp":"Bloom Energy","pdt":"6 MW","uquote":"This month, we're excited to announce that our Draper, Utah, office will have 100% renewable coverage for the next two years through a partnership with local utility provider, Rocky Mountain Power (RMP) and their Blue Sky program.","rto":"non-RTO","nerc":"WECC","op":"eBay","spon":"eBay","tenant":"eBay","ay":2008,"oy":2010,"deal":"$27.3 million in tax incentives (2008), $334 million project cost (2008)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2e6c2bef592c","cid":"2e6c2bef592c","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Salt Lake City","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"All five Flexential Utah data and colocation centers purchase wind-generated electricity through the Rocky Mountain Power Blue Sky renewable energy program as a visionary-level participant.","uconf":"High","uquote":"All five Flexential Utah data and colocation centers purchase wind-generated electricity through the Rocky Mountain Power Blue Sky renewable energy program as a visionary-level participant.","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Flexential","spon":"GI Partners","deal":"GI Partners closed investments in Flexential on August 20, 2025","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e8fcc3618c24","cid":"e8fcc3618c24","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"West Jordan","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"A 480V utility power feed is served to the data center with wind generated electricity through Rocky Mountain Power Blue Sky renewable energy program making it an green energy efficient data center.","pscan":"https://cloudandcolocation.com/datacenters/flexential-south-valley-data-center/","uquote":"A 480V utility power feed is served to the data center with wind generated electricity through Rocky Mountain Power Blue Sky renewable energy program making it an green energy efficient data center.","uscan":"https://cloudandcolocation.com/datacenters/flexential-south-valley-data-center/","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Flexential","ay":2000,"oy":2000,"deal":"ViaWest acquired Consonus data center assets in Utah in October 2010.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/flexential-south-valley-data-center/"],"lflag":"source_quality_reclassified"},{"id":"dee5eab6fc58","cid":"dee5eab6fc58","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Eagle Mountain","county":"Utah","state":"UT","lat":40.120425,"lng":-111.668508,"cprec":"shared_centroid","status":"Operational","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"We worked with Rocky Mountain Power to meet our 100% clean and renewable energy goal for the Eagle Mountain Data Center. This includes supporting 13 new renewable energy projects in Utah and helping create an innovative renewable energy program that is available to other customers looking to meet their renewable energy goals.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Eagle-Mountain-Data-Center.pdf","uconf":"High","uquote":"We worked with Rocky Mountain Power to meet our 100% clean and renewable energy goal for the Eagle Mountain Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Eagle-Mountain-Data-Center.pdf","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2018,"oy":2021,"deal":"Capital investment of $1.5 billion by October 2022; 20-year power purchase agreement with Rocky Mountain Power for Faraday Solar project (operational Sept 2025)","dealScan":"https://www.heraldextra.com/news/local/2022/oct/04/meta-announces-expansion-to-eagle-mountain-data-center/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"datacenters.atmeta.com;heraldextra.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Eagle-Mountain-Data-Center.pdf","https://www.heraldextra.com/news/local/2022/oct/04/meta-announces-expansion-to-eagle-mountain-data-center/"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"2132e817a432","cid":"2132e817a432","canon":1,"dups":1,"ftype":"data_center","name":"Newfold Digital","city":"Provo","county":"Utah","state":"UT","lat":40.120425,"lng":-111.668508,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"BlueHost Holdings operates a data center in Utah County. The data center operates three (3) diesel-fueled emergency generators rated 2 MW each.","pscan":"https://daqpermitting.utah.gov/DocViewer?IntDocID=149577&contentType=application/pdf","uquote":"Power: Reliable energy solutions to keep your business running smoothly.... The Energy Department is the largest municipality-owned electric utility in Utah and provides reliable energy services through investing in employees, infrastructure, technology, and community outreach.","uscan":"https://www.provo.gov/518/Utility-Providers","rto":"non-RTO","nerc":"WECC","op":"Newfold Digital","spon":"Clearlake Capital Group, Siris Capital Group","oy":2003,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"daqpermitting.utah.gov;provo.gov","srcUrls":["https://daqpermitting.utah.gov/DocViewer?IntDocID=149577&contentType=application/pdf","https://www.provo.gov/518/Utility-Providers"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"3b629e7a1a6e","cid":"3b629e7a1a6e","canon":1,"dups":1,"ftype":"data_center","name":"NOVVA Data Centers","city":"West Jordan","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"Novva has requested to expand power generation at its existing West Jordan Data Center. The source is requesting to install 72 new natural gas-fired IC engines, which will power generators providing primary power for the site's two (2) new data center buildings. The campus also features a \"Centralized and secure on-campus 200MW substation with N+1 redundancy.\"","pscan":"https://daqpermitting.utah.gov/DocViewer?IntDocID=151396&contentType=application/pdf","proc":"Co-located generation","pcp":"NOVVA Data Centers (self-generation)","pdt":"200 megawatts of power (natural gas plant), 72 new natural gas-fired IC engines","uquote":"The company noted Rocky Mountain Power can't provide the electricity needed until 2031, and even then, it's not guaranteed.","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"Novva Data Centers","spon":"CIM Group","ay":2020,"oy":2026,"contro":"State approval for a 200 MW natural gas plant in December 2024, and an application for a two-year presidential exemption from the Clean Air Act in March to operate using diesel generators while the natural gas plant is built.","deal":"$2 billion in financing from J.P. Morgan and Starwood Property Trust to complete phases 2 and 3, announced March 2025.","dealScan":"https://www.enr.com/articles/60451-novva-secures-2b-to-complete-utah-data-center-campus-construction","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"daqpermitting.utah.gov;enr.com","srcUrls":["https://daqpermitting.utah.gov/DocViewer?IntDocID=151396&contentType=application/pdf","https://www.enr.com/articles/60451-novva-secures-2b-to-complete-utah-data-center-campus-construction"]},{"id":"52b228d3fc5a","cid":"52b228d3fc5a","canon":1,"dups":1,"ftype":"data_center","name":"Tonaquint Data Centers","city":"St. George","county":"Washington","state":"UT","lat":37.262531,"lng":-113.4878,"cprec":"distinct","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The power feeds into the facility come from the city utility company. Currently, the data center has a 3000 Amp/2.5kW feed into the building from the primary 25 MVA substation (Green Valley) and a manual switch backup to the secondary separate substation (15 MVA - Southgate).","uquote":"Power: Utility: City Power; Most Economical Power in the region.","uscan":"https://baxtel.com/data-center/valorc3-st-george","rto":"non-RTO","nerc":"WECC","op":"ValorC3 Data Centers","spon":"CVC DIF (CVC Capital Partners)","ay":2007,"oy":2008,"deal":"DIF Capital Partners acquired Tonaquint Data Centers in January 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/valorc3-st-george"]},{"id":"f879292b6b0b","cid":"f879292b6b0b","canon":1,"dups":1,"ftype":"data_center","name":"US National Security Agency","city":"Lehi","county":"Utah","state":"UT","lat":40.120425,"lng":-111.668508,"cprec":"shared_centroid","status":"Operational","mw":65,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The center will constantly use 65 megawatts of power -- enough to power 33,000 houses. Reliable power: The power for this operation will come from its own substation, which will supply the necessary 65-megawatts, along with the capability to run itself on generators for up to three days.","pscan":"https://www.vocalcom.com/blog/taking-a-closer-look-at-the-nsas-data-center/","uconf":"High","uquote":"Lehi City Power is a municipally owned organization providing electricity in Lehi, Utah and other areas of Utah County. The Lehi City Power Department provides reliable electrical service to our customers with local control and competitive rates.","uscan":"https://www.lehi-ut.gov/departments/power/","ukey":"10879|UT","uname":"Lehi City Corporation","rto":"non-RTO","nerc":"WECC","op":"National Security Agency","spon":"US Government","tenant":"National Security Agency","ay":2010,"oy":2014,"contro":"Public protests and controversy over mass surveillance following Edward Snowden's disclosures.","controScan":"https://www.cbsnews.com/sacramento/news/ex-nsa-executive-says-utah-data-center-a-symbol-of-agencys-unbridled-power/","deal":"Construction contract awarded for $1.2 billion in September 2010.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"vocalcom.com;lehi-ut.gov;cbsnews.com","srcUrls":["https://www.vocalcom.com/blog/taking-a-closer-look-at-the-nsas-data-center/","https://www.lehi-ut.gov/departments/power/","https://www.cbsnews.com/sacramento/news/ex-nsa-executive-says-utah-data-center-a-symbol-of-agencys-unbridled-power/"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"04f086e08480","cid":"04f086e08480","canon":0,"dups":2,"ftype":"data_center","name":"DataBank","city":"Bluffdale","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Proposed","mw":22,"pc":"Grid","pconf":"High","pquote":"Offers diverse A/B power feeds from Rocky Mountain Power—reliable, redundant, low-cost, and scalable power for compute-intensive workloads. The campus features its own 66MW, N+1 substation guaranteeing lower costs and scalability needed for the most ambitious enterprises and hyper-scale cloud ventures.","uquote":"Offers diverse A/B power feeds from Rocky Mountain Power—reliable, redundant, low-cost, and scalable power for compute-intensive workloads.","uscan":"https://www.databank.com/data-centers/salt-lake-city/","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"DataBank","spon":"DigitalBridge","ay":2021,"oy":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/salt-lake-city/"],"band":"10-25 MW","oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"d5292506c625","cid":"d5292506c625","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Bluffdale","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"DataBank's SLC5 data center in Bluffdale, UT taps into the unique power and network infrastructure of our Granite Point Campus to create the ideal data center for the high-performance computing.... 100% Renewable Energy Source.","pscan":"https://www.databank.com/data-centers/salt-lake-city/granite-point-campus/14870-s-pony-express-road/","uconf":"High","uquote":"Consisting of multiple, redundant 22MW transformers, the N+1 substation was engineered to 'step down' high voltage electricity from the transmission system and includes: – Direct power feeds from Rocky Mountain Power. – Diverse A&B feeds with 138,000 volts per feed.","uscan":"https://www.databank.com/resources/press-releases/databank-completes-66mw-substation-at-granite-point-salt-lake-campus/","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"DataBank","spon":"DigitalBridge","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"databank.com","srcUrls":["https://www.databank.com/data-centers/salt-lake-city/granite-point-campus/14870-s-pony-express-road/","https://www.databank.com/resources/press-releases/databank-completes-66mw-substation-at-granite-point-salt-lake-campus/"],"lflag":"citation_artifact_removed"},{"id":"4ec387696263","cid":"383475c74f78","canon":0,"dups":2,"ftype":"data_center","name":"DataBank","city":"Bluffdale","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Rocky Mountain Power","pdt":"66MW substation capacity","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e59db81977c8","cid":"04f086e08480","canon":0,"dups":2,"ftype":"data_center","name":"DataBank","city":"Bluffdale","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Proposed","mw":22,"pc":"Grid","pconf":"High","pquote":"Offers diverse A/B power feeds from Rocky Mountain Power—reliable, redundant, low-cost, and scalable power for compute-intensive workloads.","uquote":"Offers diverse A/B power feeds from Rocky Mountain Power—reliable, redundant, low-cost, and scalable power for compute-intensive workloads.","ukey":"14354|UT","uname":"PacifiCorp","rto":"non-RTO","nerc":"WECC","op":"DataBank","spon":"IPI Partners","ay":2023,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"383475c74f78","cid":"383475c74f78","canon":0,"dups":2,"ftype":"data_center","name":"DataBank","city":"Bluffdale","county":"Salt Lake","state":"UT","lat":40.667883,"lng":-111.92424,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pdt":"66-megawatt substation","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"88e8b91142d9","cid":"88e8b91142d9","canon":1,"dups":1,"ftype":"data_center","name":"11751 Meadowville Owner LLC c/o GFH Capital Ltd","city":"Chester","county":"Chesterfield","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center provides 100% SLA on power and cooling with N+1 configured redundancy. Dominion Energy provides electric power to Chesterfield County.","uconf":"High","uquote":"Dominion Energy provides electric power to Chesterfield County.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corporate Office Properties","spon":"GFH Capital Limited","ay":2007,"oy":2007,"deal":"Acquisition of a portfolio exceeding US$100 million by GFH Capital Limited in April 2017.","dealScan":"https://gfh.com/press-release/gfh-signs-to-acquire-us-virginia-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"gfh.com","srcUrls":["https://gfh.com/press-release/gfh-signs-to-acquire-us-virginia-data-center/"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"e69c4d33f34a","cid":"e69c4d33f34a","canon":1,"dups":1,"ftype":"data_center","name":"1304 SQUIRE CT","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Amazon AWS","spon":"Amazon AWS","tenant":"Amazon AWS","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"84806d802486","cid":"84806d802486","canon":1,"dups":1,"ftype":"data_center","name":"1501 Moran Road Development Owner, LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Future / Expansion","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The PJM Interconnection's board on Feb. 12, 2026, approved a transmission expansion plan that includes Dominion Energy's Virginia utility building roughly $4.8 billion in projects, partly to meet demand growth driven by data centers.... The project is designed to deliver 3,000 MW into Loudoun County in northern Virginia, the area with the most data center capacity in the world.","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses.... Dominion, along with the Northern Virginia Electric Cooperative, serves the Northern Virginia market where most of the commonwealth's data centers have been built.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"EdgeCore Digital Infrastructure","spon":"Penzance, EdgeCore Digital Infrastructure","ay":2023,"oy":2027,"deal":"February 2023: Equity recapitalization and joint venture with EdgeCore to co-develop the site. March 2023: 1501 Moran Road Development Owner LLC (a Penzance affiliate) acquired a 7.6-acre site for $2.6 million.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","lflag":"citation_artifact_removed status_adjusted_future_expansion","srcUrls":["https://www.loudoun.gov/2674/Utilities"],"rawStatus":"Operational"},{"id":"2f6907dab3a0","cid":"2f6907dab3a0","canon":1,"dups":1,"ftype":"data_center","name":"21110 Ridgetop Circle LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center has multiple levels of electrical and mechanical redundancy protecting the power load during any event, and offers 100% SLA on power. The data center is a N+1 power design, and a total of 4.3 MW of power is fed to the facility.... Power failure is protected by redundant UPS systems in N+1 configuration with a battery bank, with automatic transfer to standby diesel generators in the event there is a loss of utility power.","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/21110-ridgetop-circle-llc-f0f2315b","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Centersquare","spon":"Mapletree Industrial Trust (MIT) / Mapletree Investments (MIPL)","oy":2001,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/21110-ridgetop-circle-llc-f0f2315b"],"lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"06f0838005ef","cid":"06f0838005ef","canon":1,"dups":1,"ftype":"data_center","name":"21310 BEAUMEADE CIR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses. Dominion Virginia Power - 866-366-4357.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Compu-dynamics","spon":"BEAUMEADE DC BUILDING","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.loudoun.gov/2674/Utilities"]},{"id":"ba09e5f6c17e","cid":"ba09e5f6c17e","canon":1,"dups":1,"ftype":"data_center","name":"21320 BEAUMEADE CIR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Data centers require baseload power, which renewables and battery energy storage have been unable to satisfy.... roughly 70% of global internet traffic flows through Northern Virginia, with the vast majority of those facilities served by Dominion Energy.... The U.S. Department of Energy used the Federal Power Act on Monday to allow data centers within the regional grid operated by PJM Interconnection, including those in Virginia, to use generators at PJM's discretion through Jan. 31.","pscan":"https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","uconf":"High","uquote":"roughly 70% of global internet traffic flows through Northern Virginia, with the vast majority of those facilities served by Dominion Energy.... Energy demand is rising quickly, especially in Loudoun County, which is a major center for technology and innovation. To keep up, Dominion Energy is planning and building new transmission lines while working with local, state, and community leaders.","uscan":"https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"BEAUMEADE DC BUILDING","spon":"BEAUMEADE DC BUILDING","contro":"General community opposition, power constraints, and zoning restrictions affecting data center development in Loudoun County.","controScan":"https://www.datacenterknowledge.com/data-center-site-selection/virginia-faces-new-headwinds-in-data-center-growth","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"amperon.co;datacenterknowledge.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","https://www.datacenterknowledge.com/data-center-site-selection/virginia-faces-new-headwinds-in-data-center-growth"]},{"id":"a4d6dd297c07","cid":"a4d6dd297c07","canon":1,"dups":1,"ftype":"data_center","name":"21551 BEAUMEADE CIR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The data center has a single utility feed, and provides electrical capacity of 15 kVA per cabinet.... Immediate power failure is protected by 1124 kW/kVA capacity UPS system per suite, and 281 kW/kVA capacity UPS system per sub-suite, in a 2N configuration. Standby power is provided by 1 x dedicated 2 MW diesel generator per suite, and 1 x shared...DC10 Ashburn datacenter offers 4 to 6 kVA per cabinet from two separate utility feeds. Backed by 2N UPS block redundant and 10x 2,000 kW diesel N+1 generators.","pscan":"https://www.clouvider.com/ashburn-dc-equinix-dc10-equinix-datacenter/","uconf":"High","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses. Grid Operator. Dominion Energy Virginia. Utility. Dominion.","uscan":"https://www.interconnection.fyi/project/pjm-ag1-221","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","tenant":"Colocation facility with multiple tenants","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"clouvider.com;interconnection.fyi","lflag":"operational_null_capacity citation_artifact_removed utility_alias_corrected source_quality_reclassified","srcUrls":["https://www.clouvider.com/ashburn-dc-equinix-dc10-equinix-datacenter/","https://www.interconnection.fyi/project/pjm-ag1-221"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"47b194e3a622","cid":"47b194e3a622","canon":1,"dups":1,"ftype":"data_center","name":"21571 Beaumeade Circle LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The UPS configuration is 2N, supported by a single utility feeder and a standby power configuration of N+1. Six 2,000 kW diesel generators, equipped with five belly tanks and one stand-alone tank, provide standby power.","uquote":"Customer load request will be evaluated per Dominion's Facility Interconnection Requirements Document and Dominion's Transmission Planning Criteria.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Centersquare","spon":"Mapletree Industrial Trust","deal":"Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.","dealScan":"https://baxtel.com/data-center/centersquare-ashburn-wdc1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/centersquare-ashburn-wdc1"],"lflag":"source_quality_reclassified"},{"id":"8946006ada77","cid":"8946006ada77","canon":1,"dups":1,"ftype":"data_center","name":"21641 CHARLES VIEW DR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Loudoun County, Virginia, known within the industry as Data Center Alley, currently consumes approximately 5.3 GW of electricity, a significant increase from about 2 GW in 2021. This level of demand is equivalent to the output of five large nuclear reactors, all concentrated within a single county northwest of Washington, D.C. Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses. Dominion Virginia Power Opens a New Window. - 866-366-4357;","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon AWS","spon":"Corporate Office Properties Trust (CABIN BRANCH CREEK )","tenant":"Amazon AWS","oy":2020,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"frontiermap.substack.com;loudoun.gov","lflag":"operational_null_capacity","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift","https://www.loudoun.gov/2674/Utilities"]},{"id":"204b7e7a2d10","cid":"204b7e7a2d10","canon":1,"dups":1,"ftype":"data_center","name":"21745 BEAUMEADE CIR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":120,"pc":"Grid","pconf":"High","pquote":"Cologix's 120 MW capacity, state-of-the-art Energy Star certified facility with 455,000 SQFT of data center colocation space is a highly efficient and scalable facility and is the only data center in the region designed and built for Hyperscale Edge traffic from the ground up.... Package 1 platform grating for generators and PODs.","pscan":"https://www.loudoun.gov/DocumentCenter/View/217666/Building-Permits-Issued-October-1-31-2025","rto":"PJM","nerc":"SERC","op":"Cologix","oy":2020,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","srcUrls":["https://www.loudoun.gov/DocumentCenter/View/217666/Building-Permits-Issued-October-1-31-2025"],"band":"100-250 MW","lflag":"citation_artifact_removed"},{"id":"f1f6d7b8d8a2","cid":"f1f6d7b8d8a2","canon":1,"dups":1,"ftype":"data_center","name":"21821 UUNET DR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":120,"pc":"Grid","pconf":"High","pquote":"It features an on-site substation for reliable power delivery. - Generators and UPS systems are in place to provide backup power in case of outages.","pscan":"https://inflect.com/building/21821-uunet-drive-ashburn/aligned-energy/datacenter/iad02","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/21821-uunet-dr-f10f50bf","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Data Centers","spon":"Aligned Energy Data Centers","oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"inflect.com;interconnection.fyi","srcUrls":["https://inflect.com/building/21821-uunet-drive-ashburn/aligned-energy/datacenter/iad02","https://www.interconnection.fyi/data-center/project/21821-uunet-dr-f10f50bf"],"band":"100-250 MW"},{"id":"bc1c8d2a98ad","cid":"bc1c8d2a98ad","canon":1,"dups":1,"ftype":"data_center","name":"21955 LOUDOUN COUNTY PKWY","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":144,"pc":"Grid","pconf":"High","pquote":"Dominion Energy is the largest supplier of electricity in the Commonwealth of Virginia and the predominant electricity provider in Loudoun County.... Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Iskandar Ventures (LC1A); Jamshid Ventures (LC1B)","oy":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25"],"band":"100-250 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"8687f27c9b05","cid":"8687f27c9b05","canon":1,"dups":1,"ftype":"data_center","name":"22350 KIPPER DR AWS","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"As residential concerns may come up with any corporate construction, the local authorities' approval hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line that some local residents and a county supervisor were opposed to. Luckily for AWS, the region's utility company, Dominion, and Blue Ridge Group, a company acting on Amazon's behalf, were able to come up with an alternative plan that Loudoun County supervisors approved.","pscan":"https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/","uconf":"High","uquote":"Grid Operator. Dominion Energy. As residential concerns may come up with any corporate construction, the local authorities' approval hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line that some local residents and a county supervisor were opposed to.","uscan":"https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"AWS","ay":2020,"oy":2022,"contro":"Residential concerns and opposition to a power line led to an alternative power plan being required for approval.","controScan":"https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"futurumgroup.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/"]},{"id":"d308e7ec385b","cid":"d308e7ec385b","canon":1,"dups":1,"ftype":"data_center","name":"22370 KIPPER DR AWS","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market.... Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.... Talen supplies Amazon with up to 1,920 MW of the plant's output through the PJM grid, with full capacity expected by 2032.","uquote":"Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).... DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon AWS","spon":"Amazon AWS","tenant":"Amazon AWS","oy":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"6313348306c9","cid":"6313348306c9","canon":1,"dups":1,"ftype":"data_center","name":"22810-22860 International Drive LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The campus boasts impressive utility infrastructure, including 2.9 MW of utility power, 3.2 MW of UPS capacity with an N+1 configuration for uninterrupted power supply, and 3.2 MW of generator capacity, also in an N+1 configuration, supported by a substantial 9,000-gallon fuel capacity. Power Utility: Dominion Virginia Power.","uconf":"High","uquote":"Power Utility: Dominion Virginia Power.","uscan":"https://baxtel.com/data-center/centersquare-iad2-b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Csquare","spon":"Brookfield","deal":"Brookfield acquired Cyxtera in November 2023, combining it with Evoque.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/centersquare-iad2-b"],"lflag":"source_quality_reclassified"},{"id":"861dc362d00a","cid":"861dc362d00a","canon":1,"dups":1,"ftype":"data_center","name":"22945 INTERNATIONAL DR AWS","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/22945-international-dr-aws-13e2247e","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/22945-international-dr-aws-13e2247e","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon AWS","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/22945-international-dr-aws-13e2247e"]},{"id":"771bf23acf17","cid":"771bf23acf17","canon":1,"dups":1,"ftype":"data_center","name":"22995 Wilder Court LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":4,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The power failure is protected by redundant UPS system in N+1 configuration with battery bank, and automatic transfer to standby diesel generators on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/cyxtera-sterling-data-center-iad3-a/","uconf":"High","uquote":"The operational and planning functions of Dominion Energy's electric transmission system are provided by PJM Interconnection, a regional transmission organization (RTO).","uscan":"https://www.dominionenergy.com/about/delivering-energy/electric-transmission-access","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Csquare","spon":"Brookfield","ay":2006,"oy":2006,"deal":"Brookfield acquired Cyxtera in November 2023, leading to a merger with Evoque and rebranding to Centersquare/Csquare in April 2024/October 2025.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cloudandcolocation.com;dominionenergy.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyxtera-sterling-data-center-iad3-a/","https://www.dominionenergy.com/about/delivering-energy/electric-transmission-access"],"lflag":"source_quality_reclassified"},{"id":"49bdec06bec9","cid":"49bdec06bec9","canon":1,"dups":1,"ftype":"data_center","name":"23005 INTERNATIONAL DR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia","uquote":"Just before midnight on a humid July evening, a lightning arrestor failed along a 230-kV transmission line feeding Dominion Energy's Northern Virginia corridor.","uscan":"https://www.globaldatacenterhub.com/p/when-15-gigawatts-vanished-what-the","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon AWS","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"globaldatacenterhub.com","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.globaldatacenterhub.com/p/when-15-gigawatts-vanished-what-the"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"56cc11d60a05","cid":"56cc11d60a05","canon":1,"dups":1,"ftype":"data_center","name":"24244 QUAIL RIDGE LN","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/quail-ridge-c-d-7114a719","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon","oy":2024,"deal":"Amazon.com, Inc. acquired 56.7 acres of land and two powered shells for $146m on December 30, 2021.","dealScan":"https://baxtel.com/data-center/amazon-quail-ridge-4","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"frontiermap.substack.com;interconnection.fyi;baxtel.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift","https://www.interconnection.fyi/data-center/project/quail-ridge-c-d-7114a719","https://baxtel.com/data-center/amazon-quail-ridge-4"]},{"id":"deb90c1b5ceb","cid":"deb90c1b5ceb","canon":1,"dups":1,"ftype":"data_center","name":"43831 DEVIN SHAFRON DR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a0198f59","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a0198f59","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Digital Core REIT","tenant":"Amazon","ay":2006,"oy":2013,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a0198f59"]},{"id":"bee032e9ec98","cid":"bee032e9ec98","canon":1,"dups":1,"ftype":"data_center","name":"44470 Chilum Place","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"The data center has single utility feed, and six power transformers. The data center provides 34.5 kV- 3 phase AC power, and DC power to customer's equipment. The immediate power failure is protected by UPS in N+1 configuration. The standby power is provided by 7 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-ashburn-data-center-dc3/","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","tenant":"Multiple (colocation)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-ashburn-data-center-dc3/"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"efc4c44bd6ab","cid":"efc4c44bd6ab","canon":1,"dups":1,"ftype":"data_center","name":"44490 CHILUM PL","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Grid","pconf":"High","pquote":"Loudoun County, Virginia, known within the industry as Data Center Alley, currently consumes approximately 5.3 GW of electricity... Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uquote":"Loudoun County, Virginia, known within the industry as Data Center Alley, currently consumes approximately 5.3 GW of electricity... Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility...","uscan":"https://frontiermap.substack.com/p/the-demand-shift","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"frontiermap.substack.com","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift"],"band":"10-25 MW"},{"id":"7cc60fb826bb","cid":"7cc60fb826bb","canon":1,"dups":1,"ftype":"data_center","name":"44520 HASTINGS DR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":13,"pc":"Grid","pconf":"High","pquote":"Customers benefit from multiple major fiber carriers, some of the nation's most competitive power rates and myriad tax incentives. PJM and Dominion Energy plan to bring an additional 6.3 Gw into Loudoun County by 2028 to meet Loudoun's growing power demands, but it is unclear how much of this additional power will reach “Data Center Alley.”","pscan":"https://www.linncountyiowa.gov/DocumentCenter/View/27657/Loudoun-County---Data-Center-Capital---A-Strategy-for-a-Changing-Paradigm---energy","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses. The Golden to Aspen Line proposed by Dominion Energy is to serve the growing energy demand from data centers in eastern Loudoun.","uscan":"https://www.waterfordfoundation.org/transmission-lines/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Core REIT","ay":2006,"oy":2006,"deal":"Acquisition of Dupont Fabros Technology by Digital Realty in September 2017 for approximately $7.6 billion.","dealScan":"https://matrixbcg.com/blogs/brief-history/digitalrealty","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"linncountyiowa.gov;waterfordfoundation.org;matrixbcg.com","srcUrls":["https://www.linncountyiowa.gov/DocumentCenter/View/27657/Loudoun-County---Data-Center-Capital---A-Strategy-for-a-Changing-Paradigm---energy","https://www.waterfordfoundation.org/transmission-lines/","https://matrixbcg.com/blogs/brief-history/digitalrealty"],"band":"10-25 MW"},{"id":"3947f0a45f49","cid":"3947f0a45f49","canon":1,"dups":1,"ftype":"data_center","name":"44621 WAXPOOL RD","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":88,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Kaveh Ventures","oy":2019,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"38137225c842","cid":"38137225c842","canon":1,"dups":1,"ftype":"data_center","name":"44790 PERFORMANCE CIR","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Standby Power Configuration: 4 x 3,000 kW diesel generators; Standby Power Redundancy N+1","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/44790-performance-cir-ca1eb64c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/44790-performance-cir-ca1eb64c"]},{"id":"fd2f5fef1227","cid":"fd2f5fef1227","canon":1,"dups":1,"ftype":"data_center","name":"45845 NOKES BLVD","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":4,"pc":"Grid","pconf":"High","pquote":"Power failure is protected by a redundant UPS system in N+1 configuration with a battery bank, and automatic transfer to standby diesel generators in the event there is a loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/cyxtera-sterling-data-center-iad1-b/","uquote":"Power Utility: Dominion Virginia Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Csquare","spon":"Brookfield Infrastructure Partners","deal":"Brookfield Infrastructure Partners acquired Cyxtera for $775 million, finalized on January 12, 2024. Evoque and Cyxtera merged and rebranded as Centersquare in April 2024, which then rebranded to Csquare in October 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;baxtel.com;ionanalytics.com","uscan":"https://www.baxtel.com/data-centers/centersquare-sterling-dc3","dealScan":"https://ionanalytics.com/intelligence/brookfield-explores-options-for-data-center-company-csquare/","srcUrls":["https://cloudandcolocation.com/datacenters/cyxtera-sterling-data-center-iad1-b/","https://www.baxtel.com/data-centers/centersquare-sterling-dc3","https://ionanalytics.com/intelligence/brookfield-explores-options-for-data-center-company-csquare/"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"e4e44ef6a9d9","cid":"e4e44ef6a9d9","canon":1,"dups":1,"ftype":"data_center","name":"6200 TECHNOLOGY BLVD","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Grid","pconf":"High","pquote":"Meta has worked closely with Dominion Energy and other partners to bring over 500MW of new renewable energy to the Virginia grid, and the Henrico campus is supported by 100 percent new solar energy sourced from the Commonwealth.","pscan":"https://www.vedp.org/case-study/meta-friends-virginia","uconf":"High","uquote":"Meta has worked closely with Dominion Energy and other partners to bring over 500MW of new renewable energy to the Virginia grid, and the Henrico campus is supported by 100 percent new solar energy sourced from the Commonwealth.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2017,"oy":2020,"deal":"Meta announced plans to establish a data center with an initial investment of $750 million in October 2017, expanding to over $1 billion.","dealScan":"https://richmondbizsense.com/2022/11/28/facebook-parent-meta-adding-to-henrico-footprint-with-code-named-project-tropical-data-center-development/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"vedp.org;richmondbizsense.com","srcUrls":["https://www.vedp.org/case-study/meta-friends-virginia","https://richmondbizsense.com/2022/11/28/facebook-parent-meta-adding-to-henrico-footprint-with-code-named-project-tropical-data-center-development/"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"420bfde9502d","cid":"420bfde9502d","canon":1,"dups":1,"ftype":"data_center","name":"7301 TECHNOLOGY BLVD","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 700 megawatts of new renewable energy in Virginia.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Henrico-Data-Center.pdf","uconf":"High","uquote":"We worked with Dominion Energy to meet our 100% clean and renewable energy goal for the Henrico Data Center.","uscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Henrico-Data-Center.pdf","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2017,"oy":2020,"deal":"Investment of over $1 billion—with more than $1.7 billion in cumulative construction costs, announced October 2017.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Henrico-Data-Center.pdf"],"band":"250+ MW"},{"id":"d15685d9576b","cid":"d15685d9576b","canon":1,"dups":1,"ftype":"data_center","name":"ABTEEN VENTURES LLC (CloudHQ)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":120,"proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"14-year contracts with minimum demand charges (85% for transmission, 85% for distribution, and 60% for generation) for large-load users (25 MW or more)","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/abteen-ventures-llc-cloudhq-ec33272d","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"ABTEEN VENTURES (CloudHQ)","spon":"CloudHQ","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/abteen-ventures-llc-cloudhq-ec33272d"],"band":"100-250 MW"},{"id":"7e0c3b24ebac","cid":"7e0c3b24ebac","canon":1,"dups":1,"ftype":"data_center","name":"ACC4 Digital Realty","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Incoming Electrical Service Type: Networked Power Grid.","pscan":"https://marketplace.upstack.com/data-centers/digital-realty-dft-data-center-ashburn-acc4","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2006,"oy":2007,"deal":"Aug 2017 - M&A - DFT ACC4. Digital Realty merges with DuPont Fabros Technology, adding 12 data centers to its portfolio.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"marketplace.upstack.com;loudoun.gov","srcUrls":["https://marketplace.upstack.com/data-centers/digital-realty-dft-data-center-ashburn-acc4","https://www.loudoun.gov/2674/Utilities"],"band":"25-50 MW"},{"id":"c0a92f5c5bdf","cid":"c0a92f5c5bdf","canon":1,"dups":1,"ftype":"data_center","name":"ACC5 ACC6 Digital Realty","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":62,"pc":"Grid","pconf":"High","pquote":"Networked Power Grid.","pscan":"https://marketplace.upstack.com/data-centers/digital-realty-dft-data-center-ashburn-acc5","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","oy":2009,"deal":"Digital Realty acquired DuPont Fabros, including ACC5 and ACC6, in August/September 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;interconnection.fyi","srcUrls":["https://marketplace.upstack.com/data-centers/digital-realty-dft-data-center-ashburn-acc5","https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89"],"band":"50-100 MW"},{"id":"a00523d05150","cid":"a00523d05150","canon":1,"dups":1,"ftype":"data_center","name":"ACC7 Digital Realty","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":41,"pc":"Grid","pconf":"High","pquote":"It is also the first data center built using the company's new data center design, which features a medium-voltage (4,160V) electrical distribution system and an isolated-parallel uninterruptible power supply topology, which enables the company to provide a wide range of space, cabinet layouts and power densities in the facility's 28 computer rooms.","pscan":"https://www.datacenterknowledge.com/business/dupont-fabros-brings-massive-ashburn-data-center-online","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","oy":2014,"deal":"Digital Realty acquires DuPont Fabros, adding 12 data centers to its portfolio (2016)","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/business/dupont-fabros-brings-massive-ashburn-data-center-online"],"band":"25-50 MW"},{"id":"4506049331b6","cid":"4506049331b6","canon":1,"dups":1,"ftype":"data_center","name":"Aerospace Data Facility - East","city":"Fort Belvoir","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"PJM serves as the grid operator for a 243,417- square-mile control area that covers all or parts of Delaware, Indiana, Illinois, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia, with a population of about 61 million.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/aerospace-data-facility-east-607de311","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"National Reconnaissance Office","spon":"U.S. Government","ay":2008,"oy":1977,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified legacy_facility_year_review","srcUrls":["https://www.interconnection.fyi/data-center/project/aerospace-data-facility-east-607de311"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"f73d816b0dd1","cid":"f73d816b0dd1","canon":1,"dups":1,"ftype":"data_center","name":"AID1 DataBank","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"18-acre campus, home to IAD1, IAD3, and IAD4 data centers with rich interconnection options and 70MW of utility substation power.","pscan":"https://www.databank.com/data-centers/northern-virginia/","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DataBank","spon":"IPI Partners, DigitalBridge, Swiss Life Asset Management AG, EDF Invest, Northleaf Capital Partners, Ardian","oy":2009,"deal":"DataBank's initial recapitalization led by Swiss Life Asset Management AG, EDF Invest, Northleaf Capital Partners and Ardian for $1.5 billion, closing August 30, 2022.","dealScan":"https://www.databank.com/resources/press-releases/databank-completes-first-phase-of-major-recapitalization/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"databank.com;loudoun.gov","srcUrls":["https://www.databank.com/data-centers/northern-virginia/","https://www.loudoun.gov/2674/Utilities","https://www.databank.com/resources/press-releases/databank-completes-first-phase-of-major-recapitalization/"],"band":"< 10 MW"},{"id":"a776a7d66d29","cid":"a776a7d66d29","canon":1,"dups":1,"ftype":"data_center","name":"ALIGNED DATA CENTER IAD01","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/aligned-data-center-iad01-2ec0a750","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/aligned-data-center-iad01-2ec0a750","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Data Centers","spon":"AI Infrastructure Partnership (AIP), MGX, BlackRock's Global Infrastructure Partners, Nvidia, Microsoft, xAI, Kuwait Investment Authority","oy":2019,"deal":"Aligned Data Centers acquired by a consortium of investors for approximately $40 billion (October 2025)","dealScan":"https://www.macquarie.com/au/en/about/news/2025/macquarie-asset-management-to-lead-sale-of-aligned-data-centers-at-an-enterprise-value-of-us-40-billion.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;macquarie.com","srcUrls":["https://www.interconnection.fyi/data-center/project/aligned-data-center-iad01-2ec0a750","https://www.macquarie.com/au/en/about/news/2025/macquarie-asset-management-to-lead-sale-of-aligned-data-centers-at-an-enterprise-value-of-us-40-billion.html"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"d47da45c4019","cid":"d47da45c4019","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":72,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","oy":2023,"deal":"Aligned Data Centers closed a $2.58 billion revolving credit facility in March 2026, backed by six data centers in its portfolio, including Northern Virginia.","dealScan":"https://www.datacenterknowledge.com/investing/aligned-data-centers-closes-on-credit-facility","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/investing/aligned-data-centers-closes-on-credit-facility"],"lflag":"source_quality_reclassified"},{"id":"d43f287b30e9","cid":"775a27be2277","canon":0,"dups":2,"ftype":"data_center","name":"Aligned Data Centers","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":180,"pc":"Grid","pconf":"High","pquote":"When complete, the 26-acre, 180 MW masterplanned data center campus will offer over 1 mm sq. ft. of space, ultimately drawing redundant, critical power from two diverse 230kV Dominion substations.","pscan":"https://aligneddc.com/wp-content/uploads/2025/10/Aligned-Ashburn-Case-Study.pdf","uquote":"When complete, the 26-acre, 180 MW masterplanned data center campus will offer over 1 mm sq. ft. of space, ultimately drawing redundant, critical power from two diverse 230kV Dominion substations.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Data Centers","spon":"Artificial Intelligence Infrastructure Partnership (BlackRock, Global Infrastructure Partners, MGX, Microsoft, NVIDIA)","ay":2019,"oy":2023,"deal":"Planned acquisition of all equity in Aligned by Artificial Intelligence Infrastructure Partnership for about $40 billion in 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"aligneddc.com","srcUrls":["https://aligneddc.com/wp-content/uploads/2025/10/Aligned-Ashburn-Case-Study.pdf"],"band":"100-250 MW"},{"id":"775a27be2277","cid":"775a27be2277","canon":1,"dups":2,"ftype":"data_center","name":"Aligned Data Centers","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":180,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"When complete, the 26-acre, 180 MW masterplanned data center campus will offer over 1 mm sq. ft. of space, ultimately drawing redundant, critical power from two diverse 230kV Dominion substations.","pscan":"https://aligneddc.com/wp-content/uploads/2025/10/Aligned-Ashburn-Case-Study.pdf","uconf":"High","uquote":"Power: Power is less expensive in Data Center Alley. Dominion Energy, the local power provider, charges data center companies rates 28% lower than the national average.","uscan":"https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","ay":2019,"deal":"Aligned Data Centers closed a $2.6 billion revolving credit facility in March 2026 to support U.S. data center expansion, including Northern Virginia. Additionally, a consortium led by BlackRock Inc.'s Global Infrastructure Partners agreed in 2025 to acquire Aligned Data Centers for $40 billion, with the acquisition expected to close later in 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aligneddc.com;digitalrealty.com","lflag":"online_before_announced","srcUrls":["https://aligneddc.com/wp-content/uploads/2025/10/Aligned-Ashburn-Case-Study.pdf","https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers"]},{"id":"4a0cd915b93e","cid":"4a0cd915b93e","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Data Centers IAD03","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":72,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Aligned's IAD-03 hyperscale data center campus is carrier-neutral and positioned atop fiber and conduit routes that offer access to one of the highest concentrations of high-capacity dark fiber providers, major long-haul fiber carriers, and international networks in the nation. The IAD‑03 Data Center, operated by Aligned Data Centers and located at 22715 Relocation Drive in Sterling, Virginia — in the heart of Northern Virginia's “Data Center Alley” — occupies a four-storey, purpose-built facility with approximately 430,000 sq ft of space and up to 72 MW of planned critical load capacity. Data Center Alley skews the entire PJM grid's growth rate and puts pressure on utilities and consumers across the region. – 3 MW back-up generators – 2 MW UPS line-ups – N+1 block redundant topology – 500 KVA PDUs – 415V distribution to racks (A+B distribution) – 100% Uptime SLA – Multiple network carriers in proximity to site.","pscan":"https://aligneddc.com/northern-virginia-data-centers/","uconf":"High","uquote":"PJM's public (but redacted) documentation on their proposed expanded grid, accessible from their website, mentions 'PJM's Data Center Planning Initiative' and calls out 'Northern Virginia's Dominion Data Center Alley' which “…will require major … reinforcements.” The Dominion Energy Data Center Team will optimize opportunities to maximize process efficiency.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Data Centers","spon":"Macquarie Asset Management","oy":2023,"deal":"Acquisition of Aligned Data Centers by a consortium including BlackRock, GIP, MGX, Microsoft, and NVIDIA for approximately $40 billion, announced October 15, 2025, expected to close H1 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"aligneddc.com","srcUrls":["https://aligneddc.com/northern-virginia-data-centers/"]},{"id":"8c8e32c94253","cid":"8c8e32c94253","canon":1,"dups":1,"ftype":"data_center","name":"Aligned Energy Data Center","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"The campus sits positioned atop fiber and conduit routes that offer access to more than 50 carriers in the immediate area. It is also among the few in the region that will draw critical power from multiple diverse 230kV substations for maximum redundancy.","pscan":"https://aligneddc.com/press-release/aligned-begins-construction-on-second-hyperscale-data-center-in-ashburn-va/","uconf":"High","uquote":"The campus sits positioned atop fiber and conduit routes that offer access to more than 50 carriers in the immediate area. It is also among the few in the region that will draw critical power from multiple diverse 230kV substations for maximum redundancy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Energy Data Centers","spon":"Aligned Energy Holdings L.P.","tenant":"Hyperscale, Cloud, Enterprise, Managed Service Providers","ay":2018,"oy":2019,"deal":"Secured credit facility of $495 million in October 2019","dealScan":"https://www.crn.com/news/data-center/aligned-energy-building-new-data-center-after-securing-495m","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aligneddc.com;crn.com","srcUrls":["https://aligneddc.com/press-release/aligned-begins-construction-on-second-hyperscale-data-center-in-ashburn-va/","https://www.crn.com/news/data-center/aligned-energy-building-new-data-center-after-securing-495m"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"b7e40872fa1c","cid":"b7e40872fa1c","canon":1,"dups":2,"ftype":"data_center","name":"Aligned Energy Data Centers (Ashburn), LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":180,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"When complete, the 26-acre, 180 MW masterplanned data center campus will offer over 1 mm sq. ft. of space, ultimately drawing redundant, critical power from two diverse 230kV Dominion substations.","pscan":"https://aligneddc.com/wp-content/uploads/2025/10/Aligned-Ashburn-Case-Study.pdf","uquote":"In Ashburn, Virginia, a high-stakes battle is brewing as families push back against Dominion Energy's proposed 165-foot transmission towers.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Energy Data Centers (Ashburn)","spon":"Macquarie Infrastructure Partners, BlueMountain Capital Management","ay":2018,"oy":2019,"deal":"Aligned completed a $1 billion senior secured credit facility, the first U.S. data center sustainability-linked financing, in September 2020.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"aligneddc.com;baxtel.com","srcUrls":["https://aligneddc.com/wp-content/uploads/2025/10/Aligned-Ashburn-Case-Study.pdf","https://baxtel.com/data-center/aligned-ashburn"],"uscan":"https://baxtel.com/data-center/aligned-ashburn","lflag":"duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized"},{"id":"876c0a1d30e2","cid":"b7e40872fa1c","canon":0,"dups":2,"ftype":"data_center","name":"ALIGNED ENERGY DATA CENTERS ASHBURN","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":180,"pc":"Grid","pconf":"High","pquote":"Upon completion, the campus offered over 1 million sq. ft. of space and drew redundant, critical power from two diverse 230kV Dominion substations.","pscan":"https://www.datacenterknowledge.com/cloud/aligned-expanding-to-n-virginia-with-plans-for-enormous-campus","uquote":"Utility Provider: Dominion Energy.","uscan":"https://baxtel.com/data-center/aligned-ashburn","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Aligned Energy Data Centers","spon":"Macquarie Infrastructure Partners, BlueMountain Capital Management","ay":2018,"oy":2019,"deal":"Aligned Closes $1 Billion Credit Facility and First-Ever U.S. Data Center Sustainability-Linked Financing (March 10, 2020)","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;baxtel.com","srcUrls":["https://www.datacenterknowledge.com/cloud/aligned-expanding-to-n-virginia-with-plans-for-enormous-campus","https://baxtel.com/data-center/aligned-ashburn"],"band":"100-250 MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"e9f01ea6a8d8","cid":"e9f01ea6a8d8","canon":1,"dups":1,"ftype":"data_center","name":"ALLEGRO SOUTH CAMPUS","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":48,"pc":"Grid","pconf":"High","pquote":"Yondr Group, a leading developer, owner and operator of hyperscale data centers, has completed the first ready for service (RFS) milestone of its second 48MW data center in Loudoun County, Northern Virginia.","pscan":"https://www.yondrgroup.com/newsroom/press-release/yondr-group-completes-first-rfs-milestone-for-second-building-at-96mw-northern-virginia-campus/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/allegro-north-campus-e7ad11bc","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Yondr Group","spon":"JK Land Holdings","ay":2021,"oy":2024,"deal":"Land acquisition of 270 acres in Loudoun and Prince William Counties in 2021. Partnership with JK Land Holdings, LLC.","dealScan":"https://www.yondrgroup.com/newsroom/press-release/yondr-group-completes-first-rfs-milestone-for-second-building-at-96mw-northern-virginia-campus/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"yondrgroup.com;interconnection.fyi","srcUrls":["https://www.yondrgroup.com/newsroom/press-release/yondr-group-completes-first-rfs-milestone-for-second-building-at-96mw-northern-virginia-campus/","https://www.interconnection.fyi/data-center/project/allegro-north-campus-e7ad11bc"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"62ffa0e49705","cid":"62ffa0e49705","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"ccbd20288364","cid":"ccbd20288364","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","uconf":"Medium","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2021,"contro":"Lawsuits filed by Gainesville residents concerned over noise and environmental effects of data centers.","controScan":"https://www.jdsupra.com/legalnews/amazon-s-billion-dollar-data-center-8270080/","deal":"Land acquisition: $52.4 million in April 2021 for 58.5 acres at 5945 Wellington Road, and $87.8 million in June 2022 for 58.5 acres at 5845 Wellington Road.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;jdsupra.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","https://www.jdsupra.com/legalnews/amazon-s-billion-dollar-data-center-8270080/"]},{"id":"e69a0d7f1dc3","cid":"e69a0d7f1dc3","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":50,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","oy":2017,"contro":"Opposition to transmission lines for the Amazon data center in Haymarket (near Gainesville) due to concerns about property value.","controScan":"https://www.datacenterknowledge.com/hyperscalers/amazon-data-center-project-in-virginia-stumbles-over-power-line-opposition","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;datacenterknowledge.com","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","https://www.datacenterknowledge.com/hyperscalers/amazon-data-center-project-in-virginia-stumbles-over-power-line-opposition"],"band":"50-100 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"7d08689067e3","cid":"7d08689067e3","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":50,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"contro":"The implementation of Prince William Digital Gateway, one of the largest data center developments in the world, has been debated in rural Gainesville for years. When the Prince William Board of County Supervisors approved the project in 2023, 11 local residents, backed by the Oak Valley Homeowners' Association, sought to block the development with lawsuits.","deal":"Amazon Data Services purchased a large Prince William County data center campus (Devlin Tech Park in Bristow, near Gainesville) for $700 million in November 2025.","dealScan":"https://northernvirginiamag.com/news/2025/11/04/amazon-buys-northern-virginia-data-center-site-for-record-700-million/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;northernvirginiamag.com","lflag":"online_before_announced,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-e6d4b441","https://northernvirginiamag.com/news/2025/11/04/amazon-buys-northern-virginia-data-center-site-for-record-700-million/"],"band":"50-100 MW"},{"id":"4be27238ff7e","cid":"4be27238ff7e","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Haymarket","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Utility Provider: Dominion Energy.","pscan":"https://baxtel.com/data-center/amazon-iad-195","uconf":"High","uquote":"Utility Provider: Dominion Energy.","uscan":"https://baxtel.com/data-center/amazon-iad-195","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2023,"contro":"Concerns over historical preservation and transmission line impact.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://baxtel.com/data-center/amazon-iad-195"]},{"id":"36c10123dc8f","cid":"36c10123dc8f","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Haymarket","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":50,"pc":"Grid","pconf":"High","pquote":"When utility Dominion Power proposed construction of a 230 kV transmission line and a new substation to serve the future data center, many local residents voiced strong opposition, fearing the transmission lines would bring property values in the area down.","pscan":"https://www.datacenterknowledge.com/infrastructure/data-center-power-transmission-bill-introduced-in-virginia","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-55-iad-64-iad-84-9666c549","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2023,"oy":2023,"contro":"Opposition to new power transmission lines and general community pushback against the 'Haymarket Amazon data center complex' leading to the creation of a Data Center Opportunity Zone Overlay District.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;interconnection.fyi","srcUrls":["https://www.datacenterknowledge.com/infrastructure/data-center-power-transmission-bill-introduced-in-virginia","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-55-iad-64-iad-84-9666c549"],"band":"50-100 MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"45aff9447c31","cid":"36c10123dc8f","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Haymarket","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":50,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-55-iad-64-iad-84-9666c549","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-55-iad-64-iad-84-9666c549","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","contro":"Community opposition due to 'chaos and misery' caused by the data center complex.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-55-iad-64-iad-84-9666c549"],"band":"50-100 MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"efd66fab3a16","cid":"efd66fab3a16","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Haymarket","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"To provide enough power for the future facility, code-named \"Midwood Center,\" utility Dominion Power needs to build a new substation and a transmission line.","uconf":"High","uquote":"To provide enough power for the future facility, code-named \"Midwood Center,\" utility Dominion Power needs to build a new substation and a transmission line.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2015,"oy":2023,"contro":"Community opposition regarding power lines, substations, and environmental impact.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"40b5e45e8dc0","cid":"edfb7d8f4c18","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":250,"pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-165-166-167-168-613-12f542c1","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2023,"deal":"Land acquisition by Amazon Data Services Inc. for $54 million in October 2020.","dealScan":"https://baxtel.com/data-center/amazon-iad-165","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"rmi.org;interconnection.fyi;baxtel.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-165-166-167-168-613-12f542c1","https://baxtel.com/data-center/amazon-iad-165"],"band":"250+ MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"baddb52aebae","cid":"edfb7d8f4c18","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uconf":"High","uquote":"Dominion Virginia Power (DVP) provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2019,"oy":2023,"deal":"Amazon Data Services Inc. paid $54 million for the 2.4 million-square-foot site at 13600 EDS Drive in a deal that closed Oct 2020.","dealScan":"https://baxtel.com/data-center/amazon-iad-165","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/amazon-iad-165"],"lflag":"source_quality_reclassified"},{"id":"dd530dd337fc","cid":"dd530dd337fc","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon","contro":"Fairfax County approved new zoning ordinances for data centers, including restrictions on size, distance from residential lots, and noise studies.","deal":"Amazon Data Services Inc. paid $54 million for the 2.4 million-square-foot site at 13600 EDS Drive in a deal that closed Oct 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rmi.org","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"]},{"id":"edfb7d8f4c18","cid":"edfb7d8f4c18","canon":1,"dups":4,"ftype":"data_center","name":"Amazon","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":250,"pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-165-166-167-168-613-12f542c1","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2020,"oy":2023,"deal":"Site acquisition by Amazon Data Services Inc. (Vadata) for $54 million in October 2020.","dealScan":"https://baxtel.com/data-center/amazon-iad-165","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-165-166-167-168-613-12f542c1","https://baxtel.com/data-center/amazon-iad-165"],"band":"250+ MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"7f0d66bbdd93","cid":"edfb7d8f4c18","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":250,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"oy":2023,"deal":"Amazon Data Services Inc. paid $54 million for the 2.4 million-square-foot site at 13600 EDS Drive in a deal that closed Oct 2020.","dealScan":"https://baxtel.com/data-center/amazon-iad-165","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/amazon-iad-165"],"band":"250+ MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"f92b8f22fd1a","cid":"f92b8f22fd1a","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/manassas-technology-partners-llc-amazon-548a200f","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/manassas-technology-partners-llc-amazon-548a200f","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","oy":2003,"contro":"Community opposition due to noise pollution from Amazon data centers in Manassas.","deal":"Amazon Data Services purchased the 7.66-acre data center campus at 7505 Mason King Court for $65 million on March 26, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/manassas-technology-partners-llc-amazon-548a200f"]},{"id":"3434420f1d41","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The energy Amazon buys flows onto the regional grid, not necessarily to the company's data centers, but the contracts allow Amazon to include this clean energy in their emissions accounting.","pscan":"https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2023,"contro":"Community opposition due to noise complaints from an Amazon data center in Manassas.","controScan":"https://www.wusa9.com/article/news/local/virginia/the-battle-over-data-centers-in-prince-william-county/65-96ba9976-18ae-41c2-b9e4-070a1e97391b","deal":"Amazon Data Services purchased a 7.66-acre data center campus at 7505 Mason King Court in Manassas for $65 million on March 26, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"thenation.com;interconnection.fyi;wusa9.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","https://www.interconnection.fyi/data-center/project/amazon-e4679582","https://www.wusa9.com/article/news/local/virginia/the-battle-over-data-centers-in-prince-william-county/65-96ba9976-18ae-41c2-b9e4-070a1e97391b"]},{"id":"e79eca36c490","cid":"e79eca36c490","canon":1,"dups":2,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market. Through an energy management services agreement DVP may provide PJM-related services to AWS. Such services will assist in the integration and administration of its renewable portfolio in the market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"oy":2023,"contro":"Community opposition due to noise pollution from Amazon Web Services data centers in Manassas.","controScan":"https://insideclimatenews.org/news/10022023/virginia-data-centers-amazon-prince-william-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"rmi.org;interconnection.fyi;insideclimatenews.org","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","https://insideclimatenews.org/news/10022023/virginia-data-centers-amazon-prince-william-county/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"5dd7b49642a3","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"One hyperscale data center, like those operated by Google, Amazon and Microsoft, can consume 100 megawatts of power continuously. That's enough to power around 16,500 homes in the U.S. And they need that energy nonstop: The data centers Dominion powers can only have 5 minutes and 42 seconds of down time per year, Dominion stated in the filing.","pscan":"https://www.whro.org/business-growth/2026-03-23/dominion-energy-says-data-centers-arent-raising-peoples-bills-energy-researchers-say-they-are","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"oy":2023,"contro":"Noise pollution protests from residents.","deal":"Amazon.com paid $65 million to purchase a 7.66-acre data center campus in Manassas on March 26.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"whro.org","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.whro.org/business-growth/2026-03-23/dominion-energy-says-data-centers-arent-raising-peoples-bills-energy-researchers-say-they-are"]},{"id":"4302e856a63a","cid":"4302e856a63a","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Dominion Energy provides grid power supplemented by massive renewable energy purchases, though the underlying generation mix remains heavily dependent on natural gas and nuclear.","pscan":"https://www.mmcginvest.com/post/aws-at-scale-inside-the-largest-private-infrastructure-buildout-the-world-has-ever-seen","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mmcginvest.com;interconnection.fyi","srcUrls":["https://www.mmcginvest.com/post/aws-at-scale-inside-the-largest-private-infrastructure-buildout-the-world-has-ever-seen","https://www.interconnection.fyi/data-center/project/amazon-e4679582"],"lflag":"merged_duplicate"},{"id":"4de98ce02154","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-e4679582"]},{"id":"99bc279d0b99","cid":"f92b8f22fd1a","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market. Through an energy management services agreement DVP may provide PJM-related services to AWS. Such services will assist in the integration and administration of its renewable portfolio in the market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP). Recently, RMI met with members of AWS to better understand how they are working together with Dominion Virginia Power (DVP) to help meet their renewable energy goals in Virginia. DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","oy":2003,"deal":"Amazon.com purchased a 7.66-acre data center campus for $65 million on March 26, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rmi.org","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"]},{"id":"f5af372de48d","cid":"f5af372de48d","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"56f107becddb","cid":"4302e856a63a","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","contro":"Noise complaints from nearby residents due to a vast Amazon Web Services data center.","controScan":"https://insideclimatenews.org/news/10022023/virginia-data-centers-amazon-prince-william-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;insideclimatenews.org","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-e4679582","https://insideclimatenews.org/news/10022023/virginia-data-centers-amazon-prince-william-county/"]},{"id":"1a2d94798b87","cid":"116c210c401d","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2023,"contro":"Noise pollution from Amazon data centers in Manassas has led to protests from residents in nearby communities.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"5fa34b7cc785","cid":"5fa34b7cc785","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia. Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2023,"contro":"Residents have protested noise pollution from Amazon data centers in Manassas, leading to complaints of migraines and anxiety. The Manassas City Council has approved a first reading of a zoning ordinance to tighten development rules for data centers due to noise, appearance, and proximity concerns near residential areas.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"39aec3938819","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Virginia is already home to the majority of U.S. data centers, with most of them being in Loudoun County and Manassas. Amazon Web Services owns or is developing many of them. About 70% of them are in Northern Virginia's “Data Center Alley.” Power demand in Virginia is growing by more than 5% annually and is expected to double in the next 15 years.","pscan":"https://threee60.com/amazon-and-dominion-power-team-up-to-build-small-nuclear-reactors-to-power-virginia-ai-data-centers/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"oy":2023,"contro":"Community opposition due to noise pollution and environmental concerns.","controScan":"https://www.fox5dc.com/news/manassas-residents-protest-over-noise-pollution-from-amazon-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"threee60.com;interconnection.fyi;fox5dc.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://threee60.com/amazon-and-dominion-power-team-up-to-build-small-nuclear-reactors-to-power-virginia-ai-data-centers/","https://www.interconnection.fyi/data-center/project/amazon-e4679582","https://www.fox5dc.com/news/manassas-residents-protest-over-noise-pollution-from-amazon-data-center"]},{"id":"438a5a4377a5","cid":"438a5a4377a5","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2019,"contro":"Noise complaints from nearby residents.","controScan":"https://insideclimatenews.org/news/10022023/virginia-data-centers-amazon-prince-william-county/","deal":"Amazon.com paid $65 million to purchase a 7.66-acre data center campus at 7505 Mason King Court on March 26, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"insideclimatenews.org","srcUrls":["https://insideclimatenews.org/news/10022023/virginia-data-centers-amazon-prince-william-county/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"05693f83bf1e","cid":"116c210c401d","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","oy":2016,"contro":"Noise pollution protests from local residents.","controScan":"https://baxtel.com/news/protests-over-amazon-s-manassas-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://baxtel.com/news/protests-over-amazon-s-manassas-data-center"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"271eb6716deb","cid":"271eb6716deb","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":20,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-7-iad-11-iad-24-5e845654","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-7-iad-11-iad-24-5e845654","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","oy":2009,"deal":"Amazon Data Services purchased the property at 7505 Mason King Court for $65 million on March 26, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-7-iad-11-iad-24-5e845654"],"band":"10-25 MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"ccb23a85be38","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy. Permit Status: Approved.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2019,"contro":"Noise complaints from nearby residents.","controScan":"https://insideclimatenews.org/news/10022023/virginia-data-centers-amazon-prince-william-county/","deal":"Amazon.com recently paid $65 million to purchase a 7.66-acre data center campus in Manassas, May 12, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"insideclimatenews.org","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://insideclimatenews.org/news/10022023/virginia-data-centers-amazon-prince-william-county/"]},{"id":"ec6ba499306c","cid":"ec6ba499306c","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"South Riding","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-9339f24b","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-9339f24b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2022,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-9339f24b"]},{"id":"745e7998fddd","cid":"745e7998fddd","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Springfield","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market. Through an energy management services agreement DVP may provide PJM-related services to AWS. Such services will assist in the integration and administration of its renewable portfolio in the market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-064-7e335cd7","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2021,"oy":2023,"deal":"AWS acquired two 111,000-square-foot office buildings at 7951 and 7961 Loisdale Road for $28 million from Loisdale 24 LLC.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;interconnection.fyi","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-064-7e335cd7"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"ecddacda399a","cid":"418c8e65a29d","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2021,"oy":2022,"contro":"Noise complaints from nearby residents, leading to Amazon retrofitting some sites with acoustic shrouds.","deal":"Amazon Data Services Inc. acquired a 33-acre data center campus at 45900 Pathfinder Plaza in Sterling for $135.75 million on June 24, 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9e3166b55db2","cid":"9e3166b55db2","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"9b1abcb0fc15","cid":"418c8e65a29d","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"It has access to 32.0 MW of power.","uquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rmi.org","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"],"lflag":"source_quality_reclassified"},{"id":"db6d44689ef8","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2020,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"]},{"id":"d61f6ebe35e3","cid":"d61f6ebe35e3","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2020,"oy":2022,"contro":"Loudoun County is experiencing community opposition due to the energy demands of data centers, including proposals for new transmission lines to support their growth.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rmi.org","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"f9b40e398f83","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-51f8b90e","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-51f8b90e","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-51f8b90e"]},{"id":"123c8c2f3337","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2020,"contro":"Complaints are common in Loudoun and Prince William counties, where some facilities sit within 200 feet of homes. Amazon has retrofitted some sites with acoustic shrouds, but the problem persists for many neighbors.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"]},{"id":"a564ce4b8269","cid":"d61f6ebe35e3","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market. Through an energy management services agreement DVP may provide PJM-related services to AWS. Such services will assist in the integration and administration of its renewable portfolio in the market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2020,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;interconnection.fyi","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"]},{"id":"629594e6197c","cid":"d61f6ebe35e3","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market. Through an energy management services agreement DVP may provide PJM-related services to AWS. Such services will assist in the integration and administration of its renewable portfolio in the market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2020,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;interconnection.fyi","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"],"lflag":"source_quality_reclassified"},{"id":"815edced9e2b","cid":"418c8e65a29d","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. DVP is a fully integrated utility, that either self generates and/or purchases electricity from others, and distributes it to its customers at a retail price approved by the Virginia State Corporation Commission (SCC). This includes selling the electricity to AWS for its data centers in northern Virginia.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2020,"oy":2022,"deal":"Amazon Data Services Inc. acquired TransDulles Centre 2 at 45900 Pathfinder Plaza for $135.75 million on June 24, 2024.","dealScan":"https://southernbusiness.com/amazon-data-center-arm-buys-sterling-campus-for-136m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;southernbusiness.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://southernbusiness.com/amazon-data-center-arm-buys-sterling-campus-for-136m/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"418c8e65a29d","cid":"418c8e65a29d","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market. Through an energy management services agreement DVP may provide PJM-related services to AWS. Such services will assist in the integration and administration of its renewable portfolio in the market. DVP's power mix today includes generation from both renewable and fossil fuel sources, but the ratio does not enable AWS to meet its ambitious renewable energy goals.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. A key requirement for data centers is access to large, stable electricity supplies, and Rizer says that the local utility, Dominion Energy, has been a crucial partner.","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2020,"oy":2022,"contro":"Community complaints regarding noise and environmental impacts from data centers in Loudoun County, including those operated by Amazon.","deal":"Amazon Data Services Inc. acquired the 33-acre TransDulles Centre 2 at 45900 Pathfinder Plaza in Sterling for $135.75 million on June 24, 2024.","dealScan":"https://southernbusiness.com/amazon-data-center-arm-buys-sterling-campus-for-136m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;southernbusiness.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://southernbusiness.com/amazon-data-center-arm-buys-sterling-campus-for-136m/"],"band":"25-50 MW","lflag":"merged_duplicate"},{"id":"d60158b86843","cid":"d60158b86843","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"It has access to 32.0 MW of power. Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","uquote":"Grid Operator: Dominion Energy. the vast majority of those facilities served by Dominion Energy.","uscan":"https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon AWS","spon":"Amazon","tenant":"Amazon AWS","contro":"Community opposition and regulatory pushback against data center expansion in Loudoun County due to environmental impact and infrastructure strain.","controScan":"https://engage.erm.com/novareliability/page/project","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;amperon.co;engage.erm.com","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-522a7c34","https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","https://engage.erm.com/novareliability/page/project"],"band":"25-50 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"0fe165b26683","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2020,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"]},{"id":"04f4f6deda26","cid":"418c8e65a29d","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-4229f7ab","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-4229f7ab","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-4229f7ab"],"band":"25-50 MW"},{"id":"ad0a3114cdfd","cid":"730d1f100de0","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"it is the hulking buildings powered by heavy transmission lines that criss-cross farmlands and ferry power generated by natural gas. Dominion Energy, the local utility in Virginia, disclosed that data centers there drew 2.8 gigawatts of electricity in 2022.","pscan":"https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-62-68-81-83-93-609-61-726685e7","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2022,"oy":2022,"contro":"Northern Virginia is grappling with the environmental effects of a booming data-center empire, including concerns about power infrastructure and community impact.","controScan":"https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"thenation.com;interconnection.fyi","srcUrls":["https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-62-68-81-83-93-609-61-726685e7"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"59fdf076b75a","cid":"59fdf076b75a","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW. Substations that step down this power for data halls are typically sized between 100 and 300 MW each.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility.","uscan":"https://frontiermap.substack.com/p/the-demand-shift","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"frontiermap.substack.com","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift"],"band":"25-50 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"f71b464803c1","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.... The vast majority of those facilities served by Dominion Energy. That is not a regional story. That is a global infrastructure story playing out on one grid, in one load zone.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity citation_artifact_removed","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"]},{"id":"fa5bb140d8bb","cid":"fa5bb140d8bb","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"There are two main utility companies in Virginia, both of which are Investor Owned Utilities (IOUs), meaning they're private for-profit companies: Dominion Virginia Power....Dominion Energy.","uscan":"https://www.energysage.com/local-data/electricity-cost/va/loudoun-county/sterling/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"energysage.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified,merged_duplicate","srcUrls":["https://www.energysage.com/local-data/electricity-cost/va/loudoun-county/sterling/"]},{"id":"c42a7e5faeb1","cid":"418c8e65a29d","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2017,"contro":"Concerns over generator pollution and broader environmental impact of data center expansion.","deal":"AWS purchased TransDulles Centre 2 complex for $135.8 million on July 23, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"8b9fb89c35d0","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2020,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"]},{"id":"41e9b7dd1221","cid":"730d1f100de0","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-acc2ffed","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2020,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-acc2ffed"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"d75f231e3334","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2020,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"]},{"id":"39d07dd91e6c","cid":"39d07dd91e6c","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Stevenburg","county":"Culpeper","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-060-979dacf1","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-060-979dacf1","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"oy":2023,"contro":"Community opposition regarding rezoning of agricultural land, impact on historic resources, and environmental concerns.","controScan":"https://www.battlefields.org/preserve/speak-out/fight-against-development-threats-culpeper-county","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;battlefields.org","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-060-979dacf1","https://www.battlefields.org/preserve/speak-out/fight-against-development-threats-culpeper-county"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"846a19e046b0","cid":"846a19e046b0","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Warrenton","county":"Fauquier","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"It is estimated that the proposed Amazon data center at Blackwell Road will consume approximately 40 MW of power on a 24/7 basis (roughly 345,600,000 kWh per year) from Dominion's grid.","pscan":"https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","uquote":"Then in late March 2022, Dominion Energy shared plans to build a new substation at the Amazon site and then bring a new 230-kV transmission line into that substation in order to serve the proposed data center.","uscan":"https://www.pecva.org/warrenton-transmission-line/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2021,"contro":"Significant community opposition, lawsuits, and regulatory pushback regarding the data center's approval, noise, and associated power lines.","controScan":"https://baxtel.com/data-center/amazon-warrenton-va","deal":"Amazon Web Services, Inc. purchased a 42-acre parcel at 719 Blackwell Road in September 2021 for nearly $40 million.","dealScan":"https://baxtel.com/data-center/amazon-warrenton-va","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"pecva.org;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","https://www.pecva.org/warrenton-transmission-line/","https://baxtel.com/data-center/amazon-warrenton-va"]},{"id":"470eebb24329","cid":"470eebb24329","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"6848916a0b97","cid":"6848916a0b97","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Aldie","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Once Amazon and other companies announce plans for new data centers, regional energy providers are required to meet that demand. In a 2023 proposal, regional power company Dominion said the increasing energy demand in the region was “driven primarily by data centers.”","pscan":"https://baxtel.com/data-center/amazon-iad124","uconf":"High","uquote":"Dominion, the utility monopoly in the region, and Blue Ridge Group, a company acting on Amazon's behalf, have apparently managed to come up with a solution Loudoun County supervisors found satisfactory.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2022,"contro":"Community opposition to power line construction for Amazon data centers in Loudoun County.","deal":"Amazon Data Services, Inc. acquired 56.7 acres and two powered shells at 24214 and 24244 Quail Ridge Lane in Aldie for $146 million on December 30, 2021.","dealScan":"https://baxtel.com/data-center/amazon-iad124","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://baxtel.com/data-center/amazon-iad124"]},{"id":"8ee0345e8d0c","cid":"8ee0345e8d0c","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Aldie","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2023,"contro":"Community opposition to power lines and general data center development impacts.","deal":"Land acquisition for $146M on December 30, 2021","dealScan":"https://baxtel.com/data-center/amazon-iad124","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;baxtel.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://baxtel.com/data-center/amazon-iad124"]},{"id":"0a832d9f2a16","cid":"0a832d9f2a16","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Aldie","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"But for the residents of northern Virginia's Data Center Alley, “the cloud” is not some abstract omnipresence or a crisp virtual model; it is the hulking buildings powered by heavy transmission lines that criss-cross farmlands and ferry power generated by natural gas.","pscan":"https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","uconf":"High","uquote":"Dominion, the utility monopoly in the region, and Blue Ridge Group, a company acting on Amazon's behalf, have apparently managed to come up with a solution Loudoun County supervisors found satisfactory.","uscan":"https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon.com","tenant":"Amazon Web Services","oy":2022,"contro":"Community opposition regarding environmental effects and visual impact.","deal":"Acquisition of 56.7 acres of land and two powered shells for $146 million on December 30, 2021.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"thenation.com;datacenterknowledge.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted"]},{"id":"9fa3207c3e9e","cid":"9fa3207c3e9e","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Aldie","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"But for the residents of northern Virginia's Data Center Alley, “the cloud” is not some abstract omnipresence or a crisp virtual model; it is the hulking buildings powered by heavy transmission lines that criss-cross farmlands and ferry power generated by natural gas.","pscan":"https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-124-125-126-127-b9b0fdeb","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon","ay":2023,"oy":2023,"contro":"Noise complaints from cooling fans and inclusion in a 2020 lawsuit alleging real estate fraud.","deal":"Acquisition of 56.7 acres of land and two powered shells for $146 million on December 30, 2021.","dealScan":"https://baxtel.com/data-center/amazon-iad124","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"thenation.com;interconnection.fyi;baxtel.com","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified,merged_duplicate","srcUrls":["https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-124-125-126-127-b9b0fdeb","https://baxtel.com/data-center/amazon-iad124"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"3b6c942a9d31","cid":"899ff10ae922","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a0198f59","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a0198f59","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"VADATA","tenant":"Amazon Web Services","ay":2006,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a0198f59"]},{"id":"899ff10ae922","cid":"899ff10ae922","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility. DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a0198f59","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2006,"oy":2013,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;interconnection.fyi","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-a0198f59"],"lflag":"merged_duplicate"},{"id":"25fb14dd4101","cid":"4755d4b70775","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Loudoun County, Virginia, known within the industry as Data Center Alley, currently consumes approximately 5.3 GW of electricity, a significant increase from about 2 GW in 2021. This level of demand is equivalent to the output of five large nuclear reactors, all concentrated within a single county northwest of Washington, D.C. Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500... Thus, even data centers located next to large reactors ultimately rely on grid-based power delivery.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a0198f59","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2006,"oy":2013,"contro":"Loudoun County officials were \"blindsided\" by Amazon's acquisition of the George Washington University campus in Ashburn for data center development, with local leaders bracing to fight the addition of one more data center.","deal":"Amazon Data Services acquired a 122-acre campus in Northern Virginia's Loudoun County from George Washington University for $427 million in March 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"frontiermap.substack.com;interconnection.fyi","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift","https://www.interconnection.fyi/data-center/project/amazon-a0198f59"]},{"id":"a3a9ea214ef7","cid":"e1fedf286d16","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Future / Expansion","mw":45,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Additionally, the project will feature EV charging stations, a bird-friendly building design and 67 acres of open green space with walking trails for public use. Diesel backup generators at the data center are designed to reduce particulate matter and noxious emissions by 90%.","uconf":"High","uquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Penzance","tenant":"Amazon Web Services (AWS)","ay":2025,"oy":2027,"contro":"Community opposition regarding environmental impact, noise, water use, and transparency during the approval process.","controScan":"https://www.ffxnow.com/2024/01/22/fairfax-county-board-to-hold-public-hearing-on-chantilly-data-center-proposal-amid-opposition/","deal":"$100 million in construction financing secured by Penzance in October 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;ffxnow.com","lflag":"status_adjusted_future_expansion source_quality_reclassified","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.ffxnow.com/2024/01/22/fairfax-county-board-to-hold-public-hearing-on-chantilly-data-center-proposal-amid-opposition/"],"rawStatus":"Operational"},{"id":"416a18622a5f","cid":"9f7235c36852","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-134-135-136-2f43ba92","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-134-135-136-2f43ba92","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2022,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-134-135-136-2f43ba92"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"3ccf0c1ebb48","cid":"9f7235c36852","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon AWS","oy":2022,"deal":"Land acquisition at 3980 Virginia Mallory Dr in Chantilly in 2021, including 14501 and 14721 Avion Parkway sites for $55.9 million.","dealScan":"https://baxtel.com/data-center/amazon-3980-virginia-mallory-dr","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://baxtel.com/data-center/amazon-3980-virginia-mallory-dr"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"87c029d37345","cid":"e1fedf286d16","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Future / Expansion","mw":45,"pc":"Grid","pconf":"High","pquote":"The facility will use minimal water and rely on outside air for cooling for 95% of the year, according to Josh Weissman, director of data center delivery for AWS. Additionally, the project will feature EV charging stations, a bird-friendly building design and 67 acres of open green space with walking trails for public use. Diesel backup generators at the data center are designed to reduce particulate matter and noxious emissions by 90%.","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-96dc1dec","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Penzance","tenant":"Amazon Web Services (AWS)","oy":2027,"deal":"Penzance secured $100 million in construction financing in October","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"status_adjusted_future_expansion","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-96dc1dec"],"band":"25-50 MW","rawStatus":"Operational"},{"id":"87ea34ca5001","cid":"87ea34ca5001","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"GS-5 rate class, 14-year commitments (effective January 2027)","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"5f24bd101afc","cid":"5f24bd101afc","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2025,"oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888"],"band":"250+ MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"b224b68f9faf","cid":"b224b68f9faf","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Approval of the project to build 1.75 million square feet of data center space on a 100-acre site just south of the Dulles International Airport, in Loudoun County, hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line some local residents (and a county supervisor) were opposed to.","uconf":"High","uquote":"Approval of the project to build 1.75 million square feet of data center space on a 100-acre site just south of the Dulles International Airport, in Loudoun County, hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line some local residents (and a county supervisor) were opposed to.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2020,"contro":"Local residents and a county supervisor opposed the building of a power line to the site.","deal":"Land acquisition by Amazon subsidiary for $73 million in early 2020.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"94b97e404033","cid":"94b97e404033","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"15c9f85292ba","cid":"e1fedf286d16","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Future / Expansion","mw":45,"pc":"Grid","pconf":"High","pquote":"Backup generators are in place to ensure continuity for essential services. Diesel backup generators at the data center are designed to reduce particulate matter and noxious emissions by 90%.","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Penzance","tenant":"Amazon Web Services (AWS)","oy":2027,"deal":"Penzance secured $100 million in construction financing in October.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text status_adjusted_future_expansion","band":"25-50 MW","rawStatus":"Operational","srcUrls":null,"srcDom":null},{"id":"603a1d0b5404","cid":"33eca722bdd4","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"021afdb74356","cid":"e1fedf286d16","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Future / Expansion","mw":45,"pc":"Grid","pconf":"High","pquote":"The facility will use minimal water and rely on outside air for cooling 95% of the year. Backup generators are in place to ensure continuity for essential services.","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Penzance","tenant":"Amazon Web Services (AWS)","ay":2025,"oy":2027,"deal":"$100 million in construction financing (October 2025)","dealScan":"https://northernvirginiamag.com/news/2025/11/25/penzance-breaks-ground-on-new-amazon-data-center-in-chantilly/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"loudoun.gov;northernvirginiamag.com","lflag":"status_adjusted_future_expansion","srcUrls":["https://www.loudoun.gov/2674/Utilities","https://northernvirginiamag.com/news/2025/11/25/penzance-breaks-ground-on-new-amazon-data-center-in-chantilly/"],"band":"25-50 MW","rawStatus":"Operational"},{"id":"8e518954c061","cid":"9f7235c36852","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2025,"oy":2025,"contro":"Loudoun County's 2025 decision to remove by-right zoning for data centers marked a major turning point for the industry, requiring additional approvals and slowing expansion.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-156-iad-157-iad-158-i-8cba7888"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"33eca722bdd4","cid":"33eca722bdd4","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"9f7235c36852","cid":"9f7235c36852","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"The facility will utilize air-cooled systems and rooftop HVAC units.... Backup generators are in place to ensure continuity for essential services.","uquote":"Dominion, the utility monopoly in the region, and Blue Ridge Group, a company acting on Amazon's behalf, have apparently managed to come up with a solution Loudoun County supervisors found satisfactory.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon AWS","contro":"Loudoun County has experienced community opposition to data center development, particularly regarding power line infrastructure and general impacts, leading to updated regulations.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text citation_artifact_removed,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"0c1f6b368e56","cid":"0c1f6b368e56","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Elkwood","county":"Culpeper","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Rappahannock Electric Cooperative.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-fa27849c","uconf":"High","uquote":"Grid Operator. Rappahannock Electric Cooperative.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-fa27849c","ukey":"40228|VA","uname":"Rappahannock Electric Coop","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2008,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-fa27849c"]},{"id":"1226c3b10bc6","cid":"1226c3b10bc6","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services - DCA-51","city":"Warrenton","county":"Fauquier","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Then in late March 2022, Dominion Energy shared plans to build a new substation at the Amazon site and then bring a new 230-kV transmission line into that substation in order to serve the proposed data center.","pscan":"https://www.pecva.org/warrenton-transmission-line/","uconf":"High","uquote":"Then in late March 2022, Dominion Energy shared plans to build a new substation at the Amazon site and then bring a new 230-kV transmission line into that substation in order to serve the proposed data center.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","ay":2021,"contro":"Community opposition, lawsuit, and concerns over power lines and visual impact.","controScan":"https://baxtel.com/data-center/amazon-warrenton-va","deal":"Land acquisition: Amazon Web Services, Inc. purchased a 42-acre parcel at 719 Blackwell Road for nearly $40 million in September 2021.","dealScan":"https://baxtel.com/data-center/amazon-warrenton-va","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"pecva.org;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.pecva.org/warrenton-transmission-line/","https://baxtel.com/data-center/amazon-warrenton-va"]},{"id":"2248568639c8","cid":"2248568639c8","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services (IAD-130, IAD-131, IAD-313 and DCA-072))","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Amazon's applications indicate the development of seven electrical substations in collaboration with Dominion Energy and Rappahannock Electric Cooperative. This power infrastructure is important for powering the massive data center activities.","pscan":"https://www.renderexpo.com/post/how-amazon-s-massive-virginia-data-center-campus-is-shaping-the-future-of-infrastructure-and-design","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2023,"contro":"Local businesses and residents in Manassas have raised concerns about the impacts of Amazon Web Services data center construction on their operations, including constant humming sounds causing anxiety and migraines.","deal":"Amazon Data Services purchased a leased data center at 7505 Mason King Court in Manassas, Virginia, for $65 million from an affiliate of Menlo Equities.","dealScan":"https://baxtel.com/news/data-centers/amazon-iad-130","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"renderexpo.com;interconnection.fyi;baxtel.com","srcUrls":["https://www.renderexpo.com/post/how-amazon-s-massive-virginia-data-center-campus-is-shaping-the-future-of-infrastructure-and-design","https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","https://baxtel.com/news/data-centers/amazon-iad-130"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"cbe283ef5a03","cid":"cbe283ef5a03","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services IAD-215","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-215-09984a7e","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-215-09984a7e","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-215-09984a7e"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"ea1517b5289d","cid":"ea1517b5289d","canon":1,"dups":4,"ftype":"data_center","name":"AMAZON DATA SERVICES INC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The Devlin Tech Park can hold up to 3.5 million square feet of data centers and up to three substations.... Grid Operator. Dominion Energy.","pscan":"https://www.credaily.com/briefs/data-center-deal-amazon-buys-virginia-land-for-700m/","uconf":"High","uquote":"Grid Operator. Dominion Energy.... In the PJM 2022 Load Forecast Report, Dominion requested that PJM consider a forecast adjustment to account for the growth of data centers in northern Virginia.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"contro":"Community opposition and legal challenges regarding rezoning for data center development.","deal":"Amazon Data Services purchased the Devlin Tech Park site for $700 million in November 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"credaily.com","lflag":"online_before_announced operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.credaily.com/briefs/data-center-deal-amazon-buys-virginia-land-for-700m/"]},{"id":"834eab7a6c5d","cid":"ea1517b5289d","canon":0,"dups":4,"ftype":"data_center","name":"AMAZON DATA SERVICES INC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. DVP is a fully integrated utility, that either self generates and/or purchases electricity from others, and distributes it to its customers at a retail price approved by the Virginia State Corporation Commission (SCC). This includes selling the electricity to AWS for its data centers in northern Virginia. Grid Operator: Dominion Energy.","uquote":"Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP). Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2016,"contro":"Residents have reported noise complaints from operational Amazon data centers and there is broader community opposition to Amazon's data center expansion in Prince William County, leading to political upsets and legal battles over rezoning.","controScan":"https://northernvirginiamag.com/news/2025/11/04/amazon-buys-northern-virginia-data-center-site-for-record-700-million/","deal":"Amazon Data Services purchased approximately 70 percent of the 270-acre Devlin Technology Park in Bristow, Prince William County, for $700 million in November 2025, after the site was rezoned for data center use in November 2023.","dealScan":"https://therealdeal.com/national/washington-dc/2025/11/04/amazon-drops-historic-sum-on-virginia-data-center-site/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"therealdeal.com;northernvirginiamag.com","lflag":"operational_null_capacity","srcUrls":["https://therealdeal.com/national/washington-dc/2025/11/04/amazon-drops-historic-sum-on-virginia-data-center-site/","https://northernvirginiamag.com/news/2025/11/04/amazon-buys-northern-virginia-data-center-site-for-record-700-million/"]},{"id":"e78585ac6857","cid":"ea1517b5289d","canon":0,"dups":4,"ftype":"data_center","name":"AMAZON DATA SERVICES INC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The operational and planning functions of Dominion Energy's electric transmission system are provided by PJM Interconnection, a regional transmission organization (RTO).","pscan":"https://www.dominionenergy.com/about/delivering-energy/electric-transmission-access","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"dominionenergy.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.dominionenergy.com/about/delivering-energy/electric-transmission-access"]},{"id":"5d1c55385d99","cid":"5d1c55385d99","canon":0,"dups":1,"ftype":"data_center","name":"AMAZON DATA SERVICES INC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-e4679582","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-e4679582"]},{"id":"a7cc040c0e7a","cid":"ea1517b5289d","canon":0,"dups":4,"ftype":"data_center","name":"AMAZON DATA SERVICES INC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-10cd27c9","uconf":"High","uquote":"Grid Operator: Dominion Energy. Dominion Virginia Power (DVP) provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;rmi.org","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-10cd27c9","https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"]},{"id":"82053a359b72","cid":"82053a359b72","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - DCA-060","city":"Stevensburg","county":"Culpeper","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"For the Amazon project in Culpeper, Dominion is seeking approval from the State Corporation Commission to build a 230 kV transmission line and substation to power the data center campus, according to Steve Precker, an electric transmission communications consultant with Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","oy":2023,"contro":"Community opposition and planning commission denial of rezoning application due to concerns over loss of farmland, harm to historic viewsheds, and lack of information on power and water usage.","controScan":"https://starexponent.com/agriculture/culpeper-county-planners-narrowly-deny-amazon-data-center-rezoning/article_d9e748c1-665c-5e76-9c91-48ad21df279c.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"starexponent.com","srcUrls":["https://starexponent.com/agriculture/culpeper-county-planners-narrowly-deny-amazon-data-center-rezoning/article_d9e748c1-665c-5e76-9c91-48ad21df279c.html"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"a90538f77431","cid":"a90538f77431","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - DCA-064","city":"Springfield","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-064-7e335cd7","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-064-7e335cd7","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-064-7e335cd7"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"ebfa183ec6be","cid":"ebfa183ec6be","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - IAD - 500/501","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Amazon Data Services, Inc. (Amazon) is applying to the Virginia Department of Environmental Quality (VDEQ) for a minor New Source Review (NSR) permit to install 72 stationary engine-generators and 2 transitory generators at a new site in Fairfax County, Virginia, the IAD-500 and IAD-501 data centers.... Amazon's data centers are an important class of infrastructure and are designed and built for resilience requiring on-site emergency back-up power generation.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.... DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon","ay":2021,"oy":2025,"contro":"Fairfax County approved new zoning ordinances for data centers, including restrictions on size, proximity to residential areas, and noise studies, due to concerns about environmental and neighborhood impacts.","controScan":"https://northernvirginiamag.com/news/2024/10/01/amazon-to-occupy-massive-future-data-center-campus-in-fairfax-county/","deal":"Starwood Capital Group acquired the property in 2019 for $134.1 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"northernvirginiamag.com","srcUrls":["https://northernvirginiamag.com/news/2024/10/01/amazon-to-occupy-massive-future-data-center-campus-in-fairfax-county/"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"2d07d3061500","cid":"2d07d3061500","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - IAD - 550 Louisa REB","city":"Mineral","county":"Louisa","state":"VA","lat":37.972704,"lng":-77.959795,"cprec":"distinct","status":"Operational","mw":420,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-550-louisa-reb-52144c43","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-550-louisa-reb-52144c43","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services","ay":2023,"oy":2025,"deal":"$11 billion investment by Amazon Web Services in Louisa County by 2040, announced August 30, 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-550-louisa-reb-52144c43"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"fffd9a8f7b3f","cid":"fffd9a8f7b3f","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - IAD-104/105/106","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-104-105-106-86e7ab23","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-104-105-106-86e7ab23","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-104-105-106-86e7ab23"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"d80aafa56097","cid":"d80aafa56097","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - IAD-134/135/136","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2022,"oy":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"9ea2e63d50fb","cid":"9ea2e63d50fb","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - IAD-163/164/174","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"017d0ed0984e","cid":"017d0ed0984e","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - IAD-165/166/167/168/613","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-165-166-167-168-613-12f542c1","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-165-166-167-168-613-12f542c1","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2023,"deal":"Site acquisition by Amazon Data Services Inc. (Vadata) for $54 million in October 2020.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-165-166-167-168-613-12f542c1"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"45a672bbf1cc","cid":"45a672bbf1cc","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - IAD-180","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-180-3a16e931","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-180-3a16e931","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-180-3a16e931"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"d271bc35f950","cid":"d271bc35f950","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc - IAD-667, IAD-668, IAD-669, IAD-670, and IAD-671","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-667-iad-668-iad-669-i-c0a2033a","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2025,"oy":2025,"contro":"Loudoun County eliminated by-right data center development, requiring special exception approval due to community concerns. Earlier projects faced opposition regarding power line construction.","deal":"Amazon and Dominion Energy signed an agreement in October 2024 to explore the development of Small Modular Reactor (SMR) nuclear projects in Virginia, aiming to bring at least 300 megawatts of power to the region.","dealScan":"https://www.aboutamazon.com/news/sustainability/amazon-nuclear-small-modular-reactor-net-carbon-zero","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"rmi.org;interconnection.fyi;aboutamazon.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-667-iad-668-iad-669-i-c0a2033a","https://www.aboutamazon.com/news/sustainability/amazon-nuclear-small-modular-reactor-net-carbon-zero"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"f8f7955dbbae","cid":"f8f7955dbbae","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc IAD-120/121/122","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-120-121-122-29fd53de","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-120-121-122-29fd53de","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2024,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-120-121-122-29fd53de"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"f30b63dcc751","cid":"f30b63dcc751","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc IAD-124/125/126/127","city":"Aldie","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"6d3dd220048e","cid":"6d3dd220048e","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc IAD-156 IAD-157 IAD-158 IAD-159 IAD-327","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"3ca5fcf70dc7","cid":"3ca5fcf70dc7","canon":1,"dups":1,"ftype":"data_center","name":"Amazon IAD Data Center Cluster — Ashburn, VA","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia....DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia....Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2024,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rmi.org","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"],"rawName":"Amazon Data Services Inc IAD-161, IAD-162, IAD-606, IAD-285, IAD-286, IAD-299, IAD-611","lflag":"display_name_normalized citation_artifact_removed utility_alias_corrected source_quality_reclassified","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"fc037d57dc13","cid":"fc037d57dc13","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc IAD-169/179","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-169-179-84134100","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-169-179-84134100","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2024,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-169-179-84134100"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"3aa9e3f2c2c3","cid":"3aa9e3f2c2c3","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc IAD-195/196/197/198","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-195-196-197-198-fef89e74","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-195-196-197-198-fef89e74","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2025,"oy":2025,"contro":"Residents in Northern Virginia, including Gainesville in Prince William County, have voiced concerns and filed lawsuits regarding noise and environmental effects of data centers, following a Board of County Supervisors vote to approve a data center complex.","controScan":"https://www.jdsupra.com/legalnews/amazon-s-billion-dollar-data-center-8270080/","deal":"Amazon Data Services purchased approximately 188.5 acres in Devlin Technology Park, Prince William County, for $700 million from Stanley Martin Homes, with the deal closing on November 5, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;jdsupra.com","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-195-196-197-198-fef89e74","https://www.jdsupra.com/legalnews/amazon-s-billion-dollar-data-center-8270080/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"300a19b0cbb7","cid":"300a19b0cbb7","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc IAD-205/307/317/612/612x","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-205-307-317-612-612x-37205b49","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-205-307-317-612-612x-37205b49","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2025,"oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-205-307-317-612-612x-37205b49"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"7c41fe84de25","cid":"7c41fe84de25","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc IAD-210/211","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-210-211-150b62d9","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-210-211-150b62d9","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon","oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-210-211-150b62d9"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"f757de5afaaa","cid":"f757de5afaaa","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc IAD-350","city":"Stafford","county":"Stafford","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia. DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uquote":"Grid Operator: Dominion Energy Virginia. Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2025,"deal":"Stafford Supervisors approved an incentive agreement with Amazon for $6 billion in investments, approved January 3, 2024.","dealScan":"https://www.youtube.com/watch?v=BP3xnBS75JE","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;youtube.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.youtube.com/watch?v=BP3xnBS75JE"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"0c165d2cdd9b","cid":"0c165d2cdd9b","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services Inc. IAD450 Cosner Tech Campus","city":"Fredericksburg","county":"Spotsylvania","state":"VA","lat":38.182431,"lng":-77.657226,"cprec":"shared_centroid","status":"Future / Expansion","mw":450,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The Cosner site will have two substations; neither are visible from the road. Asked about concerns expressed by many citizens about the amount of power data centers draw, an Amazon representative noted that the company is making significant investments in Virginia to strengthen energy production. This includes installing solar sites, which help make the grid cleaner, and in the near future using small modular nuclear reactors.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad450-cosner-tech-campus-d7aec6da","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2029,"contro":"Community opposition regarding noise, water, and visual impact; regulatory enforcement action for environmental violations.","deal":"Amazon has invested over $480 million in its Cosner Tech campus.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"utility_alias_corrected status_adjusted_future_expansion source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad450-cosner-tech-campus-d7aec6da"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","rawStatus":"Operational"},{"id":"14bdbc2e70fa","cid":"14bdbc2e70fa","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc.","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"d2034e47446f","cid":"d2034e47446f","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-14 IAD-52 IAD-59","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-14-iad-52-iad-59-6b3f0f4e","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-14-iad-52-iad-59-6b3f0f4e","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VADATA","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2014,"oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-14-iad-52-iad-59-6b3f0f4e"],"rawName":"Amazon Data Services, Inc.  IAD-14 IAD-52 IAD-59","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"233f66953d21","cid":"233f66953d21","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-90 IAD-91 IAD-92","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-90-iad-91-iad-92-d3c8ee4d","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2024,"oy":2024,"deal":"Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.","dealScan":"https://baxtel.com/data-center/amazon-iad-90","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"rmi.org;interconnection.fyi;baxtel.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-90-iad-91-iad-92-d3c8ee4d","https://baxtel.com/data-center/amazon-iad-90"],"rawName":"Amazon Data Services, Inc.  IAD-90 IAD-91 IAD-92","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"268597250257","cid":"268597250257","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD 50 IAD 60 IAD-71 IAD-78 IAD-79 IAD-80","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-50-iad-60-iad-71-iad--8aa2285d","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-50-iad-60-iad-71-iad--8aa2285d","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-50-iad-60-iad-71-iad--8aa2285d"],"rawName":"Amazon Data Services, Inc. IAD 50 IAD 60 IAD-71  IAD-78 IAD-79 IAD-80","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"d5fe8e5f1e23","cid":"d5fe8e5f1e23","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-1 IAD-9","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"In “higher load periods,” the data center would use power from Dominion Energy. A backup diesel generator would be used in emergency situations when other power sources are not available.","pscan":"https://northernvirginiamag.com/news/2026/05/12/a-fuel-cell-powered-data-center-is-proposed-for-chantilly/","uquote":"Most residents are served by Dominion Virginia Power.","uscan":"https://www.fairfaxcounty.gov/cableconsumer/csd/utility-and-cable-providers","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"northernvirginiamag.com;fairfaxcounty.gov","srcUrls":["https://northernvirginiamag.com/news/2026/05/12/a-fuel-cell-powered-data-center-is-proposed-for-chantilly/","https://www.fairfaxcounty.gov/cableconsumer/csd/utility-and-cable-providers"]},{"id":"48195cae1f83","cid":"48195cae1f83","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-10 IAD-32 IAD-98 IAD-99 IAD-118 IAD-119 IAD-129","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"Medium","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. DVP is a fully integrated utility, that either self generates and/or purchases electricity from others, and distributes it to its customers at a retail price approved by the Virginia State Corporation Commission (SCC). This includes selling the electricity to AWS for its data centers in northern Virginia.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"Medium","uquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","contro":"Opposition to power line construction for Amazon data centers in Loudoun County.","controScan":"https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"rmi.org;datacenterknowledge.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted"]},{"id":"f90455605365","cid":"f90455605365","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-100 IAD-101 IAD-102 IAD-103","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","contro":"Community opposition and protests over noise pollution from Amazon data centers in Manassas, Prince William County.","controScan":"https://baxtel.com/news/protests-over-amazon-s-manassas-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"rmi.org;interconnection.fyi;baxtel.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-data-services-iad-130-iad-131-iad-313-and-d-9311e007","https://baxtel.com/news/protests-over-amazon-s-manassas-data-center"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"28d48ca3ed0d","cid":"28d48ca3ed0d","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-114 IAD-115","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-114-iad-115-19d2cc2c","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-114-iad-115-19d2cc2c","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-114-iad-115-19d2cc2c"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"c12f40fb3d28","cid":"c12f40fb3d28","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-116 IAD-117","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-116-iad-117-ceb841a9","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-116-iad-117-ceb841a9","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-116-iad-117-ceb841a9"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"9b912133bbd3","cid":"9b912133bbd3","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-12 IAD-15 IAD-16 IAD-76 IAD-230","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-acc2ffed","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-acc2ffed","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2020,"oy":2020,"contro":"Local authorities' approval for an AWS data center campus in Loudoun County hinged on finding an alternative way to get power to the site without building a power line that some local residents and a county supervisor opposed.","controScan":"https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/","deal":"Amazon Data Services purchased the 120-acre George Washington University Virginia Science & Technology Campus for $427 million in February/March 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;futurumgroup.com","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-acc2ffed","https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"40d72134172a","cid":"40d72134172a","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-132 IAD-133","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Between 2019 and 2024, there was only one outage on the No. 231 transmission line that would supply primary power to Amazon's data center campus, and it lasted less than one minute.","pscan":"https://mde.maryland.gov/programs/permits/AirManagementPermits/Documents/Public-Review/Alt%20NSPS/Amazon%20Final%20Determination%20RTC%202025.pdf","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-132-iad-133-9e938968","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2022,"oy":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"mde.maryland.gov;interconnection.fyi","srcUrls":["https://mde.maryland.gov/programs/permits/AirManagementPermits/Documents/Public-Review/Alt%20NSPS/Amazon%20Final%20Determination%20RTC%202025.pdf","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-132-iad-133-9e938968"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"62f5f766271a","cid":"62f5f766271a","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-140/141/143","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2022,"oy":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"9a6e42ab7cfb","cid":"9a6e42ab7cfb","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-144 IAD-145","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-144-iad-145-393425b0"],"rawName":"Amazon Data Services, Inc. IAD-144  IAD-145","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"9709cd50f584","cid":"9709cd50f584","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-150 IAD-151 IAD-152","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":44,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"This project will include high-efficiency air-cooled systems, rooftop HVAC units, and “acoustically enclosed generators to limit operational noise and vibration.”","pscan":"https://northernvirginiamag.com/news/2025/11/25/penzance-breaks-ground-on-new-amazon-data-center-in-chantilly/","uconf":"High","uquote":"Dominion, the utility monopoly in the region, and Blue Ridge Group, a company acting on Amazon's behalf, have apparently managed to come up with a solution Loudoun County supervisors found satisfactory.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"northernvirginiamag.com","srcUrls":["https://northernvirginiamag.com/news/2025/11/25/penzance-breaks-ground-on-new-amazon-data-center-in-chantilly/"],"lflag":"source_quality_reclassified"},{"id":"2ab18e09d47c","cid":"2ab18e09d47c","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-51 IAD-56 IAD-88 IAD-89","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-51-iad-56-iad-88-iad--1cdb8275","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-51-iad-56-iad-88-iad--1cdb8275","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2024,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-51-iad-56-iad-88-iad--1cdb8275"],"rawName":"Amazon Data Services, Inc. IAD-51 IAD-56 IAD-88  IAD-89","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"f284c6f85f7c","cid":"f284c6f85f7c","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-55 IAD-64 IAD-84","city":"Haymarket","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"By the mid to late 2010's, Cloud HQ, Iron Mountain and Amazon were building large cloud campuses in PWC, drawn by the availability of land and transmission power lines.","uconf":"High","uquote":"The Coalition to Protect Prince William County is a grassroots movement originally formed in 2014 in response to Dominion Power's proposal to erect 100-plus-foot-tall transmission towers and a new substation for a single customer — Amazon – that wanted to establish a data center campus in Haymarket, Va.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2014,"oy":2023,"contro":"Community opposition regarding transmission towers and a new substation for the data center campus. The data center complex also caused 'chaos and misery' leading to the creation of a Data Center Opportunity Zone Overlay District.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"522205c1cc13","cid":"522205c1cc13","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-57 IAD-58Amazon Data Services, Inc. IAD-57 IAD-58","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-57-iad-58amazon-data--8884432e","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-57-iad-58amazon-data--8884432e","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2014,"oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-57-iad-58amazon-data--8884432e"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"b6045e2ce06e","cid":"b6045e2ce06e","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-6 IAD-13 IAD-54","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-6-iad-13-iad-54-62a82ca5","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-6-iad-13-iad-54-62a82ca5","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-6-iad-13-iad-54-62a82ca5"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"a6ce11f048cf","cid":"a6ce11f048cf","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-61 IAD-63 IAD-65 IAD-86 IAD-155 IAD-600 IAD-018","city":"Chantilly","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"Luckily for AWS, the region's utility company, Dominion, and Blue Ridge Group, a company acting on Amazon's behalf, were able to come up with an alternative plan that Loudoun County supervisors approved.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","contro":"Community opposition to power line construction for a new data center campus in Loudoun County.","deal":"Amazon Data Services Inc. acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.","dealScan":"https://baxtel.com/data-center/amazon-iad86","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"frontiermap.substack.com;baxtel.com","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift","https://baxtel.com/data-center/amazon-iad86"],"rawName":"Amazon Data Services, Inc. IAD-61 IAD-63 IAD-65  IAD-86 IAD-155 IAD-600 IAD-018"},{"id":"3b56e64e0d55","cid":"3b56e64e0d55","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-62/68/81/83/93/609/614","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-62-68-81-83-93-609-61-726685e7","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-62-68-81-83-93-609-61-726685e7","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2022,"oy":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-62-68-81-83-93-609-61-726685e7"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"17fa3e45695f","cid":"17fa3e45695f","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-7 IAD-11 IAD-24","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Operational Amazon Data Services, Inc. IAD-7 IAD-11 IAD-24 data center in Manassas, Prince William County, VA. Capacity: 100-250 MW.... Based on regional energy operator PJM's forecasting, that will contribute to a doubling of the area's peak energy demand by 2040 and will require a state grid with the same capacity as France's.... Amazon purchases energy from solar and wind facilities through contracts with utilities known as power-purchase agreements. The energy Amazon buys flows onto the regional grid, not necessarily to the company's data centers, but the contracts allow Amazon to include this clean energy in their emissions accounting.... Together, the facilities, when they are all up and running, will have emergency generators capable of producing more than 4.6 gigawatts of power.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.... Luckily for AWS, the region's utility company, Dominion, and Blue Ridge Group, a company acting on Amazon's behalf, were able to come up with an alternative plan that Loudoun County supervisors approved.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"8febc74cd95a","cid":"8febc74cd95a","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-73 IAD-74 IAD-602 IAD-193 IAD-194","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"3d1d4a283660","cid":"3d1d4a283660","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Data Services, Inc. IAD-75 IAD-85 IAD-95 IAD-96","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Amazon intends to build seven electrical substations on the property in collaboration with Dominion Energy and Rappahannock Electric Cooperative, indicating a power capacity of nearly one gigawatt.... The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.","pscan":"https://baxtel.com/data-center/amazon-8190-bethlehem","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.... Amazon intends to build seven electrical substations on the property in collaboration with Dominion Energy and Rappahannock Electric Cooperative, indicating a power capacity of nearly one gigawatt.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon.com","tenant":"Amazon Web Services (AWS)","ay":2024,"oy":2024,"contro":"Residents in the Great Oak subdivision near Manassas have complained about constant, low-pitch noise and vibrations from a complex of Amazon data centers, leading to calls for stricter noise ordinances.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/amazon-8190-bethlehem"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"d365c44ee661","cid":"d365c44ee661","canon":1,"dups":1,"ftype":"data_center","name":"Amazon DCA-50","city":"Elkwood","county":"Culpeper","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-dca-50-73bd4c50","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-dca-50-73bd4c50","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2020,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-dca-50-73bd4c50"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"affab1614934","cid":"affab1614934","canon":1,"dups":1,"ftype":"data_center","name":"Amazon DCA-54","city":"Fort Belvoir","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-dca-54-49fb57c2","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","ay":2020,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-dca-54-49fb57c2"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"e70387ccc829","cid":"e70387ccc829","canon":1,"dups":1,"ftype":"data_center","name":"Amazon Web Services Mallory","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Energy use depends on type of cooling & IT equipment. • Air-cooled systems use more energy and less water vs. evaporative cooling systems use more water and less energy. • Need access to transmission lines and substations. – SCC process for review and approval of transmission lines.","pscan":"https://www.fairfaxcounty.gov/planningcommission/sites/planningcommission/files/Assets/Documents/PDF/LUPR/Data%20Centers%20PowerPoint%20Presentation.pdf","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-96dc1dec","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","deal":"Land acquisition in 2021 for $55.9 million for a 46.4-acre plot.","dealScan":"https://baxtel.com/news/amazon-to-develop-new-data-center-in-chantilly-virginia","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"fairfaxcounty.gov;interconnection.fyi;baxtel.com","lflag":"operational_null_capacity","srcUrls":["https://www.fairfaxcounty.gov/planningcommission/sites/planningcommission/files/Assets/Documents/PDF/LUPR/Data%20Centers%20PowerPoint%20Presentation.pdf","https://www.interconnection.fyi/data-center/project/amazon-96dc1dec","https://baxtel.com/news/amazon-to-develop-new-data-center-in-chantilly-virginia"]},{"id":"7678a74dc979","cid":"7678a74dc979","canon":1,"dups":1,"ftype":"data_center","name":"American Real Estate Partners (AREP)","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c1a82292b198","cid":"c1a82292b198","canon":1,"dups":1,"ftype":"data_center","name":"Anthem CDC 3","city":"Harrisonburg","county":"Harrisonburg city","state":"VA","lat":38.436255,"lng":-78.873303,"cprec":"distinct","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"DBT has arranged for up to 40 megawatts of power from the Harrisonburg Electric Commission (HEC) at an attractive price of 3.5 cents per kilowatt hour. HEC is currently building a substation at the property to accommodate that capacity. DBT has procured six 2.5 megawatt Caterpillar generators, and expects to eventually have 12 generators supporting the site.","pscan":"https://www.datacenterknowledge.com/business/dbt-data-acquires-criticon-s-virginia-project","uquote":"DBT has arranged for up to 40 megawatts of power from the Harrisonburg Electric Commission (HEC) at an attractive price of 3.5 cents per kilowatt hour.","ukey":"15410|VA","uname":"Prince George Electric Coop","rto":"PJM","nerc":"SERC","op":"DBT-Data","spon":"DBT Development Group","tenant":"Anthem Health","ay":2008,"deal":"DBT-Data acquired the Cyber Integration Center in Harrisonburg in October 2013 for $35M.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"online_before_announced","srcUrls":["https://www.datacenterknowledge.com/business/dbt-data-acquires-criticon-s-virginia-project"]},{"id":"dc7fdc06c9b3","cid":"dc7fdc06c9b3","canon":1,"dups":1,"ftype":"data_center","name":"ASH2 Lockridge Data Center - QTS Investment Properties Ashburn II LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"QTS Investment Properties Ashburn II","spon":"Blackstone Infrastructure Partners and Blackstone Real Estate Income Trust (BREIT)","oy":2022,"deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion in an all-cash transaction, including the assumption of debt, expected to close in the second half of 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"6f8d9256fb9d","cid":"6f8d9256fb9d","canon":1,"dups":1,"ftype":"data_center","name":"ASH3 DC2","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":42,"pc":"Grid","pconf":"High","pquote":"Power provided by two dedicated substations with transmission from Dominion Energy, the leading energy provider in the region; Multiple, diverse power feeds supporting the campus; 480V end-to-end electrical distribution.","uquote":"Power provided by two dedicated substations with transmission from Dominion Energy, the leading energy provider in the region","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"700185c69e03","cid":"d8961af6cf4b","canon":0,"dups":4,"ftype":"data_center","name":"AWS H&M Property","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4"]},{"id":"d997ea053c5f","cid":"d997ea053c5f","canon":1,"dups":1,"ftype":"data_center","name":"AWS IAD61-IAD63 South Riding","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-61-iad-63-iad-65-iad--fede1500","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-61-iad-63-iad-65-iad--fede1500","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-61-iad-63-iad-65-iad--fede1500"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"a1a0bfe28036","cid":"a1a0bfe28036","canon":1,"dups":1,"ftype":"data_center","name":"AWS Westfax A","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-96dc1dec","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2012,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://www.interconnection.fyi/data-center/project/amazon-96dc1dec"]},{"id":"ce8a7fd7c70a","cid":"ce8a7fd7c70a","canon":1,"dups":1,"ftype":"data_center","name":"AWS Westfax B","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market. Through an energy management services agreement DVP may provide PJM-related services to AWS. Such services will assist in the integration and administration of its renewable portfolio in the market.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rmi.org","lflag":"operational_null_capacity","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"]},{"id":"ea85925baa28","cid":"ea85925baa28","canon":1,"dups":1,"ftype":"data_center","name":"Bank of America","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","uquote":"Electric. Dominion Virginia Power: 1-866-366-4357.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Bank of America","spon":"Mapletree Industrial Trust","tenant":"Bank of America","deal":"Sale of campus to Mapletree Industrial Trust for $208 million on March 12, 2021.","dealScan":"https://richmondbizsense.com/2021/03/26/bank-of-americas-multi-building-complex-in-henrico-sells-for-208m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"richmondbizsense.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://richmondbizsense.com/2021/03/26/bank-of-americas-multi-building-complex-in-henrico-sells-for-208m/"]},{"id":"121e65fa9e10","cid":"121e65fa9e10","canon":1,"dups":1,"ftype":"data_center","name":"Bank of America - Villa Park Drive","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"Bank of America","spon":"Mapletree Industrial Trust","tenant":"Bank of America","oy":2008,"deal":"Sale of campus for $208 million to Mapletree Industrial Trust on March 12, 2021","dealScan":"https://richmondbizsense.com/2021/03/26/bank-of-americas-multi-building-complex-in-henrico-sells-for-208m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"richmondbizsense.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://richmondbizsense.com/2021/03/26/bank-of-americas-multi-building-complex-in-henrico-sells-for-208m/"]},{"id":"6a711d1df186","cid":"6a711d1df186","canon":1,"dups":1,"ftype":"data_center","name":"Bank of America-Sandston","city":"Sandston","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","uquote":"Why Dominion Energy Virginia? We provide more than 2.7 million electric customers in Virginia with safe, reliable, affordable energy while keeping a keen focus on safety and the environment.","uscan":"https://www.dominionenergy.com/economic-development/virginia","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Bank of America","spon":"Bank of America","tenant":"Bank of America","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"dominionenergy.com","srcUrls":["https://www.dominionenergy.com/economic-development/virginia"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"5728f8ccd8e6","cid":"5728f8ccd8e6","canon":1,"dups":1,"ftype":"data_center","name":"BCORE COPT DC-15","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","uconf":"High","uquote":"Loudoun County Department of Economic Development Assistant Director Buddy Rizer explained, “This area of Loudoun County is close to the backbone of the Internet, as well as to Dominion Virginia Power's Beaumeade substation.","uscan":"https://investors.copt.com/news-events/press-releases/detail/293/copt-announces-two-build-to-suit-projects-in-ashburn-va","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"COPT Defense Properties","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"investors.copt.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://investors.copt.com/news-events/press-releases/detail/293/copt-announces-two-build-to-suit-projects-in-ashburn-va"]},{"id":"9e60fa030af0","cid":"9e60fa030af0","canon":1,"dups":1,"ftype":"data_center","name":"BEAUMEADE LC PHASE III LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"BEAUMEADE LC PHASE III","spon":"BEAUMEADE LC PHASE III","oy":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"55dd2b8e552d","cid":"55dd2b8e552d","canon":1,"dups":1,"ftype":"data_center","name":"Belmont Innovation Campus Data Center","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"If you allow it to be built, you're asking for another 600 megawatts of power, which Dominion is obligated to provide. We don't have enough power, so we're going to have to bring in more from dirty coal plants.”","pscan":"https://blueridgeleader.com/reduced-belmont-innovation-gateway-proposal-up-for-reconsideration/","uconf":"High","uquote":"Mr. Richardson, the Director of Communications for Dominion Energy said, by law, they must power whatever is approved and built.","uscan":"https://blueridgeleader.com/reduced-belmont-innovation-gateway-proposal-up-for-reconsideration/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Loudoun GC","spon":"SDC Capital Partners","ay":2022,"contro":"Initial proposal denied due to community opposition and power concerns; approved after significant reduction in size.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"blueridgeleader.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://blueridgeleader.com/reduced-belmont-innovation-gateway-proposal-up-for-reconsideration/"]},{"id":"3ff0df1bb3e7","cid":"3ff0df1bb3e7","canon":1,"dups":1,"ftype":"data_center","name":"BIT HOLDINGS FIFTY-FOUR","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5c9f8500f4fe","cid":"5c9f8500f4fe","canon":1,"dups":1,"ftype":"data_center","name":"BLUE SLING ACC 9","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":28,"pc":"Grid","pconf":"High","pquote":"This Tier 3 Equivalent data center in Ashburn, VA has a concurrently maintainable Electric and Mechanical systems and 23 companies listed in its ecosystem. Get colocation pricing for this data center directly from Digital Realty.... Networked Power Grid. Iso-parallel Redundant. Rotary (Flywheel) UPS. Avg Power Capacity Per Rack. 6.0 kW. Min Power Capacity Per Rack. 1.0 kW. Number Of Generators. 20. Diesel Fuel Runtime At Full Load. 48 Hrs.","pscan":"https://marketplace.upstack.com/data-centers/digital-realty-dft-ashburn-data-center-acc9","uconf":"High","uquote":"Loudoun County, Virginia, known within the industry as Data Center Alley, currently consumes approximately 5.3 GW of electricity, a significant increase from about 2 GW in 2021. This level of demand is equivalent to the output of five large nuclear reactors, all concentrated within a single county northwest of Washington, D.C. Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.... Dominion currently connects approximately 15 data centers annually, adding nearly one gigawatt of new load each year.","uscan":"https://frontiermap.substack.com/p/the-demand-shift","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","oy":2016,"deal":"Acquired from Dupont Fabros in September 2017 by Digital Realty as part of a merger. A subsequent transaction in December 2019 involved a buyer acquiring an 80% interest in a JV at $811M, valuing the total portfolio (including 21745 Sir Timothy Drive) at $1.013 B.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;frontiermap.substack.com","srcUrls":["https://marketplace.upstack.com/data-centers/digital-realty-dft-ashburn-data-center-acc9","https://frontiermap.substack.com/p/the-demand-shift"],"band":"25-50 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"276a161eafc8","cid":"276a161eafc8","canon":1,"dups":1,"ftype":"data_center","name":"BOURZOU VENTURES LLC (CloudHQ)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":106,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"BOURZOU VENTURES","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357"],"band":"100-250 MW"},{"id":"f3100a5cc90d","cid":"f3100a5cc90d","canon":1,"dups":1,"ftype":"data_center","name":"Brush Mountain Blacksburg","county":"Montgomery County","state":"VA","lat":37.175538,"lng":-80.387794,"cprec":"distinct","status":"Operational","pc":"Grid","pconf":"High","pquote":"The site also benefits from regional access to Dominion Energy infrastructure and transportation connectivity through Roanoke-Blacksburg Regional Airport. The environment includes redundant power systems, redundant HVAC infrastructure, geo-diverse systems, digital access controls, and 24x7 proactive monitoring capabilities. For several years Brush Mountain has offered unparalleled levels of regional high speed bandwidth powered by the VTCRC's fully redundant Gigabit Internet connectivity, (that's TWO giant Gigabit Internet pipes to make sure data stays moving) redundant cooling and standby generator service.","uconf":"High","uquote":"Power Provider: Connected to Dominion Energy Virginia infrastructure.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Brush Mountain Data Center","spon":"Advanced Logic Industries","oy":2006,"deal":"Acquired by Advanced Logic Industries in 2013","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"6b916adb60ff","cid":"6b916adb60ff","canon":1,"dups":1,"ftype":"data_center","name":"C1 NORTHERN VA - STERLING I-III","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":48,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy. The U.S. Department of Energy used the Federal Power Act on Monday to allow data centers within the regional grid operated by PJM Interconnection, including those in Virginia, to use generators at PJM's discretion through Jan. 31.","pscan":"https://insideclimatenews.org/news/29012026/data-centers-in-pjm-grid-can-rely-solely-on-generators-during-the-cold-doe-rules/","uconf":"High","uquote":"Grid Operator: Dominion Energy. PJM, the northeast Regional Transmission Organization, of which Dominion Energy is a member, recognizes an impending exponential increase in power demand from Loudoun County's “Data Center Alley.”","uscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2016,"deal":"CyrusOne Data Centers Issuer I LLC's series 2025-1 class A-2 note issuance is a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s 13 completed and operating data centers in Sterling, Va., San Antonio, Texas, and Houston.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"insideclimatenews.org;loudoun.gov","srcUrls":["https://insideclimatenews.org/news/29012026/data-centers-in-pjm-grid-can-rely-solely-on-generators-during-the-cold-doe-rules/","https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979"]},{"id":"cc8cfb9f0973","cid":"cc8cfb9f0973","canon":1,"dups":1,"ftype":"data_center","name":"Capital One Services Incorporated","city":"Glen Allen","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia","uquote":"Dominion Energy (NYSE: D) has one advantage that artificial intelligence companies lack – it has the ability to power data centers from various energy sources, including renewable energy.","uscan":"https://quantfury.com/market-insights/d/","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"quantfury.com","srcUrls":["https://quantfury.com/market-insights/d/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"f81b153439b5","cid":"f81b153439b5","canon":0,"dups":1,"ftype":"data_center","name":"Capital One Services Incorporated","city":"Glen Allen","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/capital-one-services-incorporated-a1249f99","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/capital-one-services-incorporated-a1249f99","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Capital One Services","spon":"Capital One Financial","tenant":"Capital One","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/capital-one-services-incorporated-a1249f99"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"5c13e69f772c","cid":"5c13e69f772c","canon":1,"dups":1,"ftype":"data_center","name":"Captone Mission Ridge, LLC","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/captone-mission-ridge-llc-21fa3e4c","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/captone-mission-ridge-llc-21fa3e4c","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"I & G Mission Ridge","ay":2014,"oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/captone-mission-ridge-llc-21fa3e4c"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"b99609988403","cid":"b99609988403","canon":1,"dups":1,"ftype":"data_center","name":"Cardinal Energy","city":"Middletown","county":"Frederick","state":"VA","lat":39.20366,"lng":-78.263829,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"MDC is one of North America's first and only data centers utilizing its own micro grid and uninterruptable power supplied by natural gas generators – alongside traditional diesel backup – and is strategically located in Middletown, Va.","pscan":"https://www.prnewswire.com/news-releases/new-virginia-data-center-fully-commissioned-ready-for-immediate-occupancy-301553856.html","proc":"Co-located generation","uquote":"Electrical Power. First Energy; Rappahannock Electric Coop (REC); Shenandoah Valley Electric Coop (SVEC).","rto":"PJM","nerc":"SERC","op":"Middletown Data Center","spon":"Cardinal Energy","oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/new-virginia-data-center-fully-commissioned-ready-for-immediate-occupancy-301553856.html"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"4a181f571518","cid":"4a181f571518","canon":1,"dups":1,"ftype":"data_center","name":"Cardinal Energy Corporation","city":"Middletown","county":"Frederick","state":"VA","lat":39.20366,"lng":-78.263829,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"MDC is one of North America's first and only data centers utilizing its own micro grid and uninterruptable power supplied by natural gas generators – alongside traditional diesel backup – and is strategically located in Middletown, Va., 60 miles west of Washington, D.C.","pscan":"https://www.prnewswire.com/news-releases/new-virginia-data-center-fully-commissioned-ready-for-immediate-occupancy-301553856.html","proc":"Co-located generation","uquote":"Electricity. Rappahannock Electric Cooperative · Shenandoah Valley Electric Cooperative.","rto":"PJM","nerc":"SERC","op":"Cardinal Energy","spon":"Cardinal Energy","oy":2021,"contro":"Frederick County amended its zoning code to require conditional use permits for most data centers, indicating increased regulatory scrutiny.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/new-virginia-data-center-fully-commissioned-ready-for-immediate-occupancy-301553856.html"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"1c25fd0658f9","cid":"1c25fd0658f9","canon":1,"dups":1,"ftype":"data_center","name":"Cashvad Ventures LLC","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/cashvad-ventures-llc-f2d1d7c8","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/cashvad-ventures-llc-f2d1d7c8","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Cashvad Ventures","ay":2018,"oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cashvad-ventures-llc-f2d1d7c8"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"7061024df62a","cid":"7061024df62a","canon":1,"dups":1,"ftype":"data_center","name":"Cavalier Innsbrook Data Center","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Utility power sourced from the regional Virginia grid; Redundant UPS systems; Backup generators supporting extended uptime; Designed for continuous operation and high availability.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Windstream","spon":"Windstream","oy":2010,"deal":"Cavalier acquired NET Telcos (including data center) on Jan 25, 2010; PAETEC acquired Cavalier Telephone in Dec 2010; Windstream acquired PAETEC in Dec 2011.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"256ad95c1857","cid":"256ad95c1857","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":47,"pc":"Grid","pconf":"Medium","pquote":"Power Utility: Dominion Virginia Power.","pscan":"https://baxtel.com/data-center/centersquare-sterling-dc3","uquote":"Power Utility: Dominion Virginia Power.","uscan":"https://baxtel.com/data-center/centersquare-sterling-dc3","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","ay":2024,"oy":2024,"contro":"Trademark infringement lawsuit filed by CenterSquare Investment Management against Centersquare (Brookfield).","deal":"Brookfield Infrastructure Partners acquired Cyxtera Technologies for approximately $775M in late 2023, leading to the formation of Centersquare in 2024. Additionally, Centersquare acquired IAD2-A&B in Sterling, VA for $60.5M in Jan 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/centersquare-sterling-dc3"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"adcadd1ee8c6","cid":"adcadd1ee8c6","canon":0,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":23,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility power: 23.9MW.","uconf":"High","uquote":"As the global data center hotspot, Northern Virginia has regularly been in the news over the last year. Powering that hotspot in PJM is Dominion Energy, which released their 2024 IRP earlier in October.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","deal":"Acquisition of 10 data centers across US and Canada for $1 billion (October 2025)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"ddfc7bf4b537","cid":"ddfc7bf4b537","canon":0,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Power Utility: Dominion Virginia Power.","pscan":"https://baxtel.com/data-center/centersquare-iad2-a","uconf":"High","uquote":"Power Utility: Dominion Virginia Power.","uscan":"https://baxtel.com/data-center/centersquare-iad2-a","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Centersquare","spon":"Brookfield Asset Management","oy":2000,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://baxtel.com/data-center/centersquare-iad2-a"]},{"id":"f8f22f92824e","cid":"f8f22f92824e","canon":0,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"N+1 redundant power systems with UPS-backed power and on-site generators ensuring continuous uptime. Utility capacity: 143.2MW; UPS capacity: 19.8MW; Generator capacity: 37.5MW","uquote":"Dominion serves 3.6 million customers in Virginia, North Carolina, and South Carolina. In Ashburn, Virginia, it services Data Center Alley — nearly 300 data centers for Google, Meta, Amazon and others.","uscan":"https://refreshmiami.com/news/to-meet-data-center-demand-nextera-to-acquire-dominion-energy-for-67b/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Csquare","spon":"Brookfield Infrastructure Partners","oy":1999,"deal":"Brookfield acquired Cyxtera for $775 million in November 2023 and merged it with Evoque; the combined entity rebranded as Centersquare in April 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"refreshmiami.com","srcUrls":["https://refreshmiami.com/news/to-meet-data-center-demand-nextera-to-acquire-dominion-energy-for-67b/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"fb40842c26a2","cid":"fb40842c26a2","canon":0,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":6,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility power: 35.8MW.... Power Utility: Dominion Virginia Power.","pscan":"https://baxtel.com/data-center/centersquare-sterling-dc2","uquote":"Power Utility: Dominion Virginia Power.","uscan":"https://baxtel.com/data-center/centersquare-sterling-dc2","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Centersquare","spon":"Brookfield","ay":2000,"deal":"Brookfield acquired Cyxtera in November 2023 and combined it with Evoque; Evoque and Cyxtera merged and rebranded as Centersquare in April 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified,merged_duplicate","srcUrls":["https://baxtel.com/data-center/centersquare-sterling-dc2"]},{"id":"549bb340502b","cid":"549bb340502b","canon":1,"dups":1,"ftype":"data_center","name":"CHANTILLY TECHNOLOGY PARTNERS","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":16,"pc":"Grid","pconf":"High","pquote":"Northern Virginia's data center occupancy is very low, with near-term supply constraints due to utility power limitations from Dominion Power.","pscan":"https://h5datacenters.com/virginia-data-center.html","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"H5 Data Centers","spon":"Menlo Equities","oy":2005,"deal":"Menlo Equities acquired the data center property located at 4030-4050 Lafayette Center Drive in Chantilly, Virginia, from Digital Realty in September 2023.","dealScan":"https://www.menloequities.com/properties/4030-4050-lafayette-center-dr-chantilly-va/","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"h5datacenters.com;menloequities.com","srcUrls":["https://h5datacenters.com/virginia-data-center.html","https://www.menloequities.com/properties/4030-4050-lafayette-center-dr-chantilly-va/"],"band":"10-25 MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"f33fa647f6d4","cid":"f33fa647f6d4","canon":1,"dups":1,"ftype":"data_center","name":"Chantilly Technology Partners, LLC/H5 VA","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":23,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Northern Virginia's data center occupancy is very low, with near-term supply constraints due to utility power limitations from Dominion Power.","pscan":"https://h5datacenters.com/virginia-data-center.html","uquote":"Northern Virginia's data center occupancy is very low, with near-term supply constraints due to utility power limitations from Dominion Power.","uscan":"https://h5datacenters.com/virginia-data-center.html","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"H5 Data Centers","spon":"H5 Data Centers","ay":2014,"oy":2014,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"h5datacenters.com","srcUrls":["https://h5datacenters.com/virginia-data-center.html"]},{"id":"331b16ebba96","cid":"331b16ebba96","canon":1,"dups":1,"ftype":"data_center","name":"Chirisa Richmond LLC","city":"Chester","county":"Chesterfield","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Utility. Dominion Energy. POWER EXPANSION TIMELINE. Critical IT Load. 4.2 MW today. 2.4 MW of expansion in 90 – 120 days;. 20 MW of expansion within 18 months;. 100 - 250+ MW of expansion in 24 – 36 months. Subject to changes with Dominion Power.","uconf":"High","uquote":"Utility. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Chirisa Richmond","spon":"Chirisa Investments","tenant":"CoreWeave","oy":2019,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"ec303ab9743a","cid":"ec303ab9743a","canon":1,"dups":1,"ftype":"data_center","name":"Chirisa Technology Parks","city":"Chester","county":"Chesterfield","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Future / Expansion","mw":28,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Chirisa is developing a 300MW substation in collaboration with Dominion Energy. The campus is designed to provide AI-optimized infrastructure supported by 300 MW of secured power from the adjacent Meadowville substation. This substation, currently under construction in partnership with Dominion Energy, is part of a broader initiative to reinforce the grid at the Meadowville Technology Park with an eventual goal of adding over 1 GW of power capacity.","uconf":"High","uquote":"Additionally, Chirisa is developing a 300MW substation in collaboration with Dominion Energy. The campus is designed to provide AI-optimized infrastructure supported by 300 MW of secured power from the adjacent Meadowville substation. This substation, currently under construction in partnership with Dominion Energy, is part of a broader initiative to reinforce the grid at the Meadowville Technology Park with an eventual goal of adding over 1 GW of power capacity.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Chirisa Technology Parks","spon":"Chirisa Investments","tenant":"CoreWeave","ay":2019,"oy":2028,"deal":"Crestline Investors committed approximately $215 million of construction and land acquisition debt over 15 months (announced April 17, 2025). Blue Owl Capital and Machine Investment Group closed a joint venture partnership including $4 billion of funding for CoreWeave developments (announced August 25, 2025). Blue Owl, Chirisa Technology Parks and PowerHouse Data Centers announced a $5 Billion Joint Venture Development Partnership (announced August 29, 2024).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text status_adjusted_future_expansion shared_coordinate_precision_downgraded","rawStatus":"Operational","srcUrls":null,"srcDom":null},{"id":"605da209ebfe","cid":"605da209ebfe","canon":1,"dups":1,"ftype":"data_center","name":"CLOP Ashland VA LLC","city":"Ashland","county":"Hanover","state":"VA","lat":37.760215,"lng":-77.491317,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Connect Data Centers","spon":"Oppidan","ay":2025,"oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected shared_coordinate_precision_downgraded","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"7515ecc2a689","cid":"a8c08feb96e4","canon":0,"dups":3,"ftype":"data_center","name":"Cloud HQ","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"CloudHQ's MDC campus is located in the heart of the Manassas data center market just south of the intersection of Routes 28 and 234. The two on-site substations will provide up to 300 MWs of critical IT load which can be delivered in many different configurations.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Abteen Ventures , Bourzou Ventures , and Manuchehr Ventures","ay":2020,"oy":2021,"deal":"CloudCapital, an affiliate of CloudHQ, acquired the DC-6 data center in Manassas, Va., for $222.5 million from Corporate Office Properties Trust in January 2022.","dealScan":"https://commercialobserver.com/2022/01/cloudhq-buys-manassas-data-center-for-223m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;commercialobserver.com","srcUrls":["https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357","https://commercialobserver.com/2022/01/cloudhq-buys-manassas-data-center-for-223m/"]},{"id":"1ede3929fa5b","cid":"1ede3929fa5b","canon":1,"dups":1,"ftype":"data_center","name":"CLOUD HQ LC3","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":96,"proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"LOHRASP VENTURES","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"1c335c8133ce","cid":"1c335c8133ce","canon":0,"dups":1,"ftype":"data_center","name":"CloudHQ","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":84,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Abteen Ventures , Bourzou Ventures , and Manuchehr Ventures","oy":2019,"deal":"CloudCapital, an affiliate of data center developer CloudHQ, acquired DC-6, a 233,000-square-foot data center in Manassas, Va., for $222.5 million on January 26, 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"b15ff15de95c","cid":"b15ff15de95c","canon":0,"dups":1,"ftype":"data_center","name":"CloudHQ","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":19,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The power is fed by dedicated 50 MW NOVEC feeder to the building.","pscan":"https://cloudandcolocation.com/datacenters/copt-data-center-solutions-copt-dc-6-data-center/","uquote":"Utility Provider: NOVEC. The power is fed by dedicated 50 MW NOVEC feeder to the building.","uscan":"https://baxtel.com/data-center/cloudhq-manassas-hornbaker","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"CloudCapital","deal":"Acquisition of DC-6 from Corporate Office Properties Trust by CloudCapital (an affiliate of CloudHQ) for $222.5 million on January 26, 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;baxtel.com","srcUrls":["https://cloudandcolocation.com/datacenters/copt-data-center-solutions-copt-dc-6-data-center/","https://baxtel.com/data-center/cloudhq-manassas-hornbaker"],"lflag":"merged_duplicate"},{"id":"6350e9bb4d7e","cid":"6350e9bb4d7e","canon":1,"dups":1,"ftype":"data_center","name":"CloudHQ","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":382,"pc":"Grid","pconf":"High","pquote":"The data center will be served by the completion of a new utility power substation constructed on the adjacent site.","pscan":"https://www.dva-arch.com/projects/mcc1-data-center","uconf":"High","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Abteen Ventures , Bourzou Ventures , and Manuchehr Ventures","ay":2017,"oy":2026,"deal":"CloudCapital, an affiliate of CloudHQ, acquired a 233,000-square-foot data center (DC-6 at 9651 Hornbaker Road) in Manassas, Va., for $222.5 million on January 26, 2022.","dealScan":"https://commercialobserver.com/2022/01/cloudhq-buys-manassas-data-center-for-223m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"dva-arch.com;commercialobserver.com","srcUrls":["https://www.dva-arch.com/projects/mcc1-data-center","https://commercialobserver.com/2022/01/cloudhq-buys-manassas-data-center-for-223m/"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"7db78c9d3a49","cid":"a8c08feb96e4","canon":0,"dups":3,"ftype":"data_center","name":"CloudHQ","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":300,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The two on-site substations will provide up to 300 MWs of critical IT load which can be delivered in many different configurations.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"CloudCapital","oy":2026,"deal":"CloudCapital, an affiliate of CloudHQ, acquired the DC-6 data center in Manassas, VA for $222.5 million on January 26, 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357"]},{"id":"a8c08feb96e4","cid":"a8c08feb96e4","canon":0,"dups":3,"ftype":"data_center","name":"CloudHQ","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":300,"pc":"Grid","pconf":"High","pquote":"The two on-site substations will provide up to 300 MWs of critical IT load which can be delivered in many different configurations. Grid Operator: Dominion Energy.","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Abteen Ventures , Bourzou Ventures , and Manuchehr Ventures","ay":2020,"oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cloudhq-51e6b357"],"band":"250+ MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"fd8be92f9b7f","cid":"fd8be92f9b7f","canon":0,"dups":1,"ftype":"data_center","name":"CloudHQ","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":160,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25","uquote":"Utility Provider: Dominion Virginia.","uscan":"https://baxtel.com/data-center/cloudhq-ashburn-campus","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Iskander Enterprise, Kaveh Enterprise","tenant":"Microsoft","ay":2019,"oy":2019,"contro":"Community complaints regarding persistent droning noise and black smoke from the facility.","controScan":"https://www.youtube.com/watch?v=xtdT6d7LO0E","deal":"$1.4bn securitization deal (CLDHQ 2026-1) backed by two Ashburn data centers, dated April 17, 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;baxtel.com;youtube.com","srcUrls":["https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25","https://baxtel.com/data-center/cloudhq-ashburn-campus","https://www.youtube.com/watch?v=xtdT6d7LO0E"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"18339e4dd355","cid":"18339e4dd355","canon":1,"dups":2,"ftype":"data_center","name":"CloudHQ","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":1256,"pc":"Grid","pconf":"High","pquote":"CloudHQ's LC campus offers two data center buildings, both fully permitted and powered by a new 225 kV on-site substation.","pscan":"https://baxtel.com/data-centers/cloudhq","uquote":"Utility Provider: Dominion Virginia.","uscan":"https://baxtel.com/data-center/cloudhq-ashburn-campus","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"CloudHQ","tenant":"Meta, Google","ay":2018,"oy":2024,"contro":"Community opposition due to noise and environmental concerns.","controScan":"https://www.youtube.com/watch?v=xtdT6d7LO0E","deal":"CloudHQ plans to invest $400 million in building LC8 and $1 billion for LC4 construction.","dealScan":"https://baxtel.com/data-center/cloudhq-lc8","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"baxtel.com;youtube.com","srcUrls":["https://baxtel.com/data-centers/cloudhq","https://baxtel.com/data-center/cloudhq-ashburn-campus","https://baxtel.com/data-center/cloudhq-lc8","https://www.youtube.com/watch?v=xtdT6d7LO0E"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"8357424b6919","cid":"18339e4dd355","canon":0,"dups":2,"ftype":"data_center","name":"CloudHQ","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":1256,"pc":"Grid","pconf":"High","pquote":"A construction crew works on a CloudHQ data center on July 17, 2024, in Ashburn, Va. Utility customers in seven PJM Interconnection states, including Virginia, paid $4.4 billion last year for transmission upgrades needed to bring data centers online, the Union of Concerned Scientists said in a report released on Sept. 29, 2025.","pscan":"https://www.utilitydive.com/news/pjm-data-center-transmission-costs-ratepayers/761579/","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","tenant":"Meta (Facebook), Google","ay":2018,"oy":2024,"contro":"Community opposition and regulatory concerns regarding transmission costs and environmental impact of data center expansion in Ashburn.","deal":"CloudHQ plans to invest $400 million in building LC8, a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus.","dealScan":"https://baxtel.com/data-center/cloudhq-lc8","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"utilitydive.com;interconnection.fyi;baxtel.com","srcUrls":["https://www.utilitydive.com/news/pjm-data-center-transmission-costs-ratepayers/761579/","https://www.interconnection.fyi/data-center/project/cloudhq-29c51b25","https://baxtel.com/data-center/cloudhq-lc8"],"band":"250+ MW"},{"id":"69025bd650de","cid":"69025bd650de","canon":0,"dups":1,"ftype":"data_center","name":"CloudHQ","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":298,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Utility Provider: Dominion Virginia.","uquote":"Utility Provider: Dominion Virginia.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"CloudCapital","tenant":"Microsoft","ay":2018,"oy":2024,"contro":"Community backlash due to persistent droning noise and black smoke from the facility.","deal":"$1.4bn securitization deal (CLDHQ 2026-1) for two Ashburn data centers with 160MW combined capacity, dated April 17, 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"bfeeadc80b5d","cid":"bfeeadc80b5d","canon":1,"dups":1,"ftype":"data_center","name":"Cologix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":120,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"ASH2 is a 226K SQFT, two-story, Cologix-owned facility under construction at 21673 Beaumeade Circle in Ashburn, Virginia. Designed for high-density workloads, the facility enables flexible deployment across liquid-cooled and air-cooled environments, supported by dual independent utility feeds, block-redundant power architecture and a prime location in Data Center Alley — the world's most interconnected data center market.","rto":"PJM","nerc":"SERC","op":"Cologix","spon":"Stonepeak","ay":2020,"oy":2023,"deal":"Pre-leasing of the entire 120 MW ASH1 data center in 2023","dealScan":"https://datacenterrichness.substack.com/p/cologix-buys-land-for-new-campus","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"datacenterrichness.substack.com","srcUrls":["https://datacenterrichness.substack.com/p/cologix-buys-land-for-new-campus"],"lflag":"source_quality_reclassified"},{"id":"ddf1af637bc8","cid":"ddf1af637bc8","canon":1,"dups":1,"ftype":"data_center","name":"Cologix ASH1","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":120,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Cologix's 120 MW capacity, state-of-the-art Energy Star certified facility with 455,000 SQFT of data center colocation space is a highly efficient and scalable facility and is the only data center in the region designed and built for Hyperscale Edge traffic from the ground up. Cologix provides future-ready solutions for enterprises through multi-cloud direct onramps and network interconnection options.","rto":"PJM","nerc":"SERC","op":"Cologix","spon":"Stonepeak","tenant":"major global technology company","ay":2020,"oy":2023,"deal":"Equity recapitalization of Cologix by Stonepeak for $3.0 billion in equity value (April 2022); $1.65 billion asset-backed securitization (early 2022)","dealScan":"https://cologix.com/news/stonepeak-successfully-completes-3-0-billion-equity-recapitalization-portfolio-company-cologix/","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cologix.com","srcUrls":["https://cologix.com/news/stonepeak-successfully-completes-3-0-billion-equity-recapitalization-portfolio-company-cologix/"]},{"id":"872506e50412","cid":"872506e50412","canon":1,"dups":1,"ftype":"data_center","name":"Comcast","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/comcast-ccf1df8f","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/comcast-ccf1df8f","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Comcast","spon":"Comcast Cable Communications","ay":2012,"oy":2014,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/comcast-ccf1df8f"]},{"id":"5c27f72f46dd","cid":"5c27f72f46dd","canon":1,"dups":1,"ftype":"data_center","name":"Comcast Cablevision of Virginia Incorporated","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"832088d17daa","cid":"832088d17daa","canon":1,"dups":4,"ftype":"data_center","name":"Compass Datacenters","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"power in Leesburg is delivered by the Northern Virginia Electric Cooperative, a separate provider than Ashburn's, and more importantly, the high-voltage lines serving the site are different than those supporting Data Center Alley.","uquote":"power in Leesburg is delivered by the Northern Virginia Electric Cooperative, a separate provider than Ashburn's, and more importantly, the high-voltage lines serving the site are different than those supporting Data Center Alley.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"Compass Datacenters","spon":"Brookfield Infrastructure, Ontario Teachers' Pension Plan, KKR","ay":2019,"oy":2022,"contro":"Neighbors near the Leesburg campus elevated sound concerns, leading Compass Datacenters and Vertiv to implement mitigation efforts.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9f481fb707a6","cid":"832088d17daa","canon":0,"dups":4,"ftype":"data_center","name":"Compass Datacenters","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"In addition, power in Leesburg is delivered by the Northern Virginia Electric Cooperative, a separate provider than Ashburn's, and more importantly, the high-voltage lines serving the site are different than those supporting Data Center Alley.","uconf":"High","uquote":"In addition, power in Leesburg is delivered by the Northern Virginia Electric Cooperative, a separate provider than Ashburn's, and more importantly, the high-voltage lines serving the site are different than those supporting Data Center Alley.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"Compass Datacenters","spon":"KKR, Ontario Teachers' Pension Plan, Brookfield Infrastructure","tenant":"Hyperscaler (unnamed)","ay":2019,"contro":"Neighbors raised sound concerns due to an elevated pitch from the facility's fans.","deal":"Compass Datacenters established a permanent, long-term capital partnership with KKR on March 16, 2026.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"50-100 MW","srcUrls":null,"srcDom":null},{"id":"8d7f1ac1c15d","cid":"832088d17daa","canon":0,"dups":4,"ftype":"data_center","name":"Compass Datacenters","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"This site in Loudoun County has 56 MVA of day-one utility power capacity with substantial capability to add more in the future.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/compass-datacenters-7d2f8cac","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Compass Datacenters","spon":"Brookfield Infrastructure Partners, Ontario Teachers' Pension Plan","ay":2018,"oy":2023,"contro":"Community opposition regarding noise and environmental concerns (proximity to Goose Creek).","deal":"Acquisition of Compass Datacenters by Brookfield Infrastructure Partners and Ontario Teachers' Pension Plan for approximately $5.5 billion, finalized end of 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/compass-datacenters-7d2f8cac"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"443796cacf42","cid":"832088d17daa","canon":0,"dups":4,"ftype":"data_center","name":"Compass Datacenters","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"pc":"Grid","pconf":"High","pquote":"In addition, power in Leesburg is delivered by the Northern Virginia Electric Cooperative, a separate provider than Ashburn's, and more importantly, the high-voltage lines serving the site are different than those supporting Data Center Alley.","uconf":"High","uquote":"In addition, power in Leesburg is delivered by the Northern Virginia Electric Cooperative, a separate provider than Ashburn's, and more importantly, the high-voltage lines serving the site are different than those supporting Data Center Alley.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"Compass Datacenters","spon":"Ontario Teachers' Pension Plan and Brookfield Infrastructure","ay":2018,"oy":2018,"contro":"Neighbors raised sound concerns; environmental concerns addressed during approval.","deal":"Equity backing by Ontario Teachers' Pension Plan and Brookfield Infrastructure","dealScan":"https://business.loudounchamber.org/list/member/compass-datacenters-28585","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"business.loudounchamber.org","srcUrls":["https://business.loudounchamber.org/list/member/compass-datacenters-28585"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"042a94951a5a","cid":"042a94951a5a","canon":1,"dups":1,"ftype":"data_center","name":"COMPASS DATACENTERS IAD I","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/compass-datacenters-7d2f8cac","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/compass-datacenters-7d2f8cac","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Compass Datacenters","spon":"Brookfield Infrastructure Partners, Ontario Teachers' Pension Plan","tenant":"Hyperscale customer (unnamed)","ay":2019,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/compass-datacenters-7d2f8cac"],"band":"< 10 MW"},{"id":"e7fc71a65bc3","cid":"e7fc71a65bc3","canon":1,"dups":1,"ftype":"data_center","name":"Compass IAD Datacenter","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":120,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"power in Leesburg is delivered by the Northern Virginia Electric Cooperative, a separate provider than Ashburn's, and more importantly, the high-voltage lines serving the site are different than those supporting Data Center Alley.","uconf":"High","uquote":"power in Leesburg is delivered by the Northern Virginia Electric Cooperative, a separate provider than Ashburn's, and more importantly, the high-voltage lines serving the site are different than those supporting Data Center Alley.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"Compass Datacenters","spon":"Ontario Teachers' Pension Plan, Brookfield Infrastructure Partners","ay":2019,"oy":2022,"contro":"Neighbors raised concerns about sound from the campus.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1ca9a2346358","cid":"1ca9a2346358","canon":1,"dups":1,"ftype":"data_center","name":"Computer Sciences Corporation","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"DXC Technology","spon":"Institutional and individual investors (publicly traded company)","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"ed43a8d887fd","cid":"ed43a8d887fd","canon":1,"dups":1,"ftype":"data_center","name":"COPT DC 19 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"The PJM Interconnection can curtail data centers and other large loads that have backup generation under an emergency order issued Monday by the U.S. Department of Energy. PJM on Sunday asked to be able to direct transmission owners and electric utilities in its Mid-Atlantic and Midwest footprint for permission to curtail those facilities if needed for three days starting May 18 because of hot weather combined with planned power plant maintenance outages.","pscan":"https://www.utilitydive.com/news/pjm-doe-emergency-order-curtail-data-centers/820571/","uconf":"High","uquote":"Providing reliable service is Dominion Energy's core mission. Our team, comprised of the foremost experts in the industry, stands ready to provide customized energy solutions ranging from site selection, permitting assistance, infrastructure planning, and rate option reviews.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"COPT Defense Properties","spon":"COPT Defense Properties","tenant":"Amazon Data Services","oy":2016,"tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"utilitydive.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.utilitydive.com/news/pjm-doe-emergency-order-curtail-data-centers/820571/"]},{"id":"9185a4ed42a3","cid":"9185a4ed42a3","canon":1,"dups":1,"ftype":"data_center","name":"COPT DC INNOVATION LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"“Prince William County is a good choice for COPT to expand because of the abundant availability of land, power and low latency fiber connectivity found within Innovation Park,” says COPT CEO Steve Budorick.","pscan":"https://princewilliamliving.com/copt-to-build-two-data-centers-in-innovation-park/","uconf":"High","uquote":"Dominion Energy (NYSE: D), headquartered in Richmond, Va., provides regulated electricity service to 3.6 million homes and businesses in Virginia... This growth is driven by the need to provide reliable power to many of America's most important war fighting installations, the world's largest warship manufacturer, and the largest concentration of data centers on the planet as well as the leading edge of the AI revolution.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"COPT DC INNOVATION","spon":"Corporate Office Properties Trust (COPT)","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"princewilliamliving.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://princewilliamliving.com/copt-to-build-two-data-centers-in-innovation-park/"]},{"id":"6a99373aafb7","cid":"6a99373aafb7","canon":1,"dups":1,"ftype":"data_center","name":"COPT Defense Properties","city":"Lebanon","county":"Russell","state":"VA","lat":36.93342,"lng":-82.095934,"cprec":"distinct","status":"Operational","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The data center provides 100% SLA on power and cooling with N+1 configured redundancy.","uquote":"The largest electricity provider in the city based on megawatt hours sold is Appalachian Power Company.","ukey":"733|VA","uname":"Appalachian Power Co","rto":"PJM","nerc":"SERC","op":"COPT Defense Properties","spon":"COPT Defense Properties","tenant":"Northrop Grumman IT, Virginia Information Technologies Agency","oy":2007,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"37bdce39d2a5","cid":"37bdce39d2a5","canon":1,"dups":1,"ftype":"data_center","name":"COPT Defense Properties","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","op":"COPT Defense Properties","spon":"COPT Defense Properties","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"5fc773d9d9d0","cid":"5fc773d9d9d0","canon":1,"dups":1,"ftype":"data_center","name":"COPT Defense Properties","city":"Chester","county":"Chesterfield","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"COPT Defense Properties","spon":"COPT Defense Properties","tenant":"Northrop Grumman IT, Virginia Information Technologies Agency","oy":2007,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"eae528486086","cid":"eae528486086","canon":1,"dups":1,"ftype":"data_center","name":"COPT STONECROFT","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"COPT Defense Properties","spon":"COPT Defense Properties","tenant":"Federal user","ay":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"74b490153303","cid":"74b490153303","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"UTILITY PROVIDER. Dominion Energy - with two diverse sub-stations and utility feeders. UPS/PDU/RPP. 2N redundancy. UPTIME. 100% uptime SLA. OPERATIONS.","uconf":"High","uquote":"UTILITY PROVIDER. Dominion Energy - with two diverse sub-stations and utility feeders.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CoreSite","spon":"American Tower","ay":2008,"oy":2025,"contro":"Community opposition to expansion due to concerns about height, proximity to residences, noise, traffic, light pollution, and environmental impacts. CoreSite also filed a lawsuit against Fairfax County regarding requests for tenant information.","controScan":"https://www.ffxnow.com/2025/07/02/coresite-moves-to-expand-reston-data-centers-alarming-some-residents/","deal":"American Tower acquired CoreSite for approximately $10.1 billion in November 2021. CoreSite acquired Sunrise Technology Park for $60 million in 2016.","dealScan":"https://www.restonnow.com/2016/08/17/coresite-will-spend-60-million-for-reston-data-center-space/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"restonnow.com;ffxnow.com","srcUrls":["https://www.restonnow.com/2016/08/17/coresite-will-spend-60-million-for-reston-data-center-space/","https://www.ffxnow.com/2025/07/02/coresite-moves-to-expand-reston-data-centers-alarming-some-residents/"],"lflag":"source_quality_reclassified"},{"id":"26498e2cfbd2","cid":"26498e2cfbd2","canon":0,"dups":1,"ftype":"data_center","name":"CoreSite","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":51,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Utility Provider. Dominion Energy - with two diverse sub-stations and utility feeders.","pscan":"https://www.coresite.com/data-center/va2-reston-va","uconf":"High","uquote":"UTILITY PROVIDER. Dominion Energy - with two diverse sub-stations and utility feeders.","uscan":"https://www.coresite.com/data-center/va2-reston-va","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CoreSite","spon":"American Tower","ay":2018,"oy":2025,"contro":"Community opposition regarding height, noise, traffic, light pollution, and environmental impacts; lawsuit filed by CoreSite against Fairfax County over tenant information requests.","controScan":"https://patch.com/virginia/reston/reston-data-center-owner-refuses-release-names-tenants-report","deal":"Land acquisition of 22-acre Sunrise Technology Park for $60 million in 2016.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"coresite.com;patch.com","srcUrls":["https://www.coresite.com/data-center/va2-reston-va","https://patch.com/virginia/reston/reston-data-center-owner-refuses-release-names-tenants-report"],"lflag":"merged_duplicate"},{"id":"507603c41ec0","cid":"507603c41ec0","canon":1,"dups":1,"ftype":"data_center","name":"Coresite 12100 SV & 12098 SV","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"CoreSite's Northern Virginia data centre campus, comprised of three operating data centres (VA1, VA2, and VA3) and scalable to provide over 100 megawatts of capacity at full buildout, provides direct, low-latency access to all major cloud service providers, which are natively deployed within its Reston data centre campus. The portfolio for Dominion Energy's 100% Renewable Energy ProgramSM currently includes locally-sourced solar, hydroelectric, and biomass energy. Redundant power with UPS and generator backup. Double-stacked diesel generators were designed to provide ten (10) 2.5MW Generators within a very small equipment yard.","uconf":"High","uquote":"The largest electricity provider in Fairfax County by megawatt hours sold is Dominion Energy. Most residents are served by Dominion Virginia Power. Dominion Energy - Virginia.","uscan":"https://wattbuy.com/en/electricity-rates/virginia/reston/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CoreSite","spon":"American Tower","ay":2008,"oy":2008,"contro":"CoreSite LLC filed a civil suit against Fairfax County for requesting tenant lists. Community residents expressed alarm over CoreSite's data center expansion plans in Reston.","controScan":"https://www.ffxnow.com/2025/07/02/coresite-moves-to-expand-reston-data-centers-alarming-some-residents/","deal":"CoreSite acquired the property at 12100 Sunrise Valley Drive from AOL in 2008. CoreSite Realty Corporation was acquired by American Tower Corporation for US$10.1 billion.","dealScan":"https://thetechcapital.com/coresites-northern-virginia-campus-reaches-100-renewable-energy-status/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"wattbuy.com;thetechcapital.com;ffxnow.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://wattbuy.com/en/electricity-rates/virginia/reston/","https://thetechcapital.com/coresites-northern-virginia-campus-reaches-100-renewable-energy-status/","https://www.ffxnow.com/2025/07/02/coresite-moves-to-expand-reston-data-centers-alarming-some-residents/"]},{"id":"4b9d7bb0ebfa","cid":"4b9d7bb0ebfa","canon":1,"dups":1,"ftype":"data_center","name":"Coresite Real Estate 12100 Sunrise Valley Drive","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"b9959afbe504","cid":"b9959afbe504","canon":1,"dups":1,"ftype":"data_center","name":"CoreSite Real Estate Sunrise Technology Park, LLC","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"UTILITY PROVIDER. Dominion Energy - with two diverse sub-stations and utility feeders.","pscan":"https://www.coresite.com/data-center/va1-reston-va","uconf":"High","uquote":"UTILITY PROVIDER. Dominion Energy.","uscan":"https://www.coresite.com/data-center/va3-reston-va","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CoreSite","spon":"American Tower","ay":2018,"oy":2019,"contro":"Local residents expressed alarm over CoreSite's expansion plans, citing concerns about noise and proximity to residential areas.","controScan":"https://www.ffxnow.com/2025/07/02/coresite-moves-to-expand-reston-data-centers-alarming-some-residents/","deal":"CoreSite acquired the 22-acre Sunrise Technology Park from Brookfield Office Properties for $60 million in 2016.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"coresite.com;ffxnow.com","srcUrls":["https://www.coresite.com/data-center/va1-reston-va","https://www.coresite.com/data-center/va3-reston-va","https://www.ffxnow.com/2025/07/02/coresite-moves-to-expand-reston-data-centers-alarming-some-residents/"]},{"id":"48c63137f33a","cid":"48c63137f33a","canon":1,"dups":1,"ftype":"data_center","name":"Corporate Office Properties Trust (COPT - DC6)","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":19,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"A critical power of 5 MW is served to data center with modular container ready pads available. The power is fed by dedicated 50 MW NOVEC feeder to the building.","pscan":"https://cloudandcolocation.com/datacenters/copt-data-center-solutions-copt-dc-6-data-center/","uconf":"High","uquote":"The power is fed by dedicated 50 MW NOVEC feeder to the building.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Cloud Capital (affiliate of CloudHQ)","ay":2010,"oy":2009,"deal":"Sale of COPT DC-6 to Cloud Capital, an affiliate of CloudHQ, for $222.5 million on January 25, 2022.","dealScan":"https://investors.copt.com/news-events/press-releases/detail/453/copt-sells-dc-6-for-222-5-million","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;investors.copt.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://cloudandcolocation.com/datacenters/copt-data-center-solutions-copt-dc-6-data-center/","https://investors.copt.com/news-events/press-releases/detail/453/copt-sells-dc-6-for-222-5-million"]},{"id":"86df95d52068","cid":"86df95d52068","canon":1,"dups":1,"ftype":"data_center","name":"Corporate Office Properties, L.P. - Park Center","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"COPT Defense Properties","spon":"COPT Defense Properties","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"2bac6c471453","cid":"2bac6c471453","canon":1,"dups":1,"ftype":"data_center","name":"CPUS STERLING LP","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/cpus-sterling-lp-972b6399","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cpus-sterling-lp-972b6399","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CPUS STERLING","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/cpus-sterling-lp-972b6399"]},{"id":"ebc33aa92c0d","cid":"ebc33aa92c0d","canon":0,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Up to 105 MW at full build;... Diverse power delivered by two independent circuits; 750kVA Mitsubishi UPS systems; each power leg has a dedicated UPS with battery backup; Scalable 2.25MW Detroit Diesel dedicated generators pre-wired for additional capacity; 6,000-gallon belly tank per generator.","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2014,"oy":2016,"deal":"Securitization of real estate and tenant lease payments for space and electrical capacity in eight data centers in Sterling, Va., and San Antonio, Texas, through CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, dated March 05, 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c"],"lflag":"citation_artifact_removed source_quality_reclassified,merged_duplicate"},{"id":"0a0e4938727d","cid":"0a0e4938727d","canon":0,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":105,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Up to 105 MW at full build; Up to 1000 W per square foot; Multiple levels of redundancy available within the same footprint (e.g., N, 2N); Diverse power delivered by two independent circuits; 750kVA Mitsubishi UPS systems; each power leg has a dedicated UPS with battery backup; Scalable 2.25MW Detroit Diesel dedicated generators pre-wired for additional capacity; 6,000-gallon belly tank per generator.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"Kohlberg Kravis Roberts and Global Infrastructure Partners","ay":2017,"oy":2022,"deal":"Series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas (March 5, 2024)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c"],"lflag":"merged_duplicate"},{"id":"f6ca1f66b5bc","cid":"f6ca1f66b5bc","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":135,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Power - Utility capacity – 135 MW total - Utility voltage – 34.5 kV - Number of Utility Feeders – 4 (2 redundant) - Number of transformers on site – 40 each - UPS configuration and capacity – 4:3 distributed redundant, 1500 kW each - Generator power – 2250 kW x 80 each = 180 MW Cooling - York Roof Mounted Air Cooled Chillers - 530 tons x 70 each = 37,100 total tons of DH cooling.","uconf":"High","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","oy":2020,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","srcUrls":["https://www.loudoun.gov/2674/Utilities"]},{"id":"704bb2c812eb","cid":"66f253cae492","canon":0,"dups":2,"ftype":"data_center","name":"CyrusOne","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Power: - 24MW critical IT capacity - 34.5kV incoming feed - One utility feeder currently planned, possibly three long term - 20 transformers on site plus 1.5MW house - 4.5MW and 7.5MW block redundant designs - 45MW of generator power plus 1.5MW house power.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c"]},{"id":"66f253cae492","cid":"66f253cae492","canon":0,"dups":2,"ftype":"data_center","name":"CyrusOne","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","deal":"Securitization of real estate and tenant lease payments for space and electrical capacity in eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas, as part of CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance (March 5, 2024).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"06e6fde34f58","cid":"06e6fde34f58","canon":0,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"The facility features zero-water cooling systems and boasts highly efficient chillers, variable frequency drives, and energy-efficient CRAH units. Water-Free Cooling; Minimal water usage for humidification and maintenance; Highly efficient chillers and variable frequency drives; Energy-efficient CRAH units.","pscan":"https://www.cyrusone.com/data-centers/north-america/sterling-virginia-nva4","uquote":"Interconnection.fyi, a directory of US ISO & utility interconnection queues, lists Dominion Energy as the Grid Operator for CyrusOne in Sterling, VA.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2016,"oy":2016,"deal":"Securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne's Sterling, VA, and San Antonio, TX, data centers (Series 2024-1 class A-2 note issuance) on March 5, 2024.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cyrusone.com;interconnection.fyi","srcUrls":["https://www.cyrusone.com/data-centers/north-america/sterling-virginia-nva4","https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c"],"lflag":"merged_duplicate"},{"id":"775283de40f9","cid":"775283de40f9","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne – NVA14","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":60,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Total critical power capacity of 36 MW, expandable to 80 MW from an on-site 300 MW substation from Dominion Energy.","uquote":"Total critical power capacity of 36 MW, expandable to 80 MW from an on-site 300 MW substation from Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR, Global Infrastructure Partners (GIP)","ay":2023,"oy":2023,"deal":"CyrusOne acquired PowerHouse ABX-1 for $154.1 million in December 2024.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b0a00749ac2f","cid":"b0a00749ac2f","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Kincora","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/cyrusone-kincora-18b5a79f","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and BlackRock","ay":2016,"oy":2017,"deal":"Virginia Transportation Infrastructure Bank (VTIB) received payment of more than $8 million when CyrusOne acquired the land in June 2016.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-kincora-18b5a79f"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"c365ec7d8d2f","cid":"c365ec7d8d2f","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Loudoun Tech Center","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":84,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"With 420,000 sq. ft. of IT technical space and 84MW of power, the facility features zero-water cooling, variable frequency drives, and energy-efficient CRAH units.","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2014,"oy":2015,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c"],"lflag":"source_quality_reclassified"},{"id":"b99566a9b42d","cid":"b99566a9b42d","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Northern Virginia Data Center - Maries Road","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The operational and planning functions of Dominion Energy's electric transmission system are provided by PJM Interconnection, a regional transmission organization (RTO).... Power: - 24MW critical IT capacity - 34.5kV incoming feed - One utility feeder currently planned, possibly three long term - 20 transformers on site plus 1.5MW house - 4.5MW and 7.5MW block redundant designs - 45MW of generator power plus 1.5MW house power.","pscan":"https://www.dominionenergy.com/about/delivering-energy/electric-transmission-access","uconf":"High","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2019,"oy":2022,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"dominionenergy.com","srcUrls":["https://www.dominionenergy.com/about/delivering-energy/electric-transmission-access"],"lflag":"citation_artifact_removed"},{"id":"96269bea7cfc","cid":"96269bea7cfc","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Northern Virginia Data Center - Shaw Road","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/cyrusone-northern-virginia-data-center-shaw-road-730a2e21","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-northern-virginia-data-center-shaw-road-730a2e21","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","ay":2016,"oy":2016,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-northern-virginia-data-center-shaw-road-730a2e21"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"302458b1a876","cid":"302458b1a876","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne Sterling IX/X/XI","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":135,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Utility voltage – 34.5 KV. Number of Utility Feeders – 5 primary (5 redundant)","pscan":"https://baxtel.com/data-center/cyrusone-sterling-ix","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","oy":2020,"deal":"Securitization of real estate and tenant lease payments for space and electrical capacity in eight data centers, including Sterling, VA facilities, as part of CyrusOne Data Centers Issuer I LLC's series 2024-1 note issuance (March 2024).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;interconnection.fyi","srcUrls":["https://baxtel.com/data-center/cyrusone-sterling-ix","https://www.interconnection.fyi/data-center/project/cyrusone-f83a096c"],"lflag":"source_quality_reclassified"},{"id":"ff81050d621e","cid":"ff81050d621e","canon":1,"dups":1,"ftype":"data_center","name":"CYXTERA COLOCATION","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":4,"pc":"Grid","pconf":"High","pquote":"The data center is N+1 power design, and a total of 4.3 MW of power is fed to the facility.","pscan":"https://cloudandcolocation.com/datacenters/cyxtera-sterling-data-center-iad1-c/","uconf":"High","uquote":"Dominion Energy says it has resumed providing new connections to data center customers in a power-constrained section of Loudoun County, Virginia.","uscan":"https://www.datacenterfrontier.com/energy/article/11436951/dominion-resumes-new-connections-but-loudoun-faces-lengthy-power-constraints","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Csquare","spon":"Brookfield","deal":"Brookfield acquired Cyxtera in November 2023, combining it with Evoque.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;datacenterfrontier.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyxtera-sterling-data-center-iad1-c/","https://www.datacenterfrontier.com/energy/article/11436951/dominion-resumes-new-connections-but-loudoun-faces-lengthy-power-constraints"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"85ad6eaead4b","cid":"85ad6eaead4b","canon":1,"dups":1,"ftype":"data_center","name":"CYXTERA DC2 COLOCATION","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":2,"pc":"Grid","pconf":"High","pquote":"Power Utility: Dominion Virginia Power.","pscan":"https://baxtel.com/data-center/centersquare-sterling-dc2","uconf":"High","uquote":"Power Utility: Dominion Virginia Power.","uscan":"https://baxtel.com/data-center/centersquare-sterling-dc2","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Csquare","spon":"American Realty Advisors (via ACPF Nova Data Center )","tenant":"Cyxtera Technologies","oy":1999,"deal":"Cyxtera's DC2 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies. ACPF Nova Data Center LLC, an affiliate of Los Angeles investment firm American Realty Advisors, has bought two Cyxtera Technologies data centre buildings in Sterling for $51 million, according to Loudoun property records.","dealScan":"https://datacentre.me/newsletter/acpf-nova-data-center-llc-acquires-two-cyxtera-data-centre-facilities/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;datacentre.me","srcUrls":["https://baxtel.com/data-center/centersquare-sterling-dc2","https://datacentre.me/newsletter/acpf-nova-data-center-llc-acquires-two-cyxtera-data-centre-facilities/"],"band":"< 10 MW"},{"id":"f45cf64ff5bb","cid":"f45cf64ff5bb","canon":1,"dups":1,"ftype":"data_center","name":"Darab Ventures One, Two, Six LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Dominion Energy.... Dominion Energy's ability to plan ahead and keep up with unprecedented development now supports 1,027 megawatts (MW) according to the CBRE 1H2019 North American Data Center report.","pscan":"https://www.interconnection.fyi/data-center/project/darab-ventures-six-13e55c9d","uconf":"High","uquote":"Grid Operator: Dominion Energy.... In Loudoun County, the approval process for data centers has been streamlined through a fast-track program, while Dominion Energy's ability to plan ahead and keep up with unprecedented development now supports 1,027 megawatts (MW) according to the CBRE 1H2019 North American Data Center report.","uscan":"https://www.interconnection.fyi/data-center/project/darab-ventures-six-13e55c9d","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"CloudHQ","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/darab-ventures-six-13e55c9d"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"3aee9b091d35","cid":"3aee9b091d35","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER BUILDING C","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","uquote":"Coupled with Dominion Energy's ongoing power shortages in Northern Virginia, developers are redirecting investments to counties with more flexible permitting and available land, the report notes.","uscan":"https://www.datacenterknowledge.com/data-center-site-selection/virginia-faces-new-headwinds-in-data-center-growth","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DCT DULLES PHASE II","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","lflag":"operational_null_capacity source_quality_reclassified generic_permit_record","srcUrls":["https://www.datacenterknowledge.com/data-center-site-selection/virginia-faces-new-headwinds-in-data-center-growth"]},{"id":"3f069d366b9c","cid":"3f069d366b9c","canon":1,"dups":1,"ftype":"data_center","name":"DATA CENTER VINT HILL","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Redundant power is critical for our infrastructures to operate smoothly, so we use a double power supply. Autonomous generators can also take over in the event of a general outage.","pscan":"https://www.ovhcloud.com/en/datacenter/","uconf":"High","uquote":"Todd Haymore, Virginia Secretary of Commerce and Trade, believes the project is a “win-win,” stating, “OVH will invest in infrastructure enhancements to the Vint Hill Business Park; opening access to the development of nearly 150 acres with increased fiber, sewer, water, and electrical capacity.”","uscan":"https://www.meritalk.com/articles/ovh-to-establish-its-first-u-s-data-center-in-virginia/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"OVHcloud","spon":"OVHcloud (with minority stake by KKR and TowerBrook Capital Partners)","tenant":"OVHcloud","ay":2016,"oy":2017,"deal":"$47 million investment for establishment (2016); $4.8 million property acquisition (October 2016)","dealScan":"https://www.meritalk.com/articles/ovh-to-establish-its-first-u-s-data-center-in-virginia/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"ovhcloud.com;meritalk.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.ovhcloud.com/en/datacenter/","https://www.meritalk.com/articles/ovh-to-establish-its-first-u-s-data-center-in-virginia/"]},{"id":"aba242ceda03","cid":"aba242ceda03","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Mclean","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"100% Renewable Energy Source.","pscan":"https://www.databank.com/data-centers/northern-virginia/mclean/","uconf":"Medium","uquote":"DOM, the Dominion zone covering most of Virginia and a slice of North Carolina.","uscan":"https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DataBank","spon":"DigitalBridge","deal":"DataBank acquired the site from zColo in 2020","dealScan":"https://baxtel.com/data-center/databank-mclean-iad2","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"databank.com;amperon.co;baxtel.com","srcUrls":["https://www.databank.com/data-centers/northern-virginia/mclean/","https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","https://baxtel.com/data-center/databank-mclean-iad2"],"lflag":"source_quality_reclassified"},{"id":"203bc41230a2","cid":"203bc41230a2","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"N+1 Power Design; 40MW Critical IT Load; 120V, 208V, 3P AC Power; 100% Renewable Energy Source.","uquote":"Grid Operator: Dominion Energy.","uscan":"https://cleanview.co/data-centers/virginia/1141/ashburn-campus-data-center-iad1","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DataBank","spon":"AustralianSuper, DigitalBridge, Swiss Life Asset Management, EDF Invest","ay":2021,"oy":2023,"deal":"DataBank is looking to raise $1.067B in funding by securitizing three data centers, including a 40 MW Ashburn facility custom-built in 2022, around September 2025.","dealScan":"https://www.bisnow.com/national/news/data-center/databank-billion-dollar-debt-raise-backed-by-three-us-data-centers-130910","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cleanview.co;bisnow.com","srcUrls":["https://cleanview.co/data-centers/virginia/1141/ashburn-campus-data-center-iad1","https://www.bisnow.com/national/news/data-center/databank-billion-dollar-debt-raise-backed-by-three-us-data-centers-130910"],"lflag":"source_quality_reclassified"},{"id":"4b28bbbca993","cid":"4b28bbbca993","canon":0,"dups":1,"ftype":"data_center","name":"DataBank","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"22df840794e1","cid":"22df840794e1","canon":1,"dups":1,"ftype":"data_center","name":"DBT Data","city":"Harrisonburg","county":"Harrisonburg city","state":"VA","lat":38.436255,"lng":-78.873303,"cprec":"distinct","status":"Operational","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"DBT has arranged for up to 40 megawatts of power from the Harrisonburg Electric Commission (HEC) at an attractive price of 3.5 cents per kilowatt hour. HEC is currently building a substation at the property to accommodate that capacity. DBT has procured six 2.5 megawatt Caterpillar generators, and expects to eventually have 12 generators supporting the site. The data center is supported by a dual-fed 69,000 volt utility service feeding on-site redundant transformers and delivers a 100% Service Level Agreement (SLA).","uquote":"DBT has arranged for up to 40 megawatts of power from the Harrisonburg Electric Commission (HEC) at an attractive price of 3.5 cents per kilowatt hour.","ukey":"15410|VA","uname":"Prince George Electric Coop","rto":"PJM","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","tenant":"Anthem Health","ay":2007,"oy":2008,"deal":"DBT-DATA sold its Cyber Integration Center in Harrisonburg in 2014 to an entity later acquired by QTS.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"f2e12719bb75","cid":"f2e12719bb75","canon":1,"dups":1,"ftype":"data_center","name":"DBT Data Cyber Integration Center","city":"Harrisonburg","county":"Harrisonburg","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Operational","mw":25,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/dbt-data-cyber-integration-center-ecfd8265","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"AC 139 TYCO STREET","spon":"AC 139 TYCO STREET","tenant":"Anthem Health","ay":2007,"oy":2007,"deal":"Sale to DBT-Data for $35M in Sept 2013","dealScan":"https://www.harrisonburghousingtoday.com/blog/archives/2013/10/harrisonburg-cyber-integration-center_1382433601/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;harrisonburghousingtoday.com","srcUrls":["https://www.interconnection.fyi/data-center/project/dbt-data-cyber-integration-center-ecfd8265","https://www.harrisonburghousingtoday.com/blog/archives/2013/10/harrisonburg-cyber-integration-center_1382433601/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"31150ba92a43","cid":"31150ba92a43","canon":1,"dups":1,"ftype":"data_center","name":"DBT-DATA ASHBURN HOLDING I","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Power is available from Dominion Power. The property is adjacent to the CenturyLink Data Center.... The second site is 23.58 acres on Broderick Drive near its intersection with Waxpool Road, which is adjacent to the AOL campus. It is anticipated that this site will accommodate 600,000 square feet of developable area from which electricity will be supplied by Dominion Power.","pscan":"https://www.prnewswire.com/news-releases/dbt-data-acquires-sterling-va-and-ashburn-va-sites-for-conversion-to-data-center-use-300272515.html","uconf":"High","uquote":"Power is available from Dominion Power. The property is adjacent to the CenturyLink Data Center.... The second site is 23.58 acres on Broderick Drive near its intersection with Waxpool Road, which is adjacent to the AOL campus. It is anticipated that this site will accommodate 600,000 square feet of developable area from which electricity will be supplied by Dominion Power.","uscan":"https://www.prnewswire.com/news-releases/dbt-data-acquires-sterling-va-and-ashburn-va-sites-for-conversion-to-data-center-use-300272515.html","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","spon":"DBT-Data","ay":2010,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","lflag":"online_before_announced operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.prnewswire.com/news-releases/dbt-data-acquires-sterling-va-and-ashburn-va-sites-for-conversion-to-data-center-use-300272515.html"]},{"id":"8d90b75bc192","cid":"8d90b75bc192","canon":1,"dups":1,"ftype":"data_center","name":"DC 11 DE LLC (Amazon)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Dominion Energy, Inc., commonly referred to as Dominion, is an American energy company headquartered in Richmond, Virginia that supplies electricity in parts of Virginia, North Carolina, and South Carolina","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"dbd9fcc0252f","cid":"dbd9fcc0252f","canon":1,"dups":1,"ftype":"data_center","name":"DC 12 14 DE LLC (Amazon)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Data centers already consume ~25% of Virginia's electricity and could reach 46% by 2030, driving massive grid upgrades and new generation needs (JLARC report). Utilities like Dominion cite data-center demand as a key factor in recent rate cases.... instead of building their own infrastructure they tap into the existing grid and force the power provider Dominion to build new infrastructure.","pscan":"https://www.youtube.com/watch?v=waqxwYIbbjk","uconf":"High","uquote":"Utilities like Dominion cite data-center demand as a key factor in recent rate cases.... Providing reliable service is Dominion Energy's core mission. Our team, comprised of the foremost experts in the industry, stands ready to provide customized energy solutions ranging from site selection, permitting assistance, infrastructure planning, and rate option reviews.","uscan":"https://www.dominionenergy.com/virginia/large-business-services/data-center-requests","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"youtube.com;dominionenergy.com","lflag":"operational_null_capacity citation_artifact_removed","srcUrls":["https://www.youtube.com/watch?v=waqxwYIbbjk","https://www.dominionenergy.com/virginia/large-business-services/data-center-requests"]},{"id":"ec342d8bf4b3","cid":"ec342d8bf4b3","canon":1,"dups":1,"ftype":"data_center","name":"DC 21/IAD 98","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"BCORE COPT DC-21","spon":"Blackstone Real Estate, Corporate Office Properties Trust (COPT)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"3b7b4bec3d5c","cid":"3b7b4bec3d5c","canon":1,"dups":1,"ftype":"data_center","name":"DC 8 9 10 DE","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","uquote":"Energy demand is rising quickly, especially in Loudoun County, which is a major center for technology and innovation. To keep up, Dominion Energy is planning and building new transmission lines while working with local, state, and community leaders.","uscan":"https://www.dominionenergy.com/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DC 8 9 10 DE","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"dominionenergy.com","lflag":"operational_null_capacity","srcUrls":["https://www.dominionenergy.com/"]},{"id":"a1bdb923e60c","cid":"a1bdb923e60c","canon":1,"dups":1,"ftype":"data_center","name":"DCT DULLES DOWNS Land Bay A","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ad6b8e9cb4c9","cid":"ad6b8e9cb4c9","canon":1,"dups":1,"ftype":"data_center","name":"DCT DULLES DOWNS Land Bay B","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","uquote":"Dominion said the infrastructure is needed to strengthen Virginia's grid and move electricity toward Northern Virginia, where data centers in Loudoun, Fairfax, and Prince William counties consume enormous amounts of power.","uscan":"https://www.thecooldown.com/green-business/power-line-proposal-virginia-data-centers/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DCT DULLES DOWNS","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"thecooldown.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.thecooldown.com/green-business/power-line-proposal-virginia-data-centers/"]},{"id":"342810e42c7d","cid":"3d66ea35bfc6","canon":0,"dups":2,"ftype":"data_center","name":"DCT DULLES PHASE II","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"DCT DULLES PHASE II","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"3d66ea35bfc6","cid":"3d66ea35bfc6","canon":1,"dups":2,"ftype":"data_center","name":"DCT DULLES PHASE II","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","uconf":"Low","uquote":"Dominion Energy will host a virtual open house tonight, January 6, from 5:00 - 6:00 p.m. to provide information and answer questions on their project to construct a new substation and associated transmission infrastructure on the southern border of the airport. The project, which is being referred to as Aviator 230 kV, will support a data center and will help meet rapid growth in electrical demand in the area.","uscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/11689","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DCT DULLES PHASE II","spon":"Prologis","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","lflag":"operational_null_capacity","srcUrls":["https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/11689"]},{"id":"7b279fe1c065","cid":"7b279fe1c065","canon":1,"dups":1,"ftype":"data_center","name":"Digital Fortress: Richmond","county":"Chesterfield County","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Operational","mw":25,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Tier III data center design with N+1 concurrently maintainable UPS and fully distributed redundant and uninterruptible power supply; Day one availability of 18,270 SF data center space with 4.1 MW of in place IT load. Additional 200,000 SF shell core expansion space supporting up to 25 MW of total power, deployable in under 20 weeks. Meadowville Technology Park is equidistant from Ashburn, VA and Virginia Beach cable landing stations. The site is connected with a newly built fully diverse multi-duct fiber system offering 4ms latency to hubs in Ashburn and Virginia Beach, and onward direct connectivity to subsea fiber systems serving Europe and South America. The electrical system is laid out in an n plus one concurrently maintainable distributed redundant with no single point of failure the two utility services are routed along either side of meadowville technology parkway with a separate 34.5 kilovolt circuit.","uconf":"High","uquote":"Dominion Energy delivers power to Meadowville Technology Park. Current service is 34.5 kV on site with 230 kV transmission available for large capacity loads. Dominion Energy can provide true dual feeds in Meadowville with power coming from two substations – Tyler and Enon.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Fortress","spon":"Chirisa Technology Parks","ay":2021,"oy":2021,"deal":"Acquisition of wholesale data center in Richmond, VA in March 2021 with over $100 Million invested in the campus to date.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"f5f56301d3ab","cid":"f5f56301d3ab","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL LOUDOUN IV","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/digital-loudoun-iv-ef04f652","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-loudoun-iv-ef04f652","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty Trust","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-loudoun-iv-ef04f652"]},{"id":"4ff56e791e26","cid":"4ff56e791e26","canon":1,"dups":2,"ftype":"data_center","name":"Digital Loudoun Pkwy Center N LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Digital Realty Data Center in Loudoun County, VA... Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","uconf":"High","uquote":"Digital Realty Data Center in Loudoun County, VA... Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty Trust","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;loudounpossible.com","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","https://loudounpossible.com/news/digital-realty-makes-150-million-commitment-in-loudoun-county"],"lflag":"citation_artifact_removed duplicate_cluster_canonical high_confidence_duplicate_consolidated","deal":"Digital Realty Trust, Inc. committed to invest at least $150 million by 2015 in its Loudoun County operation, announced July 10, 2013.","dealScan":"https://loudounpossible.com/news/digital-realty-makes-150-million-commitment-in-loudoun-county"},{"id":"7796ce21ef01","cid":"4ff56e791e26","canon":0,"dups":2,"ftype":"data_center","name":"Digital Loudoun Pkwy Center N LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The Ashburn campus is powered by 80 MW from the Greenway Substation which is located on Digital Realty's property. The construction of a second dedicated substation, the Enterprise Substation, also located on Digital Realty's property was constructed and completed in early 2014. This brings the total capacity of the Digital Ashburn campus to 230MW. Power is distributed to each building via dedicated underground, concrete encased duct banks.","uconf":"High","uquote":"The site is adjacent to one of the main fiber trunk runs in the county as well as a recently constructed sub-station and Dominion Virginia Power transmission lines.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2013,"oy":2015,"deal":"Digital Realty Trust, Inc. committed to invest at least $150 million by 2015 in its Loudoun County operation, announced July 10, 2013.","dealScan":"https://loudounpossible.com/news/digital-realty-makes-150-million-commitment-in-loudoun-county","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"loudounpossible.com","srcUrls":["https://loudounpossible.com/news/digital-realty-makes-150-million-commitment-in-loudoun-county"],"lflag":"source_quality_reclassified high_confidence_duplicate_consolidated"},{"id":"6d2fcb8abda9","cid":"36eb5ba67d87","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":13,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The facility includes three stories of state-of-the-art computer rooms plus a penthouse packed with N+2 backup diesel generators.","uquote":"160 MW renewable energy contracted in Dominion territory since 2017.","uscan":"https://www.digitalrealty.com/resources/blog/sustainability-spotlight-northern-virginia","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","oy":2003,"deal":"Acquired by Digital Realty from DuPont Fabros as part of a $7.6 Billion 12 datacenter deal in September 2017.","dealScan":"https://baxtel.com/data-center/1780-business-center-drive-va3-digital-realty","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalrealty.com;baxtel.com","srcUrls":["https://www.digitalrealty.com/resources/blog/sustainability-spotlight-northern-virginia","https://baxtel.com/data-center/1780-business-center-drive-va3-digital-realty"]},{"id":"36eb5ba67d87","cid":"36eb5ba67d87","canon":1,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":13,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The facility includes three stories of state-of-the-art computer rooms plus a penthouse packed with N+2 backup diesel generators.... Digital Realty is finding new ways to power data centers. We have contracted 1+ gigawatts of renewable energy since 2016 with utility-scale wind and solar power plants.","pscan":"https://www.digitalrealty.com/about/newsroom/press-releases/122574/digital-realty-advances-renewable-energy-solutions-in-northern-virginia-and-oregon","uquote":"160 MW renewable energy contracted in Dominion territory since 2017.","uscan":"https://www.digitalrealty.com/resources/blog/sustainability-spotlight-northern-virginia","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tenant":"Amazon Web Services (AWS)","oy":2003,"deal":"Acquired by Digital Realty from DuPont Fabros Technology in September 2017 as part of a $7.6 billion 12 data center deal.","dealScan":"https://baxtel.com/data-center/1780-business-center-drive-va3-digital-realty","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"digitalrealty.com;baxtel.com","srcUrls":["https://www.digitalrealty.com/about/newsroom/press-releases/122574/digital-realty-advances-renewable-energy-solutions-in-northern-virginia-and-oregon","https://www.digitalrealty.com/resources/blog/sustainability-spotlight-northern-virginia","https://baxtel.com/data-center/1780-business-center-drive-va3-digital-realty"],"lflag":"citation_artifact_removed"},{"id":"c81798fee098","cid":"c81798fee098","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":1000,"pc":"Grid","pconf":"High","pquote":"The Dulles Digital campus, situated in Sterling, is planned to eventually comprise 14 buildings and achieve up to 1GW of capacity, supported by six substations.","uconf":"High","uquote":"In an effort to insulate residential ratepayers, Virginia's State Corporation Commission approved a proposal by utility company Dominion Energy last year to place its largest users — mostly data centers — into a separate rate class.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Blackstone","ay":2018,"oy":2023,"contro":"Environmental impact on wetlands and streams; controversy over data centers pushing energy infrastructure costs onto residential consumers.","deal":"Site acquisition in 2018 for $236.5 million; joint venture with Blackstone for development.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"large_project_duplicate_review unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1665e6250274","cid":"1665e6250274","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":225,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"A Dominion Power substation is located adjacent to the property.","pscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007","uconf":"High","uquote":"A Dominion Power substation is located adjacent to the property.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tenant":"Amazon","deal":"Site acquisition by Digital Realty in March 2007 for $62.5 million.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"42abe85d66d6","cid":"42abe85d66d6","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"The datacenter is equipped with 15 MW of critical power capacity. - It features an N+1 UPS redundancy, ensuring reliable power distribution. - There is also a backup power system with N+1 generators, providing additional assurance against power outages.","rto":"PJM","nerc":"SERC","deal":"Acquisition of 4030-4050 Lafayette Center Drive, Chantilly, VA by Menlo Equities from Digital Realty in September 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f79d3c1223a3","cid":"bfec1ad4c10e","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","deal":"Digital Realty sold a non-core data center in Chantilly, Virginia for approximately $43 million in September 2023.","dealScan":"https://www.digitalrealty.com/about/newsroom/press-releases/123226/digital-realty-reports-third-quarter-2023-results","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"digitalrealty.com","lflag":"operational_null_capacity","srcUrls":["https://www.digitalrealty.com/about/newsroom/press-releases/123226/digital-realty-reports-third-quarter-2023-results"]},{"id":"bfec1ad4c10e","cid":"bfec1ad4c10e","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","proc":"Dedicated PPA","pcp":"ENGIE North America","pdt":"107,000 megawatt-hours annually from a 50-megawatt solar project","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"2e8368be4388","cid":"5bcec4012965","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"ffae1629c369","cid":"ffae1629c369","canon":1,"dups":6,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Grid","pconf":"High","pquote":"The Ashburn campus is powered by 80 MW from the Greenway Substation which is located on Digital Realty's property. The construction of a second dedicated substation, the Enterprise Substation, also located on Digital Realty's property was constructed and completed in early 2014. This brings the total capacity of the Digital Ashburn campus to 230MW. Power is distributed to each building via dedicated underground, concrete encased duct banks.","uconf":"High","uquote":"A Dominion Power substation is located adjacent to the property.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","deal":"Digital Realty and TPG Real Estate established a joint venture in which TPG acquired a majority stake in three stabilized hyperscale data centers in Northern Virginia for an aggregate value of $1.5 billion, announced July 27, 2023.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"d041688d48e5","cid":"ffae1629c369","canon":0,"dups":6,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Grid","pconf":"High","pquote":"The Ashburn campus is powered by 80 MW from the Greenway Substation which is located on Digital Realty's property. The construction of a second dedicated substation, the Enterprise Substation, also located on Digital Realty's property was constructed and completed in early 2014. This brings the total capacity of the Digital Ashburn campus to 230MW.","pscan":"https://www.highlandassociates.com/dlrashburn","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tenant":"investment grade customers","ay":2013,"oy":2015,"contro":"A neighborhood in Ashburn, Virginia, is suddenly finding itself in the headlines after word got out homeowners were being offered $4 million each to sell for data center development. But some residents say that headline doesn't at all represent an accurate picture of the quandry they face.","controScan":"https://www.youtube.com/watch?v=vOXYnNbdJWA","deal":"Digital Realty Trust announced a $188 million joint venture with Griffin Capital Essential Asset REIT. Digital Realty is contributing a 130,000-square-foot turn-key data center in Ashburn, Virginia, valued at about $185.5 million, excluding $2.1 million of closing costs, or $20,611 per kW.","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-sells-80-of-ashburn-data-center-to-griffin-capital","tier":2,"tlbl":"Reputable journalism","srcCt":4,"srcDom":"highlandassociates.com;interconnection.fyi;datacenterknowledge.com;youtube.com","srcUrls":["https://www.highlandassociates.com/dlrashburn","https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-sells-80-of-ashburn-data-center-to-griffin-capital","https://www.youtube.com/watch?v=vOXYnNbdJWA"],"band":"250+ MW"},{"id":"265f96b8865d","cid":"265f96b8865d","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Dominion Energy, the local power provider, charges data center companies rates 28% lower than the national average. This makes it much more affordable for data centers to power and scale infrastructure. Its location near the Potomac River also provides a steady flow of water for cooling systems via municipal water networks.","pscan":"https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers","uquote":"Dominion Energy, the local power provider, charges data center companies rates 28% lower than the national average.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tenant":"Amazon.com, Microsoft, Yahoo!, Facebook","ay":2007,"contro":"Local politicians and residents in Loudoun County are expressing concerns and opposition to data center expansion due to potential health impacts, noise, and strain on energy infrastructure, leading to proposed rate increases for residential customers.","controScan":"https://vadogwood.com/news/politics/virginians-share-concerns-about-data-centers-at-ashburn-town-hall/","deal":"Digital Realty formed a $188 million joint venture with Griffin Capital Essential Asset REIT in 2014, contributing a 130,000-square-foot data center in Ashburn. In 2023, Digital Realty and TPG Real Estate established a joint venture where TPG acquired a majority stake in three hyperscale data centers in Northern Virginia for an aggregate value of $1.5 billion.","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-sells-80-of-ashburn-data-center-to-griffin-capital","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"digitalrealty.com;datacenterknowledge.com;vadogwood.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified,merged_duplicate","srcUrls":["https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-sells-80-of-ashburn-data-center-to-griffin-capital","https://vadogwood.com/news/politics/virginians-share-concerns-about-data-centers-at-ashburn-town-hall/"]},{"id":"c045bfbbbf60","cid":"ffae1629c369","canon":0,"dups":6,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Grid","pconf":"High","pquote":"Our Ashburn Campus offers 500 MW of power capacity. Reliable and low-cost power is provided by a top transmission system and distributed through underground concrete-encased duct banks.","pscan":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad37","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"TPG Real Estate","tenant":"investment grade customers","ay":2007,"contro":"Uncertainty over data center cost allocation and environmental concerns regarding increased pollution from generators.","controScan":"https://www.utilitydive.com/news/pjm-accelerates-backstop-reliability-auction-amid-uncertainty-over-data-cen/820707/","deal":"Joint venture with TPG Real Estate where TPG acquired an 80% stake in three hyperscale data centers in Northern Virginia for $1.5 billion, announced July 27, 2023.","dealScan":"https://www.prnewswire.com/news-releases/digital-realty-and-tpg-announce-joint-venture-of-hyperscale-data-centers-in-northern-virginia-301887667.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"digitalrealty.com;prnewswire.com;utilitydive.com","lflag":"online_before_announced","srcUrls":["https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad37","https://www.prnewswire.com/news-releases/digital-realty-and-tpg-announce-joint-venture-of-hyperscale-data-centers-in-northern-virginia-301887667.html","https://www.utilitydive.com/news/pjm-accelerates-backstop-reliability-auction-amid-uncertainty-over-data-cen/820707/"],"band":"250+ MW"},{"id":"88e52e3508b7","cid":"88e52e3508b7","canon":0,"dups":3,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":230,"pc":"Grid","pconf":"High","pquote":"The power is provided by one of the most reliable transmission systems in the country with reduced risk of electrical interruptions and rates that are below the national average.","uquote":"Dominion Energy, the local power provider, charges data center companies rates 28% lower than the national average.","uscan":"https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tenant":"Amazon","ay":2007,"contro":"Local politicians in northern Virginia are running campaigns to slow data center expansion, citing strain on energy infrastructure and community friction.","deal":"Digital Realty announced a $188 million joint venture with Griffin Capital Essential Asset REIT for a 130,000-square-foot data center in Ashburn in 2014. Additionally, in 2023, Digital Realty and TPG Real Estate established a joint venture where TPG acquired a majority stake in three hyperscale data centers in Northern Virginia for an aggregate value of $1.5 billion.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"digitalrealty.com","lflag":"online_before_announced source_quality_reclassified,merged_duplicate","srcUrls":["https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers"],"band":"100-250 MW"},{"id":"98ba304b257f","cid":"ffae1629c369","canon":0,"dups":6,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Hybrid","pconf":"High","pquote":"The Ashburn campus is powered by 80 MW from the Greenway Substation which is located on Digital Realty's property. The construction of a second dedicated substation, the Enterprise Substation, also located on Digital Realty's property was constructed and completed in early 2014. This brings the total capacity of the Digital Ashburn campus to 230MW. Power is distributed to each building via dedicated underground, concrete encased duct banks. The power is provided by one of the most reliable transmission systems in the country with reduced risk of electrical interruptions and rates that are below the national average.... Redundant power sources, from UPS systems for shorter periods to backup generators for longer outages, are essential.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"A Dominion Power substation is located adjacent to the property.... Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","ay":2007,"oy":2014,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null},{"id":"5bcec4012965","cid":"5bcec4012965","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"e787074e2c23","cid":"88e52e3508b7","canon":0,"dups":3,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":230,"pc":"Grid","pconf":"High","pquote":"The Ashburn campus is powered by 80 MW from the Greenway Substation which is located on Digital Realty's property. The construction of a second dedicated substation, the Enterprise Substation, also located on Digital Realty's property was constructed and completed in early 2014. This brings the total capacity of the Digital Ashburn campus to 230MW. Power is distributed to each building via dedicated underground, concrete encased duct banks.","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"Amazon (AMZN)","ay":2010,"oy":2014,"contro":"Local politicians in northern Virginia are now running campaigns to slow the expansion instead of promising to attract more construction. Dozens of people attended a town hall at Stone Hill Middle School in Ashburn on Thursday night to raise concerns about data centers and the energy needed to power them to US Rep. Suhas Subramanyam of Virginia's 10th congressional district.","deal":"Digital Realty, the largest owner and operator of data center properties, paid $63.3 million to acquire properties at 21561 & 21571 Beaumeade Circle in Ashburn and 45901 & 45845 Nokes Boulevard in Sterling.","dealScan":"https://www.prnewswire.com/news-releases/digital-realty-trust-acquires-two-fully-leased-datacenter-properties-and-land-parcel-in-northern-virginia-80571272.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;prnewswire.com","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","https://www.prnewswire.com/news-releases/digital-realty-trust-acquires-two-fully-leased-datacenter-properties-and-land-parcel-in-northern-virginia-80571272.html"],"band":"100-250 MW"},{"id":"24d7c838ddc4","cid":"24d7c838ddc4","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":26,"pc":"Grid","pconf":"High","pquote":"The Ashburn campus is powered by 80 MW from the Greenway Substation which is located on Digital Realty's property. The construction of a second dedicated substation, the Enterprise Substation, also located on Digital Realty's property was constructed and completed in early 2014. This brings the total capacity of the Digital Ashburn campus to 230MW.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2022,"oy":2025,"contro":"Community opposition regarding noise, air pollution, and calls for undergrounding transmission lines in Loudoun County.","controScan":"https://capstonedc.com/insights/data-center-investors-face-growing-risk-from-local-opposition/","deal":"Digital Realty closed a $3.25 billion U.S. hyperscale data center fund, focusing on markets including Northern Virginia (March 31, 2026).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;capstonedc.com","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","https://capstonedc.com/insights/data-center-investors-face-growing-risk-from-local-opposition/"],"band":"25-50 MW","lflag":"merged_duplicate"},{"id":"a214ea3660fc","cid":"a214ea3660fc","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":96,"pc":"Grid","pconf":"High","pquote":"The Dulles Digital campus, situated in Sterling, is planned to eventually comprise 14 buildings and achieve up to 1GW of capacity, supported by six substations.","uconf":"Medium","uquote":"In an effort to insulate residential ratepayers, Virginia's State Corporation Commission approved a proposal by utility company Dominion Energy last year to place its largest users — mostly data centers — into a separate rate class.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Blackstone","tenant":"Savvis","ay":2018,"oy":2023,"contro":"Noise complaints from residents","deal":"Acquisition of 424 acres (Western Lands) for $236.5 million from Metropolitan Washington Airports Authority","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"2bfee8ede464","cid":"ffae1629c369","canon":0,"dups":6,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Grid","pconf":"High","pquote":"Our Ashburn Campus offers 500 MW of power capacity. Reliable and low-cost power is provided by a top transmission system and distributed through underground concrete-encased duct banks.","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","ay":2013,"oy":2015,"deal":"Digital Realty entered a $1.5 billion joint venture with TPG Real Estate Partners, selling an 80% stake in three stabilized data centers in Ashburn, VA, in July 2023.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89"],"band":"250+ MW"},{"id":"d3041b054436","cid":"ffae1629c369","canon":0,"dups":6,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Grid","pconf":"High","pquote":"A Dominion Power substation is located adjacent to the property.","uquote":"A Dominion Power substation is located adjacent to the property.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"Amazon (AMZN)","ay":2007,"oy":2011,"deal":"Joint venture with TPG Real Estate for three hyperscale data centers in Northern Virginia at an aggregate value of $1.5 billion.","dealScan":"https://www.digitalrealty.com/about/newsroom/press-releases/123162/digital-realty-and-tpg-announce-joint-venture-of-hyperscale-data-centers-in-northern-virginia","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"digitalrealty.com","srcUrls":["https://www.digitalrealty.com/about/newsroom/press-releases/123162/digital-realty-and-tpg-announce-joint-venture-of-hyperscale-data-centers-in-northern-virginia"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"37e22c60b2a6","cid":"37e22c60b2a6","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"84ea29f28ae2","cid":"84ea29f28ae2","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"c272c7c1c9a2","cid":"88e52e3508b7","canon":0,"dups":3,"ftype":"data_center","name":"Digital Realty","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":230,"pc":"Grid","pconf":"High","pquote":"The Ashburn campus is powered by 80 MW from the Greenway Substation which is located on Digital Realty's property. The construction of a second dedicated substation, the Enterprise Substation, also located on Digital Realty's property was constructed and completed in early 2014. This brings the total capacity of the Digital Ashburn campus to 230MW.","uquote":"Dominion Energy, the local power provider, charges data center companies rates 28% lower than the national average.","uscan":"https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","tenant":"Amazon (AMZN)","ay":2007,"oy":2011,"deal":"Digital Realty Trust announced a $188 million joint venture with Griffin Capital Essential Asset REIT. Digital Realty is contributing a 130,000-square-foot turn-key data center in Ashburn, Virginia, valued at about $185.5 million","dealScan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-sells-80-of-ashburn-data-center-to-griffin-capital","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalrealty.com;datacenterknowledge.com","srcUrls":["https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-sells-80-of-ashburn-data-center-to-griffin-capital"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"827fcbb8b9dc","cid":"827fcbb8b9dc","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Bristow","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"The power infrastructure is supported by diverse utility feeds and on-site generators, ensuring ample energy supply for hosting critical IT equipment.","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","oy":2000,"deal":"Digital Realty merges with DuPont Fabros","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6ac1b897f62d","cid":"6ac1b897f62d","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty - Ashburn Campus","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"4f9102a759d2","cid":"a19dafd9741c","canon":0,"dups":2,"ftype":"data_center","name":"Digital Realty - Ashburn Campus","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Our Ashburn Campus offers 500 MW of power capacity. Reliable and low-cost power is provided by a top transmission system and distributed through underground concrete-encased duct banks.","pscan":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad37","uquote":"The site is adjacent to one of the main fiber trunk runs in the county as well as a recently constructed sub-station and Dominion Virginia Power transmission lines.","uscan":"https://www.prnewswire.com/news-releases/digital-realty-acquires-1259-acres-in-loudoun-county-virginia-300179102.html","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tenant":"Amazon Web Services (AWS)","ay":2009,"oy":2009,"contro":"PJM Interconnection is accelerating a backstop reliability auction to address rising demand from data centers, urging states to establish rules to shield residential and existing customers from costs.","controScan":"https://www.utilitydive.com/news/pjm-accelerates-backstop-reliability-auction-amid-uncertainty-over-data-cen/820707/","deal":"Digital Realty and TPG Real Estate established a joint venture where TPG acquired a majority stake in three hyperscale data centers in Northern Virginia for an aggregate value of $1.5 billion.","dealScan":"https://www.digitalrealty.com/about/newsroom/press-releases/123162/digital-realty-and-tpg-announce-joint-venture-of-hyperscale-data-centers-in-northern-virginia","tier":1,"tlbl":"Primary/Authoritative","srcCt":4,"srcDom":"digitalrealty.com;prnewswire.com;utilitydive.com","srcUrls":["https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad37","https://www.prnewswire.com/news-releases/digital-realty-acquires-1259-acres-in-loudoun-county-virginia-300179102.html","https://www.digitalrealty.com/about/newsroom/press-releases/123162/digital-realty-and-tpg-announce-joint-venture-of-hyperscale-data-centers-in-northern-virginia","https://www.utilitydive.com/news/pjm-accelerates-backstop-reliability-auction-amid-uncertainty-over-data-cen/820707/"],"lflag":"source_quality_reclassified"},{"id":"a19dafd9741c","cid":"a19dafd9741c","canon":1,"dups":2,"ftype":"data_center","name":"Digital Realty - Ashburn Campus","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Our Ashburn Campus offers 500 MW of power capacity. Reliable and low-cost power is provided by a top transmission system and distributed through underground concrete-encased duct banks.","pscan":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad37","uquote":"A Dominion Power substation is located adjacent to the property.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tenant":"Amazon Web Services (AWS)","ay":2007,"deal":"Digital Realty entered a $1.5 billion joint venture with TPG Real Estate Partners, selling an 80 percent stake in three stabilized data centers in Ashburn, VA, on July 27, 2023.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalrealty.com;datacenterknowledge.com","lflag":"online_before_announced","srcUrls":["https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad37","https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007"]},{"id":"dae9810396ed","cid":"dae9810396ed","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty - Lemur Properties, LLC (VA3)","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b7d96cd5b907","cid":"b7d96cd5b907","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty - Porpoise Ventures LLC (VA4)","city":"Bristow","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"The power infrastructure is supported by diverse utility feeds and on-site generators, which provide redundancy and ensure uninterrupted power delivery.","pscan":"https://inflect.com/building/8217-linton-hall-road-gainesville/digital-realty/datacenter/digital-realty-8217-linton-hall-road","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","ay":2000,"oy":2000,"deal":"AOL sold its 230,000-square-foot building to Porpoise Ventures LLC for $58.5 million on June 28, 2005. Digital Realty merged with DuPont Fabros in August 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","srcUrls":["https://inflect.com/building/8217-linton-hall-road-gainesville/digital-realty/datacenter/digital-realty-8217-linton-hall-road"]},{"id":"db76ff9fe5c5","cid":"db76ff9fe5c5","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty - Sterling Premiere LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","rto":"PJM","nerc":"SERC","op":"Digital Realty - Sterling Premiere","spon":"Digital Realty Trust","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"8a6728edc1d1","cid":"8a6728edc1d1","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty (Digital Loudoun 3 & 4, LLC)","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","proc":"Dedicated PPA","pcp":"SunEnergy1","pdt":"80MW solar installation for 40MW of Facebook's data center capacity, long-term","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ec16458ee5b0","cid":"ec16458ee5b0","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL REALTY ACC10","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":42,"pc":"Grid","pconf":"High","pquote":"The facility ensures uninterrupted power supply through diverse utility feeds, on-site generators, and UPS systems.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-acc10-db3d3e69","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-realty-acc10-db3d3e69"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"4dee85fb94a3","cid":"4dee85fb94a3","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL STERLING PREMIER","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"The site is adjacent to one of the main fiber trunk runs in the county as well as a recently constructed sub-station and Dominion Virginia Power transmission lines.","pscan":"https://www.prnewswire.com/news-releases/digital-realty-acquires-1259-acres-in-loudoun-county-virginia-300179102.html","uconf":"High","uquote":"The site is adjacent to one of the main fiber trunk runs in the county as well as a recently constructed sub-station and Dominion Virginia Power transmission lines.","uscan":"https://www.prnewswire.com/news-releases/digital-realty-acquires-1259-acres-in-loudoun-county-virginia-300179102.html","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty Trust","spon":"Digital Realty Trust","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.prnewswire.com/news-releases/digital-realty-acquires-1259-acres-in-loudoun-county-virginia-300179102.html"]},{"id":"2d4b56537b79","cid":"2d4b56537b79","canon":1,"dups":1,"ftype":"data_center","name":"Digital Western Lands LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The Dulles Digital campus, situated in Sterling, is planned to eventually comprise 14 buildings and achieve up to 1GW of capacity, supported by six substations.","uconf":"High","uquote":"JLARC concluded that building enough generation and transmission infrastructure to meet that level of demand would be “very difficult,” and that even meeting half of the projected demand would still be challenging — a prediction that Dominion Energy and other utilities share.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty; Blackstone (for part of the development)","ay":2018,"oy":2023,"contro":"The project has required modifications to environmental permits due to impacts on wetlands and streams, and the U.S. Army Corps of Engineers noted potential impact on the Northern Long Eared Bat.","deal":"Digital Realty acquired the site, formerly known as Western Lands, in 2018 for $236.5 million from the Metropolitan Washington Airports Authority. A joint venture with Blackstone is involved in the development of at least four buildings on the site.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1c19e2abb147","cid":"1c19e2abb147","canon":1,"dups":1,"ftype":"data_center","name":"DIGITAL-GCEAR1 ASHBURN","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":9,"pc":"Grid","pconf":"High","pquote":"The approximately 132,280 square foot data center was developed in 2009 and maintains a robust 16 megawatts of utility capacity and 9 megawatts of IT load capacity powered by the dedicated 80-megawatt Greenway Substation located within the Ashburn Campus.","uquote":"A Dominion Power substation is located adjacent to the property.","uscan":"https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"GI Partners, California Public Employees' Retirement System (CalPERS)","ay":2009,"oy":2010,"deal":"Acquisition by GI Partners and California Public Employees' Retirement System for $150 million in April 2023.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/next-gen-data-centers/digital-realty-s-225-megawatt-data-center-update-from-november-2007"],"band":"< 10 MW"},{"id":"5d1c7e4c4974","cid":"5d1c7e4c4974","canon":1,"dups":1,"ftype":"data_center","name":"DigitalThird Second Manassas, LLC & Digital Carver Brickyard, LLC","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty Trust","ay":2018,"oy":2025,"deal":"Property purchased by Digital Second for $5.75 million in 2018.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"806a3307ea37","cid":"806a3307ea37","canon":1,"dups":1,"ftype":"data_center","name":"DP Facilities","city":"Wise","county":"Wise","state":"VA","lat":36.974561,"lng":-82.62156,"cprec":"shared_centroid","status":"Operational","mw":9,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"The site connectivity features up to 45 MW of low-cost utility power, with up to 3MW from an adjacent solar farm, and access to major cloud providers. Mineral Gap has access to up to 45 megawatts of power from Old Dominion Power and also is supported by a 3.5-megawatt solar installation built on land previously mined for coal. In 2023, Mineral Gap made history by powering up Virginia's first commercial-scale solar field on previously coal mined land—a 3.6 MW array that provides behind-the-meter electricity to the data center.","pscan":"https://cardinalnews.org/2025/08/27/wise-county-voters-asked-to-consider-new-electric-authority/","proc":"Co-located generation","pcp":"Sun Tribe Solar","pdt":"3.6 MW array, $4.6 million project","uquote":"Mineral Gap has access to up to 45 megawatts of power from Old Dominion Power and also is supported by a 3.5-megawatt solar installation built on land previously mined for coal.","uscan":"https://cardinalnews.org/2025/08/27/wise-county-voters-asked-to-consider-new-electric-authority/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DP Facilities","spon":"DP Facilities, (Developer: DP Facilities South, )","oy":2016,"deal":"DP Facilities South invested $65 million to construct the data center. The Virginia Tobacco Commission approved a $350,000 grant. A $4.6 million solar project, supported by $500,000 in federal funds, was green-lighted to power the data center.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cardinalnews.org","srcUrls":["https://cardinalnews.org/2025/08/27/wise-county-voters-asked-to-consider-new-electric-authority/"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"3b49fad7aae4","cid":"3b49fad7aae4","canon":1,"dups":1,"ftype":"data_center","name":"DP Facilities Inc South LLC","city":"Wise","county":"Wise","state":"VA","lat":36.974561,"lng":-82.62156,"cprec":"shared_centroid","status":"Operational","mw":45,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Mineral Gap has access to up to 45 megawatts of power from Old Dominion Power and also is supported by a 3.5-megawatt solar installation built on land previously mined for coal.","uquote":"Mineral Gap has access to up to 45 megawatts of power from Old Dominion Power","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DP Facilities South","ay":2015,"oy":2017,"deal":"$65 million investment (announced 2015), $350,000 grant in Tobacco Region Opportunity Funds, $500,000 Abandoned Mine Land Pilot Program grant","dealScan":"https://www.dpfacilities.com/in-the-news/65-million-minderal-gap-data-center-to-be-built/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"dpfacilities.com","srcUrls":["https://www.dpfacilities.com/in-the-news/65-million-minderal-gap-data-center-to-be-built/"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"4b3b6926eac5","cid":"4b3b6926eac5","canon":1,"dups":2,"ftype":"crypto_hpc","name":"DP Facilities: Mineral Gap","county":"Wise County","state":"VA","lat":36.974561,"lng":-82.62156,"cprec":"shared_centroid","status":"Operational","mw":45,"pc":"Grid","pconf":"High","pquote":"The site connectivity features up to 45 MW of low-cost utility power, with up to 3MW from an adjacent solar farm","uconf":"Medium","uquote":"Reliable electric power with transmission upgrades from Old Dominion Power.","uscan":"https://elevatewisecounty.com/top-industries/data-centers/","ukey":"733|VA","uname":"Appalachian Power Co","rto":"PJM","nerc":"SERC","op":"DP Facilities","spon":"DP Facilities","ay":2015,"oy":2017,"deal":"Virginia Tobacco Commission approved a $350,000 grant in Tobacco Region Opportunity Funds for the project (date not specified); Wise County IDA received a $500,000 Abandoned Mine Land Economic Revitalization (AMLER) Program grant for the solar farm (December 16, 2021)","dealScan":"https://www.dpfacilities.com/in-the-news/new-data-center-expected-to-bring-40-jobs-to-wise-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"elevatewisecounty.com;dpfacilities.com","srcUrls":["https://elevatewisecounty.com/top-industries/data-centers/","https://www.dpfacilities.com/in-the-news/new-data-center-expected-to-bring-40-jobs-to-wise-county/"],"band":"25-50 MW","lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"1536d544b8e7","cid":"1536d544b8e7","canon":1,"dups":1,"ftype":"data_center","name":"Duffield Premier Data Center Site","county":"Scott County","state":"VA","lat":36.712776,"lng":-82.613624,"cprec":"distinct","status":"Operational","pc":"Hybrid","pconf":"High","pquote":"The utility power is provided by TVA, and is provided through two independent circuits from 2 x 1 MW N+1 diesel generators through dual Liebert Series 610 3-phase UPS in N+1 redundancy, directly into the 'A' and 'B' power supplies of client's servers.","pscan":"https://cloudandcolocation.com/datacenters/onepartner-duffield-data-center-atac/","uquote":"The utility power is provided by TVA","uscan":"https://cloudandcolocation.com/datacenters/onepartner-duffield-data-center-atac/","rto":"PJM","nerc":"SERC","op":"OnePartner ATAC","spon":"ONEPARTNER","oy":2008,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","lflag":"operational_null_capacity","srcUrls":["https://cloudandcolocation.com/datacenters/onepartner-duffield-data-center-atac/"]},{"id":"fdad806e222f","cid":"fdad806e222f","canon":1,"dups":1,"ftype":"data_center","name":"DULLES BERRY LC4","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":180,"uquote":"Utility. Dominion.","uscan":"https://www.interconnection.fyi/project/pjm-ag1-221","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"CloudHQ","ay":2022,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/project/pjm-ag1-221"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"ab05526e7306","cid":"ab05526e7306","canon":1,"dups":1,"ftype":"data_center","name":"DULLES NCP LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Northstar Commercial Partners","spon":"IPI Partners","tenant":"Amazon","oy":2018,"contro":"Lawsuit regarding alleged fraudulent kickback scheme related to data center lease transactions.","controScan":"https://courts.delaware.gov/Opinions/Download.aspx?id=334360","deal":"Joint Venture formed between Northstar and IPI Partners to fund data center projects for Amazon.","dealScan":"https://courts.delaware.gov/Opinions/Download.aspx?id=334360","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"courts.delaware.gov","lflag":"operational_null_capacity","srcUrls":["https://courts.delaware.gov/Opinions/Download.aspx?id=334360"]},{"id":"8a5497ce0b06","cid":"8a5497ce0b06","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","uquote":"There are two main utility companies in Virginia, both of which are Investor Owned Utilities (IOUs), meaning they're private for-profit companies: Dominion Virginia Power. Appalachian Power.","uscan":"https://www.energysage.com/local-data/electricity-cost/va/loudoun-county/chantilly/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DXC Technology","spon":"DXC Technology","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"energysage.com","srcUrls":["https://www.energysage.com/local-data/electricity-cost/va/loudoun-county/chantilly/"],"lflag":"source_quality_reclassified"},{"id":"816eb5749efd","cid":"816eb5749efd","canon":1,"dups":1,"ftype":"data_center","name":"DXC Technology","city":"Clarksville","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"53d4ca2a2df0","cid":"53d4ca2a2df0","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX Norfolk","city":"Norfolk","county":"Norfolk","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: PDU; UPS; Generators. Incoming Electrical Service Type. Single Feed. Electrical Distribution. Distributed Redundant. UPS Type. Static UPS. UPS Redundancy. N+1. PDU Redundancy. N+1. Generator Redundancy. N+1.","uconf":"High","uquote":"Dominion Energy is the only provider we have covering Norfolk city. To start or transfer electricity, contact Dominion Energy by phone at (866)366-4357 or visit their website.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"EdgeConneX","spon":"EQT Infrastructure","tenant":"Lumos Networks","oy":2015,"deal":"Acquisition of EdgeConneX by EQT Infrastructure","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2d12b650174a","cid":"2d12b650174a","canon":1,"dups":1,"ftype":"data_center","name":"EdgeConneX Richmond - EDCRIC01","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Grid","pconf":"High","pquote":"Concurrently maintainable power in a minimum of an N+1 configuration to include: PDU; UPS; Generators.","rto":"PJM","nerc":"SERC","op":"EdgeConneX","tenant":"Cloudflare, Comcast - Richmond, Netflix","oy":2014,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"08707bc16bb6","cid":"08707bc16bb6","canon":1,"dups":1,"ftype":"data_center","name":"ELIAS DC ASSETS","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"248787087cdf","cid":"248787087cdf","canon":1,"dups":1,"ftype":"data_center","name":"EQUINEX DC13","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"Incoming Electrical Service Type. Dual Circuits. Operating on 100% renewable energy, DC13 demonstrates Equinix's commitment to sustainability","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-ed147fe6","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","deal":"Acquisition of Verizon's data centers","dealScan":"https://baxtel.com/data-center/equinix-dc13","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-ed147fe6","https://baxtel.com/data-center/equinix-dc13"],"band":"10-25 MW"},{"id":"e2eb61cae11f","cid":"e2eb61cae11f","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"The datacenter is equipped with a reliable power infrastructure to ensure continuous operation. It has multiple power feeds and on-site generators, providing a stable power supply that can handle the demands of high-density computing environments.","pscan":"https://inflect.com/building/460-springpark-place-herndon/equinix/datacenter/dc97","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"LDI PROPCO 2","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","srcUrls":["https://inflect.com/building/460-springpark-place-herndon/equinix/datacenter/dc97"],"lflag":"source_quality_reclassified"},{"id":"00df3eef4b25","cid":"00df3eef4b25","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Closed transition transfer scheme featuring redundant utility and paralleling switchgear. 2N, Isolated Redundant Electrical Distribution.","pscan":"https://marketplace.upstack.com/data-centers/equinix-data-center-manassas-dc14-frmr-vz","uconf":"High","uquote":"The City of Manassas owns and maintains the electric distribution system within the city limits. City of Manassas Utility is a municipally owned entity operating in Manassas, Virginia and rural areas of Manassas city.","ukey":"11560|VA","uname":"City of Manassas - (VA)","rto":"PJM","nerc":"SERC","op":"Equinix","ay":2001,"deal":"Acquisition of 29 data centers from Verizon","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"marketplace.upstack.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://marketplace.upstack.com/data-centers/equinix-data-center-manassas-dc14-frmr-vz"]},{"id":"9aece0637282","cid":"9aece0637282","canon":0,"dups":2,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"Ashburn DC1 data center is a N+1 power infrastructure, and offer 99.999% SLA on power. The data center provides electrical capacity of 2.4 kVA per cabinet. The data center has single utility feed, and two power transformers. The data center has 480V – 3 phase AC power, and DC power to customer's equipment. The immediate power failure is protected by UPS in 2N configuration. The standby power is provided by 3 x 800 kW and 1 x 750 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-ashburn-data-center-dc1/","proc":"Tariff (utility)","pcp":"Dominion Energy","uconf":"Medium","uquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","uscan":"https://frontiermap.substack.com/p/the-demand-shift","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"Amazon Web Services (AWS), Google Cloud Platform, Microsoft Azure, ACN, Allied Telecom, Altice USA, ARIN, Arelion, Astound Business Solutions, Atlantech Online, Avanz Technologies, Bestel, Bright Telecom, China Telecom, Cincinnati Bell, Cogent, Colt, Comcast, PCCW Global, Cox Communications, Crown Castle, Cybersmart, Durand Tavola Internet, Earthwave, ESnet, euNetworks, Frontier, Fusion, GlobalDots, Infobip, Internet2, Internet Binat, Lumos Networks, Managed Nodes, Maryland Broadband Cooperative, Media Network Services, Openband Multimedia, Orange Business Services, PacketFabric, QuadraNet, SES, Shentel Service Company, Skyhigh Networks, Swisscom, T-Mobile, Videotron","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;frontiermap.substack.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-ashburn-data-center-dc1/","https://frontiermap.substack.com/p/the-demand-shift"],"lflag":"merged_duplicate"},{"id":"b099df6039f5","cid":"9aece0637282","canon":0,"dups":2,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Ashburn DC1 data center is a N+1 power infrastructure, and offer 99.999% SLA on power. The data center provides electrical capacity of 2.4 kVA per cabinet. The data center has single utility feed, and two power transformers. The data center has 480V – 3 phase AC power, and DC power to customer's equipment. The immediate power failure is protected by UPS in 2N configuration. The standby power is provided by 3 x 800 kW and 1 x 750 kW diesel generators in N+1 configuration.","uquote":"Dominion warned last summer that it did not have enough transmission lines and substations to serve newly built data centers in the county. The utility company said it has since accelerated its development plans to meet the demand for power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"Amazon Web Services (AWS), Google Cloud Platform, Microsoft Azure","ay":1999,"oy":1999,"contro":"Data centers in Northern Virginia, including the Equinix Ashburn campus, have faced controversy regarding noise from cooling fans and land use concerns from nearby residents.","deal":"Equinix acquired the Ashburn, Virginia technology campus, which includes DC1, for $53.0 million in 2005.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/equinix-buys-dc-data-center-for-53-million","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/equinix-buys-dc-data-center-for-53-million"]},{"id":"6a420314ca03","cid":"6a420314ca03","canon":0,"dups":1,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"94876fec7af3","cid":"94876fec7af3","canon":0,"dups":2,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Hybrid","pconf":"High","pquote":"Ashburn DC1 data center is a N+1 power infrastructure, and offer 99.999% SLA on power. The data center has single utility feed, and two power transformers. The data center has 480V – 3 phase AC power, and DC power to customer's equipment. The immediate power failure is protected by UPS in 2N configuration. The standby power is provided by 3 x 800 kW and 1 x 750 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-ashburn-data-center-dc1/","proc":"Tariff (utility)","pcp":"Dominion Energy","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-ashburn-east-ead9e533","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"Amazon Web Services (AWS), Google Cloud Platform, Microsoft Azure, Alibaba, Oracle Cloud, SAP Cloud, SoftLayer, Cisco Systems, , Cogent Communications, , Apple , Fidelity National Information Services, , GitHub","ay":1999,"oy":2020,"contro":"Local opposition to data centers in Loudoun County, where Ashburn is located, exists due to concerns about noise from cooling fans, demands on local water and power supplies, and the visual impact of the structures. Local and state Democrats have called on Dominion Energy to install underground transmission lines to mitigate the number of lines running through residential communities.","deal":"Equinix acquired 34 acres of land in Ashburn for $34.5 million in March 2017 for data center expansion. Equinix also bought its Ashburn, Virginia technology campus for $53.0 million in October 2005. Parts of the Ashburn campus, specifically ACC4 and ACC6, were acquired from Dupont Fabros in September 2017.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;interconnection.fyi","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-ashburn-data-center-dc1/","https://www.interconnection.fyi/data-center/project/equinix-ashburn-east-ead9e533"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"e9fe02d7f347","cid":"e9fe02d7f347","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Culpeper","county":"Culpeper","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","proc":"Tariff (utility)","pcp":"Town of Culpeper Electric Department","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"371ddc4f7422","cid":"371ddc4f7422","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Operational","mw":62,"pc":"Grid","pconf":"High","pquote":"As part of a four‑building, physically redundant campus with multi‑layered security and 100% renewable energy coverage, CU1 delivers unmatched trust, reliability, and continuity for mission‑critical workloads.","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-llc-cu-1-4-b6db2b84","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Terremark Worldwide","tenant":"Government agencies, Fortune 1000 companies","ay":2008,"oy":2008,"contro":"Yes","controScan":"https://www.saveculpeper.com/concerns","deal":"Acquisition by Equinix from Verizon for $3.6 billion","dealScan":"https://www.datacenterknowledge.com/deals/done-deal-equinix-closes-3-6b-verizon-data-center-acquisition","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"interconnection.fyi;datacenterknowledge.com;saveculpeper.com","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-llc-cu-1-4-b6db2b84","https://www.datacenterknowledge.com/deals/done-deal-equinix-closes-3-6b-verizon-data-center-acquisition","https://www.saveculpeper.com/concerns"],"band":"50-100 MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"84119f30855d","cid":"84119f30855d","canon":1,"dups":1,"ftype":"data_center","name":"Equinix DC 97","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"The datacenter is equipped with a reliable power infrastructure to ensure continuous operation. It has multiple power feeds and on-site generators, providing a stable power supply that can handle the demands of high-density computing environments.","pscan":"https://inflect.com/building/460-springpark-place-herndon/equinix/datacenter/dc97","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"LDI PROPCO 2","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"inflect.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://inflect.com/building/460-springpark-place-herndon/equinix/datacenter/dc97"]},{"id":"260b58dc8ae3","cid":"260b58dc8ae3","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX DC21","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility's power and cooling systems ensure N+2 UPS redundancy and N+1 standby power redundancy, supported by air-cooled chiller plant CRAH units.","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-llc-dc-21-dc-22-cc2cee9d","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2019,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-llc-dc-21-dc-22-cc2cee9d"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"d5c290cb5063","cid":"d5c290cb5063","canon":0,"dups":1,"ftype":"data_center","name":"Equinix LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":21,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center has a single utility feed, and ten power transformers. The data center provides 34.5 kVAC power, and DC power to customer's equipment. Immediate power failure is protected by redundant UPS' in N+1 configuration. Standby power is provided by 10 x 2,000 kW diesel generators in N+1 configuration.","pscan":"https://cloudandcolocation.com/datacenters/equinix-ashburn-data-center-dc11/","uquote":"Power costs are low with Dominion Power very accommodating to the data center sector.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"LightEdge Ashburn Data Center, Amazon Web Services (AWS), Oracle Cloud","ay":2013,"oy":2013,"contro":"A power outage affected Equinix data centers DC1 through DC6 and DC10 through DC12 in Ashburn, Virginia, causing connectivity problems for some Amazon cloud customers.","controScan":"https://www.datacenterknowledge.com/outages/equinix-power-outage-one-reason-behind-aws-cloud-disruption","deal":"The DC11 project represents about $79 million in capital investment.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"cloudandcolocation.com;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/equinix-ashburn-data-center-dc11/","https://www.datacenterknowledge.com/outages/equinix-power-outage-one-reason-behind-aws-cloud-disruption"],"lflag":"merged_duplicate"},{"id":"973cdf9cf79e","cid":"973cdf9cf79e","canon":1,"dups":1,"ftype":"data_center","name":"Equinix LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Ashburn DC2 data center is a N+1 power infrastructure, and offer 99.999% SLA on power.... The data center has single utility feed, and seven power transformers. The data center has 480V – 3 phase AC power, and DC power to customer's equipment. The immediate power failure is protected by UPS in N+1 configuration. The standby power is provided by 6x 2,000 kW diesel generators in N+1 configuration.","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"LightEdge Ashburn Data Center","ay":1998,"deal":"Acquisition of Ashburn campus for $53.0 million","dealScan":"https://www.datacenterknowledge.com/hyperscalers/equinix-buys-dc-data-center-for-53-million","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;datacenterknowledge.com","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","https://www.datacenterknowledge.com/hyperscalers/equinix-buys-dc-data-center-for-53-million"]},{"id":"7dae5222b4f9","cid":"7dae5222b4f9","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":8,"pc":"Grid","pconf":"High","pquote":"N+1 Power redundancy. Incoming Electrical Service Type. Dual Circuits. Electrical Distribution. Distributed Redundant. UPS Redundancy. N+1. Generator Redundancy. N+1.","pscan":"https://marketplace.upstack.com/data-centers/equinix-data-center-manassas-dc14-frmr-vz","uquote":"Grid Operator. Dominion Energy. Dominion's transmission easement for 500, 320 and 115kV power abuts and bisects the properties in Phase 1, meaning that transmission level power required by data center development would be added with NO NEW OVERHEAD POWER LINES in the county.","uscan":"https://www.pwcva.gov/assets/2022-08/Applicant%20Response%20Planning%20Commission%20Questions%20Letter%208.9.22_0.pdf","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","oy":2001,"deal":"Equinix acquired DC14 in Manassas as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon IAD4.","dealScan":"https://baxtel.com/data-center/equinix-manassas-dc14","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"marketplace.upstack.com;pwcva.gov;baxtel.com","srcUrls":["https://marketplace.upstack.com/data-centers/equinix-data-center-manassas-dc14-frmr-vz","https://www.pwcva.gov/assets/2022-08/Applicant%20Response%20Planning%20Commission%20Questions%20Letter%208.9.22_0.pdf","https://baxtel.com/data-center/equinix-manassas-dc14"],"band":"< 10 MW"},{"id":"bb1cd7c53056","cid":"bb1cd7c53056","canon":1,"dups":1,"ftype":"data_center","name":"Equinix LLC - DC 13","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Utility Feeders. 2. UPS Configuration. Isolated redundant. UPS Redundancy. N+1. Standby Power. Configuration. Two systems with each having 8 x 2,000. kW diesel generators. Standby Power. Redundancy. 2 x (N+1).","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-d0a489dd","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"Verizon, Zayo","ay":2000,"oy":2000,"deal":"Equinix acquired DC13 in Ashburn as well as 28 other datacenters from Verizon in May 2017. It was formerly named \"Verizon Washington Ashburn.\"","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-d0a489dd"]},{"id":"c6578889446b","cid":"c6578889446b","canon":1,"dups":1,"ftype":"data_center","name":"Equinix LLC (DC-21/DC-22)","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Equinix DC22 is a state-of-the-art, new data center situated in one of the most interconnected campuses in the region. It is covered by 100% renewable energy and supports high-density cooling solutions for your deployments.... DC21 is equipped with double-interlock pre-action fire suppression, VESDA, and 5.0 kVA per cabinet power density. The facility's power and cooling systems ensure N+2 UPS redundancy and N+1 standby power redundancy, supported by air-cooled chiller plant CRAH units.","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-llc-dc-21-dc-22-cc2cee9d","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"AWS Direct Connect, Microsoft Azure, 8x8, , Apple , Atlantech Online","ay":2020,"oy":2020,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-llc-dc-21-dc-22-cc2cee9d"],"lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"b2e9ac083631","cid":"b2e9ac083631","canon":1,"dups":1,"ftype":"data_center","name":"Equinix, LLC - Ashburn","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"DC10 Ashburn datacenter offers 4 to 6 kVA per cabinet from two separate utility feeds. Backed by 2N UPS block redundant and 10x 2,000 kW diesel N+1 generators.","pscan":"https://www.clouvider.com/ashburn-dc-equinix-dc10-equinix-datacenter/","proc":"Tariff (utility)","pcp":"Dominion Energy","uconf":"High","uquote":"At the same time, industry reporting says Dominion Energy's transmission upgrades remain a gating factor for delivering new megawatts in eastern Loudoun, with those upgrades expected to ease constraints around 2026, per Data Center Frontier.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","tenant":"LightEdge Ashburn Data Center","ay":1999,"oy":2020,"contro":"Local residents and elected officials in Loudoun County have expressed concerns about data centers, including potential health impacts from transmission lines, noise, and the industry's rapid growth and demand for power and water.","controScan":"https://vadogwood.com/news/politics/virginians-share-concerns-about-data-centers-at-ashburn-town-hall/","deal":"Equinix acquired the Ashburn, Virginia technology campus housing its primary DC-area data center for $53.0 million in October 2005. In March 2017, Equinix purchased four parcels of land spanning 34.5 acres in Loudon County, Virginia, proximate to its current Ashburn data center campus, for $34.5 million, to build multiple new International Business Exchange™ (IBX®) data centers.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"clouvider.com;vadogwood.com","srcUrls":["https://www.clouvider.com/ashburn-dc-equinix-dc10-equinix-datacenter/","https://vadogwood.com/news/politics/virginians-share-concerns-about-data-centers-at-ashburn-town-hall/"],"lflag":"source_quality_reclassified"},{"id":"f7bdcfe96adf","cid":"f7bdcfe96adf","canon":1,"dups":1,"ftype":"data_center","name":"Equinix, LLC - CU 1-4","city":"Culpeper","county":"Culpeper","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Operational","mw":62,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"As part of a four‑building, physically redundant campus with multi‑layered security and 100% renewable energy coverage, CU1 delivers unmatched trust, reliability, and continuity for mission‑critical workloads. Backed by Equinix's industry‑leading uptime and 100% renewable energy coverage, CU3 is well‑suited for sovereignty‑focused and high‑assurance workloads. Renewable Energy Coverage: 100% from RECs from U.S. wind VPPAs and Green-e wind RECs.","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-llc-cu-1-4-b6db2b84","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","tenant":"government agencies and regulated enterprises","ay":2016,"oy":2018,"contro":"Opposition to data centers in Culpeper, including concerns about noise, grid impact, and potential for crypto mining, with Equinix being an established facility in the area.","deal":"Acquisition of Verizon data center portfolio by Equinix for $3.6 billion.","dealScan":"https://baxtel.com/data-center/equinix-culpeper-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-llc-cu-1-4-b6db2b84","https://baxtel.com/data-center/equinix-culpeper-campus"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"323ff209ae01","cid":"49228326e3e5","canon":0,"dups":2,"ftype":"data_center","name":"Equinix, LLC - DC 14","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The data center boasts N+1 UPS redundancy, N+1 cooling redundancy, and is powered by 100% renewable energy from U.S. wind VPPAs and Green-e wind RECs, emphasizing Equinix's commitment to sustainability and operational excellence.","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"Verizon Communications","ay":2001,"oy":2001,"deal":"Acquisition of 29 data centers from Verizon Communications Inc. by Equinix.","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"investor.equinix.com","srcUrls":["https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from"],"lflag":"source_quality_reclassified"},{"id":"49228326e3e5","cid":"49228326e3e5","canon":1,"dups":2,"ftype":"data_center","name":"Equinix, LLC - DC 14","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The incoming service is 12.47kV with a closed transition transfer scheme featuring redundant utility and paralleling switchgear.... Utility Feeders. 2.... Standby Power. Configuration. 5 x 2,000 kW diesel generators in parallel.... powered by 100% renewable energy from U.S. wind VPPAs and Green-e wind RECs","pscan":"https://marketplace.upstack.com/data-centers/equinix-data-center-manassas-dc14-frmr-vz","rto":"PJM","nerc":"SERC","op":"Equinix","tenant":"Level 3 Communications, Verizon, Zayo","ay":2001,"oy":2017,"deal":"Acquisition by Equinix from Verizon","dealScan":"https://baxtel.com/data-center/equinix-manassas-dc14","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"marketplace.upstack.com;baxtel.com","srcUrls":["https://marketplace.upstack.com/data-centers/equinix-data-center-manassas-dc14-frmr-vz","https://baxtel.com/data-center/equinix-manassas-dc14"],"lflag":"citation_artifact_removed"},{"id":"b332c4990960","cid":"b332c4990960","canon":1,"dups":1,"ftype":"data_center","name":"Equinix, LLC - DC 97","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The datacenter is equipped with a reliable power infrastructure to ensure continuous operation. It has multiple power feeds and on-site generators, providing a stable power supply that can handle the demands of high-density computing environments.","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"LDI PROPCO 2","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7254fe76f778","cid":"7254fe76f778","canon":1,"dups":1,"ftype":"data_center","name":"Fadeley Campus","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"01a03f482f10","cid":"01a03f482f10","canon":1,"dups":1,"ftype":"data_center","name":"Filigree Ct Campus","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Equinix DC6 is equipped with a power capacity of 7.0 MW. The facility utilizes a diverse range of utility feeds to provide redundancy and reliability. Cooling: The datacenter employs a state-of-the-art cooling system to maintain optimal temperatures for the equipment. This includes N+1 redundancy, ensuring that even in the event of a failure, the cooling capacity remains unaffected.","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","tenant":"LightEdge","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-316c0f6b"]},{"id":"84f1d47fe12b","cid":"84f1d47fe12b","canon":1,"dups":1,"ftype":"data_center","name":"Flexential","city":"Richmond","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The critical infrastructure is protected by redundant UPS system on the loss of utility power that is backed up by redundant 2,000 kW diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/flexential-richmond-data-center/","uconf":"High","uquote":"Dependable. affordable electric energy supplied by Dominion Energy.","uscan":"https://henrico.com/locate-here/utilities/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Flexential","tenant":"American Telesis, AT&T, Comcast, Cox Communications, Crown Castle, Lumen Technologies, Lumos Networks, Verizon Business, Windstream, Zayo","ay":2007,"oy":2007,"deal":"Acquisition of bayMountain by Peak 10","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;henrico.com","srcUrls":["https://cloudandcolocation.com/datacenters/flexential-richmond-data-center/","https://henrico.com/locate-here/utilities/"],"lflag":"source_quality_reclassified"},{"id":"1efd74d21d5a","cid":"1efd74d21d5a","canon":1,"dups":1,"ftype":"data_center","name":"FR SUMMIT AWS","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"FR SUMMIT","tenant":"AWS","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"cbe35ca6c0ed","cid":"cbe35ca6c0ed","canon":1,"dups":1,"ftype":"data_center","name":"Freddie Mac Building - 8250 Jones Branch Drive","city":"McLean","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"Freddie Mac","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b8379f58e165","cid":"b8379f58e165","canon":1,"dups":1,"ftype":"data_center","name":"Freddie Mac Corporation","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"Freddie Mac","spon":"Freddie Mac","tenant":"Freddie Mac","oy":2002,"deal":"Freddie Mac Buys 110,000-SF Data Center for $19.5M","dealScan":"https://www.globest.com/2002/02/22/freddie-mac-buys-110000-sf-data-center-for-19-5m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"globest.com","srcUrls":["https://www.globest.com/2002/02/22/freddie-mac-buys-110000-sf-data-center-for-19-5m/"],"lflag":"source_quality_reclassified"},{"id":"3d2e6cf5453e","cid":"56ee0dbe3dac","canon":0,"dups":3,"ftype":"data_center","name":"Gainesville Crossing Data Campus","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":326,"pc":"Grid","pconf":"High","pquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","pscan":"https://corscale.com/","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/gainesville-crossing-data-campus-aeaba2b3","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale","spon":"Patrinely","ay":2021,"oy":2024,"deal":"Corscale Data Centers, a subsidiary of the Class A building developer Patrinely","dealScan":"https://www.corgan.com/projects/corscale-gainesville-crossing-data-center-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"corscale.com;interconnection.fyi;corgan.com","srcUrls":["https://corscale.com/","https://www.interconnection.fyi/data-center/project/gainesville-crossing-data-campus-aeaba2b3","https://www.corgan.com/projects/corscale-gainesville-crossing-data-center-campus"],"band":"250+ MW","lflag":"high_confidence_duplicate_consolidated"},{"id":"56ee0dbe3dac","cid":"56ee0dbe3dac","canon":1,"dups":3,"ftype":"data_center","name":"Gainesville Crossing Data Campus","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":326,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","pscan":"https://corscale.com/","uquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","uscan":"https://corscale.com/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale","spon":"Patrinely Group, Affinius Capital","ay":2021,"oy":2024,"contro":"The Gainesville Crossing Data Campus has been mentioned in discussions regarding data center restrictions and general opposition to data center proliferation in Prince William County, with concerns raised about noise from chillers and the need for extensive transmission lines and substations.","controScan":"https://www.thebanner.com/politics-power/local-government/montgomery-county-council-data-center-restrictions-24F7F7KOAJGLHNY5Z43CGCDM34/","deal":"Corscale Data Centers was formed as a new platform by Patrinely Group and USAA Real Estate (now Affinius Capital).","dealScan":"https://www.americanrepartners.com/news/new-data-center-developers-continue-to-flock-to-northern-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"corscale.com;americanrepartners.com;thebanner.com","srcUrls":["https://corscale.com/","https://www.americanrepartners.com/news/new-data-center-developers-continue-to-flock-to-northern-virginia","https://www.thebanner.com/politics-power/local-government/montgomery-county-council-data-center-restrictions-24F7F7KOAJGLHNY5Z43CGCDM34/"],"lflag":"source_quality_reclassified duplicate_cluster_canonical high_confidence_duplicate_consolidated"},{"id":"d63c2101d1a2","cid":"d63c2101d1a2","canon":1,"dups":1,"ftype":"data_center","name":"GCDC PURCHASER PHASE 1 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":72,"pc":"Grid","pconf":"High","pquote":"The Gainesville Crossing Data Center Campus (“GCDC Campus”, “GCDC”, or the “Project”) is a 130-acre development that is programmed to contain five (5) data centers totaling 306 MW of power capacity and a dedicated on-site substation at full build-out. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","pscan":"https://corscale.com/","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"GCDC PURCHASER PHASE 1","spon":"Patrinely Group, Affinius Capital","ay":2021,"oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"corscale.com","srcUrls":["https://corscale.com/"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"51975e96554a","cid":"51975e96554a","canon":1,"dups":1,"ftype":"data_center","name":"George Washington University - VA Campus Bldg II","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","ay":2026,"contro":"Loudoun County officials have voiced disapproval for Amazon building a data center on the former campus. Juli E. Briskman, a member of the Loudoun County Board of Supervisors whose district includes the campus, said she was disappointed to hear about the sale. She said under a 2023 zoning ordinance change, that parcel of land would require a special exception to build data centers there. She said she will fight hard not to have more added in that area because she believes the county has enough data centers and should diversify its economy, the area is power-constrained because of the data centers, and more housing is needed.","controScan":"https://www.southlakessentinel.com/news/2026/03/23/george-washington-university-sells-virginia-campus-to-aws-to-build-data-center/","deal":"Sale of George Washington University's Virginia Science and Technology Campus to Amazon Data Services for $427 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"southlakessentinel.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.southlakessentinel.com/news/2026/03/23/george-washington-university-sells-virginia-campus-to-aws-to-build-data-center/"]},{"id":"c08e947c797d","cid":"c08e947c797d","canon":1,"dups":1,"ftype":"data_center","name":"GI TC 45360 SEVERN WAY LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Amazon AWS","spon":"GI TC 45360 SEVERN WAY","tenant":"Amazon Web Services (AWS)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"26c2d38eb4e2","cid":"26c2d38eb4e2","canon":1,"dups":1,"ftype":"data_center","name":"GI TC 7510 MASON KING CT LLC (Amazon)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":46,"rto":"PJM","nerc":"SERC","op":"Amazon Data Services","tenant":"Amazon Web Services","oy":2003,"deal":"$65 million purchase by Amazon Data Services","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"484892d807e7","cid":"484892d807e7","canon":1,"dups":1,"ftype":"data_center","name":"Globalinx Virginia Beach","city":"Virginia Beach","county":"Virginia Beach","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"Energy provision is robust, redundant and low-cost; Served by a 34.5 kV, three-phase primary underground distribution feeder with a nearby 115 kV transmission line in the Corporate Landing Business Park.","pscan":"https://www.globalinxdatacenters.com/campus/","uquote":"Dominion Energy Certified Data Center Sites","uscan":"https://www.globalinxdatacenters.com/campus/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Globalinx Data Centers","tenant":"FiberLight, Mid-Atlantic Broadband (MBC)","oy":2018,"deal":"Virginia Beach Development Authority approved an $800,000 grant for expansion","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"globalinxdatacenters.com","srcUrls":["https://www.globalinxdatacenters.com/campus/"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"6242ea927ab1","cid":"6242ea927ab1","canon":1,"dups":1,"ftype":"data_center","name":"H5 CAPITAL-ASHBURN","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Dominion Power can provide the Ashburn data center with up to 30 MWs of reliable and affordable power (average annual costs per kWh of less than $0.065). Utility power can be delivered diverse substations. 8.5 MVA from Dominion Power is available immediately.","uconf":"High","uquote":"Dominion Power can provide the Ashburn data center with up to 30 MWs of reliable and affordable power (average annual costs per kWh of less than $0.065). Utility power can be delivered diverse substations. 8.5 MVA from Dominion Power is available immediately.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"H5 Data Centers","spon":"ASHBURN DATA PROPERTY OWNER","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"eb2c67423bc8","cid":"eb2c67423bc8","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Pro-growth incentives from state government and Dominion Power.","pscan":"https://h5datacenters.com/h5-acquires-ashburn-data-center.html","uquote":"Pro-growth incentives from state government and Dominion Power.","uscan":"https://h5datacenters.com/h5-acquires-ashburn-data-center.html","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"H5 Data Centers","spon":"Ashburn Data Property Owner, L.P.","ay":2015,"oy":2015,"deal":"H5 Data Centers acquired a wholesale data center at 21800 Beaumeade Drive in Ashburn, Virginia, on June 10, 2015.","dealScan":"https://h5datacenters.com/h5-acquires-ashburn-data-center.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"h5datacenters.com","srcUrls":["https://h5datacenters.com/h5-acquires-ashburn-data-center.html"],"lflag":"source_quality_reclassified"},{"id":"b5fe57ea09ad","cid":"b5fe57ea09ad","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers - Ashburn","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":42,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Utility power from dominion at rates below the national average.","pscan":"https://h5datacenters.com/slick_ashburn.pdf","uquote":"Strategically located in the heart of Northern Virginia's Data Center Alley, H5 Data Centers' Ashburn site is a 255,000 square foot new build with access to 42 Megawatts from Dominion Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"H5 Data Centers","spon":"Ashburn Data Property Owner, L.P.","tenant":"unnamed hyperscale client","ay":2023,"oy":2024,"deal":"Acquisition of wholesale data center at 21800 Beaumeade Drive in Ashburn, Virginia by H5 Data Centers","dealScan":"https://h5datacenters.com/h5-acquires-ashburn-data-center.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"h5datacenters.com","srcUrls":["https://h5datacenters.com/slick_ashburn.pdf","https://h5datacenters.com/h5-acquires-ashburn-data-center.html"],"lflag":"source_quality_reclassified"},{"id":"d82109a95b27","cid":"d82109a95b27","canon":1,"dups":1,"ftype":"data_center","name":"HAYDEN TECHNOLOGIES","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/hayden-technologies-llc-05aa7094","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/hayden-technologies-llc-05aa7094","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Hayden Technologies","ay":2025,"oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/hayden-technologies-llc-05aa7094"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"4b8fba3ff7fc","cid":"4b8fba3ff7fc","canon":1,"dups":1,"ftype":"data_center","name":"Hayden Technologies, LLC","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/hayden-technologies-llc-05aa7094","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/hayden-technologies-llc-05aa7094","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Hayden Technologies","spon":"Hayden Technologies","oy":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/hayden-technologies-llc-05aa7094"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"1b2fb6e0f023","cid":"1b2fb6e0f023","canon":1,"dups":1,"ftype":"data_center","name":"IAD 01-04","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":180,"proc":"Dedicated PPA","pcp":"AES, Constellation, Pleinmont, Virginia Electric, and Volt","pdt":"Not specified for this facility, but Microsoft aims for 100% renewable energy coverage globally by 2025 through PPAs.","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"570650f48866","cid":"570650f48866","canon":1,"dups":1,"ftype":"data_center","name":"IAD 41, IAD 42, BLDG P","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The facility offers a power density of up to 12 kW per cabinet. It has diverse underground utility feeds, providing reliable and robust power infrastructure. The datacenter is supported by N+1 UPS systems and N+1 emergency generators, ensuring power redundancy and backup.","pscan":"https://inflect.com/building/44751-round-table-plaza-ashburn/digital-realty/datacenter/44751-round-table","uquote":"Dominion Energy is the largest supplier of electricity in the Commonwealth of Virginia and the predominant electricity provider in Loudoun County.","uscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"DIGITAL LOUDOUN 3","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"inflect.com;loudoun.gov","lflag":"operational_null_capacity","srcUrls":["https://inflect.com/building/44751-round-table-plaza-ashburn/digital-realty/datacenter/44751-round-table","https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979"]},{"id":"53be19dca7fb","cid":"53be19dca7fb","canon":1,"dups":1,"ftype":"data_center","name":"IAD Digital Loudoun Plaza","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":500,"pc":"Grid","pconf":"High","pquote":"Our Ashburn Campus offers 500 MW of power capacity. Reliable and low-cost power is provided by a top transmission system and distributed through underground concrete-encased duct banks.","uconf":"High","uquote":"Power: Power is less expensive in Data Center Alley. Dominion Energy, the local power provider, charges data center companies rates 28% lower than the national average.","uscan":"https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","ay":2012,"oy":2013,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"digitalrealty.com","srcUrls":["https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers"],"band":"250+ MW"},{"id":"89d34b9f2eea","cid":"89d34b9f2eea","canon":1,"dups":1,"ftype":"data_center","name":"IAD Round Table Campus Digital Realty","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":96,"pc":"Grid","pconf":"High","pquote":"The datacenter is equipped with a reliable power infrastructure, including multiple power feeds from diverse substations. This ensures continuous power supply to maintain operational uptime. Additionally, the facility has backup generators and uninterruptible power supply (UPS) systems to provide redundancy and protect against power outages.","pscan":"https://inflect.com/building/44540-round-table-plaza-ashburn/digital-realty/datacenter/iad73","uconf":"High","uquote":"Digital Realty Data Center in Loudoun County, VA - Interconnection.fyi: \"Grid Operator: Dominion Energy.\"","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"DIGITAL LOUDOUN 3","oy":2017,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"inflect.com;interconnection.fyi","srcUrls":["https://inflect.com/building/44540-round-table-plaza-ashburn/digital-realty/datacenter/iad73","https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89"],"band":"50-100 MW"},{"id":"57ab5f155f5e","cid":"57ab5f155f5e","canon":1,"dups":1,"ftype":"data_center","name":"IAD03","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":72,"band":"50-100 MW","pc":"Grid","pconf":"Medium","pquote":"Aligned's IAD-03 hyperscale data center campus is carrier-neutral and positioned atop fiber and conduit routes that offer access to one of the highest concentrations of high-capacity dark fiber providers, major long-haul fiber carriers, and international networks in the nation.","pscan":"https://www.connectcre.com/stories/aligned-data-centers-begins-way-cool-second-hyperscale-campus-in-sterling/","rto":"PJM","nerc":"SERC","op":"Aligned Data Centers","spon":"Aligned Data Centers","oy":2023,"tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"connectcre.com","srcUrls":["https://www.connectcre.com/stories/aligned-data-centers-begins-way-cool-second-hyperscale-campus-in-sterling/"],"lflag":"source_quality_reclassified"},{"id":"d80ba6674f39","cid":"d80ba6674f39","canon":1,"dups":1,"ftype":"data_center","name":"IAD11","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-corp-blue-ridge-iad11-12-13-data-center-f85423b3","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corp-blue-ridge-iad11-12-13-data-center-f85423b3","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","ay":2022,"oy":2025,"contro":"While several data center projects in Loudoun County and elsewhere in Northern Virginia have been delayed or withdrawn in recent months due to opposition from some community groups, Microsoft's Stone Ridge project is unlikely to face any such holdups.","deal":"Microsoft paid $93.7M for the property in August 2020, acquiring the site from a joint venture involving Baltimore-based St. John Properties and JK Land Holdings.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corp-blue-ridge-iad11-12-13-data-center-f85423b3"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"a88fcfe41216","cid":"a88fcfe41216","canon":1,"dups":1,"ftype":"data_center","name":"IAD114","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-114-iad-115-19d2cc2c","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-114-iad-115-19d2cc2c","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"BEAUMEADE LC PHASE III","oy":2024,"contro":"Approval of the project to build 1.75 million square feet of data center space on a 100-acre site just south of the Dulles International Airport, in Loudoun County, hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line some local residents (and a county supervisor) were opposed to.","controScan":"https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;datacenterknowledge.com","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-114-iad-115-19d2cc2c","https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"0e94b01be332","cid":"0e94b01be332","canon":1,"dups":1,"ftype":"data_center","name":"IAD12","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Two dedicated substations and one of the country's most reliable transmission systems provide power to the campus, minimizing the risk of interruptions.","pscan":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad12","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-12-iad-15-iad-16-iad--dad0396f","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Digital Realty","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"digitalrealty.com;interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected source_quality_reclassified","srcUrls":["https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad12","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-12-iad-15-iad-16-iad--dad0396f"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"88b8d5893756","cid":"88b8d5893756","canon":1,"dups":1,"ftype":"data_center","name":"IAD14","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":12,"pc":"Grid","pconf":"High","pquote":"The campus is powered by two dedicated substations and one of the nation's most dependable transmission systems.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","tenant":"Amazon AWS","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/digital-realty-fb0a4b89"],"band":"10-25 MW"},{"id":"f9dd0fb28368","cid":"f9dd0fb28368","canon":1,"dups":1,"ftype":"data_center","name":"IAD2 Evoque Cyxtera","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":1,"pc":"Grid","pconf":"High","pquote":"The power failure is protected by redundant UPS system in N+1 configuration with battery bank, and automatic transfer to standby diesel generators on the loss of utility power.","pscan":"https://cloudandcolocation.com/datacenters/cyxtera-sterling-data-center-iad2-a/","rto":"PJM","nerc":"SERC","op":"Centersquare","spon":"Brookfield Infrastructure Partners","oy":1999,"deal":"Brookfield Infrastructure Partners acquired Cyxtera Technologies through its portfolio company, Evoque Data Center Solutions, for US$1.3 billion, including US$775 million for assets and approximately $525 million for real estate at seven U.S. data centers.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudandcolocation.com","srcUrls":["https://cloudandcolocation.com/datacenters/cyxtera-sterling-data-center-iad2-a/"],"band":"< 10 MW","lflag":"source_quality_reclassified"},{"id":"ea6d61f2d00e","cid":"ea6d61f2d00e","canon":1,"dups":1,"ftype":"data_center","name":"IAD214","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"b97358cdab7e","cid":"b97358cdab7e","canon":1,"dups":1,"ftype":"data_center","name":"IAD24","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"pc":"Grid","pconf":"High","pquote":"Our Ashburn Campus, located on 98 acres in the Dulles tech corridor of VA, features facilities for both Turn-Key and Powered Base Building configurations. With a total capacity of 500 MW and power supplied by a dependable transmission system at below-average rates, this campus offers prime connectivity and access to the MAE East Exchange and an extensive fiber network.","pscan":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad24","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"DIGITAL LOUDOUN II","tenant":"Amazon AWS","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"digitalrealty.com","srcUrls":["https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad24"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"d86670b121fd","cid":"d86670b121fd","canon":1,"dups":1,"ftype":"data_center","name":"IAD3 DataBank","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"171a4214dd7d","cid":"171a4214dd7d","canon":1,"dups":1,"ftype":"data_center","name":"IAD3 Evoque Cyxtera","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"591fbb64d2c3","cid":"591fbb64d2c3","canon":1,"dups":1,"ftype":"data_center","name":"IAD44","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":96,"pc":"Grid","pconf":"High","pquote":"In terms of power, the IAD44 data center is equipped with energy-efficient solutions and an UPS redundancy of N+1, ensuring continuous operation and reliability for critical infrastructure.","rto":"PJM","nerc":"SERC","op":"Digital Realty","ay":2018,"oy":2024,"deal":"Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).","dealScan":"https://baxtel.com/data-center/digital-realty-iad44","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-realty-iad44"],"band":"50-100 MW"},{"id":"77555601f5d9","cid":"77555601f5d9","canon":1,"dups":1,"ftype":"data_center","name":"IAD76","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/iad76-df1e349d","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/iad76-df1e349d","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"AWS","contro":"Local authorities' approval for a broader AWS data center campus hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line that some local residents and a county supervisor were opposed to.","deal":"Land acquisition for a broader AWS data center campus by Amazon Data Services, an Amazon subsidiary.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/iad76-df1e349d"]},{"id":"1e00556ac4bf","cid":"1e00556ac4bf","canon":1,"dups":1,"ftype":"data_center","name":"Infotel Systems Data Center","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":200,"pc":"Hybrid","pconf":"High","pquote":"Power: 200,000 KW peak electrical service; One hour UPS for all systems in the unlikely event our primary generator has issues; Redundant generators with 20-day supply of propane fuel.","pscan":"https://infotelsystems.com/facilities/","proc":"Tariff (utility)","pcp":"Dominion Energy (inferred)","rto":"PJM","nerc":"SERC","op":"Infotel Systems","spon":"Infotel Systems","tenant":"Puritan Cleaners, NCI Information Systems","oy":2000,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"infotelsystems.com","srcUrls":["https://infotelsystems.com/facilities/"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"93568f29aff8","cid":"93568f29aff8","canon":1,"dups":1,"ftype":"data_center","name":"Inova","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"501aebc6be0d","cid":"501aebc6be0d","canon":1,"dups":1,"ftype":"data_center","name":"Inova Health Care Systems - IT Operations","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"Inova Health Care Systems","spon":"Inova Health System","tenant":"Inova Health System","ay":2005,"deal":"Inova Health System has leased an additional 30,220 square feet at 45745 Nokes Boulevard in The Corporate Office Park at Dulles Town Center. The new Inova space will be totally devoted to their IT Department.","dealScan":"https://lerner.com/news/inova-health-system-expands-at-dulles-town-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"lerner.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://lerner.com/news/inova-health-system-expands-at-dulles-town-center/"]},{"id":"71d341c2552f","cid":"71d341c2552f","canon":1,"dups":1,"ftype":"data_center","name":"Intergate Ashburn, LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"Intergate Ashburn, LLC, 73935, 7, 12/03/2024, Article 6 - mNSR, Loudoun County, Northern.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Grid Operator. Dominion Energy Virginia","uscan":"https://www.interconnection.fyi/data-center/project/intergate-ashburn-llc-46eb492d","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Intergate-Ashburn","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/intergate-ashburn-llc-46eb492d"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"cc7905a19c38","cid":"cc7905a19c38","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":280,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Iron Mountain data centers are powered by 100% renewable energy thanks to carbon credit assistance and low PUE.","uquote":"PRP also worked closely with NOVEC and Dominion Power to secure an expedited power and equipment delivery schedule to achieve its aggressive development timeline.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Iron Mountain Data Centers","spon":"Iron Mountain (NYSE: IRM)","ay":2016,"oy":2017,"deal":"PRP sold Manassas Point, a 40-acre data center development site, to Iron Mountain Inc. for $113.5 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"61a2e556fb50","cid":"61a2e556fb50","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain Information Management LLC","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":400,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Our data centers are powered by 100% renewable energy, utilizing techniques such as natural cooling and water recycling within its portfolio to minimize energy consumption. This commitment to sustainability enables customers to reduce their carbon footprint and achieve their environmental goals.","uquote":"Grid Operator: Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Iron Mountain Information Management","tenant":"Wasabi Technologies","ay":2016,"oy":2017,"deal":"Iron Mountain paid PRP $113.5M for the Manassas, Virginia, development site in a deal that closed Thursday, PRP told Bisnow. The company's acquisition of a 40-acre development site in Manassas, VA enables two planned new data center buildings at its further expanded Manassas campus, offering an estimated 150 MW of additional capacity.","dealScan":"https://www.bisnow.com/washington-dc/news/data-center/prp-sells-manassas-campus-planned-for-data-centers-for-114m-126791","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","srcUrls":["https://www.bisnow.com/washington-dc/news/data-center/prp-sells-manassas-campus-planned-for-data-centers-for-114m-126791"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"58fcd411e76f","cid":"58fcd411e76f","canon":1,"dups":1,"ftype":"data_center","name":"Iskander (LC-1A) Jamshid (LC-1B) Kaveh (LC2) Lohrasp Ventures (LC3)","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":256,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"An on-site 300 MW substation, jointly developed with utility Dominion Energy, would increase the data center's capacity up to around 60 MW, with the remaining power distributed to the surrounding area.","pscan":"https://www.bisnow.com/national/news/data-center/arep-jv-lands-full-building-lease-for-its-first-ashburn-data-center-project-118959","uquote":"Utility Provider: Dominion Virginia. An on-site 300 MW substation, jointly developed with utility Dominion Energy, would increase the data center's capacity up to around 60 MW, with the remaining power distributed to the surrounding area.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ Services","spon":"LOHRASP VENTURES , Iskandar Enterprise, Kaveh Enterprise, Zebra Ventures","oy":2019,"deal":"$1.4 billion asset-backed securities deal for Iskandar and Kaveh data centers","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"bisnow.com","srcUrls":["https://www.bisnow.com/national/news/data-center/arep-jv-lands-full-building-lease-for-its-first-ashburn-data-center-project-118959"]},{"id":"96582d54aab1","cid":"96582d54aab1","canon":1,"dups":1,"ftype":"data_center","name":"KH DATA CAPITAL BUILDING 4 LLC C/O IRON MOUNTAIN GLOBAL REAL ESTATE","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","rawName":"KH DATA CAPITAL BUILDING 4 LLC\nC/O IRON MOUNTAIN GLOBAL REAL ESTATE","srcUrls":null,"srcDom":null},{"id":"de9973e3f5e3","cid":"de9973e3f5e3","canon":1,"dups":1,"ftype":"data_center","name":"KH Data Capital Development","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c11232a0cb69","cid":"c11232a0cb69","canon":1,"dups":1,"ftype":"data_center","name":"KH DATA CAPITAL DEVELOPMENT LAND LLC C/O IRON MOUNTAIN GLOBAL REAL ESTATE","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"KH Data Capital Development","spon":"Iron Mountain","ay":2021,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity unlinked_source_text","rawName":"KH DATA CAPITAL DEVELOPMENT LAND LLC\nC/O IRON MOUNTAIN GLOBAL REAL ESTATE","srcUrls":null,"srcDom":null},{"id":"354c515c2a20","cid":"354c515c2a20","canon":1,"dups":1,"ftype":"data_center","name":"Kincora Data Center","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/cyrusone-kincora-18b5a79f","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/cyrusone-kincora-18b5a79f","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"CyrusOne","ay":2016,"oy":2022,"deal":"Texas-based Data center provider CyrusOne has purchased a 40-acre parcel of Kincora — a 6.7-million-square-foot, mixed-use development property in Loudoun County. The company said the purchase and ensuing construction activities are expected to result in more than $1 billion in new investment in Loudoun.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/cyrusone-kincora-18b5a79f"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"263a74e3d528","cid":"263a74e3d528","canon":1,"dups":1,"ftype":"data_center","name":"LEE ROAD PROPERTY","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy","pscan":"https://www.interconnection.fyi/data-center/project/lee-road-property-de910e83","uquote":"Grid Operator. Dominion Energy","uscan":"https://www.interconnection.fyi/data-center/project/lee-road-property-de910e83","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"LEE ROAD PROPERTY","spon":"LEE ROAD PROPERTY","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/lee-road-property-de910e83"]},{"id":"09106425616b","cid":"09106425616b","canon":1,"dups":1,"ftype":"data_center","name":"LEMUR PROPERTIES LLC","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Digital Realty","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"5182bdfc8b61","cid":"5182bdfc8b61","canon":1,"dups":1,"ftype":"data_center","name":"Level 3 Communications Herndon Gateway","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":1,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Utility Capacity: Three 480 voltage utility feeds distributed through a fully redundant configuration.","pscan":"https://cloudscene.global.ssl.fastly.net/FacilityPDF/1040/Herndon-Brochure.pdf","uconf":"High","uquote":"Dominion Virginia Power provides electricity to most of Fairfax County. For service, questions or to report a power outage, call 888-667-3000 or visit https://service.vapower.com/cssresconn.asp. Parts of western Fairfax County, specifically Centreville, Clifton and Fairfax Station, get their power from the Northern Virginia Electric Cooperative. 703-335-0500 or www.novec.com.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Level 3 Communications","oy":2019,"deal":"Level 3 Communications was acquired by CenturyLink (now Lumen Technologies) in a cash and stock transaction.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cloudscene.global.ssl.fastly.net","srcUrls":["https://cloudscene.global.ssl.fastly.net/FacilityPDF/1040/Herndon-Brochure.pdf"],"lflag":"source_quality_reclassified"},{"id":"73114f18596a","cid":"73114f18596a","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Richmond 1","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Designed to meet Tier III standards, the Richmond 1 Data Center features redundant power systems, including dual utility feeds, uninterruptible power supplies (UPS), and backup generators, ensuring continuous uptime and high availability.","uconf":"High","uquote":"Greater Richmond-based Dominion Energy powers more than 12 million sq.ft. of data centers in Virginia.","uscan":"https://www.grpva.com/data-centers/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Lumen Technologies","spon":"Lumen Technologies","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"grpva.com","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.grpva.com/data-centers/"]},{"id":"0e87b9b7cd7a","cid":"0e87b9b7cd7a","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Richmond 2","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","pc":"Hybrid","pconf":"High","pquote":"Engineered to meet Tier III standards, the Richmond 2 facility features fully redundant power systems, including dual utility feeds, UPS (uninterruptible power supplies), and on-site backup generators to ensure continuous uptime and operational resilience. The datacenter is equipped with a reliable power infrastructure to ensure continuous operation. It features multiple power feeds and backup generators, providing a robust power supply that ensures uptime even during power outages.","pscan":"https://inflect.com/building/8851-park-central-drive-richmond/lumen/datacenter/level-3-richmond","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/lumen-richmond-2-4b3b6217","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Lumen Technologies","spon":"Level 3 Communications","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"inflect.com;interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://inflect.com/building/8851-park-central-drive-richmond/lumen/datacenter/level-3-richmond","https://www.interconnection.fyi/data-center/project/lumen-richmond-2-4b3b6217"]},{"id":"adee4507bc76","cid":"adee4507bc76","canon":1,"dups":1,"ftype":"data_center","name":"Lumen Technologies","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Built to Tier III standards, the Herndon 1 Data Center features redundant power infrastructure, including dual utility feeds, backup generators, and uninterruptible power supplies (UPS), delivering maximum uptime and business continuity.","uconf":"High","uquote":"Providers In Each City in Fairfax County: Herndon, Virginia: Dominion Energy: 100.00%","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Lumen Technologies","spon":"Lumen Technologies","oy":2000,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"186808585c9c","cid":"186808585c9c","canon":1,"dups":1,"ftype":"data_center","name":"MANASSAS NCP LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"MANASSAS NCP","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"bb3c93d4ae07","cid":"bb3c93d4ae07","canon":1,"dups":1,"ftype":"data_center","name":"MANASSAS TECHNOLOGY PARTNERS LLC (Amazon)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"MANASSAS TECHNOLOGY PARTNERS (Amazon)","spon":"Menlo Equities","tenant":"Amazon Web Services (AWS)","oy":2003,"deal":"Amazon.com recently paid $65 million to purchase a 7.66-acre data center campus in Manassas, according to Prince William County property records. Manassas Technology Partners, an affiliate of California-based Menlo Equities, sold the property at 7505 Mason King Court to Amazon Data Services on March 26.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f22f73cfa23a","cid":"f22f73cfa23a","canon":1,"dups":1,"ftype":"data_center","name":"MANUCHEHR VENTURES LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":42,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"MANUCHEHR VENTURES","spon":"MANUCHEHR VENTURES","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4541f9611d1f","cid":"4541f9611d1f","canon":1,"dups":1,"ftype":"data_center","name":"MARIES TECH PARK LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Power","rto":"PJM","nerc":"SERC","op":"COPT Defense Properties","spon":"Blackstone","tenant":"Amazon","deal":"Blackstone secured a $268 million loan on Dec. 1 for five data center properties, public records show. The facilities include... 45761-45771 Maries Road, worth $73.6 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f0ef14f0cf6c","cid":"f0ef14f0cf6c","canon":1,"dups":1,"ftype":"data_center","name":"MCI COMMUNICATION SERVICES LLC VERIZON GLOBAL REAL ESTATE","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Hybrid","pconf":"High","pquote":"The data center provides AC, DC, and three phase power to the customer equipment. The facility has A & B DC power feeds offering redundancy and protection. Single-feed commercial AC power with a UPS system supported by two battery strings providing approximately 9 minutes of backup at full load. Standby diesel generators with automatic transfer switch (ATS), weekly and monthly full-load testing, and 24-hour onsite fuel storage.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/verizon-d3088cd4","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Verizon","spon":"MCI COMMUNICATION SERVICES VERIZON GLOBAL REAL ESTATE","ay":1998,"deal":"Data Center bought by Verizon in 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/verizon-d3088cd4"]},{"id":"832a655438cc","cid":"832a655438cc","canon":1,"dups":1,"ftype":"data_center","name":"MCP 22745 & 22755 RELOCATION DRIVE","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"MCP 22745 & 22755 RELOCATION DRIVE","spon":"MCP 22745 & 22755 RELOCATION DRIVE","tenant":"Amazon AWS","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7ca82101c31b","cid":"7ca82101c31b","canon":1,"dups":1,"ftype":"data_center","name":"MECP1 ASHBURN 1 LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/mecp1-ashburn-1-llc-67e3836d","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/mecp1-ashburn-1-llc-67e3836d","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"MECP1 ASHBURN 1","spon":"MECP1 ASHBURN 1","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/mecp1-ashburn-1-llc-67e3836d"]},{"id":"da7670241315","cid":"da7670241315","canon":1,"dups":1,"ftype":"data_center","name":"MECP1 Ashburn 2, LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/mecp-1-ashburn-2-llc-c743708c","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/mecp-1-ashburn-2-llc-c743708c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"EdgeCore Digital/Partners Group","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/mecp-1-ashburn-2-llc-c743708c"]},{"id":"ab2137c20a8b","cid":"ab2137c20a8b","canon":1,"dups":1,"ftype":"data_center","name":"MECP2 ASHBURN 2 LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"8f3477ba66b1","cid":"8f3477ba66b1","canon":1,"dups":1,"ftype":"data_center","name":"MECP3 ASHBURN 3 LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"MECP3 ASHBURN 3","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"c373fa9114c2","cid":"c373fa9114c2","canon":1,"dups":1,"ftype":"data_center","name":"Meta","city":"Sandston","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":500,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The campus targets LEED® BD+C Gold certification, runs on 100% renewable energy and supports clean energy growth by enabling 700 MW of solar projects across Virginia.","pscan":"https://www.dpr.com/projects/meta-henrico-data-center","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/meta-967a162e","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2017,"oy":2020,"deal":"Backed by an investment of over $1 billion—with more than $1.7 billion in cumulative construction costs—the site supports a peak workforce of around 1,500 skilled trade workers and sustains over 200 permanent jobs in the region. Meta purchased the 475-acre property from Henrico County's development authority for $35.3M in October, according to Richmond BizSense. Dominion Energy and Meta worked together to create a renewable energy tariff called Schedule RF. The tariff allows Meta and other large energy users to meet their needs through the addition of renewable energy sources.","dealScan":"https://www.dpr.com/projects/meta-henrico-data-center","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"dpr.com;interconnection.fyi","srcUrls":["https://www.dpr.com/projects/meta-henrico-data-center","https://www.interconnection.fyi/data-center/project/meta-967a162e"]},{"id":"df119a0431fb","cid":"df119a0431fb","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","proc":"Dedicated PPA","pcp":"AES Corporation","pdt":"15-year agreement, 576 MW of contracted renewable assets","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"d6574306fbb0","cid":"d6574306fbb0","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"South Hill","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Microsoft will power its data centers in Virginia with 24/7 clean energy through a 15-year agreement with AES Corporation. The partnership supports Microsoft's goal of matching 100% of its electricity consumption with zero carbon energy purchases by 2030. AES will source the energy from a portfolio of 576 MW of contracted renewable assets, including wind, solar, as well as battery energy storage projects in PJM.","uquote":"Grid Operator: Dominion Energy Virginia. Dominion Energy, which supplies power across Mecklenburg County, acknowledges on its website that “as data center development continues to materialize in Mecklenburg County, the need for new electric infrastructure is needed.”","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-avc-data-center-842dc5fb","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","ay":2023,"oy":2023,"contro":"Environmental groups, including the Sierra Club Virginia Chapter, have targeted the spread of data centers in Mecklenburg County, including South Hill, citing impacts on the environment. Microsoft also reported a subcontractor cleared land outside permitted space, causing destruction of 2.33 acres of “palustrine forested wetlands” and unauthorized impact to 1,515 linear feet of stream channels near the site from sedimentation.","controScan":"https://www.sovanow.com/articles/data-center-debates/","deal":"Microsoft has a 15-year agreement with AES Corporation to power its Virginia data centers with 24/7 clean energy, sourcing from a portfolio of 576 MW of contracted renewable assets, including wind, solar, and battery energy storage projects in PJM.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;sovanow.com","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corporation-avc-data-center-842dc5fb","https://www.sovanow.com/articles/data-center-debates/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"7317a4327bec","cid":"7317a4327bec","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Warrenton","county":"Fauquier","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-033f74bc","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-033f74bc","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","ay":2023,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-033f74bc"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"63ac6193024a","cid":"63ac6193024a","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft","city":"South Hill","county":"Middlesex","state":"VA","lat":37.606975,"lng":-76.528082,"cprec":"distinct","status":"Operational","mw":75,"band":"50-100 MW","proc":"Dedicated PPA","pcp":"AES Corporation","pdt":"15-year agreement, 576 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"992e78702789","cid":"992e78702789","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"La Crosse","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Hybrid","pconf":"High","pquote":"Microsoft will power its data centers in Virginia with 24/7 clean energy through a 15-year agreement with AES Corporation. By collaborating with Dominion Virginia Power and the Commonwealth of Virginia, Microsoft is able to bring new renewable energy directly to the grid that serves its Virginia data center.","proc":"Dedicated PPA","pcp":"AES Corporation, sPower","pdt":"15-year agreement with AES for 576MW; purchase of 315MW from sPower's Pleinmont I and II solar projects","uconf":"High","uquote":"Roanoke River Regional Business Park is located between La Crosse and Brodnax off U.S. 58. The business park was qualified by Dominion Power for data center projects.","uscan":"https://mbc-va.com/news/microsoft-snaps-up-land-at-three-industrial-parks/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","ay":2020,"deal":"Microsoft Corporation has purchased all or most of the land in three industrial parks located in Mecklenburg County — Hillcrest Industrial Park in South Hill, Roanoke River Regional Business Park located between La Crosse and Brodnax, and Lakeside Commerce Park near Clarksville. All three land transfers occurred in the past week.","dealScan":"https://mbc-va.com/news/microsoft-snaps-up-land-at-three-industrial-parks/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mbc-va.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://mbc-va.com/news/microsoft-snaps-up-land-at-three-industrial-parks/"]},{"id":"10b3df25d4b6","cid":"10b3df25d4b6","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Aldie","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","proc":"Dedicated PPA","pcp":"AES Corporation","pdt":"15-year agreement, 576 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3806fd97400d","cid":"83307293aede","canon":0,"dups":3,"ftype":"data_center","name":"Microsoft","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"The site is served by Dominion Virginia Power and its water utility is the Roanoke River Public Service Authority.","pscan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","uconf":"High","uquote":"The site is served by Dominion Virginia Power and its water utility is the Roanoke River Public Service Authority.","uscan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","tenant":"Microsoft Azure","ay":2010,"oy":2010,"contro":"Attempted sabotage; environmental concerns regarding water use and land conversion; broader opposition to data center spread in the region.","controScan":"https://www.sovanow.com/articles/sabotage_attempt_thwarted_at_microsoft_data_center/","deal":"Initial investment of up to $499 million; $2.1 million grant from Governor's Opportunity Fund; $4.8 million from Virginia Tobacco Indemnification and Community Revitalization Commission; Data Center Sales and Use tax exemptions.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;sovanow.com","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","https://www.sovanow.com/articles/sabotage_attempt_thwarted_at_microsoft_data_center/"]},{"id":"83307293aede","cid":"83307293aede","canon":1,"dups":3,"ftype":"data_center","name":"Microsoft","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Constellation announced an agreement with Microsoft to significantly reduce the carbon footprint of one of Microsoft's data centers in Boydton, Virginia. Under the agreement, the facility will receive up to 35 percent in environmental attributes from nuclear power, complementing the company's new wind and solar purchases. Dominion Energy was another instrumental partner that could guarantee all of Microsoft's long-term electric needs would be met. Microsoft signed a renewable energy agreement with AES to source energy from a portfolio of 576MW of contracted renewable assets, including wind, solar, and battery energy storage projects in the PJM interconnection. Additionally, we purchased 315 megawatts of energy from Pleinmont I and II, two solar projects in the Commonwealth of Virginia.","proc":"Dedicated PPA","pcp":"Constellation","pdt":"up to 35 percent nuclear energy","uquote":"The site is served by Dominion Virginia Power. Dominion Energy was another instrumental partner that could guarantee all of Microsoft's long-term electric needs would be met.","uscan":"https://www.vedp.org/case-study/microsoft-corporations-expanding-virginia-footprint","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","tenant":"Microsoft (for Azure cloud services)","ay":2010,"oy":2012,"contro":"Attempted sabotage; environmental concerns from local groups.","deal":"State and local economic incentives; renewable energy purchase agreements.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"vedp.org","srcUrls":["https://www.vedp.org/case-study/microsoft-corporations-expanding-virginia-footprint"],"lflag":"source_quality_reclassified"},{"id":"0e19a7b48e9d","cid":"0e19a7b48e9d","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"For Microsoft, the RECs are helping offset the carbon footprint of its data center in Boydton, Virginia, and contributing to the company's goal of buying enough renewable energy to equal 100 percent of its energy consumption.... We've committed to achieving 100% renewable energy coverage globally by 2025. In this region, we will fulfill that commitment through power purchase agreements with AES, Constellation, Pleinmont, Virginia Electric, and Volt.... Microsoft signed a renewable energy agreement with AES to source energy from a portfolio of 576MW of contracted renewable assets, including wind, solar, and battery energy storage projects in the PJM interconnection. Additionally, we purchased 315 megawatts of energy from Pleinmont I and II, two solar projects in the Commonwealth of Virginia.","pscan":"https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","proc":"Tariff (utility)","pcp":"Dominion Virginia Power","uconf":"High","uquote":"The site is served by Dominion Virginia Power.... Dominion Energy was another instrumental partner that could guarantee all of Microsoft's long-term electric needs would be met.... Grid Operator. Dominion Energy Virginia.","uscan":"https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft Azure","ay":2010,"oy":2010,"contro":"Environmental groups have targeted the spread of data centers in Mecklenburg County, including Microsoft's, citing concerns about environmental impact and quality of life. Microsoft also entered a consent agreement with the Virginia Department of Environmental Quality after self-reporting water violations at a construction site near Clarksville. Additionally, a sabotage attempt was thwarted at the Microsoft data center in Boydton in 2017.","controScan":"https://www.sovanow.com/articles/data-center-debates/","deal":"The state offered a rich package of incentives to lure Microsoft to the 175-acre Boydton Plank Road Industrial Park. This included a $2.1 million grant from the Governor's Opportunity Fund and $4.8 million in funds from the Virginia Tobacco Indemnification and Community Revitalization Commission. For later expansions, Governor Northam approved a $1.5 million grant from the Commonwealth's Opportunity Fund, and the company is eligible for Data Center Sales and Use tax exemptions.","dealScan":"https://www.sovanow.com/articles/mecklenburg_lands_microsoft_data_center/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;sovanow.com","srcUrls":["https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","https://www.sovanow.com/articles/mecklenburg_lands_microsoft_data_center/","https://www.sovanow.com/articles/data-center-debates/"],"lflag":"citation_artifact_removed utility_alias_corrected source_quality_reclassified,merged_duplicate","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"8bfc21e10ff2","cid":"8bfc21e10ff2","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The site is served by Dominion Virginia Power and its water utility is the Roanoke River Public Service Authority.","pscan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","uquote":"The site is served by Dominion Virginia Power. Grid Operator. Dominion Energy Virginia.","uscan":"https://baxtel.com/data-center/microsoft-boydton-va","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","tenant":"Microsoft Azure","ay":2010,"oy":2010,"contro":"Attempted sabotage; environmental opposition regarding water use and electricity prices.","controScan":"https://www.sovanow.com/articles/sabotage_attempt_thwarted_at_microsoft_data_center/","deal":"Virginia Governor's Opportunity Fund grants and Data Center Sales and Use tax exemptions.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;baxtel.com;sovanow.com","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","https://baxtel.com/data-center/microsoft-boydton-va","https://www.sovanow.com/articles/sabotage_attempt_thwarted_at_microsoft_data_center/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"4fdae490d830","cid":"4fdae490d830","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Warrenton","county":"Fauquier","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","proc":"Dedicated PPA","pcp":"AES Corporation","pdt":"15-year agreement, 576 MW of contracted renewable assets","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"d407efa8b842","cid":"d407efa8b842","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft - Gainesville Data Center - MNZ03","city":"Bristow","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-gainesville-data-center-mnz03-9f2b78f4","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-gainesville-data-center-mnz03-9f2b78f4","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft Azure","ay":2024,"oy":2024,"deal":"In 2021 Microsoft acquired 83 acres off Devlin Road in Bristow, Prince William County, Virginia for $83.84 million, as part of a larger 92.6-acre acquisition for a multi-phase data center campus where MNZ03 is planned.","dealScan":"https://baxtel.com/data-center/microsoft-mnz03","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-gainesville-data-center-mnz03-9f2b78f4","https://baxtel.com/data-center/microsoft-mnz03"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"658ea1aac20f","cid":"658ea1aac20f","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft - Manassas Data Center - MNZ01","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","proc":"Tariff (utility)","pcp":"NOVEC (Northern Virginia Electric Cooperative)","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"a613ce541769","cid":"a613ce541769","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Azure","county":"Mecklenburg County","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"pc":"Hybrid","pconf":"High","pquote":"One of Microsoft's data centers in Boydton, Virginia will be powered by up to 35 percent nuclear energy, under a new agreement with Constellation. The nuclear power will complement Microsoft's new wind and solar purchases and bring the data center to operating at close to 100 percent carbon-free electricity around the clock.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"The site is served by Dominion Virginia Power. Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","tenant":"Microsoft Azure","ay":2010,"oy":2012,"contro":"The Sierra Club Virginia Chapter will host a public forum in Chase City next week to discuss what the group contends is the “unchecked” spread of data centers, impacting the environment and the health and quality of life of Virginia. Earlier this year, Microsoft entered into a consent agreement with the Virginia Department of Environmental Quality after self-reporting four separate water violations at the company's construction site near Clarksville in the Lakeside Commerce Park. An employee conducting a routine safety check Thursday afternoon at the Microsoft data center in Boydton stopped what authorities describe as an attempted sabotage of one of the newest buildings under construction at the cloud computing site. Microsoft is changing its approach to building massive data centers for artificial intelligence, unveiling what it calls a “community first” initiative in response to growing opposition from people across the country facing higher electricity bills and dwindling water supplies.","controScan":"https://www.sovanow.com/articles/data-center-debates/","deal":"Constellation announced an agreement with Microsoft to significantly reduce the carbon footprint of one of Microsoft's data centers in Boydton, Virginia. Under the agreement, the facility will receive up to 35 percent in environmental attributes from nuclear power, complementing the company's new wind and solar purchases. Virginia's sales and use tax exemptions for data centers accounted for about $80 million in uncollected state revenue in fiscal 2018. Mecklenburg County provided a $1.5 grant to support the expansion (in addition to the sales and use tax exemptions already obtained).","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"sovanow.com","srcUrls":["https://www.sovanow.com/articles/data-center-debates/"],"band":"250+ MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"67222de31bb5","cid":"67222de31bb5","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp - AVC17 Datacenter","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Hybrid","pconf":"Medium","pquote":"One of Microsoft's data centers in Boydton, Virginia will be powered by up to 35 percent nuclear energy, under a new agreement with Constellation. In May 2018, Microsoft announced the purchase of 315-megawatts of energy from two new solar projects in the Commonwealth of Virginia, which represented the single largest corporate purchase of solar energy in the United States.”","proc":"Dedicated PPA","pcp":"Constellation","pdt":"up to 35 percent in environmental attributes from nuclear power","uconf":"High","uquote":"The site is served by Dominion Virginia Power.","uscan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","ay":2010,"oy":2013,"contro":"Attempted sabotage at the Microsoft data center in Boydton.","controScan":"https://www.sovanow.com/articles/sabotage_attempt_thwarted_at_microsoft_data_center/","deal":"Grants from the Governor's Opportunity Fund ($2.1 million) and the Virginia Tobacco Indemnification and Community Revitalization Commission ($4.8 million).","dealScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;sovanow.com","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","https://www.sovanow.com/articles/sabotage_attempt_thwarted_at_microsoft_data_center/"]},{"id":"ded28d4601f9","cid":"ded28d4601f9","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp - Leesburg Data Center (IAD01-02-03-04-05)","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft will power its data centers in Virginia with 24/7 clean energy through a 15-year agreement with AES Corporation. The partnership supports Microsoft's goal of matching 100% of its electricity consumption with zero carbon energy purchases by 2030....AES will source the energy from a portfolio of 576 MW of contracted renewable assets, including wind, solar, as well as battery energy storage projects in PJM.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corp-leesburg-data-center-iad01-02-03-04-f5e5e54b","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft (for its cloud services)","oy":2019,"contro":"Microsoft is funding over $25 million in water and sewer improvements at its Leesburg data center and entered a service agreement with the Town of Leesburg for water and sewer availability to the Microsoft campus (data centers IAD-01 through-05) to address infrastructure needs.","deal":"15-year agreement with AES Corporation for 24/7 clean energy supply. Service agreement with the Town of Leesburg for water and sewer availability and infrastructure upgrades.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corp-leesburg-data-center-iad01-02-03-04-f5e5e54b"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"8696d993e509","cid":"8696d993e509","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp - LVL Data Center","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-east-coast-data-center-d54a107d","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-east-coast-data-center-d54a107d","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","oy":2023,"contro":"Environmental groups have targeted the spread of Microsoft's data centers in Mecklenburg County, including Boydton, citing concerns about environmental impact and water usage. Additionally, an attempted sabotage was thwarted at a Microsoft data center in Boydton in February 2017.","controScan":"https://www.sovanow.com/articles/data-center-debates/","deal":"Microsoft's data center expansions in Mecklenburg County have been supported by grants, including a $1.5 million grant from the Commonwealth's Opportunity Fund, and the company is eligible for Data Center Sales and Use tax exemptions. Microsoft also entered into a public-private partnership with Dominion Energy and the Commonwealth of Virginia for a solar project, where Microsoft agreed to purchase Renewable Energy Certificates (RECs) to offset the carbon footprint of its Boydton data center.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;sovanow.com","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corporation-east-coast-data-center-d54a107d","https://www.sovanow.com/articles/data-center-debates/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"ba35badc5e6e","cid":"ba35badc5e6e","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp - LYH10 Datacenter","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Operational Microsoft Corp - LYH10 Datacenter data center in Boydton, Mecklenburg County, VA. Capacity: 50-100 MW. The site is served by Dominion Virginia Power.","uquote":"The site is served by Dominion Virginia Power.","uscan":"https://baxtel.com/data-center/microsoft-boydton-va","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","tenant":"Microsoft","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/microsoft-boydton-va"]},{"id":"b03a9cdf057a","cid":"b03a9cdf057a","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp Blue Ridge (IAD11-12-13) Data Center","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia. Microsoft will power its data centers in Virginia with 24/7 clean energy through a 15-year agreement with AES Corporation. Microsoft signed a renewable energy agreement with AES to source energy from a portfolio of 576MW of contracted renewable assets, including wind, solar, and battery energy storage projects in the PJM interconnection.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-corp-blue-ridge-iad11-12-13-data-center-f85423b3","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corp-blue-ridge-iad11-12-13-data-center-f85423b3","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","ay":2022,"oy":2025,"deal":"Microsoft paid $93.7M for the property in August 2020, acquiring the site from a joint venture involving Baltimore-based St. John Properties and JK Land Holdings.","dealScan":"https://www.bisnow.com/national/news/data-center/microsoft-expanding-in-loudoun-county-with-400m-data-center-116665","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;bisnow.com","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corp-blue-ridge-iad11-12-13-data-center-f85423b3","https://www.bisnow.com/national/news/data-center/microsoft-expanding-in-loudoun-county-with-400m-data-center-116665"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"7e536ab9c266","cid":"7e536ab9c266","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corp DCS - AVC09 Datacenter","city":"La Crosse","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"f9eba3f8bd13","cid":"f9eba3f8bd13","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corporation - AVC Data Center","city":"South Hill","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-avc-data-center-842dc5fb","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-avc-data-center-842dc5fb","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","oy":2023,"contro":"Environmental groups target spread of Mecklenburg sites, including South Hill, due to concerns about environmental impact and quality of life.","deal":"Microsoft Corporation purchased land in Hillcrest Industrial Park in South Hill.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corporation-avc-data-center-842dc5fb"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"155dbfaffe0c","cid":"155dbfaffe0c","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corporation - AVC43 Datacenter","city":"South Hill","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","ay":2023,"oy":2023,"contro":"Environmental groups are targeting the spread of data centers in Mecklenburg County, including Microsoft's sites in South Hill, citing concerns about water usage, water pollution, and energy consumption.","controScan":"https://www.sovanow.com/articles/data-center-debates/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"sovanow.com","srcUrls":["https://www.sovanow.com/articles/data-center-debates/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"4ad2c6a2e9b5","cid":"39a5b11ac51d","canon":0,"dups":2,"ftype":"data_center","name":"Microsoft Corporation - East Coast Data Center","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"One of Microsoft's data centers in Boydton, Virginia will be powered by up to 35 percent nuclear energy, under a new agreement with Constellation. The nuclear power will complement Microsoft's new wind and solar purchases and bring the data center to operating at close to 100 percent carbon-free electricity around the clock.... The site is served by Dominion Virginia Power.... All three are tied to the electric managed by PJM, the region's electric transmission authority.","proc":"Dedicated PPA","pcp":"Constellation","pdt":"up to 35 percent in environmental attributes from nuclear power","uconf":"High","uquote":"The site is served by Dominion Virginia Power.... The site is served by Dominion Virginia Power.... The site is served by Dominion Virginia Power and its water utility is the Roanoke River Public Service Authority.... Grid Operator. Dominion Energy Virginia.","uscan":"https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","ay":2010,"oy":2010,"contro":"Environmental groups, including the Sierra Club Virginia Chapter and Friends of the Meherrin, are targeting the 'unchecked' spread of data centers in Mecklenburg County, citing impacts on the environment and quality of life. Concerns include the construction of data centers on former farms or forestland. Microsoft also entered a consent agreement with the Virginia Department of Environmental Quality for water violations at a construction site near Clarksville, which is part of its broader Mecklenburg County operations.","controScan":"https://www.sovanow.com/articles/data-center-debates/","deal":"Virginia Governor's Opportunity Fund provided a $2.1 million grant and the Virginia Tobacco Indemnification and Community Revitalization Commission approved $4.8 million in funds for the initial project. Later, Governor Northam approved a $1.5 million grant from the Commonwealth's Opportunity Fund, and Microsoft became eligible for Data Center Sales and Use tax exemptions. Microsoft also has an agreement with Constellation to receive up to 35% nuclear energy attributes for the data center. Additionally, Microsoft agreed to a long-term agreement to purchase Renewable Energy Certificates (RECs) from a solar project with Dominion Energy to offset its carbon footprint.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;sovanow.com","srcUrls":["https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","https://www.sovanow.com/articles/data-center-debates/"],"lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"39a5b11ac51d","cid":"39a5b11ac51d","canon":1,"dups":2,"ftype":"data_center","name":"Microsoft Corporation - East Coast Data Center","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"One of Microsoft's data centers in Boydton, Virginia will be powered by up to 35 percent nuclear energy, under a new agreement with Constellation. The nuclear power will complement Microsoft's new wind and solar purchases and bring the data center to operating at close to 100 percent carbon-free electricity around the clock. The site is served by Dominion Virginia Power. Microsoft will power its data centers in Virginia with 24/7 clean energy through a 15-year agreement with AES Corporation. We've committed to achieving 100% renewable energy coverage globally by 2025. In this region, we will fulfill that commitment through power purchase agreements with AES, Constellation, Pleinmont, Virginia Electric, and Volt.","proc":"Dedicated PPA","pcp":"Constellation Energy","pdt":"20-year power purchase agreement, up to 35% nuclear energy environmental attributes","uconf":"High","uquote":"The site is served by Dominion Virginia Power. Grid Operator. Dominion Energy Virginia.","uscan":"https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","tenant":"Microsoft Azure (for its cloud services and customers)","ay":2010,"oy":2012,"contro":"Yes","controScan":"https://www.sovanow.com/articles/data-center-debates/","deal":"Initial investment of up to $499 million, followed by multiple expansions totaling approximately $2 billion by 2016.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;sovanow.com","srcUrls":["https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center","https://www.sovanow.com/articles/data-center-debates/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"ceefa1055a55","cid":"ceefa1055a55","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corporation - LYH03 Datacenter","city":"Chase City","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-lyh03-datacenter-1d9ec38a","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-lyh03-datacenter-1d9ec38a","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2023,"oy":2025,"contro":"Environmental groups, including the Sierra Club Virginia Chapter, have raised concerns about the “unchecked” spread of data centers in Mecklenburg County, including the two Microsoft projects in Chase City being constructed on former farms or forestland. Additionally, a subcontractor's actions led to an unauthorized impact to 1,515 linear feet of stream channels near the site from sedimentation and the destruction of 2.33 acres of “palustrine forested wetlands”.","controScan":"https://www.sovanow.com/articles/data-center-debates/","deal":"Microsoft Corporation acquired land from the Chase City EDA as part of a larger acquisition of nearly 900 acres from five local economic development entities in December 2020.","dealScan":"https://mbc-va.com/news/microsoft-snaps-up-land-at-three-industrial-parks/","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"interconnection.fyi;mbc-va.com;sovanow.com","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corporation-lyh03-datacenter-1d9ec38a","https://mbc-va.com/news/microsoft-snaps-up-land-at-three-industrial-parks/","https://www.sovanow.com/articles/data-center-debates/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"c5315751aafc","cid":"c5315751aafc","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Corporation - Timber Data Center","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"One of Microsoft's data centers in Boydton, Virginia will be powered by up to 35 percent nuclear energy, under a new agreement with Constellation. The nuclear power will complement Microsoft's new wind and solar purchases and bring the data center to operating at close to 100 percent carbon-free electricity around the clock.","proc":"Tariff (utility)","pcp":"Dominion Virginia Power","uconf":"High","uquote":"The site is served by Dominion Virginia Power.","uscan":"https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft Azure","ay":2010,"oy":2023,"contro":"Environmental groups target spread of Mecklenburg sites; Microsoft entered into a consent agreement with the Virginia Department of Environmental Quality after self-reporting four separate water violations.","controScan":"https://www.sovanow.com/articles/data-center-debates/","deal":"Agreement with Constellation for nuclear power and carbon-free energy matching; long-term agreement to purchase RECs from a solar project with Dominion Energy.","dealScan":"https://www.constellationenergy.com/news/2023/Constellation-signs-hourly-carbon-free-energy-matching-agreement-with-Microsoft-to-support-a-clean-powered-data-center.html","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"datacenterknowledge.com;constellationenergy.com;sovanow.com","srcUrls":["https://www.datacenterknowledge.com/cloud/microsoft-steps-up-cloud-expansion-plans","https://www.constellationenergy.com/news/2023/Constellation-signs-hourly-carbon-free-energy-matching-agreement-with-Microsoft-to-support-a-clean-powered-data-center.html","https://www.sovanow.com/articles/data-center-debates/"]},{"id":"64326d0c5059","cid":"64326d0c5059","canon":1,"dups":1,"ftype":"data_center","name":"Middletown Data Center","county":"Frederick County","state":"VA","lat":39.20366,"lng":-78.263829,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"With an uninterruptible natural gas fuel source, we ensure cutting-edge energy efficiency, bolstering our sustainability initiatives. Additionally, our disaster recovery capabilities are second to none. In the event of a catastrophic power grid event, MDC's Disaster Recovery/Continuity of Operations Program (COOP) stands ready to assist businesses in maintaining uninterrupted operations.","pscan":"https://www.middletowndatacenter.com/","proc":"Co-located generation","rto":"PJM","nerc":"SERC","op":"Middletown Data Center","spon":"Middletown Data Center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"middletowndatacenter.com","srcUrls":["https://www.middletowndatacenter.com/"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"0a678984b0f2","cid":"0a678984b0f2","canon":1,"dups":1,"ftype":"data_center","name":"MONTEREY DC ASSETS","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"MONTEREY DC ASSETS","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5fe5bb3c61b1","cid":"5fe5bb3c61b1","canon":1,"dups":1,"ftype":"data_center","name":"NeuStar","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"Neustar","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"98a83a137890","cid":"98a83a137890","canon":1,"dups":1,"ftype":"data_center","name":"NeuStar Inc","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"1a3de9da6f28","cid":"1a3de9da6f28","canon":1,"dups":1,"ftype":"data_center","name":"NOAA Wallops CDA Station","city":"Wallops Island","county":"Accomack","state":"VA","lat":37.765944,"lng":-75.757807,"cprec":"distinct","status":"Operational","mw":4,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"New power distribution systems included a new powerhouse with main switchgear, four 1MW generators, paralleling and distribution switchgear, and technical power uninterruptible power supply equipment.","pscan":"https://meb.group/project/electrical-repower-data-center-operations-building/","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/noaa-wallops-cda-station-f62cab63","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"NOAA Wallops CDA Station","spon":"NOAA (National Oceanic and Atmospheric Administration)","tenant":"NOAA (National Oceanic and Atmospheric Administration)","ay":2013,"oy":2013,"deal":"NOAA WCDAS Electrical Upgrades","dealScan":"https://meb.group/project/electrical-repower-data-center-operations-building/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"meb.group;interconnection.fyi","srcUrls":["https://meb.group/project/electrical-repower-data-center-operations-building/","https://www.interconnection.fyi/data-center/project/noaa-wallops-cda-station-f62cab63"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"8821b4140a1a","cid":"8821b4140a1a","canon":1,"dups":1,"ftype":"data_center","name":"Northrop Grumman","city":"Mclean","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"f4055c18b166","cid":"f4055c18b166","canon":1,"dups":1,"ftype":"data_center","name":"Northrop Grumman","city":"Fairfax","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"Northrop Grumman Systems","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"2e09b7e9cf84","cid":"2e09b7e9cf84","canon":1,"dups":1,"ftype":"data_center","name":"Northrop Grumman Services Corporation","city":"Fairfax","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"f0f69be5536c","cid":"f0f69be5536c","canon":1,"dups":1,"ftype":"data_center","name":"Northrop Grumman Systems Corporation","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Falls Church-based Fortune 500 defense contractor Northrop Grumman Corp. is contracting with Richmond-based Dominion Energy Inc. to purchase solar energy to offset 100% of Northrop Grumman's manufacturing and office operations in the commonwealth.","uquote":"Falls Church-based Fortune 500 defense contractor Northrop Grumman Corp. is contracting with Richmond-based Dominion Energy Inc. to purchase solar energy to offset 100% of Northrop Grumman's manufacturing and office operations in the commonwealth.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Northrop Grumman Systems","deal":"Northrop Grumman has entered into a long-term contract with Dominion to purchase the electricity generated by the solar plant as well as the renewable energy credits from the facility.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1e6f4869a1fe","cid":"1e6f4869a1fe","canon":1,"dups":1,"ftype":"data_center","name":"Northrop Grumman Systems Corporation","city":"Lebanon","county":"Russell","state":"VA","lat":36.93342,"lng":-82.095934,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center provides 100% SLA on power and cooling with N+1 configured redundancy.","pscan":"https://cloudandcolocation.com/datacenters/copt-data-center-solutions-ngit-vita-lebanon-data-center/","uquote":"Lebanon, Virginia: Appalachian Power Company: 100.00%","ukey":"733|VA","uname":"Appalachian Power Co","rto":"PJM","nerc":"SERC","op":"Northrop Grumman","spon":"Virginia Information Technologies Agency (VITA)","tenant":"Northrop Grumman IT, Virginia Information Technologies Agency","ay":2005,"oy":2007,"contro":"The facility faced controversy regarding unfulfilled job promises and a legal dispute over access for repairs.","deal":"A landmark public-private infrastructure partnership between the commonwealth of Virginia and Northrop Grumman to modernize the IT infrastructure for state government, worth up to $2 billion.","dealScan":"https://www.informationweek.com/it-leadership/virginia-taps-northrop-grumman-for-2-billion-it-overhaul","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;informationweek.com","srcUrls":["https://cloudandcolocation.com/datacenters/copt-data-center-solutions-ngit-vita-lebanon-data-center/","https://www.informationweek.com/it-leadership/virginia-taps-northrop-grumman-for-2-billion-it-overhaul"],"lflag":"source_quality_reclassified"},{"id":"3f01cfb7a017","cid":"3f01cfb7a017","canon":1,"dups":1,"ftype":"data_center","name":"Northrop Grumman Systems Corporation","city":"McLean","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"76850f673acb","cid":"76850f673acb","canon":1,"dups":1,"ftype":"data_center","name":"Northrop Grummon Systems Corporation","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Northrop Grumman Systems","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"441250787528","cid":"441250787528","canon":0,"dups":1,"ftype":"data_center","name":"Northwoods Property","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"e2cac9c36d7d","cid":"e2cac9c36d7d","canon":1,"dups":1,"ftype":"data_center","name":"Nova Mango Farms LLC","city":"Bristow","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","op":"Google","spon":"Google","ay":2019,"oy":2024,"contro":"Public concerns about energy and water consumption, land use, and location related to data center growth in Virginia, including Google's Mango Farms, have led to legislative discussions.","controScan":"https://cardinalnews.org/2025/01/15/bipartisan-legislative-effort-seeks-to-regulate-data-center-construction-in-virginia/","deal":"Google's $9 billion new investment in Virginia includes the 'Mango Farm' data center complex.","dealScan":"https://www.pecva.org/issue/the-piedmont-news-august-29-2025/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"pecva.org;cardinalnews.org","srcUrls":["https://www.pecva.org/issue/the-piedmont-news-august-29-2025/","https://cardinalnews.org/2025/01/15/bipartisan-legislative-effort-seeks-to-regulate-data-center-construction-in-virginia/"],"lflag":"source_quality_reclassified"},{"id":"2ff613af77dc","cid":"2ff613af77dc","canon":1,"dups":1,"ftype":"data_center","name":"NOVA MANGO FARMS LLC C/O CORPORATION SERVICE COMPANY","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","op":"NOVA MANGO FARMS","spon":"NOVA MANGO FARMS","tenant":"Google","ay":2019,"oy":2024,"contro":"Yes","deal":"Google's $9 billion investment in Virginia","dealScan":"https://www.pecva.org/issue/the-piedmont-news-august-29-2025/","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"pecva.org","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.pecva.org/issue/the-piedmont-news-august-29-2025/"],"rawName":"NOVA MANGO FARMS LLC\nC/O CORPORATION SERVICE COMPANY"},{"id":"8de8cfbfae10","cid":"8de8cfbfae10","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"15f5b228731d","cid":"15f5b228731d","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":224,"pc":"Grid","pconf":"High","pquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","uconf":"High","uquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","uscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT","spon":"NTT Global Data Centers Americas","ay":2022,"oy":2024,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.global.ntt","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"2e02133b6059","cid":"2e02133b6059","canon":0,"dups":2,"ftype":"data_center","name":"NTT","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Future / Expansion","mw":224,"pc":"Grid","pconf":"High","pquote":"Our Virginia data center VA1 is just outside of Washington D.C., located in the heart of \"Data Center Alley\" containing one of the largest fiber carrier densities in the world and highly-reliable, cost-effective utility power from Dominion Virginia Power.","uquote":"Our Virginia data center VA1 is just outside of Washington D.C., located in the heart of \"Data Center Alley\" containing one of the largest fiber carrier densities in the world and highly-reliable, cost-effective utility power from Dominion Virginia Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers","spon":"NTT Global Data Centers Americas","tenant":"Zendesk","ay":2016,"oy":2027,"deal":"$160 million investment for VA3 Data Center","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text status_adjusted_future_expansion,merged_duplicate","band":"100-250 MW","rawStatus":"Operational","srcUrls":null,"srcDom":null},{"id":"997c79a5ea80","cid":"2e02133b6059","canon":0,"dups":2,"ftype":"data_center","name":"NTT","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":224,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Our Virginia data center VA1 is just outside of Washington D.C., located in the heart of \"Data Center Alley\" containing one of the largest fiber carrier densities in the world and highly-reliable, cost-effective utility power from Dominion Virginia Power.","uquote":"Our Virginia data center VA1 is just outside of Washington D.C., located in the heart of \"Data Center Alley\" containing one of the largest fiber carrier densities in the world and highly-reliable, cost-effective utility power from Dominion Virginia Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers","spon":"NTT Global Data Centers Americas","contro":"The U.S. Department of Energy used the Federal Power Act on Monday to allow data centers within the regional grid operated by PJM Interconnection, including those in Virginia, to use generators at PJM's discretion through Jan. 31. A bill by Del. John McAuliff, D-Loudoun County, aims to strengthen oversight of data centers and would require notification to DEQ and air monitoring in the area.","controScan":"https://insideclimatenews.org/news/29012026/data-centers-in-pjm-grid-can-rely-solely-on-generators-during-the-cold-doe-rules/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"insideclimatenews.org","srcUrls":["https://insideclimatenews.org/news/29012026/data-centers-in-pjm-grid-can-rely-solely-on-generators-during-the-cold-doe-rules/"],"lflag":"source_quality_reclassified"},{"id":"df91f01b68b1","cid":"df91f01b68b1","canon":0,"dups":1,"ftype":"data_center","name":"NTT","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":224,"pc":"Grid","pconf":"High","pquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","uconf":"High","uquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers Americas","tenant":"Groupon, Zendesk, Gracenote","ay":2016,"oy":2018,"contro":"The U.S. Department of Energy allowed data centers in the PJM grid, including Virginia, to use generators at PJM's discretion during cold weather. A delegate's bill proposes requiring notification to DEQ and air monitoring for data centers in the area.","controScan":"https://insideclimatenews.org/news/29012026/data-centers-in-pjm-grid-can-rely-solely-on-generators-during-the-cold-doe-rules/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"insideclimatenews.org","srcUrls":["https://insideclimatenews.org/news/29012026/data-centers-in-pjm-grid-can-rely-solely-on-generators-during-the-cold-doe-rules/"],"band":"100-250 MW","lflag":"source_quality_reclassified,merged_duplicate"},{"id":"4ea7e3886ce0","cid":"4ea7e3886ce0","canon":0,"dups":1,"ftype":"data_center","name":"NTT","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":12,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","uquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"f128da821755","cid":"f128da821755","canon":0,"dups":1,"ftype":"data_center","name":"NTT","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":24,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","uquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers Americas","spon":"NTT","ay":2022,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"709d7390731b","cid":"709d7390731b","canon":1,"dups":1,"ftype":"data_center","name":"NTT Global Data Center Americas, Inc. - VA2 Data Center","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":14,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"VA2 is located in Northern Virginia, the #1 data center market in the world, containing one of the largest fiber carrier densities and highly-reliable, cost-effective utility power from Dominion Virginia Power.","uquote":"VA2 is located in Northern Virginia, the #1 data center market in the world, containing one of the largest fiber carrier densities and highly-reliable, cost-effective utility power from Dominion Virginia Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers Americas","spon":"NTT","oy":2016,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ef232fb63322","cid":"ef232fb63322","canon":1,"dups":1,"ftype":"data_center","name":"NTT Global Data Centers","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Future / Expansion","mw":224,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The Virginia market, coined 'Data Center Alley,' contains one of the largest fiber carrier densities with more than 70% of the world's internet traffic passing through the region's digital ecosystem. Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","uquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","uscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers","spon":"NTT Global Data Centers Americas","tenant":"hyperscale platforms and large enterprises","ay":2026,"oy":2027,"contro":"Power constraints and reliability concerns due to data center growth","deal":"Secured 115MW in capacity commitments, including 90+MW for a hyperscale provider at VA11 campus in Virginia","dealScan":"https://services.global.ntt/en-us/newsroom/ntt-data-continues-data-center-momentum","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"services.global.ntt","lflag":"status_adjusted_future_expansion source_quality_reclassified","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","https://services.global.ntt/en-us/newsroom/ntt-data-continues-data-center-momentum"],"rawStatus":"Operational"},{"id":"e4172c916cd3","cid":"e4172c916cd3","canon":1,"dups":1,"ftype":"data_center","name":"NTT Global Data Centers Americas, Inc.","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":224,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","uquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","uscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers Americas","spon":"NTT Global Data Centers Americas","ay":2016,"oy":2026,"contro":"Opposition to data centers in Ashburn, VA, including protests against transmission lines needed to service nearby data centers.","deal":"NTT Communications invested $160 million to build the Ashburn VA3 Data Center, which was phase one of the Ashburn Data Center Campus development. NTT Ltd.'s Global Data Centers Americas division was formerly known as RagingWire Data Centers.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.global.ntt","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center"],"lflag":"source_quality_reclassified"},{"id":"04c2935fe67e","cid":"04c2935fe67e","canon":1,"dups":1,"ftype":"data_center","name":"NTT Global Data Centers Building 7","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"VA2 is located in Northern Virginia, the #1 data center market in the world, containing one of the largest fiber carrier densities and highly-reliable, cost-effective utility power from Dominion Virginia Power. Our Ashburn campus offers highly reliable, cost-effective utility power that supports and benefits our clients.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-data-centers","uquote":"highly-reliable, cost-effective utility power from Dominion Virginia Power. Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/ntt-56ec6fe1","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers","spon":"NTT Global Data Centers Americas","ay":2021,"oy":2026,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"services.global.ntt;interconnection.fyi","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-data-centers","https://www.interconnection.fyi/data-center/project/ntt-56ec6fe1"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"e0a981077ce3","cid":"e0a981077ce3","canon":1,"dups":1,"ftype":"data_center","name":"NTT Global Data Centers VA10 LLC","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":84,"band":"50-100 MW","pc":"Hybrid","pconf":"High","pquote":"Power is delivered via four feeders with N+1 block redundancy and dual-corded distribution, supporting up to 20kW per rack. Backup generators with on-site fuel storage ensure 24-hour runtime at full load, with continuous fuel delivery available 24/7.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT","spon":"NTT Global Data Centers VA10","ay":2022,"oy":2024,"deal":"NTT Ltd. acquired 103 acres of land in Prince William County, Gainesville, VA, from Lerner Enterprises for $257.4 million to build a large-scale data center campus.","dealScan":"https://www.veritycommercial.com/project/dc-gainesville-campus/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"veritycommercial.com","srcUrls":["https://www.veritycommercial.com/project/dc-gainesville-campus/"]},{"id":"f3f8e6ad9466","cid":"f3f8e6ad9466","canon":1,"dups":1,"ftype":"data_center","name":"NV-4 CYRUSONE LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"C1 NORTHERN VIRGINIA - STERLING IV","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"ca8f8cc3b6cc","cid":"ca8f8cc3b6cc","canon":1,"dups":1,"ftype":"data_center","name":"NV-8 CYRUSONE","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":24,"pc":"Hybrid","pconf":"Medium","pquote":"One utility feeder currently planned, possibly three long term - 20 transformers on site plus 1.5MW house - 4.5MW and 7.5MW block redundant designs - 45MW of generator power plus 1.5MW house power.","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"C1 NORTHERN VIRGINIA - STERLING VIII","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"c32e29cc941e","cid":"c32e29cc941e","canon":1,"dups":1,"ftype":"data_center","name":"NV-9 CYRUSONE","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":135,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Power - Utility capacity – 135 MW total - Utility voltage – 34.5 kV - Number of Utility Feeders – 4 (2 redundant) - Number of transformers on site – 40 each - UPS configuration and capacity – 4:3 distributed redundant, 1500 kW each - Generator power – 2250 kW x 80 each = 180 MW","uconf":"High","uquote":"Dominion Energy. Permit Status. Approved.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"C1 NORTHERN VIRGINIA - STERLING IX","oy":2020,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"d3d3df2321ad","cid":"d3d3df2321ad","canon":1,"dups":1,"ftype":"data_center","name":"NVA01 STACK INFRASTRUCTURE","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17,"pc":"Grid","pconf":"High","pquote":"Multiple utility feeds, N+1 redundancy generators with minimum 48 hours of operation, N+1 UPS configuration and client access to BMS portal.","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/nva01-stack-infrastructure-c4173e5c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"SI NVA01","spon":"SI NVA01","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/nva01-stack-infrastructure-c4173e5c"],"band":"10-25 MW"},{"id":"4929c46f4b13","cid":"ed82256b08d5","canon":0,"dups":2,"ftype":"data_center","name":"NVA06 Campus","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":72,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"This 72MW campus in Leesburg, Virginia spans 52 acres and is powered by the Northern Virginia Electric Cooperative (NOVEC).","pscan":"https://www.stackinfra.com/locations/americas/northern-virginia/nva06/","uquote":"This 72MW campus in Leesburg, Virginia spans 52 acres and is powered by the Northern Virginia Electric Cooperative (NOVEC).","uscan":"https://www.stackinfra.com/locations/americas/northern-virginia/nva06/","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","ay":2024,"oy":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","srcUrls":["https://www.stackinfra.com/locations/americas/northern-virginia/nva06/"],"lflag":"source_quality_reclassified"},{"id":"ed82256b08d5","cid":"ed82256b08d5","canon":1,"dups":2,"ftype":"data_center","name":"NVA06 Campus","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":72,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Powered by the Northern Virginia Electric Cooperative (NOVEC), this campus is designed to meet the demands of high-density workloads and advanced technological needs.","uconf":"High","uquote":"Powered by the Northern Virginia Electric Cooperative (NOVEC), this campus is designed to meet the demands of high-density workloads and advanced technological needs.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","ay":2024,"oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"742a86260162","cid":"742a86260162","canon":1,"dups":1,"ftype":"data_center","name":"Oath, Inc.","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"Under current rate structures, data centers pay the full cost of the electricity they use; starting in 2027, a new rate class called GS-5 will require data centers to take on more upfront costs and make longer-term commitments.","rto":"PJM","nerc":"SERC","op":"Oath","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8cfdf1f6665b","cid":"8cfdf1f6665b","canon":1,"dups":1,"ftype":"data_center","name":"OVHcloud","city":"Warrenton","county":"Fauquier","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"734246d9fc28","cid":"734246d9fc28","canon":1,"dups":1,"ftype":"data_center","name":"Peak 10 Incorporated","city":"Richmond","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"The critical infrastructure is protected by redundant UPS system on the loss of utility power that is backed up by redundant 2,250 kW diesel generators.","pscan":"https://cloudandcolocation.com/datacenters/peak-10-richmond-data-center-2/","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"Peak 10 Incorporated","spon":"GI Partners","tenant":"Red Hat, , Eastern Virginia Bankshares (EVB)","ay":2007,"oy":2007,"deal":"Peak 10 acquired bayMountain Inc.","dealScan":"https://www.grpva.com/news/peak-10-expands-data-center-in-henrico/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;grpva.com","srcUrls":["https://cloudandcolocation.com/datacenters/peak-10-richmond-data-center-2/","https://www.grpva.com/news/peak-10-expands-data-center-in-henrico/"]},{"id":"9349802ec02b","cid":"9349802ec02b","canon":1,"dups":1,"ftype":"data_center","name":"Perspecta Datacenter Campus","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Virginia Power","rto":"PJM","nerc":"SERC","op":"Amazon","tenant":"Amazon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"25e96656011e","cid":"25e96656011e","canon":1,"dups":1,"ftype":"data_center","name":"Pixel Factory","county":"Hanover County","state":"VA","lat":37.760215,"lng":-77.491317,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Pixel Factory Data Center / PIXEL FACTORY DEVELOPMENT (Scott Brown, owner/President)","spon":"PIXEL FACTORY DEVELOPMENT","tenant":"NASCAR teams, Ford North America","oy":2014,"deal":"Connection with Mid-Atlantic Broadband Communities Corporation (MBC)","dealScan":"https://mbc-va.com/news/mbc-announces-new-connection-to-pixel-factory-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mbc-va.com","lflag":"operational_null_capacity source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://mbc-va.com/news/mbc-announces-new-connection-to-pixel-factory-data-center/"]},{"id":"f83930c0fd6d","cid":"f83930c0fd6d","canon":1,"dups":1,"ftype":"data_center","name":"Plaza Office Realty II, LLC","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Dominion Energy Virginia","uquote":"Grid Operator: Dominion Energy Virginia","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Unisys","spon":"Plaza Office Realty II","ay":2005,"oy":2005,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"pscan":"https://interconnection.fyi/data-centers/virginia/fairfax-county/plaza-office-realty-ii-llc-data-center","uscan":"https://interconnection.fyi/data-centers/virginia/fairfax-county/plaza-office-realty-ii-llc-data-center","srcUrls":["https://interconnection.fyi/data-centers/virginia/fairfax-county/plaza-office-realty-ii-llc-data-center"],"srcDom":"interconnection.fyi","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"cf0bf2846784","cid":"cf0bf2846784","canon":1,"dups":1,"ftype":"data_center","name":"PointOne","city":"Remington","county":"Fauquier","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","mw":50,"band":"50-100 MW","pc":"Hybrid","pconf":"High","pquote":"designed to deliver up to 304 MW of Critical IT, including 136 MW powered by natural gas","proc":"Co-located generation","pcp":"PointOne","pdt":"136 MW","rto":"PJM","nerc":"SERC","op":"PointOne","spon":"PointOne Holdings","ay":2018,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"abf2a31cacae","cid":"abf2a31cacae","canon":1,"dups":1,"ftype":"data_center","name":"PointOne","city":"Virginia Beach","county":"Virginia Beach city","state":"VA","lat":36.779525,"lng":-76.029142,"cprec":"distinct","status":"Operational","mw":9,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Current capacity provided by Dominion Energy already exceeds the facility and potential second facility's critical power load of 9.6MW. – Served by two diverse 34.5kV distribution feeds.","pscan":"https://www.sbballard.com/portfolios/multi-purpose-cable-landing-station-and-edge-computing-data-center-facility-in-virginia-beach/","uquote":"Current capacity provided by Dominion Energy already exceeds the facility and potential second facility's critical power load of 9.6MW.... Dominion Energy is the electric power provider.","uscan":"https://www.sbballard.com/portfolios/multi-purpose-cable-landing-station-and-edge-computing-data-center-facility-in-virginia-beach/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"PointOne","ay":2018,"oy":2019,"deal":"The Virginia Beach Economic Development Authority has approved a purchase agreement for a 10.4-acre site in Corporate Landing Business Park to PointOne for $2.08 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"sbballard.com","srcUrls":["https://www.sbballard.com/portfolios/multi-purpose-cable-landing-station-and-edge-computing-data-center-facility-in-virginia-beach/"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"12b8cb689ebf","cid":"12b8cb689ebf","canon":1,"dups":1,"ftype":"data_center","name":"PORPOISE VENTURES LLC (Digital Realty Trust)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":10,"rto":"PJM","nerc":"SERC","op":"Digital Realty Trust","spon":"Digital Realty Trust","tenant":"Investment-grade global cloud-service provider","ay":2000,"oy":2001,"deal":"Acquisition by Porpoise Ventures LLC from AOL for $58.5 million in 2005; Digital Realty merges with DuPont Fabros in 2017.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"10-25 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"39267677d250","cid":"39267677d250","canon":1,"dups":1,"ftype":"data_center","name":"PowerHouse","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":265,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Dual-feed power delivery from Dominion Energy.","uconf":"High","uquote":"Dual-feed power delivery from Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"PowerHouse Data Centers","spon":"American Real Estate Partners (AREP), Harrison Street","ay":2023,"oy":2026,"deal":"PowerHouse Data Centers, in collaboration with Harrison Street, purchased the 43-acre land for $136 million in 2021.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6b06f1a4fd36","cid":"6b06f1a4fd36","canon":1,"dups":1,"ftype":"data_center","name":"PowerHouse/AREP ABX-1","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":60,"pc":"Grid","pconf":"High","pquote":"However, after working with Dominion Energy a new plan was developed, creating a 300MW substation on only 1.5 acres of the ABX-1 campus—providing enough power for that project as well as three or four other data centers in the area.","pscan":"https://www.powerhousedata.com/news/powerhouse-tops-out-at-first-data-center-project","uconf":"High","uquote":"However, after working with Dominion Energy a new plan was developed, creating a 300MW substation on only 1.5 acres of the ABX-1 campus—providing enough power for that project as well as three or four other data centers in the area.","uscan":"https://www.powerhousedata.com/news/powerhouse-tops-out-at-first-data-center-project","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"PowerHouse Data Centers","spon":"American Real Estate Partners (AREP) and Harrison Street","ay":2022,"oy":2023,"deal":"CyrusOne acquired PowerHouse ABX-1 for $154.1 million in Q4 2024.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"powerhousedata.com","srcUrls":["https://www.powerhousedata.com/news/powerhouse-tops-out-at-first-data-center-project"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"37f02d49bde6","cid":"37f02d49bde6","canon":1,"dups":1,"ftype":"data_center","name":"POWERLOFT @ INNOVATION I","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Northern Virginia Electric Cooperative (NOVEC)","pdt":"50 megawatts of power capacity","rto":"PJM","nerc":"SERC","op":"POWERLOFT @ INNOVATION I","oy":2016,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ca12a045e09d","cid":"ca12a045e09d","canon":1,"dups":1,"ftype":"data_center","name":"Project Celtic Phase 1","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pdt":"300 megawatts of power","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f88609642b69","cid":"f88609642b69","canon":1,"dups":1,"ftype":"data_center","name":"Prologis NOVA 1","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"Embrace sustainability with renewable power options and LEED certification available.","rto":"PJM","nerc":"SERC","op":"Skybox Datacenters","spon":"Prologis","oy":2023,"deal":"Prologis and Skybox Datacenters are partnering on this facility.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9e67b608f3a0","cid":"9e67b608f3a0","canon":1,"dups":2,"ftype":"data_center","name":"PROLOGIS-EXCHANGE 43461 OLD OX ROAD","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"b6deaca6c65a","cid":"b6deaca6c65a","canon":1,"dups":1,"ftype":"data_center","name":"PWCSA - L74 Neabsco Pumping Station","city":"Woodbridge","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","op":"Prince William County Service Authority","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"5681ddb855ac","cid":"5681ddb855ac","canon":0,"dups":1,"ftype":"data_center","name":"QTS","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":55,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The datacenter is equipped with a robust power infrastructure, featuring multiple redundant power sources to ensure uninterrupted service. This includes a diverse utility feed, on-site diesel generators, and UPS systems, providing a stable power supply for critical operations.","pscan":"https://inflect.com/building/22426-lockridge-road-sterling/qts/datacenter/sterling","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-ae611e69","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone","deal":"Blackstone acquired the data center developer in 2021 in a $10B deal.","dealScan":"https://www.bisnow.com/national/news/data-center/blackstone-paid-3b-to-buy-out-ceo-of-data-center-arm-qts-130207","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"inflect.com;interconnection.fyi;bisnow.com","srcUrls":["https://inflect.com/building/22426-lockridge-road-sterling/qts/datacenter/sterling","https://www.interconnection.fyi/data-center/project/qts-ae611e69","https://www.bisnow.com/national/news/data-center/blackstone-paid-3b-to-buy-out-ceo-of-data-center-arm-qts-130207"],"lflag":"merged_duplicate"},{"id":"ce79c78a7b04","cid":"ce79c78a7b04","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":84,"pc":"Grid","pconf":"High","pquote":"Over in Ashburn, Virginia, our Ashburn-Shellhorn facility is now substantially completed, featuring two 42 megawatt facilities with modularly-deployed power designs and an expandable, adjacent substation.","uquote":"Dominion Energy is the primary electric utility provider in Loudoun County, Virginia.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone Group","tenant":"Global health insurance provider, financial services company (hyperscale tenant)","ay":2017,"oy":2022,"contro":"Protests and legal challenges related to the Prince William County Digital Gateway Project, in which QTS is involved, due to concerns about environmental impact and proximity to historic sites.","controScan":"https://www.bisnow.com/national/news/data-center/more-data-center-resistance-in-nova-with-protest-at-qts-112067","deal":"Blackstone Infrastructure Partners acquired QTS Realty Trust for approximately $10 billion in 2021.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"dominionenergy.com;bisnow.com","uscan":"https://www.dominionenergy.com/virginia/about-us/our-company/service-area","srcUrls":["https://www.dominionenergy.com/virginia/about-us/our-company/service-area","https://www.bisnow.com/national/news/data-center/more-data-center-resistance-in-nova-with-protest-at-qts-112067"],"band":"50-100 MW","lflag":"source_quality_reclassified"},{"id":"59cf538ba343","cid":"59cf538ba343","canon":0,"dups":1,"ftype":"data_center","name":"QTS","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":80,"band":"50-100 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone Infrastructure Partners","tenant":"global health insurance provider, financial services firm","ay":2017,"oy":2018,"contro":"Elected officials and residents in Loudoun County are becoming increasingly vocal about their opposition to data centers, expressing concerns about their potential health impacts.","controScan":"https://vadogwood.com/news/politics/virginians-share-concerns-about-data-centers-at-ashburn-town-hall/","deal":"Blackstone Infrastructure Partners acquired QTS Realty Trust for approximately $10 billion.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"vadogwood.com","srcUrls":["https://vadogwood.com/news/politics/virginians-share-concerns-about-data-centers-at-ashburn-town-hall/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"4bbe3fd6b459","cid":"4bbe3fd6b459","canon":1,"dups":1,"ftype":"data_center","name":"QTS Ashburn-Moran","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":6,"pc":"Hybrid","pconf":"High","pquote":"Power. Configuration options: N, N+1, 2N+1; 4 MW+ critical power capacity; Primary and reserved UPS power units; Primary engine generators; 48-hour fuel supply.","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","tenant":"global health insurance provider","ay":2015,"oy":2015,"deal":"Carpathia acquisition","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"< 10 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a2f7f81b1d9f","cid":"a2f7f81b1d9f","canon":1,"dups":1,"ftype":"data_center","name":"QTS BRODERICK ACQUISITION CO LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Hybrid","pconf":"High","pquote":"QTS has developed a Green. Power Procurement Model, which is based on a portfolio approach by using a combination of short- and long-term power purchase agreements (PPAs) to procure electricity generated from renewable sources, renewable energy credits (RECs), and onsite power generation from renewable energy sources, wherever feasible.","pscan":"https://mma.prnewswire.com/media/2519339/QTS_Sustainability_Report_2023_FINAL_compressed.pdf?p=pdf","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone","ay":2017,"oy":2018,"deal":"Acquisition of 23.5-acre site at Prentice Drive and Broderick Drive by QTS Realty Trust.","dealScan":"https://www.datacenterknowledge.com/operations-and-management/qts-plotting-major-expansion-in-northern-virginia-data-center-market","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"mma.prnewswire.com;datacenterknowledge.com","srcUrls":["https://mma.prnewswire.com/media/2519339/QTS_Sustainability_Report_2023_FINAL_compressed.pdf?p=pdf","https://www.datacenterknowledge.com/operations-and-management/qts-plotting-major-expansion-in-northern-virginia-data-center-market"],"band":"25-50 MW"},{"id":"faf30920040d","cid":"faf30920040d","canon":1,"dups":1,"ftype":"data_center","name":"QTS DATA CENTER ASH3-DC1","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":42,"pc":"Grid","pconf":"High","pquote":"Utility Provider: Dominion Power.","pscan":"https://baxtel.com/data-center/qts-ashburn-shellhorn","uquote":"Utility Provider: Dominion Power.","uscan":"https://baxtel.com/data-center/qts-ashburn-shellhorn","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS Data Centers","spon":"QTS","oy":2021,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/qts-ashburn-shellhorn"],"band":"25-50 MW"},{"id":"4628cc73a7f5","cid":"4628cc73a7f5","canon":1,"dups":1,"ftype":"data_center","name":"QTS Dulles, LLC","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Operational QTS Dulles, LLC data center in Dulles, Loudoun County, VA... Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/qts-dulles-llc-7e17e69d","uquote":"Operational QTS Dulles, LLC data center in Dulles, Loudoun County, VA... Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/qts-dulles-llc-7e17e69d","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"QTS Dulles","tenant":"Loudoun County Public Schools, Mississippi Department of Employment Security, US Department of Labor","deal":"Acquisition of the site via the Carpathia acquisition in 2015","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-dulles-llc-7e17e69d"],"lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"a87f8eecc21e","cid":"a87f8eecc21e","canon":1,"dups":1,"ftype":"data_center","name":"QTS Investment Properties Ashburn LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia","rto":"PJM","nerc":"SERC","op":"QTS Realty Trust","spon":"Blackstone","deal":"Blackstone acquired QTS Realty Trust for approximately $10 billion in an all-cash transaction.","dealScan":"https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"blackstone.com","srcUrls":["https://www.blackstone.com/news/press/qts-realty-trust-to-be-acquired-by-blackstone-funds-in-10-billion-transaction/"],"ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified","rawUkey":"19876|VA","rawUname":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"92f5172fc4cb","cid":"92f5172fc4cb","canon":1,"dups":1,"ftype":"data_center","name":"QTS Investment Properties Manassas LLC","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":190,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone","ay":2018,"oy":2022,"contro":"Significant opposition and legal challenges exist for the 'Prince William Digital Gateway' project, which involves QTS, due to its proximity to Manassas National Battlefield Park and concerns over public notice.","controScan":"https://www.bisnow.com/washington-dc/news/data-center-development/blackstones-qts-appeals-court-decision-blocking-huge-virginia-project-134390","deal":"In 2019, QTS announced a joint venture with Alinda Capital, which bought a 50 percent interest in the Manassas project.","dealScan":"https://www.datacenterfrontier.com/featured/article/11428144/blackstone-to-acquire-qts-in-blockbuster-data-center-m038a-deal","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterfrontier.com;bisnow.com","srcUrls":["https://www.datacenterfrontier.com/featured/article/11428144/blackstone-to-acquire-qts-in-blockbuster-data-center-m038a-deal","https://www.bisnow.com/washington-dc/news/data-center-development/blackstones-qts-appeals-court-decision-blocking-huge-virginia-project-134390"]},{"id":"00a8072c2504","cid":"00a8072c2504","canon":1,"dups":1,"ftype":"data_center","name":"QTS LLC - Ashburn-Shellhorn Data Center","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":84,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"We pay for the energy costs of our data centers so they do not increase local utility bills. We partner with utilities to help build out American infrastructure without raising power costs for the community, and we ensure supportive grid planning and sufficient power capacity.","pscan":"https://www.prnewswire.com/news-releases/qts-is-committed-to-putting-communities-first-while-advancing-the-digital-future-302704846.html","uconf":"High","uquote":"QTS Ashburn-Shellhorn. Short Code: ASH3-DC1. Year Built: 2021. Utility Provider: Dominion Power.","uscan":"https://baxtel.com/data-center/qts-ashburn-shellhorn","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","deal":"QTS is a Blackstone portfolio company.","dealScan":"https://www.prnewswire.com/news-releases/qts-is-committed-to-putting-communities-first-while-advancing-the-digital-future-302704846.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"prnewswire.com;baxtel.com","srcUrls":["https://www.prnewswire.com/news-releases/qts-is-committed-to-putting-communities-first-while-advancing-the-digital-future-302704846.html","https://baxtel.com/data-center/qts-ashburn-shellhorn"]},{"id":"cf78d7d3ea89","cid":"cf78d7d3ea89","canon":1,"dups":1,"ftype":"data_center","name":"QTS Lockridge ASH2 Quality Tech Lane DC1","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":80,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"QTS Investment Properties Ashburn II","spon":"QTS","oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee"],"band":"50-100 MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"53cbea868eb2","cid":"53cbea868eb2","canon":1,"dups":1,"ftype":"data_center","name":"QTS Lockridge ASH2 Quality Tech Lane DC2","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"QTS Investment Properties Ashburn II","ay":2024,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/ash2-lockridge-data-center-qts-investment-properti-54c61cee"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"b66deac918be","cid":"b66deac918be","canon":1,"dups":1,"ftype":"data_center","name":"QTS Manassas DC 2","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":20,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS Data Centers","spon":"Blackstone","tenant":"hyperscale software-as-a-service provider","ay":2019,"oy":2021,"deal":"Joint venture with Alinda Capital Partners for Manassas data center development, with Alinda committing up to $500 million over five years.","dealScan":"https://www.datacenterknowledge.com/operations-and-management/qts-adds-firepower-to-drive-mega-data-center-profits","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;datacenterknowledge.com","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-e908f3c7","https://www.datacenterknowledge.com/operations-and-management/qts-adds-firepower-to-drive-mega-data-center-profits"],"band":"10-25 MW"},{"id":"52bdf152aa04","cid":"52bdf152aa04","canon":1,"dups":1,"ftype":"data_center","name":"QTS Manassas DC 5","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"QTS","spon":"QTS","contro":"Potential noise concerns due to sound study requirements.","deal":"Assessed value of $348,596,900","dealScan":"https://www.pwcva.gov/assets/2024-09/Annual%20Report%202024.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"pwcva.gov","lflag":"operational_null_capacity source_quality_reclassified","srcUrls":["https://www.pwcva.gov/assets/2024-09/Annual%20Report%202024.pdf"]},{"id":"2d86b10f24c1","cid":"2d86b10f24c1","canon":1,"dups":1,"ftype":"data_center","name":"QTS MANASSAS I DC3 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone","oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-e908f3c7"]},{"id":"0f3090b07565","cid":"0f3090b07565","canon":1,"dups":1,"ftype":"data_center","name":"QTS Richmond Data Center","city":"Sandston","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":240,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"The Richmond data center is a fully fault tolerant facility with power fed from two transmission lines from two independent Dominion substations. Two dedicated on site substations currently 110 MVA to the facility that is upgradable to 220 MVA in future, and two 55 MVA transformers in complete redundant configuration distribute power to the site. The redundant UPS system and generators provide the back up power to the data center on the loss of utility power.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"The Richmond data center is a fully fault tolerant facility with power fed from two transmission lines from two independent Dominion substations.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS (Quality Technology Services)","ay":2010,"deal":"The purchase price for the Qimonda campus was $12 million, according to court documents.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ed75de5523b1","cid":"ed75de5523b1","canon":1,"dups":1,"ftype":"data_center","name":"Quail Ridge C - D","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"acd133cd104d","cid":"acd133cd104d","canon":1,"dups":1,"ftype":"data_center","name":"RAGING WIRE VA1","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":14,"pc":"Grid","pconf":"High","pquote":"highly-reliable, cost-effective utility power from Dominion Virginia Power.","pscan":"https://criticalfacility.com/wp-content/uploads/2020/05/RagingWire-NTT_Director-Global-Sales-Engineering_CFS-Position-Profile_5.2020_web.pdf","uquote":"highly-reliable, cost-effective utility power from Dominion Virginia Power.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers Americas","spon":"NTT Communications","tenant":"retail and large wholesale data center customers, top enterprises","ay":2012,"oy":2012,"deal":"NTT Communications acquired an 80 percent ownership stake in RagingWire Data Centers for $350 million.","dealScan":"https://www.datacenterknowledge.com/investing/ntt-completes-350-million-ragingwire-investment","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"criticalfacility.com;datacenterknowledge.com","srcUrls":["https://criticalfacility.com/wp-content/uploads/2020/05/RagingWire-NTT_Director-Global-Sales-Engineering_CFS-Position-Profile_5.2020_web.pdf","https://www.datacenterknowledge.com/investing/ntt-completes-350-million-ragingwire-investment"],"band":"10-25 MW"},{"id":"efa3a2b05684","cid":"efa3a2b05684","canon":1,"dups":1,"ftype":"data_center","name":"RDC-1807 MICHAEL FARADAY COURT","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"RDC-1807 MICHAEL FARADAY COURT","spon":"RDC-1807 MICHAEL FARADAY COURT","tenant":"Evocative Data Centers, Atlantic.net","contro":"A legal dispute in 2006 regarding the retention of a 'Restoration Escrow' after AboveNet Communications, Inc. purchased the building from 1807 Faraday Court Limited Partnership.","controScan":"https://www.ca4.uscourts.gov/Opinions/Unpublished/051398.U.pdf","deal":"AboveNet Communications, Inc. purchased the building at 1807 Faraday Court outright from 1807 Faraday Court Limited Partnership after a lease agreement.","dealScan":"https://www.ca4.uscourts.gov/Opinions/Unpublished/051398.U.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"ca4.uscourts.gov","lflag":"operational_null_capacity","srcUrls":["https://www.ca4.uscourts.gov/Opinions/Unpublished/051398.U.pdf"]},{"id":"66e1846a900a","cid":"66e1846a900a","canon":1,"dups":1,"ftype":"data_center","name":"Red Rum Dr Campus Sabey Data Centers","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Hybrid","pconf":"High","pquote":"Our redundant electrical systems provide a highly resilient environment to virtually eliminate downtime.... Onsite substation to help support our clients' current and future power requirements.... Electrical backup systems in N+1 configuration.... On-site fuel supply for emergency events with additional supply through emergency fuel contracts.","pscan":"https://sabeydatacenters.com/locations/ashburn-data-center","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"Sabey Data Centers","spon":"Sabey Data Centers","oy":2026,"contro":"Noise from generators in the Ashburn/Waxpool area, where the campus is located, has been reported by residents.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"sabeydatacenters.com","srcUrls":["https://sabeydatacenters.com/locations/ashburn-data-center"],"band":"25-50 MW","lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"fdb78e8bad5e","cid":"fdb78e8bad5e","canon":1,"dups":1,"ftype":"data_center","name":"Remington Technology Park Limited Partnership","city":"Remington","county":"Fauquier","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","proc":"Co-located generation","pcp":"Remington Technology Park Limited Partnership","pdt":"13 gas turbine generators; temporary until Dominion Energy delivers requested electricity","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"77b860881b75","cid":"77b860881b75","canon":1,"dups":1,"ftype":"data_center","name":"Roosevelt Building","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","uquote":"Most residents are served by Dominion Virginia Power.","uscan":"https://www.fairfaxcounty.gov/cableconsumer/csd/utility-and-cable-providers","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"YOSEMITE DC ASSETS","spon":"YOSEMITE DC ASSETS","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"fairfaxcounty.gov","lflag":"operational_null_capacity","srcUrls":["https://www.fairfaxcounty.gov/cableconsumer/csd/utility-and-cable-providers"]},{"id":"c10fbc0dae29","cid":"c10fbc0dae29","canon":1,"dups":1,"ftype":"data_center","name":"RREEF America REIT II Corp. VVV","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"118eaf9dd54f","cid":"118eaf9dd54f","canon":1,"dups":1,"ftype":"data_center","name":"Sabey Data Centers","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":85,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Our redundant electrical systems provide a highly resilient environment to virtually eliminate downtime.... Onsite substation to help support our clients' current and future power requirements.... On-site fuel supply for emergency events with additional supply through emergency fuel contracts.","uconf":"High","uquote":"Utility Provider: Dominion Energy.","uscan":"https://baxtel.com/data-center/sabey-intergate-ashburn-building-b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Sabey Data Centers","spon":"Sabey and National Real Estate Advisors","ay":2011,"oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/sabey-intergate-ashburn-building-b"],"lflag":"citation_artifact_removed"},{"id":"57c18e4a5241","cid":"57c18e4a5241","canon":1,"dups":1,"ftype":"data_center","name":"Science Applications International Corp (SAIC)","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/science-applications-international-corp-saic-fb38d873","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/science-applications-international-corp-saic-fb38d873","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DISCOVERY SQUARE","spon":"DISCOVERY SQUARE","tenant":"Science Applications International (SAIC)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/science-applications-international-corp-saic-fb38d873"]},{"id":"ae3ad1a2ecad","cid":"ae3ad1a2ecad","canon":1,"dups":1,"ftype":"data_center","name":"Scout Development LLC","city":"Sandston","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Our data centers' electricity use is matched with 100% clean and renewable energy, and our global operations have reached net zero emissions. Meta-supported projects are adding 700 megawatts of new renewable energy in Virginia.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Henrico-Data-Center.pdf","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/scout-development-llc-5b9791d3","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2022,"oy":2019,"deal":"Meta purchased the 475-acre property from Henrico County's development authority for $35.3M in October, according to Richmond BizSense. The proposed development — referred to as Project Tropical in county filings — comes amid layoffs and office space cuts at Meta and across the tech industry. In filings with county authorities, Meta — or an affiliated development entity known as Scout Development LLC — said it intends to build a pair of data centers and three auxiliary buildings on the site.","dealScan":"https://www.bisnow.com/national/news/data-center/project-tropical-meta-expanding-richmond-data-center-116563","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"datacenters.atmeta.com;interconnection.fyi;bisnow.com","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Henrico-Data-Center.pdf","https://www.interconnection.fyi/data-center/project/scout-development-llc-5b9791d3","https://www.bisnow.com/national/news/data-center/project-tropical-meta-expanding-richmond-data-center-116563"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"30925948ea84","cid":"30925948ea84","canon":0,"dups":1,"ftype":"data_center","name":"SDC ASHBURN I","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":36,"pc":"Grid","pconf":"High","pquote":"Our redundant electrical systems provide a highly resilient environment to virtually eliminate downtime.... Onsite substation to help support our clients' current and future power requirements.","pscan":"https://sabeydatacenters.com/locations/ashburn-data-center","uquote":"Dominion Energy is the region's main power utility, providing about 1 Gigawatt of reliable, low-cost energy throughout northern Virginia.","uscan":"https://upstack.com/blog/why-is-ashburn-known-as-data-center-alley/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Sabey Data Centers","spon":"SDC ASHBURN ALPHA I","oy":2026,"contro":"PJM Interconnection is addressing rising demand from data centers and developing rules to shield residential and other existing customers from planned auction costs related to transmission upgrades.","controScan":"https://www.utilitydive.com/news/pjm-accelerates-backstop-reliability-auction-amid-uncertainty-over-data-cen/820707/","deal":"Sabey Data Centers is a joint venture between Sabey Corporation and National Real Estate Advisors, LLC, acting as the investment manager on behalf of its institutional clients.","dealScan":"https://sabeydatacenters.com/news/sabey-breaks-ground-on-final-phase-of-ashburn-campus-expansion","tier":2,"tlbl":"Reputable journalism","srcCt":4,"srcDom":"sabeydatacenters.com;upstack.com;utilitydive.com","srcUrls":["https://sabeydatacenters.com/locations/ashburn-data-center","https://upstack.com/blog/why-is-ashburn-known-as-data-center-alley/","https://sabeydatacenters.com/news/sabey-breaks-ground-on-final-phase-of-ashburn-campus-expansion","https://www.utilitydive.com/news/pjm-accelerates-backstop-reliability-auction-amid-uncertainty-over-data-cen/820707/"],"band":"25-50 MW","lflag":"citation_artifact_removed,merged_duplicate"},{"id":"c45901c58ccb","cid":"c45901c58ccb","canon":1,"dups":1,"ftype":"data_center","name":"Sentara Healthcare","city":"Virginia Beach","county":"Virginia Beach city","state":"VA","lat":36.779525,"lng":-76.029142,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"Sentara Healthcare","spon":"Sentara Healthcare","tenant":"Sentara Healthcare","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"3b891ef51b09","cid":"3b891ef51b09","canon":0,"dups":1,"ftype":"data_center","name":"Sentara Healthcare","city":"Virginia Beach","county":"Virginia Beach city","state":"VA","lat":36.779525,"lng":-76.029142,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"b8c9e2e3926b","cid":"b8c9e2e3926b","canon":1,"dups":1,"ftype":"data_center","name":"SENTINEL ASHBURN II","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"GI TC LOUDOUN","spon":"GI TC LOUDOUN","ay":2017,"oy":2018,"deal":"GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3caa2b1d7d8c","cid":"3caa2b1d7d8c","canon":1,"dups":1,"ftype":"data_center","name":"Sentinel Ashburn Nexus","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"403c5ff36bcf","cid":"403c5ff36bcf","canon":1,"dups":1,"ftype":"data_center","name":"Sentinel Data Centers","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":46,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"On the infrastructure side, Cloud Plaza is equipped with N+1 redundancy for uninterruptible power supply (UPS), cooling, and generators, ensuring operational continuity even in the event of component failure.","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/sentinel-data-centers-79d1eede","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"GI Partners","spon":"GI Partners","ay":2018,"oy":2019,"deal":"GI Partners acquired the data center from Sentinel Data Centers for $709 million on May 19, 2022.","dealScan":"https://baxtel.com/data-center/digital-realty-dulles-expansion","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","srcUrls":["https://www.interconnection.fyi/data-center/project/sentinel-data-centers-79d1eede","https://baxtel.com/data-center/digital-realty-dulles-expansion"]},{"id":"1aafa594fb2f","cid":"1aafa594fb2f","canon":1,"dups":1,"ftype":"data_center","name":"SES AMERICOM INC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/ses-americom-inc-c6f37155","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/ses-americom-inc-c6f37155","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"SES AMERICOM","spon":"SES AMERICOM","ay":2021,"oy":2024,"deal":"$17 million investment, $500,000 Commonwealth Opportunity Fund grant, $500,000 Economic Development Opportunity Fund grant","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/ses-americom-inc-c6f37155"]},{"id":"bd2a15cb291d","cid":"bd2a15cb291d","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA 04 LLC (Avanti at Innovation)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":216,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/si-nva-04-llc-avanti-at-innovation-b81f7d07","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/si-nva-04-llc-avanti-at-innovation-b81f7d07","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","ay":2019,"deal":"Proffer Amendment and Rezoning #REZ2019-00028, Avanti at Innovation, approved by the Prince William Board of County Supervisors on July 16, 2019.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/si-nva-04-llc-avanti-at-innovation-b81f7d07"],"band":"100-250 MW"},{"id":"0c9fa6a8334b","cid":"0c9fa6a8334b","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA01 ABS, LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Multiple utility feeds, N+1 redundancy generators with minimum 48 hours of operation, N+1 UPS configuration and client access to BMS portal.","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/nva01-stack-infrastructure-c4173e5c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","deal":"Asset-backed securitization (ABS) by Stack Infrastructure Issuer, LLC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/nva01-stack-infrastructure-c4173e5c"]},{"id":"731acbe0ad28","cid":"731acbe0ad28","canon":0,"dups":1,"ftype":"data_center","name":"SI NVA02 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/si-nva02-llc-e1f8c387","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/si-nva02-llc-e1f8c387","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/si-nva02-llc-e1f8c387"]},{"id":"791cdb343948","cid":"791cdb343948","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA02 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":420,"pc":"Grid","pconf":"High","pquote":"Powering the campus are two dedicated 300MW onsite substations, supplying low-cost power and high reliability to enable top technology pioneers to forge the world's next big innovations. Sustainability Focus: Powered by 100% renewable energy to help support clients' sustainability targets and corporate responsibility goals.","pscan":"https://www.stackinfra.com/wp-content/uploads/2023/12/NVA02_Campus_120523.pdf","uconf":"High","uquote":"STACK's NVA02 campus in Prince William County offers exceptional scalability with 420MW of critical capacity, supported by two dedicated 300MW onsite substations from Northern Virginia Electric Cooperative (NOVEC).","uscan":"https://www.stackinfra.com/locations/americas/northern-virginia/nva02/","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","ay":2021,"oy":2023,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"stackinfra.com","srcUrls":["https://www.stackinfra.com/wp-content/uploads/2023/12/NVA02_Campus_120523.pdf","https://www.stackinfra.com/locations/americas/northern-virginia/nva02/"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"c166b4bebf9a","cid":"c166b4bebf9a","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA02D, LLC","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"STACK's NVA02 campus in Prince William County offers exceptional scalability with 420MW of critical capacity, supported by two dedicated 300MW onsite substations from Northern Virginia Electric Cooperative (NOVEC).","uquote":"Two dedicated 300MW onsite substations will supply committed and scalable power from Northern Virginia Electric Cooperative (NOVEC) at low cost with high reliability.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","ay":2023,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"46577ea88b7f","cid":"46577ea88b7f","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA05 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":200,"pc":"Grid","pconf":"High","pquote":"Sustainability Commitment: Planned with STACK's efficient, low-water use Basis of Design and powered by 100% renewable energy.","pscan":"https://www.stackinfra.com/wp-content/uploads/2022/04/NVA05_040523.pdf","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/si-nva05-llc-97695c13","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","oy":2024,"contro":"An enforcement action has been proposed for SI NVA05A, LLC for violations of Virginia Air Pollution Control Law and the applicable permit and regulations at the Stack NVA05A facility located in Manassas, Virginia.","deal":"$900 million in green financing","dealScan":"https://www.globenewswire.com/news-release/2025/01/14/3009273/0/en/stack-secures-900-million-in-green-financing-in-northern-virginia.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"stackinfra.com;interconnection.fyi;globenewswire.com","srcUrls":["https://www.stackinfra.com/wp-content/uploads/2022/04/NVA05_040523.pdf","https://www.interconnection.fyi/data-center/project/si-nva05-llc-97695c13","https://www.globenewswire.com/news-release/2025/01/14/3009273/0/en/stack-secures-900-million-in-green-financing-in-northern-virginia.html"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"e4fc8c2f8ccc","cid":"e4fc8c2f8ccc","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA06 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"WHEREAS, this is a public facility review (PFR) request to allow for the. NOVEC substation and a Dominion switching station; and. WHEREAS, the proposed electric substations will serve local data center. loads; and.","uconf":"High","uquote":"WHEREAS, this is a public facility review (PFR) request to allow for the. NOVEC substation and a Dominion switching station; and. WHEREAS, the proposed electric substations will serve local data center. loads; and.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Innovation Holdings","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fe44fdef6cb1","cid":"fe44fdef6cb1","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA07 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"THE PRINCE WILLIAM COUNTY DEPARTMENT OF FIRE AND RESCUE WILL BE PROVIDED A PROTOCOL FOR ACCESSING THE SITE AND NOTIFYING NOVEC IN THE EVENT OF AN EMERGENCY.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","spon":"STACK Innovation Holdings","ay":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"73d5a2986b73","cid":"73d5a2986b73","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA08 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/si-nva08-llc-f4b1c59b","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/si-nva08-llc-f4b1c59b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity","srcUrls":["https://www.interconnection.fyi/data-center/project/si-nva08-llc-f4b1c59b"]},{"id":"75fabcef1da6","cid":"75fabcef1da6","canon":1,"dups":1,"ftype":"data_center","name":"Smithsonian Institution","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"7a9903035f52","cid":"7a9903035f52","canon":0,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Operational","mw":48,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The facility operates on 100% renewable energy and incorporates low-carbon concrete in its construction, significantly reducing its environmental impact.","uconf":"High","uquote":"Scalable Electrical Infrastructure: Directly adjacent to existing high-voltage transmission lines connected to a Novec substation, which will be expanded to support the site.","uscan":"https://www.stackinfra.com/wp-content/uploads/2022/04/NVA05_040523.pdf","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","ay":2020,"oy":2024,"deal":"$900 million in green financing","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","srcUrls":["https://www.stackinfra.com/wp-content/uploads/2022/04/NVA05_040523.pdf"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"db92ac3fdfce","cid":"db92ac3fdfce","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":84,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Sustainability Commitment: Planned with STACK's efficient, low-water use Basis of Design and powered by 100% renewable energy.","uquote":"Scalable Electrical Infrastructure: Directly adjacent to existing high-voltage transmission lines connected to a Novec substation, which will be expanded to support the site.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"IPI Partners","ay":2022,"oy":2024,"deal":"$900 million in green financing","dealScan":"https://www.stackinfra.com/about/news-press/press-releases/stack-secures-900-million-in-green-financing-in-northern-virginia/","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","srcUrls":["https://www.stackinfra.com/about/news-press/press-releases/stack-secures-900-million-in-green-financing-in-northern-virginia/"],"lflag":"source_quality_reclassified"},{"id":"42a61570c81f","cid":"42a61570c81f","canon":1,"dups":1,"ftype":"data_center","name":"Stack Infrastructure","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Multiple utility feeds, N+1 redundancy generators with minimum 48 hours of operation, N+1 UPS configuration and client access to BMS portal.","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"61aaf962fd21","cid":"61aaf962fd21","canon":1,"dups":1,"ftype":"data_center","name":"STACK Infrastructure Data Center - SI NVA06A LLC","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":72,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Planned high-capacity utility power sourced from the regional grid.","uconf":"High","uquote":"This 72MW campus in Leesburg, Virginia spans 52 acres and is powered by the Northern Virginia Electric Cooperative (NOVEC).","uscan":"https://www.stackinfra.com/locations/americas/northern-virginia/nva06/","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"IPI Partners","ay":2024,"oy":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","srcUrls":["https://www.stackinfra.com/locations/americas/northern-virginia/nva06/"],"lflag":"source_quality_reclassified"},{"id":"31300df4bb5a","cid":"31300df4bb5a","canon":1,"dups":1,"ftype":"data_center","name":"STACK Infrastructure NVA13","city":"Manassas","county":"Manassas","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Operational","mw":36,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Sustainability Commitment: Planned with STACK's efficient, low-water use Basis of Design and powered by 100% renewable energy.","pscan":"https://www.stackinfra.com/wp-content/uploads/2022/04/NVAL3_USTA_041322.pdf","uquote":"Scalable Electrical Infrastructure: Directly adjacent to existing high-voltage transmission lines connected to a Novec substation, which will be expanded to support the site. The latest among STACK's portfolio of seven data center campuses in Northern Virginia, the 40-acre site will add nearly 100MW of committed and scalable power from Northern Virginia Electric Cooperative (NOVEC).","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"IPI Partners","ay":2020,"oy":2023,"deal":"Partnership with Peterson Companies for development of Manassas campus","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","srcUrls":["https://www.stackinfra.com/wp-content/uploads/2022/04/NVAL3_USTA_041322.pdf"],"lflag":"source_quality_reclassified"},{"id":"b99fb6df4f46","cid":"b99fb6df4f46","canon":1,"dups":3,"ftype":"data_center","name":"STACK NVA04","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":216,"pc":"Grid","pconf":"High","pquote":"STACK's commitment to sustainability is evident as the campus is powered by 100% renewable energy, aligning with the environmental goals of its clients while providing scalable power in a power-constrained market.","uconf":"High","uquote":"Utility power sourced from Dominion Energy; Campus-scale electrical infrastructure supporting large deployments.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4f6ff33367c5","cid":"b99fb6df4f46","canon":0,"dups":3,"ftype":"data_center","name":"STACK NVA04","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":216,"pc":"Grid","pconf":"High","pquote":"The campus will be powered by 100% renewable energy and served by STACK's trusted utility partner, Dominion.","uquote":"The campus will be powered by 100% renewable energy and served by STACK's trusted utility partner, Dominion.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","ay":2022,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a766e85bf05a","cid":"a766e85bf05a","canon":1,"dups":1,"ftype":"data_center","name":"STERLING VI, V","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":105,"pc":"Grid","pconf":"Medium","pquote":"Unlike many other data centers, CyrusOne's Northern Virginia – Sterling V facility does not use water for cooling and is therefore insulated from this regional water risk, both current and future.","uquote":"Dominion Energy is providing power for both Sterling data centers.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","tenant":"Amazon Web Services (AWS)","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8110d433fe7b","cid":"8110d433fe7b","canon":1,"dups":1,"ftype":"data_center","name":"StratCap","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","spon":"Strategic Capital Fund Management","ay":2020,"deal":"$8.25 million acquisition of Reston Data Center","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"db267cd938c7","cid":"db267cd938c7","canon":1,"dups":1,"ftype":"data_center","name":"SUNRISE TECHNOLOGY PARK","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":100,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/coresite-real-estate-sunrise-technology-park-llc-e49b448e","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/coresite-real-estate-sunrise-technology-park-llc-e49b448e","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"CoreSite","spon":"CoreSite","tenant":"Amazon Web Services, IBM, Microsoft, Google, Oracle","ay":2018,"oy":2025,"contro":"Yes","controScan":"https://www.ffxnow.com/2025/07/02/coresite-moves-to-expand-reston-data-centers-alarming-some-residents/","deal":"CoreSite bought the property from Boston Properties for $60 million in 2016.","dealScan":"https://www.fairfaxcounty.gov/publicaffairs/coresite-realtys-new-reston-data-center-approved-under-new-policy-attract-more-centers-fairfax","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"interconnection.fyi;fairfaxcounty.gov;ffxnow.com","srcUrls":["https://www.interconnection.fyi/data-center/project/coresite-real-estate-sunrise-technology-park-llc-e49b448e","https://www.fairfaxcounty.gov/publicaffairs/coresite-realtys-new-reston-data-center-approved-under-new-policy-attract-more-centers-fairfax","https://www.ffxnow.com/2025/07/02/coresite-moves-to-expand-reston-data-centers-alarming-some-residents/"],"band":"100-250 MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"20cb079d1b82","cid":"20cb079d1b82","canon":1,"dups":1,"ftype":"data_center","name":"Sutton Bay","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":44,"pc":"Grid","pconf":"Medium","pquote":"Dominion Energy is the largest supplier of electricity in the Commonwealth of Virginia and the predominant electricity provider in Loudoun County.","pscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","uquote":"Dominion Energy is the largest supplier of electricity in the Commonwealth of Virginia and the predominant electricity provider in Loudoun County.","uscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon AWS","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","srcUrls":["https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979"],"band":"25-50 MW"},{"id":"13175f4bdcd7","cid":"13175f4bdcd7","canon":1,"dups":1,"ftype":"data_center","name":"SWIFT","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"Culpeper identified a target area in close proximity to existing electrical service. Dominion Energy is ramping up its power production plans to feed the data centers, and it's likely that residential users across the state will be saddled with rate increases to cover a big part of the company's investment.","pscan":"https://www.pecva.org/issue/the-piedmont-news-august-8-2025/","uconf":"Medium","uquote":"DataBank has acquired 85 acres of land in Culpeper, Virginia, for a new data center campus. The new Culpeper Campus will host two two-story data centers. The site will also include a 300MW on-site substation from Dominion Energy. Dominion Energy is ramping up its power production plans to feed the data centers, and it's likely that residential users across the state will be saddled with rate increases to cover a big part of the company's investment.","uscan":"https://www.pecva.org/issue/the-piedmont-news-august-8-2025/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"SWIFT (Society for Worldwide Interbank Financial Telecommunication)","tenant":"SWIFT","oy":2008,"tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"pecva.org","lflag":"operational_null_capacity","srcUrls":["https://www.pecva.org/issue/the-piedmont-news-august-8-2025/"]},{"id":"29c9f766dea4","cid":"29c9f766dea4","canon":1,"dups":1,"ftype":"data_center","name":"TECfusions Clarksville LLC","city":"Clarksville","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Operational","mw":220,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"Deploy high-density, off-grid colocation with 99.999% uptime and dual utility power in a rapidly scalable Virginia facility.... Plans for on-site microgrid power generation, alongside utility power, will bring the full site capacity to 220 MW; this data center is poised to meet the growing demands of AI workloads.","pscan":"https://www.prnewswire.com/news-releases/tecfusions-unveils-ai-ready-data-center-in-record-time-302253126.html","uquote":"Richardson added that TecFusions is in talks with Dominion Power because company officials are aware they will need to have an additional transmission line run to the property after Phase 1 of their development plans is complete.... Farney said the proposed buildout will take about five years and will require Dominion Virginia Power to run a new transmission line to a substation on TecFusions' property to accommodate the power needs of data center users.","uscan":"https://www.sovanow.com/articles/mecklenburg-supes-back-data-center-rezoning-bid/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"TECfusions","ay":2023,"oy":2024,"contro":"Opposition to a power line running through Occoneechee State Park for the data center's expansion.","controScan":"https://www.sovanow.com/articles/mecklenburg-supes-back-data-center-rezoning-bid/","deal":"TECfusions secured over $300 million loan agreement for development and expansion.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"prnewswire.com;sovanow.com","srcUrls":["https://www.prnewswire.com/news-releases/tecfusions-unveils-ai-ready-data-center-in-record-time-302253126.html","https://www.sovanow.com/articles/mecklenburg-supes-back-data-center-rezoning-bid/"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"8a3e1721636d","cid":"8a3e1721636d","canon":1,"dups":1,"ftype":"data_center","name":"Telxius Cable Landing Station Virginia Beach","city":"Virginia Beach","county":"Virginia Beach","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Grid","pconf":"High","pquote":"The site has access to over 30 MW of critical power via Dominion Energy's certified infrastructure, including two independent substations.","uquote":"Utility Provider: Dominion Power.","uscan":"https://baxtel.com/data-center/telxius-cable-landing-station-virginia-beach","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Telxius (Telefónica Infra)","spon":"Telxius, Microsoft, Facebook, Google (via GU Holdings)","ay":2017,"oy":2017,"deal":"MAREA subsea cable (joint project with Microsoft and Facebook); BRUSA subsea cable (owned and operated by Telxius); Dunant subsea cable (owned by Google/GU Holdings)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/telxius-cable-landing-station-virginia-beach"],"band":"25-50 MW"},{"id":"03d392b11f6b","cid":"03d392b11f6b","canon":1,"dups":1,"ftype":"data_center","name":"TFG INDEPENDENCE CENTER I PROPERTY","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Hybrid","pconf":"Medium","pquote":"Independence Center has numerous high-value infrastructure upgrades, including:... Data centers. Backup generators.","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","spon":"Tritower Financial Group","deal":"Acquired for $66,100,000 by TFG INDEPENDENCE CENTER I REIT, LLC","dealScan":"https://www.tritowerfinancial.com/wp-content/uploads/2018/01/TFG-Acquisition-Summary.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"tritowerfinancial.com","lflag":"operational_null_capacity citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.tritowerfinancial.com/wp-content/uploads/2018/01/TFG-Acquisition-Summary.pdf"]},{"id":"5227ec344dfa","cid":"5227ec344dfa","canon":0,"dups":1,"ftype":"data_center","name":"The Aerospace Corporation","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"The Aerospace","spon":"federally funded research and development center (FFRDC)","oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"a4db85183e23","cid":"a4db85183e23","canon":1,"dups":2,"ftype":"data_center","name":"The Aerospace Corporation","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"The Aerospace","spon":"The Aerospace","tenant":"The Aerospace","ay":2020,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"0f48d5a172a3","cid":"a4db85183e23","canon":0,"dups":2,"ftype":"data_center","name":"The Aerospace Corporation","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"The Aerospace","spon":"United States Space Force","tenant":"The Aerospace","ay":2020,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"462944321bdf","cid":"462944321bdf","canon":1,"dups":1,"ftype":"data_center","name":"The Meridian Group","city":"Vienna","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/the-meridian-group-2d2afa1c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"The Meridian Group","ay":2016,"oy":2016,"deal":"The Meridian Group has closed on the sale of Tysons Technology Center, a data center and office complex in Vienna. According to Meridian, the 280,000-square-foot campus sold for $96 million to a joint venture involving an affiliate of Central Colo, a national data center operator, and Legacy Investing LLC, a Northern Virginia-based real estate investment company.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/the-meridian-group-2d2afa1c"]},{"id":"45580c4f31ca","cid":"45580c4f31ca","canon":1,"dups":1,"ftype":"data_center","name":"Tysons Enterprise West","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"Equinix","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"381faccb703c","cid":"381faccb703c","canon":1,"dups":1,"ftype":"data_center","name":"U.S. Customs and Border Protection","city":"Springfield","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The electrical usage is metered by Dominion Virginia Power. Two electric meters serve the building.","uquote":"The electrical usage is metered by Dominion Virginia Power. Two electric meters serve the building.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"U.S. Customs and Border Protection","spon":"U.S. Customs and Border Protection","tenant":"U.S. Customs and Border Protection","ay":2014,"deal":"Lease agreement with Boston Properties","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"bff6b381fdd6","cid":"bff6b381fdd6","canon":0,"dups":1,"ftype":"data_center","name":"US Customs and Border Protection","city":"Springfield","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"U.S. Customs and Border Protection (CBP)","spon":"Department of Homeland Security (DHS)","tenant":"U.S. Customs and Border Protection (CBP)","deal":"GSA Lease Prospectus for DHS CBP Office of Information Technology","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"2df2a99fa9ea","cid":"2df2a99fa9ea","canon":1,"dups":1,"ftype":"data_center","name":"US Federal Bureau of Investigation","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","op":"US Federal Bureau of Investigation","tenant":"US Federal Bureau of Investigation","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"ac288f01443f","cid":"ac288f01443f","canon":1,"dups":1,"ftype":"data_center","name":"US Federal Home Loan Mortgage Corporation","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"US Federal Home Loan Mortgage","spon":"US Federal Home Loan Mortgage","tenant":"US Federal Home Loan Mortgage","ay":2002,"deal":"Freddie Mac bought the 110,000-sf building from Goldman Sachs Whitehall Fund for $19.5 million.","dealScan":"https://www.globest.com/2002/02/22/freddie-mac-buys-110000-sf-data-center-for-19-5m/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"globest.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.globest.com/2002/02/22/freddie-mac-buys-110000-sf-data-center-for-19-5m/"]},{"id":"d56087503657","cid":"d56087503657","canon":1,"dups":1,"ftype":"data_center","name":"US Federal Home Loan Mortgage Corporation","city":"Mclean","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"US Federal Home Loan Mortgage","spon":"Federal Housing Finance Agency (FHFA)","tenant":"US Federal Home Loan Mortgage","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"e61f82083342","cid":"e61f82083342","canon":1,"dups":1,"ftype":"data_center","name":"US Federal National Mortgage Association","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"e182ed5e25ce","cid":"e182ed5e25ce","canon":1,"dups":1,"ftype":"data_center","name":"US National Counterterrorism Center","city":"Herndon","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/us-national-counterterrorism-center-2b9ea758","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/us-national-counterterrorism-center-2b9ea758","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"US National Counterterrorism Center","spon":"BP New Dominion Technology Park II","tenant":"US National Counterterrorism Center","ay":2007,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/us-national-counterterrorism-center-2b9ea758"]},{"id":"26852874b986","cid":"26852874b986","canon":1,"dups":1,"ftype":"data_center","name":"US National Oceanic and Atmospheric Association","city":"Wallops Island","county":"Accomack","state":"VA","lat":37.765944,"lng":-75.757807,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"New power distribution systems included a new powerhouse with main switchgear, four 1MW generators, paralleling and distribution switchgear, and technical power uninterruptible power supply equipment. The new complex is now protected from power outages and service disruptions to make certain the data center remains online at all times.","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/noaa-wallops-cda-station-f62cab63","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"NOAA Wallops CDA Station","spon":"National Oceanic and Atmospheric Administration (NOAA)","tenant":"National Oceanic and Atmospheric Administration (NOAA), U.S. Space Force","oy":2013,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/noaa-wallops-cda-station-f62cab63"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"96fd51cd8c18","cid":"96fd51cd8c18","canon":1,"dups":1,"ftype":"data_center","name":"US National Reconnaissance Office","city":"Fort Belvoir","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia","pdt":"$42,591,024 modification to a 50-year contract for electric utility services, performance completion date Aug. 1, 2057","rto":"PJM","nerc":"SERC","op":"National Reconnaissance Office","spon":"United States Army","tenant":"National Geospatial-Intelligence Agency","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected unlinked_source_text","rawUkey":"19876|VA","rawUname":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"27958b9bd463","cid":"27958b9bd463","canon":1,"dups":1,"ftype":"data_center","name":"VA 16","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"555881a50472","cid":"555881a50472","canon":1,"dups":1,"ftype":"data_center","name":"VA 95 BUILDING NINE LP","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","op":"VA 95 BUILDING NINE","spon":"VA 95 BUILDING NINE","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"59db04b5cea3","cid":"59db04b5cea3","canon":1,"dups":1,"ftype":"data_center","name":"VA1 Data Center","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","pscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/va1-data-center-13d12459","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"NTT (formerly RagingWire Enterprise Solutions, )","ay":2011,"oy":2011,"tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"services.global.ntt;interconnection.fyi","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-1-data-center","https://www.interconnection.fyi/data-center/project/va1-data-center-13d12459"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"ba90e16d8790","cid":"ba90e16d8790","canon":1,"dups":1,"ftype":"data_center","name":"VA6B1 and VA6B2","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Grid","pconf":"High","pquote":"High-density configurations and excellent energy efficiency with 100% green power.","rto":"PJM","nerc":"SERC","op":"Iron Mountain","ay":2016,"oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6b1d2fddb7c2","cid":"6b1d2fddb7c2","canon":1,"dups":1,"ftype":"data_center","name":"VADATA Inc MEG Four","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","op":"VADATA","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"37536d361ee7","cid":"37536d361ee7","canon":1,"dups":1,"ftype":"data_center","name":"VADATA Meg Three","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"VADATA Meg Three, Fairfax, Operational, < 10 MW.","pscan":"https://www.interconnection.fyi/data-center/state/VA","uconf":"High","uquote":"The $67 billion deal combines NextEra's size and reach with Dominion's positioning as the local utility for the world's largest concentration of data centers in northern Virginia.","uscan":"https://www.theinvadingsea.com/2026/05/20/nextera-energy-dominion-data-centers-electricity-demand-fpl-carbon-emissions-utility-rates/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"VADATA","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;theinvadingsea.com","srcUrls":["https://www.interconnection.fyi/data-center/state/VA","https://www.theinvadingsea.com/2026/05/20/nextera-energy-dominion-data-centers-electricity-demand-fpl-carbon-emissions-utility-rates/"]},{"id":"9ca79589bcff","cid":"9ca79589bcff","canon":1,"dups":1,"ftype":"data_center","name":"Valo Park","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"Medium","pquote":"In order to accommodate the diverse needs of our tenants, a variety of dedicated, high speed connectivity options are available. These include Verizon, FiberLight, XO Communications and Cox. Zayo and Nextlink are also available to offer dark fiber private network leases and internet connections that run independently from the wire line infrastructure entering the building from the street.","pscan":"https://www.valo-park.com/","rto":"PJM","nerc":"SERC","op":"TAMARES 7950 OWNER","spon":"Tamares, Ilmarinen Mutual Pension Insurance","tenant":"Appian, Pangiam","ay":2015,"deal":"Tamares, in a JV with Ilmarinen Mutual Pension Insurance Co., acquired the property from Gannett in 2015 for $270M.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"valo-park.com","lflag":"online_before_announced operational_null_capacity source_quality_reclassified","srcUrls":["https://www.valo-park.com/"]},{"id":"b1ce79c51d1d","cid":"b1ce79c51d1d","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Center VA3 LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":288,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Power provided by two dedicated substations with transmission from Dominion Energy, the leading energy provider in the region","uconf":"High","uquote":"Power provided by two dedicated substations with transmission from Dominion Energy, the leading energy provider in the region","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","ay":2022,"oy":2026,"deal":"$3 billion green loan for North American expansion","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2ba9286cd6bf","cid":"2ba9286cd6bf","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":206,"band":"100-250 MW","pc":"Behind-the-Meter","pconf":"High","pquote":"The source of the sound is a Vantage data center complex on Glenn Drive in Sterling, the first in Loudoun County to bypass the traditional power grid by generating its own electricity. Using eight natural gas turbines running around the clock, the facility is a local example of a national conversation: tech companies producing their own energy to reduce costs and grid dependency.","pscan":"https://www.wusa9.com/article/news/local/data/loudoun-county-officials-data-center-noise/65-45884219-750f-4d47-a660-71a20d8db001","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Power provided by Dominion Energy, the leading energy provider in the region","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge Group","oy":2019,"contro":"Residents in Sterling's Trailside community are raising serious concerns about a constant high-frequency noise coming from a nearby data center facility. The source of the sound is a Vantage data center complex on Glenn Drive in Sterling, the first in Loudoun County to bypass the traditional power grid by generating its own electricity. A new independent analysis finds that emissions from the Vantage Data Center's permitted on-site power system in Loudoun County could result in $53 million–$99 million per year in health-related damages, driven primarily by premature mortality as well as respiratory and cardiovascular disease.","deal":"Vantage Data Centers, a global owner of real estate supporting digital networks, raised $1.35 billion through a securitized offering of tenant lease payments in what may be the largest bond deal this year backing this fast-growing property type. The proceeds are primarily being used to refinance Vantage's existing debt tied up in work at three data centers on its flagship Northern Virginia campus and five data centers in the province of Quebec in Canada. The properties mentioned are VA11 & VA12. 45200 Vantage Data Plz, Sterling, VA.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"wusa9.com","srcUrls":["https://www.wusa9.com/article/news/local/data/loudoun-county-officials-data-center-noise/65-45884219-750f-4d47-a660-71a20d8db001"],"lflag":"source_quality_reclassified"},{"id":"076438d62b67","cid":"076438d62b67","canon":0,"dups":1,"ftype":"data_center","name":"Vantage Data Centers","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":175,"band":"100-250 MW","proc":"Co-located generation","pcp":"Vantage Data Centers","pdt":"approximately 135 megawatts","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"ea4dc20ea0b8","cid":"ea4dc20ea0b8","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTERS VA11","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":30,"pc":"Hybrid","pconf":"High","pquote":"The campus features solar and wind energy sources onsite, the first of its kind in Northern Virginia","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Power provided by Dominion Energy, the leading energy provider in the region","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","ay":2017,"oy":2019,"deal":"DigitalBridge Group acquires Vantage Data Centers","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"463d4bae865f","cid":"463d4bae865f","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers VA11 VA12 VA13 VA14 VA15","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Power provided by Dominion Energy, the leading energy provider in the region. The campus features solar and wind energy sources onsite, the first of its kind in Northern Virginia.","proc":"Co-located generation","pcp":"Vantage Data Centers (operating its own system)","pdt":"135 megawatts of electricity","uquote":"Power provided by Dominion Energy, the leading energy provider in the region.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","ay":2022,"oy":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4ed0b802546f","cid":"4ed0b802546f","canon":1,"dups":1,"ftype":"data_center","name":"VANTAGE DATA CENTERS VA12","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":32,"pc":"Hybrid","pconf":"High","pquote":"The campus features solar and wind energy sources onsite, the first of its kind in Northern Virginia, as well as industry-leading power usage effectiveness (PUE) and water usage effectiveness (WUE). The source of the sound is a Vantage data center complex on Glenn Drive in Sterling, the first in Loudoun County to bypass the traditional power grid by generating its own electricity. Using eight natural gas turbines running around the clock, the facility is a local example of a national conversation: tech companies producing their own energy to reduce costs and grid dependency.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Power provided by Dominion Energy, the leading energy provider in the region","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","ay":2020,"oy":2021,"contro":"Significant local opposition due to constant noise and emissions from eight natural gas turbines operating 24/7, which residents claim cause headaches and prevent sleep. A study commissioned by the Piedmont Environmental Council warns of serious health consequences from the center's emissions.","controScan":"https://www.youtube.com/watch?v=QCJTm7jI2Xs","deal":"Vantage Data Centers raised USD$1.35 billion in securitized notes in October 2023, with proceeds primarily used to refinance existing financings for three data centers on its flagship Northern Virginia campus, including VA12.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/watch?v=QCJTm7jI2Xs"],"band":"25-50 MW"},{"id":"0febd6ade34f","cid":"0febd6ade34f","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers VA16 LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":135,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"Vantage Data Centers says interconnection delays forced on-site gas plant in Virginia; company uses mobile turbines as short-term option. On-site plant: Tench said Vantage's Virginia site was fortunate to sit above “a high volume, high pressure, natural gas line,” which allowed a rapid build of on-site generation operating “completely independent of the grid.” He described that arrangement as effectively operating in “island mode.”","uquote":"Vantage was supposed to run the turbines temporarily, but Dominion Energy told the company it would be three years before it could connect to the grid.","uscan":"https://boingboing.net/2026/03/20/we-dont-want-to-be-outside-neighbors-cant-stand-noisy-data-center.html","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","oy":2024,"contro":"Yes","controScan":"https://www.pecva.org/resources/press/press-release-new-study-finds-on-site-power-at-virginia-data-center-could-result-in-53-million-99-million-in-annual-health-damages/","tier":4,"tlbl":"Blog/social","srcCt":2,"srcDom":"boingboing.net;pecva.org","srcUrls":["https://boingboing.net/2026/03/20/we-dont-want-to-be-outside-neighbors-cant-stand-noisy-data-center.html","https://www.pecva.org/resources/press/press-release-new-study-finds-on-site-power-at-virginia-data-center-could-result-in-53-million-99-million-in-annual-health-damages/"],"lflag":"source_quality_reclassified"},{"id":"74d22766ce8c","cid":"74d22766ce8c","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers VA2 LLC","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":96,"band":"50-100 MW","pc":"Hybrid","pconf":"High","pquote":"Vantage VA2, however, is the first data center in Loudoun that not only has back-up diesel generators, but that also runs 24/7 on natural gas turbines as its primary power source.","pscan":"https://www.pecva.org/region/loudoun/sterling-air-quality-study-event/","proc":"Co-located generation","pcp":"Vantage Data Centers","pdt":"96 MW of critical IT capacity (campus total)","uconf":"High","uquote":"Power provided by Dominion Energy, the region's leading utility provider.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge Group, Silver Lake, AustralianSuper, PSP Investments","ay":2023,"oy":2023,"contro":"The facility uses natural gas turbines as its primary power source, leading to concerns about air pollution and health impacts. A study revealed potential health-related damages from fine particulate matter emissions.","controScan":"https://www.pecva.org/region/loudoun/sterling-air-quality-study-event/","deal":"Vantage paid $46 million for 17 acres at 22318 Glenn Drive in Sterling in October 2021.","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"pecva.org","srcUrls":["https://www.pecva.org/region/loudoun/sterling-air-quality-study-event/"],"lflag":"source_quality_reclassified"},{"id":"df71df1eaaab","cid":"df71df1eaaab","canon":1,"dups":1,"ftype":"data_center","name":"Vantage V2 Campus 22318 Glenn Drive","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3d9004e49d28","cid":"3d9004e49d28","canon":0,"dups":1,"ftype":"data_center","name":"Vantage VA 3","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":96,"pc":"Hybrid","pconf":"High","pquote":"Jeff Tench of Vantage described a Virginia project where utility changes in allocation pushed the company to build an on-site natural-gas power plant in 18 months and said Vantage is also buying mobile gas turbines to bridge multi-year interconnection gaps. Power provided by two dedicated substations with transmission from Dominion Energy, the leading energy provider in the region.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Power provided by two dedicated substations with transmission from Dominion Energy, the leading energy provider in the region","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","spon":"DigitalBridge and Silver Lake","tenant":"Major Tier-1 Cloud Service Provider (Confidential Anchor Tenant)","ay":2024,"oy":2026,"contro":"Utility changes in allocation pushed the company to build an on-site natural-gas power plant and use mobile gas turbines to bridge multi-year interconnection gaps.","deal":"Vantage Data Centers obtained a $3 billion green loan for North American expansion, and acquired the 134-acre plot of land at 19509 Belmont Ridge Road for $180 million in 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"c6b9ec867e30","cid":"c6b9ec867e30","canon":1,"dups":1,"ftype":"data_center","name":"VeriSign","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VeriSign Incorporated","spon":"VeriSign Incorporated","ay":2008,"oy":2008,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"0f261ce0253e","cid":"0f261ce0253e","canon":1,"dups":1,"ftype":"data_center","name":"VERISIGN INC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/verisign-incorporated-broad-run-facility2-03785a60","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/verisign-incorporated-broad-run-facility2-03785a60","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VeriSign Incorporated","ay":2008,"oy":2008,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"operational_null_capacity utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/verisign-incorporated-broad-run-facility2-03785a60"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"0f93c6b08212","cid":"0f93c6b08212","canon":1,"dups":1,"ftype":"data_center","name":"VeriSign Incorporated Broad Run Facility2","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/verisign-incorporated-broad-run-facility2-03785a60","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/verisign-incorporated-broad-run-facility2-03785a60","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VeriSign Incorporated","ay":2008,"oy":2008,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/verisign-incorporated-broad-run-facility2-03785a60"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"286aa6cee508","cid":"286aa6cee508","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Single-feed commercial AC power with a UPS system supported by two battery strings providing approximately 9 minutes of backup at full load. Standby diesel generators with automatic transfer switch (ATS), weekly and monthly full-load testing, and 24-hour onsite fuel storage.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Verizon Communications","spon":"AOL","ay":1998,"deal":"Acquisition of AOL Manassas data center by Verizon","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"977191f22218","cid":"977191f22218","canon":1,"dups":1,"ftype":"data_center","name":"Verizon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center provides AC, DC, and three phase power to the customer equipment. The facility has A & B DC power feeds offering redundancy and protection.","pscan":"https://cloudandcolocation.com/datacenters/verizon-business-premium-data-center-ashburn/","uconf":"High","uquote":"Other established companies followed – like Verizon, Orbital Sciences and Telos – that needed connectivity and power at scale.... Power: Power is less expensive in Data Center Alley. Dominion Energy, the local power provider, charges data center companies rates 28% lower than the national average.","uscan":"https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Verizon","spon":"Verizon","contro":"Verizon Business Network Services LLC, of Ashburn, Virginia, has agreed to pay $4,091,317 to resolve False Claims Act allegations that it failed to completely satisfy certain cybersecurity controls in connection with an information technology service provided to federal agencies.","deal":"In a $212.5 million deal, Verizon sold the former home of MCI Worldcom (now MCI Inc.) in Ashburn, Va., to Davidson Kempner Capital Management, a global hedge fund with approximately $25 billion of AUM, and American Real Estate Partners (AREP), a Herndon, Va.-based operating company with approximately $2.8 billion in investment activity since 2003.... The property also includes five parking structures, a central plant and enough land to construct additional office buildings and a data center. Verizon also leased-back 1,518,365 rentable square feet for one year, but will retain more than one million square feet for an additional 11 years.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"cloudandcolocation.com;digitalrealty.com","srcUrls":["https://cloudandcolocation.com/datacenters/verizon-business-premium-data-center-ashburn/","https://www.digitalrealty.com/resources/blog/northern-virginia-ashburn-data-centers"],"lflag":"citation_artifact_removed"},{"id":"54f7731a4ec2","cid":"54f7731a4ec2","canon":1,"dups":1,"ftype":"data_center","name":"Verizon Business Network Services, Inc.","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"The data center provides AC, DC, and three phase power to the customer equipment. The facility has A & B DC power feeds offering redundancy and protection.","pscan":"https://cloudandcolocation.com/datacenters/verizon-business-premium-data-center-ashburn/","uquote":"Providing reliable service is Dominion Energy's core mission. Our team, comprised of the foremost experts in the industry, stands ready to provide customized energy solutions ranging from site selection, permitting assistance, infrastructure planning, and rate option reviews.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Verizon Business Network Services","spon":"Verizon Communications","oy":2005,"deal":"Verizon's acquisition of MCI","dealScan":"https://www.setty.com/portfolio-of-experience/verizon-campus-ashburn","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cloudandcolocation.com;setty.com","srcUrls":["https://cloudandcolocation.com/datacenters/verizon-business-premium-data-center-ashburn/","https://www.setty.com/portfolio-of-experience/verizon-campus-ashburn"],"lflag":"source_quality_reclassified"},{"id":"02ac47721fd0","cid":"02ac47721fd0","canon":1,"dups":1,"ftype":"data_center","name":"Verizon Services Corporation 74BXZ","city":"Reston","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"cc121e7a09f1","cid":"cc121e7a09f1","canon":1,"dups":2,"ftype":"data_center","name":"Vienna Cloud","city":"Vienna","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/vienna-cloud-319cc452","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/vienna-cloud-319cc452","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Science Applications International","ay":2009,"oy":2009,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/vienna-cloud-319cc452"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"213e0ddeff2d","cid":"cc121e7a09f1","canon":0,"dups":2,"ftype":"data_center","name":"Vienna Cloud","city":"Vienna","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/vienna-cloud-319cc452","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/vienna-cloud-319cc452","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Science Applications International","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/vienna-cloud-319cc452"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"568dfb2774d3","cid":"568dfb2774d3","canon":1,"dups":1,"ftype":"data_center","name":"Vint Hill Data Center LLC","city":"Warrenton","county":"Fauquier","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Operational","mw":17.5,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"5ec906606968","cid":"5ec906606968","canon":1,"dups":1,"ftype":"data_center","name":"Virginia Information Technologies Agency","county":"Chesterfield County","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Operational","pc":"Grid","pconf":"High","pquote":"The primary data center, the 192,000-square-foot Commonwealth Enterprise Solutions Center, opened in July 2007 in Chester, Va., at Tier 3 capability with power from two separate substations and an alternate water supply.","pscan":"https://www.govtech.com/pcio/Virginia-Strengthens-IT-Security-From-Data.html","uconf":"High","uquote":"Dominion Energy provides electric power to Chesterfield County.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Virginia Information Technologies Agency; Northrop Grumman","spon":"COPT Data Center Solutions; Global Securitization Services","tenant":"Northrop Grumman IT; Virginia Information Technologies Agency","oy":2007,"deal":"Site purchased in 2017 for $44 million; Unisys contract valued at $242.4 million in 2018","dealScan":"https://baxtel.com/data-center/virginia-information-technologies-agency","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"govtech.com;baxtel.com","lflag":"operational_null_capacity source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.govtech.com/pcio/Virginia-Strengthens-IT-Security-From-Data.html","https://baxtel.com/data-center/virginia-information-technologies-agency"]},{"id":"ef374fef3303","cid":"ef374fef3303","canon":1,"dups":1,"ftype":"data_center","name":"Visa","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":22,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"In line with Visa's sustainability goals, the Ashburn data center is powered entirely by renewable energy through a long-term solar energy agreement....Our infrastructure is built for operational resilience, supported by 28 megawatts of backup power, 100,000 gallons of fuel providing five days of autonomy and 5,750 tons of cooling capacity to keep systems running seamlessly.","pscan":"https://corporate.visa.com/en/sites/visa-perspectives/security-trust/inside-visa-global-commerce-engine.html","proc":"Dedicated PPA","pcp":"MP2 Energy LLC (a wholly owned subsidiary of Shell Energy North America (US), L.P.)","pdt":"multi-year energy agreement, five years of the agreement, beginning February 2023","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VISA U.S.A.","spon":"Visa","tenant":"Visa","ay":2009,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"corporate.visa.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://corporate.visa.com/en/sites/visa-perspectives/security-trust/inside-visa-global-commerce-engine.html"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"e4197d9eb799","cid":"e4197d9eb799","canon":1,"dups":1,"ftype":"data_center","name":"VISA USA INC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","pc":"Hybrid","pconf":"High","pquote":"In line with Visa's sustainability goals, the Ashburn data center is powered entirely by renewable energy through a long-term solar energy agreement.","proc":"Dedicated PPA","pcp":"Shell Energy (MP2 Energy LLC)","pdt":"multi-year energy agreement, 100% of power demand, supply began February 2023","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VISA U.S.A.","spon":"Visa","tenant":"Visa","ay":2010,"oy":2010,"deal":"long-term solar energy agreement","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"ead98a130e20","cid":"f5158a276842","canon":0,"dups":2,"ftype":"data_center","name":"Visa USA Incorporated","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"In line with Visa's sustainability goals, the Ashburn data center is powered entirely by renewable energy through a long-term solar energy agreement.","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/visa-usa-incorporated-6c8d90db","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VISA U.S.A.","spon":"Visa","tenant":"Visa","oy":2008,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/visa-usa-incorporated-6c8d90db"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"f5158a276842","cid":"f5158a276842","canon":1,"dups":2,"ftype":"data_center","name":"Visa USA Incorporated","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"In line with Visa's sustainability goals, the Ashburn data center is powered entirely by renewable energy through a long-term solar energy agreement.","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VISA U.S.A.","spon":"Visa","tenant":"Visa","oy":2008,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"a07816f999d9","cid":"a07816f999d9","canon":0,"dups":2,"ftype":"data_center","name":"Visa USA Incorporated","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":22,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"In line with Visa's sustainability goals, the Ashburn data center is powered entirely by renewable energy through a long-term solar energy agreement. Our infrastructure is built for operational resilience, supported by 28 megawatts of backup power, 100,000 gallons of fuel providing five days of autonomy and 5,750 tons of cooling capacity to keep systems running seamlessly.","proc":"Dedicated PPA","pcp":"MP2 Energy LLC, a wholly owned subsidiary of Shell Energy North America (US), L.P.","pdt":"multi-year energy agreement, 100 percent renewable energy during five years of the agreement","uquote":"Grid Operator. Dominion Energy Virginia. Grid Operator. Dominion Energy. Data centers in the area now consume almost 500 million watts of electricity, said Jim Norvelle, a spokesman for Dominion Virginia Power, the major utility there.","uscan":"https://www.interconnection.fyi/data-center/project/visa-usa-incorporated-6c8d90db","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VISA U.S.A.","spon":"Visa","tenant":"Visa","oy":2010,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/visa-usa-incorporated-6c8d90db"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"c7d46733cd73","cid":"a07816f999d9","canon":0,"dups":2,"ftype":"data_center","name":"Visa USA Incorporated","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":22,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"In line with Visa's sustainability goals, the Ashburn data center is powered entirely by renewable energy through a long-term solar energy agreement. Our infrastructure is built for operational resilience, supported by 28 megawatts of backup power, 100,000 gallons of fuel providing five days of autonomy and 5,750 tons of cooling capacity to keep systems running seamlessly.","uquote":"Grid Operator. Dominion Energy Virginia. Grid Operator. Dominion Energy. Ashburn also offers highly reliable, cost-effective utility power from Dominion Virginia Power.","uscan":"https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-4-data-center","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"VISA U.S.A.","spon":"Visa","tenant":"Visa","oy":2008,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"services.global.ntt","srcUrls":["https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/ashburn-va-4-data-center"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified"},{"id":"c0889df5ec0f","cid":"c0889df5ec0f","canon":1,"dups":1,"ftype":"data_center","name":"WATERSIDE AWS","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","spon":"WATERSIDE I","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"f91c80aea1a4","cid":"f91c80aea1a4","canon":1,"dups":1,"ftype":"data_center","name":"Wheeler Data Center","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":250,"band":"250+ MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4442639101bf","cid":"4442639101bf","canon":1,"dups":1,"ftype":"data_center","name":"WHEELER SURVEY COMPANY","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity","srcUrls":null,"srcDom":null},{"id":"a1f85dfe180b","cid":"a1f85dfe180b","canon":1,"dups":1,"ftype":"data_center","name":"White Oak Tech Park (QTS)","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Operational","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9dcc62c23a03","cid":"9dcc62c23a03","canon":1,"dups":1,"ftype":"data_center","name":"Yondr Data Center","city":"Aldie","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":48,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Yondr's published “Products” positioning describes modular infrastructure and “typical block redundancy with adaptable redundancy,” along with “transmission standard utility power” and “industry leading PUE” (as written).","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/allegro-north-campus-e7ad11bc","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Yondr Group","spon":"Yondr Group, JK Land Holdings, (JKLH)","ay":2021,"oy":2024,"deal":"DigitalBridge Group announced it would be acquiring Yondr through one of its managed investment funds. The deal is expected to close in early 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/allegro-north-campus-e7ad11bc"]},{"id":"9d818b052215","cid":"9d818b052215","canon":1,"dups":1,"ftype":"data_center","name":"Zayo Group, LLC","city":"McLean","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Zayo plans to upgrade the critical power at the site to three megawatts (MW) and enhance systems resiliency, security, audit certifications, and network connectivity.","pscan":"https://www.telecompetitor.com/zayo-acquires-data-center-mclean-virginia/","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/zayo-group-llc-fca819d3","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Zayo Group Holdings","tenant":"government agencies, web-scale companies, cloud providers and other large enterprises","ay":2018,"deal":"Zayo Group Holdings, Inc. acquired a data center in McLean, Virginia, which included tenants, data center systems, and long-term leases.","dealScan":"https://www.telecompetitor.com/zayo-acquires-data-center-mclean-virginia/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"telecompetitor.com;interconnection.fyi","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://www.telecompetitor.com/zayo-acquires-data-center-mclean-virginia/","https://www.interconnection.fyi/data-center/project/zayo-group-llc-fca819d3"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"dfbcb837e6da","cid":"dfbcb837e6da","canon":0,"dups":1,"ftype":"data_center","name":"Zayo Group, LLC","city":"McLean","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Operational","mw":3,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/zayo-group-llc-fca819d3","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/zayo-group-llc-fca819d3","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Zayo Group","spon":"Zayo Group Holdings","tenant":"tenants","ay":2018,"oy":2018,"deal":"Acquisition of data center by Zayo Group Holdings Inc.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/zayo-group-llc-fca819d3"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected,merged_duplicate"},{"id":"035662bdf5ec","cid":"035662bdf5ec","canon":1,"dups":1,"ftype":"data_center","name":"Zayo Group, LLC","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"The project additionally required installing four diesel-powered backup generators and a UPS system to ensure uninterrupted power to the 2.5 MW data center.","rto":"PJM","nerc":"SERC","op":"Zayo Group","tenant":"Mid-Atlantic Crossroads (MAX)","deal":"Power Solutions fit-out project","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"24df4ed62994","cid":"24df4ed62994","canon":1,"dups":1,"ftype":"data_center","name":"Zone5","city":"Norfolk","county":"Norfolk","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Operational","uconf":"Medium","uquote":"Dominion Energy serves more than 2.7 million electric customers in Virginia.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Fair Holdings","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"operational_null_capacity unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4c66424355a7","cid":"4c66424355a7","canon":1,"dups":1,"ftype":"data_center","name":"108 CARPENTER DRIVE","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c06a22301df0","cid":"c06a22301df0","canon":1,"dups":1,"ftype":"data_center","name":"113 EXECUTIVE DR Prologis","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"If approved, the site could support up to 600,000 square feet of data center capacity, along with a dedicated five-acre substation to meet power demands.","uconf":"High","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Prologis","spon":"Prologis","ay":2024,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","lflag":"online_before_announced","srcUrls":["https://www.loudoun.gov/2674/Utilities"]},{"id":"2ccbacfa5675","cid":"2ccbacfa5675","canon":1,"dups":1,"ftype":"data_center","name":"1501 Moran Road","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":42,"pc":"Grid","pconf":"High","pquote":"Power for both data centers will be provided by Dominion Energy.","uquote":"Power for both data centers will be provided by Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"EdgeCore Digital Infrastructure","spon":"Partners Group","ay":2023,"oy":2027,"deal":"$1.5 billion financing secured in April 2026","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"527bee4a7d9a","cid":"527bee4a7d9a","canon":1,"dups":1,"ftype":"data_center","name":"19508 Freedom Trail Road","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/19508-freedom-trail-road-b4980eae","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/19508-freedom-trail-road-b4980eae","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"JK Land Holdings","spon":"JK Land Holdings","ay":2024,"contro":"The address was part of a public hearing for a zoning map amendment to develop a data center campus, and Loudoun County now requires special exception approval and public hearings for data centers.","controScan":"https://bloximages.chicago2.vip.townnews.com/loudounnow.com/content/tncms/assets/v3/editorial/f/21/f2197c52-7101-11ed-9721-9f895cd4e9f4/6387df24dc5a7.pdf.pdf","deal":"Land acquisition: JK Land Holdings purchased 108 acres for $180 million in 2024.","dealScan":"https://baxtel.com/data-center/jk-land-freedom-trail-rd","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;baxtel.com;bloximages.chicago2.vip.townnews.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/19508-freedom-trail-road-b4980eae","https://baxtel.com/data-center/jk-land-freedom-trail-rd","https://bloximages.chicago2.vip.townnews.com/loudounnow.com/content/tncms/assets/v3/editorial/f/21/f2197c52-7101-11ed-9721-9f895cd4e9f4/6387df24dc5a7.pdf.pdf"]},{"id":"9a0965ae50ce","cid":"9a0965ae50ce","canon":1,"dups":1,"ftype":"data_center","name":"21455 Beaumeade Circle","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"300MW substation capacity; new Virginia data center tariff requires 14-year contracts","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7c75ec670872","cid":"7c75ec670872","canon":1,"dups":1,"ftype":"data_center","name":"21673 BEAUMEADE CIRCLE LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"supported by dual independent utility feeds, block-redundant power architecture","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/21673-beaumeade-circle-llc-8e89685c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Cologix","spon":"Cologix","ay":2020,"deal":"Land acquisition for $38 million in 2018.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/21673-beaumeade-circle-llc-8e89685c"]},{"id":"0a61882a15e2","cid":"0a61882a15e2","canon":1,"dups":1,"ftype":"data_center","name":"2233 Halifax Road","city":"Petersburg","county":"Petersburg","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"the project would include up to six data‑center buildings totaling roughly 145,000 square feet and two electrical substations","uconf":"High","uquote":"Operating in the Carolinas and Virginia, Dominion provides electricity to 450 data centers in Virginia.","uscan":"https://quantfury.com/market-insights/d/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Warrington Group","spon":"Warrington Group","ay":2025,"contro":"Residents expressed concerns about rezoning measures that would allow developers to build roads through the Ramblewood neighborhood to access the data center, and worried about the data center's proximity to homes and its environmental impact, noise, and smell.","deal":"Land sale of 176 acres of city-owned property to the Warrington Group for $5,000 an acre.","dealScan":"https://www.youtube.com/watch?v=QPIIGxCZb3k","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"quantfury.com;youtube.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://quantfury.com/market-insights/d/","https://www.youtube.com/watch?v=QPIIGxCZb3k"]},{"id":"eabd20e84097","cid":"eabd20e84097","canon":1,"dups":1,"ftype":"data_center","name":"22660 Executive Dr Prologis","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"If approved, the site could support up to 600,000 square feet of data center capacity, along with a dedicated five-acre substation to meet power demands.","uconf":"High","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Prologis","spon":"Prologis","contro":"Rezoning and regulatory approval process for data center development.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","srcUrls":["https://www.loudoun.gov/2674/Utilities"]},{"id":"16e11778d17a","cid":"16e11778d17a","canon":1,"dups":1,"ftype":"data_center","name":"42139 REEDS FARM LN","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Approval of the project to build 1.75 million square feet of data center space on a 100-acre site just south of the Dulles International Airport, in Loudoun County, hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line some local residents (and a county supervisor) were opposed to.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2019,"contro":"Opposition to power line construction.","deal":"Land acquisition in 2019 for $116.4 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"0c5a7e6d63da","cid":"0c5a7e6d63da","canon":1,"dups":1,"ftype":"data_center","name":"9001 Hornbaker Rd","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy. Permit Status. Proposed.","pscan":"https://www.interconnection.fyi/data-center/project/9001-hornbaker-rd-9a2f8781","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/9001-hornbaker-rd-9a2f8781","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"MJV ASSOCIATES","spon":"MJV ASSOCIATES","ay":2025,"contro":"Prince William County Planning Commission denied the data center plan; community opposition due to location outside Data Center Opportunity Zone Overlay District.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/9001-hornbaker-rd-9a2f8781"]},{"id":"1ceb0ba8e2d0","cid":"1ceb0ba8e2d0","canon":1,"dups":1,"ftype":"data_center","name":"9720 Dean Drive","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-10cd27c9","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-10cd27c9","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2021,"contro":"Community opposition regarding scale, environmental impact, noise, infrastructure strain, and energy/water bills.","controScan":"https://www.fox5dc.com/news/proposed-data-centers-spark-debate-over-major-development-prince-william-county","deal":"Land acquisition in 2021 for $6.6 million.","dealScan":"https://baxtel.com/data-center/aws-iad-205","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;baxtel.com;fox5dc.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-10cd27c9","https://baxtel.com/data-center/aws-iad-205","https://www.fox5dc.com/news/proposed-data-centers-spark-debate-over-major-development-prince-william-county"]},{"id":"4b58020c7632","cid":"4b58020c7632","canon":1,"dups":1,"ftype":"data_center","name":"ACC11 Digital Realty","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/acc11-digital-realty-e80d511c","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/acc11-digital-realty-e80d511c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","contro":"Planned work for the broader campus is expected to impact additional wetlands and streams.","controScan":"https://www.idcnova.com/html/1/59/153/4836.html","deal":"Digital Realty acquired 424 acres of undeveloped land in Loudoun County, Virginia for $236.5 million in September 2018.","dealScan":"https://www.digitalrealty.com/about/newsroom/press-releases/122524/digital-realty-to-acquire-424-acres-in-loudoun-county-virginia","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"interconnection.fyi;digitalrealty.com;idcnova.com","srcUrls":["https://www.interconnection.fyi/data-center/project/acc11-digital-realty-e80d511c","https://www.digitalrealty.com/about/newsroom/press-releases/122524/digital-realty-to-acquire-424-acres-in-loudoun-county-virginia","https://www.idcnova.com/html/1/59/153/4836.html"],"lflag":"source_quality_reclassified"},{"id":"0e977c387d4a","cid":"0e977c387d4a","canon":1,"dups":1,"ftype":"data_center","name":"Accokeek Center","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Both projects are requesting rezoning from agricultural to heavy industrial; conditional use permits to allow for electrical substations; and amendments to the county's comprehensive plan to support “higher density commercial development” on the subject parcels.","pscan":"https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold-4fc","uconf":"High","uquote":"The staff report also notes that a “load letter” from Dominion Energy, confirming that it has the capacity to serve the development, “has not been provided by the applicant due to confidentiality requirements and proprietary information.”","uscan":"https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold-4fc","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Falmouth Tech","spon":"Falmouth Tech","ay":2024,"contro":"Staff recommended denial, public hearing pulled due to confusion and negative comments, community opposition, concerns about residential compatibility, setbacks, noise, and environmental impacts.","controScan":"https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold-4fc","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fxbgadvance.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold-4fc"]},{"id":"742aee3fd1d4","cid":"742aee3fd1d4","canon":1,"dups":1,"ftype":"data_center","name":"Airport Gateway Commerce Center","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Dominion Energy's 2023 annual report noted that data centers accounted for 24 percent of Virginia Power's electricity sales, up from 21 percent in 2022. Northern Virginia Electric Cooperative expects peak electric load to grow more than 12 percent annually for the next 15 years, driven almost exclusively by data‑center demand.","uconf":"High","uquote":"This is a Public Facility Review request to allow for the construction of a 230 kV electric distribution substation for Dominion Energy to support the proposed data centers. The ±5.18-acre site is addressed as 10400 Harry J Parrish Boulevard and is located immediately northeast of the intersection of Wakeman Drive and Harry J Parrish Boulevard.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ba2f84015e2f","cid":"ba2f84015e2f","canon":0,"dups":1,"ftype":"data_center","name":"AIRPORT GATEWAY COMMERCE CENTER","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Dominion proposes this facility in order to provide better service reliability to the data center project. The transmission line servicing the project is being extended from the Cannon Branch substation in the City of Manassas. If approved, the substation is expected to go on-line in August 2013.","uconf":"High","uquote":"The application is a proposal by Dominion Virginia Power to construct a ± 4.10 acre electrical power substation on a portion of a ± 50.05 acre property.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"Unicorn Retail","tenant":"CloudHQ","ay":2002,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"0062efaaa8ed","cid":"0062efaaa8ed","canon":1,"dups":1,"ftype":"data_center","name":"ALEXANDRIA TECHNOLOGY CENTER","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone Property Advisors","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ddc906e39fab","cid":"ddc906e39fab","canon":1,"dups":1,"ftype":"data_center","name":"Allegro North Campus","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/allegro-north-campus-e7ad11bc","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/allegro-north-campus-e7ad11bc","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"YONDR JK 1","spon":"Yondr Group, JK Land Holdings","deal":"Partnership between Yondr Group and JK Land Holdings, LLC for data center project in Loudoun, Northern Virginia (announced October 13, 2022)","dealScan":"https://www.yondrgroup.com/newsroom/press-release/yondr-group-breaks-ground-on-first-data-center-campus-in-northern-virginia/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;yondrgroup.com","srcUrls":["https://www.interconnection.fyi/data-center/project/allegro-north-campus-e7ad11bc","https://www.yondrgroup.com/newsroom/press-release/yondr-group-breaks-ground-on-first-data-center-campus-in-northern-virginia/"],"lflag":"source_quality_reclassified"},{"id":"6cb23139b233","cid":"6cb23139b233","canon":1,"dups":1,"ftype":"data_center","name":"Alligned Data Centers (Balls Ford)","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","uquote":"As such, the electrical service of choice is transmission level service, which in northern Virginia is served by Dominion Energy Virginia's (Dominion) 230kV transmission lines and either Dominion or NOVEC substations.","uscan":"https://www.pwcva.gov/assets/2022-08/Memo%20to%20PC-%20QA%20PW%20Digital%20Gateway%20WS%2008.19.22_V3%20Final.pdf","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Aligned Data Centers","spon":"BlackRock's Global Infrastructure Partners (GIP), Nvidia, Microsoft, MGX","ay":2022,"contro":"Rezoning application (REZ2022-00023) was 'NOT APPROVED'.","deal":"Acquisition of Aligned Data Centers by a consortium including BlackRock's GIP, Nvidia, Microsoft, and MGX for $40 billion on October 15, 2025.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"pwcva.gov","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://www.pwcva.gov/assets/2022-08/Memo%20to%20PC-%20QA%20PW%20Digital%20Gateway%20WS%2008.19.22_V3%20Final.pdf"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"ae7b12d5c292","cid":"ae7b12d5c292","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Fort Belvoir","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","uconf":"Medium","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-96dc1dec","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2020,"contro":"Tree removal and replacement mitigation","controScan":"https://www.ncpc.gov/docs/actions/2020December/8233_Data_Storage_Center_Phase_3_Staff_Report_Dec2020.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;ncpc.gov","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-96dc1dec","https://www.ncpc.gov/docs/actions/2020December/8233_Data_Storage_Center_Phase_3_Staff_Report_Dec2020.pdf"]},{"id":"72843231be07","cid":"72843231be07","canon":1,"dups":1,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-522a7c34"]},{"id":"2986e647df5d","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2023,"deal":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022.","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced","srcUrls":["https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"0262ee9de9f0","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-522a7c34"]},{"id":"d3f83cab512f","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"deal":"Acquisition of Nokes buildings from Clark-Hook Corp for $30.8 million in July 2022.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-522a7c34"]},{"id":"f0f8b055869c","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"oy":2026,"deal":"Land acquisition deals in 2022 for Nokes Blvd ($30.8M), Manekin Plaza ($20M), and Ridgetop Circle ($26M).","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;baxtel.com","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"],"lflag":"source_quality_reclassified"},{"id":"3259a7e5d21e","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2023,"contro":"Loudoun County is taking steps to restrict data center development, with amendments to zoning ordinances and comprehensive plans to eliminate by-right zoning for data centers.","deal":"Amazon purchased three office properties at Nokes Boulevard in Sterling for $30.8 million in July 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a82e859668ea","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Data centers are spread across Virginia, but 80% of the state's data center industry is concentrated in just three Northern Virginia localities—Loudoun, Prince William, and Fairfax—with Loudoun County alone accounting for approximately half of the state's data center industry in terms of number of sites, building square footage, and estimated energy usage.... The electric utilities serving Northern Virginia Page 3 3 (PJM; Dominion Energy) will be unable to build sufficient grid infrastructure to meet the growing demand for power by the region's data centers.","pscan":"https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","uconf":"High","uquote":"Much of AWS's capacity in the region sits inside buildings that the company leases from Corporate Office Properties Trust (COPT). As residential concerns may come up with any corporate construction, the local authorities' approval hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line that some local residents and a county supervisor were opposed to. Luckily for AWS, the region's utility company, Dominion, and Blue Ridge Group, a company acting on Amazon's behalf, were able to come up with an alternative plan that Loudoun County supervisors approved.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"deal":"Amazon purchased the Nokes buildings for $30.8 million in July 2022, and the Manekin Plaza and Ridgetop Circle properties for $20 million and $26 million respectively in February 2022.","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"amperon.co;baxtel.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"e87ab903387c","cid":"f92b8f22fd1a","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","uquote":"Amazon's applications indicate the development of seven electrical substations in collaboration with Dominion Energy and Rappahannock Electric Cooperative.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","ay":2021,"deal":"AWS purchased two vacant parcels at 9720 Dean Drive and 9811 Nokesville Road in 2021 for a combined $6.6 million.","dealScan":"https://baxtel.com/data-center/aws-iad-205","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced","srcUrls":["https://baxtel.com/data-center/aws-iad-205"]},{"id":"9912fd52f9b6","cid":"e79eca36c490","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The Applicant shall develop Land Bay A with Data Centers, an Electric Substation, parking, and other uses and structures secondary and ancillary to Data Centers and Electric Substations.","uconf":"High","uquote":"Virginia law mandates. Dominion Energy's membership.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2024,"contro":"Significant opposition from residents and the Planning Commission due to concerns over noise, impact on local wildlife, and proximity to nearby schools and residential communities.","controScan":"https://baxtel.com/data-center/amazon-ashton-ave","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced","srcUrls":["https://baxtel.com/data-center/amazon-ashton-ave"]},{"id":"2ae6759a24e9","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-17cee923"]},{"id":"105156b4dfbf","cid":"116c210c401d","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Manassas Electric System.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-center-c1400e76","uconf":"High","uquote":"Grid Operator. Manassas Electric System.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-center-c1400e76","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"contro":"Community opposition and zoning disputes regarding proposed data centers in Prince William County, including Amazon's projects, due to concerns about noise, environmental impact, and infrastructure strain.","controScan":"https://www.fox5dc.com/news/proposed-data-centers-spark-debate-over-major-development-prince-william-county","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;fox5dc.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-center-c1400e76","https://www.fox5dc.com/news/proposed-data-centers-spark-debate-over-major-development-prince-william-county"]},{"id":"99cd8af729db","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy","uconf":"High","uquote":"Grid Operator: Dominion Energy","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"30a9277f5e7b","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"contro":"Community opposition regarding noise and pollution for proposed data centers in the area.","controScan":"https://www.youtube.com/watch?v=nMWvKI7attY","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;youtube.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-17cee923","https://www.youtube.com/watch?v=nMWvKI7attY"]},{"id":"eead3eb3d528","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","uquote":"Dominion Energy Virginia and Amazon have entered into a Memorandum of Understanding (MOU) to explore innovative new development structures that would help advance potential Small Modular Reactor (SMR) nuclear development in Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","contro":"County staff recommended the denial of the project.","controScan":"https://baxtel.com/data-centers/amazon-aws","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-centers/amazon-aws"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"c12854c2cbf0","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-17cee923"]},{"id":"e51f1c8acca1","cid":"e51f1c8acca1","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","contro":"Community opposition due to concerns about scale, environmental impact, noise, and infrastructure strain.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-17cee923"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"116c210c401d","cid":"116c210c401d","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"VEPCO the authority to decline to serve a new large load – Dominion must provide power to new data centers in the City. The City does have authority, through the Planning Commission, to review and approve the location of new substations consistent with the Comprehensive Plan. To date, this review has not been needed and the three proposed data centers have instead co-located with existing substations, minimize new visual impacts.","uconf":"High","uquote":"VEMA (the Municipal Electric Power. Association of Virginia) has concluded that there is no exception in the existing contract that gives. VEPCO the authority to decline to serve a new large load – Dominion must provide power to new data centers in the City.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2023,"contro":"Community opposition during public hearing regarding land sale for non-aviation purposes and lack of comprehensive data center plan.","deal":"Land sale for $27.72 million in 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"4b1f5ddd6158","cid":"438a5a4377a5","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-73-iad-74-iad-602-iad-52ff662d","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-73-iad-74-iad-602-iad-52ff662d","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2021,"oy":2026,"contro":"Planning Commission recommended denial, AWS withdrew proposal for community engagement.","controScan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-205-307-317-612-612x-37205b49","deal":"Land acquisition for $6.6 million in 2021","dealScan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-205-307-317-612-612x-37205b49","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-73-iad-74-iad-602-iad-52ff662d","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad-205-307-317-612-612x-37205b49"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"7f4b76c76d11","cid":"f92b8f22fd1a","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The Utility Department has been advised that the proposed data centers within the City of Manassas will be utilizing adiabatic cooling systems.... The three proposed data centers have instead co-located with existing substations, minimize new visual impacts.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2018,"contro":"Manassas City Council approved a first reading of a zoning ordinance that tightens development rules for data centers and other large industrial projects, citing noise, appearance, and proximity concerns near residential areas.","controScan":"https://www.potomaclocal.com/2026/02/11/manassas-tightens-data-center-zoning-rules/","deal":"The city sold a 20-acre site near the Manassas Regional Airport to Amazon Web Services for $27.72 million in 2023.","dealScan":"https://patch.com/virginia/manassas/data-centers-among-economic-development-occurring-manassas","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;patch.com;potomaclocal.com","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-17cee923","https://patch.com/virginia/manassas/data-centers-among-economic-development-occurring-manassas","https://www.potomaclocal.com/2026/02/11/manassas-tightens-data-center-zoning-rules/"]},{"id":"6392d6cdf76a","cid":"f92b8f22fd1a","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"PJM's Dominion zone currently serves the largest concentration of data centers in the world—a hotspot for data centers largely because of its fiber optic connectivity, land availability, and power infrastructure. Dominion Energy Virginia this month has released a comprehensive, long-term regional plan to meet growing power demand, and jointly proposed several new large transmission projects with First Energy and American Electric Power (AEP) to strengthen electric reliability across the 13-state PJM region over the next decade.","uconf":"High","uquote":"The utility primarily provides regulated electricity service to 3.6 million homes and businesses in Virginia, North Carolina, and South Carolina, and regulated natural gas service to 400,000 customers in South Carolina. Dominion Energy Virginia this month has released a comprehensive, long-term regional plan to meet growing power demand, and jointly proposed several new large transmission projects with First Energy and American Electric Power (AEP) to strengthen electric reliability across the 13-state PJM region over the next decade.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2023,"deal":"Land acquisition by Amazon Web Services for $27.72 million in 2023.","dealScan":"https://patch.com/virginia/manassas/data-centers-among-economic-development-occurring-manassas","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"patch.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified","srcUrls":["https://patch.com/virginia/manassas/data-centers-among-economic-development-occurring-manassas"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"fbde54b3bec9","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-17cee923"]},{"id":"f7204d31f40c","cid":"eead3eb3d528","canon":0,"dups":12,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-17cee923","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-17cee923"]},{"id":"388bb78ccad1","cid":"388bb78ccad1","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"14-year contracts, minimum 85% transmission and distribution costs, minimum 60% generation costs","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"950344c3dfea","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"\"Bringing new sources of carbon-free energy to the grid is an important part of Amazon's commitment to serve our customers and achieve net-zero carbon across our operations by 2040,\" said Kevin Miller, Amazon's Vice President of Global Data Centers. \"Nuclear energy is safe, reliable, and can help meet the energy needs of our customers for decades to come.\"","uconf":"High","uquote":"Dominion, the utility monopoly in the region, and Blue Ridge Group, a company acting on Amazon's behalf, have apparently managed to come up with a solution Loudoun County supervisors found satisfactory.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"deal":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022. In February of last year, the Manekin Plaza and Ridgetop Circle properties were acquired for $20 million and $26 million, respectively.","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"8ecd539e4efd","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","uconf":"Medium","uquote":"Loudoun County's government, led by a nine-member Board of Supervisors, supported the technology boom early on.... Dominion would even prequalify power connections before all permits were finalized and ensure that the infrastructure was ready when the centers came online.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"deal":"Acquisition of three office properties for approximately $30.8 million in July 2022.","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"f1f503978593","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Supervisor Briskman's initiative will be considered at the April 7 Board of Supervisors Business Meeting. It directs county staff to research and publish a report on the potential data center impacts associated with Amazon's purchase of the GW campus just north of Route 7 near Riverside Parkway, including power infrastructure requirements to support such a development.","uconf":"High","uquote":"PJM informed Dominion Energy that Dominion's infrastructure predictions were significantly underestimating the growing power needs of Loudoun County's data center sector.","uscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2026,"contro":"Loudoun County Supervisor Juli E. Briskman and other county officials and residents are opposing the potential data center development due to concerns about power strain on the grid, visual impact, and a desire for economic diversification.","deal":"Acquisition of George Washington University's Virginia Science & Technology Campus for $427 million in March 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","lflag":"online_before_announced,merged_duplicate","srcUrls":["https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979"]},{"id":"52c5f2ddb6f8","cid":"d61f6ebe35e3","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2020,"contro":"Local residents and a county supervisor opposed a power line needed for a new data center campus.","controScan":"https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;futurumgroup.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/"]},{"id":"5e9688050442","cid":"5e9688050442","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"063f0b96431c","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"deal":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022.","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-522a7c34","https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"27ce31225e3a","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The operational and planning functions of Dominion Energy's electric transmission system are provided by PJM Interconnection, a regional transmission organization (RTO).","pscan":"https://www.dominionenergy.com/about/delivering-energy/electric-transmission-access","uconf":"High","uquote":"The region's utility company, Dominion, and Blue Ridge Group, a company acting on Amazon's behalf, were able to come up with an alternative plan that Loudoun County supervisors approved.","uscan":"https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2023,"deal":"Acquisition of Nokes buildings for $30.8 million in July 2022, Manekin Plaza for $20 million and Ridgetop Circle for $26 million in February 2022.","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"dominionenergy.com;futurumgroup.com;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.dominionenergy.com/about/delivering-energy/electric-transmission-access","https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/","https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"730d1f100de0","cid":"730d1f100de0","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Dominion Energy, which serves the part of Virginia known as “data center alley,” has seen data center demand grow steadily in the last decade.","pscan":"https://www.latitudemedia.com/news/how-dominion-is-thinking-about-nuclear-for-data-centers/","uconf":"High","uquote":"Luckily for AWS, the region's utility company, Dominion, and Blue Ridge Group, a company acting on Amazon's behalf, were able to come up with an alternative plan that Loudoun County supervisors approved.","uscan":"https://www.globest.com/2023/05/25/amazon-data-center-expansion-targets-suburban-nova-offices/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"oy":2026,"deal":"Acquisition of Nokes Boulevard office complex for $30.8M in July 2022, Ridgetop Circle site for $26.4M in January 2022, and Manekin Plaza property for $21M in late 2021.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"latitudemedia.com;globest.com","srcUrls":["https://www.latitudemedia.com/news/how-dominion-is-thinking-about-nuclear-for-data-centers/","https://www.globest.com/2023/05/25/amazon-data-center-expansion-targets-suburban-nova-offices/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"364aa1a734f7","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Dominion Energy Virginia is part of the PJM Interconnection, LLC (“PJM”) regional transmission organization (“RTO”), which provides service to a large portion of the eastern United States.... Energy demand is rising quickly, especially in Loudoun County, which is a major center for technology and innovation. To keep up, Dominion Energy is planning and building new transmission lines while working with local, state, and community leaders.","pscan":"https://www.dominionenergy.com/about/delivering-energy/electric-projects/power-line-projects/nova","uquote":"Dominion Energy's Virginia utility building roughly $4.8 billion in projects, partly to meet demand growth driven by data centers.... Energy demand is rising quickly, especially in Loudoun County, which is a major center for technology and innovation. To keep up, Dominion Energy is planning and building new transmission lines while working with local, state, and community leaders.","uscan":"https://www.dominionenergy.com/about/delivering-energy/electric-projects/power-line-projects/nova","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2023,"deal":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022. The Manekin Plaza property was acquired from an investment fund in late 2021 in a $21M deal. acquired the Ridgetop Circle site in January 2022 for $26.4M from a subsidiary of St. John Properties.","dealScan":"https://www.bisnow.com/national/news/data-center/amazon-razing-eleven-nova-offices-for-new-data-centers-119076","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"dominionenergy.com;bisnow.com","lflag":"online_before_announced citation_artifact_removed utility_alias_corrected,merged_duplicate","srcUrls":["https://www.dominionenergy.com/about/delivering-energy/electric-projects/power-line-projects/nova","https://www.bisnow.com/national/news/data-center/amazon-razing-eleven-nova-offices-for-new-data-centers-119076"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"4207b61557ac","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Dominion serves roughly 3,500 megawatts from 452 data centers across its service territory in Virginia. About 70% is in Data Center Alley. A single data center typically demands about 30 megawatts or greater, according to Dominion Energy.","pscan":"https://www.uagetinvolved.org/content/amazon-goes-nuclear-invest-more-500-million-develop-small-modular-reactors","uconf":"High","uquote":"AWS announced it has signed an agreement with Dominion Energy, Virginia's utility company, to explore the development of a small modular nuclear reactor, or SMR, near Dominion's existing North Anna nuclear power station.","uscan":"https://www.uagetinvolved.org/content/amazon-goes-nuclear-invest-more-500-million-develop-small-modular-reactors","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon AWS","ay":2023,"deal":"Acquisition of Nokes Blvd buildings for $30.8 million (July 2022), Manekin Plaza for $20 million (February 2022), and Ridgetop Circle for $26 million (February 2022).","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"uagetinvolved.org;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.uagetinvolved.org/content/amazon-goes-nuclear-invest-more-500-million-develop-small-modular-reactors","https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"197bfcb04300","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Approval of the project to build 1.75 million square feet of data center space on a 100-acre site just south of the Dulles International Airport, in Loudoun County, hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line some local residents (and a county supervisor) were opposed to.","pscan":"https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-a4a39e97","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"deal":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"datacenterknowledge.com;interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted","https://www.interconnection.fyi/data-center/project/amazon-a4a39e97"]},{"id":"64265025d5dd","cid":"fa5bb140d8bb","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","uquote":"Dominion Energy, which serves the part of Virginia known as “data center alley,” has seen data center demand grow steadily in the last decade.","uscan":"https://www.latitudemedia.com/news/how-dominion-is-thinking-about-nuclear-for-data-centers/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2023,"contro":"Loudoun County has implemented stricter regulations for data center development, requiring special exceptions and public review for new projects.","deal":"Amazon Web Services (AWS) acquired three office properties in Sterling, Virginia, for approximately $30.8 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"latitudemedia.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.latitudemedia.com/news/how-dominion-is-thinking-about-nuclear-for-data-centers/"]},{"id":"a3ee3e3807af","cid":"a3ee3e3807af","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"7072cfe57b20","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"contro":"General community concerns in Loudoun County regarding data center expansion, noise, and strain on the electric grid, leading to changes in zoning regulations.","deal":"Acquisition of Nokes buildings for $30.8 million in July 2022; Manekin Plaza and Ridgetop Circle properties acquired for $20 million and $26 million respectively in February 2022.","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"rmi.org;baxtel.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"ca65811077ff","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5eb0439547ef","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"deal":"Property acquisitions totaling $76.8 million in July 2022 and February 2022.","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b","https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"12facd93ef86","cid":"59c498d62af7","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Loudoun County, where the site is located, is known for its abundant power and favorable tax policies for data center operations, attracting major tech companies. It directs county staff to research and publish a report on the potential data center impacts associated with Amazon's purchase of the GW campus just north of Route 7 near Riverside Parkway, including power infrastructure requirements to support such a development. “It used to be that a utility built two substations a year,” Blackwell noted. “We have roughly a hundred in the pipeline now. It's an earnings driver.” Dominion would even prequalify power connections before all permits were finalized and ensure that the infrastructure was ready when the centers came online.","pscan":"https://www.city-journal.org/article/loudoun-county-virginia-data-centers-construction","uconf":"High","uquote":"Grid Operator. Dominion Energy. “It used to be that a utility built two substations a year,” Blackwell noted. “We have roughly a hundred in the pipeline now. It's an earnings driver.” Dominion would even prequalify power connections before all permits were finalized and ensure that the infrastructure was ready when the centers came online.","uscan":"https://www.city-journal.org/article/loudoun-county-virginia-data-centers-construction","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2026,"contro":"Loudoun County officials and residents are bracing to fight Amazon's plan for a data center on the recently acquired George Washington University campus, citing concerns about power infrastructure, noise, and the desire for diversified development.","deal":"Amazon Data Services acquired the 122-acre George Washington University Virginia Science and Technology Campus for $427 million in March 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"city-journal.org","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.city-journal.org/article/loudoun-county-virginia-data-centers-construction"]},{"id":"6f49e254ba06","cid":"59c498d62af7","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Loudoun County, Virginia, known within the industry as Data Center Alley, currently consumes approximately 5.3 GW of electricity, a significant increase from about 2 GW in 2021. This level of demand is equivalent to the output of five large nuclear reactors, all concentrated within a single county northwest of Washington, D.C. Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"DVP provides retail electric service to Amazon’s northern Virginia data centers that power the AWS Cloud.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2026,"contro":"Significant opposition from Loudoun County officials and residents due to concerns about zoning, power consumption, noise, and the desire for diversified development. The property's zoning status (by-right vs. special exception) is a point of contention.","deal":"Amazon Data Services acquired the 122-acre George Washington University Virginia Science & Technology Campus for $427 million in late February 2026.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"frontiermap.substack.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift"]},{"id":"6d217716bcf3","cid":"4755d4b70775","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2026,"contro":"Loudoun County officials and residents are opposing Amazon's plan to develop a data center campus on the recently acquired George Washington University campus, citing concerns about zoning, power infrastructure, and the desire for diversified development.","deal":"Amazon Data Services acquired the 122-acre George Washington University Virginia Science and Technology Campus for $427 million in March 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"frontiermap.substack.com;interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift","https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b"]},{"id":"d62bafd0a47f","cid":"d62bafd0a47f","canon":1,"dups":2,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-1ba73cd1","uconf":"High","uquote":"Grid Operator: Dominion Energy. DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-1ba73cd1","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-1ba73cd1"]},{"id":"04eb71817398","cid":"59c498d62af7","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Loudoun County, Virginia, known within the industry as Data Center Alley, currently consumes approximately 5.3 GW of electricity, a significant increase from about 2 GW in 2021. This level of demand is equivalent to the output of five large nuclear reactors, all concentrated within a single county northwest of Washington, D.C. Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500...","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility...","uscan":"https://frontiermap.substack.com/p/the-demand-shift","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2026,"contro":"Loudoun County officials were \"blindsided\" by the sale and are bracing to fight the data center addition due to zoning, power concerns, and a desire for economic diversification. The property's zoning status is contentious, with some arguing for \"by-right\" development under a 1972 ordinance, while others state a special exception is now required.","deal":"Acquisition of 120-122 acre George Washington University Virginia Science and Technology Campus for $427 million in March 2026.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"frontiermap.substack.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift"]},{"id":"9fbd24dfb7eb","cid":"4755d4b70775","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The facilities consume quantities of power so vast that they have begun to tax entire energy grids and could exacerbate the climate crisis.... In Virginia, only 7% of the grid's power currently comes from renewable energy, according to the state's Department of Environmental Quality.","uconf":"High","uquote":"Luckily for AWS, the region's utility company, Dominion, and Blue Ridge Group, a company acting on Amazon's behalf, were able to come up with an alternative plan that Loudoun County supervisors approved.","uscan":"https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon","ay":2026,"contro":"Loudoun County officials and residents are opposing Amazon's plan to develop the GWU campus into a data center, citing concerns about power consumption, visual impact, and the desire for diversified economic development.","deal":"Acquisition of George Washington University's 122-acre Virginia Science and Technology Campus for $427 million in March 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"futurumgroup.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified","srcUrls":["https://futurumgroup.com/insights/aws-gets-greenlight-for-huge-data-center-campus-in-northern-virginia/"]},{"id":"9a8e3ea16119","cid":"899ff10ae922","canon":0,"dups":3,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b"]},{"id":"4755d4b70775","cid":"4755d4b70775","canon":0,"dups":4,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. Once Amazon and other companies announce plans for new data centers, regional energy providers are required to meet that demand. In a 2023 proposal, regional power company Dominion said the increasing energy demand in the region was “driven primarily by data centers.”","pscan":"https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/","uconf":"High","uquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. With power consumption by data centers and AI projected to more than quadruple in Virginia in the next 15 years, Amazon.com and Dominion Energy Virginia have entered into an agreement to explore potential development of small modular nuclear reactors at North Anna Power Plant in Louisa County, the two companies announced at an event Wednesday at Amazon's HQ2 East Coast headquarters in Arlington County.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tenant":"Amazon Web Services","ay":2026,"contro":"Loudoun County officials expressed being \"blindsided\" by the sale and are bracing to fight the addition of another data center, citing infrastructure saturation. The Loudoun County Board of Supervisors also approved changes to regulations, eliminating data centers as a by-right use.","deal":"Amazon Data Services acquired a 122-acre campus from George Washington University for $427 million in March 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"thenation.com","lflag":"online_before_announced utility_alias_corrected source_quality_reclassified,merged_duplicate","srcUrls":["https://www.thenation.com/article/environment/data-centers-virginia-amazon-environment/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"99de67292fab","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Grid Operator: Dominion Energy. (Note: This is for other Amazon facilities in Loudoun, but indicates the typical power source for the region and operator.)","pscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","uconf":"High","uquote":"Grid Operator: Dominion Energy. Approval of the project to build 1.75 million square feet of data center space on a 100-acre site just south of the Dulles International Airport, in Loudoun County, hinged on Amazon's and Dominion Power's ability to find an alternative way to get power to the site without building a power line some local residents (and a county supervisor) were opposed to.","uscan":"https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"deal":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;datacenterknowledge.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-522a7c34","https://www.datacenterknowledge.com/hyperscalers/another-huge-northern-virginia-aws-data-center-campus-greenlighted"]},{"id":"ff50b787a79a","cid":"59c498d62af7","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Yet the centers also consume vast amounts of power, straining the regional electrical grid and spurring concerns about potential hikes in consumers' utility bills.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2026,"contro":"Loudoun County officials and residents are fighting the proposed data center development due to zoning changes, power concerns, and a desire for economic diversification.","deal":"Amazon Data Services acquired the George Washington University Virginia Science and Technology Campus for approximately $427 million in March 2026.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-9abf7b0b"]},{"id":"a0091a6e234e","cid":"d62bafd0a47f","canon":0,"dups":2,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-1ba73cd1","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-1ba73cd1","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-1ba73cd1"]},{"id":"59c498d62af7","cid":"59c498d62af7","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"High-voltage transmission lines provide electricity to data centers in Ashburn, Virginia. Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","uconf":"High","uquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility. Grid Operator. Dominion Energy.","uscan":"https://frontiermap.substack.com/p/the-demand-shift","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2026,"contro":"Loudoun County officials and residents are opposing the data center development on the former GWU campus due to concerns about saturation, location near residential areas, and the process of acquisition. The county has also recently changed zoning rules for data centers.","deal":"Amazon Data Services acquired a 122-acre campus from George Washington University for $427 million in March 2026.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"frontiermap.substack.com","lflag":"online_before_announced source_quality_reclassified,merged_duplicate","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift"]},{"id":"09bda48da7d9","cid":"f1f503978593","canon":0,"dups":11,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud. But Amazon has also signed a number of wind and solar deals in the region that participate in the PJM wholesale market. Through an energy management services agreement DVP may provide PJM-related services to AWS. Such services will assist in the integration and administration of its renewable portfolio in the market.... AWS data centers in Virginia consumed energy from another part of the same grid paying retail rate of electricity based on DVP's power mix.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2023,"deal":"Amazon purchased the Nokes buildings from Clark-Hook Corp for $30.8 million in July 2022. Amazon Data Services acquired three office buildings at Ridgetop Circle for $26.4 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rmi.org","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"]},{"id":"96a15eaa14e6","cid":"364aa1a734f7","canon":0,"dups":16,"ftype":"data_center","name":"Amazon","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-522a7c34","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2023,"deal":"Land acquisition for $30.8 million in July 2022","dealScan":"https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-522a7c34","https://baxtel.com/news/amazon-plans-four-data-centers-in-sterling-virginia"]},{"id":"da4186597e15","cid":"59c498d62af7","canon":0,"dups":6,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW. Substations that step down this power for data halls are typically sized between 100 and 300 MW each.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"A key requirement for data centers is access to large, stable electricity supplies, and Rizer says that the local utility, Dominion Energy, has been a crucial partner.","uscan":"https://www.city-journal.org/article/loudoun-county-virginia-data-centers-construction","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2026,"contro":"Loudoun County Supervisor Juli Briskman and other officials are opposing data center development on the site due to residential proximity, environmental concerns, and power infrastructure requirements. The county also recently eliminated 'by-right' data center development, requiring special exception approval and public hearings for new projects.","controScan":"https://www.loudoun.gov/DocumentCenter/View/220482/BriskmanSeeksReviewofData-CenterImpacts-after-Amazon-Sale","deal":"Amazon Data Services acquired the 122-acre George Washington University Virginia Science and Technology Campus for $427 million in March 2026.","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"frontiermap.substack.com;city-journal.org;loudoun.gov","lflag":"online_before_announced","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift","https://www.city-journal.org/article/loudoun-county-virginia-data-centers-construction","https://www.loudoun.gov/DocumentCenter/View/220482/BriskmanSeeksReviewofData-CenterImpacts-after-Amazon-Sale"]},{"id":"75c44d8324b7","cid":"75c44d8324b7","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","pscan":"https://frontiermap.substack.com/p/the-demand-shift","uconf":"High","uquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","uscan":"https://frontiermap.substack.com/p/the-demand-shift","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2026,"contro":"Loudoun County officials and residents are fighting Amazon's plan to build a data center on the former GWU campus due to zoning, power constraints, and a desire for diversified development.","deal":"Amazon Data Services purchased the 120-acre George Washington University Virginia Science & Technology Campus for $427 million in March 2026.","dealScan":"https://www.loudoun.gov/DocumentCenter/View/220482/BriskmanSeeksReviewofData-CenterImpacts-after-Amazon-Sale","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"frontiermap.substack.com;loudoun.gov","lflag":"online_before_announced,merged_duplicate","srcUrls":["https://frontiermap.substack.com/p/the-demand-shift","https://www.loudoun.gov/DocumentCenter/View/220482/BriskmanSeeksReviewofData-CenterImpacts-after-Amazon-Sale"]},{"id":"e1fedf286d16","cid":"e1fedf286d16","canon":0,"dups":5,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","mw":45,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"DVP provides retail electric service to Amazon's northern Virginia data centers that power the AWS Cloud.","pscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","uconf":"High","uquote":"Amazon Web Services (AWS), Amazon.com's cloud computing division, has signed a first-of-its-kind agreement with its retail electric utility, Dominion Virginia Power (DVP).","uscan":"https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Penzance","tenant":"Amazon Web Services (AWS)","ay":2025,"oy":2027,"contro":"Community opposition regarding noise, diesel generators, viewshed, and watershed impacts.","deal":"Penzance secured $100 million in construction financing (October 2025)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"rmi.org","srcUrls":["https://rmi.org/resources/amazon-dominion-virginia-power-reach-breakthrough-renewable-energy-agreement/"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"082f4c67e37d","cid":"082f4c67e37d","canon":0,"dups":1,"ftype":"data_center","name":"Amazon","city":"Chantilly","county":"Fairfax","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"3ff61cae0c70","cid":"3ff61cae0c70","canon":1,"dups":3,"ftype":"data_center","name":"Amazon Data Center","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Dominion Energy has proposed a 500-kilovolt transmission line to run from its Morrisville substation in Fauquier County through parts of Prince William and Loudoun counties to the planned Wishing Star substation. Estimated to cost $852.9 million, the project also would bring in a new 230-kilovolt line in Fauquier, and the Morrisville substation would be expanded.... The Devlin Tech Park can hold up to 3.5 million square feet of data centers and up to three substations.","pscan":"https://northernvirginiamag.com/news/2025/11/04/amazon-buys-northern-virginia-data-center-site-for-record-700-million/","uconf":"High","uquote":"Wednesday's demonstration comes as Dominion Energy eyes a plan to build a six-mile-long transmission line to connect its stations.... Dominion Energy has disclosed that the expected power promised to Data Centers throughout Virginia has TRIPLED in one year.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","ay":2023,"contro":"Neighbors challenged rezoning in court; local opposition to data center development.","controScan":"https://www.credaily.com/briefs/data-center-deal-amazon-buys-virginia-land-for-700m/","deal":"Land acquisition: Amazon Data Services bought 188.5 acres for $700 million from Stanley Martin Homes, closed November 5, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"northernvirginiamag.com;credaily.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified","srcUrls":["https://northernvirginiamag.com/news/2025/11/04/amazon-buys-northern-virginia-data-center-site-for-record-700-million/","https://www.credaily.com/briefs/data-center-deal-amazon-buys-virginia-land-for-700m/"]},{"id":"399fa084633a","cid":"399fa084633a","canon":0,"dups":1,"ftype":"data_center","name":"Amazon Data Center","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The Devlin Tech Park can hold up to 3.5 million square feet of data centers and up to three substations.... Just off I-95 near Dumfries, one proposed site could include a power distribution center and as many as four data centers.... The latest concept plan would divide the property into two complexes, each with three data centers and a substation.","pscan":"https://www.fox5dc.com/news/proposed-data-centers-spark-debate-over-major-development-prince-william-county","uconf":"High","uquote":"There are two electricity providers currently serving the County: North Virginia Electric Cooporative (NOVEC)... Dominion Energy.... Dominion Energy is the largest utility company in Virginia, and it serves the most densely-populated metropolitan areas of the Commonwealth like Richmond, Hampton Roads, Charlottesville and Northern Virginia.... Virginia law mandates Dominion Energy's membership.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services / Amazon Web Services (AWS)","spon":"Amazon Data Services / Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","ay":2023,"contro":"Fierce neighborhood opposition and a two-year court battle over rezoning, with the Virginia Court of Appeals upholding the rezoning in September 2025. County lawmakers are also considering rolling back the Data Center Overlay District.","deal":"Amazon Data Services purchased approximately 188.5 acres in Devlin Technology Park for $700 million. The purchase from Stanley Martin Homes closed on November 5, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fox5dc.com","lflag":"online_before_announced citation_artifact_removed,merged_duplicate","srcUrls":["https://www.fox5dc.com/news/proposed-data-centers-spark-debate-over-major-development-prince-william-county"]},{"id":"1450921c1828","cid":"3ff61cae0c70","canon":0,"dups":3,"ftype":"data_center","name":"Amazon Data Center","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Residents also voiced opposition to proposed projects, including Dominion Energy's plan to build a six-mile transmission line to connect data center facilities. Critics worry the expansion could drive up electricity costs and strain local resources as more projects move forward.","pscan":"https://www.youtube.com/watch?v=suctNhkh-9A","uconf":"High","uquote":"Residents also voiced opposition to proposed projects, including Dominion Energy's plan to build a six-mile transmission line to connect data center facilities.","uscan":"https://www.youtube.com/watch?v=suctNhkh-9A","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2023,"contro":"Significant community opposition regarding noise, traffic, environmental impact, infrastructure strain, and rising energy/water bills. Legal challenges to rezoning decisions.","deal":"Land purchase for $700 million (November 2025)","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.youtube.com/watch?v=suctNhkh-9A"]},{"id":"269ac7cf4ba7","cid":"3ff61cae0c70","canon":0,"dups":3,"ftype":"data_center","name":"Amazon Data Center","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The Applicant shall develop Land Bay A with Data Centers, an Electric Substation, parking, and other uses and structures secondary and ancillary to Data Centers and Electric Substations.","uquote":"The Coalition began this journey in December of 2014 to expose the data center industry because of ONE Amazon Data Center Campus, only 438,000 sq ft, that needed enough power to trigger an entire massive transmission line (or “extension cord as we so fondly described it) and an electrical substation. Washington Post: Dominion agrees to bury power lines in Prince William, ending legal standoff – The Coalition to Protect Prince William County.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2022,"contro":"Community opposition to data center development due to concerns about noise, pollution, energy bills, and water prices.","controScan":"https://www.youtube.com/watch?v=nMWvKI7attY","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"online_before_announced","srcUrls":["https://www.youtube.com/watch?v=nMWvKI7attY"]},{"id":"7e80f6558085","cid":"7e80f6558085","canon":1,"dups":1,"ftype":"data_center","name":"ARCOLA","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":120,"pc":"Grid","pconf":"High","pquote":"The 37-acre campus will feature two two-story data center buildings totaling 615,000 square feet and is designed to support up to 120 MW of utility capacity, providing hyperscale customers with a highly efficient, power-secured platform for AI, cloud, and high-performance computing workloads.","uconf":"High","uquote":"On-site substations developed in partnership with Dominion Energy. Dual 230 kV utility substations dedicated to campus use. Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"PowerHouse Data Centers","spon":"American Real Estate Partners (AREP) / AREP Strategic Opportunity Fund III","tenant":"Hyperscale tenant (unnamed)","ay":2024,"oy":2026,"contro":"Loudoun County Planning Commission recommended denial of a proposal from PowerHouse Data Centers to expand an already approved data center project.","controScan":"https://baxtel.com/data-center/powerhouse-arcola","deal":"Long-term hyperscale lease executed on January 15, 2026; initial development funded through AREP Strategic Opportunity Fund III.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/powerhouse-arcola"],"band":"100-250 MW","lflag":"source_quality_reclassified"},{"id":"c5e203dee952","cid":"c5e203dee952","canon":1,"dups":1,"ftype":"data_center","name":"Arcola Pacific Campus","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":120,"pc":"Grid","pconf":"High","pquote":"The 37-acre campus will feature two two-story data center buildings totaling 615,000 square feet and is designed to support up to 120 MW of utility capacity, providing hyperscale customers with a highly efficient, power-secured platform for AI, cloud, and high-performance computing workloads.","pscan":"https://www.prnewswire.com/news-releases/powerhouse-data-centers-executes-hyperscale-lease-at-powerhouse-arcola-advancing-northern-virginia-expansion-302661927.html","uconf":"High","uquote":"On-site substations developed in partnership with Dominion Energy... The joint venture partnered with Dominion Energy to construct a dedicated, 300-megawatt power substation on the 10-acre site.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"PowerHouse Data Centers","spon":"AREP, Harrison Street","ay":2022,"oy":2025,"contro":"Loudoun County Planning Commission recommended denial of a proposal to expand the project.","controScan":"https://baxtel.com/data-center/powerhouse-arcola","deal":"Long-term hyperscale lease executed (Jan 15, 2026); $1 billion joint venture commitment with AREP and Harrison Street (announced Sep 13, 2022).","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"prnewswire.com;baxtel.com","srcUrls":["https://www.prnewswire.com/news-releases/powerhouse-data-centers-executes-hyperscale-lease-at-powerhouse-arcola-advancing-northern-virginia-expansion-302661927.html","https://baxtel.com/data-center/powerhouse-arcola"],"band":"100-250 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"9df9e7d37026","cid":"9df9e7d37026","canon":1,"dups":1,"ftype":"data_center","name":"ASH1-BRODERICK DC2","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":22,"pc":"Grid","pconf":"High","pquote":"This Dominion Energy substation powers data centers in Loudoun County. A key requirement for data centers is access to large, stable electricity supplies, and Rizer says that the local utility, Dominion Energy, has been a crucial partner. Data centers maintain extensive backup power systems, typically consisting of diesel generators ranging from 600 kW to 3,500 kW each.","pscan":"https://pragmaticenvironmentalistofnewyork.blog/wp-content/uploads/2025/10/physical-attributes-of-a-typical-loudoun-county-v.pdf","uconf":"High","uquote":"Grid Operator. Dominion Energy. Dominion Energy says it has resumed providing new connections to data center customers in a power-constrained section of Loudoun County, Virginia. A key requirement for data centers is access to large, stable electricity supplies, and Rizer says that the local utility, Dominion Energy, has been a crucial partner.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone","ay":2017,"oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"pragmaticenvironmentalistofnewyork.blog","srcUrls":["https://pragmaticenvironmentalistofnewyork.blog/wp-content/uploads/2025/10/physical-attributes-of-a-typical-loudoun-county-v.pdf"],"band":"10-25 MW","lflag":"source_quality_reclassified"},{"id":"5122de565fbb","cid":"5122de565fbb","canon":1,"dups":1,"ftype":"data_center","name":"Ashburn Data Center","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"14-year contracts, minimum 85% of contracted distribution and transmission demand, 60% of generation demand (for GS-5 rate class)","uquote":"Dominion Energy is the region's main power utility, providing about 1 Gigawatt of reliable, low-cost energy throughout northern Virginia.","uscan":"https://upstack.com/blog/why-is-ashburn-known-as-data-center-alley/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Luck Stone","ay":2023,"oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"upstack.com","srcUrls":["https://upstack.com/blog/why-is-ashburn-known-as-data-center-alley/"],"lflag":"source_quality_reclassified"},{"id":"950891558814","cid":"950891558814","canon":1,"dups":1,"ftype":"data_center","name":"Ashwood Addition","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"CloudHQ","ay":2018,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced","srcUrls":null,"srcDom":null},{"id":"1b9783796466","cid":"1b9783796466","canon":1,"dups":1,"ftype":"data_center","name":"Atlantic Crossing","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Dominion Energy had to apply to the State Corporation Commission for approval to install two 230-kilovolt power lines to the site and expand its existing White Oak substation.","uconf":"High","uquote":"Dominion Energy had to apply to the State Corporation Commission for approval to install two 230-kilovolt power lines to the site and expand its existing White Oak substation.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS Data Centers","spon":"QTS Data Centers","ay":2023,"contro":"Community opposition and regulatory pushback regarding data center development in Henrico County, including this 600-acre project, led to new county regulations.","deal":"QTS Data Centers acquired the 622-acre site for approximately $137 million, with the final portion purchased in June 2024 for $118.8 million and earlier acquisitions in December 2023 for $18 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e71d82258b01","cid":"e71d82258b01","canon":1,"dups":1,"ftype":"data_center","name":"AttoTek","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The applicant is proposing to use the property for a Data Center Facility per Article 7.1A-2-2.5 for approximately 765,000 square feet of building area as well as an area for an electrical substation. Brandy Station also lacks the key infrastructure necessary for data center development and would require a large substation and an imposing new transmission line through two to five miles of privately-owned rural lands.","pscan":"https://cleanview.co/data-centers/virginia/1709/attotek","uconf":"High","uquote":"Dominion Energy is obligated to provide power to a new data center once it's approved, and the state can use eminent domain on Dominion's behalf to claim right-of-way for new transmission lines through private property.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"AttoTek, David Martin","spon":"AttoTek, David Martin","ay":2022,"contro":"The AttoTek data center campus rezoning proposal was withdrawn due to fierce community opposition about the impacts the project would have on the historic and agricultural resources within Brandy Station.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"cleanview.co","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://cleanview.co/data-centers/virginia/1709/attotek"]},{"id":"b26f1d421385","cid":"b26f1d421385","canon":1,"dups":1,"ftype":"data_center","name":"Austin Ridge Logisitics Center","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"limiting “the amount of potable water usage permitted for data center cooling purposes to [1 million] gallons per building, per year;”","pscan":"https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold","uquote":"Dominion Power, one of the nation's largest producers and transporters of energy, serves most businesses. When calculating by number of customers, Dominion Energy is the largest electricity provider in Stafford County.","uscan":"https://www.gostaffordva.com/infrastructure/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NorthPoint Development","spon":"NorthPoint Development","ay":2022,"contro":"Regulatory pushback on setbacks and buffers.","controScan":"https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold","deal":"$133.9 million investment in Stafford County (announced June 26, 2024)","dealScan":"https://www.gostaffordva.com/2024/06/northpoint-development-hosts-groundbreaking-event-for-two-million-square-feet-industrial-development/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"fxbgadvance.com;gostaffordva.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold","https://www.gostaffordva.com/infrastructure/","https://www.gostaffordva.com/2024/06/northpoint-development-hosts-groundbreaking-event-for-two-million-square-feet-industrial-development/"]},{"id":"1d69a95bfaae","cid":"1d69a95bfaae","canon":1,"dups":1,"ftype":"data_center","name":"Avaio Digital Partners","county":"Appomattox County","state":"VA","lat":37.370725,"lng":-78.81094,"cprec":"distinct","status":"Proposed","mw":300,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"The campus will also include 30 MW of on-site, behind-the-meter solar PV generation ‍. A direct connection to the Williams Transco gas pipeline (access on site, obviating any third-party easement or rights-of-way issues) can deliver sufficient gas for behind-the-meter baseload thermal generation of up to 700 MW, starting in 2028 ‍. 50 MW via Dominion energized 2027, with load study complete and construction DPR submitted ‍. An additional 250 MW of grid power available 2030.","proc":"Co-located generation","pcp":"Avaio Digital Partners (developer/owner of onsite generation)","pdt":"up to 700 MW gas, 30 MW solar","uquote":"AVAIO Digital has confirmed 300 MW of power from CVEC and Dominion and the site is fully zoned for data centers, strategically located atop major long-haul fiber lines with direct links to major hubs, and is cleared and ready for rapid construction.","uscan":"https://www.avaiodigital.com/updates/avaio-digital-to-build-3-billion-data-center-campus-on-452-acres-in-appomattox-county-virginia","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"AVAIO Digital Partners","spon":"AVAIO Capital","ay":2024,"oy":2027,"contro":"Local opposition regarding transparency, water use, noise, traffic, land use, and project scale in a rural area.","controScan":"https://datacenterwatch.substack.com/p/briefing-03272026","deal":"Agreement with Appomattox County Economic Development Authority for purchase of 452-acre site for approximately $4.5 million. Avaio will invest $3 billion in development.","dealScan":"https://www.avaiodigital.com/updates/avaio-digital-to-build-3-billion-data-center-campus-on-452-acres-in-appomattox-county-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"avaiodigital.com;datacenterwatch.substack.com","srcUrls":["https://www.avaiodigital.com/updates/avaio-digital-to-build-3-billion-data-center-campus-on-452-acres-in-appomattox-county-virginia","https://datacenterwatch.substack.com/p/briefing-03272026"],"lflag":"source_quality_reclassified"},{"id":"dbde2c64956f","cid":"dbde2c64956f","canon":1,"dups":1,"ftype":"data_center","name":"AVION DATA CENTER","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/avion-data-center-754e1ed7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2024,"contro":"General community opposition to data center development in Fairfax County due to environmental and transparency concerns.","deal":"AWS bought the 14501 and 14721 Avion Parkway sites from Petula Prolix Development Co. LLC for $55.9 million.","dealScan":"https://baxtel.com/data-center/amazon-14501-avion-pkwy","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/avion-data-center-754e1ed7","https://baxtel.com/data-center/amazon-14501-avion-pkwy"]},{"id":"5fb9e9f9fe32","cid":"d8961af6cf4b","canon":0,"dups":4,"ftype":"data_center","name":"AWS H&M Property","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4"]},{"id":"40e9be5295f5","cid":"d8961af6cf4b","canon":0,"dups":4,"ftype":"data_center","name":"AWS H&M Property","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/aws-h-m-property-f3da28f4"]},{"id":"d8961af6cf4b","cid":"d8961af6cf4b","canon":1,"dups":4,"ftype":"data_center","name":"AWS H&M Property","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"AWS","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7402ec7547b1","cid":"7402ec7547b1","canon":1,"dups":1,"ftype":"data_center","name":"AWS Loisdale Station","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Dominion Energy provides grid power supplemented by massive renewable energy purchases, though the underlying generation mix remains heavily dependent on natural gas and nuclear.","pscan":"https://www.mmcginvest.com/post/aws-at-scale-inside-the-largest-private-infrastructure-buildout-the-world-has-ever-seen","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-064-7e335cd7","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon","tenant":"Amazon","ay":2021,"oy":2023,"contro":"Planning Commission recommended denial, AWS withdrew proposal for further community engagement.","controScan":"https://baxtel.com/data-center/amazon-7951-loisdale","deal":"AWS acquired two 111,000-square-foot office buildings at 7951 and 7961 Loisdale Road for $28 million from Loisdale 24 LLC.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"mmcginvest.com;interconnection.fyi;baxtel.com","srcUrls":["https://www.mmcginvest.com/post/aws-at-scale-inside-the-largest-private-infrastructure-buildout-the-world-has-ever-seen","https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-dca-064-7e335cd7","https://baxtel.com/data-center/amazon-7951-loisdale"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected stale_future_status_year","oy_stale":1},{"id":"2fc421855e0a","cid":"2fc421855e0a","canon":1,"dups":1,"ftype":"data_center","name":"Azalea","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Gatch had said the company liked the Azalea site for its connectivity to Dominion Energy's power grid and its separation from other parts of the county where data center development has been more prevalent.","uconf":"High","uquote":"Gatch had said the company liked the Azalea site for its connectivity to Dominion Energy's power grid and its separation from other parts of the county where data center development has been more prevalent.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DC BLOX","ay":2025,"oy":2026,"contro":"Community opposition and Planning Commission recommendation for denial of rezoning request.","deal":"Land acquisition for $8 million on Jan 16, 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"bcf033f9f01a","cid":"bcf033f9f01a","canon":1,"dups":1,"ftype":"data_center","name":"Balico","county":"Pittsylvania County","state":"VA","lat":36.821721,"lng":-79.398502,"cprec":"distinct","status":"Proposed","mw":300,"band":"250+ MW","pc":"Behind-the-Meter","pconf":"High","pquote":"Located in Pittsylvania, Virginia, this large university style campus will leverage Virginia's extensive fiber optic network, sustainable water resources for cooling, and a private, behind-the-meter natural gas power plant, offering reliable and affordable power.","pscan":"https://balicollc.com/","proc":"Co-located generation","pdt":"3,500 megawatt gas-fired power source","rto":"PJM","nerc":"SERC","op":"Balico","spon":"Balico","ay":2024,"oy":2025,"contro":"Extensive community opposition led to the Pittsylvania County Board of Supervisors denying Balico's rezoning application in April 2025, effectively halting the project for at least a year.","controScan":"https://cardinalnews.org/2025/04/16/pittsylvania-rejects-data-center-project-that-has-dominated-county-conversation-for-6-months/","deal":"EQT signed a letter of intent to supply gas to the planned Pittsylvania facility on July 8, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"balicollc.com;cardinalnews.org","srcUrls":["https://balicollc.com/","https://cardinalnews.org/2025/04/16/pittsylvania-rejects-data-center-project-that-has-dominated-county-conversation-for-6-months/"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"754f7c00ac7e","cid":"754f7c00ac7e","canon":1,"dups":1,"ftype":"data_center","name":"Birchwood AWS","county":"King George County","state":"VA","lat":38.27718,"lng":-77.162636,"cprec":"shared_centroid","status":"Proposed","mw":2175,"pc":"Grid","pconf":"High","pquote":"The site benefits from existing grid infrastructure, including a Dominion Energy substation that served the retired 258 MW coal plant","uquote":"The site benefits from existing grid infrastructure, including a Dominion Energy substation that served the retired 258 MW coal plant","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services","spon":"Amazon Web Services","tenant":"Amazon Web Services","ay":2023,"contro":"Legal dispute with King George County over performance agreement and vested rights, leading to the project being stalled.","deal":"Land acquisition for $168.8 million in December 2023; performance agreement approved in late 2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded large_project_duplicate_review","band":"250+ MW","srcUrls":null,"srcDom":null},{"id":"b6789c4e0c97","cid":"b6789c4e0c97","canon":1,"dups":1,"ftype":"data_center","name":"Blaisdell Property Data Center","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Existing transmission lines already extend through the property, and the data center buildings would be developed on about 60 acres, Payne said. Some data centers use water for cooling, but the Blaisdell campus would instead be “air-cooled,” using a system with what are basically really big air-conditioners, the lawyer said.","pscan":"https://www.govtech.com/products/virginia-residents-discuss-merits-of-data-center-in-meeting","uconf":"High","uquote":"Applicant: Stefan Brooks, Dominion Energy Virginia, 5000 Dominion Boulevard, Glen Allen, VA 23060. With the TOD approved, developers must now work with Dominion Energy to assess the site's power infrastructure.","uscan":"https://staffordcountyva.gov/government/departments_p-z/planning_and_zoning/long_range/rezonings,_cups,_comp_plan_amendments/development_review_meetings_new_applications.php","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"TC Blaisdell Owner","spon":"Trammell Crow Company","ay":2024,"oy":2028,"contro":"Community opposition regarding noise, land use, and rezoning. The project requires a rezoning from urban commercial and agricultural to heavy industrial, a conditional use permit, and a comprehensive plan amendment.","controScan":"https://www.govtech.com/products/virginia-residents-discuss-merits-of-data-center-in-meeting","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"govtech.com;staffordcountyva.gov","srcUrls":["https://www.govtech.com/products/virginia-residents-discuss-merits-of-data-center-in-meeting","https://staffordcountyva.gov/government/departments_p-z/planning_and_zoning/long_range/rezonings,_cups,_comp_plan_amendments/development_review_meetings_new_applications.php"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"32df5de39d1c","cid":"32df5de39d1c","canon":1,"dups":1,"ftype":"data_center","name":"Brambleton Business Campus Data Center","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/brambleton-business-campus-data-center-18c9a40a","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/brambleton-business-campus-data-center-18c9a40a","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/brambleton-business-campus-data-center-18c9a40a"]},{"id":"88fb9c3a1907","cid":"88fb9c3a1907","canon":1,"dups":1,"ftype":"data_center","name":"BRAMBLETON SHREVEPORT SOUTH DATA CENTER","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"bc903db80423","cid":"bc903db80423","canon":1,"dups":1,"ftype":"data_center","name":"Bristow Campus","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"A new 6.5-mile Dominion Energy transmission line in western Prince William County connecting an existing substation in Nokesville to the future Bristow switching station is sparking citizen outcry over its presumed link to increased grid demand resulting from local data centers.","uconf":"High","uquote":"A new 6.5-mile Dominion Energy transmission line in western Prince William County connecting an existing substation in Nokesville to the future Bristow switching station is sparking citizen outcry over its presumed link to increased grid demand resulting from local data centers.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","ay":2022,"contro":"Significant community opposition, multiple deferrals, and ultimate denial by the Prince William Board of County Supervisors.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"339146bfd7e0","cid":"339146bfd7e0","canon":1,"dups":1,"ftype":"data_center","name":"Capital One","city":"Glen Allen","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"f1aaa3f65ac2","cid":"f1aaa3f65ac2","canon":0,"dups":2,"ftype":"data_center","name":"Capital One","city":"Glen Allen","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"329619eb4e7a","cid":"f1aaa3f65ac2","canon":0,"dups":2,"ftype":"data_center","name":"Capital One","city":"Glen Allen","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected unlinked_source_text","rawUkey":"19876|VA","rawUname":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"2f17a859f529","cid":"2f17a859f529","canon":1,"dups":1,"ftype":"data_center","name":"Carmel Church Data Hub","county":"Caroline County","state":"VA","lat":38.028033,"lng":-77.353736,"cprec":"shared_centroid","status":"Proposed","mw":300,"proc":"Tariff (utility)","pcp":"Rappahannock Electric Cooperative","pdt":"300 MW upon full build-out by 2030","rto":"PJM","nerc":"SERC","op":"AVAIO Digital","spon":"AVAIO Digital","ay":2024,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5407775fde91","cid":"5407775fde91","canon":1,"dups":1,"ftype":"data_center","name":"Carter's Store Tech Campus","county":"Spotsylvania County","state":"VA","lat":38.182431,"lng":-77.657226,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Rappahannock Electric Cooperative","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"a384d5d7d928","cid":"a384d5d7d928","canon":1,"dups":1,"ftype":"data_center","name":"Centersquare","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"8646096e0fd0","cid":"8646096e0fd0","canon":1,"dups":1,"ftype":"data_center","name":"Cielo Digital Infrastructure","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Proposed","mw":300,"pc":"Grid","pconf":"High","pquote":"Portfolio of project sites with preferential access to grid power for data center development.","uquote":"According to 7News, Valley Link, partly owned by Dominion Energy, is proposing a 765-kilovolt transmission line running from Lynchburg to Culpeper County, along with an 88-acre substation in Culpeper.","uscan":"https://www.thecooldown.com/green-business/power-line-proposal-virginia-data-centers/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Cielo Digital Infrastructure","spon":"Arroyo Investors","ay":2023,"contro":"Community opposition regarding noise, water consumption, industrialization, and power line impacts; Board of Supervisors vote was 5-2 with concerns about generator fuel tanks.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"thecooldown.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.thecooldown.com/green-business/power-line-proposal-virginia-data-centers/"],"band":"250+ MW"},{"id":"a176e8080e13","cid":"a176e8080e13","canon":1,"dups":1,"ftype":"data_center","name":"CleanArc","county":"Caroline County","state":"VA","lat":38.028033,"lng":-77.353736,"cprec":"shared_centroid","status":"Proposed","mw":900,"pc":"Grid","pconf":"High","pquote":"Offering 900MW of grid capacity, the state-of-the-art data center campus will support the growing demand for scalable,sustainability-focused and hyperscale ready digital infrastructure.","uquote":"The company — which has offices in Reston, Dallas and Las Vegas — has already placed the campus in the queue with Dominion to receive power, which encouraged the county to approve the agreement, since it seemed likely the project would come to fruition.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CleanArc Data Centers","spon":"Snowhawk Partners","ay":2025,"oy":2027,"contro":"Bowling Green District Supervisor Jeff Sili cast the lone vote against the project.","deal":"$3 billion initial investment announced November 20, 2025","dealScan":"https://www.vedp.org/press-release/2025-11/cleanarc-caroline","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"vedp.org","srcUrls":["https://www.vedp.org/press-release/2025-11/cleanarc-caroline"],"band":"250+ MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"bd2f41997507","cid":"bd2f41997507","canon":1,"dups":1,"ftype":"data_center","name":"CloudHQ","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Proposed","mw":142,"pc":"Grid","pconf":"High","pquote":"To be clear, the existing line upgrade is to address load growth in the area as we see it now,” namely a Cloud HQ facility on 100 acres along McDevitt.","uconf":"High","uquote":"To be clear, the existing line upgrade is to address load growth in the area as we see it now,” namely a Cloud HQ facility on 100 acres along McDevitt.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CloudHQ","ay":2022,"contro":"Community opposition regarding zoning, water supply, roads, and noise impacts.","controScan":"https://www.pecva.org/region/culpeper/support-more-data-center-regulation-in-culpeper-county/","deal":"Land acquisition for $12 million in 2022.","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"pecva.org","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.pecva.org/region/culpeper/support-more-data-center-regulation-in-culpeper-county/"],"band":"100-250 MW"},{"id":"633bd697d026","cid":"633bd697d026","canon":1,"dups":1,"ftype":"data_center","name":"Cochran Mill Road","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"100 MVA available from Dominion Power","uconf":"High","uquote":"100 MVA available from Dominion Power","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"SDC Capital Partners","spon":"SDC Capital Partners","ay":2023,"oy":2026,"contro":"Piedmont Environmental Council staff testified during the Planning Commission Public Hearing about concerns regarding Cochran Tech Park, which would place data centers and a utility scale battery energy storage facility along Cochran Mill Rd on an environmentally sensitive site.","controScan":"https://www.pecva.org/region/loudoun/loudoun-updates-summer-2025/","deal":"SDC Capital Partners acquired 97-acre data center land in Virginia for $615 million in October 2025.","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"pecva.org","srcUrls":["https://www.pecva.org/region/loudoun/loudoun-updates-summer-2025/"]},{"id":"dbcc5f5f7f95","cid":"dbcc5f5f7f95","canon":1,"dups":1,"ftype":"data_center","name":"Compton Property SUP","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"for the purpose of developing a data center and an electrical substation campus.","uconf":"High","uquote":"There are two electricity providers currently serving the County:... Dominion Energy.","uscan":"https://pwc311.my.site.com/knowledgebase/s/article/Prince-William-County-Electricity-Services","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Data Services","ay":2021,"contro":"The Prince William County Planning Commission recommended denial of the Special Use Permit and Rezoning applications, noting the project is outside the Data Center Opportunity Zone Overlay District.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"pwc311.my.site.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified","srcUrls":["https://pwc311.my.site.com/knowledgebase/s/article/Prince-William-County-Electricity-Services"]},{"id":"5274488117ad","cid":"5274488117ad","canon":1,"dups":1,"ftype":"data_center","name":"Convergent Technology Park","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Convergent VA said that there would likely be 16 diesel generators per building. Convergent is unable to tap into the 500-kilovolt line that runs through the southern portion of the site, and must run underground lines to an off-site substation in Remington to connect to the grid.","pscan":"https://baxtel.com/data-center/convergent-technology-park","uconf":"High","uquote":"Convergent is unable to tap into the 500-kilovolt line that runs through the southern portion of the site, and must run underground lines to an off-site substation in Remington to connect to the grid.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Convergent VA","ay":2019,"oy":2027,"contro":"Community opposition due to proximity to town and potential for worsening flooding.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/convergent-technology-park"]},{"id":"995069606076","cid":"995069606076","canon":1,"dups":1,"ftype":"data_center","name":"Copper Ridge","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Proposed","mw":600,"pc":"Grid","pconf":"High","pquote":"Dominion has proposed a $253.7 million upgrade to the transmission infrastructure in Culpeper, Orange and Fauquier Counties, primarily to serve some of the new data centers in the Culpeper Tech Zone, specifically Databank, Copper Ridge and the Culpeper Tech Campus owned by STACK Infrastructure. The upgrade includes some additional work on substations in Fauquier and Orange counties, but the bulk of the project is focused on Culpeper's data centers.","pscan":"https://www.pecva.org/region/culpeper/culpeper-quarterly-update-culpeper-puts-guardrails-on-data-centers/","uconf":"High","uquote":"Dominion has proposed a $253.7 million upgrade to the transmission infrastructure in Culpeper, Orange and Fauquier Counties, primarily to serve some of the new data centers in the Culpeper Tech Zone, specifically Databank, Copper Ridge and the Culpeper Tech Campus owned by STACK Infrastructure.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Copper Ridge Culpeper","ay":2023,"oy":2029,"contro":"Significant community opposition due to visual impact on National Cemetery, noise, and strain on electrical infrastructure; local group 'Coalition to Save Culpeper' formed.","controScan":"https://www.saveculpeper.com/post/un-hallowed-ground-the-datacenter-threat-to-the-culpeper-national-cemetery","deal":"Dominion Energy proposed a $253.7 million upgrade to transmission infrastructure to serve data centers in the Culpeper Tech Zone, including Copper Ridge.","dealScan":"https://www.pecva.org/region/culpeper/culpeper-quarterly-update-culpeper-puts-guardrails-on-data-centers/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"pecva.org;saveculpeper.com","srcUrls":["https://www.pecva.org/region/culpeper/culpeper-quarterly-update-culpeper-puts-guardrails-on-data-centers/","https://www.saveculpeper.com/post/un-hallowed-ground-the-datacenter-threat-to-the-culpeper-national-cemetery"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"392efd92d04b","cid":"392efd92d04b","canon":0,"dups":1,"ftype":"data_center","name":"Coresite 12100 SV & 12098 SV","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"a48e060b0bae","cid":"a48e060b0bae","canon":1,"dups":6,"ftype":"data_center","name":"Corscale Data Centers","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":326,"pc":"Hybrid","pconf":"High","pquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion. 326 MW power capacity. Corscale plans to deploy e2Companies' R3Di® System for on-site power generation, energy storage, and distribution in…","proc":"Tariff (utility)","pcp":"Dominion Energy","uconf":"High","uquote":"Grid Operator: Dominion Energy. A Dominion Energy on-site substation will deliver power powered by Dominion.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale Data Centers","spon":"Affinius Capital","ay":2022,"contro":"General community opposition to data center development in Prince William County, where the campus is located, due to concerns about industrialization and zoning.","deal":"Funding from property investor USAA Real Estate (late 2021/early 2022); Strategic Partnership with e2Companies for on-site power generation, energy storage, and distribution (undated press release, mentioned in 2025 press release); Partnership with ZincFive for battery technology (undated press release).","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"250+ MW","srcUrls":null,"srcDom":null},{"id":"f601487dd12b","cid":"a48e060b0bae","canon":0,"dups":6,"ftype":"data_center","name":"Corscale Data Centers","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":326,"pc":"Grid","pconf":"High","pquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","pscan":"https://corscale.com/","uquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","uscan":"https://corscale.com/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale Data Centers","spon":"Patrinely Group, Affinius Capital","tenant":"Undisclosed hyperscale tenant","ay":2022,"oy":2024,"deal":"Funding from USAA Real Estate (now Affinius Capital) since 2020; First 72 MW facility fully leased to an undisclosed hyperscale tenant (July 2024)","dealScan":"https://www.datacenterknowledge.com/colocation/corscale-is-coming-to-northern-virginia-with-a-300mw-campus","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"corscale.com;datacenterknowledge.com","srcUrls":["https://corscale.com/","https://www.datacenterknowledge.com/colocation/corscale-is-coming-to-northern-virginia-with-a-300mw-campus"],"band":"250+ MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"a17c45292821","cid":"a48e060b0bae","canon":0,"dups":6,"ftype":"data_center","name":"Corscale Data Centers","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":326,"pc":"Grid","pconf":"High","pquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","pscan":"https://corscale.com/","uquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","uscan":"https://corscale.com/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale Data Centers","spon":"Patrinely and Affinius Capital","tenant":"Undisclosed hyperscale tenant","ay":2022,"oy":2024,"deal":"Building 2 fully leased to an undisclosed hyperscale tenant (expected completion mid-2025); Strategic Partnership with e2Companies for on-site power generation.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"corscale.com","srcUrls":["https://corscale.com/"],"band":"250+ MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"161b980c5da5","cid":"a48e060b0bae","canon":0,"dups":6,"ftype":"data_center","name":"Corscale Data Centers","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":326,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"A Dominion Energy on-site substation will deliver power and support densities beyond 300 watts per square foot.","pscan":"https://baxtel.com/data-center/corscale-gainesville-crossing","uconf":"High","uquote":"A Dominion Energy on-site substation will deliver power and support densities beyond 300 watts per square foot.","uscan":"https://baxtel.com/data-center/corscale-gainesville-crossing","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale Data Centers","spon":"Patrinely Group, Affinius Capital","ay":2022,"oy":2024,"deal":"Corscale Data Centers and Affinius Capital Announce Strategic Partnership with e2Companies for on-site power generation, energy storage, and distribution (undated, announced prior to June 2025).","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/corscale-gainesville-crossing"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"9a2cb2295aef","cid":"a48e060b0bae","canon":0,"dups":6,"ftype":"data_center","name":"Corscale Data Centers","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":326,"pc":"Grid","pconf":"High","pquote":"A Dominion Energy on-site substation will deliver power and support densities beyond 300 watts per SF. Redundant power architecture, including utility feeds, backup generation, and resilient distribution systems.","uconf":"High","uquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","uscan":"https://corscale.com/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale Data Centers","spon":"Affinius Capital","ay":2022,"oy":2024,"deal":"Investment partnership with Affinius Capital","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"corscale.com","srcUrls":["https://corscale.com/"],"band":"250+ MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"918cf4d38b7d","cid":"a48e060b0bae","canon":0,"dups":6,"ftype":"data_center","name":"Corscale Data Centers","city":"Gainesville","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":326,"pc":"Grid","pconf":"High","pquote":"Corscale's Northern Virginia data center campus is planned for 2.3 million square feet over five, two-story buildings and 306MW of utility power. A Dominion Energy on-site substation will deliver power and support densities beyond 300 watts per square foot.","pscan":"https://www.prweb.com/releases/corscale-announces-launch-of-300-mw-data-center-campus-in-northern-virginia-867702561.html","uquote":"A Dominion Energy on-site substation will deliver power and support densities beyond 300 watts per square foot.","uscan":"https://baxtel.com/data-center/corscale-gainesville-crossing","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale Data Centers","spon":"Patrinely Group, Affinius Capital","tenant":"Undisclosed hyperscale tenant(s)","ay":2022,"oy":2024,"deal":"Partnership between Patrinely Group and USAA Real Estate (now Affinius Capital) for campus development, announced February 2022.","dealScan":"https://www.prweb.com/releases/corscale-announces-launch-of-300-mw-data-center-campus-in-northern-virginia-867702561.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"prweb.com;baxtel.com","srcUrls":["https://www.prweb.com/releases/corscale-announces-launch-of-300-mw-data-center-campus-in-northern-virginia-867702561.html","https://baxtel.com/data-center/corscale-gainesville-crossing"],"band":"250+ MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"c1524ff12387","cid":"c1524ff12387","canon":1,"dups":1,"ftype":"data_center","name":"CORSCALE VA2 BLDG 1","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":80,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/corscale-va2-bldg-1-0e74b338","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/corscale-va2-bldg-1-0e74b338","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale","spon":"Affinius Capital","ay":2022,"deal":"Strategic Partnership with e2Companies for on-site power generation, energy storage, and distribution, announced April 22, 2025.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.interconnection.fyi/data-center/project/corscale-va2-bldg-1-0e74b338"],"band":"50-100 MW"},{"id":"5dadc935964e","cid":"5dadc935964e","canon":1,"dups":1,"ftype":"data_center","name":"Cosner Tech Campus","county":"Spotsylvania County","state":"VA","lat":38.182431,"lng":-77.657226,"cprec":"shared_centroid","status":"Proposed","mw":450,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad450-cosner-tech-campus-d7aec6da","uconf":"High","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad450-cosner-tech-campus-d7aec6da","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services","ay":2023,"oy":2026,"contro":"Community opposition regarding environmental impacts (water, noise) and zoning/setback disputes.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/amazon-data-services-inc-iad450-cosner-tech-campus-d7aec6da"],"band":"250+ MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected shared_coordinate_precision_downgraded"},{"id":"33373c9dde52","cid":"33373c9dde52","canon":1,"dups":1,"ftype":"data_center","name":"Cranes Corner Data Center","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"It also would use air-cooled systems, closed-loop systems or other low-impact, non-public-water-based cooling systems; water use is often a concern with data centers that instead cool their facilities with water.","uconf":"High","uquote":"Dominion Power, one of the nation's largest producers and transporters of energy, serves most businesses.","uscan":"https://www.gostaffordva.com/infrastructure/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"GAM 403 Mountain","spon":"GAM 403 Mountain","ay":2024,"contro":"Community opposition and controversy regarding setbacks and noise, leading to stricter county regulations after the project's approval.","controScan":"https://www.fxbgadvance.com/p/from-the-editor-this-is-no-way-to","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"gostaffordva.com;fxbgadvance.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.gostaffordva.com/infrastructure/","https://www.fxbgadvance.com/p/from-the-editor-this-is-no-way-to"]},{"id":"ca803bb1b95b","cid":"ca803bb1b95b","canon":1,"dups":1,"ftype":"data_center","name":"Cross Mill Center","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"This application asks the County to rezone 22.73 acres in the Leesburg Joint Land Management Area to the Industrial Park Zoning District for up to 927,910 square feet of data center development (equal to 4+ Walmart Supercenters) and any other uses allowed in that zoning district. Because this application includes non data center uses in a high value commercial location, the best answer to this request would be a proffer to remove data centers as an allowed use in the rezoning. Share Your Concerns with the Planning Commission. It is very important that the planning commissioners hear from members of the community on these applications and even more important for the public to weigh in when they move on to the Board of Supervisors in the coming months.","uconf":"High","uquote":"Then, in 2022, PJM informed Dominion Energy that Dominion's infrastructure predictions were significantly underestimating the growing power needs of Loudoun County's data center sector.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"JK Land Holdings","spon":"JK Land Holdings","ay":2025,"contro":"The Loudoun County Board of Supervisors voted to rezone a 22-acre site near Leesburg Executive Airport, allowing industrial park development. The vote passed by a narrow margin, with County Chair Phyllis J. Randall casting the deciding vote.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"e9139e5f3d62","cid":"e9139e5f3d62","canon":1,"dups":1,"ftype":"data_center","name":"Culpeper Technology Campus","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Proposed","mw":600,"pc":"Grid","pconf":"High","pquote":"This project will divert treated wastewater effluent to Culpeper Technology Campus for evaporative cooling, reducing the power load of Culpeper Technology Campus and reducing the wastewater effluent discharge from the Water Pollution Control Facility. A 2.1-million-square-foot data campus like the Culpeper Technology Campus will likely have over 100 generators the size of train cars or tractor-trailers at full build-out, all of which must be run regularly for","pscan":"https://files.culpeperva.gov/FY25%20TOC%20Annual%20Report.pdf?t=202512111447430&t=202512111447430","uconf":"High","uquote":"Dominion has proposed a $253.7 million upgrade to the transmission infrastructure in Culpeper, Orange and Fauquier Counties, primarily to serve some of the new data centers in the Culpeper Tech Zone, specifically Databank, Copper Ridge and the Culpeper Tech Campus owned by STACK Infrastructure. The Culpeper Tech Zone 230 kV Electric Transmission Project will support data center load growth and area reliability in the Culpeper, Orange, and Fauquier County areas.","uscan":"https://www.pecva.org/region/culpeper/culpeper-quarterly-update-culpeper-puts-guardrails-on-data-centers/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"Blue Owl","tenant":"Federal agencies (potential)","ay":2023,"oy":2029,"contro":"Community opposition regarding noise, water usage, and zoning disputes.","deal":"Minimum Revenue Agreement with Town of Culpeper (Oct 2025); Dominion Energy $253.7M transmission upgrade (proposed).","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"files.culpeperva.gov;pecva.org","srcUrls":["https://files.culpeperva.gov/FY25%20TOC%20Annual%20Report.pdf?t=202512111447430&t=202512111447430","https://www.pecva.org/region/culpeper/culpeper-quarterly-update-culpeper-puts-guardrails-on-data-centers/"],"band":"250+ MW"},{"id":"bd4bf65564fa","cid":"bd4bf65564fa","canon":1,"dups":1,"ftype":"data_center","name":"CYRUSONE BROADLANDS DATA CENTER","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"High-capacity utility power sourced from regional providers.","uconf":"High","uquote":"Power costs are low with Dominion Power very accommodating to the data center sector.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2023,"contro":"Environmental review for impacts on stream channel and wetlands.","deal":"Land purchase in January 2023","dealScan":"https://theburn.com/2023/01/19/prominent-ashburn-land-parcel-to-become-a-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"theburn.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://theburn.com/2023/01/19/prominent-ashburn-land-parcel-to-become-a-data-center/"]},{"id":"ef0643f7ffb8","cid":"ef0643f7ffb8","canon":1,"dups":1,"ftype":"data_center","name":"Dahlgren West","county":"King George County","state":"VA","lat":38.27718,"lng":-77.162636,"cprec":"shared_centroid","status":"Proposed","mw":1200,"pc":"Grid","pconf":"High","pquote":"To that end, Dahlgren West has engaged with Northern Neck Electric Cooperative, Old Dominion Electric Cooperative, and Dominion Energy to evaluate the impacts of this project and are working together to address them.","uquote":"To that end, Dahlgren West has engaged with Northern Neck Electric Cooperative, Old Dominion Electric Cooperative, and Dominion Energy to evaluate the impacts of this project and are working together to address them.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Oasis Digital Properties","spon":"Oasis Digital Properties","ay":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","band":"250+ MW","srcUrls":null,"srcDom":null},{"id":"2fcf8626524a","cid":"2fcf8626524a","canon":1,"dups":1,"ftype":"data_center","name":"DARAB VENTURES SIX","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","uconf":"Low","uquote":"The importance of the coordination between electric utilities, local government, and state agencies to attract new business and support existing data center expansions can't be overstated. In Loudoun County, the approval process for data centers has been streamlined through a fast-track program, while Dominion Energy's ability to plan ahead and keep up with unprecedented development now supports 1,027 megawatts (MW) according to the CBRE 1H2019 North American Data Center report.","uscan":"https://www.vedp.org/news/dawn-data","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"vedp.org","srcUrls":["https://www.vedp.org/news/dawn-data"],"lflag":"source_quality_reclassified"},{"id":"4a1bf11e869d","cid":"4a1bf11e869d","canon":1,"dups":1,"ftype":"data_center","name":"DataBank","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"192MW critical IT power","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ad998a5e2018","cid":"ad998a5e2018","canon":0,"dups":1,"ftype":"data_center","name":"DBT DATA Cyber Integration Center","city":"Harrisonburg","county":"Harrisonburg","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Harrisonburg Electric Commission (HEC)","pdt":"up to 40 megawatts of power at 3.5 cents per kilowatt hour","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"438bcfbffd6c","cid":"438bcfbffd6c","canon":1,"dups":1,"ftype":"data_center","name":"DC-4","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":100,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone","ay":2018,"oy":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"269af8989ca3","cid":"269af8989ca3","canon":0,"dups":1,"ftype":"data_center","name":"DCT DULLES DOWNS Land Bay A","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/dulles-distribution-landbay-a-2dc369d3","uquote":"The Dominion Virginia Power and NOVEC provide electricity to Loudoun County homes and businesses. Grid Operator. Dominion Energy.","uscan":"https://www.loudoun.gov/2674/Utilities","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Prologis","spon":"Prologis","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;loudoun.gov","srcUrls":["https://www.interconnection.fyi/data-center/project/dulles-distribution-landbay-a-2dc369d3","https://www.loudoun.gov/2674/Utilities"],"lflag":"merged_duplicate"},{"id":"27ca0e734a2c","cid":"27ca0e734a2c","canon":0,"dups":1,"ftype":"data_center","name":"DCT DULLES DOWNS Land Bay B","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"c4ff26a7969e","cid":"c4ff26a7969e","canon":1,"dups":1,"ftype":"data_center","name":"Delvin Technology Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The Devlin Tech Park can hold up to 3.5 million square feet of data centers and up to three substations.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon Web Services (AWS)","ay":2022,"contro":"Community opposition, rezoning challenges, and lawsuits regarding noise, environmental impact, and procedural issues.","deal":"Land acquisition by Amazon Data Services from Stanley Martin Homes for $700 million in late 2025.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"11108f72bc94","cid":"11108f72bc94","canon":1,"dups":1,"ftype":"data_center","name":"Digital Filigree","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":40,"rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","ay":2022,"oy":2024,"deal":"Site acquisition for $28 million in 2019","dealScan":"https://baxtel.com/data-center/digital-realty-iad-56","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/digital-realty-iad-56"],"band":"25-50 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"96bad61234c4","cid":"96bad61234c4","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","mw":96,"pc":"Grid","pconf":"High","pquote":"Digital Realty's portfolio includes key markets like Northern Virginia, where the company operates advanced, AI-ready infrastructure designed to support the most demanding computational workloads. These facilities feature high-density power capabilities, sophisticated cooling systems, and robust connectivity that aligns with the requirements of modern AI applications.","pscan":"https://www.prnewswire.com/news-releases/digital-realty-advances-ai-infrastructure-innovation-supporting-nvidia-ai-factory-research-center-and-nvidia-dsx-blueprint-302602973.html","uquote":"Grid Operator: Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty, NVIDIA","tenant":"Nvidia","ay":2025,"oy":2026,"deal":"Collaboration with NVIDIA","dealScan":"https://www.prnewswire.com/news-releases/digital-realty-advances-ai-infrastructure-innovation-supporting-nvidia-ai-factory-research-center-and-nvidia-dsx-blueprint-302602973.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"prnewswire.com","srcUrls":["https://www.prnewswire.com/news-releases/digital-realty-advances-ai-infrastructure-innovation-supporting-nvidia-ai-factory-research-center-and-nvidia-dsx-blueprint-302602973.html"],"band":"50-100 MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified,merged_duplicate"},{"id":"c89dcc9e78ae","cid":"c89dcc9e78ae","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy Virginia.","pscan":"https://www.interconnection.fyi/data-center/project/digitalthird-second-manassas-llc-digital-carver-br-c11a3f0e","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/digitalthird-second-manassas-llc-digital-carver-br-c11a3f0e","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Second Manassas 2","tenant":"Bank (unnamed)","ay":2018,"oy":2024,"contro":"Yes","controScan":"https://www.potomaclocal.com/2025/05/05/city-officials-caught-off-guard-as-bank-tenant-sidesteps-millions-in-data-center-taxes/","deal":"Acquisition of Glen-Gery Brickyard site by Digital Realty Trust","dealScan":"https://cms9files.revize.com/manassasva/Communications/2025%20Press%20Releases/NR%20003%20-%20Brickyard%20Data%20Center.pdf","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;cms9files.revize.com;potomaclocal.com","srcUrls":["https://www.interconnection.fyi/data-center/project/digitalthird-second-manassas-llc-digital-carver-br-c11a3f0e","https://cms9files.revize.com/manassasva/Communications/2025%20Press%20Releases/NR%20003%20-%20Brickyard%20Data%20Center.pdf","https://www.potomaclocal.com/2025/05/05/city-officials-caught-off-guard-as-bank-tenant-sidesteps-millions-in-data-center-taxes/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected stale_future_status_year,merged_duplicate","oy_stale":1},{"id":"088a27a37086","cid":"088a27a37086","canon":1,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Concentration supports low-latency interconnection and economies of scale but magnifies regional reliance on Dominion Energy's grid. Digital Realty is developing first-of-its-kind grid-flexible power management at our newest Northern Virginia facility.","pscan":"https://www.digitalrealty.com/resources/blog/building-the-foundation-for-americas-ai-future","uquote":"Grid Operator. Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/digitalthird-second-manassas-llc-digital-carver-br-c11a3f0e","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Digital Realty","tenant":"Nvidia","ay":2025,"oy":2025,"deal":"Digital Second Manassas LLC, a subsidiary of Digital Realty, purchased the 9905 Godwin Drive site for $5.75 million in 2018.","dealScan":"https://baxtel.com/data-center/digital-realty-9905-godwin","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"digitalrealty.com;interconnection.fyi;baxtel.com","srcUrls":["https://www.digitalrealty.com/resources/blog/building-the-foundation-for-americas-ai-future","https://www.interconnection.fyi/data-center/project/digitalthird-second-manassas-llc-digital-carver-br-c11a3f0e","https://baxtel.com/data-center/digital-realty-9905-godwin"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"f95d6dbb7c4d","cid":"f95d6dbb7c4d","canon":0,"dups":1,"ftype":"data_center","name":"Digital Realty","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"CEO Andrew Power mentioned in a recent earnings call the potential for 900 megawatts of buildable capacity at Digital Dulles, with access to power expected in 2026 and beyond.","pscan":"https://www.connectcre.com/stories/data-center-giant-plans-to-expand-in-sterling/","uconf":"High","uquote":"The site is adjacent to one of the main fiber trunk runs in the county as well as a recently constructed sub-station and Dominion Virginia Power transmission lines.","uscan":"https://www.prnewswire.com/news-releases/digital-realty-acquires-1259-acres-in-loudoun-county-virginia-300179102.html","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Blackstone","ay":2024,"oy":2026,"contro":"Planned work expected to impact additional wetlands and streams.","deal":"Joint venture with Blackstone for development of at least four buildings (reported 2024). Land acquisition for Western Lands campus for $236.5 million in 2018.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"connectcre.com;prnewswire.com","srcUrls":["https://www.connectcre.com/stories/data-center-giant-plans-to-expand-in-sterling/","https://www.prnewswire.com/news-releases/digital-realty-acquires-1259-acres-in-loudoun-county-virginia-300179102.html"],"lflag":"source_quality_reclassified,merged_duplicate"},{"id":"55739d856fc8","cid":"55739d856fc8","canon":1,"dups":1,"ftype":"data_center","name":"Digital Second Manassas","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia","rto":"PJM","nerc":"SERC","op":"DIGITAL CARVER BRICKYARD","spon":"DIGITAL CARVER BRICKYARD","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected unlinked_source_text","rawUkey":"19876|VA","rawUname":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"c7c056f29644","cid":"4b3b6926eac5","canon":0,"dups":2,"ftype":"crypto_hpc","name":"DP Facilities: Mineral Gap","county":"Wise County","state":"VA","lat":36.974561,"lng":-82.62156,"cprec":"shared_centroid","status":"Proposed","mw":45,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The site connectivity features up to 45 MW of low-cost utility power, with up to 3MW from an adjacent solar farm. In 2023, Mineral Gap made history by powering up Virginia's first commercial-scale solar field on previously coal mined land—a 3.6 MW array that provides behind-the-meter electricity to the data center.","uquote":"Old Dominion Power serves about 28,000 Southwest Virginia customers in Dickenson, Lee, Russell, Scott and Wise counties. It's the Virginia arm of Kentucky Utilities","uscan":"https://cardinalnews.org/2025/08/27/wise-county-voters-asked-to-consider-new-electric-authority/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"DP Facilities","spon":"DP Facilities","ay":2015,"oy":2017,"deal":"$65 million investment announced October 27, 2015; $500,000 federal grant for solar farm","dealScan":"https://www.dpfacilities.com/in-the-news/new-data-center-expected-to-bring-40-jobs-to-wise-county/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"cardinalnews.org;dpfacilities.com","srcUrls":["https://cardinalnews.org/2025/08/27/wise-county-voters-asked-to-consider-new-electric-authority/","https://www.dpfacilities.com/in-the-news/new-data-center-expected-to-bring-40-jobs-to-wise-county/"],"lflag":"source_quality_reclassified stale_future_status_year coordinate_cluster_reclassified","oy_stale":1},{"id":"404f8d88355d","cid":"404f8d88355d","canon":1,"dups":1,"ftype":"data_center","name":"Dulles 2000 Redevelopment","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","uconf":"High","uquote":"PJM and Dominion Energy plan to bring an additional 6.3 Gw into Loudoun County by 2028 to meet Loudoun's growing power demands","uscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"BlackChamber Group","ay":2021,"deal":"Land purchase by BlackChamber Group (operating through Dulles 28 Centre Lot 2A LLC) of 11 acres in Sterling, Loudoun County, Virginia, on August 5, 2021.","dealScan":"https://baxtel.com/data-center/dulles-2000-campus","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"loudoun.gov;baxtel.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","https://baxtel.com/data-center/dulles-2000-campus"]},{"id":"c9fe6f1b457f","cid":"c9fe6f1b457f","canon":1,"dups":1,"ftype":"data_center","name":"Dulles 28 Technology Park","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/dulles-28-technology-park-39ec2918","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/dulles-28-technology-park-39ec2918","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"BlackChamber Group","spon":"BlackChamber Group","ay":2022,"contro":"The development, branded as the Dulles 28 Technology Park, was opposed by county planning officials, who argued that the proposal was in “direct conflict” with the county's development plan that was finalized in 2019.","controScan":"https://www.bisnow.com/national/news/data-center/one-controversial-loudoun-data-center-project-approved-while-another-scales-back-after-opposition-112662","deal":"On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.","dealScan":"https://baxtel.com/data-center/dulles-28-technology-park","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"interconnection.fyi;baxtel.com;bisnow.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/dulles-28-technology-park-39ec2918","https://baxtel.com/data-center/dulles-28-technology-park","https://www.bisnow.com/national/news/data-center/one-controversial-loudoun-data-center-project-approved-while-another-scales-back-after-opposition-112662"]},{"id":"c4e3e1c2ae3c","cid":"c4e3e1c2ae3c","canon":1,"dups":1,"ftype":"data_center","name":"Dulles Commerce","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"2491e0d8bffa","cid":"2491e0d8bffa","canon":1,"dups":1,"ftype":"data_center","name":"DULLES DESIGN DATA CENTER","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c7c608181371","cid":"c7c608181371","canon":1,"dups":1,"ftype":"data_center","name":"DULLES DISTRIBUTION Landbay A","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6a65bd4f9e86","cid":"6a65bd4f9e86","canon":1,"dups":1,"ftype":"data_center","name":"DULLES DISTRIBUTION Landbay B","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"722b9e3f516a","cid":"722b9e3f516a","canon":1,"dups":1,"ftype":"data_center","name":"DULLES NORTH CORPORATE PARK 8","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/dulles-north-corporate-park-8-3ca2f3cb","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/dulles-north-corporate-park-8-3ca2f3cb","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"John Collich/BF SAUL REAL ESTATE INVESTMENT","spon":"John Collich/BF SAUL REAL ESTATE INVESTMENT","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/dulles-north-corporate-park-8-3ca2f3cb"],"lflag":"source_quality_reclassified"},{"id":"547a9260cce9","cid":"547a9260cce9","canon":1,"dups":1,"ftype":"data_center","name":"DULLES SOUTH INNOVATION CENTER","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"There is no electrical capacity left on the current line running down Pageland Lane, OR Sanders Lane. AND this new line being built will barely have anything left for ONE massive data center project much less for a SECOND digital “gateway to hell” project!","uquote":"Dominion (NYSE: D) said the problem had to do “transmission constraints,” but provided few details.","uscan":"https://www.pwcva.gov/assets/2022-08/Memo%20to%20PC-%20QA%20PW%20Digital%20Gateway%20WS%2008.19.22_V3%20Final.pdf","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"LSI 360 (LSI Communications)","spon":"LSI 360 (LSI Communications)","ay":2025,"contro":"Significant community opposition regarding land use, power capacity, noise, traffic, and environmental impact. The project is described as 'beyond absurd' by a local coalition.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"pwcva.gov","lflag":"online_before_announced","srcUrls":["https://www.pwcva.gov/assets/2022-08/Memo%20to%20PC-%20QA%20PW%20Digital%20Gateway%20WS%2008.19.22_V3%20Final.pdf"]},{"id":"8df48c06c5d2","cid":"8df48c06c5d2","canon":1,"dups":1,"ftype":"data_center","name":"Dulles Trade Center West","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","spon":"10 Trade West Drive /Charles S Kuhn Manager","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"22253b131681","cid":"22253b131681","canon":1,"dups":1,"ftype":"data_center","name":"Enon Road Technologies","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/enon-road-technologies-6e3b3e6c","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/enon-road-technologies-6e3b3e6c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"ENON RD","spon":"ENON RD","ay":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/enon-road-technologies-6e3b3e6c"]},{"id":"4dd9e48501e8","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-316c0f6b"]},{"id":"cb5d168eef9d","cid":"94876fec7af3","canon":0,"dups":2,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","ay":2002,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-316c0f6b"]},{"id":"c167ebe72a19","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2002,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-316c0f6b"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"b3d3e69ba573","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"Medium","pquote":"NEW 4-STORY BUILDING CONSISTING OF 12 DATA HALLS, MECHANICAL PENTHOUSE, BACKUP GENERATORS, POWER EQUIPMENT CENTERS AND ADMINISTRATIVE FUNCTIONS.","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-b0a10bfd","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2022,"deal":"Estimated Construction Cost: $89,516,135.00","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-b0a10bfd"]},{"id":"215252da6812","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2014,"oy":2017,"deal":"Land acquisition for $34.5 million","dealScan":"https://investor.equinix.com/news-events/press-releases/detail/305/equinix-acquires-34-acres-of-land-in-ashburn-for","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"interconnection.fyi;investor.equinix.com","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-316c0f6b","https://investor.equinix.com/news-events/press-releases/detail/305/equinix-acquires-34-acres-of-land-in-ashburn-for"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"3a2b78deea1f","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","ay":2026,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"cd9d9320f5a4","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"At the same time, industry reporting says Dominion Energy's transmission upgrades remain a gating factor for delivering new megawatts in eastern Loudoun, with those upgrades expected to ease constraints around 2026, per Data Center Frontier.","uconf":"High","uquote":"At the same time, industry reporting says Dominion Energy's transmission upgrades remain a gating factor for delivering new megawatts in eastern Loudoun, with those upgrades expected to ease constraints around 2026, per Data Center Frontier.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2026,"oy":2026,"contro":"Dominion Energy's transmission upgrades remain a gating factor for delivering new megawatts in eastern Loudoun. The county's review calendar and public hearings tied to the filings are also factors to watch.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"f189b11ec31c","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Equinix is looking to bulk up its Ashburn footprint with a fresh data center building and utility upgrades right in the heart of Northern Virginia's famed Data Center Alley. [...] Dominion Energy's transmission upgrades remain a gating factor for delivering new megawatts in eastern Loudoun","uquote":"Dominion Energy's transmission upgrades remain a gating factor for delivering new megawatts in eastern Loudoun","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","ay":2026,"oy":2026,"contro":"Yes","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"fc805527b86e","cid":"fc805527b86e","canon":1,"dups":1,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/equinix-b0a10bfd","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-b0a10bfd","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2022,"oy":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-b0a10bfd"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"bff7db6742f9","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/equinix-b0a10bfd","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-b0a10bfd","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","ay":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-b0a10bfd"]},{"id":"a7d8d9c0a1b0","cid":"b3d3e69ba573","canon":0,"dups":9,"ftype":"data_center","name":"Equinix","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/equinix-ed147fe6","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/equinix-ed147fe6","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","spon":"Equinix","ay":2022,"oy":2024,"contro":"In March 2025, the board, led by Randall, ended the county's decades-old “by-right” zoning for data centers, requiring all new projects to undergo public review.","controScan":"https://www.city-journal.org/article/loudoun-county-virginia-data-centers-construction","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;city-journal.org","srcUrls":["https://www.interconnection.fyi/data-center/project/equinix-ed147fe6","https://www.city-journal.org/article/loudoun-county-virginia-data-centers-construction"],"oy_stale":1,"lflag":"stale_future_status_year"},{"id":"5d3c7e6107fb","cid":"5d3c7e6107fb","canon":1,"dups":1,"ftype":"data_center","name":"EQUINIX ASHBURN EAST","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Equinix","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"319c82807b1d","cid":"319c82807b1d","canon":1,"dups":1,"ftype":"data_center","name":"Farah-Naples Data Center","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"BROAD RUN HOLDINGS","spon":"BROAD RUN HOLDINGS","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"pscan":"https://interconnection.fyi/data-center/farah-naples-data-center-loudoun-county-va","uscan":"https://interconnection.fyi/data-center/farah-naples-data-center-loudoun-county-va","srcUrls":["https://interconnection.fyi/data-center/farah-naples-data-center-loudoun-county-va"],"srcDom":"interconnection.fyi"},{"id":"9d5c4926f4fa","cid":"9d5c4926f4fa","canon":1,"dups":1,"ftype":"data_center","name":"Firefox Dulles","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"5e5b0bed4bb5","cid":"5e5b0bed4bb5","canon":1,"dups":1,"ftype":"data_center","name":"Forest Lane Data Center","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/forest-lane-data-center-b80f7fda","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/forest-lane-data-center-b80f7fda","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Real Estate Pursuits 2 LC","spon":"Real Estate Pursuits 2 LC","ay":2025,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/forest-lane-data-center-b80f7fda"]},{"id":"bcf7bb44547d","cid":"56ee0dbe3dac","canon":0,"dups":3,"ftype":"data_center","name":"Gainesville Crossing Data Campus","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":326,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Gainesville Crossing Campus is a 130-acre master-planned campus for secure, sustainable, and scalable growth. This multi-phase project in a premier location outside of Washington DC encompasses 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion.","pscan":"https://corscale.com/","uquote":"A Dominion Energy on-site substation will deliver power and support densities beyond 300 watts per square foot.","uscan":"https://baxtel.com/data-center/corscale-gainesville-crossing","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Corscale","spon":"Affinius Capital","ay":2021,"oy":2026,"contro":"noise you hear from data centers are those chillers turning on those are the air conditioning units. and that's one of the noises that people complain about in all these data center um campuses is the noise that comes from these chillers. and it's 24/7. and the decibel level is pretty high sometimes up to 70 or 80%.","controScan":"https://www.youtube.com/watch?v=B3EEuvaQR0Q","deal":"Corscale Data Centers, a subsidiary of the Class A building developer Patrinely, made a strong entrance into the data center market with a large campus... Vertically integrated with our affiliate and investment partner, Affinius Capital, Corscale Data Centers brings together investment capital, large-scale project experience, and an exceptional team of data center professionals to deliver energy-efficient, sustainable data centers that enable our hyperscale customers to reliably innovate the digital world.","dealScan":"https://www.corgan.com/projects/corscale-gainesville-crossing-data-center-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":4,"srcDom":"corscale.com;baxtel.com;corgan.com;youtube.com","srcUrls":["https://corscale.com/","https://baxtel.com/data-center/corscale-gainesville-crossing","https://www.corgan.com/projects/corscale-gainesville-crossing-data-center-campus","https://www.youtube.com/watch?v=B3EEuvaQR0Q"],"lflag":"high_confidence_duplicate_consolidated"},{"id":"7b560147030d","cid":"7b560147030d","canon":1,"dups":1,"ftype":"data_center","name":"Gainsville East","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"511778e0b571","cid":"511778e0b571","canon":1,"dups":1,"ftype":"data_center","name":"Gainsville Tech Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"b1c8a4d977f7","cid":"b1c8a4d977f7","canon":1,"dups":1,"ftype":"data_center","name":"Gardner Property","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"9708fe098d4e","cid":"9708fe098d4e","canon":1,"dups":1,"ftype":"data_center","name":"George Washington Village Data Center","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","mw":2100,"pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Garrett Development","spon":"Garrett Development","ay":2024,"contro":"Stafford County-based developer The Garrett Companies is seeking approval from the county to build a data center campus on 1,042 acres off Ramoth Church Road in the Hartwood district. The applicant is requesting the rezoning of 20 parcels to heavy industrial, or M2, use as well as a conditional use permit to increase the permitted height of any data center building and electric transmission or substation facility to a maximum of 105 feet. In May 2025, the Board directed the Planning Commission to review regulations due to citizen concerns.","deal":"ARA, a Newmark company, is marketing the property for its owner, The Garrett Cos., a commercial real estate firm based in Stafford.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced large_project_duplicate_review unlinked_source_text","band":"250+ MW","srcUrls":null,"srcDom":null},{"id":"07a51bda0506","cid":"07a51bda0506","canon":1,"dups":1,"ftype":"data_center","name":"Gigaland Remington","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Fauquier County ordinances explicitly prohibit data centers from using water for cooling. This is simply false—and they've been informed of this repeatedly. We're not draining wells – the facility is not allowed to use water for cooling as per zoning ordinance and written proffers.","pscan":"https://www.gigaland.me/data-center-facts","uquote":"Dominion planned to phase in power for the nearby Gigaland data center project — which is now on hold — over three years, from 25 megawatts in 2026, to 50 megawatts in 2027, to 75 megawatts in 2028, according to documents.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Gigaland Data Centers","spon":"Gigaland Data Centers","ay":2023,"contro":"Gigaland has scrapped its initial plans for an 800MW data center campus in Fauquier County, Virginia, after facing local opposition. The Piedmont Environmental Council (PEC) opposes the outsized development, which we believe will overwhelm the town and open the door for more data centers and transmission lines, straining electricity and water supplies in Fauquier and contributing to unhealthy air, noise and water pollution. On June 18, 2025, the Fauquier County Planning Commission voted 4-1 in opposition to Gigaland.","controScan":"https://baxtel.com/data-center/gigaland-remington-va","deal":"the Gigaland developers offered a $15 million farmland conservation deal to revive their stalled data center proposal","dealScan":"https://datacenterwatch.substack.com/p/briefing-07042025","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"gigaland.me;datacenterwatch.substack.com;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.gigaland.me/data-center-facts","https://datacenterwatch.substack.com/p/briefing-07042025","https://baxtel.com/data-center/gigaland-remington-va"]},{"id":"2bf17cea30c4","cid":"2bf17cea30c4","canon":1,"dups":1,"ftype":"data_center","name":"GLENN DRIVE NORTH & SOUTH","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/glenn-drive-north-south-e47a9ea7","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/glenn-drive-north-south-e47a9ea7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Prologis","spon":"Prologis","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/glenn-drive-north-south-e47a9ea7"]},{"id":"7529df78975d","cid":"7529df78975d","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Bristow","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The proposed campus at 6201 Wellington Road will include four data center buildings, along with an administrative facility and an electrical substation.","pscan":"https://www.bisnow.com/national/news/data-center/google-linked-data-center-campus-gets-green-light-in-northern-virginia-123272","uconf":"Medium","uquote":"As for the denied substation, the Northern Virginia Electric Cooperative says it is evaluating next steps.","uscan":"https://www.fox5dc.com/news/prince-william-planning-commission-rejects-power-station-plan-tied-data-center-expansion","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"Google","spon":"Sharpless Enterprises","ay":2023,"contro":"Significant community opposition and denial of related proposals. The Prince William County Planning Commission voted down a 300-megawatt power substation in Bristow, which developers stated was critical to powering a new data center campus. The Prince William Board of County Supervisors also denied a controversial Bristow Campus data center application in September 2025.","controScan":"https://www.fox5dc.com/news/prince-william-planning-commission-rejects-power-station-plan-tied-data-center-expansion","deal":"Sharpless Enterprises, a Delaware-based firm, is reportedly a shell company linked with Google for this proposal.","dealScan":"https://www.bisnow.com/national/news/data-center/google-linked-data-center-campus-gets-green-light-in-northern-virginia-123272","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"bisnow.com;fox5dc.com","lflag":"online_before_announced","srcUrls":["https://www.bisnow.com/national/news/data-center/google-linked-data-center-campus-gets-green-light-in-northern-virginia-123272","https://www.fox5dc.com/news/prince-william-planning-commission-rejects-power-station-plan-tied-data-center-expansion"]},{"id":"4ba8e98960b8","cid":"4ba8e98960b8","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","proc":"Dedicated PPA","pcp":"AES Corporation","pdt":"10-year supply contract, 500 MW portfolio","rto":"PJM","nerc":"SERC","op":"Google","spon":"Google","tenant":"Google","contro":"The Leesburg Gateway data center developer has proposed an amendment to the Leesburg Town Plan that would allow for data center and warehouse development close to residential neighborhoods in the town gateway, near the eastern border of the town along Route 7. This proposed amendment would negatively impact quality of life and go against the Town Plan guidelines that call for reducing conflicts between data centers and residential neighborhoods. Update: The Jan. 27 hearing on the Leesburg Gateway data center amendment to the Town Plan has been deferred to a later date at the request of the applicant.","controScan":"https://www.pecva.org/region/loudoun/leesburg-gateway/","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"pecva.org","srcUrls":["https://www.pecva.org/region/loudoun/leesburg-gateway/"]},{"id":"13843c581862","cid":"13843c581862","canon":1,"dups":1,"ftype":"data_center","name":"Google","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Power: Designed for multiple hundreds of megawatts of IT load; Redundant 2N electrical architecture; On-site substations developed in partnership with Dominion Energy.","uconf":"High","uquote":"On-site substations developed in partnership with Dominion Energy","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Google","tenant":"Google","deal":"Google bought a 91-acre parcel for $58 million (about $640,000 per acre) and a 57-acre one for $31 million ($540,000 per acre), according to the Loudoun Times-Mirror, the local news outlet that first reported the land deal.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"7666d9e534fe","cid":"7666d9e534fe","canon":1,"dups":1,"ftype":"data_center","name":"Green Energy Center","county":"Surry County","state":"VA","lat":37.119761,"lng":-76.880172,"cprec":"distinct","status":"Proposed","mw":1000,"pc":"Hybrid","pconf":"High","pquote":"The SGEC will be a new data centre hub powered by carbon-free green energy and from small modular reactors (SMRs) on-site. GEP has secured 641 acres in Surry County on which to build the centre. The project includes a fleet of 4-6 SMRs powering 20-30 data centres, generating hydrogen fuel, and providing back-up power for Virginia's grid.","pscan":"https://world-nuclear-news.org/Articles/IP3,-GEP-team-up-for-Surry-Green-Energy-Center","proc":"Co-located generation","pcp":"IP3 Corporation and Green Energy Partners LLC (joint venture)","pdt":"1-gigawatt of data centers, powered by 4-6 SMRs (250 MWe each)","uquote":"Property and project development company GEP announced plans in April to build the USA's first integrated green energy centre adjacent to Dominion Energy's Surry nuclear power plant.","uscan":"https://world-nuclear-news.org/Articles/IP3,-GEP-team-up-for-Surry-Green-Energy-Center","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Green Energy Partners, IP3","spon":"Green Energy Partners of Virginia (GEP), IP3","ay":2023,"oy":2036,"contro":"Surry County supervisors voted 3-2 to approve rezoning of the site at a meeting on February 8.","deal":"IP3 Corporation and Green Energy Partners LLC formed a joint venture to establish the Surry Green Energy Center, LLC. The project is estimated to cost $6.45 billion.","dealScan":"https://world-nuclear-news.org/Articles/IP3,-GEP-team-up-for-Surry-Green-Energy-Center","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"world-nuclear-news.org","srcUrls":["https://world-nuclear-news.org/Articles/IP3,-GEP-team-up-for-Surry-Green-Energy-Center"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"1e1f2eb55e57","cid":"1e1f2eb55e57","canon":1,"dups":1,"ftype":"data_center","name":"Green Energy Ventures Data Center","county":"King George County","state":"VA","lat":38.27718,"lng":-77.162636,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Green Energy Ventures","spon":"Green Energy Ventures","ay":2022,"contro":"Significant opposition from residents and initial unfavorable recommendation from Planning Commission due to concerns over height, water use, noise, and cumulative impacts.","deal":"GEV proffered $3 million to the county upon first building permit, $500,000 for public safety training, and an aerial ladder truck for the fire department.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"684d39dbaaea","cid":"684d39dbaaea","canon":1,"dups":1,"ftype":"data_center","name":"Greenfield","county":"Botetourt County","state":"VA","lat":37.565482,"lng":-79.797546,"cprec":"distinct","status":"Proposed","proc":"Dedicated PPA","pcp":"Rocky Forge Wind project (Apex Clean Energy)","pdt":"full output (79.3 megawatts)","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"b3b948b74f5b","cid":"b3b948b74f5b","canon":1,"dups":1,"ftype":"data_center","name":"Greenlin Park","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":300,"pc":"Grid","pconf":"High","pquote":"Data centers are spread across Virginia, but 80% of the state's data center industry is concentrated in just three Northern Virginia localities—Loudoun, Prince William, and Fairfax—with Loudoun County alone accounting for approximately half of the state's data center industry in terms of number of sites, building square footage, and estimated energy usage.... the vast majority of those facilities served by Dominion Energy.","pscan":"https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","uquote":"Dominion Energy, the regional utility provider, is at the center of this growing energy demand.","uscan":"https://broadbandbreakfast.com/dateline-ashburn-data-centers-drive-new-energy-disputes-in-northern-virginia/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"JK Land Holdings","spon":"JK Land Holdings","ay":2025,"contro":"Yes","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"amperon.co;broadbandbreakfast.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified","srcUrls":["https://www.amperon.co/blog/why-virginia-data-centers-matter-to-all-of-pjm","https://broadbandbreakfast.com/dateline-ashburn-data-centers-drive-new-energy-disputes-in-northern-virginia/"],"band":"250+ MW"},{"id":"9041f62362e5","cid":"9041f62362e5","canon":0,"dups":1,"ftype":"data_center","name":"GWV","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","mw":2100,"pc":"Grid","pconf":"Medium","pquote":"Low electricity costs – approximately 5.9 cents/kwh, with incentive riders available for major data center users; Redundant power feeds and fiber connectivity throughout region;","pscan":"https://www.gostaffordva.com/data-centers/","uconf":"High","uquote":"Grid Operator. Dominion Energy. Permit Status. Proposed. County. Stafford County. State. Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/george-washington-village-data-center-761ac821","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"The Garrett Companies","spon":"The Garrett Companies","ay":2024,"contro":"Yes","controScan":"https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"gostaffordva.com;interconnection.fyi;fxbgadvance.com","lflag":"online_before_announced large_project_duplicate_review,merged_duplicate","srcUrls":["https://www.gostaffordva.com/data-centers/","https://www.interconnection.fyi/data-center/project/george-washington-village-data-center-761ac821","https://www.fxbgadvance.com/p/stafford-planning-commission-to-hold"],"band":"250+ MW"},{"id":"045845932f2a","cid":"045845932f2a","canon":1,"dups":1,"ftype":"data_center","name":"Heartland Innovative Technology (HIT) Park","county":"Prince Edward County","state":"VA","lat":37.224881,"lng":-78.432957,"cprec":"distinct","status":"Proposed","mw":300,"pc":"Grid","pconf":"High","pquote":"Electrical: Dominion Energy 230kV & 115kV Transmission On-Site with Large Scale Capacity.... AVAIO Digital has already completed preliminary site engineering and is in process with Dominion for 300 MW of power.","uconf":"High","uquote":"Electrical: Dominion Energy 230kV & 115kV Transmission On-Site with Large Scale Capacity.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"AVAIO Digital","spon":"AVAIO Digital","ay":2025,"contro":"Delay due to electricity supply","controScan":"https://farmvilleherald.com/2026/04/contract-for-data-center-extended/","deal":"Land purchase for $12.2 million on January 27, 2025","dealScan":"https://farmvilleherald.com/2026/04/contract-for-data-center-extended/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"farmvilleherald.com","lflag":"online_before_announced citation_artifact_removed source_quality_reclassified","srcUrls":["https://farmvilleherald.com/2026/04/contract-for-data-center-extended/"],"band":"250+ MW"},{"id":"7d72419db299","cid":"7d72419db299","canon":1,"dups":1,"ftype":"data_center","name":"Hillcrest Data Center","county":"Mecklenburg County","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Proposed","mw":336,"pc":"Grid","pconf":"High","pquote":"Plans call for the construction of a data center facility. Three data center buildings, a substation, road, utilities, and storm water management facilities. So a lot is going in this project.","uquote":"Roanoke River Regional Business Park is located between La Crosse and Brodnax off U.S. 58. The business park was qualified by Dominion Power for data center projects.","uscan":"https://mbc-va.com/news/microsoft-snaps-up-land-at-three-industrial-parks/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2020,"oy":2026,"contro":"The original test fit design for the Hillcrest project included eight data center buildings totaling 336MW of total capacity... but would have resulted in 'impacts to nearly every wetland and stream feature' located on the site. The plan was reduced to three planned buildings with reduced total power capacity.","controScan":"https://baxtel.com/data-center/microsoft-hillcrest-campus-avc01","deal":"Microsoft Corporation has purchased all or most of the land in three industrial parks located in Mecklenburg County — Hillcrest Industrial Park in South Hill, Roanoke River Regional Business Park located between La Crosse and Brodnax, and Lakeside Commerce Park near Clarksville. All three land transfers occurred in the past week. (December 23 2020)","dealScan":"https://mbc-va.com/news/microsoft-snaps-up-land-at-three-industrial-parks/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"mbc-va.com;baxtel.com","srcUrls":["https://mbc-va.com/news/microsoft-snaps-up-land-at-three-industrial-parks/","https://baxtel.com/data-center/microsoft-hillcrest-campus-avc01"],"band":"250+ MW"},{"id":"951723056361","cid":"951723056361","canon":1,"dups":1,"ftype":"data_center","name":"HORSESHOE DRIVE","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"69908de5ab8b","cid":"69908de5ab8b","canon":1,"dups":1,"ftype":"data_center","name":"Hunter Property","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Plans for an electric substation that would have sustained the Hunter Property data center campus in Bristow were derailed March 11 when the Prince William County Planning Commission denied the public facilities review for the project. The Northern Virginia Electric Cooperative, or NOVEC, was the applicant behind the facility – known as the \"Diamond Hill substation.\"","pscan":"https://www.pecva.org/our-work/energy-matters/data-centers-energy-demand/data-center-news/?_page=9","uquote":"The Northern Virginia Electric Cooperative, or NOVEC, was the applicant behind the facility – known as the \"Diamond Hill substation.\"","uscan":"https://www.pecva.org/our-work/energy-matters/data-centers-energy-demand/data-center-news/?_page=9","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","ay":2020,"contro":"Yes, significant community opposition regarding noise and buffers, leading to protests and a NASA scientist conducting a noise study. The Prince William County Planning Commission denied a proposed substation for the project.","controScan":"https://www.wusa9.com/article/tech/prince-william-county-data-centers-vote/65-1976ec9e-0f24-4c6c-b627-34cd3f959ad9","deal":"Rezoning #REZ2020-00022, Comprehensive Plan Amendment #CPA2020-00011, Zoning Text Amendment #DPA2021-00014, and the denied Diamond Hill substation by NOVEC.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"pecva.org;wusa9.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.pecva.org/our-work/energy-matters/data-centers-energy-demand/data-center-news/?_page=9","https://www.wusa9.com/article/tech/prince-william-county-data-centers-vote/65-1976ec9e-0f24-4c6c-b627-34cd3f959ad9"]},{"id":"6f6e2e51e390","cid":"6f6e2e51e390","canon":1,"dups":1,"ftype":"data_center","name":"Hunter's Ridge","county":"Spotsylvania County","state":"VA","lat":38.182431,"lng":-77.657226,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Spotsylvania was the first locality in Virginia to require data centers to build infrastructure and utilize “re-use water,” which is treated, non-potable water, to cool the equipment in data centers.","uquote":"That meeting will be a joint session with the planning commission, along with representatives from Amazon Web Services, Dominion Power and Rappahannock Electric Cooperative.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Hunter's Ridge","spon":"Hunter's Ridge","ay":2025,"contro":"The approval was not unanimous with some supervisors expressing concerns about impacts to wetlands and Massaponax Creek. The five residents who spoke felt the county could get more in proffers for traffic and wetlands impacts. Supervisors Jacob Lane of the Livingston District and Lori Hayes of the Lee Hill District voted against the project after Hayes made a motion that failed, 4-3, to defer any decision until the Sept. 23 meeting.","deal":"The Hunter's Ridge applicant has agreed to numerous proffers. Among those proffers are upgrades to Cosner Drive, extending and widening a portion of the road to four lanes. Those improvements will trigger a proffer by Amazon, as part of the Cosner Tech Campus project, to further extend Cosner Drive, as a two-lane road, to Massaponax Church Road.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"9f74062bde4d","cid":"9f74062bde4d","canon":1,"dups":1,"ftype":"data_center","name":"I-66 and Route 29 Technology Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":300,"pc":"Grid","pconf":"High","pquote":"If/when 300 MW exceeded “[Dominion] would offset the load with new transmission facilities to be located at or near Heathcote Substation, interconnected with the existing, nearby transmission infrastructure, east of that station.”","uquote":"If/when 300 MW exceeded “[Dominion] would offset the load with new transmission facilities to be located at or near Heathcote Substation, interconnected with the existing, nearby transmission infrastructure, east of that station.”","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"NTT","spon":"Southview 66, & Gainesville JM LC","ay":2020,"contro":"Yes","deal":"Rezoning and Proffer Amendment approval with financial commitments for water quality monitoring.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"250+ MW","srcUrls":null,"srcDom":null},{"id":"3be5bc81156e","cid":"3be5bc81156e","canon":1,"dups":1,"ftype":"data_center","name":"INNOVATION EXECUTIVE CENTER DC-3","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"QTS","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"ae17e060d0df","cid":"ae17e060d0df","canon":1,"dups":1,"ftype":"data_center","name":"Innovation On The Parkway PRA","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"University Blvd","spon":"University Blvd","ay":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced","srcUrls":null,"srcDom":null},{"id":"46c9179acff5","cid":"46c9179acff5","canon":0,"dups":4,"ftype":"data_center","name":"Iron Mountain","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":150,"pc":"Grid","pconf":"High","pquote":"Iron Mountain's acquisition of a 40-acre development site in Manassas, VA enables two planned new data center buildings at its further expanded Manassas campus, offering an estimated 150 MW of additional capacity. This acquisition includes the planned development of an electricity substation to ensure continued uninterrupted power supply across the Manassas campus.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/iron-mountain-building-7-b9af00e8","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Iron Mountain Data Center","spon":"Iron Mountain","ay":2024,"contro":"The project as proposed would impact 0.19 acre of palustrine forested wetlands (PFO) and 280 linear feet of stream channel.... The applicant has proposed to mitigate for these impacts with the purchase of 0.38 wetland credits and 286 stream credits from the Whitewood Farm Mitigation Bank, LLC.","deal":"Iron Mountain has acquired a 40-acre data center-zoned property in Manassas, Prince William County, Virginia, for $113.5 million from PRP Real Estate Investment Management.","dealScan":"https://baxtel.com/data-center/iron-mountain-manassas-point","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"interconnection.fyi;baxtel.com;battlefields.org","lflag":"online_before_announced citation_artifact_removed duplicate_cluster_canonical high_confidence_duplicate_consolidated source_url_canonicalized,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/iron-mountain-building-7-b9af00e8","https://baxtel.com/data-center/iron-mountain-manassas-point","https://www.battlefields.org/news/american-battlefield-trust-urges-virginia-supreme-court-reject-manassas-data-center-developer"],"band":"100-250 MW","controScan":"https://www.battlefields.org/news/american-battlefield-trust-urges-virginia-supreme-court-reject-manassas-data-center-developer"},{"id":"0496b948cfdc","cid":"46c9179acff5","canon":0,"dups":4,"ftype":"data_center","name":"Iron Mountain","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":150,"pc":"Grid","pconf":"Medium","pquote":"Our facilities are matched by 100% renewable energy, and our customers can take credit for the green energy that Iron Mountain buys on their own sustainability reporting with Green Power Pass.","uquote":"PRP also worked closely with NOVEC and Dominion Power to secure an expedited power and equipment delivery schedule to achieve its aggressive development timeline.","uscan":"https://prpra.com/prp-sells-manassas-data-center-development/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Iron Mountain","spon":"Iron Mountain","ay":2024,"contro":"Yes","controScan":"https://www.battlefields.org/news/american-battlefield-trust-urges-virginia-supreme-court-reject-manassas-data-center-developer","deal":"Acquisition of 40-acre site from PRP Real Estate Investment Management for $113.5 million.","dealScan":"https://prpra.com/prp-sells-manassas-data-center-development/","tier":5,"tlbl":"Advocacy","srcCt":2,"srcDom":"prpra.com;battlefields.org","lflag":"online_before_announced high_confidence_duplicate_consolidated","srcUrls":["https://prpra.com/prp-sells-manassas-data-center-development/","https://www.battlefields.org/news/american-battlefield-trust-urges-virginia-supreme-court-reject-manassas-data-center-developer"],"band":"100-250 MW"},{"id":"90083c53ad76","cid":"46c9179acff5","canon":0,"dups":4,"ftype":"data_center","name":"Iron Mountain","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":150,"pc":"Grid","pconf":"High","pquote":"Iron Mountain data centers are powered by 100% renewable energy, utilizing techniques such as natural cooling and water recycling within its portfolio to minimize energy consumption.","uquote":"PRP also worked closely with NOVEC and Dominion Power to secure an expedited power and equipment delivery schedule to achieve its aggressive development timeline.","uscan":"https://prpra.com/prp-sells-manassas-data-center-development/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Iron Mountain","spon":"Iron Mountain","ay":2024,"deal":"Acquisition of a 40-acre development site in Manassas, VA, from PRP Real Estate Investment Management for $113.5 million.","dealScan":"https://prpra.com/prp-sells-manassas-data-center-development/","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"prpra.com","lflag":"online_before_announced source_quality_reclassified high_confidence_duplicate_consolidated","srcUrls":["https://prpra.com/prp-sells-manassas-data-center-development/"],"band":"100-250 MW"},{"id":"1079fa31b5a9","cid":"1079fa31b5a9","canon":0,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":28,"pc":"Grid","pconf":"High","pquote":"Scheduled for completion in Q4 2026, it will offer 66,850 ft2 of customer space and 28 MW of green power in the heart of the world's largest data center ecosystem. Our Manassas campus offers tax and power savings compared to Ashburn and exceptional levels of energy efficiency as well as a diverse and accessible ecosystem of cloud, network and other service providers.","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Iron Mountain Data Centers","spon":"Iron Mountain Incorporated","ay":2025,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"519ed05379e5","cid":"46c9179acff5","canon":0,"dups":4,"ftype":"data_center","name":"Iron Mountain","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":150,"pc":"Grid","pconf":"High","pquote":"Iron Mountain plans to build two data center buildings and a new electricity substation on the site. PRP had assembled the Manassas Point site from three parcels between 2022 and 2023, and rezoned it for up to 1.1 million square feet (102,195 square meters) of data centers across three buildings, including a 300MW substation.","uconf":"High","uquote":"PRP also worked closely with NOVEC and Dominion Power to secure an expedited power and equipment delivery schedule to achieve its aggressive development timeline.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Iron Mountain","spon":"Iron Mountain","ay":2024,"oy":2026,"contro":"Yes","deal":"PRP, a real estate investment management company headquartered in Washington, D.C., announced today that it has sold its Northern Virginia data center property located in Prince William County, VA, to Iron Mountain Inc. (NYSE: IRM). The total consideration for the transaction was $113.5 million, or $2,837,500 per acre. The 40-acre site of heavy industrial-zoned land, known as Manassas Point, was assembled by PRP in 2022–2023.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text high_confidence_duplicate_consolidated","srcUrls":null,"srcDom":null},{"id":"2791bbe31da2","cid":"2791bbe31da2","canon":0,"dups":1,"ftype":"data_center","name":"Iron Mountain","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"NOVEC and Dominion Power","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"5da7ea4cb8ad","cid":"5da7ea4cb8ad","canon":1,"dups":1,"ftype":"data_center","name":"Iron Mountain Building 7","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":36,"pc":"Grid","pconf":"High","pquote":"100% Renewable Power","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"IRON MOUNTAIN DATA CENTERS VA 7","spon":"Iron Mountain","oy":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"25-50 MW","lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"2724e623abb8","cid":"2724e623abb8","canon":1,"dups":1,"ftype":"data_center","name":"IRON MOUNTAIN DATA CENTERS LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"14-year power contracts","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"9c5e72b802d2","cid":"9c5e72b802d2","canon":1,"dups":1,"ftype":"data_center","name":"Ironhorse East Ashland","county":"Hanover County","state":"VA","lat":37.760215,"lng":-77.491317,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Wells said he added the site has good access to transmission lines, water and sewer for a data center project.","uconf":"High","uquote":"Dominion Energy Transmission Line.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"WestDulles Properties","spon":"WestDulles Properties","ay":2024,"contro":"Hanover County is facing an unprecedented wave of proposed data center development that threatens the character, health, and stability of our communities. Multiple large-scale data center projects, which include the Mountain Road Technology Park, and proposed sites near Route 54 in Ashland (Iron Horse Industrial Park) and Old Ridge Road.","controScan":"https://www.hanoverdatacenters.com/","deal":"Reston-based WestDulles Properties last week earned Ashland Town Council approval for the zoning request for the project that would stretch across both localities. While that approval cleared the way for the development on the Ashland side of the line, the Hanover Planning Commission opted to defer its decision on the project until its November meeting.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"hanoverdatacenters.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://www.hanoverdatacenters.com/"]},{"id":"239cc495d52c","cid":"239cc495d52c","canon":1,"dups":1,"ftype":"data_center","name":"JK TECHNOLOGY PARK #3","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"JK Land Holdings","spon":"JK Land Holdings","ay":2019,"contro":"Yes","deal":"Rezoning of 21.23 acres from Rural Commercial to Planned Development-Industrial Park (PD-IP) for data center use.","dealScan":"https://www.loudoun.gov/DocumentCenter/View/154093/LD-Applications-Received-September-09-01-2019","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","lflag":"online_before_announced","srcUrls":["https://www.loudoun.gov/DocumentCenter/View/154093/LD-Applications-Received-September-09-01-2019"]},{"id":"60701107377c","cid":"60701107377c","canon":1,"dups":1,"ftype":"data_center","name":"John Marshall CommonsTech Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":80,"pc":"Grid","pconf":"High","pquote":"The Applicant shall request that Dominion Energy serve the Property from the existing electrical infrastructure along John Marshall Highway. In the event that additional distribution lines are needed to serve the data center campus, the Applicant shall make commercially reasonable best efforts to compel Dominion Energy to place the additional lines, including road crossings, underground.","uquote":"The Applicant shall request that Dominion Energy serve the Property from the existing electrical infrastructure along John Marshall Highway.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CTP-1","spon":"The BlackChamber Group","ay":2021,"contro":"The Planning Commission made a failed motion to deny the application and a failed motion to approve the application.... Provision to not construct the data center facility if power infrastructure / transmission lines originate from the west.... Mathe said the data center cluster at John Marshall Highway and Catharpin, “is leading towards what is seeming to be needing new infrastructure.” “Although we don't have firm ideas from these land developers or these data center developers on firm load requirements, we are anticipating that those reliability concerns will come into play and that there could be, or will be, a need for new transmission lines,” Mathe said.","deal":"On December 15, 2021, The BlackChamber Group, through the entity CTP-II LLC, acquired 22.5 acres of land at the intersection of John Marshall Highway (Route 55) and Catharpin Road in Gainesville, Virginia. The purchase price of $16.4 million reflects the strategic value of the location, inferring a valuation of $730k per acre.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text citation_artifact_removed","band":"50-100 MW","srcUrls":null,"srcDom":null},{"id":"6bf4e422907c","cid":"6bf4e422907c","canon":1,"dups":1,"ftype":"data_center","name":"Keyser Farm","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The applicant is proposing to use the property for a Data Center Campus per Article 7.1A-2-2.5 including an area for an electrical substation and associated equipment.","uquote":"Dominion Energy is obligated to provide power to a new data center once it's approved, and the state can use eminent domain on Dominion's behalf to claim right-of-way for new transmission lines through private property.","uscan":"https://www.pecva.org/region/culpeper/new-data-center-proposals-in-brandy-station-and-near-the-town-of-culpeper/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Red Ace Capital Management","spon":"Red Ace Capital Management","ay":2024,"contro":"Yes","deal":"Rezoning approval by Culpeper County Board of Supervisors","dealScan":"https://starexponent.com/news/local/government-politics/in-split-vote-board-approves-data-center-on-keyser-farm/article_18305bc4-395e-11ef-8591-1bf42acd91d7.html","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"pecva.org;starexponent.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.pecva.org/region/culpeper/new-data-center-proposals-in-brandy-station-and-near-the-town-of-culpeper/","https://starexponent.com/news/local/government-politics/in-split-vote-board-approves-data-center-on-keyser-farm/article_18305bc4-395e-11ef-8591-1bf42acd91d7.html"]},{"id":"b1d4fb49795d","cid":"b1d4fb49795d","canon":1,"dups":1,"ftype":"data_center","name":"Lake Anna Tech Campus","county":"Louisa County","state":"VA","lat":37.972704,"lng":-77.959795,"cprec":"distinct","status":"Proposed","mw":420,"pc":"Grid","pconf":"High","pquote":"The campus is also expected to include an administration building, two smaller buildings, described in the application as “specialty data centers,” two substations capable of providing 300 MW of power each, stormwater basins, a rainwater harvesting pond and water and sewer infrastructure.","pscan":"https://lakeannalife.com/amazon-provides-details-for-lake-anna-tech-campus/","uquote":"Two utilities pads have been constructed at the rear of the property for Dominion Energy and Rappahannock Electric Cooperative that will house transformers powering the data center site.","uscan":"https://lakeannalife.com/lake-anna-data-center-site-will-mark-one-year-anniversary/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","tenant":"Amazon Web Services (AWS)","ay":2023,"oy":2025,"contro":"Community opposition to AWS data centers in Louisa County regarding noise, traffic, strain on the electrical grid, property values, and environmental impacts including wetlands and waterways. The county created a Technology Overlay District to address concerns like noise and rural character.","controScan":"https://lakeannalife.com/amazon-provides-details-for-lake-anna-tech-campus/","deal":"Amazon announced plans to invest $11 billion in two data center campuses in Louisa County, Virginia, as part of a larger $35 billion investment in Virginia by 2040.","dealScan":"https://lakeannalife.com/amazon-provides-details-for-lake-anna-tech-campus/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"lakeannalife.com","srcUrls":["https://lakeannalife.com/amazon-provides-details-for-lake-anna-tech-campus/","https://lakeannalife.com/lake-anna-data-center-site-will-mark-one-year-anniversary/"],"band":"250+ MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"1b8af13a76e8","cid":"1b8af13a76e8","canon":1,"dups":1,"ftype":"data_center","name":"Leesburg Gateway","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"290e41396d2f","cid":"290e41396d2f","canon":1,"dups":1,"ftype":"data_center","name":"Loudoun Commerce Center","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"Amazon","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c53f773ee9bc","cid":"c53f773ee9bc","canon":1,"dups":1,"ftype":"data_center","name":"LYH03 Bailey – Microsoft","county":"Mecklenburg County","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Proposed","mw":250,"pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy Virginia. The site is served by Dominion Virginia Power","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corporation-lyh03-datacenter-1d9ec38a","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2023,"oy":2025,"contro":"Environmental concerns regarding wetlands and streams, and general opposition to data center spread.","controScan":"https://www.sovanow.com/articles/data-center-debates/","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"interconnection.fyi;sovanow.com","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corporation-lyh03-datacenter-1d9ec38a","https://www.sovanow.com/articles/data-center-debates/"],"band":"250+ MW","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"42a4e5805856","cid":"42a4e5805856","canon":1,"dups":1,"ftype":"data_center","name":"Manassas Corporate Center MCC-7 PRA","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":36,"pc":"Grid","pconf":"High","pquote":"The subject property has an existing (Cloverhill) electric substation on-site.","uconf":"High","uquote":"Please find enclosed for electronic filing in the above-captioned proceeding the application for approval of electric transmission facilities on behalf of Virginia Electric and Power Company (the “Company”). This filing contains the Application, Appendix, Direct Testimony, and DEQ Supplement, including attachments. As indicated in Section II.A.12.b of the Appendix, an electronic copy of the maps of the Virginia Department of Transportation “General Highway Map” for Fairfax County and Prince... The Manassas Airport Area has been designated as part of the Data Center Opportunity Overlay District in Prince William County and has therefore been a coveted location for data center developers. The Company has received multiple DP requests for new transformers at existing substations as well as new substations to accommodate this projected load growth.","uscan":"https://www.pwcva.gov/assets/2023-04/Electric%20and%20Power%20Company.pdf","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"CloudHQ","ay":2025,"oy":2026,"contro":"Public concern was raised regarding the project's proximity to existing residences, with residents voicing concerns about noise, lighting, and buffers.","deal":"Rezoning approval (REZ2024‑00025) and Proffer Amendment (PRA) for the Manassas Corporate Center site.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"pwcva.gov","srcUrls":["https://www.pwcva.gov/assets/2023-04/Electric%20and%20Power%20Company.pdf"],"band":"25-50 MW","lflag":"citation_artifact_removed utility_alias_corrected","rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"3bb73db0f5a0","cid":"3bb73db0f5a0","canon":1,"dups":1,"ftype":"data_center","name":"Manassas Point","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":300,"pc":"Grid","pconf":"High","pquote":"The development will include three buildings and a dedicated 300MW substation, strategically located in the heart of Northern Virginia's data center market.","uquote":"PRP also worked closely with NOVEC and Dominion Power to secure an expedited power and equipment delivery schedule to achieve its aggressive development timeline.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Iron Mountain","spon":"PRP Real Estate Investment Management","ay":2024,"contro":"Challenging zoning approval process","deal":"Sale of 40-acre site for $113.5 million from PRP Real Estate Investment Management to Iron Mountain Inc.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"250+ MW","srcUrls":null,"srcDom":null},{"id":"b37edc6e2512","cid":"b37edc6e2512","canon":1,"dups":1,"ftype":"data_center","name":"Manekin Plaza","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4d237b2a7df2","cid":"4d237b2a7df2","canon":1,"dups":1,"ftype":"data_center","name":"Maple Tree Farm","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","ay":2023,"contro":"Community opposition and strict county policy regarding data center development.","controScan":"https://www.pecva.org/region/fauquier/more-data-center-news-in-warrenton/","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"pecva.org","lflag":"online_before_announced","srcUrls":["https://www.pecva.org/region/fauquier/more-data-center-news-in-warrenton/"]},{"id":"2ea73b677399","cid":"2ea73b677399","canon":1,"dups":1,"ftype":"data_center","name":"Marvell Developments","county":"Culpeper County","state":"VA","lat":38.48593,"lng":-77.956476,"cprec":"shared_centroid","status":"Proposed","mw":135,"pc":"Grid","pconf":"High","pquote":"Concurrently, the digital facilities are tripling energy demands in Dominion Energy's portion of the grid, resulting in the transformation of large swaths of land not only for the construction of data centers, but also for the massive infrastructure overhaul that is required to supply them with enough power and water to operate.","uquote":"Concurrently, the digital facilities are tripling energy demands in Dominion Energy's portion of the grid, resulting in the transformation of large swaths of land not only for the construction of data centers, but also for the massive infrastructure overhaul that is required to supply them with enough power and water to operate.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","spon":"Amazon","ay":2021,"contro":"The Marvell data center was part of the broader data center development in Culpeper County that faced significant public opposition and led to changes in zoning regulations.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","band":"100-250 MW","srcUrls":null,"srcDom":null},{"id":"1fd97a96045e","cid":"1fd97a96045e","canon":0,"dups":1,"ftype":"data_center","name":"Mattameade Tech Campus","county":"Caroline County","state":"VA","lat":38.028033,"lng":-77.353736,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"7058ccfb51dd","cid":"7058ccfb51dd","canon":1,"dups":1,"ftype":"data_center","name":"Mattameade Tech Campus","county":"Spotsylvania County","state":"VA","lat":38.182431,"lng":-77.657226,"cprec":"shared_centroid","status":"Proposed","mw":770,"pc":"Grid","pconf":"High","pquote":"The campus will include access roads, parking lots, dock areas, stormwater management facilities, and three substation pads to connect the campus to the electrical grid.","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services","ay":2023,"oy":2027,"contro":"Environmental impact on wetlands and streams, requiring mitigation.","deal":"Performance agreements with Amazon Data Services and an Economic Growth Sharing Agreement between Spotsylvania and Caroline counties.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3a3261383871","cid":"3a3261383871","canon":1,"dups":1,"ftype":"data_center","name":"MCC5","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":60,"rto":"PJM","nerc":"SERC","op":"CloudHQ","spon":"UNICORN INTERESTS","ay":2024,"contro":"A wave of proposed data center projects could bring major development to Prince William County, but is also sparking growing concern among nearby residents about noise, traffic and quality of life.","controScan":"https://www.youtube.com/watch?v=nMWvKI7attY","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"online_before_announced","srcUrls":["https://www.youtube.com/watch?v=nMWvKI7attY"],"band":"50-100 MW"},{"id":"93b809421434","cid":"93b809421434","canon":1,"dups":1,"ftype":"data_center","name":"ME-DC Pacific","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":60,"pc":"Grid","pconf":"High","pquote":"Dual-feed power delivery from Dominion Energy","uquote":"Dual-feed power delivery from Dominion Energy. In addition to touting a productive partnership with Dominion Energy","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"PowerHouse Data Centers","spon":"American Real Estate Partners","ay":2023,"oy":2027,"deal":"Acquisition of 43 acres of former AOL campus from Oath for $136 million.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1fa1279e7a7f","cid":"1fa1279e7a7f","canon":1,"dups":1,"ftype":"data_center","name":"MECP 1 ASHBURN 2 LLC","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/mecp-1-ashburn-2-llc-c743708c","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"EdgeCore Digital/Partners Group","spon":"EdgeCore Digital/Partners Group","ay":2025,"oy":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/mecp-1-ashburn-2-llc-c743708c"]},{"id":"33680c2ff544","cid":"33680c2ff544","canon":1,"dups":1,"ftype":"data_center","name":"MERCURE BUSINESS PARK LOT 22","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Data center facilities are already placing a significant strain on the local power grid. We are already experiencing increased power bills due to data center power demand-related infrastructure build-out. New high-voltage transmission lines through our towns and neighborhoods are required to bring the power to these data center facilities.","uquote":"AI will drive up energy demands for our existing data centers far in excess of Dominion Energy's and NOVEC's (Northern Virginia Electric Cooperative) capacity to meet that demand.","uscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"loudoun.gov","srcUrls":["https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979"]},{"id":"f00390976c6d","cid":"f00390976c6d","canon":1,"dups":1,"ftype":"data_center","name":"MERCURE BUSINESS PARK LOT 4A1B","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6ec9a398b0b7","cid":"6ec9a398b0b7","canon":1,"dups":1,"ftype":"data_center","name":"MERCURE BUSINESS PARK LOTS 19 AND 20","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/mercure-business-park-lots-19-and-20-89f5da63","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/mercure-business-park-lots-19-and-20-89f5da63","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Chuck Kuhn","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/mercure-business-park-lots-19-and-20-89f5da63"]},{"id":"52d1e7cb6911","cid":"52d1e7cb6911","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Microsoft has already invested in power purchase agreements (PPA) to support the Loudoun County datacenter and will procure 100% renewable energy coverage globally by 2025.","uconf":"High","uquote":"Grid Operator: Dominion Energy Virginia.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-corp-leesburg-data-center-iad01-02-03-04-f5e5e54b","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","ay":2022,"contro":"Yes","controScan":"https://www.pecva.org/wp-content/uploads/Oppose-the-Data-Center-Town-Plan-Amendment-talking-points-1-12-26.pdf","deal":"Land acquisition for $93.7 million","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;pecva.org","lflag":"online_before_announced utility_alias_corrected","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-corp-leesburg-data-center-iad01-02-03-04-f5e5e54b","https://www.pecva.org/wp-content/uploads/Oppose-the-Data-Center-Town-Plan-Amendment-talking-points-1-12-26.pdf"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"b0a8dc9a39de","cid":"b0a8dc9a39de","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Manassas","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","pc":"Hybrid","pconf":"High","pquote":"We've committed to achieving 100% renewable energy coverage globally by 2025. In this region, we will fulfill that commitment through power purchase agreements with AES, Constellation, Pleinmont, Virginia Electric, and Volt. Microsoft said it will pay utility rates high enough to cover its power costs and work with local utilities to expand supply when needed for its data centers.","proc":"Tariff (utility)","pcp":"NOVEC (Northern Virginia Electric Cooperative)","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-740e6737","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2024,"contro":"The Microsoft data center at Balls Ford Road is located just west of the Manassas National Battlefield Park, an area that has been subject to significant opposition and legal challenges as part of the broader 'Prince William Digital Gateway' project. The Virginia Court of Appeals has rejected the rezonings approving the world's largest data center complex alongside Manassas National Battlefield Park, upholding a lower court ruling that found Prince William County had improperly fast-tracked the votes without properly advertising the proposal or making its text available to the public. Prince William County, Virginia, has surrendered its legal fight to build a massive data center corridor near Manassas National Battlefield, potentially killing the project after spending $1.72 million on court fees. On Tuesday, the Prince William County Board of Supervisors voted not to take the PW Digital Gateway appeal to the Virginia Supreme Court.","controScan":"https://www.wusa9.com/article/tech/fight-over-massive-data-center-project-prince-william-county-ends-as-leaders-vote-no-to-bring-appeal-to-virginia-supreme-court/65-7d94e76f-6201-4ae9-96c0-f049463c0769","deal":"Microsoft Corp. (NASDAQ: MSFT) acquired 46 acres in western Prince William County for $29 million, specifically at 11314 Balls Ford Road in Manassas, according to public records.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;wusa9.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-740e6737","https://www.wusa9.com/article/tech/fight-over-massive-data-center-project-prince-william-county-ends-as-leaders-vote-no-to-bring-appeal-to-virginia-supreme-court/65-7d94e76f-6201-4ae9-96c0-f049463c0769"]},{"id":"cc8f81f424b7","cid":"cc8f81f424b7","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Bristow","county":"Prince William","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","proc":"Dedicated PPA","pcp":"AES Corporation","pdt":"15-year agreement, 576 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"30d174d3bc55","cid":"83307293aede","canon":0,"dups":3,"ftype":"data_center","name":"Microsoft","city":"Boydton","county":"Mecklenburg","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Microsoft signed a renewable energy agreement with AES to source energy from a portfolio of 576MW of contracted renewable assets, including wind, solar, and battery energy storage projects in the PJM interconnection. Additionally, we purchased 315 megawatts of energy from Pleinmont I and II, two solar projects in the Commonwealth of Virginia. All three are tied to the electric managed by PJM, the region's electric transmission authority.","pscan":"https://www.sovanow.com/articles/data-center-debates/","proc":"Dedicated PPA","pcp":"Constellation","pdt":"up to 35% of environmental attributes from nuclear power, hourly matching agreement","uquote":"The site is served by Dominion Virginia Power. Grid Operator. Dominion Energy Virginia.","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Microsoft","ay":2010,"oy":2013,"contro":"Environmental groups have targeted the spread of data centers in Mecklenburg County, with the Sierra Club Virginia Chapter hosting a public forum to discuss their impact. In 2017, an attempted sabotage involving crossed wiring was thwarted at one of the newest buildings under construction at the Microsoft data center in Boydton.","controScan":"https://www.sovanow.com/articles/sabotage_attempt_thwarted_at_microsoft_data_center/","deal":"Virginia Governor Bob McDonnell approved a $2.1 million grant from the Governor's Opportunity Fund to assist Mecklenburg County with the project, and the Virginia Tobacco Indemnification and Community Revitalization Commission approved $4.8 million in funds. In 2019, Governor Northam approved a $1.5 million grant from the Commonwealth's Opportunity Fund to assist Mecklenburg County with the project, and the company is eligible for Data Center Sales and Use tax exemptions.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"sovanow.com","srcUrls":["https://www.sovanow.com/articles/data-center-debates/","https://www.sovanow.com/articles/sabotage_attempt_thwarted_at_microsoft_data_center/"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"2525a0c270e0","cid":"2525a0c270e0","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft Azure","county":"Mecklenburg County","state":"VA","lat":36.687256,"lng":-78.368959,"cprec":"shared_centroid","status":"Proposed","proc":"Dedicated PPA","pcp":"AES Corporation","pdt":"15-year agreement, 576 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"7c5552db7ead","cid":"7c5552db7ead","canon":1,"dups":1,"ftype":"data_center","name":"MICROSOFT CORPORATION","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/microsoft-740e6737","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/microsoft-740e6737","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Microsoft","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/microsoft-740e6737"]},{"id":"6c6cdfc6254e","cid":"6c6cdfc6254e","canon":1,"dups":1,"ftype":"data_center","name":"Mid-Atlantic Advanced Manufacturing Center","county":"Greensville County","state":"VA","lat":36.680336,"lng":-77.560277,"cprec":"distinct","status":"Proposed","mw":300,"pc":"Hybrid","pconf":"High","pquote":"Onsite behind-the-meter natural gas generation for up to 300 MW of power currently in development; Electricity is provided by Mecklenburg Electric Cooperative (MEC).","proc":"Co-located generation","pdt":"up to 300 MW of power","uquote":"Electricity is provided by Mecklenburg Electric Cooperative (MEC). The Greensville County Water and Sewer Authority provide water services in partnership with the City of Emporia. The Greensville County Water and Sewer Authority provides sewer services to the site. Natural gas service is available through Columbia Gas of Virginia.","uscan":"https://mamacva.com/about-mamac/","ukey":"12260|VA","uname":"Mecklenburg Electric Cooperative","rto":"PJM","nerc":"SERC","op":"Oasis Digital Properties","spon":"Oasis Digital Properties","ay":2026,"deal":"Oasis Digital has forged a strategic partnership to develop a state-of-the-art data center campus at the ideally located 1,600-acre MAMaC megasite in Greensville County, VA.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"mamacva.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://mamacva.com/about-mamac/"],"band":"250+ MW"},{"id":"bedb81c33253","cid":"bedb81c33253","canon":1,"dups":1,"ftype":"data_center","name":"Mid-County Industrial Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"MINNIEVILLE CAPITAL ACQUISITION","spon":"Minnieville Capital Acquisitions","tenant":"Amazon","ay":2024,"contro":"Yes","controScan":"https://www.fox5dc.com/news/64-acre-data-center-approved-prince-william-county","deal":"Minnieville Capital Acquisitions LLC purchased approximately 39 acres for $56.6 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"fox5dc.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.fox5dc.com/news/64-acre-data-center-approved-prince-william-county"]},{"id":"2bf432bad114","cid":"2bf432bad114","canon":1,"dups":1,"ftype":"data_center","name":"NEON AT CELEBRATE VIRGINIA SOUTH","city":"Fredericksburg","county":"Fredericksburg","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"We also understand that any power requirements for data center uses at Celebrate Virginia South will be properly analyzed and reviewed by Dominion Energy in accordance with applicable Virginia law.... Further and most recently, the City's Economic Development Authority (“EDA”) has procured with Dominion Energy a study to determine the feasibility of extending transmission facilities to Celebrate Virginia South for purposes of supporting a large scale data center development.","pscan":"https://www.fredericksburgva.gov/DocumentCenter/View/29166/NEON-Proffer-Amendment-Justification","uconf":"High","uquote":"We also understand that any power requirements for data center uses at Celebrate Virginia South will be properly analyzed and reviewed by Dominion Energy in accordance with applicable Virginia law.... Further and most recently, the City's Economic Development Authority (“EDA”) has procured with Dominion Energy a study to determine the feasibility of extending transmission facilities to Celebrate Virginia South for purposes of supporting a large scale data center development.","uscan":"https://www.fredericksburgva.gov/DocumentCenter/View/29166/NEON-Proffer-Amendment-Justification","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"Silver Companies","ay":2025,"contro":"Significant public opposition regarding environmental and noise pollution, water usage, and the pace of development.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"fredericksburgva.gov","lflag":"online_before_announced","srcUrls":["https://www.fredericksburgva.gov/DocumentCenter/View/29166/NEON-Proffer-Amendment-Justification"]},{"id":"457cf09a7259","cid":"457cf09a7259","canon":1,"dups":1,"ftype":"data_center","name":"North Creek Tech Campus","county":"Louisa County","state":"VA","lat":37.972704,"lng":-77.959795,"cprec":"distinct","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Improvements to power grid are expected over the course of the project's development. The power utilities and/or AWS will be responsible for the upgrades and associated costs.","uquote":"To support the campus, AWS plans to work with Dominion Energy and Rappahannock Electric Cooperative to build seven substations on the property, which is bifurcated by a 230-kilovolt (kV) Dominion-owned transmission line.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","ay":2023,"oy":2028,"contro":"Yes","controScan":"https://www.youtube.com/shorts/UM9MDSPsnZg","deal":"Amazon plans to invest $11 billion in two data center campuses in Louisa County, part of a larger $35 billion investment in Virginia by 2040.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","srcUrls":["https://www.youtube.com/shorts/UM9MDSPsnZg"]},{"id":"13638fc0a09f","cid":"13638fc0a09f","canon":1,"dups":1,"ftype":"data_center","name":"Northwoods Property","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"New data centers with expected loads of less than 50 megawatts can frequently be connected by utilizing existing electric distribution infrastructure.","pscan":"https://www.dominionenergy.com/virginia/large-business-services/data-center-requests","uconf":"Medium","uquote":"Working with Dominion Energy Providing reliable service is Dominion Energy's core mission.","uscan":"https://www.dominionenergy.com/virginia/large-business-services/data-center-requests","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","deal":"The facility would sit on 55 acres of land.","dealScan":"https://cleanview.co/data-centers/virginia/1775/northwoods-property","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"dominionenergy.com;cleanview.co","srcUrls":["https://www.dominionenergy.com/virginia/large-business-services/data-center-requests","https://cleanview.co/data-centers/virginia/1775/northwoods-property"],"lflag":"source_quality_reclassified"},{"id":"401e7c4bba54","cid":"401e7c4bba54","canon":1,"dups":1,"ftype":"data_center","name":"NTT Global Data Centers Building 9","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"NTT Global Data Centers","spon":"NTT Global Data Centers","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"8f55a81a21c2","cid":"8f55a81a21c2","canon":0,"dups":1,"ftype":"data_center","name":"NV-9 CYRUSONE","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners (GIP)","deal":"CyrusOne acquired by KKR and Global Infrastructure Partners (GIP)","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"e74383488dd9","cid":"e74383488dd9","canon":1,"dups":1,"ftype":"data_center","name":"NVA05A & NVA05B Proffer Amendment and Rezoning","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":48,"pc":"Grid","pconf":"High","pquote":"The facility operates on 100% renewable energy and incorporates low-carbon concrete in its construction, significantly reducing its environmental impact.","uconf":"High","uquote":"Scalable Electrical Infrastructure: Directly adjacent to existing high-voltage transmission lines connected to a Novec substation, which will be expanded to support the site.","uscan":"https://www.stackinfra.com/wp-content/uploads/2022/04/NVA05_040523.pdf","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"SI NVA05B","ay":2024,"contro":"The proposed increase in gross floor area has been somewhat offset by the incorporation of landscape buffering within this proposal.","deal":"Proffer Amendment and Rezoning #REZ2024-00009","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.stackinfra.com/wp-content/uploads/2022/04/NVA05_040523.pdf"],"band":"25-50 MW"},{"id":"ebb5990a03b5","cid":"ebb5990a03b5","canon":1,"dups":1,"ftype":"data_center","name":"NVA05C","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"1faa0d415da2","cid":"1faa0d415da2","canon":1,"dups":1,"ftype":"data_center","name":"NVA15 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","rto":"PJM","nerc":"SERC","op":"STACK NVA15","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"49b82949d3d4","cid":"49b82949d3d4","canon":1,"dups":1,"ftype":"data_center","name":"NVA16 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"d1195563f1de","cid":"d1195563f1de","canon":1,"dups":1,"ftype":"data_center","name":"Oaklawn","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","spon":"Keane Enterprises","contro":"The planning commission's recommendation to nix the project comes after significant community opposition was raised during a pair of public hearings in August and September, according to LoudounNow.","deal":"plan by developer Keane Enterprises to build a 450K SF data center and 184 units of affordable housing on 165 acres in the town's Oaklawn neighborhood, LoudounNow reported.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"1ac63afe87fe","cid":"1ac63afe87fe","canon":1,"dups":1,"ftype":"data_center","name":"Old Potomac Church Data Center","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The clusters are located along major transmission lines, which will facilitate the large power needs of the campuses.","uconf":"High","uquote":"Electrical usage is an issue that has arisen in Northern Virginia, with Dominion Power seeking upgrades to handle the facilities.... The Potomac Church Tech Center applicant, Amazon, wants to build two facilities totaling approximately 510,000 square feet on 49.9 acres, zoned B-2 for urban commercial development. The property is on the east side of Old Potomac Church Road, across from the intersection with South Campus Boulevard.","uscan":"https://www.govtech.com/computing/stafford-county-va-to-hold-meeting-on-data-center-proposal","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon","tenant":"Amazon-occupied","ay":2023,"oy":2026,"contro":"Citizen concerns regarding noise and impact on surrounding communities.","deal":"Amazon plans to invest around $1 billion in the project and has agreed to fund $7 million for a county pumping station and water pipeline. Stafford officials approved a data center agreement with Amazon in December 2023. An AWS performance agreement runs until 2051.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"govtech.com","srcUrls":["https://www.govtech.com/computing/stafford-county-va-to-hold-meeting-on-data-center-proposal"],"lflag":"citation_artifact_removed"},{"id":"6ae688f2c97f","cid":"6ae688f2c97f","canon":1,"dups":1,"ftype":"data_center","name":"Oppidan","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Oppidan's approach remains focused on working closely with utilities and end users to secure reliable power resources, essential for high-demand data centers.","pscan":"https://oppidan.com/blog/datacenterleadership","uconf":"High","uquote":"Electricity is delivered via a high-voltage grid operated by Dominion, the regional utility, with a single 500 kV line capable of carrying around 2 GW.","uscan":"https://frontiermap.substack.com/p/the-demand-shift","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Oppidan Investment Company","spon":"Oppidan Investment Company","ay":2026,"tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"oppidan.com;frontiermap.substack.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://oppidan.com/blog/datacenterleadership","https://frontiermap.substack.com/p/the-demand-shift"]},{"id":"703cad03c972","cid":"703cad03c972","canon":1,"dups":1,"ftype":"data_center","name":"Orme Farm Rezoning","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","ay":2022,"contro":"Yes","controScan":"https://loudounwildlife.org/2024/12/orme-farm-rezoning-application/","deal":"Rezoning application for industrial uses, initially including data center, but later removed.","dealScan":"https://loudounwildlife.org/2024/12/orme-farm-rezoning-application/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"loudounwildlife.org","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://loudounwildlife.org/2024/12/orme-farm-rezoning-application/"]},{"id":"8207fcdf5482","cid":"8207fcdf5482","canon":1,"dups":1,"ftype":"data_center","name":"OVHcloud Data Center Expansion","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"OVHcloud","spon":"OVHcloud","ay":2023,"contro":"Fauquier County adopted a strict data center policy on December 14, 2023, which limits where data centers can be established and regulates various aspects of their development process. The policy states that Vint Hill, where the OVH Cloud center is located, is \"fully occupied by the OVH Cloud center, which just expanded its plot\".","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5fd507c782d5","cid":"5fd507c782d5","canon":1,"dups":1,"ftype":"data_center","name":"Paragon Park Lot 3B","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/paragon-park-lot-3b-6df45370","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/paragon-park-lot-3b-6df45370","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"BlackChamber Group","spon":"BlackChamber Group","ay":2021,"deal":"On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million. The land, located east of Pacific Boulevard and west of Route 28, was sold by Eugenia Investments Inc.","dealScan":"https://baxtel.com/data-center/paragon-park-lot-3b","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/paragon-park-lot-3b-6df45370","https://baxtel.com/data-center/paragon-park-lot-3b"]},{"id":"178d3f4a9d5c","cid":"178d3f4a9d5c","canon":1,"dups":1,"ftype":"data_center","name":"Parcel J at Ashburn Center","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":33,"pc":"Grid","pconf":"High","pquote":"Power is distributed to each building via dedicated underground, concrete encased duct banks. The power is provided by one of the most reliable transmission systems in the country with reduced risk of electrical interruptions and rates that are below the national average. Two dedicated substations and one of the country's most reliable transmission systems provide power to the campus, minimizing the risk of interruptions.","pscan":"https://res.cloudinary.com/hjlz68xhm/image/upload/v1555103551/yfk3a7bh8s7cdfmgdxqq.pdf","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"res.cloudinary.com","srcUrls":["https://res.cloudinary.com/hjlz68xhm/image/upload/v1555103551/yfk3a7bh8s7cdfmgdxqq.pdf"],"band":"25-50 MW","lflag":"source_quality_reclassified"},{"id":"721f79b595e6","cid":"721f79b595e6","canon":1,"dups":1,"ftype":"data_center","name":"PARKSTONE TECH PARK, LLC","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"PARKSTONE TECH PARK","ay":2021,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced","srcUrls":null,"srcDom":null},{"id":"4fde0c97c3cb","cid":"4fde0c97c3cb","canon":1,"dups":1,"ftype":"data_center","name":"PARSONS BUSINESS PARK LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","ay":2024,"contro":"The plan to build a data center campus on the property stirred interest and controversy within the community. In a recent public hearing held on February 7, 2024, the Planning Commission made a significant decision regarding the future of Parsons Business Park. The commission recommended the denial of the Proffer Amendment, signaling a setback for the proposed rezoning of 90 acres of land.","deal":"Amazon Data Services Inc. acquired a 91-acre property in Prince William County, Virginia, in April 2024. The company purchased the land, located at 14237 and 14209 Dumfries Road, from Parsons Business Park LLC for $218 million.","dealScan":"https://www.connectcre.com/stories/amazon-data-center-arm-acquires-manassas-site-for-218m/","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"connectcre.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.connectcre.com/stories/amazon-data-center-arm-acquires-manassas-site-for-218m/"]},{"id":"cdac51ecf466","cid":"cdac51ecf466","canon":1,"dups":1,"ftype":"data_center","name":"PDCREF 2 Chantilly","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"High","pquote":"The developer plans to install noise buffers and silencers on equipment and enclose the facility's 27 diesel-powered generators, aiming to reduce external noise from the HVAC system and generators from the county's limit of 60 decibels — equivalent to a normal conversation — to 50 decibels, akin to rainfall, per noiseawareness.org. The data center will be supported by a new, off-site substation. The details and final location of this off-site substation are being coordinated with Dominion Virginia Power and will be finalized at the time of site plan.","proc":"Tariff (utility)","pcp":"Dominion Virginia Power","uquote":"The data center will be supported by a new, off-site substation. The details and final location of this off-site substation are being coordinated with Dominion Virginia Power and will be finalized at the time of site plan.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"PDCREF 2 CHANTILLY","spon":"Penzance","ay":2022,"contro":"Yes","controScan":"https://www.ffxnow.com/2024/01/25/fairfax-county-greenlights-chantilly-data-center-leading-residents-to-consider-lawsuit/","deal":"Site acquisition by PDCREF 2 Chantilly LLC (an affiliate of Penzance) for $10 million in August 2022.","dealScan":"https://www.ffxnow.com/2024/01/22/fairfax-county-board-to-hold-public-hearing-on-chantilly-data-center-proposal-amid-opposition/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"ffxnow.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.ffxnow.com/2024/01/22/fairfax-county-board-to-hold-public-hearing-on-chantilly-data-center-proposal-amid-opposition/","https://www.ffxnow.com/2024/01/25/fairfax-county-greenlights-chantilly-data-center-leading-residents-to-consider-lawsuit/"]},{"id":"dc9d2675a4d1","cid":"dc9d2675a4d1","canon":0,"dups":1,"ftype":"data_center","name":"Perspecta Datacenter Campus","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"a649a2fbef12","cid":"a649a2fbef12","canon":1,"dups":1,"ftype":"data_center","name":"Plaza 500","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Starwood Capital Group is currently also pursuing a development known as the Plaza 500 data center project, which would include a potentially noisy, high-voltage electrical substation located 67 feet away from Fairfax County's Bren Mar residential neighborhood.... This area is increasingly vulnerable to air pollution and health impacts from data centers, especially from the backup diesel generators that are used when the data centers need power.","pscan":"https://chantillynews.org/19451/news/county-approves-land-sale-to-data-center-developer-raises-concerns/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/plaza-500-c0071c35","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Starwood Capital Group/Plaza 500","spon":"Starwood Capital Group","ay":2024,"contro":"Yes","controScan":"https://chantillynews.org/19451/news/county-approves-land-sale-to-data-center-developer-raises-concerns/","deal":"Fairfax County Board of Supervisors on March 17 approved a controversial sale of county land to a data center developer. The board agreed to sell 41.7 acres at 3721 Stonecroft Blvd. in Chantilly to the Starwood Capital Group for $166.8 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"chantillynews.org;interconnection.fyi","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://chantillynews.org/19451/news/county-approves-land-sale-to-data-center-developer-raises-concerns/","https://www.interconnection.fyi/data-center/project/plaza-500-c0071c35"]},{"id":"0fd7919569a5","cid":"0fd7919569a5","canon":1,"dups":1,"ftype":"data_center","name":"Potomac Technology Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"Plaza Realty Management","spon":"Plaza Realty Management","contro":"True","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4dc23f86a570","cid":"4dc23f86a570","canon":1,"dups":1,"ftype":"data_center","name":"PowerHouse95","county":"Spotsylvania County","state":"VA","lat":38.182431,"lng":-77.657226,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pdt":"800 MW total capacity, with three 300 MW substations","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"509267196d23","cid":"509267196d23","canon":1,"dups":1,"ftype":"data_center","name":"Prince William Digital Gateway","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"3 to 6 gigawatts of power (proposed capacity)","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"6cf59607a642","cid":"6cf59607a642","canon":1,"dups":1,"ftype":"data_center","name":"Progress Park Data Center","county":"Wyth County","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Appalachian Power will provide electrical service to the Progress Park data center. In fact, the Progress Park substation is proximate to the chosen site. This substation also powers other large industrial users like Gatorade, Amcor, and Somic America, all in Progress Park.","pscan":"https://www.wytheco.org/m/faq?cat=38","uquote":"Appalachian Power will provide electrical service to the Progress Park data center. In fact, the Progress Park substation is proximate to the chosen site. This substation also powers other large industrial users like Gatorade, Amcor, and Somic America, all in Progress Park. Water service is available through the Town of Wytheville, while wastewater is served by Wythe County's Fort Chiswell Wastewater Treatment plant.","uscan":"https://www.wytheco.org/m/faq?cat=38","ukey":"733|VA","uname":"Appalachian Power Co","rto":"PJM","nerc":"SERC","op":"Solis Arx","spon":"Solis Arx","ay":2025,"oy":2028,"contro":"Yes","controScan":"https://cardinalnews.org/2025/12/16/details-released-on-wythe-county-data-center-projects-water-usage-tax-revenues/","deal":"Wythe County provided ungraded property at no cost and the project is eligible for Enterprise Zone incentives.","dealScan":"https://www.wytheco.org/m/faq?cat=38","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"wytheco.org;cardinalnews.org","srcUrls":["https://www.wytheco.org/m/faq?cat=38","https://cardinalnews.org/2025/12/16/details-released-on-wythe-county-data-center-projects-water-usage-tax-revenues/"],"lflag":"source_quality_reclassified"},{"id":"84fba0b456cb","cid":"84fba0b456cb","canon":1,"dups":1,"ftype":"data_center","name":"PROJECT ASPEN","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"cc98dd6e3ac6","cid":"cc98dd6e3ac6","canon":1,"dups":1,"ftype":"data_center","name":"Project Celtic Phase 2","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"When fully built out, the campus will feature more than 1.5 million square feet of space and deliver 300 MW of power through a dedicated on‑site substation.","uconf":"High","uquote":"NOVEC has submitted a DP request for a new substation (Celtic) to serve a data center complex in Loudoun County with an ultimate expected capacity of 117 MW.","uscan":"https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20251008/20251008-item-12---dom-supplemental-projects.pdf","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"TA Realty","spon":"TA Realty","ay":2023,"deal":"$150,000,000","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"pjm.com","lflag":"online_before_announced","srcUrls":["https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2025/20251008/20251008-item-12---dom-supplemental-projects.pdf"]},{"id":"2890337ab01b","cid":"2890337ab01b","canon":1,"dups":1,"ftype":"data_center","name":"PROJECT INDUSTRY","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","spon":"INDUSTRIAL PARK COURT","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"a0af9a4e8496","cid":"a0af9a4e8496","canon":1,"dups":1,"ftype":"data_center","name":"Project Loch","county":"Chesterfield County","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"Medium","pquote":"“We have commitments from an energy standpoint to be operating on 24-7 carbon-free power, which means for every hour of the day we offset our use with carbon-free resources across the grids where we operate,” Tillman said. Google also continues to work closely with utilities, policymakers and developers across Virginia to drive solutions for increasing energy capacity and affordability. That includes a deal with Commonwealth Fusion Systems to purchase 200 megawatts of power from the first-of-its-kind commercial fusion energy plant the Massachusetts-based company is planning to build in Chesterfield.","pscan":"https://www.chesterfield.gov/m/newsflash/home/detail/6383","proc":"Dedicated PPA","pcp":"Commonwealth Fusion Systems","pdt":"200 megawatts of power","uconf":"High","uquote":"Google also continues to work closely with utilities, policymakers and developers across Virginia to drive solutions for increasing energy capacity and affordability. That includes a deal with Commonwealth Fusion Systems to purchase 200 megawatts of power from the first-of-its-kind commercial fusion energy plant the Massachusetts-based company is planning to build in Chesterfield. In a state experiencing a rise in electricity demand because of a boom in data centers, Virginia's Dominion Energy is planning to build a 944-megawatt gas-fired power plant at the site of a former coal plant in Chesterfield, just south of Richmond.","uscan":"https://news.oilandgaswatch.org/post/virginia-a-magnet-for-data-centers-is-hit-with-environmental-lawsuit-after-approving-large-new-gas-power-plant","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Google","spon":"Aeris Investments (on behalf of Google)","ay":2025,"oy":2027,"contro":"Concerns raised about wetlands, streams, possible unmarked graves, noise, water usage, and traffic impacts.","deal":"Aeris Investments LLC acquired approximately 340 acres near Westchester Commons for $29 million. County officials approved fixed tax agreements for 30 years.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"chesterfield.gov;news.oilandgaswatch.org","srcUrls":["https://www.chesterfield.gov/m/newsflash/home/detail/6383","https://news.oilandgaswatch.org/post/virginia-a-magnet-for-data-centers-is-hit-with-environmental-lawsuit-after-approving-large-new-gas-power-plant"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"39851cd56a9b","cid":"39851cd56a9b","canon":1,"dups":1,"ftype":"data_center","name":"Project Peanut","county":"Chesterfield County","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"Medium","pquote":"The project is strategically linked to a nearby 400 MW nuclear fusion power plant planned by Commonwealth Fusion Systems, from which Google will purchase half the generated electricity. This signals a forward-looking approach to sustainable energy sourcing for hyperscale infrastructure. The data center will have to rely on good old fashioned electrical generation and all of the emissions and pipelines (natural gas) from Dominion. We have commitments from an energy standpoint to be operating on 24-7 carbon-free power, which means for every hour of the day we offset our use with carbon-free resources across the grids where we operate.","proc":"Dedicated PPA","pcp":"Commonwealth Fusion Systems","pdt":"half the generated electricity from a 400-megawatts nuclear fusion power plant","uconf":"High","uquote":"In a state experiencing a rise in electricity demand because of a boom in data centers, Virginia's Dominion Energy is planning to build a 944-megawatt gas-fired power plant at the site of a former coal plant in Chesterfield, just south of Richmond. The data center will have to rely on good old fashioned electrical generation and all of the emissions and pipelines (natural gas) from Dominion.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Google","spon":"Google","tenant":"Google","ay":2025,"oy":2027,"contro":"Yes","deal":"Google's $9 billion investment in Virginia; power-purchase agreement with Commonwealth Fusion Systems","dealScan":"https://www.richmonder.org/google-announces-9-billion-investment-in-virginia-including-a-chesterfield-data-center/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"richmonder.org;wric.com","controScan":"https://www.wric.com/news/local-news/chesterfield-county/google-advancing-project-peanut/","srcUrls":["https://www.richmonder.org/google-announces-9-billion-investment-in-virginia-including-a-chesterfield-data-center/","https://www.wric.com/news/local-news/chesterfield-county/google-advancing-project-peanut/"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"7e2fab561d9a","cid":"7e2fab561d9a","canon":1,"dups":1,"ftype":"data_center","name":"Project Tropical","county":"Henrico County","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"We worked with Dominion Energy to meet our 100% clean and renewable energy goal for the Henrico Data Center. This includes supporting eight new solar energy projects in Virginia and helping to create an innovative renewable energy program that is available to other customers also pursuing their renewable energy goals.","pscan":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Henrico-Data-Center.pdf","uquote":"Prior to requesting construction plan approval the developer must furnish a letter from Dominion Virginia Power stating that this proposed development does not conflict with its facilities.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Meta","spon":"Meta","tenant":"Meta","ay":2022,"deal":"a 475-acre plot that was purchased by an entity tied to Meta, Facebook's parent company, in October for $35.3 million.... Scout Development LLC, the same entity Meta used to develop and purchase land in White Oak in 2017, was the buyer of the 475 acres at 3951 Portugee Road. County records show that the deal closed on Oct. 31, with Henrico's Economic Development Authority the seller.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"datacenters.atmeta.com","lflag":"online_before_announced citation_artifact_removed","srcUrls":["https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Henrico-Data-Center.pdf"]},{"id":"8338b13ddb1c","cid":"8338b13ddb1c","canon":1,"dups":1,"ftype":"data_center","name":"Project Well","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"WELLINGTON ROAD PROPERTY","spon":"WELLINGTON ROAD PROPERTY","ay":2025,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced","srcUrls":null,"srcDom":null},{"id":"f1dddac18a15","cid":"f1dddac18a15","canon":1,"dups":1,"ftype":"data_center","name":"PROLOGIS PARK GATEWAY II","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"Prologis","spon":"Prologis","ay":2024,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced","srcUrls":null,"srcDom":null},{"id":"88b7beab2531","cid":"9e67b608f3a0","canon":0,"dups":2,"ftype":"data_center","name":"PROLOGIS-EXCHANGE 43461 OLD OX ROAD","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"18c25ffde607","cid":"18c25ffde607","canon":1,"dups":1,"ftype":"data_center","name":"Province Group","county":"Powhatan County","state":"VA","lat":37.549404,"lng":-77.912855,"cprec":"distinct","status":"Proposed","mw":365,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Dominion Energy will energize the campus with an initial deployment of 365 MW. The site is approved for two-story buildings and over two million square feet of data centers.","pscan":"https://www.jll.com/en-us/newsroom/powhatan-county-approves-180-acre-data-center-development","uquote":"Dominion Energy will energize the campus with an initial deployment of 365 MW.","uscan":"https://www.jll.com/en-us/newsroom/powhatan-county-approves-180-acre-data-center-development","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Province Group / Newport Equities","spon":"Province Group / Newport Equities","ay":2024,"contro":"Yes","deal":"$2.7 billion - $4 billion investment","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"jll.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.jll.com/en-us/newsroom/powhatan-county-approves-180-acre-data-center-development"]},{"id":"f4b82c59cded","cid":"91043e996878","canon":0,"dups":4,"ftype":"data_center","name":"QTS","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"QTS Investment Properties Manassas","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-e908f3c7"]},{"id":"328e7afd04fa","cid":"328e7afd04fa","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","mw":1700,"pc":"Grid","pconf":"High","pquote":"The Prince William Digital Gateway — with 37 proposed data center buildings, roughly the equivalent of 144 Walmart Supercenters — would require 14 on-site electrical substations for operation.","pscan":"https://www.battlefields.org/news/american-battlefield-trust-urges-virginia-supreme-court-reject-manassas-data-center-developer","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"QTS Realty Trust, Compass Datacenters","ay":2022,"contro":"The Digital Gateway project, involving QTS, has faced significant opposition from residents and the American Battlefield Trust due to its proximity to Manassas National Battlefield Park, concerns about environmental impacts, and legal challenges regarding proper public notice for rezoning approvals.","deal":"The Digital Gateway project is a large development deal where QTS Realty Trust and Compass Datacenters are the developers, and contracts were signed with 112 landowners.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"battlefields.org;interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.battlefields.org/news/american-battlefield-trust-urges-virginia-supreme-court-reject-manassas-data-center-developer","https://www.interconnection.fyi/data-center/project/qts-e908f3c7"],"band":"250+ MW"},{"id":"414f699f8d97","cid":"414f699f8d97","canon":0,"dups":1,"ftype":"data_center","name":"QTS","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone","ay":2021,"contro":"The Prince William Digital Gateway project, involving QTS, has faced significant opposition from residents and preservationists due to its proximity to Manassas National Battlefield Park and concerns about environmental impact and public notice procedures. An appeals court has blocked the project, and QTS is currently appealing the decision to the Virginia Supreme Court.","deal":"QTS was a co-developer with Compass Datacenters on the Digital Gateway project, though Compass has since withdrawn its appeal.","dealScan":"https://patch.com/virginia/manassas/digital-gateway-developer-files-last-minute-va-supreme-court-appeal-report","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;patch.com","lflag":"online_before_announced,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-e908f3c7","https://patch.com/virginia/manassas/digital-gateway-developer-files-last-minute-va-supreme-court-appeal-report"]},{"id":"91043e996878","cid":"91043e996878","canon":0,"dups":4,"ftype":"data_center","name":"QTS","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"QTS Investment Properties Manassas","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced,merged_duplicate","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-e908f3c7"]},{"id":"a5464f15bba8","cid":"91043e996878","canon":0,"dups":4,"ftype":"data_center","name":"QTS","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-e908f3c7","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","ay":2018,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-e908f3c7"]},{"id":"82da30d2ceee","cid":"91043e996878","canon":0,"dups":4,"ftype":"data_center","name":"QTS","city":"Manassas","county":"Manassas city","state":"VA","lat":38.746808,"lng":-77.482633,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Blackstone","ay":2018,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"4e9490915938","cid":"4e9490915938","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Sandston","county":"Henrico","state":"VA","lat":37.43752,"lng":-77.300333,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"85054261a96f","cid":"85054261a96f","canon":0,"dups":1,"ftype":"data_center","name":"QTS","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Quality Technology Services","ay":2022,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"4ad14e6aa3df","cid":"4ad14e6aa3df","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/qts-ae611e69","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-ae611e69","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"Quality Technology Services","ay":2022,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-ae611e69"]},{"id":"9d7b6b85b99f","cid":"9d7b6b85b99f","canon":0,"dups":1,"ftype":"data_center","name":"QTS","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"Medium","pquote":"Grid Operator. Dominion Energy.","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS","spon":"QTS Dulles","ay":2009,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text,merged_duplicate","srcUrls":null,"srcDom":null},{"id":"9122c030faa7","cid":"9122c030faa7","canon":1,"dups":1,"ftype":"data_center","name":"QTS","city":"Dulles","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":17.5,"band":"10-25 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"157170a65ca3","cid":"7a55fe935538","canon":0,"dups":2,"ftype":"data_center","name":"QTS MANASSAS I DC6 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/qts-manassas-i-dc6-llc-5bd33e61","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/qts-manassas-i-dc6-llc-5bd33e61","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS MANASSAS I DC3","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/qts-manassas-i-dc6-llc-5bd33e61"]},{"id":"7a55fe935538","cid":"7a55fe935538","canon":1,"dups":2,"ftype":"data_center","name":"QTS MANASSAS I DC6 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","uconf":"High","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"QTS MANASSAS I DC3","ay":2020,"contro":"The Prince William County Planning Commission recommended denying the broader data center complex, and a Virginia Court of Appeals ruling upheld a lower court decision voiding the project, which QTS is appealing to the Virginia Supreme Court.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"8a58fe336141","cid":"8a58fe336141","canon":1,"dups":1,"ftype":"data_center","name":"Remington Innovation Campus","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","proc":"Co-located generation","pcp":"Remington Technology Park LP","pdt":"13 gas turbine generators, temporary until Dominion Energy delivers full electricity capacity","rto":"PJM","nerc":"SERC","ay":2025,"contro":"True","controScan":"https://www.pecva.org/region/fauquier/gigaland/","tier":5,"tlbl":"Advocacy","srcCt":1,"srcDom":"pecva.org","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://www.pecva.org/region/fauquier/gigaland/"]},{"id":"57fca9f543bc","cid":"57fca9f543bc","canon":1,"dups":1,"ftype":"data_center","name":"Remington Technology Park","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"a73a7d028274","cid":"a73a7d028274","canon":1,"dups":1,"ftype":"data_center","name":"Renaissance Technology Park","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"High","pquote":"Amazon has filed for air permits to install 72 stationary engine generators and two mobile units at the site. The initial construction phase features a three-story, 102-foot-tall data center, a 6-acre electrical substation, and support facilities including a guardhouse, a 3,000-square-foot security building, and a 2,800-square-foot water storage building.","pscan":"https://baxtel.com/data-center/amazon-iad-500","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Starwood Capital Group","tenant":"Amazon","ay":2021,"oy":2026,"deal":"Starwood acquired the property in 2019 for $134.1 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/amazon-iad-500"]},{"id":"bd73dc8e2554","cid":"bd73dc8e2554","canon":0,"dups":1,"ftype":"data_center","name":"Renaissance Technology Park","county":"Fairfax County","state":"VA","lat":38.82952,"lng":-77.273252,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"High","pquote":"Amazon has filed for air permits to install 72 stationary engine generators and two mobile units at the site. The project includes four planned data centers totaling 2.14 million sq ft. Amazon has filed for air permits to install 72 stationary engine generators and two mobile units at the site. The data center buildings would be constructed in phases, starting with a three-story data center building with a maximum height of 102 feet, a 6-acre electrical substation and a guardhouse.","uconf":"High","uquote":"Despite objections to one of the projects from nearby residents, the Fairfax County Planning Commission at its July 9 meeting approved Dominion Energy's requests for two new electrical substations to support future data centers in the Dulles area. The station will also provide the energy needed at the planned Renaissance Technology Park data centers to the east, and use excess capacity to support current homes and businesses as well as future development.","uscan":"https://www.ffxnow.com/2025/07/16/dominion-substations-approved-to-support-dulles-area-data-centers/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services / AWS","spon":"Starwood Capital Group","tenant":"Amazon","ay":2021,"oy":2026,"contro":"Community opposition due to concerns about noise, air pollution from diesel generators, environmental impacts, and the sale of county land for data center development.","deal":"Starwood Capital Group acquired the original 60-acre property in 2019 for $134.1 million. An adjacent 8-acre parcel was purchased from Word of Grace Christian Church for $25 million in 2023.","dealScan":"https://www.bisnow.com/washington-dc/news/deal-sheet/this-weeks-dc-deal-sheet-126084","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"ffxnow.com;bisnow.com","srcUrls":["https://www.ffxnow.com/2025/07/16/dominion-substations-approved-to-support-dulles-area-data-centers/","https://www.bisnow.com/washington-dc/news/deal-sheet/this-weeks-dc-deal-sheet-126084"],"lflag":"merged_duplicate"},{"id":"8cdf9d524164","cid":"8cdf9d524164","canon":1,"dups":1,"ftype":"data_center","name":"RIDGETOP CENTER","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"e52b1f368a30","cid":"e52b1f368a30","canon":1,"dups":1,"ftype":"data_center","name":"Roxbury Technology Park","county":"Charles City County","state":"VA","lat":37.361054,"lng":-77.05417,"cprec":"distinct","status":"Proposed","rto":"PJM","nerc":"SERC","op":"Diode Ventures","spon":"Black and Veatch","ay":2024,"contro":"Yes","controScan":"https://baxtel.com/data-center/diode-roxbury-technology-park","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced","srcUrls":["https://baxtel.com/data-center/diode-roxbury-technology-park"]},{"id":"ca3acf4a10ee","cid":"ca3acf4a10ee","canon":1,"dups":1,"ftype":"data_center","name":"SAMX Data Center","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","mw":225,"pc":"Grid","pconf":"High","pquote":"The site is zoned for industrial use and has access to scalable power infrastructure.... Redundant power architecture, incorporating backup generation and UPS systems for uptime assurance.","uquote":"Dominion's energy load projections and planned upgrades demonstrate that existing transmission lines and power generated from existing energy facilities are already maxed out.","uscan":"https://www.pecva.org/region/fauquier/update-on-data-center-development-and-transmission-lines-in-fauquier/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"SAMX Data","spon":"SAMX Data","ay":2023,"contro":"The County submitted comments that identify concerns about the plan's consistency with proffers offered, uncertainties around electrical service to the site and the proposed use of groundwater.... SAMX's numerous unresolved issues with their application — are clearly inconsistent with the intent of this policy.... an additional 4 million square feet, proposed by Convergent, SAMX and Gigaland, are still under consideration. These three proposals are currently under review by County staff and outside agencies. Public hearings with the Planning Commission and Board of Supervisors can be expected this year.","controScan":"https://www.pecva.org/region/fauquier/fauquier-county-2025-updates/","tier":5,"tlbl":"Advocacy","srcCt":2,"srcDom":"pecva.org","lflag":"online_before_announced","srcUrls":["https://www.pecva.org/region/fauquier/update-on-data-center-development-and-transmission-lines-in-fauquier/","https://www.pecva.org/region/fauquier/fauquier-county-2025-updates/"],"band":"100-250 MW"},{"id":"cd1d9e40ee7d","cid":"cd1d9e40ee7d","canon":1,"dups":1,"ftype":"data_center","name":"Scott County Regional Business & Technology Park","county":"Scott County","state":"VA","lat":36.712776,"lng":-82.613624,"cprec":"distinct","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"bf34c46703b0","cid":"bf34c46703b0","canon":1,"dups":1,"ftype":"data_center","name":"SDC ASHBURN I","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":54,"proc":"Tariff (utility)","pcp":"Dominion Energy","pdt":"14-year power contracts","rto":"PJM","nerc":"SERC","op":"Sabey Data Centers","spon":"Sabey and National Real Estate Advisors","ay":2025,"oy":2026,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"50-100 MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"00ee9368017a","cid":"00ee9368017a","canon":1,"dups":1,"ftype":"data_center","name":"Sharpless Enterprises LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"d27c6b649678","cid":"d27c6b649678","canon":1,"dups":1,"ftype":"data_center","name":"SHAW ROAD BUSINESS PARK","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"3d20997ae96b","cid":"3d20997ae96b","canon":1,"dups":1,"ftype":"data_center","name":"SI NVA17 LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6e6838c54c64","cid":"6e6838c54c64","canon":1,"dups":1,"ftype":"data_center","name":"Sisson North","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"The campus, located near Albion Lane on the Rappahannock River's banks, will include four substations.","pscan":"https://baxtel.com/data-center/peterson-project-sisson","uconf":"High","uquote":"Dominion Energy is proposing a 500 kowatt transmission line through several counties with towers standing 170 ft tall cutting a path as wide as I 95 virginia's energy crisis is powered by the thirst of data centers stafford has more than a dozen new data center proposals in the pipeline.","uscan":"https://www.youtube.com/watch?v=XmcIj83xCzc","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Peterson Companies","spon":"Peterson Companies","ay":2025,"contro":"Community pushback regarding data center growth and associated transmission lines; a grassroots group 'Protect Stafford' advocates for stricter development rules.","controScan":"https://www.youtube.com/watch?v=XmcIj83xCzc","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;youtube.com","lflag":"online_before_announced source_quality_reclassified","srcUrls":["https://baxtel.com/data-center/peterson-project-sisson","https://www.youtube.com/watch?v=XmcIj83xCzc"]},{"id":"5e4320a96ee8","cid":"5e4320a96ee8","canon":1,"dups":1,"ftype":"data_center","name":"Six Towers Industrial Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"a7196918b099","cid":"a7196918b099","canon":1,"dups":1,"ftype":"data_center","name":"South Point Phase II LLC","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"PJM Interconnection is the regional transmission organization (RTO) that administers many of the interconnections to Dominion Energy's system in accordance with the PJM Open Access Transmission Tariff (OATT).","uconf":"High","uquote":"Grid Operator: Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"South Point Phase II","spon":"South Point Phase II","ay":2020,"oy":2026,"contro":"Concerns from neighborhood residents in the Barretts Crossing community to the south of the project site regarding screening / buffering, building height, potential noise, power / electricity needs, and overall negative impacts to residential properties.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"ff6d38c33f9b","cid":"ff6d38c33f9b","canon":1,"dups":1,"ftype":"data_center","name":"Spring Valley Technology Park","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":1300,"pc":"Hybrid","pconf":"High","pquote":"Spring Valley has proposed to use “natural gas-powered hydrogen fuel cells that generate electricity without combustion, creating a low- or zero-emissions microgrid,” to power the site. The application also includes a special exception request for an on-site substation.","pscan":"https://loudounwildlife.org/2026/01/spring-valley-technology-park/","proc":"Co-located generation","pdt":"1,300 MW","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/spring-valley-technology-park-ef23feaf","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"SVTP Spring Valley","spon":"Active Infrastructure","ay":2024,"contro":"Significant opposition from environmental groups like Loudoun Wildlife Conservancy and Piedmont Environmental Council due to concerns about forest destruction, impervious surfaces, and the use of natural gas for hydrogen fuel cells.","controScan":"https://loudounwildlife.org/conservation-advocacy/current-campaigns/","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"loudounwildlife.org;interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://loudounwildlife.org/2026/01/spring-valley-technology-park/","https://www.interconnection.fyi/data-center/project/spring-valley-technology-park-ef23feaf","https://loudounwildlife.org/conservation-advocacy/current-campaigns/"],"band":"250+ MW"},{"id":"942208fe66aa","cid":"de751d3da328","canon":0,"dups":2,"ftype":"data_center","name":"Stack Infrastructure","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":72,"pc":"Grid","pconf":"High","pquote":"all served by committed power from Northern Virginia Electric Cooperative (NOVEC).","pscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-adds-72mw-northern-virginia-data-center-campus-in-loudoun-county/","uquote":"all served by committed power from Northern Virginia Electric Cooperative (NOVEC).","uscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-adds-72mw-northern-virginia-data-center-campus-in-loudoun-county/","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","ay":2024,"oy":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","srcUrls":["https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-adds-72mw-northern-virginia-data-center-campus-in-loudoun-county/"],"band":"50-100 MW","lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"de751d3da328","cid":"de751d3da328","canon":1,"dups":2,"ftype":"data_center","name":"Stack Infrastructure","city":"Leesburg","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":72,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"all served by committed power from Northern Virginia Electric Cooperative (NOVEC).","pscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-adds-72mw-northern-virginia-data-center-campus-in-loudoun-county/","uquote":"all served by committed power from Northern Virginia Electric Cooperative (NOVEC).","uscan":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-adds-72mw-northern-virginia-data-center-campus-in-loudoun-county/","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","ay":2024,"oy":2025,"tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"stackinfra.com","srcUrls":["https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-adds-72mw-northern-virginia-data-center-campus-in-loudoun-county/"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"4360db443623","cid":"b99fb6df4f46","canon":0,"dups":3,"ftype":"data_center","name":"STACK NVA04","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":216,"pc":"Grid","pconf":"High","pquote":"Powered by 100% renewable energy sources.","uquote":"Utility power sourced from Dominion Energy","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","ay":2022,"oy":2023,"tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"100-250 MW","lflag":"unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"82a37d7bf925","cid":"82a37d7bf925","canon":1,"dups":1,"ftype":"data_center","name":"Stafford Technology Campus","county":"Stafford County","state":"VA","lat":38.423084,"lng":-77.458048,"cprec":"shared_centroid","status":"Proposed","mw":1100,"pc":"Grid","pconf":"High","pquote":"The campus will include up to 19 data centers and six 300MW substations from Dominion Energy, with potential for up to 23 buildings.","pscan":"https://baxtel.com/data-center/stack-stafford-technology-campus-stc","uquote":"The campus will include up to 19 data centers and six 300MW substations from Dominion Energy, with potential for up to 23 buildings.","uscan":"https://baxtel.com/data-center/stack-stafford-technology-campus-stc","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"STACK Infrastructure","ay":2025,"oy":2027,"contro":"The project incorporates a re-claimed (purple pipe) water system for permanent industrial cooling, mitigating any impact on Stafford County's potable water supply. The site was selected with input from local stakeholders to ensure minimal community disruption. Adjoined by a landfill and light industrial development, it is strategically distanced from residential areas.","deal":"The site was previously owned by real estate firm Peterson Companies, which first filed to rezone the land for data center use in 2023.","dealScan":"https://usdatacenterprojects.com/virginia/stack-builds-first-building-at-1-gw-stafford-data-center-campus-in-virginia","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"baxtel.com;usdatacenterprojects.com","srcUrls":["https://baxtel.com/data-center/stack-stafford-technology-campus-stc","https://usdatacenterprojects.com/virginia/stack-builds-first-building-at-1-gw-stafford-data-center-campus-in-virginia"],"band":"250+ MW"},{"id":"5a779eff1091","cid":"5a779eff1091","canon":1,"dups":1,"ftype":"data_center","name":"Stoneview","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","spon":"8625 WELLINGTON ROAD","ay":2023,"deal":"Rezoning #REZ2023-00026, Stoneview","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"519565b2c058","cid":"519565b2c058","canon":1,"dups":1,"ftype":"data_center","name":"Summit Crossing Tech Campus","county":"Spotsylvania County","state":"VA","lat":38.182431,"lng":-77.657226,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia (via REC)","pdt":"295 megawatts (“MW”) by 2032 for the SpotsyTech Campus, with an initial load of 7 MW","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected shared_coordinate_precision_downgraded unlinked_source_text","rawUkey":"19876|VA","rawUname":"Dominion Energy Virginia (Virginia Electric & Power Co)","srcUrls":null,"srcDom":null},{"id":"6dafbe19590a","cid":"6dafbe19590a","canon":1,"dups":1,"ftype":"data_center","name":"Tech Park at Brambleton","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":300,"pc":"Grid","pconf":"High","pquote":"Redundant utility power feeds. Dedicated substation access.","pscan":"https://landlordledger.frondex.co/property/blackchamber-group-northern-virginia-data-center-expansion","uquote":"Dominion Energy is the largest supplier of electricity in the Commonwealth of Virginia and the predominant electricity provider in Loudoun County. DOMINION ENERGY POWER.","uscan":"https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"The BlackChamber Group","spon":"The BlackChamber Group","tenant":"Hyperscale Cloud Provider, Global Technology Firm","ay":2023,"oy":2026,"contro":"Community concerns regarding visual impact and traffic.","deal":"Land acquisition of 89.1 acres for $96.5 million.","tier":1,"tlbl":"Primary/Authoritative","srcCt":2,"srcDom":"landlordledger.frondex.co;loudoun.gov","srcUrls":["https://landlordledger.frondex.co/property/blackchamber-group-northern-virginia-data-center-expansion","https://www.loudoun.gov/ArchiveCenter/ViewFile/Item/13979"],"band":"250+ MW"},{"id":"5f89bcc58f22","cid":"5f89bcc58f22","canon":1,"dups":1,"ftype":"data_center","name":"TELOS DATA CENTER","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Hybrid","pconf":"High","pquote":"While Loudoun County's data centers are largely powered by the grid, all of them have dozens of backup diesel or gas turbine generators.","uconf":"High","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/telos-data-center-bf92b8dd","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"MARC SOLOMON","spon":"JK Land Holdings","ay":2023,"oy":2029,"contro":"The plan for the data center was not well-received by some on the Loudoun County Board of Supervisors, who admitted they lacked legal recourse to stop it. The broader context in Loudoun County indicates significant resident concerns and tightening regulations for data center development due to impacts on neighborhoods, noise, and environmental factors.","deal":"The proposed data center site was recently purchased for $60 million by JK Land Holdings. Finmarc Management Inc. had acquired the site in 2019 for $26.1 million.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/telos-data-center-bf92b8dd"]},{"id":"c9f966d079e9","cid":"c9f966d079e9","canon":0,"dups":1,"ftype":"data_center","name":"Telxius Cable Landing Station Virginia Beach","city":"Virginia Beach","county":"Virginia Beach","state":"VA","lat":37.5,"lng":-78.9,"cprec":"shared_centroid","status":"Proposed","mw":30,"pc":"Grid","pconf":"High","pquote":"The Virginia Beach CLS data center, operated by Telxius Cable, is a strategic hub for connectivity. It offers a robust power infrastructure with redundant feeds, ensuring uninterrupted service.","uconf":"High","uquote":"Utility Provider: Dominion Power. The site has access to over 30 MW of critical power via Dominion Energy's certified infrastructure, including two independent substations","uscan":"https://baxtel.com/data-center/telxius-cable-landing-station-virginia-beach","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Telxius Cable","spon":"Telefónica Group","tenant":"Microsoft, Facebook, Google","ay":2017,"oy":2018,"deal":"MAREA cable system (joint project with Microsoft and Facebook); BRUSA cable system (Telxius project); Dunant cable system (Google); Collaboration with Equinix for backhaul; Collaboration with NJFX for diverse subsea connectivity; Collaboration with Arelion for network expansion.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","srcUrls":["https://baxtel.com/data-center/telxius-cable-landing-station-virginia-beach"],"band":"25-50 MW","oy_stale":1,"lflag":"stale_future_status_year,merged_duplicate"},{"id":"e280260d1dcc","cid":"e280260d1dcc","canon":1,"dups":1,"ftype":"data_center","name":"Thayer Road","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"8027f06eaf26","cid":"8027f06eaf26","canon":1,"dups":1,"ftype":"data_center","name":"Tract Technology Campus","county":"Hanover County","state":"VA","lat":37.760215,"lng":-77.491317,"cprec":"shared_centroid","status":"Proposed","mw":2400,"pc":"Grid","pconf":"High","pquote":"Tract has partnered with Dominion Energy to ensure the necessary infrastructure is in place, with the initial substation and power bridging anticipated as early as 2026.","uquote":"Tract has partnered with Dominion Energy to ensure the necessary infrastructure is in place, with the initial substation and power bridging anticipated as early as 2026.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Tract","spon":"Tract","ay":2024,"oy":2028,"deal":"Tract announced the acquisition of 1,200 acres in Hanover County, VA. The project is expected to generate an estimated $1.78 billion in tax revenue for the County over 20 years.","dealScan":"https://tractcapital.com/news/tract-announces-acquisition-of-1200-acres-in-hanover-county-va/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"tractcapital.com","srcUrls":["https://tractcapital.com/news/tract-announces-acquisition-of-1200-acres-in-hanover-county-va/"],"band":"250+ MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded large_project_duplicate_review"},{"id":"c3f2075be769","cid":"c3f2075be769","canon":1,"dups":1,"ftype":"data_center","name":"Tuscarora Crossing Campus","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"be611cfc67e3","cid":"be611cfc67e3","canon":1,"dups":1,"ftype":"data_center","name":"Tuscarora Crossing Landbay 3","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"PJM 230kV Transmission Line. Large power line serviced by Dominion Power that is part of the Mid-Atlantic regional power grid.","uconf":"High","uquote":"Large power line serviced by Dominion Power that is part of the Mid-Atlantic regional power grid. Dominion Energy says the substation is essential, but community opposition remains firm.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"BlackChamber Group","spon":"BlackChamber Group","ay":2024,"contro":"Loudoun County Planning Commission denied a proposed substation critical to powering the data centers due to proximity to residential neighborhoods, leading to a zoning battle and an appeal to the Board of Supervisors.","deal":"Land acquisition of 37.6 acres for $64 million on November 19, 2021.","dealScan":"https://baxtel.com/data-center/tuscarora-crossing-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"baxtel.com","lflag":"online_before_announced","srcUrls":["https://baxtel.com/data-center/tuscarora-crossing-campus"]},{"id":"a1e3c301bab1","cid":"a1e3c301bab1","canon":1,"dups":1,"ftype":"data_center","name":"UNICORN INTERESTS LLC, PCL C1","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c793e20b1946","cid":"c793e20b1946","canon":1,"dups":1,"ftype":"data_center","name":"University Business Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"7678d8ca72f1","cid":"7678d8ca72f1","canon":1,"dups":1,"ftype":"data_center","name":"Mountain Road Technology Park","county":"Hanover County","state":"VA","lat":37.760215,"lng":-77.491317,"cprec":"shared_centroid","status":"Proposed","mw":900,"pc":"Grid","pconf":"High","pquote":"The proposed Mountain Road Technology Park, backed by Denver-based Tract, would have brought five data center buildings, up to three substations and hundreds of megawatts of electric demand to the Chickahominy River corridor in the eastern part of the Virginia county.","pscan":"https://timesnews.net/news/375156/hanover-rejects-mountain-road-data-center-after-marathon-meeting/","uquote":"The proposal was intended to be developed in phases through at least 2034, though Dominion Energy anticipated the first electrical service to be delivered in late 2029.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Tract","ay":2025,"oy":2029,"contro":"Significant community opposition regarding water usage, environmental impact, noise, and traffic led to the Hanover Board of Supervisors denying the project's rezoning application.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"timesnews.net","srcUrls":["https://timesnews.net/news/375156/hanover-rejects-mountain-road-data-center-after-marathon-meeting/"],"band":"250+ MW","lflag":"source_quality_reclassified shared_coordinate_precision_downgraded display_name_normalized","rawName":""},{"id":"c6d679587979","cid":"c6d679587979","canon":1,"dups":1,"ftype":"data_center","name":"STACK Infrastructure Pittsylvania County Data Center","county":"Pittsylvania County","state":"VA","lat":36.821721,"lng":-79.398502,"cprec":"distinct","status":"Proposed","proc":"Tariff (utility)","pcp":"Appalachian Power","pdt":"299 megawatts of power by the end of 2028","uquote":"The company can back out of the deal, according to the agreement, if Appalachian Power cannot confirm that 299 megawatts of power can be provided by the end of 2028.","ukey":"733|VA","uname":"Appalachian Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","ay":2026,"oy":2038,"contro":"Some nearby residents remain concerned about the project's environmental impact, specifically regarding groundwater and nearby properties.","deal":"$100 billion investment","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text generic_name_normalized","rawName":"unnamed","srcUrls":null,"srcDom":null},{"id":"bcbfcc197f1e","cid":"bcbfcc197f1e","canon":1,"dups":1,"ftype":"data_center","name":"Upper Magnolia Green East","county":"Chesterfield County","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","spon":"Chesterfield Economic Development Authority","ay":2025,"contro":"The rezoning removes more than 900 single-family homes that were previously permitted on the Upper Magnolia Green East property, which includes sites for new elementary, middle and high schools as well as a public library.","deal":"Purchase of the 2,057-acre Upper Magnolia Green property by the Chesterfield Economic Development Authority for $13 million.","dealScan":"https://www.chesterfield.gov/CivicAlerts.asp?AID=2842","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"chesterfield.gov","lflag":"online_before_announced shared_coordinate_precision_downgraded","srcUrls":["https://www.chesterfield.gov/CivicAlerts.asp?AID=2842"]},{"id":"12707a937ff8","cid":"12707a937ff8","canon":1,"dups":1,"ftype":"data_center","name":"Upper Magnolia Green West Tract A and Tract B","county":"Chesterfield County","state":"VA","lat":37.378434,"lng":-77.585847,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Dominion Energy Virginia","pdt":"300 MW by 2031","rto":"PJM","nerc":"SERC","op":"Google","spon":"Chesterfield Economic Development Authority","tenant":"Google","ay":2025,"contro":"Yes","controScan":"https://www.youtube.com/watch?v=WHOIWm8hedU","deal":"Skyward Holdings secured nearly 890 acres at 4200 Moseley Road and multiple other properties for $31 million. Google purchased two other sites in Chesterfield earlier this year: an 880-acre property at Upper Magnolia Green and a 350-acre section of Watkins Centre South adjacent to Route 288.","tier":4,"tlbl":"Blog/social","srcCt":1,"srcDom":"youtube.com","lflag":"online_before_announced utility_alias_corrected shared_coordinate_precision_downgraded","srcUrls":["https://www.youtube.com/watch?v=WHOIWm8hedU"],"ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","rawUkey":"19876|VA","rawUname":"Dominion Energy Virginia (Virginia Electric & Power Co)"},{"id":"e3909ff7e983","cid":"e3909ff7e983","canon":1,"dups":1,"ftype":"data_center","name":"VALCO Data Center Park","county":"Caroline County","state":"VA","lat":38.028033,"lng":-77.353736,"cprec":"shared_centroid","status":"Proposed","proc":"Tariff (utility)","pcp":"Rappahannock Electric Cooperative","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"dd4db8005a9d","cid":"dd4db8005a9d","canon":0,"dups":1,"ftype":"data_center","name":"Vantage Data Centers","city":"Sterling","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":37.5,"band":"25-50 MW","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text,merged_duplicate"},{"id":"223c6c868ad9","cid":"223c6c868ad9","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers","city":"Ashburn","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":32,"band":"25-50 MW","pc":"Hybrid","pconf":"High","pquote":"Sustainable features include solar and wind energy sources onsite, the first of its kind in Northern Virginia, as well as EV charging stations and an industry-leading water usage effectiveness (WUE).","proc":"Tariff (utility)","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","contro":"General opposition to data center development in Loudoun County due to impacts on neighborhoods, power consumption, and visual aspects.","deal":"Planned $1 billion 146MW campus in Northern Virginia.","dealScan":"https://vantage-dc.com/wp-content/uploads/2021/04/Vantage-Ashburn-Brochure.pdf","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"vantage-dc.com","srcUrls":["https://vantage-dc.com/wp-content/uploads/2021/04/Vantage-Ashburn-Brochure.pdf"],"lflag":"source_quality_reclassified"},{"id":"76963df0179c","cid":"76963df0179c","canon":1,"dups":1,"ftype":"data_center","name":"Vantage VA 3","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":288,"pc":"Grid","pconf":"High","pquote":"VA3 will be Vantage's third campus in Ashburn, planned to include seven multi-story data centers powered by two Dominion Energy substations.","uquote":"Power provided by two dedicated substations with transmission from Dominion Energy, the leading energy provider in the region;","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Vantage Data Centers","ay":2024,"oy":2026,"deal":"Vantage Data Centers secured $3 billion in green financing from Wells Fargo Securities for eight North American sites. The company had acquired the 134-acre plot of land at 19509 Belmont Ridge Road for $180 million in 2022.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"3e7abcfb1b93","cid":"3e7abcfb1b93","canon":1,"dups":1,"ftype":"data_center","name":"Village Place at Gainesville Technology Park","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","proc":"Dedicated PPA","pcp":"Dominion Energy","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"unlinked_source_text"},{"id":"d3dcc0122eb9","cid":"d3dcc0122eb9","canon":1,"dups":1,"ftype":"data_center","name":"Villages at Leesburg","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/villages-at-leesburg-cb04d9e8","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/villages-at-leesburg-cb04d9e8","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"STACK Infrastructure","spon":"SPRINGFIELD EAST LC","ay":2024,"contro":"The Leesburg Gateway data center developer has proposed an amendment to the Leesburg Town Plan that would allow for data center and warehouse development close to residential neighborhoods in the town gateway, near the eastern border of the town along Route 7. This proposed amendment would negatively impact quality of life and go against the Town Plan guidelines that call for reducing conflicts between data centers and residential neighborhoods.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/villages-at-leesburg-cb04d9e8"]},{"id":"b6cadb4a9325","cid":"b6cadb4a9325","canon":1,"dups":1,"ftype":"data_center","name":"Vint Hill Corners","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"83c3b9a32dd6","cid":"83c3b9a32dd6","canon":1,"dups":1,"ftype":"data_center","name":"Vint Hill Technology Campus (CyrusOne)","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Power is provided by NOVEC at a future substation on the property.","uquote":"Power is provided by NOVEC at a future substation on the property.","ukey":"13640|VA","uname":"Northern Virginia Elec Coop","rto":"PJM","nerc":"SERC","op":"CyrusOne","spon":"CyrusOne","contro":"Yes","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"2123f52aff0f","cid":"2123f52aff0f","canon":1,"dups":1,"ftype":"data_center","name":"Vulcan Data Center","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Data centers require the highest levels of electrical reliability for their mission. As such, the electrical service of choice is transmission level service, which in northern Virginia is served by Dominion Energy Virginia's (Dominion) 230kV transmission lines and either Dominion or NOVEC substations.","pscan":"https://www.pwcva.gov/assets/2022-08/Applicant%20Response%20Planning%20Commission%20Questions%20Letter%208.9.22_0.pdf","uquote":"the electrical service of choice is transmission level service, which in northern Virginia is served by Dominion Energy Virginia's (Dominion) 230kV transmission lines and either Dominion or NOVEC substations.","uscan":"https://www.pwcva.gov/assets/2022-08/Applicant%20Response%20Planning%20Commission%20Questions%20Letter%208.9.22_0.pdf","ukey":"19876|VA","uname":"Dominion Energy Virginia (Virginia Electric & Power Co)","rto":"PJM","nerc":"SERC","op":"Amazon Web Services (AWS)","spon":"Amazon Web Services (AWS)","deal":"Amazon Web Services (AWS) has acquired approximately 140 acres of land across four parcels in Manassas, Prince William County, Virginia. The purchase, totaling $152 million, includes two sites: 27 acres on Century Park Drive and 113 acres on Vulcan Lane.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"pwcva.gov","srcUrls":["https://www.pwcva.gov/assets/2022-08/Applicant%20Response%20Planning%20Commission%20Questions%20Letter%208.9.22_0.pdf"],"rawUkey":"19876|VA","rawUname":"Virginia Electric & Power Co","reportedUtility":"Dominion Energy Virginia (Virginia Electric & Power Co)","lflag":"utility_alias_corrected"},{"id":"68fc57fabf3e","cid":"68fc57fabf3e","canon":1,"dups":1,"ftype":"data_center","name":"Warrenton Amazon Data Center","county":"Fauquier County","state":"VA","lat":38.744096,"lng":-77.8215,"cprec":"shared_centroid","status":"Proposed","mw":40,"pc":"Grid","pconf":"High","pquote":"It is estimated that the proposed Amazon data center at Blackwell Road will consume approximately 40 MW of power on a 24/7 basis (roughly 345,600,000 kWh per year) from Dominion's grid.","pscan":"https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","uquote":"Then in late March 2022, Dominion Energy shared plans to build a new substation at the Amazon site and then bring a new 230-kV transmission line into that substation in order to serve the proposed data center.","uscan":"https://www.pecva.org/warrenton-transmission-line/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"Amazon Data Services","tenant":"Amazon Web Services (AWS)","ay":2021,"contro":"Local activist group, Citizens for Fauquier County (CFFC), has filed a lawsuit to stop the construction of a controversial Amazon data centre in Warrenton, North Virginia. Additionally, hundreds of residents, including actor Robert Duvall, opposed the plan at town council meetings.","deal":"Amazon purchased a property on Blackwell Road for nearly $40 million in September 2021.","dealScan":"https://baxtel.com/data-center/amazon-warrenton-va","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"pecva.org;baxtel.com","lflag":"online_before_announced","srcUrls":["https://www.pecva.org/wp-content/uploads/warrenton-amazon-data-center-town-hall-faq-handout-10-26-22.pdf","https://www.pecva.org/warrenton-transmission-line/","https://baxtel.com/data-center/amazon-warrenton-va"],"band":"25-50 MW"},{"id":"0fd976de028f","cid":"0fd976de028f","canon":1,"dups":1,"ftype":"data_center","name":"WELLINGTON GLEN TECHNOLOGY PARK","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","mw":200,"pc":"Grid","pconf":"High","pquote":"The facility is expected to require approximately 200 megawatts of power, equivalent to the consumption of around 50,000 homes.","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/wellington-glen-technology-park-88496695","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon Data Services","spon":"PWC PROP 1 & PWC PROP 2","tenant":"Amazon AWS","ay":2024,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/wellington-glen-technology-park-88496695"],"band":"100-250 MW"},{"id":"ce31bc737044","cid":"ce31bc737044","canon":1,"dups":1,"ftype":"data_center","name":"Wellington Road PRA","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator: Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/wellington-glen-technology-park-88496695","uconf":"High","uquote":"Grid Operator: Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/wellington-glen-technology-park-88496695","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","spon":"TPC WELLINGTON EAST LC","ay":2020,"contro":"The Prince William Board of County Supervisors has approved a 24-acre rezoning for a new data center development along Wellington Road, despite opposition from Supervisor Bob Weir and concerns about its proximity to Unity Reed High School.","controScan":"https://www.potomaclocal.com/2025/02/10/prince-william-supervisors-approve-data-center-near-patriot-high-school/","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"interconnection.fyi;potomaclocal.com","lflag":"online_before_announced","srcUrls":["https://www.interconnection.fyi/data-center/project/wellington-glen-technology-park-88496695","https://www.potomaclocal.com/2025/02/10/prince-william-supervisors-approve-data-center-near-patriot-high-school/"]},{"id":"d2ff8ed99848","cid":"d2ff8ed99848","canon":1,"dups":1,"ftype":"data_center","name":"Western Lands","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":1000,"pc":"Grid","pconf":"High","pquote":"The Dulles Digital campus, situated in Sterling, is planned to eventually comprise 14 buildings and achieve up to 1GW of capacity, supported by six substations.","rto":"PJM","nerc":"SERC","op":"Digital Realty","spon":"Digital Realty","ay":2020,"oy":2023,"deal":"Digital Realty acquired the site, formerly known as Western Lands, in 2018 for $236.5 million from the Metropolitan Washington Airports Authority. A joint venture with Blackstone is involved in the development of at least four buildings on the site.","tier":0,"tlbl":"No sources resolved","srcCt":0,"band":"250+ MW","lflag":"large_project_duplicate_review unlinked_source_text stale_future_status_year","srcUrls":null,"srcDom":null,"oy_stale":1},{"id":"ba1286ec2ade","cid":"ba1286ec2ade","canon":1,"dups":1,"ftype":"data_center","name":"Westview 66","county":"Prince William County","state":"VA","lat":38.701119,"lng":-77.479579,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"Medium","pquote":"Additionally, the proffer amendment provides for an electric substation if a data center is developed on the property.","rto":"PJM","nerc":"SERC","spon":"Stonebridge Acquisitions","ay":2019,"contro":"The site is located in the viewshed of the Manassas National Battlefield Park, and proffers address screening and minimizing impacts to the viewshed.","deal":"Rezoning/Proffer Amendment #REZ2019-00025 (amending REZ# 98-0019) Westview 66","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"49e24ffe996a","cid":"49e24ffe996a","canon":0,"dups":1,"ftype":"data_center","name":"WHEELER SURVEY COMPANY","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","op":"WHEELER SURVEY COMPANY","spon":"WHEELER SURVEY COMPANY","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null,"lflag":"merged_duplicate"},{"id":"3ce355564e67","cid":"3ce355564e67","canon":1,"dups":1,"ftype":"data_center","name":"Wilderness Crossing","county":"Orange County","state":"VA","lat":38.249326,"lng":-78.011092,"cprec":"distinct","status":"Proposed","mw":1500,"pc":"Grid","pconf":"High","pquote":"Under this draft ordinance, 490 acres of a 700-acre parcel could be developed into data centers — that's over 21 million square feet — which, based on our experience with other data center developments across Virginia, would require about 6.3 gigawatts of power. That amount of power would likely require two 500 kV lines/substations. And that's just one data center proposal.... if the 10 million square f feet of data center space is built out at Wilderness. Crossing it will require up to 1.5 GW of electricity to run its servers and cooling. systems enough to power half a million homes.","pscan":"https://www.pecva.org/region/orange/orange-county-proposes-new-technology-zoning-district/","uquote":"On-site power generation is increasingly a common part of data center proposals, to avoid the years-long wait to get power from Dominion Energy.... dominion Energy plans to fill this new demand primarily by running old coal and natural gas plants past their planned retirement dates.","uscan":"https://www.pecva.org/region/orange/orange-county-proposes-new-technology-zoning-district/","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Amazon","spon":"KEG Associates III","tenant":"Amazon","ay":2021,"oy":2027,"contro":"The Wilderness Crossing project has faced significant opposition and controversy, primarily due to its proximity to the Wilderness Battlefield, environmental concerns related to abandoned gold mines, and the scale of the proposed development. Multiple preservation groups and local homeowners have filed lawsuits challenging the rezoning approval.","controScan":"https://www.battlefields.org/preserve/speak-out/fight-continues-wilderness-battlefield","deal":"The Wilderness Crossing project is a larger 2,600-acre mixed-use development that includes up to 5,000 residential units and 200,000 square feet of commercial space, in addition to the data centers and distribution warehouses. Non-disclosure agreements were signed by Orange County staff and supervisors for the benefit of Amazon, LLC.","dealScan":"https://baxtel.com/data-center/amazon-wilderness-crossing","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"pecva.org;baxtel.com;battlefields.org","srcUrls":["https://www.pecva.org/region/orange/orange-county-proposes-new-technology-zoning-district/","https://baxtel.com/data-center/amazon-wilderness-crossing","https://www.battlefields.org/preserve/speak-out/fight-continues-wilderness-battlefield"],"band":"250+ MW","lflag":"citation_artifact_removed"},{"id":"ac2a5e84e173","cid":"ac2a5e84e173","canon":1,"dups":1,"ftype":"data_center","name":"Winchester Gateway LLC","county":"Frederick County","state":"VA","lat":39.20366,"lng":-78.263829,"cprec":"shared_centroid","status":"Proposed","rto":"PJM","nerc":"SERC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"3a2251745a4e","cid":"3a2251745a4e","canon":1,"dups":1,"ftype":"data_center","name":"Yondr","city":"Aldie","county":"Loudoun","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","mw":48,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Yondr Group, a leading global developer, owner and operator of hyperscale data centers, has completed its first 48MW data center in Loudoun County, Northern Virginia, in partnership with JK Land Holdings, LLC (JKLH).","pscan":"https://www.yondrgroup.com/newsroom/press-release/yondr-groups-first-northern-virginia-data-center-is-ready-for-service/","uconf":"High","uquote":"Grid Operator. Dominion Energy.","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"Yondr Group","spon":"Yondr Group","ay":2021,"oy":2024,"deal":"DigitalBridge Group acquisition of Yondr Group; Partnership with JK Land Holdings, LLC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"yondrgroup.com","srcUrls":["https://www.yondrgroup.com/newsroom/press-release/yondr-groups-first-northern-virginia-data-center-is-ready-for-service/"],"lflag":"source_quality_reclassified stale_future_status_year","oy_stale":1},{"id":"88141875f45d","cid":"88141875f45d","canon":1,"dups":1,"ftype":"data_center","name":"Zebra East","county":"Loudoun County","state":"VA","lat":39.0812,"lng":-77.638898,"cprec":"shared_centroid","status":"Proposed","pc":"Grid","pconf":"High","pquote":"Grid Operator. Dominion Energy.","pscan":"https://www.interconnection.fyi/data-center/project/zebra-east-b04d367d","uquote":"Grid Operator. Dominion Energy.","uscan":"https://www.interconnection.fyi/data-center/project/zebra-east-b04d367d","ukey":"19876|VA","uname":"Virginia Electric & Power Co","rto":"PJM","nerc":"SERC","op":"WALSH, COLUCCI, LUBELEY & WALS / MINCHEW RANDALL J.","spon":"WALSH, COLUCCI, LUBELEY & WALS / MINCHEW RANDALL J.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/zebra-east-b04d367d"]},{"id":"45579923d309","cid":"45579923d309","canon":1,"dups":1,"ftype":"data_center","name":"BlackRock","city":"East Wenatchee","county":"Douglas","state":"WA","lat":47.741763,"lng":-119.694622,"cprec":"shared_centroid","status":"Operational","mw":2,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"Renewable hydro-electric power is available for as low as 2 cents per kilowatt hour. Electricity is supplied by sustainable hydro power through Douglas County Public Utility District.","pscan":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","uquote":"Electricity is supplied by sustainable hydro power through Douglas County Public Utility District.","uscan":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","rto":"non-RTO","nerc":"WECC","op":"BlackRock","spon":"BlackRock","tenant":"BlackRock","ay":2010,"oy":2011,"contro":"Environmental concerns regarding diesel generator emissions.","deal":"Lease agreement with Sabey Corp.","dealScan":"https://www.datacenterknowledge.com/investing/blackrock-from-wall-street-to-wenatchee","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"sabeydatacenters.com;datacenterknowledge.com","srcUrls":["https://sabeydatacenters.com/locations/east-wenatchee-data-center","https://www.datacenterknowledge.com/investing/blackrock-from-wall-street-to-wenatchee"],"lflag":"coordinate_cluster_reclassified"},{"id":"1311749d9433","cid":"1311749d9433","canon":1,"dups":1,"ftype":"data_center","name":"CyrusOne","city":"Quincy","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Operational","mw":90,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The facility provides a reduced carbon footprint through 100% sourced renewable hydropower, along with excellent fiber routes including metro and long-haul networks.","pscan":"https://www.cyrusone.com/data-centers/north-america/quincy-washington","uquote":"The electricity is provided by the Grant County PUD and its hydropower projects.","ukey":"14624|WA","uname":"PUD No 2 of Grant County","rto":"non-RTO","nerc":"WECC","op":"CyrusOne","spon":"KKR and Global Infrastructure Partners","ay":2016,"oy":2024,"deal":"CyrusOne was taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"cyrusone.com","srcUrls":["https://www.cyrusone.com/data-centers/north-america/quincy-washington"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"1880725755c7","cid":"1880725755c7","canon":1,"dups":1,"ftype":"data_center","name":"H5 Data Centers","city":"Quincy","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"Access to 100% renewable hydro power","pscan":"https://h5datacenters.com/h5-acquires-quincy-data-center.html","uquote":"Grant County PUD provides the Quincy data center with utility power to support a designed load of up to 40 critical MW.","ukey":"14624|WA","uname":"PUD No 2 of Grant County","rto":"non-RTO","nerc":"WECC","op":"H5 Data Centers","tenant":"Intuit , Wave Business, Ziply Fiber, Voltage Park","ay":2018,"oy":2009,"deal":"H5 Data Centers acquired a 240,000 square-foot data center from Intuit Inc. on July 18, 2018. Intuit expected an operating loss of $75 to $80 million from the sale and leased back several megawatts at the site.","dealScan":"https://h5datacenters.com/h5-acquires-quincy-data-center.html","tier":1,"tlbl":"Primary/Authoritative","srcCt":1,"srcDom":"h5datacenters.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded","srcUrls":["https://h5datacenters.com/h5-acquires-quincy-data-center.html"]},{"id":"c1f1c3f05b44","cid":"c1f1c3f05b44","canon":0,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Quincy","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Operational","mw":30,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"The Microsoft data center in Quincy Washington takes advantage of hydro- electric power from nearby dams on the Columbia River.","pscan":"https://asset.fujifilm.com/master/americas/files/2020-03/8ef23fd892733dd9d1df8de46f64cfc9/Hyperscale_Heat_Wave.pdf","uconf":"High","uquote":"The local utility, Grant County PUD, provided power at rates as low as 1.9 or 2.5 cents per kilowatt-hour.","uscan":"https://baxtel.com/data-center/microsoft-columbia-data-center","ukey":"14624|WA","uname":"PUD No 2 of Grant County","rto":"non-RTO","nerc":"WECC","op":"Microsoft","tenant":"Microsoft","ay":2006,"oy":2007,"contro":"The facility faced controversy regarding state sales tax breaks for data centers and disputes with the local utility (Grant County PUD) over power usage and potential fines. More recently, there's broader backlash against data centers for energy and water use.","controScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-building-new-data-center-in-quincy","deal":"In December 2013, the Port of Quincy announced its intent to sell 200 acres of industrial property to Microsoft for $11 million for a new data center, which would be Microsoft's second major facility in Quincy.","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"asset.fujifilm.com;baxtel.com;datacenterknowledge.com","srcUrls":["https://asset.fujifilm.com/master/americas/files/2020-03/8ef23fd892733dd9d1df8de46f64cfc9/Hyperscale_Heat_Wave.pdf","https://baxtel.com/data-center/microsoft-columbia-data-center","https://www.datacenterknowledge.com/hyperscalers/microsoft-building-new-data-center-in-quincy"],"lflag":"shared_coordinate_precision_downgraded,merged_duplicate"},{"id":"f9301530d1f6","cid":"f9301530d1f6","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Quincy","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Operational","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"The company located there due to low land costs, abundant data fiber, and extremely low cost electricity provided by Grant County PUD for as little as 1.9 or 2.5 cents per kilowatt-hour.","uquote":"The local utility, Grant County PUD, provided power at rates as low as 1.9 or 2.5 cents per kilowatt-hour.","uscan":"https://baxtel.com/data-center/microsoft-columbia-data-center","ukey":"14624|WA","uname":"PUD No 2 of Grant County","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2006,"oy":2007,"contro":"Yes","controScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-s-energy-practices-in-quincy-under-fire","deal":"Microsoft faced a $210,000 fine from Grant County PUD for using less power than requested; controversy over tax breaks and contractor liens also reported.","dealScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-s-energy-practices-in-quincy-under-fire","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"baxtel.com;datacenterknowledge.com","srcUrls":["https://baxtel.com/data-center/microsoft-columbia-data-center","https://www.datacenterknowledge.com/hyperscalers/microsoft-s-energy-practices-in-quincy-under-fire"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"a83bbdc0bdd5","cid":"a83bbdc0bdd5","canon":1,"dups":1,"ftype":"data_center","name":"NTT","city":"Quincy","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Operational","mw":14,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"“Quincy is unique given the 100% 'green' hydroelectric power and emerging profile as a destination for large footprint data center users.","pscan":"https://www.lightwaveonline.com/data-center/article/16668010/gi-partners-buys-texas-washington-data-centers-from-ntt-data","uquote":"Grant County PUD provides the Quincy data center with utility power to support a designed load of up to 40 critical MW.","ukey":"14624|WA","uname":"PUD No 2 of Grant County","rto":"non-RTO","nerc":"WECC","op":"NTT DATA","spon":"GI Partners","tenant":"NTT DATA","oy":2012,"contro":"Reduction in diesel backup generators due to environmental concerns.","deal":"Acquisition of data center by GI Partners from NTT DATA in a sale-leaseback transaction.","dealScan":"https://www.lightwaveonline.com/data-center/article/16668010/gi-partners-buys-texas-washington-data-centers-from-ntt-data","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"lightwaveonline.com","srcUrls":["https://www.lightwaveonline.com/data-center/article/16668010/gi-partners-buys-texas-washington-data-centers-from-ntt-data"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"ecac41edfec0","cid":"ecac41edfec0","canon":1,"dups":1,"ftype":"data_center","name":"Sabey Data Centers","city":"Quincy","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Future / Expansion","mw":123,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"The facility benefits strategically from Quincy's abundant, inexpensive hydropower and favorable environmental conditions, contributing to one of the lowest total costs of ownership (TCO) in the United States.","uconf":"High","uquote":"In Grant County, data centers have been a topic of conversation due to that electricity use; data centers and other businesses that use copious amounts of electricity have resulted in the Grant County PUD using up its allotment of the power generated at Priest Rapids and Wells Dams.","ukey":"14624|WA","uname":"PUD No 2 of Grant County","rto":"non-RTO","nerc":"WECC","op":"Sabey Data Centers","ay":2011,"oy":2027,"contro":"Yes","deal":"Lawsuit over property taxes","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text status_adjusted_future_expansion shared_coordinate_precision_downgraded","rawStatus":"Operational","srcUrls":null,"srcDom":null},{"id":"19fa9143ab10","cid":"774b36540cc6","canon":0,"dups":2,"ftype":"data_center","name":"Sabey Data Centers","city":"East Wenatchee","county":"Douglas","state":"WA","lat":47.741763,"lng":-119.694622,"cprec":"shared_centroid","status":"Operational","mw":70,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Electricity is supplied by sustainable hydro power through Douglas County Public Utility District. You enjoy not only the huge competitive advantage of lower costs, but a lighter carbon footprint as well.","pscan":"https://sabeydatacenters.com/locations/east-wenatchee-data-center","uquote":"Strategically positioned in Central Washington, this facility benefits from hydro-powered utilities via the Douglas County Public Utility District, very low energy rates (≈ $0.039 per kWh), and a dry, cool climate that reduces cooling costs.","rto":"non-RTO","nerc":"WECC","op":"Sabey Data Centers","spon":"Sabey","tenant":"T-Mobile, VMware, global financial firm","ay":2006,"oy":2007,"deal":"Lease agreement with a global financial firm for 36,000 square feet","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"sabeydatacenters.com","srcUrls":["https://sabeydatacenters.com/locations/east-wenatchee-data-center"],"lflag":"source_quality_reclassified coordinate_cluster_reclassified"},{"id":"774b36540cc6","cid":"774b36540cc6","canon":1,"dups":2,"ftype":"data_center","name":"Sabey Data Centers","city":"East Wenatchee","county":"Douglas","state":"WA","lat":47.741763,"lng":-119.694622,"cprec":"shared_centroid","status":"Operational","mw":70,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Powered entirely by renewable hydroelectric energy from Douglas County Public Utility District","uquote":"hydro-powered utilities via the Douglas County Public Utility District","rto":"non-RTO","nerc":"WECC","op":"Sabey Data Centers","spon":"Sabey and National Real Estate Advisors","tenant":"T-Mobile, VMware, global financial firm","ay":2006,"oy":2007,"deal":"Expected to cost up to $100 million to construct","dealScan":"https://www.datacenterknowledge.com/investing/sabey-plans-100m-facility-in-wenatchee-wa-","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/investing/sabey-plans-100m-facility-in-wenatchee-wa-"],"lflag":"coordinate_cluster_reclassified"},{"id":"b1c82741c27e","cid":"b1c82741c27e","canon":1,"dups":1,"ftype":"data_center","name":"Serverfarm","city":"Moses Lake","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Operational","mw":22,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"low-cost renewable power, with nearly 100% of its needs supplied by hydroelectric dams on the nearby Columbia River.","pscan":"https://www.serverfarmllc.com/moses-lake-data-center/","uquote":"Utility Provider: Grant County.... Grant County PUD Rate of $0.026 per KW; among the lowest in the nation. Grant County PUD owns two large hydroelectric generating plants on the Columbia River.","uscan":"https://baxtel.com/data-center/server-farm-realty-titan-moses-lake-wa","ukey":"14624|WA","uname":"PUD No 2 of Grant County","rto":"non-RTO","nerc":"WECC","op":"Serverfarm","spon":"Red Sea Group, Manulife Investment Management","tenant":"CenturyLink","ay":2008,"oy":2011,"deal":"Server Farm Realty leased its Moses Lake facility to Century Link, Inc. in May 2015. Manulife Investment Management acquired a majority stake in Serverfarm.","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"serverfarmllc.com;baxtel.com","srcUrls":["https://www.serverfarmllc.com/moses-lake-data-center/","https://baxtel.com/data-center/server-farm-realty-titan-moses-lake-wa"],"lflag":"citation_artifact_removed shared_coordinate_precision_downgraded"},{"id":"0de5189a525c","cid":"0de5189a525c","canon":1,"dups":1,"ftype":"data_center","name":"T-Mobile","city":"East Wenatchee","county":"Douglas","state":"WA","lat":47.741763,"lng":-119.694622,"cprec":"shared_centroid","status":"Operational","mw":5,"pc":"Grid","pconf":"High","pquote":"Power is supplied by Douglas County Public Utility District via sustainable hydroelectric sources, offering some of the lowest electrical rates in the U.S. (~ US$0.05/kWh).","uquote":"Power is supplied by Douglas County Public Utility District via sustainable hydroelectric sources","rto":"non-RTO","nerc":"WECC","op":"Sabey Data Centers","spon":"Sabey","tenant":"T-Mobile","ay":2006,"oy":2009,"deal":"$250 million data center","dealScan":"https://www.datacenterknowledge.com/business/t-mobile-moves-in-sabey-eyes-quincy","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"datacenterknowledge.com","srcUrls":["https://www.datacenterknowledge.com/business/t-mobile-moves-in-sabey-eyes-quincy"],"band":"< 10 MW","lflag":"coordinate_cluster_reclassified"},{"id":"5c9b3863c16b","cid":"5c9b3863c16b","canon":1,"dups":2,"ftype":"data_center","name":"TierPoint","city":"Liberty Lake","county":"Spokane","state":"WA","lat":47.620375,"lng":-117.403371,"cprec":"distinct","status":"Operational","mw":8,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"A total of 8.8 MW of utility power is served to data center to meet the power requirements for the future needs. The data center has power system in N+1 configuration with fully diverse A & B power circuits available to customer's equipment. Power failure is protected by UPS system in N+1 configuration, and automatic transfer of load to diesel generators in N+1 redundancy.","pscan":"https://cloudandcolocation.com/datacenters/tierpoint-liberty-lake-data-center/","proc":"Tariff (utility)","pcp":"Avista Utilities","uquote":"Grid Operator. Avista Utilities.","uscan":"https://www.interconnection.fyi/data-center/project/tierpoint-0669d23e","ukey":"20169|WA","uname":"Avista Corp","rto":"non-RTO","nerc":"WECC","op":"TierPoint","tenant":"f5, Coldwater Creek, IT-Lifeline, Red Lion Hotels, several banks and dozens of Northwest companies","ay":2003,"oy":2003,"contro":"No, the facility's geothermal cooling system \"sailed through several layers of government review\" and was deemed \"environmentally beneficial\".","controScan":"https://www.spokesman.com/stories/2010/sep/05/cool-ideas/","deal":"Acquisition of TierPoint by Cequel Data Centers LLC in 2012.","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;spokesman.com","srcUrls":["https://cloudandcolocation.com/datacenters/tierpoint-liberty-lake-data-center/","https://www.interconnection.fyi/data-center/project/tierpoint-0669d23e","https://www.spokesman.com/stories/2010/sep/05/cool-ideas/"]},{"id":"c8b1db12ea64","cid":"5c9b3863c16b","canon":0,"dups":2,"ftype":"data_center","name":"TierPoint","city":"Liberty Lake","county":"Spokane","state":"WA","lat":47.620375,"lng":-117.403371,"cprec":"distinct","status":"Operational","mw":8,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"A total of 8.8 MW of utility power is served to data center to meet the power requirements for the future needs.","pscan":"https://cloudandcolocation.com/datacenters/tierpoint-liberty-lake-data-center/","uconf":"High","uquote":"Grid Operator. Avista Utilities.","uscan":"https://www.interconnection.fyi/data-center/project/tierpoint-0669d23e","ukey":"20169|WA","uname":"Avista Corp","rto":"non-RTO","nerc":"WECC","op":"TierPoint","spon":"TierPoint","ay":2003,"oy":2003,"deal":"When Cequel acquired TierPoint's Spokane, Washington, facilities in 2012, it chose to rebrand its data center products and services as TierPoint.","dealScan":"https://www.datacenterknowledge.com/business/how-tierpoint-quietly-built-a-data-center-empire-in-secondary-markets","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"cloudandcolocation.com;interconnection.fyi;datacenterknowledge.com","srcUrls":["https://cloudandcolocation.com/datacenters/tierpoint-liberty-lake-data-center/","https://www.interconnection.fyi/data-center/project/tierpoint-0669d23e","https://www.datacenterknowledge.com/business/how-tierpoint-quietly-built-a-data-center-empire-in-secondary-markets"]},{"id":"de866c685b56","cid":"de866c685b56","canon":1,"dups":1,"ftype":"data_center","name":"Vantage Data Centers","city":"Quincy","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Operational","mw":89,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Powered by Grant County Power Utility District, the Quincy campus offers the lowest per-KW rates in the United States.","uconf":"High","uquote":"Powered by Grant County Power Utility District, the Quincy campus offers the lowest per-KW rates in the United States.","rto":"non-RTO","nerc":"WECC","op":"Vantage Data Centers","spon":"Digital Bridge Holdings, Public Sector Pension Investment Board (PSP Investments), TIAA Investments","ay":2011,"oy":2013,"contro":"Quincy residents expressed concern at the number of generators as the result of a booming data center industry. Vantage voluntarily installed Tier 4-equivalent emission controls for its emergency generators, but emission testing later revealed they were unable to meet the performance guarantee.","deal":"Vantage Data Centers was acquired by a consortium including Digital Bridge Holdings, Public Sector Pension Investment Board (PSP Investments), and TIAA Investments in March 2017. In July 2020, an investor group led by Colony Capital invested $1.2 billion in Vantage's diversified portfolio, including its Quincy, Washington data center.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"e412780ce7d0","cid":"e412780ce7d0","canon":1,"dups":1,"ftype":"data_center","name":"Yahoo","city":"Quincy","county":"Grant","state":"WA","lat":47.213633,"lng":-119.467788,"cprec":"shared_centroid","status":"Operational","mw":40,"band":"25-50 MW","pc":"Grid","pconf":"High","pquote":"There is also an abundance of hydro power, which, at about $0.025 per kWh, comes at some of the lowest rates in the “developed world,” he said. Sabey's Quincy data center is next door to Yahoo's campus there.","uquote":"The industrial power rates they pay are among the lowest in the country, provided by two dams operated by Grant County Public Utility District.","uscan":"https://www.spokesman.com/stories/2014/jul/06/yahoo-data-center-plans-grant-county-growth/","rto":"non-RTO","nerc":"WECC","op":"H5 Data Centers","spon":"Yahoo","tenant":"Yahoo","ay":2005,"oy":2007,"contro":"Yes","controScan":"https://www.datacenterknowledge.com/hyperscalers/microsoft-s-energy-practices-in-quincy-under-fire","deal":"Acquisition by H5 Data Centers from Yahoo (2024), likely a sale-leaseback.","dealScan":"https://baxtel.com/data-center/h5-quincy-ii","tier":2,"tlbl":"Reputable journalism","srcCt":3,"srcDom":"spokesman.com;baxtel.com;datacenterknowledge.com","srcUrls":["https://www.spokesman.com/stories/2014/jul/06/yahoo-data-center-plans-grant-county-growth/","https://baxtel.com/data-center/h5-quincy-ii","https://www.datacenterknowledge.com/hyperscalers/microsoft-s-energy-practices-in-quincy-under-fire"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"8e7caa29e349","cid":"8e7caa29e349","canon":1,"dups":1,"ftype":"data_center","name":"1200 MW Data Center Loads","county":"Walla Walla County","state":"WA","lat":46.254606,"lng":-118.48037,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","proc":"Dedicated PPA","pcp":"Energy Northwest","pdt":"up to 320 megawatts","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"5866c5bd183b","cid":"5866c5bd183b","canon":1,"dups":1,"ftype":"data_center","name":"Atlas Agro","county":"Benton","state":"WA","lat":46.228125,"lng":-119.516659,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Atlas Agro is creating a new path to sustainable agriculture with low carbon nitrogen fertilizers. By harnessing green hydrogen and green ammonia, we produce high-quality, cost-effective nitrate fertilizers using only renewable energy, air, and water as our raw materials. “We don't see a data center as a separate business, but as a partner that helps us build the necessary power and utility infrastructure for the site,” said Dan Holmes, Atlas Agro president for North America, during the meeting. Atlas Agro intends to develop contract agreements with renewable energy projects to offset all greenhouse gas emissions from electricity usage. Despite Atlas Agro's financial investments in the power infrastructure, the company must wait for BPA to put in the interconnection, or the power line connecting the project to the electric grid, which will have a larger capacity than the needs of the fertilizer plant alone so that other future users will be able to connect to it.","pscan":"https://www.tricitiesbusinessnews.com/articles/atlas-agro-fertilizer-plant-data-center","proc":"Dedicated PPA","rto":"non-RTO","nerc":"WECC","op":"Atlas Agro","spon":"Atlas Agro","ay":2025,"oy":2027,"contro":"Federal funding for the fertilizer plant, which the data center is linked to, was cut by $157.3 million by the U.S. Department of Energy, which stated the projects \"weren't economically viable and wouldn't provide a positive return on the investment of taxpayer dollars.\" Concerns have also been raised regarding power requirements and water consumption for data centers in the region. The Port of Benton commissioners granted only a six-month extension for a land deal related to the fertilizer plant, citing \"a lot of uncertainties\" and a lack of updates from the company.","deal":"Atlas Agro plans to acquire approximately 275 acres of land at 2100 Horn Rapids Road within the Northwest Advanced Clean Energy Park for just under $24 million from the city of Richland. The company intends to invest $500 million in this data center campus. The city of Richland awarded Atlas Agro $20 million in property tax breaks. However, $157.3 million in federal funding for the associated fertilizer plant was cut. Macquarie is identified as the main project investor.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"tricitiesbusinessnews.com","srcUrls":["https://www.tricitiesbusinessnews.com/articles/atlas-agro-fertilizer-plant-data-center"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded"},{"id":"9bee4f8baa36","cid":"9bee4f8baa36","canon":1,"dups":1,"ftype":"data_center","name":"Atlas Agro Data Server Facility","county":"Benton County","state":"WA","lat":46.228125,"lng":-119.516659,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Securing the power to run both projects also continues to be a challenge. But Atlas Agro is still committed to building the green fertilizer plant despite the setbacks, CEO Petter Østbø recently told the Tri-Cities Area Journal of Business.... The BPA transmission upgrades are a key factor stalling the project.... “It's the power that's the limiting factor, both for the fertilizer plant and for the potential data center,” he said.","pscan":"https://www.tricitiesbusinessnews.com/articles/atlas-agro-fertilizer-plant-data-center","uquote":"The BPA transmission upgrades are a key factor stalling the project.... BPA caps new users for its Tier 1 program at 10 megawatts.","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Atlas Agro","spon":"Atlas Agro","ay":2025,"oy":2027,"contro":"Securing power is a challenge; fertilizer plant project lost federal funding; concerns about power and water consumption; Port of Benton granted only a 6-month extension for land deal.","deal":"Atlas Agro offered nearly $24 million for 275 acres in the Northwest Advanced Clean Energy Park. The data center project is linked to Atlas Agro's proposed $1.1 billion to $1.5 billion fertilizer plant and is intended to defray its cost.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"tricitiesbusinessnews.com","srcUrls":["https://www.tricitiesbusinessnews.com/articles/atlas-agro-fertilizer-plant-data-center"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"1738|WA","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"e7ed18012c0d","cid":"e7ed18012c0d","canon":1,"dups":1,"ftype":"data_center","name":"Atlas Agro Data Server Facility, Phase 2","county":"Benton","state":"WA","lat":46.228125,"lng":-119.516659,"cprec":"shared_centroid","status":"Proposed","mw":350,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Both the fertilizer plant and the data center are dependent on a power line that the Bonneville Power Administration is planning to put in place to power those projects as well as future endeavors.","pscan":"https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center","uquote":"Both the fertilizer plant and the data center are dependent on a power line that the Bonneville Power Administration is planning to put in place to power those projects as well as future endeavors.","uscan":"https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","op":"Atlas Agro","spon":"Atlas Agro","oy":2027,"contro":"The BPA transmission upgrades are a key factor stalling the project. Securing the power to run both projects also continues to be a challenge. With that investment comes concerns about power requirements and water consumption.","deal":"Richland's city council unanimously approved an option agreement with Atlas Agro for land for a data center at a Dec. 2 meeting. The agreement is for 275 acres of property at 2100 Horn Rapids Road, just north of Framatome. If Atlas proceeds, it will pay about $24 million for the former Hanford land.","dealScan":"https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"tricitiesbusinessnews.com","srcUrls":["https://www.tricitiesbusinessnews.com/articles/richland-oks-option-agreement-for-atlas-agro-data-center"],"lflag":"source_quality_reclassified shared_coordinate_precision_downgraded nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"1738|WA","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"07e4a5b57eb6","cid":"07e4a5b57eb6","canon":1,"dups":1,"ftype":"data_center","name":"ATP TES Data Server","county":"Benton County","state":"WA","lat":46.228125,"lng":-119.516659,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"176db1f5eda6","cid":"176db1f5eda6","canon":1,"dups":1,"ftype":"data_center","name":"Data Storage Facility","county":"Walla Walla","state":"WA","lat":46.254606,"lng":-118.48037,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","proc":"Dedicated PPA","pcp":"Energy Northwest","pdt":"up to 320MW of capacity","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"97ae2e8fc52a","cid":"97ae2e8fc52a","canon":1,"dups":1,"ftype":"data_center","name":"DOE Data Center","county":"Benton","state":"WA","lat":46.228125,"lng":-119.516659,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"DOE Data Center, L0673, -, WA, Benton County, Active. Starbuck 500 MW, L0674, -, WA, Columbia County, Active. Auxiliary Load, L0675, -, WA, Benton County, Active. KPFF, L0676, -, WA, Cowlitz County, Active. TC KERR Data Center, L0677, -, WA, Cowlitz County, Active. Winco 9.5 MW, L0678, -, WA, Kittitas County … Bonneville Power Administration Interconnection Queue.","pscan":"https://www.interconnection.fyi/projects/transmission-owner/bonneville-power-administration","uconf":"High","uquote":"DOE Data Center, L0673, -, WA, Benton County, Active. Starbuck 500 MW, L0674, -, WA, Columbia County, Active. Auxiliary Load, L0675, -, WA, Benton County, Active. KPFF, L0676, -, WA, Cowlitz County, Active. TC KERR Data Center, L0677, -, WA, Cowlitz County, Active. Winco 9.5 MW, L0678, -, WA, Kittitas County … Bonneville Power Administration Interconnection Queue.","uscan":"https://www.interconnection.fyi/projects/transmission-owner/bonneville-power-administration","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/projects/transmission-owner/bonneville-power-administration"],"lflag":"shared_coordinate_precision_downgraded nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"1738|WA","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration"},{"id":"e09c7fa0aaf2","cid":"e09c7fa0aaf2","canon":1,"dups":1,"ftype":"data_center","name":"DPUD Data Center","county":"Chelan County","state":"WA","lat":47.860974,"lng":-120.619041,"cprec":"shared_centroid","status":"Proposed","mw":250,"band":"250+ MW","proc":"Dedicated PPA","pcp":"third-party supplier (via Chelan PUD framework)","pdt":"288 megawatts for 15 years, with option to extend","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"17ab605290e1","cid":"17ab605290e1","canon":1,"dups":1,"ftype":"data_center","name":"Energizer Data Center","county":"Klickitat County","state":"WA","lat":45.870446,"lng":-120.779305,"cprec":"shared_centroid","status":"Proposed","mw":75,"band":"50-100 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/energizer-data-center-expanded-capacity-6efc0db9","rto":"non-RTO","nerc":"WECC","ay":2021,"oy":2023,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/energizer-data-center-expanded-capacity-6efc0db9"],"lflag":"shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"41602b0a1883","cid":"41602b0a1883","canon":1,"dups":1,"ftype":"data_center","name":"Energizer Data Center Expanded Capacity","county":"Klickitat County","state":"WA","lat":45.870446,"lng":-120.779305,"cprec":"shared_centroid","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","uquote":"Utility. Public Utility District No. 1 of Klickitat County.","uscan":"https://www.interconnection.fyi/project/bpa-l0444","ukey":"10393|WA","uname":"PUD No 1 of Klickitat County","rto":"non-RTO","nerc":"WECC","ay":2021,"oy":2023,"contro":"The Klickitat Public Utility District (KPUD) officials wrote in a 2020 letter to the Federal Energy Regulatory Commission that they had “engaged in recent discussions with parties interested in pursuing the development of a data center facility,” adjacent to the proposed Goldendale energy storage site, which faces significant opposition from the Yakama Nation and environmental groups due to its location on a sacred tribal site.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/project/bpa-l0444"],"lflag":"shared_coordinate_precision_downgraded stale_future_status_year","oy_stale":1},{"id":"43f56813790a","cid":"43f56813790a","canon":1,"dups":1,"ftype":"data_center","name":"Second 1200 MW Data Center Load","county":"Walla Walla County","state":"WA","lat":46.254606,"lng":-118.48037,"cprec":"shared_centroid","status":"Proposed","mw":1200,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Bonneville Power Administration Interconnection Queue. Walla Walla County, Withdrawn. Unnamed Project, G0282, Wind, WA, Benton County, Withdrawn. Unnamed Project, G0283, Wind, OR, Sherman County, Withdrawn. Lower Snake Phase 1, G0284, Wind, WA, Columbia County, Operational. Lower Snake Phase 1, G0285, Wind, WA, Garfield County, Operational. Tucannon River Wind Farm, G0286, Wind, WA, Columbia County... Second 1200 MW Data Center Load, L0682, -, WA, Walla Walla County, Active.","uquote":"Bonneville Power Administration Interconnection Queue. Walla Walla County, Withdrawn. Unnamed Project, G0282, Wind, WA, Benton County, Withdrawn. Unnamed Project, G0283, Wind, OR, Sherman County, Withdrawn. Lower Snake Phase 1, G0284, Wind, WA, Columbia County, Operational. Lower Snake Phase 1, G0285, Wind, WA, Garfield County, Operational. Tucannon River Wind Farm, G0286, Wind, WA, Columbia County... Second 1200 MW Data Center Load, L0682, -, WA, Walla Walla County, Active.","uname":"Bonneville Power Administration","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"unlinked_source_text citation_artifact_removed shared_coordinate_precision_downgraded nonrate_utility_link_removed nonretail_eia861_not_rate_utility","rawUkey":"1738|WA","rawUname":"Bonneville Power Administration","reportedUtility":"Bonneville Power Administration","srcUrls":null,"srcDom":null},{"id":"d08a16e27932","cid":"d08a16e27932","canon":1,"dups":1,"ftype":"data_center","name":"SSP-Sunset","county":"Yakima County","state":"WA","lat":46.456558,"lng":-120.740145,"cprec":"distinct","status":"Proposed","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"61c5cf64a0b2","cid":"61c5cf64a0b2","canon":1,"dups":1,"ftype":"data_center","name":"Stack IPI Data Center","county":"Klickitat County","state":"WA","lat":45.870446,"lng":-120.779305,"cprec":"shared_centroid","status":"Proposed","mw":958,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"In 2022, Puget Sound Energy filed an interconnection request with BPA for a 958 megawatt Stack data center to be built at what appears to be the Goldendale site, and listed it as in “study phase,” according to researchers at Columbia Riverkeeper.","pscan":"https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site","uquote":"The local public utility district's most recent projections in 2024 estimated industrial and commercial energy demand would rise only 3% in the next 10 years. And data from the U.S. Energy Information Administration shows electricity demand among Klickitat Public Utility District users is nearly the same for commercial and industrial customers today as it was 10 years ago.","uscan":"https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site","rto":"non-RTO","nerc":"WECC","op":"STACK Infrastructure","spon":"IPI Partners","ay":2022,"contro":"Yakamas protest clean energy project on sacred site to power data center","controScan":"https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site","deal":"Prospective Purchaser Consent Decree with STACK Infrastructure USA III, LLC","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"tricitiesbusinessnews.com","lflag":"online_before_announced source_quality_reclassified shared_coordinate_precision_downgraded utility_alias_corrected","srcUrls":["https://www.tricitiesbusinessnews.com/articles/yakamas-protest-clean-energy-project-on-sacred-site"],"ukey":"15500|WA","uname":"Puget Sound Energy Inc","reportedUtility":"Puget Sound Energy Inc"},{"id":"46ce173577ef","cid":"46ce173577ef","canon":1,"dups":4,"ftype":"data_center","name":"Microsoft Malaga Data Center","county":"Chelan","state":"WA","lat":47.860974,"lng":-120.619041,"cprec":"shared_centroid","status":"Proposed","mw":288,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"The large-load framework outlines three options for supplying energy: short-term market purchases, customer-sourced wholesale energy, and negotiated contracts at the board's discretion. All energy delivered under this framework must meet carbon-free, renewable, and capacity requirements set by Chelan PUD and applicable laws.... “Under the large load contract, we will receive energy from a third-party supplier. That means we will be bringing in new, clean power from outside the region.”","proc":"Dedicated PPA","pcp":"Third-party supplier (via Chelan PUD)","pdt":"288 megawatts for 15 years with an option to extend for additional five-year periods","uquote":"Chelan PUD is looking at results from a public comment period over how it should deal with a growing number of large load customers, such as a new Microsoft Data Center in Malaga.","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","ay":2023,"oy":2026,"contro":"Data centers are still causing unease among local orchardists who see the region's economy shifting from an agricultural base toward an industrial one. The biggest concern expressed by the public was a need to preserve reliability and affordable rates for existing customers in Chelan County. Some say the region desperately needs the economic benefits the facilities bring, while others are concerned about a potential competition for land with the giant concrete structures.","deal":"Microsoft paid up front to build the $86.5 million Jumpoff Ridge substation and other infrastructure improvements that were needed to serve the data center. Chelan PUD commissioners Monday, June 16, approved a contract to supply power to Microsoft's forthcoming data center campus in Malaga, marking the first agreement executed under the utility's large-load framework.","dealScan":"https://lakechelannow.com/pud-commissioners-consider-powering-data-center-in-a-way-that-protects-reliability-rates/","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"lakechelannow.com","srcUrls":["https://lakechelannow.com/pud-commissioners-consider-powering-data-center-in-a-way-that-protects-reliability-rates/"],"lflag":"citation_artifact_removed source_quality_reclassified display_name_normalized coordinate_cluster_reclassified","rawName":"","city":"Malaga"},{"id":"84371d174722","cid":"46ce173577ef","canon":0,"dups":4,"ftype":"data_center","name":"Microsoft Malaga Data Center","county":"Chelan","state":"WA","lat":47.860974,"lng":-120.619041,"cprec":"shared_centroid","status":"Proposed","mw":288,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"Under the large load contract, we will receive energy from a third-party supplier. That means we will be bringing in new, clean power from outside the region.”","proc":"Dedicated PPA","pcp":"third-party supplier (via Chelan PUD)","pdt":"288 MW for 15 years (with extensions)","uquote":"Chelan County PUD commissioners voted in favor of buying seven capacitor banks at about $4 million total for the upcoming Microsoft data center.","uscan":"https://www.govtech.com/computing/washington-utility-district-oks-4m-investment-in-microsoft-substation","ukey":"3413|WA","uname":"PUD No 1 of Chelan County","rto":"non-RTO","nerc":"WECC","op":"Microsoft","ay":2023,"oy":2026,"contro":"Public concerns include preserving reliability and affordable rates for existing customers, the impact on farmland, and job displacement due to the shift from an agricultural economy.","controScan":"https://www.spokesman.com/stories/2026/apr/29/data-centers-replace-fruit-orchards-in-changing-ce/","deal":"Chelan County PUD approved a contract to supply power to Microsoft's data center campus in Malaga. Microsoft has already paid for infrastructure upgrades, including the $86.5 million construction of the Jumpoff Ridge substation.","tier":2,"tlbl":"Reputable journalism","srcCt":2,"srcDom":"govtech.com;spokesman.com","srcUrls":["https://www.govtech.com/computing/washington-utility-district-oks-4m-investment-in-microsoft-substation","https://www.spokesman.com/stories/2026/apr/29/data-centers-replace-fruit-orchards-in-changing-ce/"],"rawName":"","city":"Malaga","lflag":"display_name_normalized coordinate_cluster_reclassified"},{"id":"92f8df63f1b1","cid":"46ce173577ef","canon":0,"dups":4,"ftype":"data_center","name":"Microsoft Malaga Data Center","county":"Chelan","state":"WA","lat":47.860974,"lng":-120.619041,"cprec":"shared_centroid","status":"Proposed","mw":288,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"In all three options, Chelan PUD infrastructure and power lines would be used to deliver the power directly to the customer.","pscan":"https://kpq.com/chelan-pud-mulling-plans-for-heavy-use-customers-data-centers/","uquote":"Chelan PUD commissioners recently considered contract terms that would supply power to a new Microsoft data center campus in Washington State while protecting reliability and stable, predictable rates for existing customers, Chelan PUD said on June 2.","uscan":"https://www.publicpower.org/periodical/article/chelan-pud-commissioners-consider-powering-data-center-way-protects-reliability-rates","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2023,"oy":2026,"contro":"While Microsoft and the local utility agreed to new terms to soothe electricity concerns, data centers are still causing unease among local orchardists who see the region's economy shifting from an agricultural base toward an industrial one.","deal":"Microsoft paid up front to build the $86.5 million Jumpoff Ridge substation and other infrastructure improvements that were needed to serve the data center.","dealScan":"https://www.publicpower.org/periodical/article/chelan-pud-commissioners-consider-powering-data-center-way-protects-reliability-rates","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"kpq.com;publicpower.org","srcUrls":["https://kpq.com/chelan-pud-mulling-plans-for-heavy-use-customers-data-centers/","https://www.publicpower.org/periodical/article/chelan-pud-commissioners-consider-powering-data-center-way-protects-reliability-rates"],"lflag":"source_quality_reclassified display_name_normalized coordinate_cluster_reclassified","rawName":"","city":"Malaga"},{"id":"0a89dbc38feb","cid":"46ce173577ef","canon":0,"dups":4,"ftype":"data_center","name":"Microsoft Malaga Data Center","county":"Chelan","state":"WA","lat":47.860974,"lng":-120.619041,"cprec":"shared_centroid","status":"Proposed","mw":288,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"From 2026 through 2040, the energy source will be determined under terms that align with the utility's energy marketing strategy and regulatory requirements. The large-load framework outlines three options for supplying energy: short-term market purchases, customer-sourced wholesale energy, and negotiated contracts at the board's discretion. All energy delivered under this framework must meet carbon-free, renewable, and capacity requirements set by Chelan PUD and applicable laws. “Under the large load contract, we will receive energy from a third-party supplier. That means we will be bringing in new, clean power from outside the region.”","proc":"Dedicated PPA","pcp":"Helion","pdt":"up to 50 MW of capacity, expected to deliver power by 2028","uquote":"WENATCHEE — Chelan County Public Utility District commissioners on Monday, June 16, approved a contract to supply power to Microsoft's forthcoming data center campus in Malaga, marking the first agreement executed under the utility's large-load framework.","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft","ay":2023,"oy":2026,"contro":"Yes","controScan":"https://www.spokesman.com/stories/2026/apr/29/data-centers-replace-fruit-orchards-in-changing-ce/","deal":"Chelan PUD approved a power contract with Microsoft; Microsoft funded the $86.5 million Jumpoff Ridge substation; Chelan Douglas Regional Port Authority purchased land for the project, fully funded by Microsoft.","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"spokesman.com","srcUrls":["https://www.spokesman.com/stories/2026/apr/29/data-centers-replace-fruit-orchards-in-changing-ce/"],"lflag":"source_quality_reclassified display_name_normalized coordinate_cluster_reclassified","rawName":"","city":"Malaga"},{"id":"f72fb501e714","cid":"f72fb501e714","canon":1,"dups":1,"ftype":"data_center","name":"West Richland Data Center Campus","county":"Benton","state":"WA","lat":46.228125,"lng":-119.516659,"cprec":"shared_centroid","status":"Proposed","mw":912,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"West Richland Data Center Campus is a energy project with 912 MW of capacity located in the county of Benton, WA. The project is currently active in the West (non-ISO) interconnection queue.","pscan":"https://www.interconnection.fyi/project/bpa-l0621","uquote":"Utility. Benton Rural Electric Association.","uscan":"https://www.interconnection.fyi/project/bpa-l0621","ukey":"1625|WA","uname":"Benton Rural Electric Assn","rto":"non-RTO","nerc":"WECC","ay":2024,"oy":2028,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/project/bpa-l0621"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"b6cc775fb729","cid":"b6cc775fb729","canon":1,"dups":1,"ftype":"data_center","name":"Bull Road Data Center","county":"Kittitas","state":"WA","lat":47.124441,"lng":-120.676709,"cprec":"distinct","status":"Cancelled","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"4dd93cdc0e1a","cid":"4dd93cdc0e1a","canon":1,"dups":1,"ftype":"data_center","name":"CAC Green H2 Facility","county":"Columbia County","state":"WA","lat":46.29285,"lng":-117.911634,"cprec":"distinct","status":"Cancelled","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"6e67c5c6405f","cid":"6e67c5c6405f","canon":1,"dups":1,"ftype":"data_center","name":"GLP Data Center","county":"Benton","state":"WA","lat":46.228125,"lng":-119.516659,"cprec":"shared_centroid","status":"Cancelled","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"b27fb9d29f7a","cid":"b27fb9d29f7a","canon":1,"dups":1,"ftype":"data_center","name":"Plymouth Data Center Campus","county":"Benton","state":"WA","lat":46.228125,"lng":-119.516659,"cprec":"shared_centroid","status":"Cancelled","mw":250,"band":"250+ MW","pc":"Grid","pconf":"High","pquote":"Grid Operator. Bonneville Power Administration.","pscan":"https://www.interconnection.fyi/data-center/project/plymouth-data-center-campus-ca1a0034","rto":"non-RTO","nerc":"WECC","ay":2024,"oy":2028,"tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"interconnection.fyi","srcUrls":["https://www.interconnection.fyi/data-center/project/plymouth-data-center-campus-ca1a0034"],"lflag":"shared_coordinate_precision_downgraded"},{"id":"5e163e40e93c","cid":"5e163e40e93c","canon":1,"dups":1,"ftype":"data_center","name":"PSE Cherry Point","county":"Whatcom County","state":"WA","lat":48.842653,"lng":-121.836432,"cprec":"distinct","status":"Cancelled","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c7e67daf504b","cid":"c7e67daf504b","canon":1,"dups":1,"ftype":"data_center","name":"Spearfish Data Center","county":"Klickitat County","state":"WA","lat":45.870446,"lng":-120.779305,"cprec":"shared_centroid","status":"Cancelled","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"shared_coordinate_precision_downgraded","srcUrls":null,"srcDom":null},{"id":"be736e968cd4","cid":"be736e968cd4","canon":1,"dups":1,"ftype":"data_center","name":"Trammel Crow Data Center","county":"Cowlitz","state":"WA","lat":46.196785,"lng":-122.67846,"cprec":"distinct","status":"Cancelled","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"8f047a158808","cid":"8f047a158808","canon":0,"dups":1,"ftype":"data_center","name":"Quarantined unnamed WA data-center record","county":"Chelan","state":"WA","lat":47.860974,"lng":-120.619041,"cprec":"shared_centroid","status":"Cancelled","mw":250,"band":"250+ MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"","quarantine":1,"quarantineReason":"Blank record with no operator, city, or resolved source URL; hidden from default canonical views.","lflag":"blank_unsourced_record coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"d3de42060594","cid":"d3de42060594","canon":0,"dups":1,"ftype":"data_center","name":"Quarantined unnamed WA data-center record","county":"Chelan","state":"WA","lat":47.860974,"lng":-120.619041,"cprec":"shared_centroid","status":"Cancelled","mw":175,"band":"100-250 MW","rto":"non-RTO","nerc":"WECC","tier":0,"tlbl":"No sources resolved","srcCt":0,"rawName":"","quarantine":1,"quarantineReason":"Blank record with no operator, city, or resolved source URL; hidden from default canonical views.","lflag":"blank_unsourced_record coordinate_cluster_reclassified","srcUrls":null,"srcDom":null},{"id":"85127d2a5a59","cid":"85127d2a5a59","canon":1,"dups":1,"ftype":"data_center","name":"Alpha Technologies","city":"South Charleston","county":"Kanawha","state":"WV","lat":38.328068,"lng":-81.523516,"cprec":"distinct","status":"Operational","mw":2,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"Our DC1 state-of-the-art data center offers dual redundant commercial power feeds, the lowest power cost in the region and multiple telecommunication service providers with diverse paths into the center.... Redundant commercial power feeds with battery and backup diesel generators to guarantee server availability.","pscan":"https://myalphainnovations.com/2023_Post_Files/smallbus_5-2023/doc/alpha_technologies_data_center.pdf","proc":"Tariff (utility)","rto":"PJM","nerc":"RFC","op":"Alpha Technologies","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"myalphainnovations.com","srcUrls":["https://myalphainnovations.com/2023_Post_Files/smallbus_5-2023/doc/alpha_technologies_data_center.pdf"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"107e13ea2f15","cid":"107e13ea2f15","canon":1,"dups":1,"ftype":"data_center","name":"Gtech Corporation","city":"Elkview","county":"Kanawha","state":"WV","lat":38.328068,"lng":-81.523516,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"c86a34014ff8","cid":"c86a34014ff8","canon":1,"dups":1,"ftype":"data_center","name":"Gtech Corporation","city":"Kanawha","county":"Kanawha","state":"WV","lat":38.328068,"lng":-81.523516,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","rto":"PJM","nerc":"RFC","tier":0,"tlbl":"No sources resolved","srcCt":0,"srcUrls":null,"srcDom":null},{"id":"ec25be2f0972","cid":"ec25be2f0972","canon":1,"dups":1,"ftype":"data_center","name":"Expedient","city":"Franklin","county":"Milwaukee","state":"WI","lat":42.912643,"lng":-87.862312,"cprec":"distinct","status":"Operational","mw":1,"band":"< 10 MW","pc":"Hybrid","pconf":"High","pquote":"Expedient's Milwaukee facility offers... redundant electric utility power feeds, 2 auto-cutover diesel generators, multiple cooling systems, advanced fire suppression, and a carrier-neutral telecommunications infrastructure.","proc":"Tariff (utility)","pcp":"We Energies","uquote":"We Energies serves more than 1.1 million electric customers and 1.1 million natural gas customers in Wisconsin, including all of southeast Wisconsin","uscan":"https://www.discovermilwaukee.com/move/utilities/","ukey":"20847|WI","uname":"Wisconsin Electric Power Co","rto":"MISO","nerc":"MRO","op":"Expedient Data Centers","tenant":"Harley Davidson","ay":2021,"oy":2021,"deal":"Acquisition from NTT","tier":3,"tlbl":"Aggregator/contractor","srcCt":1,"srcDom":"discovermilwaukee.com","srcUrls":["https://www.discovermilwaukee.com/move/utilities/"],"lflag":"source_quality_reclassified"},{"id":"afc04dd6088b","cid":"afc04dd6088b","canon":1,"dups":1,"ftype":"data_center","name":"FIS Global","city":"Brown Deer","county":"Milwaukee","state":"WI","lat":42.912643,"lng":-87.862312,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Grid","pconf":"High","pquote":"Grid Operator: Wisconsin Electric Power Company.","uquote":"Grid Operator: Wisconsin Electric Power Company.","ukey":"20847|WI","uname":"Wisconsin Electric Power Co","rto":"MISO","nerc":"MRO","op":"FIS Global","ay":2021,"tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text","srcUrls":null,"srcDom":null},{"id":"cb9f88cb3a43","cid":"cb9f88cb3a43","canon":1,"dups":1,"ftype":"data_center","name":"Foxconn","city":"Mt. Pleasant","county":"Racine","state":"WI","lat":42.780392,"lng":-87.771599,"cprec":"distinct","status":"Operational","mw":10,"band":"10-25 MW","pc":"Hybrid","pconf":"High","pquote":"The building housing The Globe data center operations will be heated via geothermal system and will have a 727,500 Btu/hr natural gas fired boiler for building heat as a back-up to the geothermal system. One diesel fired generator (size yet to be determined) will also be installed for The Globe.... Under the contract, We Energies will install, own, and maintain approximately 2,000 solar panels on the Foxconn campus in Mount Pleasant. The one-megawatt project is capable of producing enough energy to power 300 homes.... Conway said energy generated by the system will feed the grid but will be purchased by Foxconn through We Energies' Energy For Tomorrow program.","pscan":"https://urbanmilwaukee.com/2023/03/10/foxconn-we-energies-building-solar-farm-at-factory-campus/","proc":"Tariff (utility)","pcp":"We Energies","pdt":"2.9 cents to 4.3 cents per kilowatt-hour (wholesale price)","uconf":"High","uquote":"We Energies, a Wisconsin-based utility company of WEC Energy Group (NYSE: WEC), and Hon Hai Technology Group (“Foxconn”) (TWSE:2317) announced that this spring the companies will submit for approval with the Village of Mount Pleasant Board of Trustees and Racine County Board of Supervisors a project to install solar panels at Foxconn's Science and Technology Park in Mount Pleasant, Wisconsin.","uscan":"https://news.we-energies.com/we-energies-and-foxconn-partner-on-clean-energy-project-in-wisconsin/","ukey":"20847|WI","uname":"Wisconsin Electric Power Co","rto":"MISO","nerc":"MRO","op":"Foxconn","spon":"Foxconn","tenant":"Foxconn","ay":2020,"oy":2021,"contro":"The Foxconn project has faced local opposition for the acquisition and demolition in the community, as well as for the granting of water rights and subsidies funded by taxpayers to a foreign company.... The Wisconsin village of Mount Pleasant had effectively forced him, his girlfriend and four children from their home in 2017 to make way for a proposed 20m sq ft hi-tech plant owned by the Taiwanese electronics giant Foxconn...","deal":"The state of Wisconsin agreed to hand over a $4.1 billion subsidy to Foxconn, which will cost Wisconsinites more than a million dollars per job created.... In total, Wisconsin, Racine County and Mount Pleasant gave the company nearly $4.8 billion in tax breaks, incentives and taxpayer dollars for improvements.... Under the new expansion, Foxconn can reportedly earn up to $96 million in EITMZ credits through Dec. 31, 2029.... Then, in the summer of 2023, Microsoft paid Foxconn $50 million and bought a plot of land in Racine County, Wisconsin, to build a more than $1 billion data center...","dealScan":"https://www.manufacturingdive.com/news/foxconn-569m-expanding-mount-pleasant-wisconsin-open-ai-collaboration/806537/","tier":1,"tlbl":"Primary/Authoritative","srcCt":3,"srcDom":"urbanmilwaukee.com;news.we-energies.com;manufacturingdive.com","srcUrls":["https://urbanmilwaukee.com/2023/03/10/foxconn-we-energies-building-solar-farm-at-factory-campus/","https://news.we-energies.com/we-energies-and-foxconn-partner-on-clean-energy-project-in-wisconsin/","https://www.manufacturingdive.com/news/foxconn-569m-expanding-mount-pleasant-wisconsin-open-ai-collaboration/806537/"],"lflag":"citation_artifact_removed source_quality_reclassified"},{"id":"efb2d34706e4","cid":"efb2d34706e4","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Mt. Pleasant","county":"Racine","state":"WI","lat":42.780392,"lng":-87.771599,"cprec":"distinct","status":"Operational","mw":400,"band":"250+ MW","pc":"Hybrid","pconf":"High","pquote":"During normal operations, Microsoft's data centers will draw power from We Energies' system. The Milwaukee-based utility is investing nearly $2 billion in natural gas projects to meet increased demand for power, including from Microsoft. The company's data center campus is “anticipated to become the largest electric load” served by the utility, according to a Microsoft consultant. The company didn't provide details on its energy usage. Microsoft will use generators that rely on diesel or renewable fuel to provide backup power at its data centers as part of the company's $3.3 billion data center campus in Mount Pleasant.","pscan":"https://urbanmilwaukee.com/2024/11/15/microsofts-wisconsin-data-center-will-rely-on-diesel-backup-power/","proc":"Tariff (utility)","pcp":"We Energies","pdt":"Minimum 15-year contract, initial capacity 400 MW, expanding to 900 MW; We Energies investing nearly $1.5 billion in new gas plants to serve demand.","uquote":"During normal operations, Microsoft's data centers will draw power from We Energies' system.","uscan":"https://urbanmilwaukee.com/2024/11/15/microsofts-wisconsin-data-center-will-rely-on-diesel-backup-power/","ukey":"20847|WI","uname":"Wisconsin Electric Power Co","rto":"MISO","nerc":"MRO","op":"Microsoft","spon":"Microsoft","ay":2023,"oy":2026,"contro":"Yes","deal":"The Mount Pleasant site was previously set aside for a Foxconn manufacturing hub.","dealScan":"https://baxtel.com/data-center/microsoft-fairwater-1-campus","tier":3,"tlbl":"Aggregator/contractor","srcCt":2,"srcDom":"urbanmilwaukee.com;baxtel.com","srcUrls":["https://urbanmilwaukee.com/2024/11/15/microsofts-wisconsin-data-center-will-rely-on-diesel-backup-power/","https://baxtel.com/data-center/microsoft-fairwater-1-campus"],"lflag":"source_quality_reclassified"},{"id":"e72263523f9e","cid":"e72263523f9e","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft Fairwater Wisconsin","county":"Racine","state":"WI","lat":42.780392,"lng":-87.771599,"cprec":"distinct","status":"Construction","mw":337,"pc":"Grid","pconf":"High","pquote":"Microsoft commits to covering its energy needs without adding pressure to local prices. It is pre-paying for the energy and infrastructure it consumes, ensuring prices remain stable for residents. The company pledges to match every kilowatt hour of fossil fuel energy used with carbon-free energy supplied back to the grid.","uquote":"Microsoft is also working with WE Energies to manage transmission, generation and usage under transparent tariffs designed to protect grid reliability.","ukey":"20847|WI","uname":"Wisconsin Electric Power Co","rto":"MISO","nerc":"MRO","op":"Microsoft","spon":"Microsoft","tenant":"OpenAI, Microsoft AI, Copilot capabilities","ay":2023,"oy":2026,"contro":"Concerns about environmental impact, water usage, and potential for higher electricity bills were raised by local residents and environmental groups. Microsoft also dropped plans for a third data center (Project Nova) in Caledonia due to community opposition.","controScan":"https://www.fox6now.com/news/microsoft-wisconsin-next-infrastructure-investment-announced","deal":"Initial $3.3 billion investment, with an additional $4 billion committed for a second similar-scale data center, bringing the total investment in Wisconsin to more than $7 billion. A new 250 MW solar project in Portage County with National Grid Renewables is under construction to support the commitment to carbon-free energy.","tier":2,"tlbl":"Reputable journalism","srcCt":1,"srcDom":"fox6now.com","srcUrls":["https://www.fox6now.com/news/microsoft-wisconsin-next-infrastructure-investment-announced"],"band":"250+ MW","lflag":"source_quality_reclassified"},{"id":"5e620e21e5b5","cid":"5e620e21e5b5","canon":1,"dups":1,"ftype":"data_center","name":"Lunavi","city":"Cheyenne","county":"Laramie","state":"WY","lat":41.29283,"lng":-104.660395,"cprec":"distinct","status":"Operational","mw":5,"band":"< 10 MW","pc":"Grid","pconf":"High","pquote":"A/B redundancies from cabinet to PDUs to the UPS to the utility.","pscan":"https://www.lunavi.com/data-centers/cheyenne","uconf":"High","uquote":"Grid Operator: Black Hills Cheyenne Light Fuel and Power Transmission.","uscan":"https://www.interconnection.fyi/data-center/project/lunavi-23a8f521","ukey":"3461|WY","uname":"Cheyenne Light Fuel & Power","rto":"non-RTO","nerc":"WECC","op":"Lunavi","spon":"1547 Critical Systems Realty","ay":2014,"oy":2015,"deal":"In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.","dealScan":"https://baxtel.com/data-center/lunavi-cheyenne","tier":3,"tlbl":"Aggregator/contractor","srcCt":3,"srcDom":"lunavi.com;interconnection.fyi;baxtel.com","srcUrls":["https://www.lunavi.com/data-centers/cheyenne","https://www.interconnection.fyi/data-center/project/lunavi-23a8f521","https://baxtel.com/data-center/lunavi-cheyenne"]},{"id":"b765db284776","cid":"b765db284776","canon":1,"dups":1,"ftype":"data_center","name":"Microsoft","city":"Cheyenne","county":"Laramie","state":"WY","lat":41.29283,"lng":-104.660395,"cprec":"distinct","status":"Proposed","mw":175,"band":"100-250 MW","pc":"Hybrid","pconf":"High","pquote":"Microsoft and Black Hills Energy have developed an innovative utility partnership in Wyoming, in which power acquisition is guided by the Large Power Contract Service (LPCS) tariff. The tariff requires Microsoft to directly pay for all the infrastructure upgrades and power procured by the utility necessary to serve its load.... Enter Microsoft's onsite backup generation (“behind the meter” generation) – a critical component of all data centers to ensure mission critical reliability.","proc":"Dedicated PPA","pcp":"Black Hills Energy (Cheyenne Light, Fuel and Power Company)","pdt":"Facility capacity 100-250 MW; utility procures market power and renewables at a firm price, with Microsoft directly funding infrastructure and power procurement.","uquote":"Microsoft and Black Hills Energy have developed an innovative utility partnership in Wyoming, in which power acquisition is guided by the Large Power Contract Service (LPCS) tariff.","ukey":"19545|WY","uname":"Black Hills Power, Inc.","rto":"non-RTO","nerc":"WECC","op":"Microsoft","spon":"Microsoft","tenant":"Microsoft (Azure)","ay":2026,"contro":"Yes","deal":"Land acquisition of approximately 3,200 acres (later 3,620 acres) for data center development.","tier":0,"tlbl":"No sources resolved","srcCt":0,"lflag":"online_before_announced unlinked_source_text citation_artifact_removed","srcUrls":null,"srcDom":null}]