{"00a8072c2504":{"links":[],"unverified_note":"QTS is a Blackstone portfolio company."},"00bd5d551204":{"links":[],"unverified_note":"$5 million in incentives from the city of Richardson in March 2010","note_status":"NOT_MATERIAL"},"00c3f0dfb5d9":{"links":[],"unverified_note":"Acquisition of former Maxim semiconductor manufacturing facility in 2013."},"00df3eef4b25":{"links":[],"unverified_note":"Acquisition of 29 data centers from Verizon"},"0127dcc92c9e":{"links":[],"unverified_note":"Energy Savings Performance Contract (ESPC) with Ameresco for $183 million, announced January 13, 2025, to advance electrification with 14.4 MW solar PV and geothermal systems.","note_status":"NOT_MATERIAL"},"0150a4869e2c":{"links":[],"unverified_note":"Multibillion-dollar joint venture with Canadian real estate firm QuadReal Property Group (announced May 2025)"},"01542b8ff9a5":{"links":[],"unverified_note":"Acquisition of rights to Milsing Site in December 2025"},"017d0ed0984e":{"links":[],"unverified_note":"Site acquisition by Amazon Data Services Inc. (Vadata) for $54 million in October 2020.","note_status":"NO_PRIMARY"},"0186bbb1a6ff":{"links":[],"unverified_note":"Initial $10 billion investment in Madison County, followed by an additional $11 billion for Madison County (total $25 billion statewide).","note_status":"NOT_MATERIAL"},"018d17cc5eb4":{"links":[],"unverified_note":"15-year, $9.8 billion triple-net lease for 352 MW of IT capacity with a high-investment-grade tenant, announced May 6, 2026.","note_status":"NO_PRIMARY"},"01a6dddf119b":{"links":[],"unverified_note":"QTS purchased the existing 8 gross megawatt facility for approximately $50 million on January 30, 2017. QTS also plans to expand its existing data center campus at 14100 Park Vista Blvd. in Fort Worth, Texas, with an investment of $130 million."},"01e1a3eeae81":{"links":[],"unverified_note":"Peak Mining (by Northern Data Group) acquired Bootstrap's site in December 2023."},"01e3579039b5":{"links":[],"unverified_note":"10-year property tax abatement for the first building (estimated cost $314 million) and a data-center specific tax credit of $42 million over 35 years. Agreement with AES Indiana for Google to pay full cost of power and infrastructure, estimated at $1.3 billion.","note_status":"NOT_MATERIAL"},"0207e9ee7d42":{"links":[],"unverified_note":"$650 million construction costs for two data centers (DFW2 DC2 and DFW2 DC3) announced April 2025"},"021afdb74356":{"links":[],"unverified_note":"$100 million in construction financing (October 2025)"},"02a535668ce9":{"links":[],"unverified_note":"Blackstone acquired QTS for $10 billion (mid-2021)"},"02ccbbfc11c5":{"links":[],"unverified_note":"Initial investment of more than $800 million announced March 31, 2022. Power Purchase Agreement (PPA) with ENGIE North America for 260-MW Sypert Branch solar project, announced October 31, 2024.","note_status":"NO_PRIMARY"},"02d66f7f2f8f":{"links":[],"unverified_note":"Acquisition of seven data centers from vXchnge by H5 Data Centers, announced January 31, 2021."},"032dd762b8aa":{"links":[],"unverified_note":"CyrusOne sold four Houston data centers, including Houston Galleria, to DataBank for $670 million. The agreement was entered into on January 19, 2022, and the acquisition closed on March 3, 2022."},"0337ed929fae":{"links":[],"unverified_note":"Apple agreed to invest $250 million and pay an annual $150,000 'project fee' in lieu of property taxes (April 2012). Apple signed a deal to purchase 200 MW of power from Montague Wind Power Project and 56 MW from Solar Star Oregon II. Apple acquired the 45 Mile Hydroelectric Plant (April 2014). Apple is funding an $8.7 million Aquifer Storage and Recovery (ASR) system project.","note_status":"NOT_MATERIAL"},"033ac3307721":{"links":[],"unverified_note":"Crusoe agreed to sell the project to Google, which is incorporating it into a USD 40bn Texas investment program (announced December 15, 2025). Phase 1 capital investment is $14.6 billion."},"035662bdf5ec":{"links":[],"unverified_note":"Power Solutions fit-out project"},"0368a57f668d":{"links":[],"unverified_note":"Tax abatement approved by Red Oak City Council and Ellis County for Compass Datacenters' Red Oak campus development."},"03690a88b4ee":{"links":[],"unverified_note":"In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient."},"037826c17048":{"links":[],"unverified_note":"$2.4 billion investment over 20 years announced December 21, 2021; $600 million debt financing closed October 16, 2025."},"03a03bc9550f":{"links":[],"unverified_note":"American Electric Power (AEP) will own the natural gas-powered fuel cells for the AWS data center, with Ohio Power Siting Board (OPSB) approval effective Sept. 22, 2025."},"03a4d6837b50":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025, arranged by Santander Corporate & Investment Banking and Cantor Fitzgerald."},"03d392b11f6b":{"links":[],"unverified_note":"Acquired for $66,100,000 by TFG INDEPENDENCE CENTER I REIT, LLC"},"03eaf7146396":{"links":[],"unverified_note":"Acquisition of 8 gross megawatt facility for approximately $50 million on January 30, 2017. $220 million investment for QTS Fort Worth DC2 with construction completed early 2026. $130 million expansion of existing campus."},"04140c24c20f":{"links":[],"unverified_note":"$2.5 billion bond package approved in 2023 for Harris Health's strategic facilities plan, including Ben Taub Hospital expansion."},"042934a68a93":{"links":[],"unverified_note":"TeraWulf signed three 10-year HPC colocation agreements with Fluidstack for 360 MW at Lake Mariner, valued at approximately $6.7 billion over ten years, with Google providing a $3.2 billion backstop of Fluidstack's lease obligations and acquiring a 14% equity stake in TeraWulf (announced August 2025).","note_status":"NO_PRIMARY"},"0451cc4688e6":{"links":[],"unverified_note":"Installation of a 460-kilowatt natural gas-powered fuel cell completed May 17, 2022."},"045845932f2a":{"links":[],"unverified_note":"Land purchase for $12.2 million on January 27, 2025","note_status":"NOT_MATERIAL"},"047b5ac2a132":{"links":[],"unverified_note":"Acquisition of LA7 (and 28 other data centers) from Verizon for $3.6 billion in May 2017."},"0496b948cfdc":{"links":[],"unverified_note":"Acquisition of 40-acre site from PRP Real Estate Investment Management for $113.5 million."},"0498fddef88d":{"links":[],"unverified_note":"Digital Realty acquired the St. Louis properties for $53 million in 2007. Digital Realty sold the St. Louis properties (210 N. Tucker and 900 Walnut) to Netrality Properties in July 2016 as part of a four-building portfolio sale for $114 million.","note_status":"NO_PRIMARY"},"04eb71817398":{"links":[],"unverified_note":"Acquisition of 120-122 acre George Washington University Virginia Science and Technology Campus for $427 million in March 2026."},"0500e1fc0373":{"links":[{"record_id":"research:newsroom:cyrusone:20260324:1","name":"CyrusOne Upsizes and Extends $8.0 Billion in Loan Facilities to Support Strategic Growth and Sustainability Goals While Strengthening Liquidity Position","date":"2026-03-24","type":"Debt financing","value_label":"~$8B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:cyrusone:20260324:1","scope":"portfolio"}]},"0505509d58fa":{"links":[],"unverified_note":"Land acquisition for $52.2 million in January 2020; initial building construction valued at $123 million.","note_status":"NO_PRIMARY"},"05340b2fdcda":{"links":[],"unverified_note":"Amazon Web Services (AWS) announced a $5 billion investment into Fayette County by 2030. Amazon Data Services, Inc. purchased 589.843 acres for over $102 million, with land sale documents effective Dec. 30, 2024.","note_status":"NOT_MATERIAL"},"054487a398ea":{"links":[],"unverified_note":"Amazon secured an $83 million contract to develop a large-scale solar and battery storage facility in Oregon in January 2026."},"0590984e43cf":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, dated May 04, 2026."},"05ac9d18e151":{"links":[],"unverified_note":"Meta is paying for a second injection well for the city's water storage recovery system, with projected costs between $1 million and $3.2 million, expected to be completed by the end of 2024."},"05ec7fe9c3ca":{"links":[],"unverified_note":"Financial backing secured from Tallvine Partners in 2025"},"061643ff53d5":{"links":[],"unverified_note":"Flexential raised approximately $1 billion from GI Partners, GI Data Infrastructure, Hamilton Lane and Morgan Stanley Infrastructure Partners for expansion."},"063f0b96431c":{"links":[],"unverified_note":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022."},"065cd6407e56":{"links":[],"unverified_note":"Acquired by DataBank in 2020"},"06c6248c9660":{"links":[],"unverified_note":"$200 million data center project announced in September 2013","note_status":"NOT_MATERIAL"},"06de9eb54905":{"links":[],"unverified_note":"Partnership with Calibrant Energy for a 31 MW, 62 MWh Battery Energy Storage System (BESS) to accelerate interconnection (announced October 2025). Acquisition of Aligned Data Centers by a consortium including Nvidia, BlackRock, Microsoft, and xAI for $40 billion (announced October 2025)."},"06e6fde34f58":{"links":[],"unverified_note":"Securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne's Sterling, VA, and San Antonio, TX, data centers (Series 2024-1 class A-2 note issuance) on March 5, 2024."},"070efbecb5be":{"links":[],"unverified_note":"Apple bought a square block of office and warehouse properties for $162 million in late 2020. This expansion is part of Apple's $430 billion investment and commitment to create 20,000 jobs in the U.S. over five years.","note_status":"NO_PRIMARY"},"07155a34b1a7":{"links":[],"unverified_note":"IPO in October 2025; $165 million senior-secured equipment loan from CSG Investments, Inc. (March 2026); $500 million turbine warehouse facility with MUFG Bank (February 2026); $200 million facility from Keystone National Group and Cape Commercial Finance (February 2026); natural gas supply agreement with Energy Transfer (October 2025)."},"0747595b0830":{"links":[],"unverified_note":"Evocative acquired 9 data centers, including this one, from INAP on September 28, 2022, funded by an incremental equity investment led by Crestline Investors, Inc."},"0763b2c073f8":{"links":[],"unverified_note":"$4.8M Renovation/Alteration project registered July 11, 2012","note_status":"NOT_MATERIAL"},"0777489ed518":{"links":[],"unverified_note":"Initial $250 million investment for the first building of Phase 1, announced in late 2016.","note_status":"NOT_MATERIAL"},"07a51bda0506":{"links":[],"unverified_note":"the Gigaland developers offered a $15 million farmland conservation deal to revive their stalled data center proposal","note_status":"NOT_MATERIAL"},"07a624a194f2":{"links":[],"unverified_note":"Construction of two single-story data center buildings with an estimated cost of $765,000,000, with a start date of June 1, 2025, and completion date of July 31, 2027."},"07bbb3ed4c11":{"links":[],"unverified_note":"Peak10 acquired ViaWest for $1.67 billion in August 2017, leading to the formation of Flexential. GI Partners and Morgan Stanley Infrastructure Partners made a combined $1 billion primary equity investment in Flexential in November 2024 and August 2025."},"07d81ea79d50":{"links":[],"unverified_note":"Initial investment of $143 million (December 12, 2024)","note_status":"NOT_MATERIAL"},"07db4c961608":{"links":[],"unverified_note":"Long-term tax abatement approved Sept 26, 2022, including annual fees and a $5 million Community Development Contribution. A 25-year water service agreement approved Feb 24, 2025, with AWS covering construction costs. An $8 million contribution from AWS for an RV park project. A $20.5 million settlement reached March 31, 2026, over alleged nitrate groundwater contamination.","note_status":"NOT_MATERIAL"},"0830b27ffd8f":{"links":[],"unverified_note":"Core Scientific acquired this facility; CoreWeave leased data center space from Core Scientific."},"085dda2141b5":{"links":[],"unverified_note":"PPA with ENGIE for renewable energy, announced September 20, 2023."},"088a27a37086":{"links":[],"unverified_note":"Digital Second Manassas LLC, a subsidiary of Digital Realty, purchased the 9905 Godwin Drive site for $5.75 million in 2018.","note_status":"NOT_MATERIAL"},"08978e951984":{"links":[],"unverified_note":"Proposed $2 billion investment","note_status":"NOT_MATERIAL"},"08c9e467faff":{"links":[],"unverified_note":"Acquisition by Google from Crusoe Energy Systems, LLC, part of Google's announced USD 40bn Texas investment program (November/December 2025)."},"08fecec167f8":{"links":[],"unverified_note":"$50.0M construction project in 2017"},"09134de54f97":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025"},"091f502712e2":{"links":[],"unverified_note":"Acquisition of former IBM Black Centre building in 1998."},"0928266366b6":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital"},"09354b797e48":{"links":[],"unverified_note":"Data Center Relocation project contract amount $41,888,144.60 (April 2019); PWE Water Customer Service Center Interior Renovation estimated value $250K (April 2020)"},"096a50f67afb":{"links":[],"unverified_note":"10-year, 60-percent real property tax abatement approved by Greensburg City Council in December 2024 for a two-phase project with a $400 million investment for each phase, totaling $800 million.","note_status":"NOT_MATERIAL"},"098b223db93a":{"links":[],"unverified_note":"Purchase of 63 MW substation and 1.9 acres of land for approximately $7.1 million on December 31, 2023. Financing of capital expenditures for the site using Bitcoin reserves announced February 27, 2024."},"09bda48da7d9":{"links":[],"unverified_note":"Amazon purchased the Nokes buildings from Clark-Hook Corp for $30.8 million in July 2022. Amazon Data Services acquired three office buildings at Ridgetop Circle for $26.4 million."},"09ca585ff144":{"links":[],"unverified_note":"Construction of the 270,900-square-foot facility is estimated to cost about $85 million. The campus is a partnership with Dallas developer Bandera Ventures and Principal Asset Management.","note_status":"NOT_MATERIAL"},"09cef095edce":{"links":[],"unverified_note":"Initial construction estimated at $59,400,000 (filed August 2022); suite fit-out estimated at $40,000,000 (filed August 2023)."},"09efc0483092":{"links":[],"unverified_note":"$1.05B CMBS loan refinancing for DFW3 and DFW4, expected to close May 20, 2026"},"09fe754b2f4e":{"links":[],"unverified_note":"Acquisition of a 164,000-square-foot data center shell on January 20, 2020"},"0a07345b4b8b":{"links":[],"unverified_note":"Long-term natural gas supply agreement with Energy Transfer LP for up to 450,000 MMBtu per day, announced February 10, 2025."},"0a0e4938727d":{"links":[],"unverified_note":"Series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas (March 5, 2024)"},"0a2332308185":{"links":[],"unverified_note":"On January 26, 2021, CyrusOne announced the purchase of 67 MW of renewable energy from Enel Green Power's 284 MW Azure Sky solar + storage project, equivalent to meeting approximately 70% of the power requirements for its Carrollton data center."},"0a34eeff08d4":{"links":[],"unverified_note":"RadiusDC acquired phoenixNAP's Phoenix data center and colocation business, expected to close in Q2 2026."},"0a3e74b8d3b5":{"links":[],"unverified_note":"Sale of a 91,000 sq ft Oracle-occupied data center for $31.75 million in January 2024."},"0a50c30e3092":{"links":[],"unverified_note":"Fiserv acquired First Data Corporation for $21.3 billion on January 16, 2019.","note_status":"NEW_SOURCED"},"0a61882a15e2":{"links":[],"unverified_note":"Land sale of 176 acres of city-owned property to the Warrington Group for $5,000 an acre."},"0a832d9f2a16":{"links":[],"unverified_note":"Acquisition of 56.7 acres of land and two powered shells for $146 million on December 30, 2021."},"0a89dbc38feb":{"links":[],"unverified_note":"Chelan PUD approved a power contract with Microsoft; Microsoft funded the $86.5 million Jumpoff Ridge substation; Chelan Douglas Regional Port Authority purchased land for the project, fully funded by Microsoft."},"0aa8c4e70e40":{"links":[],"unverified_note":"$2 billion construction loan closed on April 21, 2026, led by MUFG Bank."},"0ab21b4b11e7":{"links":[],"unverified_note":"Secured Data Center Revenue Term Notes, Series 2025-1 and Series 2025-2, as of November 30, 2024 (data file date)"},"0b2918653869":{"links":[],"unverified_note":"$9.3M Renovation/Alteration (2012-2013)","note_status":"NOT_MATERIAL"},"0b767da70487":{"links":[],"unverified_note":"Microsoft committed $1 billion investment in Catawba County, with Catawba County approving grants of property and $16 million in property tax refunds over 10 years.","note_status":"NOT_MATERIAL"},"0b8824fda746":{"links":[],"unverified_note":"Zayo sold all their US data centers to DataBank in 2020."},"0b8eed24c81f":{"links":[],"unverified_note":"100% tax abatement for 10 years; Construction value $25,000,000 - $49,999,999 (bid date Sep 8, 2023)"},"0ba244b7d8b3":{"links":[],"unverified_note":"$1.05B refinancing for DFW3 and DFW4 data centers, expected to close May 20, 2026"},"0bc13d4565af":{"links":[],"unverified_note":"Microsoft paid $258 million for approximately 283 acres of land in El Mirage on May 31, 2024."},"0bfbf137cf3e":{"links":[],"unverified_note":"Water service agreement with the City of Hermiston approved Feb 24, 2025, with AWS covering $18 million in construction costs for an aquifer storage and recovery project."},"0c09bb3e4869":{"links":[],"unverified_note":"Vantage Data Centers acquired 89 acres of land in 2023."},"0c165d2cdd9b":{"links":[],"unverified_note":"Amazon has invested over $480 million in its Cosner Tech campus.","note_status":"NOT_MATERIAL"},"0c1df5584911":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025; $800 million budget for Phase 3 approved in December 2024.","note_status":"NOT_MATERIAL"},"0c2755d9ed13":{"links":[],"unverified_note":"Acquisition of a 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million."},"0c2cf64544cd":{"links":[],"unverified_note":"Sale of facility from Stream Data Centers to DataBank in 2Q 2017"},"0c9e5acfaa35":{"links":[],"unverified_note":"Wipro acquired Infocrossing for $600 million in August 2007. Infocrossing executed a $25 million sale/leaseback agreement for two data centers, including the Tempe facility, in January 2006.","note_status":"NO_PRIMARY"},"0c9fa6a8334b":{"links":[],"unverified_note":"Asset-backed securitization (ABS) by Stack Infrastructure Issuer, LLC"},"0cb16bcc72f4":{"links":[],"unverified_note":"City of Hillsboro signed six consecutive five-year contracts (HIL11-A through HIL11-F) on April 27, 2026, for property tax exemptions extending to 2051 for NTT Global Data Centers' campus at 6000 NW Jackson School Road."},"0cb38bc0af5a":{"links":[],"unverified_note":"Servers donated by Yahoo!"},"0ce4038d80ac":{"links":[],"unverified_note":"EdgeConneX Silicon Valley Holdings II acquired 3 buildings in Santa Clara, including 1700 Richard Ave, for $83.3 million on August 19, 2020.","note_status":"NO_PRIMARY"},"0cfb05042df2":{"links":[],"unverified_note":"Land acquisition from Dermody Properties for $79.3M in June 2024","note_status":"NO_PRIMARY"},"0d0e024a8f72":{"links":[],"unverified_note":"25-year water service agreement with City of Hermiston (February 24, 2025) for $18 million; $20.5 million settlement for groundwater contamination (March 31, 2026)."},"0d20081c47c1":{"links":[],"unverified_note":"Canaan Inc. acquired Cipher Mining's 49% equity interest in the joint venture (ABC Projects) for approximately US$39.75 million, funded by stock issuance, on February 23, 2026.","note_status":"NO_PRIMARY"},"0d3ba96714ae":{"links":[],"unverified_note":"Peak 10 (backed by GI Partners) acquired ViaWest for approximately $1.7 billion in August 2017."},"0de5189a525c":{"links":[],"unverified_note":"$250 million data center","note_status":"NOT_MATERIAL"},"0de6ba8d0537":{"links":[],"unverified_note":"Property acquired in partnership with NJFX in 2015."},"0dff80717d0a":{"links":[],"unverified_note":"Client collaborated to erect a 200MW wind farm 90 miles from site (implied around 2015-2017)."},"0e0304b69572":{"links":[],"unverified_note":"Land acquisition for $9.75 million in June 2006; $175 million investment for first phase in October 2007.","note_status":"NOT_MATERIAL"},"0e19a7b48e9d":{"links":[],"unverified_note":"The state offered a rich package of incentives to lure Microsoft to the 175-acre Boydton Plank Road Industrial Park. This included a $2.1 million grant from the Governor's Opportunity Fund and $4.8 million in funds from the Virginia Tobacco Indemnification and Community Revitalization Commission. For later expansions, Governor Northam approved a $1.5 million grant from the Commonwealth's Opportunity Fund, and the company is eligible for Data Center Sales and Use tax exemptions."},"0e24aa75d271":{"links":[],"unverified_note":"Equinix acquired the Infomart Dallas, which houses several Equinix data centers at 1950 North Stemmons Freeway, for $800 million in April 2018."},"0e33d5754ede":{"links":[],"unverified_note":"Switch acquired Data Foundry for $420 million in May 2021","note_status":"NO_PRIMARY"},"0e3f95e393d2":{"links":[],"unverified_note":"$6.1 billion real property investment (announced Nov 2024); $1.2 billion contracted revenue with CoreWeave (announced Feb 2025)","note_status":"NEW_SOURCED"},"0e46a69607aa":{"links":[],"unverified_note":"QTS filed for a $100 million project (QTS FTW1 DC2) and a $43.89 million project (QTS FTW1 DC1 Expansion) in 2022. Later reports indicate a $220 million project for a new two-story building of over 471,000 square feet, with construction scheduled to start in March and completion in early 2026.","note_status":"NOT_MATERIAL"},"0e880394b094":{"links":[],"unverified_note":"Equinix acquired the Infomart Dallas building for US$800 million on April 3, 2018."},"0e954c307713":{"links":[],"unverified_note":"Northern Data Group, through its subsidiary Peak Mining, acquired the project assets in December 2023. Peak Mining also purchased a second 300MW ERCOT-approved site in Corpus Christi, Texas in May 2024."},"0eeb87c8e17d":{"links":[],"unverified_note":"Sale of four Houston data centers (including Houston West I, II and III) by CyrusOne to DataBank for approximately $670 million, closed in March 2022.","note_status":"NEW_SOURCED"},"0f3090b07565":{"links":[],"unverified_note":"The purchase price for the Qimonda campus was $12 million, according to court documents.","note_status":"NOT_MATERIAL"},"0f3ba3608814":{"links":[],"unverified_note":"$1 billion initial investment (2009); $175 million expansion (2025); $448 million incremental commitment (2021); $7.3 million in incentives from Maiden and Catawba County (2009)","note_status":"NOT_MATERIAL"},"0f6a2838eb92":{"links":[],"unverified_note":"Land acquisition in Hillsboro for $26 million (October 27, 2017). Power Purchase Agreement (PPA) with Avangrid and Portland General Electric (PGE) for energy from a 120MW solar energy project (December 06, 2024)."},"0fc24c0fedc4":{"links":[],"unverified_note":"$1.15 billion green loan financing closed on August 11, 2025."},"0ffea7f3131b":{"links":[],"unverified_note":"$26,000,000 construction cost, filed March 2026."},"1000b46f178b":{"links":[],"unverified_note":"Acquisition of 29 data centers, including 2005 East Technology Circle, Tempe, from Sila Realty Trust for US$1.32 billion, expected to complete in Q3 2021."},"10075b6cd6fb":{"links":[],"unverified_note":"Fannie Mae is divesting of Fannie Mae Tech Center by year end 2026."},"104592c20936":{"links":[],"unverified_note":"$10 million in private funding","note_status":"NOT_MATERIAL"},"10512bbd6a4f":{"links":[],"unverified_note":"Five new enterprise zone agreements for property tax exemptions through 2051, signed April 27, 2026."},"1054656d0eb9":{"links":[],"unverified_note":"DataBank acquired zColo's US and UK data center assets from Zayo Group Holdings for $1.4 billion in December 2020.","note_status":"NO_PRIMARY"},"10c0cc29e86c":{"links":[],"unverified_note":"Acquisition of two data centers (Somerset, NJ and Raleigh-Durham, NC) from Sentinel Data Centers for $490 million in February/March 2017.","note_status":"NO_PRIMARY"},"10cc889a0f7d":{"links":[],"unverified_note":"$152 million construction investment (August 2024 - November 2025)"},"10d9161760d8":{"links":[],"unverified_note":"$21.8 million land acquisition in April 2020","note_status":"NOT_MATERIAL"},"10f9b7d051c5":{"links":[],"unverified_note":"Construction cost of $7,500,000"},"11108f72bc94":{"links":[],"unverified_note":"Site acquisition for $28 million in 2019","note_status":"NO_PRIMARY"},"111752816999":{"links":[],"unverified_note":"City of Richardson offered $5 million in incentives to Datacenter Park (campus where DFW25 is located) in 2010.","note_status":"NOT_MATERIAL"},"11389554937f":{"links":[],"unverified_note":"Centersquare acquired the data center at 4650 Old Ironsides Drive for $55 million in November 2025."},"11405345b934":{"links":[],"unverified_note":"$200 million facility"},"1158ecd7cbc0":{"links":[],"unverified_note":"$1.15 billion green loan financing closed August 11, 2025","note_status":"NEW_SOURCED"},"1160d2d3f1a6":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025","note_status":"NEW_SOURCED"},"1163c756cb6e":{"links":[],"unverified_note":"US Signal acquired OneNeck IT Solutions (including this data center) from Telephone and Data Systems, Inc. (TDS) in Q3 2024."},"116c210c401d":{"links":[],"unverified_note":"Land sale for $27.72 million in 2023."},"118624321b60":{"links":[],"unverified_note":"O2 Investment Partners made a significant growth investment in unWired Broadband LLC on July 6, 2021."},"118eeffacd3f":{"links":[],"unverified_note":"50% property tax reduction for QTS if it occupies at least 500,000 square feet by 2028 and invests around $350 million before January 2029.","note_status":"NOT_MATERIAL"},"11a7cfb4b5f5":{"links":[],"unverified_note":"Six consecutive five-year enterprise zone tax abatement contracts (HIL11-A through HIL11-F) signed on April 27, 2026, for NTT Global Data Centers' campus at 6000 NW Jackson School Road, extending tax-free status through 2051."},"11b37367978e":{"links":[],"unverified_note":"Acquisition of 60% of Collins Technology Park through a joint venture with Skyrise Properties (September 17, 2009)"},"11e3e196b3f2":{"links":[],"unverified_note":"GI Partners closed a continuation vehicle and strategic investment from GI Data Infrastructure in Flexential, anchored by funds managed by Hamilton Lane, and a prior investment from Morgan Stanley Infrastructure Partners, bringing total primary equity raised to approximately $1 billion (August 2025)."},"11f16a994226":{"links":[],"unverified_note":"$3.4 billion in financing from Blue Owl Capital for the Stargate Abilene project."},"1214fe92778a":{"links":[],"unverified_note":"EdgeConneX acquired by EQT Infrastructure for $2.5bn to $3bn in Q4 2020."},"121e65fa9e10":{"links":[],"unverified_note":"Sale of campus for $208 million to Mapletree Industrial Trust on March 12, 2021","note_status":"NO_PRIMARY"},"1226c3b10bc6":{"links":[],"unverified_note":"Land acquisition: Amazon Web Services, Inc. purchased a 42-acre parcel at 719 Blackwell Road for nearly $40 million in September 2021.","note_status":"NO_PRIMARY"},"1265a31f1a3b":{"links":[],"unverified_note":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million in early 2025. AWS committed a $5 billion investment into Fayette County by 2030 as part of a broader $10 billion data center expansion across Ohio."},"12707a937ff8":{"links":[],"unverified_note":"Skyward Holdings secured nearly 890 acres at 4200 Moseley Road and multiple other properties for $31 million. Google purchased two other sites in Chesterfield earlier this year: an 880-acre property at Upper Magnolia Green and a 350-acre section of Watkins Centre South adjacent to Route 288.","note_status":"NO_PRIMARY"},"12a56b6aee06":{"links":[],"unverified_note":"Equinix acquired 29 data centers from Verizon for U.S. $3.6 billion in May 2017, including DA9 (formerly Verizon DFW1).","note_status":"NEW_SOURCED"},"12b39d545275":{"links":[],"unverified_note":"Project cost estimated at approximately US$96 million.","note_status":"NOT_MATERIAL"},"12b8cb689ebf":{"links":[],"unverified_note":"Acquisition by Porpoise Ventures LLC from AOL for $58.5 million in 2005; Digital Realty merges with DuPont Fabros in 2017.","note_status":"NO_PRIMARY"},"12fa5e7a24c4":{"links":[],"unverified_note":"Community Reinvestment Act (CRA) agreement with the City of Hilliard for property tax abatement, requiring Amazon to make a total investment of $200 million by Dec. 31, 2026."},"12facd93ef86":{"links":[],"unverified_note":"Amazon Data Services acquired the 122-acre George Washington University Virginia Science and Technology Campus for $427 million in March 2026."},"1311749d9433":{"links":[],"unverified_note":"CyrusOne was taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt."},"13463eb2793f":{"links":[],"unverified_note":"Los Lunas agreed to give up property taxes for 30 years in exchange for annual payments from Facebook starting at $50,000 and going as high as $500,000. The village council in June also approved an ordinance allowing for the issuance of up to $30 billion in industrial revenue bonds to lure the facility to Los Lunas. Facebook struck a $45 million deal with the Public Service Company of New Mexico (PNM), which will build three new solar plants to power the data center complex."},"13638fc0a09f":{"links":[],"unverified_note":"The facility would sit on 55 acres of land."},"13843c581862":{"links":[],"unverified_note":"Google bought a 91-acre parcel for $58 million (about $640,000 per acre) and a 57-acre one for $31 million ($540,000 per acre), according to the Loudoun Times-Mirror, the local news outlet that first reported the land deal.","note_status":"NO_PRIMARY"},"13932e5e0514":{"links":[],"unverified_note":"Interior Finish-out of Existing Office Space with an Estimated Cost: $360,000 (2019)"},"13ab24bba994":{"links":[],"unverified_note":"Evocative acquired this facility as part of the acquisition of 9 INAP Data Centers on September 14, 2022."},"13b3d32db82f":{"links":[],"unverified_note":"DC BLOX secured an expansion of its green Senior Secured Credit Facilities loan (SSCF) to $850 million from the original $265 million in May 2026.","note_status":"NEW_SOURCED"},"140032c60d3e":{"links":[],"unverified_note":"Aphorio Carter Critical Infrastructure Fund, LLC acquired the fully leased Centennial Data Center for approximately $7.3 million in 2024.","note_status":"NOT_MATERIAL"},"1407164207f7":{"links":[],"unverified_note":"Hosting.com was acquired by Ntirety on August 31, 2009. Data Canopy acquired Ntirety's colocation business in June 2023, facilitated by a $50 million investment from Metropolitan Partners Group.","note_status":"NO_PRIMARY"},"1450921c1828":{"links":[],"unverified_note":"Land purchase for $700 million (November 2025)"},"145ec4f44a88":{"links":[],"unverified_note":"Hut 8 signed a four-year managed services agreement with Ionic Digital on February 1, 2024, with expected earnings of $81,504,800 in cash payments."},"148553022a16":{"links":[],"unverified_note":"Acquisition of Infomart building by Equinix for $800 million in 2018."},"14ab4897d799":{"links":[],"unverified_note":"H5 Data Centers acquired NextFort data center in Chandler, Arizona in January 2016."},"1503c1c7cac5":{"links":[],"unverified_note":"Renovation/Alteration project valued at $4.0M, completed June 13, 2012","note_status":"NOT_MATERIAL"},"15117fcccb81":{"links":[],"unverified_note":"GI Partners acquired One Wilshire for $437 million in 2013","note_status":"NO_PRIMARY"},"1523fcb1f87d":{"links":[],"unverified_note":"Acquisition of seven vXchnge data centers, including St. Louis, by H5 Data Centers on January 31, 2022."},"152d9d171d36":{"links":[],"unverified_note":"New construction with an estimated cost of $215,900,000."},"153c8cdf8715":{"links":[],"unverified_note":"Oregon Department of Transportation grant of $320,000 (2008); renewable energy procurement deal with Umatilla Electric Cooperative (April 11, 2023); $20.5 million settlement for nitrate pollution lawsuit (recent, prior to April 14, 2026)."},"1593a16d8f93":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's series 2025-1 class A-2 note issuance, a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s 13 completed and operating data centers in Sterling, Va., San Antonio, Texas, and Houston, dated January 30, 2025."},"15a0bcbe4212":{"links":[],"unverified_note":"CoreSite acquired three Santa Clara buildings for $100 million from GI Partners in February 2026."},"15a2d3330b57":{"links":[],"unverified_note":"Equinix acquired the Infomart building for $800 million in April 2018. Equinix completed a $140 million expansion in 2020. Equinix announced plans for a $180 million expansion in March 2023.","note_status":"NEW_SOURCED"},"15a7c067282b":{"links":[],"unverified_note":"Williams (WMB) is investing $1.6B into Project Socrates (North and South combined) for power generation facilities, backed by 10-year extendable contracts."},"15c9f85292ba":{"links":[],"unverified_note":"Penzance secured $100 million in construction financing in October."},"15ea0514753d":{"links":[],"unverified_note":"$27.1 million project cost, privately funded","note_status":"NOT_MATERIAL"},"15ffde95c8f2":{"links":[],"unverified_note":"$1.2 billion initial investment (2007); $600 million expansion (2013); 61 MW solar PPA with Duke Energy (2015); $600 million upgrade (2024); $1 billion expansion (2026).","note_status":"NOT_MATERIAL"},"161b980c5da5":{"links":[],"unverified_note":"Corscale Data Centers and Affinius Capital Announce Strategic Partnership with e2Companies for on-site power generation, energy storage, and distribution (undated, announced prior to June 2025)."},"1624a3c32f6e":{"links":[],"unverified_note":"SAT14-Phase 3 project with an estimated cost of $31,300,000, including a fourth colocation center."},"162a3f2e90f8":{"links":[],"unverified_note":"Acquisition of data center campus from PayPal Inc. by Landmark Dividend for $122 million in March 2020. Landmark Dividend acquired by DigitalBridge in June 2021. A wholly owned subsidiary of Abu Dhabi Investment Authority (\"ADIA\") acquired a 40% interest in Landmark in April 2024.","note_status":"NO_PRIMARY"},"1665e6250274":{"links":[],"unverified_note":"Site acquisition by Digital Realty in March 2007 for $62.5 million."},"169ba7d353cc":{"links":[],"unverified_note":"$220 million project for a new data center in North Fort Worth announced January 2024"},"16aafa77bca6":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital. OpenAI and Oracle entered an agreement to develop up to 4.5 gigawatts of additional Stargate capacity. Lancium struck a multi-billion dollar deal with Crusoe Energy."},"16c739fef54f":{"links":[],"unverified_note":"Acquisition of Rockwood Capital/365 Main Portfolio for approximately $725.0 million, completed July 14, 2010.","note_status":"NEW_SOURCED"},"16d9aaf134b7":{"links":[],"unverified_note":"Collaboration with Georgia Tech for High-Performance Computing Center (announced 2018)"},"16e0aa7fa0b0":{"links":[],"unverified_note":"Serverfarm closed a $589 million asset-backed securities (ABS) offering in December 2025 to refinance existing debt, using three fully leased US data centers including Chicago as collateral.","note_status":"NO_PRIMARY"},"16e11778d17a":{"links":[],"unverified_note":"Land acquisition in 2019 for $116.4 million.","note_status":"NO_PRIMARY"},"171b69b10ff0":{"links":[],"unverified_note":"Amazon agreed to pay $20.5 million to settle a lawsuit related to nitrate pollution from its data centers in the Port of Morrow."},"1743192dc1eb":{"links":[],"unverified_note":"Acquisition of data center facility from McGraw Hill Financial for approximately $75 million (July 2, 2014); additional $600 million QTS investment for expansion.","note_status":"NO_PRIMARY"},"17440a8dc621":{"links":[],"unverified_note":"Over $2.5 billion in direct investment in the data center campus."},"175b69885e2f":{"links":[],"unverified_note":"$400M investment for campus"},"175eccb83002":{"links":[],"unverified_note":"Intel announced the sale of its 61-acre corporate campus in Southwest Austin in January 2023."},"178bd6f0a66d":{"links":[],"unverified_note":"Acquisition of data center from Argo Blockchain in late 2022 for approximately $65 million; $1.4 billion project financing facility closed August 2025."},"17c164426668":{"links":[],"unverified_note":"$45 million deal with PNM for solar plants (2017); $800 million investment for Phase 3 (2024)","note_status":"NO_PRIMARY"},"17d4707c35ba":{"links":[],"unverified_note":"Land acquisition in Hillsboro for $26 million in October 2017."},"17eafe635529":{"links":[],"unverified_note":"Apple committed an incremental $448 million for construction, improvements, and equipment at its Maiden data center in April 2021. Additionally, a $175 million expansion was permitted by Catawba County in April 2025.","note_status":"NOT_MATERIAL"},"1817922a7aa9":{"links":[],"unverified_note":"Microsoft investment of $350 million per building (SAT93 and SAT94)","note_status":"NOT_MATERIAL"},"18339e4dd355":{"links":[],"unverified_note":"CloudHQ plans to invest $400 million in building LC8 and $1 billion for LC4 construction.","note_status":"NOT_MATERIAL"},"1864ee90c1e9":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville.","note_status":"NOT_MATERIAL"},"1880725755c7":{"links":[],"unverified_note":"H5 Data Centers acquired a 240,000 square-foot data center from Intuit Inc. on July 18, 2018. Intuit expected an operating loss of $75 to $80 million from the sale and leased back several megawatts at the site.","note_status":"NO_PRIMARY"},"188ccf72b941":{"links":[],"unverified_note":"Construction project for 'CyrusOne Allen Load Adder' with an estimated cost of $41,500,000, registered on 2022-10-04."},"1894e88693cb":{"links":[],"unverified_note":"NTT Data unveiled a $50 million expansion plan for TX2 and TX3, with each project estimated at $25 million, projected to be completed by 2024.","note_status":"NOT_MATERIAL"},"18c25ffde607":{"links":[],"unverified_note":"$2.7 billion - $4 billion investment","note_status":"NOT_MATERIAL"},"18cc947915d2":{"links":[],"unverified_note":"20-year nuclear energy agreement with Constellation Energy for Meta's Illinois-based data center, starting in 2027."},"18d3529f3e61":{"links":[],"unverified_note":"SoftLayer Technologies leased space for a new headquarters and data center in a Digital Realty Trust facility in Dallas (February 12, 2010). Digital Realty signed a new long-term power purchase agreement to source solar power for its Dallas-area data center portfolio from Pattern Energy's 82.5 MWac Phoenix Solar Project (October 11, 2022)."},"18eb1706578a":{"links":[],"unverified_note":"Acquisition of Ascent CH2 Data Center Facility by Carter Validus Mission Critical REIT, Inc. for $211.7 million in May 2014."},"193a6fdb5744":{"links":[],"unverified_note":"Google acquired the project from Crusoe Energy Systems and is incorporating it into its $40 billion Texas investment program (announced November 2025)."},"196603b10e62":{"links":[],"unverified_note":"Retrofit project with an estimated cost of $79,800,000, completed by June 2025."},"19705f0c0f91":{"links":[],"unverified_note":"$575 million ABS deal dated February 10, 2025, involving 13 data centers including those in San Antonio.","note_status":"NO_PRIMARY"},"197bfcb04300":{"links":[],"unverified_note":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022."},"19c2ccc926c8":{"links":[],"unverified_note":"Ohio Tax Credit Authority approved a 75%, 10-year Data Center Tax Exemption and a 2.389%, 15-year Job Creation Tax Credit on December 11, 2023."},"19fa9143ab10":{"links":[],"unverified_note":"Lease agreement with a global financial firm for 36,000 square feet"},"19fe7e4d6b9f":{"links":[],"unverified_note":"Recapitalization with $45 million new investment from O'Connor Capital Solutions (OCS) in 2024.","note_status":"NO_PRIMARY"},"1a3de9da6f28":{"links":[],"unverified_note":"NOAA WCDAS Electrical Upgrades"},"1a3e75506c02":{"links":[],"unverified_note":"Construction of a three-story data center in Plano, Texas, costing $400 million (announced December 2023)","note_status":"NOT_MATERIAL"},"1aafa594fb2f":{"links":[],"unverified_note":"$17 million investment, $500,000 Commonwealth Opportunity Fund grant, $500,000 Economic Development Opportunity Fund grant","note_status":"NOT_MATERIAL"},"1ac63afe87fe":{"links":[],"unverified_note":"Amazon plans to invest around $1 billion in the project and has agreed to fund $7 million for a county pumping station and water pipeline. Stafford officials approved a data center agreement with Amazon in December 2023. An AWS performance agreement runs until 2051."},"1ad5166d566d":{"links":[],"unverified_note":"Morrow County officials approved an estimated $1 billion in tax breaks for AWS data centers over 15 years."},"1aebfe396012":{"links":[],"unverified_note":"$880 million investment, December 8, 2025","note_status":"NOT_MATERIAL"},"1afebd0f3dfa":{"links":[],"unverified_note":"Brookfield Infrastructure Partners acquired 31 data center facilities from AT&T for $1.1 billion in 2019. Brookfield acquired Cyxtera in November 2023. Evoque and Cyxtera merged in April 2024 and rebranded as Centersquare.","note_status":"NO_PRIMARY"},"1b75341ab48f":{"links":[],"unverified_note":"Acquisition of EdgeX Data Centers by Tonaquint in late 2023"},"1b76594c64c4":{"links":[],"unverified_note":"TierPoint acquired Cosentry in January 2016 for $575 million.","note_status":"NO_PRIMARY"},"1b8f2d474df1":{"links":[],"unverified_note":"Stonepeak completed a $3.0 billion equity recapitalization of Cologix on April 4, 2022.","note_status":"NO_PRIMARY"},"1b96f1a42d11":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025; amendment to initial financial agreement on July 31, 2024."},"1b9783796466":{"links":[],"unverified_note":"QTS Data Centers acquired the 622-acre site for approximately $137 million, with the final portion purchased in June 2024 for $118.8 million and earlier acquisitions in December 2023 for $18 million.","note_status":"NO_PRIMARY"},"1c19e2abb147":{"links":[],"unverified_note":"Acquisition by GI Partners and California Public Employees' Retirement System for $150 million in April 2023.","note_status":"NO_PRIMARY"},"1c335c8133ce":{"links":[],"unverified_note":"CloudCapital, an affiliate of data center developer CloudHQ, acquired DC-6, a 233,000-square-foot data center in Manassas, Va., for $222.5 million on January 26, 2022."},"1c770326aaf5":{"links":[],"unverified_note":"Morrow County officials approved a deal for Amazon to pay almost $40 million in fees over 15 years on five new data centers, in exchange for property tax exemptions totaling over $1 billion. Amazon also secured an $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, after the original developer filed for bankruptcy."},"1c7bb85bfef5":{"links":[],"unverified_note":"DataBank acquired four Houston-area data centers from CyrusOne for $670 million in January 2022."},"1c7fa4812235":{"links":[],"unverified_note":"$1.05B CMBS loan refinancing for DFW3 and DFW4, expected to close May 20, 2026"},"1c845d4f3e08":{"links":[],"unverified_note":"Zayo Group acquired Clearview International for $18.9 million in April 2016; DataBank acquired zColo data center assets from Zayo Group for $1.43 billion in December 2020.","note_status":"NEW_SOURCED"},"1ca775bc4d1e":{"links":[],"unverified_note":"Peak Mining (Northern Data Group) purchased a second 300MW data center location in Corpus Christi, Texas on May 24, 2024."},"1caa79785d4f":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025, for Lancium's Clean Campus development."},"1ccf10b39e5c":{"links":[],"unverified_note":"Acquisition of facility for approximately $50 million (January 30, 2017); $220 million project for DC2 expansion (January 29, 2024); $130 million expansion investment (April 22, 2025).","note_status":"NO_PRIMARY"},"1cdfc230f4b1":{"links":[],"unverified_note":"Estimated cost of $280,000,000 for the building (TDLR filing, 2026). City of Fort Worth approved a 10-year economic development agreement with tax incentives for the broader campus in April 2025, with a proposed capital investment of $2.167 billion.","note_status":"NOT_MATERIAL"},"1ceb0ba8e2d0":{"links":[],"unverified_note":"Land acquisition in 2021 for $6.6 million.","note_status":"NOT_MATERIAL"},"1d403d3d1375":{"links":[],"unverified_note":"Partnership with Umatilla Electric Cooperative (UEC) for power supply (April 2023)"},"1d69a95bfaae":{"links":[],"unverified_note":"Agreement with Appomattox County Economic Development Authority for purchase of 452-acre site for approximately $4.5 million. Avaio will invest $3 billion in development.","note_status":"NOT_MATERIAL"},"1d6e63e7678e":{"links":[],"unverified_note":"Land acquisition for 216MW expansion, bringing total planned capacity to 354MW (announced May 2025)."},"1d78f60288db":{"links":[],"unverified_note":"A 25-year water service agreement with Amazon Data Services was approved by the Hermiston City Council on February 24, 2025, with AWS covering all construction costs associated with the agreement."},"1d92af7bad6e":{"links":[],"unverified_note":"Portage City Council granted property tax reductions for a $35 million building and $52 million in IT equipment (December 2023).","note_status":"NOT_MATERIAL"},"1ddd5315aa6e":{"links":[],"unverified_note":"$15 billion joint venture for 1.2 gigawatt AI data center, announced May 22, 2025","note_status":"NEW_SOURCED"},"1dec61bc6465":{"links":[],"unverified_note":"Land acquisition from RMB Capital in July 2025; withdrawal of a 50% tax abatement application (estimated $18.2 million over 10 years) in May 2026.","note_status":"NOT_MATERIAL"},"1df8549399d4":{"links":[],"unverified_note":"Acquisition of facility by Digital Realty in 2006"},"1e0af945001d":{"links":[],"unverified_note":"Acquisition of Hillsboro 4 and Hillsboro 5 data centers in May 2026, marking the largest real estate transaction in company history."},"1e1f2eb55e57":{"links":[],"unverified_note":"GEV proffered $3 million to the county upon first building permit, $500,000 for public safety training, and an aerial ladder truck for the fire department.","note_status":"NOT_MATERIAL"},"1e32194d0849":{"links":[],"unverified_note":"Project cost estimated at approximately US$96 million; land purchased in July 2023 from the University of Texas System Board of Regents."},"1e413d5ad3a3":{"links":[],"unverified_note":"DataBank acquired four Houston data center assets, including the Houston West Campus, from CyrusOne for approximately $670 million, with the transaction expected to close by the end of the first quarter of 2022."},"1e4462d74fbf":{"links":[],"unverified_note":"Oppidan acquired the Westpointe 40 Business Park site from Titan Development in September 2024."},"1e5ce8c7dc49":{"links":[{"record_id":"research:legacy-deal:50b08d76-f55d-4e4b-ae2a-71f64c461cb1","name":"XGS and Meta agree on 150 MW New Mexico geothermal; both phases projected operational by 2030","date":"2025-06-12","type":"Joint venture","value_label":"n/d","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:50b08d76-f55d-4e4b-ae2a-71f64c461cb1"}]},"1e6f4869a1fe":{"links":[],"unverified_note":"A landmark public-private infrastructure partnership between the commonwealth of Virginia and Northrop Grumman to modernize the IT infrastructure for state government, worth up to $2 billion.","note_status":"NOT_MATERIAL"},"1e9a1d761c7e":{"links":[],"unverified_note":"Land acquisition from University of Texas System Board of Regents in July 2023; project cost estimated at $96 million.","note_status":"NOT_MATERIAL"},"1eb758d4792f":{"links":[],"unverified_note":"$20.5 million settlement for nitrate contamination lawsuit (April 2026)"},"1ecb2af33c65":{"links":[],"unverified_note":"Estimated construction cost of $175,000,000"},"1edd92f58a83":{"links":[],"unverified_note":"$1.5 billion project cost","note_status":"NOT_MATERIAL"},"1ef6ec203a18":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville (May 2026)","note_status":"NOT_MATERIAL"},"1f436358672e":{"links":[],"unverified_note":"Stream Data Centers acquired by Apollo Global Management on August 6, 2025."},"1f5c4b6096eb":{"links":[],"unverified_note":"Centersquare acquired 10 data centers across the US and Canada with an enterprise value of US$1 billion in October 2025."},"1f9b775dcf43":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"1fa7d700b222":{"links":[],"unverified_note":"Investment of more than $1.5 billion for a 4 million square foot campus, announced July 28, 2022.","note_status":"NOT_MATERIAL"},"1fbb5beb21e2":{"links":[],"unverified_note":"Acquisition of Pittsburgh facility from 365 Data Centers in January 2017"},"1fbff661f3a4":{"links":[],"unverified_note":"$6,000,000 investment, announced September 2022"},"1fed6e1b7696":{"links":[],"unverified_note":"12.5 MW microgrid financing through ERCOT Demand Response Program"},"200cea36f943":{"links":[],"unverified_note":"Core Scientific priced $3.3 billion aggregate principal amount of senior secured notes due 2031 on May 6, 2026.","note_status":"NEW_SOURCED"},"20180f3fecf1":{"links":[],"unverified_note":"Tax Abatement Agreement with Childress County, Texas, for an estimated capital investment of $197,500,000.00 (February 14, 2022)"},"2027f38d042f":{"links":[],"unverified_note":"Securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas, in a series 2024-1 note issuance (March 2024)."},"202f55f3c639":{"links":[],"unverified_note":"EQT Infrastructure acquired EdgeConneX in 2020 for USD 2.6bn. In September 2024, EQT Infrastructure sold a minority stake in EdgeConneX to funds managed by Sixth Street."},"203bc41230a2":{"links":[],"unverified_note":"DataBank is looking to raise $1.067B in funding by securitizing three data centers, including a 40 MW Ashburn facility custom-built in 2022, around September 2025."},"209767b1374d":{"links":[],"unverified_note":"Power Purchase Agreement (PPA) with NV Energy and Ormat Technologies for up to 150 MW of geothermal power for Google's Nevada data centers, announced February 2026."},"20a7b88a6904":{"links":[{"record_id":"research:newsroom:sec:20250707:1","name":"CoreWeave to Acquire Core Scientific","date":"2025-07-07","type":"Acquisition","value_label":"~$9B equity value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20250707:1","scope":"portfolio"}]},"20b5b716a172":{"links":[],"unverified_note":"Acquisition of IO Data Centers U.S. operations for approximately $1.34 billion, closed January 2018.","note_status":"NO_PRIMARY"},"20e9883ee6ad":{"links":[],"unverified_note":"Land acquisition for $255.3 million in July 2022","note_status":"NO_PRIMARY"},"2123f52aff0f":{"links":[],"unverified_note":"Amazon Web Services (AWS) has acquired approximately 140 acres of land across four parcels in Manassas, Prince William County, Virginia. The purchase, totaling $152 million, includes two sites: 27 acres on Century Park Drive and 113 acres on Vulcan Lane.","note_status":"NO_PRIMARY"},"215252da6812":{"links":[],"unverified_note":"Land acquisition for $34.5 million"},"21741df2c2a0":{"links":[],"unverified_note":"Project investment of $276.8 million; Land acquisition from University of Texas System Board of Regents in July 2023.","note_status":"NOT_MATERIAL"},"218832960adc":{"links":[],"unverified_note":"Lincoln Property Co. and Harrison Street acquired 190 acres of land in May 2022. New Albany Data Center is investing $500 million to construct its Silicon Heartland Datacenter Campus. A rate arrangement between New Albany Data Center and AEP Ohio was approved by PUCO on February 7, 2024, where NADC will lease substation and associated equipment for an eight-year term. A 15-year, 100% real estate tax abatement was secured.","note_status":"NOT_MATERIAL"},"21f072f66cd0":{"links":[],"unverified_note":"CyrusOne acquired by KKR and Global Infrastructure Partners for approximately $15 billion, closed March 2022.","note_status":"NO_PRIMARY"},"222a9f60de26":{"links":[],"unverified_note":"Construction investment of $215.9 million (announced August 2022)."},"223c6c868ad9":{"links":[],"unverified_note":"Planned $1 billion 146MW campus in Northern Virginia.","note_status":"NOT_MATERIAL"},"2244054a25db":{"links":[],"unverified_note":"Acquisition of three data center properties, including 128 First Avenue, Needham, MA, for approximately $375.0 million, announced December 2009 and expected to close by January 15, 2010."},"2248568639c8":{"links":[],"unverified_note":"Amazon Data Services purchased a leased data center at 7505 Mason King Court in Manassas, Virginia, for $65 million from an affiliate of Menlo Equities."},"22ac2688d110":{"links":[],"unverified_note":"Withdrew application for 50% tax break on April 30"},"22bd3ef75b58":{"links":[],"unverified_note":"Acquisition of Switch and Data by Equinix for US$683.4 million in May 2010.","note_status":"NEW_SOURCED"},"22df840794e1":{"links":[],"unverified_note":"DBT-DATA sold its Cyber Integration Center in Harrisonburg in 2014 to an entity later acquired by QTS."},"22f5bf20af4c":{"links":[],"unverified_note":"Land acquisition through homeowner buyouts (approx. $950,000 apiece) in Roppolo subdivision, announced September 2023."},"2302d9aa943e":{"links":[],"unverified_note":"$7.5 billion Industrial Revenue Bond approved by Los Lunas Village Council in February 2025 for expansion."},"23086a8c5715":{"links":[],"unverified_note":"QTS acquired Herakles data center on January 3, 2013. Blackstone acquired QTS Realty Trust on August 31, 2021."},"23108df062b9":{"links":[],"unverified_note":"$1.05 billion refinancing deal for two existing data center buildings in Lewisville, nearing May 2026."},"232afe7566f0":{"links":[],"unverified_note":"Construction cost estimated at $288,000,000"},"233f66953d21":{"links":[],"unverified_note":"Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.","note_status":"NO_PRIMARY"},"2349be76309b":{"links":[],"unverified_note":"$2 million settlement with California Attorney General (2017) and $3 million settlement with OCR (2019) for HIPAA violations.","note_status":"NOT_MATERIAL"},"234afc1f67c0":{"links":[],"unverified_note":"Amazon purchased 156 acres for $37.1 million in September 2024.","note_status":"NO_PRIMARY"},"2358e2e14c6f":{"links":[],"unverified_note":"Initial investment of $600 million announced in December 2015. An additional investment of more than $25 million was announced in April 2022.","note_status":"NOT_MATERIAL"},"235ce5163870":{"links":[],"unverified_note":"Ohio Tax Credit Authority approved a 75%, 10-year Data Center Tax Exemption and a 2.389%, 15-year Job Creation Tax Credit on December 11, 2023, for a roughly $90,000,000 investment."},"236ec7f15a96":{"links":[],"unverified_note":"Acquisition of facility from Health Care Service Corporation for approximately $50 million on January 30, 2017. Blackstone-owned QTS Data Centers wants to build a $220 million facility in North Fort Worth, marking its second project in the Alliance area."},"2386125d7138":{"links":[],"unverified_note":"Project investment of $772 million announced in November 2023.","note_status":"NOT_MATERIAL"},"23947ea876ca":{"links":[],"unverified_note":"CyrusOne is slated to land the $1.05B fixed-rate, five-year loan for its adjacent DFW3 and DFW4 data centers on Chelsea Boulevard in Allen. The mortgage is expected to close on May 20."},"239cc495d52c":{"links":[],"unverified_note":"Rezoning of 21.23 acres from Rural Commercial to Planned Development-Industrial Park (PD-IP) for data center use."},"23a448897c13":{"links":[],"unverified_note":"Acquired by American International Group (AIG) in 2002; Acquired by Tierpoint in 2023."},"23cddcbd2921":{"links":[],"unverified_note":"Land purchase of 589.843 acres for over $102 million, effective Dec. 30, 2024."},"240519c4e884":{"links":[],"unverified_note":"Element Critical launched a new U.S. data center platform backed by 26North Partners, Arctos, Mercuria, and Safanad in December 2025."},"2434662cdd62":{"links":[],"unverified_note":"Los Lunas Village Council approved issuance and sale of industrial revenue bonds totaling $40 billion for Facebook subsidiary Greater Kudu, LLC to finance data center expansion.","note_status":"NOT_MATERIAL"},"246644bb7ece":{"links":[],"unverified_note":"Lease agreement with Verizon for data center space, including periodic maintenance."},"246b7e21c770":{"links":[],"unverified_note":"DataBank acquired zColo's U.S. and U.K. data center assets from Zayo in December 2020."},"248787087cdf":{"links":[],"unverified_note":"Acquisition of Verizon's data centers"},"248b897b05e6":{"links":[],"unverified_note":"Construction project with an estimated cost of $175,900,000, filed March 2023."},"24a12675cc62":{"links":[],"unverified_note":"QTS acquired the facility for approximately $50 million on January 30, 2017. The Fort Worth property was valued at $481 million as part of a $3.46 billion commercial mortgage-backed securities offering by Blackstone-owned data centers, expected to close in mid-December 2025.","note_status":"NO_PRIMARY"},"24a7a718010b":{"links":[],"unverified_note":"Ohio Department of Development (ODOD) approved the project for tax credit assistance; Aligned intends to invest at least $202 million.","note_status":"NOT_MATERIAL"},"24b8a4b1720c":{"links":[],"unverified_note":"DataBank acquired four Houston data centers, including Houston Galleria, from CyrusOne for $670 million in March 2022.","note_status":"NO_PRIMARY"},"24d31cd601f9":{"links":[],"unverified_note":"Investment of over $1 billion in the state of Missouri.","note_status":"NOT_MATERIAL"},"24d7c838ddc4":{"links":[],"unverified_note":"Digital Realty closed a $3.25 billion U.S. hyperscale data center fund, focusing on markets including Northern Virginia (March 31, 2026)."},"253226527301":{"links":[],"unverified_note":"Acquisition of 12001 North Freeway property by Digital Realty in 2006 as part of a $71.8 million deal. Signed energy supply contracts for 100% renewable energy coverage in Texas starting January 1, 2024.","note_status":"NO_PRIMARY"},"254a8804a824":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025"},"25512871e14f":{"links":[],"unverified_note":"Strategic equity investment from Transition Equity Partners, LLC (TEP) on December 09, 2025. Industrial Water Purchase Agreement (WPA) with AirJoule Technologies on December 04, 2025."},"256a324d1c26":{"links":[],"unverified_note":"Land acquisition by Aligned Data Centers for 100-acre property at 8785 N Reems Road in December 2024."},"256ad95c1857":{"links":[],"unverified_note":"Brookfield Infrastructure Partners acquired Cyxtera Technologies for approximately $775M in late 2023, leading to the formation of Centersquare in 2024. Additionally, Centersquare acquired IAD2-A&B in Sterling, VA for $60.5M in Jan 2024."},"2578100b7fdf":{"links":[],"unverified_note":"NVIDIA granted an NVIDIA DGX GB300 system (October 2025)"},"25973ecef352":{"links":[],"unverified_note":"Sale of four Houston data centers, including Houston Galleria, from CyrusOne to DataBank Holdings Ltd. for approximately $670 million, announced January 2022 and closed March 2022."},"25e96656011e":{"links":[],"unverified_note":"Connection with Mid-Atlantic Broadband Communities Corporation (MBC)"},"25fb14dd4101":{"links":[],"unverified_note":"Amazon Data Services acquired a 122-acre campus in Northern Virginia's Loudoun County from George Washington University for $427 million in March 2026."},"26498e2cfbd2":{"links":[],"unverified_note":"Land acquisition of 22-acre Sunrise Technology Park for $60 million in 2016."},"265f96b8865d":{"links":[],"unverified_note":"Digital Realty formed a $188 million joint venture with Griffin Capital Essential Asset REIT in 2014, contributing a 130,000-square-foot data center in Ashburn. In 2023, Digital Realty and TPG Real Estate established a joint venture where TPG acquired a majority stake in three hyperscale data centers in Northern Virginia for an aggregate value of $1.5 billion."},"267cf02c9597":{"links":[],"unverified_note":"Property sale agreement to Equinix for $30M in 2021"},"2696aa5c3693":{"links":[],"unverified_note":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved by U.S. Bankruptcy Court for the Southern District of Texas in January 2026."},"26c2d38eb4e2":{"links":[],"unverified_note":"$65 million purchase by Amazon Data Services","note_status":"NO_PRIMARY"},"26d3c3002416":{"links":[],"unverified_note":"Development partnership between Crane Data Centers Inc. and Principal Asset Management announced January 16, 2023."},"271a3c4faf17":{"links":[],"unverified_note":"April 2024 merger of Evoque and Cyxtera to form Centersquare."},"271eb6716deb":{"links":[],"unverified_note":"Amazon Data Services purchased the property at 7505 Mason King Court for $65 million on March 26, 2026."},"27516fe738f2":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital for Stargate Abilene. Multi-billion dollar deal between Lancium and Crusoe Energy. Agreement between OpenAI and Oracle to develop up to 4.5 gigawatts of additional Stargate capacity."},"276a51e5da89":{"links":[],"unverified_note":"Edged secured nearly $2 billion in cumulative financing year-to-date, including a $1.3 billion Senior Secured Notes offering in April 2026, to support development in Atlanta and Chicago.","note_status":"NO_PRIMARY"},"27a5ce51e998":{"links":[],"unverified_note":"Whinstone US, Inc. was acquired by Riot Blockchain, Inc. for approximately EUR 67 million in cash and 11.8 million shares of common stock on May 27, 2021. Whinstone also entered into a 10-year power supply agreement with TXU Energy in May 2020."},"27ce31225e3a":{"links":[],"unverified_note":"Acquisition of Nokes buildings for $30.8 million in July 2022, Manekin Plaza for $20 million and Ridgetop Circle for $26 million in February 2022."},"27dd9eca17b0":{"links":[],"unverified_note":"Centersquare acquired 10 data centers across the United States and Canada for $1 billion, announced September 30, 2025.","note_status":"NO_PRIMARY"},"28331cca9d0e":{"links":[],"unverified_note":"Banks including Natixis, MUFG, and SocGen have begun syndicating US$3 billion in loans for Meta-backed data center and power assets in New Albany, Ohio, as the company expands infrastructure for AI. Meta announced deals with three nuclear energy companies Vistra, Oklo and TerraPower to fuel its new data center supercluster Prometheus in New Albany, Ohio.","note_status":"NO_PRIMARY"},"286aa6cee508":{"links":[],"unverified_note":"Acquisition of AOL Manassas data center by Verizon"},"28bce537c10d":{"links":[],"unverified_note":"AMD partnership for up to 200MW capacity, with 50MW of compute capacity by May 2027."},"28d76efc6ab5":{"links":[],"unverified_note":"Acquisition of Bitcoin mining site from Applied Digital Corporation for $96.8 million, closed April 1, 2024.","note_status":"NO_PRIMARY"},"29150c2300b6":{"links":[],"unverified_note":"$20M Acquisition of New Flexential Nashville Data Center (2016)"},"291c897ea478":{"links":[],"unverified_note":"Amazon Web Services (AWS) plans to invest $5 billion in Fayette County by 2030. Amazon Data Services, Inc. purchased 589.843 acres in Jefferson Township for over $102 million, effective Dec. 30, 2024. Fayette County Commissioners approved a Community Reinvestment Area (CRA) Agreement with AWS, providing a 30-year, 100 percent tax exemption for new structures.","note_status":"NO_PRIMARY"},"29623b550a6f":{"links":[],"unverified_note":"Microsoft will invest $1 billion (announced June 2024). The Indiana Economic Development Corporation (IEDC) committed a 35-year data center sales tax credit for a minimum $1 billion in eligible capital investment. An updated tax agreement (March 2026) ensures Microsoft pays property taxes in full, with 15% allocated to the La Porte Community School Corp. for 20 years.","note_status":"NOT_MATERIAL"},"2986e647df5d":{"links":[],"unverified_note":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022."},"29931bb291b9":{"links":[],"unverified_note":"15-year power purchase agreement with Silicon Valley Power and Bloom Energy for 20 MW, approved July 2024."},"29ae68d9be2b":{"links":[],"unverified_note":"$326 million refinancing agreement for five hyperscale data centers in Red Oak, Texas, secured around October 2025.","note_status":"NO_PRIMARY"},"29c82202e625":{"links":[],"unverified_note":"Equinix acquired HO1 as part of a portfolio of 29 data centers from Verizon in 2017."},"29c9f766dea4":{"links":[],"unverified_note":"TECfusions secured over $300 million loan agreement for development and expansion.","note_status":"NO_PRIMARY"},"29e44c390a60":{"links":[],"unverified_note":"Cook County 6B tax incentive and over $99.5 million construction cost","note_status":"NOT_MATERIAL"},"29ed590487c3":{"links":[],"unverified_note":"Peak10 acquired ViaWest for $1.67 billion in August 2017, leading to the creation of Flexential, which operates Hillsboro 2."},"2a6c953011fa":{"links":[],"unverified_note":"Sale of Houston colocation business from INAP to Netrality Data Centers on June 2, 2020. Acquisition of INAP data centers by Evocative Data Centers in 2022."},"2acc045e9851":{"links":[],"unverified_note":"Acquisition of 29 data centers from Verizon Communications Inc. for U.S. $3.6 billion, completed May 1, 2017."},"2b5ac9ad618e":{"links":[],"unverified_note":"CyrusOne was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt."},"2ba9286cd6bf":{"links":[],"unverified_note":"Vantage Data Centers, a global owner of real estate supporting digital networks, raised $1.35 billion through a securitized offering of tenant lease payments in what may be the largest bond deal this year backing this fast-growing property type. The proceeds are primarily being used to refinance Vantage's existing debt tied up in work at three data centers on its flagship Northern Virginia campus and five data centers in the province of Quebec in Canada. The properties mentioned are VA11 & VA12. 45200 Vantage Data Plz, Sterling, VA.","note_status":"NO_PRIMARY"},"2bd8fc716afe":{"links":[],"unverified_note":"DataBank acquired four Houston data centers (including Houston West I, II, and III) from CyrusOne for $670 million in March 2022.","note_status":"NEW_SOURCED"},"2bdb0a2ba7b6":{"links":[],"unverified_note":"Crusoe agreed to sell the Project Goodnight data center development to Google. The project involves up to $29B in capital investment."},"2bf22dd4bbd1":{"links":[],"unverified_note":"JPMorgan Chase closed a $7.12 billion financing package on May 21, 2025, for a $15 billion joint venture including Blue Owl Capital, Crusoe, and Primary Digital Infrastructure. JPMorgan previously originated $2.3 billion in January 2025."},"2bf88ae8f7c2":{"links":[],"unverified_note":"Lease agreement between Equinix LLC and Digital 1350 Duane, LLC for SV2 on March 27, 2014, for approximately $180 million over the initial term."},"2bfee8ede464":{"links":[],"unverified_note":"Digital Realty entered a $1.5 billion joint venture with TPG Real Estate Partners, selling an 80% stake in three stabilized data centers in Ashburn, VA, in July 2023."},"2bffdb6f41cd":{"links":[],"unverified_note":"Acquisition of majority interest in Stream Data Centers by Apollo Global Management (announced August 7, 2025)."},"2c21faab124b":{"links":[],"unverified_note":"Windstream sold its data center business to TierPoint in 2015. TierPoint announced a $20 million data center investment in Nashville in 2017, part of a total $45 million investment in the complex.","note_status":"NEW_SOURCED"},"2c34df602e8c":{"links":[],"unverified_note":"Power contract recorded as an asset valued at approximately $78.9 million as of September 30, 2022.","note_status":"NOT_MATERIAL"},"2c9cd4b9e00f":{"links":[],"unverified_note":"Aligned acquired adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive for $93 million in an all-cash deal in September 2022.","note_status":"NO_PRIMARY"},"2ca87d70d31b":{"links":[],"unverified_note":"Acquisition of the facility from 365 Data Centers in January 2017"},"2cc153dd9e25":{"links":[],"unverified_note":"Five-year, $9.7 billion AI cloud contract with Microsoft covering 200MW, including an upfront prepayment of approximately $1.9 billion. NVIDIA's $680M annualized commitment (separate 60MW allocation).","note_status":"NO_PRIMARY"},"2cc3e7c3e6b8":{"links":[],"unverified_note":"25-year water service agreement with Amazon Data Services approved by Hermiston City Council on February 24, 2025, with AWS covering construction costs."},"2ccb386335c2":{"links":[],"unverified_note":"Construction project for $220 million, announced January 2024"},"2ccbacfa5675":{"links":[{"record_id":"research:newsroom:edgecore:20260421:1","name":"EdgeCore Digital Infrastructure Secures $1.5 Billion of Construction Financing for Two Fully Leased Hyperscale Data Centers in Northern Virginia","date":"2026-04-21","type":"Project financing","value_label":"$1.5B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:edgecore:20260421:1"}]},"2cdba9b8e0f3":{"links":[],"unverified_note":"$2 billion construction loan on April 21, 2026"},"2cff6b18cfa6":{"links":[],"unverified_note":"Meta's total investment in Huntsville to over $1.5 billion. Meta-contracted projects will add 447 MW of new renewable energy to support the Huntsville Data Center, with Meta-supported renewable energy projects in the state representing $75 million in local investment.","note_status":"NOT_MATERIAL"},"2d07d3061500":{"links":[],"unverified_note":"$11 billion investment by Amazon Web Services in Louisa County by 2040, announced August 30, 2023."},"2d125507c677":{"links":[],"unverified_note":"Data Canopy acquired Ntirety's colocation business in June 2023."},"2d14dd44a1c9":{"links":[],"unverified_note":"Amazon paid $20.5 million to settle allegations of nitrate pollution from its data centers in Morrow County (March 2026)."},"2d4b56537b79":{"links":[],"unverified_note":"Digital Realty acquired the site, formerly known as Western Lands, in 2018 for $236.5 million from the Metropolitan Washington Airports Authority. A joint venture with Blackstone is involved in the development of at least four buildings on the site."},"2d62b3903304":{"links":[],"unverified_note":"QTS Realty Trust was acquired by companies affiliated with the Blackstone Group Inc. for approximately $10 billion on August 31, 2021."},"2daa1f53d8ef":{"links":[],"unverified_note":"$220 million project cost","note_status":"NOT_MATERIAL"},"2dd46a70e49c":{"links":[],"unverified_note":"Iron Mountain acquired MAG DATACENTERS, LLC (FORTRUST) for approximately $128 million on July 28, 2017.","note_status":"NO_PRIMARY"},"2de4052a44ba":{"links":[],"unverified_note":"Industrial Revenue Bonds (IRBs) from Village of Los Lunas (December 2024); 150MW geothermal PPA with XGS Energy (June 2025); 150MW geothermal PPA with Sage Geosystems (June 2025); 2.5 GW of clean energy contracts with NextEra Energy Resources (December 2025)."},"2df1887f195a":{"links":[],"unverified_note":"$1 billion investment announced in 2022, property tax grants from Catawba County, and power purchase agreement with Duke Energy.","note_status":"NOT_MATERIAL"},"2e02133b6059":{"links":[],"unverified_note":"$160 million investment for VA3 Data Center"},"2e0b1a9cf933":{"links":[],"unverified_note":"CoreWeave acquires Core Scientific in an all-stock transaction (announced May 28, 2026)."},"2e37ec0063d4":{"links":[],"unverified_note":"$2 billion construction loan closed on April 21, 2026, led by MUFG Bank, for the first three buildings."},"2e42857aa666":{"links":[],"unverified_note":"Privately funded project with an estimated cost of $10,000,000"},"2e60e4680a09":{"links":[],"unverified_note":"Land acquisition for $96.0 million (Jan 2026); Data Center Lease with AMD for initial 25 MW, expandable to 200 MW, with expected contract value of $311.0 million over 10 years (Jan 2026), expanded to 50 MW with expected $636 million over 10 years (May 2026); $20 million settlement with SBI Crypto (March 2026)."},"2e64c5c752c4":{"links":[],"unverified_note":"Construction cost of $55,950,000, completed December 2021"},"2e6c2bef592c":{"links":[],"unverified_note":"GI Partners closed investments in Flexential on August 20, 2025"},"2e81b8031917":{"links":[],"unverified_note":"Acquisition by Cloud Capital and Arcapita in 2026"},"2edeedc09bb0":{"links":[],"unverified_note":"Acquisition of data center in Fort Worth, TX (January 8, 2024); $500 million asset-backed securities issuance (April 9, 2025) on a portfolio of 33 data centers, including two data centers (one in Dallas and one in St. Louis) newly added to that portfolio.","note_status":"NEW_SOURCED"},"2fab4e2476f7":{"links":[],"unverified_note":"Phase 2 Second Tax Abatement Agreement with Armstrong County, effective November 12, 2024, for up to $29B in capital investment for the overall campus."},"2fc421855e0a":{"links":[],"unverified_note":"Land acquisition for $8 million on Jan 16, 2025.","note_status":"NOT_MATERIAL"},"2ff613af77dc":{"links":[],"unverified_note":"Google's $9 billion investment in Virginia","note_status":"NO_PRIMARY"},"301d2eb2320c":{"links":[],"unverified_note":"$42M contribution to Goodyear's wastewater capacity expansion (March 2023); 150MW PPA with First Solar for Sun Streams 2 solar plant (July 2019); Water replenishment deal with Gila River Water Storage, LLC (June 2021).","note_status":"NO_PRIMARY"},"302458b1a876":{"links":[],"unverified_note":"Securitization of real estate and tenant lease payments for space and electrical capacity in eight data centers, including Sterling, VA facilities, as part of CyrusOne Data Centers Issuer I LLC's series 2024-1 note issuance (March 2024)."},"302ade52222a":{"links":[],"unverified_note":"$600 million debt financing package on October 16, 2025"},"305784f5fe99":{"links":[],"unverified_note":"Amazon received $1 billion in tax breaks over 15 years from Morrow County, the port, and the city of Boardman in May 2023. Amazon also acquired the Sunstone solar power project near Pendleton, Oregon, for $83 million in January 2026."},"3077bc496994":{"links":[],"unverified_note":"$1.4 billion project financing facility closed August 2025"},"308826de6bee":{"links":[],"unverified_note":"CyrusOne invested $79.8 million to retrofit an existing building in Richardson, Texas, transforming it into their new DFW6 data center.","note_status":"NOT_MATERIAL"},"30925948ea84":{"links":[],"unverified_note":"Sabey Data Centers is a joint venture between Sabey Corporation and National Real Estate Advisors, LLC, acting as the investment manager on behalf of its institutional clients."},"30d174d3bc55":{"links":[],"unverified_note":"Virginia Governor Bob McDonnell approved a $2.1 million grant from the Governor's Opportunity Fund to assist Mecklenburg County with the project, and the Virginia Tobacco Indemnification and Community Revitalization Commission approved $4.8 million in funds. In 2019, Governor Northam approved a $1.5 million grant from the Commonwealth's Opportunity Fund to assist Mecklenburg County with the project, and the company is eligible for Data Center Sales and Use tax exemptions."},"30de2f0d6e4b":{"links":[],"unverified_note":"IPO in October 2025, raising $746 million; Macquarie Term Loan for $100 million on August 29, 2025; MUFG Equipment Financing in February 2026; Keystone Master Loan Agreement in February 2026."},"31081053826e":{"links":[],"unverified_note":"New construction project with an estimated value of $70.0M.","note_status":"NOT_MATERIAL"},"31300df4bb5a":{"links":[],"unverified_note":"Partnership with Peterson Companies for development of Manassas campus"},"313b20abf821":{"links":[],"unverified_note":"Tax Abatement Agreement, executed 2016-11-15, effective 2018-01-01, expiring 2027-12-31"},"313fc13f5693":{"links":[],"unverified_note":"Investment of $215.9 million for construction, announced August 2022."},"315470fc590b":{"links":[],"unverified_note":"Databank leased a powered shell building from Digital Realty at its Digital Dallas campus in Richardson (2013)"},"318b2da0d400":{"links":[],"unverified_note":"Long-term tax abatement approved by Hermiston City Council on Sept. 26, 2022, for new campuses."},"31c30497b9a5":{"links":[],"unverified_note":"Project estimated value at built-out is $5.7 billion.","note_status":"NOT_MATERIAL"},"31d15d62baa8":{"links":[],"unverified_note":"Expansion project with an estimated cost of $43,894,400, started May 2022 and completed June 2023."},"31db7a30c2e2":{"links":[],"unverified_note":"Google to pay $1.3 billion for power infrastructure and energy projects (April 2026); 10-year, 50% abatement on property taxes for data center buildings, in return for $1 million to local schools and nonprofits (December 2025).","note_status":"NOT_MATERIAL"},"323ff209ae01":{"links":[],"unverified_note":"Acquisition of 29 data centers from Verizon Communications Inc. by Equinix."},"3259a7e5d21e":{"links":[],"unverified_note":"Amazon purchased three office properties at Nokes Boulevard in Sterling for $30.8 million in July 2022."},"326835581df0":{"links":[],"unverified_note":"Switch acquired Data Foundry for $420 million in May 2021.","note_status":"NO_PRIMARY"},"327b87bd7082":{"links":[],"unverified_note":"Acquisition of Aligned Data Centers for $40 billion by AIP, MGX, and BlackRock's Global Infrastructure Partners (expected to close H1 2026); $700 million investment for DFW-04 facility."},"328e7afd04fa":{"links":[],"unverified_note":"The Digital Gateway project is a large development deal where QTS Realty Trust and Compass Datacenters are the developers, and contracts were signed with 112 landowners."},"32a444f05106":{"links":[],"unverified_note":"Acquisition of 228,000 sq ft office/warehouse complex for $9.75 million in June 2006; $175 million investment for the first phase of CH3, grand opening October 2007."},"32bfd54039c1":{"links":[],"unverified_note":"25-year Energy-as-a-Service Power Purchase Agreement (PPA) agreed in February 2017"},"32c065db8638":{"links":[],"unverified_note":"Headquarters renovation cost nearly $80 million (2017)","note_status":"NOT_MATERIAL"},"32eb88b535eb":{"links":[],"unverified_note":"DataBank acquired four CyrusOne Houston data centers for $670 million in March 2022.","note_status":"NO_PRIMARY"},"32ff30c6898a":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"33ae73a5b213":{"links":[],"unverified_note":"Switch acquired Data Foundry for $420 million in May 2021"},"33af3ffb990b":{"links":[],"unverified_note":"Acquisition of two Houston, Texas data center campuses by Serverfarm, backed by Manulife Investment Management, in September 2024."},"33bee6bcbab7":{"links":[],"unverified_note":"DataBank acquired four Houston data centers (including Houston West I, II, and III) from CyrusOne for $670 million in March 2022."},"33eb1703e52c":{"links":[],"unverified_note":"$116 million, 11-year lease signed by LinkedIn in October 2013","note_status":"NOT_MATERIAL"},"342335f0f9b9":{"links":[],"unverified_note":"$6.1 billion real property investment for expansion (November 20, 2024); $1.2 billion in contracted revenue with CoreWeave (February 26, 2025).","note_status":"NEW_SOURCED"},"3434420f1d41":{"links":[],"unverified_note":"Amazon Data Services purchased a 7.66-acre data center campus at 7505 Mason King Court in Manassas for $65 million on March 26, 2026."},"344bc05fbe4d":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025."},"34582371ad1d":{"links":[],"unverified_note":"$600 million debt financing (October 16, 2025); $3.4 billion joint-venture (October 15, 2024); Chapter 312 Tax Abatement Agreement (December 17, 2021)"},"345d9d20bb7f":{"links":[],"unverified_note":"$5.0M renovation project for AUS02 POD2 TI, registered Oct 2023","note_status":"NOT_MATERIAL"},"3463ea5fcdae":{"links":[],"unverified_note":"Construction project with an estimated cost of $220,000,000, announced March 2024."},"3472a478a39b":{"links":[],"unverified_note":"$157 million project investment for TX21, slated to begin December 2023."},"34fe0e07b0df":{"links":[],"unverified_note":"Tax abatement of $2.82 million over the next decade, approved by the council."},"3511d5cb5ca2":{"links":[],"unverified_note":"Land acquisition from Crook County for $5.4 million in 2017."},"352104914c99":{"links":[],"unverified_note":"DataBank acquired four Houston data centers, including Houston Galleria, from CyrusOne for approximately $670 million, announced January 19, 2022.","note_status":"NEW_SOURCED"},"35223d467d30":{"links":[],"unverified_note":"QTS acquires Health Care Services Corporation data center in Fort Worth (2016)"},"35386dabbbb9":{"links":[],"unverified_note":"$53 million investment announced November 2016","note_status":"NOT_MATERIAL"},"354c515c2a20":{"links":[],"unverified_note":"Texas-based Data center provider CyrusOne has purchased a 40-acre parcel of Kincora — a 6.7-million-square-foot, mixed-use development property in Loudoun County. The company said the purchase and ensuing construction activities are expected to result in more than $1 billion in new investment in Loudoun.","note_status":"NOT_MATERIAL"},"355a8af40071":{"links":[],"unverified_note":"Odessa power contract recorded as an asset valued at approximately $78.9 million as of September 30, 2022.","note_status":"NOT_MATERIAL"},"358bb403f052":{"links":[],"unverified_note":"Fort Worth City Council approved an incentive agreement for $146.7 million in rebates over 20 years (May 2015); Tarrant County approved a 10-year tax abatement (July 2015); Total project investment of $1 billion.","note_status":"NOT_MATERIAL"},"358f38953466":{"links":[],"unverified_note":"Sale of 10 data center facilities, including Burbank, for $225 million in cash to an entity sponsored by I Squared Capital, announced May 26, 2026."},"359ac3cc7753":{"links":[],"unverified_note":"City of Mesa offered tax incentives worth at least $16 million over a 25-year period (July 2019); Google broke ground on a new $600 million data center (October 2023), with a total expected spend of $1 billion.","note_status":"NOT_MATERIAL"},"363a78188be9":{"links":[],"unverified_note":"$1.6 billion investment announced July 25, 2023; Tax rebate agreement with Plano City Council approved July 24, 2023, for minimum $800 million/year in improvements; 6-year Master Services Agreement with Lincoln Property Company for over $260 million for initial 30 MW installation.","note_status":"NO_PRIMARY"},"3642ec927417":{"links":[{"record_id":"research:newsroom:sec:20250707:1","name":"CoreWeave to Acquire Core Scientific","date":"2025-07-07","type":"Acquisition","value_label":"~$9B equity value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20250707:1","scope":"portfolio"}]},"364aa1a734f7":{"links":[],"unverified_note":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022. The Manekin Plaza property was acquired from an investment fund in late 2021 in a $21M deal. acquired the Ridgetop Circle site in January 2022 for $26.4M from a subsidiary of St. John Properties."},"368c46054300":{"links":[],"unverified_note":"Bond passed in 2014 for extensive renovations and additions, including the Data Center expansion."},"36aad43c6a35":{"links":[],"unverified_note":"Flexential acquired Hillsboro 4 and Hillsboro 5 data centers from T5 Data Centers on May 28, 2026, in the largest real estate transaction in the company's history."},"36eb5ba67d87":{"links":[],"unverified_note":"Acquired by Digital Realty from DuPont Fabros Technology in September 2017 as part of a $7.6 billion 12 data center deal.","note_status":"NEW_SOURCED"},"371ddc4f7422":{"links":[],"unverified_note":"Acquisition by Equinix from Verizon for $3.6 billion"},"372f4abe0e77":{"links":[],"unverified_note":"$220 million project"},"373d5f850b65":{"links":[],"unverified_note":"Peak 10 acquired ViaWest for approximately US$1.675 billion in August 2017, leading to the Flexential rebranding in January 2018. GI Partners closed a continuation vehicle and strategic investment in Flexential in August 2025 to fund data center development."},"374072f3764d":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025."},"375bbdc71aff":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"3766decb67ae":{"links":[],"unverified_note":"$15 billion joint venture with Blue Owl Capital and Primary Digital Infrastructure, May 21, 2025"},"378201499e02":{"links":[],"unverified_note":"$7 billion investment in Iowa, including Council Bluffs expansion (announced June 06, 2025)"},"37962279a626":{"links":[{"record_id":"research:newsroom:kirkland-ellis:20251021:1","name":"Meta Announces Joint Venture with Funds Managed by Blue Owl Capital to Develop Hyperion Data Center","date":"2025-10-21","type":"Joint venture","value_label":"~$27B investment","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:kirkland-ellis:20251021:1"}]},"37988f3c2607":{"links":[],"unverified_note":"Multi-year partnership with Nasdaq to scale cloud infrastructure (announced December 15, 2021)"},"37a3712cf674":{"links":[],"unverified_note":"Part of a larger expansion announced August 26, 2025, reclassifying 1,530 MW of capacity from exclusivity to development."},"37c9a7ac7229":{"links":[],"unverified_note":"$1.05 billion refinancing deal in May 2026","note_status":"NOT_MATERIAL"},"37ec7b034a3c":{"links":[],"unverified_note":"Sale of Houston West I, II, III, and Galleria data centers to DataBank for approximately $670 million in March 2022.","note_status":"NO_PRIMARY"},"3806fd97400d":{"links":[],"unverified_note":"Initial investment of up to $499 million; $2.1 million grant from Governor's Opportunity Fund; $4.8 million from Virginia Tobacco Indemnification and Community Revitalization Commission; Data Center Sales and Use tax exemptions."},"38097d7ee75f":{"links":[],"unverified_note":"$600 million debt financing package, October 16, 2025"},"381e11a048ce":{"links":[],"unverified_note":"Acquisition of 120 East Van Buren for $175 million by Digital Realty Trust on July 27, 2006.","note_status":"NO_PRIMARY"},"381faccb703c":{"links":[],"unverified_note":"Lease agreement with Boston Properties"},"38210632c3d7":{"links":[],"unverified_note":"Fort Worth city granted 80% abatement on incremental real and personal property taxes for 10 years in 2014. Construction cost $53 million.","note_status":"NOT_MATERIAL"},"3872f42e34f3":{"links":[],"unverified_note":"Acquisition of Carrier-1's data center in Dallas, TX (DA4) by Evocative on April 16, 2022."},"38909ca18e3b":{"links":[],"unverified_note":"Land acquisition for PHX06 site for $115M."},"38ce147e96a2":{"links":[],"unverified_note":"Land acquisition for PHX06 site for $115M in 2022.","note_status":"NO_PRIMARY"},"38e193394fb0":{"links":[],"unverified_note":"Land acquisition for $80 million in March 2025.","note_status":"NO_PRIMARY"},"38ff5d2c946c":{"links":[],"unverified_note":"$600 million debt financing package (October 16, 2025); $3.4 billion joint-venture with Blue Owl Capital and Primary Digital Infrastructure (October 15, 2024)"},"39132646c30f":{"links":[],"unverified_note":"$1 billion investment in 2024","note_status":"NOT_MATERIAL"},"3914f93d6bf6":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"39267677d250":{"links":[],"unverified_note":"PowerHouse Data Centers, in collaboration with Harrison Street, purchased the 43-acre land for $136 million in 2021.","note_status":"NO_PRIMARY"},"392b4b03d797":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"392c7253a3c1":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reinforcing the value of its established assets while positioning the company for continued expansion across the region."},"39537c74ea82":{"links":[{"record_id":"research:legacy-deal:d0eebe61-f3c7-48df-b83b-5f22cdada471","name":"Google and NV Energy clean transition energy supply agreement","date":"2024-06-11","type":"PPA / offtake","value_label":"n/d","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:d0eebe61-f3c7-48df-b83b-5f22cdada471"}]},"396bd725b5d6":{"links":[],"unverified_note":"Jamestown acquired the property as part of a $103.1 million portfolio deal in September 2018.","note_status":"NO_PRIMARY"},"3978601eb000":{"links":[],"unverified_note":"$600 million debt financing package, October 16, 2025"},"397f830abfae":{"links":[{"record_id":"research:newsroom:sec:20251103:1","name":"Executed 15-Year Data Center Campus Lease with Amazon Web Services to Support AI Workloads","date":"2025-11-03","type":"Lease / service contract","value_label":"~$5.5B total consideration","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20251103:1"}]},"39851cd56a9b":{"links":[{"record_id":"research:legacy-deal:b36efd9b-3001-49dd-9469-268119be4894","name":"Google signs 200 MW fusion offtake agreement with Commonwealth Fusion Systems","date":"2025-06-30","type":"PPA / offtake","value_label":"n/d","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:b36efd9b-3001-49dd-9469-268119be4894"}]},"399fa084633a":{"links":[],"unverified_note":"Amazon Data Services purchased approximately 188.5 acres in Devlin Technology Park for $700 million. The purchase from Stanley Martin Homes closed on November 5, 2025."},"39a012eb6dfc":{"links":[],"unverified_note":"DataBank closed a $2 billion construction loan on April 21, 2026, to fund the first three buildings (DFW9, DFW10, and DFW11)."},"39a5b11ac51d":{"links":[],"unverified_note":"Initial investment of up to $499 million, followed by multiple expansions totaling approximately $2 billion by 2016.","note_status":"NOT_MATERIAL"},"39ad49f01c07":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025 for expansion and an estimated $800 million budget for Phase 3 approved in December 2024."},"39f73163ffbc":{"links":[],"unverified_note":"Investment of more than $2 billion for the campus (as of March 2021)."},"3a1005f2da52":{"links":[],"unverified_note":"$400 million investment announced January 2026"},"3a221e2791b5":{"links":[],"unverified_note":"$1.05B CMBS refinancing for DFW3 and DFW4, expected to close May 20, 2026"},"3a2251745a4e":{"links":[],"unverified_note":"DigitalBridge Group acquisition of Yondr Group; Partnership with JK Land Holdings, LLC"},"3a48f525c950":{"links":[],"unverified_note":"In June 2016, the Village of Los Lunas authorized up to $30 billion in Industrial Revenue Bonds (IRBs). The New Mexico Economic Development Department contributed a $10 million Local Economic Development Act (LEDA) grant. In December 2024, Phase 3 was approved through new IRBs with an estimated budget of $800 million. In June 2025, Meta announced a 150-megawatt geothermal power purchase agreement with XGS Energy and a parallel 150-megawatt agreement with Sage Geosystems.","note_status":"NOT_MATERIAL"},"3a563d2f0a6d":{"links":[],"unverified_note":"25-year water service agreement with Hermiston City Council (Feb 24, 2025); Amazon's $83 million acquisition of Sunstone solar power project (Jan 2026).","note_status":"NO_PRIMARY"},"3aa9c3da64bd":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025 for expansion."},"3aa9e3f2c2c3":{"links":[],"unverified_note":"Amazon Data Services purchased approximately 188.5 acres in Devlin Technology Park, Prince William County, for $700 million from Stanley Martin Homes, with the deal closing on November 5, 2025.","note_status":"NO_PRIMARY"},"3ab658e7b526":{"links":[],"unverified_note":"City of Hillsboro signed six consecutive five-year contracts for property tax exemptions for NTT Global Data Centers campus on April 27, 2026."},"3ab97ddc14ed":{"links":[],"unverified_note":"Sale of Dynascale and Alchemy by Parlement Technologies to affiliates of the secured lender in October 2024."},"3b118dbf1287":{"links":[],"unverified_note":"A proposed $1.3 billion data center project, with Provident Realty Advisors entering an agreement to purchase 71 acres of the former Brassie Golf Course.","note_status":"NOT_MATERIAL"},"3b18d315f83b":{"links":[],"unverified_note":"$20.5 million settlement for groundwater contamination (March 2026); renewable energy power purchase agreement with Umatilla Electric Cooperative (April 2023)."},"3b49fad7aae4":{"links":[],"unverified_note":"$65 million investment (announced 2015), $350,000 grant in Tobacco Region Opportunity Funds, $500,000 Abandoned Mine Land Pilot Program grant","note_status":"NOT_MATERIAL"},"3b629e7a1a6e":{"links":[],"unverified_note":"$2 billion in financing from J.P. Morgan and Starwood Property Trust to complete phases 2 and 3, announced March 2025.","note_status":"NEW_SOURCED"},"3bac218f9a3d":{"links":[],"unverified_note":"Land acquisition in July 2022 for $255 million","note_status":"NO_PRIMARY"},"3bb73db0f5a0":{"links":[],"unverified_note":"Sale of 40-acre site for $113.5 million from PRP Real Estate Investment Management to Iron Mountain Inc.","note_status":"NO_PRIMARY"},"3bb877b56d79":{"links":[],"unverified_note":"LightEdge Solutions acquired Cabela's existing data center in September 2017."},"3bdaf850b48b":{"links":[],"unverified_note":"Land purchase agreement secured on February 25, 2025"},"3bdea375bbd6":{"links":[],"unverified_note":"Acquisition of a six-building portfolio from MetCenter Business Park (date not specified, but Digital Realty announced relocation of HQ to Austin in Jan 2021)"},"3bee686c129a":{"links":[],"unverified_note":"Community Reinvestment Act (CRA) agreement with Hilliard for property tax abatements, requiring Amazon to invest $200 million by Dec. 31, 2026."},"3c40041de73e":{"links":[],"unverified_note":"QTS is spending an estimated $32 million on demolition to add mechanical, engineering, and plumbing galleries and data halls, as well as to modify floors and ceilings (January 2024)","note_status":"NOT_MATERIAL"},"3c5236d7bd86":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"3c70313261c7":{"links":[],"unverified_note":"Debt financing of $113 million in May 2013 led by JP Morgan Chase Bank, with investments from Wells Fargo Bank, RBS Citizens Financial Group, and Raymond James, to expand the Dallas data center.","note_status":"NO_PRIMARY"},"3c8f98a5a8c9":{"links":[],"unverified_note":"CyrusOne was taken private by funds managed by KKR and Global Infrastructure Partners in March 2022 for approximately $15 billion including debt.","note_status":"NO_PRIMARY"},"3c931981f7d2":{"links":[],"unverified_note":"Sale-leaseback of Lockport data center campus to H5 Data Centers for $49 million, closed December 30, 2024.","note_status":"NO_PRIMARY"},"3ca72e4387ad":{"links":[],"unverified_note":"Renovation/Alteration project with an estimated cost of $14,200,000 for UPS equipment and lithium battery systems, started 2023, completed 2024."},"3cb23f89d3c0":{"links":[],"unverified_note":"$4B green-labeled financing in March 2025 covering Portland, Stafford, and Toronto."},"3cbbe6923ae7":{"links":[],"unverified_note":"$25,000,000 tenant improvement project, started 2023, completed 2024"},"3ccf0c1ebb48":{"links":[],"unverified_note":"Land acquisition at 3980 Virginia Mallory Dr in Chantilly in 2021, including 14501 and 14721 Avion Parkway sites for $55.9 million."},"3cdfc335da6b":{"links":[],"unverified_note":"Blockfusion announced plans to go public through a merger with Blue Acquisition Corp., a SPAC, valuing Blockfusion at approximately $450 million (November 2025).","note_status":"NEW_SOURCED"},"3ce355564e67":{"links":[],"unverified_note":"The Wilderness Crossing project is a larger 2,600-acre mixed-use development that includes up to 5,000 residential units and 200,000 square feet of commercial space, in addition to the data centers and distribution warehouses. Non-disclosure agreements were signed by Orange County staff and supervisors for the benefit of Amazon, LLC."},"3d02732cfd99":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital for Stargate Abilene"},"3d2e6cf5453e":{"links":[],"unverified_note":"Corscale Data Centers, a subsidiary of the Class A building developer Patrinely"},"3d6ab39260fa":{"links":[],"unverified_note":"Investment of more than $2 billion for an 11-building campus (announced by March 2021). Supporting two new renewable energy projects in Oregon."},"3d8a334ef202":{"links":[],"unverified_note":"Initial investment of $210 million for the first phase (2012 reporting)."},"3d9004e49d28":{"links":[],"unverified_note":"Vantage Data Centers obtained a $3 billion green loan for North American expansion, and acquired the 134-acre plot of land at 19509 Belmont Ridge Road for $180 million in 2022."},"3da1dc2442fd":{"links":[],"unverified_note":"10-year, triple-net lease agreement between Ionic Digital and Nscale for approximately $2 billion, announced October 2025.","note_status":"NEW_SOURCED"},"3e2d530c5815":{"links":[],"unverified_note":"Apollo Funds agreed to acquire a majority interest in Stream Data Centers from Stream Realty Partners, expected to be completed later in 2025."},"3e370bb7c8e3":{"links":[],"unverified_note":"Acquisition of 29 data centers from Verizon for U.S. $3.6 billion in May 2017."},"3e792b997893":{"links":[],"unverified_note":"Long-Term Rural Enterprise Zone (LTREZ) agreement with annual payments in lieu of taxes, starting at $2 million per year and increasing to $4 million per year, plus additional annual fees and public safety/student success fees, beginning in 2025."},"3ea47f768e49":{"links":[],"unverified_note":"$137,000,000 estimated cost for new construction"},"3ee5ee81068f":{"links":[],"unverified_note":"AWS committed $5 billion investment into Fayette County by 2030. Amazon Data Services, Inc. purchased 590 acres in Jefferson Township, Ohio for $102.4 million in 2025."},"3efc454dd024":{"links":[],"unverified_note":"Tax abatement agreement with City of Hutto for 50% exemption of taxable value of tangible personal property for 10 years, approved July 20, 2023, tied to a minimum capital investment of $10 billion within ten years."},"3f069d366b9c":{"links":[],"unverified_note":"$47 million investment for establishment (2016); $4.8 million property acquisition (October 2016)","note_status":"NOT_MATERIAL"},"3f489cedbe42":{"links":[],"unverified_note":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved by U.S. Bankruptcy Court in January 2026."},"3f5fe5ea7aec":{"links":[],"unverified_note":"Carter Validus Mission Critical REIT II acquired the Canton Data Center for approximately $9.4 million on October 3, 2018.","note_status":"NOT_MATERIAL"},"3f80c3c9c6d2":{"links":[],"unverified_note":"$600 million debt financing package (October 16, 2025); $3.4 billion joint-venture (October 15, 2024)"},"3fb62172a64e":{"links":[],"unverified_note":"Acquisition of Cleveland Technology Center from ByteGrid in 2017; Land acquisition by H5 affiliate CLE-Infrastructure LLC in January 2025 for an undisclosed sum."},"3ff2ea91fd99":{"links":[],"unverified_note":"Settlement of $20.5 million paid by Amazon for nitrate pollution (March 2026)"},"3ff61cae0c70":{"links":[],"unverified_note":"Land acquisition: Amazon Data Services bought 188.5 acres for $700 million from Stanley Martin Homes, closed November 5, 2025.","note_status":"NO_PRIMARY"},"3ffb41554a06":{"links":[],"unverified_note":"Mechanic's lien filed by Rogers-O'Brien Construction for $34.2 million in March 2020, followed by a lawsuit filed June 3, 2020."},"4023143b0076":{"links":[],"unverified_note":"Acquisition of Hillsboro 4 and Hillsboro 5 data centers by Flexential, closed May 28, 2026."},"403c5ff36bcf":{"links":[],"unverified_note":"GI Partners acquired the data center from Sentinel Data Centers for $709 million on May 19, 2022.","note_status":"NO_PRIMARY"},"404f8d88355d":{"links":[],"unverified_note":"Land purchase by BlackChamber Group (operating through Dulles 28 Centre Lot 2A LLC) of 11 acres in Sterling, Loudoun County, Virginia, on August 5, 2021."},"407d806cdb8a":{"links":[],"unverified_note":"$2 billion construction loan secured on April 21, 2026"},"408b0fd2da4c":{"links":[],"unverified_note":"$2.3 billion loan from J.P. Morgan for a 206 MW data center project, January 24, 2025","note_status":"NEW_SOURCED"},"40b5e45e8dc0":{"links":[],"unverified_note":"Land acquisition by Amazon Data Services Inc. for $54 million in October 2020."},"40b6ca754c52":{"links":[],"unverified_note":"Microsoft acquired 30 acres of land for $41.5 million in March 2023"},"412f149c8ca2":{"links":[],"unverified_note":"Argo Infrastructure Partners increased its ownership stake to represent a majority interest in TierPoint in July 2024, bringing its total commitment to nearly $700 million since 2020."},"414ba260f517":{"links":[],"unverified_note":"Riot Blockchain acquired Whinstone US, Inc. for $80 million cash plus 11.8 million shares of Riot common stock, totaling approximately $651 million, in May 2021."},"414f699f8d97":{"links":[],"unverified_note":"QTS was a co-developer with Compass Datacenters on the Digital Gateway project, though Compass has since withdrawn its appeal."},"4188dbb671f6":{"links":[],"unverified_note":"Majority interest acquisition of Stream Data Centers by Apollo Funds, August 06, 2025"},"418c8e65a29d":{"links":[],"unverified_note":"Amazon Data Services Inc. acquired the 33-acre TransDulles Centre 2 at 45900 Pathfinder Plaza in Sterling for $135.75 million on June 24, 2024."},"41ad5b28e8cd":{"links":[],"unverified_note":"$1 billion campus investment announced in December 2018; $21 million award from Texas Enterprise Fund over ten years.","note_status":"NOT_MATERIAL"},"41bf33d72684":{"links":[],"unverified_note":"Privately funded project with an estimated cost of $3,600,000, registered on 3/6/2026."},"41d12f247b5d":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025."},"41df5158ede0":{"links":[],"unverified_note":"Settlement of $20.5 million for nitrate pollution from existing data center operations (date not specified, but 'recently agreed')"},"4200a2db39fa":{"links":[],"unverified_note":"$50 million PIPE investment from SoftBank Group Corp. on January 30, 2025","note_status":"NEW_SOURCED"},"4207b61557ac":{"links":[],"unverified_note":"Acquisition of Nokes Blvd buildings for $30.8 million (July 2022), Manekin Plaza for $20 million (February 2022), and Ridgetop Circle for $26 million (February 2022)."},"420bfde9502d":{"links":[],"unverified_note":"Investment of over $1 billion—with more than $1.7 billion in cumulative construction costs, announced October 2017.","note_status":"NOT_MATERIAL"},"421abbef1e80":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025 for expansion"},"421b2ff56400":{"links":[],"unverified_note":"Agreement with CoreWeave for a 13 MW deployment announced April 29, 2025."},"42429b570c6f":{"links":[],"unverified_note":"Investment of more than $1.5 billion (announced by December 2020)"},"425a5f56476e":{"links":[],"unverified_note":"Development partnership announced January 16, 2023, between Crane Data Centers Inc. and Principal Asset Management for a 100+ MW campus. BMO Capital Markets Corp. and Compo Capital Advisors acted as strategic and financial advisors to Crane."},"42a4e5805856":{"links":[],"unverified_note":"Rezoning approval (REZ2024‑00025) and Proffer Amendment (PRA) for the Manassas Corporate Center site."},"42abe85d66d6":{"links":[],"unverified_note":"Acquisition of 4030-4050 Lafayette Center Drive, Chantilly, VA by Menlo Equities from Digital Realty in September 2023."},"42adcc03f789":{"links":[],"unverified_note":"CoreSite acquired by American Tower in December 2021 for approximately $10.1 billion. Stonepeak Partners LP invested an additional $570.0 million in October 2022, bringing its total investment to $3.07 billion for an approximately 36% ownership interest in American Tower's U.S. data center business."},"42c52e8bd8a8":{"links":[],"unverified_note":"Fort Worth approved financial incentives up to $147 million and Tarrant County approved a 10-year tax abatement (July 07, 2015). Meta also announced a deal to purchase 100% of power from a 600 MW Enbridge solar plant in Texas, involving a $900 million investment (July 24, 2025)."},"42ed1c92cb9a":{"links":[{"record_id":"research:legacy-deal:145e86d0-fb4a-49f9-b590-bf10e404d4e9","name":"Crusoe, Blue Owl Capital and Primary Digital Infrastructure enter $3.4 billion joint venture for AI data center development","date":"2024-10-15","type":"Joint venture","value_label":"$3.4B investment","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:145e86d0-fb4a-49f9-b590-bf10e404d4e9"}]},"42f3572130f3":{"links":[],"unverified_note":"KKR acquired Ensono in 2021 for an estimated $1.7 billion.","note_status":"NO_PRIMARY"},"431be8379d63":{"links":[],"unverified_note":"$1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, nearing May 2026","note_status":"NO_PRIMARY"},"433f8d078fe2":{"links":[],"unverified_note":"Construction project with an estimated cost of $157 million, slated to begin in December 2023."},"4363c94ad1ec":{"links":[],"unverified_note":"Acquisition of zColo's U.S. and U.K. data center assets from Zayo in December 2020."},"4371399d9cdd":{"links":[],"unverified_note":"Refinancing arranged by JLL Capital Markets in May 2022 for a newly constructed, 358,000-square-foot, Tier III data center. A seven-year, fixed-rate, non-recourse loan was placed with a life company."},"437b033c2695":{"links":[],"unverified_note":"Evocative acquired the DAL6 data center in Dallas, Texas in 2022."},"438a5a4377a5":{"links":[],"unverified_note":"Amazon.com paid $65 million to purchase a 7.66-acre data center campus at 7505 Mason King Court on March 26, 2026."},"4408724e9146":{"links":[],"unverified_note":"Rockland IDA granted CoreWeave and Databank tax benefits totaling up to $58,000,000 for the Orangeburg campus."},"4435d2c878d9":{"links":[],"unverified_note":"Cook County Class 6B Classification for property tax assessment purposes approved on February 17, 2025; Land acquisition in September 2023."},"443796cacf42":{"links":[],"unverified_note":"Equity backing by Ontario Teachers' Pension Plan and Brookfield Infrastructure"},"4453e0d93426":{"links":[],"unverified_note":"Consolidated Communications was acquired by Searchlight Capital Partners and British Columbia Investment Management Corporation for $3.1 billion, with the transaction closing on December 27, 2024.","note_status":"NEW_SOURCED"},"44c326e678da":{"links":[],"unverified_note":"Iron Mountain acquired IO Data Centers and their 4 data centers in 2017."},"44c6fa7d51cc":{"links":[],"unverified_note":"$1.05B refinancing loan for DFW3 and DFW4, expected to close May 20, 2026"},"4529030488a0":{"links":[],"unverified_note":"Acquisition of Aligned Data Centers for $40 billion by Artificial Intelligence Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners, announced October 15, 2025.","note_status":"NEW_SOURCED"},"4541f9611d1f":{"links":[],"unverified_note":"Blackstone secured a $268 million loan on Dec. 1 for five data center properties, public records show. The facilities include... 45761-45771 Maries Road, worth $73.6 million.","note_status":"NO_PRIMARY"},"45506ced9f9b":{"links":[],"unverified_note":"Acquisition of 365 Main portfolio for $725 Million in 2010; Acquisition of adjacent 360 Spear Street facility for $85 million in January 2012"},"45579923d309":{"links":[],"unverified_note":"Lease agreement with Sabey Corp."},"457cf09a7259":{"links":[],"unverified_note":"Amazon plans to invest $11 billion in two data center campuses in Louisa County, part of a larger $35 billion investment in Virginia by 2040.","note_status":"NO_PRIMARY"},"4628cc73a7f5":{"links":[],"unverified_note":"Acquisition of the site via the Carpathia acquisition in 2015"},"462944321bdf":{"links":[],"unverified_note":"The Meridian Group has closed on the sale of Tysons Technology Center, a data center and office complex in Vienna. According to Meridian, the 280,000-square-foot campus sold for $96 million to a joint venture involving an affiliate of Central Colo, a national data center operator, and Legacy Investing LLC, a Northern Virginia-based real estate investment company.","note_status":"NO_PRIMARY"},"465499d268e7":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025 for expansion."},"46577ea88b7f":{"links":[],"unverified_note":"$900 million in green financing"},"46845d1654d3":{"links":[],"unverified_note":"Centersquare was formed in 2024 when Brookfield Infrastructure combined Evoque Data Center Solutions and the acquired assets of Cyxtera Technologies."},"468f105bff76":{"links":[],"unverified_note":"Initial $600 million investment announced in 2019. Additional $2.3 billion investment in Ohio data centers (including New Albany) announced in June 2024.","note_status":"NOT_MATERIAL"},"46c9179acff5":{"links":[],"unverified_note":"Iron Mountain has acquired a 40-acre data center-zoned property in Manassas, Prince William County, Virginia, for $113.5 million from PRP Real Estate Investment Management."},"46ce173577ef":{"links":[],"unverified_note":"Microsoft paid up front to build the $86.5 million Jumpoff Ridge substation and other infrastructure improvements that were needed to serve the data center. Chelan PUD commissioners Monday, June 16, approved a contract to supply power to Microsoft's forthcoming data center campus in Malaga, marking the first agreement executed under the utility's large-load framework.","note_status":"NO_PRIMARY"},"46cee8682ffd":{"links":[],"unverified_note":"Up to $30 billion in industrial revenue bonds approved in June 2016; $45 million deal with PNM for solar plants; PPAs for 50MW solar, 190MW solar, and 100MW battery storage signed with PNM."},"472a085a9381":{"links":[],"unverified_note":"Equinix acquired the Infomart Dallas from ASB Real Estate Investments for US$800 million in a debt and cash transaction, completed on April 2, 2018."},"4755d4b70775":{"links":[],"unverified_note":"Amazon Data Services acquired a 122-acre campus from George Washington University for $427 million in March 2026."},"47583e516569":{"links":[],"unverified_note":"Acquisition of Sungard's U.S. colocation and network business (including Carlstadt facility) by 365 Data Centers, expected to close Q4 2022."},"478587fe4a5b":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital (for Stargate Abilene project)"},"47ac4715511d":{"links":[],"unverified_note":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million in January 2025; AWS to inject $5 billion into Fayette County by 2030."},"47b194e3a622":{"links":[],"unverified_note":"Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024."},"4802ca0b5a07":{"links":[],"unverified_note":"Switch acquired Data Foundry for $420 million in an all-cash transaction, announced May 3, 2021.","note_status":"NO_PRIMARY"},"481602494724":{"links":[],"unverified_note":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million on Dec. 30, 2024, as part of a $5 billion investment commitment."},"4836460d1bf6":{"links":[],"unverified_note":"Agreement with Umatilla Electric Cooperative for power supply and renewable energy procurement announced in April 2023."},"484892d807e7":{"links":[],"unverified_note":"Virginia Beach Development Authority approved an $800,000 grant for expansion"},"487a5e418a8e":{"links":[],"unverified_note":"$4B green financing in March 2025"},"487c4e6b482c":{"links":[],"unverified_note":"Project investment of $135,000,000 (estimated cost) for new construction, started 2022, completed 2024."},"4897844f15f9":{"links":[{"record_id":"research:newsroom:vinson-elkins:20260326:1","name":"Aligned Data Centers Closes on $2.58 Billion Credit Facility to Fuel Continued U.S. Expansion","date":"2026-03-26","type":"Debt financing","value_label":"$2.58B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:vinson-elkins:20260326:1","scope":"portfolio"}]},"48a2aacf6bfa":{"links":[],"unverified_note":"Land acquisition of 90 acres (around September 2025)."},"48b2fd98497d":{"links":[],"unverified_note":"Investment of more than $10 billion. Indiana Economic Development Corporation committed a 35-year data center sales tax exemption for a minimum $1 billion in eligible capital invested within the first six years, with potential for up to 50 years. Meta will make an annual community impact payment of $1.5 million to the city of Lebanon for each completed phase of the up to six-phase project. Meta is investing over $120 million in critical water infrastructure and other public improvements, including roads, transmission lines, and utility upgrades. Meta is donating $1 million per year for 20 years to the Boone REMC Community Fund for energy cost assistance.","note_status":"NOT_MATERIAL"},"48c63137f33a":{"links":[],"unverified_note":"Sale of COPT DC-6 to Cloud Capital, an affiliate of CloudHQ, for $222.5 million on January 25, 2022.","note_status":"NO_PRIMARY"},"49228326e3e5":{"links":[],"unverified_note":"Acquisition by Equinix from Verizon"},"49816b76cbd6":{"links":[],"unverified_note":"GI Partners acquired a controlling interest in LightEdge on September 14, 2021."},"49bd173a8e00":{"links":[],"unverified_note":"Cogent Communications Holdings, Inc. (NASDAQ:CCOI) announced today that its subsidiary Cogent Fiber, LLC has entered into a definitive agreement to sell 10 data center facilities to a newly formed entity sponsored by I Squared Capital for $225 million in cash.","note_status":"NO_PRIMARY"},"49bfc5716c33":{"links":[],"unverified_note":"Acquisition of Hillsboro 4 and Hillsboro 5 data centers from T5 Data Centers, closed May 28, 2026."},"49bff1985b68":{"links":[],"unverified_note":"Amazon Data Services, Inc. purchased 589.843 acres in Jefferson Township for over $102 million, with land sale documents effective Dec. 30, 2024."},"49dfa24500a0":{"links":[],"unverified_note":"DataBank acquired the Waco site as part of a $1.43 billion deal for Zayo's zColo data center assets in December 2020.","note_status":"NO_PRIMARY"},"49e1913f1e46":{"links":[],"unverified_note":"Equinix invested $142 million in the expansion for DA11, opened June 2020."},"49ecb1ec998c":{"links":[],"unverified_note":"CyrusOne was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt."},"4a0cd915b93e":{"links":[],"unverified_note":"Acquisition of Aligned Data Centers by a consortium including BlackRock, GIP, MGX, Microsoft, and NVIDIA for approximately $40 billion, announced October 15, 2025, expected to close H1 2026.","note_status":"NO_PRIMARY"},"4a31d3f83148":{"links":[],"unverified_note":"$1.2 billion investment in Nebraska data centers in 2023, including the Omaha facility; $930 million investment in Nebraska data centers in 2024."},"4a7e98fe32eb":{"links":[],"unverified_note":"DataBank issued $715 million of secured notes in March 2023 and secured a $350 million credit facility in April 2023 to fund continued expansions.","note_status":"NEW_SOURCED"},"4a8ad08934f6":{"links":[],"unverified_note":"Acquisition of powered shell for Austin III (April 2, 2015); Acquisition of 22 acres of land for expansion (January 7, 2014)."},"4ad2c6a2e9b5":{"links":[],"unverified_note":"Virginia Governor's Opportunity Fund provided a $2.1 million grant and the Virginia Tobacco Indemnification and Community Revitalization Commission approved $4.8 million in funds for the initial project. Later, Governor Northam approved a $1.5 million grant from the Commonwealth's Opportunity Fund, and Microsoft became eligible for Data Center Sales and Use tax exemptions. Microsoft also has an agreement with Constellation to receive up to 35% nuclear energy attributes for the data center. Additionally, Microsoft agreed to a long-term agreement to purchase Renewable Energy Certificates (RECs) from a solar project with Dominion Energy to offset its carbon footprint."},"4b03ae1adbbd":{"links":[],"unverified_note":"$2.1 billion data center development, economic development agreement approved April 2025"},"4b1f5ddd6158":{"links":[],"unverified_note":"Land acquisition for $6.6 million in 2021"},"4b3b6926eac5":{"links":[],"unverified_note":"Virginia Tobacco Commission approved a $350,000 grant in Tobacco Region Opportunity Funds for the project (date not specified); Wise County IDA received a $500,000 Abandoned Mine Land Economic Revitalization (AMLER) Program grant for the solar farm (December 16, 2021)"},"4b58020c7632":{"links":[],"unverified_note":"Digital Realty acquired 424 acres of undeveloped land in Loudoun County, Virginia for $236.5 million in September 2018."},"4b985628cc3d":{"links":[],"unverified_note":"$1 billion investment from Harrison Street JV (announced February 2024)","note_status":"NO_PRIMARY"},"4bbe3fd6b459":{"links":[],"unverified_note":"Carpathia acquisition"},"4bd6d6f90898":{"links":[],"unverified_note":"Microsoft paid Brennan Investment Group $52.2 million in January 2020 to purchase a 36.6-acre parcel.","note_status":"NO_PRIMARY"},"4be714325f93":{"links":[],"unverified_note":"Joint venture with Mitsubishi Corp. (65% equity interest) and Digital Realty (35% interest) for two pre-leased data centers. Project estimated cost $59.4 million.","note_status":"NO_PRIMARY"},"4bfa6a04c772":{"links":[],"unverified_note":"Single-tenant data center in Hillsboro, Oregon, sold for $31.75 million in January 2024."},"4c1dfea7b566":{"links":[],"unverified_note":"DataBank acquired Houston West I, II, and III (and Houston Galleria) from CyrusOne for approximately $670 million, announced January 19, 2022, and closed in March 2022."},"4c458cffa352":{"links":[],"unverified_note":"$600 million debt financing package announced October 16, 2025"},"4c4c88d9776e":{"links":[],"unverified_note":"STACK Infrastructure secured an additional US$3bn of green financing in August 2024, which will be used to develop campuses including one in Phoenix, Arizona.","note_status":"NO_PRIMARY"},"4c87a67b7e7b":{"links":[],"unverified_note":"Construction cost of $65,000,000 (estimated) for new construction, announced 2023."},"4c8bd3a83243":{"links":[],"unverified_note":"Acquisition of Colo4Dallas by Cequel Data Centers in July 2010; Acquisition of QuadraNet by Edge Centres LLC in April 2024."},"4c8d022ddf82":{"links":[],"unverified_note":"Acquisition of Sunstone solar power project for $83 million (January 2026); renewable energy power deal with Umatilla Electric Cooperative (April 2023); $20.5 million settlement for groundwater contamination (March 2026)."},"4cbaf53cd21a":{"links":[],"unverified_note":"Acquisition by Serverfarm and NantWorks from T5 Data Centers for $71 million in April 2021.","note_status":"NO_PRIMARY"},"4cc8cc3b099f":{"links":[],"unverified_note":"Aligned Data Centers plans to invest at least $202 million in the first phase of development (announced September 2023). Aligned Data Centers was acquired by BlackRock and MGX for $40 billion (October 11, 2025).","note_status":"NEW_SOURCED"},"4cd301a2edd7":{"links":[],"unverified_note":"$15 billion joint venture with Blue Owl Capital and Primary Digital Infrastructure (May 2025)","note_status":"NEW_SOURCED"},"4dc83217ffb9":{"links":[],"unverified_note":"Google purchased a former Gatorade plant in Pryor for potential data center use (September 2013). Google bought 240 megawatts of wind power to support Oklahoma operations (September 2013). Google announced a $600 million expansion (February 2019)."},"4de4cb2852a7":{"links":[],"unverified_note":"Received a $14.5 million property tax break from the Development Authority of Fulton County in November 2020 for a project valued at $420 million.","note_status":"NOT_MATERIAL"},"4df768236e87":{"links":[],"unverified_note":"Lambda Inc. to occupy a $700 million data center, partnership announced May 7, 2025."},"4dffa379ed1c":{"links":[],"unverified_note":"10 year tax abatement agreement approved by Ellis County in July 2018"},"4e221a71c9b9":{"links":[],"unverified_note":"$1.4 billion ABS financing package backed by 28 data centers (March 09, 2026)","note_status":"NO_PRIMARY"},"4e4957471d75":{"links":[],"unverified_note":"Project cost estimated at $96 million, with land acquired in July 2023."},"4e665b6964d7":{"links":[],"unverified_note":"$9.7 billion multi-year GPU cloud infrastructure agreement with Microsoft, announced November 2025.","note_status":"NEW_SOURCED"},"4e886af04b4a":{"links":[],"unverified_note":"Apollo-managed funds acquired a majority interest in Stream Data Centers from Stream Realty Partners, completed November 2025."},"4eaaf2d50a5e":{"links":[],"unverified_note":"Acquisition of former EDS data center by Stratacache in September 2016."},"4ed0b802546f":{"links":[],"unverified_note":"Vantage Data Centers raised USD$1.35 billion in securitized notes in October 2023, with proceeds primarily used to refinance existing financings for three data centers on its flagship Northern Virginia campus, including VA12."},"4edd2df4a769":{"links":[],"unverified_note":"DataBank acquired zColo's U.S. and U.K. data center assets in December 2020 for $1.4B, which included the 5101 Lafayette St. Santa Clara facility."},"4efa7c8578de":{"links":[],"unverified_note":"DataBank acquired four Houston data centers, including Houston Galleria, from CyrusOne for approximately $670 million. Agreement announced January 19, 2022, closed March 2022."},"4f21cc967b93":{"links":[],"unverified_note":"City of Hillsboro signed six consecutive five-year Enterprise Zone (EZ) agreements on April 27, 2026, for property tax exemptions extending through 2051."},"4f38265f25ea":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for approximately $10 billion in an all-cash transaction in August 2021."},"4f9102a759d2":{"links":[],"unverified_note":"Digital Realty and TPG Real Estate established a joint venture where TPG acquired a majority stake in three hyperscale data centers in Northern Virginia for an aggregate value of $1.5 billion."},"4f9aa2815581":{"links":[],"unverified_note":"NTT Data unveils its ambitious $50 million expansion plan for TX2 and TX3, with two distinct tenant improvement projects, each carrying an estimated price tag of $25 million, projected to be completed by 2024.","note_status":"NOT_MATERIAL"},"4fa40a9bcfec":{"links":[],"unverified_note":"Acquisition of Sungard Availability Services by 11:11 Systems in November 2022"},"4fbc1b0437c0":{"links":[],"unverified_note":"New construction project valued at $137.0M (registered March 14, 2025); Part of a $3.0 billion credit facility closed in December 2025 for hyperscale campus development.","note_status":"NEW_SOURCED"},"4fde0c97c3cb":{"links":[],"unverified_note":"Amazon Data Services Inc. acquired a 91-acre property in Prince William County, Virginia, in April 2024. The company purchased the land, located at 14237 and 14209 Dumfries Road, from Parsons Business Park LLC for $218 million.","note_status":"NO_PRIMARY"},"4ff56e791e26":{"links":[],"unverified_note":"Digital Realty Trust, Inc. committed to invest at least $150 million by 2015 in its Loudoun County operation, announced July 10, 2013.","note_status":"NOT_MATERIAL"},"500cf1ca5e48":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"50189ba427a7":{"links":[],"unverified_note":"City Council approved a 50% tax abatement agreement for a minimum capital investment of at least $10 billion, effective July 21, 2023."},"501aebc6be0d":{"links":[],"unverified_note":"Inova Health System has leased an additional 30,220 square feet at 45745 Nokes Boulevard in The Corporate Office Park at Dulles Town Center. The new Inova space will be totally devoted to their IT Department."},"5027ec73a014":{"links":[],"unverified_note":"ViaWest was acquired by Peak 10 in June 2018, later rebranded as Flexential."},"503e69b767f3":{"links":[],"unverified_note":"Lease agreement between Equinix LLC and Digital 1350 Duane, LLC for 160,000 sq ft of data center space, with an initial fixed term of 15 years and total rent obligation of approximately $180 million, dated March 27, 2014."},"507603c41ec0":{"links":[],"unverified_note":"CoreSite acquired the property at 12100 Sunrise Valley Drive from AOL in 2008. CoreSite Realty Corporation was acquired by American Tower Corporation for US$10.1 billion.","note_status":"NEW_SOURCED"},"508dbbc91c7e":{"links":[],"unverified_note":"Land sale involving American Data Centers Partners, LLC at 466 Pontoon Bridge Road."},"509a49309943":{"links":[],"unverified_note":"Development partnership with Lincoln Rackhouse (2014)"},"50d1f67cbc6f":{"links":[],"unverified_note":"Investment of $215.9 million for new construction."},"50dfc74e060b":{"links":[],"unverified_note":"NRG Energy long-term lease (Jan 2016), DUG 15MW capacity lease (Oct 2018)"},"5135579541c0":{"links":[],"unverified_note":"Amazon is planning to invest $3.5 billion by 2030 to establish new data centers in the area. New Albany City Council approved agreements with Amazon web services to help build five new data centers worth $3.5 billion. Under the agreement, Amazon gets 15 years of 100% tax breaks and an additional 15 years of a 75% discount on taxes. Amazon will spend $1.8 billion on buildings and $1.7 billion on equipment. The five new data centers and related buildings are described as the 'Phase 1 Project' of Amazon's $7.8 billion development in central Ohio.","note_status":"NOT_MATERIAL"},"5182bdfc8b61":{"links":[],"unverified_note":"Level 3 Communications was acquired by CenturyLink (now Lumen Technologies) in a cash and stock transaction."},"51975e96554a":{"links":[],"unverified_note":"Sale of George Washington University's Virginia Science and Technology Campus to Amazon Data Services for $427 million.","note_status":"NO_PRIMARY"},"519ed05379e5":{"links":[],"unverified_note":"PRP, a real estate investment management company headquartered in Washington, D.C., announced today that it has sold its Northern Virginia data center property located in Prince William County, VA, to Iron Mountain Inc. (NYSE: IRM). The total consideration for the transaction was $113.5 million, or $2,837,500 per acre. The 40-acre site of heavy industrial-zoned land, known as Manassas Point, was assembled by PRP in 2022–2023."},"51ab856ab0db":{"links":[],"unverified_note":"Acquisition of operating data center at 725 S. Wells Street by CIM Group and fifteenfortyseven Critical Systems Realty (1547) in July 2019."},"51b8c71c87e5":{"links":[],"unverified_note":"Investment of approximately $75 million, announced October 5, 2017"},"51e94cede322":{"links":[],"unverified_note":"Netrality acquired 1301 Fannin Street in February 2015. INAP sold its colocation business at 1301 Fannin to Netrality in June 2020. Netrality announced an expansion project for 2.5 MW of critical capacity in May 2023. Netrality secured a $380 million sustainability-linked loan in November 2023.","note_status":"NO_PRIMARY"},"51fa09b3e893":{"links":[],"unverified_note":"Wikimedia Foundation chose CyrusOne facility in Dallas-Fort Worth region of Texas as its new data center."},"51ffbf995978":{"links":[],"unverified_note":"Securitization deal (Series 2024-1) including SAT3 and SAT4, dated March 5, 2024"},"523a087d6825":{"links":[],"unverified_note":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved in January 2026. Amazon paid $20.5 million to settle a lawsuit over nitrate-contaminated groundwater in Morrow County, reported in March/April 2026."},"525e238b62d0":{"links":[],"unverified_note":"Acquisition of HCSC data center for approximately $50 million on January 30, 2017. New facility (DC2) project with an estimated cost of $220 million, announced January 2024."},"527bee4a7d9a":{"links":[],"unverified_note":"Land acquisition: JK Land Holdings purchased 108 acres for $180 million in 2024.","note_status":"NO_PRIMARY"},"52b228d3fc5a":{"links":[],"unverified_note":"DIF Capital Partners acquired Tonaquint Data Centers in January 2023."},"52bdf152aa04":{"links":[],"unverified_note":"Assessed value of $348,596,900"},"52d1e7cb6911":{"links":[],"unverified_note":"Land acquisition for $93.7 million","note_status":"NO_PRIMARY"},"52eb1816672c":{"links":[],"unverified_note":"$600 million debt financing, October 16, 2025"},"52eb543fa279":{"links":[],"unverified_note":"$250 million term loan closed on July 14, 2025","note_status":"NEW_SOURCED"},"534d33dfe3d0":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for approximately $10 billion, including debt, on August 31, 2021."},"537fa9c7a869":{"links":[],"unverified_note":"$15 billion joint venture with Blue Owl Capital and Primary Digital Infrastructure, announced May 21, 2025"},"53835c9c8e6c":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital"},"5386a736e70c":{"links":[],"unverified_note":"February 2025: $7.5 billion industrial revenue bond approved for expansion. June 2025: 150MW geothermal PPA with XGS Energy and 150MW with Sage Geosystems."},"5387b9189b4a":{"links":[],"unverified_note":"$20.5M settlement with Amazon Data Services Inc. over nitrate contamination, filed March 31, 2026."},"53d4ca2a2df0":{"links":[],"unverified_note":"Acquisition of EdgeConneX by EQT Infrastructure"},"53d736b8fbca":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025.","note_status":"NEW_SOURCED"},"545a5cc77202":{"links":[],"unverified_note":"$735 million refinancing package for three data centers in Goodyear, Ariz., originated by Wells Fargo, Citibank and Goldman Sachs, reported June 2025.","note_status":"NO_PRIMARY"},"545c0649dd4d":{"links":[],"unverified_note":"Macquarie Asset Management has agreed to sell Aligned Data Centers to a consortium (AIP, MGX, BlackRock's Global Infrastructure Partners) for approximately $US40 billion, with the deal expected to close in the first half of 2026."},"549bb340502b":{"links":[],"unverified_note":"Menlo Equities acquired the data center property located at 4030-4050 Lafayette Center Drive in Chantilly, Virginia, from Digital Realty in September 2023."},"54e1a6998f09":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025 for expansion"},"54f7731a4ec2":{"links":[],"unverified_note":"Verizon's acquisition of MCI"},"557bf612e6f3":{"links":[],"unverified_note":"Partnership with First Solar for a 150-megawatt Sun Streams 2 photovoltaic (PV) solar plant (announced July 2019) and investment of over $40 million to expand Goodyear's wastewater capacity (announced March 2023).","note_status":"NOT_MATERIAL"},"55ed1bf06a4c":{"links":[],"unverified_note":"Acquisition of facility from CyrusOne by DataBank in March 2022."},"564f3e4af638":{"links":[],"unverified_note":"Acquisition of Net Access by Cologix in October 2015 (terms not disclosed)"},"56761318793f":{"links":[],"unverified_note":"Amazon has committed $980,000 to help launch or expand more than 120 community-focused projects in Morrow and Umatilla counties. Amazon is also funding an underground storage project capable of storing up to 1.2 billion gallons of potable water."},"5681ddb855ac":{"links":[],"unverified_note":"Blackstone acquired the data center developer in 2021 in a $10B deal."},"56856c15889f":{"links":[],"unverified_note":"Blackstone Group acquired QTS Realty Trust for approximately $10 billion on August 31, 2021."},"56c07240c51d":{"links":[],"unverified_note":"Acquisition from Verizon in May 2017"},"56cc11d60a05":{"links":[],"unverified_note":"Amazon.com, Inc. acquired 56.7 acres of land and two powered shells for $146m on December 30, 2021.","note_status":"NO_PRIMARY"},"56cd7e14c45d":{"links":[],"unverified_note":"Proposed Interconnection Agreement from NYSEG for 60MW of non-curtailable power, received May 2026."},"56ee0dbe3dac":{"links":[],"unverified_note":"Corscale Data Centers was formed as a new platform by Patrinely Group and USAA Real Estate (now Affinius Capital)."},"56f0f0f92be3":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments for space and electrical capacity in eight completed and operating data centers, including two in San Antonio, as of March 5, 2024."},"573fe77ab876":{"links":[],"unverified_note":"10-year agreement to purchase 100% renewable energy with Citigroup Energy Inc. and Calpine Energy Solutions, LLC (May 23, 2019)"},"57506de3019b":{"links":[],"unverified_note":"Property acquisition for approximately $16.8 million on November 27, 2012","note_status":"NOT_MATERIAL"},"5768b376a596":{"links":[],"unverified_note":"Acquisition of Hillsboro 4 and Hillsboro 5 data centers by Flexential on May 28, 2026."},"578cbd8d5a73":{"links":[],"unverified_note":"DataBank acquired four Houston data center assets from CyrusOne for approximately $670 million, closed March 3, 2022."},"579076e563d8":{"links":[],"unverified_note":"March 17, 2023: Microsoft agreed to pay $36M for a $90M expansion of Goodyear's 157th Avenue Wastewater Treatment Plant, plus $5M for a new sewer line and $800K for a city coordinator. July 30, 2019: Partnership with First Solar for the 150-megawatt Sun Streams 2 photovoltaic (PV) solar plant to cover energy load.","note_status":"NOT_MATERIAL"},"5799eef22547":{"links":[],"unverified_note":"$1.4 billion project financing facility closed August 15, 2025"},"57a646063b47":{"links":[],"unverified_note":"Strategic hosting arrangement between Genesis Digital Assets Limited and Lonestar Dream, Inc. for 36 MW capacity (April 3, 2024)."},"57b456c15abc":{"links":[],"unverified_note":"Phase 3 approved by Village Council in December 2024 with an estimated budget of $800 million, bringing total campus investment to approximately $3.3 billion at completion. A $7.5 billion industrial revenue bond was approved in February 2025 to support expansion."},"57f29b7d5c8a":{"links":[],"unverified_note":"American Tower acquired CoreSite for approximately $10.1 billion, announced November 15, 2021, and closed December 28, 2021."},"58299a7b7c78":{"links":[],"unverified_note":"Google announced plans to invest at least $750 million more in Nebraska, partly for its first Omaha data center, on April 22, 2022.","note_status":"NO_PRIMARY"},"58382f6f021e":{"links":[],"unverified_note":"Off-market acquisition of the FIS Global Data Center in Minneapolis, Minnesota, assisted by Five 9s Digital. Date and amount not specified."},"583f5c046b6e":{"links":[],"unverified_note":"Project cost estimated at approximately US$96 million, construction began December 2023."},"5852a0110cf0":{"links":[],"unverified_note":"$20.5 million settlement for nitrate pollution lawsuit (recent)"},"5866c5bd183b":{"links":[],"unverified_note":"Atlas Agro plans to acquire approximately 275 acres of land at 2100 Horn Rapids Road within the Northwest Advanced Clean Energy Park for just under $24 million from the city of Richland. The company intends to invest $500 million in this data center campus. The city of Richland awarded Atlas Agro $20 million in property tax breaks. However, $157.3 million in federal funding for the associated fertilizer plant was cut. Macquarie is identified as the main project investor.","note_status":"NOT_MATERIAL"},"5869bdc99fef":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reinforcing the value of its established assets while positioning the company for continued expansion across the region."},"58b21377d62b":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"58b760c6ff0e":{"links":[],"unverified_note":"Acquisition of a 214,000 SF Tier 4 data center for $29 million (or $28.8M) on August 1, 2025, with acquisition financing arranged by JLL Capital Markets through Poverni Sheikh Group (PSG).","note_status":"NO_PRIMARY"},"58e190eb6fdd":{"links":[],"unverified_note":"$750 million initial investment announced in 2018, with $86.25 million in state incentives."},"58e64e8db615":{"links":[],"unverified_note":"600MW grid connection agreement with AEP Texas Inc. signed on March 17, 2025, involving $4.1 million non-refundable connection costs and $26.9 million in refundable deposits.","note_status":"NOT_MATERIAL"},"58f7bcc8dbf3":{"links":[],"unverified_note":"$1.05 billion refinancing deal for DFW3 and DFW4, expected to close May 20, 2026"},"58fcd411e76f":{"links":[],"unverified_note":"$1.4 billion asset-backed securities deal for Iskandar and Kaveh data centers","note_status":"NO_PRIMARY"},"591fbb64d2c3":{"links":[],"unverified_note":"Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).","note_status":"NO_PRIMARY"},"59897a174c11":{"links":[],"unverified_note":"365 Data Centers acquired all U.S. colocation data centers from Sungard Availability Services in 2022.; Stonecourt Capital LP acquired 365 Data Centers on October 6, 2020."},"598bdd9aa4bc":{"links":[],"unverified_note":"Term sheet agreement for power for a new 120 MW data center co-located with a 200 MW wind farm, signed April 2025."},"59ad83473136":{"links":[],"unverified_note":"Texas Logistic & Fulfillment Services LLC took over the former Amazon facility in Sugar Land, TX, converting the 300,000-square-foot site into a climate-controlled 3PL hub in June 2025."},"59c498d62af7":{"links":[],"unverified_note":"Amazon Data Services acquired a 122-acre campus from George Washington University for $427 million in March 2026."},"59cf538ba343":{"links":[],"unverified_note":"Blackstone Infrastructure Partners acquired QTS Realty Trust for approximately $10 billion."},"5a1e19985758":{"links":[],"unverified_note":"$220 million project announced in January 2024","note_status":"NOT_MATERIAL"},"5a779eff1091":{"links":[],"unverified_note":"Rezoning #REZ2023-00026, Stoneview"},"5a8287451931":{"links":[],"unverified_note":"Poolside is in a $2 billion fundraising round (announced October 2025).","note_status":"NO_PRIMARY"},"5a86eedacb2c":{"links":[],"unverified_note":"$272,150,000 project investment, announced 2025"},"5a9d1c9bd157":{"links":[],"unverified_note":"Hosting.com acquired by Ntirety on August 31, 2009; Data Canopy acquired Ntirety's colocation business in June 2023, facilitated by a $50 million growth capital investment from Metropolitan Partners Group.","note_status":"NO_PRIMARY"},"5ae72228f318":{"links":[],"unverified_note":"Sale of four Houston data centers, including Houston West III, from CyrusOne to DataBank for approximately $670 million, announced January 2022 and closed March 2022.","note_status":"NEW_SOURCED"},"5b2dd743abcd":{"links":[],"unverified_note":"Switch acquired Data Foundry for $420 million in an all-cash transaction in May 2021.","note_status":"NO_PRIMARY"},"5b5d42a6174e":{"links":[],"unverified_note":"National Science Foundation Major Research Instrumentation (NSF-MRI) award (#2320162) awarded in 2023"},"5b6a40e8b352":{"links":[],"unverified_note":"$3.2 billion in financing for expansion, announced December 2025.","note_status":"NEW_SOURCED"},"5b76f888b887":{"links":[],"unverified_note":"Community Reinvestment Act (CRA) agreement with the City of Hilliard for property tax abatement, requiring a $200 million investment by Dec. 31, 2026. Amazon will cover all project costs for the fuel cell facility under a private agreement with AEP Ohio."},"5b8a703274e6":{"links":[],"unverified_note":"Signed a term sheet for power for Project Annie, a new 75 MW data center co-located with a 114 MW solar farm in northeast Texas, announced May 22, 2025."},"5bc6b3369585":{"links":[],"unverified_note":"$100M conversion of office building to data center, completed 2021","note_status":"NOT_MATERIAL"},"5bf6a76886f4":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for approximately $10 billion in an all-cash transaction, expected to close in the second half of 2021."},"5c48cc4613db":{"links":[],"unverified_note":"DataBank acquired four Houston-area data centers from CyrusOne for $670 million, announced January 19, 2022.","note_status":"NEW_SOURCED"},"5c570d2d424d":{"links":[],"unverified_note":"Meta is investing $10 billion to build a massive data center campus. El Paso city and county approved Chapter 380 and Chapter 312 tax abatement agreements with Wurldwide LLC, a Meta subsidiary, in December 2023, providing 80% city and county property tax abatements for up to 5 phases over 35 years.","note_status":"NOT_MATERIAL"},"5c720ee4ab99":{"links":[],"unverified_note":"Sale of Houston West I, II, and III (and Houston Galleria) from CyrusOne to DataBank Holdings Ltd. for approximately $670 million, closed in March 2022."},"5c8cb99d3c68":{"links":[],"unverified_note":"Construction cost of $750,000"},"5c9b3863c16b":{"links":[],"unverified_note":"Acquisition of TierPoint by Cequel Data Centers LLC in 2012."},"5c9f8500f4fe":{"links":[],"unverified_note":"Acquired from Dupont Fabros in September 2017 by Digital Realty as part of a merger. A subsequent transaction in December 2019 involved a buyer acquiring an 80% interest in a JV at $811M, valuing the total portfolio (including 21745 Sir Timothy Drive) at $1.013 B.","note_status":"NO_PRIMARY"},"5cab2057d267":{"links":[],"unverified_note":"$1.5B project, announced September 2023"},"5cd1d1d7c81c":{"links":[],"unverified_note":"$79.8 million data-center redevelopment, announced May 2024","note_status":"NOT_MATERIAL"},"5d1c7e4c4974":{"links":[],"unverified_note":"Property purchased by Digital Second for $5.75 million in 2018.","note_status":"NOT_MATERIAL"},"5d2ffaa80c12":{"links":[],"unverified_note":"$400 million Saxet Energy Park announced in 2023; Northern Data Group acquired project assets in December 2023; Peak Mining purchased a 300MW mining data center site in December 2023; Peak Mining secured an option for an additional $150m of MicroBT mining hardware; Peak Mining purchased a second 300MW data center location in May 2024."},"5d902f3818b6":{"links":[],"unverified_note":"Oldham County tax abatement agreement for approximately $160,000,000.00 (March 10, 2025); Put Option Agreement with American Bitcoin Corp. (March 31, 2025)"},"5d973bdb1e3c":{"links":[],"unverified_note":"$4B green-labeled financing in March 2025"},"5dd3368a41d3":{"links":[],"unverified_note":"City of Dallas provided $2 million in economic development incentives (May 2020)","note_status":"NOT_MATERIAL"},"5dd7b49642a3":{"links":[],"unverified_note":"Amazon.com paid $65 million to purchase a 7.66-acre data center campus in Manassas on March 26."},"5dda26e2992d":{"links":[],"unverified_note":"$600 million debt financing package (October 16, 2025)","note_status":"NO_PRIMARY"},"5e0d15a4c54a":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025; $3.4 billion joint-venture announced October 15, 2024."},"5e34ad843f2e":{"links":[],"unverified_note":"Land acquisition from Crook County for $5.4 million in 2017"},"5e37a540d46c":{"links":[],"unverified_note":"$1.6 billion investment in the data center; 6-year Master Services Agreement with Lincoln Property Company for over $260 million for initial 30 MW installation; approximately $141 million in tax benefits from City of Plano"},"5e620e21e5b5":{"links":[],"unverified_note":"In 2025, a joint venture formed by Harrison Street Real Estate Capital, LLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group."},"5e836b867f78":{"links":[],"unverified_note":"Amazon agreed to pay $20.5 million to settle a lawsuit over nitrate-contaminated groundwater in Morrow County (April 1, 2026).","note_status":"NOT_MATERIAL"},"5e9d724f9a49":{"links":[],"unverified_note":"$1.05B CMBS refinancing for DFW3 and DFW4, expected to close May 20, 2026."},"5eb0439547ef":{"links":[],"unverified_note":"Property acquisitions totaling $76.8 million in July 2022 and February 2022."},"5ebad9884454":{"links":[],"unverified_note":"Acquisition of 575,000 sq ft redevelopment property for $22.3 million in June 2012.","note_status":"NOT_MATERIAL"},"5ec906606968":{"links":[],"unverified_note":"Site purchased in 2017 for $44 million; Unisys contract valued at $242.4 million in 2018","note_status":"NOT_MATERIAL"},"5ed33dd0fda6":{"links":[],"unverified_note":"CyrusOne sold its four Houston data center assets, including Houston West I, II and III, to DataBank Holdings Ltd. for approximately $670 million, announced January 19, 2022, and closed March 3, 2022."},"5f5e6315e978":{"links":[],"unverified_note":"$220 million investment for FTW1 DC2 expansion (announced Jan 2024)","note_status":"NOT_MATERIAL"},"5f773c262e6d":{"links":[],"unverified_note":"Renovation/Alteration project with an estimated value of $1.0M, registered November 4, 2016, closed February 1, 2017.","note_status":"NOT_MATERIAL"},"5f89bcc58f22":{"links":[],"unverified_note":"The proposed data center site was recently purchased for $60 million by JK Land Holdings. Finmarc Management Inc. had acquired the site in 2019 for $26.1 million.","note_status":"NO_PRIMARY"},"5fa018494251":{"links":[],"unverified_note":"Tax abatement agreements for NTT Global Data Centers in Hillsboro extending through 2051, signed in March-April 2026."},"5fc43d6cf14a":{"links":[],"unverified_note":"Acquisition of a ~175,000 sq ft powered shell in Austin's Met Center on April 2, 2015."},"5fd507c782d5":{"links":[],"unverified_note":"On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million. The land, located east of Pacific Boulevard and west of Route 28, was sold by Eugenia Investments Inc."},"5fee17d08361":{"links":[],"unverified_note":"Snowhawk and Nuveen made a strategic investment in Prime Data Centers on July 31, 2025."},"6011f2a345f7":{"links":[],"unverified_note":"Milam County held a public hearing on a Tax Abatement Agreement with SE DC DevCo, LLC for a data center project with an estimated capital investment of over $3,000,000,000."},"60235265611a":{"links":[],"unverified_note":"Over $2.5 billion in direct investment in the Los Lunas Data Center campus.","note_status":"NOT_MATERIAL"},"60701107377c":{"links":[],"unverified_note":"On December 15, 2021, The BlackChamber Group, through the entity CTP-II LLC, acquired 22.5 acres of land at the intersection of John Marshall Highway (Route 55) and Catharpin Road in Gainesville, Virginia. The purchase price of $16.4 million reflects the strategic value of the location, inferring a valuation of $730k per acre.","note_status":"NOT_MATERIAL"},"6086458c6c1b":{"links":[],"unverified_note":"Acquisition of 925 Dalton Avenue facility by H5 Data Centers on December 13, 2021"},"6088e82f5908":{"links":[],"unverified_note":"$600 million debt financing secured on October 16, 2025. $3.4 billion joint venture for AI data center development announced October 15, 2024."},"60a659f32333":{"links":[],"unverified_note":"Temple Green Data LLC purchased Rhodium's power agreements and infrastructure buildout for $40.6 million in cash, as approved by a court update on November 26, 2024.","note_status":"NO_PRIMARY"},"60f5fe6df943":{"links":[],"unverified_note":"25-year water service agreement with City of Hermiston (approved Feb 24, 2025); AWS to provide $8 million for RV park construction (Oct 13, 2025)."},"60fbfceea0c5":{"links":[],"unverified_note":"$600 million initial investment announced in 2015"},"612f6cc42e42":{"links":[],"unverified_note":"Herkimer County IDA awarded a $500,000 grant from Empire State Development (ESD) for predevelopment work (April 2026); Turin Management LLC purchased the property for $2.1 million (June 2025).","note_status":"NOT_MATERIAL"},"615a5ddf697f":{"links":[],"unverified_note":"$215.9 million investment for 245,000 sq ft facility (SAT15)"},"616634241ede":{"links":[],"unverified_note":"Six consecutive five-year enterprise zone contracts for property tax exemptions for NTT Global Data Centers, signed on April 27, 2026, extending through 2051."},"6192773b7fb1":{"links":[],"unverified_note":"New construction with an estimated cost of $55,950,000."},"61a2e556fb50":{"links":[],"unverified_note":"Iron Mountain paid PRP $113.5M for the Manassas, Virginia, development site in a deal that closed Thursday, PRP told Bisnow. The company's acquisition of a 40-acre development site in Manassas, VA enables two planned new data center buildings at its further expanded Manassas campus, offering an estimated 150 MW of additional capacity."},"61c5cf64a0b2":{"links":[],"unverified_note":"Prospective Purchaser Consent Decree with STACK Infrastructure USA III, LLC"},"61f867cfda97":{"links":[],"unverified_note":"Acquisition of DataGryd for $74 million in January 2022. Investment of $15 million for expansion. Anticipated additional $75 million of expansion capital.","note_status":"NEW_SOURCED"},"62038a4c8598":{"links":[],"unverified_note":"$113 million loan in May 2013; Equity recapitalization with ICONIQ Capital, LLC in September 2016"},"62081e7c0b22":{"links":[],"unverified_note":"Acquisition of 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million."},"622e382bb9f6":{"links":[],"unverified_note":"Multimillion dollar infrastructure upgrade to uninterruptible power supply and battery backup systems in October 2009."},"622ec6d93314":{"links":[],"unverified_note":"Change in ownership from Hp Enterprise Services LLC to Sf Houh, LLC on September 20, 2024."},"628d96433c63":{"links":[],"unverified_note":"Property tax abatements from Portage City Council for a $35 million building investment (10 years) and $52 million worth of IT equipment (5 years), approved December 2023.","note_status":"NOT_MATERIAL"},"62b1ceb06da5":{"links":[],"unverified_note":"DXC Technology acquired a Credit Suisse data center in Clifton, New Jersey, for an undisclosed sum in May 2019, and signed a long-term 13-plus year managed colocation services agreement with Credit Suisse (USA), Inc."},"62c0bbb6bfd5":{"links":[],"unverified_note":"$8,000,000 construction cost, privately funded."},"630c266e7966":{"links":[],"unverified_note":"Chapter 11 bankruptcy filing by RELLIS Campus Data and Research Center LLC on November 5, 2025, reporting $10 million to $50 million in assets and liabilities.","note_status":"NOT_MATERIAL"},"631216fb09f6":{"links":[],"unverified_note":"GI Partners closed a continuation vehicle and strategic investment from GI Data Infrastructure in Flexential, anchored by funds managed by Hamilton Lane, which, combined with the November 2024 investment from Morgan Stanley Infrastructure Partners, totals approximately $1 billion in primary equity (August 20, 2025)."},"6313348306c9":{"links":[],"unverified_note":"Brookfield acquired Cyxtera in November 2023, combining it with Evoque."},"632ca1ec398a":{"links":[],"unverified_note":"Settlement of over $20.5 million by Amazon to address nitrate-contaminated water in Morrow County (April 2026)."},"6336732272b1":{"links":[],"unverified_note":"Soluna acquired Spring Lane Capital's equity interest in Project Dorothy 1A for $16.5 million on April 16, 2026, financed partly by a $12 million unsecured promissory note.","note_status":"NOT_MATERIAL"},"633bd697d026":{"links":[],"unverified_note":"SDC Capital Partners acquired 97-acre data center land in Virginia for $615 million in October 2025.","note_status":"NO_PRIMARY"},"6350e9bb4d7e":{"links":[],"unverified_note":"CloudCapital, an affiliate of CloudHQ, acquired a 233,000-square-foot data center (DC-6 at 9651 Hornbaker Road) in Manassas, Va., for $222.5 million on January 26, 2022.","note_status":"NO_PRIMARY"},"635fe317bc64":{"links":[],"unverified_note":"Lancaster Data Center Campus, LP has 3 documented construction projects in Texas public records, with a combined value of $471.4M. The largest project is 'Skybox - Lancaster 1 Initial Improvements' for $214.3M, dated 2025-01-27. Work on the first building of the PowerCampus Dallas is estimated to cost about $85 million.","note_status":"NOT_MATERIAL"},"63807d29451d":{"links":[{"record_id":"research:newsroom:vinson-elkins:20260326:1","name":"Aligned Data Centers Closes on $2.58 Billion Credit Facility to Fuel Continued U.S. Expansion","date":"2026-03-26","type":"Debt financing","value_label":"$2.58B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:vinson-elkins:20260326:1","scope":"portfolio"}]},"6392d6cdf76a":{"links":[],"unverified_note":"Land acquisition by Amazon Web Services for $27.72 million in 2023."},"639378049da4":{"links":[],"unverified_note":"Equinix acquired Infomart Dallas from ASB Real Estate Investments for US$800 million in April 2018.","note_status":"NEW_SOURCED"},"63995cd13299":{"links":[],"unverified_note":"Investment of $142 million for the first phase, announced June 24, 2020.","note_status":"NOT_MATERIAL"},"64265025d5dd":{"links":[],"unverified_note":"Amazon Web Services (AWS) acquired three office properties in Sterling, Virginia, for approximately $30.8 million."},"643ba345b826":{"links":[],"unverified_note":"Vantage Data Centers announced an investment of over $25 billion to develop the Frontier campus in Shackelford County, Texas (August 19, 2025).","note_status":"NO_PRIMARY"},"644d86b038c8":{"links":[],"unverified_note":"DigiCo acquired two enterprise data centers in the US, 100 percent leased to insurance company State Farm, for $248 million (December 2024/January 2025)."},"644f6e9f24f5":{"links":[],"unverified_note":"Development Agreement and Government Property Lease Excise Tax (GPLET) Lease Agreement with Stone Applications, LLC, signed in July 2019, with a commitment to spend $600M in capital expenditures for Phase I and $1 billion total upon completion.","note_status":"NOT_MATERIAL"},"6452b6b4ccbd":{"links":[],"unverified_note":"Partnership with Vívaro Telecom for the San Diego data center, announced January 17, 2023."},"646c65b4fd7d":{"links":[],"unverified_note":"$300 million construction cost, announced April 2025","note_status":"NOT_MATERIAL"},"64b26d69ed02":{"links":[],"unverified_note":"$3.4 billion in financing from Blue Owl Capital"},"64cb7a220e09":{"links":[],"unverified_note":"Loan for $113 million to expand its data center, led by JP Morgan Chase Bank, Wells Fargo Bank, RBS Citizens Financial Group, and Raymond James (May 15, 2013)"},"64cd4015bbf0":{"links":[],"unverified_note":"2025 water service agreement with City of Hermiston for $18 million, and 2019 15-year tax break for up to $40 million."},"6506a25c7803":{"links":[],"unverified_note":"Switch acquired Data Foundry, Inc. for $420 million in an all-cash transaction, expected to close by mid-2021."},"6506e9de79d8":{"links":[],"unverified_note":"CyrusOne completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024."},"651566edd2d3":{"links":[],"unverified_note":"Securitization of real estate and tenant lease payments for space and electrical capacity in five operating wholesale turnkey data centers, including Plano, Texas, dated November 14, 2022."},"65397af79299":{"links":[],"unverified_note":"TDLR permit filed July 6, 2021, for Phase 1 with an estimated cost of $154,900,000."},"6543472aca47":{"links":[],"unverified_note":"Crusoe Energy Systems raised US$150 million in equity capital from venture capital funds (undated, but prior to 2018 operations). Crusoe Technologies LLC acquired the operating assets of Great American Mining on October 12, 2022, adding operational capacity in the Bakken region."},"655c54a579d2":{"links":[],"unverified_note":"Microsoft invested $215.9 million for this 245,000 sq ft facility, with a TDLR permit filed on August 18, 2022.","note_status":"NOT_MATERIAL"},"6565c16f319a":{"links":[],"unverified_note":"Refinancing deal for $1.05 billion for the DFW3 campus, reported May 1, 2026. Estimated cost of $41,500,000 for the Load Adder addition, reported October 4, 2022.","note_status":"NO_PRIMARY"},"656e80b1e7f0":{"links":[],"unverified_note":"Google announced a $600 million investment for the Papillion data center in October 2019.","note_status":"NOT_MATERIAL"},"65ab6776995d":{"links":[],"unverified_note":"Energy Savings Performance Contract (ESPC) with Ameresco for $183 million, announced January 13, 2025.","note_status":"NOT_MATERIAL"},"65eedc214c11":{"links":[],"unverified_note":"AWS is funding an underground water storage project for Hermiston costing $18 million, and an RV park project for $8 million.","note_status":"NOT_MATERIAL"},"6602ae09f2e2":{"links":[],"unverified_note":"Hermiston City Council approved a 25-year water service agreement with Amazon Data Services on February 24, 2025, for additional data centers, with AWS paying the full $18 million project cost for the Aquifer Recovery & Storage project."},"6604e7bcf68b":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reported May 2026."},"66086bfa959d":{"links":[],"unverified_note":"Acquisition of HO1 and 28 other data centers from Verizon on April 30, 2017"},"6612a1339c9f":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025; $2.4 billion partnership announced December 2021."},"6665ccb3d2a4":{"links":[],"unverified_note":"$215.9 million investment for construction, filed August 2022."},"666765fb4855":{"links":[],"unverified_note":"DataBank acquired zColo's US and UK data center assets from Zayo Group Holdings in December 2020."},"667858be0bf6":{"links":[],"unverified_note":"Pflugerville City Council approved an economic development performance agreement with Skybox and Prologis, expecting up to $548 million in capital expenditures and a 10-year expansion grant capped at $225,000 annually.","note_status":"NOT_MATERIAL"},"66933c7ae61d":{"links":[],"unverified_note":"11:11 Systems acquired iland Internet Solutions Corporation in December 2021."},"66c6878a033e":{"links":[],"unverified_note":"Over $1.5 billion investment.","note_status":"NOT_MATERIAL"},"66d46f32052d":{"links":[],"unverified_note":"Settlement of $20.5 million for a lawsuit regarding nitrate pollution (date not specified, but 'recently agreed')."},"66f253cae492":{"links":[],"unverified_note":"Securitization of real estate and tenant lease payments for space and electrical capacity in eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas, as part of CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance (March 5, 2024)."},"6715003a9972":{"links":[],"unverified_note":"$250M equity investment from TJC and $600M secondary share sale (January 30, 2025), part of a $2B equity round (October 2024)."},"67222de31bb5":{"links":[],"unverified_note":"Grants from the Governor's Opportunity Fund ($2.1 million) and the Virginia Tobacco Indemnification and Community Revitalization Commission ($4.8 million)."},"674b3186478f":{"links":[],"unverified_note":"Stream's third San Antonio campus is scheduled to support 1.5 million square feet of data center space with a $400M investment. Construction Volume: ~$700M for SATB1."},"674c18bde527":{"links":[{"record_id":"research:discovery:20261022:2025-08-15:galaxy-closes-1-4-billion-project-financing-f:bb2d2266ff01fe21","name":"Galaxy Closes $1.4 Billion Project Financing Facility to Accelerate Helios AI Datacenter Development","date":"2025-08-15","type":"Project financing","value_label":"$1.4B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2025-08-15:galaxy-closes-1-4-billion-project-financing-f:bb2d2266ff01fe21"}]},"67590dfd0e3a":{"links":[],"unverified_note":"Power purchase agreement with Longroad Energy for 150-MW Sun Streams 2 solar plant (2019); $42M contribution to Goodyear's wastewater capacity expansion (2023)."},"67b9397549bd":{"links":[],"unverified_note":"Investment of $35 million in the Dallas County project, September 2023 to January 2025.","note_status":"NOT_MATERIAL"},"67cfad8f63c2":{"links":[],"unverified_note":"Oppidan acquired the Westpointe 40 Business Park site from Titan Development in September 2024."},"680843e07588":{"links":[],"unverified_note":"DataBank acquired four Houston-area data centers from CyrusOne for $670 million, closing in March 2022."},"6822e4172b7e":{"links":[],"unverified_note":"Initial investment of $210 million for the first phase (Jan 2012); total investment in the complex reached $2 billion (Sep 2018)."},"68239b9bdbc9":{"links":[],"unverified_note":"Equinix completed the acquisition of the Infomart Dallas building from ASB Real Estate Investments for US$800 million on April 2, 2018."},"6848916a0b97":{"links":[],"unverified_note":"Amazon Data Services, Inc. acquired 56.7 acres and two powered shells at 24214 and 24244 Quail Ridge Lane in Aldie for $146 million on December 30, 2021."},"684ed1499911":{"links":[],"unverified_note":"Telx acquisition in 2015"},"685adaa0e1e3":{"links":[],"unverified_note":"$2 billion senior secured notes offering by Black Pearl Compute LLC, due 2031, issued February 11, 2026.","note_status":"NEW_SOURCED"},"6882f0ec6214":{"links":[],"unverified_note":"Second Tax Abatement Agreement between Armstrong County, Texas and GN DC1, LLC (November 12, 2024). The overall campus has an estimated capital investment of up to $29 billion.","note_status":"NOT_MATERIAL"},"68915cbb53d3":{"links":[],"unverified_note":"Construction cost of $220,000,000"},"6894ecc2d4c5":{"links":[],"unverified_note":"Milam County Tax Abatement Agreement with SE DC DevCo, LLC (June 2025)"},"68a72eed3ab4":{"links":[],"unverified_note":"Acquisition by DX Hammond in 2021"},"68c1133e66ab":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025 for expansion."},"68c276b5743a":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025."},"68fc57fabf3e":{"links":[],"unverified_note":"Amazon purchased a property on Blackwell Road for nearly $40 million in September 2021.","note_status":"NO_PRIMARY"},"69025bd650de":{"links":[],"unverified_note":"$1.4bn securitization deal (CLDHQ 2026-1) for two Ashburn data centers with 160MW combined capacity, dated April 17, 2026."},"692029e8e4f2":{"links":[],"unverified_note":"Power Purchase Agreement (PPA) with First Solar for the 150-megawatt Sun Streams 2 solar plant. Agreement with City of Goodyear to pay $36 million for a $90 million expansion of the 157th Avenue Wastewater Treatment Plant.","note_status":"NO_PRIMARY"},"693761504424":{"links":[],"unverified_note":"Equinix invested $142 million in the first phase of DA11, announced June 2020.","note_status":"NOT_MATERIAL"},"693ef582c97b":{"links":[],"unverified_note":"$27.3 million in tax incentives (2008), $334 million project cost (2008)","note_status":"NOT_MATERIAL"},"69599b0917a3":{"links":[],"unverified_note":"Accenture acquired Navisite in January 2024 (terms undisclosed)."},"6965bdc92976":{"links":[],"unverified_note":"Property tax breaks worth nearly $70 million annually, cumulatively over $1 billion. Oregon Department of Transportation grant of $320,000 for connecting to local utilities.","note_status":"NOT_MATERIAL"},"69908de5ab8b":{"links":[],"unverified_note":"Rezoning #REZ2020-00022, Comprehensive Plan Amendment #CPA2020-00011, Zoning Text Amendment #DPA2021-00014, and the denied Diamond Hill substation by NOVEC."},"69ab248b5e09":{"links":[],"unverified_note":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million on December 30, 2024. AWS committed a $5 billion investment in Fayette County by 2030, facilitated by a 30-year, 100 percent tax exemption through a Community Reinvestment Area (CRA) Agreement."},"69b544838db6":{"links":[],"unverified_note":"$3.4 billion financing from Blue Owl Capital; $3.5 billion project cost; 85% property tax abatement over 10 years from City of Abilene and Taylor County."},"6a1600fd18ea":{"links":[],"unverified_note":"Agreement with Umatilla Electric Cooperative for energy supply (April 24, 2023); $20.5 million settlement for nitrate pollution lawsuit (April 1, 2026); Purchase of over 200,000 MWh/year from 90 MW wind farm (February 22, 2024); Partnership with Energy Northwest for nuclear reactors (October 2024); Strategic Investment Program and Long Term Rural Enterprise agreements for tax breaks."},"6a534903d2e6":{"links":[],"unverified_note":"$1.05B fixed-rate, five-year CMBS loan for DFW3 and DFW4, expected to close May 20, 2026"},"6a57b62449f9":{"links":[],"unverified_note":"Acquisition of 29 data centers from Verizon Communications Inc. for $3.6 billion in cash, closed May 1, 2017.","note_status":"NO_PRIMARY"},"6a5d26600ba3":{"links":[],"unverified_note":"Acquisition of 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million."},"6a66aac8871c":{"links":[],"unverified_note":"Acquisition by DigiCo Infrastructure REIT for $248 million in January 2025."},"6a74dcb1d3a4":{"links":[],"unverified_note":"Acquisition of Zayo facilities in 2020; $2.0 billion equity raise in October 2024"},"6a7c58555e66":{"links":[],"unverified_note":"LightEdge acquired OnRamp in July 2018."},"6b06e5b6775b":{"links":[],"unverified_note":"DataBank acquired four Houston data centers from CyrusOne for $670 million on March 3, 2022."},"6b06f1a4fd36":{"links":[],"unverified_note":"CyrusOne acquired PowerHouse ABX-1 for $154.1 million in Q4 2024.","note_status":"NO_PRIMARY"},"6b12d4ace90b":{"links":[],"unverified_note":"Tax Abatement Agreement with Childress County (Feb 14, 2022); Amended and Restated Tax Abatement Agreement with Clarendon College/Childress County (Oct 14, 2024)"},"6b1bf0b9e093":{"links":[],"unverified_note":"Aligned Data Centers is being sold to BlackRock and MGX in a $40 billion deal. Partnership with Calibrant Energy to deploy a 31 MW / 62 MWh battery energy storage system, planned to be operational in 2026."},"6b228a754c37":{"links":[],"unverified_note":"Agreement with Umatilla Electric Cooperative (April 2023); acquisition of Sunstone solar project for $83 million (January 2026); long-term tax abatement deals with local governments."},"6b31e63fa4dd":{"links":[],"unverified_note":"Agreement between Flexential and CoreWeave for a 13 MW deployment in Plano, Texas, announced April 22, 2025."},"6b4aed0d0afe":{"links":[],"unverified_note":"Power Purchase Agreement (PPA) for 105 MWAC of new solar power with SunEdison, Inc. on September 23, 2015."},"6b916adb60ff":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's series 2025-1 class A-2 note issuance is a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s 13 completed and operating data centers in Sterling, Va., San Antonio, Texas, and Houston."},"6bae13a7ab76":{"links":[],"unverified_note":"Industrial Revenue Bonds (IRBs) authorized up to $30 billion in June 2016, additional IRBs of up to $7.5 billion across six series approved in December 2024, and Power Purchase Agreements (PPAs) for 50MW solar, 190MW solar, and 100MW/400MWh battery storage."},"6bdb30682637":{"links":[],"unverified_note":"Digital Realty acquired Telx for $1.886 billion in October 2015.","note_status":"NEW_SOURCED"},"6be95be30ee1":{"links":[],"unverified_note":"Acquisition of Stream Data Centers by Apollo-managed funds, completed November 2025."},"6bf4e422907c":{"links":[],"unverified_note":"Rezoning approval by Culpeper County Board of Supervisors"},"6c47e2c0fa45":{"links":[],"unverified_note":"$41,500,000 estimated cost for CyrusOne Allen Load Adder project (2022-2023)"},"6c653cbbf1e7":{"links":[],"unverified_note":"$22 million project cost, May 2024","note_status":"NOT_MATERIAL"},"6c6cdfc6254e":{"links":[],"unverified_note":"Oasis Digital has forged a strategic partnership to develop a state-of-the-art data center campus at the ideally located 1,600-acre MAMaC megasite in Greensville County, VA."},"6cb23139b233":{"links":[],"unverified_note":"Acquisition of Aligned Data Centers by a consortium including BlackRock's GIP, Nvidia, Microsoft, and MGX for $40 billion on October 15, 2025.","note_status":"NEW_SOURCED"},"6cef98fc6db0":{"links":[],"unverified_note":"$6.1 billion real property investment for expansion, approved November 20, 2024."},"6cf59607a642":{"links":[],"unverified_note":"Wythe County provided ungraded property at no cost and the project is eligible for Enterprise Zone incentives."},"6d1ec4f35e41":{"links":[],"unverified_note":"Leasehold improvements for NTECC estimated at $1,800,000.00."},"6d217716bcf3":{"links":[],"unverified_note":"Amazon Data Services acquired the 122-acre George Washington University Virginia Science and Technology Campus for $427 million in March 2026."},"6d2fcb8abda9":{"links":[],"unverified_note":"Acquired by Digital Realty from DuPont Fabros as part of a $7.6 Billion 12 datacenter deal in September 2017."},"6d90200340ba":{"links":[{"record_id":"research:legacy-deal:145e86d0-fb4a-49f9-b590-bf10e404d4e9","name":"Crusoe, Blue Owl Capital and Primary Digital Infrastructure enter $3.4 billion joint venture for AI data center development","date":"2024-10-15","type":"Joint venture","value_label":"$3.4B investment","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:145e86d0-fb4a-49f9-b590-bf10e404d4e9"}]},"6dafbe19590a":{"links":[],"unverified_note":"Land acquisition of 89.1 acres for $96.5 million.","note_status":"NO_PRIMARY"},"6e1f4d0d66d3":{"links":[],"unverified_note":"$2 billion investment announced April 26, 2024.","note_status":"NO_PRIMARY"},"6e28fb6bd6c0":{"links":[],"unverified_note":"$1.2 billion expansion agreement with CoreWeave announced February 26, 2025, and $6.1 billion real property investment approved November 20, 2024","note_status":"NEW_SOURCED"},"6e7de9888108":{"links":[],"unverified_note":"Tax abatement and Chapter 380 Economic Development Agreement with City of Houston (undated, referencing 2017 investment target); DataBank acquired CyrusOne's Houston data centers for $670M in March 2022.","note_status":"NEW_SOURCED"},"6e7f273434a2":{"links":[],"unverified_note":"Acquisition of Stream Data Centers' development by DataBank, announced June 13, 2017."},"6e843bb1cf36":{"links":[],"unverified_note":"Level 3 Communications was acquired by CenturyLink in 2016. CenturyLink rebranded to Lumen Technologies in 2020."},"6ebc16457edf":{"links":[],"unverified_note":"Sale and leaseback transaction with Legacy Investing, LLC and Invesco Real Estate for the development of Hillsboro 3, announced April 7, 2021."},"6ec077dfbc5e":{"links":[],"unverified_note":"$880 million investment for Sharka Data Center – Building 5, announced December 2025","note_status":"NOT_MATERIAL"},"6ef229b2f8ab":{"links":[],"unverified_note":"Renovation/Alteration project of $5.0M, registered April 27, 2009"},"6f069f125af1":{"links":[],"unverified_note":"Acquisition of IO Data Centers U.S. operations for $1.34 billion in January 2018","note_status":"NO_PRIMARY"},"6f44eab7baf9":{"links":[],"unverified_note":"$20.5 million settlement over nitrate pollution, agreed to recently as of April 2026."},"6f49e254ba06":{"links":[],"unverified_note":"Amazon Data Services acquired the 122-acre George Washington University Virginia Science & Technology Campus for $427 million in late February 2026."},"6f6e2e51e390":{"links":[],"unverified_note":"The Hunter's Ridge applicant has agreed to numerous proffers. Among those proffers are upgrades to Cosner Drive, extending and widening a portion of the road to four lanes. Those improvements will trigger a proffer by Amazon, as part of the Cosner Tech Campus project, to further extend Cosner Drive, as a two-lane road, to Massaponax Church Road."},"6fbaf69a0668":{"links":[],"unverified_note":"Land acquisition for $28 million in 2020.","note_status":"NO_PRIMARY"},"6fcde1f665ff":{"links":[],"unverified_note":"KKR acquired Ensono for USD 1.7 billion in 2021"},"6fd8e50c53ae":{"links":[],"unverified_note":"American Tower acquired CoreSite Realty Corporation for approximately $10.1 billion, closing on December 28, 2021.","note_status":"NO_PRIMARY"},"70048c760b5d":{"links":[],"unverified_note":"Secured a $46.9 million loan from BlockFi Lending LLC in May 2022. Canaan Inc. acquired Cipher Mining's 49% stake in Alborz LLC (and other JVs) for approximately $39.75 million in an all-stock transaction on February 23, 2026.","note_status":"NO_PRIMARY"},"702685f73d53":{"links":[],"unverified_note":"Acquisition of wind farm for $240 million, announced December 3, 2024, closed February 18, 2025.","note_status":"NEW_SOURCED"},"702cd9b0f938":{"links":[],"unverified_note":"Microsoft announced a $1 billion capital investment across three data center campuses in Licking County (New Albany, Heath, Hebron) in October 2024. The company agreed not to take real-estate tax abatements at Heath or Hebron.","note_status":"NOT_MATERIAL"},"703cad03c972":{"links":[],"unverified_note":"Rezoning application for industrial uses, initially including data center, but later removed."},"7056108fcd34":{"links":[],"unverified_note":"10-year property tax break from Bastrop County effective December 9, 2024; Estimated cost of $440,000,000 for this facility (part of a $1.44 billion campus)","note_status":"NOT_MATERIAL"},"7058ccfb51dd":{"links":[],"unverified_note":"Performance agreements with Amazon Data Services and an Economic Growth Sharing Agreement between Spotsylvania and Caroline counties."},"7061024df62a":{"links":[],"unverified_note":"Cavalier acquired NET Telcos (including data center) on Jan 25, 2010; PAETEC acquired Cavalier Telephone in Dec 2010; Windstream acquired PAETEC in Dec 2011."},"7072cfe57b20":{"links":[],"unverified_note":"Acquisition of Nokes buildings for $30.8 million in July 2022; Manekin Plaza and Ridgetop Circle properties acquired for $20 million and $26 million respectively in February 2022."},"70d073b633e6":{"links":[],"unverified_note":"Meta announced further investments to expand renewable energy capacity in Iowa, including a 225-megawatt wind project to support the facility's growing AI operations."},"7112d67a45b6":{"links":[],"unverified_note":"$157 million project investment, construction began late 2023"},"712bd8a5ae34":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025"},"719018b6e946":{"links":[],"unverified_note":"Acquisition of a 418,000-square-foot facility on 157 acres of land by Stream Data Centers on February 15, 2019."},"71e0ee3c7688":{"links":[],"unverified_note":"AWS plans to invest $5 billion into Fayette County by 2030 as part of a larger $10 billion investment across the state. Amazon Data Services, Inc. purchased 590 acres in Jefferson Township, Ohio for $102.4 million in 2025 for a data center campus."},"7203ca621328":{"links":[],"unverified_note":"Centersquare acquired 10 data centers across the United States and Canada with an enterprise value of $1 billion in October 2025.","note_status":"NEW_SOURCED"},"723059704317":{"links":[],"unverified_note":"Acquisition of a 132,000 sq ft vacant warehouse from Prologis for $22.8 MM in 2016."},"72b3700e81f6":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville (May 04 2026)."},"72c951aeacd1":{"links":[],"unverified_note":"$840 million project received a 12-year PILOT program and sales tax exemptions for construction materials, mortgage tax, and furnishings/equipment."},"730d1f100de0":{"links":[],"unverified_note":"Acquisition of Nokes Boulevard office complex for $30.8M in July 2022, Ridgetop Circle site for $26.4M in January 2022, and Manekin Plaza property for $21M in late 2021."},"7317607703d2":{"links":[],"unverified_note":"$2 million renovation planned (April 2026); $390,000 renovation (July 2024 - Jan 2025); $100,000 renovation (Nov 2018 - Feb 2019); $92,853.30 rebate from Austin Energy (March 2011)"},"734246d9fc28":{"links":[],"unverified_note":"Peak 10 acquired bayMountain Inc."},"73477a5cdc4b":{"links":[],"unverified_note":"Partnership with Principal Asset Management for a 100+ MW data center campus, announced January 16, 2023."},"734f76c489a0":{"links":[],"unverified_note":"NTT Communications acquired RagingWire Data Centers, Inc. in January 2014."},"7389969cf9ea":{"links":[],"unverified_note":"Property acquired for $23 million in September 2021. Rockland IDA granted CoreWeave and DataBank tax benefits totaling up to $58 million.","note_status":"NOT_MATERIAL"},"7402ec7547b1":{"links":[],"unverified_note":"AWS acquired two 111,000-square-foot office buildings at 7951 and 7961 Loisdale Road for $28 million from Loisdale 24 LLC.","note_status":"NO_PRIMARY"},"7425fea63db2":{"links":[],"unverified_note":"Acquisition of Crusoe's Bitcoin mining unit and Digital Flare Mitigation business by NYDIG on March 25, 2025."},"743e42d1be14":{"links":[],"unverified_note":"A $7.5 billion industrial revenue bond was approved in February 2025 to support expansion, and Meta purchased a 474-acre parcel in late December 2025. In June 2025, Meta announced 150-megawatt geothermal power purchase agreements with XGS Energy and Sage Geosystems."},"745e7998fddd":{"links":[],"unverified_note":"AWS acquired two 111,000-square-foot office buildings at 7951 and 7961 Loisdale Road for $28 million from Loisdale 24 LLC.","note_status":"NO_PRIMARY"},"74671184a975":{"links":[],"unverified_note":"Fort Worth City Council approved a 10-year economic development agreement with ACS Group in April 2025, including tax abatements up to 70% on business personal property."},"748ec7291dca":{"links":[],"unverified_note":"Blackstone Group acquired QTS Realty Trust for approximately $10 billion on August 31, 2021."},"74b490153303":{"links":[],"unverified_note":"American Tower acquired CoreSite for approximately $10.1 billion in November 2021. CoreSite acquired Sunrise Technology Park for $60 million in 2016.","note_status":"NO_PRIMARY"},"74d22766ce8c":{"links":[],"unverified_note":"Vantage paid $46 million for 17 acres at 22318 Glenn Drive in Sterling in October 2021.","note_status":"NO_PRIMARY"},"7515ecc2a689":{"links":[],"unverified_note":"CloudCapital, an affiliate of CloudHQ, acquired the DC-6 data center in Manassas, Va., for $222.5 million from Corporate Office Properties Trust in January 2022."},"7529df78975d":{"links":[],"unverified_note":"Sharpless Enterprises, a Delaware-based firm, is reportedly a shell company linked with Google for this proposal."},"7547047cb591":{"links":[],"unverified_note":"Tax breaks"},"754f7c00ac7e":{"links":[],"unverified_note":"Land acquisition for $168.8 million in December 2023; performance agreement approved in late 2023.","note_status":"NO_PRIMARY"},"7564af760113":{"links":[],"unverified_note":"Phoenix Investors acquired the site for $1.25 million in late 2022. Indiana Economic Development Corp. approved ~$42 million in tax incentives (June 2025). Michigan City Council approved property tax abatements and $26.1 million in economic development incentive payments (September 2025). Google acquired the Project Maize development from Phoenix Investors (March/April 2026).","note_status":"NOT_MATERIAL"},"75838ae6cab2":{"links":[{"record_id":"research:legacy-deal:f32c9939-c4a5-43c9-9d91-c7e9101b3e00","name":"Stonepeak Forms Joint Venture with American Tower to Construct a New Data Center in Denver, Colorado","date":"2024-07-31","type":"Joint venture","value_label":"n/d","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:f32c9939-c4a5-43c9-9d91-c7e9101b3e00"}]},"75b1221cf35a":{"links":[],"unverified_note":"$1.05B refinancing for DFW3 and DFW4 data centers, negotiated with Wells Fargo, Barclays, Citi, Goldman Sachs, and Morgan Stanley, expected to close May 20, 2026."},"75c44d8324b7":{"links":[],"unverified_note":"Amazon Data Services purchased the 120-acre George Washington University Virginia Science & Technology Campus for $427 million in March 2026."},"7626e09fd0c4":{"links":[],"unverified_note":"Peak 10 acquired ViaWest for approximately US$1.675 billion in August 2017."},"76273ae5638d":{"links":[],"unverified_note":"Amazon agreed to pay $20.5 million to settle a lawsuit regarding nitrate pollution from existing data center operations (as of April 14, 2026)."},"7631c5c58bb8":{"links":[],"unverified_note":"Cologix acquired vXchnge's 84,000 square foot data center and five-acre campus in Santa Clara, California, announced April 14, 2021, and completed May 1, 2021. The deal was funded by equity from Mubadala and increased debt facilities."},"7666d9e534fe":{"links":[],"unverified_note":"IP3 Corporation and Green Energy Partners LLC formed a joint venture to establish the Surry Green Energy Center, LLC. The project is estimated to cost $6.45 billion.","note_status":"NO_PRIMARY"},"767c5620536e":{"links":[],"unverified_note":"Sale of former EDS campus to Highland Capital in December 2018"},"76963df0179c":{"links":[],"unverified_note":"Vantage Data Centers secured $3 billion in green financing from Wells Fargo Securities for eight North American sites. The company had acquired the 134-acre plot of land at 19509 Belmont Ridge Road for $180 million in 2022.","note_status":"NO_PRIMARY"},"76d6d8308173":{"links":[],"unverified_note":"Phase 2 Second Tax Abatement Agreement with Armstrong County, Texas, approved November 12, 2024"},"76e6b68810aa":{"links":[],"unverified_note":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved in January 2026, to supply power to its Oregon data centers."},"771bf23acf17":{"links":[],"unverified_note":"Brookfield acquired Cyxtera in November 2023, leading to a merger with Evoque and rebranding to Centersquare/Csquare in April 2024/October 2025."},"774b36540cc6":{"links":[],"unverified_note":"Expected to cost up to $100 million to construct","note_status":"NOT_MATERIAL"},"775283de40f9":{"links":[],"unverified_note":"CyrusOne acquired PowerHouse ABX-1 for $154.1 million in December 2024.","note_status":"NO_PRIMARY"},"77555601f5d9":{"links":[],"unverified_note":"Land acquisition for a broader AWS data center campus by Amazon Data Services, an Amazon subsidiary."},"775a27be2277":{"links":[{"record_id":"research:newsroom:vinson-elkins:20260326:1","name":"Aligned Data Centers Closes on $2.58 Billion Credit Facility to Fuel Continued U.S. Expansion","date":"2026-03-26","type":"Debt financing","value_label":"$2.58B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:vinson-elkins:20260326:1","scope":"portfolio"}]},"777258e6e590":{"links":[],"unverified_note":"IPI Partners acquired an Elk Grove Village data center from T5 Data Centers for $118.9 million in September 2018."},"7787bfed9c7a":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital for Stargate Abilene (2025); Multi-billion dollar deal between Lancium and Crusoe Energy (July 2024); Microsoft agreement for 900 MW AI factory campus (March 27, 2026)"},"7796ce21ef01":{"links":[],"unverified_note":"Digital Realty Trust, Inc. committed to invest at least $150 million by 2015 in its Loudoun County operation, announced July 10, 2013."},"77a1b5326915":{"links":[],"unverified_note":"Industrial revenue bonds totaling $40 billion for Facebook subsidiary Greater Kudu, LLC, approved by Los Lunas Village Council."},"77e2bddc863f":{"links":[],"unverified_note":"Joint venture between Digital Realty and Mitsubishi Corporation for two data centers in Dallas metro area, with Mitsubishi acquiring 65% equity interest for approximately $200 million. Total budget for the first phase is approximately $400 million, potentially increasing to $800 million for 48 MW.","note_status":"NEW_SOURCED"},"77fa7a1a026f":{"links":[],"unverified_note":"$11.6 billion in debt and equity secured in May 2025 to expand the site."},"78265f475aa8":{"links":[],"unverified_note":"EQT Infrastructure acquired EdgeConneX in 2020"},"78283c33030a":{"links":[],"unverified_note":"Acquisition of the facility by Centersquare (via Brookfield) for $83.50M in January 2024.","note_status":"NO_PRIMARY"},"786077d95c47":{"links":[],"unverified_note":"Partnership with Calibrant Energy for a 31 MW, 62 MWh Battery Energy Storage System (BESS) to be operational in 2026."},"788de458e384":{"links":[],"unverified_note":"Evoque and Cyxtera merged and rebranded as Centersquare in April 2024."},"789ec8da77fa":{"links":[],"unverified_note":"AWS committed to purchase 200,000 megawatt hours of clean power each year from a Gilliam County wind farm (announced October 31, 2024)."},"78b26b5150c1":{"links":[],"unverified_note":"$5 billion investment by AWS in Fayette County by 2030, and a 30-year, 100 percent tax exemption via a Community Reinvestment Area (CRA) Agreement."},"78bdcb90bccc":{"links":[],"unverified_note":"$600 million debt financing package, October 16, 2025"},"78d25244fe85":{"links":[],"unverified_note":"Construction costs of approximately $650 million for two projects (DFW2 DC2 and DFW2 DC3) announced in April 2025.","note_status":"NOT_MATERIAL"},"78f272c82600":{"links":[],"unverified_note":"Acquisition of seven data centers from vXchnge, including Portland, announced January 31, 2022, for an undisclosed price."},"78f447e746f6":{"links":[],"unverified_note":"Bitdeer Technologies announced its merger with special purpose acquisition company (SPAC) Blue Safari Group Acquisition Corp. in January 2022, valuing Bitdeer at approximately $4 billion.","note_status":"NEW_SOURCED"},"7991ef67a8dd":{"links":[],"unverified_note":"Investment of $215.9 million for 245,000 sq ft facility (Year Built: 2025)"},"7a160e8eacc6":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"7a1ca5d45f79":{"links":[],"unverified_note":"$20.5 million settlement for nitrate contamination (April 1, 2026); $83 million acquisition of Sunstone solar power project (January 26, 2026)."},"7a41996a041c":{"links":[],"unverified_note":"Pflugerville City Council approved an economic development performance agreement (EDPA) with Austin Data Center 1, LLC (Skybox/Prologis joint venture) on March 8, 2022, for an intended capital investment of up to $548 million, including a grant of up to $1.58 million over 10 years.","note_status":"NOT_MATERIAL"},"7a78d55f897d":{"links":[],"unverified_note":"Acquisition by Mapletree Industrial Trust in 2017; Acquisition by Equinix from Switch & Data in 2010."},"7a84ae193d37":{"links":[],"unverified_note":"CyrusOne acquired a powered shell for AUS3 in Austin's Met Center on April 2, 2015; financial terms were not disclosed."},"7a8a09e4b5b3":{"links":[],"unverified_note":"$326 million refinancing agreement secured on October 29, 2025, backed by five hyperscale data centers.","note_status":"NO_PRIMARY"},"7a9903035f52":{"links":[],"unverified_note":"$900 million in green financing"},"7a9917ee5959":{"links":[],"unverified_note":"Antin Infrastructure Partners completed the acquisition of FirstLight Fiber from Oak Hill Capital Partners on July 25, 2018. FirstLight completed a major expansion of its Brunswick, Maine Data Center on February 4, 2025."},"7af6b2c29aa9":{"links":[],"unverified_note":"$1.4 billion project financing facility closed on August 15, 2025, and acquisition of Helios from Argo Blockchain for $65 million in late 2022."},"7b279fe1c065":{"links":[],"unverified_note":"Acquisition of wholesale data center in Richmond, VA in March 2021 with over $100 Million invested in the campus to date.","note_status":"NOT_MATERIAL"},"7b38ff78ab73":{"links":[],"unverified_note":"10-year, 50 percent City of Richardson business personal property tax abatement (announced 2018); CyrusOne invested $79.8 million to retrofit (2024-2025)","note_status":"NOT_MATERIAL"},"7b51633b96c3":{"links":[],"unverified_note":"Initial funding closed January 9, 2019, with Star America providing equity for the first phase. A $28 million investment from Energy Solutions Group and United Leasing and Finance for expansion was announced February 13, 2023.","note_status":"NOT_MATERIAL"},"7b8a86f59bfc":{"links":[],"unverified_note":"Vantage TX21: $157 million project (construction began December 2023); Vantage TX22: $272 million investment (construction scheduled to start October 2025).","note_status":"NOT_MATERIAL"},"7b9c94b771fd":{"links":[],"unverified_note":"Water rights agreement and $28.5 million water infrastructure investment (November 2021/December 2022); 100 MW clean energy agreement with Avangrid (2025); Strategic Investment Program tax abatement agreements (2021)."},"7bb1987b0902":{"links":[],"unverified_note":"$2.4 billion investment over 20 years (announced Dec 2021); $600 million debt financing (Oct 2025); $3.4 billion joint venture with Crusoe, Blue Owl Capital, and Primary Digital Infrastructure (Oct 2024)."},"7bcf6082cfee":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital; tax abatement agreement with City of Abilene and Taylor County (85% abatement over 10 years)"},"7c2e57552bf8":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital for Stargate Abilene project"},"7c43687d46ef":{"links":[],"unverified_note":"Renovation/Alteration project with an estimated cost of $750,000, started 4/3/2023 and completed 8/18/2023."},"7c75ec670872":{"links":[],"unverified_note":"Land acquisition for $38 million in 2018.","note_status":"NO_PRIMARY"},"7c9001302f79":{"links":[],"unverified_note":"$130 million investment for expansion at 14100 Park Vista Blvd, Fort Worth, Texas, mentioned in April 2025"},"7cc60fb826bb":{"links":[],"unverified_note":"Acquisition of Dupont Fabros Technology by Digital Realty in September 2017 for approximately $7.6 billion.","note_status":"NEW_SOURCED"},"7d08689067e3":{"links":[],"unverified_note":"Amazon Data Services purchased a large Prince William County data center campus (Devlin Tech Park in Bristow, near Gainesville) for $700 million in November 2025."},"7d1810a9d875":{"links":[],"unverified_note":"DataBank acquired four Texas data centers from CyrusOne for $670M in March 2022."},"7d29b1b62dc5":{"links":[],"unverified_note":"CyrusOne purchased 67 MW of renewable energy from Enel Green Power's Azure Sky solar + storage project in Haskell County, Texas, in January 2021, covering approximately 70% of the Carrollton data center's power requirements. Additionally, in April 2022, CyrusOne signed a power purchase agreement with Gexa Energy for 40 MW (30 MW solar, 10 MW wind) to supply its North Texas data centers, including Carrollton, aiming for 85% renewable energy for its ERCOT deregulated load by the end of 2023."},"7d32eef2d099":{"links":[],"unverified_note":"Amazon's $11 billion investment in the data center campus, announced in 2023/2024."},"7d72419db299":{"links":[],"unverified_note":"Microsoft Corporation has purchased all or most of the land in three industrial parks located in Mecklenburg County — Hillcrest Industrial Park in South Hill, Roanoke River Regional Business Park located between La Crosse and Brodnax, and Lakeside Commerce Park near Clarksville. All three land transfers occurred in the past week. (December 23 2020)"},"7da3f3b0d2bc":{"links":[],"unverified_note":"Agreement for services to the PDX 202 site (prior to May 2023)."},"7da46266da02":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025; 150MW geothermal PPA with XGS Energy and 150MW with Sage Geosystems in June 2025."},"7dae5222b4f9":{"links":[],"unverified_note":"Equinix acquired DC14 in Manassas as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon IAD4."},"7db025d44fea":{"links":[],"unverified_note":"Columbus City Council approved $54.3 million in tax incentives and a 15-year, 100% property tax abatement on an estimated $300 million investment in March 2021.","note_status":"NOT_MATERIAL"},"7db78c9d3a49":{"links":[],"unverified_note":"CloudCapital, an affiliate of CloudHQ, acquired the DC-6 data center in Manassas, VA for $222.5 million on January 26, 2022."},"7ddf701438d7":{"links":[],"unverified_note":"Acquisition of CyrusOne by KKR and Global Infrastructure Partners for approximately $15 billion in March 2022.","note_status":"NEW_SOURCED"},"7de65d968f53":{"links":[],"unverified_note":"Sale of the facility to an unnamed institutional client for $31.75 million in January 2024.","note_status":"NO_PRIMARY"},"7e0659541ef9":{"links":[],"unverified_note":"$6.1 billion real property investment (Nov 20, 2024); $1.2 billion expansion with CoreWeave (March 03 2025); $3.3 billion Senior Secured Notes offering (April 21 2026)","note_status":"NEW_SOURCED"},"7e0c3b24ebac":{"links":[],"unverified_note":"Aug 2017 - M&A - DFT ACC4. Digital Realty merges with DuPont Fabros Technology, adding 12 data centers to its portfolio."},"7e2fab561d9a":{"links":[],"unverified_note":"a 475-acre plot that was purchased by an entity tied to Meta, Facebook's parent company, in October for $35.3 million.... Scout Development LLC, the same entity Meta used to develop and purchase land in White Oak in 2017, was the buyer of the 475 acres at 3951 Portugee Road. County records show that the deal closed on Oct. 31, with Henrico's Economic Development Authority the seller.","note_status":"NO_PRIMARY"},"7e30ba50536a":{"links":[],"unverified_note":"Sale of four Houston data center assets, including Houston West III, from CyrusOne to DataBank for approximately $670 million in March 2022.","note_status":"NO_PRIMARY"},"7e466d15b5a0":{"links":[],"unverified_note":"QTS plans to invest up to $1 billion in the project."},"7e7d40410b59":{"links":[],"unverified_note":"Power purchase agreement with Umatilla Electric Cooperative for renewable energy."},"7e80f6558085":{"links":[],"unverified_note":"Long-term hyperscale lease executed on January 15, 2026; initial development funded through AREP Strategic Opportunity Fund III."},"7ec555313a4e":{"links":[],"unverified_note":"Flexential raised approximately $1 billion from GI Partners, GI Data Infrastructure, Hamilton Lane and Morgan Stanley Infrastructure Partners to support expansion (within 12 months prior to Sept 2025)."},"7ef2f24de7b9":{"links":[],"unverified_note":"EdgeConneX acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre, located just north of the site at 3356 Clover Valley Rd NW.","note_status":"NO_PRIMARY"},"7f0d66bbdd93":{"links":[],"unverified_note":"Amazon Data Services Inc. paid $54 million for the 2.4 million-square-foot site at 13600 EDS Drive in a deal that closed Oct 2020."},"7f1e11a5dec5":{"links":[],"unverified_note":"Economic development agreement with the City of Fort Worth approved in April 2025, including performance-based grants and a 10-year tax abatement."},"7f4b76c76d11":{"links":[],"unverified_note":"The city sold a 20-acre site near the Manassas Regional Airport to Amazon Web Services for $27.72 million in 2023."},"7f90fb216b61":{"links":[],"unverified_note":"CBRE Global Investors acquired the data center in 2019 for $72.8 million.","note_status":"NO_PRIMARY"},"7fefa18d8851":{"links":[],"unverified_note":"Phase 1 Investment of $300M","note_status":"NOT_MATERIAL"},"7ff4cfd8cdff":{"links":[],"unverified_note":"Received a $14.5 million property tax break from the Development Authority of Fulton County in November 2020. Paid $6 million in February 2024 to acquire nearly 21 acres. Paid $52.5 million in April 2024 to acquire about 136 acres.","note_status":"NOT_MATERIAL"},"80032ccbb4ef":{"links":[],"unverified_note":"Acquisition of remaining 49% equity interest from Navitas Global for approximately $8.8 million, closed May 19, 2026","note_status":"NOT_MATERIAL"},"8027f06eaf26":{"links":[],"unverified_note":"Tract announced the acquisition of 1,200 acres in Hanover County, VA. The project is expected to generate an estimated $1.78 billion in tax revenue for the County over 20 years.","note_status":"NOT_MATERIAL"},"802c54e18d2d":{"links":[],"unverified_note":"TierPoint acquired AlteredScale, including this data center, in December 2015."},"8056e1377b53":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for approximately $10 billion in August 2021."},"805abce43361":{"links":[],"unverified_note":"Flexential acquired Hillsboro 4 and Hillsboro 5 data centers on May 28, 2026, in the largest real estate transaction in the company's history."},"806a3307ea37":{"links":[],"unverified_note":"DP Facilities South invested $65 million to construct the data center. The Virginia Tobacco Commission approved a $350,000 grant. A $4.6 million solar project, supported by $500,000 in federal funds, was green-lighted to power the data center.","note_status":"NOT_MATERIAL"},"8098a90cab32":{"links":[],"unverified_note":"Acquisition of 113,406-sf property by Vesgro Corp. in August 2021. Renovation/Alteration project valued at $6.3M, registered April 25, 2025."},"8110d433fe7b":{"links":[],"unverified_note":"$8.25 million acquisition of Reston Data Center","note_status":"NOT_MATERIAL"},"813faf20d092":{"links":[],"unverified_note":"tw telecom acquired by Level 3 Communications for $7.3 billion (including debt) on October 31, 2014. Level 3 Communications acquired by CenturyLink in 2016. CenturyLink completed its $34 billion acquisition of Level 3 in November 2017.","note_status":"NO_PRIMARY"},"8140b84c9d16":{"links":[],"unverified_note":"Acquisition of DA9 (formerly Verizon DFW1) as part of Equinix's $3.8 billion acquisition of 29 Verizon data centers in May 2017."},"815d021423bd":{"links":[],"unverified_note":"QTS purchased a 700,000 square foot former semiconductor plant in February 2013."},"815edced9e2b":{"links":[],"unverified_note":"Amazon Data Services Inc. acquired TransDulles Centre 2 at 45900 Pathfinder Plaza for $135.75 million on June 24, 2024."},"816a9ae8c257":{"links":[],"unverified_note":"Aurora City Council approved a tax rebate agreement for QTS on April 24, 2023, capped at $19,088,438. QTS also required a $28 million, 230-kilovolt transmission line to connect to the grid.","note_status":"NOT_MATERIAL"},"81907bbdb4fb":{"links":[],"unverified_note":"DataBank acquired four CyrusOne Houston data centers, including HOU5, for $670 million in March 2022."},"81935fff3eb7":{"links":[],"unverified_note":"$207.8 million in state and local incentives, including a $188.2 million property tax abatement, and Apple's commitment of up to $100 million to a Public Improvement Fund.","note_status":"NOT_MATERIAL"},"81c60bbb07f8":{"links":[],"unverified_note":"CyrusOne acquired a ~175,000 sq ft powered shell at Austin's Met Center (7100 Metropolis Drive) on April 2, 2015, to establish AUS3."},"81eb6962a3c3":{"links":[],"unverified_note":"$600 million debt financing (October 16, 2025)"},"81ee32578f9a":{"links":[],"unverified_note":"$2 billion construction loan secured on April 21, 2026"},"81fa64e29ed9":{"links":[],"unverified_note":"Ohio Department of Development approved tax credit assistance and a 75 percent, 15-year data center tax exemption for a $202 million investment, announced September 2023."},"81fdff2a2f31":{"links":[],"unverified_note":"Apollo-managed funds completed the acquisition of a majority interest in Stream Data Centers on November 3, 2025."},"81fe47de7850":{"links":[],"unverified_note":"Land acquisition through discreet land deals in October 2025 and purchase options in 2024."},"82246b6621b6":{"links":[],"unverified_note":"CyrusOne acquired by Kohlberg Kravis Roberts and Global Infrastructure Partners for $15 billion in March 2022."},"823942496c0a":{"links":[],"unverified_note":"Construction estimated cost: $62,000,000"},"826c2e8e0cd5":{"links":[],"unverified_note":"Equinix acquired the Infomart Dallas building for $800 million in April 2018."},"82797d413a00":{"links":[],"unverified_note":"$482.6 million construction cost, filed July 2024."},"827fcbb8b9dc":{"links":[],"unverified_note":"Digital Realty merges with DuPont Fabros"},"8280403bd0c5":{"links":[],"unverified_note":"Acquisition of two enterprise data centers in Wood Dale, IL by Element Critical, announced January 8, 2019, with plans to invest more than $40 million to develop and enhance the facilities.","note_status":"NOT_MATERIAL"},"82a04fd3fd99":{"links":[],"unverified_note":"$3 billion planned investment for the campus, announced with groundbreaking on May 21, 2026"},"82a1cf59acec":{"links":[],"unverified_note":"Acquisition of Aligned Data Centers by a consortium including BlackRock, MGX, and AI Infrastructure Partnership for $40 billion, announced October 2025, expected to close H1 2026.","note_status":"NO_PRIMARY"},"82a37d7bf925":{"links":[],"unverified_note":"The site was previously owned by real estate firm Peterson Companies, which first filed to rezone the land for data center use in 2023."},"82b816b6e9e9":{"links":[],"unverified_note":"Energy supply agreement with Umatilla Electric Cooperative in April 2023"},"82c1a93426b0":{"links":[],"unverified_note":"Initial investment of $210 million for the first phase (Jan 2012); total investment of more than $2 billion for the 11-building campus (March 2021)."},"82cdd46607af":{"links":[],"unverified_note":"Microsoft announced a $1.5 billion investment to expand its data center operations in San Antonio, Texas (March 7, 2025)."},"82d1f6ea58e7":{"links":[],"unverified_note":"Netrality acquired 1301 Fannin Street in 2015. Netrality Data Centers acquired Internap's colocation facilities at 1301 Fannin Street in Houston in June 2020."},"82d46fdec4b9":{"links":[],"unverified_note":"Multi-billion dollar deal between Lancium and Crusoe Energy"},"82f7d1679bed":{"links":[],"unverified_note":"$800 million investment and a 35-year data center sales tax exemption from the Indiana Economic Development Corporation.","note_status":"NOT_MATERIAL"},"83307293aede":{"links":[],"unverified_note":"State and local economic incentives; renewable energy purchase agreements."},"834eab7a6c5d":{"links":[],"unverified_note":"Amazon Data Services purchased approximately 70 percent of the 270-acre Devlin Technology Park in Bristow, Prince William County, for $700 million in November 2025, after the site was rezoned for data center use in November 2023."},"8357424b6919":{"links":[],"unverified_note":"CloudHQ plans to invest $400 million in building LC8, a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus."},"8365dab4a872":{"links":[],"unverified_note":"$110,000,000 construction cost (2022-2024)"},"838a50e27c58":{"links":[],"unverified_note":"Project cost of $157,000,000"},"83a7e7befa9e":{"links":[],"unverified_note":"$1.4 billion project financing facility closed on August 15, 2025"},"83bffd3a3489":{"links":[],"unverified_note":"$100 million multi-draw, senior secured debt facility with Orion Energy Partners, L.P. (May 2020)"},"83d66e8766c0":{"links":[],"unverified_note":"City of Austin Chapter 380 Agreement with Samsung Austin Semiconductor, LLC (Years 1-8 of 20 in compliance, Year 9 in review)"},"83f4bd663216":{"links":[],"unverified_note":"Industrial asset sale to Invesco Real Estate on 08/09/2021"},"840191008628":{"links":[],"unverified_note":"75%, 10-year Data Center Tax Exemption approved on December 11, 2023"},"840dd6db1d16":{"links":[],"unverified_note":"Partnership with Calibrant Energy for a 31 MW, 62 MWh Battery Energy Storage System (BESS) to accelerate facility online date (announced Oct 2025)."},"8414607306b7":{"links":[],"unverified_note":"Sale of data center to CloudHQ for $90 million in January 2023","note_status":"NO_PRIMARY"},"8416b94aee9e":{"links":[],"unverified_note":"$11.6 billion debt and equity financing secured by Crusoe in May 2025.","note_status":"NEW_SOURCED"},"84371d174722":{"links":[],"unverified_note":"Chelan County PUD approved a contract to supply power to Microsoft's data center campus in Malaga. Microsoft has already paid for infrastructure upgrades, including the $86.5 million construction of the Jumpoff Ridge substation."},"846a19e046b0":{"links":[],"unverified_note":"Amazon Web Services, Inc. purchased a 42-acre parcel at 719 Blackwell Road in September 2021 for nearly $40 million."},"84806d802486":{"links":[],"unverified_note":"February 2023: Equity recapitalization and joint venture with EdgeCore to co-develop the site. March 2023: 1501 Moran Road Development Owner LLC (a Penzance affiliate) acquired a 7.6-acre site for $2.6 million.","note_status":"NOT_MATERIAL"},"8496f5394193":{"links":[],"unverified_note":"EdgeConneX acquired by EQT Infrastructure for between $2.5 billion and $3 billion, expected to close Q4 2020.","note_status":"NEW_SOURCED"},"84f1d47fe12b":{"links":[],"unverified_note":"Acquisition of bayMountain by Peak 10"},"851f2f83228d":{"links":[],"unverified_note":"Stonepeak Infrastructure Partners completed a $3.0 billion equity recapitalization of Cologix and Cologix completed a $1.65 billion asset-backed securitization in early 2022."},"8525ab870c18":{"links":[],"unverified_note":"DataBank purchased the building and land at 6900 South Peoria Street (DEN2) on February 2, 2022."},"852802e654d7":{"links":[],"unverified_note":"JPMorgan Chase agreed to lend $2.3 billion to OpenAI and its partners for the Stargate data center projects in Abilene, Texas on May 22, 2025.","note_status":"NO_PRIMARY"},"854d1909288e":{"links":[],"unverified_note":"Facebook announced an additional $750 million investment in its Prineville facility in September 2018, bringing total investment to $2 billion."},"857c9e65f15d":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"858b54e413ba":{"links":[],"unverified_note":"Land acquisition in August 2022 for $153.8 million.","note_status":"NO_PRIMARY"},"858ff1ca507e":{"links":[],"unverified_note":"Crusoe agreed to sell the project to Google (reported December 2025), part of Google's announced $40 billion investment in Texas data centers (November 2025). Phase 1 capital investment is approximately $14.6 billion."},"85ad6eaead4b":{"links":[],"unverified_note":"Cyxtera's DC2 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies. ACPF Nova Data Center LLC, an affiliate of Los Angeles investment firm American Realty Advisors, has bought two Cyxtera Technologies data centre buildings in Sterling for $51 million, according to Loudoun property records."},"85f47ca2ac1c":{"links":[],"unverified_note":"OpenAI and SoftBank Group jointly committed US$1bn to SB Energy (January 12, 2026); Capital investment estimated to be over $3,000,000,000 for the facility.","note_status":"NO_PRIMARY"},"86068c5370c1":{"links":[],"unverified_note":"$1.2 billion expansion agreement with CoreWeave (February 26, 2025); $6.1 billion real property investment projected (November 20, 2024); $3.3 billion senior secured notes offering (April 21, 2026).","note_status":"NEW_SOURCED"},"864fcac0b728":{"links":[],"unverified_note":"United Airlines purchased a 205,000-square-foot office building at 1421 W. Shure Drive, formerly owned by Motorola, to expand its network operations facility."},"8696d993e509":{"links":[],"unverified_note":"Microsoft's data center expansions in Mecklenburg County have been supported by grants, including a $1.5 million grant from the Commonwealth's Opportunity Fund, and the company is eligible for Data Center Sales and Use tax exemptions. Microsoft also entered into a public-private partnership with Dominion Energy and the Commonwealth of Virginia for a solar project, where Microsoft agreed to purchase Renewable Energy Certificates (RECs) to offset the carbon footprint of its Boydton data center.","note_status":"NOT_MATERIAL"},"86992c9ee96f":{"links":[],"unverified_note":"Flexential acquired Hillsboro 4 and Hillsboro 5 data centers from T5 Data Centers on May 28, 2026."},"869a2ee2528f":{"links":[],"unverified_note":"Gas purchase agreement with D90 Energy"},"86c4a87ef075":{"links":[],"unverified_note":"Google signed a 15-year, fixed-price power purchase agreement with Enlight Renewable Energy's U.S. subsidiary Clēnera Holdings for 200MWac of solar generation from the Solstice project in LeFlore County, Oklahoma, with construction targeted for 2028 and commercial operations expected in 2029. Additionally, Google announced a $9 billion investment in Oklahoma cloud and AI infrastructure, including expansion of the Pryor facility, in August 2025."},"86e7197d76f9":{"links":[],"unverified_note":"Garland approved a deal with Digital Realty to develop a $1 billion data center campus (August 2018) and an incentive agreement for a datacenter campus on 45 acres at President George Bush Turnpike & Holford Road, including a 50% sales tax rebate for 20 years and a 4-year, 40% rebate on business personal property and real estate taxes per phase (September 17, 2024).","note_status":"NOT_MATERIAL"},"872862a21cac":{"links":[],"unverified_note":"American Tower acquired CoreSite for approximately $10.1 billion, announced November 15, 2021."},"876c0a1d30e2":{"links":[],"unverified_note":"Aligned Closes $1 Billion Credit Facility and First-Ever U.S. Data Center Sustainability-Linked Financing (March 10, 2020)"},"87c029d37345":{"links":[],"unverified_note":"Penzance secured $100 million in construction financing in October"},"8839f8f5c025":{"links":[],"unverified_note":"$20.5 million settlement with Amazon Data Services Inc. over alleged nitrate groundwater contamination, announced March 31, 2026."},"883d01222822":{"links":[],"unverified_note":"Water rights agreement and infrastructure investment of $28.5 million (2021), and property tax abatements."},"884b6b9b7a8b":{"links":[],"unverified_note":"$20.5 million settlement over groundwater contamination (March 31, 2026)"},"88ddb281d73c":{"links":[],"unverified_note":"A $20.5 million settlement was reached with Amazon Data Services, Inc. over alleged nitrate groundwater contamination (March 31, 2026). Amazon also received court approval for an $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon (January 26, 2026)."},"88e52e3508b7":{"links":[],"unverified_note":"Digital Realty announced a $188 million joint venture with Griffin Capital Essential Asset REIT for a 130,000-square-foot data center in Ashburn in 2014. Additionally, in 2023, Digital Realty and TPG Real Estate established a joint venture where TPG acquired a majority stake in three hyperscale data centers in Northern Virginia for an aggregate value of $1.5 billion."},"88e8b91142d9":{"links":[],"unverified_note":"Acquisition of a portfolio exceeding US$100 million by GFH Capital Limited in April 2017.","note_status":"NEW_SOURCED"},"890be4ed5867":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025; $3.4 billion joint-venture announced October 15, 2024; over $1 billion in capital raised from strategic partners."},"89325d00a7ab":{"links":[],"unverified_note":"AES Ohio agreement with Amazon to shield utility customers from $22.8 million in project costs for the first phase.","note_status":"NOT_MATERIAL"},"893d1dcd4d34":{"links":[],"unverified_note":"Acquired existing 8 gross megawatt facility for approximately $50 million in January 2017. Included in a $3.46 billion CMBS refinancing of a QTS portfolio in November 2025, with the Fort Worth property valued at $481 million."},"89ad4dbc8daf":{"links":[],"unverified_note":"QTS acquired Herakles Data Center in 2012/2013."},"89ad6951efae":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025"},"89cbe4f82ef5":{"links":[],"unverified_note":"Evocative acquired the majority of INAP's data centers, including this facility, on September 28, 2022."},"89e4af0e6f8c":{"links":[],"unverified_note":"$2 billion construction loan in April 2026","note_status":"NEW_SOURCED"},"8a0517a4514f":{"links":[],"unverified_note":"Acquisition of Temple site from Rhodium Enterprises for $40.6 million in cash, December 2024.","note_status":"NO_PRIMARY"},"8a0d3fd72f13":{"links":[],"unverified_note":"Switch acquired Data Foundry for $420 million in an all-cash transaction, expected to close by mid-2021.","note_status":"NO_PRIMARY"},"8a244dd87449":{"links":[],"unverified_note":"Sale of Houston West I, II and III and Houston Galleria data centers from CyrusOne to DataBank for approximately $670 million, announced January 2022 and closed March 2022."},"8a3e1721636d":{"links":[],"unverified_note":"MAREA subsea cable (joint project with Microsoft and Facebook); BRUSA subsea cable (owned and operated by Telxius); Dunant subsea cable (owned by Google/GU Holdings)"},"8a4043bc33a6":{"links":[],"unverified_note":"Construction costs estimated at $100 million; $4.5 million in sales and business personal property tax rebates; 2011 land purchase for $5.3 million.","note_status":"NOT_MATERIAL"},"8a5547fa006d":{"links":[],"unverified_note":"KKR and GIP completed the acquisition of CyrusOne for approximately $15 billion on March 25, 2022.","note_status":"NO_PRIMARY"},"8a6a0698f869":{"links":[],"unverified_note":"Acquisition by Google from Crusoe Energy; partnership with Google; sale of a portion to Ensign Infrastructure."},"8aa6ca1ed183":{"links":[],"unverified_note":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved by U.S. Bankruptcy Court for the Southern District of Texas (January 26, 2026)."},"8abbd11670c9":{"links":[],"unverified_note":"Acquired by KKR and Global Infrastructure Partners for $15 billion in March 2022.","note_status":"NO_PRIMARY"},"8aee3212a142":{"links":[],"unverified_note":"In June 2016, the village of Los Lunas approved an ordinance for up to $30 billion in industrial revenue bonds for Facebook subsidiary Greater Kudu LLC.","note_status":"NOT_MATERIAL"},"8b1ef01fe939":{"links":[],"unverified_note":"AT&T sold its data center colocation operations and assets to Brookfield Infrastructure for $1.1 billion, closing in January 2019. Evoque Data Center Solutions was formed by Brookfield to operate these assets. Evoque merged with Cyxtera in January 2024 to form Centersquare, which rebranded to Csquare in late 2025.","note_status":"NEW_SOURCED"},"8b360ef9fee4":{"links":[],"unverified_note":"Acquisition of two data centers in Santa Clara for $97 million in November 2025, including $55 million for 4650 Old Ironsides Drive.","note_status":"NO_PRIMARY"},"8b685b4e6118":{"links":[],"unverified_note":"Midlothian City Council approved a 100% personal property tax abatement and 85% improvement tax abatement over 10 years for the data center development (announced June 2018)."},"8b690f722a6c":{"links":[],"unverified_note":"$1.2 billion expansion agreement with CoreWeave announced February 26, 2025; $6.1 billion real property investment projected November 20, 2024; proposed offering of $3.3 billion senior secured notes due 2031 announced April 21, 2026."},"8b7fe41ab0f2":{"links":[],"unverified_note":"Partnership with Walton Electric Membership Corporation for hundreds of MWs of renewable energy, resulting in millions of dollars of investment into solar resources."},"8b9815244e04":{"links":[],"unverified_note":"$1.6 billion investment announced July 25, 2023; $141 million in tax incentives and abatements from the City of Plano; 6-year Master Services Agreement with Lincoln Property Company for over $260 million for the initial 30 MW installation.","note_status":"NO_PRIMARY"},"8bd46518fb92":{"links":[],"unverified_note":"Acquisition of NFINIT by LightEdge in 2022."},"8bfc21e10ff2":{"links":[],"unverified_note":"Virginia Governor's Opportunity Fund grants and Data Center Sales and Use tax exemptions."},"8c07e41b02b4":{"links":[],"unverified_note":"$130 million investment to expand the existing data center campus at 14100 Park Vista Blvd. in Fort Worth, Texas, announced April 2025."},"8c4599102b31":{"links":[],"unverified_note":"DataBank acquired zColo's U.S. and U.K. data center assets in December 2020, which included this facility."},"8c5a761fe6d9":{"links":[],"unverified_note":"$440 million debt financing transaction completed March 2024","note_status":"NEW_SOURCED"},"8c646fc26856":{"links":[],"unverified_note":"$300 million estimated cost for initial phase, $1 billion for full campus buildout. Tax abatement application withdrawn.","note_status":"NOT_MATERIAL"},"8c8e32c94253":{"links":[],"unverified_note":"Secured credit facility of $495 million in October 2019","note_status":"NO_PRIMARY"},"8cc9cc7094fb":{"links":[],"unverified_note":"$11 billion investment announced in April 2024, with 50-year sales tax exemptions and 10-year property tax abatements."},"8ce97d877514":{"links":[],"unverified_note":"DataBank leased a powered shell building from Digital Realty at its Digital Dallas campus in Richardson in 2012."},"8cf1e8d35244":{"links":[],"unverified_note":"$765 million investment, announced March 2025.","note_status":"NOT_MATERIAL"},"8cfbca7ac0df":{"links":[],"unverified_note":"Construction investment of $765 million, announced March 2025."},"8d1c3e9f6aff":{"links":[],"unverified_note":"Initial investment estimated at over USD 500 million. Google has secured $56 million in tax incentives over 20 years to support the development. Google signs 615 MW PPA with NextEra Energy to restart Duane Arnold nuclear plant for AI data centers - Phase Power: 615 MW (Aug 31, 2025).","note_status":"NEW_SOURCED"},"8d1f30980456":{"links":[],"unverified_note":"The Los Lunas Village Council approved the issuance of a $7.5 billion industrial revenue bond in February 2025 to support expansion."},"8d6b7e2e9f1c":{"links":[],"unverified_note":"CoreSite expects to invest $65.0 million to acquire the facility, redevelop the powered shell, and complete the initial phase of inventory consisting of 65,000 square feet (announced January 18, 2013).","note_status":"NO_PRIMARY"},"8d72822627dd":{"links":[],"unverified_note":"$42 million construction project, announced April 2024","note_status":"NOT_MATERIAL"},"8d7f1ac1c15d":{"links":[],"unverified_note":"Acquisition of Compass Datacenters by Brookfield Infrastructure Partners and Ontario Teachers' Pension Plan for approximately $5.5 billion, finalized end of 2023."},"8db9a2450d5f":{"links":[],"unverified_note":"Google to pay full cost of powering the 390-megawatt data center project and three other energy projects across Indiana, estimated at $1.3 billion. Development agreement includes Google paying no local taxes on qualified computing equipment for a 40-year period and a 50% abatement on property taxes for 10 years on data center buildings.","note_status":"NOT_MATERIAL"},"8dbbeda4c469":{"links":[],"unverified_note":"Acquisition of two Houston data center campuses by Serverfarm, funded by Manulife Investment Management, September 10, 2024."},"8e823ef2bc6f":{"links":[],"unverified_note":"Centersquare acquired Evoque Data Center Solutions in early 2024."},"8e89441d2c3c":{"links":[],"unverified_note":"Tax abatement agreements with the city of Hillsboro that could see exemptions extend through 2051."},"8ec6fe69a53b":{"links":[],"unverified_note":"Digital Realty acquired Telx for $1.886 billion, completed on October 12, 2015.","note_status":"NEW_SOURCED"},"8ecd539e4efd":{"links":[],"unverified_note":"Acquisition of three office properties for approximately $30.8 million in July 2022."},"8ee0345e8d0c":{"links":[],"unverified_note":"Land acquisition for $146M on December 30, 2021","note_status":"NO_PRIMARY"},"8ee81f888410":{"links":[],"unverified_note":"$325 million structured debt financing, September 1, 2020"},"8ef39c8f4e6b":{"links":[],"unverified_note":"Multibillion-dollar joint venture with Canadian real estate firm QuadReal Property Group for gigawatt-scale campuses, including a 300MW campus in Lithia Springs. JV plans to raise $8B."},"8f0f9c1634a1":{"links":[],"unverified_note":"Renovation/Alteration project with an estimated cost of $8,566,900, starting April 4, 2025, and completing September 30, 2025."},"8f55a81a21c2":{"links":[],"unverified_note":"CyrusOne acquired by KKR and Global Infrastructure Partners (GIP)"},"8f5fb31451d4":{"links":[],"unverified_note":"$700 million investment reported by The Dallas Morning News (May 08 2025)","note_status":"NOT_MATERIAL"},"8faa5b8c3f78":{"links":[],"unverified_note":"Amazon Data Services, Inc. purchased 589.843 acres in Jefferson Township for over $102 million, effective Dec. 30, 2024."},"8faddaa48252":{"links":[],"unverified_note":"TierPoint acquired Cosentry in January 2016 for $575 million.","note_status":"NO_PRIMARY"},"8faefed07fc9":{"links":[],"unverified_note":"Acquisition of Expedient by AMP Capital in October 2019"},"8fcd8ed18d65":{"links":[],"unverified_note":"SpaceX affiliate acquired the 785,000-square-foot property for $185 million (May 26, 2026); Anthropic agreed to rent all compute capacity (May 6, 2026).","note_status":"NO_PRIMARY"},"8ff1a2d804b8":{"links":[],"unverified_note":"$500,000 renovation project for 'GTDC Battery Room Buildout', started March 2023, completed December 2023."},"90083c53ad76":{"links":[],"unverified_note":"Acquisition of a 40-acre development site in Manassas, VA, from PRP Real Estate Investment Management for $113.5 million."},"901f2b2dc82c":{"links":[],"unverified_note":"Acquisition of two Lehman Brothers data centers (Piscataway and Cranford, NJ) for $330 million in September 2008."},"90635d0b0c7b":{"links":[],"unverified_note":"QTS plans to expand its existing data center campus at 14100 Park Vista Blvd. in Fort Worth, Texas, with an investment of $130 million, reported April 22, 2025.","note_status":"NOT_MATERIAL"},"910ae8d9a8ca":{"links":[],"unverified_note":"Hutto City Council approved a Chapter 312 tax abatement agreement and a $10 billion capital investment commitment in July 2023.","note_status":"NOT_MATERIAL"},"911884caff13":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for approximately $10 billion in August 2021."},"918cf4d38b7d":{"links":[],"unverified_note":"Partnership between Patrinely Group and USAA Real Estate (now Affinius Capital) for campus development, announced February 2022."},"919033727467":{"links":[],"unverified_note":"$3 billion investment for the facility and a July 2025 agreement between OpenAI and Oracle to establish up to 4.5 gigawatts of additional Stargate capacity.","note_status":"NEW_SOURCED"},"91a0d61c6f9c":{"links":[],"unverified_note":"Amazon received court approval to acquire the Sunstone solar power project near Pendleton, Oregon, for $83 million (January 2026). In May, Amazon won an additional set of tax breaks, valued at $1 billion over 15 years, from Morrow County, the port and city of Boardman."},"92110e4a5e28":{"links":[],"unverified_note":"$735 million refinancing package for three data centers in Goodyear, Ariz., reported June 2025","note_status":"NO_PRIMARY"},"921f78e80bec":{"links":[],"unverified_note":"City Council approved a 15-year Chapter 380 tax reimbursement for Microsoft of 40% of city property taxes on real and personal property investment of $250 million in 2013."},"929068472a1e":{"links":[],"unverified_note":"$3.3 billion senior secured notes offering due 2030, completed May 2026","note_status":"NEW_SOURCED"},"92adf6e0e19b":{"links":[],"unverified_note":"Acquisition of 100 Taylor Street by H5 Data Centers on November 28, 2018."},"92d236723778":{"links":[],"unverified_note":"$96 million project cost"},"92f5172fc4cb":{"links":[],"unverified_note":"In 2019, QTS announced a joint venture with Alinda Capital, which bought a 50 percent interest in the Manassas project."},"92f8df63f1b1":{"links":[],"unverified_note":"Microsoft paid up front to build the $86.5 million Jumpoff Ridge substation and other infrastructure improvements that were needed to serve the data center."},"92ffe3ec9554":{"links":[],"unverified_note":"DataBank secured a $2 billion construction loan in April 2026 from a group of banks led by MUFG Bank Ltd. for the first three data centers (DFW9, DFW10, DFW11) at its Red Oak campus."},"9316e73e6486":{"links":[],"unverified_note":"$76,715,000 in sales tax abatements approved in February 2024 for the expansion, extending a property tax abatement (PILOT) from September 1, 2027 to December 1, 2044."},"934b8058751a":{"links":[],"unverified_note":"$20.5M settlement with Amazon Data Services Inc. over nitrate contamination (March 31, 2026). Power Purchase Agreement (PPA) with Avangrid for 57 MWdc (41 MWac) Oregon Trail Solar facility, expected operations 2027 (October 1, 2025).","note_status":"NO_PRIMARY"},"93638fda5aa5":{"links":[],"unverified_note":"Acquisition of Switch by DigitalBridge and IFM Investors for $11 billion in December 2022; secured a $2.6 billion syndicated letter of credit and raised nearly $770 million through another bond sale in April 2026.","note_status":"NO_PRIMARY"},"937599c88ecc":{"links":[],"unverified_note":"Infocrossing acquired by Wipro Ltd. for $600 million (August 2007)","note_status":"NO_PRIMARY"},"9381cc1afa95":{"links":[],"unverified_note":"Acquisition of seven vXchnge data centers, including Portland, by H5 Data Centers on January 31, 2021."},"93912af77148":{"links":[],"unverified_note":"Land acquisition for $29 million in March 2023, $35 million in two separate deals, and $14.2 million purchase. Development Assistance Agreement for $5,192.00 in 2023."},"93b809421434":{"links":[],"unverified_note":"Acquisition of 43 acres of former AOL campus from Oath for $136 million.","note_status":"NO_PRIMARY"},"93d78fb100d7":{"links":[],"unverified_note":"$3.9 billion project approved by Spalding County Commissioners on January 23, 2026.","note_status":"NOT_MATERIAL"},"94453c4f226a":{"links":[],"unverified_note":"Tax incentives, including a real property abatement and a 40-year personal property exemption, approved by the Indiana Economic Development Corp."},"94688690c71b":{"links":[],"unverified_note":"Brookfield affiliates acquired substantially all assets of Cyxtera in November 2023 and combined with Evoque to rebrand as Centersquare in April 2024."},"94876fec7af3":{"links":[],"unverified_note":"Equinix acquired 34 acres of land in Ashburn for $34.5 million in March 2017 for data center expansion. Equinix also bought its Ashburn, Virginia technology campus for $53.0 million in October 2005. Parts of the Ashburn campus, specifically ACC4 and ACC6, were acquired from Dupont Fabros in September 2017."},"949629279a20":{"links":[],"unverified_note":"City of Hillsboro signed six consecutive five-year tax abatement contracts (HIL11-A through HIL11-F) on April 27, 2026, for NTT Global Data Centers' campus, extending tax-free status until 2051."},"94b1029dcba1":{"links":[],"unverified_note":"$800 million capital commitment for Phase 1, with a 10-year, 75% ad valorem tax abatement agreement (announced December 2021)","note_status":"NOT_MATERIAL"},"94b5ad219ebe":{"links":[],"unverified_note":"Tax abatement agreement between Tarrant County and Winner LLC (2019)"},"94c2978909fc":{"links":[],"unverified_note":"Acquisition of a ~175,000 sq ft powered shell in Austin's Met Center on April 2, 2015."},"94f70a44fb33":{"links":[],"unverified_note":"Aphorio Carter acquired the Tucson Tech Data Center for $13 million and plans to spend an additional $8 million in improvements, announced October 19, 2023.","note_status":"NOT_MATERIAL"},"94fab766be2f":{"links":[],"unverified_note":"$1.4 billion financing package backed by 28 data centers, including Phoenix, announced March 09, 2026","note_status":"NO_PRIMARY"},"950344c3dfea":{"links":[],"unverified_note":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022. In February of last year, the Manekin Plaza and Ridgetop Circle properties were acquired for $20 million and $26 million, respectively."},"950a942db73c":{"links":[],"unverified_note":"Agreement with Umatilla Electric Cooperative to select energy supply for data center operations (2023)"},"9549eeeb6d42":{"links":[],"unverified_note":"Acquisition of 120 East Van Buren for $175 million in July 2006.","note_status":"NO_PRIMARY"},"956e600eba3b":{"links":[],"unverified_note":"Acquisition of 50% membership interest by Hut 8 in December 2022 from Compute North bankruptcy; part of the Hut 8 and US Bitcoin Corp merger completed November 2023."},"95a28f87021a":{"links":[],"unverified_note":"Evocative acquired 9 INAP data centers, including LAX14, in September 2022."},"95b21ac4f28f":{"links":[],"unverified_note":"150-megawatt geothermal power purchase agreement with XGS Energy (June 2025), parallel 150-megawatt agreement with Sage Geosystems."},"96051ad30596":{"links":[],"unverified_note":"Crusoe agreed to sell the campus to Google (Dec 2025); Crusoe sold a co-located portion to Ensign Infrastructure (March 2026); Crusoe and Serena Energy proposed a net metering arrangement for wind power (Oct 2025)."},"9662402f4d5a":{"links":[],"unverified_note":"Amazon has a deal with Umatilla Electric Cooperative to choose electricity supply for its data center operations in Boardman and Hermiston (announced April 2023)."},"9664713c3fbe":{"links":[],"unverified_note":"$59.4 million investment (February 2023)"},"9687ebed0bd6":{"links":[],"unverified_note":"Acquisition of 365 Main portfolio including Chandler site for $725 million in June 2010."},"96a15eaa14e6":{"links":[],"unverified_note":"Land acquisition for $30.8 million in July 2022"},"96bad61234c4":{"links":[],"unverified_note":"Collaboration with NVIDIA"},"96c4667194c6":{"links":[],"unverified_note":"Commercial Remodel of Existing Data Hall for $16,300,000 (reported June 2024)"},"96cc0c192ed2":{"links":[],"unverified_note":"Blackstone Group acquired QTS Realty Trust for approximately $10 billion on August 31, 2021. Avangrid and Portland General Electric (PGE) signed a Power Purchase Agreement (PPA) with QTS and Meta for energy from a 120MW solar energy project on December 6, 2024."},"96d35eadf83a":{"links":[{"record_id":"research:legacy-deal:145e86d0-fb4a-49f9-b590-bf10e404d4e9","name":"Crusoe, Blue Owl Capital and Primary Digital Infrastructure enter $3.4 billion joint venture for AI data center development","date":"2024-10-15","type":"Joint venture","value_label":"$3.4B investment","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:145e86d0-fb4a-49f9-b590-bf10e404d4e9"}]},"96d58e8883af":{"links":[],"unverified_note":"QTS Data Centers acquired 206.08 acres of land for $246,866,895 in July 2024."},"96e3f955bed8":{"links":[],"unverified_note":"Sale of four Houston data centers (including West 2) from CyrusOne to DataBank for $670 million, closed March 2022.","note_status":"NO_PRIMARY"},"96fd4a8d256c":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for approximately $10 billion, including debt, on August 31, 2021. QTS pre-leased 100% of the first phase (4.5 MW) to a global software-as-a-service provider in 2020. Joint Petition with Portland General Electric Company to Increase Green Tariff Customer Supply Option Capacity (250 MW) filed September 17, 2021."},"9708fe098d4e":{"links":[],"unverified_note":"ARA, a Newmark company, is marketing the property for its owner, The Garrett Cos., a commercial real estate firm based in Stafford."},"970d82305138":{"links":[],"unverified_note":"Equinix acquired a portfolio of 24 data center sites from Verizon for $3.6 billion, announced December 2016 and closed May 2017.","note_status":"NO_PRIMARY"},"9710e9b127bd":{"links":[],"unverified_note":"Sale of Houston West I, II, and III (and Houston Galleria) by CyrusOne to DataBank for approximately $670 million, announced January 2022, closed March 2022."},"973cdf9cf79e":{"links":[],"unverified_note":"Acquisition of Ashburn campus for $53.0 million","note_status":"NO_PRIMARY"},"97410a4cff9d":{"links":[],"unverified_note":"Lawsuit for $34.2 million in March 2020; $215.9 million investment for SAT15."},"97471e0dfbc2":{"links":[],"unverified_note":"80-year ground lease executed with Cayuga Operating Company LLC on August 14, 2025."},"977191f22218":{"links":[],"unverified_note":"In a $212.5 million deal, Verizon sold the former home of MCI Worldcom (now MCI Inc.) in Ashburn, Va., to Davidson Kempner Capital Management, a global hedge fund with approximately $25 billion of AUM, and American Real Estate Partners (AREP), a Herndon, Va.-based operating company with approximately $2.8 billion in investment activity since 2003.... The property also includes five parking structures, a central plant and enough land to construct additional office buildings and a data center. Verizon also leased-back 1,518,365 rentable square feet for one year, but will retain more than one million square feet for an additional 11 years.","note_status":"NO_PRIMARY"},"978a73c73d10":{"links":[],"unverified_note":"Long-term PPA with Leeward Renewable Energy for over 700 MW in solar projects in Oklahoma (announced January 2025). Google also committed $1.5 million to a regenerative project with Indigo Ag to replenish 200 million gallons of water over seven years (announced August 2025).","note_status":"NO_PRIMARY"},"978ddad17c04":{"links":[],"unverified_note":"Evocative acquired INAP data center portfolio in September 2022, funded by an incremental equity investment from Crestline Investors."},"97942339d44d":{"links":[],"unverified_note":"Flexential acquired Hillsboro 4 and Hillsboro 5 from T5 Data Centers on May 28, 2026."},"97af49bd1d77":{"links":[],"unverified_note":"American Tower acquired CoreSite for approximately $10.1 billion, closed December 2021.","note_status":"NEW_SOURCED"},"988748a36a82":{"links":[],"unverified_note":"TierPoint acquired the facility in January 2024. The seller and purchase price were not disclosed."},"9890854b045e":{"links":[],"unverified_note":"Tax Phase-In Agreement executed by the City and Microsoft (2007)"},"98fa48ff4a90":{"links":[],"unverified_note":"Six consecutive five-year enterprise zone agreements (HIL11-A through HIL11-F) signed on April 27, 2026, for the 6000 NW Jackson School Road campus, providing property tax exemptions through 2051."},"992e78702789":{"links":[],"unverified_note":"Microsoft Corporation has purchased all or most of the land in three industrial parks located in Mecklenburg County — Hillcrest Industrial Park in South Hill, Roanoke River Regional Business Park located between La Crosse and Brodnax, and Lakeside Commerce Park near Clarksville. All three land transfers occurred in the past week."},"994c960299f5":{"links":[],"unverified_note":"AWS plans to invest $5 billion into Fayette County by 2030 as part of a larger $10 billion expansion across Ohio. Amazon Data Services, Inc. purchased 590 acres in Jefferson Township, Ohio for $102.4 million in 2025."},"995069606076":{"links":[],"unverified_note":"Dominion Energy proposed a $253.7 million upgrade to transmission infrastructure to serve data centers in the Culpeper Tech Zone, including Copper Ridge.","note_status":"NOT_MATERIAL"},"99882c08d8c8":{"links":[],"unverified_note":"EdgeConneX plans to invest up to $210 million in developing the facility."},"99af46fbbdc6":{"links":[],"unverified_note":"Construction project with an estimated value of $280.0M.","note_status":"NOT_MATERIAL"},"99bc279d0b99":{"links":[],"unverified_note":"Amazon.com purchased a 7.66-acre data center campus for $65 million on March 26, 2026."},"99bc81a6d890":{"links":[],"unverified_note":"QTS purchased a 700,000 square foot former semiconductor plant in Irving, TX in 2013 to convert into a data center."},"99cf35609af8":{"links":[],"unverified_note":"$13M Early Stage VC funding","note_status":"NOT_MATERIAL"},"99de67292fab":{"links":[],"unverified_note":"Amazon purchased the Nokes buildings from the commercial real estate firm Clark-Hook Corp for $30.8 million in July 2022."},"99ef85e2a7f4":{"links":[],"unverified_note":"Amazon acquired the Sunstone solar power project near Pendleton, Oregon, for $83 million in January 2026."},"9a2cb2295aef":{"links":[],"unverified_note":"Investment partnership with Affinius Capital"},"9a3354370bb5":{"links":[],"unverified_note":"Settlement of $20.5 million for nitrate pollution from existing data center operations (reported January 26, 2026)."},"9a41d4a9e594":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital; 85% property tax abatement over 10 years from City of Abilene and Taylor County."},"9ad2bf6f2fe8":{"links":[],"unverified_note":"Six consecutive five-year enterprise zone agreements (HIL11-A through HIL11-F) signed on April 27, 2026, extending property tax exemptions through 2051."},"9ad4fae12c04":{"links":[],"unverified_note":"Land acquisition of 283 acres for $258 million on May 31, 2024; Power Purchase Agreement with First Solar for Sun Streams 2 (announced July 2019)","note_status":"NO_PRIMARY"},"9adb9eefc7aa":{"links":[],"unverified_note":"Rockland County Industrial Development Agency approved a nearly $77 million tax break for the expansion in 2024, and extended a 2017 property tax abatement (PILOT) from September 1, 2027, to December 1, 2044."},"9b0c739f62ef":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025."},"9b1daf3a8564":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025."},"9b28a907d0ae":{"links":[],"unverified_note":"DataBank acquired the building housing its EWR2 data center in Piscataway, New Jersey, announced May 1, 2025, for $16 million.","note_status":"NOT_MATERIAL"},"9b47fe15f2d1":{"links":[],"unverified_note":"TierPoint acquired Philadelphia Technology Park in June 2014 for an undisclosed price."},"9b912133bbd3":{"links":[],"unverified_note":"Amazon Data Services purchased the 120-acre George Washington University Virginia Science & Technology Campus for $427 million in February/March 2026.","note_status":"NO_PRIMARY"},"9bee4f8baa36":{"links":[],"unverified_note":"Atlas Agro offered nearly $24 million for 275 acres in the Northwest Advanced Clean Energy Park. The data center project is linked to Atlas Agro's proposed $1.1 billion to $1.5 billion fertilizer plant and is intended to defray its cost.","note_status":"NOT_MATERIAL"},"9bf10489bf0e":{"links":[],"unverified_note":"Acquisition by Tierpoint in 2023"},"9c5abd1b547a":{"links":[],"unverified_note":"Project estimated cost of $215.9 million."},"9c5e72b802d2":{"links":[],"unverified_note":"Reston-based WestDulles Properties last week earned Ashland Town Council approval for the zoning request for the project that would stretch across both localities. While that approval cleared the way for the development on the Ashland side of the line, the Hanover Planning Commission opted to defer its decision on the project until its November meeting."},"9c8be4cf201d":{"links":[],"unverified_note":"Poolside is in the midst of a $2 billion fundraising round.","note_status":"NO_PRIMARY"},"9c97acd91533":{"links":[],"unverified_note":"KKR acquired Ensono, LP from Charlesbank Capital Partners and M/C Partners for USD 1.7 billion in 2021."},"9c9f699e0ffd":{"links":[],"unverified_note":"Investment of $35 million in the Dallas County project, September 2023 to January 2025.","note_status":"NOT_MATERIAL"},"9ca79589bcff":{"links":[],"unverified_note":"Tamares, in a JV with Ilmarinen Mutual Pension Insurance Co., acquired the property from Gannett in 2015 for $270M.","note_status":"NO_PRIMARY"},"9ca88dea6a7b":{"links":[],"unverified_note":"Project renovation cost of $2,312,196, completed May 2012."},"9cf59961035b":{"links":[{"record_id":"research:newsroom:sec:20240603:1","name":"Core Scientific to Provide Approximately 200 MW of Infrastructure to Host CoreWeave’s High-Performance Computing Services, Capturing Significant AI Compute Opportunity","date":"2024-06-04","type":"Lease / service contract","value_label":">$3.5B total consideration","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20240603:1"}]},"9d0044615d4e":{"links":[],"unverified_note":"Compute North filed for Chapter 11 bankruptcy in September 2022; the Corpus Christi facility was an in-development asset not sold in initial auction."},"9d1e2b2d5918":{"links":[],"unverified_note":"Tax Credit/Rebate in 2024"},"9d2e736d68f6":{"links":[],"unverified_note":"Land acquisition on May 17, 2022, for 18 acres and an existing data center facility."},"9d509d09c618":{"links":[],"unverified_note":"CyrusOne Inc. acquired by KKR and Global Infrastructure Partners for approximately $15 billion on March 25, 2022.","note_status":"NEW_SOURCED"},"9d659846b8cf":{"links":[],"unverified_note":"Acquisition of Sungard Availability Services' U.S. colocation and network business by 365 Data Centers in 2022."},"9d78bf8d4f3d":{"links":[],"unverified_note":"Acquisition of Aligned Data Centers by Artificial Intelligence Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners for approximately $40 billion, expected to close in H1 2026."},"9d818b052215":{"links":[],"unverified_note":"Zayo Group Holdings, Inc. acquired a data center in McLean, Virginia, which included tenants, data center systems, and long-term leases."},"9dcc62c23a03":{"links":[],"unverified_note":"DigitalBridge Group announced it would be acquiring Yondr through one of its managed investment funds. The deal is expected to close in early 2025."},"9dd79009ce32":{"links":[],"unverified_note":"Estimated cost of $41,500,000 for additions to existing building, filed 2022."},"9dec0bc73c14":{"links":[],"unverified_note":"DataBank announced a $2 billion equity raise led by AustralianSuper ($1.5 billion) and existing investors ($483 million) in October 2024."},"9e1c0ec4fd46":{"links":[],"unverified_note":"CyrusOne Inc. announced that the company will purchase 67 MW of renewable energy delivered to the electricity grid and equivalent renewable energy credits generated by Enel Green Power's 284 MW1 Azure Sky solar + storage project located in Haskell County, Texas. (January 26, 2021)"},"9e4116877264":{"links":[],"unverified_note":"Chapter 312 tax abatement approved in July 2023; $10 billion+ capital investment; $163 million data center broke ground in 2024; $125 million data center (Building 2) filed in August 2025."},"9e50a1a14e1b":{"links":[],"unverified_note":"Acquisition of Consolidated Communications Holdings, Inc. by Searchlight Capital Partners, L.P. and British Columbia Investment Management Corporation for approximately $3.1 billion, closed December 27, 2024.","note_status":"NO_PRIMARY"},"9e583950d3c2":{"links":[],"unverified_note":"Equinix acquired the Infomart Dallas from ASB Real Estate Investments for $800 million in 2018."},"9eff95ee0a85":{"links":[],"unverified_note":"Ohio Department of Development approved tax credit assistance for an investment of at least $202 million (September 26, 2023)."},"9f09a1e1a4fa":{"links":[],"unverified_note":"AWS will provide the city of Hermiston $8 million to construct a 20-acre RV park for contractors and employees, with preference for those working for the company."},"9f0bfe0fad5d":{"links":[],"unverified_note":"Amazon filed plans in 2020 to build a 109,600-square-foot data center at 7400 Potranco Road."},"9f481fb707a6":{"links":[],"unverified_note":"Compass Datacenters established a permanent, long-term capital partnership with KKR on March 16, 2026."},"9f74062bde4d":{"links":[],"unverified_note":"Rezoning and Proffer Amendment approval with financial commitments for water quality monitoring."},"9fa3207c3e9e":{"links":[],"unverified_note":"Acquisition of 56.7 acres of land and two powered shells for $146 million on December 30, 2021."},"9fbd24dfb7eb":{"links":[],"unverified_note":"Acquisition of George Washington University's 122-acre Virginia Science and Technology Campus for $427 million in March 2026."},"9fd9240863ce":{"links":[],"unverified_note":"$600 million debt financing package closed October 2025"},"9fe4a0b3e07a":{"links":[],"unverified_note":"In 2013, AT&T sold 2600 Bishop Ranch and leased back space. In 2014, Sunset Development Co. and MetLife Inc. purchased the property."},"a00523d05150":{"links":[],"unverified_note":"Digital Realty acquires DuPont Fabros, adding 12 data centers to its portfolio (2016)"},"a00ad1513af0":{"links":[],"unverified_note":"$2.5 billion investment and $3 million community contribution (November 18, 2025)","note_status":"NOT_MATERIAL"},"a05eb5e9305f":{"links":[],"unverified_note":"Construction investment of $180,000,000 (estimated) / $186,000,000"},"a085c6e90787":{"links":[],"unverified_note":"Tax Abatement Agreement with Pecos County approved on December 8, 2025"},"a0ac313418af":{"links":[],"unverified_note":"Macquarie Infrastructure Partners IV acquired Netrality Data Centers on September 6, 2019."},"a0af9a4e8496":{"links":[],"unverified_note":"Aeris Investments LLC acquired approximately 340 acres near Westchester Commons for $29 million. County officials approved fixed tax agreements for 30 years.","note_status":"NO_PRIMARY"},"a114b1235a61":{"links":[],"unverified_note":"Initial investment of $450 million announced in 2010","note_status":"NOT_MATERIAL"},"a118038c5711":{"links":[],"unverified_note":"Equinix acquired the Infomart Dallas building from ASB Real Estate Investments for $800 million in a debt and cash transaction, completed on April 2, 2018."},"a14979ea224e":{"links":[],"unverified_note":"$1.5 billion investment announced March 2025 for expansion; 90 acres acquired September 2025; 158 acres purchased in 2015; 34-acre center acquired for $80 million in 2017.","note_status":"NOT_MATERIAL"},"a174b16c9b91":{"links":[],"unverified_note":"Digital Realty acquired the data center as part of a three-building portfolio for $375 million in 2010. Digital Realty sold the property to Camber Development for $16 million in September 2025.","note_status":"NOT_MATERIAL"},"a176e8080e13":{"links":[],"unverified_note":"$3 billion initial investment announced November 20, 2025","note_status":"NEW_SOURCED"},"a17c45292821":{"links":[],"unverified_note":"Building 2 fully leased to an undisclosed hyperscale tenant (expected completion mid-2025); Strategic Partnership with e2Companies for on-site power generation."},"a180d3c64bf7":{"links":[],"unverified_note":"QuadReal and T5 Capital raise to support data center platform growth to $8.0 billion (February 2025)."},"a193c17382b0":{"links":[],"unverified_note":"$12 billion proposed investment","note_status":"NOT_MATERIAL"},"a19dafd9741c":{"links":[],"unverified_note":"Digital Realty entered a $1.5 billion joint venture with TPG Real Estate Partners, selling an 80 percent stake in three stabilized data centers in Ashburn, VA, on July 27, 2023."},"a1b3f30b6190":{"links":[],"unverified_note":"DataBank initiated expansion efforts following the 2021 issuance of over $750 million in secured revenue notes, and further financing in 2023/2024 including $715 million in asset-backed securities and an additional $325 million."},"a1b4ab1678e2":{"links":[],"unverified_note":"$11 million in tax incentives","note_status":"NOT_MATERIAL"},"a1c0348b3c9f":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust on August 31, 2021."},"a1dfbda88563":{"links":[],"unverified_note":"Community Reinvestment Area Agreement with QTS NAL TX II, LLC approved on November 21, 2023"},"a214ea3660fc":{"links":[],"unverified_note":"Acquisition of 424 acres (Western Lands) for $236.5 million from Metropolitan Washington Airports Authority"},"a279ebf6eb62":{"links":[],"unverified_note":"Acquisition of ~175,000 sq ft powered shell for AUS3 on April 2, 2015."},"a28cabf1fdbe":{"links":[],"unverified_note":"Google is investing $880 million in Sharka Data Center – Building 5, with construction starting January 2026 and completing February 2027."},"a29d2b9e157d":{"links":[],"unverified_note":"GI Partners acquired a 65% interest in two hyperscale data centers in Elk Grove Village, IL from Digital Realty Trust, with Digital Realty retaining 35% interest and continuing operations. The deal was financed through a 10-year, $450 million fixed-rate loan from Barclays, Citigroup and Morgan Stanley banks, reported June 05, 2023."},"a2a4cef7b549":{"links":[],"unverified_note":"QTS acquired the former Maxim semiconductor plant in 2013."},"a2f7f81b1d9f":{"links":[],"unverified_note":"Acquisition of 23.5-acre site at Prentice Drive and Broderick Drive by QTS Realty Trust."},"a302f122f007":{"links":[],"unverified_note":"Benefits from 'enterprise zone' tax incentives in Hillsboro, Oregon."},"a3079cb686ae":{"links":[],"unverified_note":"Irving City Council approved a 50% property tax reduction for QTS's plan to construct three buildings, requiring QTS to invest around $350 million in the property before January 2029.","note_status":"NOT_MATERIAL"},"a3239e0d4453":{"links":[],"unverified_note":"Five-year, $9.7 billion AI cloud contract with Microsoft signed in November 2025.","note_status":"NEW_SOURCED"},"a33f73a7cfe3":{"links":[],"unverified_note":"CyrusOne Inc. acquired by KKR and Global Infrastructure Partners for approximately $15 billion on March 25, 2022."},"a34ed8b252fb":{"links":[],"unverified_note":"$350 million loan from Societe Generale for Santa Clara site redevelopment (November 23, 2022)","note_status":"NO_PRIMARY"},"a3580969b8b1":{"links":[],"unverified_note":"Intelishift acquired Data Canopy with a $50 million investment from Metropolitan Partners Group in June 2023.","note_status":"NO_PRIMARY"},"a37281180c89":{"links":[],"unverified_note":"$4 billion project cost, request for 50% property tax abatement, and commitment of over $5 million for township improvements.","note_status":"NOT_MATERIAL"},"a38bdf2275ac":{"links":[],"unverified_note":"Acquisition of CyrusOne by funds managed by KKR and Global Infrastructure Partners for approximately $15 billion (March 2022)"},"a3a9ea214ef7":{"links":[],"unverified_note":"$100 million in construction financing secured by Penzance in October 2025."},"a3b6cf312fb1":{"links":[],"unverified_note":"Amazon is investing $11 billion in the campus. The Indiana Economic Development Corporation (IEDC) is offering AWS data center sales tax exemptions for eligible capital investments over a 50-year term. St. Joseph County Council approved a 50% real property tax abatement for 10 years and an 85% Enterprise Technology Exemption for 35 years. The county granted Amazon more than $4 billion in property and technology tax exemptions over 35 years. Amazon also invested $1.25 billion in Anthropic in September 2023, followed by further investments.","note_status":"NOT_MATERIAL"},"a3e1deba9ed5":{"links":[],"unverified_note":"acquisition of a 575,000 square foot redevelopment property in Franklin Park, Ill. for $22.3 million (June 2012)"},"a400442abd19":{"links":[],"unverified_note":"$6.2M Renovation/Alteration","note_status":"NOT_MATERIAL"},"a41743554bad":{"links":[],"unverified_note":"Intergovernmental agreement for water supply with Franklin Park, including Northlake's $8 million investment in pumps and a generator, paid for by Microsoft water sales (August 2008).","note_status":"NOT_MATERIAL"},"a48e060b0bae":{"links":[],"unverified_note":"Funding from property investor USAA Real Estate (late 2021/early 2022); Strategic Partnership with e2Companies for on-site power generation, energy storage, and distribution (undated press release, mentioned in 2025 press release); Partnership with ZincFive for battery technology (undated press release)."},"a4af9b5a4c6f":{"links":[],"unverified_note":"Microsoft announced a $1.5 billion investment to expand its data center operations in San Antonio, Texas, in March 2025."},"a4d1e804aa21":{"links":[],"unverified_note":"Partnership with Calibrant Energy for a 31 MW, 62 MWh Battery Energy Storage System (BESS) to accelerate interconnection, planned operational in 2026."},"a4efba9d8624":{"links":[],"unverified_note":"Conversion Transaction Commitment Agreement with cumulative payments of up to $5 million to Hallador Power Company, effective January 2, 2025, terminated May 19, 2025.","note_status":"NOT_MATERIAL"},"a5393a087c48":{"links":[],"unverified_note":"QuadReal Property Group's $2.5 billion investment in T5 Data Centers in 2019","note_status":"NO_PRIMARY"},"a5705cbdbf22":{"links":[],"unverified_note":"Initial $1.5 billion investment increased to over $10 billion. City approved a Chapter 380 Agreement in December 2023 providing an 80% city property tax rebate. Meta purchased over 1,000 acres of city-owned land for $8.5 million in 2023. El Paso Electric is planning to develop a 366 MW power plant to power Meta's data center."},"a5e961da2de8":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025."},"a613ce541769":{"links":[],"unverified_note":"Constellation announced an agreement with Microsoft to significantly reduce the carbon footprint of one of Microsoft's data centers in Boydton, Virginia. Under the agreement, the facility will receive up to 35 percent in environmental attributes from nuclear power, complementing the company's new wind and solar purchases. Virginia's sales and use tax exemptions for data centers accounted for about $80 million in uncollected state revenue in fiscal 2018. Mecklenburg County provided a $1.5 grant to support the expansion (in addition to the sales and use tax exemptions already obtained)."},"a616fd54cffe":{"links":[],"unverified_note":"Initial $600 million investment announced in 2019. Subsequent expansions include a $1 billion investment in August 2021, an additional $1.7 billion in August 2023, and another $2.3 billion in June 2024. The facility also received a 100%, 15-year exemption from data center sales tax worth $43.5 million and 100% property tax abatement for 15 years."},"a61cf3c0cba9":{"links":[],"unverified_note":"Acquisition of Southern Union Company by Energy Transfer Partners in March 2012."},"a649a2fbef12":{"links":[],"unverified_note":"Fairfax County Board of Supervisors on March 17 approved a controversial sale of county land to a data center developer. The board agreed to sell 41.7 acres at 3721 Stonecroft Blvd. in Chantilly to the Starwood Capital Group for $166.8 million."},"a654c720e8ec":{"links":[],"unverified_note":"Land acquisition for $77.5 million in 2024; pre-development funding of up to $12.6 million in 2026; agreement with Indiana Michigan Power for large load interconnection in 2024, including $500,000 annually for five years to Indiana Community Action Association.","note_status":"NOT_MATERIAL"},"a69c9a6840e8":{"links":[],"unverified_note":"Acquisition of Alpharetta facility from T5 Data Centers in 2019."},"a6c7c3838878":{"links":[],"unverified_note":"CyrusOne is slated to land a $1.05B fixed-rate, five-year CMBS loan for its adjacent DFW3 and DFW4 data centers on Chelsea Boulevard in Allen, with the mortgage expected to close on May 20, 2026."},"a6ce11f048cf":{"links":[],"unverified_note":"Amazon Data Services Inc. acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.","note_status":"NO_PRIMARY"},"a6ddf80bb79f":{"links":[],"unverified_note":"Construction investment of $765 million (announced March 2025)"},"a73a7d028274":{"links":[],"unverified_note":"Starwood acquired the property in 2019 for $134.1 million.","note_status":"NO_PRIMARY"},"a74f6835c49d":{"links":[],"unverified_note":"Acquisition of previously enterprise-owned data center in Newark, CA by T5 Data Centers, announced October 6, 2020."},"a75539225edb":{"links":[],"unverified_note":"Part of $267 million bond program passed in May 2013; data center project estimated at $11.1M.","note_status":"NOT_MATERIAL"},"a776a7d66d29":{"links":[],"unverified_note":"Aligned Data Centers acquired by a consortium of investors for approximately $40 billion (October 2025)"},"a77ddafb01f5":{"links":[],"unverified_note":"Netrality Properties acquired the 1301 Fannin Street building in 2015. Netrality also acquired INAP's colocation and meet-me-room assets at the site in June 2020."},"a82e859668ea":{"links":[],"unverified_note":"Amazon purchased the Nokes buildings for $30.8 million in July 2022, and the Manekin Plaza and Ridgetop Circle properties for $20 million and $26 million respectively in February 2022."},"a83bbdc0bdd5":{"links":[],"unverified_note":"Acquisition of data center by GI Partners from NTT DATA in a sale-leaseback transaction."},"a841bc35c70c":{"links":[],"unverified_note":"$1.4 billion project financing facility closed in August 2025"},"a87babf20bbf":{"links":[],"unverified_note":"NSF awarded $3.7 million to Georgia Tech for HPC resource (July 23 2019)","note_status":"NOT_MATERIAL"},"a87f8eecc21e":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"a88e761ca978":{"links":[],"unverified_note":"Acquisition of Atlantic Metro Communications by 365 Data Centers, including a Los Angeles facility, in November 2020."},"a8ca26ead53f":{"links":[],"unverified_note":"Equinix acquired the Infomart Dallas from ASB Real Estate Investments in an $800 million debt and cash transaction, completed on April 2, 2018."},"a92865b29443":{"links":[],"unverified_note":"Signed a term sheet for power for Project Fei"},"a94482165a64":{"links":[],"unverified_note":"$10 billion investment announced in January 2024 for two data center campuses in Madison County."},"a9705641fc47":{"links":[],"unverified_note":"Equinix acquired the Infomart building for $800 million in April 2018."},"a98c685e093d":{"links":[],"unverified_note":"$850,000 renovation/alteration completed in 2020"},"a9969fdbf6c7":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025"},"a9bff50258af":{"links":[],"unverified_note":"Acquisition of building from Prologis for $22.8 million in 2016"},"aa0700ab55fb":{"links":[],"unverified_note":"Planned $10 billion investment in the data center campus and a commitment of up to $18 million over 20 years to the City of Cedar Rapids' Community Betterment Fund."},"aa083096f0df":{"links":[],"unverified_note":"Sale of four Houston data centers (including Houston West I, II, and III) by CyrusOne to DataBank for approximately $670 million, announced January 2022 and closed March 2022."},"aa4df560c400":{"links":[],"unverified_note":"Acquisition of seven data centers from vXchnge, announced January 31, 2021."},"aa4ff246c06a":{"links":[],"unverified_note":"$72M construction loan from Bank OZK (June 2023); $162M project with Brookhaven IDA incentives (April 2023)","note_status":"NO_PRIMARY"},"aa52ea972f27":{"links":[],"unverified_note":"25-year water service agreement with Hermiston, AWS to pay construction costs and provide $8M for RV park."},"aa6ed2e31c45":{"links":[],"unverified_note":"$800 million refinancing deal in May 2023","note_status":"NO_PRIMARY"},"aa75fa7607c0":{"links":[],"unverified_note":"DataBank announced plans to install a 3,150 kW rooftop solar array at its HOU3 data center on May 12, 2026."},"aaa9396f39b1":{"links":[],"unverified_note":"QTS plans to spend an estimated $650 million on construction costs for the two projects (DFW2 DC2 and DFW2 DC3)."},"aab4116775ad":{"links":[],"unverified_note":"Acquisition by Digital Realty in 2006"},"aabc020b2d96":{"links":[],"unverified_note":"Renovation/Alteration with an Estimated Cost: $8,200,000"},"ab05526e7306":{"links":[],"unverified_note":"Joint Venture formed between Northstar and IPI Partners to fund data center projects for Amazon."},"ab2d1c08cde4":{"links":[],"unverified_note":"DataBank announced plans to install a 3,150 kW rooftop solar array at its HOU3 data center in Houston, Texas, on May 12, 2026."},"ab3d910e883c":{"links":[],"unverified_note":"Construction projects totaling $650 million (DC2: $300 million, DC3: $350 million) announced April 2025.","note_status":"NOT_MATERIAL"},"ab625b311ffe":{"links":[],"unverified_note":"Datacenter Lease entered into on August 31, 2021, with Riot Blockchain, Inc."},"ab6a71a0f57e":{"links":[],"unverified_note":"DataBank announced a $2.0 billion equity raise led by AustralianSuper, which committed $1.5 billion, on October 15, 2024."},"aba242ceda03":{"links":[],"unverified_note":"DataBank acquired the site from zColo in 2020"},"abbe439a4a04":{"links":[],"unverified_note":"Acquisition of the site from Sungard in January 2019"},"abd30d8ff5ef":{"links":[],"unverified_note":"Galaxy Digital secures $1.4 billion financing for Helios AI data center development (August 13, 2025)"},"abe53a39e167":{"links":[],"unverified_note":"Construction project with an estimated cost of $26,800,000."},"abf2a31cacae":{"links":[],"unverified_note":"The Virginia Beach Economic Development Authority has approved a purchase agreement for a 10.4-acre site in Corporate Landing Business Park to PointOne for $2.08 million."},"abfe722b6b08":{"links":[],"unverified_note":"Telx acquired by Digital Realty in 2015"},"ac288f01443f":{"links":[],"unverified_note":"Freddie Mac bought the 110,000-sf building from Goldman Sachs Whitehall Fund for $19.5 million.","note_status":"NOT_MATERIAL"},"ac81e03698f7":{"links":[],"unverified_note":"$20M acquisition of 100% leased Flexential data center in Franklin, TN in 2016.","note_status":"NOT_MATERIAL"},"ac9b37d210aa":{"links":[],"unverified_note":"Investment of $250 million and $150,000 annual project fee in lieu of property taxes (April 2012); Acquisition of 45 Mile Hydroelectric Plant (April 2014); Power Purchase Agreements for 200.85 MW Montague Wind Farm (Oct 2019) and 69.9 MWdc Gala Solar (Oct 2017).","note_status":"NOT_MATERIAL"},"acb8722215e9":{"links":[],"unverified_note":"Microsoft committed to invest a minimum of $1 billion in the phased development of four data centers in Catawba County over 10 years, with Catawba County approving grants of property and refunding $16 million in property tax revenues over ten years. A PPA with Duke Energy for 1500 MW was also reported on Feb 10, 2026.","note_status":"NOT_MATERIAL"},"acbfed151f47":{"links":[],"unverified_note":"Brookfield Infrastructure Partners acquired Cyxtera for approximately $775M in late 2023.","note_status":"NO_PRIMARY"},"acd133cd104d":{"links":[],"unverified_note":"NTT Communications acquired an 80 percent ownership stake in RagingWire Data Centers for $350 million.","note_status":"NEW_SOURCED"},"acedac1b3ff9":{"links":[],"unverified_note":"$600 million debt financing package closed on October 16, 2025; $3.4 billion joint-venture announced October 15, 2024."},"ad6c47140538":{"links":[],"unverified_note":"Acquisition of bore pipes and conduits from SubCom LLC for approximately $2 million (February 27, 2024)","note_status":"NOT_MATERIAL"},"ad7c625797fc":{"links":[],"unverified_note":"DataBank announced a $2.0 billion equity raise led by AustralianSuper ($1.5 billion commitment) on October 15, 2024.","note_status":"NEW_SOURCED"},"ad906606eaf8":{"links":[],"unverified_note":"$3 billion in construction loans for a new data center campus in Ohio, with plans to generate power on-site using natural gas. Meta also announced agreements with TerraPower, Oklo and Vistra for nuclear power for its Prometheus AI data center that is being built in New Albany, Ohio (announced January 9, 2026).","note_status":"NO_PRIMARY"},"ad9a17a5ac22":{"links":[],"unverified_note":"Active Data Center Upgrade project involving replacement of UPS units and battery systems."},"adcadd1ee8c6":{"links":[],"unverified_note":"Acquisition of 10 data centers across US and Canada for $1 billion (October 2025)"},"add632166c25":{"links":[],"unverified_note":"Alpheus Communications acquired StratITsphere's retail colocation business unit, including a long-term lease of data center space at 1510 Primewest Parkway, Katy, Texas, on August 6, 2014."},"ae0e04eafd01":{"links":[],"unverified_note":"$90,000,000 investment and a 75%, 10-year Data Center Tax Credit approved on December 11, 2023."},"ae3ad1a2ecad":{"links":[],"unverified_note":"Meta purchased the 475-acre property from Henrico County's development authority for $35.3M in October, according to Richmond BizSense. The proposed development — referred to as Project Tropical in county filings — comes amid layoffs and office space cuts at Meta and across the tech industry. In filings with county authorities, Meta — or an affiliated development entity known as Scout Development LLC — said it intends to build a pair of data centers and three auxiliary buildings on the site.","note_status":"NO_PRIMARY"},"ae878a5f4252":{"links":[],"unverified_note":"$20.5 million settlement with Amazon Data Services Inc. over nitrate groundwater contamination, announced March 31, 2026."},"ae90e44b80f7":{"links":[],"unverified_note":"Investment of $6,000,000 for new construction, announced September 2022."},"ae96cf823b77":{"links":[],"unverified_note":"Investment of $26 million for construction, completed June 2023."},"aebbcd4a7544":{"links":[],"unverified_note":"Acquisition of Stream Data Centers' latest development in Legacy Business Park, announced June 13, 2017."},"aed73b072657":{"links":[],"unverified_note":"Modification of an economic incentive agreement received in 2021, with a pivot from a $104 million data center expansion to a $13 million renovation.","note_status":"NOT_MATERIAL"},"af00e28f4b37":{"links":[],"unverified_note":"Acquisition of 12001 North Freeway property in Houston as part of a $71.8 million deal in May 2006.","note_status":"NO_PRIMARY"},"af04ef05920b":{"links":[],"unverified_note":"Renovation/Alteration project with an estimated cost of $500,000, started 12/30/2021 and completed 5/31/2022."},"af1293bf56d5":{"links":[],"unverified_note":"Settlement of lawsuit for $20.5 million to address nitrate-contaminated water (April 1, 2026)","note_status":"NOT_MATERIAL"},"af15ac715c25":{"links":[],"unverified_note":"Acquisition of two data centers in Santa Clara for $97 million by Centersquare from Menlo Equities, including $55 million for 4650 Old Ironsides Drive, on November 18-20, 2025."},"af59afda4e6a":{"links":[],"unverified_note":"Apollo-managed funds to acquire a majority interest in Stream Data Centers from Stream Realty Partners, expected to be completed in 2025."},"af63e7d4c993":{"links":[],"unverified_note":"Ohio officials approved an incentive package for CitiCorp North America, including a 72 percent abatement on real property taxes for 15 years and a 60 percent abatement on equipment for two years (April 2006)."},"afbd517bdbca":{"links":[],"unverified_note":"$20.5 million settlement for nitrate contamination (March 31, 2026); Agreement with Umatilla Electric Cooperative for energy supply (April 4, 2023)."},"afe6501199bb":{"links":[{"record_id":"research:discovery:20261022:2026-04-01:soluna-acquires-100-of-briscoe-wind-farm-for-:189b553fa3b38dc5","name":"Soluna DV Wind SponsorCo acquires 100% of Briscoe Wind Farm, LLC for approximately $53M","date":"2026-04-03","type":"Acquisition","value_label":"~$53M total consideration","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2026-04-01:soluna-acquires-100-of-briscoe-wind-farm-for-:189b553fa3b38dc5"}]},"afef606a2df3":{"links":[],"unverified_note":"$20.5 million settlement for nitrate pollution lawsuit (recent, as of April 2026).","note_status":"NOT_MATERIAL"},"aff68a097d96":{"links":[],"unverified_note":"$300 million data center expansion announced June 2, 2015","note_status":"NOT_MATERIAL"},"b02781dd4ab8":{"links":[],"unverified_note":"DataBank closed a $2 billion construction loan on April 21, 2026, led by MUFG Bank, to fund the first three buildings (DFW9, DFW10, and DFW11)."},"b02c90a8e062":{"links":[{"record_id":"research:discovery:20261022:2026-01-16:riot-buys-rockdale-site-land-and-signs-first-:ffadd08b7795d5b0","name":"Riot signs first data center lease with AMD at the Rockdale Site","date":"2026-01-16","type":"Lease / service contract","value_label":"~$311M total consideration","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2026-01-16:riot-buys-rockdale-site-land-and-signs-first-:ffadd08b7795d5b0"}]},"b03a9cdf057a":{"links":[],"unverified_note":"Microsoft paid $93.7M for the property in August 2020, acquiring the site from a joint venture involving Baltimore-based St. John Properties and JK Land Holdings.","note_status":"NO_PRIMARY"},"b04beb44f5d1":{"links":[],"unverified_note":"DataBank acquired zColo data center assets from Zayo Group Holdings in December 2020."},"b06da722678c":{"links":[],"unverified_note":"Initial capital investment of $20 million (July 2006)","note_status":"NOT_MATERIAL"},"b099df6039f5":{"links":[],"unverified_note":"Equinix acquired the Ashburn, Virginia technology campus, which includes DC1, for $53.0 million in 2005."},"b0a00749ac2f":{"links":[],"unverified_note":"Virginia Transportation Infrastructure Bank (VTIB) received payment of more than $8 million when CyrusOne acquired the land in June 2016.","note_status":"NOT_MATERIAL"},"b0a8dc9a39de":{"links":[],"unverified_note":"Microsoft Corp. (NASDAQ: MSFT) acquired 46 acres in western Prince William County for $29 million, specifically at 11314 Balls Ford Road in Manassas, according to public records.","note_status":"NO_PRIMARY"},"b0d3b9ef760a":{"links":[],"unverified_note":"Acquisition of 11400 N. Lamar building from AT&T in 2002 for data center build-out."},"b11a7388df32":{"links":[],"unverified_note":"Acquisition of Windstream in December 2015"},"b124ecf718ee":{"links":[],"unverified_note":"Acquisition of facility from HCSC for $50 million (January 30, 2017); $130 million expansion investment (April 22, 2025); $220 million project for QTS Fort Worth DC2 (January 2024)"},"b14600f0acaa":{"links":[],"unverified_note":"City of Abilene and Taylor County tax abatement agreement for 85% over 10 years; $3.4B in financing from Blue Owl Capital; multi-billion dollar deal between Lancium and Crusoe Energy; OpenAI and Oracle agreement to develop up to 4.5 gigawatts of additional Stargate capacity."},"b15ff15de95c":{"links":[],"unverified_note":"Acquisition of DC-6 from Corporate Office Properties Trust by CloudCapital (an affiliate of CloudHQ) for $222.5 million on January 26, 2022."},"b182ef9088ee":{"links":[],"unverified_note":"CyrusOne secured approximately $9.7 billion in new debt capital (Warehouse Credit Facility and Revolving Credit Facility) in January 2025.","note_status":"NO_PRIMARY"},"b1c82741c27e":{"links":[],"unverified_note":"Server Farm Realty leased its Moses Lake facility to Century Link, Inc. in May 2015. Manulife Investment Management acquired a majority stake in Serverfarm."},"b1ce79c51d1d":{"links":[],"unverified_note":"$3 billion green loan for North American expansion","note_status":"NEW_SOURCED"},"b1d4fb49795d":{"links":[],"unverified_note":"Amazon announced plans to invest $11 billion in two data center campuses in Louisa County, Virginia, as part of a larger $35 billion investment in Virginia by 2040.","note_status":"NO_PRIMARY"},"b20a48b90b45":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"b212af564591":{"links":[],"unverified_note":"Griffin Capital acquired a Phoenix data center and office building for $91.5 million in June 2015."},"b21a29998410":{"links":[],"unverified_note":"NTT Global Data Centers acquired two office buildings for $27.5 million in November 2023 for future data center expansion (CH4).","note_status":"NO_PRIMARY"},"b224b68f9faf":{"links":[],"unverified_note":"Land acquisition by Amazon subsidiary for $73 million in early 2020."},"b2278782e3fb":{"links":[],"unverified_note":"Refinancing of $700 million in November 2023, with Toronto Dominion Bank issuing a $402 million loan and Wilmington Trust issuing a $300 million loan.","note_status":"NO_PRIMARY"},"b237bc3ba786":{"links":[],"unverified_note":"CyrusOne offers $575 million in ABS, on Virginia and Texas data centers (February 2025)"},"b26f1d421385":{"links":[],"unverified_note":"$133.9 million investment in Stafford County (announced June 26, 2024)","note_status":"NOT_MATERIAL"},"b298d1aeb614":{"links":[],"unverified_note":"Project Alluvion, a four-phase regional data center, costing a total of $1,126,218,400, with $20,256,000 in sales tax rebates approved by the Iowa Economic Development Authority."},"b2b794d5cb65":{"links":[],"unverified_note":"Acquisition of Secured Network Services by Thrive on February 13, 2025 (terms undisclosed)"},"b2c2e08fa77d":{"links":[],"unverified_note":"Construction of COL3, a $130M+ facility, announced in September 2016."},"b2c5732de154":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for approximately $10 billion, announced June 7, 2021, and completed June 21, 2024."},"b2ce2aa5f9bb":{"links":[],"unverified_note":"CyrusOne announced on April 2, 2015 the purchase of a ~175,000 sq ft powered shell at Austin's Met Center (7100 Metropolis Drive) to establish AUS3."},"b2e9ac083631":{"links":[],"unverified_note":"Equinix acquired the Ashburn, Virginia technology campus housing its primary DC-area data center for $53.0 million in October 2005. In March 2017, Equinix purchased four parcels of land spanning 34.5 acres in Loudon County, Virginia, proximate to its current Ashburn data center campus, for $34.5 million, to build multiple new International Business Exchange™ (IBX®) data centers.","note_status":"NO_PRIMARY"},"b2f6c2657576":{"links":[],"unverified_note":"Sale of four Houston data centers (including Houston West I, II, and III) from CyrusOne to DataBank for approximately $670 million, announced January 19, 2022, and closed by March 2022.","note_status":"NEW_SOURCED"},"b310daa3754b":{"links":[],"unverified_note":"$4 billion green financing secured in March 2025 for Portland, Stafford (VA), and Toronto campuses."},"b3ac6c4490c7":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital (January 2025)"},"b3bdb85d0251":{"links":[],"unverified_note":"$113 million debt financing for expansion in May 2013","note_status":"NO_PRIMARY"},"b3d3e69ba573":{"links":[],"unverified_note":"Estimated Construction Cost: $89,516,135.00"},"b41373ff3366":{"links":[],"unverified_note":"Los Lunas approved up to $40 billion in industrial revenue bonds for Facebook subsidiary Greater Kudu, LLC (March 2021) and a $45 million deal with PNM for solar plants (2017)."},"b464094a14de":{"links":[],"unverified_note":"$500,000 renovation project in 2023"},"b47f9b204d27":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital for the Stargate campus; Oracle 15-year tenancy, Microsoft 20-year tenancy."},"b4882a5d0ac8":{"links":[],"unverified_note":"Part of CyrusOne's asset-backed securities (ABS) program, which includes San Antonio assets and raised $2.6 billion by May 2024, and also included in Series 2024-1 and 2025-1 securitization deals."},"b48ccfab8905":{"links":[],"unverified_note":"$157,000,000 project investment"},"b4999d68bee8":{"links":[],"unverified_note":"Construction contract for $34 Million"},"b4e196fc597c":{"links":[],"unverified_note":"$1 billion project announced July 2015, with up to $147 million in incentives","note_status":"NOT_MATERIAL"},"b4e514481239":{"links":[],"unverified_note":"Acquisition of US data centers from Zayo in 2020."},"b4f9c4c9fc71":{"links":[],"unverified_note":"$3 billion project with a 30-year, 100% real-property tax abatement and a $50 million PILOT payment over 15 years, approved October 2025. Up to $8.0 million private contribution for road reconstruction.","note_status":"NOT_MATERIAL"},"b554ffb44744":{"links":[],"unverified_note":"Sale of 38-acre campus leased to CVS Caremark for $71.5 million to Robert C. Samuel Revocable Trust in August 2024.","note_status":"NO_PRIMARY"},"b559bc79e933":{"links":[],"unverified_note":"$465 million investment with tax abatements from Liberty Township (72% on real property for 15 years, 60% on equipment for 2 years), approved April 2006.","note_status":"NOT_MATERIAL"},"b590837bc6e5":{"links":[],"unverified_note":"DataBank acquired all data center assets from Zayo Group in 2020."},"b5fe57ea09ad":{"links":[],"unverified_note":"Acquisition of wholesale data center at 21800 Beaumeade Drive in Ashburn, Virginia by H5 Data Centers"},"b64560b0b5d7":{"links":[],"unverified_note":"Chapter 312 incentives agreement with Hutto City Council for at least $10 billion capital investment (July 2023)."},"b66deac918be":{"links":[],"unverified_note":"Joint venture with Alinda Capital Partners for Manassas data center development, with Alinda committing up to $500 million over five years."},"b68269404507":{"links":[],"unverified_note":"$600 million debt financing package (October 16, 2025); $3.4 billion joint-venture (October 15, 2024)"},"b6df8fa45f2c":{"links":[],"unverified_note":"Acquisition of CyrusOne by funds managed by KKR and Global Infrastructure Partners for approximately $15 billion in March 2022."},"b6e298ab0085":{"links":[],"unverified_note":"DataBank acquired four CyrusOne data centers in Houston for $670 million in March 2022.","note_status":"NO_PRIMARY"},"b6e69b2c5321":{"links":[],"unverified_note":"Land acquisition in September 2023"},"b6ffc37b085b":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reported May 4, 2026."},"b728ae8801d0":{"links":[],"unverified_note":"Renewable energy purchase of 67 MW from Enel Green Power's Azure Sky solar + storage project (January 26, 2021)"},"b73b9ed542a9":{"links":[],"unverified_note":"$1 billion investment; PPA with Ørsted for 300MW solar farm and 300MW battery storage."},"b765db284776":{"links":[],"unverified_note":"Land acquisition of approximately 3,200 acres (later 3,620 acres) for data center development."},"b78875b3da2a":{"links":[],"unverified_note":"Equinix sold the facility formerly known as Equinix NY12 to Chirisa Investments in August 2019."},"b7ba26a8172c":{"links":[],"unverified_note":"Amazon Data Services, Inc. purchased 589.843 acres for over $102 million (effective Dec. 30, 2024). AWS plans to invest $5 billion into Fayette County by 2030. Fayette County Commissioners approved a 30-year, 100 percent tax exemption via a Community Reinvestment Area (CRA) Agreement."},"b7d9250c5f31":{"links":[],"unverified_note":"Flexential raised approximately $1 billion in primary equity from GI Partners, Morgan Stanley Infrastructure Partners, and Hamilton Lane to fund development (August 2025)"},"b7d96cd5b907":{"links":[],"unverified_note":"AOL sold its 230,000-square-foot building to Porpoise Ventures LLC for $58.5 million on June 28, 2005. Digital Realty merged with DuPont Fabros in August 2017."},"b7e40872fa1c":{"links":[{"record_id":"research:newsroom:aligneddc:20200915:1","name":"Aligned Closes $1 Billion Credit Facility and First-Ever U.S. Data Center Sustainability-Linked Financing","date":"2020-09-16","type":"Debt financing","value_label":"$1B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:aligneddc:20200915:1","scope":"portfolio"}]},"b822c9e01718":{"links":[],"unverified_note":"Vantage Data Centers received more than $8 billion in equity investment since September (prior to Jan 2024).","note_status":"NO_PRIMARY"},"b8379f58e165":{"links":[],"unverified_note":"Freddie Mac Buys 110,000-SF Data Center for $19.5M","note_status":"NOT_MATERIAL"},"b84248351d80":{"links":[],"unverified_note":"CyrusOne offered $575 million in ABS notes in February 2025, collateralized by real property interests in 13 data centers, including those in San Antonio."},"b8432a36f2c3":{"links":[],"unverified_note":"NTT DATA secured nearly 115 MW of new data center capacity commitments across three US campuses, including Sacramento, in March 2026."},"b84b8be6eadd":{"links":[],"unverified_note":"Amazon started working with Umatilla Electric Cooperative to choose electricity supply for its data center operations near Boardman and Hermiston (announced April 2023)."},"b8511fc29eff":{"links":[],"unverified_note":"Apple invested $2 billion over 10 years to open the data center, announced in February 2015. Apple also made an agreement with Salt River Project to sell the utility 50 megawatts of energy produced at the Bonnybrooke solar farm, retaining environmental credits.","note_status":"NOT_MATERIAL"},"b85591959a32":{"links":[],"unverified_note":"Intelishift acquired Data Canopy, which had acquired Ntirety's colocation business, with a $50 million growth capital investment from Metropolitan Partners Group in June 2023.","note_status":"NO_PRIMARY"},"b8a5227b844b":{"links":[],"unverified_note":"Permit for $1,100,000 on 2018-03-06"},"b8c9e2e3926b":{"links":[],"unverified_note":"GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.","note_status":"NO_PRIMARY"},"b928bd45e695":{"links":[],"unverified_note":"Investment of nearly $2.5 billion+"},"b9959afbe504":{"links":[],"unverified_note":"CoreSite acquired the 22-acre Sunrise Technology Park from Brookfield Office Properties for $60 million in 2016.","note_status":"NO_PRIMARY"},"b9c5d66c9d1d":{"links":[],"unverified_note":"Strategic equity investment from Transition Equity Partners, LLC (TEP) in December 2025; Google backing Anthropic's multi-billion dollar project."},"b9cd1c7248b1":{"links":[],"unverified_note":"Acquisition of Infomart building by Equinix Inc for $800 million in April 2018."},"ba1286ec2ade":{"links":[],"unverified_note":"Rezoning/Proffer Amendment #REZ2019-00025 (amending REZ# 98-0019) Westview 66"},"ba70ce02d7e6":{"links":[],"unverified_note":"Debt financing from JPMorgan Chase for construction costs (amount not specified, but facility investment was ~$150 million).","note_status":"NOT_MATERIAL"},"ba96f945402a":{"links":[],"unverified_note":"$300 million investment, filed plans September 2025","note_status":"NOT_MATERIAL"},"bacbdc1dc402":{"links":[],"unverified_note":"$326 million refinancing agreement secured in October 2025, backed by five hyperscale data centers."},"baddb52aebae":{"links":[],"unverified_note":"Amazon Data Services Inc. paid $54 million for the 2.4 million-square-foot site at 13600 EDS Drive in a deal that closed Oct 2020."},"bae4dbc117c8":{"links":[],"unverified_note":"$687.1 million commercial mortgage-backed security issuance (between July 2024 and July 2025)","note_status":"NO_PRIMARY"},"bb1cd7c53056":{"links":[],"unverified_note":"Equinix acquired DC13 in Ashburn as well as 28 other datacenters from Verizon in May 2017. It was formerly named \"Verizon Washington Ashburn.\""},"bb3c93d4ae07":{"links":[],"unverified_note":"Amazon.com recently paid $65 million to purchase a 7.66-acre data center campus in Manassas, according to Prince William County property records. Manassas Technology Partners, an affiliate of California-based Menlo Equities, sold the property at 7505 Mason King Court to Amazon Data Services on March 26.","note_status":"NO_PRIMARY"},"bb4bb5052263":{"links":[],"unverified_note":"Tallvine Partners acquired TRG Datacenters in 2025."},"bb4d2a0c6d72":{"links":[],"unverified_note":"Initial investment of $210 million (January 30, 2012); 100 MW solar PPA with Invenergy and Pacific Power (July 19, 2018); total campus investment of over $2 billion (March 18, 2021)."},"bb99cf34bb4c":{"links":[],"unverified_note":"Tax Abatement Agreement with Armstrong County, Texas, for an initial capital investment of approximately $14,600,000,000.00 for Phase 1, dated November 12, 2024."},"bbb181542515":{"links":[],"unverified_note":"$1.9 billion senior secured credit facility for MECP1 Mesa 1, LLC on January 4, 2024","note_status":"NEW_SOURCED"},"bbcab181ae3a":{"links":[],"unverified_note":"Equinix received a $1 million rebate from Southern California Edison (SCE) for upgrades to the LA3 facility that boosted energy efficiency."},"bbe70800f96b":{"links":[],"unverified_note":"$250 million capital investment for data center expansion, proposed in 2014."},"bc0e0efc67c1":{"links":[],"unverified_note":"$1.4 billion project financing facility closed on August 15, 2025."},"bc1a190108be":{"links":[],"unverified_note":"NTT Global Data Centers recently signed agreements with the city of Hillsboro that could see exemptions extend through 2051, related to enterprise zone tax abatements."},"bc5b83381ba7":{"links":[],"unverified_note":"CyrusOne acquired by Kohlberg Kravis Roberts (KKR) and Global Infrastructure Partners (GIP) for approximately $15 billion.","note_status":"NO_PRIMARY"},"bc662e9cc6d5":{"links":[],"unverified_note":"Stonepeak Infrastructure Partners acquired a majority interest in Cologix (February 2, 2017)"},"bc68a5516c73":{"links":[],"unverified_note":"Settlement of $20.5 million by Amazon Data Services for nitrate pollution claims."},"bcb25a7e37b1":{"links":[],"unverified_note":"JLL Brokers $33.2M Sale of Data Center in Marlborough, Massachusetts on July 25, 2019","note_status":"NO_PRIMARY"},"bcbfcc197f1e":{"links":[],"unverified_note":"Purchase of the 2,057-acre Upper Magnolia Green property by the Chesterfield Economic Development Authority for $13 million.","note_status":"NOT_MATERIAL"},"bcf033f9f01a":{"links":[],"unverified_note":"EQT signed a letter of intent to supply gas to the planned Pittsylvania facility on July 8, 2025."},"bcf452b9c0bc":{"links":[],"unverified_note":"Equinix acquired the Infomart Dallas building from ASB Real Estate Investments for $800 million, completed April 2, 2018."},"bcf7bb44547d":{"links":[],"unverified_note":"Corscale Data Centers, a subsidiary of the Class A building developer Patrinely, made a strong entrance into the data center market with a large campus... Vertically integrated with our affiliate and investment partner, Affinius Capital, Corscale Data Centers brings together investment capital, large-scale project experience, and an exceptional team of data center professionals to deliver energy-efficient, sustainable data centers that enable our hyperscale customers to reliably innovate the digital world."},"bd159a7ac993":{"links":[],"unverified_note":"Stream Data Centers LP secured over $600 million in debt capital financing for hyperscale data center builds in Phoenix and Chicago, announced April 2, 2024, and closed April 24, 2024."},"bd1710b7761d":{"links":[],"unverified_note":"Land acquisition of 31 acres in August 2023."},"bd2a15cb291d":{"links":[],"unverified_note":"Proffer Amendment and Rezoning #REZ2019-00028, Avanti at Innovation, approved by the Prince William Board of County Supervisors on July 16, 2019."},"bd2f41997507":{"links":[],"unverified_note":"Land acquisition for $12 million in 2022.","note_status":"NOT_MATERIAL"},"bd365c15c2db":{"links":[],"unverified_note":"$9 billion investment in South Carolina from 2026 to 2027 to expand cloud and AI infrastructure, including the Berkeley County campus, announced October 13, 2025.","note_status":"NO_PRIMARY"},"bd3921906fd8":{"links":[],"unverified_note":"CyrusOne offers $575 million in ABS, on Virginia and Texas data centers, dated February 10, 2025.","note_status":"NO_PRIMARY"},"bd3bbb60d1a7":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025","note_status":"NEW_SOURCED"},"bd4bf65564fa":{"links":[],"unverified_note":"Land purchase in January 2023"},"bd6f5fa5a451":{"links":[{"record_id":"research:discovery:20261022:2025-08-15:galaxy-closes-1-4-billion-project-financing-f:bb2d2266ff01fe21","name":"Galaxy Closes $1.4 Billion Project Financing Facility to Accelerate Helios AI Datacenter Development","date":"2025-08-15","type":"Project financing","value_label":"$1.4B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2025-08-15:galaxy-closes-1-4-billion-project-financing-f:bb2d2266ff01fe21"}]},"bd73dc8e2554":{"links":[],"unverified_note":"Starwood Capital Group acquired the original 60-acre property in 2019 for $134.1 million. An adjacent 8-acre parcel was purchased from Word of Grace Christian Church for $25 million in 2023."},"bd7b3e0b1500":{"links":[],"unverified_note":"Hermiston City Council approved a 25-year water service agreement with Amazon Data Services (Feb 2025); Amazon acquired the Sunstone solar power project for $83 million (Jan 2026); Amazon signed a Power Purchase Agreement (PPA) with Avangrid for the Oregon Trail Solar facility (Oct 2025)."},"bd7e9511e528":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments, included two new data centers in San Antonio added to the master trust at closing (March 05, 2024)."},"be5532cf0ef7":{"links":[],"unverified_note":"CyrusOne offered $575 million in asset-backed securities (ABS) on February 10, 2025, collateralized by real property interests in 13 data centers, including those in San Antonio.","note_status":"NO_PRIMARY"},"be611cfc67e3":{"links":[],"unverified_note":"Land acquisition of 37.6 acres for $64 million on November 19, 2021.","note_status":"NO_PRIMARY"},"bea13d45de81":{"links":[],"unverified_note":"Acquisition of 34-acre, 202,000 sq ft center from Chevron for $80 million in 2017.","note_status":"NO_PRIMARY"},"bedb81c33253":{"links":[],"unverified_note":"Minnieville Capital Acquisitions LLC purchased approximately 39 acres for $56.6 million."},"bf4b1f4b2776":{"links":[],"unverified_note":"Economic development agreement with Pecos County, effective 11/22/2021, expiring 12/31/2042."},"bf502a6a90aa":{"links":[],"unverified_note":"Amazon's $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, approved in January 2026."},"bf54216e8454":{"links":[],"unverified_note":"$13 million expansion completed January 9, 2018; TierPoint acquired Xand in 2014.","note_status":"NOT_MATERIAL"},"bf54240fa189":{"links":[],"unverified_note":"US$2.4 billion private capital investment over 20 years for the Clean Compute Campus"},"bfca4cd19d5c":{"links":[],"unverified_note":"Digital Realty acquired the facility in 2004"},"bfeeadc80b5d":{"links":[],"unverified_note":"Pre-leasing of the entire 120 MW ASH1 data center in 2023"},"bff6b381fdd6":{"links":[],"unverified_note":"GSA Lease Prospectus for DHS CBP Office of Information Technology"},"c004d96e2049":{"links":[],"unverified_note":"Meta increased its investment to more than $10 billion (March 2026). The City of El Paso approved an incentive package and land sale agreement for $8.5 million in December 2023, including tax abatements for an initial $800 million investment."},"c045bfbbbf60":{"links":[],"unverified_note":"Joint venture with TPG Real Estate where TPG acquired an 80% stake in three hyperscale data centers in Northern Virginia for $1.5 billion, announced July 27, 2023."},"c04b491ab9dd":{"links":[],"unverified_note":"Morrow County approved a deal worth about $1 billion in tax breaks for Amazon's data centers in May 2023."},"c07f3b9cc531":{"links":[],"unverified_note":"Joint venture with PGIM Real Estate; Implementation Agreement with City of San Jose and PG&E (Jan 2026)"},"c099d5644834":{"links":[],"unverified_note":"Sale-leaseback transaction with Legacy Investing and Invesco Real Estate for its 18 MW data center in Plano, Texas (August 2021)"},"c0a2fbca42ac":{"links":[],"unverified_note":"Acquisition of Whinstone US Inc. by Riot Blockchain, Inc. for approximately $651 million in April/May 2021","note_status":"NEW_SOURCED"},"c0a92f5c5bdf":{"links":[],"unverified_note":"Digital Realty acquired DuPont Fabros, including ACC5 and ACC6, in August/September 2017."},"c11378cc0ded":{"links":[],"unverified_note":"Acquisition of Stream Data Centers' development in Legacy Business Park, announced June 13, 2017."},"c1524ff12387":{"links":[],"unverified_note":"Strategic Partnership with e2Companies for on-site power generation, energy storage, and distribution, announced April 22, 2025."},"c1a82292b198":{"links":[],"unverified_note":"DBT-Data acquired the Cyber Integration Center in Harrisonburg in October 2013 for $35M.","note_status":"NO_PRIMARY"},"c1f0a3bbd2b1":{"links":[],"unverified_note":"T5 Data Centers completed a $113 million loan to expand its T5@Dallas Data Center in Plano, Texas, which will ultimately deliver 22.5 megawatts of critical IT load power and house 247,000 square feet of space (reported in 2014).","note_status":"NO_PRIMARY"},"c1f1c3f05b44":{"links":[],"unverified_note":"In December 2013, the Port of Quincy announced its intent to sell 200 acres of industrial property to Microsoft for $11 million for a new data center, which would be Microsoft's second major facility in Quincy."},"c20417eaf39b":{"links":[],"unverified_note":"2024 Bond Package of $588.5 million approved May 4, 2024, including funds for Data Center Equipment and Technology Infrastructure."},"c20d136a888b":{"links":[],"unverified_note":"Amazon received court approval to acquire the Sunstone solar power project near Pendleton, Oregon, for an $83 million all-cash bid in January 2026."},"c2426de5c424":{"links":[],"unverified_note":"$50 million estimated cost for TDLR permit TABS2021014441 filed April 29, 2021.","note_status":"NOT_MATERIAL"},"c272c7c1c9a2":{"links":[],"unverified_note":"Digital Realty Trust announced a $188 million joint venture with Griffin Capital Essential Asset REIT. Digital Realty is contributing a 130,000-square-foot turn-key data center in Ashburn, Virginia, valued at about $185.5 million"},"c2778569cc80":{"links":[],"unverified_note":"TCA approved a 2.389%, 15-year Job Creation Tax Credit and a 75%, 10-year Data Center Tax Exemption for this project (December 11, 2023). The expansion is a roughly $90,000,000 investment."},"c2944e4214ab":{"links":[],"unverified_note":"$220 million expansion project with anticipated delivery date of April 1, 2026. Purchases renewable energy from a provider in Texas equal to 100% of the projected power consumption of the data center (April 22, 2021)."},"c2ac7fda755f":{"links":[],"unverified_note":"Meta is paying for a second injection well for the city's water storage recovery system, with projected costs between $1 million and $3.2 million (2024)."},"c2bd17e6ebaf":{"links":[],"unverified_note":"Acquisition of OVHcloud (Data Center Facility in Oregon, United States) by OVH Groupe on 23-Feb-2017."},"c2c62bf0caaa":{"links":[{"record_id":"research:newsroom:generate-capital:20250917:3","name":"Soluna Secures $100M Facility from Generate Capital to Expand Green Data Centers","date":"2025-09-16","type":"Debt financing","value_label":"up to $100M financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:generate-capital:20250917:3"}]},"c2cdfcf1ae53":{"links":[],"unverified_note":"$1.4 billion project financing facility closed on August 15, 2025"},"c31713c3d95b":{"links":[],"unverified_note":"Microsoft acquired a 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million."},"c335562daa14":{"links":[],"unverified_note":"Acquisition of 50 percent interest in 1201 Comstock Street by Digital Realty on June 30, 2008."},"c35b18abc8de":{"links":[],"unverified_note":"CyrusOne acquired a powered shell for Austin III in Austin's Met Center on April 2, 2015."},"c36389c6c066":{"links":[],"unverified_note":"Strategic hosting arrangement with Genesis Digital Assets Limited (GDA) for 36 MW of power capacity, announced April 3, 2024."},"c373fa9114c2":{"links":[],"unverified_note":"Backed by an investment of over $1 billion—with more than $1.7 billion in cumulative construction costs—the site supports a peak workforce of around 1,500 skilled trade workers and sustains over 200 permanent jobs in the region. Meta purchased the 475-acre property from Henrico County's development authority for $35.3M in October, according to Richmond BizSense. Dominion Energy and Meta worked together to create a renewable energy tariff called Schedule RF. The tariff allows Meta and other large energy users to meet their needs through the addition of renewable energy sources.","note_status":"NOT_MATERIAL"},"c3a18cbe0f16":{"links":[],"unverified_note":"Crusoe's Digital Flare Mitigation business, including its bitcoin mining operations, was acquired by NYDIG in March 2025."},"c3d11cc35809":{"links":[],"unverified_note":"Development Agreement with City of Hutto (May 4, 2023) and Chapter 312 incentives agreement for at least $10 billion capital investment."},"c3d9f302fdca":{"links":[],"unverified_note":"Acquisition of the site by DataBank from Zayo in December 2020."},"c3e30d9c6a4c":{"links":[],"unverified_note":"Settlement of $20.5 million for nitrate pollution (April 14, 2026); acquisition of Sunstone solar project for $83 million (January 2026); tax breaks worth over $1 billion cumulatively.","note_status":"NO_PRIMARY"},"c4284fa52a0f":{"links":[],"unverified_note":"Initial investment of $210 million for the first phase (2012); $200 million for a third data center (2015); acquisition of 240 acres for $5.4 million (2017)."},"c42a6a479f4a":{"links":[],"unverified_note":"Acquired facility in 2006 by Digital Realty. Digital Realty acquired Telx in 2015, which formerly operated the building."},"c42a7e5faeb1":{"links":[],"unverified_note":"AWS purchased TransDulles Centre 2 complex for $135.8 million on July 23, 2024."},"c43d8f0e0b2f":{"links":[],"unverified_note":"Strategic partnership and equity investment with Macquarie Capital, targeting capital investments in excess of $5 billion over 10 years (June 24, 2021)."},"c4b8d7be6108":{"links":[],"unverified_note":"$735M loan to refinance a trio of adjoining data centers, June 2025"},"c4dc2e076b8b":{"links":[],"unverified_note":"Agreement with AES for new clean power development (date not specified)"},"c4ff26a7969e":{"links":[],"unverified_note":"Land acquisition by Amazon Data Services from Stanley Martin Homes for $700 million in late 2025.","note_status":"NO_PRIMARY"},"c5013005cfc1":{"links":[],"unverified_note":"$850,000 renovation/alteration project, started August 2019, completed March 2020"},"c5058942e706":{"links":[],"unverified_note":"$2 billion construction loan closed on April 21, 2026"},"c528f1f49a3f":{"links":[],"unverified_note":"$600 million debt financing package, October 16, 2025"},"c52da675ebb0":{"links":[],"unverified_note":"Construction cost of $167,294,155 (estimated) for 'Project Fir' owned by SDC DFW VIII, L.P., with a start date of 11/4/2025 and completion date of 12/1/2027."},"c5315751aafc":{"links":[],"unverified_note":"Agreement with Constellation for nuclear power and carbon-free energy matching; long-term agreement to purchase RECs from a solar project with Dominion Energy."},"c55944c0747b":{"links":[],"unverified_note":"$41.5 million settlement in a class-action lawsuit with stockholders (Uniformed Sanitationmen's Association Compensation Accrual Fund v. Equinix Inc. et al.) in July 2025."},"c55f1cfaef44":{"links":[],"unverified_note":"JP Morgan's $300 million Delaware Technology Center (DTC) project in Wilmington, Delaware, a renovated space designed to house an additional 1,800 jobs.","note_status":"NOT_MATERIAL"},"c572e6873610":{"links":[],"unverified_note":"QTS Realty Trust acquired a Dallas data center campus from Health Care Services Corp. for about $50 million (January 30, 2017). QTS also plans to expand its existing data center campus at 14100 Park Vista Blvd. in Fort Worth, Texas, with an investment of $130 million (April 22, 2025)."},"c5b65177588a":{"links":[],"unverified_note":"Foundational partnership with Vívaro Telecom announced January 17, 2023. Uniti Wholesale expanded its presence with a new data center presence announced October 20, 2025."},"c5c45121ad44":{"links":[],"unverified_note":"Acquisition of Reveille data center site in Cotulla, Texas, for $2.5 million in 2024.","note_status":"NOT_MATERIAL"},"c5d48d883632":{"links":[],"unverified_note":"407 MW wind energy supply deal with MidAmerican Energy (April 2014)"},"c5d77414608d":{"links":[],"unverified_note":"Centersquare (Brookfield Infrastructure) acquired Evoque Data Center Solutions (which included the Lisle facility) and Cyxtera Technologies in early 2024."},"c5e203dee952":{"links":[],"unverified_note":"Long-term hyperscale lease executed (Jan 15, 2026); $1 billion joint venture commitment with AREP and Harrison Street (announced Sep 13, 2022).","note_status":"NO_PRIMARY"},"c5f51784c98d":{"links":[],"unverified_note":"Alpheus acquired StratITsphere's retail colocation business in August 2014."},"c60ca5400b28":{"links":[],"unverified_note":"Securitization of real estate and tenant lease payments for space and electrical capacity in seven operating wholesale turnkey data centers located in Plano, Texas (Series 2023-2 class A-2 note issuance)."},"c61808638b8e":{"links":[],"unverified_note":"Project investment of approximately $272 million","note_status":"NOT_MATERIAL"},"c65b38e742f5":{"links":[],"unverified_note":"Acquisition of CyrusOne by KKR and Global Infrastructure Partners for approximately $15 billion on March 25, 2022","note_status":"NEW_SOURCED"},"c66bc789bd0e":{"links":[],"unverified_note":"Cisco Systems plans to invest at least $184 million in the data center, with the city providing property tax abatements and road improvements (announced June 2009).","note_status":"NOT_MATERIAL"},"c670c0739492":{"links":[],"unverified_note":"Amazon won an additional set of tax breaks, valued at $1 billion over 15 years, from Morrow County, the port and city of Boardman in May."},"c6b37ade8afb":{"links":[],"unverified_note":"Hilliard offered Amazon a 15-year, 100% property tax abatement in 2019. The first phase of a data center campus in Hilliard involves a $300 million investment."},"c6d679587979":{"links":[],"unverified_note":"$100 billion investment","note_status":"NOT_MATERIAL"},"c6d84fec5ec5":{"links":[],"unverified_note":"Acquisition of former Navisite data center by NYI, September 12, 2019."},"c719296f2be2":{"links":[],"unverified_note":"Acquisition of Windstream's data center assets by TierPoint in October 2015 for $575 million."},"c74b014ed271":{"links":[],"unverified_note":"$2 billion investment announced April 2024; 10-year, 50% tax abatement from Fort Wayne (waiving over $55 million in property taxes, with a supplemental payment of at least $1 million/year); Demand Response structure agreement filed with Indiana Michigan Power in July 2025.","note_status":"NOT_MATERIAL"},"c79100e6bbc9":{"links":[],"unverified_note":"Joint Application for Net Metering Approval by West Texas Solar Project II LLC and Silver Basin Digital Infrastructure LLC, Docket No. 59115 (Dec. 12, 2025)"},"c797d7cacf08":{"links":[],"unverified_note":"Tax abatement of $2.82 million over the next decade approved by Red Oak City Council on May 12, 2026.","note_status":"NOT_MATERIAL"},"c7a2214045e0":{"links":[],"unverified_note":"$400M investment","note_status":"NOT_MATERIAL"},"c7c056f29644":{"links":[],"unverified_note":"$65 million investment announced October 27, 2015; $500,000 federal grant for solar farm"},"c7df651c126c":{"links":[],"unverified_note":"Ohio offered a 15-year, 100% property tax abatement in 2019. $300 million investment for the first phase of a data center campus in Hilliard.","note_status":"NOT_MATERIAL"},"c81798fee098":{"links":[],"unverified_note":"Site acquisition in 2018 for $236.5 million; joint venture with Blackstone for development."},"c82a6b85d52d":{"links":[],"unverified_note":"Amazon leased a data center from Hines and MetLife Investment Management, reported March 2022."},"c83e6cf416d3":{"links":[],"unverified_note":"Lease assignment and assumption on January 1, 2006; $31 million expansion/upgrade project (date not specified)","note_status":"NOT_MATERIAL"},"c89dcc9e78ae":{"links":[],"unverified_note":"Acquisition of Glen-Gery Brickyard site by Digital Realty Trust"},"c8b1db12ea64":{"links":[],"unverified_note":"When Cequel acquired TierPoint's Spokane, Washington, facilities in 2012, it chose to rebrand its data center products and services as TierPoint."},"c8b79a6a33e4":{"links":[],"unverified_note":"QTS acquired by Blackstone funds for approximately $10 billion in August 2021."},"c8da8ff8347d":{"links":[],"unverified_note":"SMU sold the Plano campus in 2018."},"c940b82f77bd":{"links":[],"unverified_note":"Village of Los Lunas approved up to $30 billion in industrial revenue bonds (IRBs) in 2016, and over $40 billion in IRBs in 2021 for expansions. The New Mexico Economic Development Department contributed a $10 million Local Economic Development Act (LEDA) grant. Meta also announced 150-megawatt geothermal power purchase agreements in June 2025."},"c95afe8da276":{"links":[],"unverified_note":"Fayette County Development Authority acquired an 85-acre parcel for $21.4 million for Microsoft data center development (March 2025).","note_status":"NOT_MATERIAL"},"c96be697a7c9":{"links":[],"unverified_note":"10-year, 50 percent City of Richardson business personal property tax abatement (announced November 2018)"},"c9987733e2c5":{"links":[],"unverified_note":"Sale of four Houston data centers by CyrusOne to DataBank for approximately $670 million, closed March 3, 2022.","note_status":"NO_PRIMARY"},"c9cdfb53a5d3":{"links":[],"unverified_note":"Project estimated cost of $3,000,000"},"c9dfda8c3859":{"links":[],"unverified_note":"Acquisition of NYI-NJ by 365 Data Centers in September 2019; Acquisition of 365 Data Centers by Stonecourt Capital in October 2020"},"c9f1576895df":{"links":[],"unverified_note":"Amazon partnered with Umatilla Electric Cooperative (UEC) for an energy supply agreement (April 4, 2023). The Hermiston City Council approved a 25-year water service agreement with Amazon Data Services (February 24, 2025)."},"c9f9527bdb9e":{"links":[],"unverified_note":"Amazon made a deal to buy renewable energy from Umatilla Electric Cooperative (April 2023) and an $83 million bid for the Sunstone solar power project (January 2026)."},"c9f966d079e9":{"links":[],"unverified_note":"MAREA cable system (joint project with Microsoft and Facebook); BRUSA cable system (Telxius project); Dunant cable system (Google); Collaboration with Equinix for backhaul; Collaboration with NJFX for diverse subsea connectivity; Collaboration with Arelion for network expansion."},"c9facf293aad":{"links":[],"unverified_note":"CyrusOne was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt."},"c9fe6f1b457f":{"links":[],"unverified_note":"On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million."},"ca06a8855994":{"links":[],"unverified_note":"Acquisition of FirstLight Fiber by Antin Infrastructure Partners, completed July 25, 2018."},"ca08fae394cb":{"links":[],"unverified_note":"Apollo Global Management to acquire a majority interest in Stream Data Centers from Stream Realty Partners (August 2025)"},"ca0b6b96dccf":{"links":[],"unverified_note":"Microsoft plans to invest a minimum of $1 billion in Catawba County over 10 years, with incentive grants approved by local governments.","note_status":"NOT_MATERIAL"},"ca130a0feeaa":{"links":[],"unverified_note":"Argo Infrastructure Partners increased its ownership stake to represent a majority interest in TierPoint, investing ~$700 million since 2020 (July 11, 2024)"},"ca23f83e6fec":{"links":[],"unverified_note":"CyrusOne acquired a powered shell for AUS3 on April 2, 2015."},"ca2f762508c2":{"links":[],"unverified_note":"Meta Platforms is working on a roughly $13 billion financing package for a data center in El Paso, Texas, led by Morgan Stanley and JPMorgan Chase, reported May 5, 2026.","note_status":"NO_PRIMARY"},"ca34987270c6":{"links":[],"unverified_note":"Proposed offering of Secured Data Center Revenue Term Notes, Series 2025-1, by QTS Issuer ABS I, LLC and QTS Co-Issuer ABS I, LLC, related to tenant leases including HIL1 (Hillsboro 1) as of March 31, 2025."},"ca4b3df51a92":{"links":[],"unverified_note":"$1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville (May 2026)"},"ca4d81484a72":{"links":[],"unverified_note":"Amazon Data Services agreed to pay $20.5 million to resolve nitrate pollution claims."},"ca653152baf2":{"links":[],"unverified_note":"$2.1 billion development, economic development agreement approved April 2025","note_status":"NOT_MATERIAL"},"ca6dd5532196":{"links":[],"unverified_note":"$20.256 million sales tax rebate approved by Iowa Economic Development Authority in April 2014."},"ca7d1f50c321":{"links":[],"unverified_note":"DigitalBridge Group, Inc. acquired CA22, a 24MW hyperscale data center in Santa Clara, for $539 million on October 1, 2021."},"cacc8248cb80":{"links":[],"unverified_note":"Land acquisition via state land auction in August 2023 for $62.7 million; $3 billion investment for build-out over next decade.","note_status":"NO_PRIMARY"},"cb178db58c8d":{"links":[],"unverified_note":"$6.3 billion data center approved by GCEDC, seeking $471.6 million in sales and mortgage tax exemptions (March 2025).","note_status":"NOT_MATERIAL"},"cb2839102590":{"links":[],"unverified_note":"Lawsuit regarding nitrate pollution settlement and a lawsuit concerning local officials profiting from a broadband deal related to Amazon's expansion."},"cb47428aeb89":{"links":[],"unverified_note":"Tax Abatement Agreement with CyrusOne, Inc. granting a fifty percent (50%), six (6) year abatement of ad valorem real and personal property taxes within the CyrusOne Reinvestment Zone for an investment of approximately $120 million, approved September 5, 2013."},"cb9c7486d512":{"links":[],"unverified_note":"DBT-DATA purchased 93 acres in the New Albany International Business Park on August 31, 2022, for approximately $21 million.","note_status":"NOT_MATERIAL"},"cb9f88cb3a43":{"links":[],"unverified_note":"The state of Wisconsin agreed to hand over a $4.1 billion subsidy to Foxconn, which will cost Wisconsinites more than a million dollars per job created.... In total, Wisconsin, Racine County and Mount Pleasant gave the company nearly $4.8 billion in tax breaks, incentives and taxpayer dollars for improvements.... Under the new expansion, Foxconn can reportedly earn up to $96 million in EITMZ credits through Dec. 31, 2029.... Then, in the summer of 2023, Microsoft paid Foxconn $50 million and bought a plot of land in Racine County, Wisconsin, to build a more than $1 billion data center...","note_status":"NOT_MATERIAL"},"cbd7e97eec3a":{"links":[],"unverified_note":"Acquisition of three buildings in Freescale Semiconductor campus for $16.3 million in January 2006.","note_status":"NOT_MATERIAL"},"cc0e45115a3f":{"links":[],"unverified_note":"Sale of four Houston data centers, including Houston Galleria, from CyrusOne to DataBank for approximately $670 million, announced January 2022."},"cc1c99fb4797":{"links":[],"unverified_note":"New construction with an estimated cost of $200,000,000"},"cc36a2fb77fc":{"links":[],"unverified_note":"City incentives including a rebate of development fees up to $500,000, a two-year rebate of 40% on business personal property taxes and a four-year rebate of 40% on real estate taxes. Joint venture with Mitsubishi Corp. where Mitsubishi acquired a 65% equity interest."},"cc3a74bb0078":{"links":[],"unverified_note":"$26 million investment, completed June 2023"},"cc64d89529f7":{"links":[],"unverified_note":"Acquisition of CoreSite Realty Corporation by American Tower Corporation for approximately $10.1 billion, completed on December 28, 2021."},"cc7450604dcd":{"links":[],"unverified_note":"$1.05B refinancing for DFW3 and DFW4 data centers, expected to close May 20, 2026"},"cc7905a19c38":{"links":[],"unverified_note":"PRP sold Manassas Point, a 40-acre data center development site, to Iron Mountain Inc. for $113.5 million.","note_status":"NO_PRIMARY"},"cc98dd6e3ac6":{"links":[],"unverified_note":"$150,000,000"},"cc9b308ea55a":{"links":[],"unverified_note":"Phase 3 approved by Village Council in December 2024 through new Industrial Revenue Bonds for two additional buildings with an estimated budget of $800 million."},"ccb133e3b3c8":{"links":[],"unverified_note":"Lightedge acquired OnRamp in July 2018"},"ccb23a85be38":{"links":[],"unverified_note":"Amazon.com recently paid $65 million to purchase a 7.66-acre data center campus in Manassas, May 12, 2026."},"ccbd20288364":{"links":[],"unverified_note":"Land acquisition: $52.4 million in April 2021 for 58.5 acres at 5945 Wellington Road, and $87.8 million in June 2022 for 58.5 acres at 5845 Wellington Road."},"ccce63a29958":{"links":[],"unverified_note":"Aligned Data Centers completed a capital raise of over $5 billion in new primary equity and over $7 billion of new debt commitments on January 15, 2025.","note_status":"NEW_SOURCED"},"cce6654028bd":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025 for expansion; Power Purchase Agreements for 885 MW solar/wind and 100 MW battery storage, and 150 MW geothermal."},"cd2535aed0cb":{"links":[],"unverified_note":"Land purchase of 112 acres for $21.8 million in April 2020."},"cd56069c9957":{"links":[],"unverified_note":"Construction estimated cost of $283,046,463"},"cdac51ecf466":{"links":[],"unverified_note":"Site acquisition by PDCREF 2 Chantilly LLC (an affiliate of Penzance) for $10 million in August 2022.","note_status":"NOT_MATERIAL"},"ce057074c40b":{"links":[],"unverified_note":"Acquisition of seven vXchnge data centers, including Portland, by H5 Data Centers in January 2022. Financial terms not disclosed."},"ce63d102946c":{"links":[],"unverified_note":"Equinix acquires Verizon's portfolio of 29 data centers on April 30, 2017."},"ce6c5d3d776c":{"links":[],"unverified_note":"$20.5 million settlement for nitrate pollution lawsuit (date not specified, but 'recently agreed')","note_status":"NOT_MATERIAL"},"ce79c78a7b04":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"ceb90cf63f71":{"links":[],"unverified_note":"$350 million construction cost, announced April 2025","note_status":"NOT_MATERIAL"},"cec254e44808":{"links":[],"unverified_note":"The IDA has set aside $3 million in funds for land acquisition and received a $500,000 FAST grant for site design and engineering.","note_status":"NOT_MATERIAL"},"ced71b5f8156":{"links":[],"unverified_note":"CyrusOne purchased 67 MW of renewable energy from Enel Green Power's Azure Sky solar + storage project, covering approximately 70% of the Carrollton data center's power requirements (January 26, 2021)."},"ceefa1055a55":{"links":[],"unverified_note":"Microsoft Corporation acquired land from the Chase City EDA as part of a larger acquisition of nearly 900 acres from five local economic development entities in December 2020."},"cef36360c9a6":{"links":[],"unverified_note":"Brookfield acquired Cyxtera (which included this facility) in November 2023."},"ceff7cce45a2":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for $10 billion in August 2021. QTS pre-leased 4.5 MW of the first phase to a global Software-as-a-Service provider in early 2020. A PPA was signed with Avangrid and Portland General Electric for a 120MW solar project with Meta and QTS in December 2024."},"cf03b9c30ec5":{"links":[],"unverified_note":"Initial investment of $800 million announced in 2022. PPA with ENGIE North America for 260 MW solar project in late 2025."},"cf1a782c8190":{"links":[],"unverified_note":"$20.5 million settlement for nitrate pollution (March 31, 2026); $10,400 fine for air and water quality violations (October 03, 2025)."},"cf2a917b0c4b":{"links":[],"unverified_note":"Construction of DFW2-DC3 with an estimated cost of $350 million, announced April 2025."},"cf379625a728":{"links":[],"unverified_note":"A 25-year water service agreement between the City of Hermiston and Amazon Web Services was approved on February 24, 2025, with AWS covering all construction costs."},"cf5153c87d10":{"links":[],"unverified_note":"Water service agreement with the City of Hermiston approved on February 24, 2025, for 25 years, with AWS covering all construction costs for aquifer storage and recovery wells and infrastructure."},"cf830c1ee68e":{"links":[],"unverified_note":"$113 million debt financing for expansion in May 2013","note_status":"NO_PRIMARY"},"cf9207dc962c":{"links":[],"unverified_note":"$130 million investment for expansion, April 2025","note_status":"NOT_MATERIAL"},"cfb657105340":{"links":[],"unverified_note":"Acquisition by Digital Realty from Validus Mission Critical REIT for $315 million in October 2017.","note_status":"NO_PRIMARY"},"cfdde3de4ad2":{"links":[],"unverified_note":"Acquisition from Chevron for $80 million in 2017; seven-year agreement with Chevron for cloud hosting in 2017; $44 million finish-out for COLO 1.","note_status":"NO_PRIMARY"},"d01d7fb2d9d0":{"links":[],"unverified_note":"M&A: DigiCo Infrastructure REIT sold its stake on the facility to an unnamed third-party North American fund manager in April 2026."},"d029038ca635":{"links":[],"unverified_note":"Peak10 acquired ViaWest for $1.67 billion in August 2017, leading to the formation of Flexential."},"d041688d48e5":{"links":[],"unverified_note":"Digital Realty Trust announced a $188 million joint venture with Griffin Capital Essential Asset REIT. Digital Realty is contributing a 130,000-square-foot turn-key data center in Ashburn, Virginia, valued at about $185.5 million, excluding $2.1 million of closing costs, or $20,611 per kW."},"d0a146087fd4":{"links":[],"unverified_note":"Expansion of existing data center campus with an investment of $130 million to expand by nearly 169,000 square feet (April 2025)."},"d1195563f1de":{"links":[],"unverified_note":"plan by developer Keane Enterprises to build a 450K SF data center and 184 units of affordable housing on 165 acres in the town's Oaklawn neighborhood, LoudounNow reported."},"d182614a1549":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital for Stargate Abilene campus."},"d1a8ed4ed621":{"links":[],"unverified_note":"$3.46 billion commercial mortgage-backed securities offering, Fort Worth property value jumped 182% to $481 million (November 14, 2025)"},"d24d88b26c4a":{"links":[],"unverified_note":"$1.6 billion investment by CoreWeave (announced July 2023); 6-year Master Services Agreement with Lincoln Property Company for over $260 million for initial 30 MW installation."},"d25feeeee7e1":{"links":[],"unverified_note":"Joint venture with Mitsubishi Corp. for 65% equity share (initial $200 million) in two data centers, Lewisville being one, announced March 5, 2024.","note_status":"NO_PRIMARY"},"d271bc35f950":{"links":[],"unverified_note":"Amazon and Dominion Energy signed an agreement in October 2024 to explore the development of Small Modular Reactor (SMR) nuclear projects in Virginia, aiming to bring at least 300 megawatts of power to the region."},"d2ff8ed99848":{"links":[],"unverified_note":"Digital Realty acquired the site, formerly known as Western Lands, in 2018 for $236.5 million from the Metropolitan Washington Airports Authority. A joint venture with Blackstone is involved in the development of at least four buildings on the site."},"d3041b054436":{"links":[],"unverified_note":"Joint venture with TPG Real Estate for three hyperscale data centers in Northern Virginia at an aggregate value of $1.5 billion."},"d308506f85e3":{"links":[],"unverified_note":"Refinancing arranged by JLL Capital Markets in May 2022 for a seven-year, fixed-rate, non-recourse loan."},"d32f20c4c212":{"links":[],"unverified_note":"$20.5 million settlement with northeast Oregonians over contaminated groundwater (March 31, 2026)"},"d33fe2a140de":{"links":[],"unverified_note":"Facebook partnered with Pacific Power to support the Prineville Data Center with 437MW of new solar developments, including two projects totaling 100MW in the Prineville area (July 20, 2018)."},"d35804cf23d1":{"links":[],"unverified_note":"CyrusOne acquired by KKR and Global Infrastructure Partners for approximately $15 billion (March 2022)","note_status":"NO_PRIMARY"},"d3660de2861c":{"links":[],"unverified_note":"$2.0 billion senior secured notes offering due 2031, completed February 2026","note_status":"NEW_SOURCED"},"d3a38393c361":{"links":[],"unverified_note":"Sixth Street acquired a minority stake in EdgeConneX from EQT on September 24, 2024."},"d3f83cab512f":{"links":[],"unverified_note":"Acquisition of Nokes buildings from Clark-Hook Corp for $30.8 million in July 2022."},"d407efa8b842":{"links":[],"unverified_note":"In 2021 Microsoft acquired 83 acres off Devlin Road in Bristow, Prince William County, Virginia for $83.84 million, as part of a larger 92.6-acre acquisition for a multi-phase data center campus where MNZ03 is planned.","note_status":"NO_PRIMARY"},"d41fb239be02":{"links":[],"unverified_note":"Austin Energy rebate of $92,853.30 for energy efficient equipment, March 2011"},"d438f3df49b3":{"links":[],"unverified_note":"25-year water service agreement with Hermiston City Council (Feb 2025); Amazon's $83 million acquisition of Sunstone solar power project (Jan 2026)."},"d43f287b30e9":{"links":[],"unverified_note":"Planned acquisition of all equity in Aligned by Artificial Intelligence Infrastructure Partnership for about $40 billion in 2026."},"d44efb0b4fef":{"links":[],"unverified_note":"Option agreement for approximately 180 acres for just over $9 million ($50,000 an acre) with a $50,000 deposit, approved January 9, 2025.","note_status":"NOT_MATERIAL"},"d47da45c4019":{"links":[{"record_id":"research:newsroom:vinson-elkins:20260326:1","name":"Aligned Data Centers Closes on $2.58 Billion Credit Facility to Fuel Continued U.S. Expansion","date":"2026-03-26","type":"Debt financing","value_label":"$2.58B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:vinson-elkins:20260326:1","scope":"portfolio"}]},"d48849502f58":{"links":[],"unverified_note":"Amazon paid a $20.5 million settlement over northeast Oregon nitrate pollution on March 31, 2026."},"d49bfc115ae6":{"links":[],"unverified_note":"CyrusOne sold its four Houston data center assets (including Houston West I, II, and III) to DataBank Holdings Ltd. for approximately $670 million. The agreement was announced on January 19, 2022, and the transaction closed by the end of Q1 2022."},"d49fa3d39f9d":{"links":[],"unverified_note":"Acquisition of Verizon's portfolio of 29 data centers by Equinix on April 30, 2017."},"d4c81b0311e7":{"links":[],"unverified_note":"$800 million investment and a 35-year data center sales tax exemption from the Indiana Economic Development Corporation.","note_status":"NOT_MATERIAL"},"d539faf3cfa0":{"links":[],"unverified_note":"Acquisition of Baltimore Technology Park by Cequel Data Centers in June 2013"},"d56e959ec4bb":{"links":[],"unverified_note":"Acquisition of 29 data centers, including 1400 Cross Beam Drive, Charlotte, from Sila Realty Trust, Inc. for US$1,320 million, agreement dated May 20, 2021.","note_status":"NEW_SOURCED"},"d5777347ae2c":{"links":[],"unverified_note":"$5 billion data center campus; 20-year Power Purchase Agreement; $2.5 million payment to county upon groundbreaking and $300,000 per building annually.","note_status":"NOT_MATERIAL"},"d5787233be31":{"links":[],"unverified_note":"CoreSite acquired by American Tower in November 2021; Stonepeak acquired 10% stake in CoreSite in July 2022."},"d58afc87d808":{"links":[],"unverified_note":"$880 million investment for Sharka Data Center – Building 5 (announced Dec 2025); $350 million estimated cost for Sharka Data Center - Building 4 (registered March 2024); more than $10 million in tax incentives (prior to Oct 2019).","note_status":"NOT_MATERIAL"},"d58b0579cf9d":{"links":[],"unverified_note":"Google provided an incremental backstop of $1.4 billion in support of project-related debt financing, increasing its total backstop to approximately $3.2 billion, announced August 18, 2025.","note_status":"NO_PRIMARY"},"d5c290cb5063":{"links":[],"unverified_note":"The DC11 project represents about $79 million in capital investment."},"d61ae02639fb":{"links":[],"unverified_note":"Acquisition by AIG in 2002; Acquisition by TierPoint in 2023"},"d64fc6dea048":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance is a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas, with two new data centers in San Antonio added to the master trust at closing (March 5, 2024)."},"d655da9739a6":{"links":[],"unverified_note":"Acquisition of HO1 from Verizon in 2017"},"d6574306fbb0":{"links":[],"unverified_note":"Microsoft has a 15-year agreement with AES Corporation to power its Virginia data centers with 24/7 clean energy, sourcing from a portfolio of 576 MW of contracted renewable assets, including wind, solar, and battery energy storage projects in PJM."},"d6616b3ca9ed":{"links":[],"unverified_note":"Amazon announced a deal to buy renewable energy from Umatilla Electric Cooperative for its data center operations near Boardman and Hermiston."},"d66e0c3739bd":{"links":[],"unverified_note":"Facility purchased for $9.5 million in November 2005.","note_status":"NOT_MATERIAL"},"d67cbb159525":{"links":[{"record_id":"research:discovery:20261022:2026-02-10:fermi-america-secures-500m-mufg-equipment-loa:9d2b87dc4c90bfdb","name":"Leading Global Power and Infrastructure Financial Institution MUFG Backs Fermi America™ with $500 Million Equipment Loan to Accelerate 11GW Private Energy Campus","date":"2026-02-10","type":"Debt financing","value_label":"$500M financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2026-02-10:fermi-america-secures-500m-mufg-equipment-loa:9d2b87dc4c90bfdb"}]},"d6ac496be9fd":{"links":[],"unverified_note":"$240 million financing package from a syndicate of lenders led by TD Bank for data center expansion (April 23, 2015)","note_status":"NEW_SOURCED"},"d71642f91ae2":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"d72c4c142cbd":{"links":[],"unverified_note":"Marathon Digital Holdings acquired two operational Bitcoin mining sites, including Granbury, from subsidiaries of Generate Capital for $178.6 million, closing in January 2024.","note_status":"NO_PRIMARY"},"d75173570e14":{"links":[],"unverified_note":"Microsoft acquired a 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million."},"d77258c8310c":{"links":[],"unverified_note":"Tax abatement request for 100% property tax relief for 10 years per phase; estimated USD 1bn capital investment per phase."},"d77ee5017d26":{"links":[],"unverified_note":"The new agreement brings an additional $1.2 billion in contracted revenue across Core Scientific's Denton TX location, solidifying Core Scientific's position as a premier provider of application-specific data centers for HPC workloads. The deal between Core Scientific and the City of Denton includes the lease of 78.85 acres of City-owned land, located near the Denton Energy Center, to Core Scientific for private use, and provisions that Core Scientific is responsible for costs associated with the electrical interconnection infrastructure."},"d7b17ae3d699":{"links":[],"unverified_note":"PNM approved for multiple Power Purchase Agreements (PPAs) for renewable energy, including 266 MW in 2018 and six new agreements filed in 2025."},"d7cb21b5617b":{"links":[],"unverified_note":"$500 million development project","note_status":"NOT_MATERIAL"},"d80ba6674f39":{"links":[],"unverified_note":"Microsoft paid $93.7M for the property in August 2020, acquiring the site from a joint venture involving Baltimore-based St. John Properties and JK Land Holdings.","note_status":"NO_PRIMARY"},"d8adb8f61ec8":{"links":[],"unverified_note":"CyrusOne offers $575 million in ABS, on Virginia and Texas data centers, with collateral underpinning CyrusOne, 2025-1's notes consisting of real property interests in 13 data centers located in Northern Virginia, San Antonio and Houston (February 10, 2025)."},"d8b23ee0d8e0":{"links":[],"unverified_note":"ERCOT interconnection request (queue no. 23INR0239) in April 2021"},"d8cd292084cb":{"links":[],"unverified_note":"New facility construction estimated cost $200,000,000"},"d8da795e5411":{"links":[],"unverified_note":"Allstate spent $50 million on the facility and received $278,000 in tax incentives and job training funds from the Illinois Department of Commerce and Economic Opportunity (announced September 2007).","note_status":"NOT_MATERIAL"},"d8e3ad9e5547":{"links":[],"unverified_note":"Industrial Revenue Bonds (IRBs) of up to $30 billion (2016), $40 billion (2021), and $7.5 billion (Feb 2025). Power Purchase Agreements (PPAs) with NextEra Energy Resources for 190MW solar and 168MW battery storage (2026-2028), and 150MW geothermal PPAs with XGS Energy and Sage Geosystems (June 2025, targeting 2030).","note_status":"NOT_MATERIAL"},"d8fe988d60d4":{"links":[],"unverified_note":"Sabey Data Centers acquired 60 acres of land for $3 million and plans a $950 million development. The company also secured a 15-year property tax break from Umatilla County and City, requiring an investment of at least $200 million and annual fees for community projects, approved on August 15, 2023.","note_status":"NOT_MATERIAL"},"d919b006190b":{"links":[],"unverified_note":"Estimated investment of approximately $1 billion."},"d945a2f4ebdc":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's data center revenue notes series 2024-1"},"d972a9904df3":{"links":[],"unverified_note":"Project estimated cost of $157,000,000 (December 2023)"},"d980768f2147":{"links":[],"unverified_note":"Zayo acquired CoreXchange, a data center and managed services provider in Dallas, Texas, on March 6, 2014. DataBank acquired all data center assets from Zayo Group in 2020."},"da0064cb51ad":{"links":[],"unverified_note":"$106 million in structured financing from the New Jersey Economic Development Authority (NJEDA) in 2006","note_status":"NOT_MATERIAL"},"da1967cb5256":{"links":[{"record_id":"research:discovery:20261022:2025-08-15:galaxy-closes-1-4-billion-project-financing-f:bb2d2266ff01fe21","name":"Galaxy Closes $1.4 Billion Project Financing Facility to Accelerate Helios AI Datacenter Development","date":"2025-08-15","type":"Project financing","value_label":"$1.4B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2025-08-15:galaxy-closes-1-4-billion-project-financing-f:bb2d2266ff01fe21"}]},"da3e135d4afa":{"links":[],"unverified_note":"New construction of first phase of Data Hall masterplan with an estimated cost of $187,675,500 (2022-2023)."},"da4186597e15":{"links":[],"unverified_note":"Amazon Data Services acquired the 122-acre George Washington University Virginia Science and Technology Campus for $427 million in March 2026."},"da5ced32df09":{"links":[],"unverified_note":"Amazon plans to invest $7 billion; agreed to pay Jasper County $90 million upfront and $22 million annually for 10 years.","note_status":"NOT_MATERIAL"},"da66aab83711":{"links":[],"unverified_note":"Capital investment of at least $202 million, approved for tax credit assistance by the Ohio Department of Development on September 26, 2023."},"dac2690f2948":{"links":[],"unverified_note":"Amazon agreed to pay $20.5 million to settle a lawsuit over nitrate pollution from its existing data center operations at the Port of Morrow."},"dac68af86d0b":{"links":[],"unverified_note":"Albert and Eunice Boscov purchased the campus in 2005 and invested over $20 million in upgrades.","note_status":"NOT_MATERIAL"},"dadbf4acab81":{"links":[],"unverified_note":"$1.46 billion in taxpayer subsidies for a nearly $20 billion project, as of March/April 2026."},"dae9775f62d6":{"links":[],"unverified_note":"QTS Realty Trust acquired by Blackstone Group on August 31, 2021"},"daf2c1db170d":{"links":[],"unverified_note":"Acquisition of Stream Data Centers' development by DataBank on June 13, 2017"},"db267cd938c7":{"links":[],"unverified_note":"CoreSite bought the property from Boston Properties for $60 million in 2016.","note_status":"NO_PRIMARY"},"db3587687e92":{"links":[],"unverified_note":"Equinix completed its $3.6 billion acquisition of 29 Verizon data centers in May 2017."},"db92ac3fdfce":{"links":[],"unverified_note":"$900 million in green financing"},"db92cc88743b":{"links":[],"unverified_note":"Walton Street Capital purchased the 805,601-square-foot Amazon sort center at 22525 Clay Road in Katy from Duke Realty, with JLL arranging a floating-rate acquisition loan with Wells Fargo Bank (announced February 9, 2021)."},"dbd60e030c9a":{"links":[],"unverified_note":"$15 million investment for construction, announced before August 2024.","note_status":"NOT_MATERIAL"},"dbde2c64956f":{"links":[],"unverified_note":"AWS bought the 14501 and 14721 Avion Parkway sites from Petula Prolix Development Co. LLC for $55.9 million.","note_status":"NO_PRIMARY"},"dc0e47fcd38e":{"links":[],"unverified_note":"$58,752,504 from the All Ohio Future Fund approved on July 22, 2025, for site preparation, roadwork, and utility upgrades."},"dc3597a9bf27":{"links":[],"unverified_note":"$11 million 10-year, fixed-rate permanent loan secured by Russo Development in August 2019","note_status":"NOT_MATERIAL"},"dc35b194de7d":{"links":[],"unverified_note":"Initial investment of $210 million for the first phase (January 2012). Total investment in the campus reached over $2 billion (March 2021). Partnership with Invenergy and Pacific Power for 100 MW of solar power (July 2018) and 437 MW of solar (July 2018) to support 100% renewable energy goals."},"dc3711c79ba8":{"links":[],"unverified_note":"$25 million tenant improvement project, announced June 2023","note_status":"NOT_MATERIAL"},"dc445c9ac39e":{"links":[],"unverified_note":"CyrusOne acquired CME Group's suburban Chicago data center in Aurora, Ill. for $130 million in March 2016.","note_status":"NO_PRIMARY"},"dc6d9deb75c4":{"links":[],"unverified_note":"Data center building sold for $31.75 million in January 2024, with Oracle remaining the sole tenant."},"dc6df1a0e3ad":{"links":[],"unverified_note":"RagingWire acquired the building from SunPower in September 2019 for $63.5 million."},"dc7fd1f75f47":{"links":[],"unverified_note":"Land purchase of 50 acres in Irving-Las Colinas by Harrison Street and PowerHouse Data Centers, announced May 15, 2024."},"dc7fdc06c9b3":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"dc9b46dd77b5":{"links":[],"unverified_note":"$3.4B in financing from Blue Owl Capital; 85% property tax abatement over 10 years from City of Abilene and Taylor County for a $3.5 billion project"},"dcb983802daa":{"links":[],"unverified_note":"DataBank acquired four Houston data centers, including Houston Galleria, from CyrusOne for $670 million. The agreement was announced in January 2022 and the migration completed in November 2022."},"dcced11b8adf":{"links":[],"unverified_note":"Clean energy commitment with DTE Energy to add 400 megawatts of new solar projects in Michigan (December 12, 2022)"},"dcd8b65a0512":{"links":[],"unverified_note":"Bond 2021 approved $34.5 million for teacher and student instructional technology in November 2021.","note_status":"NOT_MATERIAL"},"dd096281b972":{"links":[],"unverified_note":"Google's $40 billion investment in Texas data centers, announced in 2025."},"dd530dd337fc":{"links":[],"unverified_note":"Amazon Data Services Inc. paid $54 million for the 2.4 million-square-foot site at 13600 EDS Drive in a deal that closed Oct 2020."},"dd6165f7f569":{"links":[],"unverified_note":"$800 million investment in data center, $70 million investment in water and sewer system, $200 million solar project.","note_status":"NOT_MATERIAL"},"dd6abac26f82":{"links":[],"unverified_note":"$20.3 million sales tax rebate from Iowa Economic Development Authority Board and $18 million in incentives from West Des Moines for Project Alluvion.","note_status":"NOT_MATERIAL"},"ddc906e39fab":{"links":[],"unverified_note":"Partnership between Yondr Group and JK Land Holdings, LLC for data center project in Loudoun, Northern Virginia (announced October 13, 2022)"},"ddf1af637bc8":{"links":[],"unverified_note":"Equity recapitalization of Cologix by Stonepeak for $3.0 billion in equity value (April 2022); $1.65 billion asset-backed securitization (early 2022)","note_status":"NEW_SOURCED"},"de2e46598899":{"links":[],"unverified_note":"DataBank closed a $2 billion construction loan on April 21, 2026, to fund the first three buildings (DFW9, DFW10, and DFW11)."},"de3d069563f9":{"links":[{"record_id":"research:discovery:20261022:2026-01-16:riot-buys-rockdale-site-land-and-signs-first-:ffadd08b7795d5b0","name":"Riot signs first data center lease with AMD at the Rockdale Site","date":"2026-01-16","type":"Lease / service contract","value_label":"~$311M total consideration","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2026-01-16:riot-buys-rockdale-site-land-and-signs-first-:ffadd08b7795d5b0"}]},"de54c18380e3":{"links":[],"unverified_note":"Garland City Council approved a 50% tax rebate for 20 years and a four-year, 40% rebate on business personal property and real estate taxes as part of an economic development agreement with Digital Realty. The data centers project is a joint venture with the Mitsubishi Corp. Mitsubishi acquired a 65% equity interest in the venture while Digital Realty will manage the development and daily operations of the ventures and maintains a 35% interest."},"de866c685b56":{"links":[],"unverified_note":"Vantage Data Centers was acquired by a consortium including Digital Bridge Holdings, Public Sector Pension Investment Board (PSP Investments), and TIAA Investments in March 2017. In July 2020, an investor group led by Colony Capital invested $1.2 billion in Vantage's diversified portfolio, including its Quincy, Washington data center.","note_status":"NO_PRIMARY"},"de99d53a4fe4":{"links":[],"unverified_note":"Construction of shell building estimated at $59,400,000 (announced August 2022); Tenant finish out of two data hall suites estimated at $40,000,000 (announced August 2023)"},"de9b724dfff5":{"links":[],"unverified_note":"Secured financial backing from Tallvine Partners in 2025."},"ded28d4601f9":{"links":[],"unverified_note":"15-year agreement with AES Corporation for 24/7 clean energy supply. Service agreement with the Town of Leesburg for water and sewer availability and infrastructure upgrades."},"ded31fa54915":{"links":[],"unverified_note":"Purchase of 270,000 square foot facility for $9.2 million in November 2005.","note_status":"NOT_MATERIAL"},"dee30f8ba834":{"links":[],"unverified_note":"In November 2021, The Dalles City Council approved a $28.5 million deal with Google to provide water for the tech company to cool two new data centers there.... Google has agreed to pay up to 50 percent of property taxes on the structure once it is operable through fees and property taxes.... Earlier this year, Google entered an agreement with Avangrid for more than 100 megawatts of clean energy that will help enable the upgrade and repower of the Leaning Juniper IIB facility in nearby Gilliam County."},"dee5eab6fc58":{"links":[],"unverified_note":"Capital investment of $1.5 billion by October 2022; 20-year power purchase agreement with Rocky Mountain Power for Faraday Solar project (operational Sept 2025)","note_status":"NOT_MATERIAL"},"def5e656a0b2":{"links":[],"unverified_note":"$500 million capital commitments from ArcLight and DigitalBridge (announced June 25, 2025)","note_status":"NEW_SOURCED"},"df167063ace2":{"links":[],"unverified_note":"Investment of $215.9 million (announced August 2022)."},"df4741e49957":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's series 2025-1 class A-2 note issuance is a securitization of real estate and tenant lease payments for space and electrical capacity in CyrusOne L.P.'s 13 completed and operating data centers in Sterling, Va., San Antonio, Texas, and Houston. Two data centers in Houston will be added to the master trust at closing."},"dfbcb837e6da":{"links":[],"unverified_note":"Acquisition of data center by Zayo Group Holdings Inc."},"dfdceb2fabc3":{"links":[],"unverified_note":"Switch acquired Data Foundry for $420 million in an all-cash transaction, expected to close by mid-2021.","note_status":"NO_PRIMARY"},"e07320c5c78e":{"links":[],"unverified_note":"In April 2018, ASB sold the Infomart building and their data centers located in the building to Equinix Inc for $800 million."},"e07f91900300":{"links":[],"unverified_note":"AWS provided $8 million for an RV park for contractors and employees (October 2025); Amazon is funding an underground water storage project."},"e09fe2a9dc0f":{"links":[],"unverified_note":"CyrusOne acquired colocation provider Cervalis, which included the Totowa facility, in an all-cash $400-million transaction in 2015."},"e0a981077ce3":{"links":[],"unverified_note":"NTT Ltd. acquired 103 acres of land in Prince William County, Gainesville, VA, from Lerner Enterprises for $257.4 million to build a large-scale data center campus."},"e0b655a9a326":{"links":[],"unverified_note":"Microsoft bought 93 acres in Douglasville, Douglas County for $13.8 million in May 2021.","note_status":"NOT_MATERIAL"},"e0c96dd36a9e":{"links":[],"unverified_note":"$31 million project, scheduled for development between July 2025 and October 2026","note_status":"NOT_MATERIAL"},"e0d58a2f9cc8":{"links":[],"unverified_note":"$100K renovation/alteration project registered on April 27, 2009"},"e0da677dd2df":{"links":[],"unverified_note":"$600 million debt financing package closed October 2025."},"e0e5250ccfa5":{"links":[],"unverified_note":"Blackstone Group acquired QTS Realty Trust, Inc. for approximately $10 billion on August 31, 2021."},"e0f4a990dd74":{"links":[],"unverified_note":"Vantage Data Centers committed over $25 billion for the Frontier mega-campus (Shackelford County) (announced August 2025)","note_status":"NO_PRIMARY"},"e0fb9f0b76dd":{"links":[],"unverified_note":"TX21: $157 million project investment (late 2023); TX22: $272 million project investment (October 2025).","note_status":"NOT_MATERIAL"},"e13cc9cd18bf":{"links":[],"unverified_note":"$2.0 billion construction loan secured on April 21, 2026, led by MUFG Bank, Ltd. for the first three data centers. $2.0 billion equity raise announced October 15, 2024, led by AustralianSuper."},"e1691f0ef8c7":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025"},"e1996a7fa583":{"links":[],"unverified_note":"Equinix Inc acquired the Infomart building and its data centers for $800 million in April 2018."},"e1c2b92f7d10":{"links":[],"unverified_note":"CyrusOne acquired a powered shell for AUS3 in April 2015."},"e1c91eb9f0dd":{"links":[],"unverified_note":"EQT Infrastructure acquired EdgeConneX in 2020 for $2.6 billion. Sixth Street acquired a minority stake in EdgeConneX in September 2024."},"e1da2e79d2af":{"links":[],"unverified_note":"PPA with Pacific Power for 437MW of new solar developments, including two projects totaling 100MW in the Prineville area (July 20, 2018)."},"e1fb074d6fbe":{"links":[],"unverified_note":"Fee simple acquisition of 200 acres for $96.0 million (January 2026); Data Center Lease with AMD for initial 25 MW, expected to generate approximately $311.0 million in contract revenue over 10 years (January 2026)."},"e1fedf286d16":{"links":[],"unverified_note":"Penzance secured $100 million in construction financing (October 2025)"},"e2073c93c66e":{"links":[{"record_id":"research:newsroom:sec:20251103:1","name":"Executed 15-Year Data Center Campus Lease with Amazon Web Services to Support AI Workloads","date":"2025-11-03","type":"Lease / service contract","value_label":"~$5.5B total consideration","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20251103:1"}]},"e2246866c76f":{"links":[],"unverified_note":"$400,000 renovation project announced in 2023."},"e22df727d6a2":{"links":[],"unverified_note":"Renewable energy supply deal with Umatilla Electric Cooperative (April 2023); $83 million acquisition of Sunstone solar power project (January 2026); $20.5 million settlement for groundwater contamination (March 2026).","note_status":"NO_PRIMARY"},"e28e6b3f5705":{"links":[],"unverified_note":"$350 million loan in November 2022 for redevelopment of a Santa Clara site.","note_status":"NO_PRIMARY"},"e28fa81bdb42":{"links":[],"unverified_note":"Investment of $210 million for the first phase (reported January 2012)"},"e29abc38fa6e":{"links":[],"unverified_note":"Debt financing from a large global investment firm and continued equity support from Crestline Investors (December 16, 2025)."},"e2c28faaecd5":{"links":[],"unverified_note":"DataBank acquired US data centers from Zayo in 2020; DataBank announced expansion of SAN1 facility in March 2022, with grand opening in May 2023."},"e2cac9c36d7d":{"links":[],"unverified_note":"Google's $9 billion new investment in Virginia includes the 'Mango Farm' data center complex.","note_status":"NOT_MATERIAL"},"e2d12e7adf8b":{"links":[],"unverified_note":"Land acquisition from Dermody Properties for $79.3M (reported June 2024)","note_status":"NO_PRIMARY"},"e33d0934f2e0":{"links":[],"unverified_note":"$100 million multi-draw, senior secured debt facility with Orion Energy Partners, L.P. (May 26, 2020)","note_status":"NEW_SOURCED"},"e353e17e1c8c":{"links":[],"unverified_note":"$70 Million investment announced January 2010","note_status":"NOT_MATERIAL"},"e36c1e477e32":{"links":[],"unverified_note":"$600 million debt financing package (October 16, 2025)"},"e3761e89a7b2":{"links":[],"unverified_note":"Equinix acquired the building at 1990 N. Stemmons Freeway for $800m, followed by a $142m addition in 2020 and a $180m expansion."},"e39c4f8ff3c9":{"links":[{"record_id":"research:legacy-deal:b9c152df-66c5-4a21-9a0c-7cfc7b76e984","name":"Sixth Street agrees minority EdgeConneX stake from EQT Infrastructure","date":"2024-09-24","type":"Acquisition","value_label":"n/d","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:b9c152df-66c5-4a21-9a0c-7cfc7b76e984","scope":"portfolio"}]},"e3afe2424983":{"links":[],"unverified_note":"Stream Data Centers plans to invest $15,000,000.00 to build out 138,000 square feet of new space in Garland, announced February 10, 2022."},"e3c0c93ef6ad":{"links":[],"unverified_note":"Tax Credit/Rebate in 2015"},"e3d434bc4089":{"links":[],"unverified_note":"$1.4 billion senior secured term loan facility closed on August 15, 2025, arranged by Deutsche Bank."},"e3e7eca2d817":{"links":[],"unverified_note":"Land acquisition for $26 million (October 2017); QTS Realty Trust acquired by Blackstone for approximately $10 billion (August 2021); Multi-year agreement to purchase renewable energy certificates from Three Peaks Power, LLC solar facility through Calpine Energy Solutions (April 2021)."},"e3eb7f8d109c":{"links":[],"unverified_note":"Amazon Web Services acquired the Cumulus data center campus from Talen Energy for $650 million in March 2024.","note_status":"NO_PRIMARY"},"e3f1c49e3b89":{"links":[],"unverified_note":"CyrusOne was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in an approximately $15 billion all-cash transaction including debt."},"e412780ce7d0":{"links":[],"unverified_note":"Acquisition by H5 Data Centers from Yahoo (2024), likely a sale-leaseback."},"e4172c916cd3":{"links":[],"unverified_note":"NTT Communications invested $160 million to build the Ashburn VA3 Data Center, which was phase one of the Ashburn Data Center Campus development. NTT Ltd.'s Global Data Centers Americas division was formerly known as RagingWire Data Centers.","note_status":"NOT_MATERIAL"},"e4197d9eb799":{"links":[],"unverified_note":"long-term solar energy agreement"},"e46a773197bd":{"links":[],"unverified_note":"Data Canopy acquired Ntirety's colocation business in June 2023."},"e4d0d0a744fa":{"links":[],"unverified_note":"Initial $10 billion investment in Madison County announced in January 2024, later expanded by an additional $11 billion in Madison County as part of a total $25 billion statewide investment. Amazon is also funding $300 million in grid improvements with Entergy Mississippi.","note_status":"NOT_MATERIAL"},"e4e44ef6a9d9":{"links":[],"unverified_note":"Meta announced plans to establish a data center with an initial investment of $750 million in October 2017, expanding to over $1 billion."},"e4f17c6032e0":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025."},"e58011ba673f":{"links":[],"unverified_note":"Google is investing $2.3 billion in Ohio in 2024, further expanding its data centers in Columbus, Lancaster, and New Albany.","note_status":"NOT_MATERIAL"},"e5e88a17ea56":{"links":[],"unverified_note":"Acquisition of five-property data center portfolio, including 720 2nd Street in Oakland, from Rockwood Capital/365 Main, Inc. for $725 Million, announced June 2, 2010.","note_status":"NEW_SOURCED"},"e60d691615f4":{"links":[],"unverified_note":"220000000.0"},"e635fc9772a4":{"links":[],"unverified_note":"Initial investment of $50 million announced in 2008","note_status":"NOT_MATERIAL"},"e6530eedff9e":{"links":[],"unverified_note":"Acquisition of Carrier-1 by VPLS (later Evocative) on April 21, 2022; Acquisition of facility by Prime Data Centers in April 2023."},"e65ac784a4ab":{"links":[],"unverified_note":"Sale of Aligned Data Centers to a consortium including AI Infrastructure Partnership (AIP), MGX, and BlackRock's Global Infrastructure Partners (GIP) for an implied enterprise value of approximately $40 billion (September 2024).","note_status":"NEW_SOURCED"},"e6aa971f2ffb":{"links":[],"unverified_note":"Canaan Inc. acquired Cipher Mining's 49% equity interest in the joint venture (Alborz, Bear, and Chief Mountain LLC) for approximately US$39.75 million in an all-stock transaction on February 23, 2026.","note_status":"NO_PRIMARY"},"e6e247b562e7":{"links":[],"unverified_note":"Tax Abatement Agreement for an investment of approximately $550 million, approved January 2007."},"e70387ccc829":{"links":[],"unverified_note":"Land acquisition in 2021 for $55.9 million for a 46.4-acre plot."},"e72263523f9e":{"links":[],"unverified_note":"Initial $3.3 billion investment, with an additional $4 billion committed for a second similar-scale data center, bringing the total investment in Wisconsin to more than $7 billion. A new 250 MW solar project in Portage County with National Grid Renewables is under construction to support the commitment to carbon-free energy.","note_status":"NO_PRIMARY"},"e73f2f94a6e7":{"links":[],"unverified_note":"$25 million tenant improvement project, part of a $50 million expansion for TX2 and TX3, completed by 2024.","note_status":"NOT_MATERIAL"},"e74383488dd9":{"links":[],"unverified_note":"Proffer Amendment and Rezoning #REZ2024-00009"},"e787074e2c23":{"links":[],"unverified_note":"Digital Realty, the largest owner and operator of data center properties, paid $63.3 million to acquire properties at 21561 & 21571 Beaumeade Circle in Ashburn and 45901 & 45845 Nokes Boulevard in Sterling."},"e7a0ce5c21aa":{"links":[],"unverified_note":"City of Irving 50% property tax abatement (December 2024)"},"e7ed18012c0d":{"links":[],"unverified_note":"Richland's city council unanimously approved an option agreement with Atlas Agro for land for a data center at a Dec. 2 meeting. The agreement is for 275 acres of property at 2100 Horn Rapids Road, just north of Framatome. If Atlas proceeds, it will pay about $24 million for the former Hanford land.","note_status":"NOT_MATERIAL"},"e7f43bb3d200":{"links":[{"record_id":"research:newsroom:rowan-digital-infrastructure:20260527:1","name":"Rowan Closes $3B Green Financing for Turnkey Hyperscale Campus in High-Growth Texas Market","date":"2026-05-27","type":"Debt financing","value_label":"~$3B financing amount","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:rowan-digital-infrastructure:20260527:1"}]},"e83f23e4158a":{"links":[{"record_id":"research:discovery:20261022:2026-01-16:riot-buys-rockdale-site-land-and-signs-first-:ffadd08b7795d5b0","name":"Riot signs first data center lease with AMD at the Rockdale Site","date":"2026-01-16","type":"Lease / service contract","value_label":"~$311M total consideration","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2026-01-16:riot-buys-rockdale-site-land-and-signs-first-:ffadd08b7795d5b0"}]},"e86a4f1c0e54":{"links":[],"unverified_note":"Galaxy Helios I LLC plans to invest $800,000,000.00 to build out 147,457 square feet of new space in Afton, announced April 10, 2025."},"e875c96847a5":{"links":[],"unverified_note":"Serverfarm acquired two Houston data center campuses in September 2024, funded by equity commitments from Manulife Investment Management. Serverfarm secured a $3.0 billion credit facility in December 2025 to accelerate construction of multiple hyperscale data center campuses across North America, including Houston."},"e87ab903387c":{"links":[],"unverified_note":"AWS purchased two vacant parcels at 9720 Dean Drive and 9811 Nokesville Road in 2021 for a combined $6.6 million."},"e8d403a9a454":{"links":[],"unverified_note":"$125 million investment covering interior improvements to a 235,730-square-foot facility, filed in August 2025","note_status":"NOT_MATERIAL"},"e8ecb37e6ade":{"links":[],"unverified_note":"$525 million asset-backed securitization (ABS) closed on July 21, 2025, backed by its COL4 data center in Columbus, Ohio.","note_status":"NEW_SOURCED"},"e8fcc3618c24":{"links":[],"unverified_note":"ViaWest acquired Consonus data center assets in Utah in October 2010."},"e9139e5f3d62":{"links":[],"unverified_note":"Minimum Revenue Agreement with Town of Culpeper (Oct 2025); Dominion Energy $253.7M transmission upgrade (proposed).","note_status":"NOT_MATERIAL"},"e94478879c55":{"links":[],"unverified_note":"$687.1 million Single Asset Single Borrower (SASB) CMBS loan for DFW1 data center, announced January 29, 2025.","note_status":"NEW_SOURCED"},"e9a79803c303":{"links":[],"unverified_note":"Generator and UPS replacement approved June 2023 with Central Electric Ent. & Co. (RFCSP #2023-053)"},"e9b91742263e":{"links":[],"unverified_note":"Water service agreement with City of Hermiston, approved Feb 24, 2025, with AWS funding an $18 million project."},"e9e06bd9082c":{"links":[],"unverified_note":"$765 million construction investment, announced March 2025."},"e9f01ea6a8d8":{"links":[],"unverified_note":"Land acquisition of 270 acres in Loudoun and Prince William Counties in 2021. Partnership with JK Land Holdings, LLC."},"ea1517b5289d":{"links":[],"unverified_note":"Amazon Data Services purchased the Devlin Tech Park site for $700 million in November 2025.","note_status":"NO_PRIMARY"},"ea2a071b9104":{"links":[],"unverified_note":"$200 million investment and Nebraska Advantage Act incentives (2012)","note_status":"NOT_MATERIAL"},"ea2d49cd330a":{"links":[],"unverified_note":"Microsoft invested $215.9 million for construction (August 2022).","note_status":"NOT_MATERIAL"},"ea4dc20ea0b8":{"links":[],"unverified_note":"DigitalBridge Group acquires Vantage Data Centers"},"ea5b9511f0bf":{"links":[],"unverified_note":"$700 million refinancing in November 2023","note_status":"NO_PRIMARY"},"ea6b464da614":{"links":[],"unverified_note":"Six consecutive five-year enterprise zone agreements for property tax abatements, signed April 27, 2026, extending tax-free status until 2051."},"ea85925baa28":{"links":[],"unverified_note":"Sale of campus to Mapletree Industrial Trust for $208 million on March 12, 2021."},"ea95bd9a6d4f":{"links":[],"unverified_note":"Blackstone acquired QTS Realty Trust for approximately $10 billion, including debt, on August 31, 2021. Joint Petition of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC to Increase Green Tariff Customer Supply Option Capacity by an additional 250 MW, filed September 17, 2021."},"eac23ff8f699":{"links":[],"unverified_note":"$220 million construction project announced January 2024","note_status":"NOT_MATERIAL"},"eacfb2f822bf":{"links":[],"unverified_note":"Land purchased in December 2010 for $23.4 million","note_status":"NOT_MATERIAL"},"eb031a623097":{"links":[],"unverified_note":"$1.4 billion project financing facility closed on August 15, 2025."},"eb2c67423bc8":{"links":[],"unverified_note":"H5 Data Centers acquired a wholesale data center at 21800 Beaumeade Drive in Ashburn, Virginia, on June 10, 2015."},"eb32b4a3321d":{"links":[],"unverified_note":"Acquisition of Barber Lake site by Cipher Mining for $67.5 million cash and variable fee on September 24, 2024. $1.4 billion offering of senior secured notes for construction on November 4, 2025. 10-year HPC colocation agreement with Fluidstack for 300 MW, with Google providing a $1.4 billion backstop.","note_status":"NEW_SOURCED"},"eb3d5eefb7ba":{"links":[],"unverified_note":"Equinix invested $41 million to expand its existing data center in Santa Clara, Calif. by approximately 1,100 new cabinets, with expansion space expected to open in Q2 2008."},"eb472d2f70b2":{"links":[],"unverified_note":"Acquisition of Comfluent for $3 million in April 2012; Acquisition of Denver Gas and Electric Building for $38 million on April 8, 2025."},"ebc33aa92c0d":{"links":[],"unverified_note":"Securitization of real estate and tenant lease payments for space and electrical capacity in eight data centers in Sterling, Va., and San Antonio, Texas, through CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, dated March 05, 2024."},"ebdf35a0050f":{"links":[{"record_id":"research:discovery:20261022:2025-09-25:cipher-mining-signs-168-mw-10-year-ai-hosting:a86c24690a3cb99b","name":"Cipher Mining signs 168 MW, 10-year AI hosting agreement with Fluidstack","date":"2025-09-25","type":"Lease / service contract","value_label":"~$3B total consideration","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:discovery:20261022:2025-09-25:cipher-mining-signs-168-mw-10-year-ai-hosting:a86c24690a3cb99b"}]},"ebfa183ec6be":{"links":[],"unverified_note":"Starwood Capital Group acquired the property in 2019 for $134.1 million.","note_status":"NO_PRIMARY"},"ec0cabe1c0a8":{"links":[],"unverified_note":"Collaborative infrastructure deployment between CyrusOne and Eolian L.P. announced January 2026, involving Eolian modernizing and upgrading one of Texas' first utility-scale BESS systems."},"ec179f35ed59":{"links":[],"unverified_note":"Settlement of $20.5 million for nitrate pollution, announced March 31, 2026."},"ec25be2f0972":{"links":[],"unverified_note":"Acquisition from NTT"},"ec29df77f60f":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments, added two new San Antonio data centers to the master trust at closing (March 5, 2024)."},"ec303ab9743a":{"links":[],"unverified_note":"Crestline Investors committed approximately $215 million of construction and land acquisition debt over 15 months (announced April 17, 2025). Blue Owl Capital and Machine Investment Group closed a joint venture partnership including $4 billion of funding for CoreWeave developments (announced August 25, 2025). Blue Owl, Chirisa Technology Parks and PowerHouse Data Centers announced a $5 Billion Joint Venture Development Partnership (announced August 29, 2024).","note_status":"NO_PRIMARY"},"ec5f8fb842b7":{"links":[],"unverified_note":"Sale of four Houston data centers by CyrusOne to DataBank Holdings Ltd. for approximately $670 million in March 2022.","note_status":"NO_PRIMARY"},"ec5fe2d29e7a":{"links":[],"unverified_note":"Microsoft invested $215.9 million for its SAT15 data center (245,000 sq ft) and plans to spend $215 million on SAT16 at the 3555 Westover Link campus in San Antonio, Bexar County."},"ec7de7b3d763":{"links":[],"unverified_note":"Power purchase agreement with Bloom Energy and Amazon for 20 megawatts, approved July 2024."},"ecac41edfec0":{"links":[],"unverified_note":"Lawsuit over property taxes"},"ecca2cf49386":{"links":[],"unverified_note":"Peak 10 acquired ViaWest for $1.675 billion in August 2017, leading to the formation of Flexential. Morgan Stanley Infrastructure Partners made a strategic investment in Flexential in October 2024, becoming a co-control investor alongside GI Partners. GI Partners also closed a continuation vehicle for Flexential in 2025/2026."},"ecddacda399a":{"links":[],"unverified_note":"Amazon Data Services Inc. acquired a 33-acre data center campus at 45900 Pathfinder Plaza in Sterling for $135.75 million on June 24, 2024."},"ecfa431299c8":{"links":[],"unverified_note":"$600 million debt financing from Cantor Fitzgerald, October 8, 2025"},"ed33f70bdd76":{"links":[],"unverified_note":"Investment of more than $2 billion in the 11-building campus (announced by March 2021). Partnership with Pacific Power to build 437 MW of new solar projects (announced July 2018)."},"ed73d648b47e":{"links":[],"unverified_note":"Acquisition by Griffin Capital Essential Asset REIT II, Inc. for $91.5 million on May 26, 2015.","note_status":"NEW_SOURCED"},"ed8061ad394c":{"links":[],"unverified_note":"$550 million construction financing secured on February 11, 2026","note_status":"NEW_SOURCED"},"ed8522463478":{"links":[],"unverified_note":"Investment of $215.9 million for a 245,000 sq ft facility (announced August 2022)"},"edbe94f5d882":{"links":[],"unverified_note":"Tax Abatement Agreement with Armstrong County and GN DC1, LLC, dated November 12, 2024, with payments of $1.35 million per year for each building starting June/July 2026.","note_status":"NOT_MATERIAL"},"edc62cbec1a2":{"links":[],"unverified_note":"Privately funded project with an estimated cost of $35,000,000, running from September 2023 to January 2025."},"edc954e8e6ca":{"links":[],"unverified_note":"Securitization of real estate and tenant lease payments for SDC Austin Condo Unit I data center in January 2025 as part of Sabey Data Center Issuer LLC's series 2025-1 class A-2 data center revenue notes."},"edda98219641":{"links":[],"unverified_note":"Rhino Capital acquired the property in July 2020 via an 11-year sale-leaseback with Congruity360."},"edfb7d8f4c18":{"links":[],"unverified_note":"Site acquisition by Amazon Data Services Inc. (Vadata) for $54 million in October 2020.","note_status":"NO_PRIMARY"},"edfe4f534054":{"links":[],"unverified_note":"TierPoint acquired Xand in 2014; $13 million expansion completed in January 2018."},"ee5100f76f92":{"links":[],"unverified_note":"$3.5 million investment in upgrades (October 2019)","note_status":"NOT_MATERIAL"},"ee511da6d0bf":{"links":[],"unverified_note":"$102K Renovation/Alteration project registered February 14, 2012"},"ee7ba73bfb39":{"links":[],"unverified_note":"Proposed sale of the facility for approximately $14.5 million, expected to close in Q3 2026.","note_status":"NOT_MATERIAL"},"eeaeaa030410":{"links":[],"unverified_note":"$5 billion financing deal closed in late 2024 for projects in four areas."},"ef232fb63322":{"links":[],"unverified_note":"Secured 115MW in capacity commitments, including 90+MW for a hyperscale provider at VA11 campus in Virginia"},"ef2cbe5a371d":{"links":[],"unverified_note":"Peak 10 acquired ViaWest for $1.67 billion in August 2017; Cox Communications sold the facility to Viawest.","note_status":"NO_PRIMARY"},"ef5ac8e8065f":{"links":[],"unverified_note":"$1.5 billion investment announced in October 2023","note_status":"NOT_MATERIAL"},"ef8051b92982":{"links":[],"unverified_note":"8MW build-to-suit lease announced April 20, 2021"},"efa3a2b05684":{"links":[],"unverified_note":"AboveNet Communications, Inc. purchased the building at 1807 Faraday Court outright from 1807 Faraday Court Limited Partnership after a lease agreement."},"efb2d34706e4":{"links":[],"unverified_note":"The Mount Pleasant site was previously set aside for a Foxconn manufacturing hub."},"efc9d2c80409":{"links":[],"unverified_note":"$3.4 billion data center development announced by Crusoe in November, with financing from Blue Owl Capital."},"effd22fc24e4":{"links":[],"unverified_note":"CyrusOne is nearing a $1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville, reported May 2026."},"f038436e6198":{"links":[],"unverified_note":"$1.05 billion refinancing deal tied to two of its existing data center buildings in Lewisville (May 2026)","note_status":"NO_PRIMARY"},"f05acaac4c11":{"links":[],"unverified_note":"Province Group plans to invest up to $500 million in the development of the Merrillville Technology Park.","note_status":"NOT_MATERIAL"},"f0648785382d":{"links":[],"unverified_note":"Serverfarm acquired two data centers in Houston, Texas in 2024."},"f099301ba712":{"links":[],"unverified_note":"80-year lease for the site of the decommissioned Cayuga power station, announced August 2025"},"f0ef14f0cf6c":{"links":[],"unverified_note":"Data Center bought by Verizon in 2021."},"f0f158729acf":{"links":[],"unverified_note":"$126 million investment contingent on a 10-year tax abatement (June 2006)"},"f0f69be5536c":{"links":[],"unverified_note":"Northrop Grumman has entered into a long-term contract with Dominion to purchase the electricity generated by the solar plant as well as the renewable energy credits from the facility."},"f0f873cf380b":{"links":[],"unverified_note":"Amazon's property tax breaks in Morrow County were worth nearly $70 million in 2024 and are projected to cumulatively exceed $1 billion. Amazon also secured an $83 million deal in January 2026 to acquire the Sunstone solar power project in Oregon to power its data centers."},"f0f8b055869c":{"links":[],"unverified_note":"Land acquisition deals in 2022 for Nokes Blvd ($30.8M), Manekin Plaza ($20M), and Ridgetop Circle ($26M)."},"f12b3d242b5f":{"links":[],"unverified_note":"Microsoft acquired the 34-acre, 202,000-square-foot center from Chevron in 2017 for $80 million."},"f180e001b3fc":{"links":[],"unverified_note":"200 MW PPA for Montague Wind Power Project (commercial operation Oct 24, 2019); 56 MW PPA from Avangrid Renewables (Solar Star Oregon II); Acquisition of 3-5 MW 45 Mile Hydroelectric Plant (transferred Dec 2013); $8.7 million funding for Aquifer Storage and Recovery system.","note_status":"NOT_MATERIAL"},"f1947b3642b4":{"links":[{"record_id":"research:legacy-deal:145e86d0-fb4a-49f9-b590-bf10e404d4e9","name":"Crusoe, Blue Owl Capital and Primary Digital Infrastructure enter $3.4 billion joint venture for AI data center development","date":"2024-10-15","type":"Joint venture","value_label":"$3.4B investment","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:legacy-deal:145e86d0-fb4a-49f9-b590-bf10e404d4e9"}]},"f1aba54a50a7":{"links":[],"unverified_note":"Acquisition of Stream Data Centers by Apollo Funds completed on November 3, 2025, with Principal Asset Management acquiring a minority interest."},"f1ecfea2c215":{"links":[],"unverified_note":"150-megawatt geothermal power purchase agreement with XGS Energy in June 2025; parallel 150-megawatt agreement with Sage Geosystems."},"f1f503978593":{"links":[],"unverified_note":"Acquisition of George Washington University's Virginia Science & Technology Campus for $427 million in March 2026."},"f200f27de608":{"links":[],"unverified_note":"$600 million debt financing package on October 16, 2025; $3.4 billion Joint Venture for AI Data Center Development on October 15, 2024"},"f202caafb0a2":{"links":[],"unverified_note":"$2.4 billion investment over 20 years (announced Dec 2021); $600 million debt financing (Oct 2025)"},"f20c6ada12c0":{"links":[],"unverified_note":"$1.05B CMBS loan refinancing for DFW3 and DFW4, expected to close May 20, 2026"},"f23b7763dbea":{"links":[],"unverified_note":"Lancaster City Council approved an economic development agreement on Dec. 9, 2024, including incentives and job creation requirements."},"f2e12719bb75":{"links":[],"unverified_note":"Sale to DBT-Data for $35M in Sept 2013","note_status":"NO_PRIMARY"},"f2fc8a3d9116":{"links":[],"unverified_note":"Amazon announced a deal to buy renewable energy from Umatilla Electric Cooperative for its data centers in Boardman and Hermiston (April 2023)."},"f3100a5cc90d":{"links":[],"unverified_note":"Acquired by Advanced Logic Industries in 2013"},"f32444809e18":{"links":[],"unverified_note":"$600 million investment announced in August 2024","note_status":"NOT_MATERIAL"},"f3325b5cd69f":{"links":[],"unverified_note":"Meta's total investment in its Prineville data center complex reached $2 billion by September 2018.","note_status":"NOT_MATERIAL"},"f3ba6d972f0d":{"links":[],"unverified_note":"$880 million investment for a new facility at Midlothian campus (Sharka Data Center – Building 5)","note_status":"NOT_MATERIAL"},"f3e998afeb1b":{"links":[],"unverified_note":"Round Rock City Council approved an economic incentive agreement in 2022, including zoning approvals and a performance-based incentive package, supporting Sabey's commitment to investing at least $185 million in property improvements and $5 million in new equipment.","note_status":"NOT_MATERIAL"},"f3f6c2b12a4f":{"links":[],"unverified_note":"$350,000,000 investment for new construction, announced March 2024"},"f43eaf2ec570":{"links":[],"unverified_note":"BIT Mining Limited invested $25.74 million to jointly construct and operate the data center (May 21, 2021).","note_status":"NEW_SOURCED"},"f46003b1a1aa":{"links":[],"unverified_note":"Digital Realty acquired the Lakeside Technology Center (350 E Cermak) in 2005 for $140 million."},"f471ff4c4482":{"links":[],"unverified_note":"DataBank leased space from Digital Realty for a new data center in Richardson (June 2012)"},"f48610804a35":{"links":[],"unverified_note":"Estimated construction cost of $15,000,000"},"f4b53f075c55":{"links":[],"unverified_note":"Investment of at least $202 million announced in 2023 for the first phase of development."},"f501ad4c2cd2":{"links":[],"unverified_note":"EdgeConneX acquired by EQT Infrastructure for $2.6 billion in 2020"},"f510e1064848":{"links":[],"unverified_note":"Acquisition of INAP data centers by Evocative, funded by Crestline Investors, Inc. (September 28, 2022)."},"f5273e8abd1c":{"links":[],"unverified_note":"Ohio Department of Development approved tax credit assistance for a $202 million investment (September 26, 2023)."},"f54fe88a51b7":{"links":[],"unverified_note":"$250 million investment for expansion with a 15-year Chapter 380 Tax Reimbursement, approved March 2014."},"f5561f57505b":{"links":[],"unverified_note":"Permanent, long-term capital partnership with KKR, announced March 2026."},"f5f9bc053df4":{"links":[],"unverified_note":"Agreement with Umatilla Electric Cooperative for power supply (April 2023)."},"f601487dd12b":{"links":[],"unverified_note":"Funding from USAA Real Estate (now Affinius Capital) since 2020; First 72 MW facility fully leased to an undisclosed hyperscale tenant (July 2024)"},"f65c56dc2f1a":{"links":[],"unverified_note":"$600 million debt financing closed October 16, 2025"},"f688e44018c4":{"links":[],"unverified_note":"Acquisition of 85,000 square-foot carrier hotel at 100 Taylor Street in November 2018."},"f6967ff16677":{"links":[],"unverified_note":"$1.05B refinancing for DFW3 and DFW4 data centers, expected to close May 20, 2026"},"f69a75aea731":{"links":[],"unverified_note":"Acquisition of 60,000 sq ft data center space by Telehouse America in January 2011"},"f6a8fe879af7":{"links":[],"unverified_note":"Joint venture between TeraWulf (51%) and Fluidstack (49%) announced October 28, 2025. Google provided a $1.3 billion long-term lease backing for Fluidstack's obligations. Project-level financing of $1.3 billion in 7.250% Senior Secured Notes due 2030 completed on December 29, 2025."},"f6bb2aebc3be":{"links":[],"unverified_note":"Evoque Data Centers acquired the Dallas office property at 11830 Webb Chapel Road for $205,000,000 (around 2022)."},"f6e9a8f97d80":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025."},"f70cc67a0d3f":{"links":[],"unverified_note":"Amazon will pay $20.5 million to settle a lawsuit over nitrate-contaminated groundwater in Morrow County (March 31, 2026 / April 1, 2026)."},"f70e8cc34178":{"links":[],"unverified_note":"Change in Ownership on September 20, 2024"},"f7399188563b":{"links":[],"unverified_note":"Power supply deal with Umatilla Electric Cooperative (date not specified, reported April 2023)"},"f73d816b0dd1":{"links":[],"unverified_note":"DataBank's initial recapitalization led by Swiss Life Asset Management AG, EDF Invest, Northleaf Capital Partners and Ardian for $1.5 billion, closing August 30, 2022.","note_status":"NEW_SOURCED"},"f75717d2bc1c":{"links":[],"unverified_note":"Amazon to pay the city of Hobart $47 million upfront and an additional $55 million when building permits are issued, along with a 10-year 100% tax abatement and a 35-year 100% exemption for IT equipment.","note_status":"NOT_MATERIAL"},"f757de5afaaa":{"links":[],"unverified_note":"Stafford Supervisors approved an incentive agreement with Amazon for $6 billion in investments, approved January 3, 2024.","note_status":"NOT_MATERIAL"},"f79b2e190b79":{"links":[],"unverified_note":"$1.6 billion investment (announced July 25, 2023); 6-year Master Services Agreement with Lincoln Property Company for over $260 million for initial power installation; $141 million in tax incentives from City of Plano.","note_status":"NOT_MATERIAL"},"f79d3c1223a3":{"links":[],"unverified_note":"Digital Realty sold a non-core data center in Chantilly, Virginia for approximately $43 million in September 2023."},"f7bdcfe96adf":{"links":[],"unverified_note":"Acquisition of Verizon data center portfolio by Equinix for $3.6 billion."},"f7dc3f1a5e8a":{"links":[],"unverified_note":"LA3 acquisition for $34.5 million in 2005; LA4 first phase construction for $95 million in 2009; $1 million energy efficiency rebate from Southern California Edison."},"f80c8bbed154":{"links":[],"unverified_note":"New construction project with an estimated cost of $95,000,000, started July 2022."},"f816ec2305a0":{"links":[],"unverified_note":"$43,894,400 estimated cost for expansion, filed in 2022."},"f822c6b61f70":{"links":[],"unverified_note":"Acquisition of Stingray site for $4.1 million cash payment and a $1.5/MWh variable fee for initial five years, announced November 26, 2024.","note_status":"NOT_MATERIAL"},"f85b0c85bfa6":{"links":[],"unverified_note":"Switch acquired Data Foundry for $420 million cash on May 3, 2021.","note_status":"NEW_SOURCED"},"f86555f61639":{"links":[],"unverified_note":"Joint venture with GI Partners for 65% stake in two hyperscale data centers, announced July 17, 2023, with $743 million gross proceeds.","note_status":"NEW_SOURCED"},"f879292b6b0b":{"links":[],"unverified_note":"Construction contract awarded for $1.2 billion in September 2010.","note_status":"NOT_MATERIAL"},"f88609642b69":{"links":[],"unverified_note":"Prologis and Skybox Datacenters are partnering on this facility."},"f8c920f670dc":{"links":[],"unverified_note":"Land acquisition by Microsoft for 33.55 acres on Dec 23, 2020. Estimated cost for Phase 3 is $31,300,000."},"f8dedc87849b":{"links":[],"unverified_note":"Renovation/Alteration project with an estimated cost of $750,000"},"f8ef8c00acd6":{"links":[],"unverified_note":"Amazon received $1 billion in tax breaks over 15 years from Morrow County, the port, and the city of Boardman. Amazon also made an $83 million all-cash bid for the Sunstone solar power project near Pendleton, Oregon, to supply power to its Oregon data centers."},"f8f22f92824e":{"links":[],"unverified_note":"Brookfield acquired Cyxtera for $775 million in November 2023 and merged it with Evoque; the combined entity rebranded as Centersquare in April 2024."},"f90e861763a5":{"links":[],"unverified_note":"$2.1 billion CMBS note to refinance SUW1DC2, a 23-megawatt property part of a two-building, 53-acre complex in Suwanee, Ga, closing estimated Feb. 25, 2026.","note_status":"NO_PRIMARY"},"f91aa800f5e6":{"links":[],"unverified_note":"CyrusOne Data Centers Issuer I LLC's series 2024-1 class A-2 note issuance, a securitization of real estate and tenant lease payments for space and electrical capacity in eight completed and operating data centers located in Sterling, Va., and San Antonio, Texas, in March 2024."},"f92b8f22fd1a":{"links":[],"unverified_note":"Amazon Data Services purchased the 7.66-acre data center campus at 7505 Mason King Court for $65 million on March 26, 2026."},"f9301530d1f6":{"links":[],"unverified_note":"Microsoft faced a $210,000 fine from Grant County PUD for using less power than requested; controversy over tax breaks and contractor liens also reported."},"f95d6dbb7c4d":{"links":[],"unverified_note":"Joint venture with Blackstone for development of at least four buildings (reported 2024). Land acquisition for Western Lands campus for $236.5 million in 2018."},"f9a5d8505d98":{"links":[],"unverified_note":"$7.5 billion industrial revenue bond approved in February 2025 for expansion; 150-megawatt geothermal PPA with XGS Energy and 150-megawatt PPA with Sage Geosystems announced June 2025."},"f9dc1323e8b4":{"links":[],"unverified_note":"Chapter 312 incentives agreement with Hutto City Council for at least $10 billion capital investment, approved July 2023.","note_status":"NOT_MATERIAL"},"f9dd0fb28368":{"links":[],"unverified_note":"Brookfield Infrastructure Partners acquired Cyxtera Technologies through its portfolio company, Evoque Data Center Solutions, for US$1.3 billion, including US$775 million for assets and approximately $525 million for real estate at seven U.S. data centers.","note_status":"NEW_SOURCED"},"f9eba3f8bd13":{"links":[],"unverified_note":"Microsoft Corporation purchased land in Hillcrest Industrial Park in South Hill."},"fa176162798b":{"links":[],"unverified_note":"NTT Ltd. announced on February 5, 2020, the construction of a new Pacific Northwest data center campus in Hillsboro, Oregon, planning five data centers totaling 144 megawatts of critical IT load on a 47-acre property."},"fa4003384194":{"links":[],"unverified_note":"Tax deal allowing property tax deferrals for 15 years in exchange for annual lump sum payments to the city."},"fa44e62183ee":{"links":[],"unverified_note":"Los Lunas approved up to $30 billion in industrial revenue bonds for Facebook, providing a 30-year property tax break, $10 million in Local Economic Development Act funding, $3 million in Job Incentive Training Program money, and up to $1.6 million in gross receipts tax reimbursement annually. PNM invested approximately $45 million into a 30MW solar project for the data center.","note_status":"NOT_MATERIAL"},"fa7924b6c44e":{"links":[],"unverified_note":"Land parcel acquisition for Hillsboro 6 in September 2025."},"fa91470b9c77":{"links":[],"unverified_note":"Microsoft announced a $1.5 billion investment to expand data center operations in San Antonio, Texas (March 2025)."},"fa9439a7003c":{"links":[],"unverified_note":"$20.5 million settlement for nitrate pollution, recently agreed to pay."},"fb1e3dfa25bf":{"links":[],"unverified_note":"Acquisition of two facilities from 365 Data Centers in 2017."},"fb2e1dad1160":{"links":[],"unverified_note":"$600 million debt financing package closed October 16, 2025."},"fb40842c26a2":{"links":[],"unverified_note":"Brookfield acquired Cyxtera in November 2023 and combined it with Evoque; Evoque and Cyxtera merged and rebranded as Centersquare in April 2024."},"fb4f22344183":{"links":[],"unverified_note":"A 25-year water service agreement between the City of Hermiston and Amazon Web Services was approved on February 24, 2025, with AWS covering all construction costs for an aquifer storage and recovery project, estimated at $18 million."},"fb8535cb5bf2":{"links":[],"unverified_note":"Tax Abatement Agreement with Armstrong County, Texas, for an initial capital investment of approximately $14.6 billion for Phase 2, approved November 12, 2024.","note_status":"NOT_MATERIAL"},"fb962a75ca38":{"links":[],"unverified_note":"25-year water service agreement with Hermiston City Council (Feb 24, 2025); AWS paying $18 million for Aquifer Recovery & Storage project (Feb 24, 2025); $20.5 million settlement for nitrate pollution allegations (March 31, 2026).","note_status":"NOT_MATERIAL"},"fbb6e92d958c":{"links":[],"unverified_note":"On March 27, 2014, Equinix LLC and Digital 1350 Duane, LLC entered into a lease agreement for approximately 160,000 square feet of data center space in SV2, with an initial fixed term of 15 years and two options to renew at 9.5 years each, extending the term to 2048."},"fbe517970d8a":{"links":[],"unverified_note":"$510 million financing package in March 2026; $600 million ABS financing package in September 2025.","note_status":"NO_PRIMARY"},"fc063034518a":{"links":[],"unverified_note":"2.4 megawatt lease signed with a leading hyperscale enterprise software provider, expected to commence in Q1 2022 with a ten-year term."},"fc15aa9f8fd5":{"links":[],"unverified_note":"Partnership with a U.S.-based independent power producer (IPP) managing over $40 billion in assets, and a signed term sheet for power."},"fc327ce07135":{"links":[],"unverified_note":"Port of Morrow commissioners approved tax breaks for Amazon with an estimated value of $1 billion (May 2023)."},"fc41f80a7c88":{"links":[],"unverified_note":"Acquisition of Whinstone US; Data Center Lease with AMD."},"fc67c0b440d5":{"links":[],"unverified_note":"Agreement between Flexential and CoreWeave for a 13 MW deployment announced April 29, 2025."},"fcca6b8f46b2":{"links":[],"unverified_note":"$20.5 million settlement for nitrate pollution lawsuit (April 2026)"},"fcdbdabdc933":{"links":[],"unverified_note":"Refinancing of $1.05B fixed-rate, five-year loan for DFW3 and DFW4, expected to close May 2026."},"fcef037fe74b":{"links":[],"unverified_note":"CyrusOne acquired by funds managed by KKR and Global Infrastructure Partners (GIP) for approximately $15 billion on March 25, 2022.","note_status":"NEW_SOURCED"},"fd2f5fef1227":{"links":[],"unverified_note":"Brookfield Infrastructure Partners acquired Cyxtera for $775 million, finalized on January 12, 2024. Evoque and Cyxtera merged and rebranded as Centersquare in April 2024, which then rebranded to Csquare in October 2025."},"fd72a5bb13cf":{"links":[],"unverified_note":"colocation partnership with Texas Advanced Computing Center (TACC) for Horizon supercomputer"},"fd76e215ab3d":{"links":[],"unverified_note":"Renovation/Alteration project with estimated cost of $1,055,000, completed February 2013."},"fd8be92f9b7f":{"links":[],"unverified_note":"$1.4bn securitization deal (CLDHQ 2026-1) backed by two Ashburn data centers, dated April 17, 2026."},"fd9be6037c85":{"links":[],"unverified_note":"Site acquisition and development launched in 2020."},"fda91e80fd6a":{"links":[],"unverified_note":"$20.5 million settlement over nitrate groundwater contamination (March 31, 2026)"},"fe320bacfe9d":{"links":[],"unverified_note":"PPA with Invenergy and Pacific Power for 100 megawatts of solar energy, announced July 2018."},"fe4a7e985814":{"links":[],"unverified_note":"$202,000,000 capital investment and tax credit assistance approved by Ohio Department of Development in September 2023."},"feb928491ab2":{"links":[],"unverified_note":"$800 million acquisition of Infomart Dallas by Equinix from ASB Real Estate Investments, announced February 14, 2018, completed April 2, 2018."},"fed9e227af98":{"links":[],"unverified_note":"Land acquisition of 240 acres from Crook County for $5.4 million in 2017 for new buildings; $200 million investment for a third data center announced in 2015."},"ff06f619b753":{"links":[],"unverified_note":"$5 billion investment","note_status":"NOT_MATERIAL"},"ff156dbe3fb6":{"links":[],"unverified_note":"Settlement of $20.5 million to address nitrate-contaminated water in Morrow County (April 2026)."},"ff387efd28cd":{"links":[],"unverified_note":"CoreSite acquired the MI2 facility for $34 million on September 27, 2022.","note_status":"NO_PRIMARY"},"ff452fa1ff02":{"links":[],"unverified_note":"EdgeConneX was acquired by EQT Infrastructure in 2020."},"ff50b787a79a":{"links":[],"unverified_note":"Amazon Data Services acquired the George Washington University Virginia Science and Technology Campus for approximately $427 million in March 2026."},"ff5322266e0e":{"links":[],"unverified_note":"Construction project valued at $22,000,000.00 announced February 22, 2024."},"ff583bed06b3":{"links":[],"unverified_note":"Proposed initial investment of $10 billion to $12 billion.","note_status":"NOT_MATERIAL"},"ff6d595f2ea2":{"links":[],"unverified_note":"CyrusOne acquired by KKR and Global Infrastructure Partners for approximately $15 billion (March 2022)","note_status":"NO_PRIMARY"},"ff7471c78b09":{"links":[{"record_id":"research:newsroom:sec:20210607:2","name":"QTS Realty Trust to Be Acquired by Blackstone Funds in $10 Billion Transaction","date":"2021-06-07","type":"Acquisition","value_label":"~$10B enterprise value","url":"https://research-sunya-october-2026-pilot-sunya1.vercel.app/#/record/research:newsroom:sec:20210607:2","scope":"portfolio"}]},"ff81050d621e":{"links":[],"unverified_note":"Brookfield acquired Cyxtera in November 2023, combining it with Evoque."},"ffae1629c369":{"links":[],"unverified_note":"Digital Realty and TPG Real Estate established a joint venture in which TPG acquired a majority stake in three stabilized hyperscale data centers in Northern Virginia for an aggregate value of $1.5 billion, announced July 27, 2023.","note_status":"NEW_SOURCED"},"fff7cffbc792":{"links":[],"unverified_note":"TX4 expansion construction cost of $42 million (September 2024 - April 2026)","note_status":"NOT_MATERIAL"}}